PC Resolution 2023-023 Hampton Inn Hotel SPA & SDPPLANNING COMMISSION RESOLUTION 2023 - 023
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF LA QUINTA, CALIFORNIA,
RECOMMENDING TO THE CITY COUNCIL APPROVAL OF
A SPECIFIC PLAN AMENDMENT AND SITE
DEVELOPMENT PERMIT FOR, A 125 -ROOM HAMPTON
INN HOTEL LOCATED AT THE SOUTHWEST CORNER OF
AUTO CENTRE DRIVE AND LA QUINTA DRIVE WITHIN
THE CENTRE AT LA QUINTA SPECIFIC PLAN AREA
CASE NUMBERS:
SPECIFIC PLAN 2022-0003
SITE DEVELOPMENT PERMIT 2022-0007
APPLICANT: VERDANT LAQUINTA LLC
WHEREAS, the Planning Commission of the City of La Quinta, California did, on
December 12, 2023, hold a duly noticed Public Hearing to consider a request by Verdant
LaQuinta LLC, for a 125 room hotel project at the southwest corner of Auto Centre Drive
and La Quinta Drive, more commonly described as:
600-340-060
WHEREAS, the Design and Development Department published a public hearing
notice in The Desert Sun newspaper on December 1, 2023, as prescribed by the
Municipal Code. Public hearing notices were also mailed to all property owners within 500
feet of the site; and
Saecific Plan 2022-0003
WHEREAS, at said Public Hearing, upon hearing and considering all testimony and
arguments, if any, of all interested persons desiring to be heard, said Planning
Commission did make the following mandatory findings pursuant to Section 9.240.010 of
the La Quinta Municipal Code to justify recommending to the City Council approval of said
Specific Plan Amendment [Exhibit A]:
Consistencv with General Plan
The proposed Specific Plan Amendment is consistent with the goals and
policies of the La Quinta General Plan in that it will result in the development of
a 125 -room hotel which is permitted in the General Commercial land use
designation. The proposed project is consistent with the following Goals and
Policies:
• Policy LU -2.2 which requires Specific Plans for projects proposing
flexible development standards that differ from the Zoning Ordinance.
PLANNING COMMISSION RESOLUTION 2023-023
SPECIFIC PLAN 2022-0003
SITE DEVELOPMENT PERMIT AMENDMENT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 2 OF 5
This project proposes variations from several development standards
therefore a Specific Plan Amendment is appropriate for the project.
2. Public Welfare
Approval of the proposed Specific Plan Amendment will not create conditions
materially detrimental to public health, safety, and general welfare. The La
Quinta Design and Development Department has prepared an addendum to
the Mitigated Negative Declaration for Centre at La Quinta Specific Plan
Amendment No. 5, EA2017-0009, adopted by the La Quinta City Council on
July 3, 2018, Resolution 2018-038, pursuant to Section 15164 of the California
Environmental Quality Act (CEQA), in that no substantial changes to the project
are proposed that result in new significant environmental effects.
3. Land Use Compatibility
The proposed Specific Plan Amendment incorporates a land use that is
compatible with zoning on adjacent properties. The property will continue to be
zoned as Regional Commercial which is intended for major retail, professional
office restaurants, and hotels.
4. Property Suitability
The uses permitted in the Specific Plan are suitable and appropriate for the
subject property in that the site is relatively flat, vacant, and the area can be
served by all necessary public services and utilities. The proposed project is
located adjacent to other major retailers that could provide synergy between
the other commercial uses.
Site Development Permit 2022-0007
WHEREAS, at said Public Hearing, upon hearing and considering all testimony and
arguments, if any, of all interested persons desiring to be heard, said Planning
Commission did make the following mandatory findings pursuant to Section 9.210.010 of
the Municipal Code to justify approval of said Site Development Permit:
1. Consistency with General Plan
The proposed development is consistent with the General Plan land use
designation of General Commercial. The proposed project is consistent with
the following Goals and Policies:
• Goal LU -6 and ED -1 as Hotel will contribute to a balanced and varied
economic base which provides fiscal stability to the City and a broad
range of services to the region.
• Program CIR-1.12.a: which encourages land uses that provide jobs and
housing near each other to allow the use of alternative modes of travel
PLANNING COMMISSION RESOLUTION 2023-023
SPECIFIC PLAN 2022-0003
SITE DEVELOPMENT PERMIT AMENDMENT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 3 OF 5
and produce shorter work commutes. The project will be developed near
the existing residential Solterra apartment development directly south of
it, providing an opportunity for jobs and housing near each other.
• Program CIR-1.12.b which encourages mixed use and contiguous
commercial development to provide optimum internal connections
between uses. The development will provide and be conditioned to
provide connections to commercial development on the north, east, and
west.
• Policy ED -1.5 which states projects proposed on commercial land shall
be evaluated for their job creating and revenue generating potential. This
project's scope and operations will create jobs and lead to annual sales
tax and generate transit occupancy tax revenue for the City.
2. Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the development
standards of the City's Zoning Code and Centre at La Quinta Specific Plan, as
applicable. The Site Development Permit has been conditioned to ensure
compliance with the zoning standards and other supplemental standards as
established in Title 9 of the La Quinta Municipal Code. The project is consistent
with the non-residential development standards and permitted use table,
except deviations that include requested increase in the floor area ratio and
decreasing the parking minimum standard. These development standards and
land use deviations may be approved with the Specific Plan Amendment.
3. Compliance with CEQA
The Design and Development Department has prepared Environmental
Assessment 2022-0011 for this project, in compliance with the requirements of
the CEQA. The Design and Development Director has determined that
although the proposed project could have a significant effect on the
environment, there will not be a significant effect because revisions in the
project have been made by or agreed to by the project proponent and mitigation
measures have been incorporated.
4. Architectural Design
The architectural design of the project, including, but not limited to, the
architectural style, scale, building mass, materials, colors, architectural details,
roof style and other architectural elements are compatible with surrounding
development and with the quality of design prevalent in the city.
5. Site Design
The site design of the project including, but not limited to, project entries,
interior circulation, pedestrian and bicycle access, pedestrian amenities,
PLANNING COMMISSION RESOLUTION 2023-023
SPECIFIC PLAN 2022-0003
SITE DEVELOPMENT PERMIT AMENDMENT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 4 OF 5
screening of equipment and trash enclosures, exterior lighting, and other site
design elements are compatible with surrounding development and with the
quality of design prevalent in the city.
6. Landscape Design
Project landscaping, including, but not limited to, the location, type, size, color,
texture and coverage of plant materials, has been designed so as to provide
visual relief, complement buildings, visually emphasize prominent design
elements and vistas, screen undesirable views, provide a harmonious
transition between adjacent land uses and between development and open
space, and provide an overall unifying influence to enhance the visual
continuity of the project. The proposed project is consistent with the
landscaping standards and plant palette and implements the standards for
landscaping and aesthetics established in the General Plan and Zoning Code.
The permanent overall site landscaping utilizes various tree and shrub species
to enhance the building architecture.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the Findings of the
Planning Commission in this case; and
SECTION 2. That the above project be determined by the Planning Commission to be
consistent with Environmental Assessment 0017-0009; and
SECTION 3. That it does hereby recommends to the City Council approval of Specific
Plan 2022-0003 and Site Development Permit 2022-0007 for the reasons set forth in this
Resolution and subject to the attached Conditions of Approval [Exhibits B & C].
PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La
Quinta Planning Commission, held on December 12, 2023, by the following vote:
AYES: Commissioners Caldwell, Guerrero, Hassett, McCune, Tyerman, and
Chairperson Nieto
NOES: None
ABSENT: Commissioner Hernandez
ABSTAIN: None
PLANNING COMMISSION RESOLUTION 2023-023
SPECIFIC PLAN 2022-0003
SITE DEVELOPMENT PERMIT AMENDMENT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 5 OF 5
STEPHEN T. NIETO, Chairperson
City of La Quinta, California
ATTEST:
DANNY CASTRO, Design and Development Director
City of La Quinta, California
PLANNING COMMISSION RESOLUTION 2023-023
ADOPTED: DECEMBER 12, 2023
3.1.2 Standards
EXHIBIT A
Section 3: Development Regulations
The development requirements for the Specific Plan can be found in Table 3.1: Development Standards
- Regional Commercial and Table 3.2: Development Standards- Residential.
Table 3.1: Development Standards - Regional Commercial
Development
74.400 SF
Maximum development, intensity
FAR 35
FAR .6 1,
Minimum lot size
2.8 Acres
-
Maximum structure height*
50'
So'
4
Maximum number of stories 4
Minimum public street setbacks
20' building/ 20' building/
Auto Centre Drive
10' landscape 10' landscape
20' building/ 20' building/
Auto Center Way South
10' landscape 10' landscape
20' building/
20' building/
La Quinta
10' landscape
10' landscape
Minimum setback adjacent to
50' building/
residential parcels
50 *
10' landscape
Landscape
5% of total site
5% of total site
*Setbacks shall be increased 0.5' for every foot above 35 feet in height
1.0 Space perl
.l Space per room (min)
Hotel Parking
Room
1.3 Space per room (max)
SLF-Adams Street La Quinta, LLC
Adopted July 3, 2018
The Centre at La Quinta Specific Plan Amendment No. 6
33
PLANNING COMMISSION RESOLUTION 2019 - 023 EXHIBIT B
CONDITIONS OF APPROVAL — ADOPTED
SPECIFIC PLAN 2022-0003 (SP 1997-029, AMENDMENT 6)
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
Page 1 of 1
C,FNFRAI
1. The applicant agrees to defend, indemnify, and hold harmless the City of La Quinta
("City"), its agents, officers and employees from any claim, action or proceeding to
attack, set aside, void, or annul the approval of this Specific Plan. The City shall have
sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding and shall
cooperate fully in the defense.
