Loading...
Earth Systemsta oa�fra STATEMENT OF QUALIFICATIONS TO PROVIDE ON-CALL MATERIALS TESTING SERVICES FOR THE CITY OF LA QUINTA MAY 23, 2023 f EARTH e - rri L� EARTH SYSTEMS TABLE OF CONTENTS COVERLETTER.............................................................................................................................1 1. BACKGROUND AND QUALIFICATIONS...................................................................................3 2. REFERENCES OF CALIFORNIA GOVERNMENT AGENCIES .................................................. 11 3. COMPLETE PRICING LIST...................................................................................................... 12 4. LIST OF COMPLEMENTARY SERVICES OFFERED BY PROPOSER ........................................ 17 5. STAFFING AND PROJECT ORGANIZATION........................................................................... ZS 6. SUBCONTRACTING SERVICES..............................................................................................22 7. DISCLOSURES.......................................................................................................................23 8. ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS..................................................24 9. NON -COLLUSION AFFIDAVIT............................................................................................... 25 10. ACKNOWLEDGEMENT OF ADDENDA................................................................................26 APPENDIX A: RESUMES............................................................................................................27 APPENDIX B: CONTRACT MODIFICATION...............................................................................32 About �__i EARTH SYSTEMS � . ........ ......... EST, 1969 * 135 �#'ffffo EMPLOYEES FREMONT H0LLISTER SALINAS SAN LU15 OBISPO 5A NTA MARIA SANTA BARBARA VENTURA PASADENA PALM DALE BERMUDA DUNES PERRIS EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA Primary Services Geotechnical Engineering Geology and Hydrogeoiogy Environmental Assesment Materials Testing & Inspection • Materials Testing Laboratory 6 DSA APPROVED LABORATORIES EARTH SYSTEMS COVER LETTER May 23, 2023 1 FIRM BACKGROUND City of La Quinta YEARS IN BUSINESS: Attn: Julie Mignogna, Management Analyst Earth Systems Pacific: 24 78495 Calle Tampico Earth Systems, Inc.: 54 La Quinta, CA 92253 TAXPAYER SUBJECT: STATEMENT OF QUALIFICATIONS TO PROVIDE ON-CALL IDENTIFICATION NO.: MATERIALS TESTING SERVICES FOR THE CITY OF LA QUINTA 77-0521790 Dear Ms. Mignogna: NUMBER OF YEARS Earth Systems' anticipated role for this contract will be IN PLANNING, Earth Systems Pacific (Earth Systems) is pleased to submit this Statement CONSTRUCTION, I of Qualifications to provide On -Call Materials Testing Services for the City DESIGN: of La Quinta. Earth Systems is well qualified to provide these services on Founded as a California an on-call basis due to our local knowledge of geotechnical and geologic corporation in 1969, conditions in the La Quinta area, our well qualified staff and materials Earth Systems Inc. testing capabilities, and our extensive experience in providing services for has over 54 years similar projects throughout this region. We pride ourselves on our ability to of experience in the develop high quality, constructible solutions that minimally impact project geotechnical and costs and schedules. materials testing/ single site visit to address a specific site issue to a full geotechnical and/ inspection industry. AN EXPERIENCED AND WELL QUALIFIED STAFF OF MAIN OFFICE: asGEOPROFESSIONALS AND TECHNICAL STAFF 720Aerovista PI., Suite The Earth Systems staff includes registered geotechnical San Luis Obispo, CA engineers, civil engineers, certified engineering geologists, 93401 environmental geologists, technicians, special inspectors, and laboratory staff that have decades of experience I LOCAL OFFICE: providing geotechnical, geologic, construction observation and materials 79-811B Country Club Dr. testing services for a wide spectrum of capital projects ranging from minor Bermuda Dunes, CA improvements such as parking lots to major public works structures. 92203-1244 ARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA Earth Systems Pacific, Earth Systems' anticipated role for this contract will be a subsidiary of Earth to provide 1) geotechnical consultation, geotechnical ElQUALIFICATIONS Systems, Inc., was investigations, geologic hazard studies, geotechnical established as a observation and testing, and other geotechnical -related California corporation services, and 2) materials testing and special inspection on September 3,1999. services as necessary to support the City's projects. Earth Systems has extensive experience in providing on-call services for local municipalities; POINT OF CONTACT additional information regarding our qualifications and experience is INFORMATION: presented on the following pages. For an on-call contract such as this, Kevin Paul, PE, GE our involvement from a geotechnical perspective may range from a Vice President single site visit to address a specific site issue to a full geotechnical and/ Earth Systems Pacific or geologic engineering investigation. Similarly, during construction, we 79-811B Country Club Dr. can provide limited assistance or a full complement of construction testing Bermuda Dunes, CA and inspection support services, depending upon the City's needs. We 92203-1244 are available to respond to any type of service request, large or small, and (760) 345-1588 recognize that staff availability and the ability to respond quickly are key for kpaul@earthsystems.com an on-call consultant to be effective in this role. DIR REGISTRATION: We offer the following: 1000003643 AN EXPERIENCED AND WELL QUALIFIED STAFF OF MAIN OFFICE: asGEOPROFESSIONALS AND TECHNICAL STAFF 720Aerovista PI., Suite The Earth Systems staff includes registered geotechnical San Luis Obispo, CA engineers, civil engineers, certified engineering geologists, 93401 environmental geologists, technicians, special inspectors, and laboratory staff that have decades of experience I LOCAL OFFICE: providing geotechnical, geologic, construction observation and materials 79-811B Country Club Dr. testing services for a wide spectrum of capital projects ranging from minor Bermuda Dunes, CA improvements such as parking lots to major public works structures. 92203-1244 ARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA LOCAL OFFICE WITH CALTRANS-APPROVED MATERIALS TESTING LABORATORY With a full-service engineering office located in nearby Bermuda Dunes, we are available to provide rapid response to requests for services, which can be essential for on-call contracts where projects may have short design and construction timeframes. Our materials testing laboratory is certified and accepted by numerous accreditation agencies, including Caltrans, AMRL, AASHTO, CCRL, and the Division of the State Architect (DSA). COST CONTROL With increasing budget constraints affecting public agencies, value engineering has $1become an integral part of the geoprofessional industry. We often work with public agencies during the site acquisition process, performing geotechnical engineering/ geology feasibility studies to assess potential site constraints that could add project costs, - or identify issues that could increase the difficulty of development or result in construction delays. With our local knowledge of geotechnical and geologic conditions, coupled with our involvement during the construction of many projects, we can quickly identify issues that may affect project costs, and utilize knowledge gained from past projects to assist in achieving a successful and cost-effective outcome. During construction, we track materials testing and inspection progress and notify the client of any issues or circumstances that may impact anticipated materials testing and inspection costs. EXPERIENCE, STAFFING, PROJECT APPROACH, REFERENCES AND PRICING Information pertaining to Earth Systems' qualifications, experience, project understanding and approach, and references are presented on the following pages. A Fee Schedule is also presented. Following review of the City's Standard Professional Agreement by Earth Systems' legal counsel, Earth Systems respectfully requests incorporation of a contract amendment (see Appendix). The proposed changes are made with our shared interests in mind, with the objective of providing services to the City under a contract for operations whereby provisions are insurable by the applicable insurance policies. We maintain insurance as required by the Agreement; a sample insurance certificate evidencing appropriate coverage can also be found in Section 8: Acknowledgement of Insurance Requirements. The undersigned confirms that the information and pricing contained in this proposal will remain valid for a period of at least ninety days, and that individuals who will perform work for the City in relationship to this contract are free from conflicts of interest. The Respondent submitting this RFQ response acknowledges receipt of Addenda No. 1 dated May 17tH 2023, and confirms that the requirements noted in the foregoing addendum are incorporated into the RFQ response. We appreciate your consideration of Earth Systems to provide services under this contract. Please feel free to contact the undersigned if you have any questions or if any additional information is needed. Sincerely, Earth Systems Pacific Kevin Paul, PE, GE Managing Principal EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA EARTH SYSTEMS 1. BACKGROUND AND QUALIFICATIONS Earth Systems Pacific (Earth Systems) is a professional consulting firm with services that encompass geotechnical engineering, engineering geology, environmental assessment, construction monitoring, and materials testing and special inspection. Earth Systems, Inc. was founded as a California corporation in 1969, with its original offices in Palo Alto and Ventura, California. Earth Systems Pacific, a subsidiary of Earth Systems, Inc., was established as a California corporation in 1999. Earth Systems' staff of approximately 135 consists of registered geotechnical engineers, certified engineering geologists, soil technicians, special inspectors, and laboratory technicians, augmented by drilling, drafting, and support personnel. Approximately 30 employees are employed locally. Office locations in California include Fremont, Hollister, Salinas, San Luis Obispo, Santa Maria, Santa Barbara, Ventura, Pasadena, Palmdale, Bermuda Dunes, and Perris. The projects undertaken under this contract would be managed from our Bermuda Dunes office, which is located at 79-811B Country Club Drive in Bermuda Dunes, California. With many decades of experience in Riverside County, Earth Systems brings detailed knowledge of soil, groundwater, and geologic conditions to projects planned for this region. Earth Systems offers expertise in development of geotechnical criteria for public works projects, including buildings, water and sewer infrastructure, bridges and roadways, and public parks, as well as materials testing and special inspection during the construction process. We have extensive experience with pavement construction and rehabilitation, including new construction, overlays, recycled materials, permeable pavers, and stabilization of poor subgrade conditions. We have worked with many jurisdictions throughout southern California, providing services such as subsurface exploration, pavement coring, laboratory testing of soils, aggregate, HMA, and other pavement materials, pavement deflection studies, development of materials sampling, acceptance, and independent assurance plans, and infiltration testing for low impact development (LID) improvements. In addition to providing detailed studies, Earth Systems can assist in specific identification of any adverse geotechnical or geologic properties of sites that may adversely impact proposed projects. Responsive service is the hallmark of Earth Systems' reputation. Our local geotechnical engineering and materials testing professionals have an excellent track record for providing thorough, high quality services for hundreds of projects. Our goal for every project is to be responsive to our client's objectives, budget, and time -frame; to use our expertise and experience to provide thorough and technically accurate assessments; to provide rapid response to requests for services; and to ensure that our thoroughness and attention to detail provide assurance to our clients that the geotechnical aspects of their projects are addressed in accordance with current professional practice as well as local jurisdictional requirements. We offer a full-service, Caltrans approved materials laboratory and a highly qualified and experienced staff of special inspectors and technicians to help assure that construction proceeds smoothly and that the requirements of the project plans and specifications are met. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA EXPERIENCE WITH LOCAL MUNICIPALITIES Earth Systems' history of working with various municipalities in Riverside County dates back decades; we have provided geotechnical and/or materials testing/special inspection services for road realignments, water and sewer infrastructure, water and wastewater treatment plants, public works buildings, and community parks. Local municipalities for which we have provided services for capital improvement and similar projects include the following: • City of Cathedral City • City of Palm Springs • City of Goleta • City of Coachella 0 City of Riverside 0 City of Carpinteria • City of Indian Wells • City of Santa Paula • County of San Diego • City of Indio • City of San Buenaventura • County of Los Angeles (Ventura) • City of La Quinta • County of Orange • City of Santa Barbara • City of Oxnard • County of Ventura • City of Camarillo • City of Menifee • County of San Bernadino • City of Simi Valley • City of Moreno Valley • County of Santa Barbara • City of Thousand Oaks • City of Palm Desert 0 County of Riverside • City of Twenty -Nine Palms SERVICES Geotechnical engineering and geology services available through Earth Systems include the following: • Design -level geotechnical engineering investigations • Geotechnical and geologic feasibility studies • Slope stability evaluations • Fault location studies • Liquefaction and seismicity evaluation • Seismic refraction/rippability • Geotechnical criteria for shallow and deep foundations, including caissons, driven piles, and micropiles • Criteria for earth retention structures and embankments • Engineering analysis of settlement -reduction methods • Pavement assessment and development of geotechnical criteria for pavement construction and rehabilitation, including new construction, overlays, recycled materials, permeable pavers, and stabilization of poor subgrade conditions • Rock/pavement coring • Pavement deflection studies • Evaluation of acceptability of construction materials • Development of Material Sampling, Acceptance, and Independent Assurance Plans • Infiltration testing for low -impact development (LID) improvements • Geotechnical observation and testing during construction • Failure investigations of foundations, retaining walls, slopes, and pavement • Peer review services • Full materials testing laboratory (Caltrans) with capability of soil and rock type classification, determination of shear strength, expansion potential, compressibility, and other geotechnical properties of soils and other construction materials EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 4 Materials testing and special inspection services available through Earth Systems include the following: • Sampling and testing of soils, aggregate base, and asphalt concrete • Foundation excavation observation • Sampling of potentially contaminated soils and testing for hydrocarbons, other petroleum products, and lead • Sampling and testing of asphalt concrete • Sampling and testing of concrete; including slump, casting test cylinders, and compression testing • Sampling and testing of reinforcing steel • Sampling and testing of masonry; including block compliance, prisms, mortar strength, grout strength and cores of completed construction • Batch plant inspection of concrete and grout • Special inspection of concrete • Special inspection of masonry • Special inspection of shop and field welding • Special inspection of high strength bolts • Special inspection of paints and coatings • Special inspection of driven or drilled piles • Laboratory testing of construction materials including soil, asphalt, concrete, masonry, grout, steel, fabrics, adobe and other specialty materials • Testing or inspection of fabrics or other various construction materials • Asphalt and concrete mix design review OUR ROLE Earth Systems' role during the design phase of projects will be to provide geotechnical consultation, geotechnical investigations, geologic hazard studies, pavement studies, core sampling and other services of a geotechnical nature that may be necessary to support design of proposed capital improvement projects. For an on-call contract such as this, our involvement may range from a single site visit to address a specific site issue to a full geotechnical/geologic engineering investigation. We are available to respond to any type of service request, large or small, and recognize that staff availability and the ability to respond quickly are key for an on-call consultant to be effective in this role. In addition to providing detailed studies, Earth Systems can assist in specific identification of any adverse geotechnical or geologic properties of the site that may adversely impact the project. We pride ourselves on our ability to develop high quality, constructible solutions that minimally impact project costs and schedules. We are available to attend meetings and consult with the City or members of the design team to review site conditions and discuss potential solutions. During construction, Earth Systems can provide materials testing, special inspection, material identification, and other services to document that the work performed meets the requirements of the project plans, specifications and the requirements of the CBC, Greenbook, and/or Caltrans as appropriate. FULL-SERVICE MATERIALS TESTING LABORATORIES The Earth Systems laboratories have the capacity to perform hundreds of tests upon soils, concrete, asphalt, steel, masonry, and other building materials. Earth Systems laboratories have been certified or inspected by the U.S. Army Corps of Engineers, the Division of the State Architect (DSA), the Cement and Concrete Reference Laboratory (CCRL), and the AASHTO re:Source (formerly AMRL). We also maintain several Caltrans -approved laboratories. Having multiple laboratories allows us to control sample handling, chain of custody, and quality of tests so accurate results can be assured. Earth Systems participates in the Caltrans Reference Sample Program, the Cement and Concrete Reference Laboratory (CCRL) and AASHTO resource Proficiency Sample Programs for Concrete, Soil, Aggregate and Rebar. The laboratory equipment is calibrated annually, and the calibrations are traceable to the National Bureau of Standards. We maintain our own CBR and R -value (resistance to deformation under repeated loading) test equipment, allowing us to provide timely test results without shipping samples to an out-of-town facility. We have mobile laboratory equipment for soil, concrete, and asphalt concrete testing. Tests are conducted by trained technicians/inspectors in accordance with ASTM, Caltrans, AASHTO, and other appropriate laboratory standards. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA With decades of experience in the local area, Earth Systems offers extensive experience and detailed knowledge and detailed knowledge of soil, groundwater, and geologic conditions in this region. We have conducted numerous geotechnical investigations and geologic studies for projects ranging from minor infrastructure to large-scale new construction of public works projects. With a local office and full-service materials testing laboratory in Bermuda Dunes, we are available to provide rapid response to requests for services, which can be essential for on-call contracts where projects may have short design and construction timeframes. As this is an on-call contract, scopes and project approaches will vary depending upon the needs of the City and the project. The following are brief descriptions of the types of services that we envision under this contract, and Earth Systems' general approach to each. GEOTECHNICAL FEASIBILITY STUDIES When a property is under consideration for a project, a geotechnical study can be invaluable to assess conditions that may affect the desired use of the site. Studies may include geologic research, review of aerial photographs and possibly limited subsurface exploration to identify potential geologic constraints, infiltrometer testing to determine suitability for on-site storm water retention or detention, or percolation tests to determine suitability for on-site effluent disposal. Such studies allow for informed decision making before investing further in a particular site. GEOTECHNICAL ENGINEERING INVESTIGATIONS Geotechnical engineering investigations are design -level studies intended to provide sufficient data and criteria to allow design of the project and meet jurisdictional requirements. To evaluate subsurface conditions, typically a series of borings are drilled to depths of interest, which will vary based upon the type of project, the grading concept, and the anticipated subsurface profile. Borings may be drilled using hollow -stem auger techniques or using Cone Penetrometer methods. For hollow stem borings, standard penetration tests are typically performed (ASTM D 1586) and soil samples are obtained using a ring -lined barrel sampler (ASTM D 3550). Bulk soil samples are also obtained from the auger cuttings. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 6 .i'��� ..fit.• - Prior to initiating any subsurface exploration, Earth Systems coordinates with Underground Service Alert (USA) for underground utility coordination and determination of the locations of other subsurface features that could potentially be impacted by drilling operations. Soil samples are tested in the laboratory to determine a variety of soil properties, depending upon the type of project, the proposed development concept, and the materials encountered. Such tests as unit weight and moisture, plasticity index, grain size determination, maximum density versus optimum moisture, expansion index, one-dimensional consolidation, angle of shearing resistance, R -value, and unconfined compressive strength may be performed. All laboratory testing is performed in our accredited laboratories by trained technicians and according to ASTM or other applicable standards. The field and laboratory data are reviewed by a Registered Geotechnical Engineer and/or a Certified Engineering Geologist and evaluated with respect to development of geotechnical criteria for the proposed project. Geotechnical engineering investigations and reports comply with the requirements of Sections 1803.1 through 1803.6 and J104.3 of the applicable edition of California Building Code (CBC). Geotechnical engineering investigations are supervised by qualified and experience geotechnical professionals who develop programs for subsurface exploration, laboratory analysis, and data evaluation. GEOLOGIC HAZARD STUDIES Projects involving a geologic scope are supervised by a Certified Engineering Geologist. These may be stand-alone reports or may be incorporated into the geotechnical investigation. Depending upon the type of project, the work may include a review of geologic literature and maps, air photo interpretation, seismic refraction surveys, fault investigation, excavation of exploratory trenches, borings and down -hole logging, and various types of software analysis. Typical projects include geologic hazard studies, landslide evaluations, ocean bluff retreat studies, wave run-up analyses, and geophysical explorations. Geologic hazards reports comply with Section 1803.6 of the CBC, California Geological Survey Note 48, and Special Publications 42 and 117, as applicable. INFILTRATION/PERCOLATION TESTING Infiltration and/or percolation testing may be performed for projects where low -impact developments such as on-site stormwater retention or infiltration is planned, or where on-site wastewater disposal may be necessary. Services may include excavation of witness pits or borings to identify the soil profile; drilling, presaturation and testing of percolation test holes, double -ring infiltration testing, along with interpretation of test data and preparation of a written report. Typically, testing includes an initial background evaluation based upon review of existing data and the proposed development plan, excavation of multiple test pit test locations, and infiltration/permeability or percolation testing (for on-site wastewater disposal). The specific methods used will depend upon the purpose of the testing, the specific site conditions and type of development planned. Test results form the basis of determination of whether the site conditions are suitable for infiltration or percolation, and establishes rates to be used in design calculations. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA GEOTECHNICAL CONSULTATION For some on-call contracts, geotechnical engineering/geologic investigation may not be necessary, but there may be concerns of a geotechnical nature for which the City would like expert advice, such as a high groundwater condition or unstable soils. Earth Systems has a full staff of experienced geotechnical engineers and geologists available to provide such consultation on an as -needed basis. We can also provide consultation regarding issues such as pavement deterioration, unstable slopes, or forensic studies for buildings or other structures. Plans and specifications can also be reviewed for Standard of Care, adherence to City Standards, or for conformance to applicable reports. FORENSIC STUDIES Occasionally, issues with an existing structure occur in the form of cracks, settlement, or other forms of distress. Causes can range from deficiencies in construction materials, improper construction techniques, settlement of artificial fill soils, or other factors. Identification of the cause of distress is key to developing an appropriate mitigation strategy. Earth Systems has a wide array of forensic services and tools available to assist in forensic evaluation, include floor level surveys, unreinforced masonry testing, concrete evaluation, structure load testing, tendon/reinforcing steel location, pulse velocity testing, and sounding/ echo impact testing. CONSTRUCTION OBSERVATION, SPECIAL INSPECTION AND MATERIALS TESTING SERVICES During construction of projects, Earth Systems can provide geotechnical consultation and sampling, testing and/or special inspection of construction materials including soil, concrete, asphalt concrete, masonry, steel, bolting, and spray -applied fireproofing. This may involve site visits by a qualified engineer or geologist, sampling, testing and/or special inspection of materials by a qualified field technician or special inspector, and laboratory testing of soil materials as necessary to support the project. As part of these tasks, resolution of issues associated with the geotechnical properties of the site and construction materials may be necessary; we are available to attend meetings and consult with the City to discuss any such issues. Scheduling of services is conducted through our dispatcher, who is available (in person, not a message machine) from 7:00 a.m. to 5:00 p.m. Monday through Friday. Sampling and testing will typically be conducted at the direction of the City. Daily reports detailing the progress of the work and the services provided will be left at the site. The results of the tests/inspections will be provided in periodic summary reports, not to exceed 14 days from the date of the last test/inspection when needed. Materials test reports will be provided upon completion of the tests. Results of materials tests are generally available within 48 hours of the material's submittal. All test reports will be prepared or reviewed by Earth Systems' project manager Kevin Paul, or qualified reviewer. Test reports will be sent to the City; the reports will include all of the test results, regardless of the satisfactory or unsatisfactory outcome of the tests. The reports will indicate the location of samples, any special sampling procedures used (as applicable) and will clearly indicate what materials were sampled and what test methods were used. Concrete tests will show the specified design strength. The test reports will contain a definitive statement as to whether or not the materials tested comply with the EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 8 project plans and specifications, and other requirements as appropriate. Any deviations will be promptly reported. Test results not meeting the project requirements will be logged separately and the retests or remedial measures taken will be reported. All reports are reviewed by the project manager, and peer- reviewed by another professional staff member to assure report accuracy and quality. We are committed to deliver our work products in a timely manner and are always available and responsive to phone or email communications as well as requests for meetings or on-site consultation. QUALITY ASSURANCE/QUALITY CONTROL All geotechnical and materials testing services will be performed in accordance with the California Building Code (CBC) requirements and standards for public improvement projects, project plans and specifications, and the City's Quality Assurance Program (QAP) as applicable. Geotechnical engineering reports comply with the requirements of Sections 1803.1 through 1803.6, and J104.3 and J104.4 of the applicable edition of California Building Code (CBC) and California Geological Survey (CGS) Special Publication 117, as applicable; geologic hazards reports comply with Section 1803.7 and J104.4 of the CBC, CGS Note 48, and CGS Special Publications 42 and 117, as applicable. Geotechnical engineering investigations are supervised by Registered Geotechnical Engineers who develop programs for subsurface exploration, laboratory analysis, and data evaluation. Projects involving a geologic scope are supervised by a Certified Engineering Geologist. All reports are peer-reviewed by another staff professional experienced with similar projects and certified or licensed in the appropriate discipline. For materials testing and special inspection projects, all work is overseen by the project manager, who visits the sites and reviews the inspection/testing program with field and laboratory personnel. All reports are reviewed by the project manager, and peer-reviewed by another professional staff member to assure report accuracy and quality. MONITORING OF BUDGETS AND SCOPES Earth Systems recognizes the need for budget control on publicly funded projects and works collaboratively with our public agency clients to control costs associated with geotechnical and materials testing/ inspection services, and we understand the need to adhere to the project's allocated budget. Geotechnical and geologic investigations are typically provided on a fixed fee basis, while materials testing, special inspection and core sampling services are provided on a time -and -materials basis. Prior to the start of the work, budget estimates are developed based upon reviews of project plans and contractor schedules for various aspects of the sampling and testing program. Placement of materials, the schedule of the contractor and the progress of the work are critical factors that can affect fees. Other variables include the location of material fabrication, identification of construction materials, and the need for retests. To avoid unanticipated budget overruns, we implement a budget tracking system. Hours for observation or sampling/testing are estimated based upon the contractor's construction schedule, and are tracked by category, i.e. soil, concrete, asphalt concrete, etc. If the progress of the work begins to deviate significantly from that shown in the project schedule for any category, thus potentially affecting fees, the client is notified. Similarly, if other situations such as unidentified materials, nonconforming materials, or excessive retesting occur, he or she is informed and apprised as to the effect upon the project budget. This affords the City the opportunity to convene with the contractor to discuss the project schedule or other factors that may affect testing or observation fees, and measures that can be taken to better control the progress of the work. COMMUNICATION WITH CLIENTS AND STAKEHOLDERS Excellent client service is the hallmark of Earth Systems' reputation and has earned us extensive commendations and loyalty from clients and stakeholders. We respond rapidly to client requests and our goal is to always work collaboratively with clients, the design team, and contractors while meeting tight schedules and deadlines. We accomplish this by clear communication, always keeping our clients and other stakeholders apprised of project milestones and being respectful of the project schedule and budget. Should issues arise on a project, we immediately notify the client and work with all involved parties to come to a resolution that is practical, constructible, cost-effective, and minimizes project delays. We are committed to deliver our work products in a timely manner and are always available and responsive to phone or email communications as well as requests for meetings or consultation. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA The schedule for services will vary depending upon the type of service requested under the on-call contract. Requests for consultation are responded to immediately, with site visits typically scheduled for the same or the following week. For geotechnical engineering or engineering geology investigations, the time -frame will generally be four to six weeks following the Notice -to -Proceed, and may be influenced by such factors as weather and site accessibility. Materials testing and special inspection timeframes are governed by the contractor's construction schedule; a minimum of 24 -hours' notice is requested for inspection services, however, we endeavor to have testing and inspection personnel available as necessary to serve the needs and timeframes of projects. Below is an example project timeline for a typical geotechnical engineering report. ACTIVITY WEEK 1 WEEK 2 WEEK 3 �..IMMMMMMMEN0■ MENEM DAT '• • • PLANNING MOMMM MOMMM MOMMM SITE CHARACTERIZATION MENEM MEN on MENEM FIELD EXPLORATION MENEM MENEM MENEM LABORATORY MENNo MENNo MENEM GEOTECHNICAL MENEM MENEM MENEM FINAL REPORT MEMEMIMMEME MENEM ACTIVITY WEEK 4 WEEK 5 WEEK 6 �..MIMMMMMMMENNo MENEM ,• PLANNING • • •O MEMMM MOMMM MOMMM SITE CHARACTERIZATION 00000 000 No MENEM FIELD EXPLORATION MENEM MENEM MENEM LABORATORY MENEM MENEM MENEM • MENEM MENEM MENEM •O• FINAL REPORT . For Materials Testing and Special Inspection projects, the timeline is determined by the Contractor's schedule and that our work is scheduled accordingly. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 10 EARTH SYSTEMS 2. REFERENCES OF CALIFORNIA GOVERNMENT AGENCIES ALESSANDRO WEST ROAD IMPROVEMENTS, CITY OF Client: City of Palm Desert PALM DESERT, CA Attn: Mr. Ryan Gayler Earth Systems was retained by the City of Palm Desert to provide 73-510 Fred Waring Drive field and laboratory testing for Alessandro West Improvements, Palm Desert, CA 92260 Phase II. Earth Systems' scope of work included field density (760) 346-0611 testing and associated laboratory testing (maximum density and Rgayler@cityofpaImdesert.org soil gradation) for storm drain backfill; curb/gutter subgrade and base; valley, wedge and cross gutters and street subgrade and base. Density testing and observation of asphalt concrete placement was also performed. Field density tests were conducted in accordance with ASTM D 6938 and laboratory maximum density vs. optimum moisture testing was performed per ASTM D 1557. Date of Service: May 2022 - Present Team Members: Kevin Paul, Anthony Colarossi, Mark Houghton, Field Staff Outcome: Services completed on-time and within authorized budget CATHEDRAL CITY AMPHITHEATER PROJECT, CATHEDRAL Client: City of Cathedral City CITY, CA Attn: Mr. John A. Corella In 2019, Earth Systems provided review of geotechnical engineering 68-700 Avenida Lalo Guerrero reports (prepared previously by others) to verify compliance with Cathedral City, CA 92234 Cathedral City guidelines and the accepted professional standard (760) 770-0327 of care, and to update geotechnical criteria to conform to current jcorella@cathedralcity.gov California Building Code requirements. Supplemental geotechnical recommendations were also developed. The project was a stage structure for a proposed amphitheater, which was to be constructed at the intersection of Cathedral Canyon Drive and Avenida Lalo Guerrero in Cathedral City. Challenges at the site included the potential for seismically induced settlement and the presence of shallow electrical lines that crossed within the stage foundation area. Supplemental recommendations presented options for site grading in foundation areas to allow flexibility for the client to select the most cost-effective approach based upon available budget and project objectives. Geotechnical criteria were also developed for excavation, utility trenches, and foundations. During construction, Earth Systems provided geotechnical observation and materials testing. Date of Service: 2020 Team Members: Kevin Paul, Anthony Colarossi, Mark Houghton, Field Staff Outcome: Services completed on-time and within authorized budget MURRIETA ROAD REHABILITATION PROJECT, MENIFEE, CA Client: City of Menifee Earth Systems provided grading observation and testing for the Attn: Mr. Carlos Geronimo rehabilitation of Murrieta Road near the boundary of the cities 29714 Haun Road of Perris and Menifee. Murrieta Road was degraded and required Menifee, CA 92586 removal and replacement (grinding) of the upper road surface, (951) 723-3722 driveway connections, placement of aggregate base and AC for cgeronimo@cityofinenifee.us small road widening areas as rehabilitation along with replacement of the asphalt concrete. Earth Systems' scope of work consisted of compaction testing of soils, compaction testing of asphalt concrete, and preparation of a summary report. Date of Service: 2017 Team Members: Kevin Paul, Anthony Colarossi, Mark Houghton, Field Staff Outcome: Services completed on-time and within authorized budget EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 11 EARTH SYSTEMS 3. COMPLETE PRICING LIST PERSONNEL Principal Professional........................................................ Associate Professional....................................................... Senior Professional............................................................ Project Professional........................................................... Staff Professional............................................................... Special Inspector, Prevailing Wage* .................................. Technician, Prevailing Wage* ............................................ Special Services/Caltrans Technician, Prevailing Wage* ... Special Services Technician ................................................ Special Inspector............................................................... Non -Destructive Testing (NDT) Inspector .......................... Technical Assistant............................................................. Technician.......................................................................... Clerical/Administrative...................................................... HOURLY RATE ........................................................... $260.00 ........................................................... $220.00 ........................................................... $200.00 ........................................................... $180.00 ........................................................... $145.00 ........................................................... $145.00 ........................................................... $140.00 ........................................................... $145.00 ........................................................... $120.00 ........................................................... $110.00 ........................................................... $150.00 ........................................................... $105.00 ........................................................... $100.00 ............................................................. $90.00 *Tech nician/Inspector Classifications as defined by the State of California Department of Industrial Relations. BASIS OF CHARGES 1. Charges for non -Prevailing Wage services are calculated in one-hour increments and accumulate on a portal-to-portal basis. A 2 -hour cancellation charge applies if scheduled inspection or testing is cancelled after 3 p.m. the day prior to the scheduled work. 2. Field technician services for regular workdays for Prevailing Wage projects are subject to a 4 -hour minimum charge, then billed in 2 -hour increments portal to portal. Special inspection is billed in 4 -hour increments. 3. Work performed on Saturdays, night work, and for premium hours (before 7 a.m., after 5 p.m. or more than 8 hours in one day) for personnel are at time and one-half; Sundays and holidays are at double time. Work performed on weekends, holidays, and when work starts outside of regular business hours is subject to a 4 -hour minimum charge. 4. Mileage is invoiced at a rate of $1.05 per mile (portal-to-portal, includes basic equipment transport e.g., Nuclear Density Gauge). 5. Minimum report charge: $160.00. Report copies: $50.00 each (minimum). 6. State regulations require electronic submittal of Certified Payroll to DIR. A fee of $80.00/week will be assessed. Additional time required to address specific requests related to DIR/Labor Compliance will be charged at the clerical/administrative services rates. 7. Subcontracted services, materials, rental equipment, out of town travel, and expenses are charged at cost plus 20 percent. Fixed per diem rates for specific projects can be provided upon request. 8. Invoices are payable upon presentation. Invoices thirty days past due are subject to a service charge of one and a one-half percent per month. Payments using a credit card will be assigned a 3% surcharge. 9. Rates are effective through December 31, 2023. An annual escalation rate of 3 percent will be applied to hourly rates for professional staff and non -prevailing wage services; rate increases for prevailing wage services will be based upon determinations by the State of California Department of Industrial Relations. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 12 BASIS OF CHARGES Rates for field work such as materials sampling, construction inspection, and field evaluation will be in accordance with the Personnel Rates listed in the basic Fee Schedule. The below listed rates apply to standard ASTM test methods. An additional hourly charge ($90.00/hr.) will be applied for cutting, capping, or other preparation of non-standard samples and, where noted, for steel samples. SOILS All prices are based on California and Modified California sample sizes (2" — 2.5" diameter) unless noted otherwise. Preparation of 3" diameter samples add $21.00. Testing of contaminated soil will be per quote. Samples will be returned to sender for proper disposal. Atterberg Limits: Liquid Limit or Plastic Limit................................................................................................................$116.00 Atterberg Limits: Plasticity Index..................................................................................................................................$247.00 California Bearing Ratio, 3 points; incl. ref maximum density......................................................................................$867.00 California Bearing Ratio, 9 points; incl. ref maximum density...................................................................................$1,208.00 Consolidation, one dimensional....................................................................................................................................$258.00 Consolidation, timed, per point......................................................................................................................................$74.00 Basic Corrosivity w/out Report (pH, Sulfate, Chl., Resistivity)......................................................................................$294.00 Direct Shear, per point, 3 points minimum..................................................................................................................$289.00 ExpansionIndex Test.....................................................................................................................................................$195.00 Maximum Density and Optimum Moisture: 4" Mold...................................................................................................$220.00 Maximum Density and Optimum Moisture: 6" Mold...................................................................................................$240.00 Maximum Density and Optimum Moisture: California Impact.....................................................................................$252.00 Moisture and Unit Weight Determination, from ring samples.......................................................................................$29.00 MoistureOnly..................................................................................................................................................................$21.00 Permeability Tests, constant head or falling head.................................................................................................... Per Quote R-Value.......................................................................................................................................................................... $310.00 R -Value, CA State Hwy/set of 3, Cement, Lime, Other additives..................................................................................$330.00 HydroCollapse Potential...............................................................................................................................................$153.00 Hydrometer Analysis, assumed specific gravity, with 200 wash...................................................................................$247.00 Sieve/Hydrometer Analysis, assumed specific gravity, w/200 wash.............................................................................$247.00 Sieve Analysis, Aggregate Base/Subbase......................................................................................................................$184.00 SieveAnalysis 200 wash only........................................................................................................................................$126.00 SieveAnalysis with wash...............................................................................................................................................$170.00 Sieve Analysis, Oversize Material..................................................................................................................................$221.00 SpecificGravity..............................................................................................................................................................$195.00 SwellTest, undisturbed.................................................................................................................................................$195.00 SwellTest, remolded.....................................................................................................................................................$247.00 Unconfined Compressive Strength, untreated..............................................................................................................$174.00 Unconfined Compressive Strength, lime or cement treated material..........................................................................$604.00 THERMAL RESISTIVITY TESTS Concrete, 1 point w/moisture content (requiring special collection procedure)................................................................... $231.00 Field Testing using Thermal Resistivity Meter........................................................................................................................ $342.00 Soil, per moisture point, per sample...................................................................................................................................... $284.00 Soil, 3 moisture points with dry -out curve, per sample......................................................................................................... $856.00 CONCRETE AGGREGATE Abrasion, L.A. Rattler, 100 and 500 revolutions..................................................................................................................... $273.00 Absorption, Coarse Aggregate................................................................................................................................................ $100.00 Absorption, Fine Aggregate.................................................................................................................................................... $147.00 Clay Lumps and Friable Particles in Aggregate....................................................................................................................... $170.00 Cleanness Value of Coarse Aggregate.................................................................................................................................... $200.00 Crushed Particles, each size.................................................................................................................................................... $130.00 Durability Index, Coarse or Fine Aggregate............................................................................................................................ $200.00 EARTH SYSTEMS I Soo TO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 13 Flat and Elongated Particles in Aggregate.............................................................................................................................. $200.00 Organic Impurities in Fine Aggregate..................................................................................................................................... $100.00 Potential Reactivity of Aggregated by Chemical Method, each size................................................................................... Per Quote SandEquivalent...................................................................................................................................................................... $147.00 SieveAnalysis, washed........................................................................................................................................................... $179.00 Soundness, Sodium Sulfate, 5 cycles...................................................................................................................................... $500.00 SpecificGravity, Coarse Aggregate......................................................................................................................................... $147.00 SpecificGravity, Fine Aggregate............................................................................................................................................. $147.00 Uncompacted Void Content of Fine Aggregate Angularity, w/fine Aggregate SG.................................................................. $252.00 UnitWeight of