Loading...
Website Publication - Avenue 50 Bridge - Prof Eng Services Project 2019-02 - Pre-Proposal ConferenceAvenue 50 Bridge Professional Engineering Services Intent to Propose as Prime List Consultant/Firm Name Contact Name Email Address Kimley Horn Frank Hoffman Frank. Hoff mann(o)kimley-horn.com CNS Engineers James Lu james.lu(a)_cnsenginc.com JSTM Inc. Jonis Smith jsmith jstminc.com TYLin Ebonnye Dunn ebonnye.duna@lylin.com Michael Baker International Steven Latino steven.latino(c)mbakerintl.com Mark Thomas Paul Mittica pmittica(a)-markthomas.com EXP U.S. Services Portia Gonzalez Portia. gonzalez .exp.com MV.13 AVENUE 50 BRIDGE PROJECT FEDERAL AID NO: BR-NBIL(547) CITY PROJECT NO: 2019-02 Pre -Proposal Conference July 19, 2023 11:00AM via ZOOM Introduction • PROJECT TITLE: • ISSUE DATE: • DUE DATE: • REQUESTING DEPT: • QUESTIONS DUE: Avenue 50 Bridge Project July 12, 2023 August 16, 2023 Public Works Department July 21, 2023* * Question due date may be extended I Project Team • Bryan McKinney, — City of La Quinta, Engineer • Julie Mignogna — City of La Quinta, • Ubaldo Ayon PE I Public Works Director/City Management Analyst — City of La Quinta, Assistant Construction Manager • Lorissa Gruehl, PE — NAI Consulting, Project Manager/Engineer Submission Requirements WORK PROPOSALS: — Submitted via email and hard copy (hand delivery or mail) 4 — All proposals must bear original or electronic signatures — Submit one (1) paper original in a sealed envelope — AND email an electronic original, as a single document in a pdf format COST PROPOSALS: — Submitted via hand delivery or mail (DO NOT EMAIL) — Submit one (1) paper original in a sealed envelope clearly labeled as "Cost Proposal" Special Requirement • Federally Funded • Must Comply with Federal Regulations: — Contract Subject To Audit/Approval by Independent Office of' Audits Investigation (IOAI) , — DBE Goal — 21% — Exhibit 10-1 (Notice To Proposers DBE Information) — LAPM Form 10-01 (Consultant Proposal DBE Commitment); or — LAPM Form 15-H (DBE Information Good Faith Efforts) r � Timeline * Question due date will be extended to August 1, 2023 Purpose The purpose of the proposed improvements is to replace the existing low-water crossing spanning the La Quinta Evacuation Channel at Avenue 50 with an all-weather access ' bridge. During severe winter and summer - storms, the existing Avenue 50 low water crossing is frequently inundated and damaged due to flows within the storm water channel. Proposed Improvements • Construct an approximate 200 foot long bridge with a curb to curb width of 76 feet with a 6 foot clear wide sidewalk along both sides; • Construct roadway grade approach on both the east and west approaches to meet the hydraulic clearance required for the bridge structure; • Coordinate with utility companies on access to utility cells (conduits) within the bridge structure; • Construct required slope protection along the northern channel bank and replace existing slope protection along the southern bank as necessary to accommodate the new bridge. • Coordinate required utility relocations for underground cable TV, natural gas, domestic water main and sanitary sewer; and • Relocation and necessary modifications to the City storm drain system outletting into the LQEC. Proposed Improvements 0 Additional Consideration: — From the proposed western termini of the bridge project to Washington Street is approximately 400 feet. It is the City's intent on widening the last section of Avenue 50 within the project limits to the ultimate street section. , — This gap closure will be a HBP Non -Participating portion of the project, however it will be included in the overall project description and processing. — The work associated with this 400 foot section of roadway improvements will include street widening, installation of a right turn lane and a minor signal modification. Proposed Improvements • Additional Considerations (continued): — The project will include special architectural treatment to achieve the community design goals. The consultant will perform a project specific aesthetics study during Phase I of the project. Also, all utility relocation and Right -of -Way acquisition efforts shall be coordinated appropriately in addition to meeting all the resource agency permit requirements; — It is anticipated that IID Transmission Lines and Poles will need to be protected in place with all other aerial lines potentially under -grounded; — Right of Way shall also include any Temporary Construction Easements (TCE), Right -to -Enter and Construct or any other right of way service that may be required for the project; — Consider potential development at the northeast corner of Washington Street and Avenue 50. PROJECT DEVELOPME PROCESS • Phase I — Project Approval Documents (PA&ED) and Environmental • Phase II — Plans, Specifications, and Estimate (PS&E) • Phase III —Right of Way Acquisition • Phase IV — Construction Support PROJECT DEVELOPMEFJ& PROCESS • The City has successfully obtained funding obligation to prepare Phase I — Project Approval and Environmental Documents. • It is envisioned that Phase I will allow the project to be developed through approximately 35% of the engineering phase. • Phase II, III, and IV will not be authorized until the City obtains funding obligation for the remainder of the Preliminary Engineering Phase. JW Links Provided 1 . Application for Caltrans Highway Bridge Program funds, prepared by Heptagon Seven Consulting in partnership with Bengal Engineering, linked: 2. City's Focused Drainage Study, Various Utility Maps, and Various Record Drawings: _____ I Planning Commission Agenda and Staff Report for the potential development at the northeast corner of Washington Street and Avenue 50 with environmental document: n aca.gov ome/showpublisheddocumen Questions? Intent to Submit July 19, 2023 by 5:00PIVI Questions/Clarifications July 21, 2023 by 5:OOPM* � Will be extended to August 1, 2023 via email to: jmignogna@laquintaca.gov -� CALIFORNIA