CC Resolution 2023-029 Master Fees Schedule - SUPERSEDEDRESOLUTION NO. 2023 — 029
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
LA QUINTA, CALIFORNIA, ADOPTING A REVISED
MASTER FEE SCHEDULE OF VARIOUS USER AND
REGULATORY FEES
WHEREAS, this action is exempt under the California Environmental Quality Act
(CEQA), Article 18, Statutory Exemptions, Section 15273(a) Rates Tolls Fares and
Charges; and
WHEREAS, the City Council adopted Resolution No. 2022-031 on August 2, 2022,
updating the City's Master Fee Schedule of various user and regulatory fees; and
WHEREAS, the City Council desires that annually the fees be increased based on
the all -urban consumers Consumer Price Index (CPI) for Riverside — San Bernardino —
Ontario region; and
WHEREAS, the City commissioned ClearSource Financial Consulting to conduct
the analysis to determine the user and regulatory fee update, which is included in the staff
report and available for public review; and
WHEREAS, the City Council hereby finds that the supporting documents, along
with the most recently completed comprehensive study completed in July 2019, provide
adequate evidence to conclude that the adjusted fees are set at amounts that do not
exceed the estimated reasonable cost to provide the service.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of La
Quinta, California, as follows:
SECTION 1. Each recital, set forth above, is hereby adopted as a specific finding
of this City Council.
SECTION 2. Resolution No. 2022-031 is hereby superseded, and revised fees as
listed in the Master Fee Schedule attached hereto as "Exhibit A," and incorporated
herewith by this reference, are hereby adopted.
SECTION 3. Annually on July 1 the City Manager or his/her designee shall update
and promulgate a new fee schedule whereby all fees are increased based on the all -
urban consumers CPI for Riverside — San Bernardino — Ontario computed from March of
the previous year to March of the current year. If the CPI does not change or goes down
in a given year, no change shall be made to the Master Fee Schedule that year.
SECTION 4. This Resolution shall become effective upon adoption. The fees
imposed by this Resolution shall go into effect October 1, 2023.
Resolution No. 2023 — 029
Master Fee Schedule — Update of User and Regulatory Fees
Adopted: July 18, 203
Page 2 of 2
PASSED, APPROVED, and ADOPTED at a regular meeting of the La Quinta City
Council held on this 18th day of July 2023, the following vote:
AYES: Councilmembers Fitzpatrick, McGarrey, Pella, Sanchez, and Mayor
Evans
NOES: None
ABSENT: None
ABSTAIN: None
LINDA EVANS, Mayor
City of La Quinta, California
ATTEST:
MONIKA RAE5EVACity Clerk
City of La Quinta, California
APPROVED AS TO FORM:
•
Wit4,1,42c
WILLIAM H. IHRKE, City Attorney
City of La Quinta, California
RESOLUTION NO. 2023-029
EXHIBIT A
ADOPTED: JULY 18, 2023
��Qdifitai
GEM of the DESERT —
City of La Quinta
Master Fee Schedule
- Effective October 1, 2023 -
Table of Contents
Contents Page
21
22
Building Fees - Mechanical, Plumbing, and Electrical
Building Fees - Miscellaneous Items
Building Fees - New Construction
Building Fees - Other Fees
Planning Fees
Public Works Fees
Fire Fees
NPDES Ongoing Inspection Fees
Short -Term Vacation Rental Permit Fees
Medical Cannabis Delivery Application Fees
False Alarm Response Fees
Vehicle Impound Cost Recovery Fees
Code Enforcement Hourly Rate for Services
Pool Drain Permit Fees
Home Occupation Permit Fees
Film/Photography Permit Fees
Bingo Permit Fees
Administrative Fees
Appeal Fees
Facility Use Fees
SilverRock Event Site Facility Rental Fees
Parking Lot and Open Space Rental Fees
1
4
7
8
10
13
19
21
22
23
24
25
26
27
28
29
30
31
32
33
35
36
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
Fee Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
Permit Issuance
Permit Issuance (Mechanical, Plumbing, Electrical)
Mechanical
Installation or relocation of each forced -air or gravity -type furnace or
burner, including ducts and vents attached to such appliance
Installation or relocation of each suspended heater, recessed wall heater,
or floor -mounted unit heater
Repair of, alteration of, or addition to each heating appliance,
refrigeration unit, cooling unit, absorption unit, or each heating, cooling,
absorption, or evaporative cooling system, including installation of
controls regulated by the UMC
Installation or relocation of each boiler, condenser, compressor, or each
absorption system
Air -handling unit, including attached ducts
Evaporative cooler, other than portable -type
Ventilation fan connected to a single -duct
Installation of each hood which is served by mechanical exhaust,
including the ducts for such hood
Each appliance or piece of equipment not classified in other appliance
categories, or for which no other fee is listed
Mechanical Change -Out
Condenser Only
Furnace Only
Other Equipment
Packaged Unit
Repair / Alteration
Split -System
Plumbing
Each plumbing fixture or trap or set of fixtures on one trap (including
water, drainage piping, and backflow protection)
Sewer Connection / Septic Abandonment
Rainwater systems, per drain (inside building)
Water heater and/or vent
Industrial waste pretreatment interceptor including its trap and vent,
excepting kitchen -type grease interceptors functioning as fixture traps
Fees
Permit Plan Check Total
$115.94
$45.77
$30.51
$15.26
$45.77
$45.77
$15.26
$15.26
$15.26
$45.77
$45.77
$45.77
$45.77
$45.77
$15.26
$45.77
$15.26
$30.51
$15.26
$15.26
$45.77
$30.51
$15.26
$6.10
$30.51
$15.26
$15.26
$6.10
$6.10
$45.77
$30.51
$30.51
$45.77
$30.51
$6.10
$91.53
$15.26
$21.36
$15.26
$9.15
$15.26
$115.94
$76.28
$45.77
$21.36
$76.28
$61.02
$30.51
$21.36
$21.36
$91.53
$76.28
$76.28
$91.53
$76.28
$21.36
$137.30
$30.51
$51.87
$30.51
$24.41
$61.02
Notes
1
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing, and Electrical
Fee Description
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
Installation, alteration, or repair of water piping and/or water -treating
equipment, drainage or vent piping, each fixture
Backflow protective device other than atmospheric -type vacuum breakers
Gas piping system - 1 to 4 outlets
Gas piping system - 5 or more outlets
Solar (Thermal)
Electrical
New Construction
Residential - First 1,000 SF
(includes livable and non -livable SF)
Residential - Each Additional 1,000 SF
(includes livable and non -livable SF)
