Loading...
BRES2020-0039 - Energy ReportRegistration Number: 220-P010039864D-000-001-E01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:32:17 CERTIFICATE OF INSTALLATION CF2R-ENV-01-E Fenestration Installation (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 If more than one person has responsibility for installation of the items on this certificate, each person shall prepare and sign a certificate applicable to the portion of construction for which they are responsible. Alternatively, the person with chief responsibility for construction shall prepare and sign this certificate for the entire construction. The signer agrees that all applicable Mandatory Measures were met. Temporary labels are not to be removed before verification by the building inspector. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-01-E Fenestration Installation (Page 2 of 5) Registration Number: 220-P010039864D-000-001-E01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:32:17 A. Fenestration/ Glazing Includes all Windows, Skylights, Greenhouse or Bay Windows and Glazed Doors.Note: If meeting Exception 1 to 150.1(c)3A, Installing <= 3 ft 2 glass in door, it is assumed to meet the minimum required U-factor (0.30) and SHGC (0.23).      If meeting Exception 1 to 150.1(c)3A, Installing <= 3 ft 2 tubular skylight, it is assumed to meet the minimum required U-factor (0.55) and SHGC (0.30).      Doors with greater than or equal to 25 percent glazing area are considered glazed doors and are treated as fenestration products. 01 02 03 04 05 06 07 08 09 10 11 12 Tag ID Manufacturer/ Brand Fenestration Area (ft 2)Orientation Chromogenic U-factor Source SHGC Source Fenestration Type Exterior Shading Devices Comments/Sp ecial Features 12080 SGD MBed owens 96 90 No 0.32 NFRC 0.2 NFRC Window Standard bug screens 12030 Transom MBed owens 36 90 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 22080 SGD GreatRoom owens 176 90 No 0.32 NFRC 0.2 NFRC Window Standard bug screens 22030 Transom GreatRoom owens 66 90 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 6080 Sidelite Entry owens 48 90 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 4080 FrDr Entry owens 32 90 No 0.32 NFRC 0.29 NFRC Window Standard bug screens 10030 Transom Entry owens 30 90 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 2040 SH Laundry owens 8 90 No 0.27 NFRC 0.23 NFRC Window Standard bug screens 5050 XO Bed2 owens 25 180 No 0.27 NFRC 0.22 NFRC Window Standard bug screens 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-01-E Fenestration Installation (Page 3 of 5) Registration Number: 220-P010039864D-000-001-E01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:32:17 A. Fenestration/ Glazing Includes all Windows, Skylights, Greenhouse or Bay Windows and Glazed Doors.Note: If meeting Exception 1 to 150.1(c)3A, Installing <= 3 ft 2 glass in door, it is assumed to meet the minimum required U-factor (0.30) and SHGC (0.23).      If meeting Exception 1 to 150.1(c)3A, Installing <= 3 ft 2 tubular skylight, it is assumed to meet the minimum required U-factor (0.55) and SHGC (0.30).      Doors with greater than or equal to 25 percent glazing area are considered glazed doors and are treated as fenestration products. 01 02 03 04 05 06 07 08 09 10 11 12 Tag ID Manufacturer/ Brand Fenestration Area (ft 2)Orientation Chromogenic U-factor Source SHGC Source Fenestration Type Exterior Shading Devices Comments/Sp ecial Features 5050 XO Bed1 owens 25 180 No 0.27 NFRC 0.22 NFRC Window Standard bug screens 2050 SH BathBed3 owens 10 180 No 0.27 NFRC 0.23 NFRC Window Standard bug screens 5050 XO Bed3 owens 25 270 No 0.27 NFRC 0.22 NFRC Window Standard bug screens 2050 SH Kitchen owens 10 270 No 0.27 NFRC 0.23 NFRC Window Standard bug screens 2050 SH Kitchen 2 owens 10 270 No 0.27 NFRC 0.23 NFRC Window Standard bug screens 9020 Transom Kitchen owens 18 270 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 8080 SGD GreatRoom owens 64 270 No 0.32 NFRC 0.2 NFRC Window Standard bug screens 8020 Transom GreatRoom owens 16 270 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 8080 SGD GreatRoom 2 owens 64 270 No 0.32 NFRC 0.2 NFRC Window Standard bug screens 8020 Transom GreatRoom 2 owens 16 270 No 0.26 NFRC 0.24 NFRC Window Standard bug screens 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-01-E Fenestration Installation (Page 4 of 5) Registration Number: 220-P010039864D-000-001-E01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:32:17 A. Fenestration/ Glazing Includes all Windows, Skylights, Greenhouse or Bay Windows and Glazed Doors.Note: If meeting Exception 1 to 150.1(c)3A, Installing <= 3 ft 2 glass in door, it is assumed to meet the minimum required U-factor (0.30) and SHGC (0.23).      If meeting Exception 1 to 150.1(c)3A, Installing <= 3 ft 2 tubular skylight, it is assumed to meet the minimum required U-factor (0.55) and SHGC (0.30).      Doors with greater than or equal to 25 percent glazing area are considered glazed doors and are treated as fenestration products. 01 02 03 04 05 06 07 08 09 10 11 12 Tag ID Manufacturer/ Brand Fenestration Area (ft 2)Orientation Chromogenic U-factor Source SHGC Source Fenestration Type Exterior Shading Devices Comments/Sp ecial Features 8080 SGD MBed owens 64 270 No 0.32 NFRC 0.2 NFRC Window Standard bug screens 2050 SH MBath owens 10 0 No 0.27 NFRC 0.23 NFRC Window Standard bug screens 5050 XO MBath owens 25 0 No 0.27 NFRC 0.22 NFRC Window Standard bug screens B. Fenestration Installation 01 The U-factor of the installed windows for new construction and existing buildings must be equal to or less than those listed on the CF1R. 02 The SHGC of the installed windows for new construction and existing buildings must be equal to or less than those listed on the CF1R in climate zones 2, 4 and 8-15. For climate zones 1, 3, 5 and 16 there is no SHGC requirement. 03 Temporary labels are not to be removed until verified by the building inspector. 04 The fenestration product manufacturer's installation specifications shall be followed when installing these products. The space between the fenestration product and rough opening shall be completely filled with insulation. If batt insulation is used, it is cut to size and placed properly around the fenestration product. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-01-E Fenestration Installation (Page 5 of 5) Registration Number: 220-P010039864D-000-001-E01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:32:17 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): OWNER Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: 2021-10-15 07:29:56.000 2021-10-15 07:31:05.000 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05.000 Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 1 of 7) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 Medium and light density SPF manufacturers claim various R-values per inch. In California the maximum R-value that can be claimed for ccSPF is an R-value of 5.8 per inch and for ocSPF is an R-value of 3.6 per inch unless documentation is provided showing that the product and/or manufacturer has a current ICC Evaluation Service Report (ESR) that shows compliance with Acceptance Criteria for Spray-Applied Foam Plastic Insulation (AC-377). Note:The Energy Standards Section 110.7 requires that 'all joints, penetrations and other openings in the building envelope that are potential sources of air leakage shall be caulked, gasketed, weather stripped, or otherwise sealed to limit infiltration and exfiltration.' In areas where spray foam (SPF) insulation is used, the SPF can be considered the air barrier. Other than rigid board insulation, all other forms of insulation are not considered as an air barrier. A. Roof/Ceiling Insulation 01 02 03 04 05 06 07 08 09 10 I.D.Manufacturer and Brand Assembly/Framin g Material Assembly Thickness (inches) Framing Size and Spacing Insulation Type ESR Number Core/Cavity Insulation R-value Insulation Depth (inches) Continuous Insulation R-value R-38 HP Attic Option B owens Wood Framed Ceiling 15.12 R-9.1 / 2x4 Cellulose n/a 38 5.5 n/a Attic RoofWhole House owens Wood Framed Ceiling 4.2 R-13.0 / 2x4 Cellulose n/a 13 5.5 n/a B. Wall Insulation 01 02 03 04 05 06 07 08 09 10 I.D.Manufacturer and Brand Assembly/Framin g Material Assembly Thickness (inches) Framing Size and Spacing Insulation Type ESR Number Core/Cavity Insulation R-value Insulation Depth (inches) Continuous Insulation R-value R-21 Wall + 1 EPS owens Wood Framed Walls 7.88 R-21 / 2x6 Cellulose n/a 21 5.5 21 C. Mass Insulation This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 2 of 7) Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 D. Raised Floor Insulation This section does not apply to this project. E. Slab Floor/Perimeter Insulation (See Section F. For Insulation Requirements For Heated Slabs) This section does not apply to this project. F. Heated Slabs Insulation 01 All heated slabs shall be insulated as required by Section 110.8(g). Footings must meet required insulation levels. 02 Insulation shall be installed from the top of the slab, down 16 inches or to the frost line, whichever is greater. Climate zones 1-15 require R-5, and climate zone 16 requires R-10. 03 Alternatively, vertical insulation from top of slab at inside edge of outside wall down to the top of the horizontal insulation. Horizontal insulation from the outside edge of the vertical insulation extending 4 feet toward the center of the slab in a direction normal to the outside of the building in plain view. Climate zones 1-5 require R-5, and climate zone 16 requires R-10 vertical and R-7 horizontal. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. G. Minimum Mandatory Measures 01 Insulation - 110.8(a): All installed Insulation is certified and listed with Department of Consumer Affairs, "Standards for Insulating Material". 02 Insulation - 110.8(b): Urea formaldehyde foam insulation is protected by 4 mil polyethylene vapor retarder. 03 Insulation - 110.8(c): Flame spread and smoke density requirements of CBC are met. 04 Raised Floor - 150.0(d): All raised wood-frame floor have a minimum R-19 insulation or equivalent U-factor 05 Slab Floor/Perimeter - 150.0(l): Water absorption rate for the insulation material alone without facings is no greater than 0.3%; water vapor permeance rate is no greater than 2.0 perm/inch and is protected from physical damage and UV light deterioration. 06 Above Grade Exterior Wall - 150.0(c)1 and 150.1(c)6: All 2x4 wood-frame walls have a minimum R-13 insulation or equivalent U-factor not exceeding U-0.102. 07 Above Grade Exterior Wall - 150.0(c)2 and 150.1(c)6: All 2x6 wood-frame walls have a minimum R-20 insulation or equivalent U-factor not exceeding U-0.071. 08 Ceiling/Rafter Roof - 150.0(a)1: All wood-frame ceiling have a minimum R-22 insulation or equivalent U-factor. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 3 of 7) Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 G. Minimum Mandatory Measures 09 Vapor Retarder - 150(g)1: In Climate Zones 1 through 16, the earth floor of unvented crawl space shall be covered with a Class I or Class II vapor retarder. This requirement shall also apply to controlled ventilation crawl space for buildings complying with the Exception to Section 150.0(d). 10 Vapor Retarder - 150(g)2: In Climate Zones 14 and 16, a Class I or Class II vapor retarder shall be installed on the conditioned space side of all insulation in all exterior walls, vented attics and unvented attics with air-permeable insulation. 11 Heated Slabs - 110.8(g): All heated slabs shall be insulated as required. •Insulation shall be installed from the top of the slab, down 16 inches or to the frost line, whichever is greater. Climate zones 1-5 require R-5, and climate zone 16 requires R-10. •Alternatively, vertical insulation from top of slab at inside edge of outside wall down to the top of the horizontal insulation. Horizontal insulation from the outside edge of the vertical insulation extending 4 feet toward the center of the slab in a direction normal to the outside of the building in plain view. Climate zones 1-5 require R-5, and climate zone 16 requires R-10 vertical and R-7 horizontal. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. H. Installed Insulation 01 Installed insulation R-values are the same or greater than listed on the CF1R. 02 No gaps or voids between the insulation and framing. 03 No gaps between the sides or ends of batt insulation. 04 Loose-fill insulation must be installed to the minimum installed weight per square foot (density) of the manufacturer's cut sheet for the proposed R-value. 05 Batt insulation is not compressed (no stuffing of the insulation into the cavity) and is installed to its full thickness. 06 Insulation is cut around obstructions such as electrical boxes. 07 Batt insulation is delaminated around all plumbing and electrical lines in ceilings, walls and floors. 08 Band joists are insulated to the same R-value as the wall. 09 In all narrow cavities the insulation shall be cut to fit or filled with expanding foam. 10 Insulation was installed per manufacturer instructions. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 4 of 7) Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 I. Wall Insulation 01 When allowed by manufacturer, low expanding foam shall be used to fill gaps and voids around windows and doors. If not, the cavity must be air tight and filled completely with insulation. Batt insulation must be cut to width. No stuffing allowed. 02 Install wall insulation before installing tubs, showers and fireplaces. 03 Electric panels on walls separating conditioned and unconditioned space are sealed and insulated behind the panel with rigid insulation or expanding foam. 04 All walls of interior closets vented to the outside for HVAC or water heating equipment have the same R-value and air barrier as the exterior walls and ceiling. Doors are insulated and weather stripped. 05 Ducting not allowed in exterior walls unless insulated to R6 or greater and the insulation and duct are not crushed. Ducting not allowed in 2x4 wall assemblies. 06 Corner channels, wall intersections, and double sided shear walls insulated to the required R-value before enclosing the wall. 07 Insulation that does not fill the cavity placed against exterior air barrier. 08 Band joists are insulated to the same R-value as the walls. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. J. Ceiling Roof Insulation 01 Insulation extends to the outside edge of the exterior top plates and is flush against any ventilation dams/baffles. 02 Insulation is in direct contact with ceiling, so there are no gaps between the ceiling and the insulation. 03 For chimneys and flues, the insulation is in contact with the sheet metal collar. 04 Can lights are covered with insulation to the same depth as required by the CF1R for ceiling insulation. If not an area weighted calculation is required to be turned in with this compliance document. 05 Walkways and mechanical platforms insulated to the same R-value as required for the ceiling. If not an area weighted calculation is required to be turned in with this compliance document. 06 Insulate soffits by adding an air barrier and cover with insulation, or insulate the entire soffit including floor and walls. 07 Knee walls and skylight shafts are insulated to the wall R-value and in full contact with the interior air barrier. If framing on these surfaces is laid flat batt insulation is cut to fit around the framing. Batt insulation is not allowed to be draped over the framing. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 5 of 7) Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 J. Ceiling Roof Insulation 08 Attic access doors insulated to the same R-value as ceiling. The insulation is permanently attached using adhesive or mechanical fasteners. 