GRP2021-0006 InspectionsPermit Number: GRP2021-0006
Applied: 6/17/2021
Issued: 6/18/2021
Status: ISSUED
Parent Permit:
Parent Project:
Details
Approved:6/18/2021
Finaled:
Description: SILVERROCK TM37730 MONTAGE RESIDENCES GRADING
AND PM-10
Site Address: SILVERROCK WAY AND AHMANSON LN
City, State Zip Code: , CA
Applicant: SILVERROCK PHASE I, LLC-JOSH FRANTZ
Owner: CITY OF LA QUINTA
Contractor: N E I INC
LIST OF
SEQ
SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS
ID
1/18/2022 1/18/2022 EH -WEEKLY
EDWARD PARTIALLY
PM10/NPDES
HERNANDEZ APPROVED
Notes:
8:00-8:25amWeather - sunny with a high of 75 degrees and a low of 51 degrees Several trades on site today Windscreen fence is up for dust control
Rock placed at stabilized entrance for mud track out Portable bathrooms with spill pans and adjacent hand wash stations on site Water trucks are on
site watering down for dust control Overall site is PM10 compliant No NPDES violations noticed at site visit
1/25/2022
1/25/2022
EH -WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
7:10-7:35amWeather - sunny with a high of 77 degrees and a low of 44 degrees Several trades on site today Windscreen fence is up for dust control
Rock placed at stabilized entrance for mud track out Portable bathrooms with spill pans and adjacent hand wash stations on site Water trucks are on
site watering down for dust control Overall site is PM10 compliant No NPDES violations noticed at site visit
2/1/2022
2/1/2022 09:00
EH -WEEKLY
I
EDWARD
PARTIALLY
I
AM
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
8:40-9:00amWeather - cloudy with a high of 71 degrees and a low of 48 degrees Several trades on site today Windscreen fence is up for dust control
Rock placed at stabilized entrance for mud track out Portable bathrooms with spill pans and adjacent hand wash stations on site Water trucks are on
site watering down for dust control Overall site is PM10 compliant No NPDES violations noticed at site visit
2/8/2022
2/8/2022
EH -WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
9:00-9:15amWeather- sunny with a high of 84 degrees and a low of 44 degrees Contractor was shut down for the dayNo work is to continue until
permits are pulled with City of La Quinta
2/15/2022
2/15/2022
EH -WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
Weather - sunny with a high of 73 degrees and a low of 52 degrees No inspection needed for today
2/22/2022
2/23/2022
1 7
EH -WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
Weather - cloudy with a high of 60 degrees and a low of 42 degrees No inspection needed for today
Printed: Monday, 11 July, 2022 1 of 2
a1�WYSrEMS
3/2/2022
3/2/2022
EH -WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
Weather - sunny with a high of 89 degrees and a low of 50 degrees Several trades on site today Windscreen fence is up for dust control Rock placed
at stabilized entrance for mud track out Portable bathrooms with spill pans and adjacent hand wash stations on site Water trucks are on site watering
down for dust control Overall site is PM10 compliant No NPDES violations noticed at site visit
3/9/2022
3/9/2022
EH -WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
Weather - sunny with a high of 79 degrees and a low of 45 degrees Site is idle No construction activities at this location till further notice
3/16/2022
3/16/2022 7AM
EH-WEEKLY
EDWARD
PARTIALLY
I
PM10/NPDES
HERNANDEZ
APPROVED
Notes:
7:20-7:50amWeather - sunny with a high of 90 degrees and a low of 64 degrees Contractor for sewer main line is onsiteContractor has fire hose
attached to hydrant for dust control Contractor is excavating for sewer line and manhole structures going west from Ahmanson Lane into Montage
residences Site has track out plates on entrance to site
3/23/2022
3/23/2022
EH -WEEKLY
EDWARD
APPROVED
PM10/NPDES
HERNANDEZ
Notes:
Printed: Monday, 11 July, 2022 2 of 2