PM102021-0004 RevisionI N THE C I TY ;;F L- QU I NTA , COUNTY OF F I VERS I DE , STATE OF CAL I FORN I A
SILV RROCK RESORT - MONTAGE HOTEL, SPA & GUESTROOMS
FUGITIVE DUST (PM -10) MITIGATION
ENTRANCE
SHOWN
COUNTRY CLUB J DR 40TH AVE
� 42ND AVE
Q
o Bermudar
cD DunesFRED cc WARIN
VICINITY MAP
WATER SUPPLY AND HOSE FOR TIRE WASH
CORRUGATED STEEL PANELS
A
�, B
LOCATED WITHIN A PORTION OF THE SW 1/4, OF SECTION 5 R A PORTION OF
THE NW, NE, R SE 1/4 OF SECTION 8, T.6S., R.7E., S.B.B.R M.
CONSTRUCT0_ ;, ,f; ;�8�Boas/ .
Sand
j�, I I \ Tee `, �s:
Y
DSC T DER DETA
,✓ l .23.3 � .
tea\ ...7 - .. BELOW EEE/
9 �r)NiCTn —FN n��EC�
T-
IMI141 / , ,
PJ[,' FENCE
(3" TO 6" DIA. STONES)
CRUSHED CIL
AGGREGATE
FILTER FABRIC
L- 12" MINIMUM
� la
(3" TO 6" DIA. STONES) CORRUGATED STEEL PANELS
CRUSHED
TE � AGGREGATE
r FILTER FABRIC
WHICHEVER IS GREATER. L 12" MINIMUM "'•"""^'- Vl.lILL
PLAN MEINSECTION A -A �oQ�tOFESS/ON9l
STABILIZED C 7�No. C58608 N ENTRANCE " �� m
� M
NOT TO SCALE
qTF 0F
LEGEND
PROJECT BOUNDARY
x WIND FENCE
WORK AREA BOUNDARY
0
STABILIZED CONSTRUCTION ENTRANCE/EXIT
GRAVEL EQUIPMENT STORAGE (FIELD LOCATED BY CONTRACTOR)
CONSTRUCTION TRAILER, PORTABLE RESTROOM
PM -10 SIGN (4' x 8')
PLAN
-59 /
(PA2)
AGE
100 50 0 100 200 300
SCALE: 1"=100'
WDID NO.
no
PLEASE READ AND FILL OUT THIS DOCUMENT APPROPRIATELY. EVEN SMALL PROJECTS MUST
DO THEIR PART. PMS DUST (POWDERY DUST OF 10 MICRONS OR SMALLER DIAMETER) HAS
X
BEEN IDENTIFIED AS POTENTIALLY SERIOUS HEALTH THREAT. THIS FINE DUST CAN LODGE
DEEP IN THE LUNGS AND HAS BEEN ASSOCIATED WITH BRONCHITIS AND OTHER RESPIRATORY
ILLNESSES. DESERT DUST CAN BE PARTICULARLY UNHEALTHFUL, BEING ASSOCIATED WITH
"DESERT LUNG SYNDROME" AND LUNG INFECTIONS CAUSED BY FUNGAL SPORES CARRIED IN
DESERT DUST. CHILDREN, THE ELDERLY, AND PERSONS WITH RESPIRATORY CONDITIONS, ARE
PARTICULARLY SENSITIVE TO FINE DUST, BUT EVERYONE IS ADVERSELY AFFECTED BY THE
RELATIVELY HIGH LEVELS OF PM10 THAT OCCUR IN THE COACHELLA VALLEY. LARGER SAND
PARTICLES CAN BE TURNED INTO THIS DUST THROUGH THE GRINDING ACTION OF TIRES ON
ROADWAYS AND THROUGH REPETITIVE PLOWING AND DISKING OPERATIONS.
PROJECT DATA (SEE ATTACHED PLAN ALSO)
DATE.- 06-03-2021 PROJECT NAME. SILVERROCK RESORT -MONTAGE HOTEL & SPA
STREET ADDRESS / SITE LOCATION: 79-179 AHMANSON LANE LA QUINTA, CA 92253
PHASE 'A':• ROUGH GRAD/NG (S/TE PREP. & MOBILIZATION) CONTINUED
5. THE TIRES OF VEHICLES BEING USED ON-SITE SHOULD BE INSPECTED AND WASHED IF
NECESSARY TO STOP TRACKING OF DIRT ONTO PUBLIC STREETS. IF EXTENSIVE EXPORT OR
IMPORT OF DIRT IS TO BE DONE, A PAVED OR GRAVELED WHEEL WASHING AREA AT LEAST 12'
WIDE BY 100' LONG SHOULD BE PROVIDED AT THE EXIT, TO FACILITATE THE INSPECTION AND
CLEANING OF TIRES. 'RUMBLE STRIPS" MADE FROM LUMBER, RAILROAD TRACK,OR SIMILAR
MATERIALS CAN HELP REDUCE THE MUD GETTING ONTO THE CLEANING AREA. STREET SWEEPING
AND WASHING IS STILL TYPICALLY REQUIRED, BUT MAY BE REDUCED BY PROPER USE OF A
"WHEEL WASHING AREA" LIKE THIS. THEY ARE REQUIRED ON PROJECTS OVER 5 ACRES OR WITH
OVER 5,000 CUBIC YARDS OF IMPORT OR EXPORT.
6. A STANDARD SIGN WITH THE FOLLOWING INFORMATION MUST BE POSTED ON THE SITE,
AT LEAST ONE SIGN PER FRONTING STREET. THE SIGN MUST INCLUDE.- THE GRADING PERMIT
NUMBER, THE PROJECT NAME, MAP NUMBER IF APPROPRIATE, THE AUTHORIZED DUST CONTROLLER
ADJOINING PROPERTY INFO. (FOR SENSITIVITY, TYP. WINDS BLOW N.W. TO S.E.) PHONE NUMBER(S), THE CITY PHONE NUMBER, AND THE SOUTH COAST AIR QUALITY MANAGEMENT
EASTERLY ALL AMERICAN CANAL, VACANT PA8 DISTRICT (S. C.A. Q. M. D.) PHONE NUMBER.
SOUTHEASTERLY SILVERROCK GOLF COURSE
SOUTHERLY SILVERROCK GOLF COURSE 7. VEHICLES TRAVELING ON DIRT AND OR ON UNPAVED ROADS SHOULD RESTRICT THEIR SPEED TO
SOUTHWESTERLY SILVERROCK GOLF COURSE /
WESTERLY GOLF COURSE VACANT DESERT MOUNTAINS 15 M.P.H. MAXIMUM. SIGNS TO THAT EFFECT SHOULD BE PLACED AT THE PROJECT ENTRANCE
NORTHWESTERLY GOLF COURSE/PA3 RESIDENTIAL (NOT CONSTRUCTED,) ON PROJECTS OVER 5 ACRES TO IMPROVE COMPLIANCE.