09 Attic access must be surrounded with a dam at least the same depth as the insulation to prevent loss of ceiling insulation. 10 Batt insulation cut to fit around cross bracings and truss webs in attic. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. K. Raised Floor Insulation 01 Insulation in full contact with subfloor. 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 If netting or mesh is used, the cavity under the floor is filled and in contact with the subfloor. 04 If the basement is conditioned the walls adjacent to the crawlspace must meet minimum wall R-value requirements. This includes framed stem walls, and vertical concrete retaining walls. 05 If access to the crawl space is from the conditioned area, the raised floor must have an airtight insulated access hatch. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. L. Floor Above Garage Insulation 01 Insulation must be in full contact with subfloor if the air barrier is at the band joist at the garage/house wall. 02 Insulation hangers spaced at 18 inches or less, insulation hangers must not compress insulation. 03 If netting or mesh is used, the cavity under the floor is filled and in contact with the subfloor. 04 If air barrier is at the perimeter of the garage, below conditioned subfloor, the insulation is placed on the garage ceiling. The perimeter of subfloor is also insulated. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 6 of 7) Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 M. Cantilevered Floor Insulation 01 Insulation in full contact with cantilevered subfloor. Insulation hangers spaced at 18 inches or less, insulation hangers do not compress insulation. 02 If netting or mesh is used, the cavity under the floor is filled and in contact with the subfloor. 03 Sealed blocking is installed between joists where wall rim joist would be located in the absence of a cantilever. Insulation is placed on both sides of this block. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. N. Attached Porch Roof Insulation 01 The exterior insulated wall at the intersection with the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is at the top and bottom of each wall/roof section and insulated. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-03-E Insulation Installation (Page 7 of 7) Registration Number: 220-P010039864D-000-001-E03001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:26:51 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): OWNER Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: 2021-10-15 07:29:56 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-E04001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:27:23 CERTIFICATE OF INSTALLATION CF2R-ENV-04-E Roofing Radiant Barrier (Page 1 of 4) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. General Information 01 Construction Type Attic 02 Total Attic Area (ft 2)100 03 Radiant Barrier Installed?No 04 Attic Space Ventilated or Unventilated?Ventilated 05 Minimum Ventilation Method of Compliance 1/150 Note: in order to comply with the 1/300 exception, a Class I or II vapor retarder is required to be installed in climate zone 14 and 16. B. Radiant Barrier This section does not apply to this project. C. Schedule of Lower Vents The Net Free Area (NFA) of a manufactured product is stated on the packaging or on the manufacturer's specification data sheet. For non-manufactured products, assume that the net free area is one third of the total aperture area. 01 02 03 04 Type of Vent For instance, eyebrow vent, eave vent, round vent NFA per vent (in 2) (Manufacturer's Specification Sheet) Number of Vents Installed Total NFA Per Vent Type (in 2) Eave vent 100 5 500 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-04-E Roofing Radiant Barrier (Page 2 of 4) Registration Number: 220-P010039864D-000-001-E04001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:27:23 D. Schedule of Upper Vents The Net Free Area of a manufactured product is stated on the packaging or on the manufacturer's specification data sheet. For non-manufactured products, assume that the net free area is one third of the total aperture area. 01 02 03 04 Type of Vent (For instance, eyebrow vent, eave vent, round vent, ridge vent) NFA per vent (in 2)/Per Linear Foot (Manufacturer's Specification Sheet) Number of Vents/Linear Feet Installed Total NFA Per Vent Type (in 2) Eave vent 100 5 500 E. Required Vent Area 01 Combined NFA of installed upper and lower vents (in 2)1000 02 Minimum required combined NFA of upper and lower vents (in 2)48 03 NFA of installed upper vents (in 2)500 04 Minimum required NFA of upper vents (in 2)14.4 05 Compliance Statement Building complies F. Radiant Barrier - Additional Requirements This section does not apply to this project. G. Attic Ventilation - Additional Requirements Lower Vents 01 Lower vents are within one foot of the eave. Upper Vents 02 Upper vents are within three feet of the ridge. Vent Area 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-04-E Roofing Radiant Barrier (Page 3 of 4) Registration Number: 220-P010039864D-000-001-E04001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:27:23 G. Attic Ventilation - Additional Requirements 03 The NFA of upper vents must be within required NFA range of upper vents Note: per Exception to R806.2 of the CBC Title 24, Part2, Vol.2.5, if the net free ventilating area is less than 1:150, then the upper ventilation must be at least 40% and no more than 50%. Part 2 contains additional requirements that must be met if the area is less than 1:150. The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. H. Roofing Products (Cool Roof) Installation Information 01 02 03 04 05 06 07 08 09 10 11 12 Tag/ID Roof Pitch CRRC Product ID Number Product type CRRC Listed Aged Solar Reflectance Installed Required Initial Solar Reflectance Aged Solar Reflectance Thermal Emittance SRI Aged Solar Reflectance Thermal Emittance SRI Attic Whole House Roof pitch is < 2 :12 2564125 Asphalt shingles No 1 1 1 1 0.72 0.91 I. Roofing Products (Cool Roof) - Additional Requirements 01 Any roof area covered by building integrated photovoltaic panels and solar thermal panels are exempt from the above Cool Roof requirements 02 Liquid field applied coatings must comply with installation criteria from section 110.8(i)4 03 Mass roof 25 lb/ft 2 or greater: Mass roofs are not required to have a cool roof even if the climate zone specifies minimum performance requirements The responsible persons signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-ENV-04-E Roofing Radiant Barrier (Page 4 of 4) Registration Number: 220-P010039864D-000-001-E04001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:27:23 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): OWNER Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: 2021-10-15 07:29:56 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-E21001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:13 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H QII - Air Infiltration Sealing - Framing Stage (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 77 Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Air Barrier Materials 01 A continuous sealed exterior air barrier is required in all thermal envelope assemblies to limit air movement between unconditioned/ outside spaces and conditioned/ inside spaces, and must comply using one of the following methods: 1.Using individual materials that have an air permeance not exceeding 0.004 cfm/ft 2 under a pressure differential of 0.3 in. w.g. (1.57 pcf) (0.02 L/s.m 2 at 75 pa) when tested in accordance with ASTM E2178; or 2.Using assemblies of materials and components that have an average air leakage not to exceed 0.04 cfm/ft 2 under a pressure differential of 0.3 in. w.g. (1.57 pcf) (0.2 L/s.m 2 at 75 pa) when tested in accordance with ASTM E2357, ASTM E1677, ASTM E1680, or ASTM E283; or 3.Testing the complete building and demonstrating that the air leakage rate of the building envelope does not exceed 0.40 cfm/ft 2 under a pressure differential of 0.3 in. w.g. (1.57 pcf) (2.0 L/s.m 2 at 75 pa) when tested in accordance with ASTM E779 or an equivalent approved method. 02 Method of Compliance Method 1 (Individual Materials) Note:      SPF insulation is an acceptable air barrier and sealant when installed to a minimum thickness of 2 inches for closed cell and 5.5 inches for open cell, except where not allowed by manufacturer (e.g. flues, vents, can lights, etc). The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. B. Raised Floor Adjacent to Unconditioned Space or Separate Dwelling Units 01 All gaps in the raised floor are sealed. 02 All chases sealed at floor level using a sealed hard cover. 03 All holes (e.g. for plumbing and electrical wires) that penetrate the floor or bottom plates of walls are sealed. 04 Subfloor sheathing is glued or sealed at all panel edges to create a continuous air tight subfloor air barrier. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. C. Walls Adjacent to Unconditioned Space 01 All penetrations through the exterior wall air barrier are sealed to provide an air-tight envelope to unconditioned spaces such as the outdoors, attic, garage and crawl space. 02 Exterior wall air barrier is sealed to the top plate and bottom plate in each stud bay. 03 All electrical boxes, including knockouts that penetrate the air barrier to unconditioned space are sealed. 04 All openings in top and bottom plate, including all interior and exterior walls, to unconditioned space are sealed; such as holes drilled for electrical and plumbing. 05 Exterior bottom plates (all stories) are sealed to the floor. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H QII - Air Infiltration Sealing - Framing Stage (Page 2 of 5) Registration Number: 220-P010039864D-000-001-E21001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:13 C. Walls Adjacent to Unconditioned Space 06 All gaps around windows and doors are sealed. The sealant used follows manufacturer specifications. 07 Rim joist gaps and openings are fully sealed. 08 Fan exhaust duct outlet/ damper at the exterior wall are sealed. 09 Knee walls have solid and sealed blocking at the bottom, top, left and right sides to prevent air movement into insulation. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. D. Ceiling Air Barrier Adjacent to Unconditioned Space 01 There is a continuous air barrier at the ceiling level. All openings into walls, drops, chases or double walls are sealed. 02 All penetrations through the top plate of interior and exterior walls are sealed. 03 Fire sprinklers penetrating a ceiling air barrier shall be sealed to prevent air movement according to the manufacturer's instructions. 04 All fixtures cut into the ceiling air barrier (e.g. HVAC registers, electrical boxes, fire alarm boxes, exhaust fan housing, and recessed lighting fixtures) are sealed to the surrounding dry wall. If it is not possible to seal the fixture directly, a secondary air barrier shall be created around the fixture. 05 All installed recessed lighting fixtures that penetrate the ceiling to unconditioned space are rated to be Insulation Contact and Airtight (IC and AT) which allow direct contact with insulation. 06 All dropped ceiling areas are covered with hard covers that are sealed to the framing, or else the bottom and sides of dropped ceiling areas are all insulated and sealed as ceilings and walls as required on the Certificate of Compliance. 07 All vertical chases (e.g. HVAC ducts and plumbing) and soffits are sealed at the ceiling level. 08 Chimneys and flues require sheet metal flashing at the ceiling level. The flashing shall be sealed to the chimney/flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 09 Framing locations where air may move down into the walls from the attic (e.g. double walls, pocket doors, architectural bump-outs, etc) have a sealed hard cover to prevent air movement. 10 Attic access forms an airtight seal between the conditioned space and unconditioned space. Vertical attic access requires mechanical compression using screws or latches. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. E. Roof Air Barrier - Unvented Attics Adjacent to Unconditioned Space 01 There is a continuous air barrier at the roof deck and gable ends. 02 Chimneys and flues require sheet metal flashing at the roof deck. The flashing shall be sealed to the chimney/flue with fire rated caulk. The flashing shall be sealed to the surrounding framing. 03 All penetrations in the roof deck and gable ends for plumbing, electrical, etc. are sealed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H QII - Air Infiltration Sealing - Framing Stage (Page 3 of 5) Registration Number: 220-P010039864D-000-001-E21001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:13 F. Conditioned Space Above Or Adjacent To Garage Air Barrier 01 All penetrations in the subfloor above the garage into conditioned space must follow the raised floor air barrier requirements above. 02 Infiltration between the space above the garage and subfloor is prevented by one of the following methods: •Seal all edges of garage ceiling (typically drywall) at the perimeter of the garage to create a continuous air tight surface between the garage and adjacent conditioned envelope. Seal all plumbing, electric and mechanical penetrations between the garage and the adjacent conditioned space. For an open-web truss, airtight blocking is added on four sides of the garage perimeter. Insulation can be placed on the garage ceiling. •Seal the band joist above the wall at the garage to conditioned space transition. Seal all subfloor seams and penetrations between the garage and adjacent conditioned space. Insulation must be placed in contact with the subfloor below the conditioned space. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. G. Cantilevered Floor Air Barrier 01 Airtight blocking is installed between joists where the wall rim joist would have been located in the absence of a cantilever. 02 Exterior sheathing is installed to the bottom of the cantilever so that there is a continuous air and weather barrier for the cantilever. The cantilevered joist must be insulated to the same R value as would be required for the subfloor prior to closing. 03 Any gaps, cracks or penetrations in the air barrier of the cantilever are sealed. Recessed can lights in the cantilever are IC and AT and properly sealed to the sheathing. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. H. Walls For Attached Porch, Attic, Double Wall Air Barrier 01 An exterior wall air barrier is required at the intersection of the porch and exterior wall when there is conditioned space on the other side. The exterior wall includes an air barrier where the attic attaches to the conditioned space. 02 Truss framing blocking is used at the top and bottom of each wall/ roof section. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. I. Air Barriers in Multifamily Dwellings 01 Each dwelling unit must be sealed to stop air movement between dwelling units. Treat adjacent dwelling units as unconditioned space for air sealing. 02 All penetrations through the floor and ceiling of each dwelling unit are sealed including, electric and gas utilities, water pipes, drain pipes, fire protection service pipes, and communication wiring. 03 Elevator penthouse, mechanical penthouse, stairwell doors, roof access hatches, and plumbing stacks that separate conditioned and unconditioned space are all sealed. 04 Vertical chases for garbage chutes, elevator shafts, HVAC ducting and plumbing shall be treated as unconditioned space for sealing. 05 Common hallways shall be treated as unconditioned space for sealing. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H QII - Air Infiltration Sealing - Framing Stage (Page 4 of 5) Registration Number: 220-P010039864D-000-001-E21001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:13 J. Special Requirements for SIPs 01 SIPs are considered an air barrier when properly sealed at top, bottom, sides and all penetrations. 02 Air barrier is continuous across all surfaces, including between SIPs and non-SIP sections. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. K. Special Requirements for ICF 01 ICF sections are considered an air barrier when properly sealed at top, bottom, sides and all penetrations. 02 Air barrier is continuous across all surfaces, including between ICF and non-ICF sections. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-21-H QII - Air Infiltration Sealing - Framing Stage (Page 5 of 5) Registration Number: 220-P010039864D-000-001-E21001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:13 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46.000 2021-10-15 07:31:05.000 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05.000 Registration Number: 220-P010039864D-000-001-E22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:10 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H QII - Insulation Installation (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 77 Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Insulation Materials Installed 01 Roof Deck Insulation Material Installed Batt and Blanket 02 Ceiling Insulation Material Installed Batt and Blanket 03 Exterior Wall Insulation Material Installed Batt and Blanket 04 Raised Floor Insulation Material Installed Batt and Blanket 05 Slab Edge Insulation Material Installed Batt and Blanket B. All Surfaces 01 Air barrier installation and preparation for insulation was done and verified prior to insulation being installed. 02 All surfaces between conditioned and unconditioned space are sealed and insulated to meet or exceed the levels specified on the Certificate of Compliance 03 All structural framing areas shall be insulated in a manner that resists thermal bridging through the assembly separating conditioned from unconditioned space. Structural bracing, tie-downs, and framing of steel, or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and/ or specified design drawings indicating the R-value of insulation and fastening method to be used. 04 All insulation was installed according to the manufacturer's installation instructions. 05 Labels or specification/ data sheets for each insulation material shall be provided to the HERS rater. Loose-fill material includes insulation material bag labels or coverage charts. 06 Loose-fill insulation - the installed depth and density of insulation is verified in at least 6 random locations to ensure that the minimum thickness and installed density meet R-value specified on the Certificate of Compliance, and are consistent with the manufacturer's coverage chart. 07 If kraft paper faced insulation is used, paper is installed on the conditioned (warm in winter) side of surface. Paper must be in contact with air barrier to within 2" framing (stud, joists, etc.). The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. C. Raised Floor Adjacent to Unconditioned Space 01 Insulation is in full contact with the subfloor. 02 Insulation hangers are spaced at 18 inches or less. Insulation hangers do not compress insulation. 03 Netting, or mesh, can be used if the cavity under the floor is filled and in contact with the subfloor. 04 When daylight basements are adjacent to crawlspaces, if the basement is conditioned the walls adjacent to the crawlspace are insulated to the R-value listed on the Certificate of Compliance. This includes framed stem walls, and vertical concrete retaining walls. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H QII - Insulation Installation (Page 2 of 5) Registration Number: 220-P010039864D-000-001-E22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:10 C. Raised Floor Adjacent to Unconditioned Space 05 If access to the crawlspace is from the conditioned area the raised floor includes an airtight insulated access hatch. Where possible locate crawl space access on the exterior. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. D. Walls Adjacent to Unconditioned Space 01 Insulation quality was verified prior to the installation of the interior air barrier (typically gypsum board). 02 Loose-fill and batt insulation is in contact with all six sides of wall cavities (top, bottom, back, left, right, front [to be installed later]) with no gaps, voids or compression. Special Situation: Where framing depth is greater than required insulation thickness (e.g., double walls or framed bump-outs) a secondary air barrier shall be installed and in contact with the insulation, so that the insulation fills the cavity formed by the additional air barrier. 03 Insulation fits snuggly around obstructions (e.g., electrical boxes, plumbing and wiring) with no gaps, voids or compression. 04 Structural metal tie-downs and shear panels are insulated between exterior air barrier and metal. 05 Hard to access wall stud cavities, such as corner channels or wall intersections, are insulated to the proper R-value prior to the installation of exterior sheathing or exterior stucco lathe. 06 Insulation and interior air barrier are installed behind tub, shower, fireplace enclosures and stairwells to the R-value listed on the Certificate of Compliance when located against exterior walls. 07 All single-member window and door headers shall be insulated to a minimum of R-3 for a 2x4 framing, or equivalent width, and a minimum of R-5 for all other assemblies. No header insulation is required for single-member headers that are the same width as the wall, provided that the entire wall has at least R-2 insulation. 08 After insulation is installed: All insulated walls have interior and exterior air barriers, including kneewalls and walls of skylight wells. Exception: Rim joists. Interior air barrier (typically gypsum board) is sealed to top plate. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. E. Ceiling Adjacent to Unconditioned Space 01 Insulation extends to the outside surface of the exterior wall. 02 Insulation is in direct contact with the ceiling air barrier so there are no gaps, voids or compression. 03 Chimneys and flues (except zero clearance) have a sheet metal collar at the ceiling level to prevent contact with the insulation. The collar is at least as tall as the depth of the insulation. There is a minimum 1" clearance between the collar and the chimney/flue for double wall vent, and 6" for single wall vent, unless manufacturer's instructions require otherwise. The collar is sealed to the ceiling with high temperature sealant to prevent air leakage. The insulation is in contact with the sheet metal collar. 04 Recessed can lights penetrating the ceiling air barrier are covered with insulation to the depth needed to meet the ceiling R-value specified on the Certificate of Compliance. 05 External surfaces of steel studs, steel-framed kneewalls, skylight shafts, and gable ends are covered with insulation. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H QII - Insulation Installation (Page 3 of 5) Registration Number: 220-P010039864D-000-001-E22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:10 F. Ceiling Insulation in Vented Attics 01 Required eave ventilation shall not be obstructed. The net-free ventilation area of the eave vent is maintained. 02 Eave vent baffles and dams are installed to prevent air movement under or into the ceiling insulation. 03 Attic access is insulated to the same R-value required by the Certificate of Compliance for ceiling insulation and the insulation is permanently attached using adhesive or mechanical fasteners. 04 Attic access must have a dam around the access to at least the same depth as the insulation. 05 Attic rulers specified to the installed loose-fill material (brand and type) are installed and evenly distributed throughout the attic to verify depth (one ruler for every 250 ft 2). The rulers are clearly readable and scaled to read inches of insulation and the R-value installed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. G. Insulation in unvented Attics 01 The roof sheathing is the air barrier and is sealed to prevent air movement to the outside. 02 Insulation is in full contact with the air barrier (roof sheathing). 03 If insulated using air permeable insulation, gable end walls are sealed and insulated the same as exterior walls, including interior air barrier. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. H. Insulation in Vented Attics (High Performance Vented Attics) 01 Insulation is in full contact with roof sheathing and firmly supported to prevent sagging. 02 Batt insulation between roof trusses is acceptable with minimal gaps and voids caused by roof truss members. 03 Insulation is not required on gable end walls. 04 Required roof deck insulation over any conditioned space, or HVAC ducts, is installed on the entire attic roof deck; even over unconditioned spaces (e.g., garage, covered porch). Roof deck of attic over unconditioned space without HVAC ducts and separated from other attics by a sealed air barrier do not need to be insulated. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. I. Special Requirements for Skylight Shafts and Attic Knee Walls 01 Insulation must meet all the requirements for walls and insulation is in contact with the air barrier on all six sides unless SPF is used. 02 Insulation shall be in full contact with the interior wall finish. Batt insulation must be cut to fit around 2x4's that are laid flat. 03 Skylight shafts and attic knee walls shall be completely enclosed by vertical and horizontal framing, including horizontal plates at the top and bottom of the insulation. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H QII - Insulation Installation (Page 4 of 5) Registration Number: 220-P010039864D-000-001-E22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:10 J. Special Requirements for Floors Above Garages 01 If the air barrier is at the perimeter of the garage below the conditioned subfloor, then the insulation may be placed on the garage ceiling. The perimeter of the subfloor must also be insulated. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. K. Special Requirements for Cantilevered Floors 01 Sealed blocking shall be installed between joists where the wall rim joist would have been located in the absence of a cantilever. Insulation shall be placed on both sides of the block. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. L. Special Requirements for Attached Porches 01 Exterior wall at the intersection of the porch roof is fully insulated above, below and behind the roof line. 02 Where truss framing is used, airtight blocking is used at the top and bottom of each wall/ roof section and is insulated. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. M. Special Requirements for SPF Insulation 01 Installed product meets the claimed R-value per inch. Non-standard values are supported by an ICC Evaluation Service Report (ESR) number (e.g., ESR-xxxx) and documented on the CF2R-ENV-03. Non-standard values are anything greater than R-5.8/inch for closed cell and R-3.6/inch for open cell. 02 Installed thickness meets the required R-value from the Certificate of Compliance. Verified in at least 6 random places for each surface type: floors, walls and ceilings. 03 Insulation is spray applied to fully adhere to structural assembly framing, floor and ceiling joists, and other framing surfaces within the construction cavity. 04 If multiple layers are applied, each foam lift (e.g., spray application) adheres to the substrate and foam interfaces. 05 Closed cell SPF: In area where an air barrier is required the foam is at least 2" thick. 06 Open cell SPF: In area where an air barrier is required the foam is at least 5.5" thick. 07 Open cell SPF: Depressions in the foam insulation are not greater than 1/2" of the required thickness provided these depressions do not exceed 10% of the surface area being insulated. 08 Open cell SPF: Insulation completely fills cavities of 2x4 framing. 09 SPF insulation is not applied directly to recessed lighting fixtures unless specifically allowed by manufacturer's instructions. when not allowed, can lights are: A.Covered with a minimum of 1.5" of mineral fiber insulation or B.Enclosed in a manufacturer's approved box fabricated from an approved material, such as 18 gauge sheet metal or 1/2" gypsum board. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05.000 CERTIFICATE OF INSTALLATION CF2R-ENV-22-H QII - Insulation Installation (Page 5 of 5) Registration Number: 220-P010039864D-000-001-E22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:32:10 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Office Manager Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46.000 2021-10-15 07:31:05.000 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05.000 Registration Number: 220-P010039864D-000-001-L01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:27:43 CERTIFICATE OF INSTALLATION CF2R-LTG-01-E Lighting Single Family Dwellings (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Installed Lighting and Controls Select Yes or No according to whether your work on the project includes each of the following types of lighting and controls. See sections B through H for applicable requirements. 01 High Efficacy luminaires installed in any interior rooms. (See Section B.) No 02 JA8 compliant luminaires and controls installed in any interior rooms. (See Section B.) No 03 Recessed downlight luminaires in ceilings in any interior room (See Section C). No 04 Screw-based luminaires installed in any interior rooms (See Section D.) No 05 Enclosed or recessed luminaires installed in any interior room (See Section D). No 06 Lighting and controls in bathrooms (See Section E.)No 07 Lighting and controls in laundry rooms (See Section E.)No 08 Lighting and controls in utility rooms (See Section E.)No 09 Lighting and controls in garage (See Section E.)No 10 Outdoor lighting and controls (See Section H.)No 11 Blank electrical boxes installed more than 5 feet from finished floor. (See Section F.) No 12 Internally illuminated address signs. (See Section G.)No B. High Efficacy Luminaires and Controls This section does not apply to this project. C. Recessed Downlight LuminaIres in Ceilings This section does not apply to this project. D. Additional Luminaire Requirements This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-LTG-01-E Lighting Single Family Dwellings (Page 2 of 3) Registration Number: 220-P010039864D-000-001-L01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:27:43 E. Additional Lighting Controls This section does not apply to this project. F. Blank Electrical Boxes This section does not apply to this project. G. Address Signs This section does not apply to this project. H. Single Family Outdoor Lighting This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-LTG-01-E Lighting Single Family Dwellings (Page 3 of 3) Registration Number: 220-P010039864D-000-001-L01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:27:43 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed:   2021-10-15 07:29:56 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 1 of 10) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. General Information 01 Dwelling Unit Name 53595 Avenue Vallejo 02 Climate Zone 15 03 Dwelling Unit Total Conditioned Floor Area (ft 2)2594 04 Number of Space Conditioning Systems in this dwelling unit. 2 05 Certificate of Compliance Type Performance (CF1R-PRF)06 Method Used to Calculate HVAC Loads ASHRAE Handbook 07 Calculated Dwelling Unit Sensible Cooling Load (Btu/h) 86000 08 Calculated Dwelling Unit Heating Load (Btu/h) 126000 09 Dwelling Unit Number of Bedrooms 4 MCH-01a - Space Conditioning Systems Ducts