TTM 36744 Preliminary Hydrology ReportLocated in a Portion of the Northeast % of Section 15,
Township 6 South, Range 7 East, SBM
City of La Quinta, California
Tentative Tract Map No. 36 744
"The Estates at Griffin Lak,
RECEIVED
DEC 16 2014
Cn If OF LA QUINTA
OdMMUNITY DEVELOPMENT
December 15, 2014
Prepared far:
Griffin Ranch Investors, LR
JN: 2168
MSA CONSULTING, INC.
PLAIMM . cam. EWGUafflRM . LANs sMVXVM
IF
34200 Bon Hom nom ■ RANCHO MnLAw ■ CA 92270
TnuumoNB (760) 320,9M ■ FAx (760) 323-7893
Located in a Portion of the Northeast'/4 of Section 15,
Township 6 South, Range 7 East, SBM
City of La Quinta, California
Tentative Tract Map No. 36744
"The Estates at Griffin Lake"
December 15, 2014
Prepared for:
Griffin Ranch Investors, LP
JN: 2158
MSA CONSULTING, INC.
PLAmmgo ■ Orm 4 ■ LAND SURVMWO
$1 D 34300 Hae Hom DRm ■ RAN= blam B ■ CA 9=70
Tmmsom (760) 320-9M ■ FAx (160) 373-7M
TABLE OF CONTENTS
PROJECT DESCRIPTION.................................................................1
EXISTING CONDITIONS....................................................................1
FLOOD CONTROL REQUIREMENTS...............................................1
PROPOSED HYDROLOGY...............................................................1
WATER QUALITY MANAGEMENT PLAN........................................1
RUN-OFF ANALYSIS.........................................................................2
RESULTS AND CONCLUSIONS.......................................................2
LIST OF APPENDICES:
A.
B.
VICINITY MAP
FEMA MAP
C.
HYDROLOGIC SOIL GROUP CLASSIFICATION
D.
SYNTHETIC UNIT HYDROGRAPH SHORTCUT METHOD CALCULATONS
E.
NOAA ATLAS 14
F.
EXISTING CONDITIONS EXHIBIT
G.
PROPOSED SYNTHETIC UNIT HYDROGRAPH EXHIBIT
H.
PRELIMINARY GRADING PLAN
Project Description
The subject project, Tentative Tract Map 36744, is located on the south side of Avenue 54,
% to Y: -way between Madison and Monroe Streets in the city of La Quinta, California. The
proposed site is approximately 38.16 acres, consisting of the existing main house and
adjoining buildings, proposed single family housing, and a lake (see Vicinity Map, Appendix
A).
Existing Conditions
Flood Rate Map: The project area is covered by FIRM Panel Number 06065C2263G,
revised August 28, 2008. This panel is not printed, indicating no special flood hazard areas
(see Appendix B).
Existing Ori -Site Conditions: The project area is the former Mery Griffin estate, consisting of
a main house, multiple guest houses, equestrian facilities, and a lake.
Existing On -Site Flows: The northwest corner of the site is tiered, with the main house and
adjoining guest houses sitting above the lake, which in turn sits above the remainder of the
site. The portion of the western side of the site, south of the lake between the perimeter wall
and the race track, drains to a small retention area in the southwest corner. The remainder
of the site drains to the retention area in the southeast corner.
Existing Off -Site Flows: The project area is elevated above the existing Griffin Ranch
development, which bounds the site on the west, south and east sides, preventing flows
from entering from those directions. Avenue 54 runs along the site's northern side, directing
flows past the project.
Flood Control Requirements
The project site lies within the flood jurisdiction of the City of La Quinta. City policy for this
area dictates that the entirety of the runoff generated by the 104 -year design storm shall be
captured and stored on-site until such time as it is percolated into the ground.
Proposed Hydrology and Flood Control Improvements
In the proposed design, all storm runoff generated on-site will be conveyed via surface flow
to the proposed lake (the existing lake will be demolished). The storage above the lake's
normal high water elevation will be sufficient to store the runoff from the 100 -year design
storm. The lowest pad elevation will be set a minimum of one foot above the lake's 100 -
year design storm high water elevation.
The normal high water elevation is maximum water surface elevation of the lake during
typical conditions. The normal high water elevation is six inches below the top of the
concrete edge of the lake. The normal water volume of the lake is 1,336,419 cubic feet.
Water Quality Management Plan
A formal separate Water Quality Management Plan will be prepared for this project.
The Synthetic Unit Hydrograph Exhibit (Appendix G) illustrates the storm runoff volume of
the project and the required storage capacities of the proposed lake. Since the proposed
lake will be lined, no percolation is included in the calculations. The design of the proposed
lake includes two sets of pumps; one set to circulate the water to prevent stagnation and for
vector control, and another set to provide irrigation water to the development for both the
common areas and private residences. Because of these two systems, the storm water
runoff will be drawn down through a combination of use as irrigation water,
evapotranspiration, and percolation along the shoreline.
The proposed lake is more than adequately sized to retain the entirety of the 100 -year
design storm for each drainage area within the 6 inch freeboard of the lake and the slope of
the shore.
It is therefore concluded that the proposed development of the subject property meets the
hydrologic requirements set forth by the City of La Quinta.
APPENDIX A
VICINITY MAP
Wj
E
r `+
Vicinity Map
�3E { e
R ] Al
i{I LU 4
4 ,in
#
1NOAVE�4 �C
NUfll��� -
AK T., A-y'r'
till �tr°4 G1ty oSITE L -608t� �I
Selected parcel(s):
757-320-013
FOUR SEASONS PL
e, ---> ISI 1 I I ��
0 1,350 Feet
E4T H AVE ---I
9
`IMPORTANT'
Maps and data are to be used for reference purposes only. Map features are approximate, and are not necessarily accurate to surveying or engineering
standards The County of Riverside makes no warranty or guarantee as to the content (the source is often third party), accuracy, timeliness, or
completeness of any of the data provided, and assumes no legal responsibility For She information contained on this map. Any use of this prpductwith
respect t4 accuracy and precision shall be the sole responsibility of the user -
REPORT PRINTED ON --- Tue Jun 24 2014 07:42,03 GMT -0700 (Pack Daylight Time)
Version 131127
Let 33d39'17" Lon -116d14'41"
KINGSTON NEAT"
rr
til VIII VIII
c
Riverside County
a�
TLMA GIS
Selected parcel(s):
757-320-013
FOUR SEASONS PL
e, ---> ISI 1 I I ��
0 1,350 Feet
E4T H AVE ---I
9
`IMPORTANT'