Non -Residential - First 2,000 SF
Non -Residential - Each Additional 2,000 SF
Solar (Photovoltaic)
Solar (PV) Less than 10kW
Solar (PV) Greater than 10kW
Each Additional String (<20)
Receptacle, Switch, and Lighting Outlets
Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - first 20
Receptacle, switch, lighting, or other outlets at which current is used or
controlled, except services, feeders, and meters - each additional
Lighting Fixtures
Lighting fixtures, sockets, or other lamp -holding devices - first 20
Lighting fixtures, sockets, or other lamp -holding devices - each add'I
Pole or platform -mounted light replacement, repair or alteration - first 10
Pole or platform -mounted light replacement, repair or alteration - each
additional
Fees
Permit Plan Check Total
$15.26
$15.26
$15.26
$45.77
$30.51
$183.07
$15.56
$137.30
$45.77
$30.51
$45.77
$3.05
$30.51
$3.05
$15.26
$6.10
$30.51
$30.51
$30.51
$60.41
$6.41
$106.18
$12.20
$30.51
$45.77
$0.76
$30.51
$0.76
$30.51
$21.36
$45.77
$76.28
$61.02
$243.48
$21.97
$243.48
$57.97
$61.02
$91.53
$3.81
$61.02
$3.81
$30.51 $30.51 $61.02
$3.05 $0.76 $3.81
$30.51 $30.51 $61.02
$3.05 $0.76 $3.81
Notes
2
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Mechanical, Plumbing,
and Electrical
Fees
Fee Description
Permit
Plan Check
Total
Notes
Residential Appliances
40
Fixed residential appliances or receptacle outlets for same, including wall-
mounted electric ovens; counter -mounted cooking tops; electric ranges;
self-contained room, console, or through -wall air conditioners; space
heaters; food waste grinders; dishwashers; washing machines; water
heaters; clothes dryers; or other motor -operated appliances not
exceeding one horsepower (HP) in rating, each
$15.26
$15.26
$30.51
Non -Residential Appliances
41
Residential appliances and self-contained, factory -wired, non-residential
appliances not exceeding one horsepower (HP), kilowatt (KW) , or kilovolt
ampere (KVA) in rating, including medical and dental devices; food,
beverage, and ice cream cabinets; illuminated show cases; drinking
fountains; vending machines; laundry machines; or other similar types of
equipment, each
$30.51
$30.51
$61.02
Power Apparatus
42
Motors, generators, transformers, rectifiers, synchronous converters,
capacitors, industrial heating, air conditioners and heat pumps, cooking or
baking equipment, and other apparatus, each
$30.51
$30.51
$61.02
Signs, Outline Lighting, and Marquees
43
Signs, outline lighting systems, or marquees, each
$45.77
$61.02
$106.79
Services
44
Services, each
$30.51
$15.26
$45.77
Temporary Power Services
45
Temporary service power pole or pedestal, including all pole or pedestal-
mounted receptacle outlets and appurtenances, each
$30.51
$21.36
$51.87
Miscellaneous Apparatus, Conduits, and Conductors
46
Electrical apparatus, conduits, and conductors for which a permit is
required, but for which no fee is identified
$30.51
$30.51
$61.02
* In addition to the fees identified in this schedule, the City will pass -through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application.
[a] Plan review fees will be waived if approved real time code review software is used.
3
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Fee Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
Addition
Residential Addition
a) Residential Addition - Up to 100 SF
b) Residential Addition - Each Additional 500 SF
c) Structural Review
Non -Residential Addition
a) Non -Residential Addition - Up to 100 SF
b) Non -Residential Addition - Each Additional 500 SF
c) Structural Review
Antenna
Dish > 2 Ft
Cellular/Mobile Phone
Equipment Shelter
Appeal
Appeal
Awning/Canopy (Supported by Building)
Awning/Canopy
Balcony Addition
Balcony Addition
Block Wall
Block Wall - First 100 LF
Block Wall - Each Addt'I 50 LF
Retaining / Combination Wall - Each 50 LF
Carport
Carport - First
Carport - Each Additional
Compliance Survey/Special Inspection
Compliance Survey/Special Inspection
Demolition
Demolition
Demolition - Interior
Demolition - Exterior
Fence
Fence - First 100 LF
Fence - Each Additional 50 LF
Fireplace
Fireplace
Flag/Lighting Pole
Flag/Lighting Pole - First
Flag/Lighting Pole - Each Additional
Fees
Permit Plan Check Total
$153.78
$78.72
$216.02
$21.97
$369.80
$100.69
bill hourly (1 hour min.)
$176.84
$90.53
$248.42
$25.26
$425.27
$115.79
bill hourly (1 hour min.)
$45.77
$183.07
$45.77
$168.42
$259.96
$122.66
$214.19
$443.03
$168.42
bill hourly (1 hour min.)
$18.31 $259.96 $278.26
$183.07 $214.19 $397.26
$61.02 $76.28 $137.30
$18.31 $18.31
$18.31 $18.31
$91.53 $122.66 $214.19
$91.53 $48.82 $140.35
$91.53 $228.84 $320.37
$31.12 $109.84 $140.96
$45.77 $122.66 $168.42
$45.77 $137.30 $183.07
$60.41 $76.89 $137.30
$18.31 $18.31
$183.07 $274.60 $457.67
$45.77 $122.66 $168.42
$18.31 $5.49 $23.80
Notes
4
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Fee Description
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
Grading
Residential Precise Grading (Tract Homes) - Per Home
Residential Precise Grading (Custom Home) - Lot <= 7,000 SF
Residential Precise Grading (Custom Home) - Lot > 7,000 SF
Partition
Partition
Patio Cover / Covered Porch / Lattice
Standard, Open, Pre -Engineered (First)
Standard, Enclosed, Pre -Engineered (First)
Special Design (First)
Each Additional
Pool / Spa
Swimming Pool / Spa
Detached Spa / Water Feature
Gunite Alteration
Equipment Change -out Alone
Remodel
Non -Structural Review - Up to 100 SF
Non -Structural Review - Each Additional 500 SF
Structural Review
Replacement of Plans/Job Card
Replacement of Job Copy of Approved Plans
Replacement of Inspection Record Card
Re -Roof
Re -Roof - Up to 2,000 SF
Re -Roof - Each Additional 1,000 SF
Sign
Monument Sign - First
Monument Sign - Each Additional
Wall/Awning Sign - First
Wall/Awning Sign - Each Additional
Storage Racks
Storage Racks - First 100 LF
Storage Racks - Each Additional 100 LF
Stucco Application
Stucco Application - First 500 SF
Stucco Application - Each Additional 500 SF
Temporary Trailer
Temporary Trailer
Utility Release
Electrical Utility Release
Fees
Permit Plan Check Total
$168.42
$45.77
$45.77
$91.53
$122.66
$122.66
$168.42
$61.02
$228.84
$228.84
$228.84
$30.51
$45.77
$228.84
$168.42
$120.83
$166.59
$212.36
$45.77
$124.49
$124.49
$115.94
$168.42
$91.53
$274.60
$259.96
$243.48
$289.25
$380.78
$106.79
$353.32
$228.84
$353.32
$146.46
$62.24 $170.25 $232.50
$27.46 $21.97 $49.43
bill hourly (1 hour min.)
