FSS2020-0067ADDITIONAL SITES
CHRONOLOGY
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT JASON PIVNIK 7356 Fulton Ave.North
Hollywood
CA 91605 (818)764-7990 jpivnik@deltafireprote
ction.com
CONDITION
TYPE CONTACT DATE
ADDED
DATE
REQUIRED
DATE
SATISFIED STATUS REMARKS NOTES
READY TO ISSUE
CHECKLIST
STEPHANIE
KHATAMI 5/21/2020 5/21/2020 COMPLETE
NEEDS TO PAY BUSINESS LICENSE 768751,
APPLICATION IN PENDING FILE WITH JACK
JACK LIMA CONFIRMED BL HAS BEEN PAID AND
IS NOW CURRENT.
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
PLAN CHECK SUBMITTAL
RECEIVED STEPHANIE SWANSTROM 5/21/2020 5/21/2020 NEEDS BUSINESS LICENSE
CONDITIONS
Description: MODIFY FIRE SPRINKLER COVERAGE FOR NEW TENANT
Type: FIRE SPRINKLER (WEB)Subtype: TENANT IMPROVEMENT Status: FINALED Applied: 5/21/2020 EPRS
Parcel No: 600390029 Site Address: 79024 HIGHWAY 111 STE 103 LA QUINTA,CA 92253 Approved: 6/2/2020 KHET
Subdivision: PM 29351 Block: Lot: 11 Issued: Online
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 9/10/2020 KHET
Valuation: $2,000.00 Occupancy Type: Construction Type: Expired:
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details:
Printed: Tuesday, February 21, 2023 10:42:11 AM 1 of 4
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2020-0067
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
BILL TO Jason Pivnik - Delta Fire Protection 7356 Fulton Ave.North
Hollywood
Ca 91605 (818)764-7990 jpivnik@deltafireprote
ction.com
CONTRACTOR DELTA FIRE PROTECTION 7356 FULTON AVE NORTH
HOLLYWOOD
CA 91605 (818)764-7990 jpivnik@deltafireprote
ction.com
OWNER INLAND AMERICAN LAQUINTA PAV P O BOX 9271 OAK BROOK IL 92253 (818)764-7990
INSPECTIONS
SEQID INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
FIRE SPRINKLER
SYSTEMS - TENANT
IMPROVEMENT OVER
10 HEADS
101-0000-42420 0 $161.00 $161.00 5/21/20 WEB5228 07345G CREDIT Jason Pivnik EPRS
FIRE SPRINKLER
SYSTEMS - TENANT
IMPROVEMENT OVER
10 HEADS PC
101-0000-42420 0 $242.00 $242.00 5/21/20 WEB5228 07345G CREDIT Jason Pivnik EPRS
Total Paid for FIRE FEES: $403.00 $403.00
RECORDS
MANAGEMENT FEE 101-0000-42416 0 $10.00 $10.00 5/21/20 WEB5228 07345G CREDIT Jason Pivnik EPRS
Total Paid for RECORDS MANAGEMENT FEE: $10.00 $10.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 5/21/20 WEB5228 07345G CREDIT Jason Pivnik EPRS
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$418.00 $418.00
Printed: Tuesday, February 21, 2023 10:42:11 AM 2 of 4
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2020-0067
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 5/21/2020 EtrakitPublicReg 1ST SUBMITTAL :
SPRINKLER PLAN
79024 Hwy 111 - FS TI
Plan.pdf 1
DOC 5/21/2020 EtrakitPublicReg 1ST SUBMITAL :
SPRINKLER SPECS
79024 Hwy 111 -
sprinkler pendant
spec.pdf
1
DOC 5/21/2020 EtrakitPublicReg
1ST SUBMITTAL : SPECS
WALK IN DRY
SPRINKLERS
79024 Hwy 111 - Dry
Pendant spec.pdf 1
BOND INFORMATION
OVERHEAD ROUGH
PIPING KHET 7/9/2020 7/9/2020 NOT READY REMOTE VIDEO
INSPECTION STILL MOVING PIPE
OVERHEAD HYRO KHET 7/9/2020 7/9/2020 NOT READY REMOTE VIDEO
INSPECTION NOT READY - NO WATER ON THE SYSTEM.
