LAQ-15-BP-002ADDITIONAL SITES
CHRONOLOGY
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
E-MAIL BURT HANADA 8/11/2016 8/11/2016
REQUEST FOR APPLICATION EXTENSION RECEIVED AND
CONDITIONALLY APPROVED TO BEDROS. FEES PAID ON
8/19/16. EXTENSION GRANTED TO 11/9/2016. SEE
ATTACHMENTS FOR EMAIL CORRESPONDENCE.
NOTE ARMANDO MAGALLON 9/27/2018 9/27/2018 REV ISSUED
NOTE ARMANDO MAGALLON 10/11/2018 10/11/2018 EXTENSION FEE PAID AND APPROVED BY JW. NEW
EXPIRATION DATE IS 11/23/2018
NOTE ARMANDO MAGALLON 3/20/2019 3/20/2019 RE-INSPECTION FEE ADDED PER JFU
NOTE JIM JOHNSON 3/27/2015 4/8/2015 CORRECTIONS REQUIRED
Description: AMERICAN TIRE DEPOT, SDP 2013-936
Type: BUILDING COMMERCIAL Subtype: STORES/CUSTOMER
SERVICE
Status: FINALED Applied: 12/19/2014 MFA
Parcel No: 600010023 Site Address: 79762 HIGHWAY 111 LA QUINTA,CA 92253 Approved: 11/8/2016 JJO
Subdivision: PM 28593 Block: Lot: 2 Issued: 11/8/2016 MFA
Lot Sq Ft: 0 Building Sq Ft: 0 Zoning: Finaled: 2/3/2020 AOR
Valuation: $274,131.90 Occupancy Type: Construction Type: Expired:
No. Buildings: 0 No. Stories: 0 No. Unites: 0
Details: 8/11/2016 - PLAN CHECK FEES & EXTENSION PROCESSING FEE PAID. APPLICATION EXTENSION GRANTED TO NOVEMBER 9, 2016 TO
PURCHASE PERMIT.
NEW 6720 SQ. FT. COMMERCIAL TIRE SHOP. 715 SQ. FT. IS A/C. GREASE INTERCEPTOR WAS WAIVED BY CVWD SARA LOPEZ.
BUILDING IS FIRE SPRINKLED PER 2013 UBC'S
REVISION 1 - REVISED ROOF FRAMING - ADD BEAM TO ATTACH AND SUPPORT FIRE SPRINKLER SYSTEM PIPING.
REVISION #3 - REVISED PANEL SCHEDULES WITH REVISED ELECTRICAL PLAN TO MATCH.
Recheck address. Other Permits and Parcel information shows 79840 Hwy 111.
Printed: Wednesday, March 01, 2023 11:57:37 AM 1 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
NOTE KAY HENSEL 1/7/2015 1/7/2015 1 PLAN SET & PLANNING COMMENTS PICKED UP FROM
BUCKET ROOM. COMMENTS INSERTED INTO FOLDER
NOTE MARY FASANO 3/16/2018 3/16/2018
PER RON, HE WENT OUT FOR A SPECIAL INSPECTION AND
THEY FAILED. SO HE WILL BE GOING OUT ON HIS DAY OFF
AND TOLD CONTRACTOR HE WOULD OWE FOR THIS
INSPECTION.
OFFICE MEETING JIM JOHNSON 11/24/2015 11/24/2015
SPOKE WITH BURT ABOUT THE CORRECTION RESPONSES.
HAVE NO RESPONSES FROM APPLICANT. PLAN CHECK HAS
EXPIRED, WILL NEED A EXTENTION LETTER.
PLAN CHECK COMMENTS
FROM CONSULTANT
RECEIVED
KAY HENSEL 1/12/2015 1/12/2015 STRUC RFC 1/9/2015
PLAN CHECK COMMENTS
FROM CONSULTANT
RECEIVED
PHILIP JUAREZ 4/6/2015 4/6/2015
PLAN CHECK PICKED UP MARY FASANO 10/5/2016 10/5/2016 CORRECTIONS PICKED UP FOR SCHOOL FEES AND RESTAMP
CALCS
PLAN CHECK PICKED UP PHILIP JUAREZ 1/12/2015 1/12/2015 PLANS PICKED UP BY HRAG SABOUN DJAN.
PLAN CHECK SUBMITTAL
RECEIVED KAY HENSEL 12/19/2014 12/19/2014 1 SET TO PLANNING, STRUC TO YOUNG
PLAN CHECK SUBMITTAL
RECEIVED MARY FASANO 9/26/2016 9/27/2016 PLANS WERE SUBMITTED TO STEPH AND I PROCESSED
PLAN CHECK SUBMITTAL
RECEIVED STEPHANIE KHATAMI 3/25/2015 3/25/2015
PUBLIC COUNTER VISIT AARON HICKSON 2/7/2019 2/7/2019
ALLEN ALBERT STOPPED IN TO ASK ABOUT RELOCATING
HANDICAP SPOT. INFORMED HIM TO C=ALL JF AND SEE IF
PLAN NEEDED TO BE SUBMITTED.
Printed: Wednesday, March 01, 2023 11:57:37 AM 2 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
PUBLIC COUNTER VISIT ARMANDO MAGALLON 10/3/2018 11/8/2018
TILE WORKER, JACK, STOPPED BY BECAUSE THERE WAS NO
POWER TO HIS TEMP METER. HE CONTACTED ,SHATI FROM
CORPORATE, WHO WANTED THE POWER BACK ON SO HE
COULD PLACE THE TILE. I LET BOTH OF THEM KNOW THAT WE
DID NOT HAVE ANYTHING TO DO WITH THE POWER BEING
OFF AND THAT THEY NEEDED TO CONTACT IID. WE CALLED
IID AND THEY SAID THE METER WAS SHUT OFF AND THEY
NEEDED A SPECIAL INSPECTION FROM US(THE BUILDING
DEPARTMENT) TO REINSTATE POWER.
I LET JACK KNOW THAT THE CONTRACTOR NEEDED TO APPLY
FOR AN IID RELEASE TO TURN POWER BACK ON.
JACK SAID HE WOULD CONTACT CORPORATE AND LET THEM
KNOW SO THAT THEY SEND THE CONTRACTOR TO APPLY FOR
THIS PERMIT.
RESUBMITTAL PHILIP JUAREZ 7/29/2015 7/29/2015
PLANS RESUBMITTED BY GIL SAENZ GAVE TO KAY . BURT &
JIMMY SPOKE TO MR.SAENZ ABOUT RESUBMITTAL AND
SAID IT WAS OK TO TAKE IN.
SENT TO PLAN CHECK
CONSULTANT STEPHANIE KHATAMI 3/25/2015 3/26/2015
TELEPHONE CALL JAKE FUSON 9/19/2018 9/19/2018
NOTIFIED BEDROS DARKJIAN THAT REVISION 1 PLANS WERE
APPROVED AND FEES WERE READY TO BE PAID IN ORDER TO
ISSUE APPROVED PLANS.
TELEPHONE CALL JIM JOHNSON 1/12/2015 1/12/2015 CALLED BEDROS DARKJIAN TO INFORE HIM PLANS READY
FOR CORRECTIONS.
TELEPHONE CALL JIM JOHNSON 4/8/2015 4/8/2015
CALLED BEDROS DARKJIAN TO INFORM HIM PLANS REQUIRE
CORRECTIONS, BUILDING AND PLANNING DEPT. FEES HAVE
NOT BEEN FINALISED
TELEPHONE CALL AJ ORTEGA 11/7/2016 11/7/2016
SPOKE WITH REPRESENTITIVE FROM CONSTRUCTION
COMPANY (626-278-5828), THEY CALLED TO FIND OUT WHAT
THEY NEED TO PULL THE PERMIT, FROM THE NOTES ON FILE
THE FOLLOWING IS REMAINING: CITY BUSINESS LICENSE,
RECYCLING REPORT, SCHOOL FEE PAYMENT AND PLANNING
APPROVAL.
