Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BSOL2021-0225
BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 12/02/2021 ISSUED DATE: 02/22/2022 Permit Type: Permit Number: Property Address: APN: Legal Description Property Zoning: Valuation: Solar 51430 CALLE HUENEME BSOL2021-0225 770164010 $32,742.00 Owner:CRAIG L. & SHERI L. BAGAUS 51480 CALLE HUENEME, LA QUINTA, CA 92253 Applicant:P T ELECTRIC 531 N GIRARD ST, HEMET, CA 92544 Contractor:P T ELECTRIC 531 N GIRARD ST, HEMET, CA 92544 Declaration / Acknowledgement PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER-BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors’ State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors’ State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors’ State License Law does not apply to an owner of property who, through employees’ or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner-Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors’ State License Law. As an Owner-Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner-builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS’ COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES. 1) Has and will maintain a certificate of consent to self-insure for workers’ compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers’ compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers’ compensation laws of California, and agree that, if should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above-mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 4/30/24 11:01 pm Page 1 of 3 Permit Type: Permit Number: Property Address: Solar BSOL2021-0225 51430 CALLE HUENEME BUILDING PERMIT BAGAUS/5.475kW PV SYSTEM- (15) PANELS W/ MICROINV + 125A SUB *** 5.475kW SOLAR ARRAY - (15) 365W ZNSHINE ZXM6-NH120-365/M PANELS W/ (8) APS YC600 MICROINVERTERS + NEW 125A PV LOAD CENTER [300SF] 2019 CALIFORNIA BUILDING CODES. Use of Permit Construction Details 5.475System Size (kW DC)2PV Strings (EA)1PV Miscellaneous Equipment EA Valuation Details Type Group Sq Ft Value Financial Information Fee AmountFee Amount PaidInvoice No. PERMIT-BSOL2021-022 5 $27.79 PV SYSTEM LESS THAN 10KW PC $27.79 $105.60 PERMIT ISSUANCE $105.60 $11.00 RECORDS MANAGEMENT FEE $11.00 $27.79 PV SYSTEM MISC EQUIPMENT $27.79 $2.00 BSAS SB1473 FEE $2.00 $27.79 PV SYSTEM LESS THAN 10KW $27.79 $27.79 PV SYSTEM MISC EQUIPMENT PC $27.79 $5.00 TECHNOLOGY ENHANCEMENT FEE $5.00 $234.76 $234.76 Total for Invoice PERMIT-BSOL2021-0225 Grand Total for Permit $234.76 $234.76 Workflow / Inspections Workflow Step / Action Name Action Type Start Date End Date Inspections v.1 12/02/2021 0:00 SOLAR FINAL** v.1 Inspection Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. Inspections Printed: 4/30/24 11:01 pm Page 2 of 3 Permit Type: Permit Number: Property Address: Solar BSOL2021-0225 51430 CALLE HUENEME BUILDING PERMIT A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. Certificate of Occupancy A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Service Utilities Printed: 4/30/24 11:01 pm Page 3 of 3 INSTALL A 5.475 KW PV ARRAY THAT INCLUDES 15 ROOF MOUNTED SOLAR PANELS. MODULE MODEL : ZnShine PV-TECH ZXM6-NH120-365/M MODULE MAX POWER (P/MAX): 365W MODULE QTY : [15] INVERTER MODEL : ALTENERGY POWER SYSTEM YC600 INVERTER QTY : [8] ROOF PITCH : 0° PV ARRAY PITCH : 0° AZIMUTH: (15) MODULES @ 180° ROOF TYPE: ROLLED COMPOSITION ROOF LAYER(S): 01 RAFTERS: 2X6 [24"] ON CENTER ELECTRIC UTILITY COMPANY: IID ENERGY MAIN SERVICE AMPERAGE: 200A 5.475kW DC SOLAR ELECTRIC SYSTEM AC CEC:4.93kW ONE STORY BUILDING T1-TITLE PLAN, GENERAL NOTES PV SYSTEM SUMMARY A1-SITE PLAN / A1.1-SYSTEM INFORMATION A2-PANEL AND RACKING LAYOUT / A3-GENERAL DETAIL E1-SINGLE LINE DIAGRAM / E2-LABELS AND PLACARD MANUFACTURER SPEC SHEETS T1 DATE:CRAIG BAGAUSHOMEOWNER:ADDRESS:LICENSE #CONTRACTOR: PT Electric Inc92001551430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17"SHEET TITLE: COVER PAGE LA QUINTA CA 92253SCALE: NTS JOB#: PM3357 REVISIONS DATE REV. VICINITY MAP SCALE: NTS SHEET INDEX SCOPE OF WORK SOLAR PERMIT PACKAGE 11/22/21 CODE SUMMARY: 1.ALL MATERIALS, EQUIPMENT, INSTALLATION AND WORK SHALL COMPLY WITH THE FOLLOWING APPLICABLE CODES: 2019 CA BUILDING CODE, PART 2 2019 CA RESIDENTIAL CODE PART, 2.5 2019 CA MECHANICAL CODE, PART 4 2019 CA ELECTRICAL CODE, PART 3 2019 CA PLUMBING CODE, PART 5 2019 CA EXISTING BUILDING CODE, PART 10 2019 CA GREEN BUILDING STANDARDS CODE, PART 11 2019 CA REFERENCE STANDARDS CODE, PART 12 2019 CA FIRE CODE 2.EXISTING PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, VENTILATION'S INTAKE AIR OPENINGS SHALL NOT BE COVERED BY THE SOLAR PHOTOVOLTAIC SYSTEM. 3.ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A RECOGNIZED ELECTRICAL TESTING LABORATORY AND INSTALLED PER THE LISTING REQUIREMENTS AND THE MANUFACTURER'S INSTRUCTIONS. [NEC 690.4(D)] 4.ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ALL ROOF MOUNTED TRANSITION BOXES AND SWITCHES. 5.PAINT PV CONDUIT TO MATCH THE DWELLING EXTERIOR. 6.CONTACT THE SERVICING UTILITY BEFORE POWERING ON THE PHOTOVOLTAIC SYSTEM AERIAL MAP SCALE: NTS - ADEQUATE SPACING WILL BE MAINTAINED BETWEEN ANY PLUMBING SEWER VENTS EXTENDING THROUGH THE ROOF AND THE UNDERSIDE OF THE PHOTOVOLTAIC PANELS ( 6" MINIMUM RECOMMENDED) - ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL BE RAIN-TIGHT AND APPROVED FOR USE IN WET LOCATIONS. 