OVERHEAD ROUGH
PIPING KHET 7/20/2020 7/20/2020 APPROVED REMOTE VIDEO
INSPECTION
OVERHEAD HYRO KHET 7/20/2020 7/20/2020 APPROVED REMOTE VIDEO
INSPECTION
OBSERVED 95 PSI STATIC. (HYDRAULIC CALC
PLATE = .20/1500 DENSITY REQUIRING 309
GPM @ 74.2 PSI RESIDUAL)
FIRE FINAL**KHET 9/10/2020 9/10/2020 APPROVED REMOTE VIDEO
INSPECTION
REVIEWS
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE
STATUS REMARKS NOTES
1ST PERMIT TECH (1
DAY)
STEPHANIE
SWANSTROM
5/21/2020 5/22/2020 5/21/2020 COMPLETE 1ST SUBMITAL RECEIVED.
1ST FIRE (2 WK)KOHL
HETRICK
5/21/2020 6/4/2020 6/2/2020 APPROVED SEE ATTACHMENTS
PARENT PROJECTS
Printed: Tuesday, February 21, 2023 10:42:11 AM 3 of 4
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2020-0067
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 6/2/2020 KOHL HETRICK FSS2020-0067 -
APPROVED PLANS.pdf
FSS2020-0067 -
APPROVED PLANS.pdf 1
DOC 6/2/2020 KOHL HETRICK FSS2020-0067 - COA and
JOB CARD.pdf
FSS2020-0067 - COA and
JOB CARD.pdf 1
Printed: Tuesday, February 21, 2023 10:42:11 AM 4 of 4
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2020-0067
APPROVED
By:
FIRE SAFETY SPECIALIST
06/02/2020 10:54:44 AM
The approval of plans and specifications does not
permit the violation, deletion, omission or faulty
installation of any requirements of Title 24 or any
Local Ordinances. Construction shall remain
accessible and exposed for inspection purposes
until approved by the Fire Department.
PERMIT # -FSS2020-0067
DEC 2019 GFS-110 PAGE 1 OF 6
GENERAL DESCRIPTION
Globe Series GL-SR sprinklers sheet are Listed Standard
Response sprinklers which utilize a 5mm frangible glass
bulb as the thermosensitive operating element. These
sprinklers are available in upright, pendent, and recessed
pendent orientations. They are Listed and Approved as
Standard Coverage sprinklers and are to be installed in ac-
cordance with the guidelines of the appropriate Installation
Standard being mandated by the AHJ (i.e. NFPA 13; FM
2-0). These sprinklers are available in various K-factors,
temperatures and finishes as shown. Recessed escutch-
eons with either ½” or ¾” vertical adjustment are available
(See Approvals Table for appropriate sprinkler/escutcheon
combinations and Listings). Some pendent models are ad-
ditionally available with a special “Seismic” escutcheon to
meet the IBC-ASCE/SEI 7 requirements for use in seismic
design categories C, D & E.
TECHNICAL DATA
SIN
• Upright: GL2861, GL4261, GL5661, GL8161, GL8164
• Pendent, Recessed Pendent: GL2851, GL4251,
GL5651, GL8151, GL8156
Approvals
• cULus • FM • LPCB • CE
• See Approval Tables
Maximum Working Pressure
• 175 psi (12 bar)
Minimum Operating Pressure
• 7 psi (48 kPa)
Temperature Rating
• See Approval Tables
Materials of Construction
• Frame - bronze • Deflector - brass • Screw - brass
• Lodgement Wire - stainless steel • Bulb seat - copper
• Spring - nickel alloy • Seal - teflon
• Bulb - glass with glycerin solution, 5mm
• Escutcheon Assembly - carbon steel
SERIES GL-SR
STANDARD COVERAGE, STANDARD RESPONSE
UPRIGHT, PENDENT & RECESSED PENDENT SPRINKLER
K-FACTOR: 2.8, 4.2, 5.6, 8.0
FINISHES AND ACCESSORIES
Finishes
• Factory Bronze • Chrome • White Polyester
• Black Polyester - special order
• Wax Coated - special order
Escutcheons
• Brass • Chrome • White Polyester • Black Polyester
Wrenches
• Standard • Recess • 1/2” NPT • 3/4” NPT
OPERATION
Upon exposure to heat such as from a fire, the fluid in the
bulb expands, compressing the air bubble within the bulb.
