Loading...
FNCUW2018-0003ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT M C Z CONSTRUCTION INC 12223 16TH STREET YUCAIPA CA 92399 MCZCONSTRUCTION@ HOTMAIL.COM BILL TO M C Z CONSTRUCTION INC 12223 16TH STREET YUCAIPA CA 92399 MCZCONSTRUCTION@ HOTMAIL.COM CONDITION TYPE CONTACT DATE ADDED DATE REQUIRED DATE SATISFIED STATUS REMARKS NOTES READY TO ISSUE CHECKLIST FIRE BUCKET 2/11/2019 PENDING CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES NOTE AARON HICKSON 9/17/2018 9/17/2018 JAMES SNOW PICKED UP FNCUW2018-0003 CONDITIONS Description: WASHINGTON ST APTS / UG WATER Type: FIRE NEW COMMERCIAL UNDERGROUND WATER Subtype: Status: FINALED Applied: 9/5/2018 AMA Parcel No: 609040028 Site Address: 42800 WASHINGTON ST LA QUINTA,CA 92253 Approved: 9/17/2018 EGO Subdivision: Block: Lot: Issued: 9/17/2018 AHI Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 7/15/2021 KHET Valuation: $0.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: Printed: Thursday, February 09, 2023 9:46:45 AM 1 of 6 Permit Details City of La Quinta PERMIT NUMBER FNCUW2018-0003 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL CONTRACTOR M C Z CONSTRUCTION INC 12223 16TH STREET YUCAIPA CA 92399 MCZCONSTRUCTION@ HOTMAIL.COM OWNER REDEVELOPMENT AGENCY CITY OF P O BOX 1504 LA QUINTA CA 0 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES UG ROUGH PIPING EGO 10/10/2018 10/11/2018 PARTIALLY APPROVED FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE NEW COMMERCIAL - UNDERGROUND WATER 101-0000-42421 0 $156.00 $156.00 9/5/18 R39210 17220 CHECK M C Z CONSTRUCTION INC AMA FIRE NEW COMMERCIAL - UNDERGROUND WATER PC 101-0000-42420 0 $312.00 $312.00 9/5/18 R39210 17220 CHECK M C Z CONSTRUCTION INC AMA Total Paid for FIRE FEES: $468.00 $468.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $10.00 $10.00 9/5/18 R39210 17220 CHECK M C Z CONSTRUCTION INC AMA Total Paid for RECORDS MANAGEMENT FEE: $10.00 $10.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 9/5/18 R39210 17220 CHECK M C Z CONSTRUCTION INC AMA Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$483.00 $483.00 Printed: Thursday, February 09, 2023 9:46:45 AM 2 of 6 Permit Details City of La Quinta PERMIT NUMBER FNCUW2018-0003 UG HYDRO EGO 10/10/2018 10/11/2018 PARTIALLY APPROVED UG ROUGH PIPING EGO 10/11/2018 10/11/2018 PARTIALLY APPROVED UG HYDRO EGO 10/11/2018 10/11/2018 PARTIALLY APPROVED UG ROUGH PIPING EGO 10/15/2018 10/15/2018 PARTIALLY APPROVED UG HYDRO EGO 10/15/2018 10/15/2018 PARTIALLY APPROVED UG ROUGH PIPING EGO 10/17/2018 10/17/2018 PARTIALLY APPROVED UG HYDRO EGO 10/17/2018 10/17/2018 PARTIALLY APPROVED UG ROUGH PIPING EGO 10/22/2018 10/22/2018 PARTIALLY APPROVED UG HYDRO EGO 10/22/2018 10/22/2018 PARTIALLY APPROVED UG ROUGH PIPING EGO 10/25/2018 10/25/2018 PARTIALLY APPROVED UG HYDRO EGO 10/25/2018 10/25/2018 PARTIALLY APPROVED FLUSH EGO 10/25/2018 10/25/2018 PARTIALLY APPROVED PHASE 1 UNDERGROUND FLUSHED. OK TO HOOK UP ANY FIRE SPRINKELR SERVED UNDER PH. 1. FLUSH EGO 2/6/2019 2/13/2019 APPROVED PHASE II FIRE LINE FLUSH APPROVED. FLUSH EGO 2/6/2019 2/11/2019 APPROVED THRUST BLOCK PRE-POUR EGO 2/11/2019 7/15/2021 APPROVED PER CALENDAR NOTES UG ROUGH PIPING EGO 2/13/2019 7/15/2021 APPROVED PER CALENDAR NOTES FIRE FINAL**EGO 2/13/2019 7/15/2021 APPROVED PER CALENDAR NOTES Printed: Thursday, February 09, 2023 9:46:45 AM 3 of 6 Permit Details City of La Quinta PERMIT NUMBER FNCUW2018-0003 UG HYDRO EGO 2/27/2019 7/15/2021 APPROVED PER CALENDAR NOTES FLUSH EGO 2/28/2019 7/15/2021 APPROVED PER CALENDAR NOTES REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST PERMIT TECH (1 DAY) ARMANDO MAGALLON 9/5/2018 9/6/2018 9/6/2018 COMPLETE 9/17/2018 Robert Arthur MCZ Construction 12223 16th St. Yucaipa CA, 92399 Re: UG Private Water Service Plan Review – Washington St. Apartments FNCUW2018-0003 42-800 Washington St. La Quinta, CA 92253 The above referenced water plans have been reviewed and are approved by the Riverside County Fire Department with the following conditions: The following inspections and tests must be observed: 1) Pre-Pour Thrust Block cutout inspection 2) Rough Piping – Confirm pipe material, bury depth and backfill requirements. a. All pipe nomenclature shall be visible upon inspection. PARENT PROJECTS Printed: Thursday, February 09, 2023 9:46:45 AM 4 of 6 Permit Details City of La Quinta PERMIT NUMBER FNCUW2018-0003 1ST FIRE (2 WK)EDGAR GONZALEZ 9/5/2018 9/19/2018 9/17/2018 APPROVED- CONDITIONS b. Non-ferrous pipe shall be provided with appropriate tracing wire. c. All fittings shall be protected against corrosion. d. All pipe have a burry depth of 3’ or more. e. Only partial center loading of pipe is allowed during rough piping inspection. 