and Fans - For use with Performance Certificate of Compliance 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 2 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 B. Design Space Conditioning (SC) System Component Specifications from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 SC System ID/Name from CF1R SC System Type Heating System Type Cooling System Type Central Fan Ventilation Cooling System Type Distribution System Type Required Thermostat Type Low Leakage Air-Handling Unit (LLAHU) Status Bypass Duct Status Cooling Zoning Type Cooling System Compressor Speed System 1 Heat pump heating cooling Central split HP Central split HP n/a Unconditioned attic Setback Yes credit is taken No Bypass Duct Not Zonal Single Speed System 2 Heat pump heating cooling Central split HP Central split HP n/a Unconditioned attic Setback Yes credit is taken No Bypass Duct Not Zonal Single Speed Notes: C. Design Space Conditioning (SC) System Compliance Requirements from CF1R This table reports the space conditioning system features that were specified on the registered CF1R-PRF compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 SC System ID/ Name from CF1R Heating Efficiency Type Minimum Heating Efficiency Value (%) Heat Pump Heating Capacity at 47 °F Heat Pump Heating Capacity at 17 °F Minimum Cooling Efficiency SEER Minimum Cooling Efficiency EER/CEER Minimum Cooling System Airflow Rate (CFM/ton) Maximum Fan Efficacy (W/CFM) Modeled Duct R-Value Central Fan Ventilation Cooling Airflow Central Fan Ventilation Cooling Fan Efficacy System 1 HSPF 9.6 45500 31850 16.5 13 350 0.45 R-8 n/a n/a System 2 HSPF 9.6 45500 31850 16.5 13 350 0.45 R-8 n/a n/a Notes: 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 3 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 D. Installed Space Conditioning (SC) System Component Information 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from CF1R SC System Description of Area Served Conditioned Floor Area Served by the System (ft 2) Heating System Type Cooling System Type Number of Indoor Units for this System Distribution System Type SC System Thermostat Type Cooling Zoning Type Cooling System Compressor Speed Type System 1 Loving Room 1300 Central split HP Central split HP 1 Unconditioned attic Setback Not Zonal Single Speed System 2 Living Area 1294 Central split HP Central split HP 1 Unconditioned attic Setback Not Zonal Single Speed Notes: E. Installed Heating System Equipment Information (not heat pumps) This section does not apply to this project. F. Installed Cooling System Outdoor Condensing Unit or Package Unit Equipment Information (not heat pumps) This section does not apply to this project. 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 4 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 G. Installed Split System Indoor Unit ( Coil or Fan Coil) Equipment Information - applicable to DX or hydronic heating or cooling, coils and fan coil units. Systems with more than one indoor unit coil or fan coil unit (e.g. multi-split systems) shall provide information for each of the system indoor coils or fan coil units. 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Indoor Unit Type Indoor Unit Duct Status Does Indoor Unit Provide CFI IAQ Ventilation? Indoor Unit Manufacturer Indoor Unit Model Number Indoor Unit Serial Number Indoor Unit Nominal Cooling Capacity (ton) System 1 Loving Room Loving Room HP Coil Ducted > 10ft length No Trane TAM9AOC60U51DAB 20381L1BV Value not required System 2 Living Area Living Area HP Coil Ducted > 10ft length No NA NA NA Value not required Notes: H. Installed Heat Pump System - Split System Condensing Unit or Package Unit Equipment Information 01 02 03 04 05 SC System ID/ Name from CF1R SC System Description of Area Served Condenser or Package Unit Manufacturer Condenser or Package Unit Model Number Condenser or Package Unit Serial Number System 1 Loving Room 4TWR6048H1000AC 4TWR6048H1000AC 21164A6P5F System 2 Living Area Trane TAM9AOC60U51DAB 20381L1BV Notes: 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 5 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 I. Installed Heat Pump System -Efficiency and Performance Compliance Information 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from CF1R SC System Description of Area Served Heating Efficiency Type Heating Efficiency Value System Rated Heating Capacity at 47 °F System Rated Heating Capacity at 17 °F System Rated Cooling Efficiency SEER System Rated Cooling Efficiency EER/CEER System Cooling Capacity at Design Conditions (Btu/h) Condenser Nominal Capacity (ton) System 1 Loving Room HSPF 9.6 45500 31850 16.5 13 48000 4 System 2 Living Area HSPF 9.6 45500 31850 16.5 13 48000 4 Notes: J. Installed Duct System Information 01 02 03 04 05 06 07 08 09 10 11 12 13 14 SC System ID/ Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Supply Duct Location Supply Duct R-Value Return Duct Location Return Duct R-Value Exception from Min R-Value Method of compliance with Airflow and Fan Efficacy Req's in 150.0(m)13 Bypass Duct Status Number of Air Filter Devices on Indoor Unit Can Approved Airflow Protocols be used to test this System? Can Approved Fan Efficacy Protocol be used to test this System? Total Duct Length System 1 Loving Room Loving Room Uncondition edAttic R8 Uncondition edAttic R8 NoException HERS_FanEff icacyAirflow Rate 0 1 Yes Yes DuctsGT10F t System 2 Living Area Living Area Uncondition edAttic R8 Uncondition edAttic R8 NoException HERS_FanEff icacyAirflow Rate 0 1 Yes Yes DuctsGT10F t 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 6 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 K. Installed Air Filter Device Information Mandatory requirements for air filter devices are specified in Section 150.0(m)12. The installer shall place a sticker in or near the filter grille displaying the filter grille/rack design airflow rate and the maximum allowed clean filter pressure drop at the design airflow rate. This will inform the occupant of the airflow vs pressure drop performance required for replacement air filters. 01 02 03 04 05 06 07 08 09 10 11 12 13 SC System ID/ Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Air Filter Device Name or Description of Area Served Air Filter Device Type Design Airflow Rate for Air Filter Device (cfm) Air Filter Nominal Depth (inch) Air Filter Nominal Length (inch) Air Filter Nominal Width (inch) Air Filter Calculated Nominal Face Area (inch 2) Air Filter Required Minimum Face Area (inch2) Face Area Compliance Design Allowable Pressure Drop for Air Filter Device (inch W.C.) System 1 Loving Room Loving Room Air Filter 1 Duct Mounted 1 1 1 1 1 0.96 Complies 0.1 System 2 Living Area Living Area Air Filter 1 Duct Mounted 1 1 1 1 1 0.96 Complies 0.1 Notes: L. Air Filter Device Requirements 01 The system shall be designed to ensure that all recirculated air and all outdoor air supplied to the occupiable space is filtered before passing through the system's thermal conditioning components. 02 The system shall be designed to accommodate the clean-filter pressure drop imposed by the system air filter device(s). The design airflow rate and maximum allowable clean-filter pressure drop at the design airflow rate applicable to each air filter shall be determined by the system designer. The system installer shall affix a sticker/label to each system air filter grille/rack location that discloses the filter's design airflow rate and the filter's maximum allowable clean-filter pressure drop at the design airflow rate. The sticker/labels shall be permanently affixed to the air filter grille/rack, readily legible, and visible to a person replacing the air filter. 03 All system air filter devices shall be located and installed in such a manner as to allow access and regular service by the system owner. 04 The system shall be provided with air filter media having a designated efficiency equal to or greater than MERV 13 when tested in accordance with ASHRAE Standard 52.2, or a particle size efficiency rating equal to or greater than 50% in the 0.30 to 1.0 µm range and equal to or greater than 85 percent in the 1.0 - 3.0 µm range when tested in accordance with AHRI Standard 680. 05 The system shall be provided with air filters that have been labeled by the manufacturer to disclose efficiency and pressure drop ratings that conform to the efficiency and pressure drop requirements for the air filter grilles/racks.. 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 7 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 L. Air Filter Device Requirements The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met M. HERS Verification Requirements For Duct Systems 01 02 03 04 05 06 07 08 09 10 SC System ID/ Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served MCH-20 Duct Leakage Test MCH-21 Duct Location Verification MCH-22 AHU Fan Efficacy (W/cfm) MCH-23 AHU Airflow Rate (cfm/ton) MCH-28 Return Duct Design Table 150.0-B or C MCH-29 Supply Duct Surface Area R-Value Buried Ducts MCH30 Central Fan Ventilation Cooling Credit System 1 Loving Room Loving Room Yes No Yes Yes No No No System 2 Living Area Living Area Yes No Yes Yes No No No Notes: N. HERS Verification Requirements For Space Conditioning Equipment 01 02 03 04 05 SC System ID/ Name from CF1R SC System Description of Area Served MCH-25 Refrigerant Charge MCH-26 Rated SC System Equipment Verification MCH-33 VCHP Compliance Credit System 1 Loving Room Yes Yes No System 2 Living Area Yes Yes No Notes: 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 8 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 O. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heating Equipment 01 Equipment Efficiency: All heating equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 02 Controls: All unitary heating systems, including heat pumps, must be controlled by a setback thermostat. These thermostats must be capable of allowing the occupant to program the temperature set points for at least four different periods in 24 hours. See Sections 150.0(i), 110.2(b). 03 Sizing: Heating load calculations must be done on portions of the building served by new heating systems to prevent inadvertent undersizing or oversizing. See sections 150.0(h)1 and 2). 04 Furnace Temperature Rise: Central forced-air heating furnace installations must be configured to operate at or below the furnace manufacturer's maximum inlet-to-outlet temperature rise specification. See Section 150.0(h)4. 05 Standby Losses and Pilot Lights: Fan-type central furnaces may not have a continuously burning pilot light. Section 110.5 and Section 110.2(d). Cooling Equipment 06 Equipment Efficiency: All cooling equipment must meet the minimum efficiency requirements of Section 110.1 and Section 110.2(a) and the Appliance Efficiency Regulations. 07 Refrigerant Line Insulation: All refrigerant line insulation in split system air conditioners and heat pumps must meet the R-value and protection requirements of Section 150.0(j)2 and 3, and Section 150.0(m)9. 08 Condensing Unit Location: Condensing units shall not be placed within five (5) feet of a dryer vent outlet. See Section 150.0(h)3A. 09 Liquid Line Filter Drier: A liquid line filter drier shall be installed according to the manufacturer's specifications 150.0(h)3B 10 Sizing: Cooling load calculations must be done on portions of the building served by new cooling systems to prevent inadvertent undersizing or oversizing. See Section 150.0(h)1 and 2. Air Distribution System Ducts, Plenums and Fans 11 Insulation: The minimum duct insulation value is R-6. Note that higher values may be required by the prescriptive or performance requirements. See Section 150.0(m)1. 12 Connections and Closures: All installed air-distribution system ducts and plenums must meet the requirements of CMC Sections 601.0, 602.0, 603.0, 604.0, 605.0 and ANSI/SMACNA-006-2006: Supply-air and return-air ducts and plenums must be insulated to a minimum installed level of R-6.0, otherwise a minimum of R-4.2 is allowed if the system is enclosed entirely in conditioned space as confirmed through field verification and diagnostic testing in accordance with the requirements of Reference Residential Appendix RA3.1.4.3.8. Exceptions for ducts in interior wall cavities or exposed ducts entirely in conditioned space are specified in Section 150.0(m)1B. 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 9 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 O. Space Conditioning Systems, Ducts and Fans -Mandatory Requirements and Additional Measures Additional mandatory requirements from Section 150.0 that are not listed here may be applicable to some systems. These requirements may be applicable to only newly installed equipment or portions of the system that are altered. Existing equipment may be exempt from these requirements. Heat Pump Thermostat 13 A thermostat shall be installed that meets the requirements of Section 110.2(b) and Section 110.2(c). 14 The thermostat shall be installed in accordance with the manufacturers published installation specifications 15 First stage of heating shall be assigned to heat pump heating. 16 Second stage back up heating shall be set to come on only when the indoor set temperature cannot be met. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-01-E Space Conditioning Systems, Ducts, and Fans (Page 10 of 10) Registration Number: 220-P010039864D-000-001-M01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:09:28 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed:   2021-10-15 07:24:46 2021-10-15 07:31:04 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:04 Registration Number: 220-P010039864D-000-001-M20001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:13:34 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Loving Room 03 Indoor Unit Name or Description of Area Served Loving Room 04 Building Type from CF-1R Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from CF1R?Low Leakage Air Handling Unit (LLAHU) method Mch20c should be used 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20c - Low Leakage Air-Handling Unit (LLAHU) 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 220-P010039864D-000-001-M20001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:13:34 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)4 03 Indoor Unit Nominal Cooling Capacity n/a 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft 2)n/a 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)80 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)79 12 Air Handling Unit Manufacturer Name Trane 13 Air Handling Unit Model Number 21164A6P5F 14 Compliance Statement System passes leakage test C. Additional Requirements for Compliance 01 The Low Leakage Air-handling Unit Model identified on this compliance document is included in the list of certified Low Leakage Air-Handling Units published on the Energy Commission Website at: http://www.energy.ca.gov/title24/equipment_cert/llahu/low_leakage_air_handling_units.pdf 02 System was tested in its normal operation condition. No temporary taping allowed. 03 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 04 All supply and return register boots were sealed to the drywall. 05 Building cavities were not used as plenums or platform returns in lieu of ducts. 06 If cloth backed tape was used it was covered with Mastic and draw bands. 