2024-25 Bengal Engineering Amendment 13 - Dune Palms Bridge Project 2011-05MEMORANDUM 40idgrai i::lE.lEl)H.NE.1 DATE: April 3, 2024 TO: Jon McMillen, City Manager FROM: Carley Escarrega, Administrative Technician RE: Amendment no. 13 to agreement with Bengal Engineering for project no. 2011-05, Dune Palms Bridge Please list the Contracting Party / Vendor Name, type of agreement to be executed, including any change orders or amendments, and the type of services to be provided. Make sure to list any related Project No. and Project Name. Authority to execute this agreement is based upon: Approved by City Council on March 14, 2024 Consent 8 City Manager's signing authority provided under the City's Purchasing Policy [Resolution No. 2019-021] for budget expenditures of $50,000 or less. Department Director's or Manager's signing authority provided under the City's Purchasing Policy [Resolution No. 2019-021] for budget expenditures of $15,000 and $5,000, respectively, or less. Bid Sole Source Procurement Method (one must apply): RFQ n 3 written informal bids RFP Select Source Cooperative Procurement Requesting department shall check and attach the items below as appropriate: Agreement payment will be charged to Account No.: 401 -0000 -60188 -111205 -CT Agreement term: Start Date _ End Date December 31, 2024 Amount of Agreement, Amendment, Change Order, etc.: $ 45,200 REMINDER: Signing authorities listed above are applicable on the aggregate Agreement amount, not individual Amendments or Change Orders! nInsurance certificates as required by the Agreement for Risk Manager approval Approved by: Compliant myCOI Date: 4/3/2024 Bonds (originals) as required by the Agreement (Performance, Payment, etc.) Conflict of Interest Form 700 Statement of Economic Interests from Consultant(s) NOTE: Review the "Form 700 Disclosure for Consultants" guidance to determine if a Form 700 is required pursuant FPPC regulation 18701(2) Business License No. 0100872 Expires: 6/30/2024 Requisition for a Purchase Order has been prepared (Agreements over $5,000) AMENDMENT NO. 13 TO PROFESSIONAL SERVICES AGREEMENT WITH BENGAL ENGINEERING. INC. This Amendment No. 13 to Professional Services Agreement with Bengal Engineering ("Amendment No. 13") is made and entered into as of the 20th day of March 2024 ("Effective Date") by and between the CITY OF LA QUINTA ("City"), a California municipal corporation and Bengal Engineering, Inc., a California corporation ("Consultant"). RECITALS WHEREAS, on or about July 1, 2014, the City and Consultant entered into a Professional Services Agreement to provide those services related to the Dune Palms Road Low Water Crossing Replacement at the Coachella Valley Storm Water Channel, Project No. 2011-05. The term of the Agreement expires on June 30, 2023; and WHEREAS, Amendment 1, executed on or about March 24, 2015, previously amended Scope of Services, and Contract Sum to include additional Utility Pothole, Data Collection, and Noise Modeling work and to remove Section 7 Consultation Work Objective, resulting in a net contract sum decrease in the amount of ($2,233.00); and WHEREAS, Amendment 2, executed on or about December 1, 2015, previously amended Scope of Services and Contract Sum to include additional Cultural and Architectural Survey, resulting in a net contract sum increase in the amount of $7,800.00; and WHEREAS, Amendment 3, executed on or about July 7, 2016, previously amended Scope of Services and Contract Sum to revise the Traffic Technical Memorandum and Noise Study and to prepare and process an Air Quality Report, resulting in a net contract sum increase in the amount of $31,678.00; and WHEREAS, Amendment 4, executed on or about July 13, 2016, previously amended Scope of Services and Contract Sum to include the development of Three Conceptual Grade Control Structure Alternatives, resulting in a net contract sum increase in the amount of $16,100.00; and WHEREAS, Amendment 5 executed on or about June 13, 2016, previously amended Scope of