Loading...
PWP2021-0005 InspectionsPermit Number: PWP2021-0005 Applied: 10/12/2021 Issued:10/13/2021 Status: ISSUED Parent Permit: Parent Project: Details Approved:10/13/2021 Finaled: Description: SILVERROCK TM37730 MONTAGE RESIDENCES STREET & STORM DRAIN Site Address: SILVERROCK WAY AND AHMANSON LN City, State Zip Code: , CA Applicant: ROBERT GREEN RESIDENTIAL INC - BRUCE MAIZE Owner: CITY OF LA QUINTA Contractor: TAYLOR UNDERGROUND INC LIST OF SEQ SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS ID 6/17/2022 6/17/2022 JP-ONSITE STORM JIM PETERS PARTIALLY DRAIN APPROVED Notes: 1215 to 1400Weather - Clear - Temperature 77 to 104 - Breeze SE 6 mph - Humidity 17% Witnessed storm drain crossing at Station 23+17 on Conchella Way pipe in place and placing aggregate bedding for the pipe Reviewed the catch basin forms they were building and want to place concrete on TuesdayPrinted out plans in office after call to Amy 6/20/2022 6/20/2022 P-ONSITE STORM P JIM PETERS PARTIALLY DRAIN APPROVED Notes: 1015 to 1030Weather - Clear - Temperature 72 to 105 - Breeze NW 6 mph - Humidity 15% Contractor set form for Catch basin #ton north side of Conchilla Court -OK to place concrete Also started excavating from the detention basin lake on south side outlet back north to the catch basins 6/21/2022 6/21/2022 JP-ONSITE STORM I JIM PETERS PARTIALLY DRAIN APPROVED Notes: 1130 to 1300Weather - Clear - Temperature 72 to 106 - Breeze NW 2 mph - Humidity 26% Arrived at site contractor making final adjustments to catch basin #1 and#2 OK to place Concrete tomorrowWhen checking the storm drain Pipe from the catch basin to the detention pond The contractor has placed 30 inch HDPE pipe the complete distance - However my approved plan dated 5/16/2022 shows 265 feet for 4 - 18 inch HDPE pipe - contractor and Kelly from Robert Green argues they had this changed back to the original plan - I have called Bryan and Amy for clarification and have not gotten response back yet Later Amy called me and said she spoke with Bryan and it was ok for contractor/developer to change back to original plan of only 130 inch storm drain 6/28/2022 6/28/2022 JP-ONSITE STORM I JIM PETERS PARTIALLY DRAIN APPROVED Notes: 1030 to 1115 Weather - Clear - Temperature 85 to 111 - Breeze E 4 mph - Humidity 16% Contractor placing concrete for local depression for the 21 foot catch basin on the south side of the street and the north side 14 foot basin is formed and will be placed next weekConcrete placed is 560-C-3250 from Superior Ready Mix 6/29/2022 6/29/2022 JP-ONSITE STORM I JIM PETERS NOT READY DRAIN Notes: 1000 to 1015 Weather - Clear - Temperature 87 to 112 - Breeze WNW 5 mph - Humidity 20%No work going on until next week Printed: Monday, 11 July, 2022 1 of 1 RWYSrEMS