Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
FSS2022-0068
ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT Patrick Del Rey 1109 N. Armando St.Anaheim CA 92806 (714)535-5761 patrick@lindleyfire.co m CONTRACTOR Expedite Fire, Inc. dba Lindley Fire 1109 N. Armando St.Anaheim CA 92806 (714)535-5761 patrick@lindleyfire.co m OWNER COSTCO WHOLESALE CORP 999 LAKE DR ISSAQUAH WA 92253 (714)535-5761 CONDITIONS Description: REARRANGE HEADS IN DELI DUE TO DEMOLISH OF WALL Type: FIRE SPRINKLER (WEB)Subtype: TENANT IMPROVEMENT Status: FINALED Applied: 3/8/2022 EPRS Parcel No: 600440010 Site Address: 79795 HIGHWAY 111 LA QUINTA,CA 92253 Approved: 3/28/2022 KHET Subdivision: PM 33960 Block: Lot: 1 Issued: 4/6/2022 JOD Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 6/22/2022 LIN Valuation: $9,300.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: 1 RELOCATED HEAD AND 1 NEW HEAD FINANCIAL INFORMATION Printed: Wednesday, April 05, 2023 9:50:31 AM 1 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0068 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD ROUGH PIPING LIN 6/7/2022 6/7/2022 DISAPPROVE D Requested resubmittals 060722 - Met Javier on site and he was unable to show me the scope of work area. Unable to match the plans to the site. I asked him for resubmittals and he stated he would send those in OVERHEAD ROUGH PIPING KHET 6/20/2022 6/20/2022 APPROVED See Final for Corrections Required DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE FAILED OR ADDITIONAL RE- INSPECTION 101-0000-42421 0 $167.00 $167.00 6/17/22 WEB12209 637722727 75 CREDIT Patrick Del Rey EPRS FIRE FAILED OR ADDITIONAL RE- INSPECTION 101-0000-42421 0 $167.00 $167.00 6/20/22 WEB12233 637765804 62 CREDIT Patrick Del Rey EPRS FIRE STAFF - PER HOUR 101-0000-42420 1 $167.00 $167.00 4/5/22 WEB11259 636427362 32 CREDIT Patrick Del Rey EPRS Total Paid for FIRE FEES: $501.00 $501.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $11.00 $11.00 4/5/22 WEB11259 636427362 32 CREDIT Patrick Del Rey EPRS Total Paid for RECORDS MANAGEMENT FEE: $11.00 $11.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 4/5/22 WEB11259 636427362 32 CREDIT Patrick Del Rey EPRS Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TOTALS:$517.00 $517.00 Printed: Wednesday, April 05, 2023 9:50:31 AM 2 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0068 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 3/8/2022 Etrakit Public Registration 1ST SUBMITTAL PLAN La Quinta Deli Piping Plan.pdf 1 DOC 3/8/2022 Etrakit Public Registration 1ST SUBMITTAL VIKING VK1001.pdf 1 DOC 3/28/2022 KOHL HETRICK FSS2022-0068 - COA AND JOB CARD.pdf FSS2022-0068 - COA AND JOB CARD.pdf 1 BOND INFORMATION FIRE FINAL**KHET 6/20/2022 6/20/2022 DISAPPROVE D SEE NOTES Revised As-Builts required for different heads used and the correct floor plan and head layout. *(4) heads are located less than 12-inches from an obstruction and are sitting about 1- inches above the lowest edge of the obstruction. NFPA 13 8.6.5.1.2 requires the deflector to be parallel with or lower than the plane of the obstruction or be 12-inches away. Contractor will seek to extend