Loading...
FSS2021-0253ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT simon chavero 82417 priscilla ct indio CA 92201 (760)574-6512 simon@silveradofire.c om CONTRACTOR SILVERADO FIRE PROTECTION 82417 PRISCILLA STREET INDIO CA 92201 (760)574-6512 SIMON@SILVERADOFI RE.COM OWNER CHAU DOAN / NATSUKI CHAU TSUBOMI 54125 AVENIDA JUAREZ LA QUINTA CA 92253 (760)574-6512 CONDITIONS Description: CHAU / FIRE SPRINKLERS / BRES2020-0259 Type: FIRE SPRINKLER (WEB)Subtype: RESIDENTIAL - CUSTOM HOMES Status: FINALED Applied: 11/5/2021 EPRS Parcel No: 774193018 Site Address: 54125 AVENIDA JUAREZ LA QUINTA,CA 92253 Approved: 11/29/2021 KHET Subdivision: SANTA CARMELITA VALE LA QUINTA UNIT 24 Block: 257 Lot: 6 Issued: 12/6/2021 JOD Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 3/9/2022 LIN Valuation: $5,800.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: FINANCIAL INFORMATION Printed: Friday, March 03, 2023 9:53:03 AM 1 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0253 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD HYRO KHET 12/8/2021 12/8/2021 DISAPPROVE D OVERHEAD ROUGH PIPING KHET 12/8/2021 12/8/2021 DISAPPROVE D Inspection failed due to observable decreases in water size and significant Sprinkler pipe layout and coverage changes. Revised plans and calcs required. Reinspection is required. *Builder needs to get approval for the observed floor plan construction changes. DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE PLAN REVISION SUBMITTALS 101-0000-42420 0 $167.00 $167.00 3/7/22 WEB10927 635820823 83 CREDIT simon chavero EPRS FIRE SPRINKLER SYSTEMS - SINGLE FAMILY DETACHED 101-0000-42421 0 $167.00 $167.00 12/6/21 WEB10074 634063255 86 CREDIT simon chavero EPRS FIRE SPRINKLER SYSTEMS - SINGLE FAMILY DETACHED PC 101-0000-42420 0 $250.00 $250.00 12/6/21 WEB10074 634063255 86 CREDIT simon chavero EPRS Total Paid for FIRE FEES: $584.00 $584.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $11.00 $11.00 12/6/21 WEB10074 634063255 86 CREDIT simon chavero EPRS Total Paid for RECORDS MANAGEMENT FEE: $11.00 $11.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 12/6/21 WEB10074 634063255 86 CREDIT simon chavero EPRS Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$600.00 $600.00 Printed: Friday, March 03, 2023 9:53:03 AM 2 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0253 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 11/5/2021 Etrakit Public Registration 1ST SUBMITTAL PLAN Site (3).pdf 1 DOC 11/5/2021 Etrakit Public Registration 1ST SUBMITTAL SPRINKLER HEAD Senju RC-QR 4.9 Pendant.pdf 1 DOC 11/5/2021 Etrakit Public Registration 1ST SUBMITTAL FLOW ANALYSIS Results.pdf 1 DOC 11/5/2021 Etrakit Public Registration 1ST SUBMITTAL PIPING PLAN Piping.pdf 1 BOND INFORMATION OVERHEAD ROUGH PIPING KHET 12/13/2021 12/13/2021 APPROVED BASED ON THE REVISED PLANS AND CALCS - ORIGINAL INSPECTION WAS SUFFICIENT. *NOT A PHYSICAL REINSPECTION. OVERHEAD HYRO KHET 12/13/2021 12/13/2021 APPROVED BASED ON THE REVISED PLANS AND CALCS - ORIGINAL INSPECTION WAS SUFFICIENT. *NOT A PHYSICAL REINSPECTION. FIRE FINAL**LIN 3/9/2022 3/9/2022 APPROVED REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST FIRE - ETRAKIT (2 WK) KOHL HETRICK 11/5/2021 11/22/2021 11/29/2021 APPROVED SEE ATTACHMENTS 1ST PERMIT TECH – ETRAKIT (1 DAY) PERMIT TECH BUCKET 11/5/2021 11/8/2021 11/8/2021 COMPLETE 2ND FIRE (1 DAY)KOHL HETRICK 12/13/2021 12/20/2021 12/20/2021 APPROVED REVISED