Loading...
Minagar and Associates, Inc.Request for Proposals to Provide On -Call Traffic Engineering Services City of La Quints, CA Minagar & Associates, Inc's Recommended Improvements for the City of Big Bear Lake's Local Roadway Safety Plan - bile -:._... W i 91p Bex 6Nd a LaYsriaw d p�M"71J �Y �.' ."....-A.:: a7i7t Romrrerdod Improrc ren Minagar & Associates, Inc. Speed Zone Analysis Sample Minagar & Associates, Inc. Signal Summary for the City of Needles' E&TS and Striping Plans City of La Quinta Street Classification Map ��:2:747e1:7497747: CITY OF LA QUINTA Public Works Department 78495 Calle Tampico CITY HALL La }. Quinta, CA 92253 OIF PREPARED BY: MINAGAR $ ASSOCIATES, INC. Traffic/Civil/Electrical Engineering — ITS — Transportation Planning — CEM 23282 Mill Creek Drive, Suite 120 Laguna Hills, CA 92653 Tel: (949) 707-1199 ext. 2# SpYearsotEzcel�nco May 23, 2023 I REQUEST FOR PROPOSALS (RFP) FOR ON-CALL TRAFFIC ENGINEERING SERVICES FOR THE CITY OF LA QUINTA PUBLIC WORKS DEPARTMENT PRESENTED TO: PREPARED BY: 0 MINAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering - ITS - Transportation Planning - CEM 23282 Mill Creek Drive, Suite 120 Laguna Hills, CA 92653 Tel: (949) 707-1199 MAY 23, 2023 CITY OF LA QUINTA Public Works Department 78495 Calle Tampico La Quinta, CA 92253 PREPARED BY: 0 MINAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering - ITS - Transportation Planning - CEM 23282 Mill Creek Drive, Suite 120 Laguna Hills, CA 92653 Tel: (949) 707-1199 MAY 23, 2023 TABLE OF CONTENTS Section1: Cover Letter............................................................................................................ 1 Section 2: Firm Background, Qualifications, and Experience .............................................. 4 Project Understanding and Approach................................................................................ 6 Scopeof Work...................................................................................................................... 7 ProjectSchedule.................................................................................................................18 Section 3: References of California Government Agencies.................................................18 Section 4: Complete Pricing List/Fee Schedule....................................................................30 Section 5: Staffing and Project Organization........................................................................31 Section 6: Subcontracting Services......................................................................................32 Section7: Disclosures............................................................................................................32 Section 8: Acknowledgement of Insurance Requirements..................................................32 Section 9: Non -Collusion Affidavit........................................................................................32 Section 10: Acknowledgement of Addenda..........................................................................33 M I NAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering —ITS —Transportation Planning & CEM Section 1: Cover Letter May 23, 2023 Ms. Julie Mignogna Management Analyst City of La Quinta Public Works Department 78495 Calle Tampico La Quinta, CA 92253 Re: Request for Proposals to Provide On -Call Traffic Engineering Services in the City of La Quinta, CA Dear Ms. Mignogna, On behalf of the Minagar & Associates, Inc. team, I would like to present to you our proposal for providing On -Call Traffic Engineering Services for the City of La Quinta. Minagar & Associates, Inc. is a Southern California firm located in Laguna Hills, Orange County, CA with national experience and international exposure. The following statement of qualifications demonstrates why Minagar & Associates, Inc. is so uniquely qualified to perform these services for the City of La Quinta. Since 1993, our firm has completed 900+ projects in 17 states between New York & Hawaii, as well as projects for over 87 public a_pencies in California, including: ➢ 900+ Projects in 17 States between New York & Hawaii ➢ 120+ Traffic Signal Plans, Specifications & Estimates (PS&E) Projects ➢ 9 On-call City Traffic Engineer Contracts in California for the following public agencies: - City of Chino Hills - City of Colton - City of San Bernardino - City of Baldwin Park - City of EI Monte - City of Gardena - City of South Pasadena - City of Beaumont - City of Rancho Santa Margarita ➢ 350+ Traffic and Safety Studies & 50+ Parking Studies ➢ 400+ Traffic Control Plan (TCP), Traffic Signal & ITS Design Projects ➢ 1,600+ Signals' Retiming and Synchronization o 951 in Southern California, 550 in Northern California, 107 in other States ➢ 24 Citywide Engineering and Traffic Speed Surveys (E&TS) ➢ 42 ITS (Intelligent Transportation Systems) Design & Deployment Projects Additionally, over 85% of the company's projects are from repeat clients and client referrals. The figures on the next page show some of Minagar & Associates, Inc.'s private sector and public clients over the past 30 years. 23282 Mill Creek Drive, East Tower, Suite 120, Laguna Hills, CA 92653 1 Tel: (949) 707-1199, Email: minagarf(a�minagarinc.com, Web: www.minagarinc.com C N 0 D N 9T Mm LIMO 1 �. Representative Public Clients Tree w LTJL WATER COMPARY fAmf. ji tON.j o". FLORA OPA,Federal Highway Administration --WdNL Representative Private Sector Clients Tree ®�® RCVR!�:.E COLLEGE Ilk �wwwl . , rp, FRITEI' ® AID M Dm I All— I E FARCO I E "r IwTramrrid� TmVG(n"j)jm - "Tranm➢ BAY HAT" I 'UR -A-AG KB MINAGAR & ASSOCIATES, INC. 2g Traffic/Civil/Electrical Engineering —ITS —Transportation Planning & CEM Some other relevant agencies we have served in the last 30 years include the County of Riverside, Riverside County Transportation Commission (RCTC), Caltrans District 8, and the Cities of Beaumont, Perris, Riverside, and Coachella. RIVERSIDE COUNTY TRANSPORTATION: raMMlsslaN BEAUMONT As the Officer -in -Charge, I accept all the terms & conditions outlined in the RFP and hereby state that no exceptions are taken. We do not have any conflict of interest that would impact the ability to serve the City of La Quinta, and we do have all the necessary expertise and staff availabilities to provide the required services. I affirm that this proposal is valid up to ninety (90) days following the submittal deadline. Sincerely, MINAGAR & ASSOCIATES, INC. (a State of California SBE firm) Fred Minagar, MS, RCE, PE, FITE President/Senior Project Manager *�155�Vni�r4�llr ir..1 ,, pwSSOC� •,, ' SEMI-. - -.- ��irri!r' 23282 Mill Creek Drive, East Tower, Suite 120, Laguna Hills, CA 92653 Tel: (949) 707-1199, Email: minagarfjc�minagarinc.com, Web: www.minagarinc.com - REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Section 2: Firm Background, Qualifications, and Experience O 55 Me Minagar & Associates, Inc. has been providing engineering services for the past 30 years since its incorporation in 1993. Listed below are the corporate information: - Federal Taxpayer Identification Number: 33-0932477 - Federal System Vendor Number: 20377869 - Federal UEI Number: ZDF6N7LE3EN9 - Federal CAGE Number: 7RM72 - DUNS Number: 946106762 - Number of years planning construction, and design services: 30+ - Minagar & Associates, Inc. is an "S" Corporation which was founded in 1993 and was incorporated in the State of California on Oct. 30, 2000. - Minagar & Associates, Inc. is not a subsidiary of any parent company. Minagar & Associates, Inc. is home to ten (10) full-time employees, six (6) of which are proposed to provide services for the City of La Quinta. Resumes for the proposed key personnel are provided in the following pages. 4 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA M Statement of Qualifications Minagar & Associates, Inc. is a full-service traffic engineering, transportation planning, and ITS professional consulting firm based in the City of Laguna Hills in Southern California. Our firm is specialized in the areas of: Traffic Engineering Traffic Operations Transportation Planning Parking Studies Construction Engineering Management (CEM) Intelligent Transportation Systems (ITS) Planning, Design & Deployment Since 1993, Minagar has completed over 100 ITS and 900 traffic engineering projects in 11 counties and 87 cities in the State of California, as well as 17 other states from Hawaii to New York. Successful completed projects include the following: 40+ ITS Design/PS&E Projects 1600+ Synch ronized/Retimed Signals & Systems Evaluations 120+ Traffic Signal Operations & Engineering Studies 250+ Traffic Signal Designs 80+ Plans, Specification & Estimates (PS&E) 30+ Traffic Control Plans (TCP) Minagar & Associates, Inc. is also the recipient of several local, regional, state and national awards in traffic signal timing and ITS. Recent notable awards include: Orange County Engineering Council's (OCEC) 2019 Outstanding Engineering Services Award; ASCE's 2016 Outstanding Civil Engineer in the Private Sector in the State of California Award; ASCE Los Angeles Section's Outstanding Civil Engineer in the Private Sector Award; ASCE Orange County's 2016 Outstanding Civil Engineer in Private Sector Award; Orange County Engineering Council's (OCEC) 2016 Outstanding Engineering Services Award; Cal-EPA/California Air Resource Board's Cool California Climate Leader Award (2012) ASCE's Outstanding Private Sector Civil Engineering Project in Metropolitan Los Angeles ■ L.A. County Metro's Award of Excellence for three separate years ■ Caltrans' Excellence in Transportation Award in the State of California ■ ASCE's Outstanding Public/Private Sector Civil Engineering Project in Metropolitan L.A. APWA's Best Traffic Congestion Mitigation Project of the Year in Southern California PTI's Best Transportation Technology Solutions Award in the United States ITS -CA's Best Return on Investment Project Award in the State of California 5 MINAGAR & ASSOCIATES, INC. MINAGAR & ASSOCIATES, INC. Traffic Engineering - ITS - Civil/Electrical Engineering - Transportation Planning — CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE EDUCATION • Harvard University, John F. Kennedy School of Government, Executive Education, Leadership Decision Making Program Diploma • The George Washington University, Washington, D.C. ITS Program Diploma • Pepperdine University School of Law, Malibu, CA, Negotiation Skills & Advocacy • St. John's University, New York, NY, Management Diploma • New York University, New York, NY, Management Practice • University of Cincinnati, Cincinnati, OH, M.S. Transportation Engineering • Thesis and Research work with computer analysis at Transportation Research Center of Ohio • University of Louisiana, Lafayette, LA, B.S.C.E. Civil Engineering REGISTRATION • NATIONAL: ■ National Council of Examiners for Engineering & Surveying, No. 9112 • STATE: • California: Registered Civil Engineering. No. C053466 ■ New Jersey: Registered Professional Engineer. No. GE33090 ■ New York: Registered Professional Engineer. No. 066559 (Inactive) ■ Washington: Registered Professional Civil Engineer. No. 27994 (Inactive) EXPERIENCE • 37 Years of Professional Public & Private Consulting Experience • Engineered, Managed & Administered Over 150 ITS and 800 Traffic Engineering & Transportation Planning Projects in Over 17 States EXPERTISE • Traffic Engineering & Transportation Planning • Intelligent Transportation System (ITS); ATMS, ATIS, System Communications • EIR & EIS, TDM, TMP & TSM Special Studies • Civil & Electrical Engineering Areas of Traffic Engineering Projects AWARDS/HONORS • Re -Elected City Council Member, Laguna Niguel, CA, Nov 2018, Mayor & MPT 2017 & 2020 & 2021 • Elected to Planning Commission Chairman, City of Laguna Niguel, CA, 2012 & 2007 • Re-elected to Traffic & Transportation Commission Chairman, City of Laguna Niguel, CA, 2003 & 2002 • Winner of Caltrans' 2009 Award of Excellence in Transportation • Winner of the ASCE 2007 & 2009 Outstanding Public/Private Civil Engineering Projects • Winner of the Best Traffic Congestion Mitigation Award in Los County, 2005 • Recipient of the PTI's Best Transportation Technology Solutions for Synchronizing 121 Caltrans, County & City Traffic Signals Award in the U. S., 2003 • Awarded the United States Congressional Order of Merit, 2003 & 2006 • Recipient of the 2002 National Leadership Award • Recipient of the CAATS' 2002 Award of Excellence for Best California Return on Investment Project • Recipient of the Los Angeles County MTA's Teamwork Award for the Countywide Signal Systems Training Program, 2000 • Re -appointed to Traffic & Transportation Commissioner by the Mayor & Council of the City of Laguna Niguel, California for 1997-1999, 1999-2001, 2001-2003 • Publicity/Public Relations Chairman, 11t Annual Meeting of California Alliance for Advanced Transportation System (CAATS), Newport Beach, 1995 • Publicity/PR Chairman, 44th Annual Meeting of ITE D-6 Anaheim, CA, 1991 • Certificates of Appreciation, Western ITE Newsletter Technical Editor, 1990-1994 • Recipient of 1990 ITE International Award, Orlando, Florida, USA • Recipient of 1989 ITE International Award, San Diego California, USA • Recipient of 1988 ITE International Award, Vancouver, Canada • Certificate of Appreciation, ITE Met. Section of New York & New Jersey, 1987 and 1989 • Founded and Organized ITE Student Chapter at University of Cincinnati, 1984 • The Southwestern Award of Merit, 1981 • Outstanding Young Man of America for 1982 MINAGAR & ASSOCIATES, INC. Traffic Engineering - ITS - Civil/Electrical Engineering - Transportation Planning — CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE Page 2 SYNOPSIS of PROFESSIONAL EXPERIENCE: Municipal / City Traffic Engineering Services • Served over 85 Cities in California providing Consulting and Municipal City Traffic Engineering Services • Served as City Traffic Engineer for the City of South Pasadena in Los Angeles County, South Pasadena, CA - Performed well over 68 Task Orders including but not limited to the followings: - Performed the Citywide 2012 & 2014 Engineering & Traffic Surveys (ETS) - Safe Routes To School Program Evaluation and Assessment - Prepared the Grant Applications for the Los Angles County MTA (Metro) and was Ranked Number 1 in the Traffic Signal Synchronization, Bus Rapid Transit & Intelligent Transportation Systems (ITS) Modal Category to obtain Funding from Metro for a New Central TMC/TOC and Traffic Signal Interconnect System - Traffic Signal and Stop Sign Installation Warrant Assessments at Over Two (2) Dozens Locations - Prepared Numerous Traffic Signal and Signing/Striping Plans - Reviewed and Prepared Traffic Signal Timing Charts - Created and Computer Modeled Numerous Existing and Future Traffic Conditions for Presentations to the City Council, Planning Commission, Public Works Commission as well as Public Forums - Prepared Numerous Traffic Diet & Traffic Calming Measures and Designs - Presented the City as the City Traffic Engineer at Numerous City Council, Planning Commission, Public Works and Public Forums - Prepared the Biennial Highway Monitoring Report for the Los Angeles County Metro - Presented the City on the Metro's Quarterly Arterial ITS Configuration Committee • Has been serving as City Traffic Engineer for the City of Colton in San Bernardino County, Colton, CA - Served the City for over 15 Years Continuously - Has been serving the City as City Traffic Engineer for 6 Years - Performed well over 60 Task Orders including but not limited to the followings: - Performed the Citywide 2014 Engineering & Traffic Survey (ETS) - Designed over 15 Traffic Signals and Prepared the PS&E Packages - Reviewed the Traffic and Parking Scoping Elements of New Developments - Presented the City at SANBAG and Caltrans D-8 Meetings - Attended as City Traffic Engineer at the Monthly Meetings of the City's Traffic Committee - Presented the City at the City Council & Planning Commission meetings on as -needed - Created Policies for the City on Speed Humps & Bumps in the Residential, Commercial and Public Streets • Served as City Traffic Engineer for the City of Chino Hills in San Bernardino County, Chino Hills, CA - Performed over 68 Task Orders - Currently On -Call Traffic Engineering Consultant on Traffic, Planning & Environmental Projects • Has been serving as City Traffic Engineer for the City of Beaumont in Riverside County, Beaumont, CA - Has performed over 62 Task Orders on Traffic/Transportation's technical, operational, legal, financial and City Council/Planning Commission matters - Currently On -Call Traffic Engineering Consultant on Traffic, Planning & Environmental Projects • Served as the On-call Traffic Engineering Consultant for the following Cities in Southern California: • City of Mission Viejo in Orange County, CA • City of Lake Forest in Orange County, CA • City of Glendora in Los Angeles County, CA • City of Irvine in Orange County, CA • City of Diamond Bar in Los Angeles County, CA • City of Baldwin Park in Los Angeles County, CA • City of Ceres in Stanislaus County, CA • City of Modesto in Stanislaus County, CA • County of Stanislaus County in Northern California MINAGAR & ASSOCIATES, INC. ITS —Traffic/Civil/Electrical Engineering -Transportation Planning — Homeland Security - CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE Page 3 SYNOPSIS of PROFESSIONAL EXPERIENCE: Civil/Traffic Engineering & Transportation Planning • City of La Puente's Citywide Street Name Sign, Traffic Control Devices Inventory & LSRP, La Puente, CA • City of South Gate's Citywide Parking Space Asset Inventory and Study, South Gate, CA • City of Burbank's HSIP Cycle 3 Engineering Services for Verdugo & Keystone, Burbank, CA • City of Burbank's HSIP Cycle 4 Engineering Services for Verdugo Bike Lane Extension, Burbank, CA • City of Coachella's HSIP-5294 (006) Engineering Services for Citywide Traffic Control & Street Name Sign Upgrade, Coachella, CA • City of Coachella's ATP Cycle 1 ST -86 PS&E & Engineering Services for Citywide Active Transportation Plan • City of Coachella's ATP Cycle 2 ST -100 PS&E & Engineering Services for Citywide Active Transportation Plan • City of Coachella's SR2S Cycle 8 PS&E Engineering Services for Citywide Safe Route To School Improvement • Los Angeles County MTA's Interstate 210 Freeway Truck Origin -Destination Study, LA, CA • Los Angeles County MTA's Evaluation of the Santa Monica Freeway/Smart Corridor, L.A., CA • Los Angeles County MTA's Evaluation of RSTI Projects, Evaluated 10 Major Projects, Los Angeles County, CA • Los Angeles County MTA's State Routes 57 & 60 Interchange Improvements Feasibility Traffic Study • Los Angeles County MTA's Countywide Traffic Signal Operation and Maintenance Training Workshops • Identification of Funding, STIP & CIP Programs for Metrolink Commuter Rail System, Southern CA • Metrolink's Traffic Engineering Analysis of the New Maintenance Facility Design Requirements for a New Access Road for SCRRA, Los Angeles, CA • Metrolink's Traffic Engineering and Cost Estimating for local Street Improvement near San Bernardino and Upland Train Stations for SCRRA, Southern CA • Metrolink Commuter Rail System's Traffic Engineering Design & Study Reports for Chatsworth Train Station and Lassen Grade Crossing for SCRRA, Southern CA • Los Angeles World Airport -Palmdale Airport Master Plan, Transportation Planning & Computer Modeling Utilizing TRANPLAN & EMME II Computer Models • Massachusetts Bay Transit Authority's Red Line Subway Systems Computer Modeling, Boston, Beacon Hill and Cambridge, MA • City of Palmdale's Traffic Impact Fee Assessment a Traffic Model Using TRANPLAN Model, Palmdale, CA • Rote 24 Extension Traffic Study Utilizing UTPS Computer Model, Morristown, NJ • North Carolina State University Campus Expansion Traffic Study, Raleigh, North Carolina • Consultant to FHWA/NAHSC on AHS O&M Components & Institutional Constraints • Consultant to FHWA/NAHSC on AHS Outreach Program, Conducting Focus Group Meeting in Boston, MA, Denver, CO & Washington, D.C. • Southern California ITS Deployment Plan for Caltrans District 7, Los Angeles, California • Caltrans TSM Grant Application Preparation for the City of Oceanside, California • City of Sacramento's Arden/Arcade Local Area Transportation Study TSM & Traffic Operations Studies. Sacramento, CA • Governor's Island Ferry Stacking TSM Project - U.S. Coast Guard. Manhattan, New York City • TMP Preparation Including Reg. XV Implementation for the U.S. Army Depot. Sacramento, CA • Wal-Mart Traffic and Parking Impact Study, Santa Clarita, California • 720 Paularino Parking Study, Variance, and CUP Application for the City of Costa Mesa, CA • Rye Canyon Business Park, 3 million SF North South Campus Traffic Parking Impact Studies, Santa Clarita, CA • Truck Route Feasibility Study for Vulcan Materials Plant in Irwindale for City of Baldwin Park, CA • Los Angeles Grand Sports Arena Traffic Engineering Feasibility Study for a Private Developer near Downtown Los Angeles, California • Caltrans AB -680 Highway 118-126 Toll Road, Los Angeles and Ventura Counties, CA • Denver W-470 Toll Revenue Study for Engineer 470 Partnership, Denver, Colorado • New Jersey Turnpike Widening Transportation & Toll Plaza Study for the NJ Turnpike Authority • Port of San Diego B -Street Pier Alignment, Traffic Engrg Study for a New Cruise Ship Terminal, San Diego, CA • Port of Long Beach's SCAQMD's Grant for Air Quality/Emission Control Improvements at Port's Roadways/Highways, Long Beach, CA • Port Liberte (Caven Point) Traffic Impact Study, Jersey City, New Jersey • Review of Draft Traffic Impact Report for the Port of Los Angeles' West Basin, Los Angeles, CA 0 Palmdale Airport Plaza Traffic Impact Report, Palmdale, CA MINAGAR & ASSOCIATES, INC. ITS —Traffic/Civil/Electrical Engineering -Transportation Planning — Homeland Security - CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE Page 4 SYNOPSIS of PROFESSIONAL EXPERIENCE CONTINUED: Intelligent Transportation System (ITS) • Caltrans State Route 66 Adaptive Traffic Control Systems, CCTV & Fiber Optic PS&E • Palmdale's Ave. R Traffic Signal Interconnect & CCTV Design for the City of Palmdale & Metro • Upgrade of Calabasas Regional Transportation Operations Center & Las Virgenes Corridor Interconnect PS & E • Santa Clarita's Intelligent Transportation Management Systems Project, Preparation of PS&E for 22 CCTV's, 3 CMS, TOC Design Modification & Fiber Optic Design • Santa Clarita's Thoroughfare Signal Interconnect PS&E for 30 miles along 22 Corridors & Traffic Signal Synchronization of 93 City, LA County & Caltrans Locations • Los Angeles County MTA Trainer, Systems Communications, Video Surveillance & Video Detection, Bus Signal Priority, CtNet & QuicNet Systems & Signal Timing, Workshops, 1999-2005 • FHWA Trainer, Freeway Surveillance & Control Training Workshops • Los Angeles County MTA's Santa Monica Freeway "Smart Corridor" Evaluation of ITS, Operational, Environmental & Energy Components for FHWA, Caltrans D7, Cities of LA, Beverly Hills, Culver City & Santa Monica • City of Temecula ITS Deployment: TOC, Systems Communications & Fiber Optic Design for the City & Caltrans District 8 • City of Temecula Interconnect Design: Preparing PS & E Package • City of Modesto's CCTV Expansion of 13 New Cameras for the City and Caltrans District 10 • Modesto CCTV & Ceres ATMS Design and Implementation Project, Northern California • City of Ceres' CCTV Expansion of 3 New Camera the City and Caltrans District 10 • City of Modesto's 121 Traffic Signal Synchronization for the City and Caltrans District 10 • Consultant to FHWA/NAHSC on AHS Operational & Maintenance Components & Institutional Constraints • Consultant to FHWA/NAHSC on AHS Outreach Program. Conducting Focus Group Meeting in Boston, MA, Denver, CO & Washington, D.C. • Southern California ITS Deployment Plan for Caltrans District 7. Los Angeles, California • 20 -Mile Extension of $90 Million 1-95 HOV/TSM, Washington, D.C. • Santa Monica Freeway (Interstate 10) ITS/CCTV and Fiber Optic Network for Caltrans District 7. Los Angeles, California • Los Angeles County MTA's Evaluation of Regional Surface Transportation Improvement Projects for 8 Agencies • Interstate 5 & 405 Confluence "EI Toro Y" TSM & Construction Engineering Management, Caltrans District 12. Orange County, California • Caltrans TSM Grant Application Preparation for the City of Oceanside, California • City of Sacramento's Arden/Arcade Local Area Transportation Study TSM & Traffic Operations Studies. Sacramento, California • Governor's Island Ferry Stacking TSM Project for the U.S. Coast Guard. Manhattan, New York City • Traffic Signal Computerization. Design Implementation, Installation, Fine Tuning & Training City's Staff for 98 Intersection. City of Modesto, Northern California • Traffic Signal Computerization. Design Implementation, Installation for 17 Intersections. City of Ceres, Northern California • Traffic Signal Computerization. Design Implementation, Installation, Fine Tuning & Training City's Staff for 16 Intersections. City of Baldwin Park, California • ITS, Traffic Signal Computerization & Support On-call Services. City of Palmdale, California • TMP Preparation Including Reg.XV Implementation for the U.S. Army Depot. Sacramento, California • Dulles International Airport Access Road. Ramp Metering Feasibility to E.B. 1-66, Northern Virginia • City of Temecula's Red Light Camera System Evaluation • City of Santa Clarita's Red Light Camera System Proposal Evaluation MINAGAR & ASSOCIATES, INC. ITS —Traffic/Civil/Electrical Engineering -Transportation Planning — Homeland Security - CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE Page 5 SYNOPSIS of PROFESSIONAL EXPERIENCE CONTINUED: Traffic Signal Design/Timing/Coordination/Synchronization • Los Angeles County MTA's Countywide Traffic Signal Operation and Maintenance Training Workshops • Los Angeles County MTA's Countywide Traffic Signal Timing Training Workshops • Los Angeles County MTA's Countywide Video Detection and Surveillance Training Workshops • Los Angeles County MTA's Countywide Type 170 Controller Training Workshops • Los Angeles County MTA's Countywide Systems (Data, Video, and Audio) Communications Training Workshops • Los Angeles County MTA's Countywide Bus Signal Priority, CtNet & QuicNet Systems Training • The Governor's Go California Project of Adaptive Traffic Signal Control Systems PS & E for SR 66 for Caltrans District 7 • Synchronization of 144 Caltrans & City of Modesto Traffic Signals, Modesto, CA • Synchronizing 72 Downtown Traffic Signals for Caltrans District 10, Stanislaus County & the City of Modesto • Traffic Signal Synchronization, Implementation, and Fine Tuning of 121 Signals for the City of Modesto and Caltrans D-10 • Santa Clarita's Traffic Signal Synchronization for 38 Locations along 3 major Regional Arterials • City of Modesto Traffic Signal Coordination. Retiming and Upgrade for 98 Locations, City of Modesto, CA • City of Chino Hills Traffic Signal Plan Check Services • City of Palmdale Traffic Signal Coordination. Retiming and Fine-tuning for 22 Locations, City of Palmdale, Southern California • City of Ceres Traffic Signal Coordination & Retiming for 17 Locations, Ceres, Northern California • Newport Boulevard Traffic Signal System Improvement for the City of Costa Mesa, CA • Plan Preparation and Design Utilizing Caltrans Standards and AutoCAD for the City of Lancaster, CA • Burke Lake Road's Signal. Northern Virginia/Washington, D.C. • Interstate 1-95 Service Roads and Local Intersections in Northern Virginia/Wash., D.C. • U.S. Route 27 Traffic Signal Progression, Cincinnati, Ohio • U.S. Route 7 Relocation Study. Signal Design & Capacity Analysis for Connecticut Department of Transportation, Norwalk, Connecticut • Packard/Bambergers Development Traffic Signals Cost Estimating, Hackensack, New Jersey • Virginia Beach's Traffic Signal Cost Estimating, Virginia Beach, Virginia • Traffic Signal Retiming, Installation and Fine Tuning for the City of Baldwin Park and LA County • Pacific Coast Highway and EI Camino Real's Traffic Signal for the City of San Clemente • Traffic Signal Inspection & Construction Engineering Management for the City of Baldwin Park • Los Angeles County MTA's Evaluation of RSTI Projects • On -Call Traffic Signal Timing and Design Services for the City of Palmdale • On -Call Traffic Signal Construction Inspection Services for the City of Colton • Preparing PS&E Package for New Signals for the City of San Bernardino • Preparing PS&E for Signal Design Packages for the City of Baldwin Park • Preparing PS&E Packages for Signals in Colton • Consulting Design and PS&E Services for Railroad Pre-emption at Sierra Highway and Avenue P&R for Metrolink and the City of Palmdale • Baldwin Park's Master Interconnect Design and PS&E for the City • State Route 14 and Avenue S Signal and Striping PS&E Preparation for the City of Palmdale, Los Angeles County, and Caltrans D-7 • Design services for the Interconnect Modification of Avenue R and 51h Street East for the City of Palmdale • Construction Engineering Management for State Route 14 and Avenue S for the City of Palmdale and Caltrans D-7 • Los Angeles County MTA's Evaluation of the SMART/Santa Monica Freeway ITS Systems MINAGAR & ASSOCIATES, INC. ITS —Traffic/Civil/Electrical Engineering -Transportation Planning — Homeland Security - CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE Page 6 SYNOPSIS OF PROFESSIONAL EXPERIENCE CONTINUED: Toll Roads/Financial Studies • Caltrans AB -680 Highway 118-126 Toll Road, Los Angeles and Ventura Counties, CA • Denver W-470 Toll Revenue Study for Engineer 470 Partnership, Denver, Colorado • New Jersey Turnpike Widening Transportation and Toll Plaza Study for the New Jersey Turnpike Authority • Identification of Funding, STIP and CIP Programs for Metrolink Commuter Rail System, Southern California Traffic and Parking Impact Studies • City of San Clemente Traffic Control Plans (TCP) for the Vintage Shores Senior Apartments on Camino De Estrella, San Clemente, California • City of San Clemente's Traffic Signal Plans, Specifications, and Estimates (PS&E) for EI Camino Real and Pacific Coast Highway, San Clemente, California • City of San Clemente/Kaufman and Broad Coastal, Villa Pacifica's Tract 15870 Traffic Signal Plans, Specifications, and Estimates (PS&E), San Clemente, California • Honali Plaza Parking Study, Laguna Hills, California • Wal-Mart Traffic and Parking Impact Study, Santa Clarita, California • 720 Paularino Parking Study, Variance, and CUP Application for the City of Costa Mesa, California • Dodge Dealership Traffic and Parking Study, Lompoc, California • Washington Mutual Bank's Parking Study and Variance Application for the City of Laguna Hills, California • Rye Canyon Business Park, 3 million SF North and South Campus Traffic and Parking Impact Studies, Santa Clarita, CA • Truck Route Feasibility Study for Vulcan Materials Plant in Irwindale for the City of Baldwin Park, California • City of Huntington Beach Traffic Control Plans (TCP) preparation for the Huntington Beach Central Park Sports Complex, Huntington Beach, California • State Route 55 Fly -over 1-5 