Maps and data are to be used for reference purposes only. Map features are approximate, and are not necessarily accurate to surveying or engineering
standards The County of Riverside makes no warranty or guarantee as to the content (the source is often third party), accuracy, timeliness, or
completeness of any of the data provided, and assumes no legal responsibility For She information contained on this map. Any use of this prpductwith
respect t4 accuracy and precision shall be the sole responsibility of the user -
REPORT PRINTED ON --- Tue Jun 24 2014 07:42,03 GMT -0700 (Pack Daylight Time)
Version 131127
Let 33d39'17" Lon -116d14'41"
APPENDIX 8
FEMA MAP
APPENDIX C
HYDROLOGIC SOIL GROUP
CLASSIFICATION
Hydrologic Soil Group—RiversideCanty, Coachella Valley Area, California
m w
569500 569500 559700 569900 569900 5700M 570100 57M 510006 570400 570500 570W
33° 39F 29' N R 33° 39' 29" N
r.F 2Cg
wifimb 54th -Ave
s
3' 1
r Q 5Ii'
Lag � E
569500 569600 569700 569900 569900 570700 570100 570200 570300 S70400 570600 570"
°i Map Stale: 1;5,740 (printed cn A k3rxtcape (W x BY) deet
mem
N r«
0 50 100 200 300
fo
0 250 500 1000 1500
Map projection: web Malraux' Confer axrdhates; WCS84 Edge tics: LffM Zane JUN WGS94
(SM Natural Resources Web Soil Survey 811212014
Conservation Service National Cooperative Soil Survey Page 1 of 4
Hydrologic Soil Group—Riverside County, Coachella Valley Area, Califomia
F
11
Hydrologic Soil Group
Hydrologic Soil Group-- Summary by tbp Unit — Riverside County, Coachella Valley Area, Califomla [CA880]
Map unit symbol Map unit name Bating Acres In AOI Percent of AOI
CPA Coachella fine sand, 0 to A
2 percent slopes
77.2
66-0%
GbA Gilman fine sandy loam, B
24.7
21.1%
0 to 2 percent slopes
Is Indio very fine sandy B
4.6
4.0%
loam
8.3
7.10A
MaB 'Myoma fine sand, a to 5 A
percent slopes
W Water
2.2
1,9%
117.0
100.09
Totals for Area of Interest
Natural Resources Web Soil Survey 611212014
Conservation Service National Cooperative Soil Surrey Page 3 of 4
APPENDIX D
SYNTHETIC UNIT HYDROGRAPH
SHORTCUT METHOD
CALCULATIONS
RCFCD SYNTHETIC UNIT HYDROGRAPH - SHORTCUT METHOD
DATA INPUT SHEET
DATE: jJune 34, 2014
WORKSHEET PREPARED BY' Isaw
PROJECT NAME
PROJECT NUMBER
CONCENTRATION POINT DESIGNATION
AREA DESIGNATION
AMC NUMBER
The Estates at Griffin Lake
216$
IUDDer Lake
Drainaae Area A
Low Loss Conditions: X --Existing; D=Developed; BS=Retention
AREA SOIL TRIBUTARY AREAS ACRES
SF - 114 ACRE
PAVING[HARDSCAPE
LENGTH OF WATERCOURSE {L}
200 it
LENGTH TO POINT OPPOSITE CENTROID (Lira)
I 100 ft
ELEVATION OF HEADWATER
497.0 ft
ELEVATION OF CONCENTRATION POINT
490.0 ft
AVERAGE MANNINGS ' N' VALUE
0.Oi5
STORM FREQUENCY (YEAR)
100
LOW LOSS RATE (For Storms Greater Than 10 Years)
B5%
POINT RAIN FROM NOAA ATLAS
14
1 -HOUR
1.38 in
3 -HOUR
2.09 in
6 -HOUR
2.72 in
24-HOUR
4.37 in
AMC II
LOW LOSS
RI
INFILTRATION
IMPERVIOUS
CONDITION
NUMBER
RATE
PERCENT
D
32
0.74
0.50
D
32
0.74
1.00
1%4.�
RCFC & WCD
"UDIROL®W
SYNTHETIC UNIT HYDROGRAPH METHOD
BASIC DATA CALCULATION FORM
AMC II
PROJECT:
Job No.:
6Y:
The Estates at Griffin Lake
2188
saw DATE:
6/30114
AVERAGE ADJUSTED LOSS RATE
SOIL LAND USE
GROUP
Plate C-1
RI PERVIOUS DECIMAL ADJUSTED
NUMBER AREA PERCENT INFILTRATION
INFILTRATION OF AREA RATE
RATE IMPERVIOUS
(inmr) {inlhr)
Plate E-6.1 late E-6.2 Plate E-6.3
AREA
MAX LOW LOW
AREA AVERAGE LOSS LOSS RATE
WEIGHTED ADJUSTED CONDITION PER
AVERAGE INFILTRATION RCFC12322
RATE
(infhr) (inlhr)
MIN
AVERAGE
ADJUSTED
INFILTRATION
RATE
(Inmr)
A SF - 114 ACRE
32 0.14 50% G-41
0.86
0.623 0.2536 DEVELOPED 6.5000
0.3116
A PAMNGIHARDSCAPE
32 0.74 100% 0.07
0.52
0.371 0.0279 DEVELOPED 0-1000
0.0377
SUM
VARIABLE LOSS RATE CURVE 24-HOUR STORM ONLY)
Fm= 0.14076067
C= 0.00261
Fi=C(24-(7160))"1.55 = 0.U0251 [24IT160]P11.55 + 0.14
CONSTANT LOSS RATE (3 & 6 HOUR STORMS) = 0.2815 inlhr
LOW LOSS RATE = 0.8600 in/hr
Where.
T=Time in minutes. To get an average value for each unit time period, Use T-1/2 the unll lime for the first time period,
T-1 V2 unit time for the second period. etc.
1.38
1W
SUM 0.2815
NOTE: Law loss rates established per RCFCI2322 (Dated: May -30-$E)
For 10 Year Storms or Less
Undeveloped Condition: Low Loss = 90%
Developed Condition: Low Lass = 0.9 -(0.8' %impervious)
Basin Site: Law Loss =10%
For 100 Year Storm - Law Lass should be between 80% & 9096
of the Rainfall Rate
0.3483
Plate E-2.1
Page 3 of 9
RCFC & WCC
P rl n" Cell
NMUAL
SYNTHETIC UNIT HYDROGRAPH METHOD
SHORTCUT METHOD
3 -HOUR STORM
128
PROJECT:
Job No.,
BYL
The Estates at Griffin Lake
2168 DATE
saw 6130N4
FLOOD VOLUME (cuff)
UNIT HYDRDGRAPH and EFFECTIVE RAIN CALCULATION
FORM
2.47
DRAINAGE AREA -ACRES
UNIT TIME -MINUTES
LAG TIME - MINUTES
UNIT TIME -PERCENT OF LAG
TOTAL ADJUSTED STORM RAIN -INCHES
CONSTANT LOSS RATE-irJhr
LOW LOSS RATE - PERCENT
1.38
5
0.51
977.2
2.09
0.28
85%
Unit Time Time
Period Mipit"s
Hours
Pattern
Percent
Plate E-5.9
Storm
Rain
in/hr
Max
Lass Rate
irohr
Low
EffecOve
Rain
inmr
Flood
Hydrapraph
Flaw
cfa
1 5
0.08
1.3
0.33
028
0.28
0.04
0.08
2 10
0.17
1.3
0.33
0.28
0.28
0.04
0.06
3 15
035
1.1
028
0.28
0.23
0.04
0.06
4 2D
0.33
1.5
0.38
028
0.32
0.09
0.13
5 25
0.42
1.5
0.38
0.28
0.32
0.09
0.13
6 30
0.50
1.8
0.45
0.28
0.38
0.17
0.24
7 35
0.58
1.5
0.38
0.28
0.32
0.09
0.13
8 40
0.67
1.Q
0.45
0.28
0.38
0.17
0.24
9 45
0.75
1.8
0.45
0.28
0.38
0.17
0.24
10 50
0.63
1.5
0.38
0.28
0.32
0.08
0.13
I 1 55
0.92
1.6
0.40
0.28
0.34
0.12
0.17
12 60
1.00
1.8
0.45
0.28
0.36
0.17
0.24
13 55
1.08
2.2
0.55
0.28
0.47
0.27
0.38
14 70
1.17
2.2
0.55
0.28
0.47
0.27
0.38
is 75
1.25
2.2
0.55
0.28
0.47
0.27
0.38
is 80
1.33
2.0
0.50
0.28
0.43
022
0.31
17 85
1.42
2.6
0.65
0.28
0.55
0.37
0.52
is 90
1.50
2.7
0.88
028
0.58
040
0.55
19 95
1.58
2.4
0.80
0.28
0.51
0.32
0.45
20 100
1.67
2.7
0.68
0.28
0.58
0.40
0.55
21 105
1.75
3.3
D.83
028
0.70
0.55
0.76
22 110
1.83
3.1
0.78
0.28
0.66
0,50
0.69
23 115
1.92
2.9
0.73
0.28
0.62
0.45
0.52
24 120
2.00
3.0
0.75
0.28
0.64
0.47
0.$$
25 125
2.08
3.1
0.78
028
0.65
0.50
0.89
26 130
2.17
43
1.05
0.28
0.90
0.77
1.07
27 135
2.25
5.0
1.25
0.28
1.07
0.97
1.35
28 140
2.33
3.5
0.86
9.28
0.75
0.60
0.83
29 145
2.42
6.8
1.71
0.28
1.45
1.42
1.98
30 150
2.50
7.3
1.83
0.28
1.58
1.55
2.16
31 155
2.58
8.2
2.06
0.28
1.75
1.78
2.47
32 160
2.07
5.9
1.48
0.28
1,26
1.20
1.67
33 165
2.75
2-0
0.50
0.28
0.43
0.22
0.31
34 170
2.83
1.8
0.45
0.28
0.38
0.17
0.24
35 175
2.92
1.8
0.45
0.28
0.38
0.17
0.24
38 180
3.00
0.6
0.15
0.28
0.13
0.02
0.03
EFFECTIVE RAIN 8 FLOOD VOLUMES SUMMARY
EFFECTIVE RAIN (in)
128
FLOOD VOLUME (arrtt)
0.15
FLOOD VOLUME (cuff)
6,323
