Loading...
BRES2021-0834Description: PACIFIC VIEW ESTATES/ 4,241SF DWELLING/VB/R-3/CLASS A-FR/13D Type: BUILDING RESIDENTIAL Subtype: DWELLING - SINGLE Status: FINALED Applied: 11/30/2021 ECON (WEB) FAMILY DETACHED Approved: 4/12/2022 JFU Parcel No: 770230016 Site Address: 78761 DEACON DR E ,CA Subdivision: TR 28470-1 Block: Lot: 26 Issued: 4/14/2022 AHI Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 7/26/2023 JAN Valuation: $385,668.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: 4,241SF SINGLE FAMILY DWELLING - [VB/RES-3/CLASS A-FR/13D] THIS PERMIT DOES NOT INCLUDE PV SYSTEM, POOL, SPA, BLOCK WALLS, DRIVEWAY APPROACH OR OTHER SIMILAR EXTERIOR STRUCTURES. 2019 CALIFORNIA BUILDING CODES. REVISION 1- SOLAR PV SYSTEM UPDATES + BUILDING ENVELOPE INSULATION CHANGE. 469 2 133 Applied to Approved Approved to Issued _j Issued to Finaled ADDITIONAL CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES - NOTIFIED APPLICANT THAT NO TRUSS PACKAGE HAS BEEN E-MAIL DUANE CLAYTON 9/16/2022 9/16/2022 SUBMITTED FOR REVIEW AND APPROVAL. APPLICANT TO RESCHEDULE ROOF NAIL AFTER TRUSSES HAVE BEEN SUBMITTED, REVIEWED, AND APPROVED. E-MAIL JAKE FUSON 1/27/2022 1/27/2022 NOTIFIED APPLICANT OF 1ST REVIEW COMMENTS, SENT CORRECTION LIST VIA EMAIL. NOTIFIED APPLICANT THAT THE ONLY COMMENT FROM THE E-MAIL JAKE FUSON 4/12/2022 4/12/2022 2ND ROUND OF REVIEWS IS TO PROVIDE A FOUNDATION PLAN REVIEW LETTER AS REQUESTED BY THE STRUCTURAL REVIEWER. ALSO SENT CONDITIONS FOR ISSUANCE. E-MAIL JAKE FUSON 9/22/2022 9/22/2022 NOTIFIED APPLICANT THAT DEFERRED TRUSS DESIGNS ARE APPROVED AND READY FOR PAYMENT. E-MAIL JAKE FUSON 7/17/2023 7/17/2023 NOTIFIED APPLICANT & OWNER OF REVISION 1 - 2ND REVIEW COMMENTS. Printed: Tuesday, October 17, 2023 10:15:30 AM 1 of 22 WSYSiEMS NOTIFIED APPLICANT THAT REVISION 1 IS APPROVED AND E-MAIL JAKE FUSON 7/20/2023 7/20/2023 READY FOR FEE PAYMENT. PUBLIC COUNTER VISIT JACK LIMA 12/13/2022 12/13/2022 PENDING SUBCONTRACTOR LIST RESUBMITTAL JAKE FUSON 3/1/2022 3/1/2022 2ND SUBMITTAL RECEIVED VIA ETRAKIT. NO GREEN SHEET RECEIVED SO PW REVIEW WILL NOT BE SCHEDULED. CONDITIONS CONDITION DATE DATE DATE CONTACT STATUS REMARKS NOTES TYPE ADDED REQUIRED SATISFIED THE FOLLOWING ARE REQUIRED PRIOR TO PERMIT ISSUANCE: -FOUNDATION PLAN REVIEW LETTER READY TO ISSUE JAKE FUSON 4/12/2022 4/14/2022 4/14/2022 COMPLETE -GRANT DEED CHECKLIST -SCHOOL FEE PAYMENT UPDATE: GRANT DEED AND FOUNDATION PLAN REVIEW LETTER RECEIVED. SCHOOL FEE PAYMENT STILL OUTSTANDING. CONTACTS NAME TYPE NAME ADDRESSI CITY STATE ZIP PHONE FAX EMAIL APPLICANT JAMES DEFORD MISSION CA 91691 ( CONTRACTOR JEFF RIPPEE 52700 AVENIDA LA QUINTA CA 92253 (619)972-4545 JRIPPEE@PACIFICVIEW VALLEJO ESTATESINC.COM CONTRACTOR SUNROSE CORPORATION 72850 SOMERA RD PALM DESERT CA 92260 (619)972-4545 SUNROSE.SEDONA@G (HISTORY) MAIL.COM OWNER PACIFIC VIEW ESTATES INC atesinc.com Printed: Tuesday, October 17, 2023 10:15:30 AM 2 of 22 WSYSiEMS CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY 2.5 CREDIT CARD 101-0000-43505 0 $2.18 $2.18 1/4/23 R73891 393584 DEBIT JEFF RIPPEE AHI PROCESSING FEE Total Paid for 2.5 CREDIT CARD PROCESSING FEE: $2.18 $2.18 CHANGE OF CONTR/ARCH/OWNER 101-0000-42600 0 $117.30 $117.30 12/13/22 R73632 769729112 CREDIT JEFF RIPPEE EMO PROCESSING PARTIAL INSPECTION 101-0000-42400 0 $87.53 $87.53 12/7/22 WEB13780 765937640 CREDIT 533670 ECON FEE RE -INSPECTION FEE 101-0000-42400 0 $87.53 $87.53 1/4/23 R73891 393584 DEBIT JEFF RIPPEE AHI Total Paid for ADMINISTRATIVE: $292.36 $292.36 ART IN PUBLIC PLACES - 270 0000 43201 0 $464.17 $464.17 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI RESIDENTIAL 9 ESTATESINC Total Paid for ART IN PUBLIC PLACES - AIPP: $464.17 $464.17 HOURLY CHARGE - CITY 101-0000-42600 1 $167.00 $167.00 9/22/22 WEB13131 729603242 CREDIT 533670 ECON BUILDING STAFF HOURLY CHARGE - CITY 101-0000-42600 0.5 $87.50 $87.50 6/30/23 WEB15589 111133314 CREDIT AEC1219 ECON BUILDING STAFF 1 HOURLY CHARGE - CITY 101-0000-42600 2 $350.00 $350.00 7/20/23 WEB15771 112380840 CREDIT AEC1219 ECON BUILDING STAFF 2 Total Paid for BLDG CITY STAFF - PER HOUR: $604.50 $604.50 BSAS SB1473 FEE 101-0000-20306 0 $16.00 $16.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC Total Paid for BUILDING STANDARDS ADMINISTRATION $16.00 $16.00 BSA: DIF - CIVIC CENTER 252-0000-43200 0 $1,230.00 $1,230.