Loading...
2024-28 Mark Thomas & Company - Prof Eng Services Project 2019-02 Ave 50 BridgeMEMORANDUM DATE: April 30, 2024 W �W U]I ORN1.1 TO: Jon McMillen, City Manager FROM: Carley Escarrega, Administrative Technician RE: Mark Thomas & Company for Professional Engineering Services for project no. 2019-02, Avenue 50 Bridge. Please list the Contracting Party / Vendor Name, type of agreement to be executed, including any change orders or amendments, and the type of services to be provided. Make sure to list any related Project No. and Project Name. Authority to execute this agreement is based upon: IV -6 Approved by City Council on February 20, 2024 - B2 .a City Manager's signing authority provided under the City's Purchasing Policy [Resolution No. 2023-008] for budget expenditures of $50,000 or less. Department Director's or Manager's signing authority provided under the City's Purchasing Policy [Resolution No. 2023-008] for budget expenditures of $15,000 and $5,000, respectively, or less. Procurement Method (one must apply): .Q Bid ❑✓ RFP 0 RFQ _❑. 3 written informal bids QSole Source F] Select Source 1-1 Cooperative Procurement Reauestina deuartment shall check and attach the items below as auurouriate: 7 Agreement payment will be charged to Account No.: 401-0000-60185-201902-D February 20, 2024 June 30, 2028 ✓ Agreement term: Start Date _ _ _ End Date . ✓Q Amount of Agreement, Amendment, Change Order, etc.: $ 2,332,864.66 REMINDER: Signing authorities listed above are applicable on the aggregate Agreement amount, not individual Amendments or Change Orders! FV—/1 Insurance certificates as required by the Agreement for Risk Manager approval Approved by: Oscar Mojica Date: 5/1/2024 aBonds (originals) as required by the Agreement (Performance, Payment, etc.) Conflict of Interest Form 700 Statement of Economic Interests from Consultant(s) NOTE: Review the "Form 700 Disclosure for Consultants" guidance to determine if a Form 700 is required pursuant FPPC regulation 18701(2) _a Business License No. In progress - CE Expires: .Q Requisition for a Purchase Order has been prepared (Agreements over $5,000) AGREEMENT FOR CONTRACT SERVICES THIS AGREEMENT FOR CONTRACT SERVICES (the "Agreement") is made and entered into by and between the CITY OF LA QUINTA, ("City"), a California municipal corporation, and Mark Thomas & Company, a Corporation with a place of business at 4200 Concours Street, Suite 330, Ontario, CA 91764 ("Contracting Party"). The parties hereto agree as follows: 1. SERVICES OF CONTRACTING PARTY. 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, Contracting Party shall provide those Professional Engineering Services related to preparing the plans, specifications, and engineer's estimate for the Avenue 50 Bridge Project (Federal Project No. NBIL (547), (City Project No. 2019-02), as specified in the "Scope of Services" attached hereto as "Exhibit A" and incorporated herein by this reference (the "Services"). If Exhibit A includes "Phases" or "Optional Tasks", Contracting Party hereby understands that this was done in accordance with Section 13.13 of this Agreement and all phases beyond the first phase and/or the optional tasks may be deducted from the scope by the Contract Officer along with their corresponding Contract Sum without additional compensation. Contracting Party represents and warrants that Contracting Party is a provider of first-class work and/or services and Contracting Party is experienced in performing the Services contemplated herein and, in light of such status and experience, Contracting Party covenants that it shall follow industry standards in performing the Services required hereunder, and that all materials, if any, will be of good quality, fit for the purpose intended. For purposes of this Agreement, the phrase "industry standards" shall mean those standards of practice recognized by one or more first-class firms performing similar services under similar circumstances. 1.2 Compliance with Law. All Services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, regulations, and laws of the City and any Federal, State, or local governmental agency of competent jurisdiction. 1.3 Wage and Hour Compliance, Contracting Party shall comply with applicable Federal, State, and local wage and hour laws. 1.4 Licenses, Permits, Fees and Assessments. Except as otherwise specified herein, Contracting Party shall obtain at its sole cost and expense such licenses, permits, and approvals as may be required by law for the performance of the Services required by this Agreement, including a City of La Quinta business license. Contracting Party and its employees, agents, and subcontractors shall, at their sole cost and expense, keep in effect at all times during the term of this Agreement any licenses, permits, and approvals that are legally required for the performance of the Services required by this Agreement. Contracting Party shall have the sole obligation to pay for any fees, assessments, and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the performance of the Services required by this Agreement, and shall indemnify, defend (with counsel selected by City), and hold City, its elected officials, officers, employees, and agents, free and harmless against any such fees, assessments, taxes, penalties, or interest levied, assessed, or imposed against City hereunder. Contracting Party shall be responsible for all subcontractors' compliance with this Section. 1.5 Familiarity with Work. By executing this Agreement, Contracting Party warrants that (a) it has thoroughly investigated and considered the Services to be performed, (b) it has investigated the site where the Services are to be performed, if any, and fully acquainted itself with the conditions there existing, (c) it has carefully considered how the Services should be performed, and (d) it fully understands the facilities, difficulties, and restrictions attending performance of the Services under this Agreement. Should Contracting Party discover any latent or unknown conditions materially differing from those inherent in the Services or as represented by City, Contracting Party shall immediately inform City of such fact and shall not proceed except at Contracting Party's risk until written instructions are received from the Contract Officer, or assigned designee (as defined in Section 4.2 hereof). 1.6 Standard of Care. Contracting Party acknowledges and understands that the Services contracted for under this Agreement require specialized skills and abilities and that, consistent with this understanding, Contracting Party's work will be held to an industry standard of quality and workmanship. Consistent with Section 1.5 hereinabove, Contracting Party represents to City that it holds the necessary skills and abilities to satisfy the industry standard of quality as set forth in this Agreement. Contracting Party shall adopt reasonable methods during the life of this Agreement to furnish continuous protection to the Services performed by Contracting Party, and the equipment, materials, papers, and other components thereof to prevent losses or damages, and shall be responsible for all such damages, to persons or property, until acceptance of the Services by City, except such losses or damages as may be caused by City's own negligence. The performance of Services by Contracting Party shall not relieve Contracting Party from any obligation to correct any incomplete, inaccurate, or defective work at no further cost to City, when such inaccuracies are due to the negligence of Contracting Party. 1.7 Additional Services. In accordance with the terms and conditions of this Agreement, Contracting Party shall perform services in addition to those specified in the Scope of Services ("Additional Services") only when directed to do so by the Contract Officer, or assigned designee, provided that Contracting Party shall not be required to perform any Additional Services without compensation. Contracting Party shall not perform any Additional Services until receiving prior written authorization (in the form of a written change order if Contracting Party is a contractor performing the Services) from the Contract Officer, or assigned designee, incorporating therein any adjustment in (i) the Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written approval of Contracting Party. It is expressly understood by Contracting Party that the provisions of this Section shall not apply to the Services specifically set forth in the Scope of Services or reasonably contemplated therein. It is specifically understood and agreed that oral requests and/or approvals of Additional Services shall be barred and are unenforceable. Failure of Contracting Party to secure the Contract Officer's, or assigned designee's written authorization for -2- Additional Services shall constitute a waiver of any and all right to adjustment of the Contract Sum or time to perform this Agreement, whether by way of compensation, restitution, quantum meruit, or the like, for Additional Services provided without the appropriate authorization from the Contract Officer, or assigned designee. Compensation for properly authorized Additional Services shall be made in accordance with Section 2.4 of this Agreement. 1.8 Special Requirements. Additional terms and conditions of this Agreement, if any, which are made a part hereof are set forth in "Exhibit D" (the "Special Requirements"), which is incorporated herein by this reference and expressly made a part hereof. In the event of a conflict between the provisions of the Special Requirements and any other provisions of this Agreement, the provisions of the Special Requirements shall govern. 2. COMPENSATION 2.1 Contract Sum. For the Services rendered pursuant to this Agreement, Contracting Party shall be compensated based on Lump Sum in accordance with "Exhibit B" (the "Schedule of Compensation"). The total amount payable by City shall not exceed Two Million Three Hundred Thiry -two Thousand Eight Hundred Sixty -Four Dollars and Sixty -Six Cents ($2,332,864.66) (the "Contract Sum"), except as provided in Section 1.7. The total lump sum price paid to Contracting Party will include compensation for all work and deliverables, including travel and equipment described in "Exhibit A". The Contract Sum shall include the attendance of Contracting Party at all project meetings reasonably deemed necessary by City; Contracting Party shall not be entitled to any additional compensation for attending said meetings. Compensation may include reimbursement for actual and necessary expenditures for reproduction costs, transportation expense, telephone expense, and similar costs and expenses when and if specified in the Schedule of Compensation. No additional compensation will be paid to Contracting Party unless there is a change in the scope of the work or the scope of the project. In the instance of a change in the scope of work or scope of the project, adjustment to the total lump sum compensation will be made in accordance with Section 1.7. 2.2 Method of Billing & Payment. Progress payments will be made monthly in arrears based on the percentage of work completed by Contracting Party. If Contracting Party fails to submit the required deliverable items according to the schedule set forth in Section 3.2, City shall have the right to delay payment or terminate this Agreement. Any month in which Contracting Party wishes to receive payment, Contracting Party shall submit to City no later than the tenth (10th) working day of such month, in the form approved by City's Finance Director, an invoice for Services rendered prior to the date of the invoice. Invoices shall be submitted no later than thirty (30) calendar days after the performance of work for which Contracting Party is billing. Invoices shall detail the work performed on each milestone and each project as applicable. Invoices shall follow the format stipulated in the Schedule of Compensation and shall reference this Agreement number (or City project number for which this Agreement applies) and project title. Invoices shall contain a certification by a principal member of Contracting Party specifying that the payment requested is for Services performed in accordance with the terms of this -3- Agreement. Upon approval in writing by the Contract Officer, or assigned designee, and subject to retention pursuant to Section 8.3, City will pay Contracting Party for all items stated thereon which are approved by City pursuant to this Agreement no later than thirty (30) days after invoices are received by the City's Finance Department. No payment will be made prior to approval of any work, nor for any work performed prior to approval of this Agreement. The final invoice must contain the final cost and all credits due City including any equipment purchased under the provisions of Section 13.8. Except as provided for Section 10.3, the final invoice should be submitted within sixty (60) calendar days after completion of Contracting Party's work. 2.3 Prompt Payment: The City shall make all project progress payment within 30 days after receipt of an undisputed and properly submitted payment request from Contracting Party on a professional service contract. If the City fails to pay promptly, the City shall pay interest to the Contracting Party, which accrues at the rate of 10 percent per annum on the principal amount of a money judgment remaining unsatisfied and pre - rated as necessary. Upon receipt of the payment request, the City shall act in accordance with both of the following: 1) The City shall review each payment request as soon as feasible after receipt to verify it is a proper payment request. 2) The City must return any payment request deemed improper by the City to the Contracting Party as soon as feasible, but not later than seven (7) days, after receipt. A request returned pursuant to this paragraph shall include documentation setting forth in writing the reasons why it is an improper payment request. For projects awarded on or after September 1, 2023: the Contracting Party must now submit Exhibit 9-P to the City administering the Agreement by the 15th of the month following the month of any payment(s). If the Contracting Party does not make any payments to subconsultants, supplier(s), and/or manufacturers Contracting Party must report "no payments were made to subs this month" and write this visibly and legibly on Exhibit 9-P. The City must verify all Exhibit 9-P information, monitor compliance with prompt payment requirements for DBE and non -DBE firms, and address any shortfalls to the DBE commitment and prompt payment issues until the end of the project. The City must email a copy of Exhibit 9-P to DBE.Forms(a_dot.ca.gov before the end of the month after receiving the Exhibit 9-P from the Contracting Party. 2.4 Compensation for Additional Services. Additional Services approved in advance by the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement shall be paid for in an amount agreed to in writing by both City and Contracting Party in advance of the Additional Services being rendered by Contracting Party. Any compensation for Additional Services amounting to five percent (5%) or less of the Contract Sum may be approved by the Contract Officer, or assigned designee. Any greater amount of compensation for Additional Services must be approved by the La Quinta City Council, the City Manager, or Department Director, depending upon City laws, .me regulations, rules and procedures concerning public contracting. Under no circumstances shall Contracting Party receive compensation for any Additional Services unless prior written approval for the Additional Services is obtained from the Contract Officer, or assigned designee, pursuant to Section 1.7 of this Agreement. 3. PERFORMANCE SCHEDULE. 3.1 Time of Essence. Time is of the essence in the performance of this Agreement. If the Services are not completed in accordance with the Schedule of Performance, as set forth in Section 3.2 and "Exhibit C", it is understood that the City will suffer damage. 3.2 Schedule of Performance. All Services rendered pursuant to this Agreement shall be performed diligently and within the time period established in "Exhibit C" (the "Schedule of Performance"). Extensions to the time period specified in the Schedule of Performance may be approved in writing by the Contract Officer, or assigned designee. Contracting Party shall not commence performance of work or services until this Agreement has been approved by City and notification to proceed has been issued by City's Contract Officer. 3.3 Force Majeure. The time period specified in the Schedule of Performance for performance of the Services rendered pursuant to this Agreement shall be extended because of any delays due to unforeseeable causes beyond the control and without the fault or negligence of Contracting Party, including, but not restricted to, acts of God or of the public enemy, fires, earthquakes, floods, epidemic, quarantine restrictions, riots, strikes, freight embargoes, acts of any governmental agency other than City, and unusually severe weather, if Contracting Party shall within ten (10) days of the commencement of such delay notify the Contract Officer, or assigned designee, in writing of the causes of the delay. The Contract Officer, or assigned designee, shall ascertain the facts and the extent of delay, and extend the time for performing the Services for the period of the forced delay when and if in the Contract Officer's judgment such delay is justified, and the Contract Officer's determination, or assigned designee, shall be final and conclusive upon the parties to this Agreement. Extensions to time period in the Schedule of Performance which are determined by the Contract Officer, or assigned designee, to be justified pursuant to this Section shall not entitle the Contracting Party to additional compensation in excess of the Contract Sum. 3.4 Term. Unless earlier terminated in accordance with the provisions in Section 8.0 of this Agreement, the term of this agreement shall commence on February 20, 2024, contingent upon approval by City, and Contracting Party shall commence work after notification to proceed by City's Contract Officer. The Agreement shall terminate on June 30, 2028, unless extended by an Amendment to this Agreement. Contracting Party is advised that any recommendation for Agreement award is not binding on City until the Agreement is fully executed and approved by City. -5- 4. COORDINATION OF WORK. 4.1 Representative of Contracting Party. The following principals of Contracting Party ("Principals") are hereby designated as being the principals and representatives of Contracting Party authorized to act in its behalf with respect to the Services specified herein and make all decisions in connection therewith: (a) [NAME] Paul Mittica, PE Tel No.: (626) 862-1583 E-mail: pmittica@markthomas.com It is expressly understood that the experience, knowledge, capability, and reputation of the foregoing Principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing Principals shall be responsible during the term of this Agreement for directing all activities of Contracting Party and devoting sufficient time to personally supervise the Services hereunder. For purposes of this Agreement, the foregoing Principals may not be changed by Contracting Party and no other personnel may be assigned to perform the Services required hereunder without the express written approval of City. 4.2 Contract Officer. The "Contract Officer" shall be Bryan McKinney P.E., Public Works Director/City Engineer or other such assigned designee as may be designated in writing by the City Manager of City. It shall be Contracting Party's responsibility to assure that the Contract Officer, or assigned designee, is kept informed of the progress of the performance of the Services and Contracting Party shall refer any decisions, which must be made by City, to the Contract Officer, or assigned designee. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the Contract Officer, or assigned designee. The Contract Officer, or assigned designee, shall have authority to sign all documents on behalf of City required hereunder to carry out the terms of this Agreement. 4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge, capability, and reputation of Contracting Party, its principals, and its employees were a substantial inducement for City to enter into this Agreement. Except as set forth in this Agreement, Contracting Party shall not contract or subcontract with any other entity to perform in whole or in part the Services required hereunder without the express written approval of City. In addition, neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated, or encumbered, voluntarily or by operation of law, without the prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five percent (25%) of the present ownership and/or control of Contracting Party, taking all transfers into account on a cumulative basis. Any attempted or purported assignment or contracting or subcontracting by Contracting Party without City's express written approval shall be null, void, and of no effect. No approved transfer shall release Contracting Party of any liability hereunder without the express consent of City. 4.4 Independent Contractor. Neither City nor any of its employees shall have any control over the manner, mode, or means by which Contracting Party, its agents, or its employees, perform the Services required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision, or control of Contracting Party's employees, servants, representatives, or agents, or in fixing their number or hours of service. Contracting Party shall perform all Services required herein as an independent contractor of City and shall remain at all times as to City a wholly independent contractor with only such obligations as are consistent with that role. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contracting Party in its business or otherwise or a joint venture or a member of any joint enterprise with Contracting Party. Contracting Party shall have no power to incur any debt, obligation, or liability on behalf of City. Contracting Party shall not at any time or in any manner represent that it or any of its agents or employees are agents or employees of City. Except for the Contract Sum paid to Contracting Party as provided in this Agreement, City shall not pay salaries, wages, or other compensation to Contracting Party for performing the Services hereunder for City. City shall not be liable for compensation or indemnification to Contracting Party for injury or sickness arising out of performing the Services hereunder. Notwithstanding any other City, state, or federal policy, rule, regulation, law, or ordinance to the contrary, Contracting Party and any of its employees, agents, and subcontractors providing services under this Agreement shall not qualify for or become entitled to any compensation, benefit, or any incident of employment by City, including but not limited to eligibility to enroll in the California Public Employees Retirement System ("PERS") as an employee of City and entitlement to any contribution to be paid by City for employer contributions and/or employee contributions for PERS benefits. Contracting Party agrees to pay all required taxes on amounts paid to Contracting Party under this Agreement, and to indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Contracting Party shall fully comply with the workers' compensation laws regarding Contracting Party and Contracting Party's employees. Contracting Party further agrees to indemnify and hold City harmless from any failure of Contracting Party to comply with applicable workers' compensation laws. City shall have the right to offset against the amount of any payment due to Contracting Party under this Agreement any amount due to City from Contracting Party as a result of Contracting Party's failure to promptly pay to City any reimbursement or indemnification arising under this Section. 4.5 Identity of Persons Performing Work. Contracting Party represents that it employs or will employ at its own expense all personnel required for the satisfactory performance of any and all of the Services set forth herein. Contracting Party represents that the Services required herein will be performed by Contracting Party or under its direct supervision, and that all personnel engaged in such work shall be fully qualified and shall be authorized and permitted under applicable State and local law to perform such tasks and services. 4.6 City Cooperation. City shall provide Contracting Party with any plans, publications, reports, statistics, records, or other data or information pertinent to the -7- Services to be performed hereunder which are reasonably available to Contracting Party only from or through action by City. 5. INSURANCE. 5.1 Insurance. Prior to the beginning of any Services under this Agreement and throughout the duration of the term of this Agreement, Contracting Party shall procure and maintain, at its sole cost and expense, and submit concurrently with its execution of this Agreement, policies of insurance as set forth in "Exhibit E" (the "Insurance Requirements") which is incorporated herein by this reference and expressly made a part hereof. 5.2 Proof of Insurance. Contracting Party shall provide Certificate of Insurance to Agency along with all required endorsements. Certificate of Insurance and endorsements must be approved by Agency's Risk Manager prior to commencement of performance. 6. INDEMNIFICATION. 6.1 Indemnification. To the fullest extent permitted by law, Contracting Party shall indemnify, protect, but not defend, and hold harmless City and any and all of its officers, and employees as set forth in "Exhibit F" ("Indemnification") which is incorporated herein by this reference and expressly made a part hereof. 7. RECORDS AND REPORTS. 7.1 Reports. Contracting Party shall periodically prepare and submit to the Contract Officer, or assigned designee, such reports concerning Contracting Party's performance of the Services required by this Agreement as the Contract Officer, or assigned designee, shall require. Contracting Party's Project Manager shall meet with City as necessary to discuss progress on the Agreement. Contracting Party hereby acknowledges that City is greatly concerned about the cost of the Services to be performed pursuant to this Agreement. For this reason, Contracting Party agrees that if Contracting Party becomes aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the cost of the Services contemplated herein or, if Contracting Party is providing design services, the cost of the project being designed, Contracting Party shall promptly notify the Contract Officer, or assigned designee, of said fact, circumstance, technique, or event and the estimated increased or decreased cost related thereto and, if Contracting Party is providing design services, the estimated increased or decreased cost estimate for the project being designed. 7.2 Records. Contracting Party shall keep, and require any subcontractors to keep, such ledgers, books of accounts, invoices, vouchers, canceled checks, reports (including but not limited to payroll reports), studies, Independent CPA Audited Indirect Cost Rate workpapers, or other documents relating to the disbursements charged to City and the Services performed hereunder (the "Books and Records"), as shall be necessary to perform the Services required by this Agreement and enable the Contract Officer, or assigned designee, to evaluate the performance of such Services. Any and all such Books and Records, including those of the Contracting Party's Independent CPA, shall be maintained in accordance with generally accepted accounting principles and shall be complete and detailed. The Contract Officer, Caltrans Auditor, FHWA or any duly authorized representative of the Federal government having jurisdiction under Federal laws or regulations (including the basis of Federal Funding in whole or in part), or assigned designee, shall have full and free access to such Books and Records at all times during normal business hours of City, including the right to inspect, copy, audit, and make records and transcripts from such Books and Records. Such Books and Records shall be maintained for a period of three (3) years following completion of the Services hereunder, and City shall have access to such Books and Records in the event any audit, examination, workpaper review, excerpt, or transaction is required. In the event of dissolution of Contracting Party's business, custody of the Books and Records may be given to City, and access shall be provided by Contracting Party's successor in interest. Under California Government Code Section 8546.7, if the amount of public funds expended under this Agreement exceeds Ten Thousand Dollars ($10,000.00), this Agreement shall be subject to the examination and audit of the State Auditor, at the request of City or as part of any audit of City, for a period of three (3) years after final payment under this Agreement. 7.3 Ownership of Documents. All drawings, specifications, maps, designs, photographs, studies, surveys, data, notes, computer files, reports, records, documents, and other materials plans, drawings, estimates, test data, survey results, models, renderings, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings, digital renderings, or data stored digitally, magnetically, or in any other medium prepared or caused to be prepared by Contracting Party, its employees, subcontractors, and agents in the performance of this Agreement (the "Documents and Materials") shall be the property of City and shall be delivered to City upon request of the Contract Officer, or assigned designee, or upon the expiration or termination of this Agreement, and Contracting Party shall have no claim for further employment or additional compensation as a result of the exercise by City of its full rights of ownership use, reuse, or assignment of the Documents and Materials hereunder. Any use, reuse or assignment of such completed Documents and Materials for other projects and/or use of uncompleted documents without specific written authorization by Contracting Party will be at City's sole risk and without liability to Contracting Party, and Contracting Party's guarantee and warranties shall not extend to such use, revise, or assignment. Contracting Party may retain copies of such Documents and Materials for its own use. Contracting Party shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall provide for assignment to City of any Documents and Materials prepared by them, and in the event Contracting Party fails to secure such assignment, Contracting Party shall indemnify City for all damages resulting therefrom. 7.4 In the event City or any person, firm, or corporation authorized by City reuses said Documents and Materials without written verification or adaptation by Contracting Party for the specific purpose intended and causes to be made or makes any changes or alterations in said Documents and Materials, City hereby releases, discharges, and exonerates Contracting Party from liability resulting from said change. WE The provisions of this clause shall survive the termination or expiration of this Agreement and shall thereafter remain in full force and effect. 7.5 In the event of Termination under Section 8.0, immediately upon termination, City shall be entitled to, and Contracting Party shall deliver to City, reports, investigations, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date, whether completed or not, and other such materials as may have been prepared or accumulated to date by Contracting Party in performing this Agreement which is not Contracting Party's privileged information, as defined by law, or Contracting Party's personnel information, along with all other property belonging exclusively to City which is in Contracting Party's possession. 7.6 Licensing of Intellectual Property. This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, rights of reproduction, and other intellectual property embodied in the Documents and Materials. Contracting Party shall require all subcontractors, if any, to agree in writing that City is granted a non-exclusive and perpetual license for the Documents and Materials the subcontractor prepares under this Agreement. Contracting Party represents and warrants that Contracting Party has the legal right to license any and all of the Documents and Materials. Contracting Party makes no such representation and warranty in regard to the Documents and Materials which were prepared by design professionals other than Contracting Party or provided to Contracting Party by City. City shall not be limited in any way in its use of the Documents and Materials at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. Publication of the information derived from work performed or data obtained in connection with services rendered under this Agreement must be approved in writing by City. Additionally, it is agreed that the Parties intend this to be an Agreement for services and each considers the products and results of the services to be rendered by Contracting Party hereunder to be work made for hire. Contracting Party acknowledges and agrees that the work (and all rights therein, including, without limitation, copyright) belongs to and shall be the sole and exclusive property of City without restriction or limitation upon its use or dissemination by City. 7.7 Release of Documents. The Documents and Materials shall not be released publicly without the prior written approval of the Contract Officer, or assigned designee, or as required by law. Contracting Party shall not disclose to any other entity or person any information regarding the activities of City, except as required by law or as authorized by City. 7.8 Confidential or Personal Identifying Information. Contracting Party covenants that all City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussion notes, or other information, if any, developed or received by Contracting Party or provided for performance of this Agreement are deemed confidential and shall not be disclosed by Contracting Party to any person or entity without prior written authorization by City or unless required by law. City shall grant authorization for disclosure if required by any lawful administrative or legal proceeding, court order, or similar directive with the force of -10- law. Permission to disclose information on one occasion, or public hearing held by City relating to the Agreement, shall not authorize Contracting Party to further disclose such information, or disseminate the same on any other occasion. Contracting Party shall not comment publicly to the press or any other media regarding the Agreement or City's actions on the same, except to City's staff, Contracting Party's own personnel involved in the performance of this Agreement, at public hearings, or in response to questions from a Legislative committee. Contracting Party shall not issue any news release or public relations item of any nature, whatsoever, regarding work performed or to be performed under this Agreement without prior review of the contents thereof by City, and receipt of City's written permission. All City data, data lists, trade secrets, documents with personal identifying information, documents that are not public records, draft documents, discussions, or other information shall be returned to City upon the termination or expiration of this Agreement. All information related to the construction estimate is confidential and shall not be disclosed by Contracting party to any entity, other than City, Caltrans, and/or FHWA. All of the materials prepared or assembled by Contracting Party pursuant to performance of this Agreement are confidential and Contracting Party agrees that they shall not be made available to any individual or organization without the prior written approval of City or except by court order. If Contracting Party or any of its officers, employees, or subcontractors does voluntarily provide information in violation of this Contract, City has the right to reimbursement and indemnity from Contracting Party for any damages caused by Contracting Party releasing the information, including, but not limited to, City's attorney's fees and disbursements, including without limitation experts' fees and disbursements. Contracting Party's covenant under this section shall survive the termination or expiration of this Agreement. 8. ENFORCEMENT OF AGREEMENT. 8.1 California Law. This Agreement shall be interpreted, construed, and governed both as to validity and to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any dispute, claim, or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the County of Riverside, State of California, or any other appropriate court in such county, and Contracting Party covenants and agrees to submit to the personal jurisdiction of such court in the event of such action. 8.2 Disputes. In the event of any dispute arising under this Agreement, the injured party shall notify the injuring party in writing of its contentions by submitting a claim therefore. Prior to either party commencing any legal action under this Agreement, the parties agree to try in good faith, to settle any dispute amicably between them. If a dispute has not been settled after forty-five (45) days of good -faith negotiations and as may be otherwise provided herein, then either party may commence legal action against the other. The injured party shall continue performing its obligations hereunder so long as the injuring party commences to cure such default within ten (10) days of service of such notice and completes the cure of such default within forty-five (45) days after service of the notice, or such longer period as may be permitted by the Contract Officer, or assigned designee; provided that if the default is an immediate danger to the health, safety, or general welfare, City may take such immediate action as City deems warranted. -11- Compliance with the provisions of this Section shall be a condition precedent to termination of this Agreement for cause and to any legal action, and such compliance shall not be a waiver of any party's right to take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City's right to terminate this Agreement without cause pursuant to this Section 8.0. During the period of time that Contracting Party is in default, City shall hold all invoices and shall, when the default is cured, proceed with payment on the invoices. In the alternative, City may, in its sole discretion, elect to pay some or all of the outstanding invoices during any period of default. Any dispute, other than audit, concerning a question of fact arising under this Agreement that is not disposed of by agreement shall be decided by a committee consisting of City's Contract Officer and City Manager (or authorized designee), who may consider written or verbal information submitted by Contracting Party. Not later than thirty (30) calendar days after completion of all deliverables necessary to complete the plans, specifications and estimate, Contracting Party may request review by City Governing Board of unresolved claims or disputes, other than audit. The request for review shall be submitted in writing. Neither the pendency of a dispute, nor its consideration by the committee will excuse Contracting Party from full and timely performance in accordance with the terms of this Agreement. Audit Disputes shall be considered as provided for Section 10. 8.3 Retention of Funds. City may withhold from any monies payable to Contracting Party sufficient funds to compensate City for any losses, costs, liabilities, or damages it reasonably believes were suffered by City due to the default of Contracting Party in the performance of the Services required by this Agreement. 8.4 Waiver. No delay or omission in the exercise of any right or remedy of a non -defaulting party on any default shall impair such right or remedy or be construed as a waiver. City's consent or approval of any act by Contracting Party requiring City's consent or approval shall not be deemed to waive or render unnecessary City's consent to or approval of any subsequent act of Contracting Party. Any waiver by either party of any default must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this Agreement. 8.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at the same or different times, of any other rights or remedies for the same default or any other default by the other party. 8.6 Legal Action. In addition to any other rights or remedies, either party may take legal action, at law or at equity, to cure, correct, or remedy any default, to recover damages for any default, to compel specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy consistent with the purposes of this Agreement. 8.7 Termination Prior To Expiration of Term. This Section shall govern any termination of this Agreement, except as specifically provided in the following Section for termination for cause. City reserves the right to terminate this Agreement at any time, -12- with or without cause, upon thirty (30) days' written notice to Contracting Party. Upon receipt of any notice of termination, Contracting Party shall immediately cease all Services hereunder except such as may be specifically approved by the Contract Officer, or assigned designee. Upon termination, City shall be entitled to all work, including but not limited to, reports, investigations, appraisals, inventories, studies, analyses, drawings and data estimates performed to that date, whether completed or not, and in accordance with Section 7.5. Contracting Party shall be entitled to compensation for all Services rendered prior to receipt of the notice of termination and for any Services authorized by the Contract Officer, or assigned designee, thereafter in accordance with the Schedule of Compensation or such as may be approved by the Contract Officer, or assigned designee, except amounts held as a retention pursuant to this Agreement. Notwithstanding any provisions of this Agreement, Contracting Party shall not be relieved of liability to City for damages sustained by City by virtue of any breach of this Agreement by Contracting Party, and City may withhold any payments due to Contracting Party until such time as the exact amount of damages, if any, due City from Contracting Party is determined. 8.8 Termination for Default of Contracting Party. If termination is due to the failure of Contracting Party to fulfill its obligations under this Agreement, Contracting Party shall vacate any City -owned property which Contracting Party is permitted to occupy hereunder and City may, after compliance with the provisions of Section 8.2, take over the Services and prosecute the same to completion by contract or otherwise, and Contracting Party shall be liable to the extent that the total cost for completion of the Services required hereunder exceeds the compensation herein stipulated (provided that City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to Contracting Party for the purpose of setoff or partial payment of the amounts owed City. 8.9 Attorneys' Fees. If either party to this Agreement is required to initiate or defend or made a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to reasonable attorneys' fees; provided, however, that the attorneys' fees awarded pursuant to this Section shall not exceed the hourly rate paid by City for legal services multiplied by the reasonable number of hours spent by the prevailing party in the conduct of the litigation. Attorneys' fees shall include attorneys' fees on any appeal, and in addition a party entitled to attorneys' fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and discovery, and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is prosecuted to judgment. The court may set such fees in the same action or in a separate action brought for that purpose. 8.10 Suspension of Work. City may temporarily suspend this Agreement, at no additional cost to City, provided that Contracting Party is given written notice (delivered by certified mail, return receipt requested) of temporary suspension. If City gives such notice of temporary suspension, Contracting Party shall immediately suspend its activities -13- under this Agreement. A temporary suspension may be issued concurrent with the notice of termination provided for in this Section 8.0. 9. CITY OFFICERS AND EMPLOYEES; NON-DISCRIMINATION. 9.1 Non -liability of City Officers and Employees. No officer, official, employee, agent, representative, or volunteer of City shall be personally liable to Contracting Party, or any successor in interest, in the event or any default or breach by City or for any amount which may become due to Contracting Party or to its successor, or for breach of any obligation of the terms of this Agreement. 9.2 Conflict of Interest. Contracting Party covenants that neither it, nor any officer or principal of it, has or shall acquire any interest, directly or indirectly, which would conflict in any manner with the interests of City or which would in any way hinder Contracting Party's performance of the Services under this Agreement. Contracting Party further covenants that in the performance of this Agreement, no person having any such interest shall be employed by it as an officer, employee, agent, or subcontractor without the express written consent of the Contract Officer, or assigned designee. Contracting Party agrees to at all times avoid conflicts of interest or the appearance of any conflicts of interest with the interests of City in the performance of this Agreement. During the term of this Agreement, the Contracting Party shall disclose any financial, business, or other relationship with City that may have an impact upon the outcome of this Agreement or any ensuing City construction project. The Contracting Party shall also list current clients who may have a financial interest in the outcome of this Agreement or any ensuing City construction project which will follow. No officer or employee of City shall have any financial interest, direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to this Agreement which effects his financial interest or the financial interest of any corporation, partnership or association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. Contracting Party warrants that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining this Agreement. Contracting Party certifies that it has disclosed to City any actual, apparent, or potential conflicts of interest that may exist relative to the services to be provided pursuant to this Agreement. Contracting Party agrees to advise City of any actual, apparent or potential conflicts of interest that may develop subsequent to the date of execution of this Agreement. Contracting Party further agrees to complete any statements of economic interest if required by either City ordinance or State law. Contracting Party hereby certifies that the Contracting Party or subconsultant and any firm affiliated with the Contracting Party or subconsultant that bids on any construction contract or on any Agreement to provide construction inspection for any construction project resulting from this Agreement, has established necessary controls to ensure a conflict of interest does not exist. An affiliated firm is one, which is subject to the control of the same persons, through joint ownership or otherwise. -14- 9.3 Covenants against Discrimination. The Contracting Party's signature affixed herein and dated shall constitute a certification under penalty of perjury under the laws of the State of California that the Contracting Party has, unless exempt, complied with the nondiscrimination program requirements of Gov. Code §12990 and 2 CCR § 8103. During the performance of this Agreement, Contracting Party and its subconsultants shall not deny the Agreement's benefits to any person on the basis of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status, nor shall they unlawfully discriminate, harass, or allow harassment against any employee or applicant for employment because of race, religious creed, color, national origin, ancestry, physical disability, mental disability, medical condition, genetic information, marital status, sex, gender, gender identity, gender expression, age, sexual orientation, or military and veteran status. Contracting Party and subconsultants shall insure that the evaluation and treatment of their employees and applicants for employment are free from such discrimination and harassment. Contracting Party and subconsultants shall comply with the provisions of the Fair Employment and Housing Act (Gov. Code §12990 et seq.), the applicable regulations promulgated there under (2 CCR §11000 et seq.), the provisions of Gov. Code §§11135- 11139.5, and the regulations or standards adopted by City to implement such article. The applicable regulations of the Fair Employment and Housing Commission implementing Gov. Code §12990 (a -f), set forth 2 CCR §§8100-8504, are incorporated into this Agreement by reference and made a part hereof as if set forth in full. Contracting Party shall permit access by representatives of the Department of Fair Employment and Housing and the City upon reasonable notice at any time during the normal business hours, but in no case less than twenty-four (24) hours' notice, to such of its books, records, accounts, and all other sources of information and its facilities as said Department or City shall require to ascertain compliance with this clause. Contracting Party and its subconsultants shall give written notice of their obligations under this clause to labor organizations with which they have a collective bargaining or other Agreement. Contracting Party shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under this Agreement. The Contracting Party, with regard to the work performed under this Agreement, shall act in accordance with Title VI of the Civil Rights Act of 1964 (42 U.S.C. §2000d et seq.). Title VI provides that the recipients of federal assistance will implement and maintain a policy of nondiscrimination in which no person in the United States shall, on the basis of race, color, national origin, religion, sex, age, disability, be excluded from participation in, denied the benefits of or subject to discrimination under any program or activity by the recipients of federal assistance or their assignees and successors in interest. -15- The Contracting Party shall comply with regulations relative to non-discrimination in federally -assisted programs of the U.S. Department of Transportation (49 CFR Part 21 - Effectuation of Title VI of the Civil Rights Act of 1964). Specifically, the Contracting Party shall not participate either directly or indirectly in the discrimination prohibited by 49 CFR §21.5, including employment practices and the selection and retention of Subconsultants. The Contracting Party, subrecipient or subconsultant will never exclude any person from participation in, deny any person the benefits of, or otherwise discriminate against anyone in connection with the award and performance of any contract covered by 49 CFR 26 on the basis of race, color, sex, or national origin. In administering the City components of the DBE Program Plan, Contracting Party, subrecipient or subconsultant will not, directly, or through contractual or other arrangements, use criteria or methods of administration that have the effect of defeating or substantially impairing accomplishment of the objectives of the DBE Program Plan with respect to individuals of a particular race, color, sex, or national origin. Title VI Assurances — Appendix A During the performance of this Agreement, the contractor, for itself, its assignees and successors in interest (hereinafter collectively referred to as Consultant) agrees as follows: a. Compliance with Regulations: Consultant shall comply with the regulations relative to nondiscrimination in federally assisted programs of the Department of Transportation, Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are herein incorporated by reference and made a part of this agreement. b. Nondiscrimination: Consultant, with regard to the work performed by it during the agreement, shall not discriminate on the grounds of race, color, sex, national origin, religion, age, or disability in the selection and retention of sub -applicants, including procurements of materials and leases of equipment. Consultant shall not participate either directly or indirectly in the discrimination prohibited by Section 21.5 of the Regulations, including employment practices when the agreement covers a program set forth in Appendix B of the Regulations. c. Solicitations for Sub -agreements, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by Consultant for work to be performed under a Sub- agreement, including procurements of materials or leases of equipment, each potential sub -applicant or supplier shall be notified by Consultant of the Consultant's obligations under this Agreement and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. d. Information and Reports: Consultant shall provide all information and reports required by the Regulations, or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information, and its -16- facilities as may be determined by the recipient or FHWA to be pertinent to ascertain compliance with such Regulations or directives. Where any information required of Consultant is in the exclusive possession of another who fails or refuses to furnish this information, Consultant shall so certify to the recipient or FHWA as appropriate, and shall set forth what efforts Consultant has made to obtain the information. e. Sanctions for Noncompliance: In the event of Consultant's noncompliance with the nondiscrimination provisions of this agreement, the recipient shall impose such agreement sanctions as it or the FHWA may determine to be appropriate, including, but not limited to: withholding of payments to Consultant under the Agreement within a reasonable period of time, not to exceed 90 days; and/or ii. cancellation, termination, or suspension of the Agreement, in whole or in part. f. Incorporation of Provisions: Consultant shall include the provisions of paragraphs (1) through (6) in every sub -agreement, including procurements of materials and leases of equipment, unless exempt by the Regulations, or directives issued pursuant thereto. Consultant shall take such action with respect to any sub -agreement or procurement as the recipient or FHWA may direct as a means of enforcing such provisions including sanctions for noncompliance, provided, however, that, in the event Consultant becomes involved in, or is threatened with, litigation with a sub -applicant or supplier as a result of such direction, Consultant may request the recipient enter into such litigation to protect the interests of the State, and, in addition, Consultant may request the United States to enter into such litigation to protect the interests of the United States. Title VI Assurances — Appendix E During the performance of this contract, the Contracting Party, for itself, its assignees, and successors in interest agrees to comply with the following nondiscrimination statutes and authorities; including but not limited to: Pertinent Nondiscrimination Authorities: - Title VI of the Civil Rights Act of 1964 (42 U.S.C. § 2000d et seq., 78 stat. 252), (prohibits discrimination on the basis of race, color, national origin); and 49 CFR Part 21. - The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601), (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal -aid programs and projects); -17- - Federal -Aid Highway Act of 1973, (23 U.S.C. § 324 et seq.), (prohibits discrimination on the basis of sex); - Section 504 of the Rehabilitation Act of 1973, (29 U.S.C. § 794 et seq.), as amended, (prohibits discrimination on the basis of disability); and 49 CFR Part 27; - The Age Discrimination Act of 1975, as amended, (42 U.S.C. § 6101 et seq.), (prohibits discrimination on the basis of age); - Airport and Airway Improvement Act of 1982, (49 U.S.C. § 4 71, Section 4 7123), as amended, (prohibits discrimination based on race, creed, color, national origin, or sex); - The Civil Rights Restoration Act of 1987, (PL 100-209), (Broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, The Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms "programs or activities" to include all of the programs or activities of the Federal -aid recipients, subrecipients and contractors, whether such programs or activities are Federally funded or not); Titles II and III of the Americans with Disabilities Act, which prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities (42 U.S.C. §§ 12131-12189) as implemented by Department of Transportation regulations at 49 C.F.R. parts 37 and 38; Page 2of2 - The Federal Aviation Administration's Nondiscrimination statute (49 U.S.C. § 47123) (prohibits discrimination on the basis of race, color, national origin, and sex); - Executive Order 12898, Federal Actions to Address Environmental Justice in Minority Populations and Low -Income Populations, which ensures discrimination against minority populations by discouraging programs, policies, and activities with disproportionately high and adverse human health or environmental effects on minority and low-income populations; Executive Order 13166, Improving Access to Services for Persons with Limited English Proficiency, and resulting agency guidance, national origin discrimination includes discrimination because of limited English proficiency (LEP). To ensure compliance with Title VI, you must take reasonable steps to ensure that LEP persons have meaningful access to your programs (70 Fed. Reg. at 74087 to 74100); - Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. 1681 et seq). 10. AUDIT REVIEW PROCEDURES. 10.1 Audit Disputes. Any dispute concerning a question of fact arising under an interim or post audit of this Agreement that is not disposed of by agreement provided for in Section 8.0, shall be reviewed by City's Chief Financial Officer. Not later than thirty (30) calendar days after issuance of the final audit report, Contracting Party may request a review by City's Chief Financial Officer of unresolved audit issues. The request for review will be submitted in writing. Neither the pendency of a dispute nor its consideration by City will excuse Contracting Party from full and timely performance, in accordance with the terms of this Agreement. 10.2 Audit Review Procedures. Contracting Party and subconsultant Agreements, including Schedule of Compensation, cost proposals and Indirect Cost Rates (ICR), may be subject to audits or reviews such as, but not limited to, an Agreement audit, an incurred cost audit, an ICR Audit, or a CPA ICR audit work paper review. If selected for audit or review, the Agreement, cost proposal and ICR and related work papers, if applicable, will be reviewed to verify compliance with 48 CFR Part 31 and other related laws and regulations. In the instances of a CPA ICR audit work paper review it is Contracting Party's responsibility to ensure federal, City, or local government officials are allowed full access to the CPA's work papers including making copies as necessary. The Agreement, cost proposal, and ICR shall be adjusted by Contracting Party and approved by City Contract Officer to conform to the audit or review recommendations. Contracting Party agrees that individual terms of costs identified in the audit report shall be incorporated into the Agreement by this reference if directed by City at its sole discretion. Refusal by Contracting Party to incorporate audit or review recommendations, or to ensure that the federal, City or local governments have access to CPA work papers, will be considered a breach of Agreement terms and cause for termination under Section 8.0 of the Agreement and disallowance of prior reimbursed costs. 10.3 Caltrans Audits and Investigations Work Paper Review. Contracting Party's Schedule of Compensation may be subject to a CPA ICR Audit Work Paper Review and/or audit by Independent Office of Audits and Investigation (AOAI). IOAI, at its sole discretion, may review and/or audit and approve the CPA ICR documentation. The Schedule of Compensation shall be adjusted by the Contracting Party and approved by the City Contract Officer to conform to the Work Paper Review recommendations included in the management letter or audit recommendations included in the audit report. Refusal by the Contracting Party to incorporate the Work Paper Review recommendations included in the management letter or audit recommendations included in the audit report will be considered a breach of the Agreement terms and cause for termination under Section 8.0 of the Agreement and disallowance of prior reimbursed costs. During IOAI's review of the ICR audit work papers created by the Contracting Party's independent CPA, IOAI will work with the CPA and/or Contracting Party toward a -19- resolution of issues that arise during the review. Each party agrees to use its best efforts to resolve any audit disputes in a timely manner. If IOAI identifies significant issues during the review and is unable to issue a cognizant approval letter, City will reimburse the Contracting Party at an accepted ICR until a FAR (Federal Acquisition Regulation) compliant ICR {e.g. 48 CFR Part 31; GAGAS (Generally Accepted Auditing Standards); CAS (Cost Accounting Standards), if applicable; in accordance with procedures and guidelines of the American Association of State Highways and Transportation Officials (AASHTO) Audit Guide; and other applicable procedures and guidelines}is received and approved by IOAI. Accepted rates will be as follows: A. If the proposed rate is less than one hundred fifty percent (150%) -the accepted rate reimbursed will be ninety percent (90%) of the proposed rate. B. If the proposed rate is between one hundred fifty percent (150%) and two hundred percent (200%) - the accepted rate will be eighty-five percent (85%) of the proposed rate. C. If the proposed rate is greater than two hundred percent (200%) - the accepted rate will be seventy-five percent (75%) of the proposed rate. If IOAI is unable to issue a cognizant letter per this Section 10.3, IOAI may require Contracting Party to submit a revised independent CPA -audited ICR and audit report within three (3) months of the effective date of the management letter. IOAI will then have up to six (6) months to review the Contracting Party's and/or the independent CPA's revisions. If the Contracting Party fails to comply with the provisions of this Section 10.3, or if IOAI is still unable to issue a cognizant approval letter after the revised independent CPA audited ICR is submitted, overhead cost reimbursement will be limited to the accepted ICR that was established upon initial rejection of the ICR and set forth this Section 10.3 for all rendered services. In this event, this accepted ICR will become the actual and final ICR for reimbursement purposes under this Agreement. Contracting Party may submit to City final invoice only when all of the following items have occurred: (1) IOAI accepts or adjusts the original or revised independent CPA audited ICR; (2) all work under this Agreement has been completed to the satisfaction of City; and, (3) IOAI has issued its final ICR review letter. The Contracting Party must submit its final invoice to City no later than sixty (60) calendar days after occurrence of the last of these items. The accepted ICR will apply to this Agreement and all other agreements executed between City and the Contracting Party, either as a prime or subconsultant, with the same fiscal period ICR. 11. STATE PREVAILING WAGE RATES 11.1 State Prevailing Wage Rates. No Consultant or Subconsultant may be awarded an Agreement containing public work elements unless registered with the -20- Department of Industrial Relations (DIR) pursuant to Labor Code §1725.5. Registration with DIR must be maintained throughout the entire term of this Agreement, including any subsequent amendments. The Contracting Party shall comply with all of the applicable provisions of the California Labor Code requiring the payment of prevailing wages. The General Prevailing Wage Rate Determinations applicable to work under this Agreement are available and on file with the Department of Transportation's Regional/District Labor Compliance Officer (https:Hdot.ca.gov/programs/construction/labor-compliance). These wage rates are made a specific part of this Agreement by reference pursuant to Labor Code §1773.2 and will be applicable to work performed at a construction project site. Prevailing wages will be applicable to all inspection work performed at City construction sites, at City facilities and at off-site locations that are set up by the construction contractor or one of its subcontractors solely and specifically to serve City projects. Prevailing wage requirements do not apply to inspection work performed at the facilities of vendors and commercial materials suppliers that provide goods and services to the general public. General Prevailing Wage Rate Determinations applicable to this project may also be obtained from the Department of Industrial Relations Internet site at http://www.dir.ca.gov. 11.2 Payroll Records. Contracting Party and each Subconsultant shall keep accurate certified payroll records and supporting documents as mandated by Labor Code §1776 and as defined in 8 CCR §16000 showing the name, address, social security number, work classification, straight time and overtime hours worked each day and week, and the actual per diem wages paid to each journeyman, apprentice, worker, or other employee employed by the Contracting Party or Subconsultant in connection with the public work. Each payroll record shall contain or be verified by a written declaration that it is made under penalty of perjury, stating both of the following: A. The information contained in the payroll record is true and correct. B. The employer has complied with the requirements of Labor Code §1771, §1811, and §1815 for any work performed by his or her employees on the public works project. The payroll records enumerated under this Section 11.2 shall be certified as correct by the Contracting Party under penalty of perjury. The payroll records and all supporting documents shall be made available for inspection and copying by City representative's at all reasonable hours at the principal office of the Contracting Party. The Contracting Party shall provide copies of certified payrolls or permit inspection of its records as follows: A. A certified copy of an employee's payroll record shall be made available for inspection or furnished to the employee or the employee's authorized representative on request. B. A certified copy of all payroll records enumerated in this Section 11.2 shall be made available for inspection or furnished upon request to a representative of City, the Division of Labor Standards Enforcement and the Division of Apprenticeship Standards of the Department of Industrial Relations. Certified payrolls submitted to City, the Division of Labor Standards Enforcement and -21- the Division of Apprenticeship Standards shall not be altered or obliterated by the Contracting Party. C. The public shall not be given access to certified payroll records by the Contracting Party. The Contracting Party is required to forward any requests for certified payrolls to the City Contract Officer by both email and regular mail on the business day following receipt of the request. Contracting Party and all subconsultants shall submit a certified copy of the records enumerated in this Section 11.2, to the entity that requested the records within ten (10) calendar days after receipt of a written request. Any copy of records made available for inspection as copies and furnished upon request to the public or any public agency by City shall be marked or obliterated in such a manner as to prevent disclosure of each individual's name, address, and social security number. The name and address of the Contracting Party or Subconsultant performing the work shall not be marked or obliterated. The Contracting Party shall inform City of the location of the records enumerated under this Section 11.2, including the street address, city and county, and shall, within five (5) working days, provide a notice of a change of location and address. The Contracting Party or Subconsultant shall have ten (10) calendar days in which to comply subsequent to receipt of written notice requesting the records enumerated in this Section 11.2. In the event the Contracting Party or Subconsultant fails to comply within the ten (10) day period, he or she shall, as a penalty to City, forfeit one hundred dollars ($100) for each calendar day, or portion thereof, for each worker, until strict compliance is effectuated. Such penalties shall be withheld by City from payments then due. Contracting Party is not subject to a penalty assessment pursuant to this section due to the failure of a Subconsultant to comply with this section. 11.3 Responsibility. When prevailing wage rates apply, the Contracting Party is responsible for verifying compliance with certified payroll requirements. Invoice payment will not be made until the invoice is approved by the City Contract Officer. 11.4 Penalty. The Contracting Party and any of its Subconsultants shall comply with Labor Code §1774 and §1775. Pursuant to Labor Code §1775, the Contracting Party and any Subconsultant shall forfeit to the City a penalty of not more than two hundred dollars ($200) for each calendar day, or portion thereof, for each worker paid less than the prevailing rates as determined by the Director of DIR for the work or craft in which the worker is employed for any public work done under the Agreement by the Contracting Party or by its Subconsultant in violation of the requirements of the Labor Code and in particular, Labor Code §§1770 to 1780, inclusive. The amount of this forfeiture shall be determined by the Labor Commissioner and shall be based on consideration of mistake, inadvertence, or neglect of the Contracting Party or Subconsultant in failing to pay the correct rate of prevailing wages, or the previous record of the Contracting Party or Subconsultant in meeting their respective prevailing -22- wage obligations, or the willful failure by the Contracting Party or Subconsultant to pay the correct rates of prevailing wages. A mistake, inadvertence, or neglect in failing to pay the correct rates of prevailing wages is not excusable if the Contracting Party or Subconsultant had knowledge of the obligations under the Labor Code. The Contracting Party is responsible for paying the appropriate rate, including any escalations that take place during the term of the Agreement. In addition to the penalty and pursuant to Labor Code §1775, the difference between the prevailing wage rates and the amount paid to each worker for each calendar day or portion thereof for which each worker was paid less than the prevailing wage rate shall be paid to each worker by the Contracting Party or Subconsultant. If a worker employed by a Subconsultant on a public works project is not paid the general prevailing per diem wages by the Subconsultant, the Contracting Party is not liable for the penalties described above unless the Contracting Party had knowledge of that failure of the Subconsultant to pay the specified prevailing rate of wages to those workers or unless the Contracting Party fails to comply with all of the following requirements: A. The Agreement executed between the Contracting Party and the Subconsultant for the performance of work on public works projects shall include a copy of the requirements in Labor Code §§ 1771, 1775, 1776, 1777.5, 1813, and 1815. B. The Contracting Party shall monitor the payment of the specified general prevailing rate of per diem wages by the Subconsultant to the employees by periodic review of the certified payroll records of the Subconsultant. C. Upon becoming aware of the Subconsultant's failure to pay the specified prevailing rate of wages to the Subconsultant's workers, the Contracting Party shall diligently take corrective action to halt or rectify the failure, including but not limited to, retaining sufficient funds due the Subconsultant for work performed on the public works project. D. Prior to making final payment to the Subconsultant for work performed on the public works project, the Contracting Party shall obtain an affidavit signed under penalty of perjury from the Subconsultant that the Subconsultant had paid the specified general prevailing rate of per diem wages to the Subconsultant's employees on the public works project and any amounts due pursuant to Labor Code §1813. Pursuant to Labor Code §1775, City shall notify the Contracting Party on a public works project within fifteen (15) calendar days of receipt of a complaint that a Subconsultant has failed to pay workers the general prevailing rate of per diem wages. If City determines that employees of a Subconsultant were not paid the general prevailing rate of per diem wages and if City did not retain sufficient money under the Agreement to pay those employees the balance of wages owed under the general prevailing rate of per diem wages, the Contracting Party shall withhold an amount of moneys due the -23- Subconsultant sufficient to pay those employees the general prevailing rate of per diem wages if requested by City. 11.5 Hours of Labor. Eight (8) hours labor constitutes a legal day's work. The Contracting Party shall forfeit, as a penalty to the City, twenty-five dollars ($25) for each worker employed in the execution of the Agreement by the Contracting Party or any of its Subconsultants for each calendar day during which such worker is required or permitted to work more than eight (8) hours in any one calendar day and forty (40) hours in any one calendar week in violation of the provisions of the Labor Code, and in particular §§1810 to 1815 thereof, inclusive, except that work performed by employees in excess of eight (8) hours per day, and forty (40) hours during any one week, shall be permitted upon compensation for all hours worked in excess of eight (8) hours per day and forty (40) hours in any week, at not less than one and one-half (1.5) times the basic rate of pay, as provided in §1815. 