NORTHERLY GOLF COURSE/ROUGH GRADED COMMERCIAL PA4 & 5
NORTHEASTERLY GOLF COURSE/ROUGH GRADED COMMERCIAL PA4 & 5 8. WHEN WIND SPEEDS EXCEED 25 MPH, BY CONTINUOUS ANEMOMETER READING, OR IN GUSTS AT
CURRENT LAND USAGE. GOLF COURSE / VACANT LEAST TWICE WITHIN A THIRTY MINUTE PERIOD, MEASURED ON THE SITE, VEHICULAR ACTIVITY ON
PROPOSED LAND USAGE.- HOTEL / SPA THE SITE SHALL CEASE, EITHER VOLUNTARILY, OR BY CITY OR A.Q.M.D. INSPECTOR NOTIFICATION,
LOT• 3 & 4 TRACT/PM• 37207 LAND USE PERMIT NO EXCEPT FOR WATER TRUCKS AND SPRINKLER -TENDING VEHICLES, IF ANY.
A.P.N. SEE BOTTOM RIGHT OF SHEET PARCEL SIZE: N A ACRES N/A SQ. FT.
ROUGH GRADING
SITE PREPARATION MOBILIZATION
777-050-031
2.5"
SITE SPECIFIC DETAILS:
APPROX. DATE
EARTHWORK QUANTITIES EST/MATE (BALANCED SITE PREFERRED)
SPRINKLER AC. WATER
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
TOTAL AREA TO BE DISTURBED 21.7 ACRES 945,252 SQ. FT
1.
PRE -WATERING METHOD (AS SHOWN IN
1. OR AS DETAILED HERE):
STRIPPING & SUBSIDENCE LOSSES (TYP. 0.2' X ARE4/27CF./CY.) 0 C. Y.
21.7
1 WATER TRUCK PER EACH
8 ACRES OF DISTURBED AREA
RAW CUT VOLUME: 1.357 C. Y. CUT AFTER SHRINKAGE: 1.357 C. Y.
THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT
2.0"
NONE
RAW FILL VOLUME: 9.320 C. Y. FILL AFTER SHRINKAGE: 9,320 C.Y.
A3
WATER AVAILABILITY, INITIAL STAGE
GOLF COURSE IRRIGATION PIPELINES
COMPACTED FILL VOLUME: 9.320 C. Y,
NOON
POINT OF CONNECTION TO BE LOCATED BY CONTRACTOR
RAW EXPORT VOLUME: C. Y, COMPACTED IMPORT VOL.: 7,963 C.Y
ROUGH GRADING
MASS GRADING
OF STREETS PADS RET. BASINS PERIMETER WALL
(SEE HAUL ROUTE DETAIL ON ATTACHED PLAN IF ANY IMPORT OR EXPORT, EXCEPT TRASH.)
2.
OFF-SITE WORK PERMISSION NEEDED:
N/A
TRUCK AC.
PHASING OF GRAD/NG ACTIVITIES
J.
ACCESS WILL BE CONTROLLED BY-
AS SHOWN ON SHEET 1
THE AMOUNT OF ACTIVE DISTURBED AREA MUST BE LIMITED TO WHAT CAN BE EFFECTIVELY WATERED
21.7
3
B2
4 TIMES PER DAY BY EITHER SPRINKLERS OR WATER TRUCKS. TYPICAL 2000 GALLON WATER TRUCKS
4.
INITIAL STAGING AREA:
AS SHOWN ON SHEET 1
CAN EFFECTIVELY WATER ABOUT 4 ACRES PER HOUR. THEREFORE AN 8 HR. WORKDAY DIVIDED BY
4 WATERINGS PER DAY TIMES 4 AC./HR. = 8 ACRES PER TRUCK. SINCE WATER TRUCKS ARE
PHASE 'C"
EQUIPMENT STORAGE
AS LOCATED BY CONTRACTOR
ALLOWED TO WORK 7 DAYS A WEEK, 24 HOURS A DAY, IN SOME LOCATIONS, UP TO 24 AC. PER
SUB -PHASE
APPROX. DATE
DISTURBED AC.
TRUCK MAY BE ACHIEVED THAT WAY, WITH SPECIAL PERMISSION. LARGER PROJECTS MUST HAVE
TRUCK AC.
TEMPORARY OFFICE
AS LOCATED BY CONTRACTOR
- 07-2022
MORE TRUCKS, MORE HOURS, MORE SPRINKLERS, OR LESS DISTURBED AREA AT ANY ONE TIME.
0
21.7
3
AREAS ALREADY GRADED OR STOCKPILED MUST BE STABILIZED WITH CHEMICALS, HYDROMULCH, OR
EMPLOYEE PARKING
AS LOCATED BY CONTRACTOR
VEGETATION, BEFORE ADDITIONAL AREAS CAN BE STRIPPED FOR GRADING. THE PHASING PATTERN
5.
WHEEL WASHING PROVISIONS:
GARDEN HOSE AT CONSTRUCTION ENTRANCE
BELOW SHALL BE SHOWN IN THE REFERENCE MAP ON THIS SHEET AT UPPER RIGHT. DRIVING ROUTES
PHASE 'D"
THROUGH A PROJECT MUST BE COUNTED IN ALL PHASES WHERE THEY ARE ONLY TREATED WITH WATER.
LANDSCAPING
IT IS BETTER TO TREAT THEM WITH AN APPROVED "OIL" (LIKE ENVIROKLEEN) OR SIMILAR NON -CRUSTING
SUB -PHASE
APPROX. DATE
DISTURBED AC.
DUST PALLIATIVE, TO SAVE WATER.
6.
SPEED RESTRICTION SIGN LOCATION:
AS SHOWN ON SHEET 1
PHASE ';4"
ROUGH GRADING
SITE PREPARATION MOBILIZATION
777-050-031
2.5"
SUB -PHASE
APPROX. DATE
DISTURBED AC.
SPRINKLER AC. WATER
TRUCK AC.
# OF TRUCKS
Al 08-2021
- 11-2021
21.7
0
21.7
3
A2
mm
THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT
2.0"
NONE
1.5"
A3
NOON
OR CAL AIR QUALITY MANAGEMENT DISTRICT AT: 1-800-288-7664
NOON
PHASE 'B"
ROUGH GRADING
MASS GRADING
OF STREETS PADS RET. BASINS PERIMETER WALL
SUB -PHASE
APPROX. DATE
DISTURBED AC.
