Loading...
Appendix C.1 - Air Quality Analysis ImpactAppendix C.1 Air Quality Analysis Impact Urban Crossroads, 2021 Travertine SPA Draft EIR SCH# 201811023 Technical Appendices October 2023 CROSSROADS 0 URBAN Travertine Specific Plan AIR QUALITY IMPACT ANALYSIS CITY OF LA QUINTA PREPARED BY: Haseeb Qureshi hqureshi@urbanxroads.com Alyssa Tamase atamase@urbanxroads.com OCTOBER 13, 2021 12188-05 AQ Report Travertine Specific Plan Air Quality Impact Analysis TABLE OF CONTENTS TABLE OF CONTENTS APPENDICES II LIST OF EXHIBITS II LIST OF TABLES II LIST OF ABBREVIATED TERMS IV EXECUTIVE SUMMARY 1 ES.1 Summary of Findings 1 ES.2 Standard Regulatory Requirements 1 ES.3 Construction -Source Mitigation 2 ES.4 Operational -Source Mitigation 2 1 INTRODUCTION 5 1.1 Site Location 5 1.2 Project Description 5 2 AIR QUALITY SETTING 9 2.1 Atmospheric Setting 9 2.2 Criteria Pollutants 10 2.3 Existing Air Quality 17 2.4 Regional Air Quality 20 2.5 Local Air Quality 20 2.6 Regulatory Background 21 3 PROJECT AIR QUALITY IMPACT 27 3.1 Introduction 27 3.2 Standards of Significance 27 3.3 Methodology 28 3.4 Construction Emissions 29 3.5 Operational Emissions 41 3.6 Localized Significance 45 3.7 Construction -Source Emissions LST Analysis 50 3.8 Operational -Source Emissions LST Analysis 57 3.9 CO "Hot Spot" Analysis 58 3.10 Air Quality Management Planning 60 3.11 Potential Impacts to Sensitive Receptors 62 3.12 Odors 64 3.13 Cumulative Impacts 65 4 REFERENCES 68 5 CERTIFICATIONS 72 12188-05 AQ Report (? URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDICES APPENDIX 2.1: STATE/FEDERAL ATTAINMENT STATUS OF CRITERIA POLLUTANTS APPENDIX 3.1: CALEEMOD PHASE A CRUSHING EMISSIONS MODEL OUTPUTS APPENDIX 3.2: CALEEMOD PHASE A GRADING & TANK CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.3: CALEEMOD WELL #1 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.4: CALEEMOD WELL #2 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.5: CALEEMOD WELL #3 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.6: CALEEMOD WELL #4 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.7: CALEEMOD WELL #5 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.8: CALEEMOD WELL #6 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.9: CALEEMOD WELL #7 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.10: CALEEMOD WELL #8 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.11: CALEEMOD WELL #9 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.12: CALEEMOD SUBSTATION CONSTRUCTION EMISSIONS MODEL OUTPUTS (UNMITIGATED) APPENDIX 3.13: CALEEMOD PHASE B CRUSHING EMISSIONS MODEL OUTPUTS APPENDIX 3.14: CALEEMOD PHASE B GRADING EMISSIONS MODEL OUTPUTS APPENDIX 3.15: CALEEMOD PHASE 1 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.16: CALEEMOD PHASE 2 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.17: CALEEMOD PHASE 3 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.18: CALEEMOD SUBSTATION CONSTRUCTION EMISSIONS MODEL OUTPUTS (MITIGATED) APPENDIX 3.19: CALEEMOD PHASE 1 OPERATIONAL EMISSIONS MODEL OUTPUTS APPENDIX 3.20: CALEEMOD PHASE 2 OPERATIONAL EMISSIONS MODEL OUTPUTS APPENDIX 3.21: CALEEMOD PHASE 3 OPERATIONAL EMISSIONS MODEL OUTPUTS APPENDIX 3.22: RCEM MADISON AVENUE WITH WATER LINE EMISSIONS MODEL OUTPUTS APPENDIX 3.23: RCEM AVENUE 62 WITH WATER LINE EMISSIONS MODEL OUTPUTS APPENDIX 3.24: RCEM JEFFERSON WITH WATER LINE EMISSIONS MODEL OUTPUTS APPENDIX 3.25: EMFAC2017 OUTPUTS APPENDIX 3.26: SCAQMD BRIEF LIST OF EXHIBITS EXHIBIT 1-A: LOCATION MAP 6 EXHIBIT 1-B: SITE PLAN 7 EXHIBIT 3-A: SENSITIVE RECEPTOR LOCATIONS 49 LIST OF TABLES TABLE ES -1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS 1 TABLE 2-1: CRITERIA POLLUTANTS 10 TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (1 OF 2) 18 TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (2 OF 2) 19 TABLE 2-3: ATTAINMENT STATUS OF CRITERIA POLLUTANTS IN THE SSAB 20 TABLE 2-4: PROJECT AREA AIR QUALITY MONITORING SUMMARY 2018-2020 21 TABLE 3-1: MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS 27 12188-05 AQ Report Lei► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-2: CONSTRUCTION DURATION (1 OF 3) 31 TABLE 3-2: CONSTRUCTION DURATION (2 OF 3) 32 TABLE 3-2: CONSTRUCTION DURATION (3 OF 3) 33 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (1 OF 7) 33 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (2 OF 7) 34 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (3 OF 7) 35 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (4 OF 7) 36 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (5 OF 7) 37 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (6 OF 7) 38 TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (7 OF 7) 39 TABLE 3-4: OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITHOUT MITIGATION) 40 TABLE 3-5: OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITH MITIGATION) 41 TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (1 OF 2) 44 TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (2 OF 2) 45 TABLE 3-7: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (1 OF 3) 50 TABLE 3-7: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (2 OF 3) 51 TABLE 3-7: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (3 OF 3) 52 TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (1 OF 6) 52 TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (2 OF 6) 53 TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (3 OF 6) 54 TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (4 OF 6) 55 TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (5 OF 6) 56 TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (6 OF 6) 57 TABLE 3-9: CO MODEL RESULTS 58 TABLE 3-10: TRAFFIC VOLUMES 59 TABLE 3-11: CUMULATIVE WITH PHASE 3 PROJECT (2031) ADT 60 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis LIST OF ABBREVIATED TERMS Percent °F Degrees Fahrenheit (1) Reference µg/m3 Microgram per Cubic Meter 1992 CO Plan 1992 Federal Attainment Plan for Carbon Monoxide 1993 CEQA Handbook SCAQMD's CEQA Air Quality Handbook (1993) 2003 AQMP SCAQMD's 2003 Air Quality Management Plan 2016 AQMP SCAQMD's Final 2019 Air Quality Management Plan 2016-2040 RTP/SCS 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy AB 2595 California Clean Air Act AQIA Air Quality Impact Analysis AQMD Air Quality Management District AQMP Air Quality Management Plan BAAQMD Bay Area Air Quality Management District Brief Brief of Amicus Curiae by the SCAQMD in the Friant Ranch Case C2H3CI Vinyl Chloride CAA Federal Clean Air Act CAAQS California Ambient Air Quality Standards CaIEEMod California Emissions Estimator Model CaIEPA California Environmental Protection Agency CALGreen CCR, Title 24, Part 11: California Green Building Standards Code Caltrans California Department of Transportation CAPCOA California Air Pollution Control Officers Association CARB California Air Resources Board CCR California Code of Regulations CEC California Energy Commission CEQA California Environmental Quality Act CEQA Guidelines 2019 CEQA Statute and Guidelines City City of La Quinta CN Neighborhood Commercial CO Carbon Monoxide COHb Carboxyhemoglobin CT Tourist Commercial 12188-05 AQ Report iv Lei URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis CY Cubic Yards EIR Environmental Impact Reports EMFAC EMissions FACtor Model EPA Environmental Protection Agency FHWA Federal Highway Administration FTA Federal Transit Administration g/L Grams per Liter gal/day Gallons Per Day GC Golf Course GHG Greenhouse Gas H2S Hydrogen Sulfide HI Hazard Index lbs/day Pounds Per Day LST Localized Significance Threshold LST METHODOLOGY Final Localized Significance Threshold Methodology MDR Medium Density Residential MICR Maximum Individual Cancer Risk mph Miles Per Hour MWELO Model Water Efficient Landscape Ordinance N2 Nitrogen N20 Nitrous Oxide NAAQS National Ambient Air Quality Standards NO Nitric Oxide NO2 Nitrogen Dioxide NOx Nitrogen Oxides 02 Oxygen 03 Ozone Pb Lead Mho Particulate Matter 10 microns in diameter or less PM2.5 Particulate Matter 2.5 microns in diameter or less ppm Parts Per Million Project Travertine Specific Plan RECLAIM Regional Clean Air Incentives Market RL Low Density Residential RMH Medium -High Density Residential ROG Reactive Organic Gases Rule 402 Nuisance Rule 403 Fugitive Dust 12188-05 AQ Report v (_mo) URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Rule 445 Wood Burning Devices Rule 1113 Architectural Coating SCAB South Coast Air Basin SCAG Southern California Association of Governments SCAQMD South Coast Air Quality Management District sf Square Feet SIP State Implementation Plans SO2 Sulfur Dioxide SO4 Sulfates SOx Sulfur Oxides SRA Source Receptor Area TAC Toxic Air Contaminants Title 24 CCR Title 24 Part 6: California's Energy Efficiency Standards for Residential and Nonresidential Buildings TITLE I Non -Attainment Provisions TITLE II Mobile Sources Provisions VOC Volatile Organic Compounds VPH Vehicles Per Hour 12188-05 AQ Report vi [^moi URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report VI' tmoi URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis EXECUTIVE SUMMARY ES.1 SUMMARY OF FINDINGS The results of this Travertine Specific Plan Air Quality Impact Analysis (AQIA) are summarized below based on the significance criteria in Section 3 of this report consistent with Appendix G of the California Environmental Quality Act (CEQA) Guidelines (CEQA Guidelines) (1). Table ES -1 shows the findings of significance for each potential air quality impact under CEQA before and after any required mitigation measures (MM) described below. TABLE ES -1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS Analysis Report Section Significance Findings Unmitigated Mitigated Regional Construction Emissions 3.4 Potentially Significant Less Than Significant Localized Construction Emissions 3.7 Less Than Significant n/a Regional Operational Emissions 3.5 Potentially Significant Significant and Unavoidable Localized Operational Emissions 3.8 Less Than Significant n/a CO "Hot Spot" Analysis 3.9 Less Than Significant n/a Air Quality Management Plan 3.10 Potentially Significant Significant and Unavoidable Sensitive Receptors 3.11 Less Than Significant n/a Odors 3.12 Less Than Significant n/a Cumulative Impacts 3.13 Potentially Significant Significant and Unavoidable ES.2 STANDARD REGULATORY REQUIREMENTS Measures listed below (or equivalent language) shall appear on all Project grading plans, construction specifications and bid documents, and the City shall ensure such language is incorporated prior to issuance of any development permits. South Coast Air Quality Management District (SCAQMD) Rules that are currently applicable during construction and operational activity for this Project include but are not limited to Rule 403 (Fugitive Dust), Rule 445 (Wood 12188-05 AQ Report 1 ��► URBAN Travertine Specific Plan Air Quality Impact Analysis Burning Devices), and Rule 1113 (Architectural Coatings) (2) (3) (4). As such, credit for Rule 403, Rule 1113, and Rule 445 have been taken. SCAQMD RULE 403 Rule 403 is intended to reduce the amount of particulate matter entrained in the ambient air as a result of anthropogenic (human -made) fugitive dust sources by requiring actions to prevent, reduce, or mitigate fugitive dust emissions. Rule 403 applies to any activity or human -made condition capable of generating fugitive dust, and requires best available control measures to be applied to earth moving and grading activities (2). SCAQMD RULE 445 Rule 445 is intended to reduce the emission of particulate matter from wood -burning devices (3). The Project is required to comply with SCAQMD Rule 445, which prohibits the use of wood burning stoves and fireplaces in new development (3). SCAQMD RULE 1113 Rule 1113 serves to limit the Volatile Organic Compounds (VOC) content of architectural coatings used on projects in the SCAQMD. Any person who supplies, sells, offers for sale, or manufactures any architectural coating for use on projects in the SCAQMD must comply with the current VOC standards set in this rule (4). ES.3 CONSTRUCTION -SOURCE MITIGATION MM AQ -1 The Construction Contractor shall ensure that during substation construction activities, off-road diesel construction equipment rated at 50 horsepower (hp) or greater, complies with EPA/CARB Tier 4 off-road emissions standards or equivalent and shall ensure that all construction equipment is tuned and maintained in accordance with the manufacturer's specifications. ES.4 OPERATIONAL -SOURCE MITIGATION It is important to note that the majority of VOC emissions are derived from consumer products. For analytical purposes, consumer products include cleaning supplies, aerosols, and other consumer products (5). As such, the Project Applicant cannot meaningfully control the use of consumer products by future building users via mitigation; thus, VOC emissions are considered significant and unavoidable as no feasible mitigation measure exists that would reduce this impact to less than significant levels. Additionally, it should be noted that the majority of the Project's NOx emissions are derived from vehicle usage. Since neither the Project Applicant nor the City have regulatory authority to control tailpipe emissions, no feasible mitigation measures exist that would reduce these emissions to levels that are less -than -significant, thus NOx emissions are considered significant and unavoidable. It should be noted that over time, emissions associated with the Project would be reduced through compliance with applicable state mandates for new development and new 12188-05 AQ Report 2 ��► URBAN Travertine Specific Plan Air Quality Impact Analysis vehicle tailpipe emission standards (e.g., solar, carbon neutral requirements, and EV fleet requirements for new vehicles). 12188-05 AQ Report 3 L�1 URBAN Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report 4 [^�1 URBAN Travertine Specific Plan Air Quality Impact Analysis 1 INTRODUCTION This report presents the results of the AQIA prepared by Urban Crossroads, Inc., for the proposed Travertine Specific Plan (Project). The purpose of this AQIA is to evaluate the potential impacts to air quality associated with construction and operation of the proposed Project and recommend measures to mitigate impacts considered potentially significant in comparison to thresholds established by the SCAQMD. 1.1 SITE LOCATION The proposed Travertine Specific Plan Project is generally located south of the hypothetical westerly extension of Avenue 60 and west of the hypothetical southerly extension of Madison Street in the City of La Quinta, as shown on Exhibit 1-A. Bureau of Land Management land is located adjacent to the Project's southern boundary, Martinez Mountain is located to the southwest, and existing residential homes are located north and east of the Project site. 1.2 PROJECT DESCRIPTION At buildout, the proposed mixed-use Project consists of approximately 758 single family detached residential homes, 442 duplex residential units, a 100 -room resort hotel, and a golf course (12 holes). The preliminary land use plan for the proposed Project is shown on Exhibit 1- B. The Project is anticipated to be constructed in phases with the total development for each phase summarized below: • Phase 1 (2026) — 530 single family detached residential homes, 74 duplex residential units, and a golf course (12 holes). • Phase 2 (2029) —143 single family detached residential homes, and 163 duplex residential units. • Phase 3 (2031) —85 single family detached residential homes, 205 duplex residential units, and a 100 -room resort hotel. • Full Project Buildout —758 single family detached residential homes, 442 duplex residential units, a 100 -room resort hotel and a golf course (12 holes) The Travertine Project is proposed to be served by two access points: 1) the southerly extension of South Jefferson as a Modified Secondary, south of Avenue 58, and 2) the westerly extension of Avenue 62 as a Modified Secondary, west of Monroe Street. An emergency vehicle access (EVA) is provided via Madison Street, from the northerly boundary of the Project's Planning Area 18 to Avenue 60. 12188-05 AQ Report 5 [_�► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Quarry At La Ouaita Fazio Ln`' '14 EXHIBIT 1-A: LOCATION MAP 581h Ave Cord Mountain Regional Park Aracena 4 alus'a4 Andalusia Country C lub Trilogy AI La Qumra t, s a 285741 Rustic CanYonO� F1sh Tri Arc halo to Site. Sources: Esri, HERE, Garmin, intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster Nt., Ordnance Survey, Esri Japan, METI, Esri Chino (Hong Kong), (c) OpenStreetMap contributors, and the GIS 12188-05 AQ Report 6 [_�► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis EXHIBIT 1-B: SITE PLAN PHASE. I -.t (.6 mlucflue SS' vkx Pith..€ 2 {'un.luteip6lSllhs Ph lj.d Lew here Demi* PalmyTomei Deaky T.r�t 21.16 MO 10 Lox Demiq Pas/di l 211 1_-425 dn'.e 2.9 74 Ytl.1r1 1116511. 1.1 R.esod., Golf 46.2 1 14. Ikadi Kputicncial 1.3 166.. Density 1465610566 01 32-2 13-1.5 dm* kP 101 P % l3 tow [amity Rkdderdel 261 11.13 Au4r 11 41 626,1666 Deelol} Icraxknurl 14 Lar Density Re klestir 391 13-13 do1m ] -7 66 1.1 IyA 1.e. [knit. Medde+y4d 90.4 154.2.d4las :-1 u Ie, veru[. Revelential IQ Open Space keeaodn66 23.1 1.34.3 ,I it 33 10 Cr, Spee tiuwel 3613 39,41 P66e S Tnl•h Plum 1-A Tat*. SM.! 6.6 51.1 31 PHASE I-IICoatlocti. '..lr. [lien tirsr,r kn.rriyn. 1131 PA L.. 4 1.6 Ann 11":"''R."!'7 erre 1566111 ! Argo l nd. %lila% S 166 [knec3 Re.id61.64 1.6= 1343 du -.c 1,6 }1 Maw l 1A.k I L,,.. [kn.., Rr.-.kncd 11L7 IJ -416k7,5 3.3 61 11 1 L..-., 17.r.6:, Rr..drnd l 16.9 1143di.ew 43 73 llnlsum 16:611.1. Krsidmli•1 141 4.2-1L34166z 59 74 15-6 L. Ikn.[r keswkncill 12.4 1.554143 21 21 11 Open Staze Re»o. 14-7 Ta42.7 21 Rua 1..R6Y 716 1 I\ &LAMSON Sr EVA 12188-05 AQ Report 7 [_�► URBAN CROSSROADS Pith..€ 2 {'un.luteip6lSllhs PA I.•od 1 . Atm Mosby Row Ytl.1r1 1116511. Ytrgrl 1 616 11116. 1 14. Ikadi Kputicncial 4. 1.3-4.5 du* P % 6 626,1666 Deelol} Icraxknurl 20.1 4.5-1.5 rki.lc 1.1 163 16 Ie, veru[. Revelential 56.4 1.34.3 ,I it 33 116 39,41 P66e S Tnl•h 64.1 # 31 NL &LAMSON Sr EVA 12188-05 AQ Report 7 [_�► URBAN CROSSROADS PHASE 3 Co11loclionf:11TMV FA _ Lm41'et .ism D3m12 Ilallt T•rlet 115.516 Target L'.1n Y1116,1, 1 Reseaa • 5ro 53 1 1113 2 Medira Densait ReMessimi 251-9 41.3.1.5 du,•r 7.9 $O$ 3 la.' jSrn.i., Rea*.did 39,41 1$a .1u'* 2-4 # 12 [lien tirsr,r kn.rriyn. 1131 Maw l 1A.k 111.7 11 241 111 &LAMSON Sr EVA 12188-05 AQ Report 7 [_�► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report 8 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 2 AIR QUALITY SETTING This section provides an overview of the existing air quality conditions in the Project area and region. 2.1 ATMOSPHERIC SETTING The Project site is located within Salton Sea Air Basin (SSAB) within the jurisdiction of the SCAQMD. The SSAB (also referred to herein as "the Basin") is aligned in a north -west-southwest orientation stretching from Banning Pass to the Mexican border. The regional climate, as well as the temperature, wind, humidity, precipitation, and amount of sunshine significantly influence the air quality in the Basin. The climate of the Coachella Valley is a continental, desert -type climate, with hot summers, mild winters, and very little annual rainfall. Precipitation is less than six inches annually and occurs mostly in the winter months from active frontal systems and in the late summer months from thunderstorms. Almost all of the annual rainfall comes from the fringes of mid -latitude storms from late November to early April with summers often being completely dry. Temperatures exceed 100 degrees Fahrenheit (°F), on the average, for four months each year, with daily highs near 110 °F during July and August. Summer nights are cooler with minimum temperatures in the mid-70s. During the winter season, daytime highs are quite mild, but the dry air is conducive to nocturnal radiational cooling, with early morning lows around 40 °F. The Coachella Valley and adjacent areas are exposed to frequent gusty winds. The flat terrain of the valley and strong temperature differentials, created by intense solar heating, produce moderate winds and deep thermal convection. Wind speeds exceeding 31 miles per hour (mph) occur most frequently in April and May. On an annual basis, strong winds (greater than 31 mph) are observed 0.6 percent of the time and speeds of less than 6.8 mph account for more than one- half of the observed winds. Prevailing winds are from the northwest through southwest, with secondary flows from the southeast. The strongest and most persistent winds typically occur immediately to the east of Banning Pass, which is noted as a wind power generation resource area. Aside from this locale, the wind conditions in the remainder of the Coachella Valley are geographically distinct. Stronger winds tend to occur closer to the foothills. Less frequently, widespread gusty winds occur over all areas of the Valley. Portions of the SSAB experience surface inversions almost every day of the year. Inversions in the SSAB are attributed to strong surface heating, but are usually broken, allowing pollutants to disperse more easily. Weak surface inversions are caused by cooling of air in contact with the cold surface of the earth at night. In the valleys and low-lying areas, this condition is intensified by the addition of cold air flowing downslope from the hills and pooling on the valley floor. In addition, inversions in the SSAB caused by the presence of the Pacific high-pressure cell can cause the air mass aloft to sink. As the air descends, compressional heating warms the air to a temperature higher than the air below. This subsidence inversion can act as a nearly impenetrable lid to the vertical mixing of pollutants. These inversions can persist for one or more 12188-05 AQ Report 9 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis days, causing air stagnation and the buildup of pollutants. Subsidence inversions are common from November through June and are relatively absent from July through October. Within the Project area, there is a natural sand migration process, called "blowsand," that has direct and indirect effects on air quality. Blowsand produces particulate matter (PM10) in two ways: (1) by direct particle erosion and fragmentation as natural PM10, and (2) by secondary effects, as sand deposits on road surfaces. Also, where water has already receded around the Salton Sea, the surface areas contain a salty mix of sediments that can change from a hardened salt crust to a fluffy soft layer of dust depending upon the season. Exposed sediments could elevate PM10 levels throughout the region. Almost 120,000 acres of Salton Sea lakebed could be exposed as inflows to the Sea decrease in future years. Local communities may be affected by 60,000 potentially dust -blowing acres, which will cause PM10 levels to rise. 2.2 CRITERIA POLLUTANTS Criteria pollutants are pollutants that are regulated through the development of human health based and/or environmentally based criteria for setting permissible levels. Criteria pollutants, their typical sources, and health effects are identified below (6): TABLE 2-1: CRITERIA POLLUTANTS Criteria Pollutant Description Sources Health Effects CO CO is a colorless, odorless gas Any source that Individuals with a deficient produced by the incomplete burns fuel such as blood supply to the heart are combustion of carbon -containing fuels, such as gasoline or wood. automobiles, trucks, heavy construction the most susceptible to the adverse effects of CO CO concentrations tend to be the equipment, farming exposure. The effects highest during the winter equipment and observed include earlier morning, when little to no wind and surface -based inversions trap the pollutant at ground levels. Because CO is emitted directly from internal combustion engines, unlike ozone (03), motor vehicles operating at slow speeds are the primary source of CO in the SCAB. The highest ambient CO concentrations are generally found near congested transportation corridors and intersections. residential heating. onset of chest pain with exercise, and electrocardiograph changes indicative of decreased oxygen (02) supply to the heart. Inhaled CO has no direct toxic effect on the lungs but exerts its effect on tissues by interfering with 02 transport and competing with 02to combine with hemoglobin present in the blood to form carboxyhemoglobin (COHb). Hence, conditions with an increased demand for 02 supply can be adversely affected by exposure to CO. Individuals most at risk 12188-05 AQ Report 10 LI) URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis Criteria Pollutant Description Sources Health Effects include fetuses, patients with diseases involving heart and blood vessels, and patients with chronic hypoxemia (02 deficiency) as seen at high altitudes. S02 S02 is a colorless, extremely irritating gas or liquid. It enters the atmosphere as a pollutant mainly as a result of burning high sulfur -content fuel oils and coal and from chemical processes occurring at chemical plants and refineries. When S02 oxidizes in the atmosphere, it forms SO4. Collectively, these pollutants are referred to as sulfur oxides (SOx). Coal or oil burning power plants and industries, refineries, diesel engines A few minutes of exposure to low levels of S02 can result in airway constriction in some asthmatics, all of whom are sensitive to its effects. In asthmatics, increase in resistance to air flow, as well as reduction in breathing capacity leading to severe breathing difficulties, are observed after acute exposure to 502. In contrast, healthy individuals do not exhibit similar acute responses even after exposure to higher concentrations of S02. Animal studies suggest that despite S02 being a respiratory irritant, it does not cause substantial lung injury at ambient concentrations. However, very high levels of exposure can cause lung edema (fluid accumulation), lung tissue damage, and sloughing off of cells lining the respiratory tract. Some population -based studies indicate that the mortality and morbidity effects associated with fine particles show a similar association with ambient S02 levels. In these studies, efforts to separate the effects of S02 from those of fine particles have not been successful. It is not clear whether the two pollutants act synergistically, or one 12188-05 AQ Report 11 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Criteria Pollutant Description Sources Health Effects pollutant alone is the predominant factor. NOx NOx consist of nitric oxide (NO), nitrogen dioxide (NO2) and nitrous oxide (N20) and are formed when nitrogen (N2) combines with 02. Their lifespan in the atmosphere ranges from one to seven days for nitric oxide and nitrogen dioxide, to 170 years for nitrous oxide. NOx is typically created during combustion processes and are major contributors to smog formation and acid deposition. NO2 is a criteria air pollutant and may result in numerous adverse health effects; it absorbs blue light, resulting in a brownish -red cast to the atmosphere and reduced visibility. Of the seven types of nitrogen oxide compounds, NO2 is the most abundant in the atmosphere. As ambient concentrations of NO2 are related to traffic density, commuters in heavy traffic may be exposed to higher concentrations of NO2 than those indicated by regional monitoring station. Any source that burns fuel such as automobiles, trucks, heavy construction equipment, farming equipment and residential heating. Population -based studies suggest that an increase in acute respiratory illness, including infections and respiratory symptoms in children (not infants), is associated with long-term exposure to NO2 at levels found in homes with gas stoves, which are higher than ambient levels found in Southern California. Increase in resistance to air flow and airway contraction is observed after short-term exposure to NO2 in healthy subjects. Larger decreases in lung functions are observed in individuals with asthma or chronic obstructive pulmonary disease (e.g., chronic bronchitis, emphysema) than in healthy individuals, indicating a greater susceptibility of these sub -groups. In animals, exposure to levels of NO2 considerably higher than ambient concentrations result in increased susceptibility to infections, possibly due to the observed changes in cells involved in maintaining immune functions. The severity of lung tissue damage associated with high levels of 03 exposure increases when animals are exposed to a combination of 03 and NO2. 03 03 is a highly reactive and unstable gas that is formed when VOCs and NOx, both byproducts of internal combustion engine Formed when reactive organic gases (ROG) and NOx Individuals exercising outdoors, children, and people with preexisting lung disease, such as asthma and 12188-05 AQ Report 12 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Criteria Pollutant Description Sources Health Effects exhaust, undergo slow react in the chronic pulmonary lung photochemical reactions in the presence of disease, are considered to be presence of sunlight. 03 sunlight. ROG the most susceptible sub - concentrations are generally sources groups for O3 effects. Short - highest during the summer include any source term exposure (lasting for a months when direct sunlight, that burns fuels, few hours) to 03 at levels light wind, and warm (e.g., gasoline, typically observed in temperature conditions are natural gas, wood, Southern California can result favorable to the formation of this oil) solvents, in breathing pattern changes, pollutant. petroleum reduction of breathing processing and capacity, increased storage and pesticides. susceptibility to infections, inflammation of the lung tissue, and some immunological changes. Elevated 03 levels are associated with increased school absences. In recent years, a correlation between elevated ambient 03 levels and increases in daily hospital admission rates, as well as mortality, has also been reported. An increased risk for asthma has been found in children who participate in multiple outdoor sports and live in communities with high 03 levels. 03 exposure under exercising conditions is known to increase the severity of the responses described above. Animal studies suggest that exposure to a combination of pollutants that includes 03 may be more toxic than exposure to 03 alone. Although lung volume and resistance changes observed after a single exposure diminish with repeated exposures, biochemical and cellular changes appear to persist, which can lead to subsequent lung structural changes. 12188-05 AQ Report 13 LI') URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis Criteria Pollutant Description Sources Health Effects Particulate Matter PMio: A major air pollutant Sources of PMio A consistent correlation consisting of tiny solid or liquid particles of soot, dust, smoke, fumes, and aerosols. Particulate include road dust, windblown dust and construction. Also between elevated ambient fine particulate matter (PMio and PM2.5) levels and an matter pollution is a major cause of reduce visibility (haze) which is caused by the scattering of light and consequently the significant formed from other pollutants (acid rain, NOx, 50x, organics). increase in mortality rates, respiratory infections, number and severity of asthma attacks and the reduction air clarity. The size of Incomplete number of hospital the particles (10 microns or combustion of any admissions has been smaller, about 0.0004 inches or less) allows them to easily enter fuel. observed in different parts of the United States and various the lungs where they may be PM2.5 comes from areas around the world. In deposited, resulting in adverse fuel combustion in recent years, some studies health effects. Additionally, it should be noted that PMio is motor vehicles, equipment and have reported an association between long-term exposure considered a criteria airindustrial pollutant. sources, residential and to air pollution dominated by fine particles and increased PM2.5: A similar air pollutant to agricultural mortality, reduction in lifespan, and an increased PMio consisting of tiny solid or liquid particles which are 2.5 burning. Also formed from mortality from lung cancer. microns or smaller (which is often reaction of other Daily fluctuations in PMz.s referred to as fine particles). pollutants (acid concentration levels have also been related to hospital These particles are formed in the atmosphere from primary gaseous emissions that include SO4 formed from SO2 release from power plants and industrial facilities and nitrates that are formed from NOx release from power plants, automobiles and other types of combustion sources. The chemical composition of fine particles highly depends on location, time of year, and weather conditions. PM2.5 is a criteria air pollutant. rain, NOx, 50x, organics). admissions for acute respiratory conditions in children, to school and kindergarten absences, to a decrease in respiratory lung volumes in normal children, and to increased medication use in children and adults with asthma. Recent studies show lung function growth in children is reduced with long term exposure to particulate matter. The elderly, people with pre- existing respiratory or cardiovascular disease, and children appear to be more susceptible to the effects of high levels of PMio and PM2.s. VOC VOCs are hydrocarbon Organic chemicals Breathing VOCs can irritate compounds (any compound containing various combinations are widely used as ingredients in the eyes, nose and throat, can cause difficulty breathing of hydrogen and carbon atoms) household and nausea, and can damage that exist in the ambient air. products. Paints, the central nervous system as 12188-05 AQ Report 14 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Criteria Pollutant Description Sources Health Effects VOCs contribute to the formation of smog through atmospheric photochemical reactions and/or may be toxic. Compounds of carbon (also known as organic compounds) have different levels of reactivity; that is, they do not react at the same speed or do not form 03 to the same extent when exposed to photochemical processes. VOCs often have an odor, and some examples include gasoline, alcohol, and the solvents used in paints. Exceptions to the VOC designation include CO, carbon dioxide, carbonic acid, metallic carbides or carbonates, and ammonium carbonate. VOCs are a criteria pollutant since they are a precursor to 03, which is a criteria pollutant. The terms VOC and ROG (see below) interchangeably. varnishes and wax all contain organic solvents, as do many cleaning, disinfecting, cosmetic, degreasing and hobby products. Fuels are made up of organic chemicals. All of these products can release organic compounds while you are using them, and, to some degree, when they are stored. well as other organs. Some VOCs can cause cancer. Not all VOCs have all these health effects, though many have several. ROG Similar to VOC, ROGs are also precursors in forming 03 and consist of compounds containing methane, ethane, propane, butane, and longer chain hydrocarbons, which are typically the result of some type of combustion/decomposition process. Smog is formed when ROG and NOx react in the presence of sunlight. ROGs are a criteria pollutant since they are a precursor to 03, which is a criteria pollutant. The terms ROG and VOC (see previous) interchangeably. Sources similar to VOCs. Health effects similar to VOCs. Lead (Pb) Pb is a heavy metal that is highly persistent in the environment and is considered a criteria pollutant. In the past, the primary source of Pb in the air was emissions from vehicles burning leaded gasoline. The major sources of Pb emissions are ore and metals processing, Metal smelters, resource recovery, leaded gasoline, deterioration of Pb paint. Fetuses, infants, and children are more sensitive than others to the adverse effects of Pb exposure. Exposure to low levels of Pb can adversely affect the development and function of the central nervous system, leading to learning disorders, 12188-05 AQ Report 15 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Criteria Pollutant Description Sources Health Effects particularly Pb smelters, and piston -engine aircraft operating on leaded aviation gasoline. Other stationary sources include waste incinerators, utilities, and lead -acid battery manufacturers. distractibility, inability to follow simple commands, and lower intelligence quotient. In adults, increased Pb levels are associated with increased blood pressure. It should be noted that the Project does not include operational activities such as metal processing or Pb acid battery manufacturing. As such, the Project is not anticipated to generate a quantifiable amount of Pb emissions. Pb poisoning can cause anemia, lethargy, seizures, and death; although it appears that there are no direct effects of Pb on the respiratory system. Pb can be stored in the bone from early age environmental exposure, and elevated blood Pb levels can occur due to breakdown of bone tissue during pregnancy, hyperthyroidism (increased secretion of hormones from the thyroid gland) and osteoporosis (breakdown of bony tissue). Fetuses and breast-fed babies can be exposed to higher levels of Pb because of previous environmental Pb exposure of their mothers. Odor Odor means the perception Odors can come Offensive odors can experienced by a person when from many sources potentially affect human one or more chemical substances in the air come into contact with the human olfactory nerves (7). including animals, human activities, industry, natures, and vehicles. health in several ways. First, odorant compounds can irritate the eye, nose, and throat, which can reduce respiratory volume. Second, studies have shown that the VOCs that cause odors can stimulate sensory nerves to cause neurochemical changes that might influence health, for instance, by compromising the immune system. Finally, unpleasant odors can trigger memories or attitudes linked to unpleasant odors, causing cognitive and emotional effects such as stress. 