PEAK FLOW RATE (ds)
2.47
Plate E-2.2
3 -Baur Storm
Page 5 of 9
RCFC & WCD
HIM[G®d@12w
MMUIRL
SYNTHETIC UNIT HYDROGRAPH METHOD
SHORTCUT METHOD
6 -HOUR STORM
PROJECT:
Job No.:
BY:
The Estates at Griffin Lake
2168 DATE
saw 6!30114
UNIT
HYDROGRAPH and EFFECTIVE RAIN CALCULATION
FORM
PEAL( FLOW RATE (Cfs)
2.15
DRAINAGE AREA -ACRES
UNIT TIME -MINUTES
LAG TIME - MINUTES
UNIT TIME -PERCENT OF LAG
TOTAL ADJUSTED STORM RAI WINCHES
CONSTANT LOSS RATE-in/hr
LOW LOSS RATE - PERCENT
1.38
5
0.51
977.2
2.72
0.282
85%
Unit Time Time
Period Minutes
Hours
Pattern
Percent
Plate E-5.9
Storm
Rain
inlhr
Loss Rate
irdhr
Max Low
Effective
Rain
in/hr
Flood
Hydrograph
Flow
ds
51 255
4.25
1.9
0.620
0.28
0.53
0.34
0.47
52 260
4.33
2.0
0.653
0.28
0.55
0.37
0.52
53 265
4.42
2.1
0.685
0.28
0.58
0.40
0.56
54 270
4.50
2.1
0.685
0.28
0.58
0.40
0.56
55 275
4.58
2.2
0.718
0.28
0.61
0.44
0.61
56 280
4.67
2.3
0.751
0.28
0.64
0.47
0.65
57 285
4.75
2.4
0.783
0.28
0.67
0.50
0.70
58 290
4.83
2.4
0.783
0.28
0.67
0.50
0.70
59 295
4.92
2.5
0.816
0.28
0.69
0.53
0-74
60 300
500
2.6
0.849
0.28
0.72
0.57
0.79
61 305
5.08
3.1
1.012
0.28
0.86
0.73
1.02
62 310
5.17
3.6
1.175
0.28
1.00
0.89
1.24
63 315
5.25
3.9
1.273
028
1.08
0.99
1.38
64 320
5.33
4.2
1.371
0.26
1.17
1.09
1.52
65 325
5.42
4.7
1.534
0.28
1.30
1.25
1.74
66 330
5.50
5.6
1.828
0.28
1.55
1.55
2.15
67 335
5.58
1.9
0.620
0.28
0.53
0.34
0.47
fib 340
5.67
0.9
0.294
0.28
0.25
0e01
0.02
69 345
5.75
0.6
0.106
0.28
0.17
0.03
D.04
70 350
5.83
0.3
0.163 1
0.28
0.14
0.02
0.03
71 1 355
5.92
0.3
0.098 1
0.28
0.08
0.01
0.02
72 360
6.D0
0.2
0.065 1
0.28
0.06
0.01
0.01
EFFECTIVE RAIN & FLOOD VOLUMES SUMMARY
EFFECTIVE RAIN (In)
1.25
FLOOD VOLUME (acR)
0.14
FLOOD VOLUME (Cult)
6,243
PEAL( FLOW RATE (Cfs)
2.15
Plate E-2.2
6 -Hour Storm
Page 7 of 9
RCFC & WCd
M' MINGLOW
Iamu "
SYNTHETIC UNIT HYDROGRAPH METHOD
SHORTCUT METHOD
24-HOUR STORM
PROJECT:
Jot) No.:
BY:
The Estates at Griffin Lake
2168 DATE:
saw 6134114
UNIT
HYDROGRAPH and EFFECTIVE RAIN CALCULATION
FORM
DRAINAGE AREA -ACRES
UNIT TIME -MINUTES
LAGTIME- MINUTES
UNIT TIME -PERCENT OF LAG
TOTAL ADJUSTED STORM RAIN -INCHES
1.380
15
0.51
2931.7
4.37
CONSTANT LOSS RATE-inlhr
VARIABLE LOSS RATE (AVG) in/hr
MINIMUM LOSS KATE (for var. loss) -inthr
LOW LOSS RATE - DECIMAL
C
nla
0.2815
0.141
0.85
0.00261
Unit Time
Period
Time
Minutes Hours
Pattem
Percent
Plate E-5.8
Storm
Rain
In1hr
Loss Rate
irdhr
Max Low
Effective
Rain
inthr
flood
HydroBraph
Flow
ds
61
915
15.25
2.4
0.420
0.218
0.357
0.202
0.28
62
930
15.50
2.3
0.402
0.214
0.342
0.188
0.26
83 1
945
15.75
1.9
0.332 1
0.211
0.882
0.121
0.17
64
980
16.00
1.9
0.332
1208
0.282
0.124
0.17
65
975
16.25
0.4
0.070
0.205
0.059
0.010
0.01
66
990
16.50
0.4
0,070
0.202
0.059
0.010
0.01
67
1005
16.75
0.3
0.052
0.198
0.045
0.008
0.01
68
1020
17.00
0.3
0.052
0.195
0.045
0.008
0.01
69
1035
17.25
0.5
0.087
0.193
0.074
0.013
0.02
76
1050
17.50
0.5
0.087
0.190
0.074
0.013
0.02
71
1065
17.75
0.5
0.067
0.187
0.074
0.013
0.02
72
1080
18.00
0.4
0.070
0.184
0.059
0.010
0.01
73
1095
18.25
0.4
0.070
0.181
0.059
0.010
0.01
74
1110
18.50
0.4
0.070
0.179
0.059
0.010
0.01
75
1125
18.75
0.3
0.052
0.176
0 045
0.008
0.01
76
1140
19.00
0.2
0.035
0.174
0.030
0.005
0.01
77
1155
19.25
0.3
0.052
0.171
0.045
0,008
0.01
78
1170
19.50
0.4
0.070
0.159
0.059
0.010
0.01
79
1185
19.75
01
0.052
0.166
0.045
0.008
0.01
80
1200
20.00
02
0.035 1
0.164
0.030
0.005
0.01
81
1215
20.25
0.3
0.052
0.162
0.045
0.008
0.01
82
1230
20.50
0.3
0.052
0.160
0.045
0.008
0.01
83
1245
20.75
0.3
0.052
0.158
0.045
0,008
0.01
64
1260
21.00
0.2
0.035
0.156
0.030
0.005
0.01
85
1275
21.25
0.3
0.052
0.154
0.045
0.008
0.01
Be
1290
21.50
0.2
0.035
0.152
0.030
0.005
0.01
87
1305
21.75
0.3
0.052
0.151
0.045
0.008
0.01
88
1320
22.00
0.2
0.035
0.149
0.030
0.005
0.01
89
1,335
22.25
0.3
0.052
0.148
0.045
0.008
0.01
90
1350
22.50
02
0.035
0.146
0.030
0.005
0.01
91
1355
22.75
0.2
0.035
0.145
0.030
0.ou
0.01
92
1380
23.00
0.2
0.035
0.144
0.030
0.005
0.01
93
1395
23.25
0.2
0.035
0.143
0.030
0.005
0.01
94
1410
23.50
0.2
0.035
0.142
1 0.030
0.005
0.01
95
1425
1 23.75
0.2
0.035
0.141
0.030
0.005
0.01
96
1440
1 24.00
0.2
1 0.035
0.141
0.030 1
0.005
0.01
EFFECTIVE RAIN & FLOOD VOLUMES SUMMARY
EFFECTIVE RAIN (in) 1.25
FLOOD VOLUME (acct) 0.14
FLOOD VOLUME (tuft) 6,275
PEAK FLOW (cfs) 0.49
Plate E-2.2
24 Hour Storm
Pape 9 of 9
IV
RCFCD SYNTHETIC UNIT HYDROGRAPH - SHORTCUT METHOD
DATA INPUT SHEET
DATE:
I
June 30, 2414
Soo ft
ELEVATION OF HEADWATER
WORKSHEET PREPARED BY-
ELEVATION OF CONCENTRATION POINT
saw
AVERAGE MANNINGS'N' VALUE
0.015
PROJECT NAME
IThe Estates at Griffin Lake
LOW LOSS RATE (For Starrns Greater Than 10 Years)
85%
PROJECT NUMBER
2168
1 -HOUR
1.38 in
CONCENTRATION POINT DESIGNATION
2.09 in
6 -HOUR
2.72 in
24-HOUR
Lower Lake
AREA DESIGNATION
Drainage Area B
AMC NUMBER
0
Low Loss Conditions: X=Exlsting; D=Developed; BS=Retention
AREA SOIL TRIBUTARY AREAS
ACRES
LOW LOSS
RI
DESIG GROUP
CONDITION
NUMBER
5 1A
Sf -114 ACRE
32.87
D
32
2 1 A
PAVINGIHARDSCAPE
I 5.44
D
32
LENGTH OF WATERCOURSE (L)
1,000 ft
LENGTH TO POINT OPPOSITE CENTROID (Lra)
Soo ft
ELEVATION OF HEADWATER
PERCENT
ELEVATION OF CONCENTRATION POINT
479.0 ft
AVERAGE MANNINGS'N' VALUE
0.015
STORM FREQUENCY (YEAR)
100
LOW LOSS RATE (For Starrns Greater Than 10 Years)
85%
POINT RAIN FROM NOAA ATLAS
14
1 -HOUR
1.38 in
3 -HOUR
2.09 in
6 -HOUR
2.72 in
24-HOUR
4.37 In
AMC II
INFILTRATION
IMPERVIOUS
RATE
PERCENT
4.74
0.50
0.74
1.00
RCFC & WCD
9BQL@@1y
4
SYNTHETIC UNIT HYDROGRAPH METHOD
BASIC DATA CALCULATION FORM
AM C I I
PROJECT:
Jab No.:
BY:
The Estates at GrIffim Lake
2168
sew DATE:
6130114
AVERAGE ADJUSTED
LOSS RATE
SOIL LAND USE
GROUP
Plate C-1
RI PERVIOUS DECIMAL ADJUSTED
NUMBER AREA PERCENT INFILTRATION
INFILTRATION OF AREA RATE
RATE IMPERVIOUS
(iNhr) (inRu)
Plate E-9-1 Plate E-6.2 Plate E-6.3
AREA
MAX LOW LOW
AREA AVERAGE LOSS LOSS RATE
WEIGHTED ADJUSTED CONDITION PER
AVERAGE INFILTRATION RCFC12322
RATE
(inlhr) (iruhr)
MIN
AVERAGE
ADJUSTED
INFILTRATION
RATE
(irAr)
A ISF - 114 ACRE
32 0.74 50% 0.41
32.87
0.858 0.3494 DEVELOPED 0.54D0 1
0.4292
A PAVINCdHARDSCAPE
32 0.74 1DO% 0.07
5.44
0.142 0.0105 DEVELOPED 0.1000
0.0142
SUMI
VARIABLE LOSS RATE CURVE 24-HOUR STORM ONLY)
Fm= 0.179918841
C= 0.1)0333
F1=C(24-(T160))^1,$5 = 0.003 (24-(1160))^1.55+ 0.18
CONSTANT LOSS RATE (3A 6 HOUR STORMS) = 0.3586 inMT
LOW LOSS RATE 0,8501) Inlhr
Where:
T=Time in minutes. To get an average value for each unit time period, Use T=112 the unit time for the first time period,
T=1 112 unit time for the second period, etc.