07 All connection points between the air handler and the supply and return plenums are completely sealed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:04 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 220-P010039864D-000-001-M20001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:13:34 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46 2021-10-15 07:31:04 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:04 Registration Number: 220-P010039864D-000-001-M20002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:15:09 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Living Area 03 Indoor Unit Name or Description of Area Served Living Area 04 Building Type from CF-1R Single family 05 Verified Low Leakage Ducts in Conditioned Space (VLLDCS) Credit from CF1R? No, credit is not taken 06 Verified Low Leakage Air Handling Unit Credit from CF1R?Low Leakage Air Handling Unit (LLAHU) method Mch20c should be used 07 Duct System Compliance Category New 08 Portions of Duct Located in Garage?No 09 Is the system type Small Duct High Velocity (SDHV) ?No MCH-20c - Low Leakage Air-Handling Unit (LLAHU) 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 2 of 3) Registration Number: 220-P010039864D-000-001-M20002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:15:09 B. Duct Leakage Diagnostic Test 01 Air Handling Unit Airflow (AHU Airflow) Determination Method Cooling system method 02 Condenser Nominal Cooling Capacity (ton)4 03 Indoor Unit Nominal Cooling Capacity n/a 04 Heating Capacity (kBtu/h)n/a 05 Conditioned Floor Area Served by this HVAC System (ft 2)n/a 06 Measured AHU Airflow (cfm)n/a 07 Duct Leakage Test Conditions Test final 08 Duct Leakage Test Method Total leakage 09 Leakage Factor 0.05 10 Calculated Target Allowable Duct Leakage (cfm)80 11 Actual Duct Leakage Rate from Leakage Test Measurement (cfm)79 12 Air Handling Unit Manufacturer Name TRANE 13 Air Handling Unit Model Number 21162GL95F 14 Compliance Statement System passes leakage test C. Additional Requirements for Compliance 01 The Low Leakage Air-handling Unit Model identified on this compliance document is included in the list of certified Low Leakage Air-Handling Units published on the Energy Commission Website at: http://www.energy.ca.gov/title24/equipment_cert/llahu/low_leakage_air_handling_units.pdf 02 System was tested in its normal operation condition. No temporary taping allowed. 03 Outside air (OA) duct connections to the central forced air duct system shall not be sealed/taped off during duct leakage testing. OA ducts used for Central Fan Integrated (CFI) Indoor Air Quality ventilation systems, or Central Fan Ventilation Cooling Systems, that utilize dampers that open only when OA is required and automatically close when OA is not required, may configure the OA damper to the closed position during duct leakage testing. 04 All supply and return register boots were sealed to the drywall. 05 Building cavities were not used as plenums or platform returns in lieu of ducts. 06 If cloth backed tape was used it was covered with Mastic and draw bands. 07 All connection points between the air handler and the supply and return plenums are completely sealed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-20-H Duct Leakage Diagnostic Test (Page 3 of 3) Registration Number: 220-P010039864D-000-001-M20002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:15:09 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M23001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:15:58 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Description of Area Served Loving Room 03 Indoor Unit Name Loving Room 04 System Installation Type New 05 Nominal Cooling Capacity (tons)4 06 Condenser Speed Type Single Speed 07 Cooling System Zonal Control Type Not Zonal 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status No Bypass Duct 10 Date of System Airflow Rate Measurement 2021-10-11 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus 3410 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 220-P010039864D-000-001-M23001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:15:58 D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1400 03 Actual System Airflow Rate Measurement (cfm)1426 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 220-P010039864D-000-001-M23001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:15:58 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M23002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:16:44 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Description of Area Served Living Area 03 Indoor Unit Name Living Area 04 System Installation Type New 05 Nominal Cooling Capacity (tons)4 06 Condenser Speed Type Single Speed 07 Cooling System Zonal Control Type Not Zonal 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status No Bypass Duct 10 Date of System Airflow Rate Measurement 2021-10-11 11 Airflow Rate Protocol Utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently Installed Static Pressure Probe (PSPP) in the Supply Plenum. Procedures for installing HSPP or PSPP are specified in RA3.3.1.1. 01 Method Used to Demonstrate Compliance with the HSPP/PSPP Requirement HSPP installed and labeled consistent with Figure RA3.3-1 C. Airflow Rate Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1.1, and system airflow rate measurement apparatus information is given in RA3.3.2. 01 Airflow Rate Measurement Type used for this airflow rate verification. Traditional Flow Capture Hood according to procedure in RA3.3.3.1.4 02 Manufacturer of Airflow Measurement Apparatus ALNOR 03 Model number of Airflow Measurement Apparatus 3701 04 Certification Status of the Airflow Measurement Apparatus Accuracy Certified by Manufacturer and listed on CEC Website at http://www.energy.ca.gov/title24/equipment_cert/ama_fas/index. html MCH-23a Forced Air System Airflow Rate Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 2 of 3) Registration Number: 220-P010039864D-000-001-M23002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:16:44 D. Forced Air System Airflow Rate Measurement The procedures for System Airflow Rate Verification are specified in Reference Residential Appendix RA3.3. 01 Required Minimum System Airflow Rate (cfm/ton)350 02 Required Minimum System Airflow Target (cfm)1400 03 Actual System Airflow Rate Measurement (cfm)1430 04 Compliance Statement:System airflow rate complies E. Additional Requirements 01 Air filters that meet the applicable requirements of Standards Section 150.0(m)12 or 150.0(m)13 were properly installed in the system during system air flow rate measurement identified on this Certificate of Installation. 02 The airflow rate measurement apparatus used to perform the airflow rate measurement identified on this Certificate of Installation was calibrated in accordance with the apparatus manufacturer's specifications and conforms to the instrumentation specifications given in RA3.3.1. 03 A visual inspection shall confirm that bypass ducts that deliver conditioned supply air directly to the space conditioning system return duct airflow are not used on newly constructed zonally controlled systems unless the Performance Certificate of Compliance indicates an allowance for use of a bypass duct. When a bypass duct is accounted for on the Performance Certificate of Compliance, the airflow rate shall conform to the specifications listed on the Certificate of Compliance. 04 All registers were fully open during the diagnostic test. 05 System fan was set at maximum speed during the diagnostic test. 06 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 07 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 08 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-23-H Space Conditioning System Airflow Rate (Page 3 of 3) Registration Number: 220-P010039864D-000-001-M23002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20191201 Report Generated: 2021-10-15   07:16:44 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:17:21 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name System 1 02 System Location or Area Served Loving Room 03 Indoor Unit Name or Description of Area Served Loving Room 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser Speed Type Single Speed 07 Cooling System Zonal Control Type Not Zonal 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status No Bypass Duct 10 Date of System Airflow Rate Measurement 2021-10-11 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 100 02 Actual Tested Airflow from MCH-23 (cfm)1426 03 Required Fan Efficacy (Watts/cfm)0.45 04 Actual Fan Efficacy (Watts/cfm)0.07 05 Compliance Statement:System fan efficacy complies 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 220-P010039864D-000-001-M22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:17:21 D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 220-P010039864D-000-001-M22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:17:21 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M22002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:17:48 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Ducted Cooling System Information 01 System Identification or Name System 2 02 System Location or Area Served Living Area 03 Indoor Unit Name or Description of Area Served Living Area 04 System Installation Type New 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser Speed Type Single Speed 07 Cooling System Zonal Control Type Not Zonal 08 Central Fan Integrated (CFI) Ventilation System Status Not a CFI system 09 System Bypass Duct Status No Bypass Duct 10 Date of System Airflow Rate Measurement 2021-10-11 11 Airflow Rate Protocol utilized RA3.3 procedures for airflow rate measurement 12 Central Fan Ventilation Cooling System Status Not a CFVCS B. Fan Watt Measurement Apparatus and Procedure Information Instrument Specifications are given in RA3.3.1, and system fan watt measurement apparatus information is given in RA3.3.2.2. 01 Fan Watt Verification Device Used.Portable Watt Meter MCH-22a Forced Air System Fan Efficacy Measurement - Newly Installed Non-Zoned Systems or Zoned Multi-Speed Compressor C. Forced Air System Fan Efficacy Measurement The procedures for System Fan Watt Verification are specified in Reference Residential Appendix RA3.3 01 Actual Tested Watts 100 02 Actual Tested Airflow from MCH-23 (cfm)1430 03 Required Fan Efficacy (Watts/cfm)0.45 04 Actual Fan Efficacy (Watts/cfm)0.07 05 Compliance Statement:System fan efficacy complies 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 2 of 3) Registration Number: 220-P010039864D-000-001-M22002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:17:48 D. Additional Requirements 01 All registers were fully open during the diagnostic test. 02 System fan was set at maximum speed during the diagnostic test. 03 If fresh air duct is part of the HVAC system it was not closed during the diagnostic test. 04 Airflow rate and fan watt draw shall be simultaneous measurements when used to calculate the Fan Efficacy tested value. 05 Multi-speed compressor space cooling systems or variable speed compressor systems shall verify air flow (cfm/ton) and fan efficacy (Watt/cfm) with system operating in cooling mode at the maximum compressor speed and the maximum air handler fan speed. 06 Zoned cooling air distribution systems with single speed compressors shall meet both the airflow (cfm/ton) and fan efficacy (Watt/cfm) criteria in every zonal control mode. 07 Portable watt meters used for measurements of air handler watt draws shall be true power measurement systems (i.e. sensor plus data acquisition system) having an accuracy of +- 2% of reading or +- 10 Watts whichever is greater The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-22-H Space Conditioning System Fan Efficacy (Page 3 of 3) Registration Number: 220-P010039864D-000-001-M22002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:17:48 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M25001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:19:24 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. System Information Each system requiring refrigerant charge verification will be documented on a separate certificate. 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Location or Area Served Loving Room 03 Condenser (or package unit) Make or Brand 4TWR6048H1000AC 04 Condenser (or package unit) Model Number 4TWR6048H1000AC 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser (or package unit) Serial Number 21164A6P5F 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) Yes 10 System Installation Type Replacement 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer). This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2021-10-11 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HVAC system installer 17 HERS Verification Compliance Requirement Status System qualifies for group sampling MCH-25b - Refrigerant Charge Verification - Subcooling Method 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 2 of 5) Registration Number: 220-P010039864D-000-001-M25001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:19:24 B. Metering Device Verification Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2021-10-11 02 Date of Digital Thermocouple Calibration 2021-10-11 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status Loving Room 1400 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 3 of 5) Registration Number: 220-P010039864D-000-001-M25001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:19:24 F. Data Collection and Calculations Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2. 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 77 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 95 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)78.2 05 Measured Liquid Line Pressure (Pliquid) (psig)286.3 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 90.6 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)12.4 08 Target Subcooling from Manufacturer ( °F)10 09 Compliance Statement: System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)63.9 02 Measured Suction Line Pressure (Psuction) (psig)118.4 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 40 04 Measured Superheat (Line G01- Line G03) ( °F)23.9 05 Measured Superheat (Line G04) is between 4 °F and 25 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Not known 07 Compliance Statement Metering device verification passes MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID) H. Fault Indicator Display This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 4 of 5) Registration Number: 220-P010039864D-000-001-M25001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:19:24 I. Fault Indicator Display Additional Requirements This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 5 of 5) Registration Number: 220-P010039864D-000-001-M25001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:19:24 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M25002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:23:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. System Information Each system requiring refrigerant charge verification will be documented on a separate certificate. 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Location or Area Served Living Area 03 Condenser (or package unit) Make or Brand Trane 04 Condenser (or package unit) Model Number TAM9AOC60U51DAB 05 Nominal Cooling Capacity (tons) of Condenser 4 06 Condenser (or package unit) Serial Number 20381L1BV 07 Refrigerant Type R-410A 08 Other Refrigerant Type (if applicable)n/a 09 Liquid Line Filter Drier Installed According to Manufacturers Specifications (if applicable) NA 10 System Installation Type New 11 Fault Indicator Display (FID) Status (Note: Even systems with a FID must have refrigerant charge verified by installer). This system does not have a FID device installed 12 Is the system of a type that the minimum airflow can be verified for all indoor units using an approved measurement procedure (RA3.3 or RA3.3.3)? Yes 13 Is the system of a type that approved refrigerant charge verification procedures can be used to verify compliance with the refrigerant charge verification requirements when temperatures are >= 55 °F (RA3.2.2, or RA1)? Yes, one of the Refrigerant charge verification procedures from RA3.2.2 or RA1 is applicable to this system and can be used to verify compliance 14 Date of Refrigerant Charge Verification for this system 2021-10-11 15 Refrigerant charge verification method used.Subcooling (outdoor temperature must be equal to or greater than 55 degF) 16 Person who performed the Refrigerant Charge Verification reported on this Certificate of Installation HVAC system installer 17 HERS Verification Compliance Requirement Status System qualifies for group sampling MCH-25b - Refrigerant Charge Verification - Subcooling Method 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 2 of 5) Registration Number: 220-P010039864D-000-001-M25002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:23:05 B. Metering Device Verification Subcooling Method can only be used on systems that have a variable metering device. 