Loading...
FSS2021-0234ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT jose martinez 9630 Jurupa R.D Riverside CA 92509 (951)314-4338 josem.acerfire@gmail.c om CONTRACTOR ACER FIRE PROTECTION 4661 Mane Street montclair CA 91763 (951)314-4338 josem.acerfire@gmail.c om OWNER WASHINGTON ADAM PARTNERSHIP 46753 ADAMS STREET LA QUINTA CA 92253 (951)314-4338 CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES E-MAIL AARON HICKSON 9/21/2021 9/21/2021 SENT BL APPLICATION TO APPLICANT TO ADD CONTRACTOR ACCOUNT CONDITIONS Description: modification of existing system Type: FIRE SPRINKLER (WEB)Subtype: COMMERCIAL/INDUSTRIAL Status: FINALED Applied: 9/20/2021 EPRS Parcel No: 643220001 Site Address: 78670 HIGHWAY 111 LA QUINTA,CA 92253 Approved: 10/4/2021 KHET Subdivision: PM 25865 Block: Lot: 2 Issued: 10/25/2021 JOD Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 11/9/2021 KHET Valuation: $1,000.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: RELOCATE 3 PENDENT HEADS FINANCIAL INFORMATION Printed: Friday, March 03, 2023 8:45:26 AM 1 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0234 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD ROUGH PIPING KHET 10/28/2021 10/28/2021 APPROVED SEE NOTES QR heads added need to be changed to SSP as existing style in the occupancy. FIRE FINAL**KHET 11/9/2021 11/9/2021 APPROVED All items addressed. REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST FIRE - ETRAKIT (2 WK) KOHL HETRICK 9/20/2021 10/4/2021 10/4/2021 APPROVED SEE ATTACHMENTS PARENT PROJECTS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE SPRINKLER SYSTEMS COMMERCIAL/INDUSTR IAL 101-0000-42421 0 $161.00 $161.00 10/25/21 WEB9703 633197281 87 CREDIT jose martinez EPRS FIRE SPRINKLER SYSTEMS COMMERCIAL/INDUSTR IAL PC 101-0000-42420 0 $80.50 $80.50 10/25/21 WEB9703 633197281 87 CREDIT jose martinez EPRS Total Paid for FIRE FEES: $241.50 $241.50 RECORDS MANAGEMENT FEE 101-0000-42416 0 $10.00 $10.00 10/25/21 WEB9703 633197281 87 CREDIT jose martinez EPRS Total Paid for RECORDS MANAGEMENT FEE: $10.00 $10.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 10/25/21 WEB9703 633197281 87 CREDIT jose martinez EPRS Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$256.50 $256.50 Printed: Friday, March 03, 2023 8:45:26 AM 2 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0234 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 9/20/2021 Etrakit Public Registration 1ST SUBMITTAL FIRE SPRINKLER PLAN NAILS STUDIO FIRE SPRINKLER PLAN LA QUINTA CA.pdf 1 DOC 9/20/2021 Etrakit Public Registration 1ST SUBMITTAL FIRE SPRINKLER CUTSHEET 031414.pdf 1 DOC 10/4/2021 KOHL HETRICK FSS2021-0234 - APPROVED PLANS.pdf FSS2021-0234 - APPROVED PLANS.pdf 1 DOC 10/4/2021 KOHL HETRICK FSS2021-0234 - COA AND JOB CARD.pdf FSS2021-0234 - COA AND JOB CARD.pdf 1 BOND INFORMATION 1ST PERMIT TECH – ETRAKIT (1 DAY) AARON HICKSON 9/20/2021 9/21/2021 9/21/2021 COMPLETE NEED TO ADD CONTRACTOR ACCOUNT WHEN BL APPLICATION IS CREATED. 1047478 Printed: Friday, March 03, 2023 8:45:26 AM 3 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0234 FSS2021-0234 MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 1 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com 1. DESCRIPTION The Viking Micromatic® Standard Response Pendent VK102 Sprinkler is a small, thermosensitive, glass-bulb spray sprinkler available in several different finishes and temperature ratings to meet design requirements. The special Polyester, and Electroless Nickel PTFE (ENT) coatings can be used in decorative applications where colors are desired. In addition, these coatings have been investigated for installation in corrosive environments and are listed/approved as indicated in the Approval Charts. Viking standard response sprinklers may be ordered and/or used as open sprinklers (glass bulb and pip cap assembly removed) on deluge systems. Refer to Ordering Instructions. 