When the air bubble can no longer compress, the fluid ex-
pansion causes breakage of the glass bulb, resulting in re-
lease of the water seat assembly, and discharge of water
from the sprinkler.
PENDENT
RECESSED PENDENT
RECESSED PENDENT
SEISMIC
IBC/ASCE/SEI CODES
UPRIGHT
4077 Airpark Dr. Standish, MI 48658 • 989-846-4583 • www.globesprinkler.com
Technical Support • 989-414-2600 • techservice@globesprinkler.com
NOTE:
Users should refer to Globe’s web site (www.globesprinkler.com)
to ensure that the most recent technical literature is being utilized.
NOTE:
Corrosion resistant coatings, where applicable, are utilized to
extend the life of copper alloy sprinklers beyond that which would
otherwise be expected when exposed to corrosive atmospheres.
Although corrosion resistant coated sprinklers have passed the
standard corrosion tests of the applicable approval agencies,
the testing is not representative of all possible corrosive atmo-
spheres. Consequently, it is recommended that the end user be
consulted with respect to the suitability of these coatings for any
given corrosive environment. The effects of ambient temperature,
concentration of chemicals, humidity, and gas/chemical velocity,
should be considered, as a minimum, along with the corrosive
nature of the chemical to which the sprinklers will be exposed.
SERIES GL-SR STANDARD COVERAGE, STANDARD RESPONSE UPRIGHT, PENDENT & RECESSED PENDENT SPRINKLERS K-FACTOR: 2.8, 4.2, 5.6, 8.0 SERIES GL-SR STANDARD COVERAGE, STANDARD RESPONSE UPRIGHT, PENDENT & RECESSED PENDENT SPRINKLERS K-FACTOR: 2.8, 4.2, 5.6, 8.0 GFS-110 GFS-110
DEC 2019 GFS-110 PAGE 2 OF 6
NOTICE
Do not install any bulb-type sprinkler if the bulb is cracked or there is loss of liquid from the bulb. Sprinklers should be tightened enough to obtain a leak-tight joint when water pressure is applied and/or hydrostatic test is performed. Sprinklers should not be overtightened as this can result in distortion and subsequent leak-age. It is recommended not to exceed 14 ft.-lb. (19.0 Nm) torque for 1/2 inch NPT sprinkler threads; 20 ft.-lb. (26.8 Nm) to 3/4 inch NPT threads.
Step1. Sprinklers must be properly oriented.
Step2. With pipe thread sealant applied to the pipe
threads, hand tighten the sprinkler into the sprin-
kler fitting. Note: Do not grasp the sprinkler by
the deflector.
Step3. Wrench-tighten the sprinkler using only the
appropriate wrench. Wrenches are only to be
applied to the sprinkler wrench flats or wrench
hex as applicable. Note: Do not apply wrench to
frame arms.
INSTALLATION
CARE AND MAINTENANCE
Prior to installation, it is important to read and follow the
“Sprinkler Caution” sheet included within each box of sprin-
klers. This sheet (GFS-840) is available on Globe’s web
site (www.globesprinkler.com).
Store sprinklers in a cool, dry place. Exposure to extreme
heat will damage the thermal sensing element, possibly re-
sulting in premature activation. Avoid direct sunlight.
Replace any sprinkler that shows any corrosion, damage,
or loss of liquid from the glass bulb.
Do not attempt to paint or alter the sprinkler’s coating in any
manner after leaving the manufacturing plant.
Do not attach wiring, ropes, decorations or fixtures to a
sprinkler.
Absence of an escutcheon, used to cover a ceiling hole,
may delay sprinkler operation in a fire situation.
It is the owner’s responsibility for inspection, testing and
maintenance of the fire sprinkler system with all components
and devices in accordance with the National Fire Protection
Association Pamphlet 25 as well as any other requirements
as set forth by the local Authority Having Jurisdiction (AHJ).