Freeway Traffic Control Plans and Traffic Management Plan for Caltrans District 12, Santa Ana, California • Los Angeles Grand Sports Arena Traffic Engineering Feasibility Study for a Private Developer near Downtown Los Angeles, California • Calabasas Volvo Dealership Traffic Impact Study, Calabasas, CA • The Gallery Traffic Impact Report, San Clemente, CA • Lockheed Martin Traffic Impact Analysis, Palmdale, CA • Palmdale Airport Plaza Traffic Impact Report, Palmdale, CA • Quartz Hill Traffic & Fee Impact Studies, Palmdale, CA • North San Diego County Future Urbanizing Area Traffic Study, San Diego, CA • Village Shopping Center Traffic Impact Report, San Clemente, CA • Lockheed Martin Aircraft Facility Plant Traffic Study, Palmdale, CA • Serra Catholic School Traffic Impact Report Review, Rancho Santa Margarita, CA • GFW's Five Power Plants Traffic Impacts in the Bay Area Air Quality Management District, Contra Costa County, CA • Port Liberte (Caven Point) Traffic Impact Study, New York Harbor, NY • Packhard/Bambergers Traffic Impact, Cost Estimating & Alternatives Studies, Hackensack, NY • California Exposition Center Expansion Draft EIR & Traffic Impact Study, Sacramento, CA • Arden -Fair Mall Expansion: Fourth Anchor Tenant Traffic Impact & EIR, Sacramento, CA MINAGAR & ASSOCIATES, INC. ITS —Traffic/Civil/Electrical Engineering -Transportation Planning — Homeland Security - CEM Consultants FRED MINAGAR, MS, RCE, PE, FITE Page 6 SYNOPSIS OF PROFESSIONAL EXPERIENCE CONTINUED: Toll Roads/Financial Studies • Caltrans AB -680 Highway 118-126 Toll Road, Los Angeles and Ventura Counties, CA • Denver W-470 Toll Revenue Study for Engineer 470 Partnership, Denver, Colorado • New Jersey Turnpike Widening Transportation and Toll Plaza Study for the New Jersey Turnpike Authority • Identification of Funding, STIP and CIP Programs for Metrolink Commuter Rail System, Southern California Traffic and Parking Impact Studies • City of San Clemente Traffic Control Plans (TCP) for the Vintage Shores Senior Apartments on Camino De Estrella, San Clemente, California • City of San Clemente's Traffic Signal Plans, Specifications, and Estimates (PS&E) for EI Camino Real and Pacific Coast Highway, San Clemente, California • City of San Clemente/Kaufman and Broad Coastal, Villa Pacifica's Tract 15870 Traffic Signal Plans, Specifications, and Estimates (PS&E), San Clemente, California • Honali Plaza Parking Study, Laguna Hills, California • Wal-Mart Traffic and Parking Impact Study, Santa Clarita, California • 720 Paularino Parking Study, Variance, and CUP Application for the City of Costa Mesa, California • Dodge Dealership Traffic and Parking Study, Lompoc, California • Washington Mutual Bank's Parking Study and Variance Application for the City of Laguna Hills, California • Rye Canyon Business Park, 3 million SF North and South Campus Traffic and Parking Impact Studies, Santa Clarita, CA • Truck Route Feasibility Study for Vulcan Materials Plant in Irwindale for the City of Baldwin Park, California • City of Huntington Beach Traffic Control Plans (TCP) preparation for the Huntington Beach Central Park Sports Complex, Huntington Beach, California • State Route 55 Fly -over 1-5 Freeway Traffic Control Plans and Traffic Management Plan for Caltrans District 12, Santa Ana, California • Los Angeles Grand Sports Arena Traffic Engineering Feasibility Study for a Private Developer near Downtown Los Angeles, California • Calabasas Volvo Dealership Traffic Impact Study, Calabasas, CA • The Gallery Traffic Impact Report, San Clemente, CA • Lockheed Martin Traffic Impact Analysis, Palmdale, CA • Palmdale Airport Plaza Traffic Impact Report, Palmdale, CA • Quartz Hill Traffic & Fee Impact Studies, Palmdale, CA • North San Diego County Future Urbanizing Area Traffic Study, San Diego, CA • Village Shopping Center Traffic Impact Report, San Clemente, CA • Lockheed Martin Aircraft Facility Plant Traffic Study, Palmdale, CA • Serra Catholic School Traffic Impact Report Review, Rancho Santa Margarita, CA • GFW's Five Power Plants Traffic Impacts in the Bay Area Air Quality Management District, Contra Costa County, CA • Port Liberte (Caven Point) Traffic Impact Study, New York Harbor, NY • Packhard/Bambergers Traffic Impact, Cost Estimating & Alternatives Studies, Hackensack, NY • California Exposition Center Expansion Draft EIR & Traffic Impact Study, Sacramento, CA • Arden -Fair Mall Expansion: Fourth Anchor Tenant Traffic Impact & EIR, Sacramento, CA MINAGAR & ASSOCIATES, INC. Civil Engineering -Traffic Engineering -Transportation Planning Consultants FIROZ VOHRA, MS, TE EDUCATION • University of Cincinnati, Cincinnati, Ohio, MSCR in Transportation Engineering • Maharaja Sayajirao University of Baroda, Baroda, India, BSCE in Highway Engineering PROFESSIONAL CAPABILITIES/SUMMARY Firoz Vohra is an experienced traffic engineer with over 34 years of experience. He began his career in the private sector where responsibilities included planning and designing highway alignments, developing traffic demand projections and preparing and analyzing traffic studies. He then moved to the public sector as a City Traffic Engineer for the City of Modesto where he served in that position for 15 years and then served the City as Deputy Director of Public Works for 7 years. The experience and knowledge gained throughout my career presents an invaluable asset to my clients. He is a proven team player with a focus on utilizing his public-service experience to achieve the goals of the clients he serves. PROFESSIONAL EXPERIENCE Senior Traffic Engineer for Minagar & Associates, Inc. Jul 2018 — Present Senior Engineer for the Public Works Transportation Division of Stockton, CA 2010-2018 Responsibilities include administering & managing the recently combined Transportation Engineering Division within the Public Works Department. The purpose is to bring Transportation projects to the County by leveraging Federal & State grant funds with Local transportation dollars; improve traffic flow, enhance safety & reduce congestion by prioritizing projects based on roadway capacity & safety. Manager III for the Public Works Engineering Support Division of Modesto, CA 2009-2010 Responsible for the Development Services, Community Service Districts, Landscape and Lighting Districts, Encroachment and Transportation Permits, County Surveys, Mapping Services and Traffic Engineering Units. Responsibilities include managing and implementing the workload, people and resources of these units. Provide supervision, attend public meetings, develop projects and perform traffic analysis. Duties also include development and maintenance of Development Design Standards and Master Plan Standards. Produce and process annual engineer reports for Community Service Districts, Landscaping and Lighting Districts. Act as County Project Manager on major projects. Deputy Director for the Public Works Department of Modesto, CA 2002— 2009 Headed the Streets and Traffic Services Division of the Public Works Department. Reported to Department Director and City Manager. Assumed Acting Director of Public Works role during the Director's absence. Supervised Streets Engineering, Traffic Engineering/Operation and Street Maintenance staff (52 FTEs). Permanent substitute for the City Manager at the StanCOG Technical Advisory Committee. Regularly briefed the Mayor and Council Members on policy issues prior to all StanCOG policy board meetings and offered recommendations. Chaired the City of Modesto's Fees Task Force committee. Developed and monitored division budgets (Operating & CIP) and workflow. Secured CMAQ, STP, SR2S grants for capital projects. Developed the ARRA-2009 (Stimulus Package) projects proposal. Developed county -wide MINAGAR & ASSOCIATES, INC. Civil Engineering -Traffic Engineering -Transportation Planning Consultants FIROZ VOHRA, TE PROFESSIONAL EXPERIENCE CONTINUED: Pavement Management System and roadway repair priorities. Developed the SR 99/Pelandale Interchange project concept and led it to PA&ED state through CalTrans District 10. Served on the regional North County Corridor (25 miles long new expressway) project as the Technical Advisory Committee member to the Joint Powers Authority. City Traffic Engineer for the City of Modesto, CA 1987— 2002 Reported to Department Director and Deputy Director. Supervised the research, analysis and planning of development projects and other transportation studies which ensure safe and efficient traffic flow and mobility while enabling economic development. Have conducted and overseen research and analysis on development projects; planned and organized transportation planning studies; neighborhood traffic planning and analysis; traffic impact reports for development projects; plans, and environmental review. Developed strategies to build —livable communities by creating new streetscapes that provide maximum safety for pedestrians, bicycles and motorists, while keeping travel speeds low and providing optimum access. Developed traffic management strategies and systems to manage the growing traffic demands by employing state-of-the-art technologies. Prepared and presented a variety of reports; developed division's operating as well as capital improvement budgets. MINAGAR & ASSOCIATES, INC. ITS - Traffic/Civil/Electrical/Mechanical Engineering - Transportation Planning - Homeland Security - CEM ARIAN ABRISHAMI, BSEE, PE, PMP EDUCATION REGISTRATION EXPERTISE SOFTWARE • San Diego State University, San Diego, CA, BSEE, Computer Software Engineering/ Hardware Engineering (Alumni member of Beta Kappa Nu (Electrical) & Tau Beta Pi Engineering Honor Societies) • San Diego State University, San Diego, CA, Core MS Courses in Telecommunications • California, Registered Professional Electrical Engineer #14694 • California, Project Management Professional #492168 • California, Contractors License Electrical C-10 #721267 • California, Contractors General Engineering A #721267 • California, Contractors General Building B #721267 • California, Certified General Electrician #141726 • OSHA 30, For Construction Safety, Certified #32-00920905 • HAM Radio and GROL PGGB004108 FRN (#0010904068), Dec 1994 • Electrical Engineering • Computer & Software Engineering • Preparing PS&E, Project Management & Control, Inspection • ITS, ATMS, Fiber Optic, Systems Communications Landline & Wireless • Hirsch/Identify systems hardware access control and intrusion systems training for security agency • CISCO CCIE classes and lab (wide area network routers, switches) • Courses in OSI (networking protocol) • Microstation (State of CA design software) • Primavera project management software • Seimens Delta V software training for validation, commissioning & operation optimization • Microsoft Office and project • Changeable Message Sign software and programming • Siemens Building Management Systems PROFESSIONAL CAPABILITIES/SUMMARY Has performed in variety of professional roles from project management to design with a deep knowledge of construction requirements. including Project Manager, Design Manager, Project Engineer of multiple Capital Improvement and Maintenance projects; performing professional electrical engineering tasks in preparation of designs, construction plans, specifications, engineering economic and cost analysis studies, project schedules, contracts and reports for electrical systems and equipment, commercial buildings, associated facilities and equipment; security systems, access control and camera systems; conducting quality assurance and safety and functional testing, inspection and research activities; providing technical direction and support in the licensing, design, construction, installation, maintenance, and operation and inspection of a wide variety of electrical systems and intelligent transportation systems and access and camera control in Security equipment as well as to proven to be a trouble shooter and problem solver in integrated systems. PROFESSIONAL EXPERIENCE Project Management & Engineering Minagar & Associates, Inc. Jan 2010 —Present Performing design, construction and project management for local government projects regarding CCTV; traffic signal systems; intelligent wireless transportation systems (ITS); wide area network (WAN); fiber optics; CAT5e, CAT6 copper connectivity. Traffic management network revamping and cutovers due to upgrades, and associated security systems associated with the command and control centers and its connectivity with the county government and the State TMCs in order to fulfill the Homeland Security criteria set forth for sharing information amongst agencies. MINAGAR & ASSOCIATES, INC. ITS - Traffic/Civil/Electrical/Mechanical Engineering - Transportation Planning - Homeland Security - CEM ARIAN ABRISHAMI, BSEE, PE, PMP Page 2 SYNOPSIS of PROFESSIONAL EXPERIENCE CONTINUED: State of California, Departments of Transportation and Industrial Relations Jul 1984 — Jan 2010 • Cal/OSHA Elevator Inspector, Division Industrial Relations Jul 2009 — Jan 2010 Performed code enforcement and compliance related to design and specifications of the all equipment related to conveyances, in order to ensure the safety of the riding public and to protect the workers in the elevator industry. ■ Caltrans Senior Transportation Electrical Engineer (Supervisory), Traffic Operations Jul 1998 — Jun 2009 Supervised a staff of a dozen office and field engineers (traffic signal operations and design). He was responsible for electrical design and review, operations and inspection of numerous projects for North Los Angeles County and Ventura County; this included lighting systems, traffic signal systems, CCTV and HAIR systems and electrical utilities. • Caltrans System Software Specialist, Information Systems Oct 1997 — Jul 1998 Responsible for IT infrastructure to connect 25,000 computers; duties included negotiating contracts with phone companies and DGS which saved more than $1.2M annually; standardized all computers in the Caltrans system, which saved over $1 M annually, served as the Technical Advisor in Advanced Wireless Technologies & Advanced ITS Networks while coordinating and providing network troubleshooting remote assistance to IT personnel in the four Caltrans off-site locations. • Caltrans New Technology & Research Program Jul 1996 — Oct 1997 Project Manager/System's Designer for Intertie for four southern California sites; responsibilities included installation, operation, and maintenance network devices such as wide -area switches, routers, servers, modems, and network management and their communications software. As the Project Manager I was responsible for Fiber Optic intertie wired and wireless; over $40M. ■ Caltrans Associate Electrical Engineer, Supervisor (Traffic Systems TMC Support) Jul 1989 — Jul 1996 Operated and maintained hardware and software for traffic operations center (TMC); reported wiring, specification review for scopes of work, and obtained MOU funding; served as Project Manager, SYNOPSIS of PROFESSIONAL EXPERIENCE CONTINUED: Technical Advisor, and Researcher for advanced technology projects (saved more than $3M). He supervised a staff of ten office administration and engineers. Caltrans Electrical Engineer Maintenance and Traffic Systems (TMC Support) / Coronado Bridge Jul 1984 — Jul 1989 Designer and Field Inspector on a variety of transportation projects including highway lighting; ramp metering signals; traffic signals; and highway advisory radios high voltage conversion (5000 to 480) Volt AC for public safety; managed toll collection air monitoring system for toll collectors' safety and reported results to Head Quarters; ensured