2. LISTINGS AND APPROVALS cULus Listed: Category VNIV FM Approved: Classes 2001, 2002, 2015, 2017, 2043 VdS Approved: Certificate G414006 & G414004 LPCB Approved CE: Standard EN 12259-1, DOP_Sprinklers_LPCB_5-2-19 & DOP_VK102WAX_2-12-19 MED Certified: Standard EN 12259-1, EC-certificate 0832-MED-1003 China Approval: Approved according to China GB standard. NOTE: Other International approval certificates are available upon request. Refer to Approval Charts and Design Criteria for listing and approval requirements that must be followed. 3. TECHNICAL DATA Specifications: Minimum Operating Pressure: 7 psi (0.5 bar)* Maximum Working Pressure: 175 psi (12 bar) wwp Factory tested hydrostatically to 500 psi (34.5 bar) Thread size: 1/2” NPT, 15 mm BSPT Nominal K-factor: 5.6 U.S. (80.6 metric**) Glass-bulb fluid temperature rated to -65 °F (-55 °C) Overall Length: 2-1/4” (57 mm) * cULus Listing, FM Approval, and NFPA 13 installs require a minimum of 7 psi (0.5 bar). The minimum operating pressure for LPCB and CE Approvals ONLY is 5 psi (0.35 bar). ** Metric K-factor measurement shown is in Bar. When pressure is measured in kPa, divide the metric K-factor shown by 10.0. Material Standards: Frame Casting: Brass UNS-C84400 or QM Brass Deflector: Phosphor Bronze UNS-C51000 (Not for FM Approval) or Copper UNS-C19500 Bulb: Glass, nominal 5 mm diameter Belleville Spring Sealing Assembly: Nickel Alloy, coated on both sides with PTFE Tape Screw: Brass UNS-C36000 Pip Cap and Insert Assembly: Copper UNS-C11000 and Stainless Steel UNS-S30400 For Polyester Coated Sprinklers: Belleville Spring-Exposed For ENT coated Sprinklers: Belleville Spring - Exposed, Screw and Pipcap - ENT plated. Ordering Information: Refer to Table 1 4. INSTALLATION Refer to appropriate NFPA Installation Standards. 5. OPERATION During fire conditions, the heat-sensitive liquid in the glass bulb expands, causing the glass to shatter, releasing the pip cap and sealing spring assembly. Water flowing through the sprinkler orifice strikes the sprinkler deflector, forming a uniform spray pattern to extinguish or control the fire. 6. INSPECTIONS, TESTS AND MAINTENANCE Refer to NFPA 25 for Inspection, Testing and Maintenance requirements. Replaces Form No. F_031414 Rev 19.2 (Revised CE approval) MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 2 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com 7. AVAILABILITY The Viking Micromatic® Standard Response Upright Sprinkler VK100 is available through a network of domestic and international distributors. See The Viking Corporation web site for the closest distributor or contact The Viking Corporation. 8. GUARANTEE For details of warranty, refer to Viking’s current list price schedule or contact Viking directly. TABLE 1: ORDERING INFORMATION Instructions: Using the sprinkler base part number, (1) add the suffix for the desired Finish (2) add the suffix for the desired Temperature Rating. Sprinkler Base Part No. Size 1: Finishes 2: Temperature Ratings NPT Inch BSPT mm Description Suffix1 Nominal Rating Bulb Color Hazard Classification Max. Ambient Ceiling Temperature2 Suffix 12987 1/2 --Brass A 135 °F (57 °C)Orange Ordinary 100 °F (38 °C)A 12989 --15 Chrome F 155 °F (68 °C)Red Ordinary 100 °F (38 °C)B 20229 --15 White Polyester 3,5 M-/W 175 °F (79 °C)Yellow Intermediate 