Aggregate....................................................................................................................................................... $147.00 CONCRETE CYLINDERS, BEAMS AND CORES Shear Test on Masonry Cores, 2 faces.................................................................................................................................... Compression Test of Cast Cylinders......................................................................................................................................... $36.00 Compression Test of Cored Samples, cored at laboratory..................................................................................................... $100.00 Compression Test of cores delivered by others....................................................................................................................... $84.00 Compression Test of Lightweight Concrete.............................................................................................................................. $40.00 Densityof Concrete Cylinders.................................................................................................................................................. $79.00 Densityof Hardened Concrete............................................................................................................................................... $111.00 Flexural Strength, Simple Beam with Third Point Loading..................................................................................................... $163.00 Gradingof Shotcrete Cores.................................................................................................................................................... $168.00 Sample Storage, monthly per sample....................................................................................................................................... $32.00 Shrinkage, set of 3.................................................................................................................................................................. $441.00 Unit Weight of Lightweight Concrete..................................................................................................................................... $116.00 Enviro. Recycling Fee, per cylinder, core or beam.......................................................................................................................$2.50 EnviroRecycling Fee, per flex beam............................................................................................................................................$6.00 Enviro Recycle Fee/Form Stripping, per shotcrete panel/beam............................................................................................... $55.00 Absorptionof Block, set of 3.................................................................................................................................................. $163.00 Compression Test, 2" x 4" Mortar Cylinders............................................................................................................................ $44.00 Compression Test, 3" x 3" x 6" Grout Samples......................................................................................................................... $44.00 Compression Test on Block, set of 3....................................................................................................................................... $163.00 Compression Test on Grouted Prisms, includes cutting......................................................................................................... $250.00 Compression Test on Masonry Cores....................................................................................................................................... $84.00 Coring of Grouted Masonry by Subcontractor................................................................................................................... cost + 20% MasonryShrinkage, set of 3................................................................................................................................................... $315.00 Moisture Content of Block as received, set of 3..................................................................................................................... $137.00 Shear Test on Masonry Cores, 2 faces.................................................................................................................................... $168.00 Specific Gravity and Unit Weight of Block, set of 3................................................................................................................ $184.00 EnviroRecycling Fee, per prism................................................................................................................................................ $10.00 Enviro Recycling Fee, per mortar or grout sample......................................................................................................................$2.50 Idlay]:TOTad 10 rd FireproofBond Test.................................................................................................................................................................. $84.00 FireproofingDensity Test....................................................................................................................................................... $100.00 ASPHALT CONCRETE Bulk Specific Gravity of Compacted Specimens and Core Samples.......................................................................................... $58.00 Compaction of Lab Samples, CA Kneading Compactor, set of 3............................................................................................. $441.00 Compaction of Lab Samples, CA Kneading Compactor, set of 5............................................................................................. $709.00 Compaction of Lab Samples, Marshall Method set of 3 -(50 blows/side)............................................................................. $336.00 Compaction of Lab Samples, Marshall Method set of 3 -(75 blows/side)............................................................................. $441.00 Extraction of Oil from A.C. Mixtures....................................................................................................................................... $300.00 Extraction of Oil from Rubberized Mixtures........................................................................................................................... $394.00 Hazardous Waste Handling Charge for Extracted Oil............................................................................................................... $98.00 EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 14 Ignition Oven Binder Content, after initial correction value is determined........................................................................... $205.00 Ignition Oven Binder Gradation Correction Value /mix design, average of 3...................................................................... $1,400.00 MoistureContent..................................................................................................................................................................... $58.00 Sieve Analysis of Extracted Aggregate.................................................................................................................................... $226.00 Sieve Analysis of Ignition Oven Residue................................................................................................................................. $226.00 Specific Gravity, Theoretical Maximum, Rice Method............................................................................................................ $163.00 Stability and Flow, Marshall Apparatus, set of 3.................................................................................................................... $252.00 Stabilometer, Hveem S -Value, set of 3................................................................................................................................... $250.00 Enviro Recycling Fee, per sample................................................................................................................................................$4.00 Enviro Recycling Fee for Extracted Oils..................................................................................................................................... $40.00 REINFORCING AND STRUCTURAL STEEL Bend Test of Welded Specimen, sample preparation not included..............................................................................$179.00 Pipe Flattening Test, sample preparation not included................................................................................................$179.00 Reinforcing Steel Coupler Tensile and Slip Tests...........................................................................................................$336.00 Structural Steel Bend Test, sample preparation not included......................................................................................$184.00 Structural Steel Machining/Sample Preparation.......................................................................................................cost + 20% Structural Steel Tensile Test, sample prep not included...............................................................................................$184.00 Tensile and Bend Tests of Reinforcing Bar, #2 through#9............................................................................................$168.00 Tensile and Bend Tests of Reinforcing Bar, #10 through #18................................................................................... Per Quote Enviro Recycling Fee, per sample......................................................................................................................................$3.00 BOLT TESTS Bolt Tests, chemical or mechanical...............................................................................................................................$132.00 WELDER QUALIFICATION AWS D1.1: 3/8" Plate, per position........................................................................................................................... Per Quote AWS D1.1: 1" Plate, per position............................................................................................................................... Per Quote AWSD1.3: Sheet Steel............................................................................................................................................... Per Quote AWSD1.4: Reinforcing Bar........................................................................................................................................ Per Quote ASME/API Pipe Sections............................................................................................................................................ Per Quote EQUIPMENT/CHARGES (Does Not Include Personnel) 110 -volt Portable Electric Generator.................................................................................................................... $111.00/day AnchorPull Test Equipment......................................................................................................................................$84.00/hr. Bailer (disposable) w/dedicated rope...................................................................................................................... $32.00/ea. Concrete and Asphalt Concrete Coring Equipment............................................................................................... $111.00/day Concrete Slab Moisture Transmission Kit................................................................................................................. $58.00/ea. ConductivityMeter.................................................................................................................................................. $90.00/day Cut -Off Saw............................................................................................................................................................. $84.00/day Double Ring Infiltrometer (per set)....................................................................................................................... $163.00/day DrumDolly............................................................................................................................................................... $27.00/day Drums....................................................................................................................................................................... $84.00/ea. Dynamometer, In-line Scale.................................................................................................................................... $58.00/day HammerDrill........................................................................................................................................................... $58.00/day Hand Auger/Sampler Equipment............................................................................................................................ $58.00/day Lock n, Load VOC Sample Pres. Sys.......................................................................................................................... $27.00/ea. Magnetic Particle Equipment.................................................................................................................................... Per Quote Manometer........................................................................................................................................................... $111.00/day Mini -Troll Groundwater Level Transducer................................................................................................................ Per Quote EARTH SYSTEMS I Soo TO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 15 Nuclear Density Equipment, per hour.............................................................................................................................