12188-05 AQ Report 16 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 2.3 EXISTING AIR QUALITY Existing air quality is measured at established SCAQMD air quality monitoring stations. Monitored air quality is evaluated in the context of ambient air quality standards. These standards are the levels of air quality that are considered safe, with an adequate margin of safety, to protect the public health and welfare. National Ambient Air Quality Standards (NAAQS) and California Ambient Air Quality Standards (CAAQS) currently in effect are shown in Table 2-2 (8). The determination of whether a region's air quality is healthful or unhealthful is determined by comparing contaminant levels in ambient air samples to the state and federal standards. At the time of this AQIA, the most recent state and federal standards were updated by California Air Resources Board (CARB) on May 4, 2016 and are presented in Table 2-2. The air quality in a region is considered to be in attainment by the state if the measured ambient air pollutant levels for 03, CO (except 8 -hour Lake Tahoe), SO2 (1 and 24 hour), NO2, PM10, and PM2.5 are not to be exceeded. All others are not to be equaled or exceeded. It should be noted that the three-year period is presented for informational purposes and is not the basis for how the State assigns attainment status. Attainment status for a pollutant means that the SCAQMD meets the standards set by the Environmental Protection Agency (EPA) or the California EPA (CaIEPA). Conversely, nonattainment means that an area has monitored air quality that does not meet the NAAQS or CAAQS standards. In order to improve air quality in nonattainment areas, a State Implementation Plan (SIP) is drafted by CARB. The SIP outlines the measures that the state will take to improve air quality. Once nonattainment areas meet the standards and additional redesignation requirements, the EPA will designate the area as a maintenance area (9). 12188-05 AQ Report 17 ��i URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (1 OF 2) Ambient Air Quality Standards Pollutant Averaging Time California Standards • National Standards 2 Concentration a Method a 35 Primary Secondary 3,8 Method Ozone (O3]e 1 Hour 0.09 pprn (180 trgim3) Ultraviolet Photometry Same as Primary Standard Ultraviolet Photometry 8 Hour 3 0.070 ppm (137 pgrm) 3 0.070 ppm (137 pg/m ) Respirable Particulate Matter (PM10)9 24 Hour 50 pglm3 Gravimetric or Beta Attenuation 150 lig/m3 Same as Primary Standard Inertial Separation and Gravimetric Analysis Annual Arithmetic Mean 20 pglm3 — Particulate Matter (PM2.5)5 24 Hour 35 pg/m2 Primary Standard Inertial Separation and Gravimetric Analysis y Annual Arithmetic Mean 12 pglm Gravimetric or Beta Attenuation 3 12.0 pglm 3 15 pgfm Carbon Monoxide (CO) 1 Hour 20 ppm (23 mg/m2) Non -Dispersive Infrared Photometry (NDIR) 35 ppm (40 mg/m2) — Non -Dispersive Infrared Photometry (NDIR) 8 Hour 9.0 ppm (10 mg/m3) 9 ppm (10 m9(m3) — 8 Hour (Lake Tahoe) 6 ppm (7 mg/m3) Nitrogen Dioxide ru (NO2),1° 1 Hour 0.18 ppm (339 pg1m3) Gas Phase Chemiluminescence 100 ppb (188 pg/m2) — Sas Phase Chemiluminescence Annual Arithmetic Mean 0030 m3 ppm(57 l ) m 100 m3 0053 pP ( 1'4 ) Same as Primary Standard Sulfur Dioxide (s02)11 1 Hour 025 ppm (655 pg/m3) Ultraviolet Fluorescence 75 ppb (196 pg/m3) — Flouresl cence; Spectrophotometry (Pararosaniline Method) 3 Hour — — 0 5 ppm 3 (1300 pglm ) 24 Hour 3 0114 ppm (105 yglm) 0.14 ppm (for certain areas)" _ Annual Arithmetic Mean 0.030 ppm (foi certain areas)" Lead12'13 30 Day Average 1.5 nom'. Atomic Absorption High Volume Sampler and Atomic Absorption Calendar Quarter — 1.5 pglm3 (for certain areas)12 Same as Primary Standard Rolling 3 -Month Average 0.15 pglm 3 Visibility Reducing Particles' 8 Hour See footnote 14 Beta Attenuation and Transmittance through Filter Tape No National Standards Sulfates 24 Hour 25pg/m3 Ion Chromatography Hydrogen Sulfide 1 Hour 0.03 ppm (42 pg/m3) Ultraviolet Fluorescence VinylGas S2 Chloride 24 Hour 0.01 ppm (26 pg/m3) Chromatography See footnotes on next page .. For more information please call ARB-PIO at (916) 322-2990 California Air Resources Board (514116) 12188-05 AQ Report 18 L,► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 2-2: AMBIENT AIR QUALITY STANDARDS (2 OF 2) 1 California standards for ozone, carbon monoxide (except 8 -hour Lake Tahoe), sulfur dioxide (1 and 24 hour), nitrogen dioxide. and particulate matter (PM10, PM2.5, and visibility reducing particles), are values that are not to be exceeded. All others are not to be equaled or exceeded. California ambient air quality standards are listed in the Table of Standards in Section 70200 of Title 17 of the California Code of Regulations. 2 National standards (other than ozone, particulate matter, and those based on annual ariflnnetic mean) are not to be exceeded more than once a year. The ozone standard is attained when the fourth highest 8 -hour concentration measured at each site in a year, averaged over three years, is equal to or less than the standard. For PM10, the 24 hour standard is attained when the expected number of days per calendar year with a 24-hour average concentration above 150 Ng/ru is equal to or less than one. For PM2.5. the 24 hour standard is attained when 98 percent of the daily concentrations, averaged over three years, are equal to or less than the standard. Contact the U.S. EPA for further clarification and current national policies. 3. Concentration expressed first in units in which it was promulgated. Equivalent units given in parentheses are based upon a reference temperature of 25°C and a reference pressure of 760 torr. ldost measurements of air quality are to be corrected to a reference temperature of 25°C and a reference pressure of 760 torr, ppm in this table refers to ppm by volume, or micromoles of pollutant per mole of gas. 4 Any equivalent measurement method which can be shown to the satisfaction of the ARB to give equivalent results at or near the level of the air quality standard may be used. 5 National Primary Standards: The levels of air quality necessary, with an adequate margin of safety to protect the public health. 6 National Secondary Standards: The levels of air quality necessary to protect the public welfare from any known or anticipated adverse effects of a pollutant. 7 Reference method as described by the U -S_ EPA An "equivalent method" of measurement may be used but must have a "consistent relationship to the reference method" and must be app.uvedby the U.S. EPA. 8. On October 1, 2015, the national 8 -hour ozone primary and secondary standards were lowered from 0.075 to 0.070 ppm 9 On December 14, 2012: the national annual PM2.5 primary standard was lowered from 15 }tglu>3 to 12.0 nem'. The existing national 24- hour PM2 5 standards (primary and secondary) were retained at 35 item', as was the aminal secondary standard of 15 pg/m3_ The existing 24-hour PM10 standards (primary and secondary) of 150 pgln' also were retained. The form of the annual primary and secondary standards is the amoral mean, averaged over 3 years. 10. To attain the 1 -hour national standard, the 3 -year average of the annual 98th percentile of the 1 -hour daily maximum concentrations at each site must not exceed 100 ppb- Note that the national 1 -hour standard is in units of parts per billion (ppb)- California standards are in units of parts per million (ppm). To directly compare the national 1 -hour standard to the California standards the units can be converted from ppb to ppm. In this case, the national standard of 100 ppb is identical to 0.100 ppm. 11 On June 2, 2010, a new 1 -hour SO2 standard was established and the existing 24-hour and annual primary standards were revoked. To attain the 1 -hour national standard, the 3 -year average of the annual 99th percentile of the 1 -hour daily maximum concentrations at each site must not exceed 75 ppb. The 1971 SO2 national standards (24-haur and annual) remain in effect until one year after an area is designated for the 2010 standard. except that in areas designated nonattairunent for the 1971 standards, the 1971 standards remain in effect until implementation plans to attain or maintain the 2010 standards are approved Note that the 1 -hour national standard is in units of parts per billion (ppb). California standards are in units of parts per million (ppm). To directly compare the 1 -hour national standard to the California standard the units can be converted to ppm. In this case, the national standard of 75 ppb is identical to 0.075 ppm_ 12 The ARB has identified lead and vinyl chloride as 'toxic air contaminants' with no threshold level of exposure for adverse health effects determined- These actions allow for the implementation of control measures at levels below the ambient concentrations specified for these pollutants. 13. The national standard for lead was revised on October 15, 2008 to a rolling 3 -month average. The 1978 lead standard (1.5 mini as a quarterly average) remains in effect until one year after an area is designated for the 2008 standard, except that in areas designated nonattainment for the 1978 standard, the 1978 standard remains in effect until implementation plans to attain or maintain the 2008 standard are approved 14. In 1989, the ARB converted both the general statewide 10 -mile visibility standard and the Lake Tahoe 30 -mile visibility standard to instrumental equivalents, which are "extinction of 0.23 per kilometer' and "extinction of 0.07 per kilometer" for the statewide and Lake Tahoe Air Basin standards, respectively. For more information please call ARB-PIO at (916) 322-2990 California Air Resources Board. (514116) 12188-05 AQ Report 19 Co URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 2.4 REGIONAL AIR QUALITY Air pollution contributes to a wide variety of adverse health effects. The EPA has established NAAQS for six of the most common air pollutants: CO, Pb, 03, particulate matter, NO2, and SO2 which are known as criteria pollutants. The SCAQMD monitors levels of various criteria pollutants at 37 permanent monitoring stations and 5 single -pollutant source Pb air monitoring sites throughout the air district (10). On February 21, 2019, CARB posted the 2018 amendments to the state and national area designations. See Table 2-3 for attainment designations for the SSAB (11). Appendix 2.1 provides geographic representation of the state and federal attainment status for applicable criteria pollutants within the SSAB. TABLE 2-3: ATTAINMENT STATUS OF CRITERIA POLLUTANTS IN THE SSAB Criteria Pollutant State Designation Federal Designation 03— 1 -hour standard Nonattainment - 03 — 8 -hour standard Nonattainment Nonattainment PMio Nonattainment Nonattainment PM2.s Attainment Nonattainment CO Attainment Unclassifiable/Attainment NO2 Attainment Unclassifiable/Attainment SO2 Unclassifiable/Attainment Unclassifiable/Attainment Pb Attainment Unclassifiable/Attainment Note: See Appendix 2.1 for a detailed map of State/National Area Designations within the SSAB = The national 1 -hour 03 standard was revoked effective June 15, 2005. 2.5 LOCAL AIR QUALITY The Project site is located within the Source Receptor Area (SRA) 30. Within SRA 30, the SCAQMD Coachella Valley 2 monitoring station, located 7.36 miles northeast of the Project site, is the nearest long-term air quality monitoring station for 03, PM10, and PM2.s. As the Coachella Valley 2 monitoring station does not include statistics for CO and NO2, the next nearest station will be used. The Coachella Valley 1 monitoring station, located 23.01 miles northwest of the Project, is the next nearest monitoring station that reports air quality statistics for CO and NO2. The most recent three (3) years of published data available from SCAQMD is shown on Table 2-4 and identifies the number of days ambient air quality standards were exceeded for the study area, which is considered to be representative of the local air quality at the Project site. Data for 03, CO, NO2, PM10, and PM2.5 for 2018 through 2020 was obtained from the SCAQMD Air Quality Data Tables (12). Additionally, data for SO2 has been omitted as attainment is regularly met in the SCAB and few monitoring stations measure SO2 concentrations. 12188-05 AQ Report 20 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 2-4: PROJECT AREA AIR QUALITY MONITORING SUMMARY 2018-2020 Pollutant Standard Year 2018 2019 2020 03 Maximum Federal 1 -Hour Concentration (ppm) 0.106 0.103 0.097 Maximum Federal 8 -Hour Concentration (ppm) 0.091 0.087 0.084 Number of Days Exceeding State 1 -Hour Standard > 0.09 ppm 4 4 2 Number of Days Exceeding State/Federal 8 -Hour Standard > 0.070 ppm 49 43 42 CO Maximum Federal 1 -Hour Concentration > 35 ppm 1.1 1.3 0.8 Maximum Federal 8 -Hour Concentration > 20 ppm 0.8 0.7 0.5 NO2 Maximum Federal 1 -Hour Concentration > 0.100 ppm 0.043 0.041 0.047 Annual Average 0.007 0.007 0.006 PMio Maximum Federal 24 -Hour Concentration (µg/m3) > 150 µg/m3 146 141 77 Annual Federal Arithmetic Mean (µg/m3) 33.2 27.8 29.1 Number of Days Exceeding Federal 24 -Hour Standard > 150 µg/m3 0 0 0 Number of Days Exceeding State 24 -Hour Standard > 50 µg/m3 43 27 8 PM2.5 Maximum Federal 24 -Hour Concentration (µg/m3) > 35 µg/m3 28.70 15.00 25.60 Annual Federal Arithmetic Mean (µg/m3) > 12 µg/m3 8.32 7.37 8.41 Number of Days Exceeding Federal 24 -Hour Standard > 35 µg/m3 0 0 0 p.g/m3 = Microgram per Cubic Meter Source: Data for 03, CO, NO2, PM10, and PM2.s was obtained from SCAQMD Air Qua ity Data Tables. 2.6 REGULATORY BACKGROUND 2.6.1 FEDERAL REGULATIONS The EPA is responsible for setting and enforcing the NAAQS for 03, CO, NOx, S02, PM1o, and Pb (13). The EPA has jurisdiction over emissions sources that are under the authority of the federal government including aircraft, locomotives, and emissions sources outside state waters (Outer Continental Shelf). The EPA also establishes emission standards for vehicles sold in states other than California. Automobiles sold in California must meet the stricter emission requirements of the CARB. The Federal Clean Air Act (CAA) was first enacted in 1955 and has been amended numerous times in subsequent years (1963, 1965, 1967, 1970, 1977, and 1990). The CAA establishes the federal air quality standards, the NAAQS, and specifies future dates for achieving compliance (14). The CAA also mandates that states submit and implement SIPs for local areas not meeting these 12188-05 AQ Report 21 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis standards. These plans must include pollution control measures that demonstrate how the standards will be met. The 1990 amendments to the CAA that identify specific emission reduction goals for areas not meeting the NAAQS require a demonstration of reasonable further progress toward attainment and incorporate additional sanctions for failure to attain or to meet interim milestones. The sections of the CAA most directly applicable to the development of the Project site include Title I (Non -Attainment Provisions) and Title II (Mobile Source Provisions) (15) (16). Title I provisions were established with the goal of attaining the NAAQS for the following criteria pollutants 03, NO2, S02, PM10, CO, PM2.5, and Pb. The NAAQS were amended in July 1997 to include an additional standard for 03 and to adopt a NAAQS for PM2.s. Table 2-3 (previously presented) provides the NAAQS within the SCAB. Mobile source emissions are regulated in accordance with Title II provisions. These provisions require the use of cleaner burning gasoline and other cleaner burning fuels such as methanol and natural gas. Automobile manufacturers are also required to reduce tailpipe emissions of hydrocarbons and NOx. NOx is a collective term that includes all forms of NOx which are emitted as byproducts of the combustion process. 2.6.2 CALIFORNIA REGULATIONS CARB The CARB, which became part of the CaIEPA in 1991, is responsible for ensuring implementation of the California Clean Air Act (AB 2595), responding to the federal CAA, and for regulating emissions from consumer products and motor vehicles. AB 2595 mandates achievement of the maximum degree of emissions reductions possible from vehicular and other mobile sources in order to attain the state ambient air quality standards by the earliest practical date. The CARB established the CAAQS for all pollutants for which the federal government has NAAQS and, in addition, establishes standards for SO4, visibility, hydrogen sulfide (H2S), and vinyl chloride (C2H3CI). However, at this time, H2S and C2H3CI are not measured at any monitoring stations in the SSAB because they are not considered to be a regional air quality problem. Generally, the CAAQS are more stringent than the NAAQS (17) (13). Local air quality management districts, such as the SCAQMD, regulate air emissions from stationary sources such as commercial and industrial facilities. All air pollution control districts have been formally designated as attainment or non -attainment for each CAAQS. Serious non -attainment areas are required to prepare Air Quality Management Plans (AQMP) that include specified emission reduction strategies in an effort to meet clean air goals. These plans are required to include: • Application of Best Available Retrofit Control Technology to existing sources; • Developing control programs for area sources (e.g., architectural coatings and solvents) and indirect sources (e.g. motor vehicle use generated by residential and commercial development); • A District permitting system designed to allow no net increase in emissions from any new or modified permitted sources of emissions; 12188-05 AQ Report 22 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis • Implementing reasonably available transportation control measures and assuring a substantial reduction in growth rate of vehicle trips and miles traveled; • Significant use of low emissions vehicles by fleet operators; • Sufficient control strategies to achieve a 5% or more annual reduction in emissions or 15% or more in a period of three years for ROGs, NOx, CO and Milo. However, air basins may use alternative emission reduction strategy that achieves a reduction of less than 5% per year under certain circumstances. State law makes CARB the lead agency for all purposes related to the SIP. Local air districts and other agencies prepare SIP elements and submit them to CARB for review and approval. CARB then forwards SIP revisions to the USEPA for approval and publication in the Federal Register. The 2016 Air Quality Management Plan (AQMP) and Coachella Valley PMioState Implementation Plan constitute the SIP for the Riverside County portion of the SSAB. These air quality plans, promulgated by the SCAQMD, establish programs of rules and regulations directed at reducing air pollutant emissions and achieving state (California) and national ambient air quality standards. Pollutant control strategies are based on the latest scientific and technical information and planning assumptions, including the Southern California Association of Governments' (SCAG's) latest Regional Transportation Plan/Sustainable Communities Strategy, updated emission inventory methodologies for various source categories, and the latest growth forecasts. The 2016 AQMP constitute the SIP 03 within the Riverside County portion of the SSAB. The 2016 AQMP contains strategies stated in the SIPs for achieving air quality standards on a regional basis. TITLE 24 ENERGY EFFICIENCY STANDARDS AND CALIFORNIA GREEN BUILDING STANDARDS California Code of Regulations (CCR) Title 24 Part 6: California's Energy Efficiency Standards for Residential and Nonresidential Buildings, was first adopted in 1978 in response to a legislative mandate to reduce California's energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. CCR Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, commercial, and school buildings that went in effect on January 1, 2011, and is administered by the California Building Standards Commission. CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2019 California Green Building Code Standards that became effective January 1, 2020. Local jurisdictions are permitted to adopt more stringent requirements, as state law provides methods for local enhancements. CALGreen recognizes that many jurisdictions have developed existing construction and demolition ordinances and defers to them as the ruling guidance provided, they establish a minimum 65% diversion requirement. The code also provides exemptions for areas not served by construction and demolition recycling infrastructure. The State Building Code provides the minimum standard that buildings must meet in order to be certified for occupancy, which is generally enforced by the local building official. Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases greenhouse gas (GHG) emissions. The 2019 version of Title 24 was adopted by the California Energy Commission (CEC) and became effective on January 1, 2020. 12188-05 AQ Report 23 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis The 2019 Title 24 standards will result in less energy use, thereby reducing air pollutant emissions associated with energy consumption in the SCAB and across the State of California. For example, the 2019 Title 24 standards will require solar photovoltaic systems for new homes, establish requirements for newly constructed healthcare facilities, encourage demand responsive technologies for residential buildings, and update indoor and outdoor lighting requirements for nonresidential buildings. The CEC anticipates that single-family homes built with the 2019 standards will use approximately 7% less energy compared to the residential homes built under the 2016 standards. Additionally, after implementation of solar photovoltaic systems, homes built under the 2019 standards will use about 53% less energy than homes built under the 2016 standards. Nonresidential buildings (such as the Project) will use approximately 30% less energy due to lighting upgrade requirements (18). Because the Project will be constructed after January 1, 2020, the 2019 CALGreen standards are applicable to the Project and require, among other items (19): • Short-term bicycle parking. If the new project or an additional alteration is anticipated to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitors' entrance, readily visible to passers-by, for 5% of new visitor motorized vehicle parking spaces being added, with a minimum of one two -bike capacity rack (5.106.4.1.1). • Long-term bicycle parking. For new buildings with tenant spaces that have 10 or more tenant - occupants, provide secure bicycle parking for 5% of the tenant -occupant vehicular parking spaces with a minimum of one bicycle parking facility (5.106.4.1.2). • Designated parking. In new projects or additions to alterations that add 10 or more vehicular parking spaces, provide designated parking for any combination of low -emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.2 (5.106.5.2). • Construction waste management. Recycle and/or salvage for reuse a minimum of 65% of the nonhazardous construction and demolition waste in accordance with Section 5.408.1.1. 5.405.1.2, or 5.408.1.3; or meet a local construction and demolition waste management ordinance, whichever is more stringent (5.408.1). • Excavated soil and land clearing debris. 100% of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. For a phased project, such material may be stockpiled on site until the storage site is developed (5.408.3). • Recycling by Occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of non -hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste, and metals or meet a lawfully enacted local recycling ordinance, if more restrictive (5.410.1). • Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following: o Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush (5.303.3.1) o Urinals. The effective flush volume of wall -mounted urinals shall not exceed 0.125 gallons per flush (5.303.3.2.1). The effective flush volume of floor -mounted or other urinals shall not exceed 0.5 gallons per flush (5.303.3.2.2). 12188-05 AQ Report 24 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis o Showerheads. Single showerheads shall have a minimum flow rate of not more than 1.8 gallons per minute and 80 psi (5.303.3.3.1). When a shower is served by more than one showerhead, the combine flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi (5.303.3.3.2). o Faucets and fountains. Nonresidential lavatory faucets shall have a maximum flow rate of note more than 0.5 gallons per minute at 60 psi (5.303.3.4.1). Kitchen faucets shall have a maximum flow rate of not more than 1.8 gallons per minute of 60 psi (5.303.3.4.2). Wash fountains shall have a maximum flow rate of not more than 1.8 gallons per minute (5.303.3.4.3). Metering faucets shall not deliver more than 0.20 gallons per cycle (5.303.3.4.4). Metering faucets for wash fountains shall have a maximum flow rate not more than 0.20 gallons per cycle (5.303.3.4.5). • Outdoor portable water use in landscaped areas. Nonresidential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water Efficient (MWELO), whichever is more stringent (5.304.1). • Water meters. Separate submeters or metering devices shall be installed for new buildings or additions in excess of 50,000 square feet (sf) or for excess consumption where any tenant within a new building or within an addition that is project to consume more than 1,000 gallons per day (gal/day) (5.303.1.1 and 5.303.1.2). • Outdoor water use in rehabilitated landscape projects equal or greater than 2,500 sf. Rehabilitated landscape projects with an aggregate landscape area equal to or greater than 2,500 sf requiring a building or landscape permit (5.304.3). • Commissioning. For new buildings 10,000 sf and over, building commissioning shall be included in the design and construction processes of the building project to verify that the building systems and components meet the owner's or owner representative's project requirements (5.410.2). 2.6.3 AIR QUALITY MANAGEMENT PLANNING Currently, the NAAQS and CAAQS are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards (20). The Coachella Valley PM10 State Implementation Plan (CVSIP) establishes additional controls needed to demonstrate expeditious attainment of the PM10 standards in the Coachella Valley, located in the Salton Sea Air Basin. This area which is under South Coast AQMD's jurisdiction has been designated as a serious non -attainment area for PM10. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy. A detailed discussion on the AQMP and Project consistency with the AQMP is provided in Section 3.10. 12188-05 AQ Report 25 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report 26 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 3 PROJECT AIR QUALITY IMPACT 3.1 INTRODUCTION The Project has been evaluated to determine if it will violate an air quality standard, contribute to an existing or projected air quality violation, or determine if it will result in a cumulatively considerable net increase of a criteria pollutant for which the SCAB is non -attainment under an applicable NAAQS and CAAQS. Additionally, the Project has been evaluated to determine consistency with the applicable AQMP, exposure of sensitive receptors to substantial pollutant concentrations, and the impacts of odors. The significance of these potential impacts is described in the following section. 3.2 STANDARDS OF SIGNIFICANCE The criteria used to determine the significance of potential Project -related air quality impacts are taken from the CEQA Guidelines (14 CCR §§15000, et seq.). Based on these thresholds, a project would result in a significant impact related to air quality if it would (1): • Conflict with or obstruct implementation of the applicable air quality plan. • Result in a cumulatively considerable net increase of any criteria pollutant for which the project region is in non -attainment under an applicable federal or state ambient air quality standard. • Expose sensitive receptors to substantial pollutant concentrations. • Result in other emissions (such as those leading to odors) adversely affecting a substantial number of people. The SCAQMD has also developed regional significance thresholds for other regulated pollutants, as summarized at Table 3-1 (21). The SCAQMD's CEQA Air Quality Significance Thresholds (April 2019) indicate that any projects in the SCAB with daily emissions that exceed any of the indicated thresholds should be considered as having an individually and cumulatively significant air quality impact. TABLE 3-1: MAXIMUM DAILY REGIONAL EMISSIONS THRESHOLDS Pollutant Construction Regional Thresholds Operational Regional Thresholds NOx 100 lbs/day 55 lbs/day VOC 75 lbs/day 55 lbs/day PMio 150 lbs/day 150 lbs/day PM2.5 55 lbs/day 55 lbs/day SOx 150 lbs/day 150 lbs/day CO 550 lbs/day 550 lbs/day Pb 3 lbs/day 3 lbs/day lbs/day = Pounds Per Day 12188-05 AQ Report 27 [_%i URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 3.3 METHODOLOGY 3.3.1 CALEEMoD Land uses such as the Project affect air quality through construction -source and operational - source emissions. On October 17, 2017, the SCAQMD in conjunction with the California Air Pollution Control Officers Association (CAPCOA) and other California air districts, released the latest version of the CaIEEMod Version 2016.3.2. The purpose of this model is to calculate construction -source and operational -source criteria pollutant (VOCs, NOx, SOx, CO, PM10, and PM2.5) and GHG emissions from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation (22). Accordingly, the latest version of CaIEEMod has been used for this Project to determine construction and operational air quality emissions. Output from the model runs for both construction and operational activity are provided in Appendices 3.1 through 3.21. 3.3.2 ROAD CONSTRUCTION EMISSIONS MODEL (RCEM) Project specific sources resulting from Madison Avenue, Avenue 62, and Jefferson construction activities are estimated utilizing the most recent RCEM Version 9.0. RCEM was developed by the Sacramento Metropolitan Air Quality Management District as part of their CEQA Guidelines and Tools to analyze new road construction, road widening, bridge/overpass construction, and other linear projects. Although the CaIEEMod is typically utilized for land use development projects in this region, the SCAQMD has identified the RCEM as an acceptable emissions modeling program when the use of CaIEEMod is not appropriate, as is the case with projects such as this. Based on the nature of the project, emissions associated with the construction of the Madison Avenue, Avenue 62, and Jefferson are considered within the scope of this assessments. Air quality outputs from the model runs are provided in Appendices 3.22 through 3.24. 3.3.3 EMISSION FACTORS MODEL (EMFAC) On August 19, 2019, the EPA approved the 2017 version of the EMFAC web database for use in SIP and transportation conformity analyses. EMFAC2017 is a mathematical model that was developed to calculate emission rates, fuel consumption, VMT from motor vehicles that operate on highways, freeways, and local roads in California and is commonly used by the CARB to project changes in future emissions from on -road mobile sources (23). This AQIA utilizes summer, winter, and annual EMFAC2017 emission factors in order to derive vehicle emissions associated with Project operational activities, which vary by season. Because the EMFAC2017 emission rates are associated with vehicle fuel types while CaIEEMod vehicle emission factors are aggregated to include all fuel types for each individual vehicle class, the EMFAC2017 emission rates for different fuel types of a vehicle class are averaged by activity or by population and activity to derive CaIEEMod emission factors. The equations applied to obtain CaIEEMod vehicle emission factors for each emission type are detailed in CaIEEMod User's The specific RCEM option for new road construction was utilized for analysis of this Project. Subsequent subphases and equipment list are part of the defaults in that model and were therefore used in the analysis. 12188-05 AQ Report 28 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Guide Appendix A: Calculation Details for CaIEEMod (24). EMFAC2017 emission rates utilized in this analysis can be found in Appendix 3.25 of this report. 3.4 CONSTRUCTION EMISSIONS 3.4.1 CONSTRUCTION ACTIVITIES Construction activities associated with the Project will result in emissions of VOCs, NOx, SOx, CO, PM1o, and PM2.5. Construction related emissions are expected from the following construction activities: PHASE A GRADING ACTIVITIES • Crushing • Madison EVA with Water Line o Grubbing/Land Clearing o Grading/Excavation o Drainage/Utilities/Sub-Grade o Paving • Grading & Tank Construction • Avenue 62 with Water Line o Grubbing/Land Clearing o Grading/Excavation o Drainage/Utilities/Sub-Grade o Paving WATER WELL CONSTRUCTION WELLS #1-9) • Site Preparation • Trenching • Building Construction SUBSTATION CONSTRUCTION • Demolition • Grading • Building Construction PHASE B GRADING ACTIVITIES • Crushing • Grading • Jefferson with Water Line o Grubbing/Land Clearing 12188-05 AQ Report 29 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis o Grading/Excavation o Drainage/Utilities/Sub-Grade o Paving PHYSICAL CONSTRUCTION (PHASES 1 THROUGH 3) • Site Preparation • Grading • Building Construction • Paving • Architectural Coating Grading Activities Dust is typically a major concern during grading activities. Because such emissions are not amenable to collection and discharge through a controlled source, they are called "fugitive emissions". Fugitive dust emissions rates vary as a function of many parameters (soil silt, soil moisture, wind speed, area disturbed, number of vehicles, depth of disturbance or excavation, etc.). CaIEEMod was utilized to calculate fugitive dust emissions resulting from this phase of activity. Based on information provided by the Project Applicant, the Project will be graded in two phases (Phase A and B) before Project infrastructure construction begins. Total earthwork for Phase A is 5,003,741 cubic yards (cut and remedial) and 7,171,789 cubic yards (cut and remedial) for Phase B. Based on consultation with the Project Engineer, the Project will not generate hauling trips as material will be used onsite. Crushing Activities It is our understanding that the Project site now proposes on-site crushing activity during grading activity. Based on information provided by the construction contractor, it is anticipated that the Project will process approximately 691,944 tons of debris during Phase A and 1,006,814 tons of debris during Phase B. It is our understanding that the crushed rock will not be exported off-site and therefore no export activities are anticipated. The type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. For purposes of analysis, a 350 horsepower Sandvik QJ331 has been modeled. The duration of crushing activity is anticipated to occur over 230 working days and 336 working days for Phase A and B, respectively. For purposes of analysis, crushing activities will overlap with grading. As such, emissions associated with the crushing operation were calculated using CaIEEMod and the emissions were then added to the Phase A and B Grading activities. Construction Worker Vehicle Trips Construction emissions for construction worker vehicles traveling to and from the Project site, as well as vendor trips (construction materials delivered to the Project site) were estimated based on information from CaIEEMod defaults. 12188-05 AQ Report 30 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis 3.4.2 CONSTRUCTION DURATION The construction schedule utilized in the analysis, shown in Table 3-2, represents a "worst-case" analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent.2 The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines (1). The duration of construction activity was based on the buildout year of each phase. TABLE 3-2: CONSTRUCTION DURATION (1 OF 3) Phase Subphase Start Date End Date Days Phase A Grading Activities Crushing Demolition 07/01/2023 12/27/2024 390 Madison Avenue with Water Line Grubbing/Land Clearing 01/01/2024 01/19/2024 15 Grading/Excavation 01/20/2024 04/01/2024 51 Drainage/Utilities/Sub-Grade 04/02/2024 06/04/2024 46 Paving 06/05/2024 07/02/2024 20 Grading & Tank Construction Grading 10/01/2023 09/29/2025 521 Avenue 62 with Water Line Grubbing/Land Clearing 07/01/2024 08/06/2024 27 Grading/Excavation 08/07/2024 12/30/2024 104 Drainage/Utilities/Sub-Grade 12/31/2024 05/07/2025 92 Paving 05/08/2025 07/01/2025 39 Well Construction Well #1 Site Preparation 10/01/2025 10/14/2025 10 Trenching 10/15/2025 12/10/2025 41 Building Construction 12/11/2025 12/31/2025 15 Well #2 Site Preparation 07/01/2026 07/14/2026 10 Trenching 07/15/2026 09/09/2026 41 Building Construction 09/10/2026 09/30/2026 15 Well #3 Site Preparation 04/01/2027 04/14/2027 10 Trenching 04/15/2027 06/10/2027 41 Building Construction 06/11/2027 07/01/2027 15 2 As shown in the CaIEEMod User's Guide Version 2016.3.2, Section 4.3 "Off-road Equipment" as the analysis year increases, emission factors for the same equipment pieces decrease due to the natural turnover of older equipment being replaced by newer less polluting equipment and new regulatory requirements. 12188-05 AQ Report 31 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-2: CONSTRUCTION DURATION (2 OF 3) Phase Subphase Start Date End Date Days Well Construction Well #4 Site Preparation 01/01/2028 01/14/2028 10 Trenching 01/15/2028 03/13/2028 41 Building Construction 03/14/2028 04/03/2028 15 Well #5 Site Preparation 10/01/2028 10/13/2028 10 Trenching 10/14/2028 12/08/2028 40 Building Construction 12/09/2028 12/29/2028 15 Well #6 Site Preparation 07/01/2029 07/13/2029 10 Trenching 07/14/2029 09/10/2029 41 Building Construction 09/11/2029 10/01/2029 15 Well #7 Site Preparation 04/01/2030 04/12/2030 10 Trenching 04/13/2030 06/10/2030 41 Building Construction 06/11/2030 07/01/2030 15 Well #8 Site Preparation 01/01/2031 01/14/2031 10 Trenching 01/15/2031 03/12/2031 41 Building Construction 03/13/2031 04/02/2031 15 Well #9 Site Preparation 10/01/2031 10/14/2031 10 Trenching 10/15/2031 12/10/2031 41 Building Construction 12/11/2031 12/31/2031 15 Substation Construction Substation Construction Demolition 01/01/2024 01/19/2024 15 Grading 01/20/2024 05/24/2024 90 Building Construction 05/25/2024 07/01/2025 287 Phase B Grading Activities Crushing Demolition 04/01/2025 06/28/2027 585 Grading Grading 01/01/2026 12/31/2027 522 Jefferson with Water Line Grubbing/Land Clearing 04/01/2026 06/11/2026 52 Grading/Excavation 06/12/2026 03/31/2027 209 Drainage/Utilities/Sub-Grade 04/01/2027 12/12/2027 182 Paving 12/13/2027 03/30/2028 79 12188-05 AQ Report 32 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-2: CONSTRUCTION DURATION (3 OF 3) Phase Subphase Start Date End Date Days Physical Construction (2029) Phase 1 (2026-2029) Site Preparation 07/01/2025 09/08/2025 50 Grading 09/09/2025 11/17/2025 50 Building Construction 11/18/2025 12/11/2028 800 Paving 09/26/2028 12/11/2028 55 Architectural Coating 09/07/2027 12/11/2028 330 Phase 2 (2029-2031) Site Preparation 01/01/2029 02/09/2029 30 Grading 02/10/2029 03/23/2029 30 Building Construction 03/24/2029 12/13/2030 450 Paving 10/27/2030 12/13/2030 35 Architectural Coating 4/13/2030 12/13/2030 175 Phase 3 (2031-2033) Site Preparation 01/01/2031 02/18/2031 35 Grading 02/19/2031 04/08/2031 35 Building Construction 04/09/2031 12/28/2032 450 Paving 11/03/2032 12/28/2032 40 Architectural Coating 03/24/2032 12/28/2032 200 3.4.3 CONSTRUCTION EQUIPMENT Site specific construction fleet may vary due to specific project needs at the time of construction. The associated construction equipment was generally based on CaIEEMod defaults. A detailed summary of construction equipment assumptions by phase is provided at Table 3-3. TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (1 OF 7) Phase Subphase Equipment Type Quantity Hours Per Day Phase A Grading Activities Crushing Demolition Crushing/Processing Equipment 1 8 Madison Avenue with Water Line Grubbing/Land Clearing Crawler Tractors 1 8 Excavators 1 8 Signal Boards 2 8 12188-05 AQ Report 33 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (2 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Phase A Grading Activities Madison Avenue with Water Line Grading/Excavation Crawler Tractors 1 8 Excavators 3 8 Off -Highway Tractors 1 8 Rollers 2 8 Rubber Tired Loaders 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Drainage/Utilities/ Sub -Grade Air Compressors 1 8 Generator Sets 1 8 Graders 1 8 Plate Compactors 1 8 Pumps 1 8 Rough Terrain Forklifts 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Paving Pavers 1 8 Paving Equipment 1 8 Rollers 3 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Grading & Tank Construction Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 12188-05 AQ Report 34 [_%i URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (3 OF 7) Phase Subphase Equipment Type Quantity Hours Per Day Phase A Grading Activities Avenue 62 with Water Line Grubbing/Land Clearing Crawler Tractors 1 8 Excavators 1 8 Signal Boards 2 8 Grading/Excavation Crawler Tractors 1 8 Excavators 3 8 Off -Highway Tractors 1 8 Rollers 2 8 Rubber Tired Loaders 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Drainage/Utilities/ Sub -Grade Air Compressors 1 8 Generator Sets 1 8 Graders 1 8 Plate Compactors 1 8 Pumps 1 8 Rough Terrain Forklifts 1 8 Scrapers 2 8 Signal Boards 2 8 Paving Pavers 1 8 Paving Equipment 1 8 Rollers 3 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Well Construction Wells #1-9 Site Preparation Bore/Drill Rig 1 16 Other Construction 6 16 Aerial Lift 1 16 Tractors/Loaders/ Backhoes 1 16 12188-05 AQ Report 35 L,, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (4 OF 7) Phase Subphase Equipment Type Quantity Hours Per Day Well Construction Wells #1-9 Trenching Bore/Drill Rig 1 24 Other Construction Equipment 7 24 Pump 1 24 Generator Sets 1 24 Aerial Lift 1 24 Tractors/Loaders/ Backhoes 1 24 Dumpers/Tenders 1 24 Off -Highway Truck 1 24 Building Construction Bore/Drill Rig 1 24 Other Construction Equipment 4 24 Aerial Lift 1 24 Off -Highway Truck 1 24 Substation Construction Substation Construction Demolition Off -Highway Trucks 13 8 Rubber Tired Dozers 1 8 Grader 1 8 Excavator 2 8 Grading Off -Highway Trucks 26 8 Rubber Tired Dozers 1 8 Grader 1 8 Scraper 2 8 Plate Compactor 1 8 Skid Steer 1 8 Sweeper/Scrubber 1 8 12188-05 AQ Report 36 URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (5 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Substation Construction Substation Construction Building construction Off -Highway Trucks 28 8 Air Compressor 1 8 Generator 1 8 Rubber Tired Dozers 1 8 Grader 1 8 Scraper 2 8 Compactor 1 8 Tractors/Loaders/ Backhoes 4 8 Excavator 3 8 Skid Steer 1 8 Forklift 1 8 Trencher 1 8 Crane 2 8 Other Construction Equipment 5 8 Rollers 2 8 Phase B Grading Activities Crushing Demolition Crushing/Processing Equipment 1 8 Grading Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 Jefferson with Water Line Grubbing/Land Clearing Crawler Tractors 1 8 Excavators 1 8 Signal Boards 2 8 12188-05 AQ Report 37 URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (6 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Phase B Grading Activities Jefferson with Water Line Grading/Excavation Crawler Tractors 1 8 Excavators 3 8 Off -Highway Tractors 1 8 Rollers 2 8 Rubber Tired Loaders 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Drainage/Utilities/ Sub -Grade Air Compressors 1 8 Generator Sets 1 8 Graders 1 8 Plate Compactors 1 8 Pumps 1 8 Rough Terrain Forklifts 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Paving Pavers 1 8 Paving Equipment 1 8 Rollers 3 8 Signal Boards 2 8 Tractors/Loaders/ 2 8 Physical Construction Phases 1-3 Site Preparation Crawler Tractors 4 8 Rubber Tired Dozers 3 8 12188-05 AQ Report 38 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-3: CONSTRUCTION EQUIPMENT ASSUMPTIONS (7 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Physical Construction Phases 1-3 Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 Building Construction Cranes 1 8 Crawler Tractors 3 8 Forklifts 3 8 Generator Sets 1 8 Welders 1 8 Paving Pavers 2 8 Paving Equipment 2 8 Rollers 2 8 Architectural Coating Air Compressors 1 8 3.4.4 REGIONAL CONSTRUCTION EMISSIONS SUMMARY WITHOUT MITIGATION The estimated maximum daily construction emissions are summarized on Table 3-4. Detailed construction model outputs are presented in Appendices 3.1 through 3.17. Prior to implementation of MM AQ -1, emissions resulting from the Project construction will exceed thresholds established by the SCAQMD for emissions of NOx during construction activity. WITH MITIGATION The Project will implement MM AQ -1, which would reduce the severity of the NOx impacts. Detailed construction model outputs are presented in Appendices 3.1 through 3.16 and 3.18. As shown in Table 3-5, after implementation of MM AQ -1, Project construction -source emissions of NOx would not exceed applicable SCAQMD thresholds. 12188-05 AQ Report 39 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-4: OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITHOUT MITIGATION) Construction Activities Emissions (lbs/day) VOC NOx CO SOx PMio PM2.5 Phase A Grading Activities Crushing 1.19 5.91 5.20 0.02 15.13 2.46 Madison Avenue with Water Line 3.98 41.73 28.56 0.07 6.26 3.10 Grading & Tank Construction 3.95 38.34 37.82 0.09 51.64 11.87 Avenue 62 with Water line 3.89 37.97 37.44 0.09 51.62 11.85 Well Construction Well #1 11.13 97.75 139.22 0.26 4.53 4.19 Well #2 11.13 97.74 139.21 0.26 4.53 4.19 Well #3 11.13 97.74 139.21 0.26 4.53 4.19 Well #4 11.13 97.74 139.20 0.26 4.53 4.19 Well #5 11.13 97.74 139.20 0.26 4.53 4.19 Well #6 11.13 97.74 139.20 0.26 4.53 4.19 Well #7 9.48 37.86 138.99 0.31 1.18 1.15 Well #8 9.48 37.86 138.99 0.31 1.18 1.15 Well #9 9.48 37.86 138.99 0.31 1.18 1.15 Substation Construction Substation Construction 21.36 165.80 165.76 0.51 7.77 6.21 Phase B Grading Activities Crushing 1.07 4.52 5.17 0.02 14.62 2.34 Grading 3.44 33.21 26.47 0.07 5.92 2.78 Jefferson with Water Line 3.69 33.50 37.02 0.09 51.43 11.67 Physical Construction Phase 1 23.79 36.27 40.46 0.11 10.75 5.51 Phase 2 19.28 35.74 37.94 0.10 10.75 5.51 Phase 3 21.78 23.63 40.01 0.12 9.88 4.75 Maximum Daily Emissions 23.79 165.80 165.76 0.51 51.64 11.87 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO YES NO NO NO NO 12188-05 AQ Report 40 L%► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-5: OVERALL CONSTRUCTION EMISSIONS SUMMARY (WITH MITIGATION) Construction Activities Emissions (lbs/day) VOC NOx CO SOx PMio PM2.5 Phase A Grading Activities Crushing 1.19 5.91 5.20 0.02 15.13 2.46 Madison Avenue with Water Line 3.98 41.73 28.56 0.07 6.26 3.10 Grading & Tank Construction 3.95 38.34 37.82 0.09 51.64 11.87 Avenue 62 with Water line 3.89 37.97 37.44 0.09 51.62 11.85 Well Construction Well #1 11.13 97.75 139.22 0.26 4.53 4.19 Well #2 11.13 97.74 139.21 0.26 4.53 4.19 Well #3 11.13 97.74 139.21 0.26 4.53 4.19 Well #4 11.13 97.74 139.20 0.26 4.53 4.19 Well #5 11.13 97.74 139.20 0.26 4.53 4.19 Well #6 11.13 97.74 139.20 0.26 4.53 4.19 Well #7 9.48 37.86 138.99 0.31 1.18 1.15 Well #8 9.48 37.86 138.99 0.31 1.18 1.15 Well #9 9.48 37.86 138.99 0.31 1.18 1.15 Substation Construction Substation Construction 7.81 43.80 251.59 0.51 4.23 2.28 Phase B Grading Activities Crushing 1.07 4.52 5.17 0.02 14.62 2.34 Grading & Tank Construction 3.44 33.21 26.47 0.07 5.92 2.78 Jefferson with Water Line 3.69 33.50 37.02 0.09 51.43 11.67 Physical Construction Phase 1 23.79 36.27 40.46 0.11 10.75 5.51 Phase 2 19.28 35.74 37.94 0.10 10.75 5.51 Phase 3 21.78 23.63 40.01 0.12 9.88 4.75 Maximum Daily Emissions 23.79 97.75 251.59 0.51 51.64 11.87 SCAQMD Regional Threshold 75 100 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO 3.5 OPERATIONAL EMISSIONS Operational activities associated with the proposed Project will result in emissions of VOCs, NOx, SOx, CO, PM10, and PM2.5. Operational emissions would be expected from the following primary sources: • Area Source Emissions 12188-05 AQ Report 41 URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis • Energy Source Emissions • Mobile Source Emissions 3.5.1 AREA SOURCE EMISSIONS ARCHITECTURAL COATINGS Over a period of time the buildings that are part of this Project will be subject to emissions resulting from the evaporation of solvents contained in paints, varnishes, primers, and other surface coatings as part of Project maintenance. The emissions associated with architectural coatings were calculated using CaIEEMod. CONSUMER PRODUCTS Consumer products include, but are not limited to detergents, cleaning compounds, polishes, personal care products, and lawn and garden products. Many of these products contain organic compounds which when released in the atmosphere can react to form ozone and other photochemically reactive pollutants. The emissions associated with use of consumer products were calculated based on defaults provided within CaIEEMod. HEARTHS/FIREPLACES The emissions associated with use of hearths/fireplaces were calculated based on assumptions provided in CaIEEMod. The Project is required to comply with SCAQMD Rule 445, which prohibits the use of wood burning stoves and fireplaces in new development. In order to account for the requirements of this Rule, the unmitigated CaIEEMod default estimates were adjusted to remove wood burning stoves and fireplaces. As the project is required to comply with SCAQMD Rule 445, the removal of wood burning stoves and fireplaces is not considered "mitigation" although it must be identified as such in CaIEEMod in order to treat the case appropriately. LANDSCAPE MAINTENANCE EQUIPMENT Landscape maintenance equipment would generate emissions from fuel combustion and evaporation of unburned fuel. Equipment in this category would include lawnmowers, shedders/grinders, blowers, trimmers, chain saws, and hedge trimmers used to maintain the landscaping of the Project. The emissions associated with landscape maintenance equipment were calculated based on assumptions provided in CaIEEMod. 3.5.2 ENERGY SOURCE EMISSIONS COMBUSTION EMISSIONS ASSOCIATED WITH NATURAL GAS AND ELECTRICITY Electricity and natural gas are used by almost every project. Criteria pollutant emissions are emitted through the generation of electricity and consumption of natural gas. However, because electrical generating facilities for the Project area are located either outside the region (state) or offset through the use of pollution credits (RECLAIM) for generation within the SCAB, criteria pollutant emissions from offsite generation of electricity is generally excluded from the evaluation of significance and only natural gas use is considered. The emissions associated with natural gas use were calculated using CaIEEMod. 12188-05 AQ Report 42 L�► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TITLE 24 ENERGY EFFICIENCY STANDARDS California's Energy Efficiency Standards for Residential and Nonresidential Buildings was first adopted in 1978 in response to a legislative mandate to reduce California's energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. Energy efficient buildings require less electricity. The 2019 version of Title 24 was adopted by the CEC and became effective on January 1, 2020. The CEC anticipates that residential buildings will use approximately 53% less energy and nonresidential buildings will use approximately 30% less energy (18). It should be noted that future building codes will require zero net construction and that the Project would likely be built to comply with those standards. However, as no specific standards have been proposed, this analysis conservatively reflects the 2019 Title 24 standards. As such, the CaIEEMod defaults for Title 24 — Electricity, Title 24 — Natural Gas, and Lighting Energy were reduced by 30% for nonresidential uses and 53% for residential uses in order to reflect consistency with the 2019 Title 24 standard. 3.5.3 MOBILE SOURCE EMISSIONS The Project related operational air quality impacts derive primarily from vehicle trips generated by the Project. Trip characteristics available from the Travertine Specific Plan Traffic Phasing Analysis report were utilized in this analysis (25). FUGITIVE DUST RELATED TO VEHICULAR TRAVEL Vehicles traveling on paved roads would be a source of fugitive emissions due to the generation of road dust inclusive of brake and tire wear particulates. The emissions estimates for travel on paved roads were calculated using CaIEEMod. 3.5.4 REGIONAL OPERATIONAL EMISSIONS SUMMARY As previously stated, CaIEEMod utilizes summer and winter EMFAC2017 emission factors in order to derive vehicle emissions associated with Project operational activities, which vary by season. As such, operational activities for summer and winter scenarios are presented in Table 3-6. Detailed construction model outputs are presented in Appendices 3.19 and 3.21. During Phase 1, the Project would exceed the numerical thresholds of significance established by the SCAQMD for emissions of NOx. During Phases 2 and 3, the Project will exceed the thresholds of significance for emissions of VOC and NOx. It is important to note that the majority of VOC emissions are derived from consumer products. For analytical purposes, consumer products include cleaning supplies, aerosols, and other consumer products (5). As such, the Project Applicant cannot meaningfully control the use of consumer products by future building users via mitigation. On this basis, it is concluded that Project operational -source VOC emissions cannot be definitively reduced below applicable SCQMD thresholds. Additionally, it should be noted that the majority of the Project's NOx emissions are derived from vehicle usage. Since neither the Project Applicant nor the City have regulatory authority to 12188-05 AQ Report 43 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis control tailpipe emissions, no feasible mitigation measures exist that would reduce these emissions to levels that are less -than -significant. TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (1 OF 2) Summer Scenario Emissions (lbs/day) VOC NOx CO SOx PMio PM2.S Phase 1 (2026) Area Source 34.31 10.59 54.05 0.07 1.09 1.09 Energy Source 0.30 2.55 1.08 0.02 0.21 0.21 Mobile Source 14.16 31.10 124.72 0.38 35.37 9.69 Total Maximum Daily Emissions 48.77 44.24 179.86 0.46 36.66 10.98 SCAQMD Regional Threshold 55 55 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Phase 2 (2029)1 Area Source 48.26 15.96 81.43 0.10 1.64 1.64 Energy Source 0.42 3.62 1.54 0.02 0.29 0.29 Mobile Source 17.93 41.95 163.24 0.50 51.38 14.04 Total Maximum Daily Emissions 66.62 61.53 246.21 0.63 53.31 15.97 SCAQMD Regional Threshold 55 55 550 150 150 55 Threshold Exceeded? YES YES NO NO NO NO Phase 3 (2031) 2 Area Source 67.52 21.04 107.23 0.13 2.16 2.16 Energy Source 0.87 7.59 4.50 0.05 0.60 0.60 Mobile Source 22.65 56.09 213.92 0.66 69.08 18.85 Total Maximum Daily Emissions 91.04 84.73 325.64 0.84 71.83 21.61 SCAQMD Regional Threshold 55 55 550 150 150 55 Threshold Exceeded? YES YES NO NO NO NO 12188-05 AQ Report 44 ey URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-6: SUMMARY OF PEAK OPERATIONAL EMISSIONS (2 OF 2) Winter Scenario Emissions (lbs/day) VOC NOx CO SOx PM.o PM2.5 Phase 1 (2026) Area Source 34.31 10.59 54.05 0.07 1.09 1.09 Energy Source 0.30 2.55 1.08 0.02 0.21 0.21 Mobile Source 10.64 33.20 99.78 0.34 35.37 9.69 Total Maximum Daily Emissions 45.25 46.34 154.91 0.42 36.66 10.98 SCAQMD Regional Threshold 55 55 550 150 150 55 Threshold Exceeded? NO NO NO NO NO NO Phase 2 (2029)1 Area Source 48.26 15.96 81.43 0.10 1.64 1.64 Energy Source 0.42 3.62 1.54 0.02 0.29 0.29 Mobile Source 13.46 44.88 131.25 0.46 51.38 14.04 Total Maximum Daily Emissions 62.14 64.45 214.23 0.58 53.31 15.97 SCAQMD Regional Threshold 55 55 550 150 150 55 Threshold Exceeded? YES YES NO NO NO NO Phase 3 (2031) 2 Area Source 67.52 21.04 107.23 0.13 2.16 2.16 Energy Source 0.87 7.59 4.50 0.05 0.60 0.60 Mobile Source 17.02 60.07 172.07 0.59 69.07 18.85 Total Maximum Daily Emissions 85.40 88.70 283.80 0.77 71.83 21.61 SCAQMD Regional Threshold 55 55 550 150 150 55 Threshold Exceeded? YES YES NO NO NO NO lEmissions for Phase 2 operational emissions are inclusive of Phase 1. z Emissions for Phase 3 operational emissions are inclusive of Phases 1 and 2. 3.6 LOCALIZED SIGNIFICANCE 3.6.1 BACKGROUND ON LOCALIZED SIGNIFICANCE THRESHOLD (LST) DEVELOPMENT The analysis makes use of methodology included in the SCAQMD Final Localized Significance Threshold Methodology (LST Methodology) (26). The SCAQMD has established that impacts to air quality are significant if there is a potential to contribute or cause localized exceedances of the NAAQS and CAAQS. Collectively, these are referred to as LSTs. The SCAQMD established LSTs in response to the SCAQMD Governing Board's Environmental Justice Initiative I-43. LSTs represent the maximum emissions from a project that will not cause 'The purpose of SCAQMD's Environmental Justice program is to ensure that everyone has the right to equal protection from air pollution and fair access to the decision-making process that works to improve the quality of air within their communities. Further, the SCAQMD 12188-05 AQ Report 45 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis or contribute to an exceedance of the most stringent applicable federal or state ambient air quality standard at the nearest residence or sensitive receptor. The SCAQMD states that lead agencies can use the LSTs as another indicator of significance in its air quality impact analyses. LSTs were developed in response to environmental justice and health concerns raised by the public regarding exposure of individuals to criteria pollutants in local communities. To address the issue of localized significance, the SCAQMD adopted LSTs that show whether a project would cause or contribute to localized air quality impacts and thereby cause or contribute to potential localized adverse health effects. The analysis makes use of methodology included in the LST Methodology (27). 3.6.2 APPLICABILITY OF LSTs FOR THE PROJECT For this Project, the appropriate SRA for the LST analysis is the SCAQMD Coachella Valley 2 (SRA 30). LSTs apply to CO, NO2, PM10, and PM2.5. The SCAQMD produced look -up tables for projects less than or equal to 5 acres in size. In order to determine the appropriate methodology for determining localized impacts that could occur as a result of Project -related construction, the following process is undertaken: • CaIEEMod is utilized to determine the maximum daily on-site emissions that will occur during construction activity. • The SCAQMD's Fact Sheet for Applying CaIEEMod to Localized Significance Thresholds and CaIEEMod User's Guide Appendix A: Calculation Details for CaIEEMod is used to determine the maximum site acreage that is actively disturbed based on the construction equipment fleet and equipment hours as estimated in CaIEEMod (28) (24). • If the total acreage disturbed is less than or equal to five acres per day, then the SCAQMD's screening look -up tables are utilized to determine if a Project has the potential to result in a significant impact. The look -up tables establish a maximum daily emissions threshold in lbs/day that can be compared to CaIEEMod outputs. • If the total acreage disturbed is greater than five acres per day, then LST impacts are appropriately evaluated through dispersion modeling. • The LST Methodology presents mass emission rates for each SRA, project sizes of 1, 2, and 5 acres, and nearest receptor distances of 25, 50, 100, 200, and 500 meters. For project sizes between the values given, or with receptors at distances between the given receptors, the methodology uses linear interpolation to determine the thresholds. 3.6.3 EMISSIONS CONSIDERED SCAQMD's LST Methodology clearly states that "off-site mobile emissions from the Project should not be included in the emissions compared to LSTs (26)." Therefore, for purposes of the construction LST analysis, only emissions included in the CaIEEMod "on-site" emissions outputs were considered. defines Environmental Justice as "...equitable environmental policymaking and enforcement to protect the health of all residents, regardless of age, culture, ethnicity, gender, race, socioeconomic status, or geographic location, from the health effects of air pollution." 12188-05 AQ Report 46 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 3.6.4 MAXIMUM DAILY DISTURBED -ACREAGE As a conservative measure, it is assumed that a maximum of 1 acre can be disturbed per day during the Well Construction (Site Preparation and Trenching) construction activities. For purposes of analysis, LSTs for a 1 -acre site will be used as a screening tool to determine if further detailed analysis is required. For Phase A Crushing (Demolition), Grading, Madison Avenue with Water Line, Avenue 62 with Water Line, Jefferson with Water Line, Substation Construction (Demolition and Grading), Phase B Crushing (Demolition), Grading, Phases 1 through 3 Physical Construction (Site Preparation and Grading) activities would disturb 5 acres per day. The LST Methodology provides look -up tables for sites with an area with daily disturbance of 5 acres or Tess. For projects that exceed 5 acres, the 5 -acre LST look -up tables can be used as a screening tool to determine which pollutants require additional detailed analysis. This approach is conservative as it assumes that all on-site emissions associated with the project would occur within a concentrated 5 -acre area. This screening method would therefore over -predict potential localized impacts, because by assuming that on-site construction activities are occurring over a smaller area, the resulting concentrations of air pollutants are more highly concentrated once they reach the smaller site boundary than they would be for activities if they were spread out over a larger surface area. On a larger site, the same amount of air pollutants generated would disperse over a larger surface area and would result in a lower concentration once emissions reach the project -site boundary. As such, LSTs for a 5 -acre site during construction are used as a screening tool to determine if further detailed analysis is required. 3.6.5 SENSITIVE RECEPTORS As previously stated, LSTs represent the maximum emissions from a project that will not cause or contribute to an exceedance of the most stringent applicable NAAQS and CAAQS at the nearest residence or sensitive receptor. Receptor locations are off-site locations where individuals may be exposed to emissions from Project activities. RESIDENTIAL RECEPTORS Some people are especially sensitive to air pollution and are given special consideration when evaluating air quality impacts from projects. These groups of people include children, the elderly, individuals with pre-existing respiratory or cardiovascular illness, and athletes and others who engage in frequent exercise. Structures that house these persons or places where they gather to exercise are defined as "sensitive receptors". These structures typically include residences, hotels, hospitals, etc. as they are also known to be locations where an individual can remain for 24 hours. Consistent with the LST Methodology, the nearest land use where an individual could remain for 24 hours to the Project site (in this case the nearest residential land use) has been used to determine construction and operational air quality impacts for emissions of PM10 and PM2.5, since PM10 and PM2.5 thresholds are based on a 24 hour averaging time. 12188-05 AQ Report 47 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis NON-RESIDENTIAL RECEPTORS As per the LST Methodology, commercial and industrial facilities are not included in the definition of sensitive receptor because employees and patrons do not typically remain onsite for a full 24 hours but are typically onsite for eight hours or less. The LST Methodology explicitly states that "LSTs based on shorter averaging periods, such as the NO2 and CO LSTs, could also be applied to receptors such as industrial or commercial facilities since it is reasonable to assume that a worker at these sites could be present for periods of one to eight hours (26)." For purposes of analysis, if an industrial/commercial use is located at a closer distance to the Project site than the nearest residential use, the nearest industrial/commercial use will be utilized to determine construction and operational LST air impacts for emissions of NO2 and CO an individual could be present at these sites for periods of one to eight hours. PROJECT -RELATED RECEPTORS Receptors in the Project study area are described below and shown on Exhibit 3-A. Localized air quality impacts were evaluated at sensitive receptor land uses nearest the Project site. Consistent with the Travertine Specific Plan Noise Impact Analysis, prepared by Urban Crossroads, Inc., all distances are measured from the Project site boundary to the outdoor living areas (e.g., backyards) or at the building facade, whichever is closer to the Project site. The selection of receptor locations is based on Federal Highway Administration (FHWA) guidelines and is consistent with additional guidance provided by California Department of Transportation (Caltrans) and the Federal Transit Administration (FTA) (29). R1: Located approximately 4,517 feet north of the Project site, R1 represents existing residential homes on Quarry Ranch Road. R2: Location R2 represents existing residential homes located approximately 6,872 feet north of the Project site on Avenue 58. R3: Location R3 represents the existing residential homes located roughly 6,951 feet northeast of the Project site at the southeast corner of Madison Street and Avenue 58. R4: Location R4 represents the existing residential homes located roughly 2,178 feet northeast of the Project site. R5: Location R5 represents the existing residential community east of the Project site at roughly 1,268 feet. The SCAQMD recommends that the nearest sensitive receptor be considered when determining the Project's potential to cause an individual and cumulatively significant impact. The nearest land use where an individual could remain for 24 hours to the Project site (in this case the nearest residential land use) has been used to determine localized construction and operational air quality impacts for emissions of PM10 and PM2.5 (since PM10 and PM2.5 thresholds are based on a 24 hour averaging time). The nearest receptor used for evaluation of localized impacts of PM10 and PM2.5 is represented by location RS which is an existing residential community located east of the Projects site at approximately 1,268 feet/386 meters. As such, the 386 -meter distance will be used for evaluation of localized PM10 and PM2.s emission impacts. 12188-05 AQ Report 48 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis EXHIBIT 3-A: SENSITIVE RECEPTOR LOCATIONS r 44.0 HERMITAGE ode •IJ • a oz o 4°3 F - a � j y _;sem AVENUE 58 ARACENA a cc 3 o 58TH AVE 59TH AVE a f • • ▪ . ▪ • •_ . Ir 1—� 1 BARREL CACTUS RD Site ▪ IMPALA O 018 a o v w O W os KzJ z SUN 04 S LN P ElGLE 0 LILPVC� r `4 mCACTUCLAW OR JAN IEL p, Iio I X N p o -FN 0 ▪ F �I m I I � -- r 1,268 6ZND A) 61ST AVE �R#w 3,071' r Aid' E4TH AVE LEGEND: = Existing 6 -Foot High Barrier Receptor Locations Existing 20-Fott High Berm —• Distance from receptor to Project site boundary (in feet) 12188-05 AQ Report 49 L%► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis As previously stated, and consistent with LST Methodology, the nearest industrial/commercial use to the Project site is used to determine construction and operational LST air impacts for emissions of NOx and CO as the averaging periods for these pollutants are shorter (8 hours or less) and it is reasonable to assumed that an individual could be present at these sites for periods of one to 8 hours. Based on Exhibit 3-A, there are no industrial/commercial receptors closer than the residential community located at R5. As such, the 386 -meter distance will be used for evaluation of localized NO2, and CO. PROJECT -RELATED RECEPTORS RELATIVE TO ON-SITE CONSTRUCTION ACTIVITIES Due to the phased nature of the Project development, future phases have the potential to generate construction impacts to previous phases of development. Phase 2 building construction activities will impact the on-site receptors planned in Phase 1. It should be noted that the LST Methodology explicitly states that "It is possible that a project may have receptors closer than 25 meters. Projects with boundaries located closer than 25 meters to the nearest receptor should use the LSTs for receptors located at 25 meters (26)." To assess the potential Phase 2 building construction activity, a 25 -meter distance will be used for evaluation of localized PM10, PM2.s, NO2, and CO. Similarly, Phase 3 building construction activities will impact the on-site receptors planned in Phases 1 and 2. To assess the potential Phase 3 building construction activity, a 25 -meter distance will be used for evaluation of localized PM10, PM2.5, NO2, and CO. 3.7 CONSTRUCTION -SOURCE EMISSIONS LST ANALYSIS 3.7.1 LOCALIZED THRESHOLDS FOR CONSTRUCTION ACTIVITY It should be noted that since the look -up tables identify thresholds at only 1 acre, 2 acres, and 5 acres, linear regression has been utilized to determine localized significance thresholds. Consistent with SCAQMD guidance, the thresholds presented in Table 3-7 were calculated by interpolating the threshold values for the Project's disturbed acreage. TABLE 3-7: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (1 OF 3) Phase Subphase Pollutant Construction Localized Thresholds Phase A Grading Activities Crushing Demolition NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day Madison Avenue with Water Line Grubbing/Land Clearing, Grading/Excavation, Drainage/Utilities/Sub-Grade, Paving NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day 12188-05 AQ Report 50 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-7: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (2 OF 3) Phase Subphase Pollutant Construction Localized Thresholds Phase A Grading Activities Grading & Tank Construction Grading NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day Avenue 62 with Water Line Grubbing/Land Clearing, Grading/Excavation, Drainage/Utilities/Sub-Grade, Paving NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day Well Construction Wells #1-9 Site Preparation, Trenching NOx 597 lbs/day CO 17,427 lbs/day PMio 163 lbs/day PM2.5 74 lbs/day Substation Construction Substation Construction Demolition, Grading NOx 750 lbs/day CO 23,159 lbs/day PMio 196 Ibs/day PM2.5 93 lbs/day Phase B Grading Activities Crushing Demolition NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day Grading Grading NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day Jefferson with Water Line Grubbing/Land Clearing, Grading/Excavation, Drainage/Utilities/Sub-Grade, Paving NOx 750 lbs/day CO 23,159 I bs/day PMio 196 Ibs/day PM2.5 93 Ibs/day 12188-05 AQ Report 51 [_%i URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-7: MAXIMUM DAILY LOCALIZED EMISSIONS THRESHOLDS (3 OF 3) Phase Subphase Pollutant Construction Localized Thresholds Physical Construction Phases 1 Site Preparation, Grading NOx 750 lbs/day CO 23,159 lbs/day PMio 196 lbs/day PM2.5 93 lbs/day Phases 2 Site Preparation, Grading NOx 304 lbs/day CO 2,292 lbs/day PMio 14 Ibs/day PM2.5 8 lbs/day Phases 3 Site Preparation, Grading NOx 304 lbs/day CO 2,292 lbs/day PMio 14 Ibs/day PM2.5 8 lbs/day 3.7.2 LOCALIZED CONSTRUCTION -SOURCE EMISSIONS Tables 3-8 identifies the localized impacts at the nearest receptor location in the vicinity of the Project area. Without mitigation, localized construction emissions would not exceed the applicable SCAQMD LSTs for emissions of any criteria pollutant during Project construction activities. Outputs from the model runs for unmitigated construction LSTs are provided in Appendices 3.1 through 3.17. TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (1 OF 6) Construction Activity Emissions (lbs/day) NOx CO PMio PMz.s Phase A Grading Activities Crushing Demolition Maximum Daily Emissions 5.91 5.12 15.10 2.46 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Madison Avenue with Water Line Grubbing/Land Clearing Maximum Daily Emissions 7.23 6.37 0.30 0.28 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO 12188-05 AQ Report 52 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (2 OF 6) Construction Activity Emissions (lbs/day) NOx CO PMio PM2.5 Madison Avenue with Water Line Grading/Excavation Maximum Daily Emissions 37.85 36.16 1.55 1.44 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Drainage/Utilities/Sub-Grade Maximum Daily Emissions 31.87 31.26 1.28 1.20 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Grading & Tank Construction Grading Maximum Daily Emissions 41.69 28.08 6.09 3.05 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Avenue 62 with Water Line Grubbing/Land Clearing Maximum Daily Emissions 6.87 6.07 0.28 0.26 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Grading/Excavation Maximum Daily Emissions 37.50 35.86 1.53 1.41 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Drainage/Utilities/Sub-Grade Maximum Daily Emissions 27.47 29.70 1.06 1.00 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Well Construction c v Site Preparation Maximum Daily Emissions 40.58 58.67 2.38 1.85 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 48.89 66.89 2.65 2.10 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO 12188-05 AQ Report 53 [ ) URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (3 OF 6) Construction Activity Emissions (lbs/day) NOx CO PMio PM2.5 Well Construction ix v Site Preparation Maximum Daily Emissions 40.58 58.67 2.38 1.85 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 48.89 66.89 2.65 2.10 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO co �' Site Preparation Maximum Daily Emissions 40.58 58.67 2.38 1.85 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 48.89 66.89 2.65 2.10 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO .7t - 4t Tu Site Preparation Maximum Daily Emissions 40.58 58.67 2.38 1.85 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 48.89 66.89 2.65 2.10 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Ln Tv - Site Preparation Maximum Daily Emissions 40.58 58.67 2.38 1.85 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 48.89 66.89 2.65 2.10 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO 12188-05 AQ Report 54 [ ) URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (4 OF 6) Construction Activity Emissions (lbs/day) NOx CO PMio PM2.5 Well Construction ix v Site Preparation Maximum Daily Emissions 40.58 1.00 2.38 1.85 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 48.89 66.89 2.65 2.10 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO N. °1 Site Preparation Maximum Daily Emissions 11.28 58.84 0.81 0.44 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 14.03 66.25 0.94 0.57 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO 4t Tu Site Preparation Maximum Daily Emissions 11.28 58.84 0.81 0.44 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 14.03 66.25 0.94 0.57 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO u Tu - Site Preparation Maximum Daily Emissions 11.28 58.84 0.81 0.44 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO Trenching Maximum Daily Emissions 14.03 66.25 0.94 0.57 SCAQMD Localized Threshold 597 17,427 163 74 Threshold Exceeded? NO NO NO NO 12188-05 AQ Report 55 [ ) URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (5 OF 6) Construction Activity Emissions (lbs/day) NOx CO PMio PM2.5 Substation Construction Substation Construction Demolition Maximum Daily Emissions 57.35 53.57 2.15 1.98 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Grading Maximum Daily Emissions 115.89 104.74 7.08 5.31 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Phase B Grading Activities Crushing Demolition Maximum Daily Emissions 4.51 5.11 14.60 2.33 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Grading Grading Maximum Daily Emissions 33.19 26.08 5.75 2.74 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Jefferson with Water Line Grubbing/Land Clearing Maximum Daily Emissions 6.98 6.87 0.28 0.27 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Grading/Excavation Maximum Daily Emissions 33.03 35.37 1.33 1.23 SCAQMD Localized Threshold 780 25,043 209 102 Threshold Exceeded? NO NO NO NO Drainage/Utilities/Sub-Grade Maximum Daily Emissions 28.55 30.60 1.10 1.04 SCAQMD Localized Threshold 780 25,043 209 102 Threshold Exceeded? NO NO NO NO 12188-05 AQ Report 56 C.,) URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-8: LOCALIZED CONSTRUCTION EMISSIONS SUMMARY (6 OF 6) Construction Activity Emissions (lbs/day) NOx CO PMio PMz.5 Physical Construction Site Preparation Maximum Daily Emissions 35.72 17.41 10.60 5.47 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO Grading Maximum Daily Emissions 33.19 26.08 5.75 2.74 SCAQMD Localized Threshold 750 23,159 196 93 Threshold Exceeded? NO NO NO NO v rara 0_ Site Preparation Maximum Daily Emissions 35.72 17.41 10.60 5.47 SCAQMD Localized Threshold 304 2,292 14 8 Threshold Exceeded? NO NO NO NO Grading Maximum Daily Emissions 33.19 26.08 5.75 2.74 SCAQMD Localized Threshold 304 2,292 14 8 Threshold Exceeded? NO NO NO NO Site Preparation Maximum Daily Emissions 16.66 14.67 9.73 4.71 SCAQMD Localized Threshold 304 2,292 14 8 Threshold Exceeded? NO NO NO NO Grading Maximum Daily Emissions 15.34 22.21 5.00 2.09 SCAQMD Localized Threshold 304 2,292 14 8 Threshold Exceeded? NO NO NO NO 3.8 OPERATIONAL -SOURCE EMISSIONS LST ANALYSIS The development of the proposed project is located on approximately 464.50 acres. As previously stated, the total development is proposed to consist of 758 single family detached residential homes, 442 duplex residential units, a 100 -room resort hotel, and a golf -course (12 holes). According to SCAQMD LST methodology, LSTs would apply to the operational phase of a proposed project, if the project includes stationary sources, or attracts mobile sources that may spend long periods queuing and idling at the site (e.g., transfer facilities and warehouse buildings). The proposed project does not include such uses, and thus, due to the lack of significant stationary source emissions, no long-term localized significance threshold analysis is needed. 12188-05 AQ Report 57 L�► URBAN CROSSROA DS Travertine Specific Plan Air Quality Impact Analysis 3.9 CO "HOT SPOT" ANALYSIS As discussed below, the Project would not result in potentially adverse CO concentrations or "hot spots." Further, detailed modeling of Project -specific CO "hot spots" is not needed to reach this conclusion. An adverse CO concentration, known as a "hot spot", would occur if an exceedance of the state one-hour standard of 20 ppm or the eight-hour standard of 9 ppm were to occur. At the time of the SCAQMD's CEQA Air Quality Handbook (1993) (1993 CEQA Handbook), the SCAB was designated nonattainment under the CAAQS and NAAQS for CO (30). It has long been recognized that CO hotspots are caused by vehicular emissions, primarily when idling at congested intersections. In response, vehicle emissions standards have become increasingly stringent in the last twenty years. Currently, the allowable CO emissions standard in California is a maximum of 3.4 grams/mile for passenger cars (there are requirements for certain vehicles that are more stringent). With the turnover of older vehicles, introduction of cleaner fuels, and implementation of increasingly sophisticated and efficient emissions control technologies, CO concentration in the SCAB is now designated as attainment, as previously noted in Table 2-3. To establish a more accurate record of baseline CO concentrations affecting the SCAB, a CO "hot spot" analysis was conducted in 2003 for four busy intersections in Los Angeles at the peak morning and afternoon time periods. This "hot spot" analysis did not predict any violation of CO standards, as shown on Table 3-9. TABLE 3-9: CO MODEL RESULTS Intersection Location CO Concentrations (ppm) Morning 1 -hour Afternoon 1 -hour 8 -hour Wilshire Boulevard/Veteran Avenue 4.6 3.5 3.7 Sunset Boulevard/Highland Avenue 4 4.5 3.5 La Cienega Boulevard/Century Boulevard 3.7 3.1 5.2 Long Beach Boulevard/Imperial Highway 3 3.1 8.4 Source: 2003 AQMP, Appendix V: Modeling and Attainment Demonstrations Notes: Federal 1 -hour standard is 35 ppm and the deferral 8 -hour standard is 9.0 ppm. Based on the SCAQMD's 2003 Air Quality Management Plan (2003 AQMP) and the 1992 Federal Attainment Plan for Carbon Monoxide (1992 CO Plan), peak CO concentrations in the SCAB were a result of unusual meteorological and topographical conditions and not a result of traffic volumes and congestion at a particular intersection. As evidence of this, for example, 9.3 ppm 8 - hour CO concentration measured at the Long Beach Boulevard and Imperial Highway intersection (highest CO generating intersection within the "hot spot" analysis), only 0.7 ppm was attributable to the traffic volumes and congestion at this intersection; the remaining 8.6 ppm were due to the ambient air measurements at the time the 2003 AQMP was prepared (31). In contrast, the ambient 8 -hour CO concentration within the Project study area is estimated at 1.4 ppm -1.6 ppm. Therefore, even if the traffic volumes for the Project were double or even triple of the traffic 12188-05 AQ Report 58 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis volumes generated at the Long Beach Boulevard and Imperial Highway intersection, coupled with the on-going improvements in ambient air quality, the Project would not be capable of resulting in a CO "hot spot" at any study area intersections. Similar considerations are also employed by other Air Districts when evaluating potential CO concentration impacts. More specifically, the Bay Area Air Quality Management District (BAAQMD) concludes that under existing and future vehicle emission rates, a given project would have to increase traffic volumes at a single intersection by more than 44,000 vehicles per hour (vph) —or 24,000 vph where vertical and/or horizontal air does not mix—in order to generate a significant CO impact (32). Traffic volumes generating the CO concentrations for the "hot spot" analysis is shown on Table 3-10. The busiest intersection evaluated was that at Wilshire Boulevard and Veteran Ave., which has a daily traffic volume of approximately 100,000 vehicles per day and AM/PM traffic volumes of 8,062 vph and 7,719 vph respectively (33). The 2003 AQMP estimated that the 1 -hour concentration for this intersection was 4.6 ppm; this indicates that, should the daily traffic volume increase four times to 400,000 vehicles per day, CO concentrations (4.6 ppm x 4= 18.4 ppm) would still not likely exceed the most stringent 1 -hour CO standard (20.0 ppm)4. As shown in the Travertine Specific Plan Traffic Phasing Analysis, on Exhibit 5-5, Cumulative with Phase 3 Project (2031) Average Daily Traffic (ADT), the highest average daily trips on a segment of road would be 42,000 daily trips on Jefferson Street and Avenue 50, which is lower than the highest daily traffic volumes at Wilshire Boulevard and Veteran Avenue of 100,000 vehicles per day (25) 5. Additionally, the 2003 AQMP determined that the highest traffic volumes on a segment of road is 8,674 vph on La Cienega Boulevard and Century Boulevard. As summarized on Table 3-11 below, the intersection of Jefferson Street and Avenue 50 would generate the highest hourly traffic volume of 5,001 vph. TABLE 3-10: TRAFFIC VOLUMES Intersection Location Peak Traffic Volumes (vph) Eastbound (AM/PM) Westbound (AM/PM) Southbound (AM/PM) Northbound (AM/PM) Total (AM/PM) Wilshire Boulevard/Veteran Avenue 4,954/2,069 1,830/3,317 721/1,400 560/933 8,062/7,719 Sunset Boulevard/Highland Avenue 1,417/1,764 1,342/1,540 2,304/1,832 1,551/2,238 6,614/5,374 La Cienega Boulevard/Century Boulevard 2,540/2,243 1,890/2,728 1,384/2,029 821/1,674 6,634/8,674 Long Beach Boulevard/Imperial Highway 1,217/2,020 1,760/1,400 479/944 756/1,150 4,212/5,514 Source: 2003 AQMP 4 Based on the ratio of the CO standard (20.0 ppm) and the modeled value (4.6 ppm) 5 The EAPC (2021) Traffic Volumes were utilized in lieu of the Horizon Year (2040) With Project Traffic Volumes as a conservative measure since CO emissions are anticipated to decrease dramatically over time as the analysis year increases (as discussed above). The potential increase in volumes in 2040 versus 2021would not be sufficient enough to result in any worse impacts than what would occur for 2021 conditions. 12188-05 AQ Report 59 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis TABLE 3-11: CUMULATIVE WITH PHASE 3 PROJECT (2031) ADT Intersection Location Peak Traffic Volumes (vph) Northbound (AM/PM) Southbound (AM/PM) Eastbound (AM/PM) Westbound (AM/PM) Total (AM/PM) Madison Street/Avenue 54 1,050/1,467 616/768 959/1,122 376/504 3,001/3,861 Jefferson Street/Avenue 52 895/1,254 1,099/1,297 1,008/1,009 828/1,022 3,830/4,582 Jefferson Street/Avenue 50 1,050/1,491 1,558/1,665 657/955 7,67/890 4,032/5,001 Monroe Street/50th Avenue 749/1,137 805/970 486/796 632/785 2,672/3,688 As such, Project -related traffic volumes are less than the traffic volumes identified in the 2003 AQMP. The Project considered herein would not produce the volume of traffic required to generate a CO "hot spot" either in the context of the 2003 Los Angeles hot spot study or based on representative BAAQMD CO threshold considerations. Therefore, CO "hot spots" are not an environmental impact of concern for the Project. Localized air quality impacts related to mobile - source emissions would therefore be less than significant. 3.10 AIR QUALITY MANAGEMENT PLANNING The Project site is located within the SSAB, which is characterized by relatively poor air quality. The SCAQMD has jurisdiction over an approximately 10,743 square -mile area consisting of the four -county Basin and the Los Angeles County and Riverside County portions of the Air Basin. In these areas, the SCAQMD is principally responsible for air pollution control, and works directly with the SCAG, county transportation commissions, local governments, as well as state and federal agencies to reduce emissions from stationary, mobile, and indirect sources to meet state and federal ambient air quality standards. Currently, these state and federal air quality standards are exceeded in most parts of the SSAB. In response, the SCAQMD has adopted a series of AQMPs to meet the state and federal ambient air quality standards. AQMPs are updated regularly in order to more effectively reduce emissions, accommodate growth, and to minimize any negative fiscal impacts of air pollution control on the economy. In March 2017, the SCAQMD released the Final 2016 AQMP (2016 AQMP). The 2016 AQMP continues to evaluate current integrated strategies and control measures to meet the NAAQS, as well as, explore new and innovative methods to reach its goals. Some of these approaches include utilizing incentive programs, recognizing existing co -benefit programs from other sectors, and developing a strategy with fair -share reductions at the federal, state, and local levels (34). Similar to the 2012 AQMP, the 2016 AQMP incorporates scientific and technological information and planning assumptions, including the 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy (2016-2040 RTP/SCS), a planning document that supports the integration of land use and transportation to help the region meet the federal Clean Air Act requirements (35). The Project's consistency with the AQMP will be determined using the 2016 AQMP as discussed below. 12188-05 AQ Report 60 [�► URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis Criteria for determining consistency with the AQMP are defined in Chapter 12, Section 12.2 and Section 12.3 of the 1993 CEQA Handbook (36). These indicators are discussed below: 3.10.1 CONSISTENCY CRITERION NO. 1 The proposed Project will not result in an increase in the frequency or severity of existing air quality violations or cause or contribute to new violations or delay the timely attainment of air quality standards or the interim emissions reductions specified in the AQMP. The violations that Consistency Criterion No. 1 refers to are the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if regional or localized significance thresholds were exceeded. Construction Impacts — Consistency Criterion 1 Consistency Criterion No. 1 refers to violations of the CAAQS and NAAQS. CAAQS and NAAQS violations would occur if LSTs or regional significance thresholds were exceeded. As evaluated, the Project's regional and localized construction -source emissions would not exceed applicable regional significance threshold and LST thresholds. As such, a less than significant impact is expected. Operational Impacts — Consistency Criterion 1 The Project regional analysis demonstrates that Project operational -source emissions has the potential to exceed applicable thresholds for VOCs and NOx. As such, Project operational -source emissions would therefore result in or cause violations of the CAAQS and NAAQS. On the basis of the preceding discussion, the Project is determined to be inconsistent with the first criterion. 3.10.2 CONSISTENCY CRITERION NO. 2 The Project will not exceed the assumptions in the AQMP based on the years of Project build- out phase. The 2016AQMP demonstrates that the applicable ambient air quality standards can be achieved within the timeframes required under federal law. Growth projections from local general plans adopted by cities in the district are provided to the SCAG, which develops regional growth forecasts, which are then used to develop future air quality forecasts for the AQMP. Development consistent with the growth projections in City of La Quinta General Plan is considered to be consistent with the AQMP. Construction Impacts — Consistency Criterion 2 Peak day emissions generated by construction activities are largely independent of land use assignments, but rather are a function of development scope and maximum area of disturbance. Irrespective of the site's land use designation, development of the site to its maximum potential would likely occur, with disturbance of the entire site occurring during construction activities. Operational Impacts — Consistency Criterion 2 12188-05 AQ Report 61 [ y URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis As previously stated, the current General Plan and Zoning designations on the property are Low Density Residential (RL), Medium High Density Residential (RMH), Neighborhood Commercial (CN), Tourist Commercial (CT), and Golf Course (GC). RL land uses are appropriate for single family residential development, whether attached or detached. These land uses are typically developed as subdivisions, country club developments, or master planned communities. RMH land uses accommodate a broad range of residential uses, including small -lot subdivisions, duplex, condominium and apartment projects. CN land uses can include the development of supermarkets and drugstores in a neighborhood shopping center, to major national retailers in large buildings. Uses can also include professional offices, service business, restaurants, hotels or motels, research and development and warehousing or similar low impact quasi -industrial projects. CT land use designations are specifically geared to tourism -related land uses, such as resort hotels, hotels and motels, and resort commercial development, such as conference centers, restaurants, resort - supporting retail and services. GC land use designations applies to parks, recreation facilities, public and private golf courses (37). The Project proposes a General Plan Amendment to change the land use designations of the Project site to provide consistency with the land uses proposed. The proposed mixed-use Project consists of approximately 758 single family detached residential homes, 442 duplex residential units, a 100 -room resort hotel, and a golf -course (12 holes), which are permitted under the City's General Plan land use and zoning designations. Although the proposed use is permitted, and in fact reduced land use intensities are proposed, the Project would exceed the applicable SCAQMD regional threshold for operational -source activity for emissions of NOx, Project operational -source NOx emissions exceedances of applicable SCAQMD regional thresholds are therefore considered significant and unavoidable. Accordingly, even though the Project proposes to develop the site less intensely compared to the growth assumptions utilized in the 2016 AQMP, a potential significant impact could occur since the regional thresholds are exceeded. Therefore, implementation the Project would have the potential to exceed the assumptions in the AQMP and would conflict with the second criterion. AQMP CONSISTENCY CONCLUSION The Project has the potential to result in or cause NAAQS or CAAQS violations. The Project's proposed land use designation for the subject site would however potentially affect the development intensities as reflected in the adopted General Plan. The Project is therefore considered to be potentially inconsistent with the AQMP and a potential significant impact would occur with respect to this threshold. 3.11 POTENTIAL IMPACTS TO SENSITIVE RECEPTORS The potential impact of Project -generated air pollutant emissions at sensitive receptors has also been considered. Sensitive receptors can include uses such as long-term health care facilities, rehabilitation centers, and retirement homes. Residences, schools, playgrounds, childcare centers, and athletic facilities can also be considered as sensitive receptors. 12188-05 AQ Report 62 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis Results of the LST analysis indicate that, the Project would not exceed the SCAQMD localized significance thresholds during construction. Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations during Project construction. Results of the LST analysis indicate that the Project would not exceed the SCAQMD localized significance thresholds during operational activity. Further Project traffic would not create or result in a CO "hotspot." Therefore, sensitive receptors would not be exposed to substantial pollutant concentrations as the result of Project operations. 3.11.1 FRIANT RANCH CASE In December 2018, in the case of Sierra Club v. County of Fresno (2018) 6 Ca1.5th 502, California Supreme Court held that an Environmental Impact Report's (EIR) air quality analysis must meaningfully connect the identified air quality impacts to the human health consequences of those impacts, or meaningfully explain why that analysis cannot be provided. As noted in the Brief of Amicus Curiae by the SCAQMD in the Friant Ranch case (April 6, 2015, Appendix 3.26) (Brief), SCAQMD has among the most sophisticated air quality modeling and health impact evaluation capability of any of the air districts in the State, and thus it is uniquely situated to express an opinion on how lead agencies should correlate air quality impacts with specific health outcomes (38). The SCAQMD discusses that it may be infeasible to quantify health risks caused by projects similar to the proposed Project, due to many factors. It is necessary to have data regarding the sources and types of air toxic contaminants, location of emission points, velocity of emissions, the meteorology and topography of the area, and the location of receptors (worker and residence) (38). The Brief states that it may not be feasible to perform a health risk assessment for airborne toxics that will be emitted by a generic industrial building that was built on "speculation" (i.e., without knowing the future tenant(s))6 (38). Even where a health risk assessment can be prepared, however, the resulting maximum health risk value is only a calculation of risk --it does not necessarily mean anyone will contract cancer as a result of the Project (38). The Brief also cites the author of the CARB methodology, which reported that a PM2.5 methodology is not suited for small projects and may yield unreliable results (38). Similarly, SCAQMD staff does not currently know of a way to accurately quantify 03 -related health impacts caused by NOx or VOC emissions from relatively small projects, due to photochemistry and regional model limitations (38). The Brief concludes, with respect to the Friant Ranch EIR, that although it may have been technically possible to plug the data into a methodology, the results would not have been reliable or meaningful (38). On the other hand, for extremely large regional projects (unlike the proposed Project), the SCAQMD states that it has been able to correlate potential health outcomes for very large emissions sources — as part of their rulemaking activity, specifically 6,620 lbs/day of NOx and 6 It should also be noted that the actual occurrence of specific health conditions is based on numerous other factors that are infeasible to quantify, such as an individual's genetic predisposition, diet, exercise regiment, stress, and other behavioral characteristics. 12188-05 AQ Report 63 [_%i URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 89,180 lbs/day of VOC were expected to result in approximately 20 premature deaths per year and 89,947 school absences due to 03 (38). At Project buildout, the proposed Project would generate 97.74 lbs/day of NOx during construction and 118.72 lbs/day of NOx during operations (1.48% and 1.79% of 6,620 lbs/day, respectively). This is well below the 6,620 lbs/day of NOx or 89,190 lbs/day of VOC emissions thresholds. The Project would also generate 26.73 lbs/day of VOC emissions during construction and 81.79 lbs/day of VOC emissions during operations (0.03% and 0.09% of 89,190 lbs/day, respectively). Therefore, the proposed Project's emissions are not sufficiently high enough to use a regional modeling program to correlate health effects on a basin -wide level. Additionally, this AQIA evaluates the proposed Project's localized impact to air quality for emissions of CO, NOx, PM10, and PM2.5 by comparing the Proposed Project's on-site emissions to the SCAQMD's applicable LST thresholds. As evaluated in this AQIA, the proposed Project would not result in emissions that exceeded the SCAQMD's LSTs. Therefore, the proposed Project would not be expected to exceed the most stringent applicable federal or state ambient air quality standards for emissions of CO, NOx, PM10, and PM2.s. 3.12 ODORS The potential for the Project to generate objectionable odors has also been considered. Land uses generally associated with odor complaints include: • Agricultural uses (livestock and farming) • Wastewater treatment plants • Food processing plants • Chemical plants • Composting operations • Refineries • Landfills • Dairies • Fiberglass molding facilities The Project does not contain land uses typically associated with emitting objectionable odors. Potential odor sources associated with the proposed Project may result from construction equipment exhaust and the application of asphalt and architectural coatings during construction activities and the temporary storage of typical solid waste (refuse) associated with the proposed Project's (long-term operational) uses. Standard construction requirements would minimize odor impacts from construction. The construction odor emissions would be temporary, short- term, and intermittent in nature and would cease upon completion of the respective phase of construction and is thus considered less than significant. It is expected that Project -generated refuse would be stored in covered containers and removed at regular intervals in compliance with the City's solid waste regulations. The proposed Project would also be required to comply with SCAQMD Rule 402 to prevent occurrences of public nuisances. Therefore, odors associated 12188-05 AQ Report 64 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis with the proposed Project construction and operations would be less than significant and no mitigation is required (39). 3.13 CUMULATIVE IMPACTS As previously shown in Table 2-3, the CAAQS designate the Project site as nonattainment for 03 PM10, and PM2.5 while the NAAQS designates the Project site as nonattainment for 03 and PM2.5. The SCAQMD has published the White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution which addresses the cumulative impacts from air pollution (40). In this report the SCAQMD clearly states: ":..the AQMD [Air Quality Management District] uses the same significance thresholds for project specific and cumulative impacts for all environmental topics analyzed in an Environmental Assessment or EIR. The only case where the significance thresholds for project specific and cumulative impacts differ is the HI [Hazard Index] significance threshold for toxic air contaminant (TAC) emissions. The project specific (project increment) significance threshold is HI > 1.0 while the cumulative (facility -wide) is HI > 3.0. It should be noted that the HI is only one of three TAC emission significance thresholds considered (when applicable) in a CEQA analysis. The other two are the maximum individual cancer risk (MICR) and the cancer burden, both of which use the same significance thresholds (MICR of 10 in 1 million and cancer burden of 0.5) for project specific and cumulative impacts. Projects that exceed the project -specific significance thresholds are considered by the SCAQMD to be cumulatively considerable. This is the reason project -specific and cumulative significance thresholds are the same. Conversely, projects that do not exceed the project -specific thresholds are generally not considered to be cumulatively significant." Therefore, this analysis assumes that individual projects that do not generate operational or construction emissions that exceed the SCAQMD's recommended daily thresholds for project - specific impacts would also not cause a cumulatively considerable increase in emissions for those pollutants for which the Basin is in nonattainment, and, therefore, would not be considered to have a significant, adverse air quality impact. Alternatively, individual project -related construction and operational emissions that exceed SCAQMD thresholds for project -specific impacts would be considered cumulatively considerable. 12188-05 AQ Report 65 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis CONSTRUCTION IMPACTS The Project -specific evaluation of emissions presented in the preceding analysis demonstrates that Project construction -source air pollutant emissions would not result in exceedances of regional thresholds after implementation of MM AQ -1. Therefore, Project construction -source emissions would be considered less than significant on a project -specific and cumulative basis. OPERATIONAL IMPACTS The Project -specific evaluation of emissions presented in the preceding analysis demonstrates that Project operational -source air pollutant emissions would result in exceedances of regional thresholds for emissions of VOCs and NOx. As previously stated, the majority of VOC emissions are derived from consumer products. For analytical purposes, consumer products include cleaning supplies, kitchen aerosols, cosmetics and toiletries (5). As such, the Project cannot meaningfully control consumer products via mitigation thus, VOC emissions are considered significant and unavoidable as no feasible mitigation measure exists that would reduce this impact to less than significant levels. It should be noted that the majority of operational -source NOx emissions are be generated from the mobile activities from vehicles that cannot be mitigated. Neither the Project applicant nor the Lead Agency (City) can substantively or materially affect reductions in Project mobile -source emissions beyond the regulatory requirements and mitigation measures identified herein. Thus, these emissions are considered significant and unavoidable. 12188-05 AQ Report 66 LI') URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report 67 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 4 REFERENCES 1. State of California. 2019 CEQA California Environmental Quality Act. 2019. 2. South Coast Air Quality Management District. RULE 403. FUGITIVE DUST. [Online] https://www.aqmd.gov/docs/default-sou rce/ru le-book/ru le-iv/rule-403. pdf?sfvrsn=4. 3. -. RULE 445. Wood -Burning Devices. [Online] http://www.agmd.gov/docs/default-source/rule- book/rule-iv/rule-445.pdf. 4. -. RULE 1113. Architectural Coatings. [Online] http://www.agmd.gov/docs/default-source/rule- boo k/reg-xi/r1113. pdf. 5. Southern California Air Quality Management District. California Emissions Estimator Model User's Guide Version 2016.3.2. [Online] http://www.agmd.gov/docs/default-source/caleemod/01_user-39- s-guide2016-3-2_15november2017.pdf?sfvrsn=4. 6. South Coast Air Quality Management District. Guidance Document for Addressing Air Quality Issues in General Plans and Local Planning. 2005. 7. St. Croix Sensory, Inc. The "Gray Line" Between Odor Nuisance and Health Effects. 2000. 8. California Air Resources Board. Ambient Air Quality Standards (AAQS). [Online] 2016. http://www.arb.ca.gov/research/aaqs/aags2.pdf. 9. United State Environmental Protection Agency. Frequent Questions about General Conformity . EPA. [Online] https://www.epa.gov/general-conformity/frequent-questions-about-general-conformity#8. 10. South Coast Air Quality Management District. Annual Air Quality Monitoring Network Plan. [Online] July 2018. http://www.agmd.gov/docs/default-source/clean-air-plans/air-quality-monitoring- network-plan/annual-air-quality-monitoring-network-plan-v2.pdf?sfvrsn=2. 11. Air Resources Board. State and National Ambient Air Quality Standards. [Online] https://www.arb.ca.gov/regact/2019/stateareadesignations/appc.pdf?_ga=2.169398369.15376157 02.1554741141-1192937971.1505156621. 12. District, South Coast Air Quality Management. Air Quality Data Tables. [Online] https://www.agmd.gov/home/air-quality/air-quality-data-studies/historical-data-by-year. 13. Environmental Protection Agency. National Ambient Air Quality Standards (NAAQS). [Online] 1990. https://www.epa.gov/environmental-topics/air-topics. 14. -. Air Pollution and the Clean Air Act. [Online] http://www.epa.gov/air/caa/. 15. United States Environmental Protection Agency. 1990 Clean Air Act Amendment Summary: Title I. [Online] https://www.epa.gov/clean-air-act-overview/1990-clean-air-act-amendment-summary- title-i. 16. -. 1990 Clean Air Act Amendment Summary: Title II. [Online] https://www.epa.gov/clean-air-act- overview/1990-clean-air-act-amendment-summary-title-ii. 17. Air Resources Board. California Ambient Air Quality Standards (CAAQS). [Online] 2009. [Cited: April 16, 2018.] http://www.arb.ca.gov/research/aaqs/caaqs/caaqs.htm. 18. The California Energy Commission. 2019 Building Energy Efficiency Standards . California Energy Commission. [Online] 2018. https://www.energy.ca.gov/titl e24/2019sta nda rds/documents/2018_Titl e_24_2019_Bu i Id i ng_Sta n d a rds_FAQ. pdf. 12188-05 AQ Report 68 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis 19. Department of General Services. Building Standards Commission. CALGreen. [Online] https://codes.iccsafe.org/content/chapter/15778/. 20. Southern California Association of Governments. 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy. [Online] April 2016. http://scagrtpscs.net/Documents/2016/final/f2016RTPSCS.pdf. 21. South Coast Air Quality Management District (SCAQMD). SCAQMD Air Quality Significance Thresholds. [Online] http://www.agmd.gov/docs/default-source/ceqa/handbook/scaqmd-air- quality-significance-thresholds.pdf?sfvrsn=2. 22. California Air Pollution Control Officers Association (CAPCOA). California Emissions Estimator Model (CaIEEMod). [Online] September 2016. www.caleemod.com. 23. California Department of Transportation. EMFAC Software. [Online] http://www.dot.ca.gov/hq/env/air/pages/emfac.htm. 24. California Air Pollution Control Officers Association (CAPCOA). Appendix A: Calculation Details for CaIEEMod. CaIEEMod. [Online] October 2017. http://www.agmd.gov/docs/default- source/caleemod/02_appendix-a2016-3-2.pdf?sfvrsn=6. 25. Urban Crossroads, Inc. Travertine Specific Plan Traffic Phasing Analysis. 2020. 26. South Coast Air Quality Management District. Localized Significance Thresholds Methodology. s.l. : South Coast Air Quality Managment District, 2003. 27. Lake Environmental. US EPA Models. Lake Environmental. [Online] http://www.weblakes.com/download/us_epa.html. 28. South Coast Air Quality Management District. Fact Sheet for Applying CaIEEMod to Localized Significance Thresholds. [Online] http://www.agmd.gov/docs/default- source/ceqa/handbook/localized-significance-thresholds/caleemod-guidance.pdf. 29. Urban Crossroads, Inc. Travertine Specific Plan Noise Impact Analysis. 2020. 30. South Coast Air Quality Management District. 2003 Air Quality Management Plan. [Online] 2003. http://www.agmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/2003-air- quality-management-plan/2003-aqmp-appendix-v.pdf. 31. -. 2003 Air Quality Management Plan. [Online] 2003. https://www.agmd.gov/home/air- quality/clean-air-plans/air-quality-mgt-plan/2003-aqmp. 32. Bay Area Air Quality Management District. [Online] http://www.baaqmd.gov/. 33. South Coast Air Quality Management District. 2003 Air Quality Management Plan. [Online] 2003. https://www.agmd.gov/home/air-quality/clean-air-plans/air-quality-mgt-plan/2003-aqmp. 34. -. Final 2016 Air Quality Management Plan (AQMP). [Online] March 2017. http://www.agmd.gov/docs/default-source/clean-air-plans/air-quality-management-plans/2016-air- quality-management-plan/final-2016-aqmp/final2016agmp.pdf?sfvrsn=11. 35. Southern California Association of Governments. 2016-2040 Regional Transportation Plan/Sustainable Communities Strategy. [Online] April 2016. http://scagrtpscs.net/Documents/2016/final/f2016RTPSCS.pdf. 36. South coast Air Quality Management District. CEQA Air Quality Handbook (1993). 1993. 37. Quinta, City of La. LA Quinta 2035 General Plan. [Online] http://www.laquintaca.gov/home/showdocument?id=33551. 12188-05 AQ Report 69 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 38. South Coast Air Quality Management District. Sierra Club, Revive the San Joaquin and League of Women Voters of Fresno, Plaintiffs and Appellants, v. County of Fresno, Defendant and Respondent and, Friant Ranchm L.P. Real Party in Interest and Respondent. [Online] 2015. https://www.cou rts.ca.gov/documents/9-s219783-ac-south-coast-ai r -q ua Iity-mgt-dist-041315. pdf. 39. —. RULE 402 NUISANCE. [Online] http://www.agmd.gov/docs/default-source/rule-book/rule-iv/rule- 402.pdf. 40. Goss, Tracy A and Kroeger, Amy. White Paper on Potential Control Strategies to Address Cumulative Impacts from Air Pollution. [Online] South Coast Air Quality Management District, 2003. http://www.agmd.gov/docs/default-source/Agendas/Environmental-Justice/cumulative-impacts- working-group/cumulative-impacts-white-paper-appendix.pdf. 41. South Coast Air Quality Management District. Annual Air Quality Monitoring Network Plan. [Online] July 2018. http://www.agmd.gov/docs/default-source/clean-air-plans/air-quality-monitoring- network-plan/annual-air-quality-monitoring-network-plan-v2.pdf?sfvrsn=2. 12188-05 AQ Report 70 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report 71 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis 5 CERTIFICATIONS The contents of this air study report represent an accurate depiction of the environmental impacts associated with the proposed Travertine Specific Plan Project. The information contained in this air quality impact assessment report is based on the best available data at the time of preparation. If you have any questions, please contact me directly at hqureshi@urbanxroads.com. Haseeb Qureshi Associate Principal hqureshi@urbanxroads.com EDUCATION Master of Science in Environmental Studies California State University, Fullerton • May 2010 Bachelor of Arts in Environmental Analysis and Design University of California, Irvine • June 2006 PROFESSIONAL AFFILIATIONS AEP — Association of Environmental Planners AWMA — Air and Waste Management Association ASTM — American Society for Testing and Materials PROFESSIONAL CERTIFICATIONS Environmental Site Assessment — American Society for Testing and Materials • June 2013 Planned Communities and Urban Infill — Urban Land Institute • June 2011 Indoor Air Quality and Industrial Hygiene — EMSL Analytical • April 2008 Principles of Ambient Air Monitoring — CARB • August 2007 AB2588 Regulatory Standards — Trinity Consultants • November 2006 Air Dispersion Modeling — Lakes Environmental • June 2006 12188-05 AQ Report 72 LI, URBAN CROSS R OA D5 Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report 73 LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 2.1: STATE/FEDERAL ATTAINMENT STATUS OF CRITERIA POLLUTANTS 12188-05 AQ Report [_moi URBAN CROSSROADS APPENDIX C MAPS AND TABLES OF AREA DESIGNATIONS FOR STATE AND NATIONAL AMBIENT AIR QUALITY STANDARDS [This page intentionally left blank] APPENDIX C MAPS AND TABLES OF AREA DESIGNATIONS FOR STATE AND NATIONAL AMBIENT AIR QUALITY STANDARDS This attachment fulfills the requirement of Health and Safety Code section 40718 for CARB to publish maps that identify areas where one or more violations of any State ambient air quality standard (State standard) or national ambient air quality standard (national standard) have been measured. The national standards are those promulgated under section 109 of the federal Clean Air Act (42 U.S.C. 7409). This attachment is divided into three parts. The first part comprises a table showing the levels, averaging times, and measurement methods for each of the State and national standards. This is followed by a section containing maps and tables showing the area designations for each pollutant for which there is a State standard in the California Code of Regulations, title 17, section 70200. The last section contains maps and tables showing the most current area designations for the national standards. C-1 Ambient Air Quality Standards (Updated 5/4/1 Pollutant Averaging Time California Standards' National Standards Concentration' Method' Primary °- Secondary' Method' Ozone (O,)° 1 Hour 0.09 ppm (180 pg/rr) Ultraviolet Photometry — Same as Primary Standard Ultraviolet Photometry 8 Hour 0.070 ppm (137 pg/ma) 0.070 ppm (137 pg/m,) Respirable Particulate Matter (PM10)' 24 Hour 50 pg/m, Gravimetric or Beta Attenuation 150 pg/m, Same as Primary Standard Inertial Separation and Gravimetric Analysis Annual Arithmetic Mean 20 pg/m3 — Fine Particulate Matter (PM2.5)' 24 Hour — — 35 pg/m+ Same as Primary Standard Inertial Separation and Gravimetric Analysis Annual Arithmetic Mean 12 pg/m3 Gravimetric or Beta Attenuation 12.0 pg/m, 15 pg/m, Carbon Monoxide (CO) 1 Hour 20 ppm (23 ng/m) Non -Dispersive Infrared Photometry (NDIR) 35 ppm (40 mg/m') Non -Dispersive Infrared Photometry (NDIR) 8 Hour 9.0 ppm(10 mg/m) 9 ppm(10 mg/m) — 8 Hour (Lake Tahoe) 6 ppm (7 ng/rrP) Nitrogen Dioxide (NO, )'° 1 Hour 0.18 ppm (339 pg/rn) Gas Phase Chemiluminescence 100 ppb (188 pg/nn) — Gas Phase Chemiluminescence Annual Arithmetic Mean 0.030 ppm (57 pg/m,) 0.053 ppm (100 pg/m,) Same as Primary Standard Sulfur Dioxide (S02)" 1 Hour 0.25 ppm (655 pg/m3) Ultraviolet Fluorescence 75 ppb (196 pg/nP) — Ultraviolet Flourescence; Spectrophotometry (Pararosanilins Method) 3 Hour — — 0.5 ppm (1300 pg/n) 24 Hour 0.04 ppm (105 pg/m) 0.14 ppm (for certain areas)" — Annual Arithmetic Mean — 0.030 ppm (for certain areas)" Lead12,13 30 Day Average 1.5 pg/m, Atomic Absorption — — High Volume Sampler and Atomic Absorption Calendar Quarter — 1.5 Ng/nr (for certain areas)' Same as Primary Standard Rolling 3 -Month Average — 0.15 pg/m Visibility Reducing Particles" 8 Hour See footnote 14 Beta Attenuation and Transmittance through Filter Tape No National Standards Sulfates 24 Hour 25 pg/m° bn Chromatography Hydrogen Sulfide 1 Hour 0.03 ppm (42 pg/rrn) Ultraviolet Fluorescence Vinyl Chloride" 24 Hour 0.01 ppm (26 pg/m+) Gas Chromatography See footnotes on next page ... C-2 1. California standards for ozone, carbon monoxide (except 8 -hour Lake Tahoe), sulfur dioxide (1- and 24-hour), nitrogen dioxide, and particulate matter (PM10, PM2.5, and visibility reducing particles), are values that are not to be exceeded. All others are not to be equaled or exceeded. California ambient air quality standards are listed in the Table of Standards in Section 70200 of Title 17 of the California Code of Regulations. 2. National standards (other than ozone, particulate matter, and those based on annual arithmetic mean) are not to be exceeded more than once a year. The ozone standard is attained when the fourth highest 8 -hour concentration measured at each site in a year, averaged over three years, is equal to or less than the standard. For PM10, the 24-hour standard is attained when the expected number of days per calendar year with a 24-hour average concentration above 150 µg/m3 is equal to or less than one. For PM2.5, the 24-hour standard is attained when 98 percent of the daily concentrations, averaged over three years, are equal to or less than the standard. Contact the U.S. EPA for further clarification and current national policies. 3. Concentration expressed first in units in which it was promulgated. Equivalent units given in parentheses are based upon a reference temperature of 25°C and a reference pressure of 760 torr. Most measurements of air quality are to be corrected to a reference temperature of 25°C and a reference pressure of 760 torr; ppm in this table refers to ppm by volume, or micromoles of pollutant per mole of gas. 4. Any equivalent measurement method which can be shown to the satisfaction of the CARB to give equivalent results at or near the level of the air quality standard may be used. 5. National Primary Standards: The levels of air quality necessary, with an adequate margin of safety to protect the public health. 6. National Secondary Standards: The levels of air quality necessary to protect the public welfare from any known or anticipated adverse effects of a pollutant. 7. Reference method as described by the U.S. EPA. An "equivalent method" of measurement may be used but must have a "consistent relationship to the reference method" and must be approved by the U.S. EPA. 8. On October 1, 2015, the national 8 -hour ozone primary and secondary standards were lowered from 0.075 to 0.070 ppm. 9. On December 14, 2012, the national annual PM2.5 primary standard was lowered from 15 µg/m3 to 12.0 µg/m3. The existing national 24-hour PM2.5 standards (primary and secondary) were retained at 35 µg/m3, as was the annual secondary standard of 15 µg/m3. The existing 24-hour PM10 standards (primary and secondary) of 150 µg/m3 also were retained. The form of the annual primary and secondary standards is the annual mean, averaged over 3 years. 10. To attain the 1 -hour national standard, the 3 -year average of the annual 98th percentile of the 1 -hour daily maximum concentrations at each site must not exceed 100 ppb. Note that the national 1 -hour standard is in units of parts per billion (ppb). California standards are in units of parts per million (ppm). To directly compare the national 1 -hour standard to the California standards the units can be converted from ppb to ppm. In this case, the national standard of 100 ppb is identical to 0.100 ppm. 11. On June 2, 2010, a new 1 -hour SO2 standard was established and the existing 24-hour and annual primary standards were revoked. To attain the 1 -hour national standard, the 3 -year average of the annual 99th percentile of the 1 -hour daily maximum concentrations at each site must not exceed 75 ppb. The 1971 SO2 national standards (24-hour and annual) remain in effect until one year after an area is designated for the 2010 standard, except that in areas designated nonattainment for the 1971 standards, the 1971 standards remain in effect until implementation plans to attain or maintain the 2010 standards are approved. Note that the 1 -hour national standard is in units of parts per billion (ppb). California standards are in units of parts per million (ppm). To directly compare the 1 -hour national standard to the California standard the units can be converted to ppm. In this case, the national standard of 75 ppb is identical to 0.075 ppm. 12. The CARB has identified lead and vinyl chloride as 'toxic air contaminants' with no threshold level of exposure for adverse health effects determined. These actions allow for the implementation of control measures at levels below the ambient concentrations specified for these pollutants. 13. The national standard for lead was revised on October 15, 2008 to a rolling 3 -month average. The 1978 lead standard (1.5 µg/m3 as a quarterly average) remains in effect until one year after an area is designated for the 2008 standard, except that in areas designated nonattainment for the 1978 standard, the 1978 standard remains in effect until implementation plans to attain or maintain the 2008 standard are approved. 14. In 1989, the CARB converted both the general statewide 10 -mile visibility standard and the Lake Tahoe 30 -mile visibility standard to instrumental equivalents, which are "extinction of 0.23 per kilometer" and "extinction of 0.07 per kilometer" for the statewide and Lake Tahoe Air Basin standards, respectively. C-3 [This page intentionally left blank] C-4 Area Designations for the State Ambient Air Quality Standards The following maps and tables show the area designations for each pollutant with a State standard set forth in the California Code of Regulations, title 17, section 60200. Each area is identified as attainment, nonattainment, nonattainment-transitional, or unclassified for each pollutant, as shown below: Attainment A Nonattainment N Nonattainment-Transitional NA -T Unclassified U In general, CARB designates areas by air basin for pollutants with a regional impact and by county for pollutants with a more local impact. However, when there are areas within an air basin or county with distinctly different air quality deriving from sources and conditions not affecting the entire air basin or county, CARB may designate a smaller area. Generally, when boundaries of the designated area differ from the air basin or county boundaries, the description of the specific area is referenced at the bottom of the summary table. C-5 FIGURE 1 NORTH COAS Humboldt'_Tnnity 2018 Area Designations for State Ambient Air Quality Standards OZONE N 0 50 100 200 110es SUTTER BUTTES MOUNTAIN COUNTIES LAKE TAHOE LAKE COUNTY Sonoma SAN FRANCISCO BAY AREA Marin San Francisco San Mateo GREAT BASI N VALLEYS Santa Cruz NORTH CENTRAL COAST Madera SOUTH CENTRAL COAST Unclassified Attainment No nattai n me nt-Transition ai Nonattainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division '60 SOUTH COAST 111. Nigh 4r SAN DIEGO COUNTY C-6 SALTON SEA TABLE 1 California Ambient Air Quality Standards Area Designations for Ozone (1) (1) AB 3048 (Olberg) and AB 2525 (Miller) signed into law in 1996, made changes to Health and Safety Code, section 40925.5. One of the changes allows nonattainment districts to become nonattainment-transitional for ozone by operation of law. C-7 N NA -T U A N NA -T U A GREAT BASIN VALLEYS AIR BASIN NORTHEAST PLATEAU AIR BASIN X Alpine County X SACRAMENTO VALLEY AIR BASIN Inyo County X Colusa and Glenn Counties X Mono County X Sutter/Yuba Counties LAKE COUNTY AIR BASIN X Sutter Buttes X LAKE TAHOE AIR BASIN X Remainder of Sutter County X MOJAVE DESERT AIR BASIN X Yuba County X MOUNTAIN COUNTIES AIR BASIN Yolo/Solano Counties X Amador County X Remainder of Air Basin X Calaveras County X SALTON SEA AIR BASIN X El Dorado County (portion) X SAN DIEGO AIR BASIN X Mariposa County X SAN FRANCISCO BAY AREA AIR BASIN X Nevada County X SAN JOAQUIN VALLEY AIR BASIN X Placer County (portion) X SOUTH CENTRAL COAST AIR BASIN Plumas County X San Luis Obispo County X Sierra County X Santa Barbara County X Tuolumne County X Ventura County X NORTH CENTRAL COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTH COAST AIR BASIN X (1) AB 3048 (Olberg) and AB 2525 (Miller) signed into law in 1996, made changes to Health and Safety Code, section 40925.5. One of the changes allows nonattainment districts to become nonattainment-transitional for ozone by operation of law. C-7 FIGURE 2 Norte NORTH COAST LAKE COUNTY 4 k:SIskiycu `..; Modoc NORTHEAST ''.PLATEAU ::Trinity Humboldt'):. • Mendocino Tehema SACRAMENTO Lassen VALLEY a* Q. .1►.t.* l Mate ♦ ., Nevadi'xx r: • '•, ,moi Placer y,. El Dorado •1 ►r♦♦♦4„: Lake Sonoma SAN FRANCISCO BAY AREA Marin Nap iy 1 a • Sutter Yolo 2018 Area Designations for State Ambient Air Quality Standards PM10 NA 50 150 200 Miles MOUNTAIN COUNTIES LAKE TAHOE Napa �. Alpine Amador ! + " r•♦•. Yosemite NP Solana=♦+. Calaveras ♦���.� Contra ► San •‘ Tuolumne r� ti<Costa Joaquin �` �r•.*P ' San Francisco . , ♦ V •♦♦ •4• Alameda ♦r♦�,, ��44.114 ►.`O GREAT Stanislaus ♦ l,....14-a_ss.��i. San Mateo 1•San#a •♦Q� Mariposa rp Ate".„ BASIN * `♦♦♦ VALLEYS Clara `�'•1 Merced I v'''• ♦♦ ♦♦`�, �.;!ti 4 Madera ••) ♦♦♦�♦♦♦♦♦♦♦44 Santa Cruz ' � ��4:4; 4 ♦ ►♦a I.•• •���� :+San�•�♦i• SAN JOAQUIN ,�♦ii♦ii♦• Benito ,VALLEY ♦��`�♦♦♦•♦♦♦••♦♦ti. CORTHAST � ♦ s s'�•�♦•• i•iii4� ��•♦i's�♦�•�♦� CENTRAL ♦ ' •• •' �♦�♦t ♦r ii♦i• •♦ • O • COAST ♦I ��► ���4 >••••• ti •• •�• �,►v �4r•. ;i-• ••♦ O• •i`"�l ili•1 • •i'••i♦ii♦i ���►I• San ''%•is•Obi'•.•i��0��0��0•♦•i•, • LuiS�.`•+• • . Dii•O�►ii9i•♦ii0•♦i�ii•i••i0i'. Z-41:4,9 �`�►, ,� '' �iy�i MOJAVE DESERT ••�►�•♦�..►•♦•� Za• •�.'��►�D•4! ��-%9••••♦ •••♦♦�•i•".iii4r Santa ��i.�..�. +fir �'♦�•i�••••••••p0•• ♦•p••tp•♦♦•••••, Barbara ♦•••• SOUTH 4-4- . •41: CENTRAL '♦�'•• �•••••� COAST Unclassified Attainment Nonattainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division 14* *Orange 71 SOUTH COAST ■ w 14. SAN DIEGO COUNTY C-8 San Diego 1 ��♦♦ ♦• i •DOS. ' 11. �♦i♦♦, , ..-' SALTON SEA TABLE 2 California Ambient Air Quality Standards Area Designation for Suspended Particulate Matter (PM10) C-9 N U A N U A GREAT BASIN VALLEYS AIR BASIN X NORTH CENTRAL COAST AIR BASIN X LAKE COUNTY AIR BASIN X NORTH COAST AIR BASIN LAKE TAHOE AIR BASIN X Del Norte, Sonoma (portion) and Trinity Counties X MOJAVE DESERT AIR BASIN X Remainder of Air Basin X MOUNTAIN COUNTIES AIR BASIN NORTHEAST PLATEAU AIR BASIN Amador County X Siskiyou County X Calaveras County X Remainder of Air Basin X El Dorado County (portion) X SACRAMENTO VALLEY AIR BASIN Mariposa County Shasta County X - Yosemite National Park X Remainder of Air Basin X - Remainder of County X SALTON SEA AIR BASIN X Nevada County X SAN DIEGO AIR BASIN X Placer County (portion) X SAN FRANCISCO BAY AREA AIR BASIN X Plumas County X SAN JOAQUIN VALLEY AIR BASIN X Sierra County X SOUTH CENTRAL COAST AIR BASIN X Tuolumne County X SOUTH COAST AIR BASIN X C-9 Deri Norte NORTH COST:i.7 NORTHEAST PLATEAU . inity Humeoldt';:;.: LAKE COUNTY Glennerra •::' . -" Nevada talusa Yuba Placer ' Sutter..-; Yele El Dorado Napa Soomo SAN FRANCISCO BAY AREA Marin FIGURE 3 2018 Area Designations for State Ambient Air Quality Standards PM2.5 NA Portola Valley M Iles 0 50 100 202 MOUNTAIN COUNTIES LAKE TAHOE San Francisco San Mateo GREAT BASIN VALLEYS Santa Ciuz NORTH CENTRAL COAST Unclassified Attainment Nonattainment Air Basin County County Portion of Federal Ozone A QMA SOUTH CENTRAL COAST Source Date: October 2018 Air Quality Plahning and Science Division "hicivriod SOUTH COAST 1/4 SAN DIEGO COUNTY .11e C-10 SALTON Calexico SEA TABLE 3 California Ambient Air Quality Standards Area Designations for Fine Particulate Matter (PM2.5) (1) California Code of Regulations, title 17, section 60200(b) (2) California Code of Regulations, title 17, section 60200(c) (3) California Code of Regulations, title 17, section 60200(a) C-11 N U A N U A GREAT BASIN VALLEYS AIR BASIN X SALTON SEA AIR BASIN LAKE COUNTY AIR BASIN X Imperial County LAKE TAHOE AIR BASIN X - City of Calexico (3) X MOJAVE DESERT AIR BASIN Remainder of Air Basin X San Bernardino County SAN DIEGO AIR BASIN X - County portion of federal Southeast Desert Modified AQMA for Ozone (1) X SAN FRANCISCO BAY AREA AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X Remainder of Air Basin X SOUTH CENTRAL COAST AIR BASIN MOUNTAIN COUNTIES AIR BASIN San Luis Obispo County X Plumas County Santa Barbara County X - Portola Valley (2) X Ventura County X Remainder of Air Basin X SOUTH COAST AIR BASIN X NORTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SACRAMENTO VALLEY AIR BASIN Butte County X Colusa County X Glenn County X Placer County (portion) X Sacramento County X Shasta County X Sutter and Yuba Counties X Remainder of Air Basin X (1) California Code of Regulations, title 17, section 60200(b) (2) California Code of Regulations, title 17, section 60200(c) (3) California Code of Regulations, title 17, section 60200(a) C-11 Del( Norte NORTH COAST };S, Siskiyou Modoc NORTHEAST PLATEAU Lassen FIGURE 4 LAKE COUN Y 2018 Area Designations for State Ambient Air Quality Standards CARBON MONOXIDE 50 7 W 200 Miles MOUNTAIN COUNTIES LAKE TAHOE Sonoma Marin SAN FRANCISCO BAY AREA San Francisco El Dorado Sac Amador Alpine Calaveras :. Sari`„ :,Tuolumne Joaquin • ... ... San Mateo GREAT BASI N VALLEYS Santa Cruz NORTH CENTRAL COAST Unclassified Attainment Air Basin County SOUTH CENTRAL COAST Source Date, October 2018 Air Quality Planning and Science Division SOUTH COAST 14. SAN DIEGO COUNTY C-12 SALTON SEA TABLE 4 California Ambient Air Quality Standards Area Designation for Carbon Monoxide* * The area designated for carbon monoxide is a county or portion of a county C-13 N NA -T U A N NA -T U A GREAT BASIN VALLEYS AIR BASIN SACRAMENTO VALLEY AIR BASIN Alpine County X Butte County X Inyo County X Colusa County X Mono County X Glenn County X LAKE COUNTY AIR BASIN X Placer County (portion) X LAKE TAHOE AIR BASIN X Sacramento County X MOJAVE DESERT AIR BASIN Shasta County X Kern County (portion) X Solano County (portion) X Los Angeles County (portion) X Sutter County X Riverside County (portion) X Tehama County X San Bernardino County (portion) X Yolo County X MOUNTAIN COUNTIES AIR BASIN Yuba County X Amador County X SALTON SEA AIR BASIN X Calaveras County X SAN DIEGO AIR BASIN X El Dorado County (portion) X SAN FRANCISCO BAY AREA AIR BASIN X Mariposa County X SAN JOAQUIN VALLEY AIR BASIN Nevada County X Fresno County X Placer County (portion) X Kern County (portion) X Plumas County X Kings County X Sierra County X Madera County X Tuolumne County X Merced County X NORTH CENTRAL COAST AIR BASIN San Joaquin County X Monterey County X Stanislaus County X San Benito County X Tulare County X Santa Cruz County X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN SOUTH COAST AIR BASIN X Del Norte County X Humboldt County X Mendocino County X Sonoma County (portion) X Trinity County X NORTHEAST PLATEAU AIR BASIN X * The area designated for carbon monoxide is a county or portion of a county C-13 uei: Norte NORTH': COAST;; Mod FIGURE 5 •.Trinity 'Humboldt•}(:ii? LAKE COUNTY Tehema'i: . SACRAMENTO :butte. Mendocino 2018 Area Designations for State Ambient Air Quality Standards NITROGEN DIOXIDE N 50 100 200 Miles MOUNTAIN COUNTIES LAKE TAHOE to 4 SonomaNapa SAN FRANCISCO BAY AREA Mann FrIVIV rEi4; San Francisco San Mateo Santa Cruz GREAT 1 BASIN VALLEYrS 1 an Bernardino NORTH CENTRAL COAST iverside rSan SOUTH Barbara;:+, CENTRAL COAST *0400 SOUTH COAST Attainment Nonattainment CA 60 (Portion) Air Basin SAN DIEGO COUNTY County Source Date: October 2018 Air Quality Planning and Science Division C-14 SALTON SEA TABLE 5 California Ambient Air Quality Standards Area Designation for Nitrogen Dioxide C-15 N U A N U A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN NORTHEAST PLATEAU AIR BASIN X CA 60 Near -road Portion of San Bernardino, Riverside, and Los Angeles Counties X Remainder of Air Basin X C-15 Debs': Norte:.4 COAST`:: r':i ::' NORmEAST:•. '•PLATEAU::: ;:.;; FIGURE 6 .Trinity Humboldt �'�.:•,:;:: LAKE COUNTY 2018 Area Designations for State Ambient Air Quality Standards SULFUR DIOXIDE 0 so 100 MOUNTAIN COUNTIES LAKE TAHOE SAN FRANCISCO BAY AREA �M San Francisco San Mateo Santa Cruz NORTH CENTRAL COAST Attainment Air Basin County SOUTH CENTRAL C OAST Source Date: October 2018 Air Quality Planning and Science Division *Oil*" SOUTH COAST 411 GREAT BASIN VALLEYS 206 Miles SAN DIEGO COUNTY - SALTON SEA C-16 TABLE 6 California Ambient Air Quality Standards Area Designation for Sulfur Dioxide* " The area designated for sulfur dioxide is a county or portion of a county C-17 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X " The area designated for sulfur dioxide is a county or portion of a county C-17 De[ Norte NORTH COAST FIGURE 7 LAKE COUNTY SACRAMENTOf,:zf;i! VALLEY''''.,: :z:. 'Botta::::: ''•..Glenn' • �� • ,. ;Sierra.,:?;; Nevada Yuba ..:;. • '..:>::::: Placer' Sonoma SAN FRANCISCO BAY AREA �a San Francisco San Mateo Solano 'JSan`- Contra Crista'':, oaquin:.. • .Alameda - 'Stanislaus Santa :.. Clara ''d: Merced 2018 Area Designations for State Ambient Air Quality Standards SULFATES N 50 100 200 Miles MOUNTAIN COUNTIES LAKE TAHOE Santa Cruz NORTH CENTRAL COAST Attainment Air Basin County GREAT BASIN VALLEYS SOUTH CENTRAL COAST Source Date: October 2018 Air Quality Planning and Science Division n Bernardino.. SOUTH COAST 4 SAN DIEGO COUNTY C-18 SALTON SEA TABLE 7 California Ambient Air Quality Standards Area Designation for Sulfates C-19 N U A N U A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X C-19 FIGURE 8 Del Norte• Modoc Srskiyou NORTHEAST= NORTH COAST Huthboldt Trinit • y Shasta .Tehama SACRAMENTO VALLEY.'- :Lassen LAKE COUNTY Sierra :' Nevada Colusa "Yuba "Placer E! Dorado'. Sonoma Alpine tNapar Solanoq - Calaveras # Tuolumne San Joaquin .,. 2018 Area Designations for State Ambient Air Quality Standards LEAD 50 ti 100 MOUNTAIN COUNTIES LAKE TAHOE SAN FRANCISCO BAY AREA San Francisco Alameda ' > Stanislaus Mariposa San Mateo Madera Fresno`-; SAN JOAQUIN VALLEY Tulare Kings 45ant Clara :Merced Santa'Cruz. San `Bonito `.;. NORTH CENTRAL Monterey.... COAST 3; Attainment Air Basin County GREAT BASIN VALLEYS San Luis Obispo SOUTH CENTRAL COAST 4qo;op� SOUTH COAST Santa Barbara �! Ventur Source Date, October 2018 Air Quality Planning and Science Division Los Angeles.':: 200 Miles MOJAVE DESERT. San Bernardino WO Orange SAN DIEGO COUNTY C-20 'i Riverside,L San Diego. ;'lrriporial I'.'. SALTON SEA TABLE 8 California Ambient Air Quality Standards Area Designations for Lead (particulate)* " The area designated for lead is a county or portion of a county. Since all areas in the State are in attainment for this standard, air basins are indicated here for simplicity. C-21 N U A N U A GREAT BASIN VALLEYS AIR BASIN X SALTON SEA AIR BASIN X LAKE COUNTY AIR BASIN X SAN DIEGO AIR BASIN X LAKE TAHOE AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOJAVE DESERT AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SACRAMENTO VALLEY AIR BASIN X " The area designated for lead is a county or portion of a county. Since all areas in the State are in attainment for this standard, air basins are indicated here for simplicity. C-21 Del, Siskiyou Norte Modoc NORTHEAST PLATEAU NORTH:::, Humboldt Lassen LAKE COUNTY Geyser Geothermal S• onoma Tehema SACRAMENTO. VALLEY Mendocino Plumas Sierra Nevada Colusa Yuba Placer Sutter Yolo Napa Sac Solano SAN FRANCISCO BAY AREA Marin FIGURE 9 2018 Area Designations for State Ambient Air Quality Standards HYDROGEN SULFIDE 0 50 100 200 MOUNTAIN COUNTIES LAKE TAHOE El Dorado San Francisco San Mateo Santa Cruz Alpine City of Sutter Creek Contra Joaauin n Tuolumne Costa 9 Alameda Stan slaws Mariposa Calaveras NORTH CENTRAL COAST Unclassified Attainment Nonattainment Air Basin County Santa Clara Morio;.., Merced GREAT BASI N VALLEYS Hiles Madera SAN JOAQUIN VALLEY Fresno A San Benito Monterey SOUTH CENTRAL COAST Source Date: October 2018 Air Quality Planning and Science Division i. Luis Obisp Kings Tulare IMI+4,+ Santa �F?,Barbara ^: Ventura Los Angeles Searles Valley MOJAVE DESERT San Bemardino SOUTH COAS IMP • 14. Orange Riverside San Diego Imperial SAN DIEGO COUNTY C-22 SALTON SEA TABLE 9 California Ambient Air Quality Standards Area Designation for Hydrogen Sulfide* " The area designated for hydrogen sulfide is a county or portion of a county (1) 52 Federal Register 29384 (August 7, 1987) (2) California Code of Regulations, title 17, section 60200(d) C-23 N NA -T U A N NA -T U A GREAT BASIN VALLEYS AIR BASIN NORTH CENTRAL COAST AIR BASIN X Alpine County X NORTH COAST AIR BASIN Inyo County X Del Norte County X Mono County X Humboldt County X LAKE COUNTY AIR BASIN X Mendocino County X LAKE TAHOE AIR BASIN X Sonoma County (portion) MOJAVE DESERT AIR BASIN - Geyser Geothermal Area (2) X Kern County (portion) X - Remainder of County X Los Angeles County (portion) X Trinity County X Riverside County (portion) X NORTHEAST PLATEAU AIR BASIN X San Bernardino County (portion) SACRAMENTO VALLEY AIR BASIN X - Searles Valley Planning Area (1) X SALTON SEA AIR BASIN X - Remainder of County X SAN DIEGO AIR BASIN X MOUNTAIN COUNTIES AIR BASIN SAN FRANCISCO BAY AREA AIR BASIN X Amador County SAN JOAQUIN VALLEY AIR BASIN X - City of Sutter Creek X SOUTH CENTRAL COAST AIR BASIN - Remainder of County X San Luis Obispo County X Calaveras County X Santa Barbara County X El Dorado County (portion) X Ventura County X Mariposa County X SOUTH COAST AIR BASIN X Nevada County X Placer County (portion) X Plumas County X Sierra County X Tuolumne County X " The area designated for hydrogen sulfide is a county or portion of a county (1) 52 Federal Register 29384 (August 7, 1987) (2) California Code of Regulations, title 17, section 60200(d) C-23 jiDel? Norte NORTH COAST FIGURE 10 Siskiyou Modac NORTHEAST PLATEAU Humboldt LAKE COUNTY Trinity Lassen Sonom SAN FRANCISCO BAY AREA Marin San Francisco 2018 Area Designations for State Ambient Air Quality Standards VISIBILITY REDUCING PARTICLES 50 100 200 Sierra — MOUNTAINCOUNTIES Nevada Placer LAKE TAHOE Colusa Yuba Sutter Yolo El Dorado Napa Sac AdormaAlpine Solana Calaveras San Tuolumne Mono Joaquin St• laus • Mariposa San Mateo Contra Costa Alameda Santa Clara Merced GREAT BASI N VALLEYS Miles Santa Cruz NORTH CENTRAL COAST San Benito Unclassified Attainment Air Basin County Monterey San Luis Obispo SOUTH CENTRAL COAST Source Date: October 2018 Air Quality Planning and Science Division Santa Barbara MOJAVE DESERT Ventura SOUTH COAS 114 San Bernardino 11/4 SAN DIEGO COUNTY C-24 SALTON SEA TABLE 10 California Ambient Air Quality Standards Area Designation for Visibility Reducing Particles C-25 N NA -T U A N NA -T U A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SALTON SEA AIR BASIN X LAKE TAHOE AIR BASIN X SAN DIEGO AIR BASIN X MOJAVE DESERT AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X C-25 Area Designations for the National Ambient Air Quality Standards The following maps and tables show the area designations for each pollutant with a national ambient air quality standard. Additional information about the federal area designations is available on the U.S. EPA website: https://www.epa.gov/green-book Over the last several years, U.S. EPA has been reviewing the levels of the various national standards. The agency has already promulgated new standard levels for some pollutants and is considering revising the levels for others. Information about the status of these reviews is available on the U.S. EPA website: https://www.epa.gov/criteria-air-pollutants Designation Categories Suspended Particulate Matter (PM,o). The U.S. EPA uses three categories to designate areas with respect to PMio: • Attainment • Nonattainment • Unclassifiable Ozone, Fine Suspended Particulate Matter (PM2.5), Carbon Monoxide (CO), and Nitrogen Dioxide (NO2). The U.S. EPA uses two categories to designate areas with respect to these standards: • Nonattainment • Unclassifiable/Attainment The national 1 -hour ozone standard was revoked effective June 15, 2005, and the area designations map reflects the 2015 national 8 -hour ozone standard of 0.070 ppm. Original designations were finalized on August 3, 2018. On December 14, 2012, the U.S. EPA established a new national annual primary PM2.5 standard of 12.0 µg/m3. New area designations reflecting this revised standard became final in December 2014. The current designation map reflects the most recently revised (2012) annual average standard of 12.0 fag/m3 as well as the 24-hour standard of 35 pg/m3, revised in 2006. On January 22, 2010, the U.S. EPA established a new national 1 -hour NO2standard of 100 parts per billion (ppb) and retained the annual average standard of 53 ppb. Designations for the primary NO2 standard became effective on February 29, 2012. All areas of California meet this standard. Sulfur Dioxide (SO2). The U.S. EPA uses three categories to designate areas with respect to the 24-hour and annual average sulfur dioxide standards. These designation categories are: • Nonattainment, • Unclassifiable, and • Attainment/Unclassifiable. On June 2, 2010, the U.S. EPA established a new primary 1 -hour SO2 standard of 75 parts per billion (ppb). At the same time, U.S. EPA revoked the 24-hour and annual C-26 average standards. Area designations for the 1 -hour SO2 standard were finalized on December 21, 2017 and are reflected in the area designations map. Lead (particulate). The U.S. EPA promulgated a new rolling 3 -month average lead standard in October 2008 of 0.15 pg/m3. Designations were made for this standard in November 2010. Designation Areas From time to time, the boundaries of the California air basins have been changed to facilitate the planning process. CARB generally initiates these changes, and they are not always reflected in the U.S. EPA's area designations. For purposes of consistency, the maps in this attachment reflect area designation boundaries and nomenclature as promulgated by the U.S. EPA. In some cases, these may not be the same as those adopted by CARB. For example, the national area designations reflect the former Southeast Desert Air Basin. In accordance with Health and Safety Code section 39606.1, CARB redefined this area in 1996 to be the Mojave Desert Air Basin and Salton Sea Air Basin. The definitions and boundaries for all areas designated for the national standards can be found in Title 40, Code of Federal Regulations (CFR), Chapter I, Subchapter C, Part 81.305. They are available on the web at: https://ecfr. io/Title-40/se40.20.81_ 1305 C-27 Del Norte NORTH COAST Siskiyou NORTHEAST Modoc. PLATEAU FIGURE 11 Area Designations for National Ambient Air Quality Standards 8 -HOUR OZONE Humboldt Lassen Tuscan Buttes Mendocino Tehama SACRAMENTO VALLEY Plumas Glenn LAKE COUNTY Colusa uba SutFer Sierra Nevada 50 N a 100 150 200 Sutter Buttes MOUNTAIN COUNTIES LAKE TAHOE El Dorado Sonoma SAN FRANCISCO BAY AREA Marin Alpine San Francisca Contra Costa wv Alameda San Joaquin Calaveras Tuolumne Mariposa GREAT BASIN VALLEYS San Mateo Santa Clara Santa Cruz NORTH CENTRAL COAST San Benito Monterey Miles Antelope Valley and Western Mojave Desert San Lois Obispo J 4 Vii+ -••;.yia :%%►�►"iti• Sand I� A"� A '+� Barbara �i}�►iei :+'�i++i+40, *0++++SOUTHEAST DESERT 4 •4 4 _i4 ti:•• • . • SOUTH CENTRAL COAST Unclassified/Attainment Nonattainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division S Bernardino SOUTH COAST C-28 Orang SAN DIEGO Valley �j�++��+r��►+++ Coachella San Diego Impenal4��►++�4• TABLE 11 National Ambient Air Quality Standards Area Designations for 8 -Hour Ozone* * Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. NOTE: This map and table reflect the 2015 8 -hour ozone standard of 0.070 ppm. (1) South Central Coast Air Basin Channel Islands: Santa Barbara County includes Santa Cruz, San Miguel, Santa Rosa, and Santa Barbara Islands. Ventura County includes Anacapa and San Nicolas Islands. South Coast Air Basin: Los Angeles County includes San Clemente and Santa Catalina Islands. (2) For this purpose, the Sacramento Metro Area comprises all of Sacramento and Yolo Counties, the Sacramento Valley Air Basin portion of Solano County, the southern portion of Sutter County, and the Sacramento Valley and Mountain Counties Air Basins portions of Placer and El Dorado counties. C-29 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN (cont.) LAKE COUNTY AIR BASIN X Yolo County (2) X LAKE TAHOE AIR BASIN X Yuba County X MOUNTAIN COUNTIES AIR BASIN SAN DIEGO COUNTY X Amador County X SAN FRANCISCO BAY AREA AIR BASIN X Calaveras County X SAN JOAQUIN VALLEY AIR BASIN X El Dorado County (portion) (2) X SOUTH CENTRAL COAST AIR BASIN (1) Mariposa County X San Luis Obispo County Nevada County - Eastern San Luis Obispo County X - Western Nevada County X - Remainder of County X - Remainder of County X Santa Barbara County X Placer County (portion) (2) X Ventura County Plumas County X - Area excluding Anacapa and San Nicolas Islands X Sierra County X - Channel Islands (1) X Tuolumne County X SOUTH COAST AIR BASIN (1) X NORTH CENTRAL COAST AIR BASIN X SOUTHEAST DESERT AIR BASIN NORTH COAST AIR BASIN X Kern County (portion) X NORTHEAST PLATEAU AIR BASIN X - Indian Wells Valley X SACRAMENTO VALLEY AIR BASIN Imperial County X Butte County X Los Angeles County (portion) X Colusa County X Riverside County (portion) Glenn County X - Coachella Valley X Sacramento Metro Area (2) X - Non-AQMA portion X Shasta County X San Bernardino County Sutter County - Western portion (AQMA) X - Sutter Buttes X - Eastern portion (non-AQMA) X - Southern portion of Sutter County (2) X - Remainder of Sutter County X Tehama County - Tuscan Buttes X - Remainder of Tehama County X * Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. NOTE: This map and table reflect the 2015 8 -hour ozone standard of 0.070 ppm. (1) South Central Coast Air Basin Channel Islands: Santa Barbara County includes Santa Cruz, San Miguel, Santa Rosa, and Santa Barbara Islands. Ventura County includes Anacapa and San Nicolas Islands. South Coast Air Basin: Los Angeles County includes San Clemente and Santa Catalina Islands. (2) For this purpose, the Sacramento Metro Area comprises all of Sacramento and Yolo Counties, the Sacramento Valley Air Basin portion of Solano County, the southern portion of Sutter County, and the Sacramento Valley and Mountain Counties Air Basins portions of Placer and El Dorado counties. C-29 Del Norte NORTH COAST Humboldt LAKE COON Siskiycu i Medoc NORTHEAST PLATEAU Trinity Lassen Tehema SACRAMENTO VALLEY/ Mendocino Glenn Butte Sonoma Napa SAN FRANCISCOtic BAY AREA Marin Solana Contra San Francisco Costa c Alameda'.-' Stanislaus „ San Mateo Santa Clara ;:,Merced FIGURE 12 Area Designations for National Ambient Air Quality Standards PM10 MOUNTAI N COUNTIES Alpine ti 0 100 150 200 Miles LAKE TAHOE Sacramento County Mono Basin Mammoth Lake GREAT BASI N VALLEYS Santa Cruz NORTH CENTRAL COAST Unclassified Attainment Nonattainment Air Basin County SOUTH CENTRAL COAST Source Date: October 2016 Air Quaiity Planning and Science Division 44c30=0 - SOUTH COAST Vih SAN DIEGO COUNTY C-30 TABLE 12 National Ambient Air Quality Standards Area Designations for Suspended Particulate Matter (PM10)* * Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. (1) Air quality in Sacramento County meets the national PM10 standards. The request for redesignation to attainment was approved by U.S. EPA in September 2013. (2) U.S. EPA designation puts the Sacramento Valley Air Basin portion of Placer County in the Mountain Counties Air Basin. (3) Air quality in Coachella Valley meets the national PM10 standards. A request for redesignation to attainment has been submitted to U.S. EPA. C-31 N U A N U A GREAT BASIN VALLEYS AIR BASIN SAN DIEGO COUNTY X Alpine County X SAN FRANCISCO BAY AREA AIR BASIN X Inyo County SAN JOAQUIN VALLEY AIR BASIN X - Owens Valley Planning Area X SOUTH CENTRAL COAST AIR BASIN X - Coso Junction X SOUTH COAST AIR BASIN X - Remainder of County X SOUTHEAST DESERT AIR BASIN Mono County Eastern Kern County - Mammoth Lake Planning Area X - Indian Wells Valley X Mono Lake Basin X - Portion within San Joaquin Valley Planning- Area X - Remainder of County X - Remainder of County X LAKE COUNTY AIR BASIN X Imperial County LAKE TAHOE AIR BASIN X - Imperial Valley Planning Area X MOUNTAIN COUNTIES AIR BASIN - Remainder of County X Placer County (portion) (2) X Los Angeles County (portion) X Remainder of Air Basin X Riverside County (portion) NORTH CENTRAL COAST AIR BASIN X Coachella Valley (3) X NORTH COAST AIR BASIN X - Non-AQMA portion X NORTHEAST PLATEAU AIR BASIN X San Bernardino County SACRAMENTO VALLEY AIR BASIN - Trona X Butte County X - Remainder of County X Colusa County X Glenn County X Placer County (portion) (2) X Sacramento County (1) X Shasta County X Solano County (portion) X Sutter County X Tehama County X Yolo County X Yuba County X * Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. (1) Air quality in Sacramento County meets the national PM10 standards. The request for redesignation to attainment was approved by U.S. EPA in September 2013. (2) U.S. EPA designation puts the Sacramento Valley Air Basin portion of Placer County in the Mountain Counties Air Basin. (3) Air quality in Coachella Valley meets the national PM10 standards. A request for redesignation to attainment has been submitted to U.S. EPA. C-31 NORTH COAST FIGURE 13 Del Norte Siskiyou Modoc NORTHEAST PLATEAU Area Designations for National Ambient Air Quality Standards PM2.5 Lassen LAKE COUNTY Mendocino 0 50 105 150 200 MOUNTAIN COUNTIES LAKE TAHOE El Dorado SAN FRANCISCO BAY AREA '1`SrEi Contra CostaR►,S 9 n San MateoStanislaus Alpine ♦ Sacramento-�+.. 3 /Amador ,Solano' . r Calaveras an Joa ui Tuolumne NORTH CENTRAL COAST Mariposa GREAT BASIN VALLEYS Miles Santa Clara Santa Cruz Merced Fresno San Benito Monterey SOUTH CENTRAL COAST Unclassified/Attainment Nonattainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division Santa Barbara y040, *tv SOUTHEAST DESERT Los Angeles Ventura San Bernardino SOUTH COAST Nit San Diego Imperial SAN DIEGO COUNTY C-32 TABLE 13 National Ambient Air Quality Standards Area Designations for Fine Particulate Matter (PM2.5)* " Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. This map reflects the 2006 24- hour PM2.5 standard as well as the 1997 and 2012 PM2.5 annual standards. (1) For this purpose, Sacramento Metro Area comprises all of Sacramento and portions of El Dorado, Placer, Solano, and Yolo Counties. Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. (2) Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. (3) Those lands of the Santa Rosa Band of Cahulla Mission Indians in Riverside County are designated Unclassifiable/Attainment. (4) That portion of Imperial County encompassing the urban and surrounding areas of Brawley, Calexico, El Centro, Heber, Holtville, Imperial, Seeley, and Westmorland. Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. C-33 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SAN DIEGO COUNTY X LAKE COUNTY AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN (2) X LAKE TAHOE AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X MOUNTAIN COUNTIES AIR BASIN SOUTH CENTRAL COAST AIR BASIN X Plumas County SOUTH COAST AIR BASIN (3) X - Portola Valley Portion of Plumas X SOUTHEAST DESERT AIR BASIN - Remainder of Plumas County X Imperial County (portion) (4) X Remainder of Air Basin X Remainder of Air Basin X NORTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SACRAMENTO VALLEY AIR BASIN Sacramento Metro Area (1) X Sutter County X Yuba County (portion) X Remainder of Air Basin X " Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. This map reflects the 2006 24- hour PM2.5 standard as well as the 1997 and 2012 PM2.5 annual standards. (1) For this purpose, Sacramento Metro Area comprises all of Sacramento and portions of El Dorado, Placer, Solano, and Yolo Counties. Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. (2) Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. (3) Those lands of the Santa Rosa Band of Cahulla Mission Indians in Riverside County are designated Unclassifiable/Attainment. (4) That portion of Imperial County encompassing the urban and surrounding areas of Brawley, Calexico, El Centro, Heber, Holtville, Imperial, Seeley, and Westmorland. Air quality in this area meets the national PM2.5 standards. A Determination of Attainment for the 2006 24-hour PM2.5 standard was made by U.S. EPA in June 2017. C-33 Del Norte Siskiyou Madoc NORTHEAST NORTH PLATEAU C OAST Humboldt LAKE COUNTY Trinity Tehama SACRAMENTO VALLEY- endocino Sonoma SAN FRANCISCO BAY AREA Marin Glenn Butte olusa Sutter Yolo San Franoisco l San Mateo Santa Cruz Solana Sac Contra San Costa Joaquin lameda Stanislaus Lassen Plumas Sierra evada El Dorado Amador Calaveras NORTH CENTRAL COAST Santa Clara Merced San enito Monterey FIGURE 14 Area Designations for National Ambient Air Quality Standards CARBON MONOXIDE 0 50 MOUNTAIN COUNTIES LAKE TAHOE Alpine Tuolumne Mariposa Madera Mono SAN JOAQUIN Fresno VALLEY Kings Tulare ti 100 150 200 Miles GREAT BASIN VALLEYS inyo SOUTH CENTRAL COAST Unclassified/Attainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division San Luis Obispo Santa Barbara Kern Ventura Los Angeles SOUTH COAST SOUTHEAST DESERT San Bernardino Orange Riverside SAN DIEGO COUNTY C-34 San Diego imperial TABLE 14 National Ambient Air Quality Standards Area Designations for Carbon Monoxide* " Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. C-35 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SAN DIEGO COUNTY X LAKE TAHOE AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SOUTHEAST DESERT AIR BASIN X " Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. C-35 Del Norte Siskiyou NORTHEASTModoc NORTH PLATEAU COAST Lassen FIGURE 15 Area Designations for National Ambient Air Quality Standards NITROGEN DIOXIDE MOUNTAIN COUNTIES LAKE TAHOE LAKE COUNTY ti 0 50 100 150 200 Miles Sonom SAN FRANCISCO BAY AREA Marin San Francisco San Mateo GREAT BASIN VALLEYS Santa Cruz NORTH CENTRAL COAST SOUTH CENTRAL COAST Unclassified/Attainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division SOUTH COAST SAN DIEGO COUNTY C-36 TABLE 15 National Ambient Air Quality Standards Area Designations for Nitrogen Dioxide* * Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. C-37 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SACRAMENTO VALLEY AIR BASIN X LAKE COUNTY AIR BASIN X SAN DIEGO COUNTY X LAKE TAHOE AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SOUTHEAST DESERT AIR BASIN X * Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. C-37 Del Nort NORTH COAST Humboldt LAKE COUNTY Siskiyou NORTHEAST Modoc PLATEAU olusa Yuba Sutter Yolo Napa Sonoma' SAN FRANCISCO Sac Lassen Ne ada Placer Amad87 Solano alave as BAY AREA Marin `t Contra San Tuolumne Mono GREAT San Francisco Costa oa ui BASIN Alameda tanislau Mariposa VALLEYS FIGURE 16 Area Designations for National Ambient Air Quality Standards SULFUR DIOXIDE NA 0 50 100 150 200 Miles MOUNTAIN COUNTIES LAKE TAHOE San Mateo Santa Cruz NORTH CENTRAL COAST Merced San Benito Monterey Madera SAN JOAQUIN Fresno VALLEY San Luis Obispo SOUTH CENTRAL COAST Unclassified/Attainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division Kings Tulare Kern Ingo Los Angeles SOUTH COAST SOUTHEAST DESERT Orange SAN DIEGO COUNTY C-38 San Bernardino Riverside San Diego Emperial TABLE 16 National Ambient Air Quality Standards Area Designations for Sulfur Dioxide* " Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. NOTE: This map and table reflect the 2010 1 -hour SO2 standard of 75 ppb. (1) South Central Coast Air Basin Channel Islands: Santa Barbara County includes Santa Cruz, San Miguel, Santa Rosa, and Santa Barbara Islands. Ventura County includes Anacapa and San Nicolas Islands. Note that the San Clemente and Santa Catalina Islands are considered part of Los Angeles County, and therefore, are included as part of the South Coast Air Basin. C-39 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SOUTH CENTRAL COAST AIR BASIN LAKE COUNTY AIR BASIN X San Luis Obispo County X LAKE TAHOE AIR BASIN X Santa Barbara County X MOUNTAIN COUNTIES AIR BASIN X Ventura County X NORTH CENTRAL COAST AIR BASIN X Channel Islands (1) X NORTH COAST AIR BASIN X SOUTH COAST AIR BASIN X NORTHEAST PLATEAU AIR BASIN X SOUTHEAST DESERT AIR BASIN SACRAMENTO VALLEY AIR BASIN X Imperial County X SAN DIEGO COUNTY X Remainder of Air Basin X SAN FRANCISCO BAY AREA AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN Fresno County X Kern County (portion) X Kings County X Madera County X Merced County X San Joaquin County X Stanislaus County X Tulare County X " Definitions and references for all areas can be found in 40 CFR, Chapter I, Part 81.305. NOTE: This map and table reflect the 2010 1 -hour SO2 standard of 75 ppb. (1) South Central Coast Air Basin Channel Islands: Santa Barbara County includes Santa Cruz, San Miguel, Santa Rosa, and Santa Barbara Islands. Ventura County includes Anacapa and San Nicolas Islands. Note that the San Clemente and Santa Catalina Islands are considered part of Los Angeles County, and therefore, are included as part of the South Coast Air Basin. C-39 Del Norte Siskiyou Modoc NORTHEAST NORTH PLATEAU COAST Humboldt Lassen FIGURE 17 endocin Tehama SACRAMENTO VALLEY- Plumas Glenn Butte LAKE COUNTY Area Designations for National Ambient Air Quality Standards LEAD MOUNTAIN COUNTIES LAKE TAHOE l: 0 50 100 150 200 Miles El Dorado Sonoma SAN FRANCISCO BAY AREA Mari San Francisco San Mateo Santa Cruz Sac Amador Calaveras Tuolumne Solano Costa lamed. Stanislaus Alpine Mariposa GREAT BASI N VALLEYS Merced NORTH CENTRAL COAST Sa enito Madera SAN JOAQUIN Fresno VALLEY Monterey Kings Tulare San Luis Obispo SOUTH CENTRAL COAST Unclassified/Attainment Nonattainment Air Basin County Source Date: October 2018 Air Quality Planning and Science Division Santa Barbara Ventura SOUTHEAST DESERT San Bernardino SOUTH COAST Riverside San Diego Imperial SAN DIEGO COUNTY C-40 TABLE 17 National Ambient Air Quality Standards Area Designations for Lead (particulate) (1) Portion of County in Air Basin, not including Channel Islands C-41 N U/A N U/A GREAT BASIN VALLEYS AIR BASIN X SAN DIEGO COUNTY X LAKE COUNTY AIR BASIN X SAN FRANCISCO BAY AREA AIR BASIN X LAKE TAHOE AIR BASIN X SAN JOAQUIN VALLEY AIR BASIN X MOUNTAIN COUNTIES AIR BASIN X SOUTH CENTRAL COAST AIR BASIN X NORTH CENTRAL COAST AIR BASIN X SOUTH COAST AIR BASIN NORTH COAST AIR BASIN X Los Angeles County (portion) (1) X NORTHEAST PLATEAU AIR BASIN X Remainder of Air Basin X SACRAMENTO VALLEY AIR BASIN X SOUTHEAST DESERT AIR BASIN X (1) Portion of County in Air Basin, not including Channel Islands C-41 Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.1: CALEEMOD PHASE A CRUSHING EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Phase A Crushing - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 768.47 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2024 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2024 Land Use - Construction Phase - Phase A Crushing anticipated to start Quarter 3 of 2023 and end Quarter 4 of 2024 Off-road Equipment - Type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. This model assumed use of Sandvik QJ331 which has a horsepower of 350. Trips and VMT - Crushing activities will occur anywhere onsite within the grading limits. Demolition - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblConstructionPhase tblConstructionPhase tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics tblTripsAndVMT Column Name Default Value New Value • NumDays 1• 500.00 Y t T • PhaseEndDate 5/30/2025 • Y• HorsePower r 85.00 . it Y• OffRoadEquipmentType T r Y• OffRoadEquipmentUnitAmount 1.00 T Y•OffRoadEquipmentUnitAmount 3.00 . Y• OffRoadEquipmentUnitAmount 2.00 T 0.00 -.•• i- 1270.91270.9 T 768.47 Y 1 1. 390.00 HaulingTripNumber 68,419.00 12/27/2024 350.00 Crushing/Proc. Equipment 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •i 1.1851 5.9130 5.1960 0.0243 38.2257 0.2024 38.4281 5.7906 0.2024 5.9930 • 0.0000 ' 2,758.609 2,758.609 0.1064 0.0000 2,761.269 PM10 6 6 I 5 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2024 .1 1.1267 5.1903 5.1818 0.0243 38.2257 0.1687 38.3944 5.7906 0.1687 5.9593 • 0.0000 i 2,757.813 2,757.813 0.1015 0.0000 2,760.351 2 2 7 2 2 • Maximum Maximum 1.1851 5.9130 5.1960 0.0243 38.2257 0.2024 38.4281 5.7906 0.2024 5.9930 0.0000 2,758.609 2,758.609 0.1064 0.0000 2,761.269 1 1 6 6 6 5 5 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •i 1.1851 5.9130 5.1960 0.0243 14.9234 0.2024 15.1257 2.2624 1 0.2024 2.4648 • 0.0000 2,758.609 2,758.609 0.1064 0.0000 2,761.269 PM10 • 6 6 1 5 Total J J J J J J J J . J J J T 2024 •i 1.1267 5.1903 5.1818 0.0243 14.9234 0.1687 15.0920 2.2624 0.1687 2.4311 • 0.0000 i 2,757.813 2,757.813 0.1015 0.0000 2,760.351 2 2 7 Maximum 1.1851 5.9130 5.1960 0.0243 14.9234 0.2024 15.1257 2.2624 0.2024 2.4648 0.0000 2,758.609 2,758.609 0.1064 0.0000 2,761.269 0.00 1 Reduction 6 6 5 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.96 0.00 60.67 60.93 0.00 59.04 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 15 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 10.9849 4.3000e- 0.0472 0.0000 1 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 9� 004 004 004 004 004 : 004 J J J J J J J J 4 J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . f J J J .1 J J J J 4 J J J T Mobile •I 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 4.3000e- 10.9849 4.3000e- 0.0472 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9849 4.3000e- I 0.0472 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 •i J .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 10.9849 4.3000e- 0.0472 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :7/1/2023 :12/27/2024 390: Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type i Demolition :Concrete/Industrial Saws Demolition :Crushing/Proc. Equipment Demolition Demolition :Excavators :Rubber Tired Dozers Amount 0 1 0 IUsage Hours I Horse Power I Load Factor 0: 8.001 81: 0.73 8.001 350: 0.78 8.001 158: 0.38 r 8.00: 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 1' 3.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix .HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Demolition - 2023 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust 9 38.2006 0.0000 1 38.2006 5.7839 i 0.0000 5.7839 • 0.0000 0.0000 f J J J J J J J J ; J J J T Off -Road 9 1.1748 5.9079 5.1231 0.0241 0.2022 0.2022 0.2022 0.2022 • i 2,736.300 2,736.300 0.1059 2,738.948 • 5 5 7 Total 1.1748 5.9079 5.1231 0.0241 38.2006 0.2022 38.4029 5.7839 0.2022 5.9862 2,736.300 2,736.300 0.1059 2,738.948 5 5 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 15 3.2 Demolition - 2023 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 7 1 Worker •1 0.0102 5.0800e- 0.0730 2.2000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- • i 22.3091 22.3091 4.7000e- 22.3209 5.1231 0.0241 003 004 004 003 004 003 • 004 Total 2.2557 0.0102 5.0800e- 0.0730 2.2000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- 22.3091 22.3091 4.7000e- 22.3209 003 5 004 004 7 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.8983 0.0000 I 14.8983 2.2557 1 0.0000 2.2557 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 1.1748 5.9079 5.1231 0.0241 0.2022 0.2022 0.2022 0.2022 • 0.0000 2,736.300 2,736.300 0.1059 2,738.948 5 5 1 7 Total 1.1748 5.9079 5.1231 0.0241 14.8983 0.2022 15.1005 2.2557 0.2022 2.4580 0.0000 2,736.300 2,736.300 0.1059 2,738.948 5 5 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 15 3.2 Demolition - 2023 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 1 1 • 1 41 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 5.1856 41 Worker •1 0.0102 5.0800e- 0.0730 2.2000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- • i 22.3091 22.3091 4.7000e- 22.3209 0.1685 38.3692 003 004 004 003 004 003 • 004 Total 0.0102 5.0800e- 0.0730 2.2000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- 22.3091 22.3091 4.7000e- 22.3209 5 5 003 004 004 003 004 003 004 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 38.2006 0.0000 38.2006 5.7839 1 0.0000 5.7839 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 1.1171 5.1856 5.1134 0.0241 0.1685 0.1685 0.1685 0.1685 • 2,736.300 2,736.300 0.1011 2,738.828 • • 5 5 1 3 Total 1.1171 5.1856 5.1134 0.0241 38.2006 0.1685 38.3692 5.7839 0.1685 5.9525 2,736.300 2,736.300 0.1011 2,738.828 ii 5 5 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 15 3.2 Demolition - 2024 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 3 1 Worker • 9.6300e- 4.6100e- 0.0684 2.2000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- • i 21.5127 21.5127 4.3000e- 21.5234 5.1134 0.0241 003 003 004 004 003 004 003 • 004 Total 2.2557 9.6300e- 4.6100e- 0.0684 2.2000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 21.5127 21.5127 4.3000e- 21.5234 003 003 5 004 004 3 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.8983 0.0000 I 14.8983 2.2557 1 0.0000 2.2557 •• i 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road •u 1.1171 5.1856 5.1134 0.0241 0.1685 0.1685 0.1685 0.1685 • 0.0000 2,736.300 2,736.300 0.1011 2,738.828 • • 5 5 1 3 Total 1.1171 5.1856 5.1134 0.0241 14.8983 0.1685 15.0668 2.2557 0.1685 2.4243 0.0000 2,736.300 2,736.300 0.1011 2,738.828 5 5 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 15 3.2 Demolition - 2024 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker • 9.6300e- 4.6100e- 0.0684 2.2000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- i i 21.5127 21.5127 4.3000e- 21.5234 003 003 004 004 003 004 003 • 004 Total 9.6300e- 4.6100e- 0.0684 2.2000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 21.5127 21.5127 4.3000e- 21.5234 003 003 004 004 003 004 003 004 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 : 0.0000 : 0.0000 : 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 I 1 • 1 1 I 1 3 + + + 4. I. + + + ,. + 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 : 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.551648' 0.035769: 0.187848: 0.110184: 0.013450: 0.004660: 0.017552: 0.070120: 0.001413: 0.001134: 0.004476: 0.000905: 0.000840 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.551648' 0.035769: 0.187848: 0.110184: 0.013450: 0.004660: 0.017552: 0.070120: 0.001413: 0.001134: 0.004476: 0.000905: 0.000840 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i 1 . I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9849 1 4.3000e- i 0.0472 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • ei. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9849 • 4.3000e- • 0.0472 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 15 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8400 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3600e- 4.3000e- 0.0472 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0472 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8400 1 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3600e- 4.3000e- 0.0472 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0472 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 15 Date: 1/5/2021 2:54 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Phase A Crushing - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 768.47 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2024 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2024 Land Use - Construction Phase - Phase A Crushing anticipated to start Quarter 3 of 2023 and end Quarter 4 of 2024 Off-road Equipment - Type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. This model assumed use of Sandvik QJ331 which has a horsepower of 350. Trips and VMT - Crushing activities will occur anywhere onsite within the grading limits. Demolition - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblConstructionPhase tblConstructionPhase tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics tblTripsAndVMT • NumDays 500.00 • 390.00 Y t T • PhaseEndDate 5/30/2025 12/27/2024 • Y• HorsePower r 85.00 T• 350.00 r Y t T • OffRoadEquipmentType Crushing/Proc. Equipment Y t T • OffRoadEquipmentUnitAmount 1.00 0.00 Y t T • OffRoadEquipmentUnitAmount 3.00 • 0.00 Y t T • OffRoadEquipmentUnitAmount 2.00 0.00 Y t T • CO2lntensityFactor 1270.9 768.47 Y 1 1. • HaulingTripNumber 68,419.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •4 1.1847 5.9131 5.1825 0.0243 38.2257 0.2024 38.4281 5.7906 0.2024 5.9930 • 0.0000 ' 2,756.327 2,756.327 0.1063 0.0000 2,758.985 PM10 0 0 I 5 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2024 .1 1.1264 5.1904 5.1690 0.0243 38.2257 0.1687 38.3944 5.7906 0.1687 5.9593 • 0.0000 i 2,755.609 2,755.609 0.1015 0.0000 2,758.146 1 1 4 1 1 • Maximum Maximum 1.1847 5.9131 5.1825 0.0243 38.2257 0.2024 38.4281 5.7906 0.2024 5.9930 0.0000 2,756.327 2,756.327 0.1063 0.0000 2,758.985 1 1 0 0 0 5 5 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •i 1.1847 5.9131 5.1825 0.0243 14.9234 0.2024 15.1257 2.2624 1 0.2024 2.4648 • 0.0000 2,756.327 2,756.327 0.1063 0.0000 2,758.985 PM10 • 0 0 1 5 Total J J J J J J J J . J J J T 2024 •i 1.1264 5.1904 5.1690 0.0243 14.9234 0.1687 15.0920 2.2624 0.1687 2.4311 • 0.0000 i 2,755.609 2,755.609 0.1015 0.0000 2,758.146 1 1 4 Maximum 1.1847 5.9131 5.1825 0.0243 14.9234 0.2024 15.1257 2.2624 0.2024 2.4648 0.0000 2,756.327 2,756.327 0.1063 0.0000 2,758.985 0.00 1 Reduction 0 0 5 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.96 0.00 60.67 60.93 0.00 59.04 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 15 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9849 4.3000e- I 0.0472 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 Area IP' •i 10.9849 4.3000e- 0.0472 0.0000 1 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 Energy 9� 004 004 004 004 004 : 004 . J J J J J J J J 4 J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • f J J J .1 J J J J 4 J J J T Mobile 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.7000e- 10.9849 4.3000e- 0.0472 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9849 4.3000e- I 0.0472 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 •i J .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 10.9849 4.3000e- 0.0472 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :7/1/2023 :12/27/2024 390: Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type i Demolition :Concrete/Industrial Saws Demolition :Crushing/Proc. Equipment Demolition Demolition :Excavators :Rubber Tired Dozers Amount 0 1 0 IUsage Hours I Horse Power I Load Factor 0: 8.001 81: 0.73 8.001 350: 0.78 8.001 158: 0.38 r 8.00: 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 1' 3.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix .HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Demolition - 2023 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust 9 38.2006 0.0000 1 38.2006 5.7839 i 0.0000 5.7839 • 0.0000 0.0000 f J J J J J J J J ; J J J T Off -Road 9 1.1748 5.9079 5.1231 0.0241 0.2022 0.2022 0.2022 0.2022 • i 2,736.300 2,736.300 0.1059 2,738.948 • 5 5 7 Total 1.1748 5.9079 5.1231 0.0241 38.2006 0.2022 38.4029 5.7839 0.2022 5.9862 2,736.300 2,736.300 0.1059 2,738.948 5 5 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 15 3.2 Demolition - 2023 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 • 1 1 7 41 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 5.1231 1 14.8983 41 Worker • 9.8600e- 5.2500e- 0.0595 2.0000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- • i 20.0265 20.0265 4.1000e- 20.0368 0.2022 2.4580 003 003 004 004 003 004 003 • 004 Total 0.1059 9.8600e- 5.2500e- 0.0595 2.0000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- 20.0265 20.0265 4.1000e- 5 20.0368 003 003 004 004 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 14.8983 0.0000 I 14.8983 2.2557 1 0.0000 2.2557 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 1.1748 5.9079 5.1231 0.0241 0.2022 0.2022 0.2022 0.2022 • 0.0000 2,736.300 2,736.300 0.1059 2,738.948 5 5 1 7 Total 1.1748 5.9079 5.1231 0.0241 14.8983 0.2022 15.1005 2.2557 0.2022 2.4580 0.0000 2,736.300 2,736.300 0.1059 2,738.948 5 5 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 15 3.2 Demolition - 2023 Mitigated Construction Off -Site Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road 9 1 1 • 1 41 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 5.1856 41 Worker • 9.8600e- 5.2500e- 0.0595 2.0000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- • i 20.0265 20.0265 4.1000e- 20.0368 0.1685 38.3692 003 003 004 004 003 004 003 • 004 Total 9.8600e- 5.2500e- 0.0595 2.0000e- 0.0251 1.5000e- 0.0253 6.6600e- 1.3000e- 6.7900e- 20.0265 20.0265 4.1000e- 20.0368 5 003 003 004 004 003 004 003 004 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 38.2006 0.0000 38.2006 5.7839 1 0.0000 5.7839 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 1.1171 5.1856 5.1134 0.0241 0.1685 0.1685 0.1685 0.1685 • 2,736.300 2,736.300 0.1011 2,738.828 • • 5 5 1 3 Total 1.1171 5.1856 5.1134 0.0241 38.2006 0.1685 38.3692 5.7839 0.1685 5.9525 2,736.300 2,736.300 0.1011 2,738.828 ii 5 5 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 15 3.2 Demolition - 2024 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 3 1 1.1171 .1 .1 I - Worker • 9.3100e- 4.7600e- 0.0556 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- • i 19.3087 19.3087 3.8000e- 19.3181 14.8983 0.1685 003 003 004 004 003 004 003 • 004 Total 2.4243 9.3100e- 4.7600e- 0.0556 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 19.3087 19.3087 3.8000e- 19.3181 003 003 004 3 004 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.8983 0.0000 I 14.8983 2.2557 1 0.0000 2.2557 •• i 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road •u 1.1171 5.1856 5.1134 0.0241 0.1685 0.1685 0.1685 0.1685 • 0.0000 2,736.300 2,736.300 0.1011 2,738.828 • • 5 5 1 3 Total 1.1171 5.1856 5.1134 0.0241 14.8983 0.1685 15.0668 2.2557 0.1685 2.4243 0.0000 2,736.300 2,736.300 0.1011 2,738.828 5 5 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 15 3.2 Demolition - 2024 Mitigated Construction Off -Site Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker • 9.3100e- 4.7600e- 0.0556 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- i i 19.3087 19.3087 3.8000e- 19.3181 003 003 004 004 003 004 003 • 004 Total 9.3100e- 4.7600e- 0.0556 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 19.3087 19.3087 3.8000e- 19.3181 003 003 004 004 003 004 003 004 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 : 0.0000 : 0.0000 : 0.0000 i 0.0000 � 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 � 0.0000 : 0.0000 i i 0.0000 '� , 1 9 I 1 1 1 1 1 I 1 1 1 I • 1 I. + + + 4. I. + + + ,. + 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 : 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.551648' 0.035769: 0.187848: 0.110184: 0.013450: 0.004660: 0.017552: 0.070120: 0.001413: 0.001134: 0.004476: 0.000905: 0.000840 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.551648' 0.035769: 0.187848: 0.110184: 0.013450: 0.004660: 0.017552: 0.070120: 0.001413: 0.001134: 0.004476: 0.000905: 0.000840 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i 1 . I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9849 1 4.3000e- i 0.0472 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • ei. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9849 • 4.3000e- • 0.0472 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 15 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8400 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3600e- 4.3000e- 0.0472 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0472 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8400 1 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3600e- 4.3000e- 0.0472 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0472 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 15 Date: 1/5/2021 2:53 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.2: CALEEMOD PHASE A GRADING & TANK CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Phase A Grading - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Construction Phase - Phase A Grading anticipated to start Quarter 4 of 2023 and end Quarter 3 of 2025 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming Maximum Daily Disturbed Acreage of 5 acres. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblAreaCoating tblConstructionPhase tblGrading tblOffRoadEquipment tblProjectCharacteristics 1 Column Name Area_Parking • • • • Default Value New Value NumDays AcresOfGrading OffRoadEquipmentUnitAmount CO2lntensityFactor 1209576 775.00 1,823.50 2.00 1270.9 1214016 521.00 2,605.00 0.00 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •i 3.9756 41.7273 28.5623 0.0730 1 11.4919 1.6713 13.1632 3.9272 1.5376 5.4648 • 0.0000 ' 7,073.595 7,073.595 2.2428 1 0.0000 7,129.665 •1 .1 ; 7 7 i 2 J J J .1 J J J J w J .1 .1 J .1 J .1 .1 le .1 .1 J 2024 •i 3.8427 39.0074 28.1124 0.0730 11.4919 1.5720 13.0640 3.9272 1.4463 5.3734 • 0.0000 i 7,066.935 7,066.935 2.2421 0.0000 7,122.986 1 1 7 J J J J J J J J w J .1 .1 J .1 J .1 .1 le .1 .1 J 2025 •i 3.4450 33.2161 26.5020 0.0729 11.4919 1.3326 12.8245 3.9272 1.2260 5.1531 • 0.0000 7,058.379 7,058.379 2.2409 0.0000 7,114.4014 • 2 2 Maximum 3.9756 41.7273 28.5623 0.0730 11.4919 1.6713 13.1632 3.9272 1.5376 5.4648 0.0000 7,073.595 7,073.595 2.2428 0.0000 7,129.665 11 7,129.665 7 7 7 7 2 2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •i 3.9756 41.7273 , 28.5623 0.0730 : 4.5839 1.6713 1 6.2552 1.5587 1.5376 3.0963 • 0.0000 7,073.595 7,073.595 2.2428 1 0.0000 7,129.665 •1 7 7 2 J J J .1 J J J J w J J J 2024 •i 3.8427 39.0074 28.1124 0.0730 4.5839 1.5720 6.1560 1.5587 1.4463 3.0050 • 0.0000 7,066.935 7,066.935 2.2421 0.0000 7,122.986 1 1 7 J J J J J J J J w J J J 2025 •i 3.4450 33.2161 26.5020 0.0729 4.5839 1.3326 5.9165 1.5587 1.2260 2.7846 • 0.0000 7,058.379 7,058.379 2.2409 0.0000 7,114.4014 • 2 2 Maximum 3.9756 41.7273 28.5623 0.0730 4.5839 1.6713 6.2552 1.5587 1.5376 3.0963 0.0000 7,073.595 7,073.595 2.2428 0.0000 7,129.665 7 7 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.11 0.00 53.07 60.31 0.00 44.43 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 18 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 10.9989 4.3000e- 0.0471 0.0000 I : 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- I 0.1079 0.1013 0.1013 2.6000e- 1 0.1079 9004 1 004 004 004 004 : 004 9004 004 004 004 004 ; J .1 .1 J .1 J .1 .1 .1 .1 J Energy •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J .1 J .1 .1 J .1 J .1 .1 .1 .1 J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total Mobile 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.0000 0.1013 0.1013 2.6000e- 0.0000 0.1079 0.1013 0.1013 004 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area •i 10.9989 4.3000e- 1 0.0471 0.0000 I 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 1 0.1079 9004 004 004 004 004 ; 004 J J J .1 J J J J w J J .1 Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J w J J J Mobile 9 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 i 0.0000 Total 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Grading •Grading :10/1/2023 :9/29/2025 521 : Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 2605 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Grading Grading Grading Grading Grading Offroad Equipment Type I Amount :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers 2 2 1 1 2 1- Grading :Tractors/Loaders/Backhoes 0: Usage Hours I Horse Power I Load Factor 8.001 212: 0.43 t -1- 8.001 8.00 i 158: 0.38 -1- 8.001 187: 0.41 t -1- 8.001 8.00 i 247: 0.40 -1- 8.001 367: 0.48 t 8.00 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Grading 8' 20.00' 0.00' 0.00' 11.00 5.40' 20.00:LD_Mix :HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Grading - 2023 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust :i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 : 0.0000 0.0000 Off -Road •1 3.9073 41.6934 28.0758 0.0715 1.6703 1.6703 1.5367 1.5367 • 6,924.868 6,924.868 2.2396 6,980.859 • 2 2 i 3 Total 3.9073 41.6934 28.0758 0.0715 11.3246 1.6703 12.9949 3.8828 1.5367 5.4195 6,924.868 6,924.868 2.2396 6,980.859 2 2 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2023 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 3 1 Worker •1 0.0683 0.0339 0.4864 1.4900e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 • i 148.7275 148.7275 3.1400e- 148.8059 28.0758 0.0715 003 004 004 • 003 Total 1.5143 0.0683 0.0339 0.4864 1.4900e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 148.7275 148.7275 3.1400e- 148.8059 2 003 004 3 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 • Off -Road 9 3.9073 41.6934 28.0758 0.0715 1.6703 1.6703 1.5367 1.5367 • 0.0000 6,924.868 6,924.868 2.2396 6,980.859 2 2 1 3 Total 3.9073 41.6934 28.0758 0.0715 4.4166 1.6703 6.0869 1.5143 1.5367 3.0510 0.0000 6,924.868 6,924.868 2.2396 6,980.859 2 2 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2023 Mitigated Construction Off -Site 3.2 Grading - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 2 1 Worker •1 0.0683 0.0339 0.4864 1.4900e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 • i 148.7275 148.7275 3.1400e- 148.8059 27.6567 0.0715 003 004 004 • 003 Total 3.8828 0.0683 0.0339 0.4864 1.4900e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 148.7275 148.7275 3.1400e- 148.8059 0 003 004 2 004 003 3.2 Grading - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 1 0.0000 3.8828 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 3.7784 38.9767 27.6567 0.0715 1.5711 1.5711 1.4454 1.4454 • 6,923.517 6,923.517 2.2392 6,979.497 • • 0 0 1 2 Total 3.7784 38.9767 27.6567 0.0715 11.3246 1.5711 12.8957 3.8828 1.4454 5.3282 6,923.517 6,923.517 2.2392 6,979.497 0 0 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 2 1 Worker •1 0.0642 0.0307 0.4557 1.4400e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 • i 143.4181 143.4181 2.8600e- 143.4896 27.6567 0.0715 003 004 004 • 003 Total 1.5143 0.0642 0.0307 0.4557 1.4400e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 143.4181 143.4181 2.8600e- 143.4896 0 003 004 2 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 3.7784 38.9767 27.6567 0.0715 1.5711 1.5711 1.4454 1.4454 • 0.0000 6,923.517 6,923.517 2.2392 6,979.497 • • 0 0 1 2 Total 3.7784 38.9767 27.6567 0.0715 4.4166 1.5711 5.9877 1.5143 1.4454 2.9597 0.0000 6,923.517 6,923.517 2.2392 6,979.497 0 0 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2024 Mitigated Construction Off -Site 3.2 Grading - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0642 0.0307 0.4557 1.4400e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 • i 143.4181 143.4181 2.8600e- 143.4896 26.0793 0.0715 003 004 004 • 003 Total 3.8828 0.0642 0.0307 0.4557 1.4400e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 143.4181 143.4181 2.8600e- 143.4896 6 003 004 0 004 003 3.2 Grading - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 1 0.0000 3.8828 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 0 41 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 26.0793 1 4.4166 41 Worker •1 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 • i 137.6727 137.6727 2.5900e- 137.7374 1.2251 2.7394 003 004 004 • 003 Total 2.2383 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 137.6727 137.6727 2.5900e- 6 137.7374 0 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 1 .J J J J .1 J J .1 .1 J 1. Off -Road .1 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 J .1 .1 .1 .1 .1 .1 J Worker 9 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 i i 137.6727 137.6727 2.5900e- 137.7374 003 004 004 • 003 Total 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 137.6727 137.6727 2.5900e- 137.7374 003 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 : 0.0000 : 0.0000 : 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 I 1 • 1 1 I 1 I. + + + 4. I. + + + ,. + 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 : 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9989 1 4.3000e- i 0.0471 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • el. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9989 • 4.3000e- • 0.0471 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 18 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8541 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8541 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 18 Date: 1/6/2021 9:07 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Phase A Grading - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Construction Phase - Phase A Grading anticipated to start Quarter 4 of 2023 and end Quarter 3 of 2025 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming Maximum Daily Disturbed Acreage of 5 acres. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblAreaCoating tblConstructionPhase tblGrading tblOffRoadEquipment tblProjectCharacteristics 1 Column Name Area_Parking • • • • Default Value New Value NumDays AcresOfGrading OffRoadEquipmentUnitAmount CO2lntensityFactor 1209576 775.00 1,823.50 2.00 1270.9 1214016 521.00 2,605.00 0.00 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •4 3.9731 41.7284 1 28.4724 0.0729 1 11.4919 1.6713 13.1632 3.9272 1.5376 5.4648 • 0.0000 ' 7,058.378 7,058.378 2.2424 1 0.0000 7,114.4382 :1 3 3 J J J .1 J J J J w J .1 .1 J .1 J .1 .1 le .1 .1 J 1. 2024 •i 3.8405 39.0084 28.0273 0.0728 11.4919 1.5720 13.0640 3.9272 1.4463 5.3734 • 0.0000 i 7,052.241 7,052.241 2.2417 0.0000 7,108.284 4 4 3 J J J J J J J J w J .1 .1 J .1 J .1 .1 le .1 .1 J 1. 2025 •i 3.4431 33.2170 26.4227 0.0727 11.4919 1.3326 12.8245 3.9272 1.2260 5.1531 • 0.0000 7,044.282 7,044.282 2.2406 0.0000 7,100.296 • 0 0 i 4 Maximum 3.9731 41.7284 28.4724 0.0729 11.4919 1.6713 13.1632 3.9272 1.5376 5.4648 0.0000 7,058.378 7,058.378 2.2424 0.0000 7,114.438 11 2.2424 0.0000 7,114.438 1 3 3 2 3 2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2023 •i 3.9731 41.7284 28.4724 0.0729 : 4.5839 1.6713 6.2552 1.5587 1.5376 3.0963 • 0.0000 7,058.378 7,058.378 2.2424 1 0.0000 7,114.4382 •1 1 •1 . 3 3 J J J .1 J J J J w J J .1 2024 •i 3.8405 39.0084 28.0273 0.0728 4.5839 1.5720 6.1560 1.5587 1.4463 3.0050 • 0.0000 7,052.241 7,052.241 2.2417 0.0000 7,108.284 4 4 3 J J J J J J J J w J J J 2025 •i 3.4431 33.2170 26.4227 0.0727 4.5839 1.3326 5.9165 1.5587 1.2260 2.7846 • 0.0000 7,044.282 7,044.282 2.2406 0.0000 7,100.296 0 0 4 • Maximum 3.9731 41.7284 28.4724 0.0729 4.5839 1.6713 6.2552 1.5587 1.5376 3.0963 0.0000 7,058.378 7,058.378 2.2424 0.0000 7,114.438 1 3 3 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.11 0.00 53.07 60.31 0.00 44.43 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 18 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 10.9989 4.3000e- 0.0471 0.0000 I : 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- I 0.1079 0.1013 0.1013 2.6000e- 1 0.1079 9004 1 004 004 004 004 : 004 9004 004 004 004 004 ; J .1 .1 J .1 J .1 .1 .1 .1 J Energy •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J .1 J .1 .1 J .1 J .1 .1 .1 .1 J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total Mobile 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.0000 0.1013 0.1013 2.6000e- 0.0000 0.1079 0.1013 0.1013 004 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area •i 10.9989 4.3000e- 1 0.0471 0.0000 I 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 1 0.1079 9004 004 004 004 004 ; 004 J J J .1 J J J J w J J .1 Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J w J J J Mobile 9 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 i 0.0000 Total 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Grading •Grading :10/1/2023 :9/29/2025 521 : Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 2605 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Grading Grading Grading Grading Grading Offroad Equipment Type I Amount :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers 2 2 1 1 2 1- Grading :Tractors/Loaders/Backhoes 0: Usage Hours I Horse Power I Load Factor 8.001 212: 0.43 I _ 8.001 158: 0.38 8.001 187: 0.41 I _ 8.001 247: 0.40 8.001 367: 0.48 t 8.00 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Grading 8' 20.00' 0.00' 0.00' 11.00 5.40' 20.00:LD_Mix :HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Grading - 2023 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust :i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 : 0.0000 0.0000 Off -Road •1 3.9073 41.6934 28.0758 0.0715 1.6703 1.6703 1.5367 1.5367 • 6,924.868 6,924.868 2.2396 6,980.859 • 2 2 i 3 Total 3.9073 41.6934 28.0758 0.0715 11.3246 1.6703 12.9949 3.8828 1.5367 5.4195 6,924.868 6,924.868 2.2396 6,980.859 2 2 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2023 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 3 1 3.9073 .1 .1 I - Worker •1 0.0657 0.0350 0.3966 1.3400e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 • i 133.5101 133.5101 2.7600e- 133.5790 4.4166 1.6703 003 004 004 • 003 Total 3.0510 0.0657 0.0350 0.3966 1.3400e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 133.5101 133.5101 2.7600e- 133.5790 2 2 003 3 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 • Off -Road 9 3.9073 41.6934 28.0758 0.0715 1.6703 1.6703 1.5367 1.5367 • 0.0000 6,924.868 6,924.868 2.2396 6,980.859 2 2 1 3 Total 3.9073 41.6934 28.0758 0.0715 4.4166 1.6703 6.0869 1.5143 1.5367 3.0510 0.0000 6,924.868 6,924.868 2.2396 6,980.859 2 2 3 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 18 3.2 Grading - 2023 Mitigated Construction Off -Site Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 2 1 Worker •1 0.0657 0.0350 0.3966 1.3400e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 • i 133.5101 133.5101 2.7600e- 133.5790 27.6567 0.0715 003 004 004 • 003 Total 3.8828 0.0657 0.0350 0.3966 1.3400e- 0.1673 9.7000e- 0.1683 0.0444 8.9000e- 0.0453 133.5101 133.5101 2.7600e- 133.5790 0 003 004 2 004 003 3.2 Grading - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 1 0.0000 3.8828 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 3.7784 38.9767 27.6567 0.0715 1.5711 1.5711 1.4454 1.4454 • 6,923.517 6,923.517 2.2392 6,979.497 • • 0 0 1 2 Total 3.7784 38.9767 27.6567 0.0715 11.3246 1.5711 12.8957 3.8828 1.4454 5.3282 6,923.517 6,923.517 2.2392 6,979.497 0 0 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 2 1 Worker •1 0.0620 0.0317 0.3706 1.2900e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 • i 128.7244 128.7244 2.5100e- 128.7872 27.6567 0.0715 003 004 004 • 003 Total 1.5143 0.0620 0.0317 0.3706 1.2900e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 128.7244 128.7244 2.5100e- 128.7872 0 003 004 2 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 3.7784 38.9767 27.6567 0.0715 1.5711 1.5711 1.4454 1.4454 • 0.0000 6,923.517 6,923.517 2.2392 6,979.497 • • 0 0 1 2 Total 3.7784 38.9767 27.6567 0.0715 4.4166 1.5711 5.9877 1.5143 1.4454 2.9597 0.0000 6,923.517 6,923.517 2.2392 6,979.497 0 0 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 18 3.2 Grading - 2024 Mitigated Construction Off -Site Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0620 0.0317 0.3706 1.2900e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 • i 128.7244 128.7244 2.5100e- 128.7872 26.0793 0.0715 003 004 004 • 003 Total 3.8828 0.0620 0.0317 0.3706 1.2900e- 0.1673 9.6000e- 0.1683 0.0444 8.8000e- 0.0453 128.7244 128.7244 2.5100e- 128.7872 6 003 004 0 004 003 3.2 Grading - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 1 0.0000 3.8828 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker 9 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 • i 123.5754 123.5754 2.2800e- 123.6324 26.0793 0.0715 003 004 004 • 003 Total 1.5143 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 123.5754 123.5754 2.2800e- 123.6324 6 003 004 0 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 1 .J J J J .1 J J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 18 3.2 Grading - 2025 Mitigated Construction Off -Site Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 J .1 .1 .1 .1 .1 .1 J Worker 9 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 i i 123.5754 123.5754 2.2800e- 123.6324 003 004 004 • 003 Total 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 123.5754 123.5754 2.2800e- 123.6324 003 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 I 1 I. + + + 4. I. + + + ,. + 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 : 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9989 1 4.3000e- i 0.0471 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • el. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9989 • 4.3000e- • 0.0471 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 18 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8541 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8541 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 18 Date: 1/6/2021 9:06 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.3: CALEEMOD WELL #1 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #1 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Construction Phase - Construction of Well #1 anticipated to start and end Quarter 4 2025 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 747.71 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 11.1292 97.7465 139.2205 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 • 0.0000 ' 25,454.76 25,454.76 7.1087 0.0000 25,632.48 • • 36 36 I 17 Maximum 11.1292 97.7465 139.2205 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 0.0000 25,454.76 25,454.76 7.1087 0.0000 25,632.48 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 36 36 17 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 11.1292 97.7465 139.2205 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 • 0.0000 25,454.76 25,454.76 7.1087 0.0000 25,632.48 PM10 36 36 1 17 Maximum 11.1292 97.7465 139.2205 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 0.0000 25,454.76 25,454.76 7.1087 0.0000 25,632.48 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 36 36 17 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 1.0200e- 0.0000 ' 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :�003 005 003 003 003 005 003 • Energy J J J .1 J J J J • J J .1 T 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J • J J .1 T Mobile •1 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J •• .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description • 1 •Site Preparation Site Preparation 110/1/2025 110/14/2025 1 5: 10: I. I i 1 I 1 i r 2 :Trenching :Grading 110/15/2025 112/10/2025 1 5: 41 i r t -r r— 4---r 3 :Building Construction •Building Construction :12/11/2025 .12/31/2025 5' 15. Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description • 1 •Site Preparation Site Preparation 110/1/2025 110/14/2025 1 5: 10: I. I i 1 I 1 i r 2 :Trenching :Grading 110/15/2025 112/10/2025 1 5: 41 i r t -r r— 4---r 3 :Building Construction •Building Construction :12/11/2025 .12/31/2025 5' 15. Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation Site Preparation Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Trenching Trenching Trenching Trenching Trenching Trenching :Aerial Lifts :Bore/Drill Rigs :Graders 1 :Other Construction Equipment +Tractors/Loaders/Backhoes :Aerial Lifts :Bore/Drill Rigs :Cranes : Dumpers/Tenders :Forklifts :Generator Sets :Off -Highway Trucks :Other Construction Equipment :Pumps +Tractors/Loaders/Backhoes :Aerial Lifts :Bore/Drill Rigs +Concrete/Industrial Saws :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers 1 16.001 1 16.001 0 8.001 6 16.001 1 16.001 1 ' 1 24.001 1 24.001 0 4.001 1 24.001 0 6.001 1 24.001 ' 1 24.001 7 24.001 1 24.001 2 24.001 1 24.001 1 24.001 0 8.001 1 24.001 4 24.001 0 1.001 1- Trenching :Tractors/Loaders/Backhoes 0: 6.00 63: 221: 187: 172: 97: 63: 221: 231: 16: 89: 84: 402: 172: 84: 97: 63: 221: 81: 402: 172: 247: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 0.37 0.31 0.50 0.73 0.38 0.42 0.40 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Building Construction Trenching • 9; 23.00: 15: 4.00. 0.00 2.001 � r 7' 18.00' 0.00' 0.00 i 0.00 i 4. 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0697 0.0322 0.4861 1.5900e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 • i 158.3236 158.3236 2.9800e- 158.3980 0.1028 0.4136 003 003 004 • 003 Total 1.8052 0.0697 0.0322 0.4861 1.5900e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 158.3236 158.3236 2.9800e- 158.3980 4 4 003 003 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 1 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2025 Mitigated Construction Off -Site 3.3 Trenching - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0697 0.0322 0.4861 1.5900e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 • i 158.3236 158.3236 2.9800e- 158.3980 1.0605 2.2314 003 003 004 • 003 Total 2.1674 0.0697 0.0322 0.4861 1.5900e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 158.3236 158.3236 2.9800e- 158.3980 50 50 003 16 003 004 003 3.3 Trenching - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 123.9054 123.9054 2.3300e- 123.9637 0.4136 2.2314 003 004 004 • 003 Total 2.0976 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 123.9054 123.9054 2.3300e- 123.9637 50 50 003 16 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 123.9054 123.9054 2.3300e- 123.9637 4.4818 003 004 004 • 003 Total 4.1745 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 123.9054 123.9054 2.3300e- 123.9637 25 25 003 29 004 004 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor • 2.9200e- 0.1250 0.0233 4.2000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 44.1065 44.1065 : 2.5900e- 44.1713 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0121 5.5900e- 0.0845 2.8000e- 0.0335 1.9000e- 0.0337 8.8800e- 1.7000e- 9.0500e- • i 27.5345 27.5345 5.2000e- 27.5475 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0150 0.1305 0.1078 7.0000e- 0.0435 2.9000e- 0.0438 0.0118 2.7000e- 0.0120 71.6410 71.6410 3.1100e- 71.7188 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •1 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.9200e- 0.1250 0.0233 4.2000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0121 5.5900e- 0.0845 2.8000e- 0.0335 1.9000e- 0.0337 8.8800e- 1.7000e- 9.0500e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 44.1065 44.1065 : 2.5900e- 44.1713 1 003 J .1 J -I- i 27.5345 27.5345 5.2000e- 27.5475 004 Total 0.0150 0.1305 0.1078 7.0000e- 004 0.0435 2.9000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 71.6410 71.6410 3.1100e- 003 71.7188 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 '� , 1 9 I 1 1 1 1 1 I 1 1 1 1 I • 1 3 + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:13 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #1 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Construction Phase - Construction of Well #1 anticipated to start and end Quarter 4 2025 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 747.71 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 11.1290 97.7447 139.2087 0.2641 1.2529 4.4821 4.5256 0.1656 4.1748 4.1865 • 0.0000 ' 25,450.03 25,450.03 7.1090 0.0000 25,627.75 • • 25 25 I 63 Maximum 11.1290 97.7447 139.2087 0.2641 1.2529 4.4821 4.5256 0.1656 4.1748 4.1865 0.0000 25,450.03 25,450.03 7.1090 0.0000 25,627.75 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 25 25 63 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 11.1290 97.7447 1 139.2087 0.2641 0.6060 4.4821 4.5256 0.0957 4.1748 4.1865 . 0.0000 25,450.03 25,450.03 7.1090 0.0000 25,627.75 PM10 25 25 1 63 Maximum 11.1290 97.7447 139.2087 0.2641 0.6060 4.4821 4.5256 0.0957 4.1748 4.1865 0.0000 25,450.03 25,450.03 7.1090 0.0000 25,627.75 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 25 25 63 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2025 110/14/2025 5: 10: i 11011512025 2 -Trenching +Grading 112/102025 Y r— —r ---r 3 :Building Construction :Building Construction :12/11/2025 :12/31/2025 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2025 110/14/2025 5: 10: i 11011512025 2 -Trenching +Grading 112/102025 Y r— —r ---r 3 :Building Construction :Building Construction :12/11/2025 :12/31/2025 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation Site Preparation Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Trenching Trenching Trenching Trenching Trenching Trenching :Aerial Lifts :Bore/Drill Rigs :Graders 1 :Other Construction Equipment +Tractors/Loaders/Backhoes :Aerial Lifts :Bore/Drill Rigs :Cranes : Dumpers/Tenders :Forklifts :Generator Sets :Off -Highway Trucks :Other Construction Equipment :Pumps +Tractors/Loaders/Backhoes :Aerial Lifts :Bore/Drill Rigs +Concrete/Industrial Saws :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers 1 16.001 1 16.001 0 8.001 6 16.001 1 16.001 1 ' 1 24.001 1 24.001 0 4.001 1 24.001 0 6.001 1 24.001 ' 1 24.001 7 24.001 1 24.001 2 24.001 1 24.001 1 24.001 0 8.001 1 24.001 4 24.001 o 1.001 1- Trenching :Tractors/Loaders/Backhoes 0: 6.00 63: 221: 187: 172: 97: 63: 221: 231: 16: 89: 84: 402: 172: 84: 97: 63: 221: 81: 402: 172: 247: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 0.37 0.31 0.50 0.73 0.38 0.42 0.40 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Building Construction Trenching • 9; 23.00: 15: 4.00. 0.00 2.001 � r 7' 18.00' 0.00' 0.00 i 0.00 i 4. 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker 9 0.0675 0.0332 0.3949 1.4200e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 • i 142.1117 142.1117 2.6200e- 142.1772 0.1028 0.4136 003 003 004 • 003 Total 1.8052 0.0675 0.0332 0.3949 1.4200e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 142.1117 142.1117 2.6200e- 142.1772 4 4 003 003 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 1 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2025 Mitigated Construction Off -Site 3.3 Trenching - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0675 0.0332 0.3949 1.4200e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 • i 142.1117 142.1117 2.6200e- 142.1772 1.0605 2.2314 003 003 004 • 003 Total 2.1674 0.0675 0.0332 0.3949 1.4200e- 0.1924 1.0800e- 0.1935 0.0510 9.9000e- 0.0520 142.1117 142.1117 2.6200e- 142.1772 50 50 003 16 003 004 003 3.3 Trenching - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 111.2179 111.2179 2.0500e- 111.2691 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 111.2179 111.2179 2.0500e- 111.2691 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 111.2179 111.2179 2.0500e- 111.2691 4.4818 003 004 004 • 003 Total 4.1745 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 111.2179 111.2179 2.0500e- 111.2691 25 25 003 29 004 004 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 3.1100e- 0.1229 0.0273 4.0000e- 0.0100 1.1000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 42.1949 42.1949 : 2.8900e- 42.2670 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0117 5.7700e- 0.0687 2.5000e- 0.0335 1.9000e- 0.0337 8.8800e- 1.7000e- 9.0500e- • i 24.7151 24.7151 4.6000e- 24.7265 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0149 0.1287 0.0960 6.5000e- 004 0.0435 3.0000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 66.9099 66.9099 3.3500e- 003 66.9935 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker •i • •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 3.1100e- 0.1229 0.0273 4.0000e- 0.0100 1.1000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0117 5.7700e- 0.0687 2.5000e- 0.0335 1.9000e- 0.0337 8.8800e- 1.7000e- 9.0500e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 42.1949 42.1949 : 2.8900e- 42.2670 1 003 J .1 J -I- i 24.7151 24.7151 4.6000e- 24.7265 004 Total 0.0149 0.1287 0.0960 6.5000e- 004 0.0435 3.0000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 66.9099 66.9099 3.3500e- 003 66.9935 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 '� , 1 9 I 1 1 1 1 1 I 1 1 1 1 I • 1 3 + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.554334' 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:12 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.4: CALEEMOD WELL #2 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #2 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 726.95 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2026 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2026 Land Use - Construction Phase - Construction of Well #2 anticipated to start and end Quarter 3 2026 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 726.95 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 11.1285 97.7448 139.2141 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 • 0.0000 ' 25,453.46 25,453.46 7.1086 0.0000 25,631.18 • • 81 81 I 33 Maximum 11.1285 97.7448 139.2141 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 0.0000 25,453.46 25,453.46 7.1086 0.0000 25,631.18 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 81 81 33 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 11.1285 97.7448 139.2141 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 • 0.0000 25,453.46 25,453.461 7.1086 0.0000 25,631.18 PM10 81 81 1 33 Maximum 11.1285 97.7448 139.2141 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 0.0000 25,453.46 25,453.46 7.1086 0.0000 25,631.18 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 81 81 33 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 1.0200e- 0.0000 ' 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :�003 005 003 003 003 005 003 • Energy J J J .1 J J J J • J J .1 T 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J • J J .1 T Mobile •1 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J •• .