Loading...
FSS2022-0426ADDITIONAL SITES CHRONOLOGY CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT DESERT FIRE EXTINGUISHER CO INC PO BOX 1607 PALM SPRINGS CA 92263 (760)322-0995 MARK@DESERT- FIRE.COM BUSINESS OWNER ROB MCFARLANE (760)322-0995 ca.laquinta@crumbl.co m CONTRACTOR DESERT FIRE EXTINGUISHER CO INC PO BOX 1607 PALM SPRINGS CA 92263 (760)322-0995 MARK@DESERT- FIRE.COM OWNER WASHINGTON 111 LTD 46480 WASHINGTON ST, STE 3 LA QUINTA CA 92253 (760)322-0995 CONDITIONS Description: CRUMBL COOKIES / FIRE SPRINKLER TI / BCOM2022-0016 Type: FIRE SPRINKLER (WEB)Subtype: TENANT IMPROVEMENT Status: FINALED Applied: 11/9/2022 ECON Parcel No: 643020068 Site Address: 46480 WASHINGTON ST STE 2 LA QUINTA,CA 92253 Approved: 11/29/2022 KHET Subdivision: TR 32683 Block: Lot: 2 Issued: ONLINE Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 12/1/2022 KHET Valuation: $3,600.00 Occupancy Type: Construction Type: Expired: No. Buildings: 0 No. Stories: 0 No. Unites: 0 Details: EXISITNG 200 DEG UPRIGHTS 15 TOTAL, MOVE EXISTING 155 DEG PENDANTS 16 TOTAL, ADD 155 DEG PENDANT 1 TOTAL, EXISTING 155 DEG PEDANT 1 TOTAL FINANCIAL INFORMATION Printed: Thursday, July 20, 2023 2:16:54 PM 1 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0426 INSPECTIONS SEQID INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES OVERHEAD ROUGH PIPING KHET 12/1/2022 12/1/2022 APPROVED FIRE FINAL**KHET 12/1/2022 12/1/2022 APPROVED REVIEWS REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST FIRE - ETRAKIT (2 WK) KOHL HETRICK 11/9/2022 11/28/2022 11/29/2022 APPROVED SEE ATTACHMENTS 1ST PERMIT TECH – ETRAKIT (1 DAY) AARON HICKSON 11/9/2022 11/10/2022 11/14/2022 COMPLETE PARENT PROJECTS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY FIRE SPRINKLER SYSTEMS - TENANT IMPROVEMENT 101-0000-42420 0 $175.00 $175.00 11/29/22 WEB13721 761664260 CREDIT 563921 ECON FIRE SPRINKLER SYSTEMS - TENANT IMPROVEMENT PC 101-0000-42420 0 $350.00 $350.00 11/29/22 WEB13721 761664260 CREDIT 563921 ECON Total Paid for FIRE FEES: $525.00 $525.00 RECORDS MANAGEMENT FEE 101-0000-42416 0 $11.00 $11.00 11/29/22 WEB13721 761664260 CREDIT 563921 ECON Total Paid for RECORDS MANAGEMENT FEE: $11.00 $11.00 TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $8.00 $8.00 11/29/22 WEB13721 761664260 CREDIT 563921 ECON Total Paid for TECHNOLOGY ENHANCEMENT FEE: $8.00 $8.00 TOTALS:$544.00 $544.00 Printed: Thursday, July 20, 2023 2:16:54 PM 2 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0426 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 11/9/2022 Etrakit Contractor 1ST TI Sprinkler Plan Crubbl Cookies_TI Sprinkler Plan.pdf 1 DOC 11/29/2022 KOHL HETRICK FSS2022-0426 - APPROVED PLANS.pdf FSS2022-0426 - APPROVED PLANS.pdf 1 DOC 11/29/2022 KOHL HETRICK FSS2022-0426 - COA AND JOB CARD.pdf FSS2022-0426 - COA AND JOB CARD.pdf 1 BOND INFORMATION Printed: Thursday, July 20, 2023 2:16:54 PM 3 of 3 Permit Details City of La Quinta PERMIT NUMBER FSS2022-0426 APPROVEDBy:FIRE SAFETY SPECIALIST11/29/2022 12:55:23 PMThe approval of plans and specifications does notpermit the violation, deletion, omission or faultyinstallation of any requirements of Title 24 or anyLocal Ordinances. Construction shall remainaccessible and exposed for inspection purposesuntil approved by the Fire Department.PERMIT # - OFFICE OF THE FIRE MARSHAL – LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7074 • www.rvcfire.org November 29, 2022 Desert Fire PO Box 1607 Palm Springs, CA 92263 Re: TI Fire Sprinkler Plan Review – CRUMBL COOKIES FSS2022-0426 / 46480 WASHINGTON STREET #2, LA QUINTA, CA 92253 The sprinkler plans you submitted for the above referenced project have been reviewed by Riverside County Fire Department - Office of the Fire Marshal personnel and are approved with the following conditions. The following inspections/tests are required to be witnessed by the Office of the Fire Marshal staff: 1) Overhead Rough: All installed/relocated piping must be visible. 2) Final inspection: All trim is in place, 5-Year certification is current. New/added heads shall be included in the spare head box compliment. *Water-flow signal test may be performed during the Final Inspection. All persons performing work on the automatic fire sprinkler system shall be Certified Sprinkler Fitters or Registered with the State Fire Marshal for Apprentice or Trainee classification. The Fire Department approved plans and conditions letter must be at the job site. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7074. Kohl Hetrick - Fire Safety Specialist 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 RIVERSIDE COUNTY FIRE PROTECTION PLANNING RECORD OF INSPECTIONS / PERMIT CARD THIS CARD IS TO REMAIN ON SITE AT ALL TIMES. INSTALLING CONTRACTOR MUST BE PRESENT FOR ALL INSPECTIONS. SEE NOTES ON REVERSE SIDE. JOB ADDRESS: 46480 WASHINGTON #2 PERMIT#: FSS2022-0426 DATE ISSUED: 11/29/2022 DESCRIPTION: CRUMBL COOKIES CONTRACTOR: DESERT FIRE HYDRANT SYSTEM DATE INITIALS SPECIAL SUPPRESSION DATE INITIALS Thrust block pre-pour Door fan test UG rough piping Abort test UG hydro Mechanical shutdown Flush Detector test Final E F Deluge/pre-action SPRINKLER U.G. Final E F Thrust block pre-pour UST/AST TANK UG rough piping Installation UG hydro Removal Flush Emergency shut off Final E F Primary piping FIRE SPRINKLER Secondary piping Weld inspection Dispensers & shear valves Overhead rough piping Final E F Overhead hydro MISC. INSPECTIONS UG flush / OK to connect Spray booths Main drain/inspectors’ test Hood/duct extinguishing High pile storage High pile rack storage In-rack sprinklers H.P. vents/access/corridors Hose racks Tract access/hydrant verification Final E F Access & Address verification HOOD EXTINGUISHING OTHER CONST. PERMIT Detection system Function test Gas/electrical shut-off Nozzle model/placement Fire alarm connection Final E F SPRAY BOOTHS FIRE CODE PERMIT(S) Installation Air flow test Mechanical interlock Extinguishing system Fire alarm connection Final E F FIRE ALARM KNOX SYSTEM Rough-wire inspection Building Knox box Function test Gate access Knox box/padlock Duct detectors/velocity BUILDING INSPECTIONS 24 hr. battery test T/I final Sprinkler monitoring Shell final Final E F Final for occupancy FINAL INSPECTION DATE: INSPECTORS SIGNATURE: **WHEN CALLING FOR AN INSPECTION PLEASE HAVE PERMIT NUMBER READY. SEE NOTES ON REVERSE SIDE** 78495 CALLE TAMPICO, LA QUINTA, CA 92253 / 760-777-7000 / INSPECTION HOTLINE: 760-777-7131 INSPECTION NOTES 1. Sway bracing and hangers will be inspected at the time of rough piping inspection. 2. All required hydrostatic pressure tests shall maintain 200 psi for a 2-hour duration. (EX: Residential Fire Sprinkler Systems) 3. Fire sprinkler system remodels: if indicated on plans or this card, a hydrostatic pressure test shall be required. 4. All underground joints and thrusts blocks shall be exposed and readily visible during the hydrostatic test. 5. Contractor shall supply all testing equipment, access and operating instructions at time of test. 6. All systems shall be inspected, tested, and approved by a Fire Inspector before any work is started that may cause the affected system to be covered or hidden. POLICIES ON FIELD INSPECTIONS A. INSPECTION REQUESTS: Inspections are made subject to availability. Please have the permit number available when scheduling inspections. For City of La Quinta inspections call: (760) 777-7131. B. APPROVED PLANS: Shall be kept on the job site at all times that work is in progress. Work shall NOT commence without approved plans. C. INSPECTION REQUESTS: As required by the California Fire Code, the appropriate installing contractor shall be required to schedule the necessary inspections and be present on site for inspections. D. RE-INSPECTIONS: Will be charged against a permit when an inspection has failed, is not ready, the responsible party not on site or where previously noted corrections have not been completed. E. COMMODITIES: Unless otherwise noted on approved plans or letter of conditions, no commodities shall be entered into the structure until clearance has been granted by the Fire Dept and Building Official. F. OCCUPANCY: Buildings shall NOT be occupied by persons other than construction workers until a Final Fire Clearance has been granted by the Fire Dept and a Certificate for Occupancy has been issued by the Building Official. INSPECTION NOTES: THIS CARD IS REQURIED TO BE POSTED AT THE CONSTRUCTION SITE. THIS CARD AND APPROVED PLANS MUST BE AVAILABLE AT THE CONSTRUCTION SITE FOR ALL INSPECTIONS. THIS PERMIT SHALL EXPIRE AND BECOME NULL AND VOID IF THE WORK AUTHORIZED IS NOT COMMENCED WITHIN 180 DAYS OR IF THE WORK IS SUSPENDED OR ABANDONED FOR A PERIOD OF 180 DAYS OR MORE. THIS PERMIT IS FOR FIRE DEPARTMENT APPROVAL ONLY AND DOES NOT INTEND TO ABROGATE MORE RESTRICTIVE REQUIREMENTS OF OTHER AGENCIES HAVING RESPONSIBILITY.