Printed: Wednesday, March 01, 2023 11:57:37 AM 3 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
CONDITION
TYPE CONTACT DATE
ADDED
DATE
REQUIRED
DATE
SATISFIED STATUS REMARKS NOTES
READY TO ISSUE
CHECKLIST JIM JOHNSON 2/4/2016 11/8/2016 11/8/2016 COMPLETE
CORRECTIONS STILL PENDING FOR BUILDING,
FIRE AND PLANNING DEPTS. SEE CORRECTIONS &
REVIEW COMMENTS
8/11/2016 FIRE DEPT APPROVED, REV REQ FOR
PLANNING DEPT, BUILDING NEEDS TO DO
RECHECK. PLANS HAVE NOT BEEN RESUBMITTED.
FIRE DEPT APPROVAL EXPIRED 8/11/2016,
PLANNING AND P/W DEPT CORRECTION
PENDING, SCHOOL FEES DUE, SOILS REPORT&
TITLE-24 STAMPS EXPIRED NEED NEW COPIES.
PLANNING DEPT CORRECTIONS STILL PENDING.
SPOKE WITH LISA, FIRE CAN EXTEND THEIR
PERMIT/APPROVAL BASED ON BUILDINGS
EXTENSION APPROVAL, ATTACHED FIRE LETTER
IS STILL VALID WITH CONDITIONS.
SPOKE WITH REPRESENTITIVE FROM
CONSTRUCTION COMPANY (626-278-5828), THEY
CALLED TO FIND OUT WHAT THEY NEED TO PULL
THE PERMIT, FROM THE NOTES ON FILE THE
FOLLOWING IS REMAINING: CITY BUSINESS
LICENSE, RECYCLING REPORT, SCHOOL FEE
PAYMENT AND PLANNING APPROVAL.
TELEPHONE CALL KOHL HETRICK 11/12/2019 11/12/2019
SPOKE WITH GC AND UPDATED AS TO ALL PERMIT STATUS'
POINTS. FIRE SPRINKLER PERMIT SHOWS AS NEVER FINALED
AND EXPIRED (SPRINKLER CONTRACTOR CSLB IS ALSO
EXPIRED).
NEED TO ALSO DO A FIRE/LIFE SAFETY INSPECTION PRIOR TO
"STOCK AND TRAIN" CLEARANCE. A FINAL FOR OCCUPANCY
INSPECTION WILL BE NECESSARY TO OBSERVE THE
OPERATION OF THE FACILITY WHEN FULLY STOCKED AND
READY TO OPPERATE.
CONDITIONS
Printed: Wednesday, March 01, 2023 11:57:37 AM 4 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT 99› ONLY STORES P O BOX 35547 TULSA OK 92253
CONTRACTOR S D DESIGN CONSTRUCTION CORP 1029 MEADOWSIDE
STREET
WEST COVINA CA 91792
OWNER AVA PROPERTY INVESTMENT LLC 14407 ALONDRA BLVD LA MIRADA CA 90638
OWNER
MAILING
ADDRESS
AVA PROPERTY INVESTMENT LLC 4490 AYERS AVE VERNON CA 90058
READY TO ISSUE
CHECKLIST JIM JOHNSON 2/4/2016 11/8/2016 11/8/2016 COMPLETE
PENDING BURRTEC WASTE PLAN, SCHOOL FEES
PAID, PLANNING APPROVED
SCHOOL FEES RECEIVED
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
PLAN CHECK/PERMIT
EXTENSION
PROCESSING
101-0000-42600 0 $107.27 $107.27 10/11/18 R40225 6376 CHECK S D DESIGN
CONSTRUCTION CORP AMA
PLAN CHECK/PERMIT
EXTENSION
PROCESSING
101-0000-42600 1 $97.17 $97.17 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
RE-INSPECTION FEE 101-0000-42400 0 $80.05 $80.05 3/20/19 R46715 851989 CREDIT
CARD ATV. INC AMA
Total Paid for ADMINISTRATIVE: $284.49 $284.49
ART IN PUBLIC PLACES -
COMMERCIAL 270-0000-43201 0 $1,370.66 $1,370.66 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for ART IN PUBLIC PLACES - AIPP: $1,370.66 $1,370.66
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1 $156.00 $156.00 9/27/18 MR624 2937 CHECK S D DESIGN
CONSTRUCTION CORP AMA
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1 $160.00 $160.00 4/8/19 R47576 00001 CREDIT
CARD BEDROS A DARKJIAN AHI
Printed: Wednesday, March 01, 2023 11:57:37 AM 5 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
HOURLY CHARGE - YES
ADMINISTRATIVE STAFF 101-0000-42600 2 $80.00 $80.00 9/27/18 MR624 2937 CHECK S D DESIGN
CONSTRUCTION CORP AMA
HOURLY CHARGE - YES
STRUCTURAL PLAN
REVIEW ENGINEER
101-0000-42600 0.25 $23.75 $23.75 9/27/18 MR624 2937 CHECK S D DESIGN
CONSTRUCTION CORP AMA
Total Paid for BLDG CITY STAFF - PER HOUR: $419.75 $419.75
BSAS SB1473 FEE 101-0000-20306 0 $11.00 $11.00 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for BUILDING STANDARDS ADMINISTRATION
BSA: $11.00 $11.00
Credit Card Fee 101-0000-43505 0 $2.88 $2.88 4/8/19 R47576 00001 CREDIT
CARD BEDROS A DARKJIAN AHI
Credit Card Fee 101-0000-43505 0 $1.44 $1.44 3/20/19 R46715 851989 CREDIT
CARD ATV. INC AMA
Credit Card Fee 101-0000-43505 0 $0.72 $0.72 11/1/19 R55602 0001 CREDIT
CARD BEDROS DARKJIAN JLIM
Credit Card Fee 101-0000-43505 0 $12.21 $12.21 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Total Paid for Credit Card Fee: $17.25 $17.25
DIF - CIVIC CENTER 252-0000-43200 0 $2,506.56 $2,506.56 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
DIF - FIRE PROTECTION 257-0000-43200 0 $1,155.84 $1,155.84 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
DIF - STREET
MAINTENANCE 255-0000-43200 0 $1,559.04 $1,559.04 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
DIF - TRANSPORTATION 250-0000-43200 0 $38,162.88 $38,162.88 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for DIF - GENERAL COMMERCIAL: $43,384.32 $43,384.32
TEMP POWER SERVICE 101-0000-42403 0 $24.17 $24.17 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Printed: Wednesday, March 01, 2023 11:57:37 AM 6 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
TEMP POWER SERVICE
PC 101-0000-42600 0 $16.92 $16.92 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Total Paid for ELECTRICAL: $41.09 $41.09
NON-RESIDENTIAL, EA
ADDITION 2,000SF 101-0000-42403 0 $108.78 $108.78 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
NON-RESIDENTIAL, EA
ADDITION 2,000SF, PC 101-0000-42600 0 $29.01 $29.01 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
NON-RESIDENTIAL,
FIRST 2,000SF 101-0000-42403 0 $108.77 $108.77 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
NON-RESIDENTIAL,
FIRST 2,000SF, PC 101-0000-42600 0 $84.12 $84.12 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Total Paid for ELECTRICAL - NEW CONSTRUCTION: $330.68 $330.68
FIRE COMMERCIAL TI 101-0000-42421 0 $312.00 $312.00 9/27/18 MR624 2937 CHECK S D DESIGN
CONSTRUCTION CORP AMA
Total Paid for FIRE FEES: $312.00 $312.00
CONDENSER/COMPRES
SOR 101-0000-42402 0 $36.26 $36.26 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
CONDENSER/COMPRES
SOR PC 101-0000-42600 0 $24.17 $24.17 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
EVAPORATIVE COOLER 101-0000-42402 0 $36.27 $36.27 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
EVAPORATIVE COOLER
PC 101-0000-42600 0 $36.27 $36.27 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
FURNACE 101-0000-42402 0 $36.26 $36.26 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
FURNACE PC 101-0000-42600 0 $24.17 $24.17 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
VENT FAN 101-0000-42402 0 $48.36 $48.36 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Printed: Wednesday, March 01, 2023 11:57:37 AM 7 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