FIGURE 1: STANDARD SPRINKLER WRENCH
½" NPT P/N 325390
¾" NPT P/N 312366
FIGURE 2: RECESSED SPRINKLER WRENCH
½" NPT P/N 325391
¾" NPT P/N 325401
DEC 2019 GFS-110 PAGE 3 OF 6
SIN GL2861 (1) (2)GL4261 (1) (2)GL5661 (1) (2) (3)GL8161 (4)GL8164 (1) (2) (3)
ORIENTATION UPRIGHT UPRIGHT UPRIGHT UPRIGHT UPRIGHT
K-FACTOR 2.8 (40 metric)4.2 (60 metric)5.6 (80 metric)8.0 (115 metric)8.0 (115 metric)
NPT 1/2” (15mm)1/2” (15mm)1/2” (15mm)1/2” (15mm)3/4” (20mm)
HAZARD*L.H.L.H ALL ALL ALL
cULus
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NOTE: 500°F (260°C) available upon request without approvals.
FM NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
—
LPCB
Ref. No. 147c/04 NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
CE NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
TABLE A: UPRIGHT SPRINKLERS
(1) AVAILABLE AS cULus LISTED CORROSION RESISTANT WITH POLYESTER COATING.
(2) AVAILABLE AS cULus LISTED CORROSION RESISTANT WITH WAX COATING FOR 155°F (68°C), 200°F (93°C) EXCLUDING GL8161.
(3) AVAILABLE AS cULus LISTED, FM APPROVED CORROSION RESISTANT WITH WAX COATING FOR 155°F (68°C), 200°F (93°C)
(4) FOR RETROFIT USE ONLY.
FIGURE 3: SERIES GL-SR UPRIGHT SPRINKLERS
GL2861, GL4261, GL5661, GL8161
FIGURE 4: SERIES GL-SR UPRIGHT SPRINKLERS
GL8164
*NOTE: Conditions of use for sprinklers within different Occupancy Hazards may vary depending on Density and sprinkler K-Factor. Refer to the appropriate
Design Standard being utilized (i.e. NFPA; FM) for these conditions.
DEC 2019 GFS-110 PAGE 4 OF 6
SIN GL2851 (1) (2)GL4251 (1) (2)GL5651 (1) (2)GL8151 (4)GL8156 (1) (2) (3)
ORIENTATION PENDENT PENDENT PENDENT PENDENT PENDENT
K-FACTOR 2.8 (40 metric)4.2 (60 metric)5.6 (80 metric)8.0 (115 metric)8.0 (115 metric)
NPT 1/2” (15mm)1/2” (15mm)1/2” (15mm)1/2” (15mm)3/4” (20mm)
HAZARD*L.H.L.H ALL ALL ALL
cULus
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NOTE: 500°F (260°C) available upon request without approvals
FM NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
LPCB
Ref. No. 147c/04 NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
CE NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
TABLE B: PENDENT SPRINKLERS
(1) AVAILABLE AS cULus LISTED CORROSION RESISTANT WITH POLYESTER COATING.
(2) AVAILABLE AS cULus LISTED CORROSION RESISTANT WITH WAX COATING FOR 155°F (68°C), 200°F (93°C) EXCLUDING GL 8151.
(3) AVAILABLE AS cULus LISTED, FM APPROVED CORROSION RESISTANT WITH WAX COATING FOR 155°F (68°C), 200°F (93°C) (4) FOR RETROFIT USE ONLY.
FIGURE 6: SERIES GL-SR PENDENT SPRINKLERS
GL8156
FIGURE 5: SERIES GL-SR PENDENT SPRINKLERS
GL2851, GL4251, GL5651, GL8151
*NOTE: Conditions of use for sprinklers within different Occupancy Hazards may vary depending on Density and sprinkler K-Factor. Refer to the appropriate
Design Standard being utilized (i.e. NFPA; FM) for these conditions.
DEC 2019 GFS-110 PAGE 5 OF 6
SIN GL2851 (1)GL4251 (1)GL5651 (1)GL8151* (1)GL8156 (1) (2)
ORIENTATION RECESSED PEND.RECESSED PEND.RECESSED PEND.RECESSED PEND.RECESSED PEND.