38.41
inmr
Suml 0.3598
NOTE: Lew loss rates established per RGFC12322 (Dated: May 70.851
For 10 Year Storms or Lass
Undeveloped Candf Dn:Low Loss =90%
Developed Condition: Low Loss = 0.9 •(D,S* %impervious)
&min Site: Low Lass = 10%
For 100 Year Storm • Law Lass should be between 80% & 90
of the Rainfall Rata
0.4433
Plate 1=-2.1
Page 3 of 9
RCFC & WCD
D IMLOW
IM&I
SYNTHETIC UNIT HYDROGRAPH METHOD
SHORTCUT METHOD
3 -HOUR STORM
1.05
PROJECT:
Job Na.:
BY:
The Estates at Griffin Lake
2168 DATE
SBvr 8 30114
FLOOD VOLUME [curt]
UNIT HYGROGRAPH and EFFECTIVE RAIN CALCULATION FORM
PEAK FLOW RATE (do)
65.71
DRAINAGE AREA -ACRES
UNIT TIME -MINUTES
LAG TWE - MINUTES
UNIT TIME -PERCENT OF LAG
TOTAL ADJUSTED STORM RAIN -INCHES
CONSTANT LOSS RATE-inthr
LOW LOSS RATE - PERCENT
38.41
5
2.17
230.8
2.09
0.36
85%
Unit Time Time
Period MInules
Hours
Pattern
Percent
Plate E-5-9
Storm
Rain
inAir
Max
Lose Rate
InRrr
Low
Ettec lve
Rain
inthr
Flood
Hydrograph
Flow
da
1 5
0.08
1.3
0.33
0.36
0.28
0.05
1,89
2 10
0.17
1.3
0.33
0.36
0-28
0.05
1.69
3 15
025
1.1
0.28
0,36
0.23
0.04
1.60
4 20
0.33
1.5
0.36
0.36
0,32
0-02
0.63
5 25
0.42
1.5
0.3B
0.36
0.32
0.02
0.63
6 30
0.50
1.8
0.45
0.36
0.38
0.09
3.55
7 35
0.58
1.5
0.38
0138
0.32
0.02
0.63
8 40
0.67
1-8
0.45
0.36
0.38
0.09
3.55
9 45
0,75
7.8
0.45
0.38
0.38
0.09
3.55
10 50
0.83
1.5
0.38
0.36
0-32
0.02
0.63
11 1 55
0.92
1.6
0.40
0.36
0.34
0.04
1.61
12 80
1.00
1.8
0.45
0.36
0.38
0.09
3.55
13 65
1.08
2.2
0.55
0.36
0.47
010
7.43
14 70
1.17
2.2
0.55
4.36
0.47
0.19
7.43
15 75
1.25
2.2
0-55
0.36
0.47
0.19
7.43
10 80
1.33
2.0
0.50
0.36
0.43
0.14
5.49
17 85
1.42
2.6
0.65
0.36
0.55
029
11.32
18 9D
1.50
2.7
0.88
0.39
0.58
0.32
12.29
19 95
1.58
2.4
0.80
0.36
0.51
0.24
9-38
20 100
1.87
2.7
0.88
0.36
0.58
0.32
12.29
21 105
1.75
3.3
0.83
0.38
0.70
0.47
18.12
22 110
1.83
3-1
0.76
0.36
0.66
0.42
18.18
23 115
1.92
2.9
0.73
0.38
0.62
0.37
1423
24 120
2.00
3.0
0.75
0.36
0.64
0.38
15.20
25 125
2.08
3.1
0,78
0.38
0.66
0.42
18.18
25 130
2.17
4.2
1.05
0.36
0.90
0.69
25.66
27 135
2.25
5.0
1.25
0.36
1.07
0.89
34.63
28 14U
2.33
3.5
0.88
0.36
0.75
0.52
20.06
29 145
2.42
6.8
1.71
0.36
1.45
1.35
52.12
30 150
2.50
7.3
1.83
0.36
1.56
1.47
56.97
31 155
2.58
8.2
2.06
0.36
1.75
1.70
65.71
32 160
2.67
5.9
1.48
0.38
1.26
1.12
43,37
33 165
2.75
2.0
0.50
0.36
0.43
0.14
5.49
34 170
2.83
1.8
0.45
0.36
0.38
0.09
3.55
35 175
2.92
1.8
0.45
0.38
0.38
0.09
3-55
36 180 1
3.00
0.6
0.15
0.38
0.13
0.02
0.87
EFFECTIVE RAIN & FLOOD VOLUMES SUMMARY
EFFECTIVE RAIN [in]
1.05
FLOOD VOLUME (acR)
3.37
FLOOD VOLUME [curt]
146.964
PEAK FLOW RATE (do)
65.71
Plate E-2.2
3 -Hour Storm
Pape 5 0f 9
RCFC & WCD
MMR@d@@,Y
M U&I
SYNTHETIC UNIT HYDROGRAPH METHOD
SHORTCUT METHOD
6 -HOUR STORM
PROJECT:
Job No.:
BY:
The Estates at Griffin Lake
2168 DATE
saw 6130114
UNIT
HYDROGRAPH and EFFECTIVE RAIN CALCULATION
FORM
PEAK FLOW RATE (Cfs)
56.86
DRAINAGE AREA -ACRES
UNIT TIME -MINUTES
LAG TIME - MINUTES
UNIT TIME -PERCENT OF LAG
TOTAL ADJUSTED STORM RAIN -INCHES
CONSTANT LOSS RATEAnlhr
LOW LOSS RATE PERCENT
38.41
5
2.17
230.8
2.72
0.360
85%
Unit Time Time
Period Minutes
Flours
Pattern
Percent
Plate E-5.9
Storm
Rain
inthr
Loss Rate
inthr
Max Low
Effective
Rain
Inlhr
Flood
Hydrograph
Flory
cfs
51 255
4.25
1.9
0,620
0.36
0.53
0.26
10.08
52 1 260
4.33
2.0
0.653
0.36
0.55
0.29
1 11.35
53 265
4.42
2.1
0.685
0.36
0.58
0.33
12,01
54 270
4.50
2.1
0.685
0.36
0.58
0.33
12,61
55 275
4.58
2.2
0.718
0.36
0.61
0.36
13.87
56 280
4.67
2.3
0.751
0.3B
0.64
0.39
15.14
57 285
4.75
2.4
0.783
0.36
0.67
0.42
16.40
58 290
4.83
2.4
0.783
0.36
0.67
0.42
16.40
59 295
4.92
2.5
0.816
0.36
0.69
0.46
1 17.67
60 300
5.00
2.6
0.849
0.36
0.72
0.49
18.93
61 305
5.08
3.1
1.012
0.36
0.86
0.65
25.25
62 310
5.17
3.6
1.175
0.36
1.00
0.82
31.57
63 315
5.25
3.9
1.273
0.36
1.08
0.91
35.37
64 320
5.33
4.2
1.371
0.36
1.17
1.01
39.16
55 325
5.42
4.7
1.534
0.36
1.30
1.17
45.48
66 330
5.50
5.6
1.828
0.36
1.55
1.47
56.86
67 335
5.58
1.9
0.620
0.36
0.53
0.266
10.08
fib 340
5.67
0.9
0.294
0.36
0.25
0.04
1.71
fig 345
5.75
0.6
0.196
0.36
0.17
0.03
1.14
70 350
5.83
0.5
0.163
0.36
0.14
0.02
0.9'5
71 355
5.92
0.3
0.098
0.36
0.08
0.01
0.57
72 1 360
6.00
0.2
0.065
0.36
0.06
0.01
0.38
EFFECTIVE RAIN & FLOOD VOLUMES SUMMARY
EFFECTIVE RAIN (in)
1.09
FLOOD VOLUME (acft)
3.49
FLOOD VOLUME (Cuff)
151,923
PEAK FLOW RATE (Cfs)
56.86
Plate E-2.2
6 -Hour Storm
Page 7 of 9
RCFC & WCD
rHMMOILO0 ®N
MMURI
SYNTHETIC UNIT HYDROGRAPH METHOD
SHORTCUT METHOD
24-HOU R STORM
PROJECT!