devices were calibrated and worked properly. Design/Field & Research Development (R&D) Engineer U.S. Elevator Corp. (Subsidiary of Cubic Corp.) Mar 1981— Jul 1984 Designed and built prototype motor and motor control and relay and MP logic elevator controllers (cable and hydraulic). R& D Elevator design and inspection CAD/ CAM MINAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering - ITS- Transportation Planning - CEM Consultants JENNY TRAN, BSCE EXPERIENCE EDUCTAION EXPERTISE • 3 Years Professional Experience • University of California, Irvine, BSC&E Civil & Environmental Engineering • Traffic & Transportation Engineering • Traffic Impact & Parking Studies • Feasibility Studies • Transportation Planning • Traffic Signal Timing • Highway Capacity • Safety Assessment • VMT & GHG Analysis& Assessment RELATED SKILLS • Use of various Traffic Engineering and Transportation Planning software: HCS, SYNCHRO, SimTraffic • AUTOCAD & MicroStation • Advanced Surveying • Highway Design (InRoads, CaiCe) • ArcGIS • MATLAB 2018, SketchUp, SolidWorks 2018, Stella, Spartan SYNOPSIS of PROFESSIONAL EXPERIENCE • Project Engineer for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Huntington Park in Los Angeles County • Project Engineer for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Guadalupe in Santa Barbara County • Engineering Assistant for the Preparation of Traffic Signal Modification, Interconnect Plans and Fiber Optic Systems for the City of Chino. Performed field investigations followed up by utilizing ACAD 2020 computer software for the base Engineering Plans • Prepared a Left Turn Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of Schaefer at Roswell for the City of Chino, CA • Prepared a Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of 7t" Street at Valley Blvd. for the City of Colton, CA • Engineering Assistant for the Evacuation Plan Improvement Traffic Study utilizing Synchro 10.0 Micro -computer Modeling and Sim Traffic Micro -computer Simulation for 5 Wildfire and 1 Tsunami Evacuation Plans via Pacific Coast Highway City of Malibu • Prepared a Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of San Bernardino Ave. at Sycamore Street for the City of Colton, CA • Prepared a Traffic Signal and Stop Sign Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of "C" Street at Meridian for the City of Colton, CA • Prepared a Technical Memo for Federal/State and City ADA Compliance at the Existing Handicap Ramps at the Two Signalized Intersections of Roswell at Schaefer and Pipeline at Schaefer in the City of Chino, CA • Prepared a Technical Memo for the Establishment of Policies and Procedures for Red - Curb Zones within the Residential and Commercial Areas for the City of Gardena, CA • Prepared a Traffic Impact Study for the Proposed Retail/Commercial Center at 81933 Indio Blvd for the City of Indio. Analyzed the Potential Impacts of the Proposed Project on the Existing and Future Capacity and Operations of the 6 Existing Signalized Intersections. • Prepared a Traffic Impact Study for the Proposed Retail/Commercial Center at Jefferson Ave at Varner for the City of Indio. Analyzed the Potential Impacts of the Proposed Project on the Existing and Future Capacity and Operations of the 6 Existing Signalized Intersections. MINAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering - ITS- Transportation Planning - CEM Consultants JENNY TRAN, BSCE Page 2 SYNOPSIS of PROFESSIONAL EXPERIENCE CONTINUED: • Prepared a Technical Memo for the Development and Establishment of VMT ( Vehicle Miles Travelled) for the Transportation Impact Analysis of the CEQA Requirement based upon the Senate Bill (SB) 743 for the City of Colton, CA • Prepared a Traffic Impact Study for the Proposed Bloomington Truck Stop within the Bloomington Unincorporated area of San Bernardino County for the County of San Bernardino. Analyzed the Potential Impacts of the Proposed Project on the Existing and Future Capacity and Operations of the 15 Existing Signalized Intersections as well as 4 Future Intersections. Analyzed the Capacity and Operations of the 17 intersections utilizing Synchro 10.0 & HCS 2000+ software. • Prepared a Traffic Signal Warrant Assessment by Utilizing CA MUTCD Standards for the Intersection of Olive Street at Meridian for the City of Colton • Prepared a Traffic Impact Study for Commercial Center and a Focused Driveway Feasibility Analysis for the City of Clovis in Central California, Clovis, CA • Prepared a Traffic Impact Study for the Gateway Plaza for the City of Tracy in Northern California, Tracy, CA • Prepared the VMT (Vehicle Miles Traveled) Analysis and Assessment for the Pennsylvania Avenue Widening Project for the City of Beaumont, Beaumont, CA • Assisted in the Preparation of the Traffic Operation Analysis Report (TOAR) document for the Pennsylvania Avenue at 1-10 Freeway Interchange Improvements for the State of California Department of Transportation (Caltrans District 8), Beaumont, CA • Prepared Traffic Control Plans (TCP) for the Metropolitan Water District of Southern California (MWD) Orange County Feeder Extension Pipeline Realignment in the Cities of Costa Mesa and Newport Beach for the Cities of Costa Mesa and Newport Beach and MWD. • Prepared Traffic Control Plans (TCP) for the Metropolitan Water District of Southern California (MWD) Orange County Feeder Blow -off Valve Rehabilitation — Upper Newport Bay on Jamboree Road for the City of Newport Beach for the City of Newport Beach and MWD. Prepared a Traffic Signal Warrant Assessment for the intersection of Magnolia Ave at Vermont Ave. and Union Pacific Railroad Tracks for the Cities of Gardena, Los Angeles and Union Pacific Railroad Company. The project was fully fund by the Los Angeles County MTA (Metro). • Prepared a Technical Memo for the ADA Requirements and compliance with the City of Chino's New Ordinance, Caltrans and the Federal Requirements of the two intersection of Schaefer Ave at Pipeline and Schaefer Avenue at Roswell Ave for the City of Chino, CA Prepared a traffic Impact Study and Parking Survey for the Learning Academy in the City of South Gate, South Gate, CA MINAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering - ITS- Transportation Planning - CEM Consultants MICHELLE NGUYEN, BSC&E EXPERIENCE • 3 Years Professional Experience EDUCTAION • University of California, Irvine, BSC&E Civil & Environmental Engineering EXPERTISE • Traffic & Transportation Engineering • Signing & Striping • Traffic Control Analysis • Transportation Planning • Traffic Signal Timing • Highway Capacity • Safety Assessment • VMT Analysis & Assessment RELATED SKILLS • Use of Various Traffic Engineering and Transportation Planning Software: • HCS • Synchro 10 ■ SimTraffic ■ TransCAD AutoCAD 2020 ArcGIS • MATLAB • SketchUp • SOLIDWORKS SYNOPSIS OF PROFESSIONAL EXPERIENCE • Engineering Assistant for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Guadalupe in Santa Barbara County • Engineering Assistant for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Huntington Park in Los Angeles County • Prepared the 2020 Engineering & Traffic Survey (E & TS) Report for 131 street segments the City of Pomona, CA • Prepared a Traffic Sight Distance Analysis Technical Memorandum for a Proposed New Driveway at 1137 & 1149 West Phillips Blvd per the City of Pomona's Standard Design Plans and AASHTO's Guidelines for the City of Pomona, CA • Prepared a Technical Memorandum for the Electrical Vehicle (EV) Charging Stations Project for the City of South Gate, CA • Prepared a PS&E Package for the Electrical Vehicle (EV) Charging Stations Design for 5 Locations for the City of South Gate, CA • City of Costa Mesa • Assessed Current and Potential Speed Humps and Traffic Calming Measures • Drafted Signing & Striping Plans for Street Improvement Project Complying with 2014 CA MUTCD and Caltrans Standard Plans & Standard Specification 2018 ■ Prepared Work Orders for Street Maintenance ■ Conducted Stop Sign & Traffic Signal Warrant Analysis by Utilizing 2014 CA MUTCD ■ Performed Field Investigations into Service Requests Regarding the Operation of Traffic Signals • Investigated Citizen Request for Speeding Countermeasures • Verified the Recommended Posted Speed for the City's 2018 Engineering and Traffic Survey • Inventoried and Prepared a Citywide Posted Speed Signs Map ■ Prepared an Updated Citywide Average Daily Traffic Map for the Year 2019 ■ Prepared an In -Kind Service Report from the Orange County Transportation Authority for funding of a Traffic Signal Synchronization Project for Harbor Boulevard ■ Performed Testing of Emergency Vehicle Preemption (EVPs) at Applicable Intersections Citywide • City of Anaheim • Conducted a Field Survey of road side units and on board units along Harbor Blvd & Anaheim Blvd to Test the Interoperability Among Different Vendors MINAGAR & ASSOCIATES, INC. ITS —Traffic/Civil/Electrical Engineering -Transportation Planning — CEM Consultants SERGE S. TAVOUR EDUCATION • Tehran Institute of Technology, Civil Engineering PROFESSIONAL EXPERIENCE • 26 years of Engineering Land Surveying and Pure Civil Engineering Design LAND SURVEYING EXPERIENCE: Key projects: • Surveying work - Topographic surveys, boundary surveys and staking. • Survey and Street Design — HSIP Federal Project for Verdugo Street, Burbank CA. • Survey and Street Design — HSIP State Project for Verdugo Street Bike Lane Extension, Burbank CA. • Designed Base project survey for Caltrans - Route 66 • Traffic control plans — Modesto, CA. • Prepared plans for numerous traffic signal and traffic control applications, signing and striping • Created plans and profile and design modify curb returns CIVIL DESIGNER EXPERIENCE: Key projects: • Traffic Control Plan — La Habra, Irvine, Laguna Niguel, Brea, Costa Mesa , CA • Street Improvement Plan — Costa Mesa, CA • Water Line — La Habra, CA • Retaining wall- Moulton Parkway • Utility plans- Caltrans 1-5 widening project Project Designer Key projects: • Andalucia Apartment Complex — Mission Viejo, CA • Sun City Shopping Center — Sun City, CA • Dos Lagos Golf Course — Corona, CA Project Designer Key projects: • Madison Single Family Housing — Irvine, CA • Whispering Heights Single Family Housing — Riverside, CA • Westborne single family housing — Irvine, CA Project Designer Key projects: • Granada Hills Townhouses — Granada Hills, CA • Housing Tract Project — Riverside, CA • Townhouse Project - Bellflower, CA • Talega Golf Course Driving Range — San Clemente, CA • Royal Cabinets — Pomona, CA • Commercial Warehouse — City of Industry, CA Designed, per contract, specifications for a variety of projects: • Traffic improvement plans • Bike pad improvement plans • Railroad track improvement plans and profiles • Land field grading plans • Commercial, residential, and industrial precise & rough grading plans • Street, sewer, and water improvement plans Senior CADD Operator 0 SCRRA (Metrolink) Commuter Rail Project MINAGAR & ASSOCIATES, INC. Traffic/Civil/Electrical Engineering - ITS- Transportation Planning - CEM Consultants ADAM BASRAWI, BSCE EXPERIENCE EDUCTAION EXPERTISE • 1 Year Professional Experience • California State Polytechnic University, Pomona, BSCE Civil Engineering • Safety & Collision Assessment/Local Roadway Safety Plan (LRSP) • Traffic & Transportation Engineering • Traffic Impact & Parking Studies • Transportation Planning • Traffic Signal Timing • Highway Capacity RELATED SKILLS • Use of various Traffic Engineering and Transportation Planning software: HCS, SYNCHRO, SimTraffic • AUTOCAD & MicroStation • Advanced Surveying • Highway Design (InRoads, CaiCe) • Civil 3D • MATIab 2018 • Adobe Photoshop & Adobe Illustrator SYNOPSIS of PROFESSIONAL EXPERIENCE Project Engineer for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Huntington Park in Los Angeles County • Project Engineer for the Preparation of the Local Roadway Safety Plan (LRSP) for the City of Guadalupe in Santa Barbara County • Engineering Assistant for the Preparation of the 2021 City of Santa Fe Springs Citywide Engineering & Traffic Survey for 115 Street Segments, analyzed traffic collisions from SWITRS and UC Berkeley TIMS data sources Engineering Assistant for the Preparation of the 2021 City of South Gate Citywide Engineering & Traffic Survey for 49 Street Segments, analyzed traffic collisions from SWITRS and UC Berkeley TIMS data sources Performed over a dozen Traffic Signal & Stop Sign Warrant Assessment for the City of Colton, CA • Prepared a Channelizers Feasibility Study for the Chandi Square Project for the City of Indio, CA • Prepared a Modification of Curb Markings for the City of Colton, CA Prepared a Traffic Impact Analysis for a Proposed Distribution Center/Warehouse for the City of La Mirada, CA • Prepared the Traffic Impact Analysis for My Kkids for the City of South Pasadena, CA • Prepared a Truck Turning Template at La Cadena & M Street for the City of Colton, CA • Evaluated the Existing Union Pacific Railroad At -grade Crossing at Magnolia and Vermont Ave for the City of Gardena, CA • Performed a Protected Left Turn Phase Traffic Signal Warrant Assessment for the Intersection of 1st St and Beaumont Ave for the City of Beaumont, CA • Conducted a Parking Study for the City of Hermosa Beach, CA • Performed a Traffic Impact Study and a Parking Study for the Proposed JetSuite Relocation at John Wayne Airport, Santa Ana & Costa Mesa, CA • Performed a Crosswalk and Stop Sign Assessment for the City of Gardena, CA • Conducted Field Measurements for the Proposed Electric Vehicle Charging Station Designs for the City of South Gate, CA • Conducted a Traffic Impact Analysis and Vehicle Miles Traveled for a Proposed Lolo's Hacienda Bed & Breakfast Inn for the City Temecula, CA Performed a Protected Left Turn Phase Traffic Signal Warrant Assessment for the Intersection of Est St and Beaumont Ave for the City of Beaumont, CA REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Prosect Understanding and Approach Minagar & Associates, Inc. understands that the scope of work requested by the City of La Quinta may vary depending on the current conditions and needs of the City. Nevertheless, Minagar staff are qualified to provide traffic engineering services for various projects. Minagar & Associates, Inc. possesses the following skills and services, shown in the table below and described in further detail in the following Scope of Work section. • Traffic Control Device Design • Plans, Specifications, & Estimates (PS&E) • Traffic Control Device Operation • Interconnect Design (fiber, wireless, etc.) Assessments • Computer Modeling, Simulation, & Signal • Traffic Engineering & Signal Upgrade System Design Studies Intelligent Transportation Systems (ITS) ITS Planning CCTV, ATMS, Video Detection & Fiber - ITS Design and Implementation Services Optic Communication Systems ITS Architecture Expansion Traffic Signal Interconnect Expansion • Traffic Counts • Identification of Grant Opportunities/ • Traffic Management Plans (TMP) Applications • Engineering & Traffic Surveys (E&TS) • Research for Federal & State • Radar Speed Surveys Infrastructure Grants Traffic Impact Analysis Studies Review Development Proposals Studies to ensure compliance with City/ County/State codes and standards EIS/EIR/EA review Demand modeling, rail/transit studies Assist in Approval of Proposed Development Projects/CUPs Review/recommend land use applications Pedestrian & Bicycle Studies roll Systems Evaluation & Support Services Evaluation of Signal Re -timing Evaluation of ITS improvement Evaluation of Synchronization Before/After Studies for Transportation Implementations Improvements L4 Traffic Control Plans (TCP) Construction Management and Inspection Electrical Engineering Services to, q: .