the head and provide with a 401 escutcheon to get the vertical clearance. ** Fees apply. FIRE FINAL**LIN 6/22/2022 6/22/2022 APPROVED REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST FIRE - ETRAKIT (2 WK) KOHL HETRICK 3/8/2022 3/22/2022 3/28/2022 APPROVED SEE ATTACHMENTS 1ST PERMIT TECH – ETRAKIT (1 DAY) PERMIT TECH BUCKET 3/8/2022 3/9/2022 3/8/2022 COMPLETE PARENT PROJECTS Printed: Wednesday, April 05, 2023 9:50:31 AM 3 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0068 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 6/6/2022 KOHL HETRICK FSS2022-0068 - APPROVED PLANS.pdf FSS2022-0068 - APPROVED PLANS.pdf 1 DOC 6/16/2022 KOHL HETRICK FSS2022-0068 - REVISED PLANS APPROVED.pdf FSS2022-0068 - REVISED PLANS APPROVED.pdf 1 DOC 6/20/2022 KOHL HETRICK La Quinta Deli Piping Plan 6-20-22.pdf La Quinta Deli Piping Plan 6-20-22.pdf 1 DOC 6/7/2022 LUCERO INIGUEZ FSS2022-0068 COSTCO DELI PREP - CORRECTIONS 060722.pdf FSS2022-0068 COSTCO DELI PREP - CORRECTIONS 060722.pdf 1 Printed: Wednesday, April 05, 2023 9:50:31 AM 4 of 4 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0068 APPROVEDRiverside County Fire DepartmentLa Quinta Office of the Fire MarshalBy:FIRE SAFETY SPECIALIST06/16/2022 10:14:53 AMThe approval of plans and specifications does notpermit the violation, deletion, omission or faultyinstallation of any requirements of Title 24 or anyLocal Ordinances. Construction shall remainaccessible and exposed for inspection purposesuntil approved by the Fire Department.PERMIT # -FSS2022-0068Kohl HetrickReason: I am approving this documentContact Info: 760-409-5109 Ø5'-0"TURNACCESSIBLECHECK-OUTAISLEACCESSIBLE ROUTE OVER LEVEL CONCRETE FLOOR (TYP.)4'-0"CLEARENTRANCE AABCDEFGHJK123456.26.97.68.29KJHGFEDCBA98.18.58.1587654321XXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXH & K FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315 FP_OC_TROUGH SINK_5-FAUCET_0117 FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315 AABCDEFGHJK123456.26.97.68.29KJHGFEDCBA98.18.58.1587654321XXXXXXXXXXXXXXXXXXXXXXXXXXXXX XXH & K FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315 FP_OC_TROUGH SINK_5-FAUCET_0117 FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315FP_OC_RR_SOAP_0315 ALTEREDDELI PREP3 OCCUPANTS(EMPLOYEEWORK AREA)EXITDELI PREPDISH PREPTALLDELI / MEATCOOLERPRODUCE COOLERDISH PREPTALLDELI / MEATCOOLERPRODUCE COOLER127.68.28.18.58.1587XXX7.68.28.18.58.1587XXXFREEZER1TYPAREA OF WORK THIS PERMIT1. PARTIALLY DEMOLISH DELIAND DISH PREPDRAWN:A101FLOOR PLAN,DETAILS, & NOTESWGDEMOLITION KEY NOTES12PARTIALLY DEMOLISH DELI AND DISH PREPRELOCATE EQUIPMENTSCALE:PARTIAL DEMOLITION PLAN1" = 20'-0"SCALE:FLOOR PLAN1" = 20'-0"THE BUILDING WILL BE OCCUPIED AND IN FULL USE BY THE OWNER DURING CONSTRUCTION.1.DO NOT INTERRUPT ANY SERVICES (WATER, PLUMBING, FIRE SPRINKLER, ETC.) WITHOUT PRIOR WRITTEN APPROVAL OF THE OWNER.2.MAINTAIN FIRE SPRINKLER AND FIRE ALARM SYSTEM IN OPERATING CONDITION AT ALL TIMES. NOTIFY THE OWNER AND COORDINATE AT LEAST 48-HOURS BEFORE PARTIALLY OR COMPLETELY DISABLING THE FIRESPRINKLER OR FIRE ALARM SYSTEMS. PROVIDE FIRE-WATCH AS REQUIRED BY THE JURISDICTION.3.THE CONTRACTOR SHALL LOCATE ALL EXISTING UNDERGROUND UTILITIES WITHIN PROXIMITY OF THE WORK AREA PRIOR TO EXCAVATION. AVOID CUTTING EXISTING CONDUIT OR PIPE EMBEDDED WITHIN FLOOR SLAB ORDIRECTLY BENEATH FLOOR SLAB, LASER SCAN OR SIMILAR METHOD SHALL BE CONDUCTED BY CONTRACTOR PRIOR TO CUTTING CONCRETE FLOOR.4.