Loading...
FS2020-0004ADDITIONAL SITES CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES E-MAIL KAYLI ALFORD 6/16/2020 6/16/2020 PER AJ: Fine for issuance (and now inspection) of the FS2020- 0004 Fire Permit with Building, but restaurant does need a City Business License. E-MAIL KOHL HETRICK 4/6/2020 4/6/2020 COMMUNICATED WITH BUILDING DEPARTMENT ABOUT CONCERNS FOR NEEDING A "TENANT IMPROVEMENT - CONSTRUCTION" PERMIT. PER AJ ORTEGA: I think it’d be important to verify if the equipment and hood types comply with each other, and then I think more building related is the fuel demand changing to where we need to assess the system… We could issue him a special inspection to verify all this if needed, have him reach out to Jake and I to discuss. Jake is in the office Monday and Tuesday (760-777-7081) and I am in the office Wednesday and Thursday (760-777-7018). CONDITIONS Description: TORAKICHI RAMEN / HOOD & DUCT / BCOM2020-? Type: FIRE SUPRESSION (WEB)Subtype: HOOD & DUCT Status: FINALED Applied: 3/19/2020 JLIM Parcel No: 600440005 Site Address: 79775 HIGHWAY 111 105 LA QUINTA,CA 92253 Approved: 4/6/2020 KHET Subdivision: PM 036269 Block: Lot: 5 Issued: 4/6/2020 KHET Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 6/18/2020 KHET Valuation: $0.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: Printed: Thursday, February 16, 2023 3:26:06 PM 1 of 3 Permit Details City of La Quinta PERMIT NUMBER FS2020-0004 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT FRANK GORTZ / FIRELINE INC 37921 PORTER DRIVE CATHEDRAL CITY CA 92234 gortz3@msn.com CONTRACTOR FIRELINE INC 37921 PORTER DRIVE CATHEDRAL CITY CA 92234 gortz3@msn.com OWNER P6K PORTFOLIO KDP 2301 ROSECRANS STE 2110 EL SEGUNDO CA 92253 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES FIRE FINAL**KHET 6/18/2020 6/18/2020 APPROVED FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE COMMERCIAL COOKING HOOD AND DUCT SYSTEMS 101-0000-42421 0 $161.00 $161.00 3/19/20 WEB4717 CREDIT FIRELINE INC ECON FIRE COMMERCIAL COOKING HOOD AND DUCT SYSTEMS PC 101-0000-42420 0 $242.00 $242.00 3/19/20 WEB4717 CREDIT FIRELINE INC ECON Total Paid for FIRE FEES: $403.00 $403.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $10.00 $10.00 3/19/20 WEB4717 CREDIT FIRELINE INC ECON Total Paid for RECORDS MANAGEMENT FEE: $10.00 $10.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 3/19/20 WEB4717 CREDIT FIRELINE INC ECON Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$418.00 $418.00 Printed: Thursday, February 16, 2023 3:26:06 PM 2 of 3 Permit Details City of La Quinta PERMIT NUMBER FS2020-0004 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 4/6/2020 KOHL HETRICK 1ST SUBMITTAL - HOOD and DUCT TI - APPROVED PLANS.pdf 1ST SUBMITTAL - HOOD and DUCT TI - APPROVED PLANS.pdf 1 DOC 4/6/2020 KOHL HETRICK FS2020-0004 - TORAKICHI RAMEN - HOOD SUPP ADJUST - COA AND JOB CARD.pdf FS2020-0004 - TORAKICHI RAMEN - HOOD SUPP ADJUST - COA AND JOB CARD.pdf 1 BOND INFORMATION REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST PERMIT TECH (1 DAY) JACK LIMA 3/19/2020 3/20/2020 3/20/2020 COMPLETE 1ST FIRE (2 WK)KOHL HETRICK 3/19/2020 4/2/2020 4/6/2020 APPROVED SEE ATTACHMENTS NO TENANT IMPROVEMENT PLANS FOUND FOR THIS PROJECT. PARENT PROJECTS Printed: Thursday, February 16, 2023 3:26:06 PM 3 of 3 Permit Details City of La Quinta PERMIT NUMBER FS2020-0004 FS2020-0004 OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org April 6, 2020 Fireline Inc 37921 Porter Drive Cathedral City, CA 92234 Re: Kitchen Suppression System – Adjustment - Plan Review – Torakichi Ramen FS2020-0004 / 79775 HIGHWAY 111 #105, LA QUINTA, CA 92253 The plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department and are approved with the following conditions: The following inspections/tests shall be witnessed by the Fire Department: o Final inspection required to ensure nozzles are installed correctly. A full acceptance test is not required by the Fire Department. Reference 2016 California Fire Code (CFC) Section 106.2 o The system shall have a current service inspection. Ref. CFC 904.5.1 o Ensure there is a sign next to the K class fire extinguisher indicating the suppression system shall be activated before the use of the fire extinguisher. Ref. NFPA 17A Section 4.4.3.6 The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 79775 HIGHWAY 111 #105 PERMIT#: FS2020-0004 DATE ISSUED: 4/6/2020 DESCRIPTION: HOOD SUPPRESSION ADJUSTMENT CONTRACTOR: FIRELINE INC. HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.