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC DIF - COMMUNITY 254-0000-43200 0 $956.00 $956.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI CULTURAL 9 ESTATESINC Printed: Tuesday, October 17, 2023 10:15:30 AM 3 of 22 WSYSiEMS ■ CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY DIF - FIRE PROTECTION 257-0000-43200 0 $369.00 $369.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC DIF - LIBRARY 253-0000-43200 0 $397.00 $397.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC DIF - MAINTENANCE 259-0000-43200 0 $313.00 $313.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI FACILITIES 9 ESTATESINC DIF - PARK 251-0000-43200 0 $2,106.00 $2,106.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI IMPROVEMENTS 9 ESTATESINC DIF - TRANSPORTATION 250-0000-43200 0 $4,009.00 $4,009.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC Total Paid for DIF - SINGLE FAMILY DWELLING 2020: $9,380.00 $9,380.00 RESIDENTIAL, EA 101-0000-42403 0 $70.85 $70.85 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI ADDITIONAL 1,000SF 9 ESTATESINC RESIDENTIAL, EA 101-0000-42600 0 $29.20 $29.20 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI ADDITIONAL 1,000SF PC 9 ESTATESINC RESIDENTIAL, FIRST 101-0000 42403 0 $166.73 $166.73 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 1,000SF 9 ESTATESINC RESIDENTIAL, FIRST 101 0000 42600 0 $55.02 $55.02 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 1,000SF PC 9 ESTATESINC Total Paid for ELECTRICAL - NEW CONSTRUCTION 2021: $321.80 $321.80 TEMP POWER SERVICE 101-0000-42403 0 $27.79 $27.79 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC TEMP POWER SERVICE 101-0000 42600 0 $19.45 $19.45 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI PC 9 ESTATESINC Total Paid for ELECTRICAL 2021: $47.24 $47.24 FIRE NEW RESIDENITIAL 101 0000 42420 0 $83.00 $83.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI PC 9 ESTATESINC FIRE NEW RESIDENTIAL 101-0000-42421 0 $83.00 $83.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC Total Paid for FIRE FEES: $166.00 $166.00 Printed: Tuesday, October 17, 2023 10:15:30 AM 4 of 22 WSYSiEMS ■ CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY RESIDENTIAL - CUSTOM 101-0000-42408 0 $41.68 $41.68 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI HOME >7KSF 9 ESTATESINC RESIDENTIAL - CUSTOM 101-0000-42600 0 $208.41 $208.41 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI HOME >7KSF PC 9 ESTATESINC Total Paid for GRADING 2021: $250.09 $250.09 CONDENSER/COMPRES 175701883 PACIFIC VIEW 101-0000 42402 0 $166.72 $166.72 4/14/22 R70008 CHECK AHI SOR 9 ESTATESINC CONDENSER/COMPRES 101-0000 42600 0 $111.16 $111.16 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI SOR PC 9 ESTATESINC EXHAUST HOOD 101-0000-42402 0 $13.89 $13.89 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC EXHAUST HOOD PC 101-0000-42600 0 $5.56 $5.56 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC FURNACE 101-0000-42402 0 $166.72 $166.72 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC FURNACE PC 101-0000-42600 0 $111.16 $111.16 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC VENT FAN 101-0000-42402 0 $111.12 $111.12 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC VENT FAN PC 101-0000-42600 0 $44.48 $44.48 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC Total Paid for MECHANICAL 2021: $730.81 $730.81 MULTI -SPECIES RESIDENTIAL 0-8 UNITS 101-0000-20310 0 $1,400.00 $1,400.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC -2021 UPDATE Total Paid for MULTI -SPECIES RESIDENTIAL: $1,400.00 $1,400.00 NEW CONSTRUCTION 101-0000 42400 0 $2,882.09 $2,882.09 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI PERMIT 2021 9 ESTATESINC Total Paid for NEW CONSTRUCTION PERMIT 2021: $2,882.09 $2,882.09 Printed: Tuesday, October 17, 2023 10:15:30 AM 5 of 22 WSYSiEMS ■ CLTD DESCRIPTION ACCOUNT CITY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY NEW CONSTRUCTION 101 0000 42600 0 $1,878.50 $1,878.50 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI PLAN CHECK 2021 9 ESTATESINC Total Paid for NEW CONSTRUCTION PLAN CHECK 2021: $1,878.50 $1,878.50 BUILDING SEWER 101-0000-42401 0 $27.79 $27.79 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC BUILDING SEWER PC 101-0000-42600 0 $19.45 $19.45 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC FIXTURE/TRAP 101-0000-42401 0 $305.58 $305.58 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC FIXTURE/TRAP PC 101-0000-42600 0 $305.58 $305.58 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC GAS SYSTEM, 5+ 101-0000-42401 0 $41.68 $41.68 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI OUTLETS 9 ESTATESINC GAS SYSTEM, 5+ 101 0000 42600 0 $27.78 $27.78 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI OUTLETS PC 9 ESTATESINC ROOF DRAIN 101-0000-42401 0 $41.67 $41.67 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC ROOF DRAIN PC 101-0000-42600 0 $41.67 $41.67 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC WATER HEATER/VENT 101-0000-42401 0 $27.78 $27.78 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC WATER HEATER/VENT 101-0000 42600 0 $16.68 $16.68 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI PC 9 ESTATESINC WATER SYSTEM 101 0000 42401 0 $13.89 $13.89 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI INST/ALT/REP 9 ESTATESINC WATER SYSTEM 101-0000-42600 0 $13.89 $13.89 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI INST/ALT/REP PC I 1 19 ESTATESINC Total Paid for PLUMBING 2021: $883.44 $883.44 Printed: Tuesday, October 17, 2023 10:15:30 AM 6 of 22 WSYSiEMS CLTD DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT # CHECK # METHOD PAID BY BY RECORDS MANAGEMENT FEE - 101-0000-42416 0 $21.00 $21.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC MAJOR Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00 SMI - RESIDENTIAL 101-0000-20308 0 $50.14 $50.14 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC Total Paid for STRONG MOTION INSTRUMENTATION SMI: $50.14 $50.14 TECHNOLOGY 502-0000-43611 0 $5.00 $5.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI ENHANCEMENT FEE 9 ESTATESINC Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00 TUMF 2021- SINGLE 224-0000-20320 0 $2,358.00 $2,358.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI FAMILY DWELLING 9 ESTATESINC Total Paid for TUMF 2021: $2,358.00 $2,358.00 NEW CONSTRUTION - SINGLE FAMILY 101-0000-42400 0 $161.00 $161.00 4/14/22 R70008 175701883 CHECK PACIFIC VIEW AHI 9 ESTATESINC RESIDENTIAL Total Paid for ZONING CLEARANCE - PLANNING PLAN $161.00 $161.00 CHECK: SEQID INSPECTION TYPE INSPECTOR SCHEDULED ED CO7DATE RESULT REMARKS NOTES DATE 7.OkW PV SYSTEM REQUIRED PER DEFERRED SUBMITTAL NOT READY PV SYSTEM APPROVED ENERGY REPORT. - CALL IN SEWER TIE-IN AND FLOW TEST UNDERGROUND PLBG DCL 5/18/2022 5/18/2022 APPROVED WHEN READY. Printed: Tuesday, October 17, 2023 10:15:30 AM 7 of 22 WSYSiEMS Pad footings where steel columns are required and grade beans, will be blocked off and concrete will be placed once templates have received dry pack approval. FOOTINGS BBL 6/10/2022 6/10/2022 PARTIALLY OK to place concrete at pad template to APPROVED allow for dry pack instal lation.AlI other footings are approved, OK to continue.Ufer ground noted at time of inspection.Top of form to the uploaded to system.Deputy report to supplied at next inspection. Slabs are approved. Pads where steel columns is required and grade beam footings, will be blocked off and poured at another time, once template has been approved for dry pack. OK to place SLAB BBL 6/10/2022 6/10/2022 PARTIALLY concrete to bottom of template at this time. APPROVED All remaining footings and pads are approved, OK to proceed. Top of form will be uploaded in system. Deputy report to follow. TEMPLATE FOOTING DCL 8/3/2022 8/3/2022 APPROVED - TWO I -BEAM FOOTINGS. FULL TEMPLATE APPROVAL. 9/15/2022 3:54 PM SUNROSE CORPORATION ROOF NAIL DCL 9/16/2022 9/16/2022 CANCELED eTRAKiT Inspection Contact Name: SUNROSE CORPORATION Request Site Address: 78761 DEACON DR E Phone:4423242298 e-Mail: SUNROSE.SEDONA@GMAIL.COM Printed: Tuesday, October 17, 2023 10:15:30 AM 8 of 22 WSYSiEMS - FOR TRUSS PACKAGE REQUIRED TO BE ROOF NAIL DCL 9/16/2022 9/16/2022 CANCELED eTRA e Inspection UPLOADED FOR REVIEW AND APPROVAL. R Request NOTIFIED APPLICANT - SEE CHRONOLOGY. DEFERRED TRUSS JFU 9/22/2022 9/22/2022 APPROVED TRUSS DESIGNS APPROVED 9/22/2022. ROOF NAIL JAN 9/23/2022 9/23/2022 APPROVED OKAY TO WRAP JAN 10/19/2022 10/19/2022 PARTIALLY Re -call for inspection once windows are APPROVED installed and flashed, u factors to be verified LATH MHU 11/8/2022 11/8/2022 DISAPPROVE WORK COVERED PRIOR TO APPROVAL FOR D OK TO WRAP - BOTTOM FLASHING VERIFIED AT EXTERIOR, AND COUNTER AND UPPER FLASHING VERIFIED AT DOUBLE FRAMED AREAS. WORK APPEARS TO CONFORM TO LATH DCL 11/15/2022 11/15/2022 PARTIALLY TYPICAL STANDARDS.