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING OR REPLACING ITEMS DAMAGED DURING DEMOLITION AND CONSTRUCTION.5.WHEN CUTTING AND PATCHING, THE CONTRACTOR SHALL USE METHODS LEAST LIKELY TO DAMAGE ELEMENTS RETAINED OR ADJOINING SURFACES. CUT HOLES AND SLOTS AS SMALL AS PRACTICAL/POSSIBLE, NEATLY TOSIZE REQUIRED AND WITH MINIMUM DISTURBANCES OF ADJACENT MATERIALS.6.WHERE EXISTING CONSTRUCTION IS REMOVED, CUT OR OTHERWISE DISTURBED, PATCH TO MATCH THE EXISTINGADJACENT SURFACES. SEAMS TO BE AS INVISIBLE AS PRACTICAL. REPAIRED FINISHES SHALL BE EXTENDED TO THE NEAREST VISUAL BREAK LINES SUCH AS CORNERS, CEILING LINES, TOP OF BASE, ETC.7.THE CONTRACTOR SHALL REMOVE ALL RUBBLE AND DEBRIS FROM THE JOBSITE DAILY AND LEAVE THE BUILDING AND GROUNDS BROOM CLEAN UPON COMPLETION OF THE WORK.CONTRACTOR NOTESOPERATION NOTESDELI PREP AND ROTISSERIE OVENS:1. EXISTING DELI PREP AND ROTISSERIE OVEN WORK AREA WILL REMAIN OPERATIONAL DURING CONSTRUCTION.CONTRACTOR SHALL REVIEW CONSTRUCTION BARRIER AND DUST CONTROL REQUIREMENT WITH STORE MANAGERPRIOR TO CONSTRUCTIONMAIN SALES:1. DEMOLITION SHALL PROCEED DURING STORE NON BUSINESS HOURS AND APPROVED BY STORE MANAGER PRIORTO CONSTRUCTION.2. OTHER FREEZERS, COOLERS AND REFRIGERATION CASES THAT ARE NOT A PART OF THIS CONSTRUCTION SHALLREMAIN OPERATIONAL AT ALL TIMES.AREA OF WORK THIS PERMITDELI PREP ALTERATION.NO CHANGE TO BUILDINGEGRESS AND TOTALBUILDING FLOOR AREAEQUIPMENT NOTE:SEE ENLARGED EQUIPMENTPLAN ON SHEET A201ROOM FINISH SCHEDULELOCATIONROOM NAMEFLOORBASEWALLCEILINGDETAIL/REMARKSMATERIALFINISHMATERIALFINISHMATERIALFINISHMATERIALFINISHHTFINISH KEY NOTES1.POLYMER FLOORING FINISH, COLOR, AND TEXTURE MATCH EXISTING.WORK AREAAREADELI / DISH PREPCOVEDSEALANTMIPMIP10'-0"NOTE 1NOTE 1646 SFPOLYMER ON CONC CURBPF-ACOSTCOWHOLESALECORPORATION999 LAKE DRIVEISSAQUAH, WA 98027T: 425.313.8100www.costco.comTERRY W. ODLE, ARCHITECTDATEDESCRIPTIONPM:© MG2, Inc. All rights reserved. No part of this document may be reproducedin any form or by any means without permission in writing from MG2, Inc.DELIEXPANSIONPERMIT SET02-1540-18DEE MARTINEZ05/26/21PERMIT SETPLOTTED BY: LAUREN SONOMURA DATE/TIME: 5/21/2021 10:25 AM FILE: \\MG2FILE01\PROJECTS\RETAIL\COSTCO\02\02-1540-18 LA QUINTA, CA - DELI EXP\07_CAD\703_CONSTDOCS\02154018 A101.DWG LA QUINTA, CA#638MASTER SET 06022017 79795 HWY 111LA QUINTA, CA 9225302/28/202305/24/202108/23/2021 SCALE:1" = 1'-0"6HAND SINK BACKING0313SECURE BACKINGTRACK TO STUD3 5/8" x 16 GABACKING RUNNERTRACK BETWEENSTUDS3/4" FRT PLYWOODSINK BACKINGBOTTOM TRACK(2) RUNNER TRACKS,BACK TO BACK AT PLYWDSCALE:3" = 1'-0"3SCALE:3" = 1'-0"1COVED SEALANT AT MIP BASE08180'-0"FFMETAL INSULATED PANEL SIO)POLYMER FLOORING ORSEALED CONCRETE PERFINISH SCHEDULECOVED SEALANT (SIO)NOTE :SUPPLIED ANDINSTALLED BYREFRIGERATIONCONTRACTORSCALE:1-1/2" = 1'-0"20117SCALE:NOT