VENT FAN PC 101-0000-42600 0 $19.32 $19.32 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Total Paid for MECHANICAL: $261.08 $261.08
MULTI-SPECIES
COMM/INDUSTRIAL -
2016 UPDATE
101-0000-20310 0 $4,851.39 $4,851.39 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for MULTI-SPECIES COMM/INDUSTRIAL - 2016
UPDATE: $4,851.39 $4,851.39
NEW CONSTRUCTION
PERMIT 101-0000-42400 0 $623.57 $623.57 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for NEW CONSTRUCTION PERMIT: $623.57 $623.57
NEW CONSTRUCTION
PLAN CHECK 101-0000-42600 0 $128.76 $128.76 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
NEW CONSTRUCTION
PLAN CHECK 101-0000-42600 0 $1,200.00 $1,200.00 12/19/14 R3254 2314 CHECK BEDROS DARKJIAN MFA
Total Paid for NEW CONSTRUCTION PLAN CHECK: $1,328.76 $1,328.76
BACKFLOW DEVICE 101-0000-42401 0 $12.09 $12.09 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
BACKFLOW DEVICE PC 101-0000-42600 0 $4.83 $4.83 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
BUILDING SEWER 101-0000-42401 0 $12.09 $12.09 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
BUILDING SEWER PC 101-0000-42600 0 $12.09 $12.09 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
FIXTURE/TRAP 101-0000-42401 0 $48.36 $48.36 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
FIXTURE/TRAP PC 101-0000-42600 0 $48.36 $48.36 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Printed: Wednesday, March 01, 2023 11:57:37 AM 8 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
GREASE INTERCEPTOR 101-0000-42401 0 $36.26 $36.26 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
GREASE INTERCEPTOR
PC 101-0000-42600 0 $12.09 $12.09 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
ROOF DRAIN 101-0000-42401 0 $48.36 $48.36 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
ROOF DRAIN PC 101-0000-42600 0 $48.26 $48.26 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
WATER HEATER/VENT 101-0000-42401 0 $24.18 $24.18 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
WATER HEATER/VENT
PC 101-0000-42600 0 $14.50 $14.50 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
WATER SYSTEM
INST/ALT/REP 101-0000-42401 0 $12.09 $12.09 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
WATER SYSTEM
INST/ALT/REP PC 101-0000-42600 0 $12.09 $12.09 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Total Paid for PLUMBING FEES: $345.65 $345.65
REPLACEMENT
INSPECTION CARD 101-0000-42600 1 $33.00 $33.00 3/7/18 R32869 CASH HENRY OKIEFE AHI
REPLACEMENT
INSPECTION CARD 101-0000-42600 1 $40.25 $40.25 11/1/19 R55602 0001 CREDIT
CARD BEDROS DARKJIAN JLIM
Total Paid for REPLACEMENT OF PLANS/JOB CARD: $73.25 $73.25
STORAGE RACKS, EA
ADDITIONAL 100 LF 101-0000-42404 0 $34.80 $34.80 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
STORAGE RACKS, FIRST
100 LF 101-0000-42404 0 $24.66 $24.66 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
STORAGE RACKS, FIRST
100 LF PC 101-0000-42600 0 $95.72 $95.72 8/19/16 R17966 2014-1047 CREDIT
CARD BEDRPS A DARKJIAN RSE
Total Paid for STORAGE RACKS: $155.18 $155.18
Printed: Wednesday, March 01, 2023 11:57:37 AM 9 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
INSPECTIONS
SEQID INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
UNDERGROUND PLBG AOR 12/22/2016 12/22/2016 APPROVED
SANITARY WASTE PIPING ONLY, PIPING RAN
TO NORTH (SOUTH SHOWN ON APPROVED
PLAN) DUE TO SEWER LATERAL BEING
SHOWN INCORRECTLY, THIS INSPECTION
DOES NOT INCLUDE SEWER CONNECTION.
TEMPORARY POWER AOR 12/28/2016 12/28/2016 APPROVED
FOOTINGS JFU 1/4/2017 1/4/2017 NOT READY
FOOTINGS AOR 1/12/2017 1/12/2017 DISAPPROVE
D
POP-OUTS NOT SET AT 24" WIDTH, PLAN
PROPOSES (2) ROWS OF 12" WIDE BLOCK
PER ARCHITECTURAL PLAN AND DETAIL19,
18/S2, ADDITIONALLY REBARD NOT ALL TIED
IN PLACE THROUGHOUT.
SLAB AOR 1/12/2017 1/12/2017 NOT READY TWO POUR PROPOSED, SLAB DOWELS NOT
INSTALLED PER APPROVED PLAN.
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
SMI - COMMERCIAL 101-0000-20308 0 $76.76 $76.76 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for STRONG MOTION INSTRUMENTATION SMI: $76.76 $76.76
INDUSTRIAL/AUTOMOT
IVE REPAIR 224-0000-20320 0 $6,158.41 $6,158.41 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for TUMF - INDUSTRIAL: $6,158.41 $6,158.41
TUMF - RETAIL
SERVICES 224-0000-20320 0 $4,262.96 $4,262.96 11/7/16 R19865 4432 CHECK AVA PROPERTY
INVESTMENT LLC TSA
Total Paid for TUMF - RETAIL SERVICES: $4,262.96 $4,262.96
TOTALS:$64,308.25 $64,308.25
Printed: Wednesday, March 01, 2023 11:57:37 AM 10 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
FOOTINGS AOR 1/13/2017 1/13/2017 NOT READY
RAINING AND WORK COULD NOT BE
CORRECTED IN TIME, WILL RECALL WHEN
READY.
SLAB AOR 1/13/2017 1/13/2017 NOT READY
RAINING AND WORK COULD NOT BE
CORRECTED IN TIME, WILL RECALL WHEN
READY.
FOOTINGS AOR 1/17/2017 1/17/2017 DISAPPROVE
D
UNABLE TO AGREE ON PLAN OF
CORRECTION WITH CONTRACTOR,
REINFORCEMENT STILL APPEARS TO BE
PLACED FOR 8" WIDE BLOCK, ADDITIONALLY
STRUCTURAL AND ARCHITECTURAL PLANS
DO NOT CORRELATE WITH POPOUTS, RFI
REQUESTED FROM EOR TO SPECIFICALLY
ADDRESS THESE ISSUES WITH DETAILING
AND PLAN REVISIONS IF NECESSARY.
OBSERVATION REPORT WILL NOT SUFFICE
AS WORK DOES NOT MATCH PLAN FOR
PLACEMENT, SPACING AND SIZE.
FOOTINGS AOR 2/8/2017 2/8/2017
APPROVED
W/EXCEPTIO
N
SPECIAL INSPECTION REPORT AND
STRUCTURAL OBSERVATION STILL
REQUIRED, SCHEDULED TO BE ONSITE JUST
AFTER MY TIME OF ARRIVAL, SPECIAL
INSPECTION REPORT NEEDS TO INCLUDE THE
FOLLOWING INSPECTOR OBSERVED
DEFICIENCY CORRECTIONS: 9C/SD2 COLUMN
AT EAST BAY OPENING AND CLEANING OF
DEBRIS THROUGHOUT FOOTINGS AND
PADS.
SLAB AOR 2/8/2017 2/8/2017
APPROVED
W/EXCEPTIO
N
SEE FOOTING COMMENTS
BOND BEAM AOR 2/15/2017 2/15/2017 PARTIALLY
APPROVED
1ST LIFT (4') AT ALL CMU WALLS, SPECIAL
INSPECTION REPORT REQUIRED.
Printed: Wednesday, March 01, 2023 11:57:37 AM 11 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
BOND BEAM AOR 2/27/2017 2/27/2017 PARTIALLY
APPROVED
2ND LIFT (4') AT ALL CMU WALLS, GROUT TO
BE HELD MINUS 8" DUE TO REBAR LAP NOT
BEING PROVIDED, SPECIAL INSPECTION
REPORT REQUIRED (1ST LIFT REPORT
COLLECTED)
BOND BEAM AOR 3/6/2017 3/6/2017 PARTIALLY
APPROVED
3RD LIFT (4') AT ALL CMU WALLS, SPECIAL
INSPECTION REPORT REQUIRED (2ND LIFT
REPORT COLLECTED)
BOND BEAM AOR 8/1/2017 8/1/2017 PARTIALLY
APPROVED
LINTAL REINFORCING WITHOUT FORMS
ONLY, SPECIAL INSPECTION AND FORMS
INSPECTION REQUIRED PRIOR TO POUR.
BOND BEAM AOR 8/14/2017 8/14/2017 PARTIALLY
APPROVED
LINTAL REINFORCING WITH FORMS ONLY,
SPECIAL INSPECTOR TO BE REGISTERED
WITH CITY AND APPROVED PRIOR TO
POURING.
BOND BEAM AOR 9/20/2017 9/20/2017 NOT READY
ONLY WORKERS ONSITE AND WORK WAS
NOT COMPLETE AND READY FOR
INSPECTION, ADDITIONALLY STOCKPILING
OF CONSTRUCTION DEBRIS TAKING PLACE
AS NO CONSTRUCTION DEBRIS CONTAINER
FROM FRANCHISED HAULER IS LOCATED ON
SITE, NO FURTHER INSPECTIONS TO BE
PERFORMED UNTIL CONTAINER IS BROUGHT
ONSITE AND CONSTRUCTION DEBRIS IS
CLEARED FROM SITE.
BOND BEAM AOR 9/22/2017 9/22/2017 NOT READY
DEBRIS CONTAINER ORDERED AND SITE
STILL NEEDS TO BE PICKED UP, REVIEWED
PLANS FOR BOND BEAM AND LEDGER BOLT
REQUIREMENTS, NOTHING FOUND FOR
LEDGER ATTACHMENT, CONTRACTOR TO
OBTAIN RFI FROM EOR AND PROPOSED LAP
REBAR IN PLACE PRIOR TO REQUESTING
REINSPECTION.
BOND BEAM JFU 9/26/2017 9/26/2017 DISAPPROVE
D
SCHEDULED PER PHONE CONVERSATION W/
A. ORTEGA.
Printed: Wednesday, March 01, 2023 11:57:37 AM 12 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
BOND BEAM JFU 9/26/2017 9/26/2017 DISAPPROVE
D
-(2) #5 TOP AND BOTTOM REQUIRED AT
ROOF LEDGER PER DETAILS 1 & 3 ON SHEET
S2. (#4 REINFORCEMENT INSTALLED)-
PROVIDE RFI FOR USAGE OF 5/8" BOLTS AT
CONNECTION PER DETAIL 5B/S2--PLAN
CALLS FOR 3/4" BOLTS
BOND BEAM JFU 9/27/2017 9/27/2017 DISAPPROVE
D
-RFI RECEIVED FOR REVISION OF ANCHOR
BOLT SIZES AT HOLD DOWNS AT ROOF
LEDGER, HOWEVER, A FIX OR RFI IS
REQUIRED AS #5 BARS THAT WERE PLACED
IN BOND BEAM HAVE NO LAP AT THE
CORNERS DUE TO THE METHOD OF
INSTALLATION AFTER THE FACT.
DRYPACK JFU 11/15/2017 11/15/2017 APPROVED
BOND BEAM JFU 11/15/2017 11/15/2017 DISAPPROVE
D
-RECONCILE PRIOR INSPECTION CORRECTION
-PROVIDE RFI FOR APROVAL OF 6' LIFT AT
SOUTHWEST CORNER OF BUILDING
-HORIZONTAL REINFORCEMENT NOT
PRESENT AT 2' LIFT AREAS
-BOND BEAM AT TOP COURSE MAY BE
REQUIRED, WILL CHECK WITH SUPERVISOR
AND REVIEW PLANS
BOND BEAM JFU 12/6/2017 12/6/2017 CANCELED
CANCELLED BY SUPERINTENDENT JAHMAR
UPON ARRIVAL. NOTIFIED HIM THAT
REINSPECTION FEES WILL APPLY TO
FURTHER CANCELLATIONS IF NOT MADE
PRIOR TO INSPECTOR'S ARRIVAL.
BOND BEAM JFU 12/12/2017 12/12/2017 CANCELED DUPLICATE INSPECTION SCHEDULED.
Printed: Wednesday, March 01, 2023 11:57:37 AM 13 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
ROOF NAIL JFU 12/12/2017 12/12/2017 PARTIALLY
APPROVED
NAILING ONLY AT ROOF DIAPHRAGM.
SECOND INSPECTION REQUIRED WHEN ALL
CRICKETS AND ROOF PENETRATIONS HAVE
BEEN INSTALLED. ADDITIONALLY, THIS IS
NOT AN APPROVAL OF THE ROOF FRAMING,
WHICH REQUIRES A STRUCTURAL
OBSERVATION IN ACCORDANCE WITH CBC
CHAPTER 17.
BOND BEAM JFU 12/12/2017 12/12/2017 APPROVED
FINAL TOP-OUT BOND BEAM AT ALL CMU
BUILDING WALLS. APPROVED PER RFI'S
(ATTACHED).
ROOF NAIL JFU 12/28/2017 12/28/2017 APPROVED
COMPLETE APPROVAL--INCLUDES ROOF
FRAMING, CRICKETS, PENETRATIONS AND
DRAINS.
FRAMING JFU 1/5/2018 1/5/2018
APPROVED
W/EXCEPTIO
N
FRAMING ONLY (NON-STRUCTURAL FLOOR-
TO-ROOF PARTITIONS) ONLY. DOES NOT
INCLUDE ROUGH MEP. OK TO ONE-SIDE
WITH GYP. BOARD.
LATH JFU 1/5/2018 1/5/2018 APPROVED
WOOD FRAMED ARCHITECTURAL FASCIA
POP-OUTS AROUND PERIMETER OF
BUILDING PER RFI.
THRUST BLOCK PRE-POUR RGR 3/2/2018 3/2/2018 DISAPPROVE
D
RONALD GRIESINGER
THRUST BLOCK PRE-POUR
1. Approved plans and permits were not on
job site.
2. Thrust block footings to small and not
completed.
3. FDC, PIV and fire hydrant not installed
4. Fire riser was not in proper location.
5. Provide proper clearance from other
utilities.
3/2/2018 10:32:16 AM
Printed: Wednesday, March 01, 2023 11:57:37 AM 14 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
FRAMING JFU 3/7/2018 3/7/2018 DISAPPROVE
D
-INSTALL FIRE SPRINKLERS AND PROVIDE
PROOF OF INSPECTION APPROVAL BY FIRE
DEPARTMENT
-PROVIDE RFI FROM ENGINEER OF RECORD
FOR THE FRAMING OF THE TIRE DISPLAY
WALLSINCLUDING THE HEADERS AT
OPENINGS
-PROVIDE ATTIC ACCESS OPENING ABOVE
BATHROOMS
-OPEN ELECTRICAL BOXES TO INSPECT
GROUNDING OF EQUIPMENT
-REVISE PLANS AND ENERGY DOCUMENTS
FOR ADDITIONAL FACADE LIGHTING NOT
SHOWN ON ELECTRICAL PLANS OR ENERGY
DOCS
NOTES:
-THIS INSPECTION DOES NOT INCLUDE
OVERHEAD AT SALES/OFFICE AREA
-CONTRACTOR NOTIFIED OF ACCESSIBILITY
CLEARANCE REQUIREMENTS AT
BATHROOMS
-VERIFY ACCESS PANELS AT TRAP PRIMERS
AT FINAL INSPECTION
ROUGH ELEC JFU 3/7/2018 3/7/2018 DISAPPROVE
D
SEE FRAMING INSPECTION CORRECTIONS
FOR ALL ROUGH FRAMING COMBINATION
CORRECTIONS.
ROUGH MECH JFU 3/7/2018 3/7/2018 DISAPPROVE
D
SEE FRAMING INSPECTION CORRECTIONS
FOR ALL ROUGH FRAMING COMBINATION
CORRECTIONS.
ROUGH PLBG JFU 3/7/2018 3/7/2018 DISAPPROVE
D
SEE FRAMING INSPECTION CORRECTIONS
FOR ALL ROUGH FRAMING COMBINATION
CORRECTIONS.