11.6 Employment of Apprentices. Where either the prime Agreement or the sub - agreement exceeds thirty thousand dollars ($30,000), the Contracting Party and any subconsultants under him or her shall comply with all applicable requirements of Labor Code §§ 1777.5, 1777.6 and 1777.7 in the employment of apprentices. The Contracting Party and its subconsultants are required to comply with all Labor Code requirements regarding the employment of apprentices, including mandatory ratios of journey level to apprentice workers. Prior to commencement of work, Contracting Party and its subconsultants are advised to contact the DIR Division of Apprenticeship Standards website at https://www.dir.ca.gov/das/, for additional information regarding the employment of apprentices and for the specific journey -to- apprentice ratios for the Agreement work. The Contracting Party is responsible for all subconsultants' compliance with these requirements. Penalties are specified in Labor Code §1777.7. 12. DISADVANTAGED BUSINESS ENTERPRISES (DBE) PARTICIPATION. The Contracting Party, subrecipient (City), or subconsultant shall take necessary and reasonable steps to ensure that DBE's have opportunities to participate in the Agreement (49 CFR 26). To ensure equal participation of DBE's provided in 49 CFR 26.5, The City shows a contract goal for DBE's. Contracting Party shall make work available to DBEs and select work parts consistent with available DBE subconsultants and suppliers. The Contracting Party shall meet the DBE goal shown elsewhere in these special provisions or demonstrate that they made adequate good faith efforts to meet this goal. It is Contracting Party's responsibility to verify at date of proposal opening that the DBE firm is certified as a DBE by using the California Unified Certification Program (CUCP) database and possesses the most specific available North American Industry Classification System (NAICS) codes or work code applicable to the type of work the firm will perform on the contract. Additionally, the Contracting Party is responsible to document the verification record by printing out the California Unified Certification Program (CUCP) data for each DBE firm. A list of DBEs certified by the CUCP can be found at https:Hdot.ca.gov/programs/civil-rights/dbe-search. -24- All DBE participation will count toward the California Department of Transportation's federally mandated statewide overall DBE goal. Credit for materials or supplies the Contracting Party purchases from DBE's counts toward the goal in the following manner: 100 percent counts if the materials or supplies are obtained from a DBE manufacturer. - 60 percent counts if the materials or supplies are purchased from a DBE regular dealer. Only fees, commissions, and charges for assistance in the procurement and delivery of materials or supplies count if obtained from a DBE that is neither a manufacturer nor regular dealer. 49 CFR 26.55 defines "manufacturer" and regular dealer." This Agreement is subject to 49 CFR Part 26 entitled "Participation by Disadvantaged Business Enterprises in Department of Transportation Financial Assistance Programs". Consultants who enter into a federally -funded agreement will assist the City in a good faith effort to achieve California's statewide overall DBE goal. 12.1 DBE Goal. The Goal for DBE participation for this Agreement is 21%. Participation by DBE Contracting Party or subconsultants shall be in accordance with information contained in Exhibit 10-02: Consultant Contract DBE Commitment attached hereto and incorporated as part of the Agreement. If a DBE subconsultant is unable to perform, the Contracting Party must make a good faith effort to replace him/her with another DBE subconsultant, if the goal is not otherwise met. 12.2 Meeting the Goal. The Contracting Party can meet the DBE participation goal by either documenting commitments to DBEs to meet the Agreement goal, or by documenting adequate good faith efforts to meet the Agreement goal. An adequate good faith effort means that the Contracting Party must show that it took all necessary and reasonable steps to achieve a DBE goal that, by their scope, intensity, and appropriateness to the objective, could reasonably be expected to meet the DBE goal. If the Contracting Party has not met the DBE goal, complete and submit Exhibit 15-H: DBE Information — Good Faith Efforts to document efforts to meet the goal. Refer to 49 CFR Part 26 for guidance regarding evaluation of good faith efforts to meet the DBE goal. 12.3 Contract Assurance. Under 49 DBR 26.13(b): The Contracting Party, subrecipient or subconsultant shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contracting Party shall carry out applicable requirements of 49 CFR 26 in the award and administration of federal -aid contracts. Failure by the Contracting Party to carry out these requirements is a material breach of this contract, which may result in the termination of this contract under Section 8.0 or such other remedy as the recipient deems appropriate, which may include, but is not limited to: -25- (1) Withholding monthly progress payments; (2) Assessing sanctions; (3) Liquidated Damages; and/or (4) Disqualifying the Contracting Party from future proposing as non -responsible. 12.4 Termination and Replacement of DBE Subconsultants. The Contracting Party shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the Contracting Party or DBE subconsultant obtains the City's written consent. The Contracting Party shall not terminate or replace a listed DBE for convenience and perform the work with their own forces or obtain materials from other sources without authorization from the City. Unless the City's consent is provided, the Contracting party shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE on the Exhibit 10-02 Consultant Contract DBE Commitment form, included in the bid. Termination of DBE Subconsultants After execution of the Agreement, termination of a DBE may be allowed for the following, but not limited to, justifiable reasons with prior written authorization from the City: 1. Listed DBE fails or refuses to execute a written contract based on plans and specifications for the project. 2. The City stipulated that a bond is a condition of executing the subcontract and the listed DBE fails to meet the City's bond requirements. 3. Work requires a consultant's license and listed DBE does not have a valid license under Contractors License Law. 4. Listed DBE fails or refuses to perform the work or furnish the listed materials (failing or refusing to perform is not an allowable reason to remove a DBE if the failure or refusal is a result of bad faith or discrimination). 5. Listed DBE's work is unsatisfactory and not in compliance with the contract. 6. Listed DBE is ineligible to work on the project because of suspension or debarment. 7. Listed DBE becomes bankrupt or insolvent or exhibits credit unworthiness. 8. Listed DBE voluntarily withdraws with written notice from the Contract. 9. Listed DBE is ineligible to receive credit for the type of work required. 10. Listed DBE owner dies or becomes disabled resulting in the inability to perform the work on the Contract. -26- 11. The City determines other documented good cause. Contracting Party must use the following procedures to request the termination of a DBE or portion of a DBE's work: 1. Send a written notice to the DBE of the Contracting Party's intent to use other forces or material sources and include one or more justifiable reasons listed above. Simultaneously send a copy of this written notice to the City. The written notice to the DBE must request they provide any response within five (5) business days to both the Contracting Party and the City by either acknowledging their agreement or documenting their reasoning as to why the use of other forces or sources of materials should not occur. 2. If the DBE does not respond within five (5) business days, Contracting Party may move forward with the request as if the DBE had agreed to Contracting Party's written notice. 3. Submit Contracting Party's DBE termination request by written letter to the City and include: • One or more above listed justifiable reasons along with supporting documentation. • Contracting Party's written notice to the DBE regarding the request, including proof of transmission and tracking documentation of Consultant's written notice. • The DBE's response to Contracting Party's written notice, if received. If a written response was not provided, provide a statement to that effect. The City shall respond in writing to Contracting Party's DBE Termination request within five (5) business days. Replacement of DBE Subconsultant After receiving the City's written authorization of DBE termination request, Contracting Party must obtain the City's written agreement for DBE replacement. Contracting Party must find or demonstrate GFEs to find qualified DBE replacement firms to perform the work to the extent needed to meet the DBE commitment. The following procedures shall be followed to request authorization to replace a DBE Firm: 1. Submit a request to replace a DBE with other forces or material sources in writing to the City which must include: a. Description of remaining uncommitted work item made available for replacement DBE solicitation and participation. -27- b. The proposed DBE replacement firm's business information, the work they have agreed to perform, and the following: • Description of scope of work and cost proposal • Proposed subcontract agreement and written confirmation of agreement to perform on the Contract • Revised Exhibit 10-02: Consultant Contract DBE Commitment 2. If Contracting Party has not identified a DBE replacement firm, submits documentation of Contracting Party's GFE's to use DBE replacement firms within seven (7) days of City's authorization to terminate the DBE. Contracting Party may request the City's approval to extend this submittal period to a total of 14 days. Submit documentation of actions taken to find a DBE replacement firm, such as: • Search results of certified DBEs available to perform the original DBE work identified and or other work Contracting Party had intended to self -perform, to the extent needed to meet DBE commitment • Solicitations of DBEs for performance of work identified • Correspondence with interested DBEs that may have included contract details and requirements • Negotiation efforts with DBEs that reflect why an agreement was not reached • If a DBE's quote was rejected, provide reasoning for the rejection, such as why the DBE was unqualified for the work, or why the price quote was unreasonable or excessive • Copies of each DBE's and non -DBE's price quotes for work identified, as the City may contact the firms to verify solicitation efforts and determine if the DBE quotes are substantially higher • Additional documentation that supports Contracting Party's GFE The City shall respond in writing to Contracting Party's DBE replacement request within five (5) business days. 12.5 Commitment and Utilization. The City's DBE program must include a monitoring and enforcement mechanism to ensure that DBE commitments reconcile to the DBE utilization. The City shall request the Contracting Party to: 1. Notify the City's contract officer or designated representative of any changes to its anticipated DBE participation Sam 2. Provide this notification before starting the affected work 3. Maintain records including: - Name and business address of each 1St tier subconsultant - Name and business address of each DBE subconsultant, DBE vendor, and DBE trucking company, regardless of tier - Date of payment and total amount paid to each business (see Exhibit 9-F Monthly Disadvantaged Business Enterprise Payment) If the Contracting Party is a DBE Consultant, they shall include the date of work performed by their own forces and the corresponding value of the work. If a DBE is decertified before completing its work, the DBE must notify the Contracting Party in writing of the decertification date. If a business becomes a certified DBE before completing its work, the business must notify the Contracting Party in writing of the certification date. The Contracting Party shall submit the notifications to the City. On work completion, the Contracting Party shall complete a Disadvantaged Business Enterprises (DBE) Certification Status Change, Exhibit 17-0, form and submit the form to the City within 30 days of contract acceptance. Upon work completion, the Contracting Party shall complete Exhibit 17-F Final Report — Utilization of Disadvantaged Business Enterprises (DBE), First -Tier Subcontractors and submit it to the City within 90 days of contract acceptance. The City will withhold $10,000 until the form is submitted. The City will release the withhold upon submission of the completed form. In the City's reports of DBE participation to Caltrans, the City must display both commitments and attainments. 12.6 Commercially Useful Function. DBE's must perform a commercially useful function (CUF) under 49 CFR 26.55 when performing work or supplying materials listed on the DBE Commitment form. The DBE value of work will only count toward the DBE commitment if the DBE performs a CUF. A DBE performs a CUF when it is responsible for execution of the work of the Agreement and is carrying out its responsibilities by actually performing, managing, and supervising the work involved. To perform a CUF, the DBE must also be responsible, with respect to materials and supplies used on the Agreement, for negotiating price, determining quality and quantity, ordering the material and installing (where applicable), and paying for the material itself. Contracting Party must perform CUF evaluation for each DBE working on a federal -aid contract, with or without a DBE goal. Contracting Party shall perform a CUF evaluation at the beginning of DBE's work and continue to monitor the performance of CUF for the duration of the project. -29- Contracting Party must provide written notification to the City at least 15 days in advance of each DBE's initial performance of work or supplying materials for the Contract. The notification must include the DBE's name, work the DBE will perform on the contract, and the location, date, and time of where their work will take place. Within 10 days of a DBE initially performing work or supplying materials on the Contract, Contracting Party shall submit to the City the initial evaluation and validation of DBE performance of a CUF using the LAPM 9-J: Disadvantaged Business Enterprise Commercially Useful Function Evaluation. Include the following information with the submittal: • Subcontract agreement with the DBE • Purchase orders • Bills of lading • Invoices • Proof of payment Contracting Party must monitor all DBE's performance of CUF by conducting quarterly evaluations and validations throughout their duration of work on the Agreement using the LAPM 9-J: DBE Commercially Useful Function Evaluation. Contracting Party must submit to the City these quarterly evaluations and validations by the 5'" of the month for the previous three months of work. Contracting Party must notify the City immediately if they believe the DBE may not be performing a CUF. The City will verify DBEs performance of CUF by reviewing the initial and quarterly submissions of LAPM 94 DBE Commercially Useful Function Evaluation, submitted supporting information, field observations, and through any additional City evaluations. The City must evaluate DBEs and their CUF performance throughout the duration of a Contract. The City will provide written notice to the Contracting Party and the DBE at least two (2) business days prior to any evaluation. The Contracting Party and the DBE must participate in the evaluation. Upon completing the evaluation, the City must share the evaluation results with the Contracting Party and the DBE. An evaluation could include items that must be remedied upon receipt. If the City determines the DBE is not performing a CUF, the Contracting Party must suspend performance of the noncompliant work. Contracting Party and DBEs must submit additional CUF related records and documents within five (5) business days of City's request such as: • Proof of ownership or lease and rental agreements for equipment • Tax records • Employee rosters • Certified payroll records • Inventory rosters -30- Failure to submit required DBE Commercially Useful Function Evaluation forms or requested records and documents can result in withholding of payment for the value of work completed by the DBE. If Contracting Party and/or the City determine that a listed DBE is not performing a CUF in performance of their DBE committed work, Contracting Party must immediately suspend performance of the noncompliant portion of the work. City may deny payment for the noncompliant portion of the work. City will ask Contracting Party to submit a corrective action plan (CAP) to the City within five (5) days of the noncompliant CUF determination. The CAP must identify how the Contracting Party will correct the noncompliance findings for the remaining portion of the DBE's work. City has five (5) days to review the CAP in conjunction with the Contracting Party's review. The Contracting Party must implement the CAP within five (5) days of the City's approval. The City will then authorize the prior noncompliant portion of work for the DBE's committed work. If corrective actions cannot be accomplished to ensure the DBE performs a commercially useful function on the Contract, Contracting Party may have good cause to request termination of the DBE. 12.7 A DBE does not perform a CUF if its role is limited to that of an extra participant in a transaction, Agreement, or project through which funds are passed in order to obtain the appearance of DBE participation. In determining whether a DBE is such an extra participant, examine similar transactions, particularly those in which DBEs do not participate. 12.8 If a DBE does not perform or exercise responsibility for at least thirty percent (30%) of the total cost of its Agreement with its own work force, or the DBE subcontracts a greater portion of the work of the Agreement than would be expected on the basis of normal industry practice for the type of work involved, it will be presumed that it is not performing a CUF. 12.9 Records. The Contracting Party shall maintain records of materials purchased or supplied from all subcontracts entered into with certified DBEs. The records shall show the name and business address of each DBE or vendor and the total dollar amount actually paid each DBE or vendor, regardless of tier. The records shall show the date of payment and the total dollar figure paid to all firms. DBE Contracting Party's shall also show the date of work performed by their own forces along with the corresponding dollar value of the work. 12.10 Decertification of DBE. If a DBE subconsultant is decertified during the life of the Agreement, the decertified subconsultant shall notify the Contracting Party in writing with the date of decertification. If a subconsultant becomes a certified DBE during the life of the Agreement, the subconsultant shall notify the Contracting Party in writing with the date of certification. Any changes should be reported to City's Contract Officer within thirty (30) calendar days. -31- 12.11 Progress Payments. For projects awarded after March 1, 2020, but before September 1, 2023: No later than the 10th of the month following the month of any payment(s), the Contracting Party must submit an invoice for payment along with Exhibit 9-F: Monthly Disadvantaged Business Enterprise (DBE) Payment to the Caltrans Business Support Unit at Business.Support.Unit(a�_dot.ca.gov. Provide a copy to the City. For projects awarded on or after September 1, 2023: Exhibit 9-F is no longer required. Instead, by the 15th of the month following the month of any payment(s), the Contracting Party must now submit Exhibit 9-P to the City. If the Contracting Party does not make any payments to subconsultants, supplier(s), and/or manufacturers Contracting Party must report "no payments were made to subs this month" and write this visibly and legibly on Exhibit 9-P. 12.12 Subcontracting. Any subcontract entered into as a result of this agreement shall contain all of the provisions of this section. 13. MISCELLANEOUS PROVISIONS. 13.1 Notice. Any notice, demand, request, consent, approval, or communication either party desires or is required to give the other party or any other person shall be in writing and either served personally or sent by prepaid, first-class mail to the address set forth below. Either party may change its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated forty-eight (48) hours from the time of mailing if mailed as provided in this Section. To City: CITY OF LA QUINTA Attention: Bryan McKinney, PE 78495 Calle Tampico La Quinta, California 92253 To Contracting Party: MARK THOMAS Paul Mittica, PE 4200 Concours Street, Suite 330 Ontario, CA 91764 13.2 Contracting Party's Reports or Meetings. The Contracting Party shall submit progress reports at least once a month. The report should be sufficiently detailed for the City' Contract Officer to determine, if the Contracting Party is performing to expectations, or is on schedule; to provide communication of interim findings, and to sufficiently address any difficulties or special problems encountered, so remedies can be developed. 13.3 Interpretation. The terms of this Agreement shall be construed in accordance with the meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 13.4 Section Headings and Subheadings. The section headings and subheadings contained in this Agreement are included for convenience only and shall not limit or otherwise affect the terms of this Agreement. -32- 13.5 Cost Principals. The Contracting Party agrees that 48 CFR Part 31, Contract Cost Principles and Procedures, shall be used to determine the allowability of individual terms of cost. The Contracting Party also agrees to comply with Federal procedures in accordance with 2 CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards. Any costs for which payment has been made to the Contracting Party that are determined by subsequent audit to be unallowable under 48 CFR Part 31 or 2 CFR Part 200 are subject to repayment by the Contracting Party to City. When Contracting Party or Subconsultant is a Non -Profit Organization or an Institution of Higher Education, the Cost Principles for Title 2 CFR Part 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards shall apply. 13.6 Subcontracting. Nothing contained in this Agreement or otherwise, shall create any contractual relation between the City and any Subconsultants, and no sub agreement shall relieve the Contracting Party of its responsibilities and obligations hereunder. The Contracting Party agrees to be as fully responsible to the City for the acts and omissions of its Subconsultants and of persons either directly or indirectly employed by any of them as it is for the acts and omissions of persons directly employed by the Contracting Party. The Contracting Party's obligation to pay its Subconsultants is an independent obligation from the City's obligation to make payments to the Contracting Party. The Contracting Party shall perform the work contemplated with resources available within its own organization and no portion of the work shall be subcontracted without written authorization by the City Contract Officer, except that which is expressly identified in the Schedule of Compensation. Any sub -agreement entered into as a result of this Agreement, shall contain all the provisions stipulated in this entire Agreement to be applicable to Subconsultants unless otherwise noted. Contracting Party shall pay its Subconsultants within Fifteen (15) calendar days from receipt of each payment made to the Contracting Party by the City. Any substitution of Subconsultants must be approved in writing by the City Contract Officer in advance of assigning work to a substitute Subconsultant. 13.7 Prompt Progress Payment. The Contracting Party or subconsultant shall pay to any subconsultant, no later than fifteen (15) days after receipt of each progress payment, unless otherwise agreed to in writing, the respective amounts allowed the Contracting Party on account of the work performed by the subconsultants, to the extent of each subconsultant's interest therein. In the event that there is a good faith dispute over all or any portion of the amount due on a progress payment from the Contracting Party or subconsultant to a subconsultant, the Contracting Party or subconsultant may withhold no more than 150 percent of the disputed amount. Any violation of this requirement shall constitute a cause for disciplinary action and shall subject the licensee to a penalty, payable to the subconsultant, of 2 percent of the amount due per month for every month that payment is not made. In any action for the collection of funds wrongfully withheld, the prevailing party shall be entitled to his or her attorney's fees and costs. The sanctions authorized under this requirement shall be separate from, and in addition to, all other remedies, either civil, administrative, or criminal. This clause applies to both DBE and non -DBE subconsultants. -33- 13.8 Prompt Payment of Withheld Funds to Subconsultants. No retainage will be held by the City from progress payments due to the Contracting Party. The Contracting Party and subconsultants are prohibited from holding retainage from subconsultants. Any delay or postponement of payment may take place only for good cause and with the City's prior written approval. Any violation of these provisions shall subject the violating Contracting Party or subconsultant to the penalties, sanctions, and other remedies specified in Section 3321 of the California Civil Code. This requirement shall not be construed to limit or impair any contractual, administrative, orjudicial remedies, otherwise available to the Contracting Party or subconsultant in the event of a dispute involving late payment or nonpayment by the Contracting Party, deficient subconsultant performance and/or noncompliance by a subconsultant. This clause applies to both DBE and non -DBE subconsultants. 13.9 Equipment Purchase. Prior authorization in writing by City Contract Officer shall be required before Contracting Party enters into any unbudgeted purchase order, or subcontract exceeding five thousand dollars ($5,000) for supplies, equipment, or services. Contracting Party shall provide an evaluation of the necessity or desirability of incurring such costs. For purchase of any item, service, or consulting work not covered in Schedule of Compensation and exceeding five thousand dollars ($5,000), with prior authorization by City Contract Officer, three competitive quotations must be submitted with the request, or the absence of proposal must be adequately justified. Any equipment purchased with funds provided under the terms of this Agreement is subject to the following: Contracting Party shall maintain an inventory of all nonexpendable property. Nonexpendable property is defined as having a useful life of at least two years and an acquisition cost of five thousand dollars ($5,000) or more. If the purchased equipment needs replacement and is sold or traded in, City shall receive a proper refund or credit at the conclusion of the Agreement, or if the Agreement is terminated as provided for in Section 8.0, Contracting Party may either keep the equipment and credit City in an amount equal to its fair market value, or sell such equipment at the best price obtainable at a public or private sale, in accordance with established City procedures; and credit City in an amount equal to the sales price. If Contracting Party elects to keep the equipment, fair market value shall be determined at Contracting Party's expense, on the basis of a competent independent appraisal of such equipment. Appraisals shall be obtained from an appraiser mutually agreeable to by City and Contracting Party, if it is determined to sell the equipment, the terms and conditions of such sale must be approved in advance by City. Regulation 2 CFR Part 200 requires a credit to State or Federal funds when participating equipment with a fair market value greater than five thousand dollars ($5,000) is credited to the project. 13.10 Rebates, Kickbacks or Other Unlawful Consideration. The Contracting Party warrants that this Agreement was not obtained or secured through rebates, kickbacks or other unlawful consideration either promised or paid to any City employee. For breach or violation of this warranty, City shall have the right, in its discretion, to -34- terminate this Agreement without liability, to pay only for the value of the work actually performed, or to deduct from this Agreement price or otherwise recover the full amount of such rebate, kickback or other unlawful consideration. 13.11 Prohibition of Expending City, State, or Federal Funds for Lobbying. The Contracting Party certifies, to the best of his or her knowledge and belief, that no State, Federal, or City appropriated funds have been paid or will be paid, by or on behalf of the Contracting Party, to any person for influencing or attempting to influence an officer or employee of any local, State, or Federal agency, a Member of the State Legislature or United States Congress, an officer or employee of the Legislature or Congress, or any employee of a Member of the Legislature or Congress in connection with the awarding or making of this Agreement, or with the extension, continuation, renewal, amendment, or modification of this Agreement. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a member of Congress in connection with this Agreement, the Contracting Party shall complete and submit Standard Form -LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. §1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than ten thousand dollars ($10,000) and not more than one hundred thousand dollars ($100,000) for each such failure. The Contracting Party also agrees by signing this document that he or she shall require that the language of this certification be included in all lower tier sub -agreements, which exceed one hundred thousand dollars ($100,000), and that all such subrecipients shall certify and disclose accordingly. 13.12 Debarment and Suspension Certification. The Contracting Party's signature affixed herein shall constitute a certification under penalty of perjury under the laws of the State of California, that the Contracting Party or any person associated therewith in the capacity of owner, partner, director, officer or manager is not currently under suspension, debarment, voluntary exclusion, or determination of ineligibility by any federal agency; has not been suspended, debarred, voluntarily excluded, or determined ineligible by any federal agency within the past three (3) years; does not have a proposed debarment pending; and has not been indicted, convicted, or had a civil judgment rendered against it by a court of competent jurisdiction in any matter involving fraud or official misconduct within the past three (3) years. Any exceptions to this certification must be disclosed to City. Exceptions will not necessarily result in denial of recommendation for award but will be considered in determining responsibility. Disclosures must indicate the party to whom the exceptions apply, the initiating agency, and the dates of agency action. Exceptions to the Federal Government Excluded Parties List System maintained by the U.S. General Services Administration are to be determined by FHWA. 13.13 Funding Requirements. It is mutually understood between the parties that this Agreement may have been written before ascertaining the availability of funds or -35- appropriation of funds, for the mutual benefit of both parties, in order to avoid program and fiscal delays that would occur if the Agreement were executed after that determination was made. This Agreement is valid and enforceable only if sufficient funds are made available to City for the purpose of this Agreement. In addition, this Agreement is subject to any additional restrictions, limitations, conditions, or any statute enacted by the Congress, State Legislature, or City governing board that may affect the provisions, terms, or funding of this Agreement in any manner. It is mutually agreed that if sufficient funds are not appropriated, this Agreement may be amended to reflect any reduction in funds. City has the option to terminate the Agreement pursuant to Section 8.0 or by mutual agreement to amend the Agreement to reflect any reduction of funds. 13.14 Contingent Fee. Contracting Party warrants, by execution of this Agreement that no person or selling agency has been employed, or retained, to solicit or secure this Agreement upon an agreement or understanding, for a commission, percentage, brokerage, or contingent fee, excepting bona fide employees, or bona fide established commercial or selling agencies maintained by Contracting Party for the purpose of securing business. For breach or violation of this warranty, City has the right to annul this Agreement without liability; pay only for the value of the work actually performed, or in its discretion to deduct from the Agreement price or consideration, or otherwise recover the full amount of such commission, percentage, brokerage, or contingent fee. 13.15 Inspection of Work. Contracting Party and any subconsultant shall permit City, the State, and the FHWA if federal participating funds are used in this Agreement; to review and inspect the project activities and files at all reasonable times during the performance period of this Agreement. 13.16 Safety. Contracting Party shall comply with OSHA regulations applicable to Contracting Party regarding necessary safety equipment or procedures. Contracting Party shall comply with safety instructions issued by City Safety Officer and other City representatives. Contracting Party personnel shall wear hard hats and safety vests at all times while working on the construction project site. Pursuant to the authority contained in Vehicle Code §591, City has determined that such areas are within the limits of the project and are open to public traffic. Contracting Party shall comply with all of the requirements set forth in Divisions 11, 12, 13, 14, and 15 of the Vehicle Code. Contracting Party shall take all reasonably necessary precautions for safe operation of its vehicles and the protection of the traveling public from injury and damage from such vehicles. Contracting Party must have a Division of Occupational Safety and Health (CAL -OSHA) permit(s), as outlined in Labor Code §6500 and §6705, prior to the initiation of any practices, work, method, operation, or process related to the construction or excavation of trenches which are five (5) feet or deeper. Any subcontract entered into as a result of this contract shall contain all of the provisions of this Section. 13.17 Claims Filed by City's Construction Contractor. If claims are filed by City's construction contractor relating to work performed by Contracting Party's personnel, and additional information or assistance from Contracting Party's personnel is required in order to evaluate or defend against such claims; Contracting Party agrees to make its -36- personnel available for consultation with City's construction contract administration and legal staff and for testimony, if necessary, at depositions and at trial or arbitration proceedings. Contracting Party's personnel that City considers essential to assist in defending against construction contractor claims will be made available on reasonable notice from City. Consultation or testimony will be reimbursed at the same rates, including travel costs that are being paid for Contracting Party's personnel services under this Agreement. Services of Contracting Party's personnel in connection with City's construction contractor claims will be performed pursuant to a written contract amendment, if necessary, extending the termination date of this Agreement in order to resolve the construction claims. 13.18 National Labor Relations Board Certification. In accordance with Public Contract Code §10296, Contracting Party hereby states under penalty of perjury that no more than one final unappealable finding of contempt of court by a federal court has been issued against Contracting Party, within the immediately preceding two-year period, because of Contracting Party's failure to comply with an order of a federal court that orders Contracting Party to comply with an order of the National Labor Relations Board. 13.19 Counterparts. This Agreement may be executed in counterparts, each of which shall be deemed to be an original, and such counterparts shall constitute one and the same instrument. 13.20 Integrated Agreement. This Agreement including the exhibits hereto is the entire, complete, and exclusive expression of the understanding of the parties. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements, and understandings, if any, between the parties, and none shall be used to interpret this Agreement. 13.21 Amendment. No amendment to or modification of this Agreement shall be valid unless made in writing and approved by Contracting Party and by the City Council of City. The parties agree that this requirement for written modifications cannot be waived and that any attempted waiver shall be void. Contracting Party shall only commence work covered by an amendment after the amendment is executed and notification to proceed has been provided by City Contract Officer. 13.22 Severability. In the event that any one or more of the articles, phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable, such invalidity or unenforceability shall not affect any of the remaining articles, phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 13.23 Unfair Business Practices Claims. In entering into this Agreement, Contracting Party offers and agrees to assign to City all rights, title, and interest in and to -37- all causes of action it may have under Section 4 of the Clayton Act (15 U.S.C. § 15) or under the Cartwright Act (Chapter 2, (commencing with Section 16700) of Part 2 of Division 7 of the Business and Professions Code), arising from purchases of goods, services, or materials related to this Agreement. This assignment shall be made and become effective at the time City renders final payment to Contracting Party without further acknowledgment of the parties. 13.24 No Third -Party Beneficiaries. With the exception of the specific provisions set forth in this Agreement, there are no intended third -party beneficiaries under this Agreement and no such other third parties shall have any rights or obligations hereunder. 13.25 Authority. The persons executing this Agreement on behalf of each of the parties hereto represent and warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and (iv) that entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. This Agreement shall be binding upon the heirs, executors, administrators, successors, and assigns of the parties. [SIGNATURES ON FOLLOWING PAGE] OWN IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below. CITY OF LA QUINTA, a California Municipal Corporation JON VC.WLEN, City Manager QAtrof La Quinta, California Dated: 'h 51d-0 -' ATTEST: MONIKA RADEVA, ( La Quinta, California lerk APPROVED AS TO FORM: WILLIAM H. IHRKE, City Attorney City of La Quinta, California -39- CONTRACTING PARTY: SIGNED IN COUNTERPART By: Name: Zach Siviglia Title: President/CEO SIGNED IN COUNTERPART By: Name: Matt Brogan Title: Vice President/Secretary IN WITNESS WHEREOF, the parties have executed this Agreement as of the dates stated below. CITY OF LA QUINTA, a California Municipal Corporation SIGNED IN COUNTERPART JON MCMILLEN, City Manager City of La Quinta, California Dated: ATTEST: SIGNED IN COUNTERPART MONIKA RADEVA, City Clerk La Quinta, California APPROVED AS TO FORM: SIGNED IN COUNTERPART WILLIAM H. IHRKE, City Attorney City of La Quinta, California -39- CONTRACTING PARTY: By: Name: Zach Siviglia Title: President/CEO By: Name: Matt Brogan Title: Vice President/Secretary ADDENDUM TO AGREEMENT If the Scope of Services include construction, alteration, demolition, installation, repair, or maintenance affecting real property or structures or improvements of any kind appurtenant to real property, the following apply: 1. Prevailing Wage Compliance. If Contracting Party is a contractor performing public works and maintenance projects, as described in this Section 1.3, Contracting Party shall comply with applicable Federal, State, and local laws. Contracting Party is aware of the requirements of California Labor Code Sections 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Sections 16000, et seq., (collectively, the "Prevailing Wage Laws"), and La Quinta Municipal Code Section 3.12.040, which require the payment of prevailing wage rates and the performance of other requirements on "Public works" and "Maintenance" projects. If the Services are being performed as part of an applicable "Public works" or "Maintenance" project, as defined by the Prevailing Wage Laws, and if construction work over twenty- five thousand dollars ($25,000.00) and/or alterations, demolition, repair or maintenance work over fifteen thousand dollars ($15,000.00) is entered into or extended on or after January 1, 2015 by this Agreement„ Contracting Party agrees to fully comply with such Prevailing Wage Laws including, but not limited to, requirements related to the maintenance of payroll records and the employment of apprentices. Pursuant to California Labor Code Section 1725.5, no contractor or subcontractor may be awarded a contract for public work on a "Public works" project unless registered with the California Department of Industrial Relations ("DIR") at the time the contract is awarded. If the Services are being performed as part of an applicable "Public works" or "Maintenance" project, as defined by the Prevailing Wage Laws, this project is subject to compliance monitoring and enforcement by the DIR. Contracting Party will maintain and will require all subcontractors to maintain valid and current DIR Public Works contractor registration during the term of this Agreement. Contracting Party shall notify City in writing immediately, and in no case more than twenty-four (24) hours, after receiving any information that Contracting Party's or any of its subcontractor's DIR registration status has been suspended, revoked, expired, or otherwise changed. It is understood that it is the responsibility of Contracting Party to determine the correct salary scale. Contracting Party shall make copies of the prevailing rates of per diem wages for each craft, classification, or type of worker needed to execute the Services available to interested parties upon request and shall post copies at Contracting Party's principal place of business and at the project site, if any. The statutory penalties for failure to pay prevailing wage or to comply with State wage and hour laws will be enforced. Contracting Party must forfeit to City TWENTY-FIVE DOLLARS ($25.00) per day for each worker who works in excess of the minimum working hours when Contracting Party does not pay overtime. In accordance with the provisions of Labor Code Sections 1810 et seq., eight (8) hours is the legal working day. Contracting Party also shall comply with State law requirements to maintain payroll records and shall provide for certified records and inspection of records as required by California Labor Code Section 1770 et seq., including Section 1776. In addition to the other indemnities provided under this Agreement, Addendum Page 1 of 3 Last revised summer 2017 Contracting Party shall defend (with counsel selected by City), indemnify, and hold City, its elected officials, officers, employees, and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. It is agreed by the parties that, in connection with performance of the Services, including, without limitation, any and all "Public works" (as defined by the Prevailing Wage Laws), Contracting Party shall bear all risks of payment or non-payment of prevailing wages under California law and/or the implementation of Labor Code Section 1781, as the same may be amended from time to time, and/or any other similar law. Contracting Party acknowledges and agrees that it shall be independently responsible for reviewing the applicable laws and regulations and effectuating compliance with such laws. Contracting Party shall require the same of all subcontractors. 2. Retention. Payments shall be made in accordance with the provisions of Section 2.0 of the Agreement. In accordance with said Sections, City shall pay Contracting Party a sum based upon ninety-five percent (95%) of the Contract Sum apportionment of the labor and materials incorporated into the Services under this Agreement during the month covered by said invoice. The remaining five percent (5%) thereof shall be retained as performance security to be paid to Contracting Party within sixty (60) days after final acceptance of the Services by the City Council of City, after Contracting Party has furnished City with a full release of all undisputed payments under this Agreement, if required by City. In the event there are any claims specifically excluded by Contracting Party from the operation of the release, City may retain proceeds (per Public Contract Code § 7107) of up to one hundred fifty percent (150%) of the amount in dispute. City's failure to deduct or withhold shall not affect Contracting Party's obligations under the Agreement. 3. Utility Relocation. City is responsible for removal, relocation, or protection of existing main or trunk -line utilities to the extent such utilities were not identified in the invitation for bids or specifications. City shall reimburse Contracting Party for any costs incurred in locating, repairing damage not caused by Contracting Party, and removing or relocating such unidentified utility facilities. Contracting Party shall not be assessed liquidated damages for delay arising from the removal or relocation of such unidentified utility facilities. 4. Trenches or Excavations. Pursuant to California Public Contract Code Section 7104, in the event the work included in this Agreement requires excavations more than four (4) feet in depth, the following shall apply: (a) Contracting Party shall promptly, and before the following conditions are disturbed, notify City, in writing, of any: (1) material that Contracting Party believes may be material that is hazardous waste, as defined in Section 25117 of the Health and Safety Code, that is required to be removed to a Class I, Class II, or Class I I I disposal site in accordance with provisions of existing law; (2) subsurface or latent physical conditions at the site different from those indicated by information about the site made available to bidders prior to the deadline for submitting bids; or (3) unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generally recognized as inherent in work of the character provided for in the Agreement. Addendum Page 2of3 (b) City shall promptly investigate the conditions, and if it finds that the conditions do materially so differ, or do involve hazardous waste, and cause a decrease or increase in Contracting Party's cost of, or the time required for, performance of any part of the work shall issue a change order per Section 1.8 of the Agreement. (c) in the event that a dispute arises between City and Contracting Party whether the conditions materially differ, or involve hazardous waste, or cause a decrease or increase in Contracting Party's cost of, or time required for, performance of any part of the work, Contracting Party shall not be excused from any scheduled completion date provided for by this Agreement, but shall proceed with all work to be performed under this Agreement. Contracting Party shall retain any and all rights provided either by contract or by law which pertain to the resolution of disputes and protests between the contracting Parties. 5. Safety. Contracting Party shall execute and maintain its work so as to avoid injury or damage to any person or property. In carrying out the Services, Contracting Party shall at all times be in compliance with all applicable local, state, and federal laws, rules and regulations, and shall exercise all necessary precautions for the safety of employees appropriate to the nature of the work and the conditions under which the work is to be performed. Safety precautions as applicable shall include, but shall not be limited to: (A) adequate life protection and lifesaving equipment and procedures; (B) instructions in accident prevention for all employees and subcontractors, such as safe walkways, scaffolds, fall protection ladders, bridges, gang planks, confined space procedures, trenching and shoring, equipment and other safety devices, equipment and wearing apparel as are necessary or lawfully required to prevent accidents or injuries; and (C) adequate facilities for the proper inspection and maintenance of all safety measures. Addendum Page 3 of 3 [See Attached] Exhibit A Exhibit A Page 1of1 EXHIBIT A SCOPE OF WORK TASK 1. PROJECT MANAGEMENT/ ADMINISTRATION (PHASE I / PHASE II & III) TASK 1.1. PROJECT MANAGEMENT/ ADMINISTRATION (PHASE 1) Task 1.1.1. Project Management (Phase 1) Coordination and Communications: Establish and implement a project document/correspondence management and distribution system to assure that information flows between all parties of the Project as intended. 1. Communicate regularly with the City and project development team by telephone, email, written correspondence, and face-to-face meetings on a monthly basis throughout the term of the contract. 2. Maintain a project contact list with names and contact information for all project development team members. 3. Prepare, maintain, and update an Action Item Log for review during monthly Project Development Team (PDT) meetings. 4. Prepare a project chronology listing all key decisions made over the life of the project and update for review during monthly PDT meetings. 5. Prepare a Submittal/Deliverable log and update for review during PDT meetings. Scheduling: Prepare a detailed project baseline schedule using a work breakdown structure (WBS) consistent with this Scope of Work. Update and distribute one week in advance of each PDT Meeting. The schedule will include the following information: 1. Task dependencies as predecessors and successors 2. Anticipated task durations with beginning and end dates 3. Critical path with milestones and percent completes for each task Budgeting: Monitor the budget for design services using a work breakdown structure consistent with this Scope of Work on a monthly basis. Project Administration: 1. Set up project accounting system consistent with the City's invoicing and tracking requirements. 2. Prepare subconsultant agreements. 3. Monitor subconsultant progress and review/approve invoices. 4. Prepare monthly progress reports and invoices in accordance with City guidelines. Monthly reports providing actual physical progress will be provided with every invoice. DELIVERABLES Monthly Progress Reports and Invoice Packages Task 1.1.2. Project Team Meetings (Phase 1) Organize, schedule, and chair meetings and conference calls as necessary to provide progress updates, coordinate between technical disciplines, and facilitate overall project communication. The engineering design and environmental team PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 1 leaders shall attend the PDT meetings as appropriate. Prepare meeting agendas and minutes within one week of the meeting for all meetings. 1. Kickoff Meeting (assume 1) 2. Virtual PDT Meetings (assume 8) 3. Virtual Meetings with Caltrans, as needed (assume 4) 4. Public Information Meetings for NEPA and CEQA compliance (assume 1) DELIVERABLES Meeting notices, agendas, special exhibits, and minutes including all items listed in Task 1.1.1. Task 1.1.3. City Council Presentations (Phase 1) - OPTIONAL Mark Thomas will develop project presentation materials for up to one (1) presentation to be given at City Council meetings. Mark Thomas, project manager and project director, will attend the presentation. Project presentation materials will include a PowerPoint presentation and exhibits compiled from existing project information. DELIVERABLES City Council Presentation (assume 1) Task 1.1.4. Quality Control and Quality Assurance (QC/QA) (Phase 1) Establish and implement a quality control process and plan to verify that all deliverables are complete and accurate, the plan shall include but not limited to, ensuring that design calculations are independently checked and that documents are checked, corrected, and backchecked for accuracy and completeness. Subconsultant report submittals will be reviewed to confirm that appropriate background information, study methodology, interpretation of data, and format and content are completed in accordance with current standards. The QC/QA Plan will be submitted for City review and approval. DELIVERABLES QC/QA Plan TASK 1.2. PROJECT MANAGEMENT/ ADMINISTRATION (PHASE II & III) Task 1.2.1. Project Management (Phase II & III) See Scope for Task 1.1.1. DELIVERABLES Monthly Progress Reports and Invoice Packages Task 1.2.2. Project Team Meetings (Phase II & III) See Scope for Task 1.1.2. 1. Kickoff Meeting (assume 1) 2. PDT Meetings: Monthly Meeting (assume 12) 3. Meetings with Caltrans, as needed (assume 4) DELIVERABLES Meeting notices, agendas, special exhibits, and minutes Task 1.2.3 City Council Presentations (Phase II & III) — OPTIONAL See Scope for Task 1.1.3. DELIVERABLES PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 2 Commission and/or City Council Presentations (assume 2) TASK 2. SURVEY (PHASE 1) TASK 2.1. ENCROACHMENT PERMITS AND PERMIT(S) TO ENTER Mark Thomas will coordinate with the City and CVWD to obtain all required encroachment permits and permit(s) needed for Phase I field activities. As directed by City, Mark Thomas shall prepare and submit all permit applications. All permit filing fees are to be paid by City. This task excludes encroachments required for the project potholing (noted in separate task), construction, and final permit rights with CVWD and/or environmental regulatory agency permits. TASK 2.2. SURVEY RESEARCH Mark Thomas will perform research and request records including recorded and filed maps and deeds.; required to identify, locate, and layout general locations of rights-of-way, easements and property lines impacting the project. A field investigation will be performed to assess existing site conditions. TASK 2.3. SITE RECONNAISSANCE Mark Thomas will conduct a site reconnaissance with the City and Caltrans as required by the Caltrans Local Assistance Procedures Manual Chapter 7, including review of the affected streets, existing improvements, and surrounding areas. TASK 2.4. RECORD DRAWING REVIEW Obtain and review existing record drawings to become familiar with on-site infrastructure and structures. TASK 2.5. SURVEYING Set control and perform a topographic survey along the alignment of the new improvements. Contract with subconsultant to provide aerial topo mapping of project area plus 50 -foot buffer at a scale of T' = 40' with 1'contour interval. Provide digital color orthophotos of the project. Include in the topographic survey: Provide topographic survey using City provided datum (CCS83 Zone 6 (2017.5 epoch)) from street right-of-way to right- of-way limits and to curb returns at intersecting streets along alignment and elevations at the grading conform limits at proposed right of way needs areas. A mobile LiDAR scanner is assumed to be utilized to collect design -level topography for the project extents. Provide one (1) -foot contours based on City of La Quinta vertical datum (NGVD 29). Provide spot elevations at critical locations along the alignment to verify vertical control, provide inverts of wet utilities as accessible from the surface (such as sewer and storm manholes and storm drain inlets), and determine curb & gutter elevations necessary to design pavement and drainage improvements. Survey inverts of surface accessible storm drain utilities crossing (culverts) crossing the project area. Show surface features and visible indications of existing utilities based on NAD 83 horizontal control to include curbs and gutters, sidewalks, existing structures, and other elements relevant to prepare a comprehensive topographic map suitable for roadway design and construction. Provide the survey control and benchmark information to be used for construction Perform a site topographic survey to the extent necessary for design and construction. 1 day of traffic control to measure inverts TASK 2.6. MONUMENTS & RIGHT OF WAY Provide assessor level GIS data including owner names and Assessor Parcel Number (APN) for properties adjacent to the project route and georeferenced this data to project control. This effort will be based only upon publicly available information from County. Tie monuments in the area of CVWD crossing and Golf Course to resolve right-of-way and boundary lines impacted by the potential acquisition. It is possible during this task that information will be uncovered requiring the filing of a Record of Survey (ROS) under Business and Professionals Code. If this information is discovered, PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 3 Mark Thomas will discuss with the client to reach agreement on separate scope and fee before moving forward with additional work. Up to two (2) preliminary title reports will be provided by Mark Thomas. TASK 2.7. LOCATE POTHOLE REFERENCE MARKS Mobilize for one day to survey surface elevation and location of reference marks created by potholing effort. It is assumed no traffic control will be necessary (reference marks set out of traffic area) and that all reference sheets will be provided before mobilization. DELIVERABLES Encroachment Permit(s) Permit to Enter Letters / Tracking Matrix Aerial topography and imaging Supplemental design survey and utility dips Existing centerline and right of way boundaries along construction impact areas, as needed Basis -of -bearing and benchmark information Survey Base mapping including LandNET / pre -construction right of way boundary mapping Two (2) Preliminary Title Reports TASK 3 UTILITY COORDINATION (PHASE I / PHASE II) TASK 3.1. UTILITY COORDINATION (PHASE 1) Task 3.1.1. Utility 'A' Letters - Mapping Requests (Phase 1) Mark Thomas shall perform a utility search along Avenue 50 for available as -built plans for the project area. Mark Thomas shall research records for both public andfranchise utilities and shall plot the location of all existing facilities. Mark Thomas shall include preparation of a database of utility records indicating the type of utility, owner, drawing number, and other vital information. The identified utility companies shall be sent a letter on City's letterhead requesting information regarding existing and proposed utilities. Task 3.1.2. Existing Utility Mapping (Phase 1) Using the information obtained, Mark Thomas shall prepare a utility base map which shall be the basis of the Utility Information Sheet. Mark Thomas shall prepare a Utility Information Sheet. The names of all utilities and points of contact shall be developed. A description of the location and existing facilities for the project shall be prepared. Task 3.1.3. Utility Prior Rights Identification (Phase 1) Mark Thomas shall coordinate with utility staff and review record research/title report to understand superior rights to preliminarily determine liability. Mark Thomas will assist the City with liability claims and potential reimbursement/agreement planning for the project. DELIVERABLES Utility 'X I-etters Utility Mapping Utility Prior Rights Identification TASK 3.2. UTILITY COORDINATION (PHASE 11) Task 3.2.1. Utility Potholing (8) (Phase 11) If necessary, Mark Thomas will coordinate with City and other agencies to arrange for potholing to confirm existing underground facilities. It is assumed that no more than eight (8) pothole locations shall be needed. Mark Thomas will prepare potholing exhibits to adequately locate underground utilities, shall enter a contract with a licensed contractor for the potholing of utilities, and shall verify appropriate permits are obtained from all appropriate jurisdictions prior to the start of work. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 4 Mark Thomas shall evaluate the potholing data and shall include the information on the utility plans in table format, with numbered or letter references to the location of the potholes. Task 3.2.2. Utility Coordination/Conflict Mapping (Phase II) Mark Thomas shall designate dedicated staff who shall be responsible for all coordination work related to utilities for the Project, including but not limited to relocations of existing trunk and mainline facilities, installation of new trunk and mainline facilities, relocation of existing electric and water services, and installation of new electric and water services. Mark Thomas will provide services here within this task to assist and provide backup to the City to gain approval of the right of way certification and E-76 from Caltrans Local assistance; including the utility tracking matrix, record of information, utility relocation design(s)/estimate(s), final claim letter(s), construction schedule, pertinent correspondence letters and final agreements (if needed). Utility agreements are provided within a separate scope per Task 9.2. Mark Thomas shall coordinate with utility owners' staff with respect to all utility related matters. Mark Thomas shall provide copies of all correspondence with utility companies and other utility related information to the City. Correspondence, as described herein, shall be prepared by Mark Thomas for City signature, as appropriate, and as directed by the City. Mark Thomas shall identify utility companies affected by the project and delineate utilities within the project's sphere of influence on the plans. Mark Thomas shall prepare preliminary plans, which shall include all existing utilities (above ground and below ground) identified by location, size, type, and owner, as appropriate. Mark Thomas shall check horizontal and vertical clearances for utilities and coordinate design with the various utility companies to address conflicts. The plans will be the basis for determining and communicating conflicts with utility owners. Mark Thomas shall send preliminary design plans through City staff to utility companies within the project limits with requests for review and comments on the plans relevant to their respective facilities, and with requests for other project specific information. Mark Thomas shall monitor responses to utility notices received and make recommendations for mitigating conflicts. Mark Thomas shall provide written responses to utility companies with regard to stated concerns and conduct design coordination meetings with utility companies as needed. Unresolved issues shall be brought to the attention of the City as early as practical. Utility conflict issues shall be resolved prior to the completion of the final design plans as follows: Mark Thomas, through City staff, shall request and obtain a written acknowledgement of any conflicts from the respective utility owners. Mark Thomas will make reasonable efforts to accommodate utility company requests for minor design changes to accommodate their facilities. Mark Thomas understands that the utility companies are generally operating within the City right-of-way but may have prior rights to that of the City in some cases. Mark Thomas shall coordinate the inclusion of special provisions in the City's bid documents for adjustments and relocations of utility facilities as alternate bid items, if requested by the owning utility. DELIVERABLES Utility Potholing, up to eight (8) potholes Utility '13' Letters Utility Conflict Mapping Utility Coordination Matrix Utility Record of Information package Utility relocation design and estimate (provided by Utility Owner unless explicitly specified in this scope) Utility Claim Letter (provided by utility owner) and Response (provided by Mark Thomas) Utility relocation construction schedule (provided by Utility Owner unless explicitly specified in this scope) TASK 4. GEOTECHNICAL ANALYSIS (PHASE 1) TASK 4.1. PRELIMINARY FOUNDATION REPORT EMI will prepare a Preliminary Foundation Report (PFR) for the bridges to provide preliminary geotechnical information to assist structural designers in the Type Selection process including responding to Caltrans comments on the PFR. This PFR will be prepared using the available subsurface data and the format will be in accordance with the current Caltrans Guidelines. In addition, EMI will obtain a representative surficial soil specimen for scour study. Specimen will be collected PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 5 using a shovel at a depth of about 1 to 2 feet below the channel bottom. Sieve analysis will be performed and results will be emailed to Mark Thomas. DELIVERABLES Preliminary Foundation Report TASK 5. HYDRAULIC ANALYSIS (PHASE 1) The Mark Thomas team shall assist the City with coordinating the responsibility of the channel analysis with CVWD. TASK 5.1. REGIONAL FLOW RATE ANALYSIS - OPTIONAL Due to the complexity of the upstream drainage system, and the relatively recent modification by CVWD on design storm standards, the 100 -Year flow rate for the La Qunita Evacuation Channel is unknown. CVWD has stated that the flow rate is believed to be between 2,000 cfs and 4,000 cfs. To determine the design flow rate more accurately, Webb Associates will perform the following tasks to establish the 100 -Year flow rate of the existing La Quinta Evacuation Channel: Watershed Delineation — WEBB will delineate the watershed tributary to the channel upstream of the proposed Avenue 50 Bridge using HUC-12 Watershed Shapefiles and FEMA LIDAR Topography for the Coachella Valley. HEC -HMS Hydrological Analysis — WEBB will further divide the tributary watershed into smaller subareas and prepare a HEC -HMS model using CVWD Methodology. The synthetic unit hydrographs generated by the HEC -HMS Model will be input into the 2-D HEC -RAS Model. Regional Storm Drain System Research — part of the complexity of the drainage system tributary to the proposed Avenue 50 Bridge is the existing network of underground storm drains and channels. WEBB will obtain all available As -Built plans for the drainage system to input into the hydraulic model, including drainage plans and studies from the private developments. 2-D HEC -RAS Model Routing — WEBB will prepare a 2-D HEC -RAS Model to route the inflow hydrographs through the existing drainage system to downstream of Avenue 50. This model will establish the flow rate that will be used for the hydraulic analysis of the proposed bridge. Sensitivity Analysis — performing a sensitivity analysis is an important step in the development of models. To perform this analysis WEBB will vary the various model parameters to determine how sensitive model results are to each particular parameter. Where model results are highly sensitive on a parameter additional justification and/or refinement will be provided as to why a particular parameter was selected. Technical Memorandum — WEBB will prepare a Technical Memorandum that documents the development and results of the hydrological and hydraulic models prepared as part of this Task. This work will be done in direct coordination with CVWD and assumed to be accomplished with two (2) meetings, one (1) submittal with two (2) plan review cycles. 111 IF -11.1 114;wa 1.1 a IDIA 4F-11yd4:,.IiilTI4-1:Wd01:7AII4181MJ_IW&I1.1 Webb Associates will analyze and prepare the following to determine the hydraulic calculations and analysis required for the bridge type selection requirements and accompany the draft/final CVWD permit application with plans for approval: Preliminary Bridge Hydraulic Analysis — WEBB will prepare a one-dimensional hydraulic analysis of existing conditions and up to three preliminary bridge alternatives using HEC -RAS and the design flow rate established in previous task. Preliminary Scour Analysis — WEBB will prepare preliminary scour calculations for existing and proposed bridge alternatives using CVWD's methodology. Scour depths are established using a combination of General Scour using the Blench Regime and Local Scour. Prepare Preliminary Bridge Design Hydraulic/Scour Report — WEBB will prepare a Preliminary Bridge Design Hydraulic/Scour Report to document the results of the hydraulic analysis performed as part of this task. Coordination with CVWD — WEBB will coordinate with CVWD Staff to obtain approval of the model(s) and report. The overall footprint and mitigation for access control and required channel improvements will be discussed and determined with CVWD's staff as part of this task. This work will be done in direct coordination with CVWD and assumed to be accomplished with one (1) meeting, one (1) submittal with two (2) plan review cycles. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 6 TASK 5.3. PRELIMINARY ROADWAY DRAINAGE REPORT / LOCAL DRAINAGE ANALYSIS (AVENUE 50 AND WASHINGTON STREET) Webb Associates will prepare the Hydrology and Hydraulic Report for the City of La Quinta. The reports will include both offsite and onsite hydrologic calculations to recommend any drainage improvements needed as a result of the proposed roadway/bridge. Calculations and concise recommendations will conform to the Riverside County Hydrology and Sedimentation Manual, and City's Storm Drain Design Manual, if applicable. The onsite hydraulic computations will be based on City and County standards. Webb Associates will analyze and prepare the following to determine the local drainage calculations required for the drainage requirements and accompany the draft CVWD permit application with plans for approval: Review Prior Studies — WEBB will obtain and review studies that have previously been prepared to analyze the drainage of the Avenue 50 and Washington Street intersection and other drainage in the area. Supplemental Hydrology — WEBB will prepare additional hydrology calculations as needed for the proposed project including conceptual plan exhibits. Cost Estimate — WEBB will prepare a preliminary cost estimate for the proposed drainage improvement in the Avenue 50 intersection. Technical Memorandum — WEBB will prepare a Technical Memorandum to document the Roadway Drainage and Local Drainage Analysis. DELIVERABLES Regional Flow Rate Technical Memorandum / Calculations Preliminary Bridge Design Hydraulic / Scour Report / Calculations Preliminary Drainage Report / Calculations / Conceptual Plan Exhibit TASK 6. ENVIRONMENTAL APPROVAL (PHASE 1) TASK 6.1. PROJECT INITIATION & PRELIMINARY ENVIRONMENTAL STUDY GPA will review existing documentation, coordinate with the engineering team, and conduct all necessary research to prepare a detailed project description, including project components, purpose and need, environmental study limits (ESL), and timing of construction. The project description will be appropriate for use in all technical studies and environmental documentation and will include maps of the regional area and project area. The FTIP would be revised prior to completion of the Preliminary Environmental Study (PES). GPA will prepare the Draft PES Form. The PES Form will be completed pursuant to Caltrans' SER and LAPM; it will include a reasoned explanation for all checklist answers, and all attachments necessary to support conclusions in the PES. GPA will submit the Draft PES to the City for review and approval. GPA will finalize the revisions, submit the PES to Caltrans, and coordinate as needed for review and approval of the document. DELIVERABLES Preliminary Environmental Study (PES) TASK 6.2. TECHNICAL STUDIES The following technical studies will be required to support the CEQA/NEPA analysis; the technical studies will be prepared by GPA unless otherwise indicated below. If Caltrans determines that the higher levels of technical study for air quality and noise would be required, optional tasks have been included in the SOW to cover that additional effort. Task 6.2.1. Air Quality & Greenhouse Gas Technical Memorandum As a subconsultant to GPA, AMBIENT Air Quality & Noise Consulting (AMBIENT) will prepare a technical Air Quality & Greenhouse Gas (GHG) Technical Memorandum to evaluate short-term construction -related air quality and GHG impacts associated with the proposed project. The technical memorandum will include a summary description of the existing environment, based on existing environmental documentation. Short-term emissions of criteria air pollutants and GHGs will be quantified and summarized in the report. Construction emissions will be quantified based, in part, on project -specific construction information to be provided. The significance of air quality and GHG impacts will be assessed in comparison to PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 7 applicable standards and recommended thresholds. Mitigation measures will be identified for significant and potentially significant impacts. This air quality scope assumes that the proposed project would not result in the construction of additional capacity nor qualify as being inconsistent with the SCAG's Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), it is anticipated that an assessment of long-term air quality impacts would not be required. The FTIP listing may need to be revised based on the findings. Deliverables: One electronic copy of the Draft and Final Air Quality & GHG Technical Memorandum Task 6.2.2. Biological Resources: Natural Environment Study GPA will conduct background research in relevant databases to identify the potential for federally and state listed species or other special -status species to be within the project area. A Biological Study Area (BSA) will be developed that covers direct and indirect impact areas for the project. GPA will survey the BSA for plant and wildlife species, their signs, and/or potential habitat. GPA will inventory botanical and wildlife resources observed in the BSA and will identify and record existing vegetation communities in this area. GPA will summarize the results of the research and surveys in a Natural Environment Study (NES) report. The NES will include a discussion of the existing biological resources in the BSA, potential project impacts on these resources, and proposed measures to avoid, minimize, and or mitigate these impacts. The NES will provide conclusions regarding project impacts on federally and/or state threatened or endangered species and will outline any future protected species consultations that may be required with resource agencies to obtain project approvals. GPA will submit the draft NES to the City for review and approval prior to submittal to Caltrans. Deliverables: One electronic copy of the Draft and Final NES Task 6.2.3. Biological Resources: Aquatic Resources Delineation GPA will delineate jurisdictional wetlands and waters of the United States (U.S.), as defined by the U.S. Army Corps of Engineers (USACE), State Water Resources Control Board, and California Department of Fish and Wildlife (CDFW). To identify the boundaries of the waters of the U.S., the ordinary high-water mark (OHWM) will be identified by GPA for the Evacuation Channel within the BSA. The presence or absence of wetlands in the BSA will be verified through an analysis of hydrologic conditions, hydrophytic vegetation, and hydric soils. GPA will summarize existing site conditions on waters of the U.S. and waters of the state in an Aquatic Resources Delineation (ARD) report. The report will summarize the location of wetlands and other waters underjurisdiction of the USACE, Regional Water Quality Control Board (RWQCB), and CDFW within and immediately adjacent to the project area. GPA will submit the draft report and will coordinate with the City as needed for review and approval prior to submittal to Caltrans. Deliverables: One electronic copy of the Draft and Final ARD Task 6.2.4. Cultural Resources: Area of Potential Effects Map GPA will electronically prepare an Area of Potential Effects (APE) Map. The APE boundary for the proposed undertaking will be delineated in consultation with Caltrans and in accordance with Attachment 3 of the Section 106 Programmatic Agreement and appropriate sections of the SER. It will be broad enough to account for potential effects to adjacent resources while maintaining a reasonable level of effort given the scope of the undertaking. GPA will collaborate internally with specialists during the APE delineation process to ensure that any potential for effects to both built environment and archaeological resources are considered. APE approval is the first step in the Section 106 process through Caltrans; once the APE has been signed, the following cultural resource tasks can commence. Deliverables: One electronic copy of the Draft and Final APE Map Task 6.2.5. Cultural Resources: Section 106 Native American Outreach & AB 52 Native American Outreach Support - OPTIONAL As a subconsultant to GPA, Duke Cultural Resources Management (DUKE CRM) will provide support in required coordination as part of the Assembly Bill (AB) 52 (City as CEQA lead agency) and National Historic Preservation Act (NHPA) (Caltrans as lead agency) process. Under each lead agency, DUKE CRM will prepare letters on City and Caltrans letterhead. Upon approval from the agencies, DUKE CRM will send the letters to Native American groups via U.S. Certified Mail. DUKE CRM will make follow up emails/phone calls to Native American groups. From this point, consultation will take place between the agencies and each Native American group. Limited follow-up/consultation support is anticipated, as all consultation is required to take place between the lead agency and the tribe(s). Deliverables: One electronic copy of the Draft and Final letter to interested parties; follow-up; consultation matrix PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 8 Task 6.2.6. Cultural Resources: Paleontological Identification Report The County of Riverside has classified the project location as high sensitivity for paleontology at or near the surface. Therefore, as a subconsultant to GPA, DUKE CRM proposes to prepare a Caltrans format combined Paleontological Identification Report (PIR)/Paleontological Evaluation Report (PER). This will involve a paleontological records search at the San Bernardino County Museum and the Western Science Center and archival research related to geology and paleontology. A paleontological field survey will also be conducted of the project area and focused on geologic exposures. The report will include a project description, setting, methods, results, paleontological sensitivity, potential impacts, and recommendations sections. Deliverables: One electronic copy of the Draft and Final PIR/PER Task 6.2.7. Cultural Resources: Archaeological Survey Report As a subconsultant to GPA, DUKE CRM will conduct research at the Eastern Information Center, Native American Heritage Commission, and on-line historic aerial maps, historic topographic maps of the area, and additional on-line research, as necessary. Following the research and after the APE Map is approved by Caltrans, DUKE CRM will conduct a systematic pedestrian field survey of the APE. If there are any archaeological resources within the project boundaries, additional budget will be required to document and evaluate any resources on State of California Department Parks and Recreation (DPR) Site Forms. DUKE CRM will prepare a Caltrans format Archaeological Survey Report (ASR), submit for City review, and process through Caltrans following City approval. Deliverables: One electronic copy of the Draft and Final ASR Task 6.2.8. Cultural Resources: Historic Properties Survey Report The Historic Properties Survey Report (HPSR) is the umbrella document that Caltrans uses for compliance with Section 106. This document includes a summary of the records search, Native American consultation, and Section 106 findings. GPA will prepare the HPSR in accordance with all Caltrans requirements; the ASR (with Native American outreach results) and APE Map will be attached to it as supporting documentation. Deliverables: One electronic copy of the Draft and Final HPSR Task 6.2.9. Cultural Resources: Section 106 Outreach (Interested Parties)- OPTIONAL GPA will assist the City and Caltrans in conducting outreach to potentially interested parties in accordance with established Section 106 procedures. GPA will prepare a draft of the letter for the City and Caltrans to review. Interested parties letters will be sent on Caltrans letterhead and signed by Caltrans Professionally Qualified Staff. GPA will send digital copies of the letters to recipients and follow up via phone or email at least three weeks after digital letters are sent. Deliverables: One electronic copy of the Draft and Final letter to interested parties; follow-up email Task 6.2.10. Hazardous Materials: Phase I Initial Site Assessment with Site Investigation Results As a sub -consultant to GPA, Crawford & Associates, Inc. (Crawford) will prepare a Phase I Initial Site Assessment (ISA) to identify evidence of Recognized Environmental Conditions (RECs) at the bridge site, and evaluate if conditions on adjacent properties have, or have the potential to, impact the project area. The ISA will be prepared to ASTM E1527- 21 (modified) and Caltrans standards. Due to the age of the roadways and previous agriculture use nearby, shallow soil samples will be collected and tested for aerially deposited lead (ADL) and organochlorine pesticides (OCPs). In addition, traffic striping will be tested for select metals and the existing crossing concrete will be tested for asbestos. The results of the ISA and analytical testing, conclusions, and pertinent recommendations will be presented in a Phase I ISA report. Crawford will begin by reviewing and summarizing geologic conditions underlying the project site based on readily available geologic mapping from the U.S. Geological Survey and the California Geological Survey, including an assessment of the potential for naturally occurring asbestos; and a summary of hydrogeologic conditions (including depth to groundwater and regional groundwater flow, if readily available) based on information from websites maintained by the State of California. Then Crawford will contract with Environmental Risk Information Service (ERIS) to provide historical aerial photographs, USGS topographic maps, street directories, and fire insurance maps for the project corridor and adjacent properties. Crawford will summarize the general historical conditions of the project area and historical uses of adjacent properties. Using ERIS, Crawford will review all publicly available federal, state, local, and tribal environmental agency databases for information pertaining to the project area and facilities/properties within ASTM standard search radii applicable to each database. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 9 Once all background research has been completed, Crawford will conduct a site reconnaissance of the project area and adjacent properties to observe current conditions. The reconnaissance will include observations of potential sources of environmental impact to the project area, including use or storage of hazardous materials and wastes; presence of underground or aboveground storage tanks; presence of drums, wells, or electrical equipment; condition of vegetation; presence of noxious odors, stockpiled soil, piled garbage, medical waste, tires and batteries, or sewage/waste disposal; and general geologic, hydrogeologic, and topographic conditions. Where records are missing or incomplete, or where regulatory clarification is needed, Crawford will contact Riverside County Department of Environmental Health or other regulatory personnel to ascertain current environmental conditions. Where warranted, Crawford will attempt to interview current and past owners of adjacent property if contact information is provided. Following these reviews, Crawford will evaluate the risk of potential hazardous materials within and adjacent to the project area. The Phase I ISA will be prepared summarizing the findings of review and site reconnaissance. The report will address identified potential contamination and hazardous material impacts to provide recommendations for investigation and analysis of any potential impacts, as appropriate. The draft ISA will be submitted for City review; Crawford will incorporate responses to comments into the document and prepare a final draft for submittal to Caltrans. Washington Street and Avenue 50 are visible in imagery from Google Earth dated 1985. This suggests that these streets were used for vehicle traffic during the late states of leaded gasoline usage in California; ADL is of potential concern. This imagery also suggests that some of the properties in the project site vicinity were used for agriculture that might have included use of OCPs. White and yellow traffic striping is visible in Google Earth imagery. Crawford will collect soil samples from up to seven locations to analyze for the presence of these compounds. All 21 soil samples will be analyzed for total lead (Environmental Protection Agency [EPA] 6010), six samples will be analyzed for OCPs (EPA 8141), and two samples will be analyzed for pH (EPA 9040). Six soil samples will be further analyzed for soluble lead (WET and TCLP methods). One sample of white traffic striping will be analyzed for total lead, and one sample of yellow traffic striping will be analyzed for total lead and total cadmium. One traffic striping sample will be analyzed for soluble lead (WET and TCLP methods). Two samples of the low water crossing concrete will be analyzed for asbestos. A summary of the methods and results of this sampling will be included in the Phase I ISA. Deliverables: One electronic copy of the Draft and Final Phase I ISA Task 6.2.11. Noise & Groundborne Vibration Technical Memorandum As a subconsultant to GPA, AMBIENT will prepare a technical memorandum to evaluate short-term construction noise and groundborne vibration impacts associated with the project. The technical memorandum will include a description of the existing noise environment, based on existing environmental documentation and a review of site reconnaissance data. Predicted construction -generated noise and groundborne vibration levels will be quantified based, in part, on project - specific construction information to be provided. The significance of noise and groundborne vibration impacts will be assessed in comparison to applicable standards and recommended thresholds. Mitigation measures will be identified for significant and potentially significant impacts, if any. Analysis of long-term traffic noise and vibration impacts is not anticipated to be required and is not included. Deliverables: One electronic copy of the Draft and Final Technical Memorandum Task 6.2.12: Abbreviated Visual Impact Assessment As part of the development of this scope of work, GPA completed the Caltrans Questionnaire to Determine Visual Impact Assessment (VIA) Level. The results of the questionnaire identified an Abbreviated VIA as the appropriate level of document for the project. GPA will prepare an Abbreviated VIA in accordance with Caltrans requirements and the Caltrans VIA Annotated Outline, to analyze the changes in the visual setting that may result from the project. The Abbreviated VIA will include a description of the existing visual setting, key viewsheds/viewpoints, and project features. The report will analyze visual impacts resulting from the project and, if necessary, identify measures to reduce these impacts. Deliverables: One electronic copy of the Draft and Final Abbreviated VIA Task 6.2.13: Water Quality Assessment Report GPA will prepare a Water Quality Assessment Report (WQAR) for the project. Background information for the project vicinity, including other studies completed, will be reviewed. GPA will identify and describe existing waterways and watersheds, identify specific water quality concerns in the area, evaluate the potential for project impacts, and identify appropriate measures, if required or not exempt, to minimize these impacts. Construction -related impacts and long-term operational impacts on water quality will be qualitatively evaluated, and both direct and cumulative impacts related to the PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 10 project will be described. The WQAR will address regulatory compliance and identify applicable best management practices included in the project design. If mitigation is required for the project, mitigation measures will be outlined in the WQAR. Deliverables: One electronic copy of the Draft and Final WQAR Task 6.2.14: Noise Study Report OPTIONAL The increased height of the bridge compared to the existing low-water crossing may trigger the need for a Noise Study Report (NSR) and barrier assessments for the nearby residential land uses. This is a higher level of document than what is identified under Task 6.2.11. If required, the cost to complete Task 6.2.11. would be utilized as well as the additional budget identified under this optional task. As a sub -consultant to GPA, AMBIENT will prepare the NSR in accordance with Federal Highway Administration (FHWA) and Caltrans requirements to assess noise impacts associated with the single build alternative. The NSR will include a description of the existing noise environment, based on existing environmental documentation and a review of site reconnaissance data. AMBIENT will conduct ambient noise monitoring at various locations in the vicinity of the project site to document existing environmental conditions and traffic noise levels. Up to twenty short-term (i.e., 10-15 minute) and three long-term (i.e., 24- hour) noise measurement surveys will be conducted, to the extent deemed necessary. Ambient traffic noise levels will be monitored during noise monitoring periods for purposes of calibrating the traffic noise model. Relevant background information, including noise fundamentals, descriptors, and applicable federal, state, and local regulatory framework, will be described. To assess potential construction noise impacts, sensitive receptors and their relative exposure to the project area (considering topographic barriers and distance) will be identified. Noise levels of specific construction equipment will be summarized in included in the report. Predicted construction -generated noise levels at nearby receptors will be calculated using the FHWA Roadway Construction Noise Model. Traffic noise modeling will be conducted in accordance with FHWA/Caltrans-recommended methodologies and guidance. Accordingly, predicted traffic noise levels will be modeled using the FHWA Traffic Noise Model, version 2.5. The TNM model will be calibrated based on the monitoring data obtained during the site reconnaissance surveys. Predicted average -hourly traffic noise levels (in Leq) will be calculated at nearby existing receptors for comparison to FHWA/Caltrans-recommended noise abatement criteria. Traffic noise modeling will be conducted for existing, no -build, and build conditions. Groundborne vibration levels typically associated with construction activities and long-term operations will be discussed, based on information to be derived from Caltrans -recommended guidance documents. To the extent necessary, groundborne vibration levels associated with major construction activities (e.g., pile driving) will be quantitatively assessed. Long-term exposure to groundborne vibration are anticipated to be minor and will be qualitatively assessed. The significance of noise -related impacts will be determined in comparison to applicable FHWA/Caltrans noise abatement criteria. Noise -abatement measures (i.e., noise barriers) will be identified and evaluated, to the extent necessary. This discussion will also address Caltrans -recommended control practices, as well as applicable local requirements for the control of construction -generated noise. A Noise Abatement Decision Report may be required at the outcome of completing the NSR Mark Thomas will review and submit additional scope for those services. Deliverables: One electronic copy of the Draft and Final NSR Task 6.2.15: Air Quality Report OPTIONAL If it is determined by Caltrans that the project would be considered capacity increasing, the roadway widening would trigger the need for an Air Quality Report (AQR). This is a higher level of technical analysis than what is identified under Task 6.2.1. If required, the cost to complete Task 6.2.1. would be utilized as well as the additional budget identified under this optional task. As a sub -consultant to GPA, AMBIENT will prepare the AQR in accordance with Federal Highway Administration and Caltrans requirements to assess air quality and GHG impacts associated with the project. Existing air quality and GHG conditions will be discussed, including applicable regulatory framework, standards, and attainment status. Short-term construction and long-term operational emissions of criteria air pollutants and GHG emissions will be quantified. Construction emissions will be quantified based on project -specific construction information and schedules utilizing the CalEEMod computer program. Long-term operational emissions of criteria air pollutants and GHGs will be quantified using emission factors to be derived from the CTEmfac model and data to be derived from the traffic analysis prepared for this project. The project's conformity with regional and project -level air quality attainment efforts will be discussed. Localized increases in mobile -source emissions attributable to this project, including carbon monoxide (CO), particulate matter (PM), and air toxics are anticipated to be minor and, therefore, will be qualitatively assessed utilizing FHWA/Caltrans- PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 11 recommended screening protocol. This scope of work assumes that the proposed project would not be considered a project of air quality concern (POAQC) with regard to localized PM air quality conformity. Mobile -source air toxics will be qualitatively discussed in accordance with FHWA/Caltrans guidance. Dispersion modeling of localized pollutant concentrations associated with short-term construction and/or long-term operation of the project and the preparation of health risk assessments are not anticipated to be required and are not included. Measures for the control of construction and long-term operational emissions will be discussed, to the extent necessary. This discussion will address Caltrans - recommended control practices, as well as applicable air district rules and regulations. The AQR will be submitted to the City for review and approval prior to submittal to Caltrans for review and approval. Deliverables: One electronic copy of the Draft and Final AQR Task 6.2.16: Air Quality Conformity Assessment OPTIONAL If it is determined by Caltrans that the project would be considered capacity increasing, the roadway widening would trigger the need for an Air Quality Conformity Assessment (AQCA). As a sub -consultant to GPA, AMBIENT will prepare an AQCA based on information contained in the AQR for the single build alternative. AMBIENT will prepare forms and supporting documentation required for submittal of the project for interagency PM-hotspot conformity review. The AQCA will be prepared using the Caltrans -recommended AQCA template and in accordance with Caltrans -recommended guidance and methodologies. Deliverables: One electronic copy of the Draft and Final AQCA TASK 6.3. VMT SCREENING ASSESSMENT Fehr and Peers will review the project description and conduct a VMT screening assessment based on the City of La Quinta Vehicle Miles Traveled (VMT) Analysis Policy (June 2020). The project will be reviewed to determine if it can be screened from VMT impact analysis. It is anticipated that the project will screen from VMT based on Project Type Screening. Per the City's guidelines, if a transportation project is consistent with SCAG's Regional Transportation Plan/Sustainable Communities Strategy (RTP/SCS), it can be screened from VMT assessment. Fehr & Peers will conduct a VMT screening and submit the VMT Screening memorandum to the Project team and respond to one round of consolidated comments. Fehr & Peers will submit the updated draft to the City for review. We will respond to one round of consolidated comments and submit a final version to the City. DELIVERABLES VMT Screening Memorandum TASK 6.4. INITIAL STUDY/MITIGATED NEGATIVE DECLARATION GPA will complete the preparation of all CEQA documentation and support the City in meeting its Lead Agency responsibilities for public notification and approval of the CEQA document. Following completion of all technical analysis, GPA will reference the result of these studies, as well as other background research, to prepare the Administrative Draft IS, consistent with CEQA Guidelines Appendix G and in a format acceptable to the City. The document will include all required sections for an IS. GPA will incorporate any review comments to prepare the Draft IS for public circulation; GPA will coordinate with the City to circulate the document for the required 30 -day public review period. The document will be posted with the State Clearinghouse (SCH) under the most current electronic submittal requirements. GPA will also prepare a Notice of Completion and Notice of Intent, if applicable. Once the Draft IS has been circulated GPA will prepare responses to public comments received and prepare the Mitigation Monitoring and Reporting Program. GPA will prepare a Final MND, incorporate any review comments, and prepare the Notice of Determination (NOD). The NOD will be filed within five days of the City's acceptance of the final document. It is assumed one (1) public meeting would be held by the City during circulation of the environmental document; the GPA PM will attend one (1) City Council meeting related to the environmental document in order to respond to questions and/or comments related to the environmental analysis. For the NEPA documentation, Caltrans will prepare the Categorical Exclusion based on the completed environmental technical studies. DELIVERABLES PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 12 Administrative Draft/Draft and Final CEQA IS/MND Draft and Final NEPA CE Support to Caltrans TASK 6.4.1. Administrative Draft Environmental Assessment - OPTIONAL Following completion of all appropriate technical analysis, GPA will reference the results of these studies, as well as other background research, to prepare the environmental document. The Administrative Draft IS/EA will be consistent with CEQA Guidelines Appendix G, the Caltrans Annotated Outline for EAs, and accessibility requirements. The document will include all required sections for an IS/EA and will address on-site and off-site impacts of the project. Once complete, GPA will submit the Administrative Draft IS/EA to the City for review and will coordinate, as needed, for review and approval of the document. The IS/EA will be delivered to the City staff for internal review and comment prior to release of the Draft IS/EA to Caltrans for review. DELIVERABLES » One (1) electronic copy of the Administrative Draft IS/EA TASK 6.4.2. Draft Environmental Assessment - OPTIONAL Once the Administrative Draft IS/EA has been approved by the City, GPA will prepare the Draft IS/EA (with MND) and coordinate with the City to transmit it to Caltrans for review. GPA will coordinate with Caltrans staff to ensure that the sections are formatted for ease of use and to meet the criteria for the IS/EA templates. Upon receipt of Caltrans comments, GPA will revise the Draft IS/EA, and re -submit it to Caltrans for a second review. Assuming no further comments from Caltrans, GPA will coordinate with the City to circulate the Draft IS/EA to the public for the 30 -day public review period, as described under the IS/MND task above. DELIVERABLES One (1) electronic copy of the Draft IS/EA (with MND) TASK 6.4.3. Draft Environmental Assessment — OPTIONAL Following circulation of the Draft IS/EA (with MND), GPA will coordinate with the City and Caltrans to prepare responses to any public comments received and incorporate the responses and any required revisions into the document. It is assumed that no more than ten public comments will be received. Additionally, GPA will prepare the Caltrans -required Environmental Commitments Record (ECR) which can also serve as the City's Mitigation Monitoring Reporting Plan (MMRP). GPA will then prepare a Final IS/EA and submit it to the City for review. GPA will coordinate as needed to make further revisions and obtain approval to finalize the document. After production of the Final IS/EA, GPA will forward the Final IS/EA to Caltrans for review. Any additional comments from Caltrans will be incorporated; GPA will coordinate with Caltrans to obtain a Finding of No Significant Impact (FONSI) for the project. Additionally, upon completion of the Final IS/EA, GPA will coordinate with the City to file a NOD, as described under the IS/MND task above. DELIVERABLES One (1) electronic copy and up to three (3) hard copies of the Final IS/EA (with MND & FONSI) TASK 7. GEOMETRIC APPROVAL DRAWINGS (PHASE 1) - 35% DESIGN TASK 7.1. PRELIMINARY ENGINEERING Mark Thomas shall develop the horizontal and vertical layout of the new bridge structure on Avenue 50 based on the survey mapping and existing utility record drawings. The geometric design shall include the original ground, traveled way, shoulders, cut/fill slopes, known utilities, and existing/proposed right-of-way. The proposed roadway cross-section shall be consistent with the City of La Quinta cross-section for the segment of Avenue 50 within the project area with exception to the reduced median width across the bridge. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 13 TASK 7.2. TRANSPORTATION STUDY - OPTIONAL To assist with developing intersection pavement marking layout, storage lengths, and signal timing updates, Fehr and Peers will utilize RIVCOM to develop peak hour forecasts at the intersection Washington Street & Avenue 50 and daily traffic forecasts on the Avenue 50 from Washington Street to Park Ave. We will collect traffic volume data during fair weather, while school is in session, and during a typical (non -holiday) Tuesday, Wednesday, or Thursday. Intersection peak period data will be collected during typical commute periods (7:00- 9:00 AM, 4:00-6:00 PM). Bicycle and pedestrian peak hour counts will be collected. The daily traffic counts (up to two 24-hour roadway counts) with vehicle classification (truck percentage) will be performed on the study roadway. If traffic data is readily available from surrounding planned development projects and with City approval, Fehr and Peers may utilize existing volume information to eliminate counts. Forecasts will be prepared by applying the Difference Method, which adds traffic growth from RIVCOM base to future year models to existing counts, consistent with National Cooperative Highway Research Program (NCHRP) Report 765. The study is not required to meet CEQA/NEPA requirements and, at the option of the City, be utilized to validate intersection geometrics and signal modification design. This scope assumes the project 4 -lane, westbound approach to the intersection will drop the second lane into a right turn only to accommodate the newly painted Avenue 50 'Road Diet' project west of Washington Street. TASK 7.3. BRIDGE TYPE SELECTION REPORT & MEETING Mark Thomas will prepare a Structure Type Selection Report per Caltrans Structures Local Assistance (SLA) Type Selection Guidelines for Local Bridge Projects - Attachment B and attend a Type Selection Meeting with Caltrans SLA. The Report will assist the City in determining the best suited structure type for the project and is required as part of the Caltrans SLA approval process. Assuming one (1) alternative studied from the bridge alternatives hydraulic analysis would be eliminated, Mark Thomas shall develop up to two (2) different alternatives to be presented in the report, which will include a General Plan, Foundation Plan, and General Plan Estimates for each structure type. The General Plan Estimate will include both roadway and bridge costs for each structure alternative. The report will discuss the advantages and disadvantages of the alternatives and will address geotechnical, hydraulic, aesthetic, constructability, and environmental issues, as well as costs. The report will be submitted to the City for review. Mark Thomas will address any comments that the City may have and will then submit the report to Caltrans SLA for review and concurrence of the recommendations. Mark Thomas will attend a Type Selection Meeting with Caltrans SLA to discuss the Type Selection Report and recommendations as required by the SLA approval process. The task shall be completed prior to the commencement of the environmental technical studies and field reviews. TASK 7.4. GEOMETRIC APPROVAL DRAWINGS Mark Thomas shall prepare geometric approval drawings showing preliminary layout and preliminary estimates. The plan must contain a view depicting geometric layout of the traffic lanes. Curve and taper information must be shown, but sign and striping type detail are not required. All utility conflicts shall be noted so advance clearing of utilities may begin during Phase I. The preliminary geometric exhibit will contain a proposed roadway alignment, roadway plan and profile on a 1" = 40' scale. The exhibit will also show limits of construction, project dimensions, and general identification of work as well as the centerline and edge of pavement design. Pedestrian Lighting Calculations and Concept Design Fehr and Peers will prepare a photometric assessment for the bridge walkways illuminated by the preferred pedestrian inset light AG132 lighting software. Fehr and Peers shall compare the results to IES RP -8 and provide any recommendations for the design and light fixture if the levels are insufficient to meet RP -8. DELIVERABLES Traffic Counts Transportation Study 35% Concept Design Plan Bridge Type Selection Report Pedestrian Lighting Calculations and Concept Design PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 14 TASK 8. FINAL PLANS, SPECIFICATIONS, AND ESTIMATE (PHASE I D The scope of services for the Final PS&E of the Avenue 50 Bridge crossing assumes the following conditions exist: Final bridge and roadway would be a four -lane facility. Design speed for Avenue 50 would match existing posted speed on Avenue 50 or be as directed by the City prior to the commencement of final design. TASK 8.1. FINAL GEOTECHNICAL ANALYSIS (PHASE II) Task 8.1.1. Geotechnical Investigations Caltrans is enforcing the AASHTO recommendations of a soil boring at each bridge support locations where substructure width is less than 100 feet; minimum of two (2) borings are required per location where substructure width is greater than 100 feet. Data obtained from some boreholes will be used for multiple design elements. Based on this information, EMI's geotechnical field investigations plan is presented in Table 1. Based on our discussion with Mark Thomas, a pavement core will be obtained at each end of the project to determine the existing pavement sections. ID rNE LIMErNBER OF APPROXIMATE RINGS DEPTH (FEET) Bridge Abutments 2 80 Bridge Piers 2 100 Roadway 2 20 Pavement Cores 2 N/A EMI will prepare a boring location plan, and this plan will be used to secure the well permits and City encroachment permits. No permit fees required with the City and CVWD or City pays permit application fees, if required. The standard WATCHBOOK manual traffic control plans are sufficient for planned initial boring locations. It is assumed that stamped site-specific traffic control plans are not required, however; if there are any limitations (utilities or hard drilling conditions) that require the borings to move and requires stamped site-specific traffic control plans, expense for the stamped traffic control plans will require a change in this scope. The design team has concluded that a dry well system will most likely not be a suitable and long-term solution for the intersection of Avenue 50 and Washington Street; therefore, infiltration test have been excluded from this scope. Task 8.1.2. Laboratory Testing Anticipated laboratory tests include: in-situ density and moisture content, grain size, Atterberg Limits, direct shear, UU triaxial, consolidation, R -value, and soil corrosion tests. The tests provide the data required for hydraulic analysis for scour. Task 8.1.3. Geotechnical Engineering Analysis and Report Following analyses will be performed for the project: prepare design ARS curve, assessment of soil liquefaction potential, seismic settlement, and lateral spreading, foundation analysis for bridge, assessment of global slope stability, and a review of City Standard pavement structural section. EMI will prepare a Foundation Report (that includes Geotechnical Engineering recommendations). The Foundation Report will include recommendations for bridge, slopes, and pavement structural sections. EMI will address any comments resulting from the City review and prepare a final Foundation Report. DELIVERABLES Draft/ Final Foundation Report PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 15 TASK 8.2. REGULATORY AGENCY PERMITS The Evacuation Channel connects to Whitewater River, which flows to the Salton Sea, and is expected to fall under the jurisdiction of the USACE, RWQCB, and CDFW. After 65% submittal, GPA will prepare the Pre -Construction Notification for submittal to the USACE, water quality certification application for submittal to the RWQCB, and the Streambed Alteration Notification for submittal to CDFW. GPA will coordinate with the City and regulatory agencies as needed to obtain the necessary permits. Coordination includes calculations of impacted jurisdictional areas including temporary and permanent impacts derived from engineering drawings. The following scope assumes less than 0.5 acre would be permanently impacted under each jurisdiction. » Section 404 of the Clean Water Act Nationwide Permit The Evacuation Channel connects to Whitewater River which flows to the Salton Sea and is expected to fall under the jurisdiction of the USACE as waters of the U.S. Because the project would result in temporary and permanent impacts on the Evacuation Channel, a Section 404 Permit will be required. GPA will prepare the PCN package for submittal to the USACE. The application will include a brief description of the project, an assessment of impacts on waters of the U.S., minimization measures and best management practices to minimize impacts to waters of the U.S., a proposed mitigation plan, and other pertinent project information, as required by the USACE. GPA will coordinate with the City and USACE as needed to obtain the 404 authorization. Section 401 of the Clean Water Act Water Quality Certification Section 401 of the Clean Water Act requires applicants acquiring permits from the USACE under Section 404 obtain a Water Quality Certification from the RWQCB for the state in which the discharge originates. GPA will prepare an application for a Section 401 Water Quality Certification for submittal to the RWQCB. The application will include a brief description of the project, an assessment of impacts to waters of the state, measures, and best management practices to minimize impacts, a proposed mitigation plan, and other pertinent project information, as required by the RWQCB. GPA will coordinate with the City and RWQCB as needed to obtain the Water Quality Certification. Section 1602 of the California Fish and Game Code Lake or Streambed Alteration Agreement Section 1602 of the California Fish and Game Code requires submittal of a Lake or Streambed Alteration Notification to the CDFW for any activity that may substantially divert or obstruct the natural flow or substantially change the bed, channel, or bank of any river, stream, or lake. Streams (and rivers) are defined by the presence of a channel bed and banks and at least an intermittent flow of water; therefore, the Evacuation Channel is expected to fall under the jurisdiction of the CDFW. GPA will prepare a Lake or Streambed Alteration Notification package for submittal to the CDFW. The notification will include a brief description of the project, an assessment of impacts to CDFW jurisdictional areas, measures, and best management practices to minimize impacts, a proposed mitigation plan, and other pertinent project information, as required by the CDFW. GPA will coordinate with the City and CDFW as needed to obtain the Streambed Alteration Agreement from CDFW. If a Habitat Mitigation and Monitoring Plan or other mitigation is required, a separate scope and fee will be prepared to conduct that work. DELIVERABLES 401 Water Quality Certification from the Regional Water Quality Control Board 404 Nationwide Permit Verification from the United States Army Corps of Engineers 1602 Streambed Alteration Agreement from the California Department of Fish and Wildlife General coordination with permitting agencies to obtain required regulatory agency permits TASK 8.3.65% ROADWAY PLANS AND ESTIMATE Upon the acceptance of the preliminary roadway geometrics, Mark Thomas will prepare the 65% roadway plans consisting of Typical Sections and Notes sheets, Construction Detail Sheets, Plan and Profile Sheets in 1" = 40' scale with construction details no larger than 1' = 10", drainage plans and details, retaining walls plans where required, pedestrian/bicycle routing plan, and detour plan. The Roadway Plan and Profile shall show the existing topography, limits of work, construction notes, right-of-way, utilities, and other general design elements. Centerline, edge of pavement and vertical design shall be provided on the profile. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 16 Fehr and Peers will prepare signing and striping plans for the roadway improvements along Avenue 50 and Washington Avenue. The final signing and striping plans shall be prepared for final plotting on Arch D -sized sheets at T' = 40', as appropriate. All design and report documents will utilize Imperial Units, with geometrics conforming City, CVWD, and/or County Standards. When noted, the anticipated Caltrans Standard Plans 2024/2025 Edition, and Caltrans 2024/2025 Standard Specification with all published updates for each document as of date of the notice to proceed for this scope of work shall be used. Should the Caltrans Standards update(s) result in significant technical changes to design during the milestone submittals or prior to Ready -to -List, the updates shall result in change in this scope. Mark Thomas will prepare cost estimates with preliminary construction quantities for the Roadway PS&E. TASK 8.3.1. 65% Sanitary Sewer Relocation Plan and Domestic Water Line Relocation Plan Upon the acceptance of the preliminary roadway geometrics, Mark Thomas will prepare the 65% plans consisting of sanitary sewer relocation plan, profile, and details, and domestic water relocation plan, profile, and details, and Sheets in 1" = 40' scale with construction details no larger than T = 10". DELIVERABLES Title Sheet and Location Map (1) Typical Section and Notes (3) Plans and Profile (3) Demolition Plan (2) Contour Grading (2) Utility Plan (2) includes existing utilities and final construction notes based on final agreement(s)/protect-in-place and/or relocation(s) by others, reference to additional relocation will be noted as needed Drainage Plans and Details — Bridge (2) Drainage Plans and Details — Intersection (1) Channel Improvement Details (4) Pedestrian and Bicycle Routing Details (1) Construction Details (4) Signing and Striping Plan (1) Signing and Striping Plan for Pedestrian and Bicycle Routing (1) Detour Plan (1) Details Sheets (6) Bridge Pedestrian Lighting Plan (1) Sanitary Sewer Relocation Plans and Details (4) Domestic Water Line Relocation Plans and Details (4) Engineer's Opinion of Probable Construction Costs TASK 8.3.2. Traffic Signal Modification Design - OPTIONAL Fehr & Peers will prepare one (1) signal modification design consisting of two (2) sheets traffic signal design plans to accommodate adjustments to existing signal equipment and detection, if necessary, based on the ultimate lane configuration and geometrics. The traffic signal design will include existing features to remain, existing features to be removed, new equipment to be installed, and the conductor and equipment schedules. The traffic signal plan will be prepared at V=20' scale and will be designed in conformance with California Manual on Uniform Traffic Control Devices (CAMUTCD) and City requirements. Two (2) traffic signal design sheet will be prepared, stamped and signed by a CA Licensed Civil Engineer. DELIVERABLES One (1) Traffic Signal Modification Plan — 2 (two) sheets (1:20 scale) TASK 8.3.3. Traffic Signal Interconnect - OPTIONAL PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 17 If necessary, based on the impacts to the traffic signal modification, Fehr & Peers is available to prepare a signal interconnect plan. The plan will include existing equipment based on as-builts, verified by our field visit. Separate pull boxes will be proposed as part of the design along with conduit connected directly to the controller cabinets. The fiber optic plans (up to 2 sheets) will be submitted and revised along with the traffic signal plans for the same review cycle. DELIVERABLES Two (2) Traffic Signal Interconnect Plans (1:40 scale) TASK 8.4.65% UNCHECKED DETAIL - STRUCTURE PLANS AND ESTIMATE Mark Thomas will prepare structural calculations, bridge plans, and a construction cost estimate for the selected bridge alternative. For the purposes of this scope of work, it is assumed that a three span, cast -in-place post tensioned concrete slab will be the preferred structure alternative. The structure design will be performed in accordance with AASHTO LRFD Bridge Design Specifications, 8th edition with California Amendments and Caltrans Seismic Design Criteria 2.0. In general, it is anticipated that the following structure plan sheets will be prepared. The construction cost estimate comprised of quantities and unit prices. Unit prices will be developed using current bid results from similar projects, Caltrans database information and Caltrans' latest Construction Cost Manual. All estimates will be done in Caltrans BEES format using Microsoft Excel. Should CVWD require a separate set of bridge plans provided on their border, the plan sheets noted may adequately cover the level of effort required to obtain CVWD approval and meet permit standards. If CVWD requests additional sheets and/or details above the intended number of sheets noted within this scope, Mark Thomas shall submit a request for scope augmentation. DELIVERABLES General Plan (1) Index to Plans (1) Foundation Plan (1) Abutment Plan (2) Abutment Details (2) Pier Layout (2) Pier Details (1) Typical Sections (1) Utility Details (2) Aesthetic Details (3) Log of Test Borings (2) TASK 8.5. IDENTIFY ROW REQUIREMENTS Mark Thomas will provide initial right of way requirement exhibits for the City to review and discuss proposed construction and grading limits with property owners. The exhibit, shall be delivered during the 65% plan preparation phase, will include existing aerial imaging, existing right of way and project design limits and features including utilities and other constraints. DELIVERABLES Right of Way Requirements Map TASK 8.6.90% ROADWAY PS&E Mark Thomas and design subconsultants will address up to one (1) round of comments for the 65% Engineering including the plans and probable construction cost estimate. The technical specifications to be included with the contract documents will be prepared at the 90% PS&E and edited in MS Word. TASK 8.6.1. 90% Sanitary Sewer Relocation Plan and Domestic Water Line Relocation Plan Mark Thomas will address up to one (1) round of comments for the 65% Engineering for the sanitary and water relocation including the plans and probable construction cost estimate. The technical specifications to be included with the contract documents will be prepared at the 90% PS&E and edited in MS Word. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 18 TASK 8.6.2. Contract Specifications and Special Provisions Environmental Support - OPTIONAL GPA will assist with ensuring that design -related avoidance and minimization measures are successfully integrated into 90 percent design drawings and contract specifications. Specifically, GPA will ensure all relevant CEQA/NEPA obligations and permitting requirements have been adequately incorporated. GPA will make direct additions, supplemental comments and/or create specialized, non-standard environmental specifications in tracked changes. DELIVERABLES Review and comments on the 90% design package including Roadway, Sanitary Sewer and Domestic Water including: Plan Update Probable Construction Cost Estimate Technical Specifications TASK 8.7. BRIDGE DESIGN INDEPENDENT CHECK The 65% unchecked bridge plans shall be independently checked by a separate licensed bridge engineer, who has not been involved in the project. A separate set of structural design check calculations including quantity calculations shall be prepared in accordance with Caltrans bridge design practice. The independent checker shall review the plans for completeness, consistency, correctness of references. The bridge designer shall revise the design and plans to mitigate checker's review comments. The checker shall perform back -check to ensure that the comments have been adequately addressed. All comments and responses shall be documented in the project files. TASK 8.8.90% (FINAL) STRUCTURES PS&E Response to all agencies' review comments for the 65% submittal shall be prepared and included in this submittal. Mark Thomas shall prepare Caltrans Standard Special Provisions for structural work at this submittal. The plans shall be updated per independent checker's comments. The 65% structures estimate will be updated based on the independent checkers comments. A separate set of quantity calculations, known as the check quantity calculations, will be prepared. The updated quantity calculations and check quantity calculations will be compared and any differences between the two will be resolved. The differences between the two sets of quantity calculations will not exceed the percentage tolerances defined in the estimating section of the Caltrans Bridge Design Aids. Additionally, Mark Thomas will provide a 4 -scale drawing of the bridge deck contours. DELIVERABLES Bridge Design and Quantity Independent Check Calculations Comment / Response to Independent Check Engineer's Opinion of Probable Construction Cost One (1) electronic Construction Plan set in PDF format One (1) electronic set of specifications in MS Word Bridge Design Calculations Response to 65% Comments from the City 4 -Scale bridge drawing of the bridge deck contours TASK 8.9.100% PS&E Mark Thomas and design subconsultants will address up to one (1) round of comments for the 90% Engineering including the plans, probable construction cost estimate and an electronic set of technical specifications. TASK 8.9.1. 100% Sanitary Sewer Relocation Plan and Domestic Water Line Relocation Plan Mark Thomas will address up to one (1) round of comments the 90% Engineering for the sanitary and water relocation including the plans, probable construction cost estimate and an electronic set of technical specifications. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 19 DELIVERABLES Engineer's Opinion of Probable Construction Cost One (1) electronic plan set in PDF format of the 100% design package including Roadway, Sanitary Sewer and Domestic Water and Bridge One (1) electronic set of specifications in MS Word Response to 90% Comments from the City 4 -Scale bridge drawing of the bridge deck contours TASK 8.10. FINAL PS&E Final Engineering shall include detailed engineering calculations, designs, construction plans, specifications and technical special provisions and engineer's construction cost estimates for the project that will enable the City to advertise and award the construction contract for the project. TASK 8.10.1. Final Sanitary Sewer Relocation Plan and Domestic Water Line Relocation Plan Final Engineering for the sanitary and water relocation shall include detailed engineering calculations, designs, construction plans, specifications and technical special provisions and engineer's construction cost estimates for the project that will enable the City to advertise and award the construction contract for the project. TASK 8.11 FINAL DRAINAGE REPORT Webb Associates will address comments for the Preliminary Drainage Report and PS&E submittals and include final plans with pipe network outputs information and figures to validate the drainage design. DELIVERABLES Engineer's Opinion of Probable Construction Cost One (1) signed/sealed electronic plans (PDF) 4 -Scale bridge drawing of the bridge deck contours One (1) signed/sealed electronic specs (MS Word) One (1) copy of appendices & bid form (MS Word/PDF) Final Drainage Report including supporting plans/calculations Response to 100% Comments from the City Final domestic water and sanitary sewer sheets in full size Mylar sheets to CVWD Final Resident's Engineer Pending File Final PS&E, right of way and E-76 support Electronic files of all submitted documents. Mark Thomas will provide a digital copy of the final signed/sealed project plans in AutoCAD 2022 .dwg or higher format and PDF to the City; providing by email or Sharepoint Drive is acceptable. Exclusions: This task excludes the preparation of a SWPPP. TASK 9. RIGHT OF WAY (PHASE 111) TASK 9.1. PLATS & LEGAL DESCRIPTIONS Mark Thomas will provide two (2) plats and legal descriptions to support acquisition and / or agreement from CVWD including access into the channel during construction and/or the one (1) other owner. It is assumed the proposed linework will not change once descriptions are started and documents will undergo one review at City and one at CVWD before approval. TASK 9.2. UTILITY AGREEMENT(S) Mark Thomas to prepare utility agreements as necessary in accordance with Caltrans Chapter 14 of the LAPM. Mark Thomas shall conduct utility coordination meetings, as needed, regarding adjustments and relocations, to resolve PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 20 conflict issues, and with respect to performing work for utility companies by City contractors. For utility conflicts that require relocating, Mark Thomas shall prepare documentation through City staff to submit the official notice(s) / order(s) to the utility companies to relocate conflicting facilities. Through City staff, Mark Thomas shall make recommendations for special provision language with regard to utility issues, recommendations for construction windows of time for utility relocation activities, recommendations for inclusion of utility bid items, etc. All utility files will be organized and maintained per Caltrans policies and procedures. TASK 9.3. FINAL ROW REQUIREMENTS Mark Thomas will update the initial right of way requirement exhibits for the City to review and discuss proposed construction and grading limits with property owners based on the final design plans. TASK 9.4. ROW APPRAISALS The appraisal will be prepared by individuals licensed with the State of California, Office of Real Estate Appraisers, as a Certified General Real Estate Appraiser. Our appraisers both retain the requisite qualifications and experience necessary to competently complete appraisals in a competent and professional manner, in accordance to applicable laws and policies. Prepare the Notice of Decision to Appraiser letter for each property, advising the property owner of the proposed project, introducing the appraiser, enclosing an Acquisition Brochure describing the City's acquisition process, and contract information to answer questions and concerns. The appraisal report will comply with laws that are applicable to the specific appraisal assignment and the Uniform Standards of Professional Appraisal Practice (USPAP). Afford the property owner or the owner's designated representative the opportunity to accompany the appraiser on the inspection of the property. Perform an inspection of the subject property. The inspection should be appropriate for the appraisal problem, and the Scope of Work should address: o The extent of the inspection and description of the neighborhood and proposed project area, o The extent of the subject property inspection, including interior and exterior areas, o The level of detail of the description of the physical characteristics of the property being appraised (and, in the case of a partial acquisition, the remaining property). In the appraisal report, identify the highest and best use. If highest and best use is in question or different from the existing use, provide an appropriate analysis identifying the market-based highest and best use. Present and analyze relevant market information. In developing and reporting the appraisal, disregard any decrease or increase in the fair market value of the real property caused by the project for which the property is to be acquired, or by the likelihood that the property would be acquired for the project. Report the appraiser's analysis, opinions, and conclusions in the appraisal report. Appraisal Review Review appraisals will be provided for each appraisal, and in accordance with State and Federal law and City policy as required. The review appraiser will, as appropriate: Identify the reviewer's client and intended users, the intended use of the reviewer's opinions and conclusions, and the purpose of the assignment. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 21 Identify the following: o Subject of the appraisal review assignment. o Effective date of the review. o Property and ownership interest appraised (if any) in the work under review. o Date of the work under review and the effective date of the opinion or conclusion in the work under review. o Appraiser(s) who completed the work under review, unless the identity was withheld. Identify the scope of work to be performed Develop an opinion as to the completeness of the material under review, given the scope of work applicable in the assignment. Develop an opinion as to the apparent adequacy and relevance of the data and the propriety of any adjustments to the data, given the scope of work applicable in the assignment. Develop an opinion as to the appropriateness of the appraisal methods and techniques used, given the scope of work applicable in the assignment, and develop the reasons for any disagreement. Develop an opinion as to whether the analyses, opinions, and conclusions are appropriate and reasonable, given the scope of work applicable in the assignment, and develop the reasons for any disagreement. Review appraisals will be forwarded to the City for establishment of just compensation prior to the preparation of offers to acquire the proposed land rights for the project. TASK 9.5. ROW AQUISITION AND NEGOTIATION Monument will provide right-of-way delivery services required for the City to purchase right-of-way required to construct the Project. The tasks will be performed in accordance with applicable Federal, State and local regulations, Caltrans Policies and Procedures and City's right-of-way Policies and Procedures. Monument will provide the following services under the direction of the City staff: Provide the Acquisition and Negotiations Services to acquire the property interests required for the Project in a timely, efficient manner and at a reasonable cost. Work shall be performed in accordance with Caltrans and the City's Policies and Procedures and applicable Federal, State and local regulations. Coordinate and manage the acquisition process with the City, legal counsel, design team, property owners, and tenants along with the title company, appraisers and other consultants to insure effective cross -discipline communications. Review right-of-way plans, appraisal reports, title reports, appraisal maps and legal descriptions and all other pertinent documents. Prepare acquisition offer packages consisting of the City's written purchase offer, appraisal summary statement, acquisition brochure, acquisition agreement, conveying instruments (Grant Deed, Permanent and/or Temporary Easements, etc.), Certificate of Acceptance, recommendation of Amount of Just Compensation, plat maps and legal descriptions, and Title VI Information. Monument's acquisition agent will meet personally with each property owner to present the City's purchase offer, explain the project design requirement and inform him or her of the City's right-of-way acquisition process. PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 22 Negotiate personally in good faith with each property owner, his/her agent or representative and discuss appraisal and valuation of the property interests, gather information from the property for consideration and address any questions or concerns that may arise during the acquisition process. Establish and maintain an acquisition file for each property owner or property interest acquired and maintain a file checklist pursuant to the City's specifications. As may be required to secure Right of Entry Agreements; licenses or permits from property owners for purposes of performing hazardous waste, archeological and other inspections. Promptly transmit executed documents (acquisition agreements, executed deeds, rental agreements, statements of information, offset statements, and the like) to the City for acceptance and processing. A report summarizing the pertinent information relative to the transaction will be included. Prepare and submit a Letter of Recommendation to the City for any proposed administrative settlements with property owners. The letter will include a chronology of the negotiation efforts, provide supporting evidence and documentation and an explanation of the benefits and rationale behind the recommendation. Escrow Coordination - Coordinate opening of escrows with direction from the project manager, assist the escrow company in obtaining additional documentation as necessary to provide clear title to the City, supervise and review the closing of escrows, and review closing statements for completeness and accuracy. We will serve as liaison between the title company, escrow holder, and the City. Upon closing of escrow, tax cancelation letters will be prepared for City signature, as necessary, for fee interest acquisitions. Recommend condemnation action when negotiations have reached an impasse. The required justification will be submitted in writing to the City. Our primary goal will be to reach an acceptance of the offer with each property owner. We will work with the City in recommending solutions to achieve acceptance of the offer. Eminent Domain Support — If requested, coordinate with City's condemnation counsel, as required, to support the condemnation activities until the Resolution of Necessity is adopted and possession is granted by the courts. Litigation support after the hearing for the Resolution of Necessity, such as depositions, mediation appearances and expert testimony, can be provided on a time -and -materials basis. Perform any other normal procedures and processes to implement the acquisition assignment and provide any other supporting information and/or correspondence required by the City. o Provide bilingual acquisition agents, if necessary. o Prepare all applicable forms, secure property owner's approval and signature and submit the forms to the City for review and acceptance. o Upon completion of the acquisition process for each property or property interest, or at project completion, Monument will provide the City with the original acquisition file as well as electronic copy of files for future audit purposes. TASK 9.6. FINAL ROW CERTIFICATION Monument will prepare and submit to Caltrans, and FHWA, if necessary, a right-of-way certification form and other required documents in accordance with the Caltrans Right of Way Manual and FHWA requirements. DELIVERABLES Two (2) signed and stamped P&LD in pelf format One (1) signed and stamped Plat in pdf format for TCE PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 23 Utility Agreement(s) Support Final Right of Way Requirements Map Right of way support services for two (2) fee acquisitions and one (1) Temporary Construction Easement (TCE) Right of way Certification Form and required documents Assumptions: Given the preliminary scope and footprint of the project, this task assumes two (2) fee acquisitions and one (1) TCE for the right of way services for property appraisals, preparation of offers, and negotiation with property owners, and final property acquisition agreements. Should the project require the need for fee take or temporary construction easement with additional owners, Mark Thomas will review and submit additional scope for those services. Right of way support services are included under Right of Way. TASK 10. CONSTRUCTION SUPPORT (PHASE IV) Design support services will be provided for construction. Budgetary amounts have been established for each of the following tasks based on a time and materials basis. TASK 10.1. BID SUPPORT When requested by the City, Mark Thomas shall remain available to attend a pre-bid meeting to be scheduled in advance of the bid opening date. Bid support will be provided on a time and materials basis as requested by the City. Mark Thomas assumes no more than 92 hours for bidding support will be needed. Should the City request that Mark Thomas prepare a bid addendum plans and documents outside a Mark Thomas error/omission, Mark Thomas will require an addendum to contract to account for the additional work. TASK 10.2. PROJECT MANAGEMENT Mark Thomas will manage the project team. This also includes general project management, preparing invoices and monthly progress reports, and maintaining project files. Mark Thomas will support this task over the 16 -month core construction period for a total of 80 hours. Mark Thomas will attend the pre -construction meeting. This task excludes attending weekly construction meetings and other coordination meetings. TASK 10.3. REQUEST FOR INFORMATION (RFI) During the construction phase, Mark Thomas will work with City to respond to Request for Information (RFIs). Mark Thomas will provide clarification and interpretation of the plans and specifications. Mark Thomas will distribute and facilitate review RFI submittals among the design team, as well as attending field meetings during construction to review the issue in question. A budget has been provided with an allowance for 60 RFls with an average effort of 4 staff hours per RFI for a total of 240 hours. DELIVERABLES Responses to Contractor RFIs TASK 10.4. SUBMITTAL REVIEWS Mark Thomas will distribute and facilitate review of shop drawings and product submittals among the design team. A budget has been provided with an allowance for 42 shop drawings or submittals with an average effort of 8 staff hours per for a total of 320 hours. DELIVERABLES Review and responses to shop drawings and submittals TASK 10.5. CONTRACT CHANGE ORDERS (CCO'S) During the construction phase, Mark Thomas will work with City to review Contractor requested Change Orders as changes become necessary. Our Team will review the Contactor's request, provide guidance and input to its validity, and review potential impacts on the design and other ancillary project components and develop independent cost PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 24 estimates as verification. We have provided a budget allowance of 80 hours to support this effort. This excludes the revision of plans and specifications. TASK 10.6. RECORD DRAWINGS Following construction, Mark Thomas will prepare record drawings for City records. The record drawings will be completed in AutoCAD 2022 and shall be based upon a marked -up set of plans to be provided by the contractor and City construction manager. Mark Thomas will provide one electronic copy. DELIVERABLES One (1) electronic copy of the Final As -Built plan set PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT MARK THOMAS The City of La Quinta Page 25 Exhibit B Schedule of Compensation With the exception of compensation for Additional Services, provided for in Section 2.4 of this Agreement, the maximum total compensation to be paid to Contracting Party under this Agreement is not to exceed Two Million Three Hundred Thiry -two Thousand Eight Hundred Sixty -Four Dollars and Sixty -Six Cents ($2,332,864.66) ("Contract Sum"). The Contract Sum shall be paid to Contracting Party in installment payments made on a monthly basis and in an amount identified in Contracting Party's schedule of compensation attached hereto for the work tasks performed and properly invoiced by Contracting Party in conformance with Section 2.2 of this Agreement. Exhibit B Page 1of1 COST PROPOSAL FOR PROJECT SCOPE: La Quinta- Avenue 50 over the La Quinta Evacuation Channel - Federal Project No. BR-NBIL(547); City Project No. 2019-02 MARK mi r THOMAS ------------------------------ Mimi 1, tiltill ------------------------------ ------------------------------ ------------------------------ ------------------------------ Note: Mark-ups are Not Allowed ■ Prime Consultant ❑ Subconsultant ❑ 2nd Tier Subconsultant Consultant: Mark Thomas & Company, Inc. Project No. La Quinta Ave 50 - BR-NBIL(547) Contract No DIRECT LABOR Cost Proposal 1 Cost Plus Fixed Fee or Lump Sum Date 2/13/2024 Classification/Title Name Range Hours Actual Hourly Rate Total Principal $138-$165 $ 154.50 $ - Sr. Engineering Manager Pat Somerville* $112-$148 38 $ 144.23 $ 5,480.74 Sr. Engineering Manager $112-$148 $ 137.82 $ - Engineering Manager $105-$126 $ 115.69 $ - Design Manager $101 -$126 $ 115.69 $ - Sr. Project Manager Paul Mittica* $75-$107 436 $ 86.84 $ 37,862.24 Sr. Project Manager $75-$107 $ 96.11 $ - Sr. Technical Lead $75-$107 116 $ 96.11 $ 11,148.75 Project Manager $62-$88 $ 77.61 $ - Project Manager Victor Sherby* $62-$88 558 $ 73.72 $ 41,135.76 Technical Lead $62-$88 146 $ 77.61 $ 11,331.54 Sr. Project Engineer $56-$78 $ 67.46 $ - Sr. Technical Engineer $56-$78 $ 67.46 $ Project Engineer $50-$70 $ 59.48 $ - Project Engineer Kimberly Barling* $50-$70 1480 $ 58.38 $ 86,402.40 Civil Engineering Designer $40-$67 $ 56.94 $ - Design Engineer II $38-$62 1368 $ 51.50 $ 70,452.55 Design Engineer 1 $30-$52 2980 $ 41.71 $ 124,290.06 Sr. Planner $38-$62 $ 51.50 $ - Planner II $31 -$53 $ 42.80 $ Planner 1 $28-$45 $ 34.09 $ - Sr. Technician $40-$63 928 $ 52.59 $ 48,802.07 Technician $23-$46 $ 35.18 $ - Intern $17-$34 $ 23.94 $ - Survey Division Manager $85-$126 12 $ 115.33 $ 1,383.98 Survey Manager II $74-$96 $ 87.77 $ - Survey Manager 1 $69-$89 $ 78.70 $ Project Surveyor III $65-$91 $ 80.51 $ - Project Surveyor 11 $60-$80 76 $ 69.63 $ 5,292.21 Project Surveyor 1 $52-$75 $ 64.19 $ - Asst Surveyor 111 $45-$65 $ 54.76 $ - Asst Surveyor II $41 -$60 96 $ 49.32 $ 4,735.14 Asst Surveyor 1 $35-$54 $ 43.88 $ - Survey Specialist 111 $58-$87 $ 76.53 $ Survey Specialist 11 $45-$69 $ 58.75 $ Survey Specialist 1 $35-$56 $ 45.70 $ Lead Survey Technician $46-$67 $ 56.94 $ Survey Technician III $37-$60 $ 49.32 $ - Survey Technician 11 $34-$56 66 $ 45.70 $ 3,016.04 Survey Technician 1 $19-$51 $ 40.26 $ - Chief of Party (OE3)* $55-$73 $ 62.02 $ Instrumentperson (OE3)* $51 -$67 $ 56.58 $ Chainperson (OE3)* $48-$65 $ 54.76 $ Apprentice (OE3)* $28-$50 $ 39.53 $ 2 -Person Crew (OE3)* $103-$129 $ 118.96 $ 3-Person Crew (OE3)* $133-$169 $ 158.85 $ - Utility Locator (PW North)* $44-$60 $ 49.32 $ 2-Person Utility Locate (PW North)* $90-$108 $ 97.20 $ Chief of Party (OE12)* $64-$84 12 $ 73.26 $ 879.13 Instrumentperson (OE12)* $58-$77 $ 66.01 $ - Chainperson (OE12)* $58-$75 $ 64.19 $ Apprentice (OE12)* $24-$50 $ 39.53 $ - 2-Person Crew (OE12)* $122-$148 48 $ 137.46 $ 6,597.85 3-Person Crew (OE12)* $146-$186 $ 175.54 $ - Utility Locator (PW South)* $62-$78 $ 67.82 $ - 2-Person Utility Locate (PW South)* $125-$148 $ 137.46 $ - LAUD Division Manager $85-$104 $ 93.93 $ - Sr. LAUD Project Manager $77-$99 102 $ 88.13 $ 8,989.36 LAUD Project Manager $65-$87 $ 76.53 $ - Sr. Landscape Architect $41 -$70 $ 59.12 $ Landscape Architect $38-$64 $ 53.68 $ - Landscape Designer II $33-$53 180 $ 42.43 $ 7,638.02 Landscape Designer 1 $27-$45 $ 34.09 $ - Landscape Intern $17-$34 $ 23.94 $ District Manager-Engineer $110-$133 $ 122.22 $ - Deputy District Manager $97-$120 $ 109.89 $ - Operations Manager $78-$106 $ 95.38 $ Sr. Sanitary Project Engineer $68-$95 $ 84.87 $ Sanitary Project Engineer $57-$85 $ 74.71 $ Associate Sanitary Engineer $54-$75 $ 64.19 $ Assistant Sanitary Engineer $48-$67 $ 56.22 $ Sr. Inspector* $42-$60 $ 49.32 $ Inspector* $34-$52 $ 41.35 $ Inspector - Apprentice* $21 -$40 $ 29.38 $ Area Manager - CM $105-$145 $ 134.19 $ - Division Manager - CM $105-$134 $ 123.31 $ - Sr. Resident Engineer $90-$118 $ 107.35 $ - Sr. Project Manager - CM $80-$112 $ 101.91 $ - Project Manager - CM $72-$103 $ 92.85 $ - Resident Engineer $72-$103 $ 92.12 $ - Project Controls/Scheduler $53-$88 $ 77.25 $ - Inspector - CM* $43-$88 $ 77.61 $ - Asst. Resident Engineer* $55-$89 $ 78.70 $ - Office Engineer $38-$66 $ 55.85 $ - Office Technician $22-$40 $ 29.38 $ - Expert Witness $170-$185 $ 179.16 $ - Strategic Consulting $170-$185 $ 179.16 $ - Funding Manager $88-$114 $ 103.36 $ - Sr. Funding Specialist $52-$78 $ 67.10 $ - Funding Specialist $38-$67 8 $ 56.94 $ 455.52 Project Accountant Manager $55-$78 $ 67.10 $ - Sr. Project Accountant $41 -$63 $ 52.95 $ - Project Accountant $36-$57 92 $ 46.79 $ 4,304.27 Sr. Project Coordinator $43-$63 64 $ 52.59 $ 3,365.66 Project Coordinator $33-$52 $ 41.71 $ - Sr. Project Assistant $34-$52 $ 41.35 $ Project Assistant $24-$42 $ 31.92 $ Sr. Technical Writer $35-$59 $ 48.96 $ Technical Writer $21 -$42 $ 31.92 $ Sr. Graphic Manager $50-$73 $ 62.74 $ Sr. Graphic Designer $40-$64 $ 53.68 $ Graphic Designer $35-$56 $ 45.70 $ LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS $ 483,563.30 $ 44, 741.69 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ d) Fringe Benefits (Rate: 95.61% ) e) Total Fringe Benefits [(c) x (d)] $ 505,112.40 f) Overhead & G&A (Rate: 55.05% ) g) Overhead [(c) x (f)] $ 290,831.90 h) General & Admin (Rate: ) i) Gen & Admin [(c) x (h)] $ - j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ FIXED FEE k) TOTAL FIXED FEE [(c) + 0)] x fixed fee: 10% $ 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) 528,304.99 795,944.30 132,424.93 Description of Item Quantity Unit Unit Cost Total Mileage (IRS Rate) 9150 MILES $ 0.66 $ 5,993.25 Structure/Quantity Calculations 200 SHEETS $ 0.05 $ 10.00 Overnight Mail/Mail 8 EA $ 15.00 $ 120.00 Utility Prior Rights Identification 1 LS $ 3,000.00 $ 3,000.00 Preliminary Title Reports 2 EA $ 1,050.00 $ 2,100.00 Potholing 8 EA $ 2,400.00 $ 19,200.00 Pier Diem/Hotel 2 DAY $ 400.00 $ 800.00 Traffic Control 2 LS $ 4,000.00 $ 8,000.00 Mobile Scanner 1 DAY $ 7,500.00 $ 7,500.00 Aerial Mapping 1 LS $ 6,500.00 $ 6,500.00 1) TOTAL OTHER DIRECT COSTS $ 53,223.25 m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: Albert A. Webb Associates $ 91,919.85 Subconsultant 2: Earth Mechanics $ 144,138.28 Subconsultant 3: Fehr & Peers $ 70,747.92 Subconsultant 4: GPA $ 448,089.29 Subconsultant 5: Monument ROW $ 68,071.85 m) TOTAL SUBCONSULTANTS' COSTS $ 822,967.19 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) + (m)] $ 876,190.44 TOTAL COST [(c) + 0) + (k) + (n)] $ 2,332,864.66 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. CALCULATIONS FOR ANTICIPATED SALARY INCREASES Consultant Mark Thomas & Company Project No. La Quinta Ave 50 - BR-NBIL(547) Contract No Date 2/13/2024 1. Calculate Average Hourly Rate for list year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $ 483,563.30 8806 = $ 54.91 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Avg Hourly Rate Proposed Escalation Year 1 $ 54.91 + 5% _ $ 57.66 Year 2 Avg Hourly Rate Year 2 $ 57.66 + 5% _ $ 60.54 Year 3 Avg Hourly Rate Year 3 $ 60.54 + 5% _ $ 63.57 Year 4 Avg Hourly Rate Year 4 $ 63.57 + 5% _ $ 66.75 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Cost per Year Year 1 0.00% * 8806.0 = 0.0 Estimated Hours Year 1 Year 2 40.00% 8806.0 = 3522.4 Estimated Hours Year 2 Year 3 40.00% * 8806.0 = 3522.4 Estimated Hours Year 3 Year 4 20.00% 8806.0 = 1761.2 Estimated Hours Year 4 Total 100% Total = 8806.0 111,956.99 Estimated Hours Year 4 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $ 54.91 0 = $ - Estimated Hours Year 1 Year 2 $ 57.66 3522 = $ 203,096.58 Estimated Hours Year 2 Year 3 $ 60.54 * 3522 = $ 213,251.41 Estimated Hours Year 3 Year 4 $ 63.57 1761 = $ 111,956.99 Estimated Hours Year 4 Total Direct Labor Cost with Escalation = $ 528,304.99 Direct Labor Subtotal before Escalation = $ 483,563.30 Estimated total of Direct Labor Salary Increase = $ 44,741.69 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Proceedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Zach Siviglia Title': President Signature: Date of Certification: 2/13/2024 Email: zsiviglia@markthomas.com Phone number: (949) 477-9000 Address: 2121 Alton Parkway, Suite 210, Irvine, CA 92606 * An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Cost Proposal 1 Cost Plus Fixed Fee or Lump Sum Note: Mark-ups are Not Allowed ❑ Prime Consultant ■ Subconsultant ❑ 2nd Tier Subconsultant Consultant: Albert A. Webb Associates Project No. BR-NBIL(547) Contract La Quinta- Ave 50 Evac Channel; 2019-02 Date 2/7/2024 DIRECT LABOR Classification/Title Name Range Hours Actual/Average Hourly Rate Miles Total Principal I I/Practice Leader Joseph Caldwell* $85-$96 $ - 93 $ 90.27 $ 8,395.14 Principal I/Senior Engineer Ranjit Singh $74-$86 $ 99 $ 79.33 $ 7,853.67 Associate II/Associate Engineer Ash Ai $40-$60 260 $ 49.12 $ 12,771.20 Project Coordinator Tiana Mundell $20-$30 64 $ 25.50 $ 1,632.00 $ $ - LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS d) Fringe Benefits f) Overhead & G&A h) General & Admin FIXED FEE $ 30,652.01 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 30,652.01 (Rate: 56.48% ) e) Total Fringe Benefits [(c) x (d)] $ (Rate: 116.14% ) g) Overhead [(c) x (f)] $ (Rate: ) i) Gen & Admin [(c) x (h)] $ 17,312.25 35, 599.24 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ k) TOTAL FIXED FEE [(c) + 0)] x fixed fee: 10% $ 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) 52,911.50 8,356.35 Description of Item Quantity Unit Unit Cost Total Mileage - IRS Rate Miles $ $ Printing Cost $ - $ Transportation Cost $ - $ Conference Calls Cost $ - $ Title Reports Cost $ - $ Permit Fees Cost $ - $ 1) TOTAL OTHER DIRECT COSTS $ - m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: m) TOTAL SUBCONSULTANTS' COSTS $ - n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) + (m)] $ TOTAL COST [(c) + (j) + (k) + (n)] $ 91,919.85 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. CALCULATIONS FOR ANTICIPATED SALARY INCREASES Consultant Albert A. Webb Associates Project No. BR-NBIL(547) Contract La Quinta- Ave 50 Evac Channel; 2019-02 Date 2/7/2024 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $ 30,652.01 516 = $ 59.40 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation % 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Avg Hourly Rate Proposed Escalation Year 1 $ 59.40 + 0% _ $ 59.40 Year 2 Avg Hourly Rate Year 2 $ 59.40 + 0% _ $ 59.40 Year 3 Avg Hourly Rate Year 3 $ 59.40 + 0% _ $ 59.40 Year 4 Avg Hourly Rate Year 4 $ 59.40 + 0% _ $ 59.40 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Cost per Year Year 1 40.00% 516.0 = 206.4 Estimated Hours Year 1 Year 2 30.00% 516.0 = 154.8 Estimated Hours Year 2 Year 3 30.00% 516.0 = 154.8 Estimated Hours Year 3 Year 4 0.00% 516.0 = 0.0 Estimated Hours Year 4 Year 5 0.00% 516.