TO SCALE4BACKING1012METAL STUDCUT FLANGE & BEND AT EA STUD6 x 16 GA CONT RUNNER TRACK(UNPUNCHED)(3) #10 SHEET METAL SCREWSNOTE:PROVIDE BACKING BEHIND TOILETACCESSORIES, DIAPER DECK, GRABBARS, HANDRAIL BRACKETS, URINALSCREENS, PAPER TOWEL DISPENSERS,SHELVING AND WALL MOUNTEDEQUIPMENT, ETC WHERE SHOWN2' - 9" AFF0' - 9" AFF0' - 0" FFCOVED SEALANT (SIO)CONCRETE SLABMETAL INSULATED WALLPANEL (SIO)POLYMER FLOORINGPLASTIC BUMPER GUARD,SEAL ALL EDGES, TYP4A601.1COUNTERSUNK SCREW,COVER WITH SEALANT45°2"1"3"1"NOTE :SUPPLIED AND INSTALLED BY REFRIGERATIONCONTRACTORSCALE:1-1/2" = 1'-0"2BUMPER GUARDSCALE:6" = 1'-0"3STAINLESS STEEL PANEL JOINTS11131/2"MINCONTINUOUSSEALANTCONTINUOUS SEALANTCOOLER WALL ORCEILING WHERE OCCURSSTAINLESS STEEL WALL PANEL5/8" CEMENT BOARD W/TAPED FINISHED JOINTSSTUD BEHIND TRIMFASTENERS AT 12" OC, MAX, TYPNOTE:TYPICAL AT ALL PANEL JOINTS -INSTALL FULL BED OF SEALANT INTRIM PIECE, AND THEN PUSH PANELINTO PLACE FOR FULL EMBEDMENTBCDEDGE TRIMPANEL JOINTINSIDE CORNERACURB (IF APPLICABLE)EOUTSIDE CORNER6A201440438ALTEREDDELI PREPWORK AREA440002006004429403435001011EXISTINGCOOLERØ5'-0"TURN2A201004011426440BUMPER GUARDTHROUGHOUTDELI AND DISHPREP, TYPINSULATED WALLPANELTHROUGHOUTDISH PREP, TYPSCALE:1/4" = 1'-0"7DELI / DISH PREP BACK WALLINSULATED WALL PANEL (SIO)006002006001403DO NOT MIRROR2A201BUMPERGUARDCOLUMNCOLUMN004011DRAWN:A201ENLARGEDEQUIPMENT PLAN& DETAILSLSSCALE:19ENLARGED EQUIPMENT PLAN1/4" = 1'-0"ROTISSERIE & DELI EQUIPMENT LISTEQ NODESCRIPTIONDETAILS/REMARKS001DETERGENT PACKAGESEXISTING0022 COMPARTMENT SINKEXISTING004HAND WASH SINKEXISTING006WALL FLASHING (SIZED TO SINK)EXISTING011PAPER TOWEL DISPENSEREXISTING403166" POWER SOAK SINKEXISTING426BLAST CHILLEREXISTING427SHELVING UNITEXISTING429SCALES / PRINTERS435ENCLOSED BASE PRINTER TABLE - 2'EXISTING438WORK TABLEEXISTING440WORK TABLESEXISTINGCOSTCOWHOLESALECORPORATION999 LAKE DRIVEISSAQUAH, WA 98027T: 425.313.8100www.costco.comTERRY W. ODLE, ARCHITECTDATEDESCRIPTIONPM:© MG2, Inc. All rights reserved. No part of this document may be reproducedin any form or by any means without permission in writing from MG2, Inc.DELIEXPANSIONPERMIT SET02-1540-18DEE MARTINEZ05/26/21PERMIT SETPLOTTED BY: LAUREN SONOMURA DATE/TIME: 5/21/2021 10:30 AM FILE: \\MG2FILE01\PROJECTS\RETAIL\COSTCO\02\02-1540-18 LA QUINTA, CA - DELI EXP\07_CAD\703_CONSTDOCS\02154018 A201.DWG LA QUINTA, CA#638MASTER SET 06022017 79795 HWY 111LA QUINTA, CA 92253E802/28/202305/24/202108/23/2021 VK1001 STANDARD RESPONSE UPRIGHT SPRINKLER (K5.6)TECHNICAL DATA The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Page 1 of 4 Form No. F_102420 21.04.02 Rev 21.1 1. DESCRIPTIONThe Viking VK1001 Standard Response Upright Sprinkler is a small thermosensitive glass bulb spray sprinkler available with various finishes and temperature ratingsto meet design requirements. The special Polyester and Electroless Nickel PTFE(ENT) coatings can be used in decorative applications where colors are desired.In addition, these coatings have been investigated for installation in corrosiveenvironments and are Listed and Approved as indicated in the Approval Chart. 