DRYWALL NAIL JFU 3/20/2018 3/20/2018 CANCELED
INSULATION JFU 3/20/2018 3/20/2018 PARTIALLY
APPROVED
WALLS AT BATHROOM ONLY. OK TO INSTALL
GYP BOARD AT BATHROOM WALLS ONLY.
Printed: Wednesday, March 01, 2023 11:57:37 AM 15 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
INSULATION JFU 3/20/2018 3/20/2018 PARTIALLY
APPROVED
WALLS AT BATHROOM ONLY. OK TO INSTALL
GYP BOARD AT BATHROOM WALLS ONLY.
FRAMING JFU 3/20/2018 3/20/2018 APPROVED NOTE: RFI RECEIVED FOR DISPLAY WALL AT
STOREFRONT (ATTACHED).
ROUGH ELEC JFU 3/20/2018 3/20/2018 APPROVED
DOES NOT INCLUDE OVERHEAD ELECTRICAL
AT T-BAR CEILINGS OR MAKEUP OF PANELS.
DOES NOT INCLUDE OVERHEAD ELECTRICAL
AT T-BAR CEILINGS OR MAKEUP OF PANELS.
ROUGH MECH JFU 3/20/2018 3/20/2018 APPROVED
DOES NOT INCLUDE T-BAR/OVERHEAD.
DOES NOT INCLUDE T-BAR/OVERHEAD.
ROUGH PLBG JFU 3/20/2018 3/20/2018 APPROVED
DRYWALL NAIL AOR 3/23/2018 3/23/2018 PARTIALLY
APPROVED
ALL AREAS WERE INSULATION NOT
REQUIRED, 1-SIDE AT INSULATED AREAS
ONLY.
INSULATION AOR 3/23/2018 3/23/2018 APPROVED WALLS AT CONDITIONED SPACE ONLY.
COMPACTION LSA 4/4/2018 4/4/2018 PARTIALLY
APPROVED
Arrived onsite for verification probed several
areas and find soft materials contractor to
rework material despite passing report from
Staten. Temp 63-93 hazy no wind
TEMP USE OF PERM PWR JFU 11/9/2018 11/9/2018 APPROVED
INCLUDES SERVICE GROUNDING, SUBPANEL
FEEDERS INSPECTION, AND MAKEUP OF
PANELS.
FRAMING JFU 11/14/2018 11/14/2018 APPROVED
EOR'S APPROVAL OF NOTCHING OF BEAMS
REQUIRED.
APPROVAL OF BEAM NOTCHING RECEIVED
(ATTACHED). INSPECTION RESULT CHANGED
TO "APPROVED."
SEWER CONNECTION JFU 11/26/2018 11/26/2018 APPROVED CONNECTION TO 6" CLAY LATERAL AT
NORTH SIDE OF BUILDING.
Printed: Wednesday, March 01, 2023 11:57:37 AM 16 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
T-BAR/OVERHEAD JFU 2/14/2019 2/14/2019 DISAPPROVE
D
-LAND CONDUIT NEAR WEST EXTERIOR
WALL
-PROVIDE COMPRESSION STRUT
-REPLACE INSULATION AT ROOF DECK
-DUCT MAY NOT LAY ON GRID AND MUST BE
SUPPORTED INDEPENDENTLY OF THE GRID
T-BAR/OVERHEAD AOR 2/22/2019 2/22/2019 DISAPPROVE
D
PREVIOUS CORRECTIONS OUTSTANDING,
ADDITIONAL CORRECTION FOR BERC CLIPS
REQUIRED AT FREESIDES AND COMPLETION
OF FIRE ALARM WIRING (BASED ON WHAT
CONTRACTOR SAID WAS NOT COMPLETE)
WITH CLOSURE OF ALL JUNCTION BOXES
ABOVE GRID.
T-BAR/OVERHEAD JFU 3/20/2019 3/20/2019 DISAPPROVE
D
-ADDITIONAL COMPRESSION STRUT
REQUIRED DUE TO PLACEMENT OF THE
STRUTS INSTALLED
-LINE VOLTAGE ELECTRICAL STILL NOT
LANDED
-CLIPS OR 2" ANGLE REQUIRED AT
UNRESTRAINED SIDE
REINSPECTION FEE ASSESSED.
T-BAR/OVERHEAD JFU 3/21/2019 3/21/2019
APPROVED
W/EXCEPTIO
N
CONTRACTOR TO LEAVE CEILING TILES OUT
AROUND WEST AND SOUTH WALLS OF
SALES ROOM TO VERIFY CLIPS.
TEMP USE OF PERM PWR JFU 3/21/2019 3/21/2019
APPROVED
W/EXCEPTIO
N
CONDUCTOR SIZIG AND MAKEU OF
SUBPANEL ARE APPROVABLE, HOWEVER
FIELD LABELED PANEL SCHEDULES DO NOT
MATCH THOSE OF THE APPROVED PLANS. IF
ADDITIONAL CIRCUITRY WAS ADDED,
ADDITIONAL PERMITTING OR REVISION OF
PLANS MAY BE REQUIRED. VERIFY
COMPLIANCE AT FINAL INSPECTION.
FINAL**JFU 4/26/2019 4/26/2019 NOT READY
NO ONE ON SITE, CONTRACTOR TO RECALL
INSPECTION WHEN OTHER AGENCY
APPROVALS HAVE BEEN GRANTED.
Printed: Wednesday, March 01, 2023 11:57:37 AM 17 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
PLANNING FINAL CFL 4/26/2019 4/26/2019 NOT READY
PER CONDITIONS OF APPROVAL, NEED
LETTER FROM LANDSCAPE ARCHITECT
STATING THAT ARCHITECT HAS PERSONALLY
INSPECTED THE INSTALLATION AND THAT IT
CONFORMS WITH THE FINAL LANDSCAPING
PLANS AS APPROVED BY THE CITY
JP-PUBLIC WORKS FINAL JPE 4/30/2019 4/30/2019 PARTIALLY
APPROVED
1130 - 1200Weather - Sunny - Temperature
68 to 85 - Breeze W to 7 mph - Humidity
27%Leonard said to wait until all other
departments have concluded their
inspections as Leonard drove thru and
identified several issues that aren't
completed yet
JP-PUBLIC WORKS FINAL JPE 5/1/2019 5/1/2019 APPROVED
Per Leonard we are waiting on Landscape
Architect to send letter accepting the project
Contractor is to call when ALL work is
complete
Printed: Wednesday, March 01, 2023 11:57:37 AM 18 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
SPECIAL INSPECTION AOR 7/3/2019 7/3/2019 NOT READY
ONSITE MEETING HELD WITH OWNER (ARA),
SUPERINTENDENT (JIM), AND DESIGNER
(PEDROS), WENT OVER REQUIREMENTS FOR
FINAL AND OTHER PENDING INSPECTION
COMMENTS. PRIOR TO REQUESTING
INSPECTION APPLICANT IS TO HAVE
RESOLVED CORRECTIONS ON PENDING
TBAR/OVERHEAD INSPECTION, MECH AND
LIGHTING INSTALLATION AND ACCEPTANCE
FORMS, AND PLANNING FINAL. CURRENT
ACCESSIBLE PARKING DOES NOT COMPLY
WITH APPROVED PLAN NOR DESIGN
GUIDELINES, OWNER WILL DISCUSS WITH
PLANNER OPTION TO REDUCE REQUIRED
PARKING TO BE UNDER THRESHOLD FOR
TWO (2) ACCESSIBLE SPACES (CURRENTLY 26
REQ'D WHICH WHEN OVER 25 REQUIRES 2
SPACES.) REVISION TO PRECISE PLAN
DEMONSTRATING AS-BUILT AND
COMPLIANT ACCESSIBILTY WILL BE
REQUIRED.
T-BAR/OVERHEAD AOR 11/1/2019 11/1/2019 APPROVED CLIPS VERIFIED AT TBAR SYSTEM.