- • • Response to Public Requests • Attendance at City Council • Response to Public Questions and Meetings/Workshops Concerns e Attendance at Public Hearings 6 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Scope of Work M TRAFFIC SIGNAL DESIGN & SIGNAL TIMING/SYNCHRONIZATION Our on-call traffic signal services generally cover the following aspects in the technical design, preparation of plans, construction documents, and timing charts: • Traffic Signal Timing & Optimization - Plans, Specifications, & Estimates (PS&E) • Traffic Signal Design & Modification Interconnect Design (fiber, wireless, etc.) • Construction Engineering Management Computer Modeling, Simulation, & Signal for Signal Projects System Design Intersection Traffic/Pedestrian Sianal & Street Liahtina Improvements Our traffic & pedestrian signal design projects generally proceed in the following manner for PS&E delivery: (1) preliminary analysis (utilizing existing data or collected field data), (2) conceptual design, (3) 90% signal/signing/striping design plans and cost estimates, (4) preparation of specifications & special provisions, (5) 100% PS&E delivery with construction plans, and (6) bid/advertisement services if required by the lead agency. General provisions & technical specifications are prepared with the agency's boilerplate specifications. All final plans & specs, signed and sealed by our California Registered Civil engineers, will conform to local (City/County/APWA Greenbook) and/or state (Caltrans) guidelines and plan preparation manuals. Final signed/sealed plans are submitted on 24"X36", 4 -millimeter Mylar sheets, or on vellum medium if requested by the agency. 1 Our signing and striping plans are prepared in accordance with the latest PMKaARD 2019 California Manual on Uniform Traffic Control Devices (CA-MUTCD 2014) and M, Caltrans Standard Plans (2018). All proposed signage and pavement markings items are identified on our plans both by construction note and MUTCD code. Traffic Signal Timing/Synchronization/Coordination Traffic signal timing and coordination of signalized intersections and arterial corridors is the staple of our firm's expertise. We utilize SMCHRO° 11.0 and SimTraffic' 11.0 micro -computer simulation modules to build traffic signal network models, analyze intersections/systems, conduct and fine-tune simulations, and develop optimized traffic signal timing plans to deploy in the field. Minagar & Associates, Inc. is a leading national authority on the application, utilization, and training of Synchro software, Ld .(, training 88 cities and all Southern California districts for the past 10 a z years. Our traffic modeling ■ SMQRE services include preparing a e 7 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA baseline model of the signal network based on existing field and office data collection, developing a set of optimized proposed peak hour timing plans, modifying the timing and coordination plans based on lead -agency comments, and conducting final fine-tuning efforts based on on-site/field implementations, as well as: - Review of existing conditions, such as roadway geometries, striping and lane configurations, traffic signal control information, as well as inventories and inspections; - Review of deficiencies, such as parking prohibitions, excessive pedestrian/bicyclist traffic, sources of congestion, and/or unusual traffic generating conditions; - Development of an effective highway model, and - Development of operational Sim Traffic micro -models. Minagar is experienced in using Synchro to analyze the operating conditions of various intersection types, including queuing, delay per vehicle, average speed, and vehicles denied entry. If, based on the traffic study, queue lengths increase when compared to the existing design, a recommendation regarding signal timing will also be included in the traffic study report. Implementation of our optimized/ synchronized timing includes: - Revising/Optimizing Traffic Signal Timings: We have consistently provided successful signal timing strategies to numerous agencies and projects, particularly in the areas of: • Cycle Lengths and Offsets; • Left -turn phasing rotations, protected left -turn phase re -service; • Timing Parameters to include full accommodation for pedestrian traffic within splits; and • Time -of -day start and stop intervals as recommended for the various timing plans. - Inputting Revised/Optimized Traffic Signal Timings: Our field and traffic signal timing staff can provide installation of new signal timings, including: • Full traffic engineering implementation services, or as technical support to local agencies; • Utilization of existing interconnect systems during implementation; and • Development of time -based signal coordination techniques. Signal Timing Improvement Strategies for the intersection/arterial/signal network will be provided to the lead agency in addition to our synchronization/coordination efforts, such as: • Providing technical support to the agency's traffic signal maintenance staff • Interfacing with adjacent jurisdictions for jointly owned or operated signals The Minagar & Associates, Inc. Team also provides evaluations of currently used time -referencing equipment for all traffic signal controllers and procurement recommendations for new/updated traffic signal controller units and/or assemblies, prior to the implementation of signal timings. This includes on-site assistance for turn -on activity of new equipment, as well as "fine-tuning" of traffic signal timings/settings and thorough logs and records of all changes carried out prior to the implementation to the satisfaction of the lead agency. 8 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA d n SYLVAN AV I n... z FA -v :gym LI Ifl � �"w•- � L n a ��5y5 3ti S RR X. LEGEtiD: CCW 9W�1 Maim rvaree � e mar maeix 0 � NGri'EIK1E � ILCM —(MX MW i®51 LO.NC x.Mr�suna n.! ae�e n S MiMAOAR 5 AS90C10.T69. INC. w OVIs�H TME CEF fW PAINIM aslAlcr Sample Minagar & Associates, Inc. Signal Synchronization Network for the City of Modesto On -Call Traffic Engineering Services INTELLIGENT TRANPORTATION SYSTEMS (ITS) DESIGN & DEPLOYMENT Intelligent Transportation Systems (ITS) projects can include a variety of improvements, such as relocation of expansion of existing ITS facilities. Our recent ITS projects have included: ITS Architecture Expansion Systems Communication/Traffic Signal ITS Planning & Design Interconnect Expansion Dynamic Message Signs (DMS) Homeland Security Advanced Traffic Management Systems Traffic Management/Operations Center (ATMS) (TMC/TOC) Deployment CCTV & VDS Camera Deployment Our procedures for designing and deploying ITS improvement projects typically follow those outlined in the previous section for traffic signal PS&E delivery. At the start of the design stage, the public agency usually has an idea of what needs to be deployed, based on previous master - planning efforts. If none are available, Minagar & Associates, Inc. will coordinate with the agency to develop appropriate ITS improvements, including FHWA ITS Architecture & Systems Engineering compliance and meeting all of Caltrans Environmental requirements. 9 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA i 1 ®�+ I ■�■� th Street East ®eeeee � s®BaBBB ®B�BBB �oeeBe ®B�BBB ®o�BOB - �BRBBB a ®eeeee s®BeBBB u z W1 BB��BRBBB R : � eeeee El IWi ------------ ------------------ 1 n �I [ oeoo 0000 eeeee r eeeee eaves A - � � ti � eeeee Sample Minagar & Associates, Inc. Video Detection System (VDS) and Signal Plans 10 MINAGAR & ASSOCIATES, INC. — m :'o x1 sox t7 O .s : Ea�ul- xo' lx 4WW u NAS �css muEavnsE No 1 � �. r oii , S V rExpslo N7 i Ps.t..s iN,faNau_r awulNatm emecr Nave slrn 'I "aE. f ❑ E��snx Ml�x�x�� PE�,q�at� ot,E�TOR Al O 9 a� ,❑ .. ;+ 3Y l f - _._______�— — �_=_e:Sr =_ Qom\ —___---.--__ _t35'____—p I --- —.--------------y--------------. smeei uex. cweulr Gwareoe a 3a� +era I I:1M10ZT tr wxEs [a�xaw, .15'7 TO PEreNN nG9V: p Nsrnu RY3 s sw '� E xm I'.E FE El. z c : oDLC D� — x'r siw ALAMEDA AVE x o xzx lea Imq _ CONDVCTOR SC EDP Cree�inaum! GENERAL NOTES: rl m r� n� o� .Viw9+fu+iwj. �' "• c a.aue,,. a„e Ne..,e . AWC CIRQIIT 0 0 ` / as.ea o otx�. Y D iee aaelnonol mnaucwn 9 to omiem me Aar- II 'i ✓ wxtlx re x al .,��. re„a t�xa-,.,,re a.o ,o mo b "I, MICA 1.E �,` i nere rraa encu ee vao�o imt. ­h= _ in'wcI.5HFE"f CITY OF BYRBSNK nt�mc lR.cFFIC N4FL�xh'C'i^,IFlCnTI^�nciVC.cci �IeTd ' wewcxorwe cenFm.ert ALAMEDA AVE AT VIC70f2Y BLVD g Ip Sample Minagar & Associates, Inc. Video Detection System (VDS) and Signal Plans 10 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Sample Minagar & Associates, Inc. CCTV & FiberOptic Interconnect Design for Caltrans MUNICIPAL ENGINEERING For 19 years, Minagar & Associates, Inc. has provided on-call professional traffic engineering and municipal support services to public agencies. In the capacity of City Traffic Engineer, our team provides consulting to the lead agency on transportation and traffic -related matters, providing services, reports, materials and other resources which are normally assigned to the Engineering Division/Section. Related services include: 11 MINAGAR & ASSOCIATES, INC. STATE OF CALIFORNIA o7 La Res a.c:-.• I cE� _.` HEET. DEPARTMENT OF TRANSPORTATION PROJECT PLANS FOR CONSTRUCTION ON m STATE HIGHWAY„ IN LOS ANOELEB COUNTY �• IN LA VERNE, POMONA ANDCLAREMONT - AT VARIOUS LOCATIONS FROM 0.9 KN WEST OF BASELINE ROAD"` W.m•.•�\, TO 0.1 KM EAST OF CLAREMONT BOULEVARD To c euFP- o, sw,xaFa PIaRq dxl, :- 62 in Work •on. � -.-� + KP 9.7� Rd 9,g BEGIN CONSTRUCTION _LLE. HIIB KP0.0 EIRIL r. L -TI - --F KP 16.00 BK= ] �, KP 0.0 dH6 PM O.D L. Ti RWTE 1:. ..".� ]0 F ErvaY _ u o s a .Ir �RFIo s CLAREMONT 1 I EIII II `r `} LA YERNE 43 LOCATIONS OF CONSTRUCTION �, ROUTE 66� / - - � LOLxTION WxttPpxT NP rvESCRIPI]Ox 1.;,. i d91J I aw x.G nOEfxY � u -v iR L4 66 WB ON1Vl+a fi 0.3 21 FF-PduP3 Ld 66 0.4 Al 1x, NOFF-141 II .IiY 3 wEx] FOMONA END CONSTRUCTION = 66 C.9 nV ..TExxr N3,TEFw c u_ KP 1.1 66 1.3 'HEELER xr4.� w� PN 5.2 =.S i+ L+ 60m 1 a :H—Ex 1, w fir, S4dL6 Le 66 xx]TE e.uhPV]T 6t - {q W 3.1- _ rR11.E a - - = Lx 66 T.3 eRTM]lliH xrPe•tl -r - _ - ...r T.e 6.3 F ­Nr Bi x0 LL -LE 11. --f TryI PI EL [.' I"ITE ' IF I E. - _ I_ x1TTrILL °a _ pssaeae 4M1e [Ime Im aea) oP Ic-.,s E T7_Mr 1, IITE _ non �x .° L°xr,�TOTsc I.t, t .. 07-@67604 Sample Minagar & Associates, Inc. CCTV & FiberOptic Interconnect Design for Caltrans MUNICIPAL ENGINEERING For 19 years, Minagar & Associates, Inc. has provided on-call professional traffic engineering and municipal support services to public agencies. In the capacity of City Traffic Engineer, our team provides consulting to the lead agency on transportation and traffic -related matters, providing services, reports, materials and other resources which are normally assigned to the Engineering Division/Section. Related services include: 11 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide 4>X ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA is • Traffic Counts • Traffic Management Plans (TMP) • Engineering & Traffic Surveys (E&TS) • Identification of Grant Opportunities/ Applications • Research for Federal & State Infrastructure Grants • Expert Witness Services • Collaborating with City, County, Caltrans staff, & local law enforcement agencies • Attending City Council, Transportation Commission, & other public meetings • Short- and long-range planning, providing recommendations, and establishing goals and budgets for traffic impact mitigation; • Civil/Structural Engineering Support of Highway Facilities Minagar & Associates, Inc.'s 24 Completed Engineering and Traffic Surveys Sample Minagar & Associates, Inc. 2022 Speed Zoning Analysis Table & Map for the City of Needles S;.pa; rya. Frpm L1md4 Ueeu Llmlrbnnn) ri1191rge To Ex 87th 1- Bailey Avenue City of Solana Beach 2023 CAMUTCD 2014 (Rev. 6, 2021) 29 2_ 2 J sl e l City of Needles 2022 CAMUTCD 2014 (Rev_ 6, 2021) 21 3- 1-40 Ov4rpass 45 44 City of Colton 2022 CAMUTCD 2014 (Rev- 6, 2021) 44 4- 30 City of South Gate 2021-2022 CAMUTCD 2014 (Rev- 6, 2021) 49 5- t�� City of Santa Fe Springs 2021-2022 CAMUTCD 2014 (Rev- 6, 2021) 115 6-. s City of Pomona 2020-2021 CAMUTCD 2014 (Rev- 5, 2020) 131 7_ 8 Elln wive City of Beaumont 2017-2018 CAMUTOD 2014 (Rev_ 2, 2017) 48 8- I.igrris Sireer 35 X City of Bell 2017 CAMUTCD 2014 (Rev- 2, 2017) 14 9- 35 City of Rancho Mirage 2017 CAMUTCD 2014 (Rev- 2, 2017) 66 1D- (*d City of Santa Fe Springs 2016-2017 CAMUTCD 2014 (Rev- 1, 2015) 115 11 ft City of South Pasadena 2014-2015 CAMUTCD 2014 60 12- t�y City of Santa Fe Springs 2014 CAMUTCD 2012 115 13- City of Colton 2013-2014 CAMUTCD 2012 44 14- City of Culver City 2013 CAMUTCD 2012 70 15- City of Lawndale 2013 CAMUTCD 2012 22 16- City of South Pasadena 2012 CAMUTCD 2012 5 17- sy, City of San Marino 2011 CAMUTCD 2010 59 iS- City of South Pasadena 2010 CAMUTCD 2010 6 19- City of Manhattan Beach 2010 CAMUTCD 2010 (2009 Rev-) 51 20- ikll City of Santa Fe Springs 2009 CAMUTCD 2006 115 21 0 City of Baldwin Park 2009 CAMUTCD 2006 54 22_ .tea City of Rancho Santa Margarita 2004 MUTCD 2003 (CA Supp_) 11 23_ City of Baldwin Park 2004 MUTCD (CA Supp_) 54 24. -_ City of Redondo Beach 2003 MUTCD 57 f. - I P ■ D.�7111411 ;p,.. - t I Sample Minagar & Associates, Inc. 2022 Speed Zoning Analysis Table & Map for the City of Needles S;.pa; rya. Frpm L1md4 Ueeu Llmlrbnnn) ri1191rge To Ex 87th ReC. Bailey Avenue 1 Washington Street J Streel 35 28 25 - Salley Avenue 2 J sl e l Llllybilli Dnve 35 40 35 - EaslBroadwayStroct 3 Citbla Sir4e4 1-40 Ov4rpass 45 44 40 0ecmiss@ West Broadway Streel 4 Cihola 51feet C streal 30 38 30 - WeS1 Broadway Streel 5 C Slreat J Str"l 30 33 30 - WBSI Broadway Streel 6 J Slreat Needitt Hiohway 30 17 30 - Cihe1a51ree1 7 D91reO Wa5l Broarnvay Streel 35 3D 25 - Coronado Street 8 Elln wive Lillyhill Drho 25 34 25 - J Stre.P.l 9 Cnrnnedo Streel I.igrris Sireer 35 X 35 - J Street 10 Morris Sueel Wesi SroD4hay Street 35 41 35 - Nunn K Street 11 Fmi Street Needles Bridge 30 36 W - Lillyhlll Driw 12 Parkway Dnye 0 Streel 30 37 30 National Trans Hiunway 13 West Parr[ Road Nogales Highway 46 49 45 Needles Highway 14 NoM K Streel Wasl Broadway Street 30 35 30 12 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA a On -Call Traffic Engineering Services -O- Our transportation planning services bridge the gap between community planning and engineering judgment and include the following, and are described in more detail below. Traffic Impact Analysis Studies Review Development Proposals Conduct studies to ensure the appropriate compliance with City, County and State codes, standards, regulations, etc. EIS/EIR/EA review — compliance with design requirements and standards Pedestrian & Bicycle Studies Parking/Toll Road/Financial studies Demand modeling, rail/transit studies Assistance in Approval for proposed development projects/CUPs Review/recommend land use applications Evaluate and provide recommendations for developer -proposed mitigation measures Demand Modeling Our demand modeling services include development and application of the local or regional demand model using available existing data on its roadways, transit ridership and network information, socioeconomic characteristics, vehicular volumes, average travel times, and planned/programmed projects in the near-term or horizon forecast scenarios. Traffic Forecasting - Trip Generation: Estimation of vehicular trips to be generated from the proposed project; - Trip Distribution: Includes developing a model to determine the projected paths of future trips; - Trip Assignment: Identification of the magnitude and direction of project vehicular trips; - Traffic Scenarios: Involves developing particular "target years" and "conditions" to analyze with respect to important milestones in both the construction phasing of the project and future conditions of the County, such as the choice of target years or application of any trip credits; - Environmental Clearance and Traffic Congestion Mitigatior Includes determining a project's traffic impacts and developing solutions reduce this through mitigation measures. Consultation with lead agency staff and Caltrans (if under state right-of-way) shall also be pursued as needed, so that reviews may be expedited and conflicts and/or misunderstandings are reduced in both the local agency review process as well as any Caltrans encroachment permit processes. Parking Studies Local municipalities generally have parking codes by which new or modified development must abide. Beyond the "black and white" parking code, however, a number of issues can arise which require studying a given site's current parking situation, and y� :+IE [ei�siu_u forecasting its future parking conditions. Lme::- ec Our typical parking study approach takes this into account and consists of the - I•,I!