150 °F (65 °C)D Black Polyester 3,5 M-/B 200 °F (93 °C)Green Intermediate 150 °F (65 °C)E Wax C 212 °F (100 °C)Green Intermediate 150 °F (65 °C)M Wax over Polyester V-/W 286 °F (141 °C)Blue High 225 °F (107 °C)G ENT 3,4,5 JN 360 °F (182 °C)Mauve Extra High 300 °F (149 °C)H 500 °F (260 °C)Black Ultra High6 465 °F (240 °C)L Example: 12987MB/W = VK102 with White Polyester Finish and 155 °F (68 °C) Nominal temperature rating. This sprinkler is to be installed into an area with a maximum ambient temperature of 100 °F (38 °C) meaning if the area will experience temperatures above the maximum ambient rating, you shall use a higher temperature-rated sprinkler. Corrosion Resistant Coatings5 • White Polyester and Black Polyester in all temperature ratings. • ENT in all temperature ratings except 135 °F (57 °C). • Wax-Coated Brass and Wax over Polyester7 for sprinklers with the following temperature ratings: 155 °F (68 °C) Lt. Brown Wax | 175 °F (79 °C) Brown Wax | 200 °F (93 °C) Brown Wax | 286 °F (141 °C) Dk. Brown Wax7 Accessories Sprinkler Wrenches (see Figure 1): A. Standard Wrench: Part No. 21475M/B B. Standard Wrench for Wax Coated Sprinklers: Part No. 10896W/B C. Socket Wrench for Recessed Pendent Sprinklers: Part No. 13655W/B (A 1/2” ratchet is required, not available from Viking) D. Socket Wrench for Wax Coated Sprinklers: Part No. 13577W/B (A 1/2” ratchet is required, not available from Viking) E. Optional Protective Sprinkler Cap Remover/Escutcheon Installer Tool9: Part No. 15915 Sprinkler Cabinet: A. Up to 6 sprinklers: Part number 01724A (available since 1971). B. 6-12 Sprinklers: Part number 01725A (available since 1971). Footnotes 1. Where a dash (-) is shown in the Finish suffix designation, insert the desired Temperature Rating suffix. See example above. 2. Based on NFPA 13, NFPA 13R, and NFPA 13D. Other limits may apply, depending on fire loading, sprinkler location, and other requirements of the Authority Having Jurisdiction. Refer to specific installation standards. 3. UL Listed as corrosion resistant. 4. FM Approved corrosion resistant. 5. The corrosion resistant and corrosion proofing coatings have passed the standard corrosion test required by the approving agencies indicated in the Approval Chart(s). These tests cannot and do not represent all possible corrosive environments. Prior to installation, verify through the end-user that the coatings are compatible with or suitable for the proposed environment. For automatic sprinklers, the coatings indicated are applied to the exposed exterior surfaces only. Note that the spring is exposed on sprinklers with Polyester and ENT coatings. For ENT coated automatic sprinklers, the waterway is coated. 6. Sprinklers of Ultra-High temperature rating are intended for use inside ovens, dryers, or similar enclosures with normal operating temperatures above 300 °F (149 °C). Where the ambient temperature around the Ultra-High temperature rated sprinkler is significantly reduced below 300 °F (149 °C), response time may be severely retarded 7. Wax melting point is 170 °F (76 °C) for 286 °F (141 °C) temperature rated sprinklers. For more inforamation regarding wax coatings, refer to Bulletin Form No. F_010201. 