FINAL**AOR 11/1/2019 11/1/2019 DISAPPROVE
D
FINAL CORRECTIONS:-FIRE FINAL,
INCLUDING SPRINKLER SYSTEM FINAL.-
WRONG ADDRESS IS ON THE BUILDING,
79762 HIGHWAY 111 IS THE CORRECT
ADDRESS.-FINISH ELECTRICAL AT SERVICE
COUNTER.-CITY BUSINESS LICENSE.
Printed: Wednesday, March 01, 2023 11:57:37 AM 19 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
SHELL FINAL KHET 11/21/2019 11/21/2019 APPROVED See Comments
Fire Clearance to Stock and Train is granted.
The following items will be addressed at the
Occupancy Final Inspection.1) Emergency
lights shall have the protective film
removed, lamps pointed to illuminate the
floor and confirmed that all are operating.2)
Tire storage shall not exceed conditioned
dimensions.3) Tenant access keys confirmed
to be in Knox Box.4) Repair Garage chemical
Storage confirmed to be in compliance with
requirements.5) Fire extinguishers are
provided with date of purchase record.6)
FACP Document Storage cabinet key to be
accessible.
FINAL**AOR 11/21/2019 11/21/2019 NOT READY
PREVIOUS FINAL CORRECTIONS RESOLVED
WITH EXCEPTION TO FIRE FINAL AND
OBTAINING A CITY BUSINESS LICENSE.
FINAL**AOR 11/25/2019 11/25/2019 NOT READY
FIRE APPROVAL NOT FOR OCCUPANCY,
STOCK AND TRAIN ONLY, AND PUBLIC
WORKS HAS NOT COMPLETELY SIGNED OFF.
MET AT COUNTER WITH AMERICAN TIRE
DEPOT EMPLOYEE AND GAVE NOTICE AND
CONTACT INFORMATION TO OBTAIN
REMAINING DEPARTMENT RELEASES.
FINAL INSPECTION KHET 12/26/2019 12/26/2019 APPROVED OCCUPANCY FINAL
FINAL**AOR 2/3/2020 2/3/2020 APPROVED APPROVAL FROM RECEIVED FROM PUBLIC
WORKS, AND CITY LICENSE IS ACTIVE.
REVIEWS
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
NON-STRUCTURAL JIM JOHNSON 12/19/2014 1/9/2015 12/19/2014 REVISIONS REQUIRED SEE ATTACHED 1ST PLAN CHECK READY FOR CORRECTIONS
PARENT PROJECTS
Printed: Wednesday, March 01, 2023 11:57:37 AM 20 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
PLANNING JAY WUU 12/19/2014 1/5/2015 1/5/2015 REVISIONS REQUIRED REVIEW FOR NEW
TIRE STORE
ASSIGNED TO JAY WUU.
PLANS CANNOT BE APPROVED UNTIL CITY
COUNCIL REVIEW AND APPROVAL
FINAL LANDSCAPING PLAN REQUIRED PRIOR TO
ISSUANCE OF BUILDING PERMIT
DARKER COLOR PALETTE REQUIRED PER COA #75
STRUCTURAL JOHN
THOMPSON 12/19/2014 1/9/2015 12/19/2014 REVISIONS REQUIRED SEE ATTACHED
STRUC TO YOUNG - DUE 1/9/15
1ST. PLAN CHECK READY FOR CORRECTIONS
FIRE JACQUELINE
GARCIA 1/13/2015 1/28/2015 1/13/2015 APPROVED-
CONDITIONS
APPROVAL EXPIRED
8/11/16
RESUBMITTAL FOR EXPIRED APPROVAL
REQUIRED PER LISA NOTTINGHAM ON 8/11/16.
SPOKE WITH LISA, FIRE CAN EXTEND THEIR
PERMIT BASED ON BUILDINGS EXTENSION
APPROVAL, STATUS UPDATED TO APPROVED-
CONIDTIONS BASED ON ATTACHED FIRE LETTER.
NON-STRUCTURAL JIM JOHNSON 3/25/2015 4/7/2015 3/27/2015 REVISIONS REQUIRED SEE 2ND PLAN CHECK CORRECTIONS DATED 4/7/
2015
PLANNING JAY WUU 3/25/2015 4/7/2015 4/2/2015 REVISIONS REQUIRED
SENT TO PLANNING.
THE FOLLOWING COMMENTS ARE STILL
OUTSTANDING FROM THE LAST ROUND OF PLAN
CHECK REVIEW:
* FINAL LANDSCAPING PLAN REQUIRED PRIOR TO
ISSUANCE OF BUILDING PERMIT
* DARKER COLOR PALETTE REQUIRED PER COA
#75; A REVISED COLORED ELEVATION AND
MATERIALS SAMPLE BOARD SHOULD BE
SUBMITTED TO PLANNING FOR REVIEW AND
APPROVAL
STRUCTURAL YOUNG
ENGINEERING 3/25/2015 4/7/2015 4/6/2015 APPROVED SENT TO YOUNG.
3RD BLDG NS (2 WK)JIM JOHNSON 9/26/2016 10/10/2016 9/28/2016 APPROVED-
CONDITIONS
Printed: Wednesday, March 01, 2023 11:57:37 AM 21 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
3RD PLANNING (2
WK)JAY WUU 9/26/2016 10/10/2016 10/6/2016 REVISIONS REQUIRED
THE FOLLOWING COMMENTS ARE STILL
OUTSTANDING FROM THE LAST ROUND OF PLAN
CHECK REVIEW:
* FINAL LANDSCAPING PLAN REQUIRED PRIOR TO
ISSUANCE OF BUILDING PERMIT
* DARKER COLOR PALETTE REQUIRED PER COA
#75; A REVISED COLORED ELEVATION AND
MATERIALS SAMPLE BOARD SHOULD BE
SUBMITTED TO PLANNING FOR REVIEW AND
APPROVAL PRIOR TO ISSUANCE OF BUILDING
PERMIT
1ST PW GREEN
SHEET AMY YU 11/2/2016 11/9/2016 11/2/2016 READY FOR APPROVAL COMPACTION REPORT AND PAD CERT
SUBMITTED AND ATTACHED
PLANNING - 1WK JAY WUU 11/7/2016 11/15/2016 11/7/2016 READY FOR APPROVAL SPOKE WITH APPLICANT AT COUNTER.
COMMENTS RESOLVED.
FIRE KOHL
HETRICK 7/20/2017 8/3/2017 8/3/2017 APPROVED-
CONDITIONS Updated Conditions See attached new letter of approval with updated
conditions
1ST BLDG NS (2 WK)JAKE FUSON 9/5/2018 9/19/2018 9/19/2018 APPROVED REV: 1
REVISION 1 - REVISED ROOF FRAMING - ADD
BEAM TO SUPPORT FIRE SPRINKLER SYSTEM
PIPING.
1ST BLDG STR (2
WK)
YOUNG
ENGINEERING 9/5/2018 9/19/2018 9/18/2018 READY FOR APPROVAL REV : 1 APPROVED PLANS ARE UPLOADED IN THE
ATTACHMENTS FOR REFERENCE
1ST FIRE (1 WK)EDGAR
GONZALEZ 3/1/2019 3/8/2019 4/8/2019 READY FOR APPROVAL
- CONDS
TIRE RACK REMOVAL REVISIONS FOR REVIEW PER
JW
Printed: Wednesday, March 01, 2023 11:57:37 AM 22 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
BOND INFORMATION
1ST FIRE (1 WK)EDGAR
GONZALEZ 3/1/2019 3/8/2019 4/8/2019 READY FOR APPROVAL
- CONDS
TIRE STORAGE CONFIGURATION SHALL BE IN
ACCORDANCE WITH THE 2016 CALIFORNIA FIRE
CODE SECITON 3409.1.
- 3409.1 - INDOOR TIRE STORAGE - PILE
DIMENTIONS:
WHERE TIRES ARE STORED ON-TREAD, THE
DIMENSION OF THE PILE INTHE DIRECTION OF
THE WHEEL HOLE SHALL BE NOT MORE THAN 50
FEET. TIRES STORED ADJECENT TO OR ALONG
ONE WALL SHALL NOT EXTEND MORE THAN 25
FEET FROM THAT WALL. OTHER PILES SHALL NOT
BE MORE THAN 50 FEET IN WIDTH.