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 516.0 - Estimated Hours Year 5 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $ 59.40 206 = $ 12,260.80 Estimated Hours Year 1 Year 2 $ 59.40 155 = $ 9,195.60 Estimated Hours Year 2 Year 3 $ 59.40 155 = $ 9,195.60 Estimated Hours Year 3 Year 4 $ 59.40 0 = $ - Estimated Hours Year 4 Year 5 $ 54.12 0 = $ - Estimated Hours Year 5 Total Direct Labor Cost with Escalation = $ 30,652.01 Direct Labor Subtotal before Escalation = $ 30,652.01 Estimated total of Direct Labor Salary Increase = $ - Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Proceedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Kevin Ferquson Signature Email Address Digitally signed by Kevin W.M. Kevin W.M. Ferguson Ferguson Date: 2024.02.12 14:36:58 -08'00' Title *: Chief Development Officer Date of Certification: 2/7/2024 Kevin.Ferguson@webbassociates.com Phone number: (951) 830-1830 3788 McCray Street, Riverside, CA 92506 * An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Civil engineering services for Avenue 50 bridge. Cost Proposal 1 Cost Plus Fixed Fee or Lump Sum Note: Mark-ups are Not Allowed ❑ Prime Consultant ■ Subconsultant ❑ 2nd Tier Subconsultant Consultant: Earth Mechanics, Inc. Project No. BR-NBIL(547) Contract La Quinta- Ave 50 Evac Channel; 2019-02 Date 2/8/2024 DIRECT LABOR Classification/Title Name Range Hours Actual/Average Hourly Rate Unit Cost Total Principal/Project Manager $101-$124 4 $ - $ - Principal/Project Manager Alahesh Thurairajah* $101-$124 100 $ 101.60 $ 10,160.00 Principal Engineer/Geologist $77-$124 40 $ 92.00 $ 3,680.00 Senior Engineer/Geologist $63-$92 190 $ 69.70 $ 13,243.00 Senior Project Engineer/Geologist $54-$84 10 $ 68.60 $ - Project Engineer/Geologist $51 -$70 72 $ 53.50 $ 3,852.00 Senior Staff Engineer/Geologist $47-$62 4 $ 51.30 $ - Staff Engineer/Geologist $33-$55 32 $ 45.10 $ 1,443.20 Senior Techncian $49-$64 40 $ 52.50 $ 2,100.00 Technician $20-$34 18 $ 27.20 $ 489.60 Project Analyst $30-$63 $ - $ - LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS d) Fringe Benefits (Rate: 58.42% ) f) Overhead & G&A (Rate: 112.26% ) h) General & Admin (Rate: ) FIXED FEE $ 34,967.80 $ 1,628.58 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 36,596.38 e) Total Fringe Benefits [(c) x (d)] $ g) Overhead [(c) x (f)] $ i) Gen & Admin [(c) x (h)] $ 21, 379.60 41, 083.09 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ k) TOTAL FIXED FEE [(c) + Q)] x fixed fee: 10% $ 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) 62,462.70 9,905.91 Description of Item Quantity Unit Unit Cost Total Drill Rig Rental 4 Day $ 5,200.00 $ 18,200.00 Traffic Control 4 Day $ 1,750.00 $ 7,000.00 EMI Coring 1 Day $ 400.00 $ 400.00 Soil Cutting Contaminants Testing 2 Test $ 350.00 $ 700.00 Soil Cuttings (drums) Disposal 10 Drum $ 300.00 $ 3,000.00 Mileage 2860 Mile $ 0.655 $ 1,873.30 Concrete Patch 4 Day $ 1,000.00 $ 4,000.00 m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: 1) TOTAL OTHER DIRECT COSTS $ 35,173.30 m) TOTAL SUBCONSULTANTS' COSTS $ - n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) + (m)] $ 35,173.30 TOTAL COST [(c) + G) + (k) + (n)] $ 144,138.28 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. CALCULATIONS FOR ANTICIPATED SALARY INCREASES Consultant Earth Mechanics, Inc. Project No. BR-NBIL(547) Contract La Quinta- Ave 50 Evac Channel; 2019-02 Date 2/8/2024 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $ 34,967.80 492 = $ 71.07 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation % 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Avg Hourly Rate Proposed Escalation Year 1 $ 71.07 + 5% _ $ 74.63 Year 2 Avg Hourly Rate Year 2 $ 74.63 + 5% _ $ 78.36 Year 3 Avg Hourly Rate Year 3 $ 78.36 + 5% _ $ 82.28 Year 4 Avg Hourly Rate Year 4 $ 82.28 + 5% _ $ 86.39 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Cost per Year Year 1 20.00% 492.0 = 98.4 Estimated Hours Year 1 Year 2 35.00% 492.0 = 172.2 Estimated Hours Year 2 Year 3 40.00% 492.0 = 196.8 Estimated Hours Year 3 Year 4 0.00% 492.0 = 0.0 Estimated Hours Year 4 Year 5 5.00% 492.0 = 24.6 Estimated Hours Year 5 Total 100% Total = 492.0 1,331.35 Estimated Hours Year 5 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $ 71.07 98 = $ 6,993.56 Estimated Hours Year 1 Year 2 $ 74.63 172 = $ 12,850.67 Estimated Hours Year 2 Year 3 $ 78.36 197 = $ 15,420.80 Estimated Hours Year 3 Year 4 $ 82.28 0 = $ - Estimated Hours Year 4 Year 5 $ 54.12 25 = $ 1,331.35 Estimated Hours Year 5 Total Direct Labor Cost with Escalation = $ 36,596.38 Direct Labor Subtotal before Escalation = $ 34,967.80 Estimated total of Direct Labor Salary Increase = $ 1,628.58 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Proceedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Alahesh Thurairajah, PE, GE, BC.GE Signature: Email: A.Thurairaiah@earthmech.com Address: 765 North Main Street. Suite 136. Corona. CA 92880 Title *: Principal Date of Certification: 2/8/2024 Phone number: (951)333-3648 An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: 541330 - Geotechnical Engineering 541380 - Laboratory Testing COST PROPOSAL 1 Page 1 of 3 ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed Prime Consultant Subconsultant X Consultant Fehr & Peers Project No. Avenue 50 Evacuation Channel Crossing Contract No. n1RrrT ICRnR Cost Proposal 1 2nd Tier Subconsultant Date Updated 8/7/2023 Classification/Title Name Hours Actual Hourly Rate Total Principal Jason Pack, P.E. 8 $ 105.77 $846.16 Principal Claude Strayer, P.E. 80 $ 73.56 $5,884.80 Sr. Associate Paul Herrmann, P.E. 20 $ 65.38 $1,307.60 Sr. Engineer j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $40,866.39 32 $ 48.08 $1,538.56 Sr. Engineer 1 192 $ 45.67 $8,768.64 Engineer/Planner 24 $ 39.90 $957.60 Project Coordinator $0.00 45 $ 50.48 $2,271.60 Graphics Support/GIS 4 $ 37.50 $150.00 0 $ - $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 LABOR COSTS Quantity a) Subtotal Direct Labor Costs $21,724.96 b) Anticipated Salary Increases (see page 2 for calculation) $543.12 0 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $22,268.08 INDIRECT COSTS $0.00 d) Fringe Benefits (Rate: 62.39% ) e) Total Fringe Benefits [(c) x (d)] $13,893.06 f) Overhead (Rate: 121.13% ) g) Overhead [(c) x (f)] $26,973.33 h) General and Administrative (Rate: ) i) Gen & Admin [(c) x (h)] $0.00 2 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $40,866.39 q) FIXED FEE 10.00% k) TOTAL FIXED FEE [(c) + (j)] x (q)] $6,313.45 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) 1 Description of Item Quantity Unit Unit Cost Total Mileage - Current IRS Rate 0 miles $0.66 $0.00 Traffic Counts 1 intersections $400.00 $400.00 Traffic Counts 2 segments $200.00 $400.00 RIVCOM Model Application 1 data purchase $500.00 $500.00 $0.00 1) TOTAL OTHER DIRECT COSTS $1,300.00 m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) m) TOTAL SUBCONSULTANTS'COSTS $ n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I)+(m)] TOTAL COST [(c) + (j) + (k) + (n)] January 2018 $1,300.00 $70,747.92 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. Local Assistance Procedures Manual Cost Proposal 1 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) COST PROPOSAL 1 Page 2 of 3 Total Hours Total Hours ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS Completed Each Year per Cost Proposal per Year (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) Year 1 50.00% * 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) = 202.5 Estimated Hours Year 1 Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $21,724.96 405 = $53.64 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) = 0.0 Estimated Hours Year 4 Avg Hourly Rate Proposed Escalation 405.0 = 0.0 Year 1 $53.64 + 5.0% _ $56.32 Year 2 Avg Hourly Rate Year 2 $56.32 + 3.0% _ $58.01 Year 3 Avg Hourly Rate Year 3 $58.01 + 3.0% _ $59.75 Year 4 Avg Hourly Rate Year 4 $59.75 + 3.0% _ $61.55 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Year 1 50.00% * 405.0 = 202.5 Estimated Hours Year 1 Year 2 50.00% * 405.0 = 202.5 Estimated Hours Year 2 Year 3 0.00% * 405.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 405.0 = 0.0 Estimated Hours Year 4 Year 5 0.00% * 405.0 = 0.0 Estimated Hours Year 5 Tota 1 100% Tota 1 = 405.0 Estimated Hours Year 5 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2018 Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $53.64 * 202.5 = $10,862.48 Estimated Hours Year 1 Year 2 $56.32 * 202.5 = $11,405.60 Estimated Hours Year 2 Year 3 $58.01 * 0.0 = $0.00 Estimated Hours Year 3 Year 4 $59.75 * 0.0 = $0.00 Estimated Hours Year 4 Year 5 $61.55 * 0.0 = $0.00 Estimated Hours Year 5 Total Direct Labor Cost with Escalation = $22,268.08 Direct Labor Subtotal before Escalation = $21,724.96 Estimated total of Direct Labor Salary Increase = $543.12 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2018 Cost Proposal 1 Cost Proposal 1 Page 3 of 3 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31- Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Signature Email Lysa Wollard Title *: CFO Date of Certification (mm/dd/yyyy): I.wollard@fehrandpeers.com Phone Number: Address: 100 Pringle Avenue, Suite 600, Walnut Creek, CA 94596 925.977.3216 02.02.2024 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Traffic Engineering and transportation planning. Specifically, development of the following deliverables in support of the porject: (1) VMT Assessment, (2) Transportation Study, (3) Lighting Calculation and Concept Design, (4) Signing & Striping Design, (5) Street Lighting Design, (6) Traffic Signal Design (Optional), (7) Traffic Signal Interconnect (Optional), and (8) Design Support During Construction. January 2018 Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed ❑ Prime Consultant 0 Subconsultant ❑ 2nd Tier Subconsultant Consultant GPA Consulting Project No. Avenue 50 Bridge, La Quinta Contract No. Date 2/13/2024 DIRECT LABOR Classification/Title Name Hours Actual Hourly Rate Total Principal Environmental Planner Erinn Silva 78 $86.54 $6,750.12 Senior Associate Environmental Plannei Ryan Todaro 6 $86.54 $519.24 Senior Environmental Planner Marya Samuelson 238 $60.10 $14,303.80 Environmental Planner Savannah Marburger 330 $32.69 $10,787.70 Environmental Planner Alyssa "Riley" Vera 90 $32.69 $2,942.10 Senior Associate Biologist Marieka Schrader 44 $74.52 $3,278.88 Senior Associate Biologist Jennifer Johnson 108 $62.50 $6,750.00 Senior Biologist Manjunath Venkat 76 $55.53 $4,220.28 Associate Biologist VictoriaMasjuan 278 $36.35 $10,105.30 Associate Biologist Lizbeth Pliego Guzman 296 $31.50 $9,324.00 Senior Associate Architectural Historian Jenna Kachour 12 $62.50 $750.00 Senior Architectural Historian Amanda Duane 34 $51.44 $1,748.96 Associate Architectural Historian Audrey von Ahrens 2 $42.31 $84.62 Associate Architectural Historian Emma Haggerty 4 $42.09 $168.36 Senior GIS Analyst Martin Rose 102 $54.47 $5,555.94 Environmental Planner Monica Carvalheira 314 $28.85 $9,058.90 Environmental Planner Kayla Fon 20 $28.85 $577.00 LABOR COSTS a) Subtotal Direct Labor Costs $86,925.20 b) Anticipated Salary Increases (see page 2 for calculation) $0.00 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $86,925.20 INDIRECT COSTS d) Fringe Benefits (Rat 51.39% e) Total Fringe Benefits [(c) x (d)] $44,673.82 f) Overhead (Rate: 51.85% g) Overhead [(c) x (f)] $45,073.15 h) General and Administrative (Rate: 74.14% i) Gen & Admin [(c) x (h)] $64,450.17 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $154,197.13 FIXED FEE k) TOTAL FIXED FEE [(c) + 0)] x fixed fee 10% ] $24,112.23 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit(s) Unit Cost Total Mileage Costs 2140 mile 0.655 $1,401.70 Copies/Reproduction 4 ea $15.00 $60.00 1) TOTAL OTHER DIRECT COSTS $1,461.70 m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: Ambient $135,554.81 Subconsultant 2: Duke CRM $25,007.09 Subconsultant 3: Crawford & Associates $20,831.12 m) TOTAL SUBCONSULTANT'S COSTS $181,393.02 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] $182,854.72 TOTAL COST [(c) + 0) + (k) + (n)] $448,089.29 NOTES: 1.Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be markedwith two asterisks All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2.The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with theconsultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3.Anticipated salary increases calculation (page 2) must accompany. January 2020 Local Assistance Procedures Manual Exhibit 10-H1 EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $86,925.20 1698 = 51.19269729 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Avg Hourly Proposed Escalation Total Hours Year 1 $51.19 * 1698 Rate per Cost Proposal per Year $56.44 * 0 Year 1 $51.19 + 5.0% _ $53.75 ' Year 2 Avg Hourly Rate Year 2 $53.75 + 5.0% _ $56.44 Year 3 Avg Hourly Rate Year 3 $56.44 + 5.0% _ $59.26 Year 4 Avg Hourly Rate Year 4 $59.26 + 5.0% _ $62.23 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Year 1 $51.19 * 1698 Completed Each Year per Cost Proposal per Year $56.44 * 0 Year 1 100.00% * 1698.0 = 1698.0 Estimated Hours Year 1 Year 2 0.00% * 1698.0 = 0.0 Estimated Hours Year 2 Year 3 0.00% * 1698.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 1698.0 = 0.0 Estimated Hours Year 4 Year 5 0.00% * 1698.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 1698.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Cost per Year Avg Hourly Rate Estimated hours = 86925.2 (calculated above) (calculated above) Year 1 $51.19 * 1698 Year 2 $53.75 * 0 Year 3 $56.44 * 0 Year 4 $59.26 * 0 Year 5 $62.23 * 0 I _ $86,925.20 Total Direct Labor Cost with Escalation _ $0.00 Direct Labor Subtotal before Escalation Estimated total of Direct Labor Salary Cost per Year = 86925.2 Estimated Hours Year 1 _ $0.00 Estimated Hours Year 2 _ $0.00 Estimated Hours Year 3 _ $0.00 Estimated Hours Year 4 _ $0.00 Estimated Hours Year 5 _ $86,925.20 _ $86,925.20 _ $0.00 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2020 Local Assistance Procedures Manual Certification of Direct Costs Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3 I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 -Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration ofEngineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Richard Galvin Title *: Vice President Signature :� - — . Date of Certification (mm/dd/yyyy; 2/13/2024 Email: richard(agpaconsultin,g-us.com Phone Number: (310) 792-2690 Address: 840 Apollo Street, Suite 312, El Segundo, CA 90245 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Environmental Consulting Services. LPP 15-01 January 2020 Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed 1:1 Prime Consultant 11 Subconsultant o 2nd Tier Subconsultant Consultant AMBIENT Air Quality & Noise Consi Project No. Contract No. Date 3/11/2024 DIRECT LABOR Classification/Title Name Hours Actual Hourly Rate Total PRINCIPAL KURT LEGLEITER 290 $90.00 $26,100.00 SPECIALIST JON PAMBAKIAN 990 $37.39 $37,019.23 ANALYST DYLAN MICK 413 $24.04 $9,927.88 $0.00 $0.00 $0.00 LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS d) Fringe Benefits f) Overhead h) General and Administrative FIXED FEE $73,047.12 $0.00 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $73,047.12 (Rate 41.30% e) Total Fringe Benefits [(c) x (d)] $30,168.46 (Rate: 0.00% g) Overhead [(c) x (f)] $0.00 (Rate: 24.74% i) Gen & Admin [(c) x (h)] $18,071.86 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $48,240.32 k) TOTAL FIXED FEE [(c) + 0)] x fixed fee 10% ] 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) $12,128.74 Description of Item Quantity Unit(s) Unit Cost Total Mileage Costs 1302.45 mile $0.67 $872.64 Meals & Incidentals 6 days $69.00 $414.00 Lodging 6 nights $142.00 $852.00 $0.00 *CDCs to be billed based on Federal per diem rates. m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: 1) TOTAL OTHER DIRECT COSTS $2,138.64 m) TOTAL SUBCONSULTANT'S COSTS n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] TOTAL COST [(c) + 0) + (k) + (n)] $0.00 $0.00 $2,138.64 $135,554.81 NOTES: LKey personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be markedwith two asterisks (**) All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2.The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with theconsultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3.Anticipated salary increases calculation (page 2) must accompany. January 2020 Local Assistance Procedures Manual Exhibit 10-H1 EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $73,047.12 1693 = 43.14655368 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation % Avg Hourly Proposed Escalation Rate Year 1 $43.15 + 5.0% _ $45.30 Year 2 Avg Hourly Rate Year 2 $45.30 + 5.0% _ $47.57Year 3 Avg Hourly Rate Year 3 $47.57 + 5.0% _ $49.95 1Year 4 Avg Hourly Rate Year 4 $49.95 + 5.0% 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) $52.44 Year 5 Avg Hourly Rate 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year (calculated above) (calculated above) Year 1 100.00% * 1693.0 = 1693.0 Estimated Hours Year 1 Year 2 0.00% * 1693.0 = 0.0Estimated Hours Year 2 Year 3 0.00% * 1693.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 1693.0 = 0.0 Estimated Hours Year 4 Year 5 0.00% * 1693.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 1693.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2020 Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $43.15 * 1693 = 73047.11538 Estimated Hours Year 1 Year 2 $45.30 * 0 = $0.00 Estimated Hours Year 2 Year 3 $47.57 * 0 = $0.00 Estimated Hours Year 3 Year 4 $49.95 * 0 = $0.00 Estimated Hours Year 4 Year 5 $52.44 * 0 = $0.00 Estimated Hours Year 5 Total Direct Labor Cost with Escalation = $73,047.12 Direct Labor Subtotal before Escalation = $73,047.12 Estimated total of Direct Labor Salary = $0.00 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2020 Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3 Certification of Direct Costs I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration ofEngineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name Signature : Kurt Legleiter Title *: Principal Email: kurt(a).ambient.consulting Date of Certification (mm/dd/yyyy; 3/11/2024 Phone Number: 805.226.2727 Address: 75 Higuera Street, Suite 105, San Luis Obispo, CA 93401 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Air Quality Study Report, Air Quality Conformity Assessment, Noise Study Report LPP 15-01 January 2020 Local Assistance Procedures Manual 1W/:11-3III fiIII: I Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed Consultant Crawford & Associates, Inc. Project No. ❑ Prime Consultant ❑Subconsultant x❑ 2nd Tier Subconsultant Contract No. Total Principal * Date 7/24/2023 Project Name Low Water Crossing Replacement Bridge - La Quinta DIRECT LABOR Classification/Title Name Hours Actual Hourly Rate $ Total Principal * Benjamin Crawford 6.0 $70.30 $ 421.80 Senior Project Manager * Chris Trumbull 0.0 $72.50 $ - Senior Project Manager* Eric Nichols 4.0 $59.09 $ 236.36 Project Manager II TBD 0.0 $54.85 $ - Project Manager I TBD 0.0 $52.88 $ - Senior Geologist TBD 47.0 $46.43 $ 2,182.21 Senior Engineer TBD 0.0 $46.43 $ - Project Engineer 11 TBD 0.0 $42.00 $ - Project Engineer I TBD 34.0 $37.50 $ 1,275.00 Staff Engineer TBD 1.0 $32.88 $ 32.88 Administrative Assistant TBD 4.0 $29.75 $ 119.00 96 LABOR COSTS Quantity Unit a) Subtotal Direct Labor Costs $ 4,267.25 b) Anticipated Salary Increases (see page 2 for calculation) $0.00 150 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 4,267.25 INDIRECT COSTS $ 98.25 d) Fringe Benefits Rate: 93.29% e) Total Fringe Benefits [(c) x (d)] $ 3,980.92 f) Overhead Rate: 116.79% g) Overhead [(c) x (f)] $ 4,983.72 h) General & Administrative Rate: 20.00% i) Gen & Admin [(c) x (h)] $ 853.45 Combined ICR %: 230.08% j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 9,818.09 FIXED FEE k) TOTAL FIXED FEE [(c) + Q)] x fixed fee 10% ] $ 1,408.53 I CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE Add additional Daaes if necessary) Description of Item Quantity Unit Unit Cost Total Mileage IRS Rate 150 Mile $ 0.655 $ 98.25 ERIS Aerials, Records, To os 1 At Cost $ 575.00 $ 575.00 Per Diem 2 Da $ 182.00 $ 364.00 Travel Expenses Air fare, car, shipping) 1 At Cost $ 1,600.00 $ 1,600.00 Hand Au er 1 Da $ 200.00 $ 200.00 Laboratory Testing 1 -Lump Sum $ 2,500.00 $ 2,500.00 $ 5,337.25 m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: Subconsultant 2: $ - m) TOTAL SUBCONSULTANT'S COSTS $ - n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) + (m)] $ 5,337.25 TOTAL COST [(c) + Q) + (k) + (n)] $ 20,831.12 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailinq waqe requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accountinq period and established by a coqnizant agencv or accepted by Caltrans. 3. Anticipated salary calculation (paqe 2) must accompany. Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1 st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $4,267.25 96 = 44.45 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation % Avg Hourly Rate Proposed Escalation Total Hours Year 1 $44.45 + 5.0% _ $46.67 Year 2 Avg Hourly Rai Year 2 $46.67 + 5.0% _ $49.01 Year 3 Avg Hourly Rai Year 3 $49.01 + 5.0% _ $51.46 Year 4 Avg Hourly Rai Year 4 $51.46 + 5.0% _ $54.03 Year 5 Avg Hourly Rai 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 years = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are qranted. 4. Calculations for anticipated salary escalation must be provided. Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Year 1 100% * 96 = 96.00 Estimated Hours Year Year 2 0% * 96 = 0.00 Estimated Hours Year Year 3 0% * 96 = 0.00 Estimated Hours Year Year 0% * 96 = 0.00 Estimated Hours Year Year 5 0% * 96 = 0.00 Estimated Hours Year Total 100% Total = 96.00 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of ho Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $44.45 96 = 4267.25 Estimated Hours Year Year 2 $46.67 0 = $0.00 Estimated Hours Year Year 3 $49.01 0 = $0.00 Estimated Hours Year Year $51.46 * 0 = $0.00 Estimated Hours Year Year 5 $54.03 * 0 = $0.00 Estimated Hours Year Total Direct Labor Cost with Escalation = $4,267.25 Direct Labor Subtotal before Escalation = $4,267.25 Estimated total of Direct Labor Salary Increase = $0.00 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 years = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are qranted. 4. Calculations for anticipated salary escalation must be provided. Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-1-11 COST PROPOSAL Page 3 of 3 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncomDliant with the federal and state reauirements are not eliaible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted In direct Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Benjamin D. Crawford Signature Title *: President Date of Certification: 7/24/2023 Email: ben.crawfordCcDcrawford-inc.com Phone Number: (916) 455-4225 Address: Crawford & Associates. Inc.. 4701 FreeDort Blvd.. Sacramento. CA 95822 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: ENVIRONMENTAL SERVICES Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed 11 Prime Consultant o Subconsultant 13 2nd Tier Subconsultant Consultant Duke Cultural Resources Managem Project No. Contract No. DIRECT LABOR Date Classification/Title Name Hours Actual Hourly Rate Total Principal Archaeologist Curt Duke 17 $80.00 $1,360.00 rincipal Investigator - Archaeologist/GI Brian Glenn 33.5 $48.00 $1,608.00 Principal Paleontologist Brian Kussman 42 $43.00 $1,806.00 Paleontologist Adrian Garibay 7 $22.00 $154.00 GIS Specialist Michelle Dominguez 11.5 $22.00 $253.00 Archaeologist Morgan Beigle 64 $36.00 $2,304.00 Archaeologist Alexandria Bulato 17 $31.00 $527.00 Archaeologist Lauren Biltonen 11 $25.00 $275.00 Administrative Assistant Shawn Steinhardt 2 $44.72 $89.44 $0.00 LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS d) Fringe Benefits f) Overhead h) General and Administrative $8,376.44 $0.00 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $8,376.44 (Rate 41.21% e) Total Fringe Benefits [(c) x (d)] $3,451.93 (Rate: 0.00% g) Overhead [(c) x (f)] $0.00 (Rate: 115.15% i) Gen & Admin [(c) x (h)] $9,645.47 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10% ] 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) $13,097.40 $2,147.38 Description of Item Quantity Unit(s) Unit Cost Total Mileage Costs 360 mile 0.655 $235.87 Cultural Records Search - Eastern Information Center (UCR) 1 $750.00 $750.00 Paleontological Record Search - Western Science Center 1 $250.00 $250.00 NA Monitor Letter Postage I 1 1 1 $150.00 1 $150.00 1) TOTAL OTHER DIRECT COSTS $1,385.87 m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: $0.00 m) TOTAL SUBCONSULTANT'S COSTS $0.00 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] $1,385.87 TOTAL COST [(c) + 0) + (k) + (n)] $25,007.09 NOTES: l.Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be markedwith two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2.The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with theconsultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. January 2020 Local Assistance Procedures Manual 3.Anticipated salary increases calculation (page 2) must accompany. Exhibit 10-H1 January 2020 Local Assistance Procedures Manual Exhibit 10-H1 EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $8,376.44 205 = 40.86068293 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalatioi 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Avg Hourly Proposed Escalation Total Hours Rate per Cost Proposal per Year (calculated above) (calculated above) Year 1 $40.86 + 5.0% _ $42.90 Year 2 Avg Hourly Rate Year 2 $42.90 + 5.0% _ $45.05 Year 3 Avg Hourly Rate Year 3 $45.05 + 5.0% _ $47.30 Estimated Hours Year 3 Year 4 Avg Hourly Rate Year 4 $47.30 + 5.0% _ $49.67 Year 5 I Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year (calculated above) (calculated above) Year 1 100.00% * 205.0 = 205.0 Estimated Hours Year 1 Year 2 0.00% * 205.0 = 0.0 Estimated Hours Year 2 Year 3 0.00% * 205.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 205.0 = 0.0 Estimated Hours Year 4 Year 5 0.00% * 205.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 205.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2020 Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $40.86 * 205 = 8376.44 Estimated Hours Year 1 Year 2 $42.90 * 0 = $0.00 Estimated Hours Year 2 Year 3 $45.05 * 0 = $0.00 Estimated Hours Year 3 Year 4 $47.30 * 0 = $0.00 Estimated Hours Year 4 Year 5 $49.67 * I 0 = $0.00 Estimated Hours Year 5 Total Direct Labor Cost with Escalation = $8,376.44 Direct Labor Subtotal before Escalation = $8,376.44 Estimated total of Direct Labor Salary = Increase $0.00 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2020 Local Assistance Procedures Manual EXHIBIT 10-111 COST PROPOSAL Page 3 of 3 Certification of Direct Costs Exhibit 10-H1 Cost Proposal I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 -Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration ofEnginccring and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Curt Duke Signature Title * President Date of Certification (mm/dd/yyyy 3/4/2024 Email: curt(aMukeam.com Phone Number: Address: 18 Technology Drive, Suite 103, Irvine CA 92618 949-356-6660 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: and paleontological resource services. LPP 15-01 January 2020 Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal Note: Mark-ups are Not Allowed Consultant Monument ROW Project No. DIRECT LABOR EXHIBIT 10-H1 COST PROPOSAL (Page 1 of 3) ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINEERING, AND ENVIRONMENTAL STUDIES) - ❑ Prime Consultant X❑ Subconsultant 2nd Tier Subconsultant Contract No. Date 2/13/2024 Classification/Title Name Hours Actual Hourly Rate Total RAV Project Manager Kim Bibolet 69 $ 82.73 $ 5,708.37 R/W Agent / Analyst Alex Flores 196 $ 36.06 $ 7,067.76 Project Support Specialist Tiffany McCloud 110 $ 31.25 $ 3,437.50 Fee Appraisal (3) - Santolucito Dore each $ 18,000.00 Appraisal Review (3) - Vaughn Hossman each $ 8,250.00 $ LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculations) Total: 375.0 $ 16,213.63 $ 16,213.63 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 17,002.26 INDIRECT COSTS d) Fringe Benefits Rate: 43.92% e) Total fringe benefits [(c) x (d)] $ 7,468.59 Overhead Rate: 72.20% g) Overhead [(c) x (f)] $ 12,276.28 h) General and Administrative Rate: 0.00% i) Gen & Admin [(c) x (h)] j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ 19,744.88 FIXED FEE k) TOTAL FIXED FEE [(c) + (j)] x fixed fee 10.00% $ 3,674.71 11 C ONSI11,TANT'S (OTHER DIRECT COSTS tODC - ITEMIZE tAdd additional naves if necessarvl Description of Item Quantity Unit Unit Cost Total Mileage Costs mile $ 1,200.00 Express Mails / Deliveries (at cost) / Copies each $ 200.00 Fee Appraisal (3) - Santolucito Dore each $ 18,000.00 Appraisal Review (3) - Vaughn Hossman each $ 8,250.00 $ 1) TOTAL OTHER DIRECT COSTS $ 27,650.00 m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: $ m) SUBCONSULTANTS' COSTS $ - n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] $ 27,650.00 TOTAL COST [(c) + (j) + (k) +(n)] $ 68,071.85 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**). All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accept by Caltrans. 3. Anticipated salary increases calculations (page 2) must accompany. Page 1 of 9 January 2018 Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL (Page 2 of 3) ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Total Hours per Avg 5 Year Labor Subtotal per Cost Proposal Hourly Contract Cost Proposal Rate Duration $16,213.63 / 375.0 - $43.24 Year 1 Avg + 4.0% - $46.76 Hourly Rate 2. Calculate hourly rate for all years (Increase the Average hourly rate for a year by proposed escalation %) 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Avg Hourly Rate Proposed Escalation Total Hours per _ $3,242.73 Year 1 $43.24 + 4.0% - $44.97 Year 2 Avg Hourly Rate Year 2 $44.97 + 4.0% - $46.76 Year 3 Avg Hourly Rate Year 3 $46.76 + 4.0% _ $48.64 Year 4 Avg Hourly Rate Year 4 $48.64 + 4.0% _ $50.58 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours (calculated above) (calculated above) Year 1 $ 43.24 * 75.0 Year 2 $ 44.97 * 150.0 Year 3 $ 46.76 * 150.0 Year 4 $ 48.64 * 0.0 Year 5 $ 50.58 * 0.0 Total Direct Labor Cost with Escalation Direct Labor Subtotal before escalation Estimated total of Direct Labor Salary Increase Cost per Estimated % Completed Total Hours per Cost Total Hours per _ $3,242.73 Estimated Hours Year I Each Year Proposal Year Estimated Hours Year 3 Year 1 20% * 375.0 = 75.0 Estimated Hours Year 1 Year 2 40% * 375.0 = 150.0 Estimated Hours Year 2 Year 3 40% * 375.0 = 150.0 Estimated Hours Year 3 Year 4 * 375.0 = 0.0 Estimated Hours Year 4 Year 5 * 375.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 375.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours (calculated above) (calculated above) Year 1 $ 43.24 * 75.0 Year 2 $ 44.97 * 150.0 Year 3 $ 46.76 * 150.0 Year 4 $ 48.64 * 0.0 Year 5 $ 50.58 * 0.0 Total Direct Labor Cost with Escalation Direct Labor Subtotal before escalation Estimated total of Direct Labor Salary Increase Cost per Year _ $3,242.73 Estimated Hours Year I _ $6,744.87 Estimated Hours Year 2 _ $7,014.66 Estimated Hours Year 3 _ $0.00 Estimated Hours Year 4 _ $0.00 Estimated Hours Year 5 _ $17,002.26 _ $16,213.63 _ $788.63 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Page 2 of 9 January 2018 Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL (Page 3 of 3) Certification of Direct Costs I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1 Generally Accepted Accounting Principles (GAAP) 2 Terms and conditions of the contract 3 Title 23 United States Code Section 112 - Letting of Contracts 4 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Services 6 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Suconsultant Certifying: Name: Joev Mendoza Signature: - Email: imen ozaPmonumentrow.com Title*: Vice President Date of Certification (mm/dd/yyyy): 2/13/2024 Phone Number: 949.378.0687 Address: 200 Spectrum Center, Suite 300, Irvine, CA 92618 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services ine consultant is proviainq unaer anis proi3osea contract: Right of Way and Utility Coordination Services Page 3 of 9 January 2018 Exhibit C Schedule of Performance Contracting Party shall complete all services identified in the Scope of Services, Exhibit A of this Agreement, in accordance with the Project Schedule, attached hereto and incorporated herein by this reference. Exhibit C Page 1 of 1 MARK THOMAS Avenue 50 BRIDGE PROJECT Environmental, Preliminary Engineering, PS&E and Right of Way Services cill - CALIFORNIA - ID Task Name PHASE I - PROJECT APPROVAL & ENVIRO DOCUMENTS Kick off Meeting PreliminaryEngineering g g Task 2 - Surveying Permits/Permit(s) to Enter Record Research/Site Visit Survey Request Surveying and Monuments & Right of Way Base Mapping Submitted Task 3 - Utility Coordination Utility 'A' Letters Utility Mapping Utility Prior Rights Identification Task 4 - Preliminary Geotechnical Analysis Task 5 - Hydraulic Analysis Preliminary Hydraulic Analysis Hydraulics, Scour, Bridge Hydraulics Report City Review/CVWD Review Finalize Report/CVWD Review & Approval Task 6 Environmental Approval CE NEPA pP QA/ PES Form Caltrans Field Review Meeting Technical Studies Cultural Resources NES Air Quality/GHG Technical Memorandum Initial Site Assessment (Phase I & Phase II) Noise & Groundborne Vibration Tech Memo Abbreviated Visual Impact Assessment Water Quality Assessment Report Approved Technical Studies Draft IS Final IS/CE CEQA/NEPA Approval Approved Environmental Document Task 7 - Geometric Approval Drawings 35% Design Prepare Preliminary Geometrics & Reviews City Review Respond to Comments Update Geometrics based on Hydraulic Report Approved Geometrics VMT Assessment VMT Assessment Structure Type Selection Report Prepare Draft TSR Duration 450 days 0 days 450 days Y 60 days 20 days 15 days 15 days 40 days 0 days 120 days 35 days 10 days 40 days 50 days 195 days 40 days 35 days 30 days 90 days 450 days Y/ 115 days 0 days 100 days 90 days 60 days 90 days 90 days 90 days 60 days 60 days 0 days 155 days 60 days 50 days 0 days 200 days 45 days 10 days 10 days 10 days 0 days 40 days 40 days 135 days 40 days Start Mon 4/1/24 Mon 4/1/24 Mon 4/1/24 Mon 4/15/24 Mon 4/15/24 Mon 4/15/24 Mon 5/13/24 Mon 5/13/24 Fri 7/5/24 Mon 4/1/24 Mon 4/1/24 Mon 7/8/24 Mon 7/22/24 Mon 7/22/24 Mon 5/13/24 Mon 5/13/24 Mon 7/8/24 Mon 8/26/24 Mon 10/7/24 Mon 4/1/24 Mon 4/1/24 Fri 10/4/24 Mon 9/9/24 Mon 9/23/24 Mon 9/9/24 Mon 9/9/24 Mon 9/9/24 Mon 9/9/24 Mon 9/9/24 Mon 9/30/24 Fri 2/7/25 Mon 12/16/24 Mon 7/21/25 Mon 10/13/25 Fri 12/19/25 Mon 7/22/24 Mon 7/22/24 Mon 9/23/24 Mon 10/7/24 Mon 10/7/24 Fri 10/18/24 Mon 9/23/24 Mon 9/23/24 Mon 10/21/24 Mon 10/21/24 Finish Fri 12/19/25 Mon 4/1/24 Fri 12/19/25 Fri 7/5/24 Fri 5/10/24 Fri 5/3/24 Fri 5/31/24 Fri 7/5/24 Fri 7/5/24 Fri 9/13/24 Fri 5/17/24 Fri 7/19/14 Fri 9/13/24 Fri 9/27/24 Fri 2/7/25 Fri 7/5/24 Fri 8/23/24 Fri 10/4/24 Fri 2/7/25 Fri 12 19 25 / Fri 9/6/24 Fri 10/4/24 Fri 1/24/25 Fri 1/24/25 Fri 11/29/24 Fri 1/10/25 Fri 1/10/25 Fri 1/10/25 Fri 11/29/24 Fri 12/20/24 Fri 2/7/25 Fri 7/18/25 Fri 10/10/25 Fri 12/19/25 Fri 12/19/25 Fri 4/25/25 Fri 9/20/24 Fri 10/4/24 Fri 10/18/24 Fri 10/18/24 Fri 10/18/24 Fri 11/15/24 Fri 11/15/24 Fri 4/25/25 Fri 12/13/24 Feb 2024 Mar Apr may Jun Jul AugSep Oct Nov Dec 2025 Jan Feb Mar I Apr I may jun jul AugSep Oct Nov Dec 2026 Jan Feb Mar Apr May Jun Jul AugSep Oct Nov Dec Jan 1 ........................... 