Inland Foundation Engineering, Inc.Prepared for: Submitted by: CITY OF LA QUINTA INLAND FOUNDATION ENGINEERING, INC. Julie Mignogna IFE Allen D. Evans, PE Management Analyst 77-622 Country Club Drive, Suite Q, 78-495 Calle Tampico Palm Desert, CA 92211 La Quinta, CA 92253 (951) 654-1555 and/or (760) 200-2400 0544 OPTFIE DESERT IFE May 23, 2023 Ms. Julie Mignogna, Management Analyst City of La Quinta 78-495 Calle Tampico La Quinta, California 92253 Inland Foundation Engineering, Inc. Subject: Proposal for On -Call Materials Testing Services Dear Ms. Mignogna: Inland Foundation Engineering, Incorporated (IFE) is pleased to submit this proposal to provide on-call materials testing services. This proposal was prepared in response to the Request for Proposal issued by the City on April 25, 2023. We have also reviewed Addendum No. 1, dated May 17, 2023. Ail information and pricing presented in this proposal is valid for 180 days. This company and its employees are free from any conflict of interest with the City of La Quinta. will be IFE's project manager and primary point of contact for this contract. I am based in our Palm Desert office and am a California -registered geotechnical engineer with more than 40 years of materials testing and inspection experience. I am authorized to bind the firm. My contact information is presented below. Phone: (760) 200-2400, Cell: (951 ) 634-6666 E-mail: aevans _.inlandfoundation,com We look forward to the opportunity to work with the City of La Quinta. If you have any questions or require any additional information, please contact us. Sincerely, Inland Foundation Engineering, Inc. " Allen D. Evans, PE. Principal iniandfoun dation.com 1310 South Santa Fe Ave. PO Box 937 San Jacinto, CA 92581 1 (951) 654-1555 77622 Country Club Dr. Suite Q. Palm Desert, CA 92211 1 (760) 260-2400 Inland Foundation Engineering, Inc. Consulting Geotechnical Engineers and Geologists TABLE OF CONTENTS 1. BACKGROUND, QUALIFICATIONS AND RELATED EXPERIENCE 1 Firm Background Information .................................................. 1 Qualifications........................................................................ 1 Resumes............................................................................... 3 Project Understanding............................................................ 6 Project Approach.................................................................... 7 Project Management............................................................... 8 Schedule............................................................................... 9 2. REFERENCES 10 3. COMPLETE PRICE LIST 15 4. LIST OF COMPLEMENTARY SERVICES 16 5. STAFFING AND PROJECT ORGANIZATION 17 6. SUBCONTRACTING SERVICES 19 7. DISCLOSURES 20 8. ACKNOWLEGEMENT OF INSURANCE 21 9. Non -Collusion Affidavit 23 10. Acknowledgement of Addnda 24 eao�W CAl"ILYEA - T Proposal for City of La Quinta On -Call Materials Testing Services IFE 1. BACKGROUND, QUALIFICATIONS AND EXPERIENCE a m� Firm Background Information c Inland Foundation Engineering, Inc. (IFE) has been a recognized leader in developing 'a �O solutions for demanding geotechnical engineering and materials testing projects for more than a 45 years. We have provided geotechnical engineering and materials testing services for more than 18,000 public and private projects and have an extensive database of soil and geologic rt conditions throughout southern California. 3' a At IFE our mission is to save our clients time and money. We work hard to understand the a needs of our clients and are committed to working collaboratively with their representatives, and k their design and construction teams. We have developed a reputation for common-sense and cost effective geotechnical and materials testing solutions to the unique needs of each project. _ We are responsive and proactive in our communication so that potential issues or conflicts are o resolved quickly. We are a California corporation founded in 1978 (FEIN 95-3230555) and a California -certified Small Business Enterprise (SB -Micro and SB -PW). We are registered with the Department of Industrial Relations (1000018288) to perform services on public works projects. We have 15 full and part-time employees that include Caltrans and ACI -certified technicians, two registered civil and geotechnical engineers, a certified engineering/professional geologist, staff geologist special construction inspectors. Qualifications Our laboratory is: • Accredited for AASHTO to meet the minimum requirements of: ■ ASTM E329, Standard Specifications for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction ■ ASTM C1077, Standard Practice for Laboratories Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Laboratory evaluation ASTM D3740, Standard Practice for Minimum Requirement for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction • Qualified by Caltrans to perform materials testing during construction of state highway projects and federally -funded local agency projects. • Approved by the California Division of State Architect, Laboratory Evaluation and Acceptance (LEA) program to provide materials testing during construction of public school and community college projects. Proposal for City of La Quinta ��V W 1 of 24 On -Call Materials Testing Services (AMORVIA E We participate in laboratory benchmark sample reference programs administered by Caltrans, CCRL and the AASHTO Materials Reference Laboratory (AMRL). We are accredited by AASHTO to perform the following tests: Aggregates I Soil & Rock ASTM C702 ASTM C40 ASTM C566 ASTM C117 ASTM C127 ASTM C128 ASTM D2419 ASTM C136 ASTM D698 ASTM D1140 ASTM D4318 ASTM D1557 ASTM D2216 Cement & Concrete ASTM C511 ASTM C39 ASTM C617 ASTM C1064 ASTM C42 ASTM C1231 ASTM C1542 ASTM C231 ASTM C31 ASTM C172 ASTM C143 ASTM C138 Practices & specifications ASTM E329 ASTM C1077 ASTM D3740 ASTM R18 Masonry ASTM C140 ASTM California Test Methods (CTM) that our laboratory is currently qualified to perform are listed below. Calculations I R -Value, Soil & Aggregates Bituminous Concrete & Sampling Mixtures, CTM 