K-FACTOR 2.8 (40 metric)4.2 (60 metric)5.6 (80 metric)8.0 (115 metric)8.0 (115 metric)
NPT 1/2”1/2”1/2”1/2”3/4”
HAZARD*L.H.L.H ALL ALL ALL
cULus
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
FM
Note: ½” Adjustable Recessed
Escutcheon only
NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
LPCB
Ref. No. 147c/04 NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
286°F (141°C)
360°F (182°C)
CE NA NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
NA
135°F (57°C)
155°F (68°C)
175°F (79°C)
200°F (93°C)
TABLE C: RECESSED PENDENT SPRINKLERS
2 15/16" DIA.
2" DIA. MIN.
HOLE IN CEILING
1 29/32" DIA.
1/8"1" MIN.
1 3/4" MAX.
1/8" MIN.
5/8" MAX. - 1/2" ADJ.
7/8" MAX. - 3/4" ADJ.
REDUCER
RETAINER
CUP
CEILING
FIGURE 7: RECESSED ESCUTCHEON
A A
4 1/2" (114mm) DIA.
3 7/8" (98mm)-
4"(101mm) DIA. MIN.
HOLE IN CEILING
1 29/32" (48mm) DIA.
1/8" (3mm) MIN.
5/8" (16mm) MAX. -
1/2" (12mm) ADJ.
7/8" (22mm) MAX. -
3/4" (19mm) ADJ.
1/4"(6mm)
1" (25mm) MIN.
1 1/2" (38mm) MAX. - 1/2" ADJ.
1 3/4" (44mm) MAX. - 3/4" ADJ.
CEILING CUP
RETAINER
REDUCER
FIGURE 8: SEISMIC RECESSED ESCUTCHEON
Meets IBC-ASCE/SEI 7 Codes for
Seismic areas C, D, & E.
TABLE E: SEISMIC ESCUTCHEON
3/4" ADJUSTABLE FRICTION FIT RECESSED ESCUTCHEON
(SEISMIC)
FINISH 1/2” NPT 3/4” NPT
Chrome 326170 326177
White 326172-W 326178-W
1/2" ADJUSTABLE FRICTION FIT RECESSED ESCUTCHEON
(SEISMIC)
FINISH 1/2” NPT 3/4” NPT
Chrome 326201 326208
White 326203-W 326210-W
TABLE D: RECESSED ESCUTCHEON
3/4" ADJUSTABLE FRICTION FIT RECESSED ESCUTCHEON
FINISH 1/2” NPT 3/4” NPT
Chrome 325422 325423
Brass 325424 325420
White Polyester 325426-W 325427-W
Black Polyester 325426-B 325427-B
Stainless Steel 326140 NA
1/2" ADJUSTABLE FRICTION FIT RECESSED ESCUTCHEON
FINISH 1/2” NPT 3/4” NPT
Chrome 332071 326040
Brass 332072 326041
White Polyester 332073-W 326042-W
Black Polyester 332073-B 326042-B
* FOR RETROFIT USE ONLY
(1) cULus/LPCB/CE APPROVED WITH 1/2" ADJUSTABLE AND 3/4" ADJUSTABLE RECESSED ESCUTCHEION
(2) FM APPROVED FOR BRASS FINISH ONLY
*NOTE: Conditions of use for sprinklers within different Occupancy Hazards may vary depending on Density and sprinkler K-Factor. Refer to the appropriate
Design Standard being utilized (i.e. NFPA; FM) for these conditions.
DEC 2019 GFS-110 PAGE 6 OF 6
PART NUMBER
SIN + TEMPERATURE + FINISH
XXXX XXX XX
SIN TEMPERATURE FINISH
GL2861 2861 135 135°F (57°C)01 BRONZE
GL4261 4261 155 155°F (68°C)02 CHROME
GL5661 5661 175 175°F (79°C)03 WHITE POLYESTER
GL8161 8161 200 200°F (93°C)04 BLACK POLYESTER
GL8164 8164 286 286°F (141°C)06 WAX COATED
GL2851 2851 360 360°F (182°C)
GL4251 4251
GL5651 5651 Note: All combinations may not be available.