SPRINKLER AC. WATER
TRUCK AC.
OF TRUCKS
Bi 12-2021
- 03-2022
21.7
0
21.7
3
B2
B3
PHASE 'C"
FINISH GRADING
MAJOR UTILITY AND STREET CONSTRUCTION
SUB -PHASE
APPROX. DATE
DISTURBED AC.
SPRINKLER AC. WATER
TRUCK AC.
OF TRUCKS
C1 04-2022
- 07-2022
21.7
0
21.7
3
C2
C3
PHASE 'D"
FINISH GRADING
LANDSCAPING
SUB -PHASE
APPROX. DATE
DISTURBED AC.
SPRINKLER AC. WATER
TRUCK AC.
# OF TRUCKS
D1 08-2022 - 11-2022
8
8
8
1
D2
D3
FUGITIVE PM 10 DUST CONTROL MEASURES
HERE IS THE SUMMARIZED MATRIX OF REQUIRED DUST MITIGATION MEASURES IDENTIFIED BY PHASE.
mm00
b.0
777-050-031
2.5"
CITY OF LA QUINTA PERMIT NO.
NOON
SDP2016-0005
3.0"
NOON
3.0"
FROM T P J T CALL
NOON
JERRY BLOOM
6.0..
NINE
1.5"
IF YOU DO NOT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL
mm
THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT
2.0"
NONE
1.5"
REPORT THE PERMIT OR PROJECT NO. AT THE PHONE NUMBER ABOVE
NOON
OR CAL AIR QUALITY MANAGEMENT DISTRICT AT: 1-800-288-7664
NOON
NOON
NOON
NOON
PRE -GRADING SITE WATERING (IRRIGATION SYSTEM FOR MIN. 72 HRS. )
SIGNS POSTED ON SITE WITH 24 HR. PHONE NUMBER(S) FOR DUST CONTROLLER
SAND FENCING (ON ALL SIDES OF PROJECT LACKING EXISTING MASONRY WALLS)
SITE WATERING 7 DAYS A WEEK (IRRIGATION SYSTEM, MIN. 4 TIMES PER 24 HRS.,
OR BY WATER TRUCKS, MIN. 4 TIMES PER 24 HRS., 1 TRUCK / 8 ACRES)
PERIMETER SPRINKLER SYSTEM (ALL SIDES, CONTINUOUS NIGHT WATERING WHEN WINDY)
GRAVEL (MIN. 1.5" DIAM. X 4" DEEP AT OFF-STREET STORAGE AND PARKING AREAS)
WHEEL CLEANING AT TRUCK EXITS, ('RUMBLE STRIPS" DRIVE-THROUGH PONDS,
GRAVEL AREAS, ETC. DETAIL METHOD ON REFERENCE MAP AT AT RIGHT)
INACTIVE AREA SOIL STABILIZERS (POLYMER, HYDROMULCH, APPROVED 0/L, OR PLANTS)
ACTIVE AREA SOIL STABILIZERS (ENVIROKLEEN "OIL", OR SIMILAR WETTING AGENTS)
STOP ALL VEHICLE ACTIVITY EXCEPT WATER TRUCKS WHEN WIND > 25 MPH
STREET SWEEPING WHENEVER NEEDED
PERMANENT VEGETATION / LANDSCAPING
BLOCK WALLS
ROAD PAVING
NOTE: THESE CONTROL METHODS ARE DISCUSSED IN DETAIL IN THE 'DUST CONTROL PLAN REVIEW
GUIDANCE FOR LOCAL GOVERNMENT" FROM THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT,
AVAILABLE FROM THE CITY OF LA QUINTA OR THE S.C.A.Q.M.D.
PROJECT RECORDKEEPING/REPORT.• RECORD ALL ACTIVITIES, CONTRACTS AND MATERIALS PURCHASES
ASSOCIATED WITH BLOWSAND/FUGITIVE DUST PROGRAM. WEEKLY REPORTS SHOULD BE SUBMITTED TO
THE PUBLIC WORKS DEPARTMENT FOR REVIEW. THIS 'FEEDBACK" WILL EVENTUALLY HELP THE CITY
TO DETERMINE WHAT METHODS OF DUST CONTROL ARE MOST COST EFFECTIVE IN BOTH SHORT TERM
AND LONG TERM SITUATIONS. SEE THE REPORT FORM THAT'S AVAILABLE FROM THE CITY OR IN THE
AFORESAID DOCUMENT.
FUGITIVE PM 10 DUST CONTROL PROGRAM DETAILS
EACH MITIGATION MEASURE OR CONTROL PROGRAM SHALL BE DESCRIBED IN DETAIL BELOW AND ON
ADDITIONAL SHEETS AS NECESSARY. PLEASE USE THE REQUIRED DUST CONTROL PLAN EXHIBIT (AT
RIGHT OR ATTACHED) TO INDICATE THE LOCATION OF ON-SITE WATER AVAILABILITY, STAGING AREAS
TEMPORARY IRRIGATION LINES, TRUCK/WHEEL WASHERS, TEMPORARY SAND FENCING, CONSTRUCTION
PHASING, WORKER'S PARKING AREAS, GRAVELED ENTRANCE/EXIT, AND OTHER THINGS AS NEEDED.
PHASE 'A': ROUGH GRAD/NG (SITE PREP. & MOBILIZATION)
GENERAL REQUIREMENTS
1. WRITTEN AND NOTARIZED PERMISSION LETTERS SHALL BE SUBMITTED TO THE PUBLIC WORKS
DEPARTMENT FROM ANY ADJACENT LAND OWNERS WHOSE PROPERTY WILL BE USED IN ANY
MANNER FOR CONSTRUCTION, STAGING, ACCESS, ETC., PRIOR TO ANY SUCH USAGE.
THE OWNER AND AUTHORIZED DUST CONTROLLER FOR THIS PROJECT WILL BE RESPONSIBLE
FOR THE DUST CONTROL ON ANY OFF-SITE DISTURBED AREAS AS WELL AS ON THIS PROJECT.