105 CTM 201 CTM 217 CTM 304 CTM 309 CTM 504 CTM 539 CTM 106 CTM 202 CTM 226 CTM 308 CTM 366 CTM 518 CTM 540 CTM 125 CTM 206 CTM 227 CTM 375 CTM 521 CTM 556 CTM 229 CTM 533 CTM 557 CTM 231 CTM 543 Following are the resumes for our project manager and key personnel for the upcoming City projects. Proposal for City of La Quinta �ii! W 2 of 24 On -Call Materials Testing Services Resumes Allen D. Evans, P.E. Principal / Project Manager As principal of Inland Foundation Engineering, Inc., Mr. Evans' responsibilities include overall management of our offices in San Jacinto and Palm Desert, California. Mr. Evans also serves as project manager for foundation investigations, preliminary soil investigations, slope stability studies, percolation investigations, and other projects associated with geotechnical, and construction engineering. Mr. Evans has 40 years of engineering and management experience. He has extensive experience in geotechnical engineering including field exploration, laboratory testing and foundation analysis. Mr. Evans has provided forensic consultation to evaluate causes of failure in geotechnical projects and has developed recommendations for repair of distressed properties. He has managed material testing programs for a number of highway, interchange and bridge projects that were designed and constructed under Caltrans oversight. Recent Project Experience: IFE Experience 40 + Years Education: B.S. Agricultural Engineering, University of Idaho, Moscow, Idaho M.S. Civil Engineering, University of Southern California, Los Angeles, California Professional Reaistrations: CA Geotechnical Engineer, No. 2060 CA Civil Engineer, No. 38104 Accnrinfinnc- American Society of Civil Engineers California Geotechnical Engineers Association American Council of Engineering Companies • City of Coachella, 5 New Traffic Signals • City of Lake Elsinore, La Laguna RV Park and Boat Launch • City of Lake Elsinore, Rosetta Canyon Park • City of Indian Wells, Bicycle and Pedestrian Bridge at Deep Canyon Channel • City of Menifee, Peacock Neighborhood Street Evaluation and Rehabilitation Projects • City of Moreno Valley, Cycle 6 ADA Pedestrian Ramp Improvements • City of Rancho Mirage, Gerald Ford and Bob Hope Drive Improvements • City of San Jacinto, Artesia Street Emergency Waterline Replacement Project • City of San Jacinto, Mountain Avenue Evaluation and Pavement Rehabilitation Projects • City of Perris, Citywide Pavement Evaluation and Pavement Rehabilitation Projects • City of Perris, Old Nuevo Road Evaluation and Pavement Rehabilitation Projects • Coachella Valley Water District, Plant 7 Aeration Improvement • Eastern Municipal Water District, 7t" Street Emergency Repair • Eastern Municipal Water District, San Jacinto Valley Raw Water Conveyance Facility • Lake Hemet Municipal Water District, Caroline and Rosalie Water Line Replacement • Michael Baker International, Palm Desert Deep Canyon Tennis Club, Street Improvement • Riverside County Economic Development Agency, John J. Benoit Detention Center • Riverside County Flood Control & Water Conservation District, Palm Springs MDP Line 41 Proposal for City of La Quinta ��V W 3 of 24 On -Call Materials Testing Services Ralph Williams Senior Material Testing Technician Mr. Williams has been a soil testing technician since 2006. As a senior technician, he performs on-site documentation of earthwork and fill compaction achieved during grading operations, verification of stations and elevations, trench backfill, concrete testing - inspection and asphalt concrete pavement testing. His experience includes materials testing for hospitals, schools, street rehabilitation and other capital improvement projects (CIP). Recent Prosect Experience: • Hemet Unified School District, Ramona Elementary School Modernization • Lake Hemet Municipal Water District, Caroline Avenue Waterline • San Jacinto Unified School District, District Office Modular • SJ t UfdSh IDttF H E tC t IFE Certifications: AGI No_ 4161483 - AGI Concrete Field ICC No_ 8455681 - ICC Soils Caltrans - Concrete Field Nuclear Gauge Safety and Training Haz mat Coachella Val ley Dust Control Education: Di ploma - an acro o niie c oo is ric , ami y ngagemen en er • San Jacinto Unified School District, Parkhill Parking Lot Improvement • Soboba Band of Luiseno Indians, Sovovatum Village Floyd Collins Senior Materials Testing Technician Mr. Collins has over 35 years of experience as a staff geologist, special inspector and senior materials testing technician. Mr. Collins performs on-site documentation of overexcavations and fill compaction during grading operations. His experience includes numerous city and county projects, school projects, residential, industrial and commercial grading projects, and municipal projects including reservoirs and pipelines. Mr. Collins also performs reinforced concrete and masonry inspection. Recent Project Experience: • City of Menifee, Peacock Neighborhood Pavement Evaluation and Rehabilitation Projects • City of Perris, Citywide Pavement Evaluation and Rehabilitation • City of Rancho Mirage, Gerald Ford and Bob Hope Drives Intersection Improvement • City of San Jacinto, Citywide Pavement Evaluation and Rehabilitation f:arfifirafinnc- ACI No. 00963356 - ACI Concrete Field - ACI Masonry Laboratory - ACI Masonry Field - ACI Aggregate Base Testing ICC No. 843062 ICC Reinforced Concrete ICC Masonry Caltrans - Concrete Field - Density Testing Confined Space Training Nuclear Gauge Safety and Training Education: BS — Geology, San Diego University • City of San Jacinto, Esplanade Avenue Street Improvements • Riverside County Economic Development Agency, John J. Benoit Detention Center Proposal for City of La Quinta ��V W 4 of 24 On -Call Materials Testing Services Scott Ferguson Senior Materials Testing Technician Mr. Ferguson has been a materials testing and laboratory testing technician since 2006. As a senior materials testing technician Mr. Ferguson performs on-site documentation of fill compaction achieved during grading operations. His soil testing experience includes mass grading, sewer, storm