1. Prior to commencement of work, the contractor shall verify the framing sizes, spacings, and spans noted in the stamped plans and accompanying calculations and notify the Engineer of Record of any discrepancies prior to starting construction. 2. These plans are stamped for structural code compliance of the roof framing supporting the proposed PV installation referenced only. These plans are not stamped for water leakage. PV modules, racking, and attachment components must follow manufacturer guidelines and requirements. 3. Please see accompanying Structural Calculations report for details regarding calculations as well as limits of scope of work and liability. NOTE TO INSTALLERS: VERIFY THE ROOF FRAMING INFO BEFORE INSTALLATION AND NOTIFY THE EOR AT 951.405.1733 IF THERE IS ANY INCONSISTENCY BETWEEN SITE VERIFICATION AND FOLLOWING: 2x6 RAFTERS @ 24" OC SPACING WITH MAX UNSUPPORTED SPAN EQUAL OR LESS THAN 12 FT. Exp: 09/30/2022 Stamped: 11/30/2021 BSOL2021-0225 5.475kW SOLAR ARRAY - (15) 365W ZNSHINE ZXM6-NH120-365/M PANELS W/ (8) APS YC600 MICROINVERTERS + NEW 125A PV LOAD CENTER [300SF] 2019 CALIFORNIA BUILDING CODES. 01/12/2022 MACSP J MIN.18" CLEAR SETBACK FROM RIDGES TO MODULES, MIN.36" ACCESS PATHWAYS. R331.2.1 (CRC 2019) Roof access point shall be located in areas that do not reTuire the placePent of Jround ladders over openinJs such as windows or doors,and located at stronJ points of buildinJ construction in locations where the access point does not conflict with overhead obstructions such as tree liPbs, wires or siJns. ROOF PITCH 0° TYP. SCALE: 1" = 11' A1CRAIG BAGAUSHOMEOWNER:ADDRESS:LICENSE #CONTRACTOR: PT Electric Inc92001551430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17"SHEET TITLE: SITE PLAN LA QUINTA CA 92253JOB#: PM3357 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE:11/22/21 PROPERTY LINE E DRIVEWAY 3" FIRE SETBACK E 2A MAIN SERVICE PANEL W2A MAIN BREAKER EXTERIOR LOCATION N AC DISCONNECT N "PV DEDICATED" SUB PANEL E UTILITY METER NEW PROPOSED PV ARRAY LOCATION 15 ZNSHINE PV-TECH ZXM-NH12-35M MODULES ALTENERGY POWER SYSTEM YC MICRO INVERTERS 5.75kW DC STC E PATIO COVER E GATE E GATE JUNCTION BOX NEW EMT CONDUIT >MIN.7" ABOVE ROOF@ PER NEC21 31.153C ALL EXPOSED CONDUITS WIRING,MOUNTING HARDWARE,EMT MUST BE PAINTED TO MATCH THE COLOR OF THE ROOF/FACADE RESPECTIVELY.CALLE HUENEMEExp: 09/30/2022 Stamped: 11/30/2021 01/12/2022 1.ETuipPent Location Scale: N/A ·ALL EQUIPMENT SHALL MEET MINIMUM SETBACKS. ·WIRING SYSTEMS INSTALLED IN DIRECT SUNLIGHT MUST BE RATED FOR EXPECTED OPERATING TEMPERATURE. ·ADDITIONAL AC DISCONNECT(S) SHALL BE PROVIDED WHERE THE INVERTER IS NOT WITHIN SIGHT OF THE AC SERVICING DISCONNECT ·ALL EQUIPMENT SHALL BE INSTALLED ACCESSIBLE TO QUALIFIED PERSONNEL. ·ALL COMPONENTS ARE LISTED FOR THEIR PURPOSE AND RATED FOR OUTDOOR USAGE WHEN APPROPRIATE 2. Interconnection Notes Scale: N/A ·THE SUM OF THE UTILITY OCPD AND INVERTER CONTINUOUS INPUT MAY NOT EXCEED 120% OF BUSBAR RATING. ·WHEN SUM OF THE PV SOURCES EQUALS >100% OF BUSBAR RATING, PV DEDICATED BACKFFED BREAKERS MUST BE LOCATED OPPOSITE END OF THE BUS FROM THE UTILITY SOURCE OCPD. ·AT MULTIPLE PV OUTPUT COMBINER PANEL, TOTAL RATING OF ALL OVER CURRENT DEVICES SHALL NOT EXCEED AMPACITY OF BUSBAR. ·SUPPLY SIDE TAP INTERCONNECTION WITH SERVICE ENTRANCE CONDUCTORS BACK FEEDING BREAKER FOR UTILITY-INTERACTIVE INVERTER OUTPUT IS EXEMPT FROM ADDITIONAL FASTENING. 3. General Notes Scale: N/A ·MODULES ARE LISTED UNDER UL 1703 AND CONFORM TO THE STANDARDS. ·INVERTERS ARE LISTED UNDER UL 1741 AND CONFORM TO THE STANDARDS. ·DRAWINGS ARE DIAGRAMMATIC, INDICATING GENERAL ARRANGEMENT OF THE PV SYSTEM AND THE ACTUAL SITE CONDITION MIGHT VARY. ·WORKING CLEARANCES AROUND THE ELECTRICAL EQUIPMENT WILL BE MAINTAINED. ·ALL GROUND WIRING CONNECTED TO THE MAIN SERVICE GROUNDING IN MAIN SERVICE PANEL/ SERVICE EQUIPMENT. ·ALL CONDUCTORS SHALL BE 600V, 90°C STANDARD COPPER UNLESS OTHERWISE NOTED. ·WHEN REQUIRED, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE WITH OSHA REGULATIONS. ·THE SYSTEM WILL NOT BE INTERCONNECTED BY THE CONTRACTOR UNTIL APPROVAL FROM THE LOCAL JURISDICTION AND/OR THE UTILITY. ·ROOF ACCESS POINT SHALL BE LOCATED IN AREAS THAT DO NOT REQUIRE THE PLACEMENT OF GROUND LADDERS OVER OPENINGS SUCH AS WINDOWS OR DOORS, AND LOCATED AT STRONG POINTS OF BUILDING CONSTRUCTION WHERE THE ACCESS POINT DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS SUCH AS TREES, WIRES OR SIGNS. ·PV ARRAY COMBINER/JUNCTION BOX PROVIDES TRANSITION FROM ARRAY WIRING TO CONDUIT WIRING . WirinJ Conduit Notes Scale: N/A ·ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING. ·DC WIRING LIMITED TO MODULE FOOTPRINT. MICRO INVERTER WIRING SYSTEMS SHALL BE LOCATED AND SECURED UNDER THE ARRAY WITH SUITABLE WIRING CLIPS. ·AC CONDUCTORS COLORED OR MARKED AS FOLLOWS: 1-PHASE A OR L1- BLACK 2-PHASE B OR L2- RED, OR OTHER CONVENTION IF THREE PHASE 3-PHASE C OR L3- BLUE, YELLOW, ORANGE*, OR OTHER CONVENTION 4-NEUTRAL- WHITE OR GREY IN WIRE DELTA CONNECTED SYSTEMS THE . Structural Notes Scale: N/A ·RACKING SYSTEM & PV ARRAY WILL BE INSTALLED ACCORDING TO CODE-COMPLIANT INSTALLATION TOP CLAMPS REQUIRE A DESIGNATED SPACE BETWEEN MODULES, AND RAILS MUST ALSO EXTEND A MINIMUM DISTANCE BEYOND EITHER EDGE OF THE ARRAY/SUBARRAY, ACCORDING TO RAIL MANUFACTURER¶S INSTRUCTIONS. ·JUNCTION BOX WILL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. IF ROOF-PENETRATING TYPE, IT SHALL BE FLASHED & SEALED PER LOCAL REQUIREMENTS. ·ROOFTOP PENETRATIONS FOR PV RACEWAY WILL BE COMPLETED AND