Services and Contract Sum to include additional Hydrology and Hydraulic Study to address concerns expressed by the Coachella Valley Water District, resulting in a net contract sum increase in the amount of $19,900.00; and WHEREAS, Amendment 6, executed on or about October 27, 2016, previously amended Scope of Services and Contract Sum to include an Extended Archeological Phase I Work Plan (XPI) as directed by Caltrans Environmental, resulting in a net contract sum increase in the amount of $9,583.00; and WHEREAS, Amendment 7, executed on or about April 20, 2017, previously amended Scope of Services and Contract Sum to include the Field Work for the Extended Archeological Phase I Work Plan required by Caltrans, resulting in a net contract sum increase in the amount of $96,449.00; and WHEREAS, Amendment 8, executed on or about October 16, 2018 previously amended Scope of Services, Contract Sum, and Agreement Term to include additional engineering services related to Coachella Valley Water District Equilibrium Slope and Scour Determination, Environmental Permitting, Right of Way Acquisition, and preparation of Water, Sewer and Landscape Plans; and WHEREAS, Amendment 9, executed on or about April 28, 2020, amended the Scope of Services to include additional engineering services related to design accommodations for connector trails and artistic CV Link Project components, design of CVWD access accommodations and additional project management, resulting in a net contract sum increase in the amount of $53,310.00; and WHEREAS, Amendment 10, executed on or about June 28, 2021, amended Section 3.4 Term of the Agreement to extend the contract term through June 30, 2023 ("Extended Term"); and WHEREAS, Amendment 11, executed on or about June 14, 2022, amended the Scope of Services to include Constructability Review in Phase 111 and shift $8,000 in funding from Phase I and 11 to Phase III Constructability; and WHEREAS, Amendment 12, executed on or about May 2, 2023, amended the Contract Sum to replenish the Construction Support Services task, resulting in a net contract sum increase in the amount of $50,000 and amended section 3.4 Term of the Agreement to extend the contract term through December 31, 2024 ("Extended Term"); and WHEREAS, the City and Contracting Party mutually agree to execute Amendment 13 to amend the Scope of Services to revise the roadway improvement plans to include the proposed widening of Dune Palms Road between Highway 111 and the bridge, and to replenish the Construction Support Services task, resulting in a net contract sum increase in the amount of $45,200 as identified in Exhibit B, attached hereto and made a part hereof, and amend section 3.4 Term of the Agreement to extend the contract term through June 30, 2025 ("Extended Term"). NOW THEREFORE, in consideration of the mutual covenant herein contained, the parties agree as follows: AMENDMENT In consideration of the foregoing Recitals and the covenants and promises hereinafter contained, and for good and valuable consideration, the sufficiency and receipt of which are hereby acknowledged, the parties hereto agree as follows: Section 1.1 — Scope of Services is amended to include the additional services to be provided by Consultant as outlined in "Exhibit A", attached hereto and made a part hereof. Section 2.1 — Contract Sum is amended to read as follows: For the Services rendered pursuant to this Agreement, Consultant shall be compensated in accordance with "Exhibit B" (the "Schedule of Compensation") in a total amount up to but shall not exceed One Million, Five Hundred Ninety -Four Thousand, Four Hundred Forty -Three Dollars ($1,594,443.00) (the "Contract Sum") for the life of the Agreement encompassing initial terms and Amendments 1 through 13, except as provided in Section 1.6. Construction Support shall be paid on a time and materials basis as requested by City Staff. Exhibit B -Budget is amended as attached in "Exhibit B", attached hereto and made a part hereof. Section 3.4 — Term