>_An: r iVbp.r bH•• F'4: following steps: 1. Conduct on-site baseline parking accumulation surveys during peak periods of development to determine the magnitude and patterns of existing parking activity. The time frame(s) for these F�U�l PARKING DEMAND & p�a�pl a�-aa-wa, wc, UTILRATM STUDY +« 54rvr/ Shoji n ..pm,an titan+«,ad LOI.Altl4EL _GIST/+ tiR L >IC: C� Fly k _FSVIIE 1'� n 41:,1 HI:YIlMY AC_ 13 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA surveys will be verified with the lead agency at the start of each parking study project. 2. Determine peak hour and day at the site from the parking surveys. 3. Estimate projected parking demand of the proposed development based on the Institute of Transportation Engineers' (ITE) and/or Urban Land Institute's (ULI) parking methodologies. 4. Compare local agency parking requirements with existing and forecasted parking demand, then determine if the site will provide an adequate parking supply under fully built -out conditions. 5. Provide recommendations and/or strategies to improve on- and/or off-site parking conditions. Mitigation Planninq & Impact Fee Analysis - Recommendation of Mitigation Measures: Customized mitigation measures techniques shall be recommended if the subject project exceeds acceptable impact thresholds. - Preparation of Mitigation Plans: This may include plans, schematics, or diagrams such as Signal Modification Plans (1:20 scale), Signing & Striping Plans (1:40 scale), or Parking Layouts. - Impact Fees: As required by the Agency, we will also conduct an impact fee analysis to determine the fair -share contribution of traffic improvements to be apportioned to a given developer. Because the methodology for determining impact fees can vary by city, county, etc., our staff will meet with the lead agency on the approved method for calculating impact fees. Public Right -of -Way Assessments Minagar & Associates, Inc's assessments include: • Assisting in overseeing traffic signal maintenance work by contractors; • Providing public works inspection and/or contract management; • Assisting staff in resolving citizen complaint responses & developing cost estimates; and • Right -of -Way feasibility assessments. SYSTEMS EVALUATION & SUPPORT SERVICES Minagar & Associates, Inc. provides systems evaluation services for measuring the Evaluation of signal re -timing/ Before/After Studies for Transportation synchronization implementations Improvements Evaluation of ITS improvements Our most common systems evaluations consist of performing "Before/After" studies, which measure improvements (travel time, mobility, fuel consumption, etc.) resulting from project implementation. "Before/After" Studies and Reports We usually perform two performance evaluation studies: (1) a field "floating car survey" study of field -collected traffic data, and (2) a comparison of computer-generated traffic simulation models (Synchro/SimTraffic 11.0). Both are used to identify improvements in the "before" & "after" Measures of Effectiveness (MOEs). Performance Evaluation of Regional Surface Transportation Improvements Projects (RSTI) We also provide RSTI evaluation services, 5 00 3-9 4.60 — _ 3-1 m m 2-66 -43 1.00 SIVeh d 0.66 Before ARer Reduction t 19% Improvement in AM travel time 14 MINAGAR & ASSOCIATES, INC. = REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA which involve quantifying and evaluating the benefits and impacts of a given completed surface improvement project on the surrounding transportation network. These include studies such as: - Signal Analyses, which measure the improved signal(s) operation & performance and may use field data such as turning movement counts (TMCs), cycle lengths, signal phasings, etc., - Arterial Analyses, which measure improved traffic flow along a given arterial, and - Unsignalized Intersection Analyses AM I Pia • EB WB EB WB Before 873 644 909 1048 After 9317 749 1854 1238 Sample Minagar & Associates, Inc. RSTI Performance Evaluation: Benefits of Ramp 5ignalization and Addition of 5 Overpass Lanes s PM EB I We Before 714 1 350 After 899 858 Sample Minagar & Associates, Inc. RSTI Performance Evaluation: Benefits of Addition of Lane Mlles to State. Route 138 Ain • E6 t,'VfB I MD EB WB I PM EB WB Bel 81D 900 1230 1350 1280 1180 After 1 850 1170 1150' 920' 1230' 1090" Sample Minagar & Associates, Inc. RSTI Performance Evaluation: Benefits of StreeVRail Grade Separation in the Po..rt of Lo..ng.Beach on Anaheim St- Normction Olympio Intersection Utilisation Sample Minagar & Associates, Inc. AM PM RSTI Performance Evaluation: EB we __ E6 YIf6_ "After 508 275 725 322 533 1 289 1762 330 Normction Olympio Intersection Utilisation Sample Minagar & Associates, Inc. Sample Minagar & Associates, Inc. RSTI Performance Evaluation, RSTI Performance Evaluation: Benefits of Roadway Widening Benefits of Approach Realignment and (Addition of lane miles and throughput) Increase in Turning Radius for Buses 15 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA TEMPORARY TRAFFIC CONTROL/WORK ZONE PLANS Traffic Control Plan (TCP) Services Minagar & Associates, Inc.'s TCPs are prepared in accordance with Caltrans requirements, the WATCH Manual, and/or the governing Agency's Standard Plans, if applicable. Our TCPs are comprehensively prepared to show exact location and limits of construction activity, follow the various staging/phasing of the project, indicate changing hours of operation and parking ------------------- I , I � �' ® � y ' I I �w•l = restrictions, show lane closures and placement of temporary traffic controls, and Image from a Sample Minagar & Associates, Inc. Traffic Control Plan include details on construction activity and equipment being used as part of construction to assist in the Agency's review. Construction Engineering Management (CEM) and Inspection Minagar & Associates, Inc. offers licensed and certified Professional Engineers and Class A, B and C electrical contractors to provide on-site, on-call construction management and inspection services to work on a "moving operation" construction team. These services include, but are not limited to: • Providing on -standby professional consulting services to resolve all construction issues; • Monitoring, inspecting & ensuring the compliance of all Contractor's work; and • Providing Public Relations (PR) services to local businesses regarding construction. Electrical Engineering Services Minagar & Associates, Inc. provides electrical engineering services, including field inspection of equipment and existing conditions. Our licensed and certified engineers and contractors provide field inspection and fine-tuning services for electrical systems, recommendations on traffic signal upgrades, and offer public agencies procurement services in purchasing new signal equipment and providing an in-depth analysis of the Agency's current traffic operations and means for improvement. PUBLIC OUTREACH SERVICES As a quality assurance measure for developing project consensus with the community, Minagar & Associates, Inc. shall lend all necessary technical and planning support to the lead agency's public outreach efforts to inform the public and gain support on given projects through studies, graphs, and other visual exhibits. This includes: 16 MINAGAR & ASSOCIATES, INC. 17) REQUEST FOR PROPOSALS to Provide O 55 ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA • Response to Public Requests Response to Public Questions and Concerns • Attendance at City Council Meetings/Workshops • Attendance at Public Hearings We will also help coordinate any presentations with associated project stakeholders, including: • Elected Officials (City Council) & Staff • Ad Hoc Committees • Community Residents near the project • Educational Institutions • Business owners/operators within the • Civic Organizations & Advocacy Groups project influence area • Transit Customers • Chambers of Commerce • Homeowners Associations (HOAs) Our public outreach services aim to attain the public's input and perspective, provide assistance to the technical issues regarding the project, and promote discussions to facilitate resolutions of community concerns. These efforts are typically required in order to satisfy the requirements of both National Environmental Policy Act (NEPA) and California Environmental Quality Act (CEQA). We have had extensive experience in providing technical assistance to the public and functioning as an instrument between the technical details of given projects and the concerns of public and private entities. Our project manager, Mr. Fred Minagar, frequently leads our project team's efforts in advocating proposed project mitigation measures and addressing the various concerns of the public. Minagar & Associates, Inc. has spearheaded high-profile political projects, such as the Automated Highway System (AHS), representing the following agencies in Cambridge/Boston, Massachusetts: • Federal Highway Administration (FHWA) • Carnegie Mellon University (CMU) • Caltrans Headquarters • General Motors (GM) • Chrysler Motor Company On a smaller scale, Fred frequently has attended Council and Planning Commission Meetings for numerous public agencies, on behalf of both the City and Private parties (depending on the nature of the contract). His most recent public outreach efforts in this stratum have included the City of San Juan Capistrano's Del Obispo Traffic Signal Coordination and Railroad Preemption Study, and the City of Chino Hills' approval of a new church development on Peyton Avenue. 1 �yCrahrGHMYhrINdoN�.hodCm1z — rIN—Feil NIRI-N—IN171.I "°� pY.[AY.16AiYf7 h UN fIN.4[A1'iifiHl' �1ti5T NQli1Fl" .�.-rqY ni.µ3ruR�:ira�v,I�I• . Sample Minagar & Associates, Inc. Public Outreach Efforts 17 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Project Schedule M Since this RFP is based upon an on-call services not a specific task or project in which the scope of work is defined, therefore, depending upon each task or project which will be requested, we shall provide a specific schedule accordingly. However, in order to demonstrate our interest for this on-call traffic engineering project, we shall respond to each task order within 48 hours with an e-mail or telephone call acknowledging the request and shall provide scope and cost accordingly as well. Section 3: References of California Government Agencies The following pages provide project examples demonstrating Minagar's wide range of expertise and experience, accompanied by client contact information for each agency. 18 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA sneer :ecfinn�L" Unsignal;xod In[ersectlan — iMe" " , ` k.A.1 I"COVNn SAN OEM 4*•'NAL CRI OF i'OAGwc"LLR Highway Safety Improvement Program (HSIP) Project for the City of Coachella & Caltrans District 8 PROJECT DESCRIPTION Minagar & Associates, Inc. prepared a complete PS&E package for the City of Coachella and Caltrans District 8 for the City's Highway Safety Improvement Program (HSIP) Cycle 2 Project. The project included 648 upgraded street name signs at approximately 160 unsignalized intersections; twenty-four (24) b- and 8 -foot overhead LED Internally -Illuminated Street Name Signs (IISNS) at 6 signalized intersections on SR -86; 224 regulatory, warning and guide signs on Harrison Street (SR- 86) and Grapefruit Boulevard (SR -111); 13,933 LF of thermoplastic traffic striping; 757 raised pavement markers (RPMs); and 9,625 SF of thermoplastic pavement markings at 27 intersections. The proposed upgrades were designed to conform with the most recent Manual on Uniform Traffic Control Devices in the State of California (2010 edition of CA-MUTCD). The project included preparing a Preliminary Environmental Study (PES) for Caltrans Review with NEPA/CEQA CE/CE environmental clearance documentation, preparing signing and striping plans, construction cost estimates and quantities, providing technical specifications and providing construction engineering management and inspection services. LOCATION J Coachella, Riverside County, CA SCOPE OF WORK Preparation of PS&E Documents J Traffic Engineering Signage Striping Environmental Services Bid Administration Services CLIENT/AGENCY J City of Coachella, CA Mr. Mark Chappell, PE Project Manager 1515 Sixth Street Coachella, CA 92236 E-mail: Now with Chandi Group me@chandigroupusa.com Tel: (760) 396-9260 DATES OF SERVICE 4 2015 STAFF ASSIGNED J Fred Minagar, Serge Tavour & Firoz Vohra 19 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA 2DSafeRoutes to School (SR2S) Project for the City of Coachella, County of Riverside, and Caltrans District 8 PROJECT DESCRIPTION Minagar & Associates, Inc. prepared a complete PS&E package for the City of Coachella and Caltrans District 8 for the City's Safe Routes to School (SR2S) Cycle 8 Project, which included traffic signal, streetscape, and signing & striping improvements for 7 elementary/middle/high schools in the City of Coachella and Riverside County at 16 signalized and unsignalized intersections. The project included design, preparation of construction cost estimates and provisions for technical specifications for a range of roadway improvements at various locations, including: bulb -out retrofitting and pedestrian refuge islands to enhance pedestrian safety by providing safe zones for crossing school children and reducing the crosswalk distance between corners; catch basin and trench drain design related to the above curb extensions to address drainage issues; high -visibility SCHOOL signage and zebra -type striping to increase driver awareness of school zones and downstream school crossings, PUFFIN signals and audible pedestrian signals (APS) to improve the accessibility of crossings at signalized intersections, and other ADA -compliant civil improvements. MINAGAR & ASSOCIATES, INC. LOCATION J Coachella, Riverside County, CA SCOPE OF WORK C+ry of coachaft • : - Safe Routes to School (SR2S) Civil Engineering x071 • . Project Locations Environmental Services Electrical Engineering ersl ilaur'min Ae aatM - E]wnel�Nf S[Imu 71A EiernenC�',S.TmI � Eieme swo � ,44FJ111C . a � (D . y ��med' N �� mm ramn H� SGM1od . 