Loading...
RFP Cultural Campus - Lumber Yard Bldg Structural Eng Assessment - Q&As 2023-12-13DATE TO RE CC& 0"a CALIFORNIA December 13, 2023 All Prospective Professional Structural Engineering Consultants Professional Structural Engineering Services: Cultural Campus — Lumber Yard Building Structural Assessment Project No. 2019-01. RESPONSE TO QUESTIONS The following are the City's responses to the questions received: 1.) Question: The RFP states that "Proposals can be submitted via email, hand delivery, or mail. All proposals must bear original or electronic signatures" However in the next statement it states "Submit one (1) paper original in a sealed envelope and email an electronic original, AND as a single document in a .PDF format, to the following contact" Can the submission be all electronic or we need to mail out "paper original". Also confirm the delivery date for paper original if required. Answer: Please mail ONE paper original of the work proposal and ONE paper original cost proposal in SEPARATE envelopes AND e-mail an electronic pdf of the Work Proposal ONLY. DO NOT EMAIL THE COST PROPOSAL. Proposals must be RECEIVED no later than Monday, December 18, 2023 by 5:OOPM PST. 2.) Question: Please confirm the total acceptable page count is 30 pages. Section IV. Proposal Format states 30 page count, however last the section also states that "The following are NOT included in the 20 -page count:" Answer: 30 -page count is acceptable 3.) Question: Do you have the 1997 permitted plans for planned seismic retrofits that can be shared now? Answer: No, they are not available. 4.) Question: Please provide the Master Plan for the new Cultural Campus. Please confirm the limitation of this scope is to assess the existing lumber yard property only and not the museum property and adjacent vacant parcel. Answer: Link to Cultural Campus Master Plan Limitation of scope is to the existing lumber yard property ONLY. CALIFORNIA 5.) Question: Is a CASp inspection required? Answer: No, only the ADA assessment against CCBC 11 B for commercial facilities is required. 6.) Question: Under task 1, it is noted to perform an assessment to determine the current building code deficiencies and to provide recommendations to bring into compliance. Please confirm that this only includes the pertinent structural requirements and not the noted assumed accessibility and other building code requirements that would be captured under Task 2. Answer: Correct.