2. LISTINGS AND APPROVALS UL Listed: Category VNIV FM Approved: Classes 2016, 2043 Also approved for use in FM Approved vacuum dry sprinkler systems with a maximum supervisory vacuum pressure of -3 PSI (-207 mbar). CE: Standard EN12259-1, DOP_XT1A_1-3-21 Refer to the Approval Chart and Design Criteria for requirements that must be followed. 3. TECHNICAL DATA Specifications:Minimum Operating Pressure: 7 PSI (0.5 bar)Rated to: UL - 250 PSI (17.2 bar) WWP FM - 175 PSI (12 bar) WWPFactory tested hydrostatically to 500 PSI (34.5 bar)Thread size: 1/2” NPT (15 mm BSPT)Nominal K-factor: 5.6 U.S. (80.6 metric*)Glass-bulb fluid temperature rated to -65 °F (-55 °C) * Metric K-factor measurement shown is in bar. When pressure is measured in kPa, divide the metric K-factor shown by 10.0. Material Standards:Sprinkler Body: Brass CW602N, UNS-C84400 or QM BrassDeflector: Stainless Steel UNS S30400Pip Cap Shell - Stainless Steel UNS-S44400 Pip Cap Disc - Stainless Steel UNS-S30100 Belleville Spring - Nickel AlloyPip Cap Seal - Polytetrafluoroethylene (PTFE)Compression Screw: Brass CW612N, CW508L, UNS-C36000 or UNS-C26000Shipping Cap: PolyethyleneBulb: Glass, nominal 5 mm diameter Ordering Information: (Refer to Table 1 and the current Viking List Price Book.) 4. INSTALLATION Refer to appropriate NFPA, FM Global, and/or any other applicable installation standards. Refer to Figure 3 NOTICE Risk of permanent damage. Over-tightening the sprinkler can cause permanent damage. >Tighten the sprinkler to a MAXIMUM torque of 14 ft-lbs (19 N-m). 5. OPERATION During fire conditions, when the temperature around the sprinkler reaches its operating temperature, the heat-sensitive liquid in the glass bulb expands, causing the bulb to shatter, releasing the pip cap assembly. Water flowing through the sprinkler orifice strikes the sprinkler deflector, forming a uniform spray pattern to extinguish or control the fire. 6. INSPECTIONS, TESTS AND MAINTENANCE Refer to NFPA 25 for Inspection, Testing and Maintenance requirements. 7. AVAILABILITY Viking Sprinklers are available through a network of domestic and international distributors. See the website for the closest distributor or contact Viking. Replaces page F_102420 Rev 20.1 (Added CE Approval) VK1001 STANDARD RESPONSE UPRIGHT SPRINKLER (K5.6)TECHNICAL DATA The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Page 2 of 4 Form No. F_102420 21.04.02 Rev 21.1 Figure 1: Sprinkler Wrench TABLE 1: ORDERING INFORMATION Instructions: Using the sprinkler base part number, (1) add the suffix for the desired Finish (2) add the suffix for the desired Temperature Rating. Sprinkler Base Part Number Size 1: Finishes 2: Temperature Ratings NPT Inch BSPT mm Description Suffix 1 Nominal Rating Bulb Color Max. Ambient Ceiling Temperature2 Suffix 238676 1/2 -- Brass A 135 °F (57 °C)Orange 100 °F (38 °C)A 238796 -- 15 Chrome F 155 °F (68 °C)Red 100 °F (38 °C)B White Polyester 3,5 M-/W 175 °F (79 °C)Yellow 150 °F (65 °C)D Black Polyester 3,5 M-/B 200 °F (93 °C)Green 150 °F (65 °C)E ENT 3,4,5 JN 286 °F (141 °C)Blue 225 °F (107 °C)G OPEN ----Z Example: 23867MB/W = VK1001 with white polyester finish and 155 °F (68 °C) nominal