01 Refrigerant metering device Thermostatic Expansion Valve (TXV) 02 Subcooling Method applicability status Subcooling Method is applicable to this system. C. Instrument Calibration Procedures for instrument calibration are given in Reference Residential Appendix RA3.2.2 and RA3.2.2.2 01 Date of Digital Refrigerant Gauge Calibration 2021-10-11 02 Date of Digital Thermocouple Calibration 2021-10-11 03 Digital Refrigerant Gauge Calibration Status Calibration is current 04 Digital Thermocouple Calibration Status Calibration is current D. Measurement Access Hole (MAH) Verification Procedures for installing MAH are specified in Reference Residential Appendix RA3.2.2.3 01 Method Used to Demonstrate Compliance with the Measurement Access Hole (MAH) Requirement MAH installed and labeled consistent with Figure 3.2-1 E. Minimum System Airflow Rate Verification Procedures for verifying minimum system airflow are specified in Reference Residential Appendix RA3.3.3. 01 02 03 Indoor Unit Name or Description of Area Served Minimum Required System Airflow Rate (cfm)System Airflow Rate Verification Status Living Area 1400 System complies with minimum airflow rate requirements 04 SC System complies with Minimum System Airflow Rate Verification Notes: 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 3 of 5) Registration Number: 220-P010039864D-000-001-M25002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:23:05 F. Data Collection and Calculations Procedures for determining Refrigerant Charge using the Standard Charge Verification Procedure are given in Reference Residential Appendix RA3.2.2. 01 Lowest Return Air Dry Bulb Temperature that Occurred During the Refrigerant Charge Verification Procedure ( °F) 77 02 Measured Condenser Air Entering Dry-Bulb Temperature (Tcondenser, db) 95 03 Outdoor Temperature Qualification Status Outdoor temperature is within range for using Subcooling refrigerant charge verification method 04 Measured Liquid Line Temperature (Tliquid) ( °F)77.8 05 Measured Liquid Line Pressure (Pliquid) (psig)263.7 06 Condenser Saturation Temperature (Tcondenser, sat) from Digital Gauge or P-T Table using Line F05 ( °F) 87 07 Measured Subcooling (Line F06 - Lilne F04 ( °F)9.2 08 Target Subcooling from Manufacturer ( °F)8 09 Compliance Statement: System complies with Subcooling Method - Must also pass metering device verification, next section G. Metering Device Verification Procedures for the verification of proper metering device operation are specified in RA3.2.2.6.2 01 Measured Suction Line Temperature (Tsuction) ( °F)50.8 02 Measured Suction Line Pressure (Psuction) (psig)103.6 03 Evaporator Saturation Temperature (Tevaporator, sat) from Digital Gauge or P-T Table using Line G02 ( °F) 33.1 04 Measured Superheat (Line G01- Line G03) ( °F)17.7 05 Measured Superheat (Line G04) is between 4 °F and 25 °F (inclusive) Passes CEC requirement 06 Measured Superheat (Line G04) is within Manufacturer's Specifications ( if known) Not known 07 Compliance Statement Metering device verification passes MCH-25d - Refrigeration Charge Verification - Fault Indicator Display (FID) H. Fault Indicator Display This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 4 of 5) Registration Number: 220-P010039864D-000-001-M25002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:23:05 I. Fault Indicator Display Additional Requirements This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-25-H Refrigerant Charge Verification (Page 5 of 5) Registration Number: 220-P010039864D-000-001-M25002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200901 Report Generated: 2021-10-15   07:23:05 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M26001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:24:31 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 Space Conditioning System Identification or Name System 1 02 Space Conditioning System Description of Area Served Loving Room 03 Status: SEER Performance Compliance Credit Check Yes 04 Status: EER Performance Compliance Credit Check No 05 Status: Heat Pump Heating Output Performance Compliance Check Yes 06 Status: HSPF Performance Compliance Credit Check Yes 07 Directory used to certify product performance AHRI 08 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 13425645 09 Does the directory used to certify product performance require a specific air handler, furnace or fan coil make and model? Fancoil air-handling unit 10 Does the directory used to certify product performance require a time delay relay (+TDR)? No 11 Does the directory used to certify product performance require a TXV (+TXV)? No B. Rated Space Conditioning System Equipment Information from Nameplate of the Installed System The data on the nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. 01 02 03 04 Data from nameplate of installed system component 05 06 07 08 09 10 SC System ID/Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Installed Indoor Unit Type Outdoor Condenser or Package Unit - Installed Manufacture r Name Outdoor Condenser or Package Unit - Installed Model Number Indoor Unit - Installed Manufacture r Name Indoor Unit - Installed Model Number Installed Furnace Manufacture r Name Installed Furnace Model Number System 1 Loving Room Loving Room HP Coil 4TWR6048H 1000AC 4TWR6048H 1000AC Trane TAM9AOC60 U51DAB n/a n/a 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 220-P010039864D-000-001-M26001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:24:31 C. Rated Space Conditioning System Equipment Information from Directory of Certified Product Performance The data on the nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. 01 02 03 04 Data from the Directory used to certify product performance for the rated system component 05 06 07 08 09 10 SC System ID/Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Installed Indoor Unit Type Outdoor Condenser or Package Unit - Installed Manufacture r Name Outdoor Condenser or Package Unit - Installed Model Number Indoor Unit - Installed Manufacture r Name Indoor Unit - Installed Model Number Installed Furnace Manufacture r Name Installed Furnace Model Number System 1 Loving Room Loving Room HP Coil 4TWR6048H 1000AC 4TWR6048H 1000AC Trane TAM9AOC60 U51DAB n/a n/a D. Verified Cooling System SEER 01 Required minimum SEER 16.5 02 Installed SEER 16.5 03 Compliance Statement:System passes SEER verification Signature by responsible person on this compliance document certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. E. Verified Cooling System EER This section does not apply to this project. F. Verified Heat Pump Heating Output 01 Required Heating BTU Output at 47 Degrees F 45500 02 Installed Heating BTU Output at 47 Degrees F 45500 03 Required Heating Output at 17 Degrees F 31850 04 Installed Heating Output at 17 Degrees F 45500 05 Compliance Statement: System Passes Heat Pump Heating Output Performance Compliance Verification Signature by responsible person on this compliance document certifies that the installed heat pump equipment meets or exceeds the required value listed on the CF1R. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 220-P010039864D-000-001-M26001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:24:31 G. Verified Heat Pump HSPF 01 Required minimum HSPF 9.6 02 Installed HSPF 9.6 03 Compliance Statement:System Passes HSPF Verification Signature by responsible person on this compliance document certifies that the installed heat pump equipment meets or exceeds the required value listed on the CF1R. H. Verified Space Conditioning System Air Handler, Furnace Or Fan Coil 01 If a specific air handler, furnace or fan coil is required by the directory used to certify product performance, the responsible person certifies by signing this compliance document that the installed air handler/furnace matches the equipment specified by the Directory of Certified Product Performance. I. Verified Space Conditioning System Time Delay Relay This section does not apply to this project. J. Verified Space Conditioning System TXV This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 220-P010039864D-000-001-M26001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:24:31 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M26002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:12:28 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 1 of 4) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. System Information Procedures for verification of High SEER and EER Equipment are described in Reference Appendix RA3.4. Each HVAC system requiring verification must use a separate form. 01 Space Conditioning System Identification or Name System 2 02 Space Conditioning System Description of Area Served Living Area 03 Status: SEER Performance Compliance Credit Check Yes 04 Status: EER Performance Compliance Credit Check No 05 Status: Heat Pump Heating Output Performance Compliance Check Yes 06 Status: HSPF Performance Compliance Credit Check Yes 07 Directory used to certify product performance AHRI 08 AHRI certification number for the installed space conditioning system from http://www.ahridirectory.org 21545215 09 Does the directory used to certify product performance require a specific air handler, furnace or fan coil make and model? Fancoil air-handling unit 10 Does the directory used to certify product performance require a time delay relay (+TDR)? No 11 Does the directory used to certify product performance require a TXV (+TXV)? No B. Rated Space Conditioning System Equipment Information from Nameplate of the Installed System The data on the nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. 01 02 03 04 Data from nameplate of installed system component 05 06 07 08 09 10 SC System ID/Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Installed Indoor Unit Type Outdoor Condenser or Package Unit - Installed Manufacture r Name Outdoor Condenser or Package Unit - Installed Model Number Indoor Unit - Installed Manufacture r Name Indoor Unit - Installed Model Number Installed Furnace Manufacture r Name Installed Furnace Model Number System 2 Living Area Living Area HP Coil Trane TAM9AOC60 U51DAB NA NA n/a n/a 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 2 of 4) Registration Number: 220-P010039864D-000-001-M26002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:12:28 C. Rated Space Conditioning System Equipment Information from Directory of Certified Product Performance The data on the nameplate of the installed component shall conform to the data for the component as shown in the Directory used to certify product performance in order to demonstrate compliance. 01 02 03 04 Data from the Directory used to certify product performance for the rated system component 05 06 07 08 09 10 SC System ID/Name from CF1R SC System Description of Area Served Indoor Unit Name or Description of Area Served Installed Indoor Unit Type Outdoor Condenser or Package Unit - Installed Manufacture r Name Outdoor Condenser or Package Unit - Installed Model Number Indoor Unit - Installed Manufacture r Name Indoor Unit - Installed Model Number Installed Furnace Manufacture r Name Installed Furnace Model Number System 2 Living Area Living Area HP Coil Trane TAM9AOC60 U51DAB Trane TT n/a n/a D. Verified Cooling System SEER 01 Required minimum SEER 16.5 02 Installed SEER 16.5 03 Compliance Statement:System passes SEER verification Signature by responsible person on this compliance document certifies that the installed cooling equipment meets or exceeds the required value listed on the CF1R. E. Verified Cooling System EER This section does not apply to this project. F. Verified Heat Pump Heating Output 01 Required Heating BTU Output at 47 Degrees F 45500 02 Installed Heating BTU Output at 47 Degrees F 45500 03 Required Heating Output at 17 Degrees F 31850 04 Installed Heating Output at 17 Degrees F 45500 05 Compliance Statement: System Passes Heat Pump Heating Output Performance Compliance Verification Signature by responsible person on this compliance document certifies that the installed heat pump equipment meets or exceeds the required value listed on the CF1R. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 3 of 4) Registration Number: 220-P010039864D-000-001-M26002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:12:28 G. Verified Heat Pump HSPF 01 Required minimum HSPF 9.6 02 Installed HSPF 9.6 03 Compliance Statement:System Passes HSPF Verification Signature by responsible person on this compliance document certifies that the installed heat pump equipment meets or exceeds the required value listed on the CF1R. H. Verified Space Conditioning System Air Handler, Furnace Or Fan Coil 01 If a specific air handler, furnace or fan coil is required by the directory used to certify product performance, the responsible person certifies by signing this compliance document that the installed air handler/furnace matches the equipment specified by the Directory of Certified Product Performance. I. Verified Space Conditioning System Time Delay Relay This section does not apply to this project. J. Verified Space Conditioning System TXV This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-26-H Rated Space Conditioning System Equipment Verification (Page 4 of 4) Registration Number: 220-P010039864D-000-001-M26002A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20190501 Report Generated: 2021-10-15   07:12:28 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M27001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:10:59 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2.