- EXCLUDES REAR APPROVED DOORS, LATH INCOMPLETE AT THIS AREA AT TIME OF INSPECTION.- PARTIAL INSPECTION FEE ASSESSED. REQUEST LATH INSPECTION FOR REAR OF DWELLING WHEN READY. OKAY TO WRAP DCL 11/15/2022 11/15/2022 APPROVED - NFRC LABELS VERIFIED. FULL APPROVAL FOR OK TO WRAP. At site, sewer system is not ready for test, no water noted in sewer connections. As SEWER CONNECTION BBL 12/8/2022 12/8/2022 NOT READY discussed with owner, at next inspection water will be installed as well as someone to remove the bladder for testing. SEWER CONNECTION BBL 12/8/2022 12/8/2022 CANCELED Duplicate inspection. SEWER CONNECTION JFU 12/13/2022 12/13/2022 APPROVED Changes in head location as well as riser OVERHEAD ROUGH LIN 1/24/2023 1/24/2023 APPROVED AS BUILTS REQUIRED location. Premature insulation was partially PIPING removed to observed all sprinkler system components. As builts required. Printed: Tuesday, October 17, 2023 10:15:30 AM 9 of 22 WSYSiEMS FRAMING JFU 1/27/2023 1 1/27/2023 DISAPPROVE D -OBTAIN SOLAR PERMIT AND GET ROUGH ELECTRICAL INSPECTION APPROVED -PROVIDE STRUCTURAL OBSERVATION REPORT FORM FOR -PROVIDE FIREBLOCKING AT DOUBLE FRAMED WALLS THROUGHOUT, SEVERAL LOCATIONS -SEPARATE THE ROMEX AT CONNECTORS AT ALL PANELS (TYPICALLY 2 PER CONNECTOR) -PROVIDE NAIL PLATES AT PLASTIC PIPING WITHIN 3/4" OF FACE OF FRAMING (GARAGE, MASTER CLOSET AND KITCHEN) -LOOSE HOLD DOWN NUT AT GARAGE (COLUMN BETWEEN GARAGE DOORS) -ANCHOR BOLTS MISSING AT SOLE PLATE BREAKS AT SEVERAL LOCATIONS -INSTALL RODENTPROOFING AT SOLE PLATES AT GARAGE, BED 3, LAUNDRY -STRAP ROMEX AT BEDROOM 3 WITHIN 12" OF BOX -LOOSE NUTS AT BEDROOM 3 CLOSET, ANCHOR BOLTS MISSING PER SHEAR WALL SCHEDULE, SPECIAL INSPECTION REQUIRED FOR EPDXY -INSTALL POLY SEAL -INSTALL TEMPERATURE & PRESSURE VALVE PIPING AT WATER HEATERS -INSTALL GROUND SCREWS AT METAL BOXES -ADDRESS HOLES IN SHEAR WALL AT BATH 2 SHOWER -NM MUST BE SECURED AT EXHAUST FAN ENCLOSURES -VERIFY LIGHT AND SWITCH AT ATTIC WINE UNIT -INSTALL CLEANOUT ON FOOT VENT OF ISLAND VENT -LAND LOOSE ROMEX AT FIREPLACES Printed: Tuesday, October 17, 2023 10:15:30 AM 10 of 22 RWSYSiEMS SEE FRAMING INSPECTION NOTES FOR ROUGH ELEC JFU 1/27/2023 1/27/2023 DISAPPROVE COMPLETE LIST OF FRAMING COMBO D CORRECTIONS. SEE FRAMING INSPECTION NOTES FOR ROUGH MECH JFU 1/27/2023 1/27/2023 DISAPPROVE COMPLETE LIST OF FRAMING COMBO D CORRECTIONS. SEE FRAMING INSPECTION NOTES FOR ROUGH PLBG JFU 1/27/2023 1/27/2023 DISAPPROVE COMPLETE LIST OF FRAMING COMBO D CORRECTIONS. LATH JFU 1/27/2023 1/27/2023 CANCELED LATH INSPECTION TO BE RECALLED. 2/2/2023 1:51 PM Jeff Rippee Contact Name: Jeff Rippee ROUGH PLBG JAN 2/3/2023 2/3/2023 APPROVED The Tradition Golf Club Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com 2/2/2023 1:51 PM Jeff Rippee Contact Name: Jeff Rippee ROUGH MECH JAN 2/3/2023 2/3/2023 APPROVED The Tradition Golf Club Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com 2/2/2023 1:51 PM Jeff Rippee Contact Name: Jeff Rippee ROUGH ELEC JAN 2/3/2023 2/3/2023 APPROVED The Tradition Golf Club Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com Printed: Tuesday, October 17, 2023 10:15:30 AM 11 of 22 WSYSiEMS LATH JAN 2/3/2023 2/3/2023 APPROVED The Tradition Golf Club 2/2/2023 1:51 PM Jeff Rippee Contact Name: Jeff Rippee Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com 2/2/2023 1:51 PM Jeff Rippee Contact Name: Jeff Rippee Site Address: 78761 DEACON DR E FRAMING JAN 2/3/2023 2/3/2023 APPROVED The Tradition Golf Club Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com -PREVIOUS INSPECTION CORRECTIONS LIST HAVE BEEN SATISFIED 2/9/2023 3:45 PM Jeff Rippee Contact Name: Jeff Rippee Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com INSULATION BLAK 2/10/2023 2/10/2023 PARTIALLY eTRAKiT Inspection Please provide site address for APPROVED Request property.Need poly foam at casita,master bath various locations all exterior walls bottom plate and exterior wall.Missing insulation at pocket doors.OK to proceed but do not cover up areas lacking poly foam and insulation recall for final approval.Upload energy report inspection paperwork to E track it. Printed: Tuesday, October 17, 2023 10:15:30 AM 12 of 22 WSYSiEMS 2/24/2023 3:15 PM Jeff Rippee Contact Name: Jeff Rippee Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com DRYWALL NAIL DCL 2/27/2023 2/27/2023 DISAPPROVE eTRAKiT Inspection - DRYWALL NAIL APPROVABLE; HOWEVER, D Request ONLY PARTIAL INSULATION APPROVAL WAS GIVEN FOR THE DWELLING PER INSULATION COMMENTS ON 2/10/2023.