PLANS/CALCS PARENT PROJECTS Printed: Friday, March 03, 2023 9:53:03 AM 3 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0253 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 11/5/2021 Etrakit Public Registration 1ST SUBMITTAL HYDRAULIC CALCULATIONS Document.pdfCalc-1 (31).pdf 1 DOC 11/5/2021 Etrakit Public Registration 1ST SUBMITTAL FP-3 Tsubomi and Doan Chau Residence - Sheet - FP-3 - RCP.pdf 1 DOC 12/10/2021 Etrakit Public Registration Document.pdfCalc-2 (9) (1).pdf 1 DOC 12/10/2021 Etrakit Public Registration AS Build.pdfRCP ed.pdf 1 DOC 12/10/2021 Etrakit Public Registration AS Build.pdfPiping ed.pdf 1 DOC 11/29/2021 KOHL HETRICK FSS2021-0253 - APPROVED PLANS AND CALCS.pdf FSS2021-0253 - APPROVED PLANS AND CALCS.pdf 1 DOC 11/29/2021 KOHL HETRICK FSS2021-0253 - COA AND JOB CARD.pdf FSS2021-0253 - COA AND JOB CARD.pdf 1 DOC 12/13/2021 KOHL HETRICK FSS2021-0253 - 12-8- 2021 Insp Notes.pdf FSS2021-0253 - 12-8- 2021 Insp Notes.pdf 1 DOC 12/13/2021 KOHL HETRICK FSS2021-0253 - REVISED APPROVED PLANS AND CALCS.pdf FSS2021-0253 - REVISED APPROVED PLANS AND CALCS.pdf 1 Printed: Friday, March 03, 2023 9:53:03 AM 4 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2021-0253 FSS2021-0253 REV 1 VITREO US CHINALAVATO RYLADENAK-2214 VITREO US CHINALAVATO RYLADENAK-2214 VITREO US CHINALAVATO RYLADENAK-2214 VITREO U S C H I N A L A V A T O R Y L A D E N A K - 2 2 1 4 VITREO U S C H I N A L A V A T O R Y L A D E N A K - 2 2 1 4 QUEENKINGQUEEN QUEEN CPVC HANGERS NO SCALE TOLCO FIG. 24 DOUBLE-FASTENER SIDE-MOUNT HANGER (OR EQUAL) SELF-DRILLING HEX HEAD SCREW TOLCO FIG. 23 DOUBLE-FASTENER STRAP TYPE HANGER (OR EQUAL) TOLCO FIG. 28M OFFSET HANGER (OR EQUAL) TOLCO FIG. 22 SINGLE-FASTENER STRAP-TYPE HANGER (OR EQUAL) TOLCO FIG. 28 DOUBLE-FASTENER STAND-OFF HANGER (OR EQUAL) TOLCO FIG. 29 DOUBLE-FASTENER DOUBLE OFFSET HANGER (OR EQUAL) CPVC HANGER SPACING PIPE SIZE 11/4" 1" MAXIMUM SUPPORT SPACING 6'-6" 6'-0" 2"8'-0" 11/2"7'-0"1"14' -4"1"11' -6"1" 6' -0" 1" 6' -0" 1" 6' -0" 1" 6' -0" 1" 6' -0" 1" 10' -8" 1" 6' -0" PERGOLA BEDROOM 1 10'-0" BATH 1 10'-0" BEDROOM 2 10'-0" BEDROOM 3 10'-0" GARAGE 10'-0" BEDROOM 4 10'-0" KITCHEN 10'-0" LIVING 10'-0" PWDR EXISTING 1" PVC UNDERGROUND 1" RISER 1" 7' -8" Water Supply Information Static Pressure: Residual Pressure: Residual Flow: Additional Hose Flow: 77.30 psi 62.80 psi 750 GPM 0 GPM Remote area number: Occupancy classification: Density: Area of application: Total water required (including hose streams): @ a required system pressure of: Fire Protection System Demand: No. of sprinklers calculated: Inside Hose Streams: Outside Hose Streams: Calc-2 R-3 2 Gpm/SqFt 512 Max SqFt 31.2179 GPM 42.4151 Psi 5 GPM 0 GPM 1 6 TORBOR DOM 72 3 Calc-2 1"29' -6"1" 2' -0" 1" 4' -1" 1" 5' -1"1"14' -0"1" 2' -2"1"4' -8"1" 0' -3"1"8' -0"1"5' -0"1"5' -0"1"1' -10"1"2' -8"1" 6' -1"1"2' -10"1" 9' -10"1"6' -5"1"4' -10"1" 9' -7" 1" 3' -9"1"2' -3"1"6' -0"1"8' -11"1"5' -1"1" 14' -0" 1" 6' -3" 1" 6' -6"1"5' -1"1"8' -11"1" 4' -7" 1" 4' -7" 1" 14' -6" 1" 9' -7"Up 1" x 5' -0"Up 1" x 9' -0"TOR BOR Domestic Supply Check Flow Control 1" CPVC 300psi Gage 1/2" Drain to Outside1"1"not to scale Fire Sprinkler Riser Detail 1-1/4" PVC Underground By Others BEDROOM 4 10'-0" 3/4" WATER METER 15 psi LossEXISTING 1" PVC UNDERGROUND 1" RISER Supply Point WM TORBOR 4 5 DOM 1"29' -6"1" 2' -0" 1" 4' -1"Up 1" x 5' -0"Up 1" x 9' -0"simon@silveradofire.com Scale Project number Date Drawn by Checked