$259.96 $259.96
$45.77 $45.77
$62.24 $124.49 $186.73
$14.65 $14.65
$91.53 $168.42 $259.96
$31.12 $31.12
$31.12 $109.84 $140.96
$31.12 $31.12 $62.24
$31.12 $120.83 $151.95
$14.65 $14.65
$31.12 $93.37 $124.49
$9.15 $9.15
$183.07 $183.07 $366.14
$91.53 $91.53
Notes
[b]
[a]
[a]
[a]
5
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Miscellaneous Items
Fee Descri • tion
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
Window / Sliding Glass Door / Other Fenestration
Retrofit/Repair - Up to 7
Retrofit/Repair - Each Additional 5
New/Alteration - First
New/Alteration - Each Additional
Administrative
Plan Check Initial Deposit - For Various Non -OTC Items
a) Miscellaneous Items
b) New Construction
Plan Check / Permit Extension Processing
Plan Check / Revisions (per hour)
Change of Contractor, Architect, Owner Processing
Request/Research for Alternative Methods/Product Review
Temporary Certificate of Occupancy
Disabled Access Compliance Inspection
Partial Inspection Fee
Re -inspection Fee
Excess Plan Check Fee
Investigation Fee for Work Commenced Without a Permit
Refunds
a) Fees Erroneously Paid or Collected by the City
b) Fees Prior to Work Being Commenced
c) 180 Days After Payment of Fees
Fees
Permit Plan Check Total
$76.89
$12.81
$122.05
$12.81
$75.06
$139.13
$14.65
$183.07
varies
$122.66
$183.07
$122.66
$151.95
$12.81
$261.18
$27.46
$183.07
$122.66
$183.07
$122.66
bill hourly (1 hour min.)
$549.21
$91.53
$91.53
$183.07
bill hourly
equal to permit fee
100% refund
up to 80% refund
no refund
$549.21
$183.07
$91.53
$91.53
Notes
[e]
[f]
[f]
[g]
[h]
[i]
[j]
* In addition to the fees identified in this schedule, the City will pass -through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application, including the
cost of structural engineering review services.
[a] Fee is intended to capture structural and non-structural reviews. Mechanical, Electrical, and Plumbing review and inspection fees
are collected separately.
[b] Plan review fees for Residential Precise Grading (Tract Homes) are identified as part of the Public Works fee schedule and based
on the number of sheets submitted for plan review. See Public Works fee schedule.
[c] Non -Refundable Initial Deposit. For projects that request permit issuance the intitial deposit amount will be credited against total
[d] Initial deposit varies depending on project details.
[e] Per issuance, each extension will be assessed fee at each occurrence.
[f] The permit fees identified in this fee schedule include initial inspection and one re -inspection. Additional fees will be collected for
the provision of all subsequent permit inspection services. See re -inspection fee and partial inspection fee for applicable fees.
[g] The base plan check fees identified in this fee schedule include initial check and one re -check. Additional fees will be collected
for the provision of all subsequent re -check services.
[h] The Building Official may authorize refunding of any fee paid, or portion thereof, which was erroneously paid or collected by the
city.
[i] No fees are refundable once the work covered by them is commenced.
[j] Whether work has commenced or not, no fees are refundable more than 180 days after their payment.
6
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - New Construction
Fee Description
Fee - Permit *
1
2
3
4
New Construction
$1 - $10,000
$10,001 - $25,000
$25,001 - $200,000
$200,000 and Up
$183.07 for the first $54.92 for each additional $1,000 or fraction
$5,000, plus thereof, to and including $10,000
$457.67 for the first $12.20 for each additional $1,000 or fraction
$10,000, plus thereof, to and including $25,000
$640.74 for the first $9.41 for each additional $1,000 or fraction
$25,000, plus thereof, to and including $200,000
$2,288.36 for the first $4.71 for each additional $1,000 or fraction
$200,000, plus thereof
Fee Description
5
6
7
8
(Project Valuation)
$1 - $10,000
$10,001 - $25,000
$25,001 - $200,000
$200,000 and Up
Fee - Plan Check *
$183.07 for the first
$5,000, plus
$640.74 for the first
$10,000, plus
$961.11 for the first
$25,000, plus
$1,556.08 for the first
$200,000, plus
$91.53 for each additional $1,000 or fraction
thereof, to and including $10,000
$21.36 for each additional $1,000 or fraction
thereof, to and including $25,000
$3.40 for each additional $1,000 or fraction
thereof, to and including $200,000
$2.72 for each additional $1,000 or fraction
thereof
Fee Description
9
(Project Valuation)
All Valuations
Fee - Plan Check for
Multiple Structures - Each Additional **
$61.02
* The new construction fees identified in this fee schedule include the cost of structural engineering review services currently
conducted by outside service providers. Additional fees will be collected for the provision of all plan review services beyond
second review.
* The permit fees identified in this fee schedule include initial inspection and one re -inspection. Additional fees will be collected
for the provision of all subsequent permit inspection services. See re -inspection fee and partial inspection fee for applicable fees.
* The base plan check fees identified in this fee schedule include initial check and one re -check. Additional fees will be collected
for the provision of all subsequent re -check services.
** Fee applies when multiple identical units are submitted for review and permitted at the same time.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine
the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
Fee Description
10
11
12
Building Department Staff
City Attorney/Other Legal Rvw
Outside Service Providers
$183 per hour
100% of actual costs
100% of actual costs
7
City of La Quinta
Master Fee Schedule
Schedule of Building Fees - Other Fees
Fee Description
1
2
3
4
5
6
7
Strong Motion Instrumentation (SMI)
Fee Calculation
Residential
Commercial
Art In Public Places (AIPP) Fee Calculation
Residential
Commercial
Building Standards Administration Special Revolving
Fund (SB 1473) Fee Calculation
Valuation:
a) $1 - $25,000
b) $25,001 - $50,000
c) $50,001 - $75,000
d) $75,001 - $100,000
e) Every $25,000 or fraction thereof above $100,000
Technology Enhancement Fee
Technology Enhancement Fee (per permit)
Digital Archiving and Records Management Fee
Digital Archiving and Records Management Fee
a) OTC Permit/Application
b) All Others
[a] Source: La Quinta Municipal Code 2.65.060.
