Loading...
FSS2020-0039ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT J C FIRE PROTECTION - MICHAEL CORDOVA 81705 DE ORO AVENUE INDIO CA 92201 JCFIREPROTECTION@V ERIZON.NET CONTRACTOR J C FIRE PROTECTION 81705 DE ORO AVENUE INDIO CA 92201 JCFIREPROTECTION@V ERIZON.NET OWNER SMITH DAVID E / SMITH ANNETTE 54080 AVENIDA OBREGON LA QUINTA CA 92253 CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES E-MAIL KOHL HETRICK 3/11/2020 3/11/2020 SYSTEM DESIGNER IS RE-DOING THE 2-HEAD CALC AND WILL SUPPLY. NEED 12GPM @ 16PSI FOR 14X14 HEAD SPACING. CONDITIONS Description: SMITH / FIRE SPRINKLERS / BRES2019-0186 Type: FIRE SPRINKLER Subtype: RESIDENTIAL - CUSTOM HOMES Status: FINALED Applied: 2/26/2020 JLIM Parcel No: 774204028 Site Address: 54080 AVENIDA OBREGON LA QUINTA,CA 92253 Approved: 3/16/2020 KHET Subdivision: PM 33991 Block: Lot: 2 Issued: 3/16/2020 KHET Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 5/26/2020 KHET Valuation: $0.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: FINANCIAL INFORMATION Printed: Thursday, January 12, 2023 2:31:39 PM 1 of 5 Permit Details City of La Quinta PERMIT NUMBER FSS2020-0039 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD ROUGH PIPING FRE 3/13/2020 5/19/2020 APPROVED 3/13/2020 - Overhead rough/hydro inspection conducted by FSI Ruben Diaz (East OFM) at the direction of DFM Ken King. FSI Diaz documented the inspection on (non- approved) job plan set. "Must resubmit as build plans for plan check prior to final. RD I-107 3/13/2020. Okay to cover. 125psi." DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE PLAN REVISION SUBMITTALS 101-0000-42420 0 $161.00 $161.00 5/20/20 WEB5225 CREDIT J C FIRE PROTECTION ECON FIRE SPRINKLER SYSTEMS - SINGLE FAMILY DETACHED 101-0000-42421 0 $161.00 $161.00 2/26/20 R60001 1839 CHECK J C FIRE PROTECTION JLIM FIRE SPRINKLER SYSTEMS - SINGLE FAMILY DETACHED PC 101-0000-42420 0 $242.00 $242.00 2/26/20 R60001 1839 CHECK J C FIRE PROTECTION JLIM Total Paid for FIRE FEES: $564.00 $564.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $10.00 $10.00 2/26/20 R60001 1839 CHECK J C FIRE PROTECTION JLIM Total Paid for RECORDS MANAGEMENT FEE: $10.00 $10.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 2/26/20 R60001 1839 CHECK J C FIRE PROTECTION JLIM Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$579.00 $579.00 Printed: Thursday, January 12, 2023 2:31:39 PM 2 of 5 Permit Details City of La Quinta PERMIT NUMBER FSS2020-0039 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 1/4/2022 JULIA AGGREH CPVC Fire Sprinkler Pipe_Fitting Submittal Sheet.pdf CPVC Fire Sprinkler Pipe_Fitting Submittal Sheet.pdf 0 DOC 1/4/2022 JULIA AGGREH Fire Review Application.pdf Fire Review Application.pdf 0 DOC 1/4/2022 JULIA AGGREH General Project Data Report_Bath1 Head_2 26 2020 .pdf General Project Data Report_Bath1 Head_2 26 2020 .pdf 0 BOND INFORMATION OVERHEAD HYRO KHET 3/13/2020 3/13/2020 APPROVED *SEE NOTES 3/13/2020 - Overhead rough/hydro inspection conducted by FSI Ruben Diaz (East OFM) at the direction of DFM Ken King. FSI Diaz documented the inspection on (non- approved) job plan set. "Must resubmit as build plans for plan check prior to final. RD I-107 3/13/2020. Okay to cover. 