A DUST CONTROL SECURITY OF .x'2,000 PER ACRE, OR AS OTHERWISE APPROVED BY THE CITY
ENGINEER, SHALL BE POSTED FOR ALL AREAS TO BE DISTURBED BY THE PROJECT, BOTH
ON-SITE AND OFF-SITE. DISTURBANCE OF SITE AREAS NOT INCLUDED IN THIS AGREEMENT
SHALL BE REASON FOR THE CITY TO ASSESS ADDITIONAL CHARGES, AND POSSIBLY STOP ALL
WORK AT THE SITE UNTIL THE EXTENT OF THE DISTURBANCE IS MEASURED. THEREFORE, IF IT
IS SUSPECTED THAT OFF-SITE AREAS MAY BE DISTURBED DURING THE WORK, SHOW THEM ON
THIS PLAN AND MAKE THE APPROPRIATE ARRANGEMENTS IN ADVANCE.
2. SAND FENCING, OF EITHER THE WOOD AND WIRE OR THE PLASTIC TYPE, SHALL BE INSTALLED
AROUND THE PERIMETER OF THE PROJECT ON ALL SIDES THAT DO NOT HAVE EXISTING MASONRY
WALLS OR SIMILAR SOLID FENCING OR HEDGES. THIS SERVES THE MULTIPLE PURPOSES OF -
CATCHING SOME WINDBLOWN DUST, • REDUCING WIND SPEEDS ON THE PROJECT PERIMETER, AND
RESTRICTING VEHICULAR ACCESS POINTS INTO THE PROJECT. THIS RESTRICTED ACCESS HELPS
REDUCE DAMAGE TO ANY "CRUST" OF STABILIZED SOIL ON THE PROJECT, AND ALLOWS PLACING
OF THE EXIT WHERE "TRACK OUT" CAN BE STOPPED PER #5 BELOW.
J. PRE -WATERING SHALL COMMENCE AT LEAST THREE (3) DAYS PRIOR TO ACTUAL GRADING
USING A TEMPORARY ON-SITE IRRIGATION SYSTEM. CONNECTION TO ANY EXISTING WATER
SYSTEM SHALL BE DONE IN COMPLIANCE WITH CITY OF LA QUINTA TEMPORARY WATER LINES SHALL
BE INSTALLED WITH A MINIMAL DISTURBANCE OF ANY OFF-SITE AREAS THEY PASS THROUGH.
WHEN THE GRADING BEGINS, A SPRINKLER SYSTEM SHALL BE PLACED AROUND THE PERIMETER
OF THE PROJECT, WITH FREQUENT WATERING, ESPECIALLY IN THE TYPICALLY WINDY EVENINGS.
PLACING THE PERIMETER SPRINKLERS ON THE SAND FENCE KEEPS THEM SAFE AND EFFECTIVE.
WATERING FOR AREAS NOT COVERED BY THE SPRINKLERS SHALL BE PROVIDED BY WATER
TRUCKS. (ONE TRUCK PER 8 ACRES FOR 8 HR. WORKDAYS. SEE ABOVE.)
4. ACTIVITY AREAS SUCH AS: EQUIPMENT STORAGE AREA, MATERIALS STORAGE AREA, TEMPORARY
OFFICE TRAILERS, AND EMPLOYEE PARKING, SHOULD BE LOCATED IF POSSIBLE ON EXISTING
PAVED SURFACES, IF TRAFFIC WOULD NOT BE AFFECTED. IN LIEU OF EXISTING PAVING, A SOIL
STABILIZER THAT DOES NOT REQUIRE CONSTANT WATERING, SUCH AS A WASHED GRAVEL, OR
"BIODEGRADABLE OIL" COULD BE USED FOR THE INITIAL STAGING AREA. ANY CHEMICALS USED
MUST BE CLEARED WITH THE CITY AND REGIONAL WATER QUALITY CONTROL BOARD.
7. NUMBER OF POSTED 'DUST CONTROL SIGNS" 1
(TYP. 1 PER FRONTING ROAD OR 1 PER 660 FEET OF FRONTAGE)
8. OTHER PRELIMINARY WORK:
PHASE "B':• ROUGH GRAD/NG (MASS GRAD/NG OF STREETS, PADS, RET. BAS/NS)
GENERAL REQUIREMENTS
1. HAULING PROCEDURES:
ALL VEHICLES GOING FROM DIRT AREAS ONTO PAVED STREETS SHALL HAVE TIRES AND
WHEELS INSPECTED AND WASHED IF NECESSARY TO AVOID 'TRACKING -OUT" DIRT.
TRUCKS HAULING DIRT ON PAVED STREETS SHALL MAINTAIN AT LEAST A HALF FOOT
"FREEBOARD" FROM RIM TO DIRT, AND COVER ALL DIRT OR DUSTY DEBRIS LOADS
WITH AN APPROPRIATE TARP.
THE HAUL ROUTE SHOULD BE SHOWN HEREON OR ON AN ATTACHED SHEET, AND
SHALL BE CLEARED WITH THE CITY ENGINEER FOR ANY APPLICABLE TRANSPORT
PERMITS PRIOR TO ITS USE. ALL HAULING TRUCKS SHALL HAVE A COPY OF THESE
PROVISIONS WITH THEM AT ALL TIMES.
THE IMPORT OR EXPORT SITE MUST HAVE A VALID GRADING PERMIT AND SHOULD
BE COMPLYING WITH ALL APPROPRIATE DUST MITIGATION MEASURES.
WHEN PRACTICAL, TRUCKS AND EQUIPMENT, SHOULD SHUT OFF ENGINES RATHER THAN
IDLING FOR EXTENDED PERIODS, TO MINIMIZE EXHAUST EMISSIONS AND NOISE. THIS
BECOMES MORE CRITICAL AS THE SIZE AND NUMBERS OF VEHICLES INCREASES.
2. ALL STRIPPED, GRADED OR OTHERWISE DISTURBED AREAS SHALL BE STABILIZED
BY SOME APPROPRIATE MEANS. AREAS ACTIVELY BEING GRADED CAN USUALLY BE
STABILIZED BY APPLYING LOTS OF WATER. DISTURBED AREAS NOT ACTIVELY BEING
WORKED MAY BE EFFECTIVELY TREATED WITH SOME MORE DURABLE SOIL STABILIZER,
SUCH AS HYDROMULCH, TO AVOID CONSTANT WATERING. THE PREFERRED METHOD OF
SITE WATERING IS BY SPRINKLER, ESPECIALLY AROUND THE PERIMETER. SPRINKLERS MUST
BE SET TO RUN ON WEEKENDS AND EVENINGS WHEN WATER TRUCK DRIVERS ARE NOT
AVAILABLE. A TYPICAL WATER TRUCK CAN ONLY HANDLE WELL ABOUT 4 ACRES PER HOUR.
J. IF PERIMETER BLOCK WALLS ARE TO BE BUILT THEY SHOULD BE GIVEN A HIGH
PRIORITY SINCE THEY WILL HELP TO CATCH BLOWSAND AND COULD THEREBY
REDUCE THE AMOUNT OF STREET SWEEPING REQUIRED.