2 3 4 5 6 7 8 9 10 ............. 11 12 13 14 19 20 21 22 23 24 25 29 30 31 36 39 40 41 42 43 44 45 52 57 62 63 64 65 66 67 68 69 70 71 Moo] tt 72 " MARK ■ ■ THOMAS Avenue 50 BRIDGE PROJECT Environmental, Preliminary Engineering, PS&E and Right of Way Services c4a -CALIFORNIA - ID Task Name Duration Start Finish 2024 Feb Mar Apr Ma Jun Jul AugSe Oct Nov Dec 2025 Jan Feb Mar Apr Ma Jun Jul AugSep Oct Nov Dec 2026 Jan Feb Mar Apr Mav Jun Jul AugSep Oct Nov Dec Jan 73 City Review Respond to Comments Hold Type Selection Meeting Caltrans Review Respond to Comments Caltrans Review/Approval II - TASK 8 - PLANS SPECIFICATIONS AND ESTIMATES Geotechnical Investigations City/CVWD Coordination/Permits Subsurface Exploration Laboratory Testing Geotechnical Analysis Draft Foundation Report Final Foundation Report Regulatory Agency Permits Prepare Draft Permits (401/404/1602) City Review Agency Review/Processing Permits Approved Plans, Specifications & Estimate 65% Plans & Estimate Structure Design Roadway Design Estimate QA/QC and Update Submit 65% Plans and Estimate City Review 90% PS&E 100% PS&E Final PS&E Approved PS&E PHASE III - TASK 9 - RIGHT OF WAY E-76 for Right of Way Legals and Plats, Appraisals, Acquisition CVWD Final Permit Approval Processing Right of Way Certification Approved Right of Way Certification Utility Coordination / Conflict Resolution / Agreements Utility Potholing Utility Conflicting Mapping ROI, NTO, UA Caltrans Review Utility Relocation / Utility Agreements PHASE IV TASK 30 -CONSTRUCTION BIDDING AND AWARD PHASE V- CONSTRUCTION 20 days 10 days 5 days 20 days 10 days 20 days 465 days Y 295 days 70 days 5 days 15 days 20 days 40 days 40 days 230 days 60 days 10 days 160 days 0 days 405 days 120 days 80 days 60 days 10 days 10 days 0 days 20 days 120 days 85 days 35 days 0 days 440 days 60 days 180 days 40 days 35 days 0 days 375 days 30 days 20 days 60 days 150 days 145 days 330 days Mon 12116124 Mon 1113125 Mon 2110125 Mon 2117125 Mon 3117125 Mon 3/31/25 Mon 2 10 25 / / Mon 2/10/25 Mon 2/10/25 Mon 6/2/25 Mon 6/9/25 Mon 6/30/25 Mon 7/28/25 Mon 2/2/26 Mon 10/27/25 Mon 10/27/25 Mon 1/19/26 Mon 2/2/26 Fri 9/11/26 Mon 5/5/25 Mon 5/5/25 Mon 5/5/25 Mon 5/5/25 Mon 8/25/25 Mon 9/8/25 Fri 9/19/25 Mon 9/22/25 Mon 12/22/25 Mon 6/8/26 Mon 10/5/26 Fri 11/20/26 Mon 3/24/25 Mon 11/10/25 Mon 2/2/26 Mon 6/8/26 Mon 10/12/26 Fri 11/27/26 Mon 3/24/25 Mon 3/24/25 Mon 9/22/25 Mon 11/10/25 Mon 2/2/26 Mon 11/30/26 Mon 6/21/27 Fri 1110125 Fri 1/24/25 Fri 2114125 Fri 3114125 Fri 3128125 Fri 4/25/25 Fri 11 20 26 / / Fri 3/27/26 Fri 5/16/25 Fri 6/6/25 Fri 6/27/25 Fri 7/25/25 Fri 9/19/25 Fri 3/27/26 Fri 9/11/26 Fri 1/16/26 Fri 1/30/26 Fri 9/11/26 Fri 9/11/26 Fri 11/20/26 Fri 10/17/25 Fri 8/22/25 Fri 7/25/25 Fri 9/5/25 Fri 9/19/25 Fri 9/19/25 Fri 10/17/25 Fri 6/5/26 Fri 10/2/26 Fri 11/20/26 Fri 11/20/26 Fri 11/27/26 Fri 1/30/26 Fri 10/9/26 Fri 7/31/26 Fri 11/27/26 Fri 11/27/26 Fri 8/28/26 Fri 5/2/25 Fri 10/17/25 Fri 1/30/26 Fri 8/28/26 Fri 6/18/27 Fri 9/22/28 Tom 74 75 76 77 78 79PHASE 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 108 115 122 123 124 125 126 127 128 129 .......... ................................... ...................................................................................... 130 131 132 133 134 140 Exhibit D Special Requirements Exhibit 10-02 — DBE Commitment Exhibit D Page 1of1 Local Assistance Procedures Manual Exhibit 10-02 Consultant Contract DBE Commitment EXHIBIT 10-02 CONSULTANT CONTRACT DBE COMMITMENT 1. Local Agency: City of La Quinta 2. Contract DBE Goal: 21% 3. Project Description: Design and Environmental for a new bridge to replace an existing low water crossing. 4. Project Location: Avenue 50 spanning the La Quinta Evac Channel from Washington St. to Park Ave. 5. Consultant's Name: Mark Thomas & Company, Inc. 6. Prime Certified DBE: ❑ 7. Total Contract Award Amount: $2,332,865 8. Total Dollar Amount for ALL Subconsultants: $822,967 9. Total Number of ALL Subconsultants: 5 10. Description of Work, Service, or Materials Supplied 11. DBE Certification Number 12. DBE Contact Information 13. DBE Dollar Amount Geotechnical Engineering/Laboratory Testing 6956 Earth Mechanics, Inc. 17800 Newhope Street $144,138 Fountain Valley, CA 92708 714 751-3826 Environmental Consulting Services 36278 GPA Consulting 840 Apollo Street, Suite 312 $448,089 EI Segundo, CA 90245 310 792-2690 ROW & Utility Coordination 46456 Monument ROW 8 Cobblestone Court, Suite 300 $68,072 La una Ni uel, CA 92677 800 577-0109 Local Agency to Complete this Section 14. TOTAL CLAIMED DBE PARTICIPATION $660,299 20. Local Agency Contract Number: 2019-02 21. Federal -Aid Project Number: BR-NBIL(547) 28.3% 22. Contract Execution Date: IMPORTANT: Identify all DBE firms being claimed for credit, regardless Local Agency certifies that all DBE certifications are valid and information on this form is complete and accurate. of tier. Written confirmation of each listed DBE is required. 02/14/2024 15. Preparer's Signature 16. Date 23. Local Agency Representative's Signature 24. Date Zach Siviglia (949) 477-9000 17. Preparer's Name 18. Phone 25. Local Agency Representative's Name 26. Phone President 27. Local Agency Representative's Title 19. Preparer's Title DISTRIBUTION: 1. Original — Local Agency 2. Copy — Caltrans District Local Assistance Engineer (DLAE). Failure to submit to DLAE within 30 days of contract execution may result in de -obligation of federal funds on contract. Page 1 of 2 July 23, 2015 Local Assistance Procedures Manual Exhibit 10-02 Consultant Contract DBE Commitment ADA Notice: For individuals with sensory disabilities, this document is available in alternate formats. For information call (916) 654-6410 or TDD (916) 654- 3880 or write Records and Forms Management, 1120 N Street, MS -89, Sacramento, CA 95814. INSTRUCTIONS — CONSULTANT CONTRACT DBE COMMITMENT CONSULTANT SECTION 1. Local Agency - Enter the name of the local or regional agency that is funding the contract. 2. Contract DBE Goal - Enter the contract DBE goal percentage as it appears on the project advertisement. 3. Project Description - Enter the project description as it appears on the project advertisement (Bridge Rehab, Seismic Rehab, Overlay, Widening, etc). 4. Project Location - Enter the project location as it appears on the project advertisement. 5. Consultant's Name - Enter the consultant's firm name. 6. Prime Certified DBE - Check box if prime contractor is a certified DBE. 7. Total Contract Award Amount - Enter the total contract award dollar amount for the prime consultant. 8. Total Dollar Amount for ALL Subconsultants — Enter the total dollar amount for all subcontracted consultants. SUM = (DBEs + all Non -DBEs). Do not include the prime consultant information in this count. 9. Total number of ALL subconsultants — Enter the total number of all subcontracted consultants. SUM = (DBEs + all Non -DBEs). Do not include the prime consultant information in this count. 10. Description of Work, Services, or Materials Supplied - Enter description of work, services, or materials to be provided. Indicate all work to be performed by DBEs including work performed by the prime consultant's own forces, if the prime is a DBE. If 100% of the item is not to be performed or furnished by the DBE, describe the exact portion to be performed or furnished by the DBE. See LAPM Chapter 9 to determine how to count the participation of DBE firms. 11. DBE Certification Number - Enter the DBE's Certification Identification Number. All DBEs must be certified on the date bids are opened. 12. DBE Contact Information - Enter the name, address, and phone number of all DBE subcontracted consultants. Also, enter the prime consultant's name and phone number, if the prime is a DBE. 13. DBE Dollar Amount - Enter the subcontracted dollar amount of the work to be performed or service to be provided. Include the prime consultant if the prime is a DBE. See LAPM Chapter 9 for how to count full/partial participation. 14. Total Claimed DBE Participation - $: Enter the total dollar amounts entered in the "DBE Dollar Amount" column. %: Enter the total DBE participation claimed ("Total Participation Dollars Claimed" divided by item "Total Contract Award Amount"). If the total % claimed is less than item "Contract DBE Goal," an adequately documented Good Faith Effort (GFE) is required (see Exhibit 15-H DBE Information - Good Faith Efforts of the LAPM). 15. Preparer's Signature - The person completing the DBE commitment form on behalf of the consultant's firm must sign their name. 16. Date - Enter the date the DBE commitment form is signed by the consultant's preparer. 17. Preparer's Name - Enter the name of the person preparing and signing the consultant's DBE commitment form. 18. Phone - Enter the area code and phone number of the person signing the consultant's DBE commitment form. 19. Preparer's Title - Enter the position/title of the person signing the consultant's DBE commitment form. LOCAL AGENCY SECTION 20. Local Agency Contract Number - Enter the Local Agency contract number or identifier. 21. Federal -Aid Project Number - Enter the Federal -Aid Project Number. 22. Contract Execution Date - Enter the date the contract was executed. 23. Local Agency Representative's Signature - The person completing this section of the form for the Local Agency must sign their name to certify that the information in this and the Consultant Section of this form is complete and accurate. 24. Date - Enter the date the DBE commitment form is signed by the Local Agency Representative. 25. Local Agency Representative's Name - Enter the name of the Local Agency Representative certifying the consultant's DBE commitment form. 26. Phone - Enter the area code and phone number of the person signing the consultant's DBE commitment form. 27. Local Agency Representative Title - Enter the position/title of the Local Agency Representative certifying the consultant's DBE commitment form. Page 2 of 2 July 23, 2015 Exhibit E Insurance Requirements E.1 Insurance. Prior to the beginning of and throughout the duration of this Agreement, the following policies shall be maintained and kept in full force and effect providing insurance with minimum limits as indicated below and issued by insurers with A.M. Best ratings of no less than A -VI: Commercial General Liability (at least as broad as ISO CG 0001) $1,000,000 (per occurrence) $2,000,000 (general aggregate) Must include the following endorsements: General Liability Additional Insured General Liability Primary and Non-contributory Commercial Auto Liability (at least as broad as ISO CA 0001) $1,000,000 (per accident) Personal Auto Declaration Page if applicable Errors and Omissions Liability $1,000,000 (per claim and aggregate) Workers' Compensation (per statutory requirements) Must include the following endorsements: Workers Compensation with Waiver of Subrogation Workers Compensation Declaration of Sole Proprietor if applicable Cyber Liability $1,000,000 (per occurrence) $2,000,000 (general aggregate) Contracting Party shall procure and maintain, at its cost, and submit concurrently with its execution of this Agreement, Commercial General Liability insurance against all claims for injuries against persons or damages to property resulting from Contracting Party's acts or omissions rising out of or related to Contracting Party's performance under this Agreement. The insurance policy shall contain a severability of interest clause providing that the coverage shall be primary for losses arising out of Contracting Party's performance hereunder and neither City nor its insurers shall be required to contribute to any such loss. An endorsement evidencing the foregoing and naming the City and its officers and employees as additional insured (on the Commercial General Liability policy only) must be submitted concurrently with the execution of this Agreement and approved by City prior to commencement of the services hereunder. Contracting Party shall carry automobile liability insurance of $1,000,000 per accident against all claims for injuries against persons or damages to property arising out Exhibit E Page 1 of 6 of the use of any automobile by Contracting Party, its officers, any person directly or indirectly employed by Contracting Party, any subcontractor or agent, or anyone for whose acts any of them may be liable, arising directly or indirectly out of or related to Contracting Party's performance under this Agreement. If Contracting Party or Contracting Party's employees will use personal autos in any way on this project, Contracting Party shall provide evidence of personal auto liability coverage for each such person. The term "automobile" includes, but is not limited to, a land motor vehicle, trailer or semi -trailer designed for travel on public roads. The automobile insurance policy shall contain a severability of interest clause providing that coverage shall be primary for losses arising out of Contracting Party's performance hereunder and neither City nor its insurers shall be required to contribute to such loss. Professional Liability or Errors and Omissions Insurance as appropriate shall be written on a policy form coverage specifically designed to protect against acts, errors or omissions of the Contracting Party and "Covered Professional Services" as designated in the policy must specifically include work performed under this agreement. The policy limit shall be no less than $1,000,000 per claim and in the aggregate. The policy must "pay on behalf of the insured and must include a provision establishing the insurer's duty to defend. The policy retroactive date shall be on or before the effective date of this agreement. Contracting Party shall carry Workers' Compensation Insurance in accordance with State Worker's Compensation laws with employer's liability limits no less than $1,000,000 per accident or disease. Contracting Party shall procure and maintain Cyber Liability insurance with limits of $1,000,000 per occurrence/loss which shall include the following coverage: a. Liability arising from the theft, dissemination and/or use of confidential or personally identifiable information; including credit monitoring and regulatory fines arising from such theft, dissemination or use of the confidential information. b. Network security liability arising from the unauthorized use of, access to, or tampering with computer systems. c. Liability arising from the failure of technology products (software) required under the contract for Consultant to properly perform the services intended. d. Electronic Media Liability arising from personal injury, plagiarism or misappropriation of ideas, domain name infringement or improper deep - linking or framing, and infringement or violation of intellectual property rights. e. Liability arising from the failure to render professional services. Exhibit E Page 2 of 6 If coverage is maintained on a claims -made basis, Contracting Party shall maintain such coverage for an additional period of three (3) years following termination of the contract. Contracting Party shall provide written notice to City within ten (10) working days if: (1) any of the required insurance policies is terminated; (2) the limits of any of the required polices are reduced; or (3) the deductible or self-insured retention is increased. In the event any of said policies of insurance are cancelled, Contracting Party shall, prior to the cancellation date, submit new evidence of insurance in conformance with this Exhibit to the Contract Officer. The procuring of such insurance or the delivery of policies or certificates evidencing the same shall not be construed as a limitation of Contracting Party's obligation to indemnify City, its officers, employees, contractors, subcontractors, or agents. E.2 Remedies. In addition to any other remedies City may have if Contracting Party fails to provide or maintain any insurance policies or policy endorsements to the extent and within the time herein required, City may, at its sole option: a. Obtain such insurance and deduct and retain the amount of the premiums for such insurance from any sums due under this Agreement. b. Order Contracting Party to stop work under this Agreement and/or withhold any payment(s) which become due to Contracting Party hereunder until Contracting Party demonstrates compliance with the requirements hereof. C. Terminate this Agreement. Exercise of any of the above remedies, however, is an alternative to any other remedies City may have. The above remedies are not the exclusive remedies for Contracting Party's failure to maintain or secure appropriate policies or endorsements. Nothing herein contained shall be construed as limiting in any way the extent to which Contracting Party may be held responsible for payments of damages to persons or property resulting from Contracting Party's or its subcontractors' performance of work under this Agreement. E.3 General Conditions Pertaining to Provisions of Insurance Coverage by Contracting Party. Contracting Party and City agree to the following with respect to insurance provided by Contracting Party: 1. Contracting Party agrees to have its insurer endorse the third party general liability coverage required herein to include as additional insureds City, its officials, employees, and agents, using standard ISO endorsement No. CG 2010 with an edition prior to 1992. Contracting Party also agrees to require all contractors, and subcontractors to do likewise. 2. No liability insurance coverage provided to comply with this Agreement shall prohibit Contracting Party, or Contracting Party's employees, or agents, from waiving the right of subrogation prior to a loss. Contracting Party agrees to waive subrogation rights Exhibit E Page 3 of 6 against City regardless of the applicability of any insurance proceeds, and to require all contractors and subcontractors to do likewise. 3. All insurance coverage and limits provided by Contracting Party and available or applicable to this Agreement are intended to apply to the full extent of the policies. Nothing contained in this Agreement or any other agreement relating to City or its operations limits the application of such insurance coverage. 4. None of the coverages required herein will be in compliance with these requirements if they include any limiting endorsement of any kind that has not been first submitted to City and approved of in writing. 5. No liability policy shall contain any provision or definition that would serve to eliminate so-called "third party action over" claims, including any exclusion for bodily injury to an employee of the insured or of any contractor or subcontractor. 6. All coverage types and limits required are subject to approval, modification and additional requirements by the City, as the need arises. Contracting Party shall not make any reductions in scope of coverage (e.g. elimination of contractual liability or reduction of discovery period) that may affect City's protection without City's prior written consent. 7. Proof of compliance with these insurance requirements, consisting of certificates of insurance evidencing all the coverages required and an additional insured endorsement to Contracting Party's general liability policy, shall be delivered to City at or prior to the execution of this Agreement. In the event such proof of any insurance is not delivered as required, or in the event such insurance is canceled at any time and no replacement coverage is provided, City has the right, but not the duty, to obtain any insurance it deems necessary to protect its interests under this or any other agreement and to pay the premium. Any premium so paid by City shall be charged to and promptly paid by Contracting Party or deducted from sums due Contracting Party, at City option. 8. It is acknowledged by the parties of this agreement that all insurance coverage required to be provided by Contracting Party or any subcontractor, is intended to apply first and on a primary, non-contributing basis in relation to any other insurance or self-insurance available to City. 9. Contracting Party agrees to ensure that subcontractors, and any other party involved with the project that is brought onto or involved in the project by Contracting Party, provide the same minimum insurance coverage required of Contracting Party. Contracting Party agrees to monitor and review all such coverage and assumes all responsibility for ensuring that such coverage is provided in conformity with the requirements of this section. Contracting Party agrees that upon request, all agreements with subcontractors and others engaged in the project will be submitted to City for review. 10. Contracting Party agrees not to self -insure or to use any self-insured retentions or deductibles on any portion of the insurance required herein (with the exception of professional liability coverage, if required) and further agrees that it will not Exhibit E Page 4of6 allow any contractor, subcontractor, Architect, Engineer or other entity or person in any way involved in the performance of work on the project contemplated by this agreement to self -insure its obligations to City. If Contracting Party's existing coverage includes a deductible or self-insured retention, the deductible or self-insured retention must be declared to the City. At that time the City shall review options with the Contracting Party, which may include reduction or elimination of the deductible or self-insured retention, substitution of other coverage, or other solutions. 11. The City reserves the right at any time during the term of this Agreement to change the amounts and types of insurance required by giving the Contracting Party ninety (90) days advance written notice of such change. If such change results in substantial additional cost to the Contracting Party, the City will negotiate additional compensation proportional to the increased benefit to City. 12. For purposes of applying insurance coverage only, this Agreement will be deemed to have been executed immediately upon any party hereto taking any steps that can be deemed to be in furtherance of or towards performance of this Agreement. 13. Contracting Party acknowledges and agrees that any actual or alleged failure on the part of City to inform Contracting Party of non-compliance with any insurance requirement in no way imposes any additional obligations on City nor does it waive any rights hereunder in this or any other regard. 14. Contracting Party will renew the required coverage annually as long as City, or its employees or agents face an exposure from operations of any type pursuant to this agreement. This obligation applies whether the agreement is canceled or terminated for any reason. Termination of this obligation is not effective until City executes a written statement to that effect. 15. Contracting Party shall provide proof that policies of insurance required herein expiring during the term of this Agreement have been renewed or replaced with other policies providing at least the same coverage. Proof that such coverage has been ordered shall be submitted prior to expiration. A coverage binder or letter from Contracting Party's insurance agent to this effect is acceptable. A certificate of insurance and an additional insured endorsement is required in these specifications applicable to the renewing or new coverage must be provided to City within five (5) days of the expiration of coverages. 16. The provisions of any workers' compensation or similar act will not limit the obligations of Contracting Party under this agreement. Contracting Party expressly agrees not to use any statutory immunity defenses under such laws with respect to City, its employees, officials, and agents. 17. Requirements of specific coverage features, or limits contained in this section are not intended as limitations on coverage, limits or other requirements nor as a waiver of any coverage normally provided by any given policy. Specific reference to a Exhibit E Page 5 of 6 given coverage feature is for purposes of clarification only as it pertains to a given issue and is not intended by any party or insured to be limiting or all-inclusive. 18. These insurance requirements are intended to be separate and distinct from any other provision in this Agreement and are intended by the parties here to be interpreted as such. 19. The requirements in this Exhibit supersede all other sections and provisions of this Agreement to the extent that any other section or provision conflicts with or impairs the provisions of this Exhibit. 20. Contracting Party agrees to be responsible for ensuring that no contract used by any party involved in any way with the project reserves the right to charge City or Contracting Party for the cost of additional insurance coverage required by this agreement. Any such provisions are to be deleted with reference to City. It is not the intent of City to reimburse any third party for the cost of complying with these requirements. There shall be no recourse against City for payment of premiums or other amounts with respect thereto. 21. Contracting Party agrees to provide immediate notice to City of any claim or loss against Contracting Party arising out of the work performed under this agreement. City assumes no obligation or liability by such notice, but has the right (but not the duty) to monitor the handling of any such claim or claims if they are likely to involve City. Exhibit E Page 6of6 Exhibit F Indemnification F.1 Indemnitv for the Benefit of Ci a. Indemnification for Professional Liability. When the law establishes a professional standard of care for Contracting Party's Services, to the fullest extent permitted by law, Contracting Party shall indemnify, protect, defend (with counsel selected by City), and hold harmless City and any and all of its officials, employees, and agents ("Indemnified Parties") from and against any and all claims, losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys' fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused in whole or in part by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. b. Indemnification for Other Than Professional Liability. Other than in the performance of professional services and to the full extent permitted by law, Contracting Party shall indemnify, defend (with counsel selected by City), and hold harmless the Indemnified Parties from and against any liability (including liability for claims, suits, actions, arbitration proceedings, administrative proceedings, regulatory proceedings, losses, expenses or costs of any kind, whether actual, alleged or threatened, including, without limitation, incidental and consequential damages, court costs, attorneys' fees, litigation expenses, and fees of expert consultants or expert witnesses) incurred in connection therewith and costs of investigation, where the same arise out of, are a consequence of, or are in any way attributable to, in whole or in part, the performance of this Agreement by Contracting Party or by any individual or entity for which Contracting Party is legally liable, including but not limited to officers, agents, employees, or subcontractors of Contracting Party. C. Indemnity Provisions for Contracts Related to Construction (Limitation on Indemnity). Without affecting the rights of City under any provision of this agreement, Contracting Party shall not be required to indemnify and hold harmless City for liability attributable to the active negligence of City, provided such active negligence is determined by agreement between the parties or by the findings of a court of competent jurisdiction. In instances where City is shown to have been actively negligent and where City's active negligence accounts for only a percentage of the liability involved, the obligation of Contracting Party will be for that entire portion or percentage of liability not attributable to the active negligence of City. Exhibit F Page 1 of 2 d. Indemnification Provision for Design Professionals. 1. Applicabilitv of this Section F.1(d). Notwithstanding Section F.1(a) hereinabove, the following indemnification provision shall apply to a Contracting Party who constitutes a "design professional" as the term is defined in paragraph 3 below. 2. Scope of Indemnification. When the law establishes a professional standard of care for Contracting Party's Services, to the fullest extent permitted by law, Contracting Party shall indemnify and hold harmless City and any and all of its officials, employees, and agents ("Indemnified Parties") from and against any and all losses, liabilities of every kind, nature, and description, damages, injury (including, without limitation, injury to or death of an employee of Contracting Party or of any subcontractor), costs and expenses, including, without limitation, incidental and consequential damages, court costs, reimbursement of attorneys' fees, litigation expenses, and fees of expert consultants or expert witnesses incurred in connection therewith and costs of investigation, to the extent same are caused by any negligent or wrongful act, error or omission of Contracting Party, its officers, agents, employees or subcontractors (or any entity or individual that Contracting Party shall bear the legal liability thereof) in the performance of professional services under this agreement. With respect to the design of public improvements, the Contracting Party shall not be liable for any injuries or property damage resulting from the reuse of the design at a location other than that specified in Exhibit A without the written consent of the Contracting Party. 3. Design Professional Defined. As used in this Section F.1(d), the term "design professional" shall be limited to licensed architects, registered professional engineers, licensed professional land surveyors and landscape architects, all as defined under current law, and as may be amended from time to time by Civil Code § 2782.8. F.2 Obligation to Secure Indemnification Provisions. Contracting Party agrees to obtain executed indemnity agreements with provisions identical to those set forth herein this Exhibit F, as applicable to the Contracting Party, from each and every subcontractor or any other person or entity involved by, for, with or on behalf of Contracting Party in the performance of this Agreement. In the event Contracting Party fails to obtain such indemnity obligations from others as required herein, Contracting Party agrees to be fully responsible according to the terms of this Exhibit. Failure of City to monitor compliance with these requirements imposes no additional obligations on City and will in no way act as a waiver of any rights hereunder. This obligation to indemnify and defend City as set forth in this Agreement are binding on the successors, assigns or heirs of Contracting Party and shall survive the termination of this Agreement. Exhibit F Page 2of2 City of La Qu i ntd BUSINESS SESSION ITEM NO.2 CITY COUNCIL MEETING: February 20, 2024 STAFF REPORT AGENDA TITLE• APPROVE AGREEMENT FOR CONTRACT SERVICES WITH MARK THOMAS & COMPANY TO PROVIDE PROFESSIONAL ENGINEERING SERVICES FOR AVENUE 50 BRIDGE PROJECT NO. 2019-02, LOCATED ON AVENUE 50 OVER THE LA QUINTA EVACUATION CHANNEL. RECOMMENDATION Contingent upon Caltrans acceptance of the contract financial documents, approve agreement for contract services with Mark Thomas & Company to provide professional engineering services for Avenue 50 Bridge Project No. 2019-02; and authorize the City Manager to finalize and execute the agreement. EXECUTIVE ouivlMARV • Avenue 50 Bridge Project (Project) (Attachment 1) will replace the existing low-water crossing spanning the La Quinta Evacuation Channel (LQEC) at Avenue 50 with an all- weather access bridge. • Following a Request for Proposals (RFP), staff selected Mark Thomas & Company (Mark Thomas) to provide professional engineering services for the Project. The total cost for the agreement is $2,332,865 (Attachment 2). • Approval of the Agreement for Contract Services (Agreement) will initiate the engineering phase of the bridge improvement project including preparation of environmental documentation, bridge and roadway engineering, and right-of-way acquisition services. FISCAL IMPACT Funding for the Project was budgeted in the 2019/20 Capital Improvement Plan. Funds are available for the environmental, right of way, and engineering design phases for the Agreement. The Project includes cost sharing between Federal Highway Bridge Program (HBP) funds, Coachella Valley Association of Governments (CVAG) funding, and local funds. The estimated overall cost of the Project is $16,349,000. These costs are separated into the following phases: Phase Estimated Cost New Bride Federal Funding Non -Participating Caltrans-HBP Plus Local Share Engineering/Design $3,393,568 $1,520,000 $1,873,568 Right of Way $1,505,000 $1,056,000 $449,000 Construction/Construction Engineering $11,450,432 $8,640,000 $2,810,432 Total Costs: $16,349,000 $11,216,000 $5,133,000 151 These costs include both participating (eligible for reimbursement), and non -participating costs. Currently, the following cost shares are anticipated: Caltrans-HBP Funding Share: $11,216,000 City of La Quinta Funding Share: $1,283,250 CVAG Funding Share: $3,849,750 Total Cost: $16,349,000 BACKGROUND/ANALYSIS The Project will replace the existing low water crossing with an all-weather access bridge on Avenue 50 at the LQEC. During severe winter and summer storms, the existing Avenue 50 low water crossing is frequently inundated and damaged due to flows within the storm water channel. In the interest of public health and safety, and in response to community concerns regarding frequent closures of the low water crossing, the City has determined that replacing it with a new bridge is the best way to ensure all weather access is maintained for the community. The proposed improvements will provide Coachella Valley motorists and pedestrians a safe path of travel across the LQEC at Avenue 50 regardless of adverse weather. The Project will also provide reliable access for emergency vehicles and improve traffic circulation on Avenue 50 and the surrounding Project areas. The City issued an RFP and received seven (7) proposals on August 23, 2023. The Consultant Selection Committee interviewed four (4) firms and recommend Mark Thomas, in the amount not to exceed $2,332,865. The total contract sum of the Agreement includes optional tasks that may be deducted from the scope of work without additional cost incurred if they are determined to be unnecessary. In order to expedite the preliminary engineering phase, staff recommends approving this Agreement contingent upon Caltrans acceptance. Since this project includes federal HBP funds, Caltrans Audit and Investigations must review and approve this Agreement; staff anticipates that Caltrans will complete their review in 30 days. ALTERNATIVES Staff does not recommend an alternative. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, Public Works Director/City Engineer Attachments: 1. Project Vicinity Map 2. Agreement for Contract Services with Mark Thomas & Company 152 Lo • r -�.. d - 4. �� M ire n 'r �•`l.iC`'%'.Ir�.-.M .-M 'ivy , lix: +a T oy rF �.ic,`s', ■/lW;, .`p, f 7�.r46 'f{ TIyiEFr { tv Ir low I ar �. 4a Is qw- • Sir . �' '�7 �: � �" "'�, � ti- + Ci 'vv- -, . *.q�� ry r y' �6ip1111i1� !' 1 {ik' zUrs IG'1 N •y`