8. Allows use from the floor by attaching a length of 1” diameter CPVC tubing to the tool. Ideal for sprinkler cabinets. Refer to Bulletin F_051808. MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 3 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Figure 1: Sprinkler Wrenches Figure 2: Sprinkler Dimensions A C D B 2-1/4ʺ (57 mm) Nominal Pipe Engagement 7/16ʺ (11 mm) MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 4 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com DESIGN CRITERIA - UL (Also refer to Approval Chart 1.) cULus Listing Requirements: The Viking Micromatic0® Standard Response Pendent Sprinkler VK102 is cULus Listed as indicated in Approval Chart 1 for installation in accordance with the latest edition of NFPA 13 for standard spray sprinklers. • Designed for use in Light, Ordinary, and Extra Hazard occupancies. • The sprinkler installation rules contained in NFPA 13 for standard spray pendent sprinklers must be followed. IMPORTANT: Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to Form No. F_080614 for general care, installation, and maintenance information. Viking sprinklers are to be installed in accordance with the latest edition of Viking technical data, the appropriate standards of NFPA, LPCB, APSAD, VdS or other similar organizations, and also with the provisions of governmental codes, ordinances, and standards, whenever applicable. Approval Chart 1 (UL) Micromatic® Standard Response Pendent Sprinkler VK102 Maximum 175 PSI (12 bar) WWP Sprinkler Base Part Number1 SIN Thread Size Nominal K-factor Overall Length Listings and Approvals3 (Refer also to UL Design Criteria.) NPT BSPT U.S.metric2 Inches mm cULus4 VdS LPCB CE8 MED 9 China Approval 12987 VK102 1/2”15 mm 5.6 80.6 2-1/4”57 A1, B3, B1Y, C4, D2, E5, G5Z A1 A1, B3, B1Y F1, G1Y, B412 F2X -- 12989 VK102 --15 mm 5.6 80.6 2-1/4”57 A1, B3, B1Y, C4, D2, E5, G5Z A1 A1, B3, B1Y F1, G1Y, B412 F2X -- 2022910 VK102 --15 mm 5.6 80.6 2-1/4”57 E6 --------E6 NOTICE - Product Below - No longer offered. 10139 VK102 1/2”15 mm 5.6 80.6 2-1/4”57 A1, B3, B1Y, C4, D2, E5, G5Z ---------- 10173 VK102 --15 mm 5.6 80.6 2-1/4”57 A1, B3, B1Y, C4, D2, E5, G5Z A1 A1, B3, B1Y --F2X -- 18020 VK102 1/2”15 mm 5.6 80.6 2-1/4”57 A1, B3, B1Y, C4, D2, E5, G5Z A1 A1, B3, B1Y F1, G1X F2X -- Approved Temperature Rating Codes A = 135 °F (57 °C), 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C), 286 °F (141 °C), and 360 °F (182 °C)B = 135 °F (57 °C), 155 °F (68 °C), 175 °F (79 °C), and 200 °F (93 °C)C = 286 °F (141 °C)D = 500 °F (260 °C)7 E = 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C), 286 °F (141 °C), 360 °F (182 °C), and 500 °F (260 °C)7 F = 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C), 286 °F (141 °C), and 360 °F (182 °C)G = 155 °F (68 °C), 175 °F (79 °C), and 200 °F (93 °C) Approved Finish Codes 1 = Brass, Chrome, White Polyester5,6 and Black Polyester5,6 2 = Brass and Chrome3 = Wax-Coated Brass and Wax Over Polyester5 4 = High Temperature 200 °F (93 °C) Wax Coating (corrosion resistant); maximum ambient temperature allowed at ceiling = 150 °F (65 °C)5 = ENT5 6 = Chrome Approved Escutcheon Codes X = Recessed with the Viking Model E-1, E-2, or E-3 Recessed EscutcheonY = Standard surface-mounted escutcheon or recessed with the Viking Model E-1, E-2, or E-3 Recessed EscutcheonZ = Standard surface-mounted escutcheon or recessed with the Viking Model E-1 Recessed Escutcheon Footnotes 1. Base part number is shown. For complete part number, refer to Viking’s current price schedule. 2. Metric K-factor shown is for use when pressure is measured in bar. When pressure is measured in kPa, divide the metric K-factor shown by 10.0. 3. This table shows the listings and approvals available at the time of printing. Check with the manufacturer for any additional approvals. 4. Listed by Underwriters Laboratories Inc. for use in the U.S. and Canada. 5. cULus Listed as corrosion resistant. 6. Other colors are available on request with the same Listings and Approvals as the standard colors. 