Loading...
BRES2023-1044 1Building Permit Number: Project Description: Exempt: ❑ (Materials may contain hazardous wastes and are not subject to recycling provisions) Construction Debris Management Plan SFR Plan Submittal Date Job Site Address Owner's Name Number, Street, or PO Box City, State. Postal Code Owner's Phone Number Owner's E-Mail Address Project Manager's Name Project Manager's Phone Number Project Manager's E-mail Address Builder / Contractor Number. Street or PO Box City, State, Postal Code Project Square Footage fz/. j 23 81590 Shackleton Way, La Quinta, CA 92253 D'Amato 81590 Shackleton Way Laquinta, CA 92253 949-477-7001 ajdamatojr@me.com Josh Hunter 949-887-2486 josh@genovacd.com Genova Construction & Development 555 Corporate Drive, Ste 120 Ladera Ranch, CA 92694 8595 Approval By Burrtec�. Date of City Approval Materials To Be Discarded: Product Trash Asphalt Brick/Block Cardboard Commingled Concrete Drywall Donated / Reuse* *Describe Items Tons Not recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable 3 O 9, ,z.5 1,s Product Masonry (broken) Plaster Scrap Metal Tile (floor) Tile (roof) Wood Landscape Debris Tons Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Recyclable Il. I,zS 1'. 0 0 0 Totals: Recycle 0.0 Trash �7 DT Projected Diversion: I understand it is the property owners responsibility to submit copies of weight tickets or receipts to the District Environmental Coordinator as these hauls occur. I hereby certify that completion, implementation and adherence of the Debris Management Plan (DMP) for the above named project shall guarantee that at least 65% of the jobsite waste is diverted from landfilling. The remaining material will be recycled or reused. I will divert, for recycling or re -use, remaining materials generated from the first day of the project through the completion of the project in accordance with this plan. This DMP is issued in the name of the property owner(s) and shall remain their property throughout the construction and/or demolition project. A contractor serving as agent of the owner may obtain a DMP for the owner. However, the DMP is still issued in the name of the property owner(s) and the owner retains legal responsibility for ensuring that the provisions of the DMP are adhered to. The property owner(s) and general contractor shall be kept informed of the diversion progress through hi -monthly rennrts if self-haiilinn. all ref'rse material from this nrniect site must he taken to an annrnverl rer..vrler nr transfer Owner / Developer / Project Manager / Superintendant Date (?n(1v)VUI Construction Debris Management Plan Summary of Requirements As of January 1, 2017, The Green Building Standards Code (CALGreen) requires that the construction of most new structures in the State of California comply with sections 4.408 and 5.408 of the code in accordance with Assembly Bill 939 requiring that no more than 35% of jobsite waste be disposed of as trash at local land fill sites and transfer stations. Exceptions may be made for certain projects under certain conditions. The City of La Quinta is committed to the highest level of environmental respect, to conserving our precious natural resources and setting an example to provide for a better world for generations to come. Recycling helps keep reusable resources out of landfills and will also reduce disposal costs. IMPORTANT: Burrtec Waste & Recycling Services is the City's franchise hauler. If you choose to self -haul any recyclables or trash, you must provide copies of all weight tickets and/or receipts from the transfer station, landfill, or recycler as the job progresses. Clean-up companies and other haulers are not permitted to haul waste or recyclables from the City of La Quinta. Self -haul weight tickets should be submitted to: Mike Veto, District Environmental Coordinator - mveto@burrtecdesert.com, or faxed to (760) 340-0417, or mailed to: 41575 Eclectic Street, Palm Desert, CA. 92260.