drain and utility trenches, street improvements and airport projects. He has provided extensive testing for Southern California Edison and San Diego Gas & Electric transmission lines. IFE Certifications: ACI No. 02177900 - ACI Concrete Field Caltrans - Concrete Field Nuclear Gauge Safety and Training Education: Diploma — West Valley High School, Hemet, CA Representative Project Experience: • KOAR Apartment Complex, Palm Springs • San Jacinto Valley Academy, San Jacinto • Southern California Edison, Underground Transmission Lines throughout Southern California • San Diego Gas and Electric, Cleveland National Forest • City of Murietta, Various Street Improvements • City of San Jacinto 2021 Street Rehabilitation Project • City of Menifee, Peacock Neighborhood Pavement Rehabilitation • Riverside County Flood Control, Palm Springs MDP Line 4 Ernesto Valenzuela Senior Soil Technician and ACI Field Technician Mr. Valenzuela has been a material testing technician since 2010. As a senior technician, he performs on-site documentation of earthwork and fill compaction achieved during grading operations. He has worked on numerous city improvement projects including street rehabilitation with sidewalks and ADA ramps and water and sewer pipeline backfill projects. He is currently our senior on-site technician during construction of the HUSD Ramona Elementary School modernization project in Hemet. Recent Prosect Experience: • Camp Ronald McDonald, Facility Upgrade, Mountain Center Project • Hemet Unified School District, Little Lake Elementary School Modernization • Eastern Municipal Water District, SJVRWCF Project • Riverside County Facilities Fire Station No. 77 • Deep Canyon Tennis Club Street Rehabilitation Project Certifications: ACI No. 01648009 - ACI Concrete Field ICC No. 8061213 - ICC Soils Caltrans - Concrete Field Nuclear Gauge Safety and Training Hazmat Certification Coachella Valley Dust Control Education: Diploma — Bell High School Bell, California Proposal for City of La Quinta ��V W 5 of 24 On -Call Materials Testing Services (AMORVIA JEREMIAH UPSON Senior Materials Testing Technician Mr. Upson has been a soils and materials testing technician with IFE since 2005. Jeremiah serves as our lead materials testing technician on large-scale public works and educational construction projects. He is proficient at plan reading and project oversight. Currently he is the senior soil technician for the EMWD San Jacinto Valley RWCF. Jeremiah was also our senior soil technician for the EMWD Temecula Valley RWRF project, the EMWD I-215 and Placentia Avenue Interchange project and the HUSD Winchester Elementary School Modernization project. Recent Project Experience: IFE Certifications: ACI No. 1271639 - ACI Concrete Field Caltrans - Concrete Field Nuclear Gauge Safety and Training Education: Diploma — San Jacinto High School, San Jacinto, CA • City of Hemet, Acacia Avenue Reconstruction, Hemet • City of Lake Elsinore, Rosetta Canyon Park, Lake Elsinore • City of San Jacinto, Esplanade Avenue Reconstruction, San Jacinto • City of San Jacinto, Hewitt Street Widening, San Jacinto • Eastern Municipal Water District, 1-215 and Placentia Avenue Interchange Sewer and Water Lines Relocation, Perris • Eastern Municipal Water District TVRWRF 23 MGD Expansion Project, Temecula • Eastern Municipal Water District, SJVRWCF Project • Hemet USD, Winchester Elementary Campus Modernization, Winchester Project Understandin_g We understand that the City of La Quinta desires to retain the services of a qualified firm to provide on-call materials testing services for a three-year contract term, from July 1, 2023 through June 30, 2026. The services may include, but are not limited to, the following intermittent observation and testing. Provide a qualified technician as necessary to conduct density tests on roadway sub -grade, aggregate base, asphaltic concrete, slope fill and trench backfill placement as required. The tests will be performed with a nuclear density gauge in accordance with ASTM D2922 or sand cone in accordance with ASTM D1556. Maximum density curves (ASTM D1557) will be performed on representative material types, including Marshall density tests on asphaltic concrete. Provide an ACI -certified technician as necessary to make sets of concrete cylinders as needed and perform slump tests for the curb, gutter, concrete dip sections, foundations, and other minor concrete. Provide a Caltrans certified technician and laboratory to perform tests on federally funded projects. Proposal for City of La Quinta ��V W 6 of 24 On -Call Materials Testing Services (AMORVIA FE Perform concrete compression strength tests in accordance with ASTM C39. a n Perform extraction / gradation tests in accordance with ASTM D2172 / C136 on asphaltic o concrete. ,a. �O Perform R -value testing of street subgrade and recommend a pavement section based on a the results of the test. n a M Report any non-compliance results of materials to the City within 24 hours ours from the time �' of sampling. a a Provide geotechnical reports and recommendations for soil samples, pavement cores, n, percolation tests and pavement recommendations. �o Project Approach At IFE, our focus is on our clients and their projects. Our mission is to provide comprehensive, practical and cost-effective material testing services as an integral part of the project construction management team. Executing this mission requires that we collaborate with, and support, all other design and construction professionals involved with the project. Our pro -active communication and focus on our clients and their projects has been the key to our firm's long- term success. Based on our understanding of the RFP, and our experience with similar on-call agreements, we anticipate that our scope of service will include. Project Plan and Specification Review: Our project manager will initially review project plans and specifications to evaluate conformance with the project geotechnical report and other requirements. This information will be used to develop a task -specific cost proposal and to identify specific