by Silverado Fire ProtectionPO Box 11474Palm Desert, Ca.92255760-574-6512C-16 # 1068664 As indicated 12/9/2021 5:40:45 AMFP-2 Piping Plan As Build Project Number 10-24-21 Author Checker No. Description Date NEW S. F. R. FORTSUBOMI and DOAN CHAU54125 Avenida JuarezLa Quinta, Ca.92253Sprinkler Schedule No. of Sprklrs Description SIN (Hydratec)K-Factor Orifice Size Temp 18 Senju 1/2 Light Concealed Temperature - 162 Finish - B Quick Response Model - Mirage SIN - SS8464 K Factor - 4.9 SS8464 4.9 1/2" 162 °F 5 Senju 1/2 Light Pendent Temperature - 205 Finish - C Special Response Model - Micromatic SIN - SS8464 K Factor - 4.9 SS8464 4.9 1/2" 205 °F : 23 Total No. of Sprinklers: 23 1/4" = 1'-0"2 UG VITREO US CHINALAVATO RYLADENAK-2214 VITREO US CHINALAVATO RYLADENAK-2214 VITREO US CHINALAVATO RYLADENAK-2214 VITREO U S C H I N A L A V A T O R Y L A D E N A K - 2 2 1 4 VITREO U S C H I N A L A V A T O R Y L A D E N A K - 2 2 1 4 QUEENKINGQUEEN QUEEN PERGOLA BEDROOM 1 10'-0" BATH 1 10'-0" BEDROOM 2 10'-0" BEDROOM 3 10'-0" GARAGE 10'-0" BEDROOM 4 10'-0" KITCHEN 10'-0" LIVING 10'-0" PWDR 2' - 11"12' - 0"2' - 11"6' - 5"14' - 3"11' - 6"10' - 6"3' - 3"6' - 9"3' - 11"8' - 10" 2' - 5"2' - 5" 17' - 7"3' - 6"2' - 11"14' - 2"2' - 11"7' - 6"3' - 6"2' - 11"8' - 0" 1' - 10"1' - 9"13' - 11"11' - 7"4' - 1"7' - 6"3' - 4"7' - 11"3' - 1"2' - 6"7' - 10"2' - 6"6' - 7"7' - 9"2' - 10"2' - 10" 2' - 11"12' - 0"10' - 11"2' - 1" 6' - 11"6' - 11"3' - 6"3' - 5"7' - 5"5' - 5"simon@silveradofire.com Scale Project number Date Drawn by Checked by Silverado Fire ProtectionPO Box 11474Palm Desert, Ca.92255760-574-6512C-16 # 1068664 1/4" = 1'-0"12/9/2021 5:41:13 AMFP-3 RCP As Build Project Number 10-24-21 Author Checker No. Description Date NEW S. F. R. FORTSUBOMI and DOAN CHAU54125 Avenida JuarezLa Quinta, Ca. 922531/4" = 1'-0"1 RCP Sprinkler Schedule No. of Sprklrs Description SIN (Hydratec)K-Factor Orifice Size Temp 18 Senju 1/2 Light Concealed Temperature - 162 Finish - B Quick Response Model - Mirage SIN - SS8464 K Factor - 4.9 SS8464 4.9 1/2" 162 °F 5 Senju 1/2 Light Pendent Temperature - 205 Finish - C Special Response Model - Micromatic SIN - SS8464 K Factor - 4.9 SS8464 4.9 1/2" 205 °F : 23 Total No. of Sprinklers: 23 3/4" observedBedroom deleted, not yetapproved yet by building.Now dining?Eliminated room Silverado Fire Protection PO Box 11474 Palm Desert, Ca. 92255 760-574-6512 Job Name : AS Build Drawing : Location : 54125 Avenida Juarez Remote Area : Calc-2 Contract : Data File : AS Build Area Calc-2.WXF Computer Programs by Hydratec Inc. Revision: 50.54.4 Silverado Fire ProtectionPage 1 AS BuildDate 10203040E50R60U70S80S90E100R110P120130140150100 200 300 400 500 600 700 800 900FLOW ( N ^ 1.85 )City Water Supply:Demand:C1C2C1 - Static Pressure : 77.3 C2 - Residual Pressure: 62.8 C2 - Residual Flow : 750 D1 - Elevation : 5.713 D2 - System Flow : 31.218 D2 - System Pressure : 42.415 Hose ( Demand ) : _______D3 - System Demand : 31.218 Safety Margin : 34.844 D1D2Water Supply CurveComputer Programs by Hydratec Inc. Revision: 50.54.4 Silverado Fire ProtectionPage 2 AS BuildDate Fitting Legend Abbrev. Name ½ ¾ 1 1¼ 1½ 2 2½ 3 3½ 4 5 6 8 10 12 14 16 18 20 24 N * CPVC 90'Ell Harvel-Spears 7 7 8 9 11 12 13 0 0 0 0 0 0 0 0 0 0 0 0 O * CPVC Tee - Branch 3 3 5 6 8 10 12 15 0 0 0 0 0 0 0 0 0 0 0 0 R * CPVC Coupling Tee - Run 1 1 1 1 1 1 2 2 0 0 0 0 0 0 0 0 0 0 0 0 Units Summary Diameter Units Inches Length Units Feet Flow