is amended to read as follows: Unless earlier terminated in accordance with the provisions in Article 8.0 of the Agreement, the term of this Agreement shall commence on July 1, 2014 and terminate on July 31, 2018 ("Initial Term"); the term of this agreement was extended via Amendment No. 8 until July 31, 2021 ("Extended Term"); and via Amendment No. 10 until June 30, 2023 ("Extended Term"); and via Amendment No. 12 until December 31, 2024 ("Extended Term"); notwithstanding any provisions to the contrary in effect prior to the date of this Amendment No. 13, the Extended Term of this agreement shall remain in full force and effect until June 30, 2025 ("Extended Term"). In all other respects, the Original Agreement shall remain in effect. IN WITNESS WHEREOF, the City and Consultant have executed this Amendment No. 13 to the Professional Services Agreement on the respective dates set forth below. CITY OF LA QUINTA a California CONSULTANT: Municipal corporation Jon Bengal Engineering, Inc. Cit filen, City Manager Scott Onishuk, P.E. Principal in Charge Dated: 4 ✓ 20 ATTEST: Monika Radeva, City Clerk City of La Quinta, California APPROVED AS TO FORM: Dated: April; 1, 2024 William H. Ihrke, City Attorney City of La Quinta, California Exhibit A Scope of Services Consultant will provide additional construction support on a time and materials basis as requested by City Staff and as specified in the original scope of work. Consultant will provide amended roadway improvement plans, widening Dune Palms Road, south of the channel to the ultimate street width, including a raised median between Corporate Centre Way and Highway 111, as part of an amended Phase 2 Task 4, Under Final Design as follows: Task 4A: Amended Roadway Improvement Plans Consultant will amend the approved roadway improvement plans to include the proposed widening of Dune Palms Road, between Highway 111 and the bridge. The amended roadway improvement plans include modifications to the following sheets: • Sheet 2, Construction Notes and Quantities • Sheet 4, Removal & Existing Utility Sheet • Sheet 7, Street Improvement Plan • Sheet 13, Signing and Striping Plan Exhibit B Budget The following represents the contract total of One Million, Five Hundred Ninety -Four Thousand, Four Hundred Forty -Three Dollars ($1,594,443.00) after the consideration of Amendments 1 through 13. Base Contract Amount: Amendment No. 1: Amendment No. 2: Amendment No. 3: Amendment No. 4: Amendment No. 5: Amendment No. 6: Amendment No. 7: Amendment No. 8: Amendment No. 9: Amendment No. 10: Amendment No. 11: Amendment No. 12: Amendment No. 13: Contract Total: $1,176,781.00 ($2,233.00) $7,800.00 $31,678.00 $16,100.00 $19,900.00 $9,583.00 $ 96,449.00 $89,875.00 $53,310.00 $0.00 $0.00 $50,000.00 $45,200.00 $ 1,594,443.00 • Additional Construction Support: $40,000 • Amended Roadway Improvement Plans: $5,200 CONSENT CALENDAR ITEM NO. 8 City of La Quinta CITY COUNCIL MEE I ING: March 19, 2024 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER ESTIMATE FOR CONTRACT WITH ORTIZ CONSTRUCTION, INC., APPROVE AMENDMENT NO. 13 TO PROFESSIONAL SERVICES AGREEMENT WITH BENGAL ENGINEERING, INC., AND AUTHORIZE AMENDMENT REQUEST TO COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS AGREEMENT FOR THE DUNE PALMS ROAD BRIDGE IMPROVEMENT PROJECT NO. 2011-05 RECOMMENDATION Approve Change Order Estimate for contract with Ortiz Construction, Inc. in the amount of $124,944, approve Amendment No. 13 to Professional Services Agreement with Bengal Engineering, Inc. in the amount of $45,200, authorize staff to submit an amendment request to the Coachella Valley Association of Governments reimbursement agreement for the Dune Palms Road Bridge Improvement Project No. 2011-05; and authorize the City Manager to execute the change order and amendments. EXECUTIVE SUMMARY • The Dune Palms Road Bridge Project (Project) (Attachment 1) is currently in construction to replace the existing low water crossing with an all-weather access bridge on Dune