Loading...
2016-03I Cactus Flower Pre-Bid Meeting Agenda La Quinta Landscape Renovation Improvement – Cactus Flower Project No. 2016-03I Pre-Bid Conference Agenda November 28, 2023 1. Introductions 2. The project consists of removing designated turf and plant material and sidewalk reconstruction along the parkway and street entrances at the Cactus Flower Development along the southside of Fred Waring Drive generally from Dune Palms Road to Monticello Avenue and on the east side of Dune Palms from Star Flower Trail to Fred Waring Drive. Work will also take place at the three retention basins within the Development. Additionally, on the east side of Jefferson Street south of Avenue 50 to 665 feet south of Avenue 50. Turf will be replaced with drought-tolerant landscaping and irrigation. The plant palette shall include Cresta rubble, multi-colored crushed rock, and ‘Baja Cresta’ boulders of varying sizes with minimal use of drought-tolerant plants and re-use of designated existing plant material. In addition, the existing perimeter wall shall be cleaned, and construction of keystone block wall at various locations. Existing lighting and electrical shall be modified and new lighting shall be furnished and installed. An additive alternate includes the construction of pickleball courts with site amenities. 3. Bid Opening Procedure A. 11:00a.m. on Monday, December 4, 2023 B. Plans and Specs available through PlanIt website. C. Submitted in Sealed Envelope per Section 7 of the Instructions to Bidders. D. 10% Bid Bond or Cashier’s Check payable to the City 4. 60 Working Days and $2,000.00/Calendar Day Liquidated Damages 5. Prime Contractor must perform at least 50% of the work with its own forces 6. Prevailing Wage Requirements are in effect 7. City shall provide survey and Material Testing unless specifications state otherwise 8. Licensing Requirements – Class A (General Contractor) and/or C27 (Landscaping Contractor) 9. Contractor is obligated to review contract documents and site conditions 10. Utilities – Contractor shall contact Dig Alert 11. Contractor shall be registered with the DIR in order to bid/receive projects 12. Federal Requirements • Certified Payroll 13. Contractor must initial bid package if addenda are issued. 14. Questions shall be submitted in writing by 11:00am on Wednesday, November 29, 2023 15. The City will require a separate rider to the contractor’s insurance listing the City as additionally insured. 16. City is required to award or reject within 60 days of the bid opening. 17. Contractor is required to submit a signed contract with bonds and insurance within ten (10) days after receiving the Notice of Award.