Units US Gallons per Minute Pressure Units Pounds per Square Inch Note: Fitting Legend provides equivalent pipe lengths for fittings types of various diameters. Equivalent lengths shown are standard for actual diameters of Sched 40 pipe and CFactors of 120 except as noted with *. The fittings marked with a * show equivalent lengths values supplied by manufacturers based on specific pipe diameters and CFactors and they require no adjustment. All values for fittings not marked with a * will be adjusted in the calculation for CFactors of other than 120 and diameters other than Sched 40 per NFPA. Fittings Used SummaryComputer Programs by Hydratec Inc. Revision: 50.54.4 Silverado Fire Protection Page 3 AS Build Date SUPPLY ANALYSIS Node at Static Residual Available Source Pressure Pressure Flow Pressure Total Demand Required Pressure 5 77.3 62.8 750.0 77.26 31.22 42.415 NODE ANALYSIS Pressure Discharge Node Tag Elevation Node Type at Node at Node Notes 1 10.19 4.9 7.04 13.0 0.05 256 2 11.0 7.33 3 11.0 10.29 TOR 11.0 12.21 DOM 1.98 17.13 5.0 BOR -3.0 20.21 4 -3.0 27.26 WM -3.0 27.28 5 -3.0 42.42 6 10.19 4.9 7.28 13.22 0.05 256 7 11.0 7.33 Flow Summary - NFPA Computer Programs by Hydratec Inc. Revision: 50.54.4 Silverado Fire Protection Page 4 AS Build Date Node1 Elev1 K Qa Nom Fitting Pipe CFact Pt to or Ftngs Pe ******* Notes ****** Node2 Elev2 Fact Qt Act Eqiv Len Total Pf/Ft Pf 1 10.19 4.90 13.00 1 N 7.0 8.810 150 7.040 to O 5.0 12.000 -0.351 2 11 13.0 1.101 20.810 0.0307 0.638 Vel = 4.38 2 11 -0.68 1 2N 14.0 60.600 150 7.327 to 2R 2.0 46.000 0.0 3 11 12.32 1.101 6O 30.0 106.600 0.0278 2.961 Vel = 4.15 3 11 13.90 1 N 7.0 9.120 150 10.288 to R 1.0 8.000 0.0 TOR 11 26.22 1.101 17.120 0.1123 1.922 Vel = 8.84 TOR 11 0.0 1 9.020 150 12.210 to 3.907 DOM 1.98 26.22 1.101 9.020 0.1122 1.012 Vel = 8.84 DOM 1.98 + 5.00 5.00 1 R 1.0 4.980 150 17.129 to 1.000 2.157 BOR -3 31.22 1.101 5.980 0.1550 0.927 Vel = 10.52 BOR -3 0.0 1 2N 14.0 31.470 150 20.213 to 14.000 0.0 4 -3 31.22 1.101 45.470 0.1551 7.051 Vel = 10.52 4 -3 0.0 1.25 0.420 150 27.264 to 0.0 WM -3 31.22 1.394 0.420 0.0476 0.020 Vel = 6.56 WM -3 0.0 1.25 2.660 150 27.284 to 15.000 * * Fixed Loss = 15 5 -3 31.22 1.394 2.660 0.0492 0.131 Vel = 6.56 0.0 5 31.22 42.415 K Factor = 4.79 6 10.19 4.90 13.22 1 N 7.0 5.810 150 7.275 to 7.000 -0.351 7 11 13.22 1.101 12.810 0.0317 0.406 Vel = 4.45 7 11 0.68 1 9R 9.0 71.250 150 7.330 to O 5.0 14.000 0.0 3 11 13.9 1.101 85.250 0.0347 2.958 Vel = 4.68 0.0 3 13.90 10.288 K Factor = 4.33 2 11 0.68 1 R 1.0 10.670 150 7.327 to O 5.0 6.000 0.0 7 11 0.68 1.101 16.670 0.0002 0.003 Vel = 0.23 0.0 7 0.68 7.330 K Factor = 0.25 Final Calculations : Hazen-Williams Computer Programs by Hydratec Inc. Revision: 50.54.4 GENERAL DESCRIPTION The Model RC-QR Commercial Flat Concealed Sprinklers are automatic sprinklers of the compressed fusible solder type. They are decorative and quick responding. The Cover Plate Assembly hides the Deflector, Heat Responsive Element etc., which is concealed above the ceiling. The cover plate has a flat profile, and its diameter is extremely small (2-5/8 inch, 68mm). The push-on and/or thread-on, thread-off design of the concealed cover plate assembly allows for easy installation of the cover plate. Therefore, the Model RC-QR should be your first choice when aesthetics is the major consideration for ultimate appeal and unbeatable performance is desired. They are to be installed per