-2016 Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings subject to amendments specified by Title 24, Part 6 Section 150.0(o)1. A. Dwelling Mechanical Ventilation - General Information 01 Dwelling unit name 53595 Avenue Vallejo 02 Building Type Single family detached 03 Project scope Newly Constructed 04 Total Conditioned Floor Area of Dwelling Unit (For addition projects the conditioned floor area equals existing area plus addition area. ) 2594 05 Number of Bedrooms in Dwelling Unit (For addition projects the number of bedrooms equals the existing bedrooms plus addition bedrooms) 4 06 Ventilation System Type Exhaust 07 Ventilation Operation Schedule Continuous Note: Non-dwelling units do not meet the definition for a dwelling unit as defined in Section 100.1(b). Non-dwelling units are not designed to provide independent living facilities and do not provide permanent provisions for living, sleeping, eating, cooking and sanitation. B. Single Family Attached/Detached General Information 01 Average Ceiling Height 11 02 Total Conditioned Volume 28534 03 Vertical distance between the lowest and highest above grade points within the pressure boundary in feet 11 04 Air Changes Per Hour at 50 Pa Default 05 Name of ANSI/ASHRAE Standard 62.2-2016 weather station for climate zone Palm Springs Intl 06 Weather and shielding factor (wsf) (Based on city identified above)0.45 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 2 of 5) Registration Number: 220-P010039864D-000-001-M27001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:10:59 C. Ventilation - Total Ventilation Rate A mechanical supply system, exhaust system or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in 150.0(o)1Ci 01 Total Required Ventilation Rate (Qtot)115.32 02 Enclosure Leakage Rate (Q50)951.13 03 Effective Annual Average Infiltration Rate (Qinf 25.03 04 Total Exterior Envelope Surface Area n/a 05 Unshared Exterior Envelope Surface Area (exclude surface areas attached to garages or other dwelling units) n/a 06 Required Mechanical Ventilation Rate (Qfan)109.89 D. Installed Ventilation - Total Ventilation Rate A mechanical supply system, exhaust system, or combination thereof shall provide whole-building ventilation with outdoor air each hour at no less than the rate in 150.0(o)1Ci 01 02 03 04 05 Fan Name Fan Location Runtime (min/hr) Installed Mechanical Ventilation Rate (CFM) Equivalent Continuous Ventilation (CFM) 1 FAU 60 1600 1600 06 Total Installed Continuous Ventilation (CFM)1600 E. Compliance Statement 01 Building Passes Mechanical Ventilation RateTest F. Other Requirements The items listed below (6.1 through 6,6 abd 6.8 through 6.9) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.8) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 01 6.1 Adjacent Spaces and Transfer Air.Measures shall be taken to minimize air movement across envelope components to dwelling units from adjacent spaces such as garages, unconditioned crawl spaces, unconditioned attics and other dwelling. Supply and balanced ventilation systems shall be designed and constructed to provide ventilation air directly from the outdoors.      6.1.1 Compliance for Attached Dwelling Units . One method of demonstrating compliance with Section 6.1 shall be to verify a leakage rate below a maximum of 0.3 cfm per ft 2 (150 L/s per 100 m2) of the dwelling unit envelope per area (i.e. the sum of the area of walls between dwelling units, exterior walls, ceiling and floor) at a test pressure of 50 Pa by a blower door test conducted in accordance with either ANSI/ASTME779 or ANSI/ASTM-E1827. The test shall be conducted with the dwelling unit as if it were exposed to outdoor air on all sides, top and bottom by opening doors and windows of adjacent dwelling units. 02 6.2 Instructions and Labeling.Information on the ventilation design and/or ventilation systems installed, instructions on their proper operation to meet the requirements of this standard, and instructions detailing any required maintenance (similar to that provided for HVAC systems) shall be provided to the owner and the occupant of the dwelling unit. Controls shall be labeled as to their function (unless that function is obvious, such as toilet exhaust fan switches). See Chapter 13 of Guideline 24 5 for information on instructions and labeling. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 3 of 5) Registration Number: 220-P010039864D-000-001-M27001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:10:59 F. Other Requirements The items listed below (6.1 through 6,6 abd 6.8 through 6.9) correspond to the information given in ASHRAE 62.2 Section 6 "Other Requirements". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.8) for information describing these "Other Requirements". The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 6.1 through 6.9 if applicable. 03 6.3 Clothes Dryers.Clothes dryers shall be exhausted directly to the outdoors. Exception: Condensing dryers plumbed to a drain. 04 6.4 Combustion and Solid-Fuel Burning Appliances.      6.4.1 Combustion and solid-fuel burning appliances must be provided with adequate combustion and ventilation air and vented in accordance with manufacturer installation instructions, NFPA 54 ANSI Z223.1,National Fuel Gas Code , NFPA 31,Standard for the Installation of Oil-Burning Equipment , or NFPA 211,Standard for Chimneys, Fireplaces, Vents, and Solid-Fuel Burning Appliances , or other equivalent code acceptable to the building official.      6.4.2 Where atmospherically vented combustion appliances or solid-fuel burning appliances are located inside the pressure boundary, the total net exhaust flow of the two largest exhaust fans (not including a summer cooling fan intended to be operated only when windows or other air inlets are open) shall not exceed 15 cfm/100 ft 2 (75 L/s per 100 m 2) of occupiable space when in operation at full capacity. If the designed total net flow exceeds this limit, the net exhaust flow must be reduced by reducing the exhaust flow or providing compensating outdoor airflow. Atmospherically vented combustion appliances do not include direct-vent appliances. Combustion appliances that pass safety testing performed according to ANSI/BPI-1200, Standard Practice for Basic Analysis of Buildings, 21 shall be deemed as complying with Section 6.4.2 05 6.5 Air Tightness Requirements      6.5.1 Garages.When an occupiable space adjoins a garage, the design must prevent migration of contaminants to the adjoining occupiable space. Air seal the walls, ceilings, and floors that separate garages from occupiable space. To be considered air sealed, all joints, seams, penetrations, openings between door assemblies and their respective jambs and framing, and other sources of air leakage through wall and ceiling assemblies separating the garage from the residence and its attic area shall be caulked, gasketed, weather stripped, wrapped, or otherwise sealed to limit air movement. Doors between garages and occupiable spaces shall be gasketed or made substantially airtight with weather stripping. 06 6.6 Ventilation Opening Area.Spaces shall have ventilation openings as listed below. Such openings shall meet the requirements of Section 6.8. Exception: Attached dwelling units and spaces that meet the local ventilation requirements set for bathrooms in Section 5 [of ASHRAE 62.2].      6.6.1 Habitable Spaces.Each habitable space shall be provided with ventilation openings with an openable area not less than 4% of the floor area or less than 5 ft2 (0.5 m2).      6.6.1 Toilets and Utility Rooms Toilets and utility rooms shall be provided with ventilation openings with an openable area not less than 4% of the floor area or less than 1.5 ft2 (0.5 m2). Exceptions: 1.Utility rooms with a dryer exhaust duct. 2.Toilet compartments in bathrooms. 07 6.8 Air Inlets.Air inlets that are part of the ventilation design shall be located a minimum of 10 ft (3 m) from known sources of contamination such as a stack, vent, exhaust hood, or vehicle exhaust. The intake shall be placed so that entering air is not obstructed by snow, plantings, or other material. Forced air inlets shall be provided with rodent/insect screens (mesh not larger than 1/2 inch [13 mm]). 1.Ventilation openings in the wall may be as close as a stretched-string distance of 3 ft (1 m) from sources of contamination exiting through the roof or dryer exhausts. 2.No minimum separation distance shall be required between windows and local exhaust outlets in kitchens and bathrooms. 3.Vent terminations covered by and meeting the requirements of the National Fuel Gas Code NFPA 54/ ANSI Z223.1)7 or equivalent. 4.Where a combined exhaust/intake termination is used to separate intake air from exhaust air originating in a living space other than kitchens, no minimum separation distance between these two openings is required. For these combined terminations, the exhaust air concentration within the intake air shall not exceed 10%, as established by the manufacturer. 08 6.9 Carbon Monoxide Alarms.A carbon monoxide alarm shall be installed in each dwelling unit in accordance with NFPA 720,Standard for the Installation of Carbon Monoxide (CO) Detection and Warning Equipment 14, and shall be consistent with requirements of applicable laws, codes, and standards. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 4 of 5) Registration Number: 220-P010039864D-000-001-M27001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:10:59 G. Air Moving Equipment The items listed below (7.1 through 7.4) correspond to the information given in ASHRAE 62.2 Section 7 "Air-Moving Equipment". Refer also to Chapter 4.6 of the Residential Compliance Manual (Section 4.6.9) for information describing these requirements in more detail. The signature of the Responsible Person in the declaration statement below certifies that the building complies with these requirements specified in ASHRAE 62.2 Section 7.1 through 7.4 if applicable. 01 7.1 Selection and Installation.Ventilation devices and equipment shall be tested and listed in accordance with ANSI/ASHRAE Standard 51/ AMCA 210,Laboratory Methods of Testing Fans for Aerodynamic Performance Rating, and ANSI/AMCA Standard 300,Reverberant Room Method for Sound Testing of Fans, and rated in accordance with the airflow and sound rating procedures of the Home Ventilating Institute (HVI) (HVI 915,Loudness Testing and Rating Procedure; HVI 916 Airflow Test Procedure; and HVI 920,Product Performance Certification Procedure Including Verification and Challenge). Installations of systems or equipment shall be carried out in accordance with manufacturers' design requirements and installation instructions. 02 7.2 Sound Ratings for Fans.Ventilation fans shall be rated for sound at no less than the minimum airflow rate required by this standard, as noted below. These sound ratings shall be at a minimum of 0.1 in. w.c. (25 Pa) static pressure in accordance with the HVI procedure referenced in 7.1. Exception: HVAC air handlers and remote mounted fans need not meet sound requirements. To be considered for this exception, a remote mounted fan must be mounted outside the habitable spaces, bathrooms, toilets, and hallways, and there must be at least 4 ft (1 m) of ductwork between the fan and the intake grille.      7.2.1 Dwelling Unit Ventilation or Continuous Local Exhaust Fans.These fans shall be rated for sound at a maximum of 1.0 sone.      7.2.2 Demand-Controlled Local Exhaust Fans.Bathroom exhaust fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone, Kitchen exhaust fans used to comply with Section 5.2 shall be rated for sound at a maximum of 3 sone at one or more airflow settings greater than or equal to 100 cfm (47 L/s). Exceptions: 1.Fans with minimum airflow settings exceeding 400 cfm (189 L/s) need not comply. 2.Kitchen Range hoods may be rated for sound at the static pressure determined at working speed as specified in HVI 916 section 7. 03 7.3 Exhaust Ducts.      7.3.1 Multiple Exhaust Fans Using One Duct.Exhaust fans in separate dwelling units shall not share a common exhaust duct. If more than one of the exhaust fans in a dwelling unit shares a common exhaust duct, each fan shall be equipped with a back draft damper to prevent the recirculation of exhaust air from one room to another through the exhaust ducting system.      7.3.2 Single Exhaust Fan Ducted to Multiple Inlets.Where exhaust inlets are commonly ducted across multiple dwelling units, one or more exhaust fans located downstream of the exhaust inlets shall be designed and intended to run continuously, or a system of one or more backdraft dampers shall be installed to isolate each dwelling unit from the common duct when the fan is not running. 04 7.4 Supply Ducts.Where supply outlets are commonly ducted across multiple dwelling units, one or more supply fans located upstream of the supply inlets shall be designed and intended to run continuously, or a system of one or more backdraft dampers shall be installed to isolate each dwelling unit from the common duct when the fan is not running. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-27-H Indoor Air Quality and Mechanical Ventilation (Page 5 of 5) Registration Number: 220-P010039864D-000-001-M27001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20200401 Report Generated: 2021-10-15   07:10:59 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:24:46 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-M32001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:28:13 CERTIFICATE OF INSTALLATION CF2R-MCH-32-H Local Mechanical Exhaust (Page 1 of 4) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 Title 24, Part 6, Section 150.0(o)Ventilation for Indoor Air Quality.All dwelling units shall meet the requirements of ANSI/ASHRAE Standard 62.2. Ventilation and Acceptable Indoor Air Quality in Low-Rise Residential Buildings.Equation and table numbering on this form corresponds to the numbering for that information in the published ANSI/ASHRAE Standard 62.2-2010 A. Local Mechanical Exhaust - General Information 01 Dwelling Unit Name Unit 1 (53595 Avenida Vallejo - APN 774122017) 02 Building Type Single family attached 03 Total Kitchen Floor Area 1023 04 Kitchen Average Ceiling Height 8 05 Kitchen Total Conditioned Volume 8184 06 Kitchen Type Non-Enclosed 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-32-H Local Mechanical Exhaust (Page 2 of 4) Registration Number: 220-P010039864D-000-001-M32001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:28:13 B. Local Mechanical Exhaust System - Fan selection and duct design criteria for compliance Local mechanical exhaust fans shall be installed in each kitchen and bathroom. Delivered local ventilation rates: •All local ventilation rates have been measured using a flow hood, flow grid, or other airflow measuring device and meet the requirements of 62.2 Tables 5.1 or 5.2. OR •The airflow rating at a pressure of 0.25 in. w.c. of a certified fan is assumed because the local ventilation system duct sizing meets the prescriptive requirements of 62.2 Table 5.3, or manufacturer's design criteria. Table 5.1 Intermittent Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 100 cfm Vented range hood (including appliance-range hood combinations) required if exhaust fan flow is less than 5 ACH. Bathroom 50 cfm Table 5.2 Continuous Local Ventilation Exhaust Airflow Rates Application Airflow Notes Kitchen 5 ACH Based on Kitchen volume. Bathroom 20 cfm Table 5.3 Prescriptive Duct Sizing Requirements Duct Type Flex Duct Smooth Duct Fan Rating cfm @ 0.25 in. w.g. 50 80 100 125 50 80 100 125 Maximum Allowable Duct Length (ft) Diameter, (in)Flex Duct Smooth Duct 3 X X X X 5 X X X 4 70 3 X X 105 35 5 X 5 NL 70 35 20 NL 135 85 55 6 NL NL 125 95 NL NL NL 145 7 and above NL NL NL NL NL NL NL NL This table assumes no elbows. Deduct 15 ft of allowable duct length for each turn, elbow, or fitting. Interpolation and extrapolation in 62.2 Table 5.3 is not allowed. For airflow values not listed, use the next higher value. This table is not applicable for airflow > 125 cfm. NL = no limit on duct length of this size. X = not allowed, any length of duct of this size with assumed turns, elbows, fittings will exceed the rated pressure drop. C. Kitchen Exhaust Systems 01 02 03 04 05 06 07 08 09 10 11 System Name Manufactur er Name System Type HVI or AHAM Directory Listed Model Number HVI or AHAM Directory Listed Rated Airflow HVI or AHAM Directory Listed Sound Rating Minimum Airflow (defaults to rated airflow) Operation Schedule Required Minimum Ventilation Rate (if demand controlled) Maximum Sound Rating Compliance Statement Hood #1 ALLTRADE Downdraft 45215825 754 0.3 754 Continuous N/A - See Table D 1 sone Complies 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-32-H Local Mechanical Exhaust (Page 3 of 4) Registration Number: 220-P010039864D-000-001-M32001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:28:13 D. Continuous Kitchen Exhaust 01 Total Continuous Ventilation Airflow 754 02 Required Minimum Continuous Ventilation Airflow 682 03 Compliance Statement Complies E. Other Requirements 01 Demand control exhaust system shall be provided with at least one of the following: 1.A readily accessible occupant-controlled on-off control. 2.An automatic control that does not impeded occupant on control. 