125psi." FIRE FINAL**KHET 5/26/2020 5/26/2020 APPROVED REMOTE VIDEO INSPECTION UPDATED APPROVED AS-BUILTS BASED ON OBSERVED CONDITIONS. REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST PERMIT TECH (1 DAY) JACK LIMA 2/26/2020 2/27/2020 2/26/2020 COMPLETE 1ST FIRE (2 WK)KOHL HETRICK 2/26/2020 3/11/2020 3/16/2020 APPROVED REVISED 2-HEAD CALCS PROVIDED 1ST FIRE (1 WK)KOHL HETRICK 5/19/2020 5/26/2020 5/19/2020 APPROVED REV 1 - AS-BUILTS PARENT PROJECTS Printed: Thursday, January 12, 2023 2:31:39 PM 3 of 5 Permit Details City of La Quinta PERMIT NUMBER FSS2020-0039 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 1/4/2022 JULIA AGGREH General Project Data Report_Kitchen 2 Head 2 26 2020.pdf General Project Data Report_Kitchen 2 Head 2 26 2020.pdf 0 DOC 1/4/2022 JULIA AGGREH Pipe Clamps Specs.pdf Pipe Clamps Specs.pdf 0 DOC 1/4/2022 JULIA AGGREH Piping Drain and CPV Valve Socket Spec.pdf Piping Drain and CPV Valve Socket Spec.pdf 0 DOC 1/4/2022 JULIA AGGREH Res Fire Sprinkler Plan Review Ltr 3 16 2020.pdf Res Fire Sprinkler Plan Review Ltr 3 16 2020.pdf 0 DOC 1/4/2022 JULIA AGGREH Residential Connection Charge Estimate with note 10 21 2019.pdf Residential Connection Charge Estimate with note 10 21 2019.pdf 0 DOC 1/4/2022 JULIA AGGREH Tech Data_Freedom Res Concealed Pendant Sprinkler VK494_K4.9 Spec.pdf Tech Data_Freedom Res Concealed Pendant Sprinkler VK494_K4.9 Spec.pdf 0 DOC 1/4/2022 JULIA AGGREH Tech Data_Freedom Res Concealed Pendant Sprinkler VK496_K3.0 Spec.pdf Tech Data_Freedom Res Concealed Pendant Sprinkler VK496_K3.0 Spec.pdf 0 DOC 1/4/2022 JULIA AGGREH Tech Data_Microfast Quick Response Pendant Sprinkler VK331_K4.2 Specs.pdf Tech Data_Microfast Quick Response Pendant Sprinkler VK331_K4.2 Specs.pdf 0 DOC 1/4/2022 JULIA AGGREH FSS2020-0039 PLAN with notes_1st 54080 Avenida Obregon.pdf FSS2020-0039 PLAN with notes 54080 Avenida Obregon.pdf 0 DOC 5/19/2020 KOHL HETRICK FSS2020-0039 - 1ST SUBM - APPROVED PLANS and CALCS.pdf FSS2020-0039 - 1ST SUBM - APPROVED PLANS and CALCS.pdf 1 Printed: Thursday, January 12, 2023 2:31:39 PM 4 of 5 Permit Details City of La Quinta PERMIT NUMBER FSS2020-0039 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 5/19/2020 KOHL HETRICK RCCE 54080 AVENIDA OBREGOB.pdf RCCE 54080 AVENIDA OBREGOB.pdf 1 DOC 5/19/2020 KOHL HETRICK FSS2020-0039 - FIRE COA and JOB CARD.pdf FSS2020-0039 - FIRE COA and JOB CARD.pdf 1 DOC 5/19/2020 KOHL HETRICK FSS2020-0039 - AS- BUILTS - APPROVED.pdf FSS2020-0039 - AS- BUILTS - APPROVED.pdf 1 IMAGE 5/19/2020 KOHL HETRICK FSI R DIAZ - INSPECTION NOTES (1)IMG_0350.jpg 1 IMAGE 5/19/2020 KOHL HETRICK FSI R DIAZ - INSPECTION NOTES (2)IMG_0349.jpg 1 Printed: Thursday, January 12, 2023 2:31:39 PM 5 of 5 Permit Details City of La Quinta PERMIT NUMBER FSS2020-0039 OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org March 16, 2020 JC Fire Protection 81705 De Oro Avenue Indio, CA 92201 Re: Residential Fire Sprinkler Plan Review – Smith Residence FSS2020-0039 / 54080 AVENIDA OBREGON, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. Permanently marked identification signs shall be attached to all control valves. The following inspections/tests are required to be witnessed by Office of the Fire Marshal Staff: (a) Overhead Rough and Hydro static test: All piping shall be visible and pumped at normal operating pressure. *No jacketed electrical and data wiring shall be in contact with, nor have the potential to contact CPVC piping once insulation is installed. (b) Final inspection The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 54080 AVENIDA OBREGON PERMIT#: FSS2020-0039 DATE ISSUED: 3/16/2020 DESCRIPTION: RES FIRE SPRINKLER SYSTEM CONTRACTOR: JC FIRE PROTECTION HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping 3/13/2020 R. DIAZ* Final E F Overhead hydro 3/13/2020 R. DIAZ* MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible dur ing the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: 3/13/2020 – Overhead rough/hydro inspection conducted by FSI Ruben Diaz (East OFM) at the direc- tion of DFM Ken King. FSI Diaz documented inspection on (non-approved) job plan set. “Must resubmit as build plans for plan check prior to final. RD I-107 3/13/2020. Okay to cover. 125psi” THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.