NFPA 13 guidelines. The Model RC-QR has a 5.6 (80.6 LPM/bar1/2) K-factor. For extended installation flexibility, the Model RC-QR provides 1/2 inch (12.8mm) vertical adjustment. This adjustment in installation decreases the need for precise cutting of the pipe that drops to the sprinkler and allows for a perfect fit with a range of pipe lengths. The heat sensitivity and water distribution design of Model RC-QR allows for an increased chance of occupants to escape or evacuate in case of a fire. However, fire sprinkler systems are not a substitute for fire safety awareness or fire safety construction required by building codes. Approvals: Sprinkler Identification Number (SIN): Maximum Working Pressure: Discharge Coefficient (Nominal K-Factor): Temperature Rating: Vertical Adjustment: Cover Plate Finishes: Standard Finishes- Custom Finishes- Please see chart on page 7 for more detail. Physical Characteristics: In case of fire, the solder component that holds together the Cover Plate and the Retainer melts. Then the Cover Plate is released at once. As a result, the Deflector drops down to the intended position. Two Heat Collectors are exposed to fire, and when sufficient heat from the fire is reached, internal components of the sprinkler fall apart. This leads to the water flow to be distributed on the affected fire area. (Ref. Figure 2) DESIGN CRITERIA The Model RC-QR sprinklers are listed by UL and C-UL as quick response / standard coverage for use in accordance with NFPA. Also the Model RC-QR is FM Approved as a Standard Response for No-Corrosive Atmospheres. The herein stated rules for use and installation of the Model RC-QR are provided by the manufacturer and must be strictly implemented for safe and full results. Locations of sprinklers must follow the obstruction rules of NFPA 13. The Model RC-QR must only be utilized in sprinkler systems per NFPA 13 guidelines. For proper operational sensitivity, the Model RC-QR must be installed beneath a solid ceiling having a smooth or textured surface. Refer to NFPA 13 for the requirements relating to the prevention of possible activation of the Heat Responsive Element of Model RC-QR, due to the exposure of a heat source other than an actual fire. Model RC-QR sprinklers should not be installed where they may be subjected to a corrosive environment including the following: Stress corrosion cracking may be caused by exposure to environments with Chlorine ion and Chloride. Exposure to this environment may result in sprinklers operating under Non-Fire conditions or Not Operating when exposed to an actual fire. Sprinkler systems should be constructed in compliance with the applicable standards and the requirements for copper piping when copper piping is used in the sprinkler system. (Reference standards NFPA 13, ASTM B813, B828, and CDA (Copper Development Association) – Solder Joint) All residual flux must be removed from the interior and exterior of the copper piping by thoroughly flushing before installation of the Sprinkler Heads. Otherwise, residues of flux may cause corrosion and leakage in the sprinkler system. The Model RC-QR must be installed in accordance with the following instructions: The installation requirements for the sprinkler are as follows: to be installed only in the pendent position with the waterway perpendicular to the ceiling. Install the sprinkler fitting so that the distance from the face of the fitting to the mounting