[b] Source: California Health and Safety Code Section 18931.6
Fee
$0.50 or valuation x .00013
$0.50 or valuation x .00028
$20.00 or 1/4 of 1% of value exceeding $200,000
$20.00 or 1/2 of 1% of value
$1
$2
$3
$4
Add $1
$8
$12
$23
Notes
[a]
[b]
8
Building Valuation Data
Occupancy and Type
Cost per
Sq Ft Avg
1 APARTMENT HOUSES:
Type I -A or I-B *
(Good)
Type V - Masonry
(or Type III)
(Good)
Type V - Wood Frame
(Good)
Type I - Basement Garage
2 AUDITORIUMS:
Type I -A or I-B
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
3 BANKS:
Type I -A or I-B *
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
4 BOWLING ALLEYS:
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
5 CHURCHES:
Type I -A or I-B
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
6 CONVALESCENT
Type I -A or I-B *
Type II -A
Type III -A
Type V-B
$72.50
$89.00
$58.80
$71.80
$51.60
$65.90
$30.80
$85.80
$61.50
$58.80
$64.60
$61.70
$61.40
$58.50
$121.40
$88.20
$85.60
$97.70
$94.30
$87.90
$85.00
$41.10
$38.30
$44.90
$41.90
$30.50
$81.20
$60.20
$57.20
$65.50
$62.50
$60.80
$58.00
$113.80
$77.20
$80.10
$75.10
Occupancy and Type
Cost per
Sq Ft Avg
7 DWELLINGS:
Type V - Masonry
(Good)
Type V - Wood Frame
(Good)
Basements -
Semi -Finished
(Good)
Unfinished
(Good)
8 FIRE STATIONS:
Type I -A or I-B
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
9 HOMES FOR THE ELDERLY:
Type I -A or I-B
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
10 HOSPITALS:
Type I -A or I-B *
Type III -A
Type V-A
11 HOTELS AND MOTELS:
Type I -A or I-B *
Type III -A
Type III-B
Type V-A
Type V-B
12 INDUSTRIAL PLANTS:
Type I -A or I-B
Type II -A
Type II-B
Type III -A
Type III-B
Tilt -up
Type V-A
Type V-B
$60.80
$78.00
$54.30
$77.90
$16.20
$18.50
$12.20
$14.30
$92.80
$60.50
$57.50
$66.70
$63.80
$62.20
$59.20
$85.00
$68.40
$65.20
$71.20
$68.20
$68.60
$65.70
$133.50
$109.40
$103.50
$82.20
$71.00
$67.60
$62.90
$59.90
$46.60
$32.10
$29.40
$35.30
$32.80
$24.10
$33.00
$30.20
Occupancy and Type
Cost per
Sq Ft Avg
13 JAILS:
Type I -A or I-B
Type III -A
Type V-A
14 LIBRARIES:
Type I -A or I-B
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
15 MEDICAL OFFICES:
Type I -A or I-B *
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
16 OFFICES**:
Type I -A or I-B *
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
17 PRIVATE GARAGES:
Wood Frame
Masonry
Open Carports
18 18. PUBLIC BUILDINGS:
Type I -A or I-B *
Type II -A
Type II-B
Type III -A
Type III-B
Type V-A
Type V-B
19 PUBLIC GARAGES:
Type I -A or I-B *
Type I or II Open
Type II-B
Type III -A
$130.00
$116.90
$88.00
$95.40
$68.90
$65.50
$72.70
$69.20
$68.20
$65.20
$97.40
$74.60
$71.20
$78.60
$75.70
$72.90
$70.00
$87.20
$57.80
$55.20
$62.40
$59.60
$57.80
$54.90
$19.60
$22.00
$13.30
$101.40
$80.90
$77.60
$83.80
$81.10
$76.70
$73.80
$39.60
$30.00
$23.20
$29.90
Cost per
Occupancy and Type Sq Ft Avg
Type III-B
Type V-A
20 RESTAURANTS:
Type III -A
Type III-B
Type V-A
Type V-B
21 SCHOOLS:
$26.70
$27.10
$78.80
$76.20
$72.00
$69.10
Type I -A or I-B $90.90
Type II -A $61.20
Type III -A $65.70
Type III-B $62.30
Type V-A $61.20
Type V-B $58.40
22 SERVICE STATIONS:
Type II-B $54.40
Type III -A $56.60
Type V-A $48.10
Canopies $22.60
23 STORES:
Type I -A or I-B * $67.40
Type II -A $40.60
Type II-B $39.80
Type III -A $49.60
Type III-B $46.80
Type V-A $41.60
Type V-B $38.40
24 THEATERS:
Type I -A or I-B $89.80
Type III -A $64.60
Type III-B $61.60
Type V-A $60.40
Type V-B $57.40
25 WAREHOUSES***:
Type I -A or I-B $40.40
Type II -A or V-A $23.60
Type II-B or V-B $22.20
Type III -A $27.10
Type III-B $25.90
EQUIPMENT
AIR CONDITIONING:
Commercial $3.50
Residential $2.90
SPRINKLER SYSTEMS: $1.70
* Add 0.5 percent to total cost for each story over three.
** Deduct 20 percent for shell -only buildings.
*** Deduct 11 percent for mini -warehouses.
Note: Building valuation data transcribed from Building Standards, July -August 1994 and adapted to 2007 CBC Types of Construction. Revised 3/5/2009.
9
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Fee Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
Temporary Use
Temporary Use Permit - Minor (Standard)
Temporary Use Permit - Minor
(Requests Requiring Additional Effort)
Temporary Use Permit - Major (Standard)
Temporary Use Permit - Major
(Requests Requiring Additional Effort)
Minor Use
Minor Use Permit
Minor Use Permit - Amendment
Conditional Use
Conditional Use Permit
Conditional Use Permit - Planned Unit Dev.
Conditional Use Permit - Amendment
Conditional Use Permit - Time Extension
Expedited Review Fee
Expedited Review Fee
Site Development
Development Agreement
Site Development Permit - Planning Commission
Site Development Permit - Administrative
Site Development Permit - Amendment
Site Development Permit - Time Extension
Modification by Applicant
Minor Adjustment
Underground Waiver
Variance
Landscape Plan
Final Landscape Plan
Housing
Senate Bill (SB) 330 Application Review
Conceptual Design Review
Conceptual Design Review
Signs
A -Frame Sign Permit
Sign Permit
Sign Program
Sign Program Amendment
Fee *
bill per hour, with
bill per hour, with
bill per hour, with
bill per hour, with
bill per hour, with
bill per hour, with
bill per hour, with
bill per
bill per
bill per
bill per
bill per
bill per
bill per
bill per
hour, with
hour, with
hour, with
hour, with
hour, with
hour, with
hour, with
hour, with
bill per hour, with
$7,292
$7,292
$3,555
$1,922
1.5x
standard
fee
$3,783
$10,130
$8,665
$5,309
$1,922
$455
$455
$2,746
$2,746
$2,288
$1,465
$2,563
$0
$404
$3,234
$1,098
$455
$455 base fee
$2,380
$2,380 base fee
$455 base fee
$455 base fee
base fee
base fee
base fee
base fee
base fee
base fee
base fee
base fee
base fee
base fee
base fee
base fee
Notes
[a]
[b]
[c]
10
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Fee Description
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
Zoning
Zone Change
Director's Determination
Certificate of Compliance
Zoning Letter - Basic Property Information
Zoning Letter - Basic Property Information with
Additional Research Required
Zoning Text Amendment
Street Name Change
Street Name Change
Historical Structures
Landmark Designation/Cert of Appropriateness
Environmental Review
Recordation of Exemption
Initial Study (ND/MND)
Environmental Impact Report
General/Specific Plan
Specific Plan
Specific Plan - Amendment
General Plan Amendment
Map
Tentative Parcel Map
Tentative Parcel Map - Waiver
Tentative Parcel Map - Amendment
Tentative Parcel Map - Revision
Tentative Parcel Map - Time Extension
Tentative Tract Map
Tentative Tract Map - Amendment
Tentative Tract Map - Revision
Tentative Tract Map - Time Extension (CC or PC)
Tentative Tract Map - Time Extension (Admin)
Tentative Condominium Map
Amended Final Parcel Map (Entitlement Support)
Amended Final Tract Map (Entitlement Support)
Zoning Clearance - Planning Plan Check
Zoning Clearance - Planning Plan Check
a) Alterations/Additions - Residential
b) New Construction - Single Family Residential
c) New Construction - 2-4 Residential Units
d) New Construction - 5+ Residential Units
e) New Construction - Non -Residential
f) Alterations/Additions - Non -Residential
Fee *
bill per hour, with $10,679 base fee
$461
$574
$299
$1,556
bill per hour, with $10,740 base fee
$2,288
$1,501
$183
bill per hour, with $3,661 base fee
bill per hour, with $10,618 base fee
bill per hour, with $12,327 base fee
bill per hour, with $5,431 base fee
bill per hour, with $11,899 base fee
bill per hour, with $5,736 base fee
$1,556
bill per hour, with $3,417 base fee
bill per hour, with $3,417 base fee
$1,098
bill per hour, with $9,520 base fee
bill per hour, with $4,516 base fee
bill per hour, with $4,516 base fee
$2,105
$1,190
bill per hour, with $9,520 base fee
bill per hour, with $4,577 base fee
bill per hour, with $7,323 base fee
$92
$183
$275
$732
$366
$183
Notes
11
City of La Quinta
Master Fee Schedule
Schedule of Planning Fees
Fee Description
56
57
58
Technology Enhancement Fee
Technology Enhancement Fee
Digital Archiving and Records Management Fee
Digital Archiving and Records Management Fee
a) OTC Permit/Application
b) All Others
Appeal
Appeal
Fee *
$8
$12
$23
$1,500
Notes
* In addition to the fees identified in this schedule, the City will pass -through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine
the appropriate fee based on the following hourly rates for staff time involved in the service or activity.