Refer to Listing/Approval Tables for available listed combinations.GL8151 8151
GL8156 8156
TABLE F: PART NUMBER SELECTION
GLOBE® PRODUCT WARRANTY
Globe agrees to repair or replace any of its manufactured
products found to be defective in material or workmanship
for a period of one year from date of shipment.
For specific details of our warranty please refer to Price List
Terms and Conditions of Sale (Our Price List).
4077 Airpark Dr. Standish, MI 48658 • 989-846-4583 • www.globesprinkler.com
Technical Support • 989-414-2600 • techservice@globesprinkler.com
• Quantity • Finish • Part Number (See TABLE D and TABLE E)
• ESCUTCHEON
• Quantity • Part Number
• WRENCH
1/2” NPT Standard . . . . . . . . . . . . . . . . . . .325390
3/4” NPT Standard . . . . . . . . . . . . . . . . . . .312366
1/2” NPT Recess . . . . . . . . . . . . . . . . . . . .325391
3/4” NPT Recess . . . . . . . . . . . . . . . . . . . .325401
ORDERING INFORMATION
• SPRINKLER
SPECIFY:
• Quantity • SIN • Orientation • Orifice • NPT • Temperature Rating
• Finish • Part Number (See TABLE F)
DEC 2017 GFS-505b (formerly A-90)
EXTENDED
STANDARD RESPONSE
AUTOMATIC SPRINKLERS
GL SERIES
DRY TYPE PENDENT
DESCRIPTION AND OPERATION
RECESSED
SPRINKLER TEMPERATURE RATING/CLASSIFICATION and COLOR CODING
SLEEVE & SKIRT
SERIES GL-SR/DRY
SURFACE
MOUNT
CLASSIFICATION AVAILABLE SPRINKLER
TEMPERATURES BULB COLOR N.F.P.A. MAXIMUM CEILING
TEMPERATURE
ORDINARY
INTERMEDIATE
HIGH
135°F/155°F
175°F/200°F
286°F
57°C/68°C
79°C/93°C
141°C
ORANGE/RED
YELLOW/GREEN
BLUE
100°F
150°F
225°F
38°C
66°C
107°C
• Water Working Pressure Rating - 175 psi (12 Bars)
• Factory tested hydrostatically to 500 psi (34 Bars)
• Maximum low temperature glass bulb rating is -67°F (-55°C)
• Frame - bronze • Defl ector - brass • Screw - brass
• Bulb Seat - brass • Spring - nickel alloy • Seal - tefl on
• Retainer - brass • Pin - stainless steel
• Torsion Spring - stainless steel • Orifi ce Insert - brass
• Bulb - glass with glycerin solution, 5mm size
• 3/4”NPT or 1”NPT • Outer Tube - galvanized steel pipe • Inner Tube - stainless steel
TECHNICAL DATA
• See reverse side for Approvals and Specifi cations.
• Temperature Ratings -
135°F (57°C), 155°F (68°C), 175°F (79°C)
200°F (93°C), 286°F (141°C)
The Globe Series GL-SR/DRY Pendent Sprinkler is designed
for use in special applications such as freezing environments and
conditions where sediment or foreign materials might accumulate
in ordinary drop nipples.
The Globe Series GL-SR/DRY Pendent Sprinkler utilizes a fran-
gible glass ampule sprinkler. At the ampule's rated temperature,
the sprinkler opens releasing the bulb seat, causing the inner tube
assembly to move, allowing spring assembly to pivot alongside
the inner tube. At this time, water fl ows through the sprinkler and
is distributed by the defl ector, in an approved discharge pattern.
The heart of Globe's Series GL-SR sprinkler proven actuating
assembly is a hermetically sealed frangible glass ampule that
contains a precisely measured amount of fl uid. When heat is
absorbed, the liquid within the bulb expands increasing the internal
pressure. At the prescribed temperature the internal pressure within
the ampule exceeds the strength of the glass causing the glass
to shatter. This results in water discharge which is distributed in
an approved pattern.
DEC 2017 GFS-505b (formerly A-90)
"A"
1" MIN. 3/4"NPT
3/4" MIN. 1"NPT
2 1/2" MIN. DIA.
HOLE IN CEILING
3 1/2" DIA.FACE OF
CEILING
FACE OF
TEE
FITTING
3 3/4" MIN.