Palms Road at the Coachella Valley Storm Water Channel (CVSWC). • As the contractor is constructing the roadway improvements associated with the northbound bridge section of the Project, staff recommends completing the roadway widening to ultimate condition on the eastern side of Dune Palms Road between Highway 111 and the bridge. • The Change Order Estimate for the construction contract with Ortiz Construction, Inc., includes additional quantities of bid items to complete the widening to the ultimate General Plan condition (Attachment 2). • Amendment No. 13 to the Professional Services Agreement (PSA) with Bengal Engineering, Inc., (Bengal) authorizes engineering design to amend the current roadway improvement plans and to provide additional construction support services on a time and materials basis (Attachment 3). • The road widening improvements are not eligible for Highway Bridge Program Funding but as part of the Coachella Valley Association of Governments (CVAG) 181 Regional Transportation Plan (RTP) in the Transportation Project Prioritization Study (TPPS) they are eligible for funding. • Staff requests approval to submit an amendment request for the existing Dune Palms Bridge Agreement with CVAG to provide 75% of the cost for the road widening improvements. FISCAL * The Project has an approved budget of $29,756,245. The following is the updated project budget per phase: Phase Project Budget Engineering/Design $2,095,200 Right of Way $1,570,554 Construction $22,017,430 Const. Engineering $2,764,651 Utility Agreement (IID) $65,750 Contingency $1,242,660 Total Costs: $29,756,245 The CVAG amendment request is for 75% of the additional road widening costs, including design and construction. Sufficient funds are available for the Bengal amendment in the amount of $45,200 and the construction contract change order estimate of approximately $124,944 in the existing project budget. BACKGROUND/ANALYSIS The Project is currently in construction to replace the existing low water crossing with an all- weather access bridge on Dune Palms Road at the CVSWC. The contractor is preparing to construct the roadway improvements associated with the northbound bridge section of the Project. Staff recommends widening the eastern side of Dune Palms Road on the northbound bridge approach, from Highway 111 to the bridge, to its ultimate General Plan condition as part of the Project. This segment of Dune Palms Road is part of the RTP and is included in the CVAG TPPS with a 2015 ranking of 9 on a scale of 0 to 15 (15 is the highest need). The TPPS uses distinct evaluation criteria and scores to form a ranking list of the regionally significant roadway segments for the nine municipalities and the County of Riverside in the Coachella Valley area. The ranking list is used to determine which roadways have the greatest need evaluated from current conditions and is used in funding decisions. 182 Completing the road widening as the contractor is constructing the roadway improvements associated with the northbound bridge section will provide overall cost savings. The City will not need to construct and remove temporary improvements in the future to widen the road to its ultimate condition. Constructing the ultimate condition at this time will also offer improved safety for bicycles and pedestrians on the east side of Dune Palms Road and provide a better link to the adjacent CV Link improvements. The road widening improvements are not eligible for HBP funding, but they are eligible for CVAG regional transportation funding. Staff requests approval to submit a request to CVAG, to amend the existing Dune Palms Bridge Reimbursement Agreement for 75% of the cost for the design and construction of the road widening improvements. The proposed construction change order estimate from Ortiz Construction, Inc., includes the additional quantities of bid items estimated to construct the road widening improvements. The final change order will be submitted based on the actual quantities required