FSS2022-0276ADDITIONAL SITES
CHRONOLOGY
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT SHASTA FIRE PROTECTION INC 72120 NORTHSHORE ST
#C
THOUSAND
PALMS
CA 92276 (760)404-1350 jpaulus@shastafire.co
m
CONTRACTOR SHASTA FIRE PROTECTION INC 72120 NORTHSHORE ST
#C
THOUSAND
PALMS
CA 92276 (760)404-1350 jpaulus@shastafire.co
m
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
E-MAIL AARON HICKSON 8/1/2022 8/1/2022
Regarding the above permit submittal. Do you have
Hydraulic calcs for review? If so please upload to the permit
number above.
E-MAIL AARON HICKSON 8/1/2022 8/1/2022 APPLICANT STATED NO HYDRAULIC CALCULATIONS
REQUIRED.
CONDITIONS
Description: DESIGN & INSTALL (11 ) FIRE SPRINKLER HEADS IN T.I.
Type: FIRE SPRINKLER (WEB)Subtype: TENANT IMPROVEMENT Status: FINALED Applied: 7/29/2022 ECON
Parcel No: 770121012 Site Address: 78065 MAIN ST STE 100 LA QUINTA,CA 92253 Approved: 9/7/2022 KHET
Subdivision: PM 30850 Block: Lot: 6 Issued: ONLINE
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 11/30/2022 KHET
Valuation: $3,000.00 Occupancy Type: Construction Type: Expired:
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details:
Printed: Friday, April 14, 2023 8:18:39 AM 1 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2022-0276
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
OWNER OLD TOWN LA QUINTA 78065 MAIN ST LA QUINTA CA 92253 (760)404-1350 katy@oldtownlaquinta
.com
INSPECTIONS
SEQID INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
OVERHEAD ROUGH
PIPING KHET 11/9/2022 11/9/2022 APPROVED SEE NOTES
One existing hanger of armover above the
freezer was not secured.
Cooler area was set to 37F and the head
should be changed appropriately.
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
FIRE SPRINKLER
SYSTEMS - TENANT
IMPROVEMENT OVER
10 HEADS
101-0000-42420 0 $167.00 $167.00 9/7/22 WEB12991 720845931 CREDIT 476633 ECON
FIRE SPRINKLER
SYSTEMS - TENANT
IMPROVEMENT OVER
10 HEADS PC
101-0000-42420 0 $333.00 $333.00 9/7/22 WEB12991 720845931 CREDIT 476633 ECON
Total Paid for FIRE FEES: $500.00 $500.00
RECORDS
MANAGEMENT FEE 101-0000-42416 0 $11.00 $11.00 9/7/22 WEB12991 720845931 CREDIT 476633 ECON
Total Paid for RECORDS MANAGEMENT FEE: $11.00 $11.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 9/7/22 WEB12991 720845931 CREDIT 476633 ECON
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$516.00 $516.00
Printed: Friday, April 14, 2023 8:18:39 AM 2 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2022-0276
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 7/29/2022 Etrakit Contractor 1ST SUBMITTAL FIRE
SPRINKLER T.I. DESIGN
22-1178 FIRE DEPT
SUBMITTAL.pdf 1
DOC 7/29/2022 Etrakit Contractor
1ST SUBMITTAL FIRE
SPKR. HEAD MATERIAL
SUBMITTAL
VIKING DRY PENDENT
SSP VK176.pdf 1
DOC 7/29/2022 Etrakit Contractor
1ST SUBMITTAL FIRE
SPKR. HEAD MATERIAL
SUBMITTAL
VIKING MICROFAST SSP
K 5.6 VK302.pdf 1
DOC 7/29/2022 Etrakit Contractor
1ST SUBMITTAL FIRE
SPKR. HEAD MATERIAL
SUBMITTAL
VIKING MICROFAST SSU
K 5.6 VK300.pdf 1
DOC 7/29/2022 Etrakit Contractor 1ST SUBMITTAL PLAN
REVIEW APPLICATION
LA QUINTA PLAN
REVIEW APP.pdf 1
DOC 9/7/2022 KOHL HETRICK FSS2022-0276 -
APPROVED PLANS.pdf
FSS2022-0276 -
APPROVED PLANS.pdf 1
DOC 9/7/2022 KOHL HETRICK FSS2022-0276 - COA
AND JOB CARD.pdf
FSS2022-0276 - COA
AND JOB CARD.pdf 1
BOND INFORMATION
FIRE FINAL**KHET 11/30/2022 11/30/2022 APPROVED
Hanger was corrected.
Walk-in cooler temp was adjusted to 40-
degrees-F or above.
