Loading...
FSS2021-0194ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT RESIDENTIAL FIRE SYSTEMS INC 8085 E CRYSTAL DRIVE ANAHEIM CA 92807 (714)666-8450 engineering@resfire.co m CONTRACTOR RESIDENTIAL FIRE SYSTEMS INC 8085 E. Crystal Drive Anaheim CA 92807 (714)666-8450 engineering@resfire.co m OWNER STEVEN ELLIOTT 221 CALDWELL AVE LOS GATOS CA 92253 (714)666-8450 CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES NOTE JOSE DELGADO 9/22/2021 Contractor cancelled Rough/Hydro inspection on 9/22/21 @ 10:45 pm CONDITIONS Description: LOGGIA AND COVERED PATIO CONVERTED INTO NEW OFFICE AND BAR Type: FIRE SPRINKLER (WEB)Subtype: TENANT IMPROVEMENT Status: FINALED Applied: 8/23/2021 ECON Parcel No: 777160039 Site Address: 80559 VIA PESSARO LA QUINTA,CA 92253 Approved: 9/8/2021 AMA Subdivision: TR 29894-2 Block: Lot: 305 Issued: 9/20/2021 JOD Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 1/6/2022 KHET Valuation: $4,785.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: FINANCIAL INFORMATION Printed: Thursday, March 02, 2023 1:17:26 PM 1 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0194 BOND INFORMATION INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD HYRO KHET 9/30/2021 9/30/2021 APPROVED OVERHEAD ROUGH PIPING KHET 9/30/2021 9/30/2021 APPROVED As Builts Required FIRE FINAL**KHET 1/6/2022 1/6/2022 APPROVED REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST FIRE (2 WK)KOHL HETRICK 8/23/2021 9/7/2021 9/8/2021 APPROVED SEE ATTACHMENTS FEES ADJUSTED FOR MODIFICATION TO EXISTING SYSTEM 1ST PERMIT TECH (1 DAY) PERMIT TECH BUCKET 8/23/2021 8/24/2021 8/24/2021 COMPLETE PARENT PROJECTS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE STAFF - PER HOUR 101-0000-42420 1.5 $241.50 $241.50 9/20/21 WEB9346 632576938 65 CREDIT 786965 ECON Total Paid for FIRE FEES: $241.50 $241.50 RECORDS MANAGEMENT FEE 101-0000-42416 0 $10.00 $10.00 9/20/21 WEB9346 632576938 65 CREDIT 786965 ECON Total Paid for RECORDS MANAGEMENT FEE: $10.00 $10.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 9/20/21 WEB9346 632576938 65 CREDIT 786965 ECON Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$256.50 $256.50 Printed: Thursday, March 02, 2023 1:17:26 PM 2 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0194 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 8/23/2021 EtrakitContractor FIRE SPRINKLER T.I. PLANS 14252 The Elliott Addition FSP-RG.pdf 1 DOC 10/4/2021 Etrakit Contractor 14252 The Elliott Addition FSP-RG Delta 2.pdf 1 DOC 9/8/2021 KOHL HETRICK FSS2021-0194 - COA AND JOB CARD.pdf FSS2021-0194 - COA AND JOB CARD.pdf 1 DOC 9/8/2021 KOHL HETRICK FSS2021-0194 - APPROVED PLANS.pdf FSS2021-0194 - APPROVED PLANS.pdf 1 DOC 9/30/2021 KOHL HETRICK FSS2021-0194 9-30- 2021 - insp notes.pdf FSS2021-0194 9-30- 2021 - insp notes.pdf 1 DOC 10/4/2021 KOHL HETRICK FSS2021-0194 - APPROVED AS- BUILTS.pdf FSS2021-0194 - APPROVED AS- BUILTS.pdf 1 Printed: Thursday, March 02, 2023 1:17:26 PM 3 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0194 FSS2021-0194 - AS-BUILT INSP. TEST 1" C O P P E R K ( E X I S T . )EX. 1" WATER METEREXISTING INSPECTOR TEST15'-0"1-1/2" PVC (EXISTING)79'-7"EXISTING RISER LOCATION(PART OF SUBMITTAL)EXISTING COVERED PATIOCONVERSION INTO NEW INTERIORWET BAR(PART OF SUBMITTAL)EXISTING FIREPLACE WASRELOCATED(PART OF SUBMITTAL)EXISTING LOGGIA CONVERSIONINTO NEW OFFICE(NOT PART OF SUBMITTAL)(NOT PART OF SUBMITTAL)RESIDENTIALfire systems inc.09.09.1643251 GALLERYH=14'-0"H=13'-0"B.O.SOFFITH=18'-6"H=14'-0"H=17'-6"B.O.SOFFITH=13'-0"B.O.SOFFITWESTINSP. TEST NEW BAR/LOUNGESOFFIT HT. 10'-8 3/4"FINISHED HDR. HT. 10'-0" FINISHED HDR. HT. 10'-0"SHADE POCKET (+8")LIGHT POCKET (+8")12'-0" CEILINGFINISHED HDR. HT. 10'-0"11'-5 1/4" CEILINGNEW OFFICECABINETARCH 8'-0" SOFFIT12'-0" CEILING12'-0" CEILING12'-0" CEILINGSHADE POCKET (+8")LIGHT POCKET (+8")11'-0" CEILING68.5 ft³H=14'-0"H=13'-0"B.O.SOFFIT34 ft³17 ft³20 ft³15 ft³NICHE NICHEFIREPLACE HEAT ZONE 68 ft³68 ft³42 ft³SHELVES MATCHLINEMATCHLINE(NOT PART OF SUBMITTAL)112MATCHLINEMATCHLINERESIDENTIALfire systems inc.09.09.1643251OBSTRUCTIONDABOBSTRUCTIONCLG.BABCLG.WALLABA08.18.16FIRE SPRINKLER PLAN (NFPA 13D) NOTES:- ALL NEW + EXISTING COMPARTMENTS WITH 1 RESIDENTIAL HEAD TO BE SPACED @ MAX. ALL COMPARTMENTS WITH 2 OR MORE RESIDENTIAL HEADS TO BE SPACED @ MAX.- ALL NEW + EXISITNG PIPING TO BE CPVC PIPE U.N.O.- ALL NEW + EXISTING DROPS TO HEADS TO BE CPVC PIPE1"1"20'x20'16'x16'1 OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org September 8, 2021 Residential Fire Systems INC 8085 E Crystal Drive Anaheim, CA 92807 Re: Residential Fire Sprinkler Plan Review – ELLIOT ADDITION FSS2021-0194 / 80559 VIA PESSARO, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. Permanently marked identification signs shall be attached to all control valves. The following inspections/tests are required to be witnessed by Office of the Fire Marshal Staff: (a) Overhead Rough and Hydro static test: All piping shall be visible and pumped at normal operating pressure. *No jacketed electrical and data wiring shall be in contact with, nor have the potential to contact CPVC piping once insulation is installed. (b) Final inspection The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 80559 VIA PESSARO PERMIT#: FSS2021-0194 DATE ISSUED: 9/8/2021 DESCRIPTION: ELLIOT ADDITION CONTRACTOR: RESIDENTIAL FIRE SYSTEMS INC HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Insp ector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible part y not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.