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. HAULING PROCEDURES: (AS SHOWN ABOVE UNLESS OTHERWISE DETAILED)
2. SOIL STABILIZATION METHODS:
ACTIVE AREA WATER SCHEDULE: (MIN. 4 TIMES PER 24 HRS.
WATER APPLIED CONTINUOUSLY TO ALL DISTURBED AREAS BY MEANS OF WATER TRUCKS
WEEKEND WATERING SCHEDULE. MIN. 4 TIMES PER 24 HRS.
SUFFICIENT WATERING TO MAINTAIN SOILS IN A DAMP CONDITION
INACTIVE AREA STABILIZATION METHOD(S). (ACRYLIC POLYMER, HYDROMULCH, PLANTINGS,
BIODEGRADABLE '0/L" OR AS SHOWN HERE) ACRYLIC POLYMERS AND OR PLANTINGS
WITHIN 10 DAYS OF CEASING ACTIVITY, AN OPERATOR SHALL IMPLEMENT AT LEAST ONE
OF THE FOLLOWING LONG-TERM STABILIZATION TECHNIQUES FOR ANY DISTURBED SURFA(
AREA WHERE CONSTRUCTION ACTIVITIES ARE NOT SCHEDULED TO OCCUR FOR AT LEAST
30 DAYS.
A. RENEGOTIATION THAT RESULTS IN 75 PERCENT GROUND COVERAGE PROVIDED THAT
AN ACTIVE WATERING SYSTEM IS IN PLACE AT ALL TIMES; OR
B. ESTABLISHMENT OF A STABILIZED SURFACE THROUGH WATERING WITH PHYSICAL
ACCESS RESTRICTION SURROUNDING THE AREA; OR
C. USE OF CHEMICAL STABILIZERS TO ESTABLISH A STABILIZED SURFACE WITH PHYSICAL
ACCESS RESTRICTION SURROUNDING THE AREA ALL SOILSTABILIZATION MATERIALS SHALL
CONTAIN GREEN COLORANT FOR CONFIRMATION OF APPLICATION.
J. PERIMETER BLOCK WALL SCHEDULE:
4. OTHER:
PHASE "C': UTILITY CONSTRUCT/ON AGGREGATE BASE, PAVING
GENERAL REQUIREMENTS
1. ALL INACTIVE AREAS SHALL BE STABILIZED BY THIS STAGE. IF PREVIOUSLY STABILIZED WITH
VEGETATION, THE ACTUAL BUILDING PADS MAY NOW NEED TO BE STRIPPED, SCARIFIED, AND
RECOMPACTED FOR BUILDING PAD COMPACTION AND ELEVATION CERTIFICATIONS. DUST SHALL BE
KEPT DOWN BY WATERING, USUALLY BY TEMPORARY SPRINKLES.
2. TRENCHING FOR BUILDING UTILITIES FORM THE BULK OF EARTHWORK AFTER THE PADS HAVE BEEN
CERTIFIED. TEMPORARY SPRINKLERS OF OTHER APPROVED STABILIZATION METHODS SHALL STILL BE
USED ON THE BUILDING SITE FOR DUST CONTROL PRIOR TO THE BEGINNING OF FRAMING.
3. ESTABLISHING THE LANDSCAPE AND SPRINKLER SYSTEM AROUND THE PERIMETER OF THE PROJECT
SHOULD BE DONE AT THIS STAGE OR BEFORE PLANTINGS AROUND THE PERIMETER SERVE AS A
WIND BUFFER AND COLLECTION SYSTEM FOR DUST AND SAND. DUST AND SAND SHALL BE UNDER
CONTROL PRIOR TO THE BUILDING PHASE.
SITE SPECIFIC DETAILS:
1. BUILDING PAD WATERING: WATER TRUCK AND HOSE (MINIMUM 4 TIMES PER DAY)
2. FORMWORK AND TRENCH WATERING: WATER TRUCK AND HOSE (MINIMUM 4 TIMES PER DAY)
3. PERIMETER LANDSCAPE SCHEDULE. WALL AND LANDSCAPING ARE INSTALLED (DISTURBED AREAS TO
BE WATERED A MINIMUM 4 TIMES A DAY)
4. OTHER: NOT APPLICABLE
PHASE T" FINISH GRAD/NG (LANDSCAPING)
GENERAL REQUIREMENTS:
1. ALL INACTIVE AREAS SHOULD HAVE BEEN STABILIZED BY THIS STAGE. IF PREVIOUSLY
COVERED, THE ACTUAL BUILDING PADS MAY NOW NEED TO BE STRIPPED, SCARIFIED,
AND RECOMPACTED FOR BUILDING PAD COMPACTION AND ELEVATION CERTIFICATIONS.
DUST WOULD BE KEPT DOWN BY WATERING, USUALLY BY TEMPORARY SPRINKLERS.
2. TRENCHING FOR BUILDING UTILITIES, DRYWELL CONSTRUCTION, POOLS, AND TENNIS
COURT CONSTRUCTION FORM THE BULK OF EARTHWORK AFTER THE PADS HAVE BEEN
CERTIFIED. TEMPORARY SPRINKLERS MAY STILL BE USED ON THE BUILDING SITE FOR
DUST CONTROL PRIOR TO THE BEGINNING OF FRAMING. TREATMENT WITH A BIODEGRADABLE
"OIL" APPROVED FOR DUST CONTROL IS RECOMMENDED WHERE IT IS DIFFICULT TO WATER.
J. ESTABLISHING THE LANDSCAPE AND SPRINKLER SYSTEM AROUND THE PERIMETER OF
LARGE PROJECTS SHOULD BE DONE AT THIS STAGE. PLANTINGS AROUND THE
PERIMETER SERVE AS A WIND BUFFER AND COLLECTION SYSTEM FOR DUST AND SAND.
IT IS GOOD TO HAVE DUST AND SAND WELL UNDER CONTROL PRIOR TO THE BUILDING
PHASE FOR THE SAKE OF CERTAIN GLUING AND PAINTING PROCESSES THAT CAN BE
RUINED BY BLOWSAND OR DUST.
4. DISTURBED AREAS AROUND BUILDINGS SHOULD BE WATERED BY HAND FOR DUST
CONTROL UNTIL SUCH TIME THAT THE SPRINKLER SYSTEM IS FULLY FUNCTIONAL
AND GROUND COVER AND/OR LANDSCAPING IS ESTABLISHED. IF WATERING IS DIFFICULT
DUE TO BUILDING INTERFERENCE, CHEMICAL OR MULCH TREATMENTS ARE AVAILABLE
THAT CAN STABILIZE THE SOIL WITHOUT FREQUENT WATERING.