Fee Description
59
60
61
Planning Department Staff
City Attorney or Other Legal Review
Outside Service Providers
Proposed Fee *
$183
pass -through of 100%
pass -through of 100%
per hour
of actual costs
of actual costs
Note: If multiple applications are received concurrently from the same applicant for different projects that require similar
application review and are generally similar except for location, one project location shall pay 100% of application review fee(s),
the fee(s) for each project application at other locations shall be 50% of the original fee(s).
[a] Request for expedited service is subject to Design & Development Department Director approval. It is dependent on staff
availability and workload.
[b] In addition to the fee shown for Development Agreement, the City shall collect a $5,000 initial deposit to offset City Attorney
costs.
[c] 50% of fee may be credited toward entitlement application submittal.
12
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description
1
2
3
4
5
6
Land Subdivision
Parcel Map:
a) Final Parcel Map
i) Initial Sheet
ii) Each Additional Sheet
b) Final Parcel Map - Amendment
i) Initial Sheet
ii) Each Additional Sheet
c) Substantial Conformance Review
i) Initial Sheet
ii) Each Additional Sheet
Tract Map:
a) Final Tract Map
i) Initial Sheet
ii) Each Additional Sheet
b) Final Tract Map - Amendment
i) Initial Sheet
ii) Each Additional Sheet
c) Substantial Conformance Review
i) Initial Sheet
ii) Each Additional Sheet
Reversion to Acreage:
a) Initial Sheet
b) Each Additional Sheet
Lot Line Adjustment/Parcel Merger
a) Lot Line Adjustment
b) Parcel Merger
Street Dedication/Vacation
a) Land Action Documents
(ROW/Easements/Grant Deeds)
b) Vacation of Street/Public ROW
Land Survey
a) Record of Survey
b) Certificate of Correction
Fee *
$2,838 per sheet
$824 per sheet
$2,838 per sheet
$824 per sheet
$3,341 per sheet
$1,465 per sheet
$3,021 per sheet
$915 per sheet
$3,021 per sheet
$915 per sheet
$3,341 per sheet
$1,465 per sheet
$3,112 per sheet
$824 per sheet
$2,197 per request
$2,197 per request
$2,243 per request
$2,746 per request
$595 per request
$778 per request
Notes
13
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description
7
Grading / Project Improvements
Plan Review (First 3 Reviews):
a) Rough Grading
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
b) Precise Grading - Commercial
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
c) Precise Grading - Tract Homes
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
d) Precise Grading - Custom Home
e) PM10
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
f) Street Improvements
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
g) Storm Drain
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
h) Signing and Striping
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
Fee *
$1,785
$915
$1,305
$915
$2,243
$1,281
$1,671
$1,281
$1,373
$229
$710
$229
$665
$0
$512
$0
$2,060
$1,098
$1,488
$1,098
$1,876
$1,098
$1,488
$1,098
$1,693
$915
$1,305
$915
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
Notes
[a]
14
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description
8
9
10
i) Traffic Signal
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
j) Sidewalk
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
k) Traffic Control Plan
I) Record Drawings Review
i) Initial Sheet
ii) Each Additional Sheet
m) Hydrology Report
i) Revisions
n) Traffic Study
o) WQMP Report
i) With Prior Entitlement
ii) Without Prior Entitlement
iii) Revisions
p) SWPPP/Erosion Control Plan
i) Revisions
q) Sewer and Water
i) Initial Sheet
ii) Each Additional Sheet
iii) Revisions - Initial Sheet
iv) Revisions - Each Additional Sheet
Plan Review (>3 Reviews)
Expedited Plan Review Fee
Permit Inspection
a) Rough Grading
i) First 3 Acres
ii) Each Additional Acre
iii) Last One Acre
b) Precise Grading
i) First 3 Acres
ii) Each Additional Acre
iii) Last One Acre
Fee *
$1,510
$732
$1,122
$732
$1,327
$549
$939
$549
$92
$961
$183
$1,968
$915
$1,510
$1,785
$2,151
$915
$2,060
$732
$1,465
$549
$915
$549
$183
1.5x standard fee
$3,661
$915
$458
$3,661
$915
$458
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per sheet
per report
per report
per study
per report
per report
per report
per plan
per plan
per sheet
per sheet
per sheet
per sheet
per hour
Notes
[b]
15
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description
c) Precise Grading - Tract Homes
d) Precise Grading - Custom Homes
e) PM10
i) < 10 Acres
ii) 10 - 50 Acres
iii) 51- 200 Acres
iv) > 200 Acres
f) Street Improvements - Off -Site
i) First 1,000 LF
ii) Each Additional 1,000 LF
iii) Last 1,000 LF
g) Street Improvements - On -Site
i) First 1,000 LF
ii) Each Additional 1,000 LF
iii) Last 1,000 LF
h) Storm Drain
i) First 1,000 LF
ii) Each Additional 1,000 LF
iii) Last 1,000 LF
i) Signing and Striping
i) First 1,000 LF
ii) Each Additional 1,000 LF
iii) Last 1,000 LF
j) Traffic Signal
k) NPDES
I) Bond Reduction Request
m) Final Inspection/Acceptance
n) Traffic Control Only
i) One Day
ii) Two - Five Days
iii) Each Additional Day (Up to 10 Days)
iv) 11+ Days
o) Cut/Bore
p) Driveway
i) Residential
ii) Commercial
Fee *
$168
$92
$4,394
$6,590
$8,787
$13,181
$5,858
$5,126
$3,295
$4,028
$3,295
$2,197
$3,478
$2,746
$1,831
$1,831
$1,098
$549
$4,943
$2,197
$2,471
$3,295
$370
$739
$370
$4,302
$824
$199
$1,190
Notes
[c]
[c]
[d]
[d]
[d]
[d]
16
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description
11
12
13
14
15
16
q) Excavation / Trenching
i) First 100 LF
ii) Each Additional 100 LF
iii) Last 100 LF
r) Sidewalk
i) First 100 Lineal Feet
ii) Each Additional 100 Lineal Feet
iii) Last 100 Lineal Feet
s) Sewer and/or Water
t) Night Work
Research/Administrative
a) Subdiv'n Improvement Agreem't (SIA)
b) SIA - Time Extension
c) Assignment & Assumptions Agreement
d) Flood Plain Research/FEMA App
e) Bid Protest Review
Reactivation of Permit
a) Reactivation of an Expired Permit / Permit Extension
Technology Enhancement Fee
Technology Enhancement Fee
Digital Archiving and Records Management Fee
Digital Archiving and Records Management Fee
a) OTC Permit/Application
b) All Others
Transportation Permits
a) Annual
b) Single Event
Refunds
a) Refunds for Plan Checks
i) If plan check has not begun
ii) If 1st plan check has begun
iii) If 2nd plan check has begun
iv) Past 2nd plan check
b) Refunds for Permits - Permit issued and no work has
commenced
Fee *
$824
$366
$183
$917
$500
$167
$1,465
$458
$2,197
$1,281
$2,380
$1,098
$824
10% of original permit
fee
$8
$12
$23
$90
$16
90% refund
30% refund
10% refund
no refund
Up to 50% of original
permit fee
per request
per request
per request
per request
one year extension
Notes
[e]
[e]
[e]
[e]
[f]
17
City of La Quinta
Master Fee Schedule
Schedule of Public Works Fees
Fee Description
Fee *
Notes
* In addition to the fees identified in this schedule, the City will pass -through to the applicant any discrete costs incurred from the
use of outside service providers required to process the specific application. Exception for contract traffic engineering and plan
review consulting costs, which are included in the fees listed above.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
Fee Description
17
18
19
Public Works Personnel
City Attorney or Other Legal Review
Outside Service Providers
Fee *
$183
100%
100%
per hour
pass -through of actual
cost
pass -through of actual
cost
[a] Plan review fees for Precise Grading - Custom Home are identified as part of the Building fee schedule and are based on the lot
size of the custom home. See Building fee schedule, Grading section.
