Website Publication - Avenue 50 Bridge - Prof Eng Services Project 2019-02 - Pre-Proposal ConferenceAvenue 50 Bridge Professional Engineering Services
Intent to Propose as Prime List
Consultant/Firm Name
Contact Name
Email Address
Kimley Horn
Frank Hoffman
Frank. Hoff mann(o)kimley-horn.com
CNS Engineers
James Lu
james.lu(a)_cnsenginc.com
JSTM Inc.
Jonis Smith
jsmith jstminc.com
TYLin
Ebonnye Dunn
ebonnye.duna@lylin.com
Michael Baker International
Steven Latino
steven.latino(c)mbakerintl.com
Mark Thomas
Paul Mittica
pmittica(a)-markthomas.com
EXP U.S. Services
Portia Gonzalez
Portia. gonzalez .exp.com
MV.13
AVENUE 50 BRIDGE PROJECT
FEDERAL AID NO: BR-NBIL(547)
CITY PROJECT NO: 2019-02
Pre -Proposal Conference
July 19, 2023
11:00AM via ZOOM
Introduction
• PROJECT TITLE:
• ISSUE DATE:
• DUE DATE:
• REQUESTING DEPT:
• QUESTIONS DUE:
Avenue 50 Bridge Project
July 12, 2023
August 16, 2023
Public Works Department
July 21, 2023*
* Question due date may be extended
I
Project Team
• Bryan McKinney,
— City of La Quinta,
Engineer
• Julie Mignogna
— City of La Quinta,
• Ubaldo Ayon
PE I
Public Works Director/City
Management Analyst
— City of La Quinta, Assistant Construction Manager
• Lorissa Gruehl, PE
— NAI Consulting, Project Manager/Engineer
Submission Requirements
WORK PROPOSALS:
— Submitted via email and hard copy (hand delivery or mail) 4
— All proposals must bear original or electronic signatures
— Submit one (1) paper original in a sealed envelope
— AND email an electronic original, as a single document in a pdf
format
COST PROPOSALS:
— Submitted via hand delivery or mail (DO NOT EMAIL)
— Submit one (1) paper original in a sealed envelope clearly labeled as
"Cost Proposal"
Special Requirement
• Federally Funded
• Must Comply with Federal Regulations:
— Contract Subject To Audit/Approval by Independent Office of'
Audits Investigation (IOAI) ,
— DBE Goal — 21%
— Exhibit 10-1 (Notice To Proposers DBE Information)
— LAPM Form 10-01 (Consultant Proposal DBE Commitment); or
— LAPM Form 15-H (DBE Information Good Faith Efforts)
r �
Timeline
* Question due date will be extended to
August 1, 2023
Purpose
The purpose of the proposed improvements
is to replace the existing low-water crossing
spanning the La Quinta Evacuation Channel
at Avenue 50 with an all-weather access '
bridge. During severe winter and summer -
storms, the existing Avenue 50 low water
crossing is frequently inundated and
damaged due to flows within the storm
water channel.
Proposed Improvements
• Construct an approximate 200 foot long bridge with a curb to curb width of 76 feet with a
6 foot clear wide sidewalk along both sides;
• Construct roadway grade approach on both the east and west approaches to meet the
hydraulic clearance required for the bridge structure;
• Coordinate with utility companies on access to utility cells (conduits) within the bridge
structure;
• Construct required slope protection along the northern channel bank and replace existing
slope protection along the southern bank as necessary to accommodate the new bridge.
• Coordinate required utility relocations for underground cable TV, natural gas, domestic
water main and sanitary sewer; and
• Relocation and necessary modifications to the City storm drain system outletting into the
LQEC.
Proposed Improvements
0 Additional Consideration:
— From the proposed western termini of the bridge project to
Washington Street is approximately 400 feet. It is the City's
intent on widening the last section of Avenue 50 within the
project limits to the ultimate street section. ,
— This gap closure will be a HBP Non -Participating portion of the
project, however it will be included in the overall project
description and processing.
— The work associated with this 400 foot section of roadway
improvements will include street widening, installation of a right
turn lane and a minor signal modification.
Proposed Improvements
• Additional Considerations (continued):
— The project will include special architectural treatment to achieve the community
design goals. The consultant will perform a project specific aesthetics study during
Phase I of the project. Also, all utility relocation and Right -of -Way acquisition efforts
shall be coordinated appropriately in addition to meeting all the resource agency
permit requirements;
— It is anticipated that IID Transmission Lines and Poles will need to be protected in
place with all other aerial lines potentially under -grounded;
— Right of Way shall also include any Temporary Construction Easements (TCE),
Right -to -Enter and Construct or any other right of way service that may be required
for the project;
— Consider potential development at the northeast corner of Washington Street and
Avenue 50.
PROJECT DEVELOPME
PROCESS
• Phase I — Project Approval
Documents (PA&ED)
and Environmental
• Phase II — Plans, Specifications, and Estimate (PS&E)
• Phase III —Right of Way Acquisition
• Phase IV — Construction Support
PROJECT DEVELOPMEFJ&
PROCESS
• The City has successfully obtained funding obligation to
prepare Phase I — Project Approval and Environmental
Documents.
• It is envisioned that Phase I will allow the project to be
developed through approximately 35% of the
engineering phase.
• Phase II, III, and IV will not be authorized until the City
obtains funding obligation for the remainder of the
Preliminary Engineering Phase. JW
Links Provided
1 . Application for Caltrans Highway Bridge Program funds, prepared by Heptagon
Seven Consulting in partnership with Bengal Engineering, linked:
2. City's Focused Drainage Study, Various Utility Maps, and Various Record
Drawings: _____
I Planning Commission Agenda and Staff Report for the potential development at
the northeast corner of Washington Street and Avenue 50 with environmental
document:
n aca.gov ome/showpublisheddocumen
Questions?
Intent to Submit
July 19, 2023 by 5:00PIVI
Questions/Clarifications
July 21, 2023 by 5:OOPM* �
Will be extended to August 1, 2023
via email to: