Loading...
BOA Architecture - Cost ProposalFIXED FEE for architectural/engineering La Quinta Fire Station #70 for: City of La Quinta by: Edward Lok Ng, Architect. BOA Architiecture job#20- date: Feb. 14, 2020 construction cost: $350,000 plus 10% contingency HOURS UNIT HR RATE COST TOTAL TOTAL PRE -DESIGN verify existing conditions, measurements, photos 8 hrs 100 800 examine Owner's dwgs.,CADD of existing conditions 4 hrs 100 400 client mtg 6 hrs 150 900 project management 4 hrs 150 600 22 2,700 SCHEMATIC DESIGN floor plan design,2 floor plan sketch options 12 hrs 150 1,800 CADD-31D drawings 30 hrs 100 3,000 project management 6 hrs 150 900 1-meeting with Client 6 hrs 150 900 mtgs with Planning Commission, City Council 20 hrs 150 3,000 compile cost estimate 4 hrs 150 600 78 10,200 ARCHITECTURAL CONSTRUCTION DOCUMENTS CADD-3D drawings 60 hrs 100 6,000 project management 6 hrs 150 900 compile drawings at 50%,90%,100% submittal 4 hrs 100 400 bldg dept corrections/submittals/resubmittal 8 hrs 100 800 client meeting or coordination 6 hrs 150 900 compile specifications 6 hrs 150 900 compile cost estimate 4 hrs 150 600 quality control review of all documents 8 hrs 150 1,200 102 11,700 SUB -CONSULTANTS structural engineering 2,000 destructive testing 0 mechanical 3,500 plumbing 1,500 electrical 3,000 civil engineering (not needed) 0 topographic survey (provided by Client if needed) 0 hazzardous materials report (provided by Client if needed) 0 soils engineering (provided by Client) 0 10,000 EXPENSES project coordination blueprints 200 travel, photocopy of specifications, misc. photocopies, courier, mail/delivery 200 400 BIDDING & CONSTRUCTION SUPPORT (limited to amount of hours stated) Pre -bid meeting 0 hrs 150 0 Pre -Construction meeting 6 hrs 150 900 site meetings 10 hrs 150 1,500 allowance for meetings, RFI's, punchlist, and techical support 12 hrs 150 1,800 4,200 TOTAL FEE $39,200 NOTES AND RESTRICTIONS 1. Soils and geology report are provide by City 2.Owner will provide blueprints for bidding to contractors 3. Owner will provide accurate as -built of architectural & structural drawings. 4. Asbestos report, structural testing, Civil/drainage engineering are not included in this Proposal. CITY OF LA QUINTA RFP FOR FIRE STATION #70 REVITALIZATION PROJECT NO.2019-07 COST PROPOSAL Job Title Principal Architect HOURLY EXCEEDNOT TO "TE $150.00 Project Manager $150.00 Project Designer $125.00 Senior Designer $110.00 Senior Technical $100.00 Draftsman/AutoCAD Operator $95.00 Other Technical Staff $85.00 Structural Engineer $150.00 Mechanical Engineer $150.00 Electrical Engineer $150.00 "Other" Sub -Consultant $150.00 Clerical Staff $80.00 Prints $0.50/s.f. 14 The above hourly rates are fully burdened or loaded, including full compensation for all overhead and profit. Billing rates shall include provision for normal office costs, including, but not limited to: office rental, utilities, insurance, cell phone or radio, equipment, normal supplies and materials, in-house reproduction services, and local travel costs. -A4 The proposed hourly rates are guaranteed for the term of the agreements to successfully fulfill the Scope of Work for each project. Black O'Dowd and Associates, Inc. o OQ DBA BOA ARCHITECTURE 1511 Cota Avenue Long Beach, CA 90813 \�\