02 Nonenclosed kitchens shall be provided with a demand-controlled mechanical exhaust system. 03 Each continuous mechanical exhaust system shall be provided with a readily accessible manual on-off control. (Multifamily dwellings are exempt from readily accessible requirement. ) 04 Continuous mechanical exhaust systems shall be designed to operate during all occupiable hours. 05 Exhaust fans in separate dwelling units shall not share a common exhaust duct. Exhaust inlets from more than one dwelling unit may be served by a single exhaust fan downstream of all the exhaust inlets if the fan is designated and intended to run continuously or if each inlet is equipped with a back-draft damper to prevent cross-contamination when the fan is not running. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-MCH-32-H Local Mechanical Exhaust (Page 4 of 4) Registration Number: 220-P010039864D-000-001-M32001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:28:13 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable):   2021-10-15 07:29:56 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-B22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:06 CERTIFICATE OF INSTALLATION CF2R-PLB-22-H HERS Verified Single Dwelling Unit Hot Water System Distribution (Page 1 of 5) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. Design HERS Verified Dwelling Unit Water Heating Systems Information This table reports the water heating system features that were specified on the registered CF1R compliance document for this project. 01 02 03 04 05 06 07 08 09 10 11 12 Dwelling Unit Name Water Heating System ID or Name Water Heating System Type Water-Heater Type # of Like (or Identical) Water Heaters in System Fuel Type Rated Input Type Rated Input Value Central DHW System Distribution Type Dwelling Unit DHW System Distribution Type Compact Distrib. Drain Water Heat Recovery Single Family DHW Sys 1 Domestic Hot Water (DHW) Consumer Instantaneous 1 Natural Gas Btu/Hr 200000 NA HERS Verified Pipe Insulation credit None None B. Installed HERS Verified Dwelling Unit Water Heating Systems Information This table reports the water heating system features that were installed in this project. 01 02 03 04 05 06 07 08 09 10 11 12 Dwelling Unit Name Water Heating System ID or Name Water Heating System Type Water-Heater Type # of Like (or Identical) Water Heaters in System Fuel Type Rated Input Type Rated Input Value Central DHW System Distribution Type Dwelling Unit DHW System Distribution Type Compact Distrib. Drain Water Heat Recovery Single Family DHW Sys 1 Domestic Hot Water (DHW) Consumer Instantaneous 1 Natural Gas Btu/Hr 200000 NA HERS Verified Pipe Insulation credit None None C. Design HERS Verified Dwelling Unit Water Heating Efficiency Information This table reports the water heater(s) efficiency features specified on the registered CF1R compliance document for this project. 01 02 03 04 05 06 07 Water Heating System ID or Name Heating Efficiency Type Heating Efficiency Value Standby Loss (%)Exterior Insul. R-Value Water Heater Storage Volume (gal) Tank Location Single Family UEF 0.95 n/a 0 n/a n/a 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-PLB-22-H HERS Verified Single Dwelling Unit Hot Water System Distribution (Page 2 of 5) Registration Number: 220-P010039864D-000-001-B22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:06 D. Installed HERS Verified Dwelling Unit Water Heating Efficiency Information This table reports the water heating system features that were installed in this project. 01 02 03 04 05 06 07 Water Heating System ID or Name Heating Efficiency Type Heating Efficiency Value Standby Loss (%)Exterior Insul. R-Value Water Heater Storage Volume (gal) Tank Location Single Family UEF 0.95 n/a 0 0 n/a E. Installed Water Heater Manufacturer Information 01 02 03 Water Heating System ID or Name Manufacturer Model Number Single Family AO Smith 369j4521 F. Mandatory Measures For All Domestic Hot Water Distribution Systems 01 Equipment shall meet the applicable requirements of the Appliance Efficiency Regulations (Section 110.3(b)1). 02 Unfired storage tanks are insulated with an external R-12 or combination of R-16 internal and external Insulation. (Section 110.3(c)4). 03 All domestic hot water pipes shall be insulated as specified in Section 609.11 of the California Plumbing Code. In addition, the following piping conditions shall have a minimum insulation wall thickness of 1 inch or a minimum insulation R-value of 7.7 (RA4.4.1) •The first 5 feet (1.5 meters) of cold water pipes from the storage tank. •All piping with a nominal diameter of 3/4 inch (19 millimeter) and less than 1 inch.. •All hot water pipes from the heating source to the kitchen fixtures. •Piping from the heating source to storage tank or between tanks. •All piping associated with a recirculation system. •All underground piping. •Insulation buried below grade must be installed in a waterproof and non-crushable casing or sleeve. •Piping that penetrates framing members shall not be required to have pipe insulation for the distance of the framing penetration. Piping that penetrates metal framing shall use grommets, plugs, wrapping or other insulating material to assure that no contact is made with the metal framing. Insulation shall butt securely against all framing members. •Piping installed in interior or exterior walls that is surrounded on all sides by at least 1 inch (2.5 cm) of insulation. •Piping installed in crawl space with a minimum of 1 inch (2.5 cm) of crawl space insulation above and below. •Piping installed in attics with a minimum of 4 inches (10 cm) of attic insulation on top •Piping insulation shall fit tightly and all elbows and tees shall be fully insulated. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-PLB-22-H HERS Verified Single Dwelling Unit Hot Water System Distribution (Page 3 of 5) Registration Number: 220-P010039864D-000-001-B22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:06 F. Mandatory Measures For All Domestic Hot Water Distribution Systems 04 For Gas or Propane Water Heaters: Ensure the following are installed (Section 150.0(n)) 1.A dedicated 120V, 20A electrical receptacle connected to the electrical panel with a 120/240V 3 conductor, 10AWG copper branch circuit, within 3 feet from the water heater and accessible with no obstructions 1.The conductor shall be labeled with the word "Spare" on both ends; and 2.A reserved single pole circuit breaker space next to the circuit breaker next to the branch circuit labeled "Future" 240V shall be provided. 2.A Category III or IV vent, or a Type B vent with straight pipe between outside and water heater 3.A condensate drain no more than 2 inches higher than the base on water heater for natural draining 4.A gas supply line with capacity of at least 200,000 Btu/Hr The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. G. HERS Verified Compact Hot Water Distribution Expanded Credit (CHWDS-H-EX) RA3.6.5 This section does not apply to this project. H. Compact Hot Water Distribution (CHWDS) RA4.4.6 This section does not apply to this project. I. HERS-Verified Drain Water Heat Recovery System (DWHR-H) (RA3.6.9) This section does not apply to this project. J. HERS-Verified Pipe Insulation Credit Requirements (PIC-H) (RA3.6.3) Systems that utilize this distribution type shall comply with these requirements 01 HERS rater shall perform a visual inspection that all hot water piping comply with the insulation requirements in 150.0(J) The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. K. HERS-Verified Parallel Piping Requirements (PP-H) (RA3.6.4) This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-PLB-22-H HERS Verified Single Dwelling Unit Hot Water System Distribution (Page 4 of 5) Registration Number: 220-P010039864D-000-001-B22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:06 L. Parallel Piping Requirements (PP) (RA4.4.4) This section does not apply to this project. M. Point of Use Requirements (POU) (RA4.4.5) This section does not apply to this project. N. Mandatory Requirements For All Recirculation Systems (RA4.4.7) This section does not apply to this project. O. Recirculation Non-Demand Controls Requirements (R-ND) (RA4.4.8) This section does not apply to this project. P. Demand Recirculation Manual Control (R-DRmc) (RA4.4.9)/ Sensor Control Requirements (RDRsc) (RA4.4.10) This section does not apply to this project. Q. HERS-Verified Demand Recirculation Manual Control (RDRmc-H) (RA3.6.6)/ Sensor Control (RDRsc - H) (RA3.6.7)Requirements This section does not apply to this project. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-PLB-22-H HERS Verified Single Dwelling Unit Hot Water System Distribution (Page 5 of 5) Registration Number: 220-P010039864D-000-001-B22001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards - 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:06 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I understand that a HERS rater will check the installation to verify compliance and if such checking determines the installation fails to comply, I am required to offer any necessary corrective action at no charge to the building owner. 5.I will ensure that a registered copy of this Certificate of Installation shall be posted, or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed: Third Party Quality Control Program (TPQCP) Status:Name of TPQCP (if applicable): 2021-10-15 07:29:56 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05 Registration Number: 220-P010039864D-000-001-V01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:03 CERTIFICATE OF INSTALLATION CF2R-PVB-01-E Photovoltaic Systems (Page 1 of 3) Project Name: 53595 Avenida Vallejo - APN 774122017 - MH Enforcement Agency: City of La Quinta Permit Number: 2021- Dwelling Address: 53595 Avenue Vallejo City: La Quinta Zip Code: 92253 A. General Information 01 Project Location (City)La Quinta 02 Building type Single family 03 Climate Zone 15 04 Method of Compliance:Performance 05 Qualifying Exceptions NA 06 Community Solar n/a B. Design Photovoltaic Systems Information 01 02 03 04 05 06 07 08 09 10 11 12 13 PV Array ID or Name Adjusted Minimum PV Size (kW) Adjusted Value from Exception Module Type CFI Azimuth (deg) Tilt Input (deg/Pitc h) Angle/Tilt Annual Solar Access (%) Inverter Efficiency (%) Shading Requirem ent Complian ce Path Array Type Module Level Power Eletronics PV Array #1 5.19 5.19 Standard 1 165.0 TiltPitch 7 100 96 MinimalS hadingCri tierion Fixed none 14 Total DC System Size (kW)5.19 C. Installed Photovoltaic Systems Information 01 02 03 04 05 06 07 08 09 10 PV Array ID or Name DC System Size (kW) Module Type Azimuth (deg) Tilt Input (deg/Pitch)Angle/Tilt Annual Solar Access (%) Inverter Efficiency (%) Array Type Module Level Power Eletronics PV Array #1 5.19 Standard 156 TiltPitch 5 100 96 Fixed Microinverte rs 11 Total DC System Size (kW)5.19 D. Shading Requirement Annual Solar Access Input The shading condition of the PV array must be properly accounted for in the performance calculation by the annual solar access input. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-PVB-01-E Photovoltaic Systems (Page 2 of 3) Registration Number: 220-P010039864D-000-001-V01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:03 E. Solar Access Verification 01 The installer shall provide documentation that demonstrates the shading condition of the actual installation of the PV module is consistent with the shading requirement in Table D. The verification must be done by measurements from an approved solar assessment tool or other CEC approved alternative methods. The satellite, drone or other digital image of the obstructions that cast shadows on the PV array must be created and dated after the installation of the photovoltaic system. If the image is dated before the installation, then additional on-site pictures must be attached to clearly show that the installed system matches the system modeled in the solar assessment report. The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. F. System Monitoring Requirements All installed PV systems must have a working web based portal and a mobile device application provide access to the following information: 01 Nominal kW rating of the PV system 02 Number of PV modules and nominal watt rating of each module 03 Hourly (or 15 min), daily, monthly and annual kWh production in numeric and graphic format 04 Running toal of daily kWh production 05 Daily kW peak power production 06 Current kW production of the entire PV system The responsible person's signature on this compliance document affirms that all applicable requirements in this table have been met. G. Qualifying Exception Requirement This section does not apply to this project. H. SMUD Solar Share Program This section does not apply to this project. I. Compliance Statement 01 Pass - dwelling does comply with the Photovoltaic System requirements 2021-10-15 07:31:05 CERTIFICATE OF INSTALLATION CF2R-PVB-01-E Photovoltaic Systems (Page 3 of 3) Registration Number: 220-P010039864D-000-001-V01001A-0000 Registration Date/Time:    HERS Provider: CalCERTS CA Building Energy Efficiency Standards 2019 Residential Compliance Report Version: 2019.1.005 Schema Version: rev 20210501 Report Generated: 2021-10-15   07:32:03 Documentation Author's Declaration Statement 1. I certify that this Certificate of Installation documentation is accurate and complete. Documentation Author Name: Tom Bachus Documentation Author Signature: Company: MLC Building Performance Signature Date: Address: 77825 Delaware Place CEA/ HERS Certification Identification (if applicable): City/State/Zip: Palm Desert CA 92211 Phone: 760-836-0066 Responsible Person's Declaration statement I certify the following under penalty of perjury, under the laws of the State of California: 1.The information provided on this Certificate of Installation is true and correct. 2.I am either: a) a responsible person eligible under Division 3 of the Business and Professions Code in the applicable classification to accept responsibility for the system design, construction, or installation of features, materials, components, or manufactured devices for the scope of work identified on this Certificate of Installation, and attest to the declarations in this statement, or b) I am an authorized representative of the responsible person and attest to the declarations in this statement on the responsible person’s behalf. 3.The constructed or installed features, materials, components or manufactured devices (the installation) identified on this Certificate of Installation conforms to all applicable codes and regulations and the installation conforms to the requirements given on the Certificate of Compliance, plans, and specifications approved by the enforcement agency. 4.I will ensure that a registered copy of this Certificate of Installation shall be posted or made available with the building permit(s) issued for the building, and made available to the enforcement agency for all applicable inspections. I understand that a registered copy of this Certificate of Installation is required to be included with the documentation the builder provides to the building owner at occupancy. Responsible Builder/Installer Name: Blanca Victoria Responsible Builder/Installer Signature: Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) VIC'S AIR CONDITIONING INC Position With Company (Title): Management Address: P O BOX 215 CSLB License: 756658 City/State/Zip: THOUSAND PALMS CA 92276 Phone: 760-343-5033 Date Signed:   2021-10-15 07:29:56 2021-10-15 07:31:05 Digitally signed by CalCERTS. This digital signature is provided in order to secure the content of this registered document, and in no way implies Registration Provider responsibility for the accuracy of the information. 2021-10-15 07:31:05