[b] Expedited Plan Review request is subject to City Engineer approval. It is dependent on staff availability and workload.
[c] Inspection fees for Precise Grading - Custom Homes and Tract Homes are identified as part of the Building fee schedule. See
Building fee schedule, Grading section.
[d] For PM10 annual permit. For permits required for less than one year, or portion of year, fees will be pro -rated based on the
number of months permitted.
[e] Upon request of the applicant, the director may authorize refunding a percentage of fees paid with the following schedule. If any
portion of the plan check fee has been paid out by the city to another agency or consultant for services rendered in connection with
the plan check, no refund of that portion of the fee shall be made.
[f] Upon request of the applicant, the director may authorize refunding of not more than 50% of fees paid when no work has been
done under an issued permit. In no case shall the refund exceed the cost of services provided to date of cancellation of permit
issuance.
18
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
Fee Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Construction -Related Fire Review and Inspection Fees
New Multi -Residential (Hotel, Motel, Apartments, Condominiums)
New Commercial / Industrial
Residential Addition / Remodel
Commercial Tenant Improvement
Commercial / Industrial Addition or Remodel
New Single Family Dwelling (Access/Water)
Automatic Suppression System
Kitchen Hood Suppression System
Fire Suppression System - Existing Modifications
Fire Alarm Systems
Fire Alarm -Monitoring and Tenant Improvements
Fire Sprinkler Systems - Single Family Detached
a) 1-50 Sprinkler Heads
b) 51-100 Sprinkler Heads
c) Over 100 Sprinkler Heads
Fire Sprinkler Systems - Tract Master Plan
Fire Sprinkler Systems - Tract Production Home
Fire Sprinkler Systems - Multi -Family 3 or more units
Fire Sprinkler Systems - Commercial / Industrial 0 - 35,000 SF
Fire Sprinkler Systems - Commercial / Industrial 35,001- 75,000 SF
Fire Sprinkler Systems - Commercial / Industrial 75,001- 120,000 SF
Fire Sprinkler Systems - Commercial / Industrial > 120,000 SF
Fire Sprinkler Systems - Tenant Improvement
Fire Pumps
Fire Standpipe Systems
Smoke Controls Systems
Private Fire Mains
Fire Protection Water Supply - Existing System Modifications
Water Storage
Public Hydrant System
Energy Storage Systems
Emergency Responder Radio Coverage
AST - Fuel Storage Tank
Fuel Dispensers
Hazardous Materials - HMIS / H-OCC
Fee *
Permit /
Plan Review Inspection Total
$549 $366
$549 $458
$91 $91
$274 $183
$274 $274
$91 $91
$366 $366
$274 $183
$183 $183
$641 $549
$274 $183
$274 $183
$274 $274
$274 $366
$274 $0
$0 $183
$366 $274
$458 $274
$549 $321
$641 $458
$732 $641
$183 $366
$366 $366
$274 $366
$641 $549
$366 $366
$183 $183
$366 $549
$183 $183
$183 $183
$274 $274
$183 $183
$183 $183
$274 $366
$915
$1,007
$182
$458
$549
$182
$731
$458
$366
$1,190
$458
$458
$549
$640
$274
$183
$640
$732
$870
$1,099
$1,374
$549
$731
$640
$1,190
$731
$366
$915
$366
$367
$549
$367
$367
$640
Notes
[a]
[a]
[a]
[a]
[b]
19
City of La Quinta
Master Fee Schedule
Schedule of Fire Fees
Fee Description
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
High -piled Combustible Storage
Solar PV Power System (Commercial)
Special Event Structure / Tent
Gas Detection System
Plan Revision Submittals - each
Plan Resubmittals (in Excess of 3 Reviews) - each
Failed or Additional Field Inspections (Excessive) - each
Operational Permit
Exhibits & Tradeshows
Fire Operational Permit (per hour)
Other
Tract access/Hydrant inspection
Fire Access Gate Assembly
Special Event Permit
Pyrotechnic Permit (Review & Standby Charge)
Fire Safety Officer Standby - Events
Fire Miscellaneous (per hour)
Fire Permit Extensions (Admin Processing)
Technology Enhancement Fee
Technology Enhancement Fee
Digital Archiving and Records Management Fee
Digital Archiving and Records Management Fee
Fee *
Permit /
Plan Review Inspection Total
$274
$183
$183
$183
$183
$183
$0
$91
bill hourly
$0
$183
$183
$183
bill hourly
bill hourly
n/a
n/a
$366
$183
$183
$183
$0
$0
$183
$183
bill hourly
$183
$183
$274
$916
bill hourly
bill hourly
n/a
n/a
$640
$367
$367
$367
$183
$183
$183
$274
per hour
$183
$366
$458
$1,099
per hour
per hour
$92
$8
$23
Notes
* In addition to the fees identified in this schedule, the City will pass -through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific application, including but
not limited to legal review.
For service requests, which have no fees listed in this Master Fee Schedule, the City Manager or his/her designee shall determine the
appropriate fee based on the following hourly rates for staff time involved in the service or activity.
Fee Description
51 City Assigned Fire Safety Specialist
52 Other County Fire Services
53 City Attorney or other legal review
54 Outside Service Providers
Fee *
$183 per hour
See County Fees
100% of actual costs
100% of actual costs
[a] Fee will not apply for all submittals. Before applying fees, Fire Department will review project submittal to determine if review is
necessary or if review fees have been collected as part of the development planning process.