SEALED WITH APPROVED CHEMICAL SEALANT PER CODE BY A LICENSED CONTRACTOR. ·ALL PV RELATED ROOF ATTACHMENTS TO BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER. 5. GroundinJ Notes Scale: N/A ·GROUNDING SYSTEM COMPONENTS SHALL BE LISTED FOR THEIR PURPOSE, AND GROUNDING DEVISES EXPOSED TO THE ELEMENTS SHALL BE RATED FOR SUCH USE. ·PV EQUIPMENT SHALL BE GROUNDED METAL PARTS OF MODULE FRAMES, MODULE RACKING, AND ENCLOSURES. ·EQUIPMENT GROUNDING CONDUCTORS SHALL BE SIZED ACCORDING TO MICRO INVERTER MANUFACTURER'S INSTRUCTIONS. ·THE GROUNDING CONNECTION TO A MODULE SHALL BE ARRANGED SUCH THAT THE REMOVAL OF A MODULE DOES NOT INTERRUPT A GROUNDING CONDUCTOR TO ANOTHER MODULE. ·GROUNDING AND BONDING CONDUCTORS, IF INSULATED, SHALL BE COLORED GREEN OR MARKED GREEN IF #4 AWG OR LARGER. ·IF EXISTING SYSTEM IS INACCESSIBLE, OR INADEQUATE, A GROUNDING ELECTRODE SYSTEM PROVIDED. . Conduit Run Details Scale: N/A 7. GroundinJ Details Scale: N/A . Disconnection OCPD Notes Scale: N/A ·DISCONNECTING SWITCHES SHALL BE WIRED SUCH THAT WHEN THE SWITCH IS OPENED, THE CONDUCTORS REMAINING ENERGIZED ARE CONNECTED TO THE TERMINALS MARKED ³LINE SIDE” (TYPICALLY THE UPPER TERMINALS). ·DISCONNECTS TO BE ACCESSIBLE TO QUALIFIED UTILITY PERSONNEL, BE LOCKABLE, AND BE A VISIBLE-BREAK SWITCH ·RAPID SHUTDOWN OF ENERGIZED CONDUCTORS BEYOND 10 FT OF PV ARRAY OR 5 FT INSIDE A BUILDING WITHIN 10 SECONDS. CONTROLLED CONDUCTORS 30V AND 240VA. LOCATION OF LABEL ACCORDING TO AHJ. ·IF REQUIRED BY AHJ, SYSTEM WILL INCLUDE ARC-FAULT CIRCUIT PROTECTION. SCALE: 1" = 0' A1.1CRAIG BAGAUSHOMEOWNER:ADDRESS:LICENSE #CONTRACTOR: PT Electric Inc92001551430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17"SHEET TITLE: SYSTEM INFORMATION LA QUINTA CA 92253JOB#: PM3357 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE:11/22/21 Exp: 09/30/2022 Stamped: 11/30/2021 01/12/2022 MACSP J 2X RAFTERS # 2" O.C R DUAL RACK RAIL A SCALE: 1" = 8' A2CRAIG BAGAUSHOMEOWNER:ADDRESS:LICENSE #CONTRACTOR: PT Electric Inc92001551430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17"SHEET TITLE: RACKING LAYOUT LA QUINTA CA 92253JOB#: PM3357 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE:11/22/21 CHEM LINK E CURB ATTACHMENT SPACING TYP. @ [48" MAX.][MIN. 24"] A ROOF MATERIAL: ROLLED COMPOSITION [TYP.] [01 LAYER]R ·20% MAX. RAIL FREE SPAN [TYP.] Exp: 09/30/2022 Stamped: 11/30/2021 01/12/2022 (E) ROOF SHEATHING TYP. 7/16 X .75" NUT, FLANGE 3/8" BOLT PLACE SEALANT AROUND LAG BOLT AND UNDER STANDOFF BASE PREDRILLED 3/16" HOLE (2) 5/16" STAINLESS STEEL LAG BOLT W/ 2-1/2" MIN. EMBEDMENT (E) ROOF FRAMING TYP.1'-5" MAXDUAL JACK STANDOFF RAFTERS 2X6 @ 24" O.C. [TYP.] L FOOT (OPTION) DUAL RACK RAIL ROLLED COMPOSITION ROOF MODULE CHEM LINK E CURB ·SUPPORT RAIL PLACEMENT SHALL NOT EXCEED 20% OF MODULE LENGTH FROM THE EDGE ·PV MODULES SHALL HAVE MIN. 3.5" ABOVE ROOF CRAIG BAGAUSHOMEOWNER:ADDRESS:LICENSE #CONTRACTOR: PT Electric Inc92001551430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17" LA QUINTA CA 92253SCALE: NTS JOB#: PM3357 REVISIONS DATE REV. SOLAR PERMIT PACKAGESHEET TITLE: ATTACHMENT DETAILDATE:11/22/21 A3 ·THE MAXIMUM DISTANCE FROM THE TOP OF THE MODULE TO THE ROOF PLANE IS LESS THAN 18 INCHES. Exp: 09/30/2022 Stamped: 11/30/2021 01/12/2022 NEW 125AMPPV DEDICATED SUB PANELMAIN LUG ONLY#1 ARRAY OF 8 MODULES @ ZXM6-NH120-365/M4 APS YC600 MICRO INVERTERS ON ARRAYTRANSITION FROMAC CABLE TO THWN-2JUNCTION BOXNEMA3R30A Utility AC Disconnect , 2 Pole,Knife-Blade Type, 240V, Lockable, Visible,Rated NEMA 3R REVENUE METER SERVICE DISCONNECT EXISTING MAIN SERVICE PANEL 200A MAIN BREAKER TOP FED 200A BUSOUTSIDE THE WALLOVERHEAD FEEDER POINT OF CONNECTION LOAD SIDE SPLIT PHASE 3W 120/240V 1 Phase / 60 Hz.Ground RodGROUNDING ELECTRODE=2=JUNCTIONBOXMAIN LUGS120/240V1-PH, 3WMAINBREAKER120/240V1-PH, 3WINCOMING UTILITYSERVICEIID ENERGYM3==#2 ARRAY OF 7 MODULES @ ZXM6-NH120-365/M4 APS YC600 MICRO INVERTERS ON ARRAY2#12 AWGMANUFACTUREWIRE2#12 AWGMANUFACTUREWIRE#6,SOLID BARE CU(L1,L2,PE)#12#6,SOLID BARE CU(L1,L2,PE)#121(n) 30A/2PARC-Fault Circuit-interruption breaker locatedON THE OPPOSITE SIDE OF THE BUS BAR AWAYFROM THE MAIN BREAKER(N) 30A/2P PVB13(N) 2X20A/2PWIRETAG#1 2 3 WIRE TYPE-QTY-SIZECONDUITOPEN AIRABOVE ROOF0" to 7/8"Above RoofWIREAMP.30ATEMP.CORRECTIONCURRENT0.9127.3A > 11.4AGRD-SIZE#6,BARE CU"THWN-2"-4-#10#8,EGC CU40ATERMINALRATING90°C90°CEMT.3/4"0.9129.12A >20A#8,EGC CU"THWN-2"-3-#1075°C35A30.8A > 30AAMP.ADJC.C.C0.8N/AN/AHI TEMP. = 39°C LOW TEMP. = -7°C(L1, L2, N)(2*L1, 2*L2)APS TO JUNCTION BOX(L1,L2,PE)#12 ALONG THE WALLEMT.3/4"0.88Min. 7/8"MODULE MFR:ZnShine PV-TechMODEL:ZXM6-NH120-365/MPower at STC: 365WPower at PTC: 340.9WVOC:40.8±}3%V VMP:34.0VISC:11.33±}3%A IMP:10.74APV SYSTEM OUTPUTINVERTERMODULE @ STCMAX DC OUTPUT = 365W * 15 = 5.475kW340.9 W PTC * 15= 5.11kW5.11kW * 0.965 INV. = 4.93kWAC ACTUAL OUTPUT=548VA*8=4.38kW 120%RULE@MAIN SERVICE:705.12(B)(2)(3)(b)BUS BAR RATING = 200A= 1.2 * 200A BUS BAR = 240ATOTAL FEED = 200A "MSB" TOP FED + 30A= 230A < 240A MAXINVERTER MFR: APSINVERTER MODEL: YC600AC NOMINAL OUTPUT CURRENT= 2.28 AMIN WIRE AMPACITYSTRING A,B = 2.28A * 1.25 * 4 [APS] = 11.4AMIN (OCPD) = 20A ,TERMINALS RATED @ 75°CPV SUB-PANEL RATINGNEW 125A BUS , SPLIT PHASE 3W 120/240VMAX OUTPUT CURRENT =INVERTER IMAX * # OF INVERTERS * 125%NEC= 2.28A * 8 * 1.25 = 22.8AMIN (OCPD) = 25A. AVAILABLE(OCPD) = 30ATERMINALS RATED @ 75°CIN: 2 * 20A PV BACKFED BREAKERSOUT:MAIN LUG CONNECTED TO 30A BREAKERMAIN SERVICE PANELALL METALLIC RACEWAYS AND EQUIPMENT SHALL BE BONDED AND ELECTRICALLY CONTINUOUS(NEC 250.90,250.96)GROUNDING BUSHINGS ARE REQUIRED AROUND PREPUNCHED CONCENTRIC KNOCKOUTS ON THE DC SIDE OF THE SYSTEM(NEC 250.97)THE GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS,EXPECT FOR SPLICES OR JOINTS AT BUSBAR WITHIN LISTED EQUIPMENT. (NEC250.64)THE EQUIPMENT GROUNDING CONDUCTOR MAY BE USED AS A GROUNDING ELECTRODE CONDUCTOR.(NEC 250.121 EXCEPTION.INSTALLED PER 250.B(A),II,III,VI)CRAIG BAGAUSHOMEOWNER: ADDRESS: LICENSE # CONTRACTOR: PT Electric Inc 920015 51430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17"SHEET TITLE: SINGLE LINE DIAGRAM LA QUINTA CA 92253SCALE: NTSJOB#: PM3357REVISIONSDATEREV.SOLAR PERMIT PACKAGEDATE:11/22/21E101/12/2022 NOTE: PANEL DISTANCE APART 10" MIN TO 5'-0" MAX AND 4'-0" MIN TO 6'-0" MAX HIGH FROM GROUND. PERIMETER WORK SPACE SHALL BE MAINTAINED (NEC 110.26) NORTH SIDE OF THE WALL MAIN SERVICE PANEL AC DISCONNECT EMT CONDUIT TO THE PV ARRAY PV SUB PANEL (UNLESS BUSBAR IS FULLY RATED) ( 705.12) WHITE LETTERS WITH RED BACKGROUND M ARRAY J/B 690.31(G)(3)(4) & 690.13(G)(4) TO BE PLACED AT LEAST EVERY 10FT WHITE LETTERS WITH RED BACKGROUND 690.56 (C)(3) WHITE LETTERS WITH RED BACKGROUND RAPID SHUTDOWN SWITCH FOR SOLAR PV SYSTEM WARNING: PHOTOVOLTAIC POWER SOURCE WARNING - Electric Shock Hazard No user serviceable parts inside Contact authorized service provider for assistance WARNING INVERTER OUTPUT CONNECTION DO NOT RELOCATE THIS OVERCURRENT DEVICE 690.13.G.3 & 690.13.G.4 WHITE LETTERS WITH RED BACKGROUND 690.15, 690.13(B) BLACK TEXT WITH YELLOW BACKGROUND CAUTION: SOLAR ELECTRIC SYSTEM CONNECTED 690.54 WHITE LETTERS WITH RED BACKGROUND 690.17(E) WARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION DC VOLTAGE IS ALWAYS PRESENT WHEN SOLAR MODULES ARE EXPOSED TO SUNLIGHT ! PHOTOVOLTAIC SYSTEM AC DISCONNECT RATED AC OPERATING CURRENT 18.24 AMPS AC NOMINAL OPERATING VOLTAGE 240 VOLTS 690.13(B) WHITE LETTERS WITH RED BACKGROUND BLACK OUTLINE WITH BLACK TEXT / WARNING IS IN BLACK TEXT AND ORANGE BACKGROUND A C SOLAR DISCONNECT SUB PANEL WARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES. TOTAL RATING OF ALL OVERCURRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR 705.12 BLACK LETTERS WITH ORANGE BACKGROUND ! PV SUB PANEL ONLY SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN 690.56(C)(1)(A) BLACK OUTLINE WITH BLACK TEXT AND WHITE BACKGROUND / NOTE ON TOP IS IN BLACK TEXT AND YELLOW BACKGROUND SOLAR ELECTRIC PV PANELS !TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SHUT DOWN PV SYSTEM AND REDUCE SHOCK HAZARD IN ARRAY NOTES: 1.BACKGROUND RED AND BLK ON YELLOW MINIMUM HEIGHT: 3/8”. 2.LETTERS: WHITE. 3.FONT: ARIAL OR SIMILAR NON-BOLD. 4.ALL LABELS SHALL HAVE CAPITAL LETTERS. 5.MINIMUM HEIGHT: 3/16” FOR REMAINING CHARACTERS. 6.ALL LABELS SHALL BE WEATHER RESISTANT MATERIAL AND MATERIAL SUITABLE FOR EXTERIOR USE. 7.ALL SYSTEMS LABELS AND WARNINGS TO BE INSTALLED AT THE SITE AND THEIR LOCATIONS IN ACCORDANCE WITH ARTICLE 690 OF THE 2017 NEC ,ARTICLE 110.21(B) ,AND THE OCFA GUIDELINES. 8.THE ABOVE LABELS SHALL BE PLACED EXACTLY AS NOTED.CALLE HUENEMECRAIG BAGAUSHOMEOWNER:ADDRESS:LICENSE #CONTRACTOR: PT Electric Inc92001551430 CALLE HUENEME SIGNATURE:__________PAPER SIZE: 11"X17"SHEET TITLE: LABELS AND PLACARD LA QUINTA CA 92253SCALE: NTS JOB#: PM3357 REVISIONS DATE REV. SOLAR PERMIT PACKAGE DATE:11/22/21 E2 POWER TO THE BUILDING IS ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN PLACARD CAUTION E 2A MAIN SERVICE PANEL W2A MAIN BREAKER EXTERIOR LOCATION N AC DISCONNECT N "PV DEDICATED" SUB PANEL E UTILITY METER NEW PROPOSED PV ARRAY LOCATION 15 ZNSHINE PV-TECH ZXM-NH12-35M MODULES ALTENERGY POWER SYSTEM YC MICRO INVERTERS 5.75kW DC STC 01/12/2022 www.znshinesolar.comZNShine PV-Tech Co., LTD, founded in 1988, is a world-leading high-performance PV module manufacturer, PV power station developer, EPC and power station operator. With its state-of-the-art production lines, the company boasts module output of 5GW. Bloomberg has listed ZNShine as a global Tier 1 PV manufacturer and Top 4 reliable PV supplier.ZXM6-NH120 SeriesZnshinesolar 9BB HALF-CELL Monocrystalline PV Module120MonoPoly Solutions9 Busbar Solar CellNo power loss thanks to improved temperature co-efficient caused by 9 busbar solar cellBetter Weak Illumination ResponseLower temperature coefficient and wide spectral response, higher power output, even under low-light settings9BBEasy to installThe module is very light in weight so the installation is easier and transport costs are lowerIndustry StandardZnshine’s StandardWarranted Power Output 100%97.5%90%80%84.3%11015255Years350W丨355W丨360W丨365W丨370WMade with selected materials and components to grant quality, dura-tion, efficiency and through outputs, the ZXM6-NH120 monocrystal-line modules by ZNSHINE SOLAR( power output 350 up to 370Wp, represent a highly flexible solution for diverse installation types, from industrial rooftop plants to small home PV systems or large ground surfaces. This allows you to produce clean energy while reducing your energy bill.ZNSHINE SOLAR’S ZXM6-NH120 Monocrystalline solar modules are tested and approved by international acknowledged laboratories, so that we can offer our customers a reliable and price-quality optimized product. The linear warranty on product outputs further ensures increased security and return on investments over time.12 years product warranty for general application15 years product warranty for Rooftop PV system25 years output warranty / 0.55% Annual Degradation over 25 yearsZnshinesolar 9BB HALF-CELL monocrystalline PV ModuleTEMPERATURE RATINGS44℃ ±3℃ -0.36%/℃-0.29%/℃0.05%/℃NOCTTemperature coefficient of PmaxTemperature coefficient of VocTemperature coefficient of IscMaximum Power Pmax(Wp)Maximum Power Voltage Vmpp(V)Maximum Power Current Impp(A)Open Circuit Voltage Voc(V)Short Circuit Current Isc(A)*NOCT(Nominal Operating Cell Temperature):Irradiance 800W/m²,Ambient Temperature 20℃,AM 1.5,Wind Speed 1m/s*The data above is for reference only and the actual data is in accordance with the pratical testingMECHANICAL DATAPACKAGING INFORMATION40’HQ30 780DIMENSION OF THE PV MODULE(mm)*STC (Standard Test Condition): Irradiance 1000W/m², Module Temperature 25℃, AM 1.5*The data above is for reference only and the actual data is in accordance with the pratical testingZXM6-NH120 SeriesELECTRICAL PROPERTIES 丨 STC*ELECTRICAL PROPETIES 丨 NOCT*I-V CURVES OF THE PV MODULEAdd : 1#, Zhixi Industrial Zone,JintanJiangsu 213251,P.R. ChinaTel:+86 519 6822 0233 E-mail:info@znshinesolar.comRemark: please read safety and installation instructions before using the product丨Subject to change without prior notice © ZNSHINE SOLAR 2020丨Version: ZXM6-NH120-2007.EMono 166×83mm120(6×20)1755×1038×35 mm20.5 kgHigh transparency,low iron,temperedGlass 3.2 mm (AR-coating)IP 68,3 diodesH1Z2Z2-K 1×4,0mm²LJQ-3 Taizhou jinxiu Electrical Science & Technology Co.,Ltd.manufactured in ChinaSolar cellsCells orientationModule dimensionWeightJunction boxCablesConnectorsPacking TypePiece/BoxPiece/ContainerWORKING CONDITIONSMaximum system voltageOperating temperatureMaximum series fuse1500 V DC-40℃~+85℃20 A3600/1600with safety factor 1.5Module TypeNominal Power Watt Pmax(W)Power Output Tolerance Pmax(%)Maximum Power Voltage Vmp(V)Maximum Power Current Imp(A)Open Circuit Voltage Voc(V)Short Circuit Current Isc(A)Module Efficiency (%) 365365±3%34.010.7440.8±3%11.33±3%20.04ZXM6-NH120-365/M370370±3%34.210.8241.0±3%11.42±3%20.31ZXM6-NH120-370/MZXM6-NH120-355/M355355±3%33.610.5740.4±3%11.14±3%19.49ZXM6-NH120-350/M350350±3%33.410.4840.2±3%11.04±3%19.21ZXM6-NH120-360/M360360±3%33.810.6640.6±3%11.24±3%19.76267.131.48.5037.89.15270.631.68.5738.09.22256.130.98.2837.28.92259.831.18.3637.49.00263.531.38.4337.69.0840 50 30 20 10 1.000 W/m2800 W/m2600 W/m2400 W/m2200 W/m23457 68 9 10 Current (A) Power(W)Voltage (V)1090501302101702502903703304100*Do not connect Fuse in Combiner Box with two or more strings in parallel connectionBarcode 2Mounting holesLabelDrainage holesBarcode 1Grounding holesGrounding identificationJunction boxMaximum load front/backGlass •Dual-module microinverter with independent MPPT•Utility-interactive with Reactive Power Control (RPC)•CA Rule 21 compliant•Continuous power of 274VA per channel, 300VA peak•Accommodates modules from 250-365W+•Wide MPPT voltage range (22V-48V)•Meets NEC 2014/2017 690.12 Rapid Shutdown requirements•ZigBee communication & free monitoringDIMENSIONSWIRING SCHEMATICWith its groundbreaking design and features, the YC600 is the pinnacle of microinverter technology. A single-phase, smart grid-compliant microinverter, the YC600 serves two modules with dual, independent MPPT. Zigbee wireless communication over a mesh network offers faster data speeds than PLC and a wider MPPT voltage range results in a greater energy harvest for homeowners.A true utility-interactive microinverter with Reactive Power Control (RPC) technology, the YC600 meets CA Rule 21 requirements and is inherently NEC 2014/2017 Rapid Shutdown compliant. The unit also builds on the successful APsystems line of multi-module microinverters, simplifying installation and reducing logistics costs. Leading the Industry inSolar Microinverter TechnologyYC600Microinverter10.24”1.24”7.4” APsystems YC600 Microinverter DatasheetINPUT DATA (DC) Module Compatibility MPPT Voltage Range Operation Voltage Range Maximum Input Voltage Maximum Input Current Maximum Total PV Array Short Circuit Current 60 & 72 Cell PV Modules22V-48V16V-55V60V12A x 215AOUTPUT DATA (AC) Maximum Continuous Output Power Peak Output Power Nominal Output Voltage Nominal Output Current Nominal Output Frequency Adjustable Output Voltage Range Adjustable Output Frequency Range Power Factor (Adjustable) Total Harmonic Distortion Maximum Units per Branch 240V548VA 600VA 240V 2.28A 60Hz 211-264V 59.3 - 60.5Hz 0.8 leading…0.8 lagging <3% 7 (14 PV modules) 208V548VA600VA208V2.63A60Hz183-229V59.3 - 60.5Hz0.8 leading…0.8 lagging<3%6 (12 PV modules)96.7%96.5%99.5%EFFICIENCYPeak Efficiency CEC Weighted Efficiency Nominal MPPT Efficiency Night Power Consumption 60mW MECHANICAL DATAOperating Ambient Temperature Range Storage Temperature Range Dimensions (WxHxD) inches Dimensions (WxHxD) mm Weight AC BUS Maximum Current Connector Type Enclosure Rating Cooling -40°F to +149°F (-40°C to +65°C)-40°F to +185°F (-40°C to +85°C)10.24” x 7.4” x 1.24”260mm x 188mm x 31.5mm5.7 lbs (2.6kg)20AMC4 TypeNEMA 6 ( IP67 )Natural Convection - No FansFEATURES & COMPLIANCECommunication Transformer Design Monitoring Emissions & Immunity (EMC) Compliance Safety & Grid Connection Compliance Wireless ZigbeeHigh Frequency Transformers, Galvanic IsolationVia EMA**Online PortalFCC PART 15, ANSI C63.4, ICES-003 UL1741, UL1741 SA, IEEE1547, CSA C22.2 No.107.1-01, NEC 2017 690.12, 690.11, CA Rule 216.28.18 © All Rights ReservedSpecifications subject to change without notice – please ensure you are using the most recent version found at APsystems.com* Depending on the local regulations. **APsystems online Energy Management Analysis (EMA) platform600 Ericksen Ave NE, Suite 200, Seattle, WA 98110 | 844.666.7035 | APsystems.com RESIDENTIAL COMMERCIAL UTILITY2290 Agate Court, Unit A-B, Simi Valley, CA 93065 www.DualRack.netRail Span (ft¹)6 pcs144”/ 168”/ 204”Ordering SpecificsStandard Packaging Dimension Weight0.68 lbs/ft STANDARD RAILDual Rack rails were designed to be customized for solar PV arrays on residential and commercial projects. They are engineered for strength and durability and tested for spans of up to eight feet. Installers prefer Dual Rack rails because they are strong, reliable, time saving, and available at the best price in the marketplace.ADVANTAGESAdvanced Dual Rack design - PE Certified in 16 states - No special training required - Save time and money on installations - Less parts, two ways to install - 3 sizes available: 12’, 14’ & 17’ in silver & black - 10 year limited warranty - Conforms to UL STD 2703 and Class A Fire Rated.A. The table above ONLY includes Dual Rack rail capacity data. It does not include roof attachment data or roof load capacity.B. Wind risk category II per ASCE7-10. C. Topographic factor, kzt is 1.0. D. Maximum mean roof height is 30 ft.E. Average parapet height is 0 ft. F. Roof pitch is between 7 degrees and 27 degrees.G. Maximum solar panel weight is 50 lbs. H. Height of solar panel is between 2” and 10” from roof. *See Zone 2 & 3 span table calculation in Installation Manual/P.E. certification. EXPWind Speed Zone 1Snow Load (psf)(Mph) 0.0 10.0 20.0 30.0 40.0 50.0 110 8.0 7.0 6.0 5.0 4.5 4.0 120 8.0 7.0 6.0 5.0 4.5 4.0 130 8.0 7.0 6.0 5.0 4.5 4.0 B 140 8.0 7.0 6.0 5.0 4.5 4.0 150 7.5 7.0 6.0 5.0 4.5 4.0 160 7.0 7.0 6.0 5.0 4.5 4.0 170 7.0 7.0 6.0 5.0 4.5 4.0 180 6.5 6.5 5.5 5.0 4.5 4.0 110 8.0 7.0 6.0 5.0 4.5 4.0 120 8.0 7.0 6.0 5.0 4.5 4.0 130 7.5 7.0 6.0 5.0 4.5 4.0 C 140 7.0 7.0 6.0 5.0 4.5 4.0 150 6.5 6.5 5.5 5.0 4.5 4.0 160 6.0 6.0 5.5 5.0 4.5 4.0 170 5.5 5.5 5.5 5.0 4.5 4.0 180 5.5 5.5 5.5 5.0 4.5 4.0Product LineItem #ST-144-C ST-168-C ST-204-C ST-144-B ST-168-B ST-204-B 2019 - V1.1ETl CLASSIFIED �us lntertek 5000799 Conforms to UL SUB 2703 (Jsn;O Product NameStandard Rail 144” - ClearStandard Rail 168” - ClearStandard Rail 204” - ClearStandard Rail 144” - BlackStandard Rail 168” - BlackStandard Rail 204” - BlackRESIDENTIAL COMMERCIAL UTILITY2290 Agate Court, Unit A-B, Simi Valley, CA 93065 www.DualRack.netStandard RailContact Info •Measure and mark the location of each standoff to roof connection.•Drill 3/8” hole through Dual Rack standard railfor each standoff location.•Attach standoff to roof with 5/16” lag screw.Attach Dual Rack standard rail to standoff with3/8” bolt and washer.•After securely installing standoff to rafter, attach L-foot with 3/8” bolt and nut to Dual Rack standard rail at desired height•Dual Rack L-foot enables height adjustment up to 1.1 inches. TOP DOWNL-FOOT STYLEInstallation GuideDual Rack is a robust, long-life photovoltaic (PV) module mounting system for both flat and pitched roofs. It consists of aluminum rails, roof attachments and all the necessary components to ensure a safe and sturdy installation. Dual Rack allows modules to be mounted in both landscape and portrait orientations.•Dual Rack technology can be installed in two different ways: Top down attachment style and L-Foot style.2019 - V1.1Dual Rack Inc.2290 Agate ct. Unit A-B, Simi Valley, CA, 93065 www.DualRack.net Email: info@DualRack.netPhone:+1 (805) 254 - 2250 5(6,'(17,$/ &200(5&,$/ 87,/,7<3URGXFW/LQH Item #DR-CLFLK-01DR-CLFLK-02 DR-BLFLK-01 DR-BLFLK-02Product Name /LWH)ODVK/.LW±´[´FOHDU /LWH)ODVK/.LW±´[´FOHDU /LWH)ODVK/.LW±´[´EODFN /LWH)ODVK/.LW±´[´EODFNQTY010101&RPSRQHQW/LVWMaterial Aluminum Flashing L Base 5/16” x 4” S.S Lag Bolt ´ 6HDOLQJ :DVKHU 3/8” x 1.5” S.S T Bolt 3/8” Flange Nut (3'0 :DVKHUDR-CLFLK-01 / DR-BLFLK-01 OEVVHW10 set/ box´/[´:[´+OEVER[DR-CLFLK-0 / DR-BLFLK-02 OEVVHW10 set/ box´/[´:[´+OEVER[2UGHULQJ6SHFLILFVProduct1HW:HLJKWStandard Pack 6WDQGDUG3DFN'LPHQVLRQ 6WDQGDUG3DFN:HLJKW%LJ3DFN %LJ3DFN:HLJKW4 Packs of 10 = Set of 40/Box 4 Packs of 10 = Set of 40/Box OEVER[ OEVER[ADVANTAGESCreates a weatherproofing seal every time.Install easily, quickly, and with confidence.All Aluminum 9.0” x 12.0” or 12.0” x 12.0” flashing.10 Year Limited Warranty.2290 Agate ct. Unit A-B, Simi Valley, CA, 93065ZZZ'XDO5DFNQHWProduct LineItem #ETl CLASSIFIED �us lntertek 5000799 Conforms to UL SUB 2703 (Jsn;O /,7()/$6+/KitDual Rack Lite Flash L-Kit is designed in both 12.0” x 12.0” and 9.0” x 12.0” sizes and comes complete with all necessary components for a quick and weatherproof installation. Standard packs include a kitted set of 10 in clear or black finish options. Our best-in-class design delivers an efficient and cost-effective solar attachment solution for composition/asphalt shingle roofs. It is compatible with all Dual Rack rails and there’s no need to cut shingles on your install.•Stainless steel hardware included.•Meets or exceeds roofing industry best practices•100% IBC Compliant.•No shingle cutting necessary.DR-CLFLK-01DR-CLFLK-02DR-BLFLK-01DR-BLFLK-02Product NameLite Flash L Kit - 12.0" x 9.0" - ClearLite Flash L Kit - 12.0" x 12.0" - ClearLite Flash L Kit - 12.0" x 9.0" - BlackLite Flash L Kit - 12.0" x 12.0" - Black5(6,'(17,$/ &200(5&,$/ 87,/,7<2290 Agate ct. Unit A-B, Simi Valley, CA, 93065ZZZ'XDO5DFNQHW,QVWDOODWLRQ*XLGH&RQWDFW,QIR2.Gently break seal betweenshingles and remove any nails.Slide mount up under shingles,with flashing lined up with raftercenter for drilling.3. Put 5/16” x 4” lag bolt through L-foot. Next, slide the EPDM washer up onto the lag bolt. 4. Secure L-foot onto Flash L Base and rooftop. (Tightening torque of 14 lbs-ft).1.Locate, choose and mark center of the rafter for racking installation. Select the courses of shingleswhere mounts will be placed. 5. Screw the 5/16” lag bolt into the rafter embedded a min.of 2.5”. *(Tightening torque is dependent on the roofing material.) 6.You are now ready toattach the rail. Slide the 3/8”T bolt through the rail groove.7. Attach the rail to the L-baseusing 3/8” T bolt and nut.8. Secure the ⅜” T bolt with the nut. (Tightening torque 14.lbs-ft).DR-CLFLK-01 DR-BLFLK-01For detailed instructions please refer to the Dual Rack installation guide/,7()/$6+/.,7DR-CLFLK-02 DR-BLFLK-02Dual Rack Inc.2290 Agate ct. Unit A-B, Simi Valley, CA, 93065 www.DualRack.net Email: info@DualRack.netPhone:+1 (805) 254 - 2250 Product LineItem #DR-CDJ-01 DR-CDJ-02 DR-CDJ-03 DR-BDJ-01 DR-BDJ-02 DR-BDJ-03 Product NameDR Dual Jack 4.0” - Clear DR Dual Jack 5.5” - ClearDR Dual Jack 7.0” - Clear DR Dual Jack 4.0” - Black DR Dual Jack 5.5” - BlackDR Dual Jack 7.0” - BlackRESIDENTIAL COMMERCIAL UTILITY2290 Agate ct. Unit A-B, Simi Valley, CA, 93065 www.DualRack.netComponent ListMaterialQTY010101010101Dual Jack 3/8” x 1.5” Hex Bolt 3/8” Flat Washer 3/8” Star Washer 5/16” x 3.5” Lag Bolt 1.5” x 5/16” x 1/8” Flat Washer 1.5” x 5/16” EPDM 01Ordering SpecificsPackedSmall box Big box Standard Package10 pcs 30120Dimensions4.0”5.5”7.0” 1.0”x OD Size4.0”5.5”7.0”Weight0.54 lbs 0.61 lbs 0.74 lbs DUAL JACK The Dual Jack (standoff) comes in 4”, 5.5” and 7” sizes and is designed to be the most efficient cost effective tool for mounting solar arrays. Dual Jack is designed to last for the life of your solar PV install. Dual Jack offers the versatility of three convenient sizes, superior durability, and a low price point. Dual Jack can be installed with or without Dual Jack base.ADVANTAGESFast & Easy install saves time and labor cost - Dual Jack design allows virtually any roof flashing to install flat on roof deck - Precision machined for superior strength - Lightweight for reduced shipping cost - Two ways to install - Available in three sizes - Available in black and clear - 10 Year limited warranty - Conforms to UL STD 2703 and Class A Fire Rated.ETl CLASSIFIED �us lntertek 5000799 Conforms to UL SUB 2703 (Jsn;O 2019 - V1.1 4.0" 5.5" 7.0" 1.0" 3/8" 3/8" 1.0" 3/8" 1.0" RESIDENTIAL COMMERCIAL UTILITY2290 Agate ct. Unit A-B, Simi Valley, CA, 93065 www.DualRack.netInstallation GuideContact Info For detailed instructions please refer to the Dual Rack installation guideTop Down Style4. Install the flashing over the standoff and addthe EPDM collar.2. Screw the 5/16” lag bolt into the rafter, embedding a min. of 2.5”. *Tightening torque is dependent on the roofing material.5.Attach the L-foot to the standoff using a 3/8” bolt, followed by the star washer and flat washer.6.Attach the rail to the L-foot using a 3/8” bolt, Followed by the star washer, nut and flat washer. *Recommended Torque is 14 (ft. lbs.).1. Drill a pilot hole using 5/16” drill bit through the roof materials and into the center of the rafter at the planned location.3. Install the EPDM sealing washer and stainless steel washer and screw the standoff into the lag bolt.4.Install the flashing over the standoff and add the EPDM collar.2.Screw the 5/16” lag bolt into the rafter, embedding a min. of 2.5”. *Tightening torque is dependent on the roofing material.1. Drill a pilot hole using 5/16” drill bit throughthe roof materials and into the center of therafter at the planned location.5. Drill a 3/8” hole through the rail. Place the starwasher on the rail followed by the flat washer.6.Screw the 3/8” bolt to the standoff taking care not to warp or damage the roof material when tightening the nut. * Recommended Torque is14 (ft. lbs).2019 - V1.1L-Foot Style*Take care not to warp or damage any of the roofing material when tightening the nut.3.Install the EPDM sealing washer and stainless steel washer and screw the standoff into the lag bolt.Dual Rack Inc.2290 Agate ct. Unit A-B, Simi Valley, CA, 93065 www.DualRack.net Email: info@DualRack.netPhone:+1 (805) 254 - 2250 Technical Data Guide Polyether Technology CSI Section No. 07 12 13Product DescriptionE-Curb penetration seals replace old-style metal pitchpans with versatile, precast components and pourablesealants. CHEM LINK’s E-Curb system can usuallybe installed in under 15 minutes and never requiresflashing or mechanical attachment.Special Characteristics• Rapid installation - “Slip-fit” light weight curb desigreduces labor significantly.Excellent adhesion to most roofing materials•No flashing or mechanical attachment required•• Service Temperature -40°F to 200°F (-40°C to 93°C)•1-Part® accommodates movement and is suggestedfor use on all granulated membranes and detailswith excessive movement.