material testing technicians that are best -suited for project assignment. On -Call Soil and Asphalt Concrete Testing: Qualified Caltrans certified technicains will perform density tests with a nuclear densometer (ASTM D6938) or sand cone (ASTM D1556) on roadway sub -grade, aggregate base, asphalt concrete, slope fill and trench backfill placement as required. Concrete Sampling and Testing: ACI -certified technicians will perform slump testing and temperature testing, and fabricate sets of conrete cylinders for curb, gutter, dip section, foundations and other minor concrete placement. Laboratory Testing Services: Representative soil and aggregate base samples will be obtained for laboratory maximum density testing in accordance with ASTM D1557. Proposal for City of La Quinta ��V W 7 of 24 On -Call Materials Testing Services (AMORVIA IFE 03 R -value testing will be performed in accordance with ASTM D2844 on street subgrade soil 0 samples, for the purpose of developing structural pavement section design recommdations. m� 0 Asphalt concrete samples will be obtained and tested for maximum density in accordance a with Caltrans Hveem methods (CTM 304, 308) or Marshall methods (ASTM D6926). Asphalt q concrete extraction and gradation testing will be performed in accordance with ASTM D2172 /C 136. n a M Concrete compressive strength testing will be performed in accordance with ASTM C39. 3 a Any non-compliance test results will be reported to the City immediately upon completion of a the test. k �o Proiect Management =' n �o To ensure client satisfaction, IFE is committed to providing services that exceed our clients' expectations. Following are key components of our project management. Technical Oversight. Personal, continued oversight by a principal engineer during project construction is a key component of our project approach. Allen will attend project meetings and provide consultation to resolve technical issues throughout project construction. Our attendance at these meetings will provide an opportunity to discuss technical issues, project schedule, cost control and other factors related to the project. Project Collaboration. IFE understands the importance of working collaboratively with other members of the project design team. We will coordinate with the City, the project construction manager and design team to ensure that we have properly interpreted the intent of the project plans and specifications and to provide prompt notification of any failed inspections or tests. We will also work with the City and construction manager to resolve materials testing and inspections issues/ conflicts as they arise and to develop alternative recommendations when necessary. Project Communication and Test Reporting. Effective, project communication is critical to ensure that the contractor and City construction management team receive inspection reports and test results in a timely manner. Daily inspection reports are typewritten and forwarded to the County inspector and other designated recipients upon completion. Laboratory test results are reviewed and stamped by a licensed engineer and immediately forwarded to the County. Project Management and Controls. IFE has an established track record of completing construction testing and inspection projects on time and within budget. We use QuickBooks accounting software, coupled with Excel spreadsheet -based budget/schedule tracking tools, to monitor the budget and schedule of all projects. Project manager meetings are held weekly, more often if necessary, to load -level staff Proposal for City of La Quinta ��V W 8 of 24 On -Call Materials Testing Services (AMORVIA E and equipment requirements among multiple projects. Clients are notified immediately when circumstances arise that may require out -of -scope services. Status reports can also be included with monthly invoices that detail services completed in the invoice period and services completed to date. Project Schedule The following Gantt Chart was prepared without and project plans or specifications. It is based on a typical street rehabilitation project. IFE will provide experienced, qualified materials testing technicians to provide observation, sampling and testing during project construction. Laboratory testing of soil, concrete, aggregate base and asphalt concrete will be performed in accordance with Greenbook requirements and the project specifications. IFE Schedule for Typical Street Rehabilitation Project Including Accesibilty Ramps and Sidewalks Item Time/Days July. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Project Plan & Specification Review Pre- Job Meeting Sample & Test for ASTM D1557 Subgrade/Base Compaction Testing Roadway & Sidewalk/Ramp Subgrade Compaction Testing Roadway & Sidewalk/Ramp Base -Finish Grade ACI Testing for Sidewalk/Ramp ,asphalt Concrete Pavement Final Review and Report XA Qwkra Proposal for City of La Quinta 9 of 24 On -Call Materials Testing Services �(MIJI-K\I.i IFE 2. REFERENCES OF CALIFORNIA GOVERNMENT AGENCIES City of San Jacinto 2021 Street Improvement Project Villines Avenue Before Client/Reference City of San Jacinto Stuart McKibbin, City Engineer 166 E. Main, Suite 2 San Jacinto, CA 92583 (951)943-6504 smckibbin@interwestgrp.com Relevance to this Contract • Pavement evaluation • Exploratory coring and drilling • Compaction testing • Batch plant inspection • Laboratory testing Start Date /Completion Date 5/2021-3/2022 Key Staff Allen Evans, GE, Project Manager Daniel Lind, CEG, Principal Geologist Floyd Collins, Staff Geologist Jeremiah Upson, Senior Materials Testing Technician Jose Jimenez, Batch Plant Sampling and Testing Villines Avenue After Project Summary The 2021 Citywide Street Improvement project consists of the rehabilitation and reconstruction of over 30,000 ft. of pavement on 15 streets throughout the city. The rehabilitation methods include grind and overlay, complete reconstruction and cold -in- place recycling. IFE Role IFE performed the pavement evaluation for design of the project improvements. Our services included documentation of the existing