to complete the improvements. Proposed Amendment No. 13, if approved, will allow Bengal to continue to provide construction support through the construction phase and amend the current roadway improvement plans to include the Dune Palms Road widening from Highway 111 to the bridge. Additional construction support is warranted to accommodate time expended on the resolution of the water main construction to satisfy CVWD Record Drawing information, and additional construction time due to delays caused by Tropical Storm Hilary in August 2023 and other subsequent storms. ALTERNATIVES Staff does not recommend an alternative. Prepared by: Approved by: Julie Mignogna, Management Analyst Bryan McKinney, Public Works Director/City Engineer Attachments: 1. Project Vicinity Map 2. Ortiz Construction, Inc. Change Order Estimate 3. Bengal Engineering Inc. Amendment No. 13 183 Dune Palms Bridge Vicinity Map u..Il.i m mow E111r1 i rn�i M n r_ • 1119IIP� 1I ■g11 G. 11 Ni1YiUili ' �f ATTACHMENT 1 r 14 2 el im Ira Jhl 11iiltlI1111W1 11114 0111111:' ¢ s ■ �'.. 4.11.= ■1111■IIli1■1 mine: nou.+- -'_ �.T 1 APIA Ora.. ■11111111111■ um iM=kill g 2 : -� =a1.1i1=■II111■1 :: 111111'':= 1iti�Y1Y11r1i111111■I °jii iiiiiii1�M�11i1II1I1111■1a1l ■A u4411111:=7:2-1 = ulrl� nilw �IIIIIIIIA MUMMY ■. nuul� n�1{ 1 t■ 111 R ■ 1111 mill=::: ■ i ■. i.- 111111111 - 1 M p ■E- 111 4:4:111111611011=r 41{1111111 - �o 11 1 ..... 111 1 ■■ .. :.IIIIIIIII I **i _ .1 r ■INN1 11.11■ 11 T. -■r? uiiii11l M ■ H 11= -r3 //1111111 11111■11 71r -��. ■ .M.11.112111-1 - 1111111 IINIYII �� :E,...,...- ."-••,•11,7,8 -:- - p ���+ IIIIN 1111111111111E �1R1111 — . 1 ii 1111 ■f t` IIYI P+iiLG1:yur i N.T.S. 184 ATTACHMENT 2 Bid Item # Description Unit New Quantity Original Quantity Change Bid Unit Price Extension Comments QUANTITIES FROM ENGINEER'S COVER SHEET 5, 91 Sawcut & Remove AC Pavement SF 3,482 677 2,805 $ 1.80 $ 5,049.00 8, 92 Clearing and Grubbing (C & G Removal) LS See Below 12 Suitable Backfill Material CY 47 - 47 $ 300.00 $ 14,100.00 96 Cold Mill AC Pavement SF 2,607 2,241 366 $ 1.00 $ 366.00 97, 14 Asphalt Concrete (4.5 ") SF 23,898 19,848 4,050 $ 3.20 $ 12,960.00 98 Asphalt Concrete (0.10') SF 2,607 2,241 366 $ 0.85 $ 311.10 15, 99 Class 2 Aggregate Base SF 23,898 19,848 4,050 $ 1.90 $ 7,695.00 17, 100 6" AC Dike LF 118 486 (368) $ 23.00 $ (8,464.00) 18, 101 6" Curb & Gutter LF 568 - 568 $ 22.00 $ 12,496.00 19, 102 8" Median Curb LF 881 - 881 $ 19.00 $ 16,739.00 20, 103 Concrete Sidewalk (5.5') SF 3,476 3,853 (377) $ 16.00 $ (6,032.00) 22, 105 Colored Stamped Median SF 1,787 - 1,787 $ 16.00 $ 28,592.00 46, 108 Signing EA 4 - 4 See Below Pavement Markings (Bike Legend) EA 3 - 3 See Below Pavement Markings (Turn Arrows) EA 2 - 2 See Below 146 Crack Seal and Slurry Seal SF 54,857 73,184 (18,327) $ 0.35 $ (6,414.45) Subtotal (Items from Engineer's Qty's) $ 77,397.65 These Items to be paid per original Bid Unit Prices 185 Bid Item # Description Unit New Quantity Original Quantity Change Bid Unit Price Extension Comments ADDITIONAL QUANTITIES Clear and Grub LF 198 - 198 $ 16.00 $ 3,168.00 Curb & Gutter Removal AC Walkway (4") SF 525 - 525 $ 14.85 $ 7,796.25 No Headers, backing, etc. 9, 93 Excavation CY 384 - 384 $ 60.00 $ 23,040.00 Raised Median Curb - Sawcutting and AC Patch LF 881 - 881 $ 12.00 $ 10,572.00 Concrete Purchase (price increases) CY 90 - 90 $ 33.00 $ 2,970.00 Subtotal (Additional Items) $ 47,546.25 TOTALS $ 124,943.90 Bid Description Unit New Original Change Bid Unit Extension Comments Item # Quantity Quantity Price CONDITIONS / QUALIFICATIONS Traffic Control & Maintenance Time and Materials Testing (QA/QC) By City Signage and Pavement Markings TBD - Dependent on Schedule and Traffic Configuration Subcontractor prices include 2 move -ins for the entire project - Mobilizations - Asphalt Paving additional move -ins will be $17,750.00 Mobilizations Concrete Curbs, Gutters, Flatwork Subcontractor prices include 2 move -ins for the entire project - additional move -ins will be $1,750.00 186