7. Sprinklers of Ultra-High temperature rating are intended for use inside ovens, dryers, or similar enclosures with normal operating temperatures above 300 °F (149 °C). Where the ambient temperature around the Ultra-High temperature rated sprinkler is significantly reduced below 300 °F (149 °C), the response time of the Ultra-High temperature rated sprinkler may be severely retarded. 8. CE: Standard EN 12259-1, EC-certificate of conformity 0832-CPD-0021. 9. MED Certified, Standard EN 12259-1, EC-certificate of conformity 0832-MED-1003 and 0832-MED-1008. 10. Approved according to China GB standard. 11. CE: Standard EC 12259-1, Declaration of Performance DOP_Sprinklers_LPCB_5-2-19 & DOP_VK102WAX_2-12-19 MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 5 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com DESIGN CRITERIA - FM (Also refer to Approval Chart 2.) FM Approval Requirements: The Viking Micromatic® Standard Response Pendent Sprinkler VK102 is is FM Approved as standard response Non-Storage pendent sprinkler as indicated in the FM Approval Guide. For specific application and installation requirements, reference the latest applicable FM Loss Prevention Data Sheets (including Data Sheet 2-0). FM Global Loss Prevention Data Sheets contain guidelines relating to, but not limited to: minimum water supply requirements, hydraulic design, ceiling slope and obstructions, minimum and maximum allowable spacing, and deflector distance below the ceiling. NOTE: The FM installation guidelines may differ from cULus and/or NFPA criteria. IMPORTANT: Always refer to Bulletin Form No. F_091699 - Care and Handling of Sprinklers. Also refer to Form No. F_080614 for general care, installation, and maintenance information. Viking sprinklers are to be installed in accordance with the latest edition of Viking technical data, the appropriate standards of NFPA, FM Global, LPCB, APSAD, VdS or other similar organiza- tions, and also with the provisions of governmental codes, ordinances, and standards, whenever applicable. Approval Chart 2 (FM) Micromatic® Standard Response Pendent Sprinkler VK102 Maximum 175 PSI (12 bar) WWP Sprinkler Base Part Number1 SIN Thread Size Nominal K-Factor Overall Length FM Approvals3 (Refer also to Design Criteria below.)NPT BSPT U.S.metric2 Inches mm 12987 VK102 1/2”15 mm 5.6 80.6 2-1/4”57 A1, B2, C3, D1, E4, G1Y, G4Z 12989 VK102 --15 mm 5.6 80.6 2-1/4”57 A1, B2, C3, D1, E4, G1Y, G4Z 202297 VK102 --15 mm 5.6 80.6 2-1/4”57 E5 NOTICE - Product Below - Limited Availability (Contact Local Viking Office) 10139 VK102 1/2”15 mm 5.6 80.6 2-1/4”57 A1, B2, C3, D1, E4, G1Y, G4Z 10173 VK102 --15 mm 5.6 80.6 2-1/4”57 A1, B2, C3, D1, E4, G1Y, G4Z 18020 VK102 1/2”15 mm 5.6 80.6 2-1/4”57 A1, B2, C3, D1, G1Y Approved Temperature Rating Codes A = 135 °F (57 °C), 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C), 212 °F (100 °C), 286 °F (141 °C), and 360 °F (182 °C) B = 135 °F (57 °C), 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C), and 212 °F (100 °C) C = 286 °F (141 °C) D = 500 °F (260 °C)5 E = 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C), 286 °F (141 °C), 360 °F (182 °C), and 500 °F (260 °C)5 F = 135 °F (57 °C), 155 °F (68 °C), 175 °F (79 °C), and 200 °F (93 °C) G = 155 °F (68 °C), 175 °F (79 °C), and 200 °F (93 °C) Approved Finish Codes 1 = Brass, Chrome, White Polyester5,6 and Black Polyester5,6 2 = Wax-Coated Brass (corrosion resistant) 3 = High Temperature 200 °F (93 °C) Wax Coating (corrosion resistant); maximum ambient temperature allowed at the ceiling = 150 °F (65 °C) 4 = ENT6 5 = Chrome Approved Escutcheon Codes Y = Standard surface-mounted escutcheon or recessed with the Viking Model E-1, E-2, or E-3 Recessed Escutcheon Z = Standard surface-mounted escutcheon or recessed with the Viking Model E-1 Recessed Escutcheon Footnotes 1. Base part number is shown. For complete part number, refer to Viking’s current price schedule. 