FS2022-0007ADDITIONAL SITES
CHRONOLOGY
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT DESERT FIRE EXTINGUISHER CO INC PO BOX 1607 PALM SPRINGS CA 92263 (760)322-0995 LAURA@DESERT-
FIRE.COM
BILL TO SAME (760)322-0995
CONTRACTOR DESERT FIRE EXTINGUISHER CO INC PO BOX 1607 PALM SPRINGS CA 92263 (760)322-0995 LAURA@DESERT-
FIRE.COM
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
E-MAIL AARON HICKSON 11/21/2022 11/21/2022
Regarding the above permit. There are not any documents
attached for review. Please upload to the permit number
above do not apply for a new permit.
CONDITIONS
Description: EL PATIO - RE-WORK OF KITCEHN SUPPRESSION SYSTEM
Type: FIRE SUPRESSION (WEB)Subtype: HOOD & DUCT Status: ISSUED Applied: 11/21/2022 ECON
Parcel No: 604050068 Site Address: 78370 HIGHWAY 111 STE 150 LA QUINTA,CA 92253 Approved: 11/29/2022 KHET
Subdivision: PM 29736 Block: Lot: 11 Issued: ONLINE
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled:
Valuation: $2,794.63 Occupancy Type: Construction Type: Expired: 6/6/2023 KHET
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details: RE-WORK FOR PROPER COOVARAGE OF APPLIANCE.
Printed: Wednesday, September 27, 2023 11:13:37 AM 1 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
FS2022-0007
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
OWNER FRANCISCO SANCHEZ 78370 HWY 111 STE
150
LA QUINTA CA 92253 (760)322-0995 POOLSBYPACO@YAHO
O.COM
INSPECTIONS
SEQID INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
DETECTION SYSTEM KHET 12/8/2022 12/8/2022
APPROVED
W/EXCEPTIO
N
SEE NOTES Need detector added above the charbroiler.
Jose to send pic of compliance.
NOZZLE
MODEL/REPLACEMENT KHET 12/8/2022 12/8/2022 APPROVED As Builts Required see attachments for noted changes.
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
FIRE COMMERCIAL
COOKING HOOD AND
DUCT SYSTEMS
101-0000-42421 0 $175.00 $175.00 12/1/22 WEB13731 762819824 CREDIT 563921 ECON
FIRE COMMERCIAL
COOKING HOOD AND
DUCT SYSTEMS PC
101-0000-42420 0 $263.00 $263.00 12/1/22 WEB13731 762819824 CREDIT 563921 ECON
Total Paid for FIRE FEES: $438.00 $438.00
RECORDS
MANAGEMENT FEE 101-0000-42416 0 $11.00 $11.00 12/1/22 WEB13731 762819824 CREDIT 563921 ECON
Total Paid for RECORDS MANAGEMENT FEE: $11.00 $11.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $8.00 $8.00 12/1/22 WEB13731 762819824 CREDIT 563921 ECON
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $8.00 $8.00
TOTALS:$457.00 $457.00
Printed: Wednesday, September 27, 2023 11:13:37 AM 2 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
FS2022-0007
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 11/21/2022 Etrakit Contractor 1ST SUBMITTAL CUT
SHEETS Cut Sheets -El Patio.pdf 1
DOC 11/21/2022 Etrakit Contractor 1ST SUBMITTAL
DRAWINGS
SHOP DRAWINGS- EL
PATIO.pdf 1
DOC 11/29/2022 KOHL HETRICK FS2022-0007 -
APPROVED PLANS.pdf
FS2022-0007 -
APPROVED PLANS.pdf 1
DOC 11/29/2022 KOHL HETRICK FS2022-0007 - COA AND
JOB CARD.pdf
FS2022-0007 - COA AND
JOB CARD.pdf 1
DOC 12/8/2022 KOHL HETRICK
FS2022-0007 - 12-8-2022
- Notes of As-Built
Conditions.pdf
FS2022-0007 - 12-8-2022
- Notes of As-Built
Conditions.pdf
1
BOND INFORMATION
FIRE FINAL**KHET 12/8/2022 12/8/2022 PARTIALLY
APPROVED
Pending As-Builts and Pic
of compliance
REVIEWS
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE
STATUS REMARKS NOTES
1ST FIRE (2 WK)KOHL
HETRICK
11/21/2022 12/7/2022 11/29/2022 APPROVED SEE ATTACHMENTS
1ST PERMIT TECH (1
DAY)
AARON
HICKSON
11/21/2022 11/22/2022 11/21/2022 COMPLETE
PARENT PROJECTS
Printed: Wednesday, September 27, 2023 11:13:37 AM 3 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
FS2022-0007
OFFICE OF THE FIRE MARSHAL – LA QUINTA
78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074
• www.rvcfire.org
November 29, 2022
Desert Fire
PO Box 1607
Palm Springs, CA 92263
Re: Kitchen Suppression System – Adjustment - Plan Review – EL PATIO RESTAURANT
FS2022-0007 / 78370 HIGHWAY 111 #150, LA QUINTA, CA 92253
The plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department
and are approved with the following conditions:
The following inspections/tests shall be witnessed by the Fire Department:
o Final inspection required to ensure nozzles are installed correctly. A full acceptance test is not required by the Fire
Department. Reference 2019 California Fire Code (CFC) Section 107.2
o The system shall have a current service inspection. Ref. CFC 904.5.1
o Ensure there is a sign next to the K class fire extinguisher indicating the suppression system shall be activated
before the use of the fire extinguisher. Ref. NFPA 17A Section 4.4.3.6
The Fire Department approved plans and conditions letter must be at the job site.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for
inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131.
All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal
staff at (760)777-7074.
Kohl Hetrick - Fire Safety Specialist
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
RIVERSIDE COUNTY FIRE PROTECTION PLANNING
RECORD OF INSPECTIONS / PERMIT CARD
THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.
INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE.
JOB
ADDRESS: 78370 HIGHWAY 111 #150 PERMIT#: FS2022-0007 DATE
ISSUED: 11/29/2022
DESCRIPTION: EL PATIO – EXISTING ADJUSTMENT CONTRACTOR: DESERT FIRE
HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS
Thrust block pre-pour Door fan test
UG rough piping Abort test
UG hydro Mechanical shutdown
Flush Detector test
Final E F Deluge/pre-action
SPRINKLER U.G. Final E F
Thrust block pre-pour UST/AST TANK
UG rough piping Installation
UG hydro Removal
Flush Emergency shut off
Final E F Primary piping
FIRE SPRINKLER Secondary piping
Weld inspection Dispensers & shear valves
Overhead rough piping Final E F
Overhead hydro MISC. INSPECTIONS
UG flush / OK to connect Spray booths
Main drain/inspectors’ test Hood/duct extinguishing
High pile storage High pile rack storage
In-rack sprinklers H.P. vents/access/corridors
Hose racks Tract access/hydrant verification
Final E F Access & Address verification
HOOD EXTINGUISHING OTHER CONST. PERMIT
Detection system
Function test
Gas/electrical shut-off
Nozzle model/placement
Fire alarm connection
Final E F
SPRAY BOOTHS FIRE CODE PERMIT(S)
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final E F
FIRE ALARM KNOX SYSTEM
Rough-wire inspection Building Knox box
Function test Gate access Knox box/padlock
Duct detectors/velocity BUILDING INSPECTIONS
24 hr. battery test T/I final
Sprinkler monitoring Shell final
Final E F Final for occupancy
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
FINAL INSPECTION DATE: INSPECTORS SIGNATURE:
**WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE**
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
INSPECTION NOTES
1. Sway bracing and hangers will be inspected at the time of rough piping inspection.
2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler
Systems)
3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required.
4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test.
5. Contractor shall supply all testing equipment, access and operating instructions at time of test.
6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the
affected system to be covered or hidden.
POLICIES ON FIELD INSPECTIONS
A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when
scheduling inspections. For City of La Quinta inspections call: (760) 777-7131.
B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence
without approved plans.
C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required
to schedule the necessary inspections and be present on site for inspections.
D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not
on site or where previously noted corrections have not been completed.
E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into
the structure until clearance has been granted by the Fire Dept and Building Official.
F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance
has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official.
INSPECTION NOTES:
THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE
AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS.
THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180
DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE.
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE
REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.