Loading...
2024-25 Ortiz Enterprises - Project 2011-05 Dune Palms Bridge - Change Order No. 7ta �W — GEM ,,ft{x DESERT — TO: Jon McMillen, City Manager FROM: Bryan McKinney, P.E., Public Works Director/City Engineer Via: Carley Escarrega, Administrative Technician DATE: June 3, 2024 RE: Contract Change Order No. 7 Dune Palms Road Bridge Project No. 2011-05 Attached for your signatures is one (1) electronic Contract Change Order No. 7 between Ortiz Enterprises, Inc. and the City of La Quinta for the project referenced above. DESCRIPTION OF CHANGE This Contract Change Order allows for Quantity Adjustments Total $60,557.25 Please sign and return the original to the City Clerk for final distribution. REQUESTING DEPARTMENT TO CHECK THE ITEMS BELOW AS APPROPRIATE: X Contract payments will be charged to the construction account number: 401 -0000 -60188 -111205 -CT Authority to execute this agreement is based upon: City Manager's signature authority provided under Resolution No. 2023-008 for budgeted expenditures of $50,000 or less. _X_ City Council approval on October 18, 2022 The following Budget Summary is provided: Project Budget $ 29,756,245 Contract Amount ($ 21,626,759.60) Change Order No. 1 - 6 ($ 256,726.52) This Contract Change Order No. 7 ($ 60,557.25) Balance Remaining $ 7,812,201.63 As indicated, adequate funding is available. 78-495 Calle Tampico La Quinta, CA 92253 760.777.7000 ta(2aiwrcu CALIFORNIA Sheet 1 of 2 CONTRACT: Dune Palms Road Bridge Improvement Project PROJECT #: 2011-05 CONTRACTOR: ORTIZ ENTERPRISES, INC. 6 Cushing Suite 200 Irvine, CA 92618-4221 CONTRACT CHANGE ORDER NO. 007 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE The following bid items have exceeded their estimated quantities and shall be reimbursed per the contract unit price for the amount over 100 %: Estimate of increase in bid items at contract unit price: Item No. 6 Remove PCC Pavement and Cut Off Wall 4,831 SF @ $6.00/SF = $28,986.00 Item No. 21 Concrete Drive Approach 237 SF @ $26.00/SF = $ 6,162.00 Item No. 79 Reconstruct Sewer Manhole 3 LF @ $ 1700/SF =$ 5,100.00 Subtotal = $ 40,248.00 The bid items below increased over estimated quantities due to the revisions for the south end widening of the east side of the roadway. Item No. 93 Unclassified Excavation (Roadway) 137.5 CY@$ 60/CY = $ 8,250.00 Item No. 96 Cold Mill AC Pavement 1,095 SF @ $ 1.00/SF = $ 1,095.00 Item No. 8 Clearing and Grubbing (Curb Removal) 198 LF @ $ 16/1-F = $ 3,168.00 Subtotal = $ 12,513.00 Estimate of new bid item at agreed unit price: Temporary AC Walkway Total estimated cost = $ 60,557.25 (,l Quigra 525 LF @ $14.85/LF = $ 7,796.25 Upon completion and acceptance of quantities installed, payment will be made as measured in the field. Price total will constitute full and complete compensation, including markups for construction work and delays incurred. Current Contract Amount $ 21,883,486.12 Add This Change Order No. 007 $ 60,557.25 Revised Contract Total $ 21,944,043.37 By reason of this contract change order the time of completion is adjusted as follows: - 5 - days added to contract time. The contract completion date shall be: 02/20/2025 Submitted By: Date: y -} Jon McMillen, City Manager Approved B Date:_ We, the undersigned Contract a given carefui consideration to the change proposed and hereby agree, if this proposal is approved, th will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all se es necessary to complete the above specified wort, and hereby accept as full payment the amount shown above, which includes all direct and indirect overhead expenses foWiy delays. Accepted By: Title:Oice v Contractor: �/�T/L E��l�9i?