BRES2023-1044 1Building Permit Number:
Project Description:
Exempt: ❑
(Materials may contain hazardous wastes and
are not subject to recycling provisions)
Construction Debris Management Plan
SFR
Plan Submittal Date
Job Site Address
Owner's Name
Number, Street, or PO Box
City, State. Postal Code
Owner's Phone Number
Owner's E-Mail Address
Project Manager's Name
Project Manager's Phone Number
Project Manager's E-mail Address
Builder / Contractor
Number. Street or PO Box
City, State, Postal Code
Project Square Footage
fz/. j 23
81590 Shackleton Way, La Quinta, CA 92253
D'Amato
81590 Shackleton Way
Laquinta, CA 92253
949-477-7001
ajdamatojr@me.com
Josh Hunter
949-887-2486
josh@genovacd.com
Genova Construction & Development
555 Corporate Drive, Ste 120
Ladera Ranch, CA 92694
8595
Approval By Burrtec�.
Date of City Approval
Materials To Be Discarded:
Product
Trash
Asphalt
Brick/Block
Cardboard
Commingled
Concrete
Drywall
Donated / Reuse*
*Describe Items
Tons
Not recyclable
Recyclable
Recyclable
Recyclable
Recyclable
Recyclable
Recyclable
Recyclable
3 O
9, ,z.5
1,s
Product
Masonry (broken)
Plaster
Scrap Metal
Tile (floor)
Tile (roof)
Wood
Landscape Debris
Tons
Recyclable
Recyclable
Recyclable
Recyclable
Recyclable
Recyclable
Recyclable
Il.
I,zS
1'.
0
0
0
Totals:
Recycle
0.0
Trash
�7 DT
Projected Diversion:
I understand it is the property owners responsibility to submit copies of weight tickets or receipts to the District
Environmental Coordinator as these hauls occur. I hereby certify that completion, implementation and adherence of the
Debris Management Plan (DMP) for the above named project shall guarantee that at least 65% of the jobsite waste is
diverted from landfilling. The remaining material will be recycled or reused. I will divert, for recycling or re -use, remaining
materials generated from the first day of the project through the completion of the project in accordance with this plan. This
DMP is issued in the name of the property owner(s) and shall remain their property throughout the construction and/or
demolition project. A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still
issued in the name of the property owner(s) and the owner retains legal responsibility for ensuring that the provisions of the
DMP are adhered to. The property owner(s) and general contractor shall be kept informed of the diversion progress through
hi -monthly rennrts if self-haiilinn. all ref'rse material from this nrniect site must he taken to an annrnverl rer..vrler nr transfer
Owner / Developer / Project Manager / Superintendant Date
(?n(1v)VUI
Construction Debris Management Plan
Summary of Requirements
As of January 1, 2017, The Green Building Standards Code (CALGreen) requires that the construction
of most new structures in the State of California comply with sections 4.408 and 5.408 of the code in
accordance with Assembly Bill 939 requiring that no more than 35% of jobsite waste be disposed of as
trash at local land fill sites and transfer stations. Exceptions may be made for certain projects under
certain conditions.
The City of La Quinta is committed to the highest level of environmental respect, to conserving our
precious natural resources and setting an example to provide for a better world for generations to come.
Recycling helps keep reusable resources out of landfills and will also reduce disposal costs.
IMPORTANT: Burrtec Waste & Recycling Services is the City's franchise
hauler. If you choose to self -haul any recyclables or trash, you must
provide copies of all weight tickets and/or receipts from the transfer
station, landfill, or recycler as the job progresses. Clean-up companies
and other haulers are not permitted to haul waste or recyclables from the
City of La Quinta. Self -haul weight tickets should be submitted to: Mike
Veto, District Environmental Coordinator - mveto@burrtecdesert.com, or
faxed to (760) 340-0417, or mailed to: 41575 Eclectic Street, Palm
Desert, CA. 92260.