Inspection Worksheet_14-02-2024_14-08-01INSPECTION WORKSHEET (IDPW-013522-2024)
FOR CITY OF LA QUINTA
CIP2024-0002Case Number:Case Module:Permit
02/14/2024 Partially ApprovedInspection Status:Inspection Date:
CIPInspection Type:Inspector:Mark Bustamante
Job Address:Parcel Number:
Company Name NameContact Type
CONSERVE LANDCARE INCContractor
CITY OF LA QUINTA - PUBLIC WOROwner
CommentsChecklist Item Results
Weather: 45-71 degrees, Sunny, 6 mph Wind
Arrival:0800
Departure: 1330
Report: Conserve Landcare had a crew of 7 people setting up
traffic control on Dune Palms and Fred Waring, before excavation
for Keystone walls along Fred Warring.
Conserve Crew:
Roberto Murillo(F)
Alexander Algandar(L)
Critstobal Archeiga(L)
Carmelo Vega Ruiz(L)
Jorge Garcia(L)
Ignacio Aguirre(L)
Victor Bernal(L)
Equipment:
1x Mini Exc
General Comments - Checklist item used to track
general comments, not specific to any other checklist
item
N/A
Page 1 of 178-495 Calle TampicoFebruary 14, 2024