/sFS; /NC'. Date:—;�'V X02 2011-05 Change Order No. 007 Final Audit Report 2024-05-29 Created: 2024-05-29 By: Carley Escarrega (cescarrega@laquintaca.gov) Status: Signed Transaction ID: CBJCHBCAABAAY5WQFY72fwzEIBrCC1hl2EUacGaNYYlu "2011-05 Change Order No. 007" History Document created by Carley Escarrega (cescarrega@laquintaca.gov) 2024-05-29 - 7:49:19 PM GMT Document emailed to Ubaldo Ayon (uayon@laquintaca.gov) for signature 2024-05-29 - 7:49:23 PM GMT Email viewed by Ubaldo Ayon (uayon@laquintaca.gov) 2024-05-29 - 7:53:53 PM GMT Document e -signed by Ubaldo Ayon (uayon@laquintaca.gov) Signature Date: 2024-05-29 - 7:54:02 PM GMT - Time Source: server Document emailed to Bryan McKinney (bmckinney@laquintaca.gov) for signature 2024-05-29 - 7:54:03 PM GMT Email viewed by Bryan McKinney (bmckinney@laquintaca.gov) 2024-05-29 - 7:54:34 PM GMT Document e -signed by Bryan McKinney (bmckinney@laquintaca.gov) Signature Date: 2024-05-29 - 7:54:54 PM GMT - Time Source: server Agreement completed. 2024-05-29 - 7:54:54 PM GMT a Adobe Acrobat Sign GENERAL ENGINEERING CONTRACTOR ENTERPRISES, INC. May 22, 2024 City of La Quinta Public Works Department 78495 Calle Tampico La Quinta, Ca. 92253 Attn: Tom Nowak, R.E. Re: Dune Palms Bridge Rd. Improvement City of La Quinta Project 2011-05 Ortiz Job No. 234 Log No. 027 Subject: CONTRACT CHANGE ORDER No. 007 For Execution Dear Mr. Nowak, LICENSE NO. 467088 6 Cu�S'tfNG SUITE 200, IRVINE, CALIFORNIA 92618-4221 PHONE (949) 753-1414 FAX (949) 753-'1477 oe+Qort¢ent.oam Via e-mail Please see attached Contract Change Order No. 007 signed by Ortiz Enterprises, Inc. Please process this change order for payment. If you have any questions regarding this change order, please feel free to contact Mac Delaney at (949)649- 9470. Sincerely, Mac Delaney Project Manager Ortiz Enterprises, Inc. Attach: CCO #007 CONSENT CALENDAR ITEM NO. 8 City of La Quinta CITY COUNCIL MEE I IN(3: March 19, 2024 STAFF REPORT AGENDA TITLE: APPROVE CHANGE ORDER ESTIMATE FOR CONTRACT WITH ORTIZ CONSTRUCTION, INC., APPROVE AMENDMENT NO. 13 TO PROFESSIONAL SERVICES AGREEMENT WITH BENGAL ENGINEERING, INC., AND AUTHORIZE AMENDMENT REQUEST TO COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS AGREEMENT FOR THE DUNE PALMS ROAD BRIDGE IMPROVEMENT PROJECT NO. 2011-05 RECOMMENDATION Approve Change Order Estimate for contract with Ortiz Construction, Inc. in the amount of $124,944, approve Amendment No. 13 to Professional Services Agreement with Bengal Engineering, Inc. in the amount of $45,200, authorize staff to submit an amendment request to the Coachella Valley Association of Governments reimbursement agreement for the Dune Palms Road Bridge Improvement Project No. 2011-05; and authorize the City Manager to execute the change order and amendments. EXECUTIVE SUMMARY • The Dune Palms Road Bridge Project (Project) (Attachment 1) is currently in construction to replace the existing low water crossing with an all-weather access bridge on Dune Palms Road at the Coachella Valley Storm Water Channel (CVSWC). • As the contractor is constructing the roadway improvements associated with the northbound bridge section of the Project, staff recommends completing the roadway widening to ultimate condition on the eastern side of Dune Palms Road between Highway 111 and the bridge. • The Change Order Estimate for the construction contract with Ortiz Construction, Inc., includes additional quantities of bid items to complete the widening to the ultimate General Plan condition (Attachment 2). • Amendment No. 13 to the Professional Services Agreement (PSA) with Bengal Engineering, Inc., (Bengal) authorizes engineering design to amend the current roadway improvement plans and to provide additional construction support services on a time and materials basis (Attachment 3). • The road widening improvements are not eligible for Highway Bridge Program Funding but as part of the Coachella Valley Association of Governments (CVAG) 181 Regional Transportation Plan (RTP) in the Transportation