2. Specific Plan 2022-0003 shall be developed in compliance with these conditions, and
the approved Specific Plan document. In the event of any conflicts between these
conditions and the provisions of SP1997-029 The Centre at La Quinta, these conditions
shall take precedence.
3. Specific Plan 2022-0003 shall comply with all applicable terms, conditions and/or
mitigation measures for the following related approvals:
Specific Plan Amendment 1997-029 The Centre at La Quinta Amendment 5
Environmental Assessment 2017-0009 and 2022-0011
Tentative Parcel Map 37359
Site Development Permit 2022-0007
4. In the event of any conflict(s) between approval conditions and/or provisions of these
approvals, the Design and Development Director shall adjudicate the conflict by
determining the precedence.
PLANNING COMMISSION RESOLUTION 2023-023 EXHIBIT C
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 1 OF 16
C,'FNFRAI
1. The applicant agrees to defend, indemnify, and hold harmless the City of La Quinta
("City"), its agents, officers and employees from any claim, action or proceeding to
attack, set aside, void, or annul the approval of this Site Development Permit. The
City shall have sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding and
shall cooperate fully in the defense.
2. Site Development Permit 2022-0007 shall comply with all applicable conditions
and/or mitigation measures for the following related approvals:
Tentative Parcel Map 37359
In the event of any conflict(s) between approval conditions and/or provisions of
these approvals, the Planning Manager shall adjudicate the conflict by determining
the precedence.
3. The Site Development Permit shall expire two years from the date of approval and
shall become null and void in accordance with La Quinta Municipal Code Section
9.200.080, unless a building permit has been issued. A time extension may be
requested per LQMC Section 9.200.080.
4. Prior to the issuance of any grading, construction, or building permit by the City,
the applicant shall obtain any necessary clearances and/or permits from the
following agencies, if required:
• Riverside County Fire Marshal
• La Quinta Development Services Division: Grading Permit and Green Sheet
(Public Works Clearance) for Building Permits, Water Quality Management
Plan (WQMP) Exemption Form — Whitewater River Region, Improvement
Permit
• La Quinta Design and Development Department
• Riverside Co. Environmental Health Department
• Desert Sands Unified School District (DSUSD)
• Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Regional Water Quality Control Board (CRWQCB)
• State Water Resources Control Board
• SunLine Transit Agency (SunLine)
• South Coast Air Quality Management District Coachella Valley (SCAQMD)
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 2 OF 16
The applicant is responsible for all requirements of the permits and/or clearances
from the above -listed agencies. When these requirements include approval of
improvement plans, the applicant shall furnish proof of such approvals when
submitting those improvements plans for City approval.
5. Coverage under the State of California General Construction Permit must be
obtained by the applicant, who then shall submit a copy of the Regional Water
Quality Control Board's ("RWQCB") acknowledgment of the applicant's Notice of
Intent ("NOI") and Waste Discharger Identification (WDID) number to the City prior
to the issuance of a grading or building permit.
6. The applicant shall comply with applicable provisions of the City's NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater
Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water);
Riverside County Ordinance No. 457; the California Regional Water Quality
Control Board — Colorado River Basin Region Board Order No. R7-2013-0011 and
the State Water Resources Control Board's Order No. 2012-0006-DWQ.
A. For construction activities including clearing, grading or excavation of land
that disturbs one (1) acre or more of land, or that disturbs less than one (1)
acre of land, but which is a part of a construction project that encompasses
more than one (1) acre of land, the Permitee shall be required to submit a
Storm Water Pollution Protection Plan ("SWPPP") to the State Water
Resources Control Board.
The applicant or design professional can obtain the California Stormwater
Quality Association SWPPP template at www.cabmphandbooks.com for
use in their SWPPP preparation.
B. The applicant shall ensure that the required SWPPP is available for
inspection at the project site at all times through and including acceptance
of all improvements by the City.
C. The applicant's SWPPP shall include provisions for all of the following Best
Management Practices ("BMPs") (LQMC Section 8.70.020 (Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non -Storm Water Management.
6) Waste Management and Materials Pollution Control.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 3 OF 16
D. The SWPPP and BMPs shall remain in effect for the entire duration of
project construction until all improvements are completed and accepted by
the City Council.
E. The inclusion in the Conditions, Covenants, and Restrictions (CC&Rs), a
requirement for the perpetual maintenance and operation of all post -
construction BMPs as required.
7. Permits issued under this approval shall be subject to the provisions of the
Development Impact Fee and Transportation Uniform Mitigation Fee programs in
effect at the time of issuance of building permit(s).
8. Approval of this Site Development Permit shall not be construed as approval for
any horizontal dimensions implied by any site plans or exhibits unless specifically
identified in the following conditions of approval.