pavement conditions, exploratory coring and drilling, laboratory testing, and preparation of report with alternative recommendations for pavement rehabilitation. Alternative recommendations were presented for full depth reclamation, grind and overlay and cold in-place recycling. During construction IFE provided: • geotechnical consultation • compaction testing of base and asphalt concrete pavement • batch plant inspection and • laboratory testing. Proposal for City of La Quinta ��V W 10 of 24 On -Call Materials Testing Services (AMORVIA IFE City of Menifee Peacock Neighborhood Resurfacing Project Before After Client/Reference City of Menifee Project Summary Diego Guillen The Peacock Neighborhood occupies approximately 36 acres with 10 paved streets and 29844 Haun Road cul-de-sacs. The project included rehabilitation of existing streets with grind and overlay, Menifee, CA 92586 and complete reconstruction in some areas. ADA curb ramps were improved to current (951) 723-3755 standards. dguillen@cityofinenifee.us Relevance to this Contract IFE Role • Pavement evaluation IFE performed a pavement investigation for the street rehabilitation, including • Exploratory coring and drilling documentation of the existing pavement conditions, types and extent of pavement • Compaction testing distress, summary of existing pavement and aggregate base thickness, laboratory • Batch plant inspection testing, site plan with core locations and alternative recommendations for pavement • Laboratory testing rehabilitation. Pavement recommendations for each street included alternative methods for full depth reclamation, grind and overlay and cold in-place recycling. IFE is provided Start Date /Completion Date geotechnical consultation, compaction testing of base and asphalt concrete pavement, 5/2021-5/2022 batch plant inspection and laboratory testing during construction. Key Staff Allen Evans, GE, Project Manager Floyd Collins, Staff Geologist Jeremiah Upson, Senior Materials Testing Technician Jose Jimenez, Batch Plant Sampling and Testing Proposal for City of La Quinta ��V W 11 of 24 On -Call Materials Testing Services (AMORVIA IFE Eastern Municipal Water District 1-215 / Placentia Avenue IC New Sewer Line Connection Client/Reference Project Summary EMWD The sewer main extends along the westerly shoulder of the West Frontage Road of Mr. Eli Rodriguez Interstate 215 (1-215) from approximately 500 feet south of Placentia Avenue to the P.O. Box 8300 extension of Orange Avenue, then easterly below 1-215 to approximately 375 feet east of Perris, California 92570 (951) 300-3087 Orange Avenue. The total project length was approximately 2,800 feet and included jack and bore excavations below 1-215. Relevance to this Contract • Geologic review and research IFE Role • Engineering analysis • Recommendations for: • Exploratory Drilling • Soil corrosivity study • Laboratory testing • Compaction testing and observation during construction Start Date /Completion Date 12/2018 to 9/2021 Key Staff Allen D. Evans, P.E., Project Manager Daniel R. Lind, CEG, Principal Geologist Floyd Collins, Staff Geologist Jose Jimenez, Laboratory Supervisor Jeremiah Upson, Materials Testing Technician Inland Foundation Engineering Inc. performed the project geotechnical investigation that included 6 exploratory borings ranging in depth from approximately 31.5 to 41.5 feet. Our report included project design and construction recommendations. This included recommendations for jack and bore construction, excavation & shoring and pipe bedding material along with the field and laboratory data. During construction our services included providing field compaction testing using Caltrans guidelines and laboratory materials testing, including testing of backfill material and Class 2 aggregate base. Proposal for City of La Quinta ��V W 12 of 24 On -Call Materials Testing Services (AMORVIA IFE City of Lake Elsinore La Laguna RV Park and Boat Launch and Rosetta rovements, Phase II Client/Reference City of Lake Elsinore Gus Papagolos 130 South Main Street Lake Elsinore, CA 92530 (951) 674-3125 gpapagolos@verizon.net Relevance to this Contract • Geotechnical Engineering • Infiltration Testing • Geotechnical Project Management • Compaction Testing During Grading • Compaction Testing Subgrade • Compaction Testing Finish Grade • Compaction Testing Utility Trenches • Compaction Testing Asphalt Concrete • ACI Field and Lab Testing • Materials Testing Start Date /Completion Date 05/2015 — 05/2019 Key Staff Allen D. Evans, P.E., Project Manager Daniel R. Lind, P.G., Principal Geologist William Owens, Supervisory Technician Dustin Race, Senior Materials Testing Technician Jeremiah Upson, Senior Materials Testing Technician Inland Foundation Engineering Inc. served as the geotechnical engineer and provided materials testing for the City of Lake Elsinore La Laguna RV Park and Boat Launch and Rosetta Canyon Sports Park Improvements, Phase II Project Summary La Laguna RV Park originated in 1963 as a California state park and campground. In 1993 the site was deeded to the city and throughout the years multiple improvements have been performed by the City and Elsinore Valley Municipal Water District. The 22 - acre park just completed major upgrades which included 3 new restrooms, a club house, snack/concession stand, check-in building and new paved interior streets. Rosetta Canyon Sports Park, Phase 11, was a major upgrade project with 5 color coded baseball fields and 1 full size football/soccer field, all complete with synthetic turf, jogging paths, a two-story concession stand with a 360 degree observation deck, relocation/improvement for the dog play area and community garden and 320 new onsite parking areas. IFE Role Inland Foundation Engineering services included geotechnical investigations and infiltration testing for the design phases of both projects. Key issues addressed by the geotechnical investigations included artificial fill and the presence of expansive soils. Recommendations for mitigation included removing and recompacting the unsuitable soil and expansive soil design criteria