Job No.:
BY:
The Estates at Griffin Lake
2168 DATE:
saw 6130114
UNIT HYDROGRAPH and EFFECTIVE RAIN CALCULATION
FORM
DRAINAGEAREA-ACRES
UNIT TIME -MINUTES
LAG TIME - MINUTES
UNIT TIME -PERCENT OF LAG
TOTAL ADJUSTED STORM RAIN -INCHES
38.410
15
2.17
692.5
4.37
CONSTANT LOSS RATE-Whr
VARIABLE LOSS RATE (AVG) inthr
MINIMUM LOSS RATE (for var. lass) - inmr
LOW LOSS RATE - DECIMAL
C
rVa
0.3598
0.180
0-85
0.00333
Unit Time
Period
Minutes
Time
Hours
Pattern
Percent
Plate E-5.9
Storm
Rain
nlhr
Loss Rate
in/hr
Max
Low
Effective
Rain
irVhr
Flood
Hydrograph
Flow
cfs
61
915
15.25
2.4
0.420
0.278
0.357
0.141
5.47
62
930
15.50
2.3
0.402
0.274
0.342
0.128
4.96
63
1 945
15.75
1.9
0.332
0.270
0.282
0.062
2.42
64
960
16.00
1.9
0.332
0.266
0.282
0.067
2.58
65
975
16.25
0.4
0.970
0.252
0,059
0.010
0.41
65
990
16.50
0.4
0.070
0.258
0.059
0.010
0.41
67
1005
16.75
0.3
0-052
0-254
0.045
0.008
0.30
68
1020
17.00
0.3
0-052
0.250
0.045
0.008
0.30
69
1035
17.25
0.5
0-087
0.246
0.074
0.013
0.51
70
1050
17.50
0.5
0.087
0.242
0.074
0.013
0.51
71
1065
17.75
0.5
0-087
0.239
0.074
0.013
0.51
72
1000
18.00
0.4
0.070
0.235
0.059
0.010
0.41
73
1095
18.25
0.4
0.070
0.232
0.059
0.010
0.41
74
1110
18.50
0.4
0.070
0.228
0.059
0.010
0.41
75
1125
18.75
0.3
0.052
0.225
0.045
0.008
0.30
76
1140
19.00
02
0.035
0.222 1
0.030
0.005
0.20
77
1155
19.25
0.3
0.052
0.219
0.045
0.008
0.30
78
1170
19.50
0.4
0.070
0.216
0.059
0.010
0.41
79
1185
19.75
0.3
0.052
0.213
0.045
0.008
0.30
80
1200
20.00
0.2
0.035
0.210
0.030
0.005
0.20
81
1215
20.25
0.3
0.052
0.207
0.045
0.008
0.30
82
1230
20.50
0.3
0.052
0204.
0.045
0.008
0.30
83
1245
20.75
0.3
0.052
0.202
0.045
0.008
0.30
84
1260
21.00
0.2
0.035
0.199
0.030
0.005
8.20
85
1275
21.25
0.3
0.052
0.197
0.045
0.008
0.30
88
1290
21.50
0.2
0.035
0.195
0-030
0.005
0.20
87
1305
21.75
0.3
0.052
0.193
0-045
0.008
0.30
Be
1320
2200.
0.2
0.035
0.191
0.030
0.005
0.20
89
1835
22-25
0.3
0,052
0.169
0.045
0.008
0.30
90
1350
22.50
02
0.035
0.767
0.030
0.005
0.20
91
1365
22-75
0.2
0.035
0.185
0.030
0.005
0.20
92
1380
23.00
0.2
0.035
0.194
0.030
0.005
0.20
93
1395
2325
02
0.035
0.183
0.030
0.005
0.20
94
1410
23.50
0.2
0.035
0.182
0.030
0.005
0.20
95
1425
1 23.75
0.2
0.035
0.181
0.030
0-005
0.20
98
1440
1 24.00
0.2
0.035
0.180
0.030
0.005
0.20
EFFECTIVE RAIN 8 FLOOD VOLUMES SUMMARY
EFFECTIVE RAIN (in) 0.97
FLOOD VOLUME (acft) 3.12
FLOOD VOLUME (cult) 135,691
PEAK FLOW (ds) 11.02
Plate E-2.2
24 Hour Storm
Page 9 of 9
�1
RUNOFF INDEX M M$ERS OF HYDROLOGIC SOIL -COVER COMPLEXES FOR PERVIOUS AREAS -AMC Ii
Cover Type {3)
Quality of
Cover (2)
Soil Grou
A
H I
C
D
NATURAL COVERS -
Barren
78
86
91
93
(Rockland, eroded and graded land)
Chaparrel, Broadleaf
Poor
53
70
80
85
(Manzonita, ceanothus and scrub oak)
Fair
40
63
75
81
Good
31
57
71
78
Chaparrel, Narrowleaf
Poor
71
82
88
91
(Chamise and redshank)
Fair
55
72
81
86
Grass, Annual or Perennial
Poor
67
78
86
89
Fair
50
69
79
84
Good
38
61
74
80
Meadows or Cienegas
Poor
63
77
85
88
(Areas with seasonally high water table,
Fair
51
70
80
84
principal vegetation is sod forming grass)
Good
30
58
72
78
Open Brush
Poor
62
76
84
88
(Soft wood shrubs - buckwheat, sage, etc.)
Fair
46
66
77
83
Good
41
63
75
81
Woodland
Poor
45
66
77
83
(Coniferous or broadleaf trees predominate.
Fair
35
60
73
79
Canopy density is at least 50 percent)
Good
28
55
70
77
woodland, Grass
Poor
57
73
82
86
(Coniferous or broadleaf trees with canopy
Fair
44
65
77
82
density from 20 to 50 percent)
Good
33
58
72
79
URBAN COVERS -
Residential or Commercial Landscaping
Gaud
55
69
75
32
(Lawn, shrubs, etc.)
174
Turf
Poor
58
83
87
(irrigated and mowed grass)
Fair
44
65
77
82
Good
33
58
72
79
AGRICULTUPAL COVERS -
Fallow
75
85
90
92
(Land plowed but not tilled or seeded)
R C F C 15 W C D -RUNOFF INDEX NUMBERS
HYDROLOGY h/JANUAL FOR
PERVIOUS AREAS
PLATE E-6.1 0 of zj
APPENDIX E
NDAA ATLAS 14
C
NQAA Atlas 14, Volume 6, Version 2
Location name: La Quints, California, US`
Latitude: 33.6547", Longitude: -116.2447°
Elevation: -13 ft'
, sourow Google Maps
POINT PRECIPITATION FREQUENCY ESTIMATES
Sanja Perim, Sarah Dietz, Sarah Heim. Lillian Hiner, Kazungu Maitaria, Deborah Martin, Sandra
PawWir, Eshani Roy. Cart Tryouk. Cale Unruh, Fenglin Yen, Michael Yekta, Tan Zhao, Geofh'ey
Bonnin, Danlal Brewer, 4i -Chuan Chen, Tye P.,Mbok, John Yarchoan
NOAA National Weather Sarvica, Silver Spring, Maryland
PF._t_atiularI PF oranhical I Maos & aerials
PF tabular
6 -hr
O.a 0-059A 17.589-01155
0.8593 .25
1.1tl-64
1.44$2.30
1.7Ar289
2.U7-9.64
2. 3-449
29515,94
3; 94.-7`,32
72 -hr
[Q,494 9 7151 [0.726770U5]
[1.47356]
{7.36�2.OSJ
1; 2.2P 87
796f](2.57-4.49)LB-00-5-55)
;2 2.79
(3-62-7-3G
R4.14o&.B4
Back to_Top
PF graphical
}11 1,
p'.
ir:+s-".AYIy� i1waE � rt'M�eaR 1Ai/'
a�
h Arrrall9P AManlrl74 .. It Caadlelle
L,# quih9s The MadFavn
' AvaYur. 5P Rvenu! SL
F4(y4q
7ararga �' Avenue 37
:C
Ruins 5vetRg4k TheAtadrsan
fle3wt ' ' `r
arro6e �aMtnaw °d p���ub �vr"ru sa
� r � +�
� :{'Fr eve R rypr} 91V�
�.� F � F� •1 la
sin' Rx! .:�i $ 56tH 0'" r
TMIWMW svrn�$f�epdBEA hiA�rimrjE
Back IQ. Tan
US Department of Commerce
National Oceanic and Atmosiphedc Admlrtistratran
National Weather Service
Office ❑f Hydraiggic Development
9325 East West Highway
Silver Spring, MD 20910
Questions? HDSCQueshans�naaa ov
pillycl rmer
J
APPENDIX F
EXISTING CONDITIONS EXHIBIT
0' 50' 100 150' 200'
SCALE 1"=50'
DIRECTION OF FLOW
EMERGENCY OVERFLOW
PROJECT NAME.
THE ESTATES AT GRIFFIN LAKE
MAP NUMBER-
TRACT MAP NO. 38744
PLAN-
EXISTING CONDITIONS EXHIBIT
EXHIBIT DATE,
DECEMBER 15, 2014
MSA CONSULTING, INC.
PLANMNG ■ Crm ENGr_rEmwo ■ LAND SvRvEyiNG
DESIGN BY
SAW
DRAWN BY
34200 Bole HOPE DRwF ■ RA»cHo MIRAGE ■ CA 92270
TELEPmNE (750) 320-98H ■ Fax (750) 323-7893
JULIAN A. DE LA TORRE 043880
SAW
CHECK BY
JAQ
APPENDIX G
PROPOSED SYNTHETIC UNIT
HYDROGRAPH EXHIBIT
y 0
_O_ ° o I/Il/ _f1l11
T� rr7�_ - - TlT1 f - - - - Trrr`�- - - r ',T /
�Trr�I fIr11 //III ICLLf ILL1L -- I ILUL 1/111 I f fIIN ILII! ILl2L
r
IH
1 � L
,_ Z__7
oo V o V 0
� 4
I _ I l
1 I
I
I
I
LOT 1_ -
FUTURE PE -488.8
I
�H
I�
LOT,2
FUTURE PE -488.5 !
1
1
1
° la
DONALI STREET e H
0
LOT 3 °
°
FUTURE PE -487.5
a
< 1�
w
J
Lu
J
Q
w
cn
LOT 4
FUTURE PE -486.5. -
LOT 5
FUTURE PE -485.3
a
u
LOT 6
FUTURE PE -484.3
ES
AVEN E 54
- - - - - -- - - - - - -�.- - - --_---_=------- - T - - --- -_--------
--- - - - --- I - - -- -- ----- - - --- r--- } --- -- - - -� -- -
_r I
E
1 2 3 4 5 I
I
t
JC=- - - - - - -
I
-
I} MEN o
I I� 1• - -- ��
} ,Jkl
DA -_A
Y+ y y S
L=200 - _f-
A�1.38 LAKE EDGE 490,00
! / - -�-
1 WSE100 489.90
r
r r
,fJ-r rf�` •f SE 489.50
--
I
I
1 �
I
1 }
1
1 �
- - - -- I 72 77 I
I �
I
DA -B
L-1400 1 1
A=38.41 ` I
1 71 78 I
L �
y
LOT rrA rr y I
yyr
J 1 f f
70
57 �� 1
39
r�� 69 f
40 '` I f 58 1 1
67 � 1
r
56 /
r
38 41 1 I j
1 1 66 1 1
1 59 i
l
I
j 1 65 I 1
37 42 1 1 55 �� �� 1 1
� 64
------ _ }
\ 1
IT
ti
_ 1
36 �- - - - _ � � 61
r
0' 50' i 00' 150' 200'
SCALE 1"=50'
32
43
44
AREA
(ac)
54
53
SINGLE FAMILY - 1/4 AC
31
30
29
m
27
26
25
24
23
22
21
19
7
10
11
12
13
14
15
17
18
13
SEATTLE SLEW WAY
--�
-�-' LOT 8
° FUTURE PE485.!�
DRAINAGE AREA A
LAND USE SUMMARY
LAND USE
AREA
(ac)
STREETS/HARDSCAPE
0.52
SINGLE FAMILY - 1/4 AC
0.85
TOTAL
1.38
STREETS/HARDSCAPE USED FOR LAKE AREA
DRAINAGE AREA B
LAND USE SUMMARY
LAND USE
AREA
(4C)
STREETS%HARDSCAPE
5.44
SINGLE FAMILY - 1/4 AC
32.97
TOTAL
38.41
STREETS/HARDSCAPE USED FOR LAKE AREA
LOT 20
1 FUTURE PE=480.6
I
LOT 19
FUTURE PE -481.0
- ❑
f�
f BOL RULER WAY
LOT 18
FUTURE PE -479.8
0
LOT 17
FUTURE PE -479.0
Q
x
w
Q
1`
Lwu !0
ILI
1
Q
LOT 16
FUTURE PE -478.0
LOT 15
FUTURE
PE -47$.9
1
1
LOT 9 4' - - _ _ - LOT 12 - �-Y J FUTUR� PE 475.9
FUTURE PE -481.8
FUTURE PE -486.5 LOT 10 LOT 11► I
'J FUTURE PE -486.5 FUTURE PE -486.1 LOT 13
L FUT.WE PE -477.9
STORM EVENT SUMMARY
DURATION 1 -HOUR
3 -HOUR
6 -HOUR
24-HOUR
EFFECTIVE RAIN (in) 1.10
1.26
1.25
1.25
FLOOD VOLUME (cu -ft} 5,503
(acre -ft 0.13
6,323
0.15
6,243
0.14
6,275
0.14
STORM EVENT SUMMARY
DURATION
1 --HOUR
3 -HOUR
6 -HOUR
24-HOUR
EFFECTIVE RAIN (in)
1.02
1.05
1.09
0.97
FLOOD VOLUME (cu -ft
(acre-ft�
142,240
3.27
145,964
3.37
151,923
3.49
135,691
3.12
UPPER
LAKE RETENTION
VOLUME DETERMINATION
100 YEAR
SURFACE
FLOOD
SURFACE
RETENTION
STORM
DEPTH
VOLUMEAREA
(cu -ft}
DEPTH
(hour)
6
(cu -ft)
(sf)
(ft)
3
1
5,323
15,676
0.40
LOWER LAKE RETENTION
VOLUME DETERMINATION
100 YEAR
FLOOD
SURFACE
RETENTION
STORM
VOLUME
AREA
DEPTH
(hour)
(cu -ft}
(sf)
(ft)
6
151,923
185,693
0.81
LEGEND
PROPOSED LAKE AND SHORELINE
DIRECTION OF FLOW PROJECT NAME- THE ESTATES AT GRIFFIN
- - - OVERFLOW ROUTE MAP NUMBER, TRACT MAP NO. 36744
APPENDIX H
PRELIMINARY
GRADING PLAN
L12 -
c. ^` 1L1L
ont
I
.- - _G„-' � G -�- � � - - `_"_ G - - - "` G � �`- G -- � - g - - g - - G
- -s- - - �s ' A'i(,ENUE 54 1
w - w- - - -w -w- - -w- w� �, ,-__-w T -
w -Ww - -w- - w �- - w- .-w - �` w--'- w -w w -w--� �w- - w 7w f -w- -w-- -� -w--' -w--- - j - -w
r41
J �-w- - w- - -w- -w-- -w w- _w L& -� w- -
f E 02 TC 487, TC 485.35 TC 484.81
MH f - -
_;-- - - .� -J �J -- - FL 487.52 �_ L 488.98 - IRR�- FL 484.31
FL 484.85
$.d GBS.
G 4 Aj
(W) 492A -- - --�- - - - _-=`-- -- -�- - -`
�. . _ - - - F
n A
a NCQ (f } (492.0} T a 4 x
TRW 49-05 f` E .5 x 85.2 - a -- PROP. CATCH BASIN (TYP.) 48;5.4
IF 491 Q- F Cone, 189-4TRW 491.7 a 1 4 TRW 488.98 TRW 488.48 TRW 487.95 TRW 487.48 N o
_ (N) 493.0 FG ),4EG..(N} 490. _
- J) (491.5) r -,..-3G. 87,9 cv" RW 489.48
& 5 �' FG (N) 488.9 FG (N} 488.4 FG {N} 487.9 FG (N) 487.4 TW 491.33 J -
�- N S 1G FG NG ' 4$ 0 F - - G [x,489.4 (} (4$4.5} f NG (S) (484.0} NG ( (484.0) NG (5) (484.0) I FG W 485.33
1491,00 TF 9.8 NG (S) (489.5); 88.85 TF 48 - I' D NG (S) (485.7)TF 484 r TF 483.54 T 483.5 + �
ATF 489.0 1 ao x 4 =I x 482 • TF 483.50 us NG E 483.33 crl�_
1 I - - - - - <' TF 485.20 \ )
�� `OB Lf _0 TRW 4 1r. 3 FS 48$.1 0 5_ L - ` I 1 I I TF 48.3 4
} I G 5 4 1.11 = j 2 3 482.-4"� ' `}
PROP. STORM DRAIN fT'
/O I G Z} i PE 487.7 PE 487 2 PE 486.7
I i X. BUILDING x 48 / TF 48s.o
I � � � � o � � PE 486.2 PE 485.7 I
11 1 1 oa5.