5. CONSTRUCTION DUST SUCH AS FROM CEMENT, PLASTER, PAINT OVERSPRAY, WOOD
CUTTING, GRINDING OPERATIONS, ETC., SHOULD BE MINIMIZED ALSO. A PERIMETER
BARRIER OF SPRINKLERS AND PLANTINGS CAN SERVE TO CATCH SOME OF THIS
POTENTIALLY HAZARDOUS MATERIAL AS WELL AS NATURAL DUST AND BLOWSAND.
CONCENTRATIONS OF CONSTRUCTION DUSTS CAN RESULT FROM WASHING OF
EQUIPMENT AND SHOULD BE PROPERLY DISPOSED OF BEFORE THEY CAN DRY OUT
AND BLOW OR BE WASHED ACROSS PROJECT BOUNDARIES.
6. NOTE THAT SWALES SHOULD BE INSPECTED BY CITY PRIOR TO SETTING OF PERMANENT
GROUND COVER OR OTHER PLANTS.
SITE SPECIFIC DETAILS:
(PLEASE DESCRIBE ANY SPECIFIC OR ADDITIONAL CONTROL MEASURE PROPOSED.)
1. BUILDING PAD WATERING: (N/A)
2. FORMWORK AND TRENCH WATERING: (N/A
J. PERIMETER LANDSCAPE SCHEDULE.- (UPON INSTALLATION OF PERMANENT VEGETATION)
4. OTHER:
ABATEMENT OF DUST MIT/GAT/ON FA/LURE
AN IRREVOCABLE LICENSE IS HEREBY GRANTED OR CAUSED TO BE GRANTED TO PERMIT THE CITY OR
THEIR DESIGNEE TO ENTER UPON THE SITE UNDER THE FOLLOWING CIRCUMSTANCES:
A. IN THE EVENT THAT WIND SPEEDS IN EXCESS OF 25 M.P.H. ARE FORECAST TO OCCUR BY
THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT (S.C.A.Q.M.D.) FOR A PARTICULAR DAY;
B. IN THE EVENT OF AN ON-SITE ANEMOMETER THAT CONFORMS TO ALL S.C.A.Q.M.D. STANDARDS
REGISTERING 2 WIND GUSTS IN EXCESS OF 25 M.P.H. WITHIN A CONSECUTIVE 30 MINUTE
PERIOD; OR
C. IN THE EVENT FUGITIVE DUST EMISSIONS ARE VISIBLE FOR A DISTANCE OF 50 FEET FROM
ANY BOUNDARY LINE; OR
D. THE CITY IS UNABLE, BY TELEPHONE, TO ESTABLISH A PERSONAL CONTACT WITH THE
'AUTHORIZED DUST CONTROLLER" AFTER A 60 MINUTE CONSECUTIVE PERIOD WHICH SHALL
START WITH THE FIRST TELEPHONE CALL, WHETHER ANSWERED OR NOT, THEN THE CITY WILL
UNDERTAKE TO INITIATE ONE OR ALL OF THE BELOW LISTED ACTIONS:
1. THE CITY WILL CAUSE THE CESSATION OF ANY ON-SITE ACTIVITY, INCLUDING BUT NOT
LIMITED TO EARTH MOVING, CONSTRUCTION, DEMOLITION OR VEHICULAR MOVEMENT AND
MANEUVERING. ANY WATER TRUCKS OR VEHICLES SERVICING SPRINKLERS WOULD CONTINUE.
2. IN THE EVENT THAT AN ON-SITE IRRIGATION SYSTEM IS NOT INSTALLED AND/OR OPERATIONAL,
THE CITY WILL CAUSE THE SITE TO BE WATERED OR TREATED WITH DUST CONTROL CHEMICALS.
THE DUST CONTROL SECURITY WILL BE UTILIZED FIRST TO COVER ANY COSTS INCURRED.
IF COSTS EXCEED ANY DUST CONTROL SECURITY REMAINING, ADDITIONAL COSTS MAY BE ASSESSED
AGAINST THE OWNER OF THE PROJECT.
J. IN THE EVENT AN ON-SITE IRRIGATION SYSTEM IS INSTALLED, BUT ITS CONTROL CLOCK HAS NOT
TURNED THE SYSTEM ON WHEN NEEDED, THE CITY MAY TAKE ALL NECESSARY STEPS TO TURN ON
THE SYSTEM. IF IT IS INACCESSIBLE BEHIND LOCKED GATES OR LOCKED CONTROL BOXES, AND THE
CITY CAN NOT FIND THE APPROPRIATE KEYS, THE CITY MAY CUT OR BREAK LOCKS AS NECESSARY.
E. IF, IN THE OPINION OF THE CITY ENGINEER OR HIS DESIGNEE, THE INTENSITY, FREQUENCY OR
DURATION OF FUGITIVE DUST EMISSIONS FROM THE SITE CONSTITUTES A HAZARD TO THE SAFETY OF
THE PUBLIC, BY INTRUSION BEYOND THE PROJECT BOUNDARY, THE CITY ENGINEER OR HIS DESIGNEE OR
AGENT MAY IMMEDIATELY ENTER UPON THE SITE OR IMMEDIATELY TAKE OTHER SUCH ACTION AS MAY BE
NECESSARY TO REMEDY THE HAZARD, SUCH AS, BUT NOT LIMITED TO COMMENCING WATERING ON THE SITE
OR ORDERING THE CESSATION OF ANY EMISSION -GENERATING ACTIVITY OCCURRING ON-SITE.
F. ANY OF THE ABOVE ACTIONS MAY BE CONSTRUED AS AN ABATEMENT FOR WHICH THE CITY
WILL 'BACK CHARGE" THE GENERAL CONTRACTOR, DEVELOPER, AND/OR THE OWNER
AS THE CITY SHALL DEEM APPROPRIATE.
�o Q?,OFESS/ON9\
co '- m
�
No. C58606 �
\F OF
PM 10 SIGN
NOT TO SCALE
APPLICATION CONSENT
APPLICATION FOR APPROVAL OF A LOCAL AIR QUALITY MANAGEMENT (L.A.Q.M.P.) PLAN IS HEREBY MADE
TO THE CITY ENGINEER OR HIS DESIGNEE, AS PART OF A GRADING PERMIT APPLICATION, SUBJECT TO
THE CONDITIONS AND RESTRICTIONS SET FORTH HEREIN:
1. EACH PERSON UPON WHOSE BEHALF THIS APPLICATION IS MADE AND EACH PERSON AT WHOSE
REQUEST AND FOR WHOSE BENEFIT WORK IS PERFORMED UNDER AND PURSUANT TO ANY PERMIT
ISSUED AS A RESULT OF THIS APPLICATION AGREES TO, AND SHALL INDEMNIFY AND HOLD HARMLESS
THE CITY OF LA QUINTA, ITS OFFICERS, AGENTS AND EMPLOYEES.