was presented. IFE performed geotechnical materials testing services during construction to verify compliance with the geotechnical reports. Proposal for City of La Quinta ��V W 13 of 24 On -Call Materials Testing Services IFE City of Indian Wells Deep Canyon Channel Pedestrian and Bicycle Bridge Client/Reference Project Summary City of Indian Wells Ken A Seumalo 44-950 Eldorado Drive Indian Wells, CA (760)766-0237 kseumalo@indianwells.com Relevance to this Contract • Geotechnical Investigation • Slope Stability Evaluation • Data Review • Report Preparation and • Recommendations for Slope Reconstruction and Rip Rap Placement Start Date /Completion Date 7/10/2016 — 8/10/2016 Key Staff Allen D. Evans, P.E., Principal Engineer Daniel R. Lind, C.G.E. Principal Geologist Hector Marquez, Staff Engineer The City requested Inland Foundation Engineering, Inc. provide geotechnical engineering recommendations for slope reconstruction and armoring with grouted rip rap. To mitigate significant erosion of the existing west slope of the Deep Canyon Channel between the bicycle and pedestrian bridge and the Highway 111 bridge to the north. ICED ole Our exploration program consisted of two exploratory hand auger borings, drilled to depths of 10 feet below the existing ground surface (bgs). Laboratory testing of representative samples included unit weight, moisture content, sieve analysis, plasticity index, maximum density, and direct shear strength. On the basis of our field exploration, laboratory testing and engineering analysis conclusions and recommendations were developed for slope stability, site clearing and grubbing, slope reconstruction, rip rap placement and construction, surface and subsurface drainage and general site grading. Proposal for City of La Quinta ��V W 14 of 24 On -Call Materials Testing Services (AMORVIA IFE 3. COMPLETE PRICING LIST/FEE SCHEDULE The following table presents our proposed Schedule of Fees for On -Call Materials Testing for the contract term of July 1, 2023 through June 30, 2026. Our firm offers other services that are not listed below. Please contact our office for a complete listing of services offered and rates. PROFESSIONAL CHARGES Principal Engineer / Geologist Project Engineer / Geologist Staff Engineer / Geologist — Prevailing Wage* Staff Engineer / Geologist — Non -prevailing Wage Construction Inspector/ Materials Testing Technician — Prevailing Wage* Construction Inspector/ Materials Testing Technician — Non -Prevailing Wage Field Technician — Prevailing Wage* Field Technician — Non -prevailing Wage Laboratory Technician Drafting Clerical LABORATORY AND EQUIPMENT CHARGES Asphalt Concrete Bitumen Content (ASTM D6307, CTM 382) Asphalt Concrete Hveem Maximum Density (CTM 304, 308) Compressive Strength, Concrete (ASTM C39) (samples cured and/or tested) Compressive Strength, Masonry/Grout (ASTM C39) Consolidation (ASTM D2435) Liquid Limit, Plastic Limit and Plasticity Index (ASTM D4318) Optimum Moisture/Maximum Density (ASTM D1557, CTM 216) R -value (ASTM D2844, CTM 301) Sand Equivalent (ASTM D2419, CTM 217) Sieve Analysis — Soil/Aggregate (ASTM D6913/C136, CTM 202) Field Vehicle with Testing Equipment Outside Services (Drilling, Backhoe, Coring, Geophysical Services, etc.) RATES $180.00/hr $150.00/hr $146.00/hr $110.00/hr $146.00/hr $85.00/hr $146.00/hr. $85.00/hr. $90.00/hr. $85.00/hr. $85.00/hr. RATES $125.00 ea. $180.00 ea. $25.00 ea. $35.00 ea. $250.00 ea. $150.00 ea. $180.00 ea. $250.00 ea. $80.00 ea. $145.00 ea. $20.00/hr. Cost plus 20% *Inland Foundation Engineering, Inc. adheres to Department of Industrial Relations (DIR) prevailing wage requirements for public works projects. We propose to perform the services on a time charge basis, as the actual services performed will be dependent on the construction methods and progress. Billing will be performed on actual accrued costs. We will work closely with the City of La Quinta to control project costs. Proposal for City of La Quinta ��V W 15 of 24 On -Call Materials Testing Services (AMORVIA Routine construction, inspection and testing services performed by IFE include: • Soil nuclear density testing (ASTM D6938) • Concrete inspection and test cylinder fabrication • Batch plant inspection (concrete and asphalt concrete) • Structural steel welding inspection (shop and field) • Reinforced masonry inspection • Expansion and epoxy anchors, inspection and pull testing • Anchor bolt inspection and pull testing If the City requires any of these services for future CIP projects we will review the request for proposal, project plans (if available) and any pertinent information to prepare a formal not to exceed cost for services. Proposal for City of La Quinta ��V W 16 of 24 On -Call Materials Testing Services IFE 4. LIST OF COMPLEMENTARY SERVICES OFFERED BY IFE rt O IFE offers a wide range of geotechnical and materials engineering services. Our experience and capabilities include but not limited to: �o 3 • Cone penetration testing (CPT) _ • Earthquake fault studies rt a • Evaluation of earth -retaining structures and excavations • Foundation engineering ^, • Groundwater investigation and control • Infiltration testing • Liquefaction and seismic settlement studies M • Onsite wastewater treatment system design • Pavement evaluation and design • Rippability studies • Seismic refraction surveys M • Slope stability analysis • Subsurface exploration Routine construction, inspection and testing services performed by IFE include: • Soil nuclear density testing (ASTM D6938) • Concrete inspection and test cylinder fabrication • Batch plant inspection (concrete and asphalt concrete) • Structural steel welding inspection (shop and field) • Reinforced masonry inspection • Expansion and epoxy anchors, inspection and pull testing • Anchor bolt inspection and pull testing If the City requires any of these services for future CIP projects we will review the request for proposal, project plans (if available) and any pertinent information to prepare a formal not to exceed cost for services. Proposal for City of La Quinta ��V W 16 of 24 On -Call Materials