Loading...
FSS2022-0033Description: Komar Center Suite Vanilla Shell TI Type: FIRE SPRINKLER (WEB) Subtype: TENANT IMPROVEMENT Status: FINALED Applied: 2/2/2022 ECON Approved: 2/10/2022 KHET Parcel No: 600440006 Site Address: 79785 HIGHWAY 111 STE 102 LA QUINTA,CA 92253 Subdivision: PM 036269 Block: Lot: 6 Issued: 2/11/2022 JAG Lot Scl Ft: 0 Building Scl Ft: 0 Zoning: Finaled: 2/15/2022 LIN Valuation: $1,500.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: ADDITIONAL milowim •• • • gqq • • • NAME TYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT DESERT FIRE EXTINGUISHER CO INC PO BOX 1607 PALM SPRINGS CA 92263 (760)322-0995 MARK@DESERT- FIRE.COM CONTRACTOR DESERT FIRE EXTINGUISHER CO INC PO BOX 1607 PALM SPRINGS CA 92263 (760)322-0995 MARK@DESERT- FIRE.COM OWNER CSRA KOMAR DESERT CENTER, DST 41 CORPORATE PARK, SUITE 230 IRVINE CA 92606 (760)322-0995 Printed: Monday, April 03, 2023 8:54:14 AM 1 of 3 WSYSiEMS DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY CLTD BY FIRE SPRINKLER SYSTEMS - TENANT 101-0000-42420 0 $83.50 $83.50 2/11/22 WEB10697 635341744 CREDIT 563921 ECON IMPROVEMENT OVER 15 10 HEADS FIRE SPRINKLER SYSTEMS - TENANT 101-0000-42420 0 $83.50 $83.50 2/11/22 WEB10697 635341744 CREDIT 563921 ECON IMPROVEMENT OVER 15 10 HEADS PC Total Paid for FIRE FEES: $167.00 $167.00 RECORDS 101-0000-42416 0 $11.00 $11.00 2/11/22 WEB10697 635341744 CREDIT 563921 ECON MANAGEMENT FEE 15 Total Paid for RECORDS MANAGEMENT FEE: $11.00 $11.00 TECHNOLOGY 502-0000-43611 0 $5.00 $5.00 2/11/22 WEB10697 635341744 CREDIT 563921 ECON ENHANCEMENT FEE 15 Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 00 $183.00 SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD HYRO LIN 2/15/2022 2/15/202 APPROVED FIRE FINAL" LIN 2/15/2022 2/15/2022 APPROVED OVERHEAD ROUGH PIPING LIN 2/15/2022 2/15/2022 APPROVED Printed: Monday, April 03, 2023 8:54:14 AM 2 of 3 WsYsrEMS 1ST FIRE - ETRAKIT KOHL 2/2/2022 2/16/2022 2/10/2022 APPROVED SEE ATTACHMENTS (2 WK) HETRICK 1ST PERMIT TECH — PERMIT TECH 2/2/2022 2/3/2022 2/3/2022 COMPLETE ETRAKIT (1 DAY) BUCKET BOND INFORMATION Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED Komar Center Suite DOC 2/2/2022 Etrakit Contractor 1ST SUBMITTAL PLAN Vanilla Shell 79785 Hwy 1 AND SPRINKLER TYPE 111 102 TI Plan.pdf DOC 2/10/2022 KOHL HETRICK FSS2022-0033 - FSS2022-0033 - 1 APPROVED PLANS.pdf APPROVED PLANS.pdf DOC 2/10/2022 KOHL HETRICK FSS2022-0033 - COA FSS2022-0033 - COA 1 AND JOB CARD.pdf AND JOB CARD.pdf Printed: Monday, April 03, 2023 8:54:14 AM 3 of 3 WsYsrEMS Fire Sprinkler Tenant Improvement Added Wall Blocking Coverage �I�CO °° °' �' ' °° `•m • F;.e Piurec6n • • • vod rs In This Area Series TV -FRB — 2.8, 4.2, 5.6, and 8.0 K•Factor Added Wall Upright, Pendent, and Recessed Pendent Sprinklers Quick Response, Standard Coverage General Description ft-6 :°ci :a.: wia`,A':'.1.:: mvMe' m 1-21e:11.7a u,�n j�x i m N a �me aaluei:e� • • • • �^; A� . Sprinkler Identification �k�°um=���.aq Number (SIN/ t it .F. .nkn .•me °m°,.m°e. °wa•°a +m w°:w^:. wm.°mMree.rm _ • to • • ro^amPi.mm:�e< rvasa+ F.•a°m e.aN. vz uFr APPROVED Riverside County Fire Department La Quinta Office of the Fire Marshal Btlis Da men sPProving Y Kohl Hetrick�o^„dl�„Eo.,n¢S,og FIRE SAFETY SPECIALIST 02/10/2022 4:44:28 PM The approval of plans and specifications does not permit the violation, deleted, omission or faulty installation of any requirements of Title 24 or any Local Ordinances. Construction shall remain accessible and exposed for inspection purposes until approved by the Fire Department. PERMIT # - FS S2022-0033 Existing 155 Deg. Pendant Heads 32 Total ---- • Added 155 Deg. Pendant Head 1 Total --------- • DESERT Fire Extinguisher Co,lnc. _- 559 E. I—Ri iy. asa. Pan i— , CnurtauA 4726 a; (]6G) 522-0 95 Fx (760) 25-7239 Lx r (C-16) 563921 ur CAL FIRE - RIVERSIDE UNIT RIVERSIDE COUNTY FIRE DEPARTMENT OFFICE OF THE FIRE MARSHAL — LA QUINTA CALIFORNIA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org February 10, 2022 Desert Fire PO Box 1607 Palm Springs, CA 92263 Re: TI Fire Sprinkler Plan Review — KOMAR CENTER VANILLA SHELL TI FSS2022-0033 / 79785 HIGHWAY 111 #102, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. The following inspections/tests are required to be witnessed by the Office of the Fire Marshal staff: 1) Overhead Rough: All installed/relocated piping must be visible. 2) Final inspection: All trim is in place, 5-Year certification is current. New/added heads shall be included in the spare head box compliment. *Water -flow signal test may be performed during the Final Inspection. All persons performing work on the automatic fire sprinkler system shall be Certified Sprinkler Fitters or Registered with the State Fire Marshal for Apprentice or Trainee classification. The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist i6RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD ai�Cv uGKCv THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.—CALIFORNIA— INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 79785 HWY 111 #102 PERMIT#: FSS2022-0033 AT ED: 2/10/2022 DESCRIPTION: TI SPK CONTRACTOR: DESERT FIRE HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre -pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final IF Deluge/pre-action SPRINKLER U.G. Final EF Thrust block pre -pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final IF Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors' test Hood/duct extinguishing High pile storage High pile rack storage In -rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final IF Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final e F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final e F FIRE ALARM KNOX SYSTEM Rough -wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final F' Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE- 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE -INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY. 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131