2. ANY PERMIT ISSUED AS A RESULT OF THIS APPLICATION BECOMES NULL AND VOID IF WORK IS
NOT COMMENCED WITHIN 90 DAYS FROM THE DATE OF ISSUANCE OF SUCH PERMIT.
J. THE APPLICANT, OWNER, CONTRACTOR(S), SUBCONTRACTOR(S) OR OTHER AGENTS, HEIRS OR
ASSIGNEES SHALL CONFORM TO THE ATTACHED DUST CONTROL PLAN AS APPROVED BY THE CITY.
SAID PLAN INCLUDES NOTES AND/OR DRAWINGS OF TEMPORARY OR PERMANENT CONTROL METHODS
OR DEVICES PROPOSED TO BE USED. THIS L.A.Q.M.P. SHALL BE CONSIDERED AN ADDENDUM TO,
AND A NECESSARY PART OF, ANY GRADING, STOCKPILE, IMPROVEMENT, OR DEMOLITION PLAN
OTHERWISE REQUIRED FOR CITY PERMITS.
4. BY AGREEING TO CONFORM TO THIS PLAN AS APPROVED BY THE CITY, THE OWNER AND DESIGNATED
'AUTHORIZED DUST CONTROLLER" DO ALSO AGREE TO ABIDE BY THE PROVISIONS OF THE ABATEMENT
PROCEDURES AS SHOWN ABOVE.
OWNER'S CERTIFICATION:
I CERTIFY THAT I HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE.
I UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY MAY BE USED
BY THE CITY, PLUS ADDITIONAL CHARGES IF NEEDED, IF I FAIL TO KEEP THE DUST UNDER CONTROL.
I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM THE
TIME THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND
MUST CONTINUE UNTIL THE TIME THAT THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED.
RESPONSIBILITY FOR THE DUST CONTROL ON THIS SITE CAN NOT BE TRANSFERRED SOLELY BY
TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER PEOPLE. A REPLACEMENT
L.A.Q.M.P. AND DUST CONTROL SECURITY MUST BE SUBMITTED FOR ANY TRANSFERRED PORTION.
I HEREBY AUTHORIZE THE PERSON LISTED BELOW AS 'AUTHORIZED DUST CONTROLLER" TO BE
MY REPRESENTATIVE AND CONTACT PERSON FOR ALL DUST COMPLAINTS INVOLVING THIS PROJECT.
I CERTIFY THAT I HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN
IS TRUE AND CORRECT. I AGREE TO COMPLY WITH CITY OF LA QUINTA MUNICIPAL CODE SECTION 6.16
AND ALL LAWS RELATING TO GRADING OPERATIONS. I AUTHORIZE REPRESENTATIVES OF THE CITY
OF LA QUINTA TO ENTER UPON THE ABOVE-MENTIONED PROPERTY FOR INSPECTION AND/OR
ABATEMENT PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY AND ITS REPRESENTATIVES
FROM LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT.
OWNER'S NAME(S) CITY OF LA QUINTA MAIN: (760) 777-7045
OWNER'S ADDRESS 78-495 CALLE TAMPICO LA QUINTA, CA 92253
OWNER'S SIGNATURES)
DATE
DATE
OWNER'S NAME(S) ROBERT GREEN MAIN: (760) 634-6543
OWNER'S ADDRESS 343 4TH AVENUE, SAN DIEGO, CA 92101
OWNER'S SIGNATURES) �;�
DATE 6/14/21
I CERTIFY THAT l HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE.
AS THE 'AUTHORIZED DUST CONTROLLER" FOR THIS PROJECT I WILL HAVE MY PHONE NUMBER ON
THE REQUIRED SITE SIGNS, AND WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT.
I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM THE
TIME THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND
MUST CONTINUE UNTIL THE TIME THAT THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED.
DUST CONTROLLER NAME (PRINT) JERRY BLOOM
DUST CONTROLLER ADDRESS 0 SPECTR TER DRIVE, SUITE 1200, IRVINE, CA 92618
DUST CONTROLLER SIGNA
CONTACT PHONE NUMBEF
A. Q. M. D. DUST CLASS CE
NOTES:
- ��pl_ :�� _
HR) (949) 697-1498
TE # CV2108-01 1267-1 1285
ZL
DATE 06-27-22
1. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT THE FUGITIVE DUST CONTROL PLAN
APPLICATION (FORM A), FORM 403N AND THE SITE-SPECIFIC FUGITIVE DUST CONTROL PLAN TO AQMD.
A COPY OF THE FORM A SHALL ALSO BE SUBMITTED TO THE CITY.
2. PM -10 TRAINING INFORMATION MAY BE OBTAINED BY CONTACTING SCAQMD AT 909-396-2183.
J. WATER SOURCE AND FLOW RATES TO BE DETERMINED BY THE CONTRACTOR IN COORDINATION
WITH THE GOLF COURSE IRRIGATION FACILITY.
FEWZ
777-050-012
b.0
777-050-031
2.5"
CITY OF LA QUINTA PERMIT NO.
3.0"
SDP2016-0005
3.0"
IF YOU SEE DUST COMING
3.0"
FROM T P J T CALL
777-050-065
JERRY BLOOM
6.0..
(949)697-1498 'A
1.5"
IF YOU DO NOT GET A RESPONSE WITHIN ONE HOUR, PLEASE CALL
1.5"
THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT
2.0"
760-416-5315
1.5"
REPORT THE PERMIT OR PROJECT NO. AT THE PHONE NUMBER ABOVE
1.5"
OR CAL AIR QUALITY MANAGEMENT DISTRICT AT: 1-800-288-7664
PM 10 SIGN
NOT TO SCALE
APPLICATION CONSENT
APPLICATION FOR APPROVAL OF A LOCAL AIR QUALITY MANAGEMENT (L.A.Q.M.P.) PLAN IS HEREBY MADE
TO THE CITY ENGINEER OR HIS DESIGNEE, AS PART OF A GRADING PERMIT APPLICATION, SUBJECT TO
THE CONDITIONS AND RESTRICTIONS SET FORTH HEREIN:
1. EACH PERSON UPON WHOSE BEHALF THIS APPLICATION IS MADE AND EACH PERSON AT WHOSE
REQUEST AND FOR WHOSE BENEFIT WORK IS PERFORMED UNDER AND PURSUANT TO ANY PERMIT
ISSUED AS A RESULT OF THIS APPLICATION AGREES TO, AND SHALL INDEMNIFY AND HOLD HARMLESS
THE CITY OF LA QUINTA, ITS OFFICERS, AGENTS AND EMPLOYEES.