2. Metric K-factor shown is for use when pressure is measured in bar. When pressure is measured in kPa, divide the metric K-factor shown by 10.0. 3. This table shows the listings and approvals available at the time of printing. Check with the manufacturer for any additional approvals. 4. Other colors are available on request with the same Approvals as the standard colors. 5. Sprinklers of Ultra-High temperature rating are intended for use inside ovens, dryers, or similar enclosures with normal operating temperatures above 300 °F (149 °C). Where the ambient temperature around the Ultra-High temperature rated sprinkler is significantly reduced below 300 °F (149 °C), the response time of the Ultra-High temperature rated sprinkler may be severely retarded. 6. FM approved as corrosion resistant. 7. Approved according to China GB standard. MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 6 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Step 1: Carefully slide the wrench sideways around the protective cap, ensuring engagement with the wrench flats. Step 1: Carefully slide the wrench sideways around the protective cap (not shown), ensuring engagement with the wrench flats. Step 2: Carefully press the wrench upwards to engage with the wrench flats. Step 2: Carefully press the wrench upwards to engage with the wrench flats. Figure 3: Installation with Recessed Wrenches *Requires a 1/2 ratchet - not available from Minimax. STANDARD FINISHES WAX COATED 13577W/B* 13655W/B* MICROMATIC® STANDARD RESPONSE PENDENT SPRINKLER VK102 (K5.6) TECHNICAL DATA Page 7 of 7 Form No. F_031414 20.10.20 Rev 20.1 The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Installed with a standard 1/8” surface-mounted escutcheon Figure 4: Installation Dimensions with Escutcheons Installed with a Model E-1 Recessed Escutcheon Installed with a Model E-2 Thread-on Recessed Escutcheon Ceiling Opening Size: 2-5/16” (59 mm) minimum 2-1/2” (64 mm) maximum Ceiling Opening Size: 2-5/16” (59 mm) minimum 2-1/2” (64 mm) maximum 1-1/8” (29 mm) Minimum 1-1/8” (29 mm) Minimum1-3/4” (45 mm) Maximum 1-3/4” (45 mm) 2” (51 mm) Maximum 2-1/8” (54 mm)2-1/8” (54 mm) Replaces Form No. F_031414 Rev 19.2 (Revised CE approval) OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org October 4, 2021 ACER Fire Protection 4661 Mane Street Montclair, CA 91763 Re: TI Fire Sprinkler Plan Review – NAIL SALON FSS2021-0234 / 78670 HIGHWAY 111, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. The following inspections/tests are required to be witnessed by the Office of the Fire Marshal staff: 1) Overhead Rough: All installed/relocated piping must be visible. 2) Final inspection: All trim is in place, 5-Year certification is current. New/added heads shall be included in the spare head box compliment. *Water-flow signal test may be performed during the Final Inspection. All persons performing work on the automatic fire sprinkler system shall be Certified Sprinkler Fitters or Registered with the State Fire Marshal for Apprentice or Trainee classification. The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 78670 HIGHWAY 111 PERMIT#: FSS2021-0234 DATE ISSUED: 10/4/2021 DESCRIPTION: NAIL SALON TI CONTRACTOR: ACER FIRE PROTECTION HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.