REVIEWS
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE
STATUS REMARKS NOTES
1ST FIRE - ETRAKIT
(2 WK)
KOHL
HETRICK
7/29/2022 8/12/2022 9/7/2022 APPROVED SEE ATTACHMENTS
1ST PERMIT TECH –
ETRAKIT (1 DAY)
AARON
HICKSON
7/29/2022 8/1/2022 8/1/2022 COMPLETE
PARENT PROJECTS
Printed: Friday, April 14, 2023 8:18:39 AM 3 of 3
Permit Details
City of La Quinta
PERMIT NUMBER
FSS2022-0276
APPROVEDRiverside County Fire DepartmentLa Quinta Office of the Fire MarshalBy:FIRE SAFETY SPECIALIST09/07/2022 3:42:20 PMThe approval of plans and specifications does notpermit the violation, deletion, omission or faultyinstallation of any requirements of Title 24 or anyLocal Ordinances. Construction shall remainaccessible and exposed for inspection purposesuntil approved by the Fire Department.PERMIT # -FSS2022-0276Kohl HetrickReason: I am approving this documentContact Info: 760-409-5109
OFFICE OF THE FIRE MARSHAL – LA QUINTA
78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074
• www.rvcfire.org
September 7, 2022
Shasta Fire Protection
72120 Northshore #C
Thousand Palms, CA 92276
Re: TI Fire Sprinkler Plan Review – CALIFORNIA BISTRO – STORAGE TI
FSS2022-0276 / 78065 MAIN STREET #100, LA QUINTA, CA 92253
The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County
Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions.
The following inspections/tests are required to be witnessed by the Office of the Fire Marshal staff:
1) Overhead Rough: All installed/relocated piping must be visible.
2) Final inspection: All trim is in place, 5-Year certification is current. New/added heads shall be
included in the spare head box compliment.
*Water-flow signal test may be performed during the Final Inspection.
All persons performing work on the automatic fire sprinkler system shall be Certified Sprinkler Fitters or
Registered with the State Fire Marshal for Apprentice or Trainee classification.
The Fire Department approved plans and conditions letter must be at the job site.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for
inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131.
All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal
staff at (760)777-7074.
Kohl Hetrick - Fire Safety Specialist
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
RIVERSIDE COUNTY FIRE PROTECTION PLANNING
RECORD OF INSPECTIONS / PERMIT CARD
THIS CARD IS TO REMAIN ON SITE AT ALL TIMES.
INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE.
JOB
ADDRESS: 78065 MAIN STREET #100 PERMIT#: FSS2022-0276 DATE
ISSUED: 9/7/2022
DESCRIPTION: CALIFORNIA BISTRO STORAGE TI CONTRACTOR: SHASTA FIRE PROTECTION
HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS
Thrust block pre-pour Door fan test
UG rough piping Abort test
UG hydro Mechanical shutdown
Flush Detector test
Final E F Deluge/pre-action
SPRINKLER U.G. Final E F
Thrust block pre-pour UST/AST TANK
UG rough piping Installation
UG hydro Removal
Flush Emergency shut off
Final E F Primary piping
FIRE SPRINKLER Secondary piping
Weld inspection Dispensers & shear valves
Overhead rough piping Final E F
Overhead hydro MISC. INSPECTIONS
UG flush / OK to connect Spray booths
Main drain/inspectors’ test Hood/duct extinguishing
High pile storage High pile rack storage
In-rack sprinklers H.P. vents/access/corridors
Hose racks Tract access/hydrant verification
Final E F Access & Address verification
HOOD EXTINGUISHING OTHER CONST. PERMIT
Detection system
Function test
Gas/electrical shut-off
Nozzle model/placement
Fire alarm connection
Final E F
SPRAY BOOTHS FIRE CODE PERMIT(S)
Installation
Air flow test
Mechanical interlock
Extinguishing system
Fire alarm connection
Final E F
FIRE ALARM KNOX SYSTEM
Rough-wire inspection Building Knox box
Function test Gate access Knox box/padlock
Duct detectors/velocity BUILDING INSPECTIONS
24 hr. battery test T/I final
Sprinkler monitoring Shell final
Final E F Final for occupancy
FINAL INSPECTION DATE: INSPECTORS SIGNATURE:
**WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE**
78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131
INSPECTION NOTES
1. Sway bracing and hangers will be inspected at the time of rough piping inspection.
2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler
Systems)
3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required.
4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test.
5. Contractor shall supply all testing equipment, access and operating instructions at time of test.
6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the
affected system to be covered or hidden.
POLICIES ON FIELD INSPECTIONS
A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when
scheduling inspections. For City of La Quinta inspections call: (760) 777-7131.
B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence
without approved plans.
C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required
to schedule the necessary inspections and be present on site for inspections.
D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not
on site or where previously noted corrections have not been completed.
E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into
the structure until clearance has been granted by the Fire Dept and Building Official.
F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance
has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official.
INSPECTION NOTES:
THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE
AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS.
THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180
DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE.
THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE
REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.