- PLEASE CONTACT INSPECTOR BILL LAKES AT 760-777 -7000 TO RESOLVE PARTIAL INSULATION APPROVAL.- UPLOAD QII LETTER TO E- TRAKIT ATTACHMENTS FOR THIS PROJECT. - NO APPROVAL TO CONTINUE AT THIS TIME. 2/27/2023 3:44 PM Jeff Rippee Contact Name: Jeff Rippee INSULATION JAN 2/28/2023 2/28/2023 CANCELED eTRAKiT Inspection Site Address: 78761 DEACON DR E Request Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com 3/1/2023 3:45 PM Jeff Rippee Contact Name: Jeff Rippee Site Address: 78761 DEACON DR E Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com INSULATION BLAK 3/2/2023 3/2/2023 DISAPPROVE eTRAKiT Inspection D Request Please provide site address for property.Need poly foam at casita,master bath various locations all exterior walls bottom plate and exterior wall.OK to proceed but do not cover up areas lacking poly foam and insulation recall for final approval. Printed: Tuesday, October 17, 2023 10:15:30 AM 13 of 22 RWSYSiEMS 3/1/2023 3:29 PM Jeff Rippee Contact Name: Jeff Rippee SHOWER PAN BLAK 3/2/2023 3/2/2023 APPROVED eTRAKiT Inspection Site Address: 78761 DEACON DR E Request Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com 3/3/2023 3:49 PM Jeff Rippee Contact Name: Jeff Rippee Site Address: 78761 DEACON DR E INSULATION JAN 3/6/2023 3/6/2023 APPROVED eTRAKiT Inspection Phone:6199724545 Request a -Mail: jrippee@pacificviewestatesinc.com Areas verify based on previous insulation inspection 3/3/2023 3:49 PM Jeff Rippee Contact Name: Jeff Rippee PARTIALLY eTRAKiT Inspection Site Address: 78761 DEACON DR E DRYWALL NAIL JAN 3/6/2023 3/7/2023 APPROVED Request Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com -PENDING HALLWAY POWDER BATHROOM 3/8/2023 3:49 PM Jeff Rippee Contact Name: Jeff Rippee DRYWALL NAIL JAN 3/9/2023 3/9/2023 APPROVED eTRAKiT Inspection Site Address: 78761 DEACON DR E Request Phone:6199724545 e-Mail: jrippee@pacificviewestatesinc.com TEMP USE OF PERM PWR RHAR 5/10/2023 5/10/2023 APPROVED FRAMING BLD 5/12/2023 5/12/2023 CANCELED - PREVIOUSLY APPROVED. ROUGH ELEC BLD 5/12/2023 5/12/2023 CANCELED - PREVIOUSLY APPROVED. Printed: Tuesday, October 17, 2023 10:15:30 AM 14 of 22 RWSYSiEMS ROUGH MECH BLD 5/12/2023 5/12/2023 CANCELED - PREVIOUSLY APPROVED. ROUGH PLBG BLD 5/12/2023 5/12/2023 CANCELED - PREVIOUSLY APPROVED. GAS LINE/TEST RHAR 5/12/2023 5/12/2023 APPROVED OBTAINED FIRE DEPARTMENT APPROVAL FINAL" JAN 6/23/2023 6/28/2023 NOT READY AND SOLAR FINAL PRIOR TO A FINAL INSPECTION REQUEST FINAL INSPECTION LRO 6/29/2023 6/29/2023 APPROVED -ANTI SIPHON VALVES REQUIRED. AT EXTERIOR HOSE BIBS -All 120-volt, single phase, 15- and 20-ampere branch circuits supplying outlets or devices installed in dwelling unit kitchens, family rooms, dining rooms, living rooms, parlors, libraries, dens, bedrooms, sunrooms, recreation rooms, closets, hallways, laundry areas or similar rooms or areas shall be protected by an listed arc -fault circuit interrupter, combination type, installed to provide protection of the branch circuit or by any of the other means described in 210.12(A)(2) through (6)." (CEC ?210.12(A))-GFCI FINAL" JAN 7/21/2023 7/21/2023 DISAPPROVE REQUIRED AT RECEPTACLE SERVING D GARAGE-6AWG CONDUCTOR UNDER SIZE FOR A 100amp OCPD at main service - PROVIDE 2" CLEARANCE FROM FLAT WORK TO WEEP SCREED. Weep screed shall have a minimum clearance of 4 inches above the earth or 2 inches above paved areas -SECURE CONDENSER TO CONCRETE PADS - MECHANICAL ROOM PROVIDE VACANCY SENSOR -PROVIDE SEDIMENT TRAP AT WATER HEATER -AIR GAP REQUIRED FOR THE DISHWASHER -PROVIDE VACANCY SENSOR AT LAUNDRY ROOM,PANTRY AND BATHROOMS-GFCI AT WET BAR NOT FUNCTIONING AT TIME OF INSPECTION Printed: Tuesday, October 17, 2023 10:15:30 AM 15 of 22 RWSYSiEMS FINAL" JAN 7/25/2023 7/26/2023 APPROVED REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED REVIEWS STATUS REMARKS NOTES DATE 1ST BLDG INTERWEST 11/30/2021 12/14/2021 12/15/2021 REVISIONS REQUIRED