2DSafeRoutes to School (SR2S) Project for the City of Coachella, County of Riverside, and Caltrans District 8 PROJECT DESCRIPTION Minagar & Associates, Inc. prepared a complete PS&E package for the City of Coachella and Caltrans District 8 for the City's Safe Routes to School (SR2S) Cycle 8 Project, which included traffic signal, streetscape, and signing & striping improvements for 7 elementary/middle/high schools in the City of Coachella and Riverside County at 16 signalized and unsignalized intersections. The project included design, preparation of construction cost estimates and provisions for technical specifications for a range of roadway improvements at various locations, including: bulb -out retrofitting and pedestrian refuge islands to enhance pedestrian safety by providing safe zones for crossing school children and reducing the crosswalk distance between corners; catch basin and trench drain design related to the above curb extensions to address drainage issues; high -visibility SCHOOL signage and zebra -type striping to increase driver awareness of school zones and downstream school crossings, PUFFIN signals and audible pedestrian signals (APS) to improve the accessibility of crossings at signalized intersections, and other ADA -compliant civil improvements. MINAGAR & ASSOCIATES, INC. LOCATION J Coachella, Riverside County, CA SCOPE OF WORK Preparation of PS&E Documents J Civil Engineering Traffic Engineering Environmental Services Electrical Engineering CLIENT/AGENCY J City of Coachella, CA Mr. Mark Chappell, PE Project Manager 1515 Sixth Street Coachella, CA 92236 E-mail: Now with Chandi Group me@chandigroupusa.com Tel: (760) 396-9260 DATES OF SERVICE ♦ 2014 STAFF ASSIGNED J Fred Minagar, Serge Tavour, . -��•^ � I IAF - +KWA j r �I 20 REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA r Traffic Control Plans (TCP) for MWD's Perris 3 Valley Pipeline North Reach Construction in Riverside County PROJECT DESCRIPTION Minagar & Associates, Inc. prepared traffic control plans for the Metropolitan Water District (MWD) of Southern California's Perris Valley Pipeline Project. In total, the project consists of 6.5 miles of 96 -inch pipeline from Metropolitan's Henry J. Mills Water Treatment Plant, east along Alessandro Boulevard, then turning south to Oleander Street in the right-of-way paralleling the 215 Freeway. Our TCPs covered the 2.5 -mile span of Alessandro Boulevard from Mission Grove Parkway to the 1-215 Freeway. Traffic control efforts throughout each construction phase were accomplished with the cooperation of the Water District, the City of Riverside and Riverside County Transportation Department. A number of temporary traffic control zone devices were used in our plans, including signs, delineators, changeable message signs, high- level warning devices, types I & III barricades (with blinking lights), flaggers, sand -filled crash cushions, k -rails, and illuminated directional arrow devices. Minagar & Associates, Inc. prepared 23 traffic control plan sheets for each construction phase, including 12 signing & striping plans and 10 temporary traffic signal plans. Signage included the following signs: W6 -3,G20-2, C17(CA)(45), R3-2, R3-18, R11- 2, W3 -5a(45), W20-1, R4 -7a, C40(CA), C30(CA), MINAGAR & ASSOCIATES, INC. M W4-7, R3 -7(R), W23-1. Construction activities external to the placement of traffic control devices included sandblasting existing/conflicting striping; removing reflective pavement markers (RPMs), and installing thermoplastic lane line striping, turn lane arrows, crosswalk lines, and bike lane lines. TCPs were prepared per the CA-MUTCD and WATCH Manual. LOCATION J Riverside, Riverside County, CA SCOPE OF WORK Preparation of Traffic Control Plans (TCP) 23+ Traffic Control Plan Sheets 12 Signing & Striping Plans 10 Temporary Traffic Sig. Plans 8 Signalized Intersections 11 Unsignalized Intersections CLIENT/AGENCY 4 Metropolitan Water District (MWD) of Southern California Mr. Tim Skrove Los Angeles, CA 90054 E-mail: Retired Tel: Retired ,yy� J County of Riverside Department of Transportation 4080 Lemon Street oFA F Riverside, CA 92502 Tel: (951) 955-6800 F r,o.oE DATES OF SERVICE 2012 STAFF ASSIGNED J Fred Minagar, Serge Tavour, Tri Pham 21 REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Proposed Posted Speed Limit m G1 Y E Z 1 25 30 35 40 45 50 111 MPH MPH MPH MPH MPH MPH - ~brio +arra H Mohave County San Bernardino County i 1W. a s, i N.T.S. -,� • Li hill yru m i N� 7 I ISan Clemente / a0 40 " 4 Needles' Citywide Engineering and Traffic Survey PROJECT DESCRIPTION The scope of work for the City of Needles 2022 Citywide Engineering and Traffic Survey (E&TS) included field inspection of citywide roadway conditions, school zones, boundary segments, traffic lanes and medians, and machine Average Daily Traffic (ADT) counts and spot speed surveys for 21 segments. Preliminary research included information on the number of crashes in the City of Needles by Primary Crash Factor (PCF) and Type of Crash, from UC Berkeley Transportation Injury Mapping System (TIMS). ADT counts were taken at each street segment and collision analysis was performed subsequently and compared to the expected collision rate. Based on this analyses, new speed limits were recommended if found to be necessary and depicted on a final map of proposed speed limits. MINAGAR & ASSOCIATES, INC. LOCATION J Needles, San Bernardino County, CA SCOPE OF WORK Field Inspection of Citywide Roadways, School Zones, Traffic Lanes and Medians Machine Counts (ADT) for 114 Segments J Spot Speed Surveys for 114 Segments ♦ 3 -Year Accident Rate Analysis 50/85t" %-Ile Speed Analysis 24"x36" ADT Wall Maps CLIENT/AGENCY J City of Needles, CA Mr. Patrick J. Martinez Assistant City Manager . 817 Third Street Needles, CA 90280 E-mail: DmartinezBcitvofneedles.com Tel: (951) 809-6448 DATES OF SERVICE ♦ 2022 STAFF ASSIGNED J Fred Minagar, Michelle Nguyen & Jenny Tran 23 REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA 5 City of Big Bear Lake's Local Roadway Safety Plan (LRSP) PROJECT DESCRIPTION After collecting 5 -year collision data from UC Berkeley TIMS and investigating existing roadway conditions through field visits, recommendations were proposed for a total of five high - collision roadway segments and five high -collision intersections in the City of Big Bear Lake. Crash diagrams and maps of recommended improvements were created for each roadway segment, and benefit -cost ratios were calculated for each intersection or segment's recommended improvements to determine eligibility for HSIP funding. M LOCATION ♦ Big Bear Lake, San Bernardino County, CA SCOPE OF WORK J Field Observations and Identification/Inventory of Existing Infrastructure and Deficiencies Protected Left -turn Phase Warrant Analysis Preparation of Plans, Specifications & Estimates - Traffic Signal Modification, Construction Plans - Engineer's Cost Estimate CLIENT/AGENCY J City of Big Bear Lake, CA Mr. Sean Sullivan Director of Public Works 38707 Big Bear Blvd. Big Bear Lake, CA 92315 ' E-mail: pmartinez(@cityofneedles.com Tel: (951) 809-6448 DATES OF SERVICE ♦ In Progress STAFF ASSIGNED Fred Minagar, Michelle Nguyen, Jenny Tran No. Item Description Unit Quantity Unit Cost Total HSIP Funding Eligibility LRStV1 CM LRSM CM No. (NS071.* No. (NS06y* 1 Install Cross Traffic Does Not Stop A° 4-4P Sin EA 1 $ 575.00 $ 575.00 909 2 Repaint Pavement W ord MarKinq SOFT 22 $ 14.00 $ 308.00 90% 3 Re aird Intersection Traffic Striping LF 12 $ 3.50 $ 42.00 90% Total $ 925.00 Wei hted.Avera a % 1009 37.89 X Norrsi nalized Countermeasure Identification of Local Roadwa� Safet� Manual (Version 1.6, Alpril2022'. "OS: Other Safety -Related Improvements Total Construction Cost: $ 925.00 Contingencies percentage athe aforementioned Total Construction Cost: 20% $ 185.00 Total Construction Cost(Including Contin encies : $ 1.110.00 24 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA dWao NIR hw, as Caah.. bn,.n 101. RMn HIR Phx7'rte , GrM� Aw. t 4. r• i f CaNM1 MIIB �kvly- Weed! kJ. , .I. WAwd Swd, lawn Unslpnlrte6 Soldy lncencecaon Elnwnt nurnoc or rraa 4 4M In ach d1,wj n FU.C6604 C6*".W6d-,. ■ ■ a Corldor`d S.. Roue .� 4— A—W C6L_ 111nor Cdlvadr Lam! Stress fLkw lYl i[ �Yllnll d'. CINIq HMf rk4y.111 Yipel­ n- Clara. Mlk rbry..a leamon a nw ,' LO[SMIYJwol Counp, Cllk Lkl iuepr11MA1mnda Rd. 5.q-1 ctirw— Pkwy a top— ii CITY OF CHINO HILLS 9 rll ld R.4 Ii - --- x. A— 1 GRfN9lv4 fl n 1 Z 0 a 0 LOS B Y� 06 Chino Hills' Citywide Transportation/ Circulation Element, Traffic Impact Study and CMP Analysis for General Plan Update PROJECT DESCRIPTION Minagar & Associates, Inc. prepared a citywide traffic impact study and assisted City of Chino Hills staff in preparing the Transportation/ Circulation Element for the City's 2012 General Plan Update. The traffic study analyzed the existing citywide circulation system, forecasted future travel demands, and identified potential traffic impacts under Existing Year 2012 conditions, as well as those likely to occur on city streets within future 15 -year (Year 2027 projection) and build -out (Year 2037) scenarios. The study provided various recommended short- and long-term improvement measures to alleviate potential traffic impacts to insignificant levels. Minagar staff collected roadway machine counts for fifty-four (54) citywide segments and turning movement traffic counts at twelve (12) major signalized intersections. A citywide traffic model was developed to analyze existing and future levels of service (LOS) based on the latest Highway Capacity Manual (HCM-2010) methods. In compliance with CEQA requirements, the traffic study also included a Congestion Management Program (CMP) analysis of two (2) CMP intersections and several roadway segments within the San Bernardino County CMP Network. The CMP analysis identified potential impacts and provided recommendations for preventing these traffic impacts. MINAGAR & ASSOCIATES, INC. LOCATION ♦ Chino Hills, San Bernardino County, CA SCOPE OF WORK Citywide Traffic Volumes Field Observations to ID Lane Geometry and Signal Timing/Phasing Parameters ♦ Travel Demand Forecasting ♦ Traffic Impact Analysis CLIENT/AGENCY 4 City of Chino Hills, CA Mr. Joe Dyer, PE Assistant City Engineer 14000 City Center Drive Chino Hills, CA 91709 (909) 364-2771 Idyer(a�chinohills.org DATES OF SERVICE 2012 STAFF ASSIGNED ♦ Fred Minagar, Arian Abrishami, Serge Tavour 25 REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA 'llF:l e'114. kii l•1�1•"•i�:W"1 11F i::✓!:�� �. Lee km MnidD A- aed Jams way hwy ty: city cafe, CA DIST: 9 Ca1:daled by: HR _ Da iW002r CCT: sell 9Mnetdhm checked ar EM Dal, 12z=t RTE" WA Dau Dry. _ n—dry __ Da,s Dat. 1rrtN2021 Imerlettied l: 002 Merldlan Aye (WW) Janas Way fEW f H60 1E4YN. TaMh + 11 1 1 D a 2 0 5 0 5 1 Oinsipmp iIIORSTREEr 97 6 dx 1 H 1 fi 72 1 75 120 1 121 113 2 115 1W 0 199 379 a18 VENCLE y ARVOKGI 40 NPR 3 Appmer4l 25 MPH +tu.,, �� PEeR 164lAlTE $a PONO Huff, RPM& vdmtddi Iln1 yOLCRE 4 4 102 2 104 RWR WERVAL venae VLIT p ra 1 me a 4111e WE D D 40 1 7E 1 79 Vo Ivem.. NO D ¢ i 714 4ehs..' 3 ' V a a 3 1 Velb.. PeJS! Vehf.. Pedy 119 3 122 VNis.. Peds F+eG- VefSs.:PoS! ldn l Prde! Pctla. N5 EW a yi 4 1 5 Rees HHe9 9B% 4% dikes BE.l3 Elees Hikes DN ADA 0 D 0 7 1 33 0 71 G 22 E. D 0 0 0 6 - 1.43 �,6 11G 0 110 D E 49 D 90 0 SSS , 2 3 B 2 10 4, 147 4 151 1694173 P' WE .1I D 73 G 89 G 0 1. 2 2 7 2 9 2 200 wph hr 21 1 43D 290 • 115E8 F7.30 80 D 114 H BO%VblW Met?;2240f Yee D 5 5 3 a N E 1 7 203 5 277 E4, 191 ] 4252.15.230 42 D 99 D 60 D D 5 5 10 a 10 1 7 7 1 158 987 183 8 38 a 77 1 '� G D D 1P 1 13 D 2 l26 2 130 66B 29 1 48 0 85 0 632245 D 2 2 2 0 x117fi1D D 0 9 5 2 7 32 a 57 4 1x9 2 D 2 2 3 0 3 92 2 94 497 11.00 • 11:15 11.15 . 11:30 11.30 11:45 11.45 12 OD 12.00 • 7215 32 D 43 D 50 D 58 1 49 a 35 D 27 D 65 D 50 0 57 6 H60 D D D D 1 1 1 D 11 1 1 D a 2 0 5 0 5 1 1 2 5 6 i7 97 6 dx 1 H 1 fi 72 1 75 120 1 121 113 2 115 1W 0 199 379 a18 9H D 60 D 102 D 88 D 110 D 54 H D 9 D II 3 9 3 5 98% 4% 12-15 . 1230 50 D 51 0 291 0 z x 1 D 1 16 4 4 102 2 104 449 1x30.1145 42 0 33 0 175 7 182 D 1 1 3 0 a D D 40 1 7E 1 79 407 1245. 7100 NO D 58 D 714 D 3 3 a a 3 1 0 119 3 122 .14 160 • 1:15 43 a 39 a 0 0 a 4 1 5 a 9B% 4% E9 1 992 4-45. 1:80 66 D 49 D ADA 0 D 0 7 1 E 22 Peek Hee 11 m 0Tn r19 1 4a9130 - 1.43 E2 a 42 0 .—g. vereyes Perslov,,vM D E D 9 0 7.00 8:OD a1 107 0 E9 D 41 D P' WE .1I D D 0 i 2 6 2 200 wph hr ]120 r14 2 43D 290 • 115E8 0 a7 a BO%VblW Met?;2240f Yee D 11 E 1 7 PM puss! 191 ] 4252.15.230 60 D 98 D 614 D 1 7 7 1 E 183 8 577 2A5 90 a 67 0 D 2 2 3 a 3 29 1 t6D 7 632245 • 3� ES a 58 D D 0 9 5 2 7 1x9 2 641 Colton's Stop Control Warrant Assessment 7 (2021) Minagar & Associates, Inc. was requested to conduct a multi - way stop control warrant assessment. Existing traffic volume counts and field data was collected to determine if the installation of a multi -way stop was warranted for the intersection of Meridian Ave and Janes Way. This data is shown in the table on the right. Through analysis of traffic volume counts and field observations, it was determined that the existing weekday conditions for the subject intersection did not fulfill the minimum warrant criteria and thus, the subject intersection was not converted to a multi -way stop control. M LOCATION J Colton, San Bernardino County, CA SCOPE OF WORK Traffic Volume Counts J Field Surveys Review of City/local guidelines and standards CLIENT/AGENCY J City of Colton, CA Mr. Victor Ortiz Engineering Manager 160S 10th Street Colton, CA 92324 (909) 370-5065 vortiz coltonca.pov DATES OF SERVICE Nov. & Dec. 2021 STAFF ASSIGNED ♦ All listed on the org chart. Table 1. Traffic Volume Warrant Analysis M hxm 8~ 114 D 54 D ly- 8~0. ftYr ANnWof D 1 1 d 0 4 Y hMes Janes Way 172 1 179 520 9H D 60 D 102 D 88 D 110 D 54 H SSfi G C• C• D 0 2 2 1 1 9 3 5 2 0 1 10 3 5 2? 33 1 164 2 166 171 2 179 169 2 171 585 U1. 176 9 47 0 0 4 4 2 3 5 175 7 182 117 0 88 a D D D 3 0 S�198 D18a 714 104 0 54 0 0 D a 1 0 t ',t184 4 184 705 1E a 54 0 D 1 1 E a 6 156 1 157 891 141Mte Veis. 4,313 2,198 1 1,967 1 -0,1fi3 •] 46 46 1M 20 170 1 210 Daily Peek Hee 11 m 0Tn AM Win& Ee1HF, PaH: SH 3 10: Teas All: 4.581 .—g. vereyes Perslov,,vM Asvage TvHe— ps...uph 7.00 8:OD 97x 3x , {N5 «� ren,I P' WE .1I 27 78 :1 MMdey PHihd• 5ltedse Crileris: a 300 rph for BrDu average? Yes 2 200 wph hr &hwr 2. bp? No 200 3:OD W%Cr4erik BO%VblW Met?;2240f Yee 90%W471 21 EE) Nb PM puss! 7D%Crilene: ?Ox 1R4?T?21 D; Yes 70% W? al 401 No 4.30 5:30 Mininum TrelrK Volumes Werremeu6trllarlon sMnBetl? NO Colton's Stop Control Warrant Assessment 7 (2021) Minagar & Associates, Inc. was requested to conduct a multi - way stop control warrant assessment. Existing traffic volume counts and field data was collected to determine if the installation of a multi -way stop was warranted for the intersection of Meridian Ave and Janes Way. This data is shown in the table on the right. Through analysis of traffic volume counts and field observations, it was determined that the existing weekday conditions for the subject intersection did not fulfill the minimum warrant criteria and thus, the subject intersection was not converted to a multi -way stop control. M LOCATION J Colton, San Bernardino County, CA SCOPE OF WORK Traffic Volume Counts J Field Surveys Review of City/local guidelines and standards CLIENT/AGENCY J City of Colton, CA Mr. Victor Ortiz Engineering Manager 160S 10th Street Colton, CA 92324 (909) 370-5065 vortiz coltonca.pov DATES OF SERVICE Nov. & Dec. 2021 STAFF ASSIGNED ♦ All listed on the org chart. Table 1. Traffic Volume Warrant Analysis M hxm 8~ W ly- 8~0. ftYr ANnWof Mslwe ib�f0d0gpe"lr" Approatchft MO I.Yntl a d0 mP477 Y hMes Janes Way Yes 520 %WW Sb1Mlt & NawAverlgs ofAppw**1g W p*ru SO~ VWhIAtt 27 MO .�.�.,.��. r�.a•..rc.e..w.