9. Developer shall reimburse the City, within thirty (30) days of presentment of the
invoice, all costs and actual attorney's fees incurred by the City Attorney to review,
negotiate, and/or modify any documents or instruments required by these
conditions, if Developer requests that the City modify or revise any documents or
instruments prepared initially by the City to effect these conditions. This obligation
shall be paid in the time noted above without deduction or offset and Developer's
failure to make such payment shall be a material breach of the Conditions of Approval.
10. Developer shall reimburse the City, within thirty (30) days of presentment of the
invoice, all costs and actual consultant's fees incurred by the City for engineering
and/or surveying consultants to review and/or modify any documents or
instruments required by this project. This obligation shall be paid in the time noted
above without deduction or offset and Developer's failure to make such payment
shall be a material breach of the Conditions of Approval.
PROPERTY RIGHTS
11. Prior to issuance of any permit(s), the applicant shall acquire or confer easements
and other property rights necessary for the construction or proper functioning of
the proposed development. Conferred rights shall include irrevocable offers to
dedicate or grant access easements to the City for emergency services and for
maintenance, construction, and reconstruction of essential improvements.
12. Pursuant to the aforementioned condition, conferred rights shall include approvals
from the master developer over easements and other property rights necessary
for construction and proper functioning of the proposed development not limited to
access rights over proposed and/or existing private streets that access public
streets and open space/drainage facilities of the master development.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 4 OF 16
13. The applicant shall offer for dedication all public street rights-of-way in
conformance with the City's General Plan, Municipal Code, applicable specific
plans, and/or as required by the City Engineer.
14. The public street right-of-way offers for dedication required for this project include:
A. PUBLIC STREETS
1) Auto Centre Drive South — No additional right-of-way dedication is
required.
2) La Quinta Drive — No additional right-of-way dedication is required.
3) Auto Centre Way — No additional right-of-way dedication is required.
15. Dedications shall include additional widths as necessary for dedicated right and
left turn lanes, bus turnouts, and other features contained in the approved
construction plans.
16. When the City Engineer determines that access rights to the proposed street
rights-of-way shown on the approved Site Development Permit are necessary prior
to approval of the improvements dedicating such rights-of-way, the applicant shall
grant the necessary rights-of-way within 60 days of a written request by the City.
17. Where public facilities (e.g., sidewalks) are placed on privately -owned setbacks,
the applicant shall offer for dedication blanket easements for those purposes.
18. The applicant shall offer for dedication those easements necessary for the
placement of, and access to, utility lines and structures, drainage basins, mailbox
clusters, park lands, and common areas.
19. Direct vehicular access to Auto Centre Dr South, La Quinta Drive, and Auto Centre
Way is restricted, except for those access points identified on the Site
Development Permit, or as otherwise conditioned in these conditions of approval.
20. The applicant shall furnish proof of easements, or written permission, as
appropriate, from those owners of all abutting properties on which grading,
retaining wall construction, permanent slopes, or other encroachments will occur.
STREET AND TRAFFIC IMPROVEMENTS
21. The applicant shall comply with the provisions of LQMC Sections 13.24.060 (Street
Improvements), 13.24.070 (Street Design - Generally) & 13.24.100 (Access for
Individual Properties and Development) for public streets; and Section 13.24.080
(Street Design - Private Streets), where private streets are proposed.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 5 OF 16
22. Streets shall have vertical curbs or other approved curb configurations that will
convey water without ponding and provide lateral containment of dust and residue
during street sweeping operations. If a wedge or rolled curb design is approved,
the lip at the flowline shall be near vertical with a 1/8" batter and a minimum height
of 0.1'. Unused curb cuts on any lot shall be restored to standard curb height prior
to final inspection of permanent building(s) on the lot.
23. The applicant shall construct the following street improvements to conform with the
General Plan (street type noted in parentheses.)
A. OFF-SITE STREETS
1) La Quinta Drive
a. The applicant shall construct 6 -foot wide sidewalk on the west
side.
Other required improvements in the right-of-way and/or adjacent landscape
setback area include:
a) All appurtenant components such as, but not limited to curb,
gutter, traffic control striping, legends, and signs.
The applicant is responsible for construction of all improvements mentioned above.
The applicant shall extend improvements beyond the project boundaries to ensure
they safely integrate with existing improvements (e.g., grading; traffic control
devices and transitions in alignment, elevation or dimensions of streets and
sidewalks).
24. The applicant shall design street pavement sections using CalTrans' design
procedure for 20 -year life pavement, and the site-specific data for soil strength and
anticipated traffic loading (including construction traffic). Minimum structural
sections shall be as follows:
Parking Lot & Aisles (Low Traffic) 3.0" a.c./4.5" c.a.b.
Parking Lot & Aisles (High Traffic) 4.5" a.c /5.5" c.a.b.
or the approved equivalents of alternate materials per the City Engineer.