4 3/4" MAX.
TEE FITTING
ANSI B16.3 CLASS 15 OR
ANSI B16.4 CLASS 125
"A"
2 1/2" MIN. 3/4"NPT
2 1/4" MIN. 1"NPT
TEE FITTING
ANSI B16.3 CLASS 15 OR
ANSI B16.4 CLASS 125
FACE OF
TEE
FITTING
FACE OF
CEILING
TWO PIECE
ESCUTCHEON
1/4"
1 1/2" MIN. DIA.
HOLE IN CEILING
TEE FITTING
ANSI B16.3 CLASS 15 OR
ANSI B16.4 CLASS 125
"A"
3 1/4" MIN. 3/4"NPT
2 3/4" MIN. 1"NPT
1/8"
2 15/16" DIA.
2" MIN. DIA.
HOLE IN CEILING
FACE OF
CEILING
FACE OF
TEE
FITTING
1 1/4" MIN.
2" MAX.CUP
FACE OF
TEE
FITTING
RETAINER
2 1/2" MIN.
4" MAX.
"A"
1 3/4" MIN. 3/4"NPT
1 1/2" MIN. 1"NPT
3 7/32" DIA.
1 3/4" MIN. DIA.
HOLE IN CEILING
FACE OF
CEILING
TEE FITTING
ANSI B16.3 CLASS 15 OR
ANSI B16.4 CLASS 125
TWO PIECE
ESCUTCHEON
NOTE: METRIC CONVERSIONS ARE APPROXIMATE.
1FINISHES AVAILABLE ON SPECIAL ORDER.
2cULus LISTED CORROSION RESISTANT WHEN SPECIFIED ON ORDER.
SPECIFICATIONS
APPROVALS
PRINTED U.S.A.
4077 AIRPARK DRIVE, STANDISH, MICHIGAN 48658
FAX 989-846-9231
www.globesprinkler.com
989-846-4583
1-800-248-0278
GLOBE® PRODUCT WARRANTY
Globe agrees to repair or replace any of its own manufactured
products found to be defective in material or workmanship for a
period of one year from date of shipment.
For specifi c details of our warranty please refer to Price List
Terms and Conditions of Sale (Our Price List).
STANDARD RESPONSE
AUTOMATIC SPRINKLERS
GL SERIES DRY TYPE
PENDENT
1SPRINKLERS SHALL BE LIMITED AS PER THE REQUIREMENTS OF NFPA13 AND ANY OTHER RELATED DOCUMENTS.
*PENDENT STYLE - FM APPROVED 155°F (68°C), 200°F (93°C), AND 286°F (141°C)
*RECESSED PENDENT STYLE - FM APPROVED 155°F (68°C) AND 200°F (93°C)
ALL: ALL HAZARDS
STYLE SIN HAZARD
1 135°F
(57°C)
155°F
(68°C)
175°F
(79°C)
200°F
(93°C)
286°F
(141°C)*FM cULus
NYC-DOB
MEA
101-92-E
MIN.
DISTANCE
BETWEEN
SPRINKLERS
Feet (Meters)
Pendent
Recessed
Pendent
GL5679 ALL X X X X X X X X
6 (1.8)GL5680 ALL X X X X X --- X X
GL8179 ALL X X X X X --- X X
CROSS SECTIONS
EXTENDED
SLEEVE & SKIRTRECESSED
SURFACE MOUNT
IMPORTANT INSTALLATION DATA
Globe GL Series Dry Pendent Sprinklers should be installed in
accordance with the requirements set forth in NFPA 13. These
sprinklers are to be installed using a pipe wrench applied to
the outer tube. When this is not possible, the proper sprinkler
head wrench may be used with extreme care for lengths up to
approximately 18”. Excessive force may distort the frame thus
destroying the unit.
When installed in a wet system extending into a freezing
area see chart on Dry Caution Sheet for minimum exposed
barrel length to prevent ice plugs. Please refer to our Dry
Caution Sheet for further important installation data.