�s.w.,ner4 26 MINAGAR 4C7s ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA 4 CITY OF F / COLTON • r 00 �.a . f I 8 Colton's City Traffic Engineering and Transportation Planning Consultant Services PROJECT DESCRIPTION Minagar & Associates, Inc. has provided contract city traffic engineering services to the City of Colton since early 2013. Major traffic engineering tasks have included preparation of traffic control device warrant studies in conformance with the latest California Manual on Uniform Traffic Control Devices (2012 CAMUTCD), sight distance analyses, independent intersection improvement recommendations, and review of developer traffic studies. A representative list of completed task orders includes: Traffic Control Device Warrant Assessment for La Cadena Drive and Litton Avenue Truck Trip Generation Study and TIA review for the Agua Mansa Warehouse/Distribution Center Development Traffic Control Device Warrant Analysis for the intersections of: Olive Street at Redlands Avenue; Pennsylvania Avenue at Mill Street; Meridian Avenue at Poema Drive; La Cadena Drive at D Street; La Cadena Drive at E Street; Cooley Drive at Old Ranch Road; La Cadena Drive at M Street; Congress Street at Pine Street; and Congress Street at Florez Street Citywide Engineering & Traffic Survey (E&TS) for 44 Speed Zone Segments LOCATION 4 Colton, San Bernardino County, CA SCOPE OF WORK • Traffic Signal Modification Plans • Temporary Traffic Control Detour Plans • Traffic Studies - Truck Trip Generation Study - Sight Distance Analyses - Traffic Control Device Warrant Analyses J Traffic Data Collection J Municipal Traffic Engineering CLIENT/AGENCY J City of Colton, CA Mr. Victor Ortiz Engineering Manager 160S 10th Street Colton, CA 92324 I` ... I. (909) 370-5065 vortiz(c)coltonca.gov DATES OF SERVICE ♦ 2013 - Present STAFF ASSIGNED All listed on the org chart. �a •• MAJOR STREET -7 d of &*Appme - (Vh) A CA9dNA 27 MINAGAR & ASSOCIATES, INC. G REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA (D Signal Synchronization & ITS Training Metra Program for Los Angeles County Metro21y LImM Ym Fm Yam 5upporL( T14' Coufll}'+flda ti�ml5yslems 7rviewlM lho�pam Fred r>�{iia,, ar, F E. Over 1S Years of Training for Metro (1999 to Present) Conducted Over 120 Workshops Created the Traffic Signal Synchronization guidelines for Metro Tra i ned Over 2,400 City Traffic Engineers, Ern gineers &. Tec hnicia ns from 195 Cities in Southern California ITaught Synchro'sComputer Software since its inception in 1991 Metros Trainirtli: + Bus Signal Priority, QuicNet &CtNet + Signal Systems & Homeland Security # Systems Communications &. Regional TMC 4 Traffic Signal Timing Parts I & I I + Video Detection & Surveillance Marion Colston Detector ofStrategrr & Organizational Pfanning Los Angeles County MTA/Metro One Gateway Plaza, Mail Stop= 99-4-6 Los Angeles, CA 90012 Tel= (213) 922-2254 E-mail, colstonmametro_net 28 MINAGAR & ASSOCIATES, INC. 0 If�•h�nraa3 jr M j Metros Trainirtli: + Bus Signal Priority, QuicNet &CtNet + Signal Systems & Homeland Security # Systems Communications &. Regional TMC 4 Traffic Signal Timing Parts I & I I + Video Detection & Surveillance Marion Colston Detector ofStrategrr & Organizational Pfanning Los Angeles County MTA/Metro One Gateway Plaza, Mail Stop= 99-4-6 Los Angeles, CA 90012 Tel= (213) 922-2254 E-mail, colstonmametro_net 28 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA 3 EIR. EHSIEA Projects 7 Traffic Imp aetReportsAnafysesProjects 2 Parking Studies 2 TDM Projects • 2 Transportation Planning Projects 7 ComputarSimulationProjecis 550 Sync hronized?Retuned Signals 2 Com puterMode ling Projects 16 Signal Timing & Opumi7ation Projects 10 System Evaluation Projects 5 Construction Management'lnspection: Inst, illation Projects 4 Teaching & Training Projects 6 'Before' &'After' Studies = 11 ITS Projects = 4 FS€E Frojeets a souasem Gafflornta= 15 EIR.'EIs'EAPiojects 88 Traffic Impact Rep orts�Anafyses Projects 43 Parking Studies 25 Transportation Planning Projects 23 System Evalucticn Projects Y& MunicQal Engineering Projects 41 Traffic Engineering Projects 4 Traffic Management Plan Projects 747 Synchrcni2Pd`Retimed Signals 2 TQM Prcjacts YT CompuPar Modeling Prcjects a Rail Transit Projecis 3 Seaport Projects Y Airport Project 13 Toll Rcad&:Financial Studies PrcoM .3f Signal Timing Projects 21 Signal Optimization Projects 5P Sign a] Design Projects 31 1ntorconnect Design Projects n PS&E Projects 2P Trafic Signal Sjstems Design Projects 15 Comp ierSimLiation Prcjects 28 Construction Managamentlrspectione Installation Projects 110 TeachiroTraining Projects 25 Traffic Control Plan Projects 23 Si nin a Std in Plan Pro' cts MINAGAR & ASSOCIATES, INC 30 Years of Excellence • Washington_ 2EIR-E&FA Projects = r Traffic Impact ReportiAnafys Project • Oregon -,EI I EIRE EISrEA Reject = r Traffic knpact ReporCAralysis Project . klaho: Y EIRi PSIS -A Project I Traffic lmpect Repo MIA na" P roject ,a +Hawaa: • Y TrafficlCtvil Errgireering Project • Lotrisiarra= Tia is ImpacrRaporuAr,*Mi a Toll Reed' Fire r� is I Smdf T s lac E ngirae ring Pmjaci - Natiornvida: 4 Prejects for the R?daraf Highway Administraum a Ohio. T Signal Optimization Project • Mew York: 3 PRIDSdEA Projects 4 Traffic Impact ReportsrAnatysis Projects i Toll RoacliFinancial Study Project 4 Trafic Engireering Rejects Y TrafffieControl Plan Project I Signing & Strpirg Project r ITS Protect • Mass wh userrs: r Computer Moyle ling — . SubwavTransitProject Oonneawtm ► -- r Signal Design Project I Irte rconnact Design Project - • MewJeM)r Y Traffic Impact Report Analysis Praia ct Y Toll RoadiRnancia] Study Project Y Computer Mode ling P rojact Y PS&E Project 2Traffic Engineering Projects i Part Project • W astfingtoan, D -C. I Signal Timing & Optimi2ation Project I Signal Design Project T Traffic Engineering Project # Virginia: I Traffic Ergireadng Project - Y Signal Timing & Optimization Project Y Signal Design Project 9 9 P 9 Je 8 Speed Suvey Projects } Coffaradac L_ #Mew Mexico. • Florida: by = rrO&tProtect ITS Projects 43 "Before" & "After' Studies Y To Road'Flr�neL,l Traffic Engnaanng Propct 7 ParWrg S 26 ITS Pro*is Study Project �' •Month Carolina: ............................................................................................. • Pea lo's Ra ubfic of Chinet • 5 ITSrTraffic Traini Pro is n9 1� -. .... ......................................................................... • sour h Korea: 1 ITSiTraffic Trairin Projects 9 le ................. .............. ®# ICfn darn al Saud Arabia - 1 ITS?Jraffic� Parking P ect n9 til A Traffic apse epo � yrs ss Projects 4 f? IComputer ModelirgPioject 29 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Section 4: Complete Pricing List/Fee Schedule 0 MINAGAR & ASSOCIATES, INC. 3o ; ITS — Traffic+Civil.Tlectrical Engineering — Transportatian Planning — Homeland Security & CEM Consultants 2023 Schedule of Rates for the City of La Quinta Updated Jmmary 1, 2023 NOTES: 1. Mileage is based on the IRS 2023 '_%Sileage Rate. 2. The _ nnuru d Escalation Rate Shall be per GPI for h and EmpiMCoachella Valley Met area for the duration of the contract. 13383 UL Creek D; 4.e' S 1[ze t. L a r! a, H[ is, C_3 Tc= r.v a, -6-12 99 30 MINAGAR & ASSOCIATES, INC. HOURLY Rawl Effective date of CLASSIFICATION BILLING Actuall hourly rate From To Payroll RATE RATE 1 Principal -in -Change $224.92 $80.69 0110112023 1213112023 2 Project Director $224.92 $80.69 0110112023 1213112023 3 Principal Engineer $224.92 $80.69 3110112023 1213112023 4 Senior Project Manager $199.83 $71.89 3110112023 1213112023 5 Field Managed $127.36 $45.69 Construction 0110112023 1213112023 6 City Traffic Engineer $179.79 $64.50 0110112023 1213112023 7 Principal Systemsl $180.62 $64.80 Electrical Engineer 0110112023 1213112023 8 Senior ❑esignerlEngineerlPlanner $167.24 $60.00 0110112423 1213112023 c Project Engineer/Planner $99.92 $35.85 10 TrafficfTransportation Engineer $75.26 $27.00 01;0112023 12/31/2023 11 Engineering Assistant $62.72 $22.53 111111011191(191 121110(19.11 12 Planning Assistant $50.17 $18.00 01101/2023 1213112022 13 Admin Assistant+lntem $48.78 $17.50 01101M22 I 12J3112023 Updated Jmmary 1, 2023 NOTES: 1. Mileage is based on the IRS 2023 '_%Sileage Rate. 2. The _ nnuru d Escalation Rate Shall be per GPI for h and EmpiMCoachella Valley Met area for the duration of the contract. 13383 UL Creek D; 4.e' S 1[ze t. L a r! a, H[ is, C_3 Tc= r.v a, -6-12 99 30 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA Section 5: Staffing and Project Organization The following six (6) key personnel are proposed to provide traffic engineering services for the City of La Quinta. The staff hierarchy and responsibility and availability of each team member are depicted below. Organization Chart Mr. Bryan McKinney, PE Public Works Director Ms. Julie Mignogna Management Analyst Ms. Amy Yu Associate Engineer 7MINAGAR & ASSOCIATES. INC. Fred Minagar, MS, PE, RCE, FITE Project Manager W MINAGAR & ASSOCIATES, INC. Arian Abrishami, BSEE, PE, PMP ITS/Signal Svstems/Electrical Enaineer `11IP MINAGAR & ASSOCIATES, INC. Firoz Vohra, MS, TE Princiaal Traffic Engineer MINAGAR & ASSOCIATES. INC. I ® MINAGAR & ASSOCIATES, INC. Jenny Tran, BSEE Serge Tavour, ASCE Fnnr_ AssPssmPnt/Analvcic RPnr)rt Pranaratinn Roadway & Intersection Geometry Evaluation MINAGAR & ASSOCIATES, INC. Michelle Nguyen, BSCE, EIT Project Traffic Engineer Key Personnel Responsibility and Availability Chart Consulting Traffic Engineering Services Team Staff Fred Minagar, MS, PE, RCE, FITE Arian Abrishami, MSEE, PE, PMP Firoz Vohra, MS, TE Serge Tavour, ASCE Jenny Tu Tran, BSEE Michelle Nguyen, BSCE 4- 0 L M as of co Experience and Expertise 38 65 ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ 31 70 ✓ ✓ ✓ ✓ ✓ 36 85 ✓ ✓ ✓ ✓ ✓ ✓ ✓ ✓ 36 90 ✓ ✓ 3 75 ✓ ✓ ✓ ✓ ✓ 3 75 ✓ ✓ ✓ ✓ ✓ 31 MINAGAR & ASSOCIATES, INC. rREQUEST FOR PROPOSALS to Provide O 55 giON-CALL TRAFFIC ENGINEERING SERVICES CITY OF LA QUINTA, CA n; O Section 6: Subcontracting Services Minagar & Associates, Inc. will not utilize the assistance of any subtractors for this contract with the City of La Quinta. Section 7: Disclosures Minagar & Associates, Inc. has not past or ongoing agreement failures, civil or criminal litigations, or pending investigations in which they have been judged guilty of liable. Section 8: Acknowledgement of Insurance Requirements If selected, Minagar & Associates, Inc. will provide the insurance coverage and indemnification as listed in the City's RFP. Section 9: Non -Collusion Affidavit NON -COLLUSION AFFIDAVIT FORM Must be execrated by proposer and submitted Mth the proposal I, Fred Minagar (name) hereby declare as follows: I am Principal of Minagar & Associates, Inc. (Title) (Company) the party making the foregoing proposal_ that the proposal is not made in the interest of, or on behalf of, any undisclosed person. partnership. company, association, organization, or corporation; that the proposal is genuine and not collusive or sham; that the proposer has not directly or indirectly induced or solicited any other proposer to put in a false or sham proposal_ and has not directly or indirectly colluded, conspired, connived, or agreed with any proposer or anyone else to put in a sham proposal, or that anyone shall refrain from proposing: that the proposer has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the proposal price of the proposer or any other proposer, or to fix any overhead, profit, or cost element of the proposal price, or of that of any other proposer_ or to secure any advantage against the public body awarding the agreement of anyone interested in the proposed agreement; that all statements contained in the proposal are true: and, further, that the proposer has not, directly or indirectly, submitted his or her proposal price or any breakdown thereof, of the contents thereof, or divulged information or data relative hereto, or paid, and will not pay, any fee to any corporation, partnership, company, association, organization. proposal depository, or to any member or agent thereof to effectuate a collusive or sham proposal_ I declare under penalty of perjuryunderthe laws of the State of California that the foregoing is true and correct_ Proposer Signature: Proposer Name: Fred Minagar Proposer Title: Principal Company Name: Minagar & Associates, Inc. Address, 23282 Mill Creek Dr, East Tower, Suite 120, Laguna Hills, CA 32 MINAGAR & ASSOCIATES, INC. REQUEST FOR PROPOSALS to Provide ON-CALL TRAFFIC ENGINEERING SERVICES `x CITY OF LA QUINTA, CA Section 10: Acknowledgement of Addenda ACKNOWLEDGEMENT OF RECEIPT OF ADDENDA Mast be executed by proposer and submitted with the proposal; if no addenda has been issued, mark "NIA' under Adden dum No_ indicating Not Applicable and sign O 55 He ADDENDUM NO. SIGNATURE INDICATING RECEIPT 2 33 On MINAGAR & ASSOCIATES, INC. • J 2019 Winner Orange County Engineering Council's Outstanding Service Award n� of the in the County of Los Angeles 2016 Winner of the ASCE's Outstanding Civil Engineer in the Private Sector Award in the State of California 2009 2016 Winner of the ASCE Los Angeles Section's Outstanding Civil Engineer in the Private Sector Award 2016 Winner of the ASCE Orange County Chapter's Outstanding Civil Engineer in the Private Sector Award Winner of the Caltrans' 2009 Excellence in Transportation Awardr 2016 Certificate of Recognition for Dedication to Support the ELTP Program by Los Angeles County MTA/Metro 2016 Winner of the Orange County Engineering Council's Outstanding Engineering Service Award S2015 2007 Orange County Business Journal's 2015 Excellence in Entrepreneurship Award Nominee L 2014 Orange County Business Journal's 2014 Excellence in Entrepreneurship Award Nominee Civil Engineering Project in Metropolitan Los Angeles 2012 Winner of Cal-EPA/California Air Resources Board's Mill 2005 Winner of the APWA's Best Traffic Congestion Mitigation Project of the Year Cool California Climate Leader + 2011 Award of Excellence in Service by Los Angeles County MTA/Metro Metro in the County of Los Angeles ® 2011 Award of Excellence in Service by Los Angeles County MTA/Metro in the State of CaliforniaCl in the County of Los Angeles •� 2003 Winner of the PTI's Best Transportation Technology Solutions Award ASCE M7 owl -I [}R.�10E C6L1T1' E3��s�tiess JaLx�•u. UR•L"CE CGUM �3��s�tius JoLxh •ii. 11r1 Metro M Metro ® 2010 Award of Excellence in Service by Los Angeles County MTA/Metro n� in the County of Los Angeles Metro 2009 Winner of the ASCE's Outstanding Private Sector Civil Engineering Project in Metropolitan Los Angeles --[� 2009 Winner of the Caltrans' 2009 Excellence in Transportation Awardr in the State of California 2007 Winner of the ASCE's Outstanding Public/Private Sector L _ Civil Engineering Project in Metropolitan Los Angeles Metro j + , qj 2005 Winner of the APWA's Best Traffic Congestion Mitigation Project of the Year Min Southern California Metro 2004 Top Nominee of Transportation Foundation's Highway Management Program in the State of CaliforniaCl •� 2003 Winner of the PTI's Best Transportation Technology Solutions Award Rem in the United States PC mom. 2002 Winner of the ITS -CA's Best Return on Investment Project Award in the State of California 2000 Award of Excellence in Service by Los Angeles County MTA/Metro A4 in the County of Los Angeles Metro • Traffic Engineering _ ry it • Transportation Planning • ITS (Intelligent Transportation Systems) • Civil/Electrical Engineering; • Homeland Security- • Construction Engineering Management MINAGAR & ASSOCIATES, INC. 23282 Mill Creek Drive, Suite 120 30 Years of Laguna Hills, CA 92653 Engin Excell& Planning Tel: (949)707-1199 Web: www.minagarinc.com