$15.00 PaintThickness Meter............................................................................................................................................... Per Quote Percolation Tank System and Trailer..................................................................................................................... $273.00/day Personal Protective Equipment Level C..................................................................................................................... Per Quote Pile Driving Equipment (for pile load testing)....................................................................................................... $893.00/day PileLoad Testing Equipment................................................................................................................................. $578.00/day PulseVelocity Meter............................................................................................................................................. $111.00/day Rebound Hammer (Schmidt Hammer).................................................................................................................... $58.00/day Reinforcing Steel Locating Equipment (DR-Meter)............................................................................................... $100.00/day RelativeHumidity Meter......................................................................................................................................... $58.00/day Safety and Specialty Equipment................................................................................................................................ Per Quote Sampling Consumables............................................................................................................................................. Per Quote Skidmore Bolting Calibration Equipment.............................................................................................................. $221.00/day Slope Inclinometer Equipment, per hole.................................................................................................................. Per Quote Soil Sampling Containers (metal)............................................................................................................................. $21.00/ea. SoilSampling Containers (glass)................................................................................................................................. $6.00/ea. TapeExtensometer................................................................................................................................................... Per Quote TensionEquipment................................................................................................................................................. $58.00/day Torque/Tension Equipment.................................................................................................................................... $69.00/day WaterLevel Indicator.............................................................................................................................................. $53.00/day PerDiem................................................................................................................................................................ $184.00/day DIRCompliance/eCPR, per week.....................................................................................................................................$80.00 DSABox Posting, ea.......................................................................................................................................................$158.00 DSALab Compliance, per week.......................................................................................................................................$53.00 Vehicle& Equipment Charge..........................................................................................................................................$10/hr CuringContainers.................................................................................................................................................... $50.00/day EARTH SYSTEMS I Soo TO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 16 EARTH SYSTEMS 4. LIST OF COMPLEMENTARY SERVICES OFFERED BY PROPOSER Geotechnical engineering and engineering geology are core services provided by Earth Systems; associated complementary services would include percolation testing, infiltration testing, forensic analysis, slab moisture testing, environmental assessment/testing, and other services that may be useful for a specific project. With respect to materials testing and special inspection, we provide inspection and materials testing for all commonly used construction materials, but can also provide inspection or testing for specialty materials, such as adobe tiles. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 17 EARTH SYSTEMS 5. STAFFING AND PROJECT ORGANIZATION KEVIN L. PAUL, PE #70084, GE #2930 Principal Geotechnical Engineer, Project Manager With over 20 years of experience in the geotechnical engineering, materials engineering, materials testing and inspection, and environmental services field, Mr. Kevin Paul specializes in public works, essential services, educational and renewable energy projects. He has been the geotechnical engineer for numerous public works projects for jurisdictions throughout southern California, including bridges, roadways, water and sewer supply and infrastructure, and buildings. His role for this contract will be principal geotechnical engineer and project manager, providing direct geotechnical engineering oversight. Mr. Paul is an experienced project manager, with the responsibility of assuring high quality subsurface study, data analysis, and budget management. He is directly involved in development of project scopes and proposals, coordination and preparation of project teams, direction of fieldwork, personnel and equipment, laboratory testing and analysis, and report preparation. He serves as the Engineer -of -Record for Earth Systems' Perris and Bermuda Dunes materials testing laboratories for the AASHTO Materials References Laboratory (AMRL) and Cement and Concrete Reference Laboratory (CCRL) accreditation, California Department of Transportation (Caltrans) certified laboratory, and Division of State Architect (DSA) Laboratory Evaluation and Acceptance (LEA) programs. Mr. Paul has developed a reputation of working collaboratively with clients, the design team, and contractors while meeting tight schedules and deadlines. He is a registered geotechnical engineer in the State of California, and a registered professional engineer in the States of California, Nevada, and Arizona. He obtained a bachelor's degree in civil engineering from Ryerson Polytechnic University in Toronto, Canada. He has been employed with Earth Systems since 2011. MARK S. SPYKERMAN, PG #3800, EG #1174, HG #331 dEdM Principal Engineering Geologist As a principal engineering geologist with Earth Systems, Mark Spykerman is responsible for evaluation of the impact of geologic and hydrologic conditions upon proposed developments. Certified bytheState of California as a professional geologist, engineering geologist, and hydrogeologist, Mr. Spykerman has over 40 years of experience on public works projects, authoring hundreds of reports that have been reviewed and approved by the California Geologic Survey (CGS). He has been responsible for oversight and management of large-scale field operations, including managing, training, and mentoring staff. Mr. Spykerman's areas of expertise include geologic hazards assessments, seismic analysis, fault investigation, analysis of liquefaction and lateral spreading, rockfall and slope stability evaluation. He is thoroughly familiar with the requirements of California Code of Regulations (CCR) Title 24, the California Building Code (CBC) and the California Geological Survey's (CGS) Note 48 Checklist. Geologic analyses are performed in accordance with the CGS guidance document Special Publication 117A for earthquake and landslide hazards. Mr. Spykerman received his Bachelor of Science degree in Geology from California State University Fresno. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 18 ANTHONY COLAROSSI, PE# 60302 Senior Engineer Anthony (Tony) Colarossi is a registered professional engineer with over 30 years of experience in the geotechnical and materials testing field. His expertise includes development of geotechnical criteria for shallow and deep foundations, mass grading operations, and analysis of sites with respect to settlement, slope stability, seismic factors, and rockfall potential. As a senior engineer, his day-to-day responsibilities include oversight of field investigations for geotechnical engineering and geologic investigations. During project construction, he supervises field activities related to materials testing and special inspection, such as field density testing for mass -grading operations and observation of shallow and deep foundation construction. Mr. Colarossi received a Bachelor of Science Degree in Civil Engineering from California Polytechnic University at Pomona, California. He has been with Earth Systems since 2014. Prior to his employment with Earth Systems, he spent ten years as a Building and Safety Plan reviewer working for the cities of La Quinta and Coronado, California. ROCIO CARRILLO, PE #75721 Project Engineer A registered civil engineer with 13 years of experience in the geotechnical field, Ms. Carrillo supervises subsurface exploration programs, provides analysis of field and laboratory test data, prepares geotechnical engineering reports, and oversees the geotechnical/materials testing aspects of projects during construction. Her extensive field experience and variety of projects that she has been involved in has allowed her to develop familiarity with the often complex geologic and geotechnical conditions that characterize the various regions of southern California. She has been involved in numerous geotechnical engineering investigations for public works projects, ranging from parking lots to large-scale infrastructure. Ms. Carrillo obtained a Bachelor of Science degree in Civil Engineering and a Master of Science degree in Geotechnical Engineering from the University of California Los Angeles (UCLA). She has been employed with Earth Systems since 2018. MARK HOUGHTON, ACI, NICET, ICC Construction Testing Services Manager Mr. Houghton has over 38 years providing materials testing, geotechnical observation and special inspection. Mr. Houghton manages our staff of soil technicians and certified special inspectors with appropriate ICC, DSA, NICET, AWS, and other credentials. Mr. Houghton will provide daily technical oversight and quality control of the technicians and inspectors assigned to projects undertaken as part of this contract. Mr. Houghton manages the special inspection team of technicians in strict adherence to CBC code requirements, project plans and specifications. He provides materials testing oversight and assists with signatory review of laboratory tests, as well as any forensic evaluation that may be needed. Mr. Houghton will be responsible for observing construction procedures, managing documentation, verifying materials comply with specifications, scheduling field operations, and coordinating with the City. Please see the Appendix for full resumes of the professional staff. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 19 FIELD AND LABORATORY CONSTRUCTION MATERIALS TESTING STAFF For construction materials testing, we will utilize highly qualified and experienced field and laboratory staff that have provided excellent service for past public works projects. They can provide geotechnical and materials testing services in accordance with ASTM, Caltrans, or other applicable standards; each technician or inspector assigned will be certified in the appropriate specialty for the work being performed. Our field staff is known for providing exemplary service, demonstrating their ability to work collaboratively with project inspectors, design consultants, and contractors alike, and earning outstanding commendations for their work. Their familiarity with ASTM, CBC and Caltrans requirements, protocols, and various software programs used during construction will facilitate the smooth execution of the soils and materials testing aspects of projects. The team includes the following members: JOSH THOMAS Field and Laboratory Coordinator 20 years of experience JUAN NUNEZ Supervisory Soils and Materials Technician ACI -Certified, Caltrans -Certified 20 years of experience JULIAN GEISINGER Senior Soils Inspector ICC -Certified 26 years of experience JOSE MURILLO Soils/Materials Laboratory Technician ACI -Certified, NICET-Certified, Caltrans -Certified 12 years of experience JARED LARGE Field Technician/Special Inspector ACI -Certified, NICET-Certified, ICC -Certified, Caltrans -Certified 15 years of experience CLAIRE BREWER Field Technician ACI -Certified 21 years of experience JOHN BONAFEDE Special Inspector AWS -Certified, ICC -Certified, ACI -Certified 35 years of experience ERIC LEWIS Special Inspector AWS -Certified 15 years of experience SUBCONTRACTORS As Earth Systems is a full-service geotechnical and materials testing/special inspection firm, subcontractors are typically used only to provide support or specialty services, such as drilling services, traffic control services, or soil/groundwater corrosivity testing. The subcontractor selected for a specific assignment would depend upon the nature of the work, the project schedule, and availability. When retaining subcontractors, we ensure that their qualifications meet the requirements of the client as well as our own quality expectations, including applicable certifications as appropriate. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 20 ORGANIZATIONAL CHART KEVIN PAUL, PE, GE Principal Geotechnical Engineer, Project Manager MARK S. SYKERMAN, PG, EG, HG Principal Engineering Geologist ANTHONY COLAROSSI, PE Senior Engineer ROCIO CARRILLO, PE Project Engineer MARK HOUGHTON Construction Testing Services Manager FIELD AND LABORATORY STAFF JOSH THOMAS Field and Laboratory Coordinator JUAN NUNEZ Supervisory Soils & Materials Technician JULIAN GEISINGER Senior Soils Inspector JOSE MURILLO Soils/Materials Laboratory Technician JARED LARGE Field Technician/Special Inspector CLAIRE BREWER Field Technician JOHN BONAFEDE Shop and Field Welding ERIC LEWIS Shop and Field Welding EARTH SYSTEMS 6. SUBCONTRACTING SERVICES As Earth Systems is a full-service geotechnical and materials testing/special inspection firm, subcontractors are typically used only to provide support or specialty services, such as drilling services, traffic control services, or soil/groundwater corrosivity testing. The subcontractor selected for a specific assignment would depend upon the nature of the work, the project schedule, and availability. When retaining subcontractors, we ensure that their qualifications meet the requirements of the client as well as our own quality expectations, including applicable certifications as appropriate. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 22 EARTH SYSTEMS 7• DISCLOSURES Proposer is currently not a party to any lawsuit as a defendant and has not been judged guilty or liable within the last 5 years. Based on the foregoing statement in response to the requested disclosure information from this section, the Proposer affirms no negative history. This representation is made based upon the information available to the undersigned as of this date. Kevin Paul, PE, GE Vice President EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 23 EARTH SYSTEMS g• ACKNOWLEDGEMENT OF INSURANCE REQUIREMENTS INSURANCE REQUIREMENTS ACKNOWLEDGEMENT Must be executed by proposer and submitted with the proposal Kevin Paul, PE, GE Earth Systems Pacific (name) hereby acknowledge and confirm that (name of company) has reviewed the City's indemnification and minimum insurance requirements as listed in Exhibits E and F of the City's Professional Services Agreement (Attachment 1); and declare that insurance certificates and endorsements verifying compliance will be provided if an agreement is awarded. I am Vice President (Title) of Earth Systems Pacific (Company) EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 24 Commercial General Liability (at least as broad as ISO CG 0001) $1,000,000 (per occurrence); $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Noncontributory Commercial Auto Liability (at least as broad as ISO CA 0001) $1,000,000 (per accident) Personal Auto Declaration Page if applicable Errors and Omissions Liability $1,000,000 (per claim and aggregate) Worker's Compensation (per statutory requirements) Must include the following endorsements: Worker's Compensation Waiver of Subrogation Worker's Compensation Declaration of Sole Proprietor if applicable EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 24 EARTH SYSTEMS 9• NON -COLLUSION AFFIDAVIT Kevin Paul NON -COLLUSION AFFIDAVIT FORM Must be executed by proposer and submitted with the proposal (name) hereby declare as follows: I am Vice President of Earth Systems Pacific (Title) (Company) the party making the foregoing proposal, that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing; that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Proposer Signature: — =- Proposer Name: Proposer Title: Company Name: Address: Kevin Paul, PE, GE Vice President Earth Systems Pacific 79-811 B Country Club Dr. Bermuda Dunes, CA 92203-1244 EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 25 EARTH SYSTEMS 10. ACKNOWLEDGEMENT OF ADDENDA ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA Must be executed by proposer and submitted with the proposal; If no addenda has been issued, mark "N/A" under Addendum No. indicating Not Applicable and sign ADDENDUM NO. I SIGNATURE INDICATING RECEIPT EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 26 EARTH SYSTEMS APPENDIX A: RESUMES KEVIN L. PAUL, PE, GE Principal Geotechnical Engineer With over 20 years of experience in geotechnical engineering, materials engineering, materials testing and inspection, and environmental services field, Mr. Kevin Paul specializes in public works, essential services, educational and renewable energy projects. He has been the geotechnical engineer for numerous public works projects for numerous jurisdictions throughout southern California, including bridges, roadways, water and sewer supply and infrastructure, and buildings. His role for this contract will be principal geotechnical engineer, providing direct geotechnical engineering oversight. Mr. Paul is an experienced project manager, with the responsibility of assuring high quality subsurface study, data analysis, and budget management. He is directly involved in development of project scopes and proposals, coordination and preparation of project teams, direction of fieldwork, personnel and equipment, laboratory testing and analysis, and report preparation. He serves as the Engineer -of -Record for Earth Systems' Perris and Bermuda Dunes materials testing laboratories for the AASHTO Materials References Laboratory (AMRL) and Cement and Concrete Reference Laboratory (CCRL) accreditation, California Department of Transportation (Caltrans) certified laboratory, and Division of State Architect (DSA) Laboratory Evaluation and Acceptance (LEA) programs. AREAS OF EXPERTISE • Geotechnical engineering studies, including subsurface exploration, laboratory testing of soil samples, engineering analyses, and report preparation • Geotechnical aspects of mass grading and excavation operations • Geotechnical aspects of shoring design • Geotechnical parameters for shallow and deep foundation systems PROJECT EXPERIENCE • Supervision of grading observation and special inspection personnel during construction activities • Engineering analyses relating to seismically induced and static settlements, slope stability, soil liquefaction, and slope stabilization • Reclamation of existing pavements, such as in-place pulverization and cement stabilization • Third -party reviews of geotechnical reports • Cathedral City Amphitheater, Cathedral City, CA • Murrieta Road Rehabilitation Project, Menifee, CA • Alessandro West Road Improvements, City of Palm Desert, CA • City of Indian Wells Highway 111 Rehabilitation Project, Indian Wells, CA • Riverside County Flood Control and Water Conservation District, Woodcrest Dam, Riverside, CA • City of Indian Wells on-call Misc. Testing Services, Indian Wells, CA • City of Temecula Citywide Street Repair, Riverside County, CA • Apache Trail Roundabouts, Exit Ramp of 1-10 Freeway, Cabazon area of Riverside County, CA • 38th Street West and West Avenue K-8 Street Improvements, Lancaster, CA • Potrero Fire Station, Potrero, CA EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA REGISTRATIONS AND CERTIFICATIONS Registered Professional Engineer (Geotechnical), State of California, (No. 2930) Registered Professional Engineer (Civil), State of California, (No. 70084) Registered Professional Engineer (Civil), State of Arizona, (No. 53526) Registered Professional Engineer (Civil), State of Nevada, (No. 22338) Certified Radiation Safety Officer OSHA 40 Hour Safety Loss Prevention System (LIPS) Program Exxon Mobil Oil Corporation, Loss Prevention System Safety Program Personal Leadership Essentials, 16 Hour Course Principal Leadership Course, 16 Hour Course EDUCATION B.S., Civil Engineering, Ryerson Polytechnic University, Toronto, Canada AWARDS Excellence Award for Major Retail, Commercial and Industrial Project Excellence, Technical Training Seminar, Best Project/Project Management for 75 -million -dollar renovation ofthe Galleria at Tyler Mall in Riverside, California. Company Fees over $1.5 million. American Society of Civil Engineers—Flood Management Project of the Year— Riverside County Flood Control and Water Conservation District - Eagle Canyon Dam and Debris Basin — Riverside and Los Angeles Chapter and California award winner. EMAIL kkpaulCcDearthsystems.com 27 MARK SPYKERMAN, PG, EG, HG Principal Engineering Geologist As a principal engineering geologist with Earth Systems Pacific, Mark Spykerman is responsible for evaluation of the impact of geologic and hydrologic conditions upon proposed developments. Certified by the State of California as a professional geologist, engineering geologist, and hydrogeologist, Mr. Spykerman has over 40 years of experience on school projects, authoring hundreds of reports that have been reviewed and approved by the California Geologic Survey (CGS). He has been responsible for oversight and management of large-scale field operations, including managing, training, and mentoring staff. Mr. Spykerman's areas of expertise include geologic hazards assessments, seismic analysis, fault investigation, analysis of liquefaction and lateral spreading, rockfall and slope stability evaluation. He is thoroughly familiar with the requirements of California Code of Regulations (CCR) Title 24, the California Building Code (CBC) and the California Geological Survey's (CGS) Note 48 Checklist. Geologic analyses are performed in accordance with the CGS guidance document Special Publication 117A for earthquake and landslide hazards. Mr. Spykerman received his Bachelor of Science degree in Geology from California State University Fresno. AREAS OF EXPERTISE • Geologic hazard studies • Landslide evaluation and mitigation • Seismic analysis, including determination of design peak bedrock accelerations, design earthquake magnitudes, and seismic response spectra • Fault investigation and assessment of potential for fault rupture I].19711111111"N]4:1I4ZIt; • Evaluation of liquefaction and lateral spreading potential • Slope stability analysis • Slope reinforcement • Erosion studies and mitigation • Fluvial geomorphology • Assessment of potential for naturally -occurring asbestos (NOA) and radon • On Call Geotechnical Services for the Ctiy of Menifee, Menifee, CA • Evans Park, Menifee, CA • Murrieta Road Rehabilitation Project, Menifee, CA • Lamprey Street, Menifee, CA • Haun and Holland Widening, Menifee, CA • Commercial Development, Dinah Shore Drive, Palm Desert, CA • City of Garden Grove Water, Sewer and Street Improvements, Garden Grove, CA • City of Banning AC Overlay, Pavement, Rehabilitation & Sidewalk Improvements, Banning, CA • Cycle 1 Active Transportation Program Citywide Safe Routes to School, Moreno Valley, CA • Sewer Bypass Alignments, Warm Springs Crossing, Church Street, Pedley Road, Highland, CA • Horseshoe Lake Park Improvements, Jurupa Valley, CA EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA Ow REGISTRATIONS AND CERTIFICATIONS Registered Engineering Geologist, State of California (No. 1174) Registered Professional Geologist, State of California (No. 3800) Certified Hydrogeologist, State of California (No. 331) EDUCATION B.A., Geology, California State University, Fresno PROFESSIONAL AFFILIATIONS