Testing Services IFE 5. STAFFING AND PROJECT ORGANIZATION For City of La Quinta projects, our field personnel will be dispatched from our Palm Desert office, located within eight miles of the La Quinta Civic Center. The IFE team has an established track record of completing materials testing projects within budget and to the satisfaction of our clients. We will provide the City of La Quinta with the same level of professionalism and attention to project detail that our clients have come to expect. Following is a list of our key staff and their areas of technical expertise. Allen Evans will be the project manager and primary point of contact for this contract. Allen is a California -registered civil and geotechnical engineer with more than 40 years of consulting geotechnical engineering and public works construction experience. He has prepared geotechnical engineering reports and managed construction inspection contracts and materials testing programs for hundreds of municipal projects throughout southern California. Allen is a principal of Inland Foundation Engineering and will ensure that company personnel and other resources are dedicated as necessary to complete the City of La Quinta projects on time, within budget and to the satisfaction of the City. All of our materials testing technicians have a minimum of 10 years experience and are qualified to perform the required testing services needed for the City's capital improvement projects. Following are materials testing technicians to be assigned to City of La Quinta project, their years of experience and most recent project. Ralph Williams - 15 years of experience. Lead materials testing technician San Jacinto Unified School District, Park Hill Elementary School Parking Lot Rehabilitation project. Ernesto Valenzuela — 13 years of experience. Senior materials testing technician for City of Perris, Citywide Pedestrian Street Improvement Project. Scott Ferguson - 20 years of experience. Senior materials testing technician on the Palm Springs MDP Line 41 for Riverside County Flood Control and Water Conservation District. Jeremiah Upson — 20 years of experience. Senior materials testing technician on the San Jacinto Valley Raw Water Conveyance Facility project for Eastern Municipal Water District. Floyd Collins — 35 years of experience. Lead inspector and materials testing technician on the Portello Basin/San Jacinto River Bed Debris Removal for Riverside County Flood Control and Water Conservation District. Eileen Schnalzer will provide accounting and dispatching support. Eileen has extensive experience with administration of materials testing agreements for public agencies and is especially adept with certified payroll reporting requirements at the Department of Industrial Relations. Proposal for City of La Quinta W 17 of 24 On -Call Materials Testing Services (AMORVIA Following is our proposed company "Organizational Chart" that shows the basic reporting relationships between the IFE team and the City of La Quinta. LA E4 RNIi IFE Allen Evans, P.E. Project Manager Public Works Department CITY INSPECTOR IFE Materials Testinq Technicians Eileen Schnalzer Ralph Williams Caltrans Qualified Administration Ernesto Valenzuela Laboratory Clerical, Dispatch, CPR Scott Ferguson Jeremiah Upson Floyd Collins Proposal for City of La Quinta ��V W 18 of 24 On -Call Materials Testing Services FE 6. SUBCONTRACTING SERVICES = 0 0 Inland Foundation Engineering, Inc. is not expecting to need subcontractors for this contract, a however, we maintain connections with a number of specialty sub -consultants and subcontractors. We have worked with all of these companies for more than 20 years and are m confident in their ability to service this on-call contract. Following are some of the subconsultants and subcontractors that we use routinely. n �o Terra Contact:ct: Donn Sc Schwartzkopf 2R Drilling, Inc. PO Box 1090 Loma Linda, CA 92354 (909) 796-4667 Geophysical Survey Services 3968 Chino Avenue (951) 325-2208 2712 E. La Cadena Contact: Brian Serl Chino, CA 91710 Exploratory Drilling Services Riverside, CA 92507 (909) 465-1765 Co Contact: Angela Beyerle 526 West Avenue L Cal-Pac Drilling Contact: Andy Van de Poppe Calimesa, CA 92320 Exploratory Drilling Services (909) 795-7500 Scorpion Backhoe P.O. Box 5011 Hemet, CA 92544 Near Surface Sampling and Contact: James Scott (951) 325-2208 2712 E. La Cadena Testing Traffic Management Riverside, CA 92507 Traffic Control and Equipment Co Contact: Angela Beyerle (951) 750-1812 Proposal for City of La Quinta ��V W 19 of 24 On -Call Materials Testing Services — CALU-01MA IFE 0 7. DISCLOSURES 0 We have no litigation, mediation, or arbitration, regarding the performance of any services with which we have been involved in the past five years. No claims or disciplinary action have been `^ taken against the Company or any key personnel within the past five years. Inland Foundation Engineering, Inc. has no negative history. Proposal for City of La Quinta ��V W 20 of 24 On -Call Materials Testing Services 8. Acknowledgement of Insurance Requirements IFE ATTACHMENT 2 INSURANCE REQUIREMENTS ACKNOWLEDGEMENT Must be executed by proposer and submitted with the proposal I. Allen D. Evans, PE (name) hereby acknowledge and confirm that Inland Foundation Engineering. Inc. (name of company) has reviewed the City's indemnification and minimum insurance requirements as listed in Exhibits E and F of the City's Professional Services Agreement (Attachment 1)-, and declare that insurance certificates and endorsements verifying compliance will be provided if an agreement is awarded_ I am Principal of Inland Foundation Engineering,lnt . (Tine} (Company) Following is a copy of our certificate of insurance. Proposal for City of La Quinta 21 of 24 On -Call Materials Testing Services CALWOA.N3.7 - Commercial General Liability (at least as broad as ISG CG 0001) $1 000,000 (per occurrence): $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Noncontributory Commercial Auto LiabiRy (at least as broad as ISO CA 0001 ) $1,000,000 (per accident) Personal Auto Declaration