� i � � � �. ! I 6_.5 f
f r x 487. a - x 486. ti 41 PE 485.1
� r _ � -__ ., _--- . - x •, :a �
E :BUILDING ` 1 - - 1 J I FG 89.383.33 )LOT --20 f
LO 1 f I f -- ------------�--------- -- �-- NG E 483.33 j FU URE PE -480.6
n TF 48 .33
I FUTURE �E 458 1� I ff - � - - - - - - - - - I "-�
cant. x 4 9.2 f �$ 0.60%� / J GP 486.88 ' f 1 TP 485649 % 0.59% !l TP 483.72 0.54% TP 483.94
48 7.3 c=j
J ` iI ��• \ - E �- -E _E - , E - k -" ti x 4 1 x 4795
I�
x 487.7 i x 49,7.7 �T- I x 484_ x 483.0 } _, 1 1 c7J
i TP 490.00 - E - - - - - r - 9
as
48 p x 488-4 o ago _ x 4F 7
s s 1498 L co
"t 3 C_� 1,
r- I
FIG (W 92. �- - X 487 5 x 486.5 - - - - I I 74 75 _ I i - x 4 f
T I I NG ( 92. ( /]BS. PE 484.7
I TF �49 .o)� C ` 48B ■ 1` j I PE 486.5 PE 484.7 ! I I TW 48B.67
1
�Y FG W 482.fi7 �
x 4$; i x 487_.5
k 4' 2.21 ! FG (E) 482.67
x 487_6 I I I _ 483. i
GBS. � ■� � , I � I I TF 481.87 y
X085. L � I �Q � �� �_... I�>� -� � FOB' � � � 1 7 .4 °
O I 1 LI cn } I�
tn 7 s 4$4 7.z ■� ! I PE 7 l ' _ i I
x 4 l I} 11� i } x -187,2 f i I _ I 8
- � o f ! �-� .- k I 7
x »97.4 �� Ill .1I I I I I 73 76 _ xI.B I I I I PE 484,3
I L L o J y I PE 486.0 PE 484, 3 I k 1 FUTURE E4 81.0
I 1 1 483 ` I I I I 1 I
I LOT 2,1 i X I I ! I� - - _ ' r } } < ,� �
FU1`URE PE -4".5 I l 97 �{� x 487.3 i I s a
I 1 Y` 1(E} (4 II 4r34. jj l 482 C5
-
x 48.3 r� I X. UILDING' --� 488.E : �j r r I I I I i I I x_ if x 79.4
ff j� 11 I \ I j 4ai / 1 1 83.8 U 1 UD 72 77
y I I ,i I _ 4.5��€� I ------ 7 I PE 483.9 ! 1 k PE 483.9
I K 48. 1. •;90.D _ r_ x 48 . f x 4 i I 1 } ti PE 485.5 TW 488.0
_--yam- ti I I } FG W 482.0 �I C
f k } , #� 3 j y- --- - �� I l I `" I i x 34.1 x 48.)_4 LQ I NG (E 481.01 j I I ti
TF 484.0
8. / I I l } i x482.1 i I BOL ILiLER��`_
-EP �, �� '� _ r / `\ �--- / k I ) ( I PROP. STORM DRAIN I I4.5 --- LAK DGE 480. � _ I I � I I I �I f _
_ LAKE EDGE 490.00 j - - \.` x 483.,x. 8, DEE - I i 1 k Q I i I I f 7, .s ` �
r 7
12' DEP SE10o 480.7 . f 1 i` k �I 10 ! I N I
11Z
DOI�ALI S - EFT r 1 1 �{ _ - _ r - l ` - _ _ _ �` WSE 489.9U -� � 5E-47$.8 -1 k-4,84 2 _ 1 I P 483:
O WSE 489.50 yy _ I I 1 E 5 I.
1 l -� -f_ --_- �x483.1 I 71 78 I j'� I u481,5 !
489.E _ 1 PE 485.0 I x
PE 483,5 it
+ _
f I I x 11.7 f 1t i1 ItiI 1
I LOT PFAFF ! � � � � .� fl '� 1 l _ It 1 •�� f r � � - _ - �-� �. ! x - I I I I I 1 �
I, x 4841 85 l l 4 I
ll hh
rw 496 I I `� � - ` l � � � i � r � � V �C' 1 _ � � l � �` -- -- _ � � � � `- _ � t1 `tom � 7� i � Tw
FG W 90.0 x4 3 ' rJ -� _n f� G 33 I
x48E.a ( ) x481 f I. F E 48067 4 I
NG (E} 90.0) 4 \ / / f _', x 477.6
TF 489. � � , I � _ / t j � l 1 I `� ~, 68 _1 � � y � 70x 482_'- �__- � 1
7 L 4 l �\ x 4�2 1 PE 04-2 ti � 484.2 �� , r E
I ti f J 1 1 [ �� I I/ e� I LOT 18
7 F TUBE PE -479.8
k 4s r J f !! S I \ 1 x 482. o i ti N
1 I 5 DRAINAGE ESMT. E
39 - , 88..E
LOT 3 x 1 I x74 o 4 x 482.4 { 1 1 1
FgTURE PE=487 5 I 1 1 �� PE `4$2.9 40 ,� x 49Q I J fv IrllA f iESM7�. 1 1 .' f �� � 9
[ t t PE 482.9 ` j r� 1 + 1 1� ~ PE I I �
�14� s.5�1 � I 0
PE 482.7
1 0 1 TC 481.33 f r 433 _ l
_P 2)9) \ I �,Tw 1
1 F LP / l l LP~' J �- , C 1 4 \ _ --� F 0-67
x 4� 6.2 0 °� ` /t _ C ' r ' 67 \ , !84. 80.67
TW 494.0 �i Y l Jfjr �- 1� y PE 483,7 fr' 79. I
F W 488.0 �� �\ ! - l ` -�` 1 f
a GC 1 { N E {48 �ga5.a _ r ti - - / x 6.
'nl l TF 486.5\ 1 _ 1 l 1 % / �1 Ii , 477.8 '
1 x 4$54.4\ \ I ti `
I 1 38 1� I P� 482.9 x 4s4.z� 1 ] 1 � ` I
- I PE 483.2 ` t 41 1 I 1- J `� - - ,#g. A c lA�1�'P.} f i
8 i I I I v I I
PE 482.9 j %"
x49 I I I \ ,\ TP 481.10 1 ■� '♦ 1��I X478
li I \ 66 - _ LP �
59 I I 7' DEEP • - - _ I " I I �' 82. ' • ` 1�1
x 4 33. i, y J 1 1 1 x ,84,o - � l PE 483.5 1 \ \ PE 483.3 �, �� � �
I y
494.4 Jf
1 I I c W 488.0
48,j l 1
TF 486.487.5} ��
J J 1 I i 37� '�'�� f 1 i iJ 55 ��� �- �� ~�_ $5 ! ! I I x 4813 1
I LOT 4 I + PE 483.8 I �� r� �1 43.4 _ f� i ! : PE 482.8 f y ; + j LOT 17
F TURF PE=48 .5 f I 1 z 1 { I PE 48314 ` ] / zr` I I I FUTiJR PE -47s-0
x 4'� f ! I -� x 485.6 _/ I I 1 14 +I1 I C x
y
�, I I I so �� j f , �: - J - 64 1 0 o 4 z9 !+
--------- I / ` PE 483.5 / / ,� __ I a
i ----------------_---------- ��--� / ! PE 482.4 I 4 7.0
481.0 }
I IL FS 481.15 '\ � � � /, 1 � \ - I I TF D A I I � I �j
435,8 , TP 482.85 r I / 5' DRAINA E ESM> . k i I 1
_ �` � p _ _ . 1 a j ,l� - l f I I L x 476.6
+ Q L r \ - ! I PROP. TORM D4 I
3� - / TP 4.81.25 _ _ }'� --- - � J _ _' � � }�ry
II f 1 } 1 PE 484.2 I I a f r' D.SD% - P X0.50% f sow I j/ 61 I ` -- I I o I x h
i � � lei ISI
485.2
I � ���� ► � ,I+� II
a
i l i I 4.6
PE 1 1 1 i I
� � I �
y I J x
x 4f34,5 48`5 f 11J l ` I
` Il
I 1 l' I I 11
l ''OT 5
FUTURE PE -485.3 i l k i�v 4 2.8 4� ;..;.2 j I I 0
I I 4 tn
7174 67 34 i
0-00
PE 485.0
++ ! I !
x 48.4 I
x 4 zl I r I I
JL64.� ., 4 !
4 PE' 5.6
` `- y- } _ta 1 I 11 i�Ix 7,5
PE 46
~_ {��'� s 62 1 `OT 16
PE 483.7 12' DEEP CROP. DRYWELL , I - I till l l FUT14 Rr; PE-478AY
477.ji 1
-4$�•8 �\ SII I � - � � ! \ �y �� � � � �4! � I t III � �
LAKE EDGE 480.38
WSE100 480.70
hh
PE
E3 ^WSE 479.88 l I`l f
48 I \I )[ �-� I I I I I
}
I PE 483.8 PE 483.7 l 1 1 1 111 I
x 3 1. I Iii
x481.
1
J PE` 4� 2.o I
� j� 1 �I �1 � 1111
50 ! PE 04.3 ! / - - J TW 4�6.6-7 I i
E 488. FG (El 480.67
EG. 7 I -
TF 479.6
-1 � 1 n
a / x 0 711 1 � f � � � Lo
a
--CL
i --- - �i1�
.4{ �
- - - f
1 18
TP 485.42 / \ J I -f TP 487.30 l ! : I r 1 _ �$� 'r PE 48f2.G
GB - � 1 I r - HP - � ! } � I � k I . �.s`� �� � /,� �
x 4 E �_l 2 TIN 48743 1
FG E 81.33 b
FG } 481.33
J 0.7C}% I - 1 t_ B°� j / I - ` ,C x 4 9..9`TF 480.33 r
k:a�4.i -`� - _ -- _>� -- -r- -_ -f -_� _�_` ---- ��� `./ -� �� �� <0 t 7 2
I x 4p0.
LOT fi � 1 -�-� � 23
FUTURE PE -484.3 + I 8 x 83.8 I \ - I 1.
f k 6131 $fi.1 y PE 487.2 Y ,,
SI I I � � . � 22 � l
x 482.9 I ! i y/ - F \ I �. _ 24 - __ - 21
i - - PE 4$5.0_
30 28 27 26- - 25 PE 487.2
� ��.� �- �PE 4 PE _ ...._�. �JPE 483.E 20�" 19 '<
l �P 4%8.5 PE -48-8.81- - _- 87.2 487.6 PE 488.0 PE 488.4 1.-_ PE 488.4 n 482.E `_�:b - - 9 2
[� 1 4 - _ x _ _ _ 4 4� _ . x 482.6 _ ` PE 483.2 PE 483.0
a=
1 x 4• J. 4•:i.•, x �Sh.4 x -84. I� � z 1ii[..