surface will be nominally 2 inch (50.8mm) as shown in Figure 3. With pipe thread sealant applied to the threads, hand tighten the sprinkler into the sprinkler fitting. Then tighten it with the Socket NR-H or Ratchet & Socket NR-H Combination (Ref. Figure 4). The grooves of the Socket must fit perfectly with the grooves on the Sprinkler for proper installation (Ref. Figure 4). If desired, the Protective Cap may also be used to locate the center of the clearance hole by gently pushing the ceiling material against the center point of the Protective Cap. Before the installation of the ceiling, the sprinkler installation can be started with a 2-3/8 inch (60mm) diameter clearance hole (Ref. Figure 3). Use the “Vertical Adjustment” indicator on the Protective Cap to check for proper installation height (Ref. Figure 3). Use the Cap Remover RC Tool to remove the Protective Cap (Ref. Figure 5), and then push or screw a Cover Plate Assembly on the Cup of the Sprinkler by hand until its flange just has contact with the ceiling (Ref. Figure 6 and Figure 7). Stop tightening the Cover Plate Assembly once the flange has contact with the ceiling. If the ceiling has been lifted from its normal position in the process of tightening the Cover Plate Assembly, readjust the cover plate assembly as necessary. If the flange of the Cover Plate Assembly cannot contact the ceiling sufficiently, readjust the sprinkler fitting as necessary. When properly installed, there is a nominal 1/16 inch (1.6mm) air gap between the lip of the Cover Plate and the ceiling, as shown in Figure 6. The following instructions must be implemented for the maintenance and service of the Model RC-QR. When placing an order, please contact a local distributor with the following information (Model Name and Finish). Model: RC-QR (SS9561, Quick Response, Standard Coverage, Flat Concealed Sprinkler, Pendent, K5.6, Temperature: 162°F(72°C)) cULus Listed 2-5/8 inch (68mm) or 3-1/4 inch (83mm) or 2-5/8 inch square (68mm), Order Separately from Sprinkler FM Approved 2-5/8 inch (68mm) or 3-1/4 inch (83mm) , Order Separately from Sprinkler Please refer to the chart below for available sizes, and finishes. Standard Finishes Custom Finishes 2-5/8" Round, 140°F - - - - 3-1/4" Round, 140°F 2-5/8" Square, 140°F 1 - - - - - - 1: cULus listed only Socket NR-H For use with a 3/8” drive ratchet (not included) Socket NR-H Plastic For use with a 1/2” drive ratchet (not included) Cap Remover RC OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org November 29, 2021 Silverado Fire 82417 Priscilla Ct Indio, CA 92201 Re: Residential Fire Sprinkler Plan Review – CHAU RESIDENCE FSS2021-0253 / 54125 AVENIDA JUAREZ, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. Permanently marked identification signs shall be attached to all control valves. The following inspections/tests are required to be witnessed by Office of the Fire Marshal Staff: (a) Overhead Rough and Hydro static test: All piping shall be visible and pumped at normal operating pressure. *No jacketed electrical and data wiring shall be in contact with, nor have the potential to contact CPVC piping once insulation is installed. (b) Final inspection The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 54125 AVENIDA JUAREZ PERMIT#: FSS2021-0253 DATE ISSUED: 11/29/2021 DESCRIPTION: CHAU RESIDENCE CONTRACTOR: SILVERADO FIRE PROTECTION HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.