Page if applicable Errors and Omissions Liability $ 1,000,000 (per claim and aggregate) Worker's Compensation (per statutory requirements) Must include the following endorsements: Worker's Compensation Waiver of Subrogation Worker's Compensation Declaration of Sole Proprietor if applicable Following is a copy of our certificate of insurance. Proposal for City of La Quinta 21 of 24 On -Call Materials Testing Services CALWOA.N3.7 - IFE ,4vRn" CERTIFICATE OF LIABILITY INSURANCE 3 `r�023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURERIS). AUTHORIZED REPRESENTATIVE OR PRODUCER. AND THE CERTIFICATE HOLDER. IMPORTANT: It the certificate holder is an ADDITIONAL INSURED, the policylies) must have ADDITIONAL INSURED provisions or be endorsed_ If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy. certain policies may require an endorsement. A statement on this certificate does not confer richts to the certificate holder in lieu of such endorsementfsl. P"MUCER I 'NMr' The Certifcate Team Assured Partners Design Professionals insurance Seroces. LLC PNOwE 3(187 Mt. Diablo Blvd Suite 230 Lafayette CA 94548 E' CertsDes nPro A FMAUFWR A. Aarniral Insurance 110trit o Inland Foundation Engineering, Inc. PO Box 837 San Jacimo CA 92581 COVERAGES CERTIFICATE NUMBEFt:26724142 REVISION NUMBER: T41C IS TO CERTIFY THAT THE POLICIES OF INSURANCE LIZTED BELOW FUIVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION Of ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSJED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLhCIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CWM,^,Im _ TYPE OF 04VJP MICEc weR PAY rnr11BFA POLICY EFF POLICY EXPLTR LARri 0 X C011wEROALOENStALLtAHKJ Y 680BH73I 45 362033 3f&3324 FAc,oco-mENGE 11,009.000 EDoCwv aRE4A6E6,Eaa¢v�enaei iIOOOOQO WD EXF air beryl a 19,0012 X Goltra[yai ao -ERSCNAL 4 ADL INJURY 11.000.000 r,c,,aee GENL AGGREGATE uMT APPLE:, PEP. GENERALACGREGATE 52.909,D90 ­­Efl Ifl .A; PRCOUCTB-COWOP AGO 112.000.000 1 JTHOZ - AUTCOIDINLELkABILM BA'ERDID56A 3''_ 102: ;AL61NE7SFNGLELJArr i 1.000.000 .y(Y "'To BODILY WURY •YerPesrn) Il DANED SJ!EDULC wros C NL" Ar•ss IiCC?(X I14 e001LT RlRY mu17'JR• i ;Z7 E�1'Y DAIAAOE 1 aRED X NOM4AfiED .NSTOS LYiL• Ar" ChLY 5 USBf>EILA UAR D:.GF EAC> OG�:WIENCE i XICRECA-E i "CES.t L" CL-,M-1AME DED rtc"E>NTION e WORPER11 CO11MEM11ATIOw UBCK&Ud=EA 3i°.2023 38,292= X GTS ER AND 911PLOYERIr LIaRE.nY M�PRCFrOETI�LPAltTf6RE}ECllT1'dE ❑ OFFiCERI.@,BEFEEYG' � ^�D' N � G ILL EACH ACCIDENT 11,000.000 EL. DISEASE -EA BAPLONEE 11.000.000 f11�WiQY Yi Wo r,ts.r1<a mdw E.L D*EAGE-POLICYLIrMT 9 1090 DEaCR1PTION OF OPEFIA71C be41r +� �mnecewwLw3tr 5�-_0001MM639 3,E.2023 1,5,2102A Prroa- SZODC'00C AcffeWe-mr 52.900,000 OE/CRrIION OF OPEFtATIOw11 - LOCATIONd . VENCLES iACML 191. AddrWf l P -M UhKW1.. nvl be alldwtl 1r cPa t raaureel For Proposal Purpose Only CERTIFICATE HOLDER CANCELLATION 30 Day Notice of Cancellaton %r Proposal purpose Only ACORD 25(2016103) SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF. NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHOWED R8W2ENTATAE 01988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Proposal for City of La Quinta 22 Of 24 On -Call Materials Testing Services C LWOA.NIA - 9. Non -Collusion affidavit NON -COLLUSION AFFIDAVIT FORK! Must be executed by proposer and submitted with live proposal Allen D- Evans. P_E- IFE Z 0 (name) hereby declare as follows' I am Principal of Inland Foundation Engineering, I. c - (Title) (Company) the party making the foregoing proposal, that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation-, that the proposal is genuine and not collusive or sham-, that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with arty proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing: that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profrt, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, proposal deposdory, or to any member or agent thereof to effectuate a collusive or sham proposal. I der -tare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Proposer SignatureJ22L�_��_ - Proposer Name- Aller( D- Evans, P -E_ Proposer Title- Principal Company Name: Inland Foundation Engineering, Inc- Address- 77-622 Country Club Drive. Suite a. Palm Desert, CA 92211 Proposal for City of La Quinta On -Call Materials Testing Services r1 4. QUiKta fi N ATTACHMENT 3 � s3 K (name) hereby declare as follows' I am Principal of Inland Foundation Engineering, I. c - (Title) (Company) the party making the foregoing proposal, that the proposal is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation-, that the proposal is genuine and not collusive or sham-, that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal, and has not directly or indirectly colluded, conspired, connived, or agreed with arty proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing: that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profrt, or cost element of the proposal price, or of that of any other proposer, or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that all statements contained in the proposal are true; and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, or the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization, proposal deposdory, or to any member or agent thereof to effectuate a collusive or sham proposal. I der -tare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Proposer SignatureJ22L�_��_ - Proposer Name- Aller( D- Evans, P -E_ Proposer Title- Principal Company Name: Inland Foundation Engineering, Inc- Address- 77-622 Country Club Drive. Suite a. Palm Desert, CA 92211 Proposal for City of La Quinta On -Call Materials Testing Services 14. Acknowledgement of Addenda IFE QUav -- i n IhIRNI I ATTACHMENT 4 ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA Most be executed by proposer and submitted with the proposal. If no addenda has been issued. mark `!WA'- under Addendum No. indicating Not Applicable and sign ADDENDUM NO. SIGNATURE INDICATING RECEIPT 1 May 17, 2023 COA Proposal for City of La Quinta On -Call Materials Testing Services (ALHO NIA