[b] Fee is per building.
20
Master Fee Schedule
Schedule of NPDES Ongoing Inspection Fees
1
2
3
NPDES Ongoing Inspection Fee
Food Establishment Facilities
Hazardous Waste/Materials Facilities
Code Compliance
Code Compliance Follow -Up, If Required
$53
$112
$134
Unit
per year
per year
per hour
21
City of La Quinta
Master Fee Schedule
Schedule of Short -Term Vacation Rental Permit Fees
Fee Description
1
2
3
4
5
Short -Term Vacation Rental Permit Fee
Homeshare Short -Term Vacation Rental Permit
Homeshare STVR Permit - Less than 5 Bedrooms
Homeshare STVR Permit - 5 Bedrooms or More
Primary Residence Short -Term Vacation Permit
Primary Residence STVR Permit - Less than 5 Bedrooms
Primary Residence STVR Permit - 5 Bedrooms or More
General Short -Term Vacation Rental Permit
General STVR Permit - Less than 5 Bedrooms
General STVR Permit - 5 Bedrooms or More
General Short -Term Vacation Rental Permit (subject to annual mitigation fees)
General STVR Permit - Less than 5 Bedrooms (subject to mitigation fees)
General STVR Permit - 5 Bedrooms or More (subject to mitigation fees)
Technology Enhancement Fee
Fee
$261
$523
$784
$1,307
$1,046
$1,307
$261
$523
$8
Unit
per year
per year
per year
per year
per year
per year
per year
per year
per year
Notes
[a]
[a]
[a] If special inspection is required, amount will be billed hourly in half-hour increments using the billing rate of the department
[b] A residential dwelling within a residential project subject to a "mitigation fee," paid to the city to offset revenue losses caused by
the development of the residential project, pursuant to a development agreement with the city, or pursuant to a condition of
approval(s) attached to any entitlement approved by the city (including but not limited to a specific plan, subdivision map, or site
development permit), pursuant to which short-term vacation rentals are a permitted use.
[As of the adoption of this resolution, the following residential projects qualify under these requirements: Codorniz, La Quinta Desert
Villas (Homewood Suites), Legacy Villas, Puerta Azul, and Signature at PGA West]
22
City of La Quinta
Master Fee Schedule
Schedule of Medical Cannabis Delivery Application Fees
Fee Description
Medical Cannabis Delivery Services Application
1 Medical Cannabis Delivery Service Application
a) Delivery Service Application - New
b) Delivery Service Application - Renewal
2 Technology Enhancement Fee
Fee
$532
$532
$8
Unit
per year
per year
per year
Notes
23
City of La Quinta
Master Fee Schedule
Schedule of False Alarm Response Fees
Fee Description
1
2
False Alarm Response
Police False Alarm Response
a) 1st False Alarm Response
b) 2nd False Alarm Response
c) 3rd False Alarm Response
d) 4th False Alarm Response
e) 5th and Each Additional False Alarm Response
Fire False Alarm Response
a) 1st False Alarm Response
b) 2nd False Alarm Response
c) 3rd False Alarm Response
d) 4th False Alarm Response
e) 5th and Each Additional False Alarm Response
[a] Based on number of false alarms in a 365 day period.
Fee
No Charge
No Charge
$68
$119
$136
No Charge
No Charge
$68
$313
$688
Unit
each
each
each
each
each
each
each
each
each
each
Notes
[a]
[a]
24
City of La Quinta
Master Fee Schedule
Schedule of Vehicle Impound Cost Recovery Fees
Fee Description
ill
1 (Vehicle Impound Cost Recovery Fee
$259
each
25
City of La Quinta
Master Fee Schedule
Schedule of Code Enforcement Hourly Rate for Services
Fee Description
1
Code Enforcement Hourly Rate
a) Code Enforcement Hourly Rate
b) Code Enforcement Hourly Rate - For Outside Agency
Reimbursement Request
Fee
$134
$123
Unit
per hour
per hour
Notes
[a]
[b]
[a] Hourly rate for Code Compliance inspections required or requested fo which no other fees are listed, requests for special event
support, etc.
[b] Hourly rate for outside agency reimbursement request is a reduced rate because the City may request direct reimbursement of
various fleet and technology related costs.
26
City of La Quinta
Master Fee Schedule
Schedule of Pool Drain Permit Fees
1 IPool Drain Permit
I
$26
Unit
per permit
27
Schedule of Home Occupation Permit Fees
1
2
Home Occupation Permit
Home Occupation Permit - Address Change
r
Fee
Unit
$114
$57
per permit
per permit
28
City of La Quinta
Master Fee Schedule
Schedule of Film/Photography Permit Fees
Fee Description
1
2
3
4
5
Film/Photography Permit
Cast and Crew Totaling One to Three Persons:
a) Permit Issuance Fee
i) Private Property
ii) Private Property with Staging in Public Right of Way
iii) Public Property
b) Location Use Fee
i) Private Property
ii) Private Property with Staging in Public Right of Way
iii) Public Property
Cast and Crew Totaling Four or More Persons:
a) Permit Issuance Fee
i) Private Property
ii) Private Property with Staging in Public Right of Way
iii) Public Property
b) Location Use Fee
i) Private Property
ii) Private Property with Staging in Public Right of Way
iii) Public Property
Other Fees, If Applicable
Pre -Application Meeting (upon request)
City Film Monitor (as needed)
Violations:
a) Filming/Photography without a Permit
b) Violation of Permit
Fee
$101
$134
$134
$235
$369
$436
$0
$284
$569
$268
$134
2 times applicable fees
$398
Unit
per permit
per permit
per permit
per day
per day
per day
per permit
per permit
per permit
per day
per day
per day
per meeting
per hour
per
violation,
per day
Notes
[a]
[a];[b]
Note: The City Manager may waive fees for bona fide student film/photography projects and projects with 501(c)(3) Federal Income
Tax Status; however, the permitting process for filming/photography is still required for these projects.
[a] Proposed fee is a market -based rate for exclusive private use of public space/facilities.
[b] Does not include any applicable facility rental fees that may apply.
29
City of La Quinta
Master Fee Schedule
Schedule of Bingo Permit Fees
Fee Description
1
Bingo Permit
a) Initial
b) Renewal
Fee
$50
$50
Unit
per permit
per permit
30
City of La Quinta
Master Fee Schedule
Schedule
of
Administrative Fees
Notes
Fee Description
Fee *
Unit
1
Black and White Copy - up to 8.5 x 14
$0.15
per single -sided page
2
Black and White Copy - 11 x 17
$0.20
per single -sided page
3
Color Copy - up to 8.5 x 14
$0.25
per single -sided page
4
Color Copy - 11 x 17
$0.50
per single -sided page
5
Oversized Sheets (Plans/Maps)
$3.00
per sheet
[a]
6
CD/DVD/Flash Drive
$5.00
per CD or DVD
7
Agency Credit Card Service Fee
2.5%
% of fees paid
[b]
8
Processing Fee for Receipt of Non -Sufficient Funds
a) First from Payee
$25.00
per occurence
[c]
b) Each Subsequent from Payee
$35.00
per occurence
[c]
* In addition to the fees identified in this schedule, the City will pass -through to the applicant any fees imposed by other agencies
and any discrete costs incurred from the use of outside service providers required to process the specific request for
information/service.