Association of Engineering and Environmental Geologists Seismological Society of America EMAIL mspykerman@earthsystems.com 28 ANTHONY COLAROSSI, PE Senior Engineer Anthony (Tony) Colarossi is a registered professional engineer with over 30 years of experience in the geotechnical and materials testing field. His expertise includes development of geotechnical criteria for shallow and deep foundations, mass grading operations, and analysis of sites with respect to settlement, slope stability, seismic factors, and rockfall potential. As a senior engineer with Earth Systems' Bermuda Dunes office, his day-to-day responsibilities include oversight of field investigations for geotechnical engineering and geologic investigations. During project construction, he supervises field activities related to materials testing and special inspection, such as field density testing for mass -grading operations and observation of shallow and deep foundation construction. Mr. Colarossi received a Bachelor of Science Degree in Civil Engineering from California Polytechnic University at Pomona, California. He has been with Earth Systems since 2014. Prior to his employment with Earth Systems, he spent ten years as a Building and Safety plan reviewer for the cities of La Quinta and Coronado, California. AREAS OF EXPERTISE • Slope stability and rockfall analysis and mitigation • Analysis and mitigation of liquefaction and lateral spreading • Analysis of static and seismic settlement, including dry sand settlement • Geotechnical engineering and construction monitoring for roadway sections, overcrossings, interchanges, roundabouts, embankments and retaining walls • Familiarity with Caltrans design processes PROJECT EXPERIENCE • Materials engineering • Observation of shallow and deep foundations, including caissons, driven piles, and micropiles • Mitigation of unstable soil conditions • Geotechnical aspects of dewatering • Extensive knowledge of applicable codes and standards, including the California Building Code (CBC), ASTM, and Caltrans • Cathedral City Amphitheater, Cathedral City, CA • Murrieta Road Rehabilitation Project, Menifee, CA • Alessandro West Road Improvements, City of Palm Desert, CA Avenue 58 Asphalt Coring, La Quinta, CA • Sidewalk Improvements Along Highway 111, La Quinta, CA • Monterey Crossing Sewer Improvements, Dinah Shore Drive, Palm Desert, CA • Toscana Country Club, Indian Wells, CA • Garage Town, Dinah Shore Drive, Palm Desert, CA • Master Planned Drainage Challenger Way Storm Drain Line, Lancaster, CA • Upper Armargosa Creek Recharge Project, Soil Cement Channel, Palmdale, CA • Empire Polo Gardens Fire Lane, Thermal, CA EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA REGISTRATIONS AND CERTIFICATIONS Registered Civil Engineer, State of California (No. 60302) FAA Drone Pilot Certified Nuclear Density Gauge Certified EDUCATION B.S., Civil Engineering, California Polytechnic University, Pomona PROFESSIONAL AFFILIATIONS Tau Beta Pi, National Engineering Honor Society EMAIL tcolarossi@earthsystems.com 29 ROCIO CARRILLO, PE Project Engineer A registered civil engineer with 13 years of experience in the geotechnical field, Rocio Carrillo supervises subsurface exploration programs, provides analysis of field and laboratory test data, prepares geotechnical engineering reports, and oversees the geotechnical/materials testing aspects of projects during construction. Her extensive field experience and variety of projects that she has been involved in has allowed her to develop familiarity with the often complex geologic and geotechnical conditions that characterize the various regions of southern California. She has been involved in numerous geotechnical engineering investigations under DSA oversight, including projects for Beaumont Unified School District, Corona -Norco Unified School District, Southern Kern Unified School District, Palm Springs Unified School District, and Banning Unified School District. Ms. Carrillo obtained a Bachelor of Science degree in Civil Engineering and a Master of Science degree in Geotechnical Engineering from the University of California Los Angeles (UCLA). She has been employed with Earth Systems since 2018. AREAS OF EXPERTISE - • Geotechnical analysis of soil/ structure interaction • Evaluation of liquefaction potential • Interpretation of cone penetrometer data • Settlement analysis • Analysis of slopes for local and global stability PROJECT EXPERIENCE • Development of geotechnical criteria for bearing capacity, lateral earth pressures, pavement design, and deep excavations • Shear key and buttress design for landslide stabilization • Field testing and geotechnical observation of mass grading operations • Horseshoe Lake Park Improvements, Jurupa Valley, CA • Vernola Family Park Expansion, Jurupa Valley, CA • The Living Desert Australian Aviary Project, Palm Desert, CA • The Living Desert Crossroads of Conservation Project, Palm Desert, CA • Horseshoe Lake Park Improvements, Jurupa Valley, CA • Vernola Family Park Expansion, Jurupa Valley, CA • Potrero Fire Station, Potrero, CA • Patton Waterline Replacement, Patton, CA • Mojave PUD Cache Creek Pipeline Replacement, Kern, CA • City of Lancaster Master Planned Drainage Storm Drain Alignment, Lancaster, CA • Avenida Miravilla and Beaumont Avenue K -Rail Support Pins, Cherry Valley and Beaumont, CA • Tachevah Dam Excess Land Evaluation, Palm Springs, CA • Riverside County Flood Control and Water Conservation District, Building 6 Modular Upgrade, Riverside, CA EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA REGISTRATIONS AND CERTIFICATIONS Registered Professional Engineer (Civil), State of California, (No. 75721) EDUCATION M.S., Geotechnical Engineering, University of California, Los Angeles B.S., Civil Engineering, University of California, Los Angeles EMAIL rcarrillo@earthsystems.com 30 MARK HOUGHTON Construction Testing Services Manager Mr. Mark Houghton will serve as the construction testing services manager for this contract. In this role, he is responsible for oversight and assurance of technical quality, as well as client relations and supervision of field and laboratory staff. Mr. Houghton started his career in the field, performing laboratory and field testing and special inspection for many major construction projects, including hospitals, educational facilities and projects under the jurisdiction of the Division of Dam Safety. As a result of this extensive background, Mr. Houghton has developed a deep knowledge of local soil conditions and has established excellent relationships within the local construction industry. He currently manages contracts for construction testing and observation services for numerous local government, state, and educational sector projects. He provides analysis and studies on stressed structures and materials, including forensic testing, rehabilitation programs, and seismic damage studies. He is intimately familiar with the special inspection process and inspection/materials testing protocols. He ensures that deadlines for inspections and report submissions are consistently met while maintaining the high quality of inspection and testing that Earth Systems is known for. AREAS OF EXPERTISE • Special inspection of various types of foundations, including caissons, driven piles, and micropiles • Shop and field welding inspection • Special inspection of reinforced, pre -stressed, and lightweight concrete • Special inspection of spray - applied fireproofing • Masonry sampling, testing and special inspection • Torque testing and proof load/ pull testing of bolts and anchors • Materials testing of specialty materials PROJECT EXPERIENCE • Preparation of cost estimates • Forensic testing and evaluation of distressed structures using destructive and nondestructive methods • Ultrasound, radar, and thermography testing • Determination of size and location of reinforcing steel in concrete block structures • Laboratory testing of construction materials, including grout, masonry, concrete, asphalt, soils, and structural and reinforcing steel • Cathedral City Amphitheater, Cathedral City, CA • Murrieta Road Rehabilitation Project, Menifee, CA • Alessandro West Road Improvements, City of Palm Desert, CA • Avenue 52 Bridge, La Quinta, CA • Eagle Canyon Dam, Riverside County Flood Control, Cathedral City, CA • Palm Springs Tramway Upgrade, Palm Springs, CA • Larson Justice Center, County of Riverside, CA • Portola Country Club Slope Evaluation and Repair, Palm Desert, CA • CHP Desert Hills Commercial Vehicle Enforcement Facility, Banning, CA • San Gorgonio Memorial Hospital, Banning, CA • Fred Waring Bridge, Palm Desert, CA EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA REGISTRATIONS AND CERTIFICATIONS ACI Concrete Testing Technician, Levels I and II NICET, Construction, Lab, Exploration, Level III ICC Reinforced Concrete, No. 0845226-88 ICC Reinforced Masonry, No. 0845336-84 CGEA CET No. 193 EDUCATION Antelope Valley College Lancaster, CA NRMCA Pervious Concrete Technician Training OSHA 40 -Hour Safety Trained Loss Prevention System Program Trained American Concrete Institute Troubleshooting Concrete Construction Training California Geotechnical Engineers Association Technician Certification Program PROFESSIONAL AFFILIATIONS International Code Council (ICC) American Concrete Institute (ACI) California Geotechnical Engineers Association (CGEA) National Institute for Certification Engineering Technologies (NICET) National Ready Mixed Concrete Association (NRMCA) EMAIL mhoughton@earthsystems.com 31 EARTH SYSTEMS APPENDIX B: PROPOSED CONTRACT MODIFICATION Proposed Changes to Agreement for Contract Services - On -Call Materials Testing Services RFQ No. CLQ042523-2 Section Comments 1.1 Paragraph is revised as follows: Scope of Services. In compliance with all terms and conditions of this Agreement, Contracting Party shall provide On -Call Survey Services, as specified in the "Scope of Services' attached hereto as "Exhibit A" and incorporated herein by this reference (the "Services"). Contracting Party represents wants that Contracting Party is a provider of first class work and/e.r professional services and Contracting Party is experienced in performing the Services contemplated herein and, in light of such status and experience, Contracting Party covenants that it shall follow industry standards in performing the Services required hereunder, ^^^' that ^m',' material ;f any, .,,II be of good quality, fit for the purpose inteR For purposes of this Agreement, the phrase "industry standards" shall mean those professional standards of practice recognized by one or more fiFSt cross firms performing similar services under similar circumstances. 1.5 Paragraph is revised as follows: Familiarity with Work. By executing this Agreement, Contracting Party vests represents that (a) it has thoroughly investigated and considered the Services to be performed based on the information provided by the City, (b) it bias will investigate4 the site where the Services are to be performed, if any, and fully aGquainted itself,•,;+h to visually observe the conditions there existing on the day of the site visit, (c) it has carefully considered how the Services should be performed, and (d) it fully understands the facilities, difficulties, and restrictions attending performance of the Services under this Agreement. Should Contracting Party discover any latent or unknown conditions materially differing from those inherent in the Services or as represented by City, Contracting Party shall immediately inform City of such fact and shall not proceed except at Contracting Party's risk until written instructions are received from the Contract Officer, or assigned designee (as defined in Section 4.2 hereof). 1.6 Paragraph is revised as follows: Contracting Party acknowledges and understands that the Services contracted for under this Agreement require specialized skills and abilities and that, consistent with this understanding, Contracting Party's work will be held to an industry standard of professionals performing similar services under similar circumstances quality and werkmaRship Consistent with Section 1.5 hereinabove, Contracting Party represents to City that it holds the necessary skills and abilities to satisfy the industry standard of quality as set forth in this Agreement. Contracting Party shall adopt reasonable methods during the life of this Agreement to furnish continuous protection to the SeFviees peFfeFmed by Contracting Party's, and the equipment, materials, papers, and other components thereof to prevent losses or damages, and shall be responsible for all such damages, to peFsens er its property, until acceptance of the Services by City, except such losses or damages as may be caused by City's own negligence. The performance of Services by Contracting Party shall not relieve Contracting Party from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to City, when such inaccuracies are due to the negligence of Contracting Party. EARTH SYSTEMS I SOQTO PROVIDE ON-CALL MATERIALS TESTING SERVICES I MAY 23, 2023 1 CITY OF LA QUINTA 32