temperature rating. This sprinkler is to be installed into an area with a maximum ambient temperature of 100 °F (38 °C) meaning if the area will experience temperatures above the maximum ambient rating, you shall use a higher temperature-rated sprinkler. Accessories Sprinkler Wrenches (see Figure 1): Standard (straight) Wrench: Part number 23559MB. Sprinkler Cabinet: A. Up to 6 sprinklers: Part number 01724A B. 6-12 sprinklers: Part number 01725A Footnotes 1. Where a dash (-) is shown in the Finish suffix designation, insert the desired Temperature Rating suffix. See example above. 2. Based on NFPA 13, NFPA 13R, and NFPA 13D. Other limits may apply, depending on fire loading, sprinkler location, and other requirements of the Authority Having Jurisdiction. Refer to specific installation standards. 3. UL Listed as corrosion resistant. 4. FM Approved as corrosion resistant. 5. The corrosion resistant and corrosion proofing coatings have passed the standard corrosion test required by the approving agencies indicated in the Approval Chart. These tests cannot and do not represent all possible corrosive environments. Prior to installation, verify through the end-user that the coatings are compatible with or suitable for the proposed environment. For automatic sprinklers, the ENT coating is applied to all exposed exterior surfaces, including the waterway. 6. UL Listed for 250 PSI (17.2 bar) WWP. Figure 2: Sprinkler Dimensions 7/16” (11 mm) Nominal Pipe Engagement 1-15/16” (49 mm) Top View 1/2” NPT or 15 mm BSPT 8. GUARANTEE For details of warranty, refer to Viking’s current list price schedule or contact Viking directly. VK1001 STANDARD RESPONSE UPRIGHT SPRINKLER (K5.6)TECHNICAL DATA The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Page 3 of 4 Form No. F_102420 21.04.02 Rev 21.1 DESIGN CRITERIA - UL cULus Listing Requirements: The Viking VK1001 Standard Response Upright Sprinkler is cULus Listed as indicated in Approval Chart for installation in accordance with the latest edition of NFPA 13 for standard spray sprinklers. • Designed for use in Light, Ordinary, and Extra Hazard occupancies. • The sprinkler installation rules contained in NFPA 13 for standard spray upright sprinklers shall be followed. DESIGN CRITERIA - FM FM Approval Requirements: The Viking VK1001 Standard Response Upright Sprinkler is FM Approved as standard response Non-Storage upright sprinkler as indicated in the FM Approval Guide. For specific application and installation requirements, reference the latest applicable FM Loss Prevention Data Sheets (including Data Sheet 2-0). FM Global Loss Prevention Data Sheets contain guidelines relating to, but not limited to: minimum water supply requirements, hydraulic design, ceiling slope and obstructions, minimum and maximum allowable spacing, and deflector distance below the ceiling. NOTE: The FM Installation guidelines may differ from UL and/or NFPA criteria. IMPORTANT: Always refer to Form Number F_091699 - Care and Handling of Sprinklers. Also refer to Form Number F_080614 for general care, installation, and maintenance information. Viking sprinklers are to be installed in