COMPLETE (2 WK) 1ST BLDG NS (3 WK) JAKE FUSON 11/30/2021 12/21/2021 1/27/2022 REVISIONS REQUIRED SEE ATTACHED 1ST REVIEW CORRECTION LIST. 1ST FIRE (1 WK) 11/30/2021 12/7/2021 12/13/2021 APPROVED IN HEOHL TRICENTS ATTAOA 1ST PLANNING (1 CARLOS 11/30/2021 12/7/2021 12/7/2021 READY FOR APPROVAL WK) FLORES PLEASE SUBMIT GREEN SHEET FOR DUST 1ST PUBLIC WORKS AMY YU 11/30/2021 12/7/2021 12/8/2021 REVISIONS REQUIRED CONTROL. (1 WK) NO COMMENT ON PGP. 1ST PERMIT TECH — PERMIT TECH 11/30/2021 12/1/2021 11/30/2021 COMPLETE ETRAKIT (1 DAY) BUCKET 2ND BLDG INTERWEST 3/1/2022 3/8/2022 3/9/2022 REVISIONS REQUIRED COMPLETE (1 WK) 2ND BLDG NS — JAKE FUSON 3/1/2022 3/8/2022 4/12/2022 APPROVED- FOUNDATION PLAN REVIEW LETTER REQUIRED IN ETRAKIT (1 WK) CONDITIONS ORDER TO SATISFY STRUCTURAL CORRECTIONS. 2ND PW GREEN AMY YU 4/11/2022 4/18/2022 4/11/2022 READY FOR APPROVAL SHEET 1ST BLDG NS- JAKEFUSON 9/21/2022 9/22/2022 9/22/2022 APPROVED DEFERRED TRUSS ETRAKIT (1 DAY) Printed: Tuesday, October 17, 2023 10:15:30 AM 16 of 22 WSYSiEMS 1. ENERGY DOCUMENTS MUST BE REGISTERED 2. REMOVE CREDIT FOR NON-STANDARD DUCT LOCATION OR REVISE PLANS 3. THE INSULATION R-VALUES AND LOCATIONS 1ST BLDG NS - JAKE FUSON 5/10/2023 5/17/2023 5/23/2023 REVISIONS REQUIRED REVISION 1 - ENERGY HAVE CHANGED IN THE REPORT BUT NO PLANS ETRAKIT (1 WK) DOCUMENTS HAVE BEEN PROVIDED SHOWING THE CHANGES. EITHER REMOVE THESE CHANGES FROM THE ENERGY REPORT OR PROVIDE REVISED PLANS FOR REVIEW. -ENERGY DOCUMENTS MUST BE REGSITERED -INSULATION IS PROPOSED TO BE CHANGED AS PART OF THIS REVISION HOWEVER THE INSULATION INSPECTION HAS ALREADY BEEN COMPLETED. AN ADDITIONAL INSULATION INSPECTION WILL BE REQUIRED TO VERIFY AIR - 1ST BLDG NS - REVISION 1 - ENERGY IMPERMEABLE (I.E. CLOSE -CELL SPRAY FOAM, SAKE FUSON 6/12/2023 6/19/2023 7/17/2023 REVISIONS REQUIRED ETRAKIT (1 WK) DOCUMENTS ETC) HAS BEEN INSTALLED AT THE ROOF DECK PER ENERGY CALCULATIONS, THUS ALLOWING THE CREDIT FOR NON-STANDARD DUCT LOCATION -ALL HERS VERIFICATION DOCUMENTATION WILL NEED TO BE RE -REGISTERED AFTER THE NEW REPORT IS REGISTERED 3RD BLDG NS — JAKE FUSON 7/20/2023 7/21/2023 7/20/2023 APPROVED REVISION 1 REVISION 1 - SOLAR PV SYSTEM UPDATES + ETRAKIT (1 DAY) BUILDING ENVELOPE INSULATION CHANGE. BOND INFORMATION Attachment Type CREATED OWNER ATTACHMENTS DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 4/14/2022 AARON HICKSON SCHOOL FEE RECEIPT 2128_001.pdf 0 Rippee Residence DOC 11/30/2021 Etrakit Contractor 1ST SUBMITTAL PLANS Submittal 1 Set 11.23.2021(1).pdf DOC 11/30/2021 Etrakit Contractor 1ST SUBMITTAL SOLAR Rippee residence -Solar 1 PLANS Plans(1).pdf Printed: Tuesday, October 17, 2023 10:15:30 AM 17 of 22 WSYSiEMS ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED 21-10-689 78761 DOC 11/30/2021 Etrakit Contractor 1ST SUBMITTAL SOILS Deacon Dr. East 1 REPORT Update.pdf 1ST SUBMITTAL 706_struct calcs DOC 11/30/2021 Etrakit Contractor STRUCTURAL 1 Ri ie. df pp p CALCULATIONS DOC 11/30/2021 Etrakit Contractor 1ST SUBMITTAL ENERGY T 24 Calcs.pdf 1 DOC 11/30/2021 Etrakit Contractor 1ST SUBMITTAL Cal cheers certified 11-17- 1 Certs 21.pdf Rippee 1_2nd BD DOC 3/1/2022 Etrakit Contractor 2ND SUBMITTAL - _Delta Submittal_02.22.2022_F 1 PLANS ull Set_Signed.pdf 2ND SUBMITTAL - Rippee residence- DOC 3/1/2022 Etrakit Contractor SOLAR PLANS (FOR Revised Solar Plans 1 REFERENCE ONLY) wStamp.pdf 2ND SUBMITTAL - PV Rippee residence - DOC 3/1/2022 Etrakit Contractor RESPONSES (FOR Response to 1 REFERENCE ONLY) comments.pdf 2ND SUBMITTAL - PV DOC 3/1/2022 Etrakit Contractor SOLAR STRUCTURAL Rippee PV Calcs 1 RESPONSES (FOR wStamp.pdf REFERENCE ONLY) 2ND SUBMITTAL - Rippee Arch. Plan Check DOC 3/1/2022 Etrakit Contractor ARCHITECTURAL 1 Response.pdf RESPONSES 2ND SUBMITTAL - REPORT OF Grading Report July 30, DOC 3/1/2022 Etrakit Contractor OBSERVATIONS AND 1 1997.pdf TESTING DURING ROUGH GRADING Printed: Tuesday, October 17, 2023 10:15:30 AM 18 of 22 WSYSiEMS ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED 2ND SUBMITTAL - DOC 3/1/2022 Etrakit Contractor GEOTECHNICAL UPDATE Tradition Update Letter 1 (12/12/1996) Dec 12, 1996.pdf 2ND SUBMITTAL - DOC 3/1/2022 Etrakit Contractor GEOTECHNICAL UPDATE Tradition Update Letter 1 July 31. 