1�
TW 4 4,. = _ TW 490.67 ` �_ L J TW 488.0
_ _ TW 488.4 l
- �-- FG N 482.4 F,; 'At 48 0 ---- �� -� TW 488-0 l B
_ _ T•411 498. 7 -_ TW 493.33
/ TM! 493 TW 492.67 f � � � - �:.-�49.4�08.aC>� � ��5�'-�k84�7 r I I
x 48f�. ` ` if F 48fi.Fi7 FG - t r_ - - f -� g FG_(NT 487 . F7.3� - - ` -- f FG �548� Q_ NG 48.0 I I
11 487-50 3 TF 483.67 Y �j
t NG E (486.67) - fC�is
46 6� _ - -TF-� , _ _ - T- - - _ __ �--485 - - 4 - �- - TF 481.0 J -- - f J 1
_ S 482.0 I 1
TF 48 - TF �7 - - - �--�F 482. TF 48 �3- - , TF. - � TF 481.4
4`� w
48 r . �� '��'Q s x 4 st-j s f - z RTTLf--SLAW-W A - Aij
1.E B6S~ -� `� -` C Z r 4TURETPE-
1�` �'� 475.9
Lai' Lor �o
{ / 9 1 FUTURE PE -486.5 -
48 o , x 481.5 LOT 8 % �! FUTURE PE 488.5 I ! LOT -11 -- L T 1 o�s� ,�,� 3 _
/ v / L T 7 FUTURE PE -465.5 x 48x',.7 Y =8F 3 I FUTURE PE -48611 "\ FUTUR7 fE-481.8 FU 477.9
1 % C / x 48U.c FUTURE 7-48 1.4
I
- - - -
7' BUILDING
LEGEND
SETBACKi
�
4
43
44
45
46
PROPOSED
PE 483.9
PE 483.4
PE 483.4
PE 483.8
PE
54
53
52
51
---EMERGENCY OVERFLOW
PE 486.6
PE 487.0
PE 487.4
PE 487.8
40'
RAW FILL
66,$58
C.Y.
PLAN,
\P
1 1
I
18' 1$'
SUBSIDENCE
5,543
C.Y.
PRELIMINARY GRADING PLAI
4031
---� DRAINAGE TO LAKE
>r/f�/j
\.
r/
f�\
<
�/�;`=
I
7.5' WIDE STRIP of UNGROUTED WEDGE CURB Pte" TC=TP
SHRINKAGE- -
OVER -EXCAVATION LOSSES
12,360
13,012
C.Y.
C.Y.
EXHIBIT DATE
` `- y- } _ta 1 I 11 i�Ix 7,5
PE 46
~_ {��'� s 62 1 `OT 16
PE 483.7 12' DEEP CROP. DRYWELL , I - I till l l FUT14 Rr; PE-478AY
477.ji 1
-4$�•8 �\ SII I � - � � ! \ �y �� � � � �4! � I t III � �
LAKE EDGE 480.38
WSE100 480.70
hh
PE
E3 ^WSE 479.88 l I`l f
48 I \I )[ �-� I I I I I
}
I PE 483.8 PE 483.7 l 1 1 1 111 I
x 3 1. I Iii
x481.
1
J PE` 4� 2.o I
� j� 1 �I �1 � 1111
50 ! PE 04.3 ! / - - J TW 4�6.6-7 I i
E 488. FG (El 480.67
EG. 7 I -
TF 479.6
-1 � 1 n
a / x 0 711 1 � f � � � Lo
a
--CL
i --- - �i1�
.4{ �
- - - f
1 18
TP 485.42 / \ J I -f TP 487.30 l ! : I r 1 _ �$� 'r PE 48f2.G
GB - � 1 I r - HP - � ! } � I � k I . �.s`� �� � /,� �
x 4 E �_l 2 TIN 48743 1
FG E 81.33 b
FG } 481.33
J 0.7C}% I - 1 t_ B°� j / I - ` ,C x 4 9..9`TF 480.33 r
k:a�4.i -`� - _ -- _>� -- -r- -_ -f -_� _�_` ---- ��� `./ -� �� �� <0 t 7 2
I x 4p0.
LOT fi � 1 -�-� � 23
FUTURE PE -484.3 + I 8 x 83.8 I \ - I 1.
f k 6131 $fi.1 y PE 487.2 Y ,,
SI I I � � . � 22 � l
x 482.9 I ! i y/ - F \ I �. _ 24 - __ - 21
i - - PE 4$5.0_
30 28 27 26- - 25 PE 487.2
� ��.� �- �PE 4 PE _ ...._�. �JPE 483.E 20�" 19 '<
l �P 4%8.5 PE -48-8.81- - _- 87.2 487.6 PE 488.0 PE 488.4 1.-_ PE 488.4 n 482.E `_�:b - - 9 2
[� 1 4 - _ x _ _ _ 4 4� _ . x 482.6 _ ` PE 483.2 PE 483.0
a=
1 x 4• J. 4•:i.•, x �Sh.4 x -84. I� � z 1ii[..
1�
TW 4 4,. = _ TW 490.67 ` �_ L J TW 488.0
_ _ TW 488.4 l
- �-- FG N 482.4 F,; 'At 48 0 ---- �� -� TW 488-0 l B
_ _ T•411 498. 7 -_ TW 493.33
/ TM! 493 TW 492.67 f � � � - �:.-�49.4�08.aC>� � ��5�'-�k84�7 r I I
x 48f�. ` ` if F 48fi.Fi7 FG - t r_ - - f -� g FG_(NT 487 . F7.3� - - ` -- f FG �548� Q_ NG 48.0 I I
11 487-50 3 TF 483.67 Y �j
t NG E (486.67) - fC�is
46 6� _ - -TF-� , _ _ - T- - - _ __ �--485 - - 4 - �- - TF 481.0 J -- - f J 1
_ S 482.0 I 1
TF 48 - TF �7 - - - �--�F 482. TF 48 �3- - , TF. - � TF 481.4
4`� w
48 r . �� '��'Q s x 4 st-j s f - z RTTLf--SLAW-W A - Aij
1.E B6S~ -� `� -` C Z r 4TURETPE-
1�` �'� 475.9
Lai' Lor �o
{ / 9 1 FUTURE PE -486.5 -
48 o , x 481.5 LOT 8 % �! FUTURE PE 488.5 I ! LOT -11 -- L T 1 o�s� ,�,� 3 _
/ v / L T 7 FUTURE PE -465.5 x 48x',.7 Y =8F 3 I FUTURE PE -48611 "\ FUTUR7 fE-481.8 FU 477.9
1 % C / x 48U.c FUTURE 7-48 1.4
I
3 CpBBLEEXISTING LAKE - S FT DEEP WITH 4:1 SIDE SLOPES
a STREET SECTION SHRINKAGE - 15% 34200 Bos HOPE DRrvs ■ RAxceo MmArm ■ CA 92270
DRAINAGE CHANNEL 1 "=10' SUBSIDENCE - 0.1 FT TEL.>f?P ONE 760) 320-98U ■ FAx 760) 323-7893
11=4' OVER --EXCAVATION - 3 FT
P%L
7' BUILDING
LEGEND
SETBACKi
PRELIMINARY EARTHWORK
ESTIMATE
PROJECT NAME-
THE ESTATES AT GRIFFIN L
M E N E M RETAINING WALL
PROPOSED
s DRAINAGE
EASEMENT
i
!
STEELi GRATE
RAW CUT
107,252
C.Y.
MAP NUMBER-
TRACT MAP NO. 36744
---EMERGENCY OVERFLOW
WALDEN
f
40'
RAW FILL
66,$58
C.Y.
PLAN,
I
18' 1$'
SUBSIDENCE
5,543
C.Y.
PRELIMINARY GRADING PLAI
4031
---� DRAINAGE TO LAKE
>r/f�/j
\.
r/
f�\
<
�/�;`=
I
7.5' WIDE STRIP of UNGROUTED WEDGE CURB Pte" TC=TP
SHRINKAGE- -
OVER -EXCAVATION LOSSES
12,360
13,012
C.Y.
C.Y.
EXHIBIT DATE
DECEMBER 15, 2014
i A r r �N INC.
��
0' S0' 1 Q0' 150' 200' �,� 1 �„ 1 1 RIPRAP TO BE PLACED BETWEEN EXPORT 9,3$2 C.Y.
THE END OF THE DRAINAGE
-=50'2.5'
CHANNEL AND THE EDGE OF
TYPICAL ON-SITE
ASSUMPTIONS '
PLA�G
-It.►1VV1-i LJ I.
. c� E�G„mmmo 0 L.um S»vE=4
SCALE 1
cno
THE LAKE.
3 CpBBLEEXISTING LAKE - S FT DEEP WITH 4:1 SIDE SLOPES
a STREET SECTION SHRINKAGE - 15% 34200 Bos HOPE DRrvs ■ RAxceo MmArm ■ CA 92270
DRAINAGE CHANNEL 1 "=10' SUBSIDENCE - 0.1 FT TEL.>f?P ONE 760) 320-98U ■ FAx 760) 323-7893
11=4' OVER --EXCAVATION - 3 FT