accordance with the latest edition of Viking Technical Data, the appropriate standards of NFPA, FM Global, LPCB, APSAD, VdS or other similar organizations, and also with the provisions of governmental codes, ordinances, and standards, whenever applicable. APPROVAL CHART Viking Standard Response Upright Sprinkler VK1001 K5.6 (80.6 metric) Sprinkler Base Part Number1 Thread Size Listings and Approvals2,6 NPT BSPT cULus FM CE6 Inch mm Approval Listing Maximum WWP Approval Listing Maximum WWP Approval Listing 23867 1/2 --A1 250 PSI (17.2 bar)A1 175 PSI (12 bar)B1 23879 -- 15 A1 250 PSI (17.2 bar)A1 175 PSI (12 bar)B1 Approved Temperature Ratings: A = 135 °F (57 °C), 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C) and 286 °F (141 °C) B = 155 °F (68 °C), 175 °F (79 °C), 200 °F (93 °C) and 286 °F (141 °C) Approved Finishes: 1 = Brass, Chrome, White Polyester 3,4, Black Polyester 3,4, and ENT 4,5 Footnotes 1 Base Part number is shown. For complete part number, refer to Viking’s current price schedule. 2 This table shows the listings and approvals available at the time of printing. Check with the manufacturer for any additional approvals. 3 Other colors are available upon request with the same Listings and Approvals as the standard colors. 4 cULus Listed as corrosion resistant. 5 FM Approved as corrosion resistant. 6 CE: Standard EN12259-1, Declaration of Performance DOP_XT1A_1-3-21. VK1001 STANDARD RESPONSE UPRIGHT SPRINKLER (K5.6)TECHNICAL DATA The Viking Corporation, 210 N Industrial Park Drive, Hastings MI 49058 Telephone: 269-945-9501 Technical Services: 877-384-5464 Fax: 269-818-1680 Email: techsvcs@vikingcorp.com Visit the Viking website for the latest edition of this technical data page www.vikinggroupinc.com Page 4 of 4 Form No. F_102420 21.04.02 Rev 21.1 Figure 3: Installation Frame arms must be parallel to the pipe. 1 2 Replaces page F_102420 Rev 20.1 (Added CE Approval) 1. Carefully slide the wrench onto the wrench flats. 2. Install the sprinkler into the pipe fitting. NOTE: The sprinkler frame arms shall be parallel to the pipe. OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org March 28, 2022 Lindley Fire 1109 N. Armando Street Anaheim, CA 92806 Re: TI Fire Sprinkler Plan Review – COSTCO DELI PREP FSS2022-0068 / 79795 HIGHWAY 111, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. The following inspections/tests are required to be witnessed by the Office of the Fire Marshal staff: 1) Overhead Rough: All installed/relocated piping must be visible. 2) Final inspection: All trim is in place, 5-Year certification is current. New/added heads shall be included in the spare head box compliment. *Water-flow signal test may be performed during the Final Inspection. All persons performing work on the automatic fire sprinkler system shall be Certified Sprinkler Fitters or Registered with the State Fire Marshal for Apprentice or Trainee classification. The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 79795 HIGHWAY 111 PERMIT#: FSS2022-0068 DATE ISSUED: 3/28/2022 DESCRIPTION: COSTCO DELI – TI CONTRACTOR: LINDLEY FIRE HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.