ORDERING INFORMATION
• Quantity • SIN • Style • Orifi ce • Temperature • Finishes
• Quantity - Wrenches - P/N 333010
• Quantity Recessed Wrenches - P/N 337014
• Escutcheons Desired
• Quantity - Protective Caps - P/N 327109-cap (Friction Fit Recessed)
“A” Dimension - Distance from face of fi tting to the fi nished ceiling line
regardless of escutcheon used.
SPECIFY
SIN NOMINAL
“K” FACTOR
THREAD
SIZE LENGTH FINISHES
GL5679 5.6 (80 metric) 1”NPT
cULus Variable to 48”
FM Variable to 36”
Factory Bronze
Chrome
White Polyester2
Black Polyester1,2
GL5680 5.6 (80 metric) 3/4”NPT
GL8179 8.0 (115 metric) 1”NPT
OFFICE OF THE FIRE MARSHAL – LA QUINTA
78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074
• www.rvcfire.org
June 2, 2020
Delta Fire Protection
Jason Pivnik
7356 Fulton Avenue
North Hollywood, CA 91605
Re: TI Fire Sprinkler Plan Review – PIEOLOGY
FSS2020-0067 / 79024 HIGHWAY 111 #103, LA QUINTA, CA 92253
The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County
Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions.
The following inspections/tests are required to be witnessed by the Office of the Fire Marshal staff:
1) Overhead Rough: All installed/relocated piping must be visible.
2) Final inspection: All trim is in place, 5-Year certification is current.
*Water-flow signal test may be performed during the Final Inspection.
The Fire Department approved plans and conditions letter must be at the job site.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for
inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131.
All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal
staff at (760)777-7074.
Kohl Hetrick - Fire Safety Specialist
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
RIVERSIDE COUNTY FIRE PROTECTION PLANNING
RECORD OF INSPECTIONS / PERMIT CARD
THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.
INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE.
JOB
ADDRESS: 79024 HIGHWAY 111 #103 PERMIT#: FSS2020-0067 DATE
ISSUED: 6/2/2020
DESCRIPTION: TI FIRE SPRINKLER CONTRACTOR: DELTA FIRE PROTECTION
HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS
Thrust block pre-pour Door fan test
UG rough piping Abort test
UG hydro Mechanical shutdown
Flush Detector test
Final E F Deluge/pre-action
SPRINKLER U.G. Final E F
Thrust block pre-pour UST/AST TANK
UG rough piping Installation
UG hydro Removal
Flush Emergency shut off
Final E F Primary piping
FIRE SPRINKLER Secondary piping
Weld inspection Dispensers & shear valves
Overhead rough piping Final E F
Overhead hydro MISC. INSPECTIONS
UG flush / OK to connect Spray booths
Main drain/inspectors’ test Hood/duct extinguishing
High pile storage High pile rack storage
In-rack sprinklers H.P. vents/access/corridors
Hose racks Tract access/hydrant verification
Final E F Access & Address verification
HOOD EXTINGUISHING OTHER CONST. PERMIT
Detection system
Function test
Gas/electrical shut-off
Nozzle model/placement
Fire alarm connection
Final E F
SPRAY BOOTHS FIRE CODE PERMIT(S)
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final E F
FIRE ALARM KNOX SYSTEM
Rough-wire inspection Building Knox box
Function test Gate access Knox box/padlock
Duct detectors/velocity BUILDING INSPECTIONS
24 hr. battery test T/I final
Sprinkler monitoring Shell final
Final E F Final for occupancy
FINAL INSPECTION DATE: INSPECTORS SIGNATURE:
**WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE**
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
INSPECTION NOTES
1. Sway bracing and hangers will be inspected at the time of rough piping inspection.
2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler
Systems)
3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required.
4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test.
5. Contractor shall supply all testing equipment, access and operating instructions at time of test.
6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the
affected system to be covered or hidden.
POLICIES ON FIELD INSPECTIONS
A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when
scheduling inspections. For City of La Quinta inspections call: (760) 777-7131.
B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence
without approved plans.
C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required
to schedule the necessary inspections and be present on site for inspections.
D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not
on site or where previously noted corrections have not been completed.
E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into
the structure until clearance has been granted by the Fire Dept and Building Official.
F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance
has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official.
INSPECTION NOTES:
THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE
AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS.
THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180
DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE.
THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE
REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.