Project Prioritization Study (TPPS) they are eligible for funding. Staff requests approval to submit an amendment request for the existing Dune Palms Bridge Agreement with CVAG to provide 75% of the cost for the road widening improvements. FISCAL The Project has an approved budget of $29,756,245. The following is the updated project budget per phase: Phase Project Budget Engineering/Design $2,095,200 Right of Way $1,570,554 Construction $22,017,430 Const. Engineering $2,764,651 Utility Agreement (IID) $65,750 Contingency $1,242,660 Total Costs: $29,756,245 The CVAG amendment request is for 75% of the additional road widening costs, including design and construction. Sufficient funds are available for the Bengal amendment in the amount of $45,200 and the construction contract change order estimate of approximately $124,944 in the existing project budget. BACKGROUND/ANALYSIS The Project is currently in construction to replace the existing low water crossing with an all- weather access bridge on Dune Palms Road at the CVSWC. The contractor is preparing to construct the roadway improvements associated with the northbound bridge section of the Project. Staff recommends widening the eastern side of Dune Palms Road on the northbound bridge approach, from Highway 111 to the bridge, to its ultimate General Plan condition as part of the Project. This segment of Dune Palms Road is part of the RTP and is included in the CVAG TPPS with a 2015 ranking of 9 on a scale of 0 to 15 (15 is the highest need). The TPPS uses distinct evaluation criteria and scores to form a ranking list of the regionally significant roadway segments for the nine municipalities and the County of Riverside in the Coachella Valley area. The ranking list is used to determine which roadways have the greatest need evaluated from current conditions and is used in funding decisions. 182 Completing the road widening as the contractor is constructing the roadway improvements associated with the northbound bridge section will provide overall cost savings. The City will not need to construct and remove temporary improvements in the future to widen the road to its ultimate condition. Constructing the ultimate condition at this time will also offer improved safety for bicycles and pedestrians on the east side of Dune Palms Road and provide a better link to the adjacent CV Link improvements. The road widening improvements are not eligible for HBP funding, but they are eligible for CVAG regional transportation funding. Staff requests approval to submit a request to CVAG, to amend the existing Dune Palms Bridge Reimbursement Agreement for 75% of the cost for the design and construction of the road widening improvements. The proposed construction change order estimate from Ortiz Construction, Inc., includes the additional quantities of bid items estimated to construct the road widening improvements. The final change order will be submitted based on the actual quantities required to complete the improvements. Proposed Amendment No. 13, if approved, will allow Bengal to continue to provide construction support through the construction phase and amend the current roadway improvement plans to include the Dune Palms Road widening from Highway 111 to the bridge. Additional construction support is warranted to accommodate time expended on the resolution of the water main construction to satisfy CVWD Record Drawing information, and additional construction time due to delays caused by Tropical Storm Hilary in August 2023 and other subsequent storms. ALTERNATIVES Staff does not recommend an alternative. Prepared by: Julie Mignogna, Management Analyst Approved by: Bryan McKinney, Public Works Director/City Engineer Attachments: 1. Project Vicinity Map 2. Ortiz Construction, Inc. Change Order Estimate 3. Bengal Engineering Inc. Amendment No. 13 183