* In addition to the fees identified in this schedule, if a request for electronic records either (1) is for a record normally issued only
periodically, or (2) requires data compilation, extraction, or programming, costs will include the cost of producing the copy, including
construction, programming and computer services.
[a] If more than two sheets are requested, the City will typically process the request using an outside vendor service.
[b] Fee is intended to function as a pass -through of credit card transaction vendor charge. Annual updates should be based on
vendor charge.
[c] Set by State (Civil Code Section 1719).
31
City of La Quinta
Master Fee Schedule
Schedule of Appeal Fees
Fee Description
1 Appeal to Hearing Officer of Administrative Citation
2 Appeal of an Administrative Decision to City Manager
3 Appeal to Construction Board of Appeals
4 Appeal to Planning Commission
5 Appeal to City Council
Fee
$25
$250
$1,500
$1,500
$1,500
Unit
per appeal
per appeal
per appeal
per appeal
per appeal
Notes
[a]
[a]
[a]
[a]
[a]
[a] Depending on the subject of the appeal, specialized expertise may be solicited, at the expense of the applicant, for the purpose of
providing input to the City Manager, Construction Board of Appeals, Planning Commission or City Council.
32
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
Fee Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
SPORTS FACILITIES
Sports Complex Baseball Diamonds/ Football Field or
La Quinta Park Baseball Diamonds (with or without
field lights)
La Quinta Park or Colonel Mitchell Paige Soccer
Fields (with or without field lights)
Sports Complex, La Quinta Park, and Colonel Mitchell
Paige Sports Fields (per field)
Sports Complex or La Quinta Park Snack Bar Use
La Quinta Boys & Girls Club Gymnasium
Tennis Courts/Pickleball Courts (per court)
PARKS
Civic Center Campus, Gazebo, Amphitheater (50
people or less)
Civic Center Campus (Non-profit events with 100
people or more; TUP required)
Cove Oasis Trailhead (50 people or less)
Fritz Burns or La Quinta Park Party (50 people or less)
Fritz Burns or La Quinta Park (Non-profit events with
100 people or more; TUP required)
BUILDINGS
Wellness Center Multi -Purpose Room (max capacity
is 200)
Museum Meeting Room (Meetings only; max
capacity is 65)
Museum Meeting Room & Courtyard (max capacity
is 150)
Museum Meeting Room, Courtyard, & Upstairs Patio
(max capacity is 175)
Library Community Room (Small events/meetings
with 60 people or less)
Library Classroom (Meetings only; max capacity is
60)
Wellness Center, Library Community Room, and
Museum Kitchen
Fees
Class I
(per season) Class II
Class III Class IV
$10 per
resident/
$15 per non-
resident
$10 per
resident/
$15 per non-
resident
N/A
$200.00
N/A
N/A
N/A
N/A
N/A
N/A
N/A
$55/hour
N/A
N/A
N/A
N/A
N/A
$10/hour
$25/hour
(per field)
$25/hour
(per field)
N/A
N/A
$25/hour
$5/hour
$75/hour
$150/hour
$75/hour
$50 (4 hours)
$100.00
$75/hour
$50/hour
$75/hour
$100/hour
$50/hour
$50/hour
$20/hour
N/A
N/A
N/A
N/A
$25/hour $35/hour
($40/hour ($55/hour
with lights) with lights)
N/A N/A
$35/hour $45/hour
$5/hour $10/hour
$125/hour $175/hour
N/A N/A
$125/hour
$65 (4 hours)
N/A
$125/hour
$50/hour
$125/hour
$150/hour
$50/hour
$50/hour
$25/hour
$175/hour
$90 (4 hours)
N/A
$175/hour
$50/hour
$175/hour
$200/hour
$50/hour
$50/hour
$30/hour
Notes
33
City of La Quinta
Master Fee Schedule
Schedule of Facility Use Fees
SECURITY DEPOSITS (Refundable
upon post conditions after use)
Proposed Fees
Notes
19
Wellness Center Multi -Purpose Room
Sports Fields
$500.00
Museum Meeting Room & Courtyard
Boys & Girls Club Gym
Museum Meeting Room & Courtyard w/Upstairs Patio
20
La Quinta Park & Sports Complex snack bars
$350.00
21
Civic Center Campus (Non-profit events with 100
people or more)
$200.00
22
Museum Meeting Room
Library Classroom
$100.00
Library Community Room
Cove Oasis Trailhead
Fritz Burns Tennis Courts (per court)
Fritz Burns or La Quinta Park (Non-profit events w/
Civic Center Campus, Gazebo,
Amphitheater (50 people or less)
100+ people)
23
Fritz Burns or La Quinta Park Party
$50.00
CLASSIFICATIONS
Class I: 501(c) 3 recreation organizations serving LQ youth (18 and under)
Class II: LQ non-profit organizations, community -based organizations, competitive youth sports leagues
(DSUSD - Sports Complex Use Only)
Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex)
Class IV: LQ business and profit organizations; non -city residents, organizations, and businesses
34
City of La Quinta
Master Fee Schedule
Schedule of SilverRock Event Site Facility Rental Fees
Entire Park Area Rental
Fee Description
Non -Profit
All Others
Notes
SILVERROCK EVENT SITE
(4-Hour Minimum Rental)
1
Permit Processing Fee (per application)
$128
$128
2
Facility Rental Fee (per hour)
$272
$272
3
Security Deposit
a) One Day Event
$500
$500
b) Event Lasting Two or More Days
$1,000
$1,000
Partial Park Area
Rental
Fee
1
2
3
Description
SilverRock - 50 people or less
SilverRock - Non-profit events with 100
people or more; TUP required
SilverRock Meeting Room
lass II
Class III
$125/hour
N/A
$50/hour
Class IV
$175/hour
N/A
$50/hour
Securi
Deposit
$100
$200
$100
$75/hour
$150/hour
$50/hour
CLASSIFICATION
Non -Profit: 501(c)3 tax organization.
Class II: LQ non-profit organizations, community -based organizations
Class III: LQ residents (DSUSD - for all other facilities other than the Sports Complex)
Class IV: LQ business and profit organizations; non -city residents, organizations, and businesses
35
City of La Quinta
Master Fee Schedule
Use of Public Property - Parking Lots and Open Space
Fee Description
1
2
Parking Lot / Open Space Use Fees
Daily Use Rate Per Space
a) Per Hour Rate
b) Maximum Per Day
Daily Use Rate Per Area
a) Per Quarter Acre
i) Hourly Rate
ii) Maximum Per Day
b) Per Acre
i) Hourly Rate
ii) Maximum Per Day
Fee
$1.75
$14
$55
$440
$219
$1,752
Notes
[a];[b]
[c]
[c]
[c]
[a] Public property use rental is facilitated by obtaining the relevant use permit approval from the Planning Division.
[b] As part of permit review and review of potential impacts on the community and facilities, staff will determine if there is a need
for a security deposit. Security deposit amount will be determined based on use requirements and will be refundable assuming
conditions of rental/use are met.
[c] Four-hour minimum.
36