1997.pdf (7/31/1997) DOC 3/1/2022 Etrakit Contractor 2ND SUBMITTAL - ESR- ESR-2316.pdf 1 2316 2ND SUBMITTAL - DOC 3/1/2022 Etrakit Contractor STRUCTURAL 706_struct calcs Rippie 1 (2).pdf CALCULATIONS 2ND SUBMITTAL - DOC 3/1/2022 Etrakit Contractor STRUCTURAL 706_pccl.pdf 1 RESPONSES Burrtec Construction DOC 4/11/2022 Etrakit Contractor WASTE MANAGEMENT Debris Management 1 PLAN Plan.pdf DOC 4/11/2022 Etrakit Contractor PM 10 GREEN SHEET PM 10 Green Sheet.pdf 1 DOC 9/21/2022 Etrakit Contractor 706_trussl_cert_.pdf 1 DOC 7/6/2023 Etrakit Contractor SUBCONTRACTOR LIST SUB -CONTRACTORS LIST 1 FILLABLE.pdf REVISION 1 - 3RD 78-761 Deacon Drive DOC 7/20/2023 Etrakit Contractor SUBMITTAL ENERGY East - All Documents 1 DOCUMENTS (3).pdf DOC 1/6/2023 ELIZABETH MOLINA SUBCONTRACTOR LIST BRES2021-0834 SUB 0 LIST.pdf STRUCTURAL DOC 2/2/2023 Etrakit Public OBSERVATION REPORT Deacon Inspection 2-2- 1 Registration & SPECIAL INSPECTION 23.pdf REPORTS Printed: Tuesday, October 17, 2023 10:15:30 AM 19 of 22 WSYSiEMS ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED Etrakit Public Deacon Pad DOC 2/2/2023 FORM CERTIFICATION 1 Registration Certification.pdf DOC 2/27/2023 Etrakit Public PRELIMINARY QII Deacon Insulation 1 Registration LETTER Cert.pdf DOC 6/12/2023 Etrakit Public REVISION 1- 2ND Tim Scott Title 24 1 Registration SUBMITTAL SHEET A7.1 Revision 1.pdf DOC 6/12/2023 Etrakit Public REVISION 1 - 2ND Tim Scott Title 24 1 Registration SUBMITTAL SHEET A7.2 Revision 2.pdf 74588 78761 Deacon Dr DOC 12/15/2021 INTERWEST 1ST REVIEW INTERWEST E New Residential SFD 0 INVOICE BRES2021-0834.pdf La Quinta-BRES2021- DOC 12/15/2021 INTERWEST 1ST REVIEW INTERWEST 0834-PC1-78761 Deacon 0 COMMENTS Dr E.docx La Quinta-BRES2021- DOC 3/9/2022 INTERWEST 2ND REVIEW 0834-PC2-78761 Deacon 0 INTERWEST COMMENTS Dr E.docx 76619 78761 DEACON DOC 3/9/2022 INTERWEST 2ND REVIEW DR E BRES2021- 0 INTERWEST INVOICE 0834.pdf BRES2021-0834 - C of DOC 7/26/2023 JULIO ANAYA C of O 1 O.pdf BRES2021-0834 - 1ST DOC 1/27/2022 JAKE FUSON 1ST REVIEW COMPLETE REVIEW COMPLETE 1 CORRECTION LIST CORRECTION LIST.pdf BRES2021-0834 - DEFERRED TRUSS DOC 4/12/2022 JAKE FUSON SUBMITTAL REQUEST DEFERRED TRUSS 1 (APPROVED) SUBMITTAL REQUEST (APPROVED).pdf Printed: Tuesday, October 17, 2023 10:15:30 AM 20 of 22 WSYSiEMS ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED BRES2021-0834 - DOC 4/12/2022 JAKE FUSON GEOTECHNICAL UPDATE GEOTECHNICAL UPDATE 1 (APPROVED) (APPROVED).pdf BRES2021-0834 - STRUCTURAL DOC 4/12/2022 JAKE FUSON CALCULATIONS STRUCTURAL 1 CALCULATIONS (APPROVED) (APPROVED).pdf DOC 4/12/2022 JAKE FUSON PLANS (APPROVED) BRES2021-0834 - PLANS 1 (APPROVED).pdf BRES2021-0834 - FOUNDATION PLAN DOC 4/13/2022 JAKE FUSON REVIEW LETTER FOUNDATION PLAN 1 (APPROVED) REVIEW LETTER (APPROVED).pdf BRES2021-0834 - DEFERRED TRUSS - 1ST DOC 9/22/2022 JAKE FUSON SUBMITTAL TRUSS DEFERRED TRUSS - 1ST 1 SUBMITTAL TRUSS CALCULATIONS CALCULATIONS.pdf BRES2021-0834 - TRUSS DOC 9/22/2022 JAKE FUSON TRUSS CALCULATIONS CALCULATIONS 1 (APPROVED) (APPROVED).pdf BRES2021-0834 - REVISION 1 - ENERGY DOC 7/20/2023 JAKE FUSON DOCUMENTS REVISION 1- ENERGY 1 (APPROVED) DOCUMENTS (APPROVED).pdf DOC 4/12/2022 JACK LIMA GRANT DEED Grant Deed.pdf 0 SUNROSE DOC 12/13/2022 JACK LIMA CORPORATION 3557 001.pdf 0 CONTRACTOR LETTER — RELEASE OF PERMIT PACIFIC VIEW ESTATES DOC 12/13/2022 JACK LIMA ARTICLES OF 3558_001.pdf 0 INCORPORATION Printed: Tuesday, October 17, 2023 10:15:30 AM 21 of 22 WSYSiEMS ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 12/13/2022 JACK LIMA OWNER BUILDER 3559 001.pdf 0 DECLARATION — REVISION 1 - 1ST ENERGY (REVISION -.p DOC 5/10/2023 JACK LIMA SUBMITTAL ENERGY 1 T-24df REPORT BRES2021-0834 - FIRE DOC 12/13/2021 KOHL HETRICK FIRE CONDITIONS OF CONDITIONS OF 1 APPROVAL APPROVAL.pdf 2ND SUBMITTAL - PHOTO 3/2/2022 Etrakit Contractor DEFERRED TRUSS IMG_1051(3).jpg 1 SUBMITTAL APPLICATION Printed: Tuesday, October 17, 2023 10:15:30 AM 22 of 22 WSYSiEMS CITY OF LA QUINTA JOB ADDRESS 78761 Deacon Dr E PERMIT NUMBER BRES2022-0834 OWNER Jeff Rippee BUILDER Jeff Rippee This form shall be posted on the job with the Building Inspection Card at all times in a conspicuous place. Only persons appearing on the list or their employees are authorized to work on this job. Any changes to this list must be approved by the Building Division prior to commencement of work. Failure to comply will result in a stoopage of work and/or the voidance of