PLEASE CORRECT PILE CONFIGURATION ON PLAN
WITH FIRE CODE SECTION REFERENCED.
WITH FLOOR TIRE STORAGE BIENG MORE THAN 6'
IN HEIGHT A FORMAL HIGH PILED STORAGE
COMMODITY REPORT PREPARED BY A FIRE
PROTECTION ENGINEER WOULD NEED TO BE
PROVIDED (UNLESS STORAGE WOULD BE
REDUCED TO 5'12'' ON PLAN.) PLEASE CORRECT
HEIGHT TO OMMIT REPORT OR MAKE NOTE ON
PLAN INDICATING AN ANALYSIS REPORT WILL BE
SUBMITTED FOR REVIEW.
Fire final inspection will be required before
approval is granted. All conditions to remain with
no racks for high piled storage.
1ST BLDG NS (1 WK)JAMES
WIATRAK 3/1/2019 3/8/2019 3/1/2019 READY FOR APPROVAL REV-2
TIRE RACK REMOVAL REVISIONS FOR REVIEW PER
JW
Revisions OK, pending Fire comments/approval.
1ST BLDG NS (1 WK)JAKE FUSON 4/8/2019 4/15/2019 4/8/2019 APPROVED REVISION #3 REVISION #3 - REVISED PANEL SCHEDULES WITH
REVISED ELECTRICAL PLAN TO MATCH.
Printed: Wednesday, March 01, 2023 11:57:37 AM 23 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 10/9/2018 AARON HICKSON Permit Extension
American Tire Depot
Permit Extension _LA
Quinta_ American Tire
Depot.pdf
0
DOC 10/9/2018 AARON HICKSON
BUILDING OFFICIAL 45
DAY EXTENSION
APPROVAL.msg
BUILDING OFFICIAL 45
DAY EXTENSION
APPROVAL.msg
0
DOC 2/8/2017 AJ ORTEGA
COMPACTION REPORT
(FOOTINGS) (ORGINAL
AND REVISED)
BCOM2014-1047 -
COMPACTION REPORT
(ORGINAL AND
REVISED).pdf
0
DOC 2/8/2017 AJ ORTEGA
FORM CERTIFICATION
(ORGINAL AND
REVISED)
BCOM2014-1047 -
FORM CERTIFICATION
(ORGINAL AND
REVISED).pdf
0
DOC 2/8/2017 AJ ORTEGA
SPECIAL INSPECTION
(CONCRETE) (ORIGINAL
AND REVISED)
BCOM2014-1047 -
SPECIAL INSPECTION
(CONCRETE)(ORIGINAL
AND REVISED).pdf
0
DOC 2/8/2017 AJ ORTEGA
STRUCTURAL
OBSERVATION -
FOUNDATION
(ORIGINAL ONLY)
BCOM2014-1047 -
STRUCTURAL
OBSERVATION
(ORIGINAL ONLY).pdf
0
DOC 2/27/2017 AJ ORTEGA SPECIAL INSPECTION
(CMU - 1ST LIFT)
BCOM2014-1047 -
SPECIAL INSPECTION
(CMU - 1ST LIFT).pdf
0
DOC 3/6/2017 AJ ORTEGA SPECIAL INSPECTION
(CMU - 2ND LIFT)
BCOM2014-1047 -
SPECIAL INSPECTION
(CMU - 2ND LIFT).pdf
0
DOC 2/3/2020 AJ ORTEGA CERTIFICATE OF
OCCUPANCY
BCOM2014-1047 -
CERTIFICATE OF
OCCUPANCY.pdf
1
Printed: Wednesday, March 01, 2023 11:57:37 AM 24 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 10/28/2016 AMY YU COMPACTION REPORT
(SITE)
COMPACTION
REPORT.pdf 0
DOC 11/2/2016 AMY YU PAD CERTIFICATION PAD CERT.pdf 0
DOC 8/11/2016 BURT HANADA CVWD INTERCEPTOR
WAIVER
American Tire Depot -
GI Waiver.pdf 0
DOC 9/20/2016 BURT HANADA EXTENSION REQUEST
LETTER
Re American Tire Depot
application extension
request.pdf
1
DOC 7/11/2017 BURT HANADA
AUTHORIZATION FOR
EXTENDED WORK
HOURS
American Tire Depot -
Extended Work Hours
(approved).pdf
0
DOC 9/17/2018 BRONZ YOUNG
1ST CHECK -
STRUCTURAL
TRANSMITTAL.pdf
1ST CHECK -
STRUCTURAL
TRANSMITTAL.pdf
0
DOC 3/14/2019 EDGAR GONZALEZ
BCOM2017-1047 -
AMERICAS TIRE DEPOT -
79762 HIGHWAY 111 -
BUILDING TIRE
STORAGE
(CORRECTIONS).docx
BCOM2017-1047 -
AMERICAS TIRE DEPOT -
79762 HIGHWAY 111 -
BUILDING TIRE
STORAGE
(CORRECTIONS).docx
1
DOC 9/27/2017 JAKE FUSON
RFI - ANCHOR BOLT SIZE
REVISION AT HDU5S AT
ROOF LEDGER
BCOM2014-1047 - RFI -
ANCHOR BOLT SIZE
REVISION AT HDU5S AT
ROOF LEDGER.pdf
1
DOC 12/12/2017 JAKE FUSON RFI - ANCHOR BOLTS AT
FASCIA DETAIL
BCOM2014-1047 - RFI -
ANCHOR BOLTS AT
FASCIA DETAIL.pdf
1
DOC 12/12/2017 JAKE FUSON
RFI - REVISED
REINFORCEMNT
CORNER LAP AT CMU
WALLS
BCOM2014-1047 - RFI -
REVISED
REINFORCEMNT
CORNER LAP AT CMU
WALLS.pdf
1
Printed: Wednesday, March 01, 2023 11:57:37 AM 25 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 12/28/2017 JAKE FUSON STRUCTURAL
OBSERVATION REPORT
BCOM2014-1047 -
STRUCTURAL
OBSERVATION
REPORT.pdf
1
DOC 3/20/2018 JAKE FUSON RFI - DISPLAY WALL AT
STOREFRONT
BCOM2014-1047 - RFI -
DISPLAY WALL AT
STOREFRONT.pdf
1
DOC 12/6/2018 JAKE FUSON RFI - APPROVAL OF
BEAM NOTCHING
BCOM2014-1047 - RFI -
APPROVAL OF BEAM
NOTCHING.pdf
1
DOC 1/13/2015 JACQUELINE GARCIA FIRE RELEASE FOR
PERMITTING
LAQ-15-BP-002 BLDG
American Tire
Depot.docx
0
DOC 1/12/2015 JIM JOHNSON
1ST REVIEW NON-
STRUCTURAL
CORRECTIONS
79-840 HWY 111.doc 0
DOC 4/7/2015 JIM JOHNSON
2ND REVIEW NON-
STRUCTURAL
CORRECTIONS
79-840 HWY 111_1.doc 0
DOC 9/20/2016 JIM JOHNSON
CORRESPONDENCE
CVAG TUMF FEE
ASSESSMENT
C-VAG FEES BCOM2014-
1047.pdf 0
DOC 9/28/2016 JIM JOHNSON
SCHOOL FEE
CERTIFICATION OF
BUILDING AREA
SCHOOL FEES
BCOM2014-1047.pdf 0
DOC 8/3/2017 KOHL HETRICK
FIRE - 8/3/2017
UPDATED CONDITIONS
OF APPROVAL
LAQ-15-BP-002 -
AMERICAN TIRE DEPOT
- NEW BLDG PC -
APPROVED.pdf
0
DOC 11/8/2016 MARY FASANO CONSTRUCTION DEBRIS
MANAGEMENT PLAN DEBRIS PLAN.pdf 0
Printed: Wednesday, March 01, 2023 11:57:37 AM 26 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 9/4/2018 NICHOLE ROMANE PSN 04493.pdf 04493.pdf 0
DOC 9/26/2016 STEPHANIE KHATAMI CVWD WASTEWATER
SOURCE CONTROL PLAN
CVWD WASTEWATER
SOURCE CONTROL PLAN
APPROVAL 9-26-16.pdf
0
DOC 9/26/2016 STEPHANIE KHATAMI 3RD SUBMITTAL
APPLICANT RESPONSES
3RD SUBMITTAL -
CHECKLIST AND
COMMENTS 9-26-16
BCOM2014-1047.pdf
0
DOC 11/7/2016 STEPHANIE
SWANSTROM GRANT DEED 11-7-16 GRANT DEED 11-7-
16.pdf 0
DOC 11/8/2016 STEPHANIE
SWANSTROM
SCHOOL FEE
CERTIFICATE OF
COMPLIANCE
79840 HIGHWAY
111.pdf 0
IMAGE 4/4/2018 LEONARD ST. SAUVER
excess concrete slag
painted in green by
super.JPG
excess concrete slag
painted in green by
super.JPG
0
IMAGE 4/4/2018 LEONARD ST. SAUVER
north looking south
making grade concrete
needs to removed
before base.JPG
north looking south
making grade concrete
needs to removed
before base.JPG
0
IMAGE 4/4/2018 LEONARD ST. SAUVER area not ready for
compaction.JPG
area not ready for
compaction.JPG 0
IMAGE 4/4/2018 LEONARD ST. SAUVER
probing ground not
compacted several
areas.JPG
probing ground not
compacted several
areas.JPG
0
Printed: Wednesday, March 01, 2023 11:57:37 AM 27 of 27
Permit Details
City of La Quinta
PERMIT NUMBER
BCOM2014-1047
8/3/2017
SDD Construction
9324 Garvey Ave
South El Monte, CA 91733
Re: New Building Construction Plan Review – American Tire Depot
LAQ-15-BP-002 / 79-840 Hwy 111, La Quinta, CA 92253
Fire Department personnel have reviewed and have approved the plans you submitted for the
above referenced project. Please be advised the following conditions apply as a part of the
conditions for the issuance of a building permit.
