BOA Architecture - Cost ProposalFIXED FEE for architectural/engineering
La Quinta Fire Station #70
for: City of La Quinta
by: Edward Lok Ng, Architect.
BOA Architiecture job#20-
date: Feb. 14, 2020
construction cost: $350,000 plus
10% contingency
HOURS UNIT
HR RATE
COST TOTAL TOTAL
PRE -DESIGN
verify existing conditions, measurements, photos
8 hrs
100
800
examine Owner's dwgs.,CADD of existing conditions
4 hrs
100
400
client mtg
6 hrs
150
900
project management
4 hrs
150
600
22
2,700
SCHEMATIC DESIGN
floor plan design,2 floor plan sketch options
12 hrs
150
1,800
CADD-31D drawings
30 hrs
100
3,000
project management
6 hrs
150
900
1-meeting with Client
6 hrs
150
900
mtgs with Planning Commission, City Council
20 hrs
150
3,000
compile cost estimate
4 hrs
150
600
78
10,200
ARCHITECTURAL CONSTRUCTION DOCUMENTS
CADD-3D drawings
60 hrs
100
6,000
project management
6 hrs
150
900
compile drawings at 50%,90%,100% submittal
4 hrs
100
400
bldg dept corrections/submittals/resubmittal
8 hrs
100
800
client meeting or coordination
6 hrs
150
900
compile specifications
6 hrs
150
900
compile cost estimate
4 hrs
150
600
quality control review of all documents
8 hrs
150
1,200
102
11,700
SUB -CONSULTANTS
structural engineering
2,000
destructive testing
0
mechanical
3,500
plumbing
1,500
electrical
3,000
civil engineering (not needed)
0
topographic survey (provided by Client if needed)
0
hazzardous materials report (provided by Client if needed)
0
soils engineering (provided by Client)
0
10,000
EXPENSES
project coordination blueprints
200
travel, photocopy of specifications, misc. photocopies, courier, mail/delivery
200
400
BIDDING & CONSTRUCTION SUPPORT (limited to amount of hours stated)
Pre -bid meeting
0 hrs
150
0
Pre -Construction meeting
6 hrs
150
900
site meetings
10 hrs
150
1,500
allowance for meetings, RFI's, punchlist, and techical support
12 hrs
150
1,800
4,200
TOTAL FEE $39,200
NOTES AND RESTRICTIONS
1. Soils and geology report are provide by City
2.Owner will provide blueprints for bidding to contractors
3. Owner will provide accurate as -built of architectural & structural drawings.
4. Asbestos report, structural testing, Civil/drainage engineering are not included in this Proposal.
CITY OF LA QUINTA
RFP FOR FIRE STATION #70 REVITALIZATION
PROJECT NO.2019-07
COST PROPOSAL
Job Title
Principal Architect
HOURLY
EXCEEDNOT TO "TE
$150.00
Project Manager
$150.00
Project Designer
$125.00
Senior Designer
$110.00
Senior Technical
$100.00
Draftsman/AutoCAD Operator
$95.00
Other Technical Staff
$85.00
Structural Engineer
$150.00
Mechanical Engineer
$150.00
Electrical Engineer
$150.00
"Other" Sub -Consultant
$150.00
Clerical Staff
$80.00
Prints
$0.50/s.f.
14 The above hourly rates are fully burdened or loaded, including full compensation for all overhead and
profit. Billing rates shall include provision for normal office costs, including, but not limited to: office
rental, utilities, insurance, cell phone or radio, equipment, normal supplies and materials, in-house
reproduction services, and local travel costs.
-A4 The proposed hourly rates are guaranteed for the term of the agreements to successfully fulfill the
Scope of Work for each project.
Black O'Dowd and Associates, Inc.
o OQ
DBA BOA ARCHITECTURE
1511 Cota Avenue
Long Beach, CA 90813
\�\