2. ANY PERMIT ISSUED AS A RESULT OF THIS APPLICATION BECOMES NULL AND VOID IF WORK IS
NOT COMMENCED WITHIN 90 DAYS FROM THE DATE OF ISSUANCE OF SUCH PERMIT.
J. THE APPLICANT, OWNER, CONTRACTOR(S), SUBCONTRACTOR(S) OR OTHER AGENTS, HEIRS OR
ASSIGNEES SHALL CONFORM TO THE ATTACHED DUST CONTROL PLAN AS APPROVED BY THE CITY.
SAID PLAN INCLUDES NOTES AND/OR DRAWINGS OF TEMPORARY OR PERMANENT CONTROL METHODS
OR DEVICES PROPOSED TO BE USED. THIS L.A.Q.M.P. SHALL BE CONSIDERED AN ADDENDUM TO,
AND A NECESSARY PART OF, ANY GRADING, STOCKPILE, IMPROVEMENT, OR DEMOLITION PLAN
OTHERWISE REQUIRED FOR CITY PERMITS.
4. BY AGREEING TO CONFORM TO THIS PLAN AS APPROVED BY THE CITY, THE OWNER AND DESIGNATED
'AUTHORIZED DUST CONTROLLER" DO ALSO AGREE TO ABIDE BY THE PROVISIONS OF THE ABATEMENT
PROCEDURES AS SHOWN ABOVE.
OWNER'S CERTIFICATION:
I CERTIFY THAT I HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE.
I UNDERSTAND THAT THE DUST CONTROL SECURITY THAT I'VE POSTED WITH THE CITY MAY BE USED
BY THE CITY, PLUS ADDITIONAL CHARGES IF NEEDED, IF I FAIL TO KEEP THE DUST UNDER CONTROL.
I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM THE
TIME THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND
MUST CONTINUE UNTIL THE TIME THAT THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED.
RESPONSIBILITY FOR THE DUST CONTROL ON THIS SITE CAN NOT BE TRANSFERRED SOLELY BY
TRANSFERRING ALL OR A PORTION OF THIS PROPERTY TO OTHER PEOPLE. A REPLACEMENT
L.A.Q.M.P. AND DUST CONTROL SECURITY MUST BE SUBMITTED FOR ANY TRANSFERRED PORTION.
I HEREBY AUTHORIZE THE PERSON LISTED BELOW AS 'AUTHORIZED DUST CONTROLLER" TO BE
MY REPRESENTATIVE AND CONTACT PERSON FOR ALL DUST COMPLAINTS INVOLVING THIS PROJECT.
I CERTIFY THAT I HAVE READ THIS APPLICATION AND THAT THE INFORMATION CONTAINED HEREIN
IS TRUE AND CORRECT. I AGREE TO COMPLY WITH CITY OF LA QUINTA MUNICIPAL CODE SECTION 6.16
AND ALL LAWS RELATING TO GRADING OPERATIONS. I AUTHORIZE REPRESENTATIVES OF THE CITY
OF LA QUINTA TO ENTER UPON THE ABOVE-MENTIONED PROPERTY FOR INSPECTION AND/OR
ABATEMENT PURPOSES, AND I AGREE TO HOLD HARMLESS THE CITY AND ITS REPRESENTATIVES
FROM LIABILITY FOR ANY ACTIONS RELATED TO THIS PERMIT.
OWNER'S NAME(S) CITY OF LA QUINTA MAIN: (760) 777-7045
OWNER'S ADDRESS 78-495 CALLE TAMPICO LA QUINTA, CA 92253
OWNER'S SIGNATURES)
DATE
DATE
OWNER'S NAME(S) ROBERT GREEN MAIN: (760) 634-6543
OWNER'S ADDRESS 343 4TH AVENUE, SAN DIEGO, CA 92101
OWNER'S SIGNATURES) �;�
DATE 6/14/21
I CERTIFY THAT l HAVE READ THIS APPLICATION AND UNDERSTAND THAT I AM RESPONSIBLE FOR THE
COMPLIANCE OF THIS PROJECT TO THE DUST CONTROL PROVISIONS NOTED OR REFERENCED HERE.
AS THE 'AUTHORIZED DUST CONTROLLER" FOR THIS PROJECT I WILL HAVE MY PHONE NUMBER ON
THE REQUIRED SITE SIGNS, AND WILL RESPOND TO DUST COMPLAINTS WITHIN THE 1 HOUR LIMIT.
I UNDERSTAND THAT DUST CONTROL IS REQUIRED 24 HOURS A DAY, 7 DAYS A WEEK, FROM THE
TIME THAT THIS SITE IS DISTURBED IN ANY WAY FROM THE NATURAL VEGETATED CONDITION, AND
MUST CONTINUE UNTIL THE TIME THAT THE PROJECT SITE IS ACCEPTABLY RE -VEGETATED OR PAVED.
DUST CONTROLLER NAME (PRINT) JERRY BLOOM
DUST CONTROLLER ADDRESS 0 SPECTR TER DRIVE, SUITE 1200, IRVINE, CA 92618
DUST CONTROLLER SIGNA
CONTACT PHONE NUMBEF
A. Q. M. D. DUST CLASS CE
NOTES:
- ��pl_ :�� _
HR) (949) 697-1498
TE # CV2108-01 1267-1 1285
ZL
DATE 06-27-22
1. PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR SHALL SUBMIT THE FUGITIVE DUST CONTROL PLAN
APPLICATION (FORM A), FORM 403N AND THE SITE-SPECIFIC FUGITIVE DUST CONTROL PLAN TO AQMD.
A COPY OF THE FORM A SHALL ALSO BE SUBMITTED TO THE CITY.
2. PM -10 TRAINING INFORMATION MAY BE OBTAINED BY CONTACTING SCAQMD AT 909-396-2183.
J. WATER SOURCE AND FLOW RATES TO BE DETERMINED BY THE CONTRACTOR IN COORDINATION
WITH THE GOLF COURSE IRRIGATION FACILITY.
FEWZ
777-050-012
777-050-031
777-050-036
777-050-045
777-050-065
REVISIONS:
REVISED DUST CONTROLLER INFORMATION
WDID NO. 733C394139