25. The applicant shall submit current mix designs (less than two years old at the time
of construction) for base, asphalt concrete and Portland cement concrete. The
submittal shall include test results for all specimens used in the mix design
procedure. For mix designs over six months old, the submittal shall include recent
(less than six months old at the time of construction) aggregate gradation test
results confirming that design gradations can be achieved in current production.
The applicant shall not schedule construction operations until mix designs are
approved.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 6 OF 16
26. General access points and turning movements of traffic are limited to the following:
Auto Centre Way South and Auto Centre Drive: Full turn movements in and out
are allowed.
27. Improvements shall include appurtenances such as traffic control signs, markings,
and other devices, raised medians if required, street name signs and sidewalks.
Mid -block street lighting is not required.
28. Improvements shall be designed and constructed in accordance with City adopted
standards, supplemental drawings and specifications, or as approved by the City
Engineer. Improvement plans for streets, access gates and parking areas shall be
stamped and signed by qualified engineers.
29. Standard knuckles and corner cut-backs shall conform to Riverside County
Standard Drawings #801 and #805, respectively, unless otherwise approved by
the City Engineer.
PARKING LOT and ACCESS POINTS
30. The design of parking facilities shall conform to LQMC Chapter 9.150 and in
particular the following:
A. The parking space and aisle widths and the double hairpin stripe parking
space design shall conform to LQMC Chapter 9.150.
B. Cross slopes should be a maximum of 2% where ADA accessibility is
required including accessibility routes between buildings.
C. Building access points shall be shown on the Precise Grading Plans to
evaluate ADA accessibility issues.
D. Accessibility routes to public streets and adjacent development shall be
shown on the Precise Grading Plan.
E. Parking space lengths shall be according to LQMC Chapter 9.150 and be a
minimum of 17 feet in length with a 2 -foot overhang for standard parking
spaces and 18 feet with a 2 -foot overhang for handicapped parking space
or as approved by the City Engineer. One (1) van accessible parking space
is required per eight (8) accessible parking spaces.
F. Drive aisles between parking spaces shall be a minimum of 26 feet with
access drive aisles to Public Streets a minimum of 30 feet or as approved
by the City Engineer.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 7 OF 16
Entry drives, main interior circulation routes, corner cutbacks, bus turnouts,
dedicated turn lanes, ADA accessibility route to public streets and other features
shown on the approved construction plans, may require additional street widths
and other improvements as may be determined by the City Engineer.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as "engineer,"
"surveyor," and "architect," refer to persons currently certified or licensed to practice their
respective professions in the State of California.
31. Improvement plans shall be prepared by or under the direct supervision of qualified
engineers and/or architects, as appropriate, and shall comply with the provisions
of LQMC Section 13.24.040 (Improvement Plans).
32. The following improvement plans shall be prepared and submitted for review and
approval by the Development Services Division. A separate set of plans for each
line item specified below shall be prepared. The plans shall utilize the minimum
scale specified, unless otherwise authorized by the City Engineer in writing. Plans
may be prepared at a larger scale if additional detail or plan clarity is desired. Note,
the applicant may be required to prepare other improvement plans not listed here
pursuant to improvements required by other agencies and utility purveyors.
A. PM10 Plan 1" = 40' Horizontal
B. Erosion Control Plan 1" = 40' Horizontal
C. WQMP (Plan submitted in Report Form)
D. Precise Grading Plan 1" = 30' Horizontal
NOTE: A through D to be submitted concurrently.
(Separate Storm Drain Plans if applicable)
Other engineered improvement plans prepared for City approval that are not listed
above shall be prepared in formats approved by the City Engineer prior to
commencing plan preparation.
All Off -Site Plan & Profile Street Plans and Signing & Striping Plans shall show all
existing improvements for a distance of at least 200 -feet beyond the project limits,
or a distance sufficient to show any required design transitions.
All On -Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit
Lines and Legends, No Parking Signs, Raised Pavement Markers (including Blue
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 8 OF 16
RPMs at fire hydrants) and Street Name Signs per Public Works Standard Plans
and/or as approved by the Engineering Department.
Precise Grading plans shall normally include all on-site surface improvements
including but not limited to finish grades for curbs & gutters, building pad and floor
elevations, wall elevations, parking lot improvements and accessibility
requirements.
33. The City maintains standard plans, detail sheets and/or construction notes for
elements of construction which can be accessed via the "Plans, Notes and Design
Guidance" section of the Public Works Department at the City website
(www.laquintaca.gov). Please navigate to the Public Works Department home
page and look for the Standard Drawings hyperlink.
34. The applicant shall furnish a complete set of all approved improvement plans on a
storage media acceptable to the City Engineer.
35. Upon completion of construction, and prior to final acceptance of the improvements
by the City, the applicant shall furnish the City with reproducible record drawings
of all improvement plans which were approved by the City. Each sheet shall be
clearly marked "Record Drawing" and shall be stamped and signed by the engineer
or surveyor certifying to the accuracy and completeness of the drawings. The
applicant shall have all approved mylars previously submitted to the City, revised
to reflect the as -built conditions. The applicant shall employ or retain the Engineer
of Record during the construction phase of the project so that the EOR can make
site visits in support of preparing "Record Drawing". However, if subsequent
approved revisions have been approved by the City Engineer and reflect said
"Record Drawing" conditions, the Engineer Of Record may submit a letter attesting
to said fact to the City Engineer in lieu of mylar submittal.
IMPROVEMENT SECURITY AGREEMENTS
36. Prior to constructing any off-site improvements, the applicant shall deposit
securities equivalent to both a Performance and Labor & Material Bonds each
valued at 100% of the cost of the off-site improvements, or as approved by the City
Engineer.
37. Improvements to be made, or agreed to be made, shall include the removal of any
existing structures or other obstructions which are not a part of the proposed
improvements; and shall provide for the setting of the final survey monumentation.
38. When improvements are phased through a "Phasing Plan," or an administrative
approval (e.g., Site Development Permits), all off-site improvements and common
on-site improvements (e.g., backbone utilities, retention basins, perimeter walls,
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 9 OF 16
landscaping and gates) shall be constructed, or secured, prior to the issuance of
any permits in the first phase of the development, or as otherwise approved by the
City Engineer.
Improvements and obligations required of each subsequent phase shall either be
completed, or secured, prior to the completion of homes or the occupancy of
permanent buildings within such latter phase, or as otherwise approved by the City
Engineer.
In the event the applicant fails to construct the improvements for the development,
or fails to satisfy its obligations for the development in a timely manner, pursuant
to the approved phasing plan, the City shall have the right to halt issuance of all
permits, and/or final inspections, withhold other approvals related to the
development of the project, or call upon the surety to complete the improvements.
39. Depending on the timing of the development of this Site Development Permit, and
the status of the off-site improvements at the time, the applicant may be required to:
A. Construct certain off-site improvements.
B. Construct additional off-site improvements, subject to the reimbursement of
its costs by others.
C. Reimburse others for those improvements previously constructed that are
considered to be an obligation of this Site Development Permit.
D. Secure the costs for future improvements that are to be made by others.
E. To agree to any combination of these actions, as the City may require.
Off -Site Improvements should be completed on a first priority basis. The applicant
shall complete Off -Site Improvements in the first phase of construction.
In the event that any of the improvements required for this development are
constructed by the City, the applicant shall, prior to the approval of the Site
Development Permit, or the issuance of any permit related thereto, reimburse the
City for the costs of such improvements.
40. The applicant shall submit detailed construction cost estimates for all proposed on-
site and off-site improvements, for checking and approval by the City Engineer.
Such estimates shall conform to the unit cost schedule as approved by the City
Engineer.
Estimates for improvements under the jurisdiction of other agencies shall be
approved by those agencies and submitted to the City along with the applicant's
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 10 OF 16
detailed cost estimates. Security will not be required for telephone, natural gas, or
Cable television improvements.
rRAnlr\lr
41. The applicant shall comply with the provisions of LQMC Section 13.24.050
(Grading Improvements).
42. Prior to occupancy of the project site for any construction, or other purposes, the
applicant shall obtain a grading permit approved by the City Engineer.
43. To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of
California,
B. A preliminary geotechnical ("soils") report prepared by an engineer
registered in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16, (Fugitive Dust Control), and
D. An Erosion Control Plan showing Best Management Practices prepared in
accordance with LQMC Sections 8.70.010 and 13.24.170 (NPDES
Stormwater Discharge Permit and Storm Management and Discharge
Controls).
E. A final WQMP prepared by an appropriate professional registered in the
State of California.
F. A grading bond in a form acceptable to the City, and in an amount sufficient
to guarantee compliance with the grading bond requirements.
All grading shall conform with the recommendations contained in the Preliminary
Soils Report and shall be certified as being adequate by soils engineer, or
engineering geologist registered in the State of California.
The applicant shall furnish security, in a form acceptable to the City, and in an
amount sufficient to guarantee compliance with the approved Fugitive Dust Control
Plan provisions as submitted with its application for a grading permit. Additionally,
the applicant shall replenish said security if expended by the City of La Quinta to
comply with the Plan as required by the City Engineer.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 11 OF 16
44. The applicant shall maintain all open graded, undeveloped land in order to prevent
wind and/or water erosion of such land. All open graded, undeveloped land shall
either be planted with interim landscaping, or stabilized with such other erosion
control measures, as were approved in the Fugitive Dust Control Plan.
45. Grading within the perimeter setback and parkway areas shall have undulating
terrain and shall conform with the requirements of LQMC Section 9.60.240(F)
except as otherwise modified by this condition. The maximum slope shall not
exceed 3:1 anywhere in the landscape setback area, except for the backslope (i.e.,
the slope at the back of the landscape lot) which shall not exceed 2:1 if fully planted
with ground cover. The maximum slope in the first six (6) feet adjacent to the curb
shall not exceed 4:1 when the nearest edge of sidewalk is within six feet (6') of the
curb, otherwise the maximum slope within the right of way shall not exceed 3:1. All
unpaved parkway areas adjacent to the curb shall be depressed one and one-half
inches (1.5") in the first eighteen inches (18") behind the curb.
46. Building pad elevation on the precise grading plan submitted for City Engineer's
approval shall conform with pad elevations shown on the preliminary grading plan,
unless the pad elevations have other requirements imposed elsewhere in these
Conditions of Approval, or as approved by the City Engineer.
47. Prior to any site grading or regrading that will raise or lower any portion of the site
by more than plus or minus half of a foot (05) from the elevations shown on the
approved Site Development Permit, the applicant shall submit the proposed
grading changes to the City Engineer for a substantial conformance review.
48. Prior to the issuance of a building permit for any building lot, the applicant shall
provide a lot pad certification stamped and signed by a qualified engineer or
surveyor with applicable compaction tests and over excavation documentation.
Each pad certification shall list the pad elevation as shown on the approved
grading plan, the actual pad elevation, and the difference between the two, if any.
Such pad certification shall also list the relative compaction of the pad soil. The
data shall be organized by lot number and listed cumulatively if submitted at
different times.
a-ir I01ILrtld
49. Stormwater handling shall conform with the approved hydrology and drainage
report for the Hampton Inn Hotel project (SDP2022-0007), or as approved by the
City Engineer. Nuisance water shall be disposed of in an approved manner.
Nuisance water shall be retained onsite and disposed of via an underground
percolation improvement approved by the City Engineer.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 12 OF 16
50. The applicant shall comply with the provisions of LQMC Section 13.24.120
(Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 —
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements. More specifically, stormwater falling on site during the 100 -
year storm shall be retained within the development, unless otherwise approved
by the City Engineer. The design storm shall be the 1 hour, 3 hour, 6 hour or 24
hour event producing the greatest total run off.
51. Nuisance water shall be retained on site. Nuisance water shall be disposed of per
approved methods contained in Engineering Bulletin No. 06-16 — Hydrology Report
with Preliminary Hydraulic Report Criteria for Storm Drain Systems and
Engineering Bulletin No. 06-015 - Underground Retention Basin Design
Requirements.
52. In design of retention facilities, the maximum percolation rate shall be two inches
per hour. The percolation rate will be considered to be zero unless the applicant
provides site specific data indicating otherwise and as approved by the City
Engineer.
53. The project shall be designed to accommodate purging and blowoff water (through
underground piping and/or retention facilities) from any on-site or adjacent well
sites granted or dedicated to the local water utility authority as a requirement for
development of this property.
54. No fence or wall shall be constructed around any retention basin unless approved
by the Planning Manager and the City Engineer.
55. For on-site above ground common retention basins, retention depth shall be
according to Engineering Bulletin No. 06-16 — Hydrology Report with Preliminary
Hydraulic Report Criteria for Storm Drain Systems. Side slopes shall not exceed
3:1 and shall be planted with maintenance free ground cover. Additionally,
retention basin widths shall be not less than 20 feet at the bottom of the basin.
56. Stormwater may not be retained in landscaped parkways or landscaped setback
lots. Only incidental storm water (precipitation which directly falls onto the setback)
will be permitted to be retained in the landscape setback areas. The perimeter
setback and parkway areas in the street right-of-way shall be shaped with berms
and mounds, pursuant to LQMC Section 9.100.040(B)(7).
57. The design of the development shall not cause any increase in flood boundaries
and levels in any area outside the development.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 13 OF 16
58. The development shall be graded to permit storm flow in excess of retention
capacity to flow out of the development through a designated overflow and into the
historic drainage relief route.
59. Storm drainage historically received from adjoining property shall be received and
retained or passed through into the historic downstream drainage relief route.
60. The applicant shall comply with applicable provisions for post construction runoff
per the City's NPDES stormwater discharge permit, LQMC Sections 8.70.010 et
seq. (Stormwater Management and Discharge Controls), and 13.24.170 (Clean
Air/Clean Water); Riverside County Ordinance No. 457; and the California
Regional Water Quality Control Board — Colorado River Basin (CRWQCB-CRB)
Region Board Order No. R7-2013-0011.
A. For post -construction urban runoff from New Development and
Redevelopments Projects, the applicant shall implement requirements of
the NPDES permit for the design, construction and perpetual operation and
maintenance of BMPs per the approved Water Quality Management Plan
(WQMP) for the project as required by the California Regional Water Quality
Control Board — Colorado River Basin (CRWQCB-CRB) Region Board
Order No. R7-2013-0011.
B. The applicant shall implement the WQMP Design Standards per
(CRWQCB-CRB) Region Board Order No. R7-2013-0011 utilizing BMPs
approved by the City Engineer. A project specific WQMP shall be provided
which incorporates Site Design and Treatment BMPs utilizing first flush
infiltration as a preferred method of NPDES Permit Compliance for
Whitewater River receiving water, as applicable.
C. The developer shall execute and record a Stormwater Management/BMP
Facilities Agreement that provides for the perpetual maintenance and
operation of stormwater BMPs.
I ITII ITIF4
61. The applicant shall comply with the provisions of LQMC Section 13.24.110
(Utilities).
62. The applicant shall obtain the approval of the City Engineer for the location of all
utility lines within any right-of-way, and all above -ground utility structures including,
but not limited to, traffic signal cabinets, electric vaults, water valves, and
telephone stands, to ensure optimum placement for practical and aesthetic
purposes.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 14 OF 16
63. Existing overhead utility lines within, or adjacent to the proposed development, and
all proposed utilities shall be installed underground.
The 92 KV transmission power poles and all existing utility lines attached to joint
use 92 KV transmission power poles are exempt from the requirement to be placed
underground.
64. Underground utilities shall be installed prior to overlying hardscape. For installation
of utilities in existing improved streets, the applicant shall comply with trench
restoration requirements maintained, or required by the City Engineer.
The applicant shall provide certified reports of all utility trench compaction for
approval by the City Engineer. Additionally, grease traps and the maintenance
thereof shall be located as to not conflict with access aisles/entrances.
CONSTRUCTION
65. The City will conduct final inspections of habitable buildings only when the
buildings have improved street and (if required) sidewalk access to publicly
maintained streets. The improvements shall include required traffic control
devices, pavement markings and street name signs. If on-site streets in residential
developments are initially constructed with partial pavement thickness, the
applicant shall complete the pavement prior to final inspections of the last ten
percent of homes within the development or when directed by the City, whichever
comes first.
LANDSCAPE AND IRRIGATION
66. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping
Setbacks) & 13.24.140 (Landscaping Plans).
67. Landscape and irrigation plans for landscaped lots and setbacks, medians,
retention basins, and parks shall be signed and stamped by a licensed landscape
architect.
68. All new and modified landscape areas shall have landscaping and permanent
irrigation improvements in compliance with the City's Water Efficient Landscape
regulations contained in LQMC Section 8.13 (Water Efficient Landscape).
69. Lighting plans shall be submitted with the final landscaping plans for a
recommendation to the Planning Manager for his approval. Exterior lighting shall
be consistent with LQMC Section 9.100.150 (Outdoor Lighting). All freestanding
lighting shall not exceed 18 feet in height and shall be fitted with a visor if deemed
necessary by staff to minimize trespass of light off the property. The illuminated
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 15 OF 16
carports shall be included in the photometric study as part of the final lighting plan
submittal.
70. All water features shall be designed to minimize "splash" and use high efficiency
pumps and lighting to the satisfaction of the Design and Development Director.
They shall be included in the landscape plan water efficiency calculations per
Municipal Code Chapter 8.13.
71. All rooftop mechanical equipment shall be completely screened from view. Utility
transformers or other ground mounted mechanical equipment shall be fully
screened with a screening wall or landscaping and painted to match the adjacent
buildings.
72. The applicant shall submit the final landscape plans for review, processing, and
approval to the Community Development Department, in accordance with the Final
Landscape Plan application process. Planning Manager approval of the final
landscape plans is required prior to issuance of the first building permit unless the
Planning Manager determines extenuating circumstances exist which justifies an
alternative processing schedule.
NOTE: Plans are not approved for construction until signed by the appropriate City
official, including the Planning Manager and/or City Engineer.
73. The applicant or his agent has the responsibility for proper sight distance
requirements per guidelines in the AASHTO "A Policy on Geometric Design of
Highways and Streets, 5th Edition" or latest, in the design and/or installation of all
landscaping and appurtenances abutting and within the private and public street
right-of-way.
74. The final design of the perimeter landscaping, particularly the perimeter wall, shall
be included with the Final Landscape Plan submittal.
PUBLIC SERVICES
75. The applicant shall provide public transit improvements if required by SunLine
Transit Agency and approved by the City Engineer.
MAINTENANCE
76. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
77. The applicant shall make provisions for the continuous and perpetual maintenance
of perimeter landscaping up to the curb, common areas, access drives, sidewalks,
and stormwater BMPs.
PLANNING COMMISSION RESOLUTION 2023-023
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0007
PROJECT: HAMPTON INN HOTEL
ADOPTED: DECEMBER 12, 2023
PAGE 16 OF 16
FEES AND DEPOSITS
78. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees
and Deposits). These fees include all deposits and fees required by the City for
plan checking and construction inspection. Deposits and fee amounts shall be
those in effect when the applicant makes application for plan check and permits.
PLANNING
79. The parking light poles along the south project border shall not exceed more than
12 feet in height.
80. The parapet architectural features shall have a minimum depth of 10 feet.
81. No building -mounted signage shall be placed on the south elevation. Signage on
the porte-cochere (west or east facing) or ground -mounted signage is acceptable
at the south side of the site.