building permmit. For each applicable trade, all information requested below must be completed by the applicant. "On File" is not an accepatble resonse. TRADE/CLASSIFICATION CONTRACTOR STATE CONTRACTOR'S LICENSE WORKER COMPENSATION INSURANCE CITY BUSINESS LICENSE Company Name Classification (e.g. A, e, c-a) California Li License Number Exp. Date Carrier Name (e.g. State Fund, CalComp) PolicyNumbers (Format Varies) Exp. Date License Number Exp. Date EARTHWORK (C-12) Sunrose Corporation B 533670 /30/24 Accredited Surety 1AUICA160135569100 /7/24 0001137 CONCRETE (C-8) Sunrose Corporation B 533670 /30/24 Accredited Surety IAUICA160135569100 2/7/24 0001137 FRAMING (C-5) Sunrose Corporation B 533670 /30/24 Accredited Surety 1AUICA160135569100 2/7/24 0001137 STRUCT. STEEL (C-51) N/A MASONRY (C-29) Sunrose Corporation B 533670 6/30/24 State Fund 1948056 1/23 0001137 PLUMBING (C-36) Sunrose Corporation B 533670 6/30/24 State Fund 1948056 1/23 0001137 LATH, PLASTER (C-35) Pavilion Plastering C-35 1062999 /29/24 Falls Lake Fire & Casualty zLA017051 /1/23 DRYWALL(C-9) H S Drywall C-9 1009783 12/31/23 Falls Lake Fire & Casualty FLA01671602 /24 HVAC (C-20) Simmons Air C-20 780534 0/31/23 American Contractors DOEKS5192 /23 0003427 99/30/23 ELECTRICAL (C-10) Rangel Electric C-10 753548 /28/23 Accredited Surety ATCA16001413 /23 0010823 9/30/23 ROOFING (C-39) Eckland Roofing C-39 715643 1/30/23 Continental Indemnity 168463770104 1/23 0001724 9/30/23 SHEET METAL (C-43) N/A FLOORING(C-16) D & R Flooring Inc. C-15 GLAZING(C-17) JMI Windows C-17 908971 5/31/24 Republic Indemnity 25604601 8/23 762612 3/31/23 INSULATION (C-2) TruTeam C-2 1034361 12/31/23 Old Republic MWC31557122 6/23 765658 3/31/23 SEWAGE DISP. (C-42) N/A PAINTING (C-33) Sunrose Corporation B 533670 /30/24 Accredited Surety 1AUICA160135569100 2/7/24 0001137 CERAMIC TILE (C-54) Sunrose Corporation B 533670 /30/24 Accredited Surety IAUICA160135569100 /7/24 0001137 CABINETS (C-6) Custom Creations of the Desert C-6 964505 /31/23 Clear Spring Property WC01229400 10/23 770726 6/30/23 FENCING (C-13) Sunrose Corporation B 533670 /30/24 Accredited Surety 1AUICA160135569100 2/7/24 0001137 LANDSCAPING (C-27) Sunrose Corporation B 533670 6/30/24 Accredited Surety 1AUICA160135569100 2/7/24 0001137 POOL (C-53) McIntyre Pools & Spas C-53 614611 9/30/23 Accredited Surety & Casualty 1AUICA160129887400 7/5/23 SUNROSE CORPORATION 40-101 Monterey Ave #131.214 Rancho Mirage, CA 92270 760-702-0119 December 12, 2022 Ref: Permit No. BRES 2021-0834 Building Permit Permit No. BPOL 2022-0354 Pool Permit 78761 Deacon Dr E La Quinta Ca 922253 Jeff Rippee, President Pacific View Estates Inc. 52700 Avenida Vallejo La Quinta, Ca 92253 Dear Mr. Rippee, hereby surrender, withdraw and release all my rights to the above referenced permits to build a single family residence and pool located at 78761 Deacon Dr. E, La Quinta Ca 92253.1 also surrender, withdraw and release all my rights to the architectural, landscape and engineering drawings attached to the permits. Sincerely, Michael Tuvell President Sunrose Corp. Dated / 2 - it-7-7- irippee@pacifrcviewestatesinc.com From: Micheal Tuveff <michaeftuveII14@gmail.com> Sent: Monday, December 12, 2022 6:08 PM To: Jeff Rippee Subject: RELEASE OF PERMIT LETTER Attachments: RELEASE OF PERMIT LETTER pdf Jeff here you go. Michael Tuvell President SUNROSE CORPORATION ► 0-101 Monterey Ave. 5uite#B1-214 Rancho Mirage, CA 92270 Office: 442-324-2298 Cell: 760-702-0119 t(v Q 0 (V GEM of the DESERT — Certificate of Occupancy Design and Development Department This Certificate is issued pursuant to the requirements of Chapter 1 Section R110 of the California Residential Code, certifying that, at the time of issuance, this structure was in compliance with the provisions of the Building Code and the various ordinances of the City regulating building construction and/or use. BUILDING ADDRESS: 78761 DEACON DR E Use classification: RESIDENTIAL - SINGLE FAMILY DWELLING Occupancy Group: R-3 U Code Edition: 2019 M JULIO ANAYA Date: 7/26/2023 Building Official: AJ ORTEGA Type of Construction: VB Sprinkler Installed: YES Permit No.: BRES2021-0834 Land Use Zone: RL Sprinkler Required: YES Owner of Building: PACIFIC VIEW ESTATES INC Address: 44451 GRAND CANYON LANE City, ST, ZIP: PALM DESERT, CA 92260 POST IN A CONSPICUOUS PLACE