1) Fire Department approval is based upon the 2013 CBC requirements for Group M & S-1
occupancies. It is prohibited to use, process or store any materials in the occupancy that
would classify it as a Group H occupancy.
2) Repair work and/or maintenance using open flame equipment, welding or the use spray
finishing is prohibited.
3) The Fire Department is required to set a minimum fire flow for the remodel or construction
of all commercial buildings using the procedure established in the 2013 CFC. A fire flow of
1,500 gpm for a 2-hour duration at 20 psi residual operating pressure must be available
before any combustible material is placed on the job site.
4) Applicant and/or developer shall separately submit 2 sets of water system plans to the Fire
Department office for review. Plans shall detail the installation of underground fire mains
servicing a minimum of (1) fire hydrant located within 400 feet of all exterior portions of the
new building. The hydrant shall also be located within 200 feet of all fire department
connections to fire sprinkler systems associated with the structure. Plans must be signed by a
registered Civil Engineer and/or water purveyor prior to Fire Marshal review and approval.
Mylar will be signed by the Fire Marshal after review and approval.
5) This “Repair Garage” facility is required to comply with Chapter 23 of the California Fire
Code as amended by local ordinance. At time of plan approval, this facility is not designed
to accommodate vehicle repair or maintenance of vehicles fueled by non-odorized gases,
such as hydrogen, Liquid Natural Gas, Liquified Petroleum Gases and similar.
The following conditions must be met prior to occupancy:
6) Whenever sprinkler overhead mains of 4” size or larger are provided, the Riverside County
Fire Department requires documentation from a structural engineer that the roof structural
members will be capable of supporting the weight of the water filled mains and attached
lines. Provide appropriate detailed documentation, with a wet stamp and signature, by the
project structural engineer.
7) Install a complete fire sprinkler system per NFPA 13. System plans must be submitted by th
installing C-16 contractor to the Fire Department for review, along with current
plan/inspection fee.
OFFICE OF THE FIRE MARSHAL
77-933 Las Montañas Rd., Ste. #201, Palm Desert, CA 92211-4131 • Phone (760) 863-8886
• Fax (760) 863-7072
www.rvcfire.org
Proudly serving the
unincorporated areas
of riverside county
and the cities of:
Banning
Beaumont
Calimesa
Canyon lake
Coachella
Desert Hot Springs
Eastvale
Indian Wells
Indio
Jurupa Valley
Lake Elsinore
La Quinta
Menifee
Moreno Valley
Norco
Palm Desert
Perris
Rancho Mirage
Rubidoux CSD
San Jacinto
Temecula
Wildomar
BOARD OF
SUPERVISORS:
Kevin Jeffries
District 1
John Tavaglione
District 2
Jeff Stone
District 3
Manuel Perez
District 4
Marion Ashley
District 5
8) Install a fire sprinkler monitoring fire alarm system as per NFPA 72 required by the
California Building Code, California Fire Code and designed in accordance with adopted
standards. A C-10 licensed contractor must submit plans to the Fire Department office for
review and approval prior to installation. (Prior to building final inspection)
Buildings/facilities
9) Install Knox Key Lock box, mounted per recommended standard of the Knox Company. If
the building/facility is protected with a fire alarm system or burglar alarm system, the lock
boxes will require "tamper" monitoring. Special forms are available from this office for the
ordering of the Key Switch. This form must be authorized and signed by this office for the
correctly coded system to be purchased.
10) Provide keys to the tenant space for inclusion in the main building Knox Box. Key(s) shall
have durable and legible tags affixed for identification of the correlating tenant space.
Other requirements:
11) Exit signs, exit marker and exit path markings shall be installed per the California Building
Code. (Prior to building final inspection)
12) Prior to final inspection of any building, the applicant shall prepare and submit to the Fire
Department for approval, a site plan designating required fire lanes with appropriate lane
painting and/or signs.
13) Certain designed areas will be required to be maintained as fire lanes and will require
approved signs and/or stenciling in red with CVC 22500.1 conspicuously posted.
14) Install portable fire extinguishers per Title 19. Contact a certified extinguisher company for
proper placement and spacing of equipment.
15) This building has not been reviewed or approved for high pile/rack storage. Prior to such
use, building(s) shall be approved for high-piled storage (materials in closely packed piles or
on pallets, or in racks where the top of storage exceeds 12 feet in height, 6 feet for Group A
plastics and certain other hazardous commodities) or aerosols products. High-piled and
aerosol stock shall be approved by the Fire Department prior to materials being stored on
site. A licensed Fire Protection Engineer or a Fire Department approved consultant must
prepare plans for high-piled storage or aerosol storage in accordance with the 2013 CFC and
NFPA 13.
16) Applicant/developer shall be responsible for obtaining aboveground tank permits from both
the County Health and Fire Departments. This includes the use of the waste oil tanks.
17) Approved building address shall be placed in such a position as to be plainly visible and
legible from the street and rear access if applicable. Building address numbers shall be a
minimum of 12”. All addressing must be legible and of a contrasting color with the
background and adequately illuminated to be visible from the street at all hours.
18) Applicable room door(s) shall be posted “ELECTRICAL ”, “FACP”, “FIRE RISER” and
“ROOF ACCESS” on the outside of the door so it is visible and in a contrasting color.
19) A durable sign stating, "This door to remain unlocked during business hours" shall be placed
on or adjacent to the front exit doors. The sign shall be in letters not less than one inch high
on a contrasting background.
The Fire Department approved plans and conditions letter must be at the job site.
Applicant/installer shall be responsible to contact the Fire Department to schedule inspections.
Requests for inspections are to be made at least 72 hours in advance and may be arranged by
calling (760)863-8886.
SUBJECT TO FIELD INSPECTION - Nothing in our review shall be construed as encompassing
structural integrity. Review of this plan does not authorize or approve any omission or deviation
from all applicable regulations. Final approval is subject to field inspection.
All questions regarding the meaning of these conditions should be referred to the Office of the Fire
Marshal staff at (760)863-8886.
Kohl Hetrick – Fire Safety Specialist