• For sloped roof applications, substituteDuraLink™non-slump adhesive/sealant for 1-Part and M-1®E-CURBTM SYSTEMSOLAR PENETRATION SEALSE-Curbs are designed for use on granulated modifiedbitumen, asphalt and coal tar B.U.R. (built up roofing).E-Curbs are specified for PVC, EPDM, PIB, and TPOsingle ply roofing membranes. TPO Primer is requiredfor use with TPO single-ply roof membrane.When installed properly, this system forms a durable, waterproof rubber seal around penetrations. An extended manufacture warranty against leaks is activated with submittal of a completed warranty card.Restrictions• Please contact customer service for applicationguidelines with temperatures below 32°F (0°C).Do not apply if rain is anticipated within 4 hours•• Do not use on Hypalon or smooth APP modifiedbitumen membrane. For smooth APP, torch downa target of granulated APP before installation.• TPO Primer must be used for TPO applications.• Do not prime bonding surfaces with asphalt prime .• Do not use asphalt cement as a “night sealant”Use M-1 for this purpose.•E-Curb kits are designed to contain enough 1-Partto fill each curb with displacement in consideration.Refer to our penetration calculator under contractorresources at chemlink.com to verify volumes.E-Curb System Components•E-Curb exterior rings, straights, and corners.•M-1 Structural Adhesive/Sealant used for bondingthe E-Curb components, sealing and priming thepenetration.•1-Part “moisture cure” pourable sealer, used to form adurable, water-tight seal around the roof penetration.E-Curb precast form components are composed of lightweight nylon resin. The E-Curb is 2-inches high and isavailable in a variety of shapes and sizes.Standard sizes include bisected circular pieces withinside diameters of 3, 4, 6 or 9 inches; corner pieceswith a 2-inch radius; straight pieces in 3-inch or 8-inchlengths; and a 4.5” x 3.4” rectangle. The outer surfaceis impervious to ice, corrosion, UV (ultraviolet) light andponding water.M-1 Structural Adhesive/Sealant is a durable, self-fixturing moisture cure mastic. Cartridges of M-1 aresupplied in each E-Curb Kit. Components are alsosold separately.1-Part is a highly flexible, self-leveling moisture curepourable sealer that eliminates mixing. It is also 100%solid rubber, has a very low VOC content, will not meltor shrink, and is resistant to deterioration. It is suppliedin 10.1-oz and 28-oz cartridges or 1/2 gallon pouches.Unused sealant can be capped and reused.Last Revision: 06/10/15Document No. L1350SChem Link Construction & MaintenanceTelephone: 800-826-1681Fax: 269-679-4448353 E. Lyons StreetSchoolcraft, MI 49087www.chemlink.comStep 1Remove all previously applied caulk, mastic, cement, asphalt, and other contaminants from penetrations with a wire brush. Clean all smooth substrates with isopropyl or denatured alcohol. Brush away all gravel or loose granules. Seal the base of each penetration with M-1. Coat penetrations with M-1 to 3” above the roof line.Step 2Hold a section of E-Curb, flat side up, and apply a 1/4” bead of M-1 to the entire bottom perimeter. Apply 1 additional 1/4” bead of M-1 down the center of the section. Do not tool the beads flat. Place the E-Curb section on the roof surface to form a half circlearound the penetration(s). Press down firmly until M-1extrudes from the outside edges.Step 3Apply M-1 to the second section of E-Curb as described above. Place the second section of curb on the roof surface to form a circle with the first section. Press firmly in place until excess adhesive extrudes from the outside edges. Apply a bead of M-1 around the outside base of the installed E-Curb, and tool to form a smooth fillet. For non E-Curb penetrations seals, add M-1 to scarf joint surfaces and tool smooth.Step 4Cut tip off 1-Part cartridge at widest point on plastic nozzle and pierce the foil seal. Insert into caulking gun and pump E-Curb full. When using a 1-Part pouch, remove cap, pour, squeeze out excess air, and reseal.Note: To provide an adequate rubber seal, maintain a 1” distance between penetrations and inside edge of the E-Curb.All properties described in this document are derived from testing conducted in laboratory conditions. Properties and performance will vary depending on environmental conditions and application technique. Test and evaluate to determine appropriate usage.Visit www.chemlink.com for the Safety Data Sheet, Technical Data Guides and full warranty for this product.LIMITED WARRANTY: Chem Link warrants this product’s performance, provided it is properly stored and applied within 1 year. If this Chem Link material is proved to be defective, return remaining product and purchase receipt for refund or replacement of product exclusive of labor or cost of labor. This is the sole and exclusive remedy for defects or failure of this product. User must read and follow the direction of the current Technical Data Guide and SDS prior to product use. User determines suitability of product for intended use and assumes all risks. Manufacturer shall not be liable for damages (including consequential or incidental damages) in excess of the purchase price, except where such exclusion or limitation is prohibited by state law. THIS WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES, WRITTEN OR ORAL, STATUTORY, EXPRESS OR IMPLIED INCLUDING ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE; except for the above express warranty given by manufacturer, the product is sold with all faults. Chem Link SHALL NOT BE RESPONSIBLE FOR THE USE OF THIS PRODUCT IN A MANNER TO INFRINGE ON ANY PATENT OR ANY OTHER INTELLECTUAL PROPERTY RIGHTS HELD BY OTHERS. This warranty gives you specific legal rights, and you may also have other rights in the U.S. which vary from state to state. For warranty claim information, call 800-826-1681.