3) Hydrostatic Test – a. Minimum 200 psi for two (2) hours or at 50 psi in excess of the maximum static pressure when it is in excess of 150 psi. b. All fittings shall be visible upon hydrostatic inspection. c. Post pour inspection shall be conducted at this time. 4) Underground Flush & Final - a. Flush of the underground supply line until clear of all debris and to the satisfaction of the inspector. b. The underground flush shall be done through a pipe or hose equal in size to the sprinkler underground supply pipe, prior to connection to the above ground sprinkler piping. c. Appropriate valve and connection signage is provided. Signage shall be properly secured on to all PIV/FDC assemblies by appropriate bracket for longevity purposes. d. Private fire hydrants are painted red and provided with OSFM tag. e. Provide the completed Contractor’s Material and Test Certificate for Underground Pipe The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least Printed: Thursday, February 09, 2023 9:46:45 AM 5 of 6 Permit Details City of La Quinta PERMIT NUMBER FNCUW2018-0003 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 9/17/2018 EDGAR GONZALEZ FNCUW2018-0003 - WASHINGTON STREET APARTMENTS - 42-800 WASHINGTON ST. - UNDERGROUND FIRE MAIN (COA).docx FNCUW2018-0003 - WASHINGTON STREET APARTMENTS - 42-800 WASHINGTON ST. - UNDERGROUND FIRE MAIN (COA).docx 1 DOC 12/29/2021 JULIA AGGREH Fire Review Application.pdf Fire Review Application.pdf 0 DOC 12/29/2021 JULIA AGGREH Submittals for Washington St Ph 1 and 2.pdf Submittals for Washington St Ph 1 and 2.pdf 0 DOC 12/29/2021 JULIA AGGREH FNCUW2018-0003 B.pdf FNCUW2018-0003 B.pdf 0 DOC 12/29/2021 JULIA AGGREH FNCUW2018-0003.pdf FNCUW2018-0003.pdf 0 DOC 12/29/2021 JULIA AGGREH FNCUW2018-0003C.pdf FNCUW2018-0003C.pdf 0 BOND INFORMATION 72 hours in advance and may be arranged by calling (760)777-7131. SUBJECT TO FIELD INSPECTION - Nothing in our review shall be construed as encompassing structural integrity. Review of this plan does not authorize or approve any omission or deviation from all applicable regulations. Final approval is subject to field inspection. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Edgar Gonzalez Fire Safety Specialist Printed: Thursday, February 09, 2023 9:46:45 AM 6 of 6 Permit Details City of La Quinta PERMIT NUMBER FNCUW2018-0003 Office of the Fire Marshal City of La Quinta 78-495 Calle Tampico, La Quinta CA 92253 • Phone (760)777-7000 •Direct (760)777-7074 9/17/2018 Robert Arthur MCZ Construction 12223 16th St. Yucaipa CA, 92399 Re: UG Private Water Service Plan Review – Washington St. Apartments FNCUW2018-0003 42-800 Washington St. La Quinta, CA 92253 The above referenced water plans have been reviewed and are approved by the Riverside County Fire Department with the following conditions: The following inspections and tests must be observed: 1) Pre-Pour Thrust Block cutout inspection 2) Rough Piping – Confirm pipe material, bury depth and backfill requirements. a. All pipe nomenclature shall be visible upon inspection. b. Non-ferrous pipe shall be provided with appropriate tracing wire. c. All fittings shall be protected against corrosion. d. All pipe have a burry depth of 3’ or more. e. Only partial center loading of pipe is allowed during rough piping inspection. 3) Hydrostatic Test – a. Minimum 200 psi for two (2) hours or at 50 psi in excess of the maximum static pressure when it is in excess of 150 psi. b. All fittings shall be visible upon hydrostatic inspection. c. Post pour inspection shall be conducted at this time. 4) Underground Flush & Final - a. Flush of the underground supply line until clear of all debris and to the satisfaction of the inspector. b. The underground flush shall be done through a pipe or hose equal in size to the sprinkler underground supply pipe, prior to connection to the above ground sprinkler piping. c. Appropriate valve and connection signage is provided. Signage shall be properly secured on to all PIV/FDC assemblies by appropriate bracket for longevity purposes. d. Private fire hydrants are painted red and provided with OSFM tag. e. Provide the completed Contractor’s Material and Test Certificate for Underground Pipe The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 72 hours in advance and may be arranged by calling (760)777-7131. Office of the Fire Marshal City of La Quinta 78-495 Calle Tampico, La Quinta CA 92253 • Phone (760)777-7000 •Direct (760)777-7074 SUBJECT TO FIELD INSPECTION - Nothing in our review shall be construed as encompassing structural integrity. Review of this plan does not authorize or approve any omission or deviation from all applicable regulations. Final approval is subject to field inspection. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Edgar Gonzalez Fire Safety Specialist