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2026 :7/14/2026 5: 10: i J7/15/2026 2 •Trenching +Grading : r___,__, 3 :Building Construction •Building Construction :9/10/2026 :9/30/2026 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2026 :7/14/2026 5: 10: i J7/15/2026 2 •Trenching +Grading : r___,__, 3 :Building Construction •Building Construction :9/10/2026 :9/30/2026 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0661 0.0294 0.4533 1.5300e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 • i 152.5549 152.5549 2.7100e- 152.6228 0.1028 0.4136 003 003 004 • 003 Total 1.8052 0.0661 0.0294 0.4533 1.5300e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 152.5549 152.5549 2.7100e- 152.6228 4 4 003 003 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 1 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2026 Mitigated Construction Off -Site 3.3 Trenching - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0661 0.0294 0.4533 1.5300e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 • i 152.5549 152.5549 2.7100e- 152.6228 0.1474 1.0605 003 003 004 • 003 Total 2.0529 0.0661 0.0294 0.4533 1.5300e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 152.5549 152.5549 2.7100e- 152.6228 50 50 003 003 004 003 3.3 Trenching - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 1 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 48.8936 .1 .1 I - Worker •1 0.0517 0.0230 0.3548 1.2000e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 • i 119.3908 119.3908 2.1200e- 119.4439 2.2314 2.6450 003 004 004 • 003 Total 0.0000 0.0517 0.0230 0.3548 1.2000e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 119.3908 119.3908 2.1200e- 119.4439 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2026 Mitigated Construction Off -Site 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 139.1127 .1 .1 I - Worker 9 0.0517 0.0230 0.3548 1.2000e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 • i 119.3908 119.3908 2.1200e- 119.4439 4.4818 003 004 004 • 003 Total 25,383.12 0.0517 0.0230 0.3548 1.2000e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 119.3908 119.3908 2.1200e- 119.4439 25 25 29 003 004 004 003 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor • 2.8500e- 0.1237 0.0226 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 43.8143 43.8143 : 2.5200e- 43.8773 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0115 5.1200e- 0.0788 2.7000e- 0.0335 1.8000e- 0.0337 8.8800e- 1.7000e- 9.0400e- • i 26.5313 26.5313 4.7000e- 26.5431 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0143 0.1289 0.1014 6.8000e- 004 0.0435 2.8000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 70.3456 70.3456 2.9900e- 003 70.4204 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2026 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.8500e- 0.1237 0.0226 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0115 5.1200e- 0.0788 2.7000e- 0.0335 1.8000e- 0.0337 8.8800e- 1.7000e- 9.0400e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.8143 43.8143 : 2.5200e- 43.8773 1 003 J .1 J -I- i 26.5313 26.5313 4.7000e- 26.5431 004 Total 0.0143 0.1289 0.1014 6.8000e- 004 0.0435 2.8000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 70.3456 70.3456 2.9900e- 003 70.4204 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.556393' 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.001115: 0.004429: 0.000881: 0.000745 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.556393' 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.001115: 0.004429: 0.000881: 0.000745 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:23 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #2 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 726.95 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2026 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2026 Land Use - Construction Phase - Construction of Well #2 anticipated to start and end Quarter 3 2026 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 726.95 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 11.1284 97.7430 139.2033 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 • 0.0000 ' 25,448.86 25,448.86 7.1088 0.0000 25,626.58 • • 46 46 I 54 Maximum 11.1284 97.7430 139.2033 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 0.0000 25,448.86 25,448.86 7.1088 0.0000 25,626.58 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 46 46 54 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 11.1284 97.7430 139.2033 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 • 0.0000 25,448.86 25,448.861 7.1088 0.0000 25,626.58 PM10 46 46 1 54 Maximum 11.1284 97.7430 139.2033 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 0.0000 25,448.86 25,448.86 7.1088 0.0000 25,626.58 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 46 46 54 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2026 :7/14/2026 5: 10: i J7/15/2026 2 •Trenching +Grading : r___,__, 3 :Building Construction •Building Construction :9/10/2026 :9/30/2026 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2026 :7/14/2026 5: 10: i J7/15/2026 2 •Trenching +Grading : r___,__, 3 :Building Construction •Building Construction :9/10/2026 :9/30/2026 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road 9 .1 .1 .1 - Vendor Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 4 4 1 98 1 4.3399 .1 .1 .1 - Worker Worker •1 0.0641 0.0304 0.3678 1.3700e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 • i 136.9359 136.9359 2.3900e- 136.9955 0.4136 1.9622 003 003 004 • 003 Total 1.8499 0.0641 0.0304 0.3678 1.3700e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 136.9359 136.9359 2.3900e- 136.9955 4 4 003 98 003 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 • 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 ii 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2026 Mitigated Construction Off -Site 3.3 Trenching - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0641 0.0304 0.3678 1.3700e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 • i 136.9359 136.9359 2.3900e- 136.9955 0.1474 1.0605 003 003 004 • 003 Total 2.0529 0.0641 0.0304 0.3678 1.3700e- 0.1924 1.0500e- 0.1935 0.0510 9.6000e- 0.0520 136.9359 136.9359 2.3900e- 136.9955 50 50 003 003 004 003 3.3 Trenching - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 1 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0502 0.0238 0.2878 1.0700e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 • i 107.1672 107.1672 1.8700e- 107.2139 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0502 0.0238 0.2878 1.0700e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 107.1672 107.1672 1.8700e- 107.2139 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2026 Mitigated Construction Off -Site 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0502 0.0238 0.2878 1.0700e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 • i 107.1672 107.1672 1.8700e- 107.2139 4.4818 003 004 004 • 003 Total 4.1745 0.0502 0.0238 0.2878 1.0700e- 0.1506 8.2000e- 0.1514 0.0400 7.5000e- 0.0407 107.1672 107.1672 1.8700e- 107.2139 25 25 003 29 004 004 003 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 3.0300e- 0.1217 0.0266 4.0000e- 0.0100 1.1000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 41.9271 41.9271 : 2.8000e- 41.9972 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0112 5.2900e- 0.0640 2.4000e- 0.0335 1.8000e- 0.0337 8.8800e- 1.7000e- 9.0400e- • i 23.8149 23.8149 4.2000e- 23.8253 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0142 0.1270 0.0905 6.4000e- 004 0.0435 2.9000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 65.7420 65.7420 3.2200e- 003 65.8225 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2026 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 3.0300e- 0.1217 0.0266 4.0000e- 0.0100 1.1000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0112 5.2900e- 0.0640 2.4000e- 0.0335 1.8000e- 0.0337 8.8800e- 1.7000e- 9.0400e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.9271 41.9271 : 2.8000e- 41.9972 1 003 J .1 J -I- i 23.8149 23.8149 4.2000e- 23.8253 004 Total 0.0142 0.1270 0.0905 6.4000e- 004 0.0435 2.9000e- 004 0.0438 0.0118 2.7000e- 004 0.0120 65.7420 65.7420 3.2200e- 003 65.8225 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.556393' 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.001115: 0.004429: 0.000881: 0.000745 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.556393' 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.001115: 0.004429: 0.000881: 0.000745 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:22 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.5: CALEEMOD WELL #3 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #3 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Construction of Well #3 anticipated to start and end Quarter 2 2027 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 706.2 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2027 •i 11.1278 97.7433 139.2085 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,452.34 25,452.34 7.1085 0.0000 25,630.05 • • 14 14 I 37 Maximum 11.1278 97.7433 139.2085 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,452.34 25,452.34 7.1085 0.0000 25,630.05 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 14 14 37 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2027 •i 11.1278 97.7433 1 139.2085 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,452.34 25,452.34 7.1085 0.0000 25,630.05 PM10 14 14 1 37 Maximum 11.1278 97.7433 139.2085 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,452.34 25,452.34 7.1085 0.0000 25,630.05 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 14 14 37 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 1.0200e- 0.0000 ' 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :�003 005 003 003 003 005 003 • Energy J J J .1 J J J J • J J .1 T 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J • J J .1 T Mobile •1 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J •• .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 14/1/2027 14/14/2027 5: 10: 2 -Trenching :Grading J4/15/2027 16/10/2027 1 5: 41 1 t Y r— —r ---r 3 :Building Construction :Building Construction :6/11/2027 :7/1/2027 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 14/1/2027 14/14/2027 5: 10: 2 -Trenching :Grading J4/15/2027 16/10/2027 1 5: 41 1 t Y r— —r ---r 3 :Building Construction :Building Construction :6/11/2027 :7/1/2027 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road 9 .1 .1 .1 - Vendor Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 4 4 1 98 1 4.3399 .1 .1 .1 - Worker Worker •1 0.0625 0.0270 0.4243 1.4800e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 • i 147.5026 147.5026 2.4800e- 147.5646 0.4136 1.9622 003 004 004 • 003 Total 1.8499 0.0625 0.0270 0.4243 1.4800e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 147.5026 147.5026 2.4800e- 147.5646 4 4 003 98 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 • 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 ii 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2027 Mitigated Construction Off -Site 3.3 Trenching - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0625 0.0270 0.4243 1.4800e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 • i 147.5026 147.5026 2.4800e- 147.5646 1.0605 2.2314 003 004 004 • 003 Total 2.1674 0.0625 0.0270 0.4243 1.4800e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 147.5026 147.5026 2.4800e- 147.5646 50 50 003 16 004 004 003 3.3 Trenching - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 48.8936 1 0.1474 .1 .1 .1 - Worker Worker •1 0.0489 0.0212 0.3320 1.1600e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 • i 115.4369 115.4369 1.9400e- 115.4854 0.0447 2.0529 003 004 004 • 003 Total 14,262.13 0.0489 0.0212 0.3320 1.1600e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 115.4369 115.4369 1.9400e- 115.4854 50 16 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2027 Mitigated Construction Off -Site 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0489 0.0212 0.3320 1.1600e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 • i 115.4369 115.4369 1.9400e- 115.4854 4.4818 003 004 004 • 003 Total 4.1745 0.0489 0.0212 0.3320 1.1600e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 115.4369 115.4369 1.9400e- 115.4854 25 25 003 29 004 004 003 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.7900e- 0.1226 0.0220 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 43.5662 43.5662 : 2.4500e- 43.6274 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0109 4.7000e- 0.0738 2.6000e- 0.0335 1.7000e- 0.0336 8.8800e- 1.6000e- 9.0400e- • i 25.6526 25.6526 4.3000e- 25.6634 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0137 0.1273 0.0958 6.7000e- 0.0435 2.7000e- 0.0438 0.0118 2.6000e- 0.0120 69.2188 69.2188 2.8800e- 69.2908 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2027 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.7900e- 0.1226 0.0220 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0109 4.7000e- 0.0738 2.6000e- 0.0335 1.7000e- 0.0336 8.8800e- 1.6000e- 9.0400e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.5662 43.5662 : 2.4500e- 43.6274 1 003 J .1 J -I- i 25.6526 25.6526 4.3000e- 25.6634 004 Total 0.0137 0.1273 0.0958 6.7000e- 004 0.0435 2.7000e- 004 0.0438 0.0118 2.6000e- 004 0.0120 69.2188 69.2188 2.8800e- 003 69.2908 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:30 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #3 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Construction of Well #3 anticipated to start and end Quarter 2 2027 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name I tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 706.2 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2027 •i 11.1277 97.7414 139.1985 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 • 0.0000 ' 25,447.84 25,447.84 7.1087 0.0000 25,625.56 • • 59 59 i 38 Maximum 11.1277 97.7414 139.1985 0.2641 1.2529 4.4821 4.5256 0.1656 4.1747 4.1865 0.0000 25,447.84 25,447.84 7.1087 0.0000 25,625.56 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 59 59 38 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2027 •i 11.1277 97.7414 1 139.1985 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 • 0.0000 25,447.84 25,447.84 7.1087 0.0000 25,625.56 PM10 59 59 1 38 Maximum 11.1277 97.7414 139.1985 0.2641 0.6060 4.4821 4.5256 0.0957 4.1747 4.1865 0.0000 25,447.84 25,447.84 7.1087 0.0000 25,625.56 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 59 59 38 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 14/1/2027 14/14/2027 5: 10: 2 -Trenching :Grading J4/15/2027 16/10/2027 1 5: 41 1 t Y r— —r ---r 3 :Building Construction :Building Construction :6/11/2027 :7/1/2027 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 14/1/2027 14/14/2027 5: 10: 2 -Trenching :Grading J4/15/2027 16/10/2027 1 5: 41 1 t Y r— —r ---r 3 :Building Construction :Building Construction :6/11/2027 :7/1/2027 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7: 18.00. 0.001 0.00 15: 4.00. 2.00. 0.00: 0.00: 4. 0.00 11.00: 5.40 : 11.00: 5.40: 11.00: 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix :HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0609 0.0279 0.3438 1.3300e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 • i 132.3957 132.3957 2.1800e- 132.4501 0.1028 0.4136 003 004 004 • 003 Total 1.8052 0.0609 0.0279 0.3438 1.3300e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 132.3957 132.3957 2.1800e- 132.4501 4 4 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 1 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2027 Mitigated Construction Off -Site 3.3 Trenching - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0609 0.0279 0.3438 1.3300e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 • i 132.3957 132.3957 2.1800e- 132.4501 1.0605 2.2314 003 004 004 • 003 Total 2.1674 0.0609 0.0279 0.3438 1.3300e- 0.1924 9.9000e- 0.1934 0.0510 9.1000e- 0.0520 132.3957 132.3957 2.1800e- 132.4501 50 50 003 16 004 004 003 3.3 Trenching - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 48.8936 .1 .1 I - Worker •1 0.0476 0.0218 0.2690 1.0400e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 • i 103.6140 103.6140 1.7100e- 103.6566 2.2314 2.6450 003 004 004 • 003 Total 0.0000 0.0476 0.0218 0.2690 1.0400e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 103.6140 103.6140 1.7100e- 103.6566 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2027 Mitigated Construction Off -Site 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 29 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 139.1127 1 .1 .1 .1 - Worker Worker •i 0.0476 0.0218 0.2690 1.0400e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 • i 103.6140 103.6140 1.7100e- 103.6566 4.1745 4.1745 003 004 004 • 003 Total 7.1056 0.0476 0.0218 0.2690 1.0400e- 0.1506 7.8000e- 0.1514 0.0400 7.1000e- 0.0407 103.6140 103.6140 1.7100e- 25 103.6566 29 003 004 004 003 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.9700e- 0.1206 0.0259 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 41.6981 41.6981 : 2.7200e- 41.7661 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0106 4.8500e- 0.0598 2.3000e- 0.0335 1.7000e- 0.0336 8.8800e- 1.6000e- 9.0400e- • i 23.0253 23.0253 3.8000e- 23.0348 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0136 0.1254 0.0857 6.2000e- 0.0435 2.7000e- 0.0438 0.0118 2.6000e- 0.0120 64.7234 64.7234 3.1000e- 64.8010 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2027 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.9700e- 0.1206 0.0259 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0106 4.8500e- 0.0598 2.3000e- 0.0335 1.7000e- 0.0336 8.8800e- 1.6000e- 9.0400e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.6981 41.6981 : 2.7200e- 41.7661 1 003 J .1 J -I- i 23.0253 23.0253 3.8000e- 23.0348 004 Total 0.0136 0.1254 0.0857 6.2000e- 004 0.0435 2.7000e- 004 0.0438 0.0118 2.6000e- 004 0.0120 64.7234 64.7234 3.1000e- 003 64.8010 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:29 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.6: CALEEMOD WELL #4 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #4 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Construction Phase - Construction of Well #4 anticipated to start and end Quarter 1 2028 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 685.44 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1272 97.7419 139.2037 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,451.37 25,451.37 7.1084 0.0000 25,629.08 • • 18 18 I 15 Maximum 11.1272 97.7419 139.2037 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,451.37 25,451.37 7.1084 0.0000 25,629.08 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 18 18 15 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1272 97.7419 139.2037 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,451.37 25,451.37 7.1084 0.0000 25,629.08 PM10 18 18 1 14 Maximum 11.1272 97.7419 139.2037 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,451.37 25,451.37 7.1084 0.0000 25,629.08 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 18 18 14 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2028 :1/14/2028 5: 10: 2 :Trenching :Grading 1111512028 13/13/2028 : 5: 41 1 t r— —r ---r 3 :Building Construction •Building Construction :3/14/2028 :4/3/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2028 :1/14/2028 5: 10: 2 :Trenching :Grading 1111512028 13/13/2028 : 5: 41 1 t r— —r ---r 3 :Building Construction •Building Construction :3/14/2028 :4/3/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 4. 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 40.5797 .1 .1 I - Worker •1 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 143.0966 143.0966 2.2800e- 143.1536 1.9622 2.3758 003 004 004 • 003 Total 0.0000 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 143.0966 143.0966 2.2800e- 143.1536 4 4 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2028 Mitigated Construction Off -Site 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 48.8936 .1 .1 I - Worker •1 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 143.0966 143.0966 2.2800e- 143.1536 2.2314 3.2919 003 004 004 • 003 Total 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 143.0966 143.0966 2.2800e- 143.1536 50 50 003 004 004 003 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 111.9886 111.9886 1.7800e- 112.0332 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 111.9886 111.9886 1.7800e- 112.0332 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2028 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 29 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 139.1127 1 Worker 9 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 111.9886 111.9886 1.7800e- 112.0332 4.4818 003 004 004 • 003 Total 25,383.12 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 111.9886 111.9886 1.7800e- 112.0332 25 25 29 003 004 004 003 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.7400e- 0.1216 0.0216 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 43.3629 43.3629 : 2.3800e- 43.4223 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0103 4.3300e- 0.0694 2.5000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- • i 24.8864 24.8864 4.0000e- 24.8963 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0130 0.1260 0.0910 6.6000e- 0.0435 2.6000e- 0.0438 0.0118 2.5000e- 0.0120 68.2493 68.2493 2.7800e- 68.3186 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.7400e- 0.1216 0.0216 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0103 4.3300e- 0.0694 2.5000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.3629 43.3629 : 2.3800e- 43.4223 1 003 J .1 J -I- i 24.8864 24.8864 4.0000e- 24.8963 004 Total 0.0130 0.1260 0.0910 6.6000e- 004 0.0435 2.6000e- 004 0.0438 0.0118 2.5000e- 004 0.0120 68.2493 68.2493 2.7800e- 003 68.3186 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 '� , 1 9 I 1 1 1 1 1 I 1 1 1 1 I • 1 3 + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041: 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041: 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #4 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Construction Phase - Construction of Well #4 anticipated to start and end Quarter 1 2028 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 685.44 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1271 97.7400 139.1944 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,446.96 25,446.96 7.1086 0.0000 25,624.68 • • 98 98 I 49 Maximum 11.1271 97.7400 139.1944 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,446.96 25,446.96 7.1086 0.0000 25,624.68 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 98 98 49 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1271 97.7400 139.1944 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,446.96 25,446.961 7.1086 0.0000 25,624.68 PM10 98 98 1 48 Maximum 11.1271 97.7400 139.1944 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,446.96 25,446.96 7.1086 0.0000 25,624.68 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 98 98 48 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2028 :1/14/2028 5: 10: 2 :Trenching :Grading 1111512028 13/13/2028 : 5: 41 1 t r— —r ---r 3 :Building Construction •Building Construction :3/14/2028 :4/3/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2028 :1/14/2028 5: 10: 2 :Trenching :Grading 1111512028 13/13/2028 : 5: 41 1 t r— —r ---r 3 :Building Construction •Building Construction :3/14/2028 :4/3/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker 9 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 128.4317 128.4317 2.0000e- 128.4817 0.1028 0.4136 003 004 004 • 003 Total 1.8052 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 128.4317 128.4317 2.0000e- 128.4817 4 4 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2028 Mitigated Construction Off -Site 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 128.4317 128.4317 2.0000e- 128.4817 1.0605 2.2314 003 004 004 • 003 Total 2.1674 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 128.4317 128.4317 2.0000e- 128.4817 50 50 003 16 004 004 003 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 100.5117 100.5117 1.5700e- 100.5509 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 100.5117 100.5117 1.5700e- 100.5509 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2028 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 100.5117 100.5117 1.5700e- 100.5509 4.4818 003 004 004 • 003 Total 4.1745 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 100.5117 100.5117 1.5700e- 100.5509 25 25 003 29 004 004 003 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor • 2.9300e- 0.1196 0.0255 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 41.5113 41.5113 : 2.6400e- 41.5773 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0100 4.4700e- 0.0561 2.2000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- • i 22.3359 22.3359 3.5000e- 22.3446 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0129 0.1241 0.0816 6.1000e- 0.0435 2.6000e- 0.0438 0.0118 2.5000e- 0.0120 63.8473 63.8473 2.9900e- 63.9220 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.9300e- 0.1196 0.0255 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0100 4.4700e- 0.0561 2.2000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.5113 41.5113 : 2.6400e- 41.5773 1 003 J .1 J -I- i 22.3359 22.3359 3.5000e- 22.3446 004 Total 0.0129 0.1241 0.0816 6.1000e- 004 0.0435 2.6000e- 004 0.0438 0.0118 2.5000e- 004 0.0120 63.8473 63.8473 2.9900e- 003 63.9220 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:37 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.7: CALEEMOD WELL #5 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #5 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Construction Phase - Construction of Well #5 anticipated to start and end Quarter 4 2028 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 40.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 40.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 685.44 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1272 97.7419 139.2037 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,451.37 25,451.37 7.1084 0.0000 25,629.08 • • 18 18 I 15 Maximum 11.1272 97.7419 139.2037 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,451.37 25,451.37 7.1084 0.0000 25,629.08 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 18 18 15 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1272 97.7419 139.2037 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,451.37 25,451.37 7.1084 0.0000 25,629.08 PM10 18 18 1 14 Maximum 11.1272 97.7419 139.2037 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,451.37 25,451.37 7.1084 0.0000 25,629.08 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 18 18 14 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2028 110/13/2028 5: 10: i r -I 4 11011412028 2 -Trenching +Grading 112/8/2028 Y r___r___, 3 :Building Construction :Building Construction :12/9/2028 :12/29/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2028 110/13/2028 5: 10: i r -I 4 11011412028 2 -Trenching +Grading 112/8/2028 Y r___r___, 3 :Building Construction :Building Construction :12/9/2028 :12/29/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 4. 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 40.5797 .1 .1 I - Worker 9 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 143.0966 143.0966 2.2800e- 143.1536 1.9622 2.3758 003 004 004 • 003 Total 0.0000 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 143.0966 143.0966 2.2800e- 143.1536 4 4 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2028 Mitigated Construction Off -Site 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 143.0966 143.0966 2.2800e- 143.1536 1.0605 2.2314 003 004 004 • 003 Total 2.1674 0.0590 0.0249 0.3989 1.4300e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 143.0966 143.0966 2.2800e- 143.1536 50 50 003 16 004 004 003 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 111.9886 111.9886 1.7800e- 112.0332 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 111.9886 111.9886 1.7800e- 112.0332 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2028 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 111.9886 111.9886 1.7800e- 112.0332 4.4818 003 004 004 • 003 Total 4.1745 0.0462 0.0195 0.3122 1.1200e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 111.9886 111.9886 1.7800e- 112.0332 25 25 003 29 004 004 003 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.7400e- 0.1216 0.0216 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 43.3629 43.3629 : 2.3800e- 43.4223 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0103 4.3300e- 0.0694 2.5000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- • i 24.8864 24.8864 4.0000e- 24.8963 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0130 0.1260 0.0910 6.6000e- 0.0435 2.6000e- 0.0438 0.0118 2.5000e- 0.0120 68.2493 68.2493 2.7800e- 68.3186 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.7400e- 0.1216 0.0216 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0103 4.3300e- 0.0694 2.5000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.3629 43.3629 : 2.3800e- 43.4223 1 003 J .1 J -I- i 24.8864 24.8864 4.0000e- 24.8963 004 Total 0.0130 0.1260 0.0910 6.6000e- 004 0.0435 2.6000e- 004 0.0438 0.0118 2.5000e- 004 0.0120 68.2493 68.2493 2.7800e- 003 68.3186 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 '� , 1 9 I 1 1 1 1 1 I 1 1 1 1 I • 1 3 + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:42 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #5 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Construction Phase - Construction of Well #5 anticipated to start and end Quarter 4 2028 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 40.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 40.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 685.44 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1271 97.7400 139.1944 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,446.96 25,446.96 7.1086 0.0000 25,624.68 • • 98 98 I 49 Maximum 11.1271 97.7400 139.1944 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,446.96 25,446.96 7.1086 0.0000 25,624.68 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 98 98 49 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2028 •i 11.1271 97.7400 139.1944 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,446.96 25,446.961 7.1086 0.0000 25,624.68 PM10 98 98 1 48 Maximum 11.1271 97.7400 139.1944 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,446.96 25,446.96 7.1086 0.0000 25,624.68 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 98 98 48 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2028 110/13/2028 5: 10: i r -I 4 11011412028 2 -Trenching +Grading 112/8/2028 Y r___r___, 3 :Building Construction :Building Construction :12/9/2028 :12/29/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2028 110/13/2028 5: 10: i r -I 4 11011412028 2 -Trenching +Grading 112/8/2028 Y r___r___, 3 :Building Construction :Building Construction :12/9/2028 :12/29/2028 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 40.5797 1 0.1028 .1 .1 .1 - Worker Worker •1 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 128.4317 128.4317 2.0000e- 128.4817 0.0447 1.8052 003 004 004 • 003 Total 9,947.350 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 128.4317 128.4317 2.0000e- 128.4817 4 98 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 • 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2028 Mitigated Construction Off -Site 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 • i 128.4317 128.4317 2.0000e- 128.4817 0.1474 1.0605 003 004 004 • 003 Total 2.0529 0.0576 0.0257 0.3228 1.2900e- 0.1924 9.2000e- 0.1934 0.0510 8.5000e- 0.0519 128.4317 128.4317 2.0000e- 128.4817 50 50 003 004 004 003 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 • i 100.5117 100.5117 1.5700e- 100.5509 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 100.5117 100.5117 1.5700e- 100.5509 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2028 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 29 1 1 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 139.1127 1 .1 .1 .1 - Worker Worker •i 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 i i 100.5117 100.5117 1.5700e- 100.5509 4.1745 4.1745 003 004 004 • 003 Total 7.1056 0.0451 0.0201 0.2526 1.0100e- 0.1506 7.2000e- 0.1513 0.0400 6.6000e- 0.0406 100.5117 100.5117 1.5700e- 25 100.5509 29 003 004 004 003 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •1 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.9300e- 0.1196 0.0255 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 41.5113 41.5113 : 2.6400e- 41.5773 11.1142 003 004 004 003 004 003 1 003 Worker •i 0.0100 4.4700e- 0.0561 2.2000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- • i 22.3359 22.3359 3.5000e- 22.3446 4.4818 003 004 004 003 004 003 • 004 Total 4.1745 0.0129 0.1241 0.0816 6.1000e- 0.0435 2.6000e- 0.0438 0.0118 2.5000e- 0.0120 63.8473 63.8473 2.9900e- 63.9220 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.9300e- 0.1196 0.0255 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 0.0100 4.4700e- 0.0561 2.2000e- 0.0335 1.6000e- 0.0336 8.8800e- 1.5000e- 9.0200e- i 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.5113 41.5113 : 2.6400e- 41.5773 1 003 J .1 J -I- i 22.3359 22.3359 3.5000e- 22.3446 004 Total 0.0129 0.1241 0.0816 6.1000e- 004 0.0435 2.6000e- 004 0.0438 0.0118 2.5000e- 004 0.0120 63.8473 63.8473 2.9900e- 003 63.9220 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.559901' 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:41 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.8: CALEEMOD WELL #6 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #6 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 664.68 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2029 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2029 Land Use - Construction Phase - Construction of Well #6 anticipated to start and end Quarter 3 2029 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 664.68 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 11.1265 97.7407 139.1992 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,450.52 25,450.52 7.1083 0.0000 25,628.22 • • 04 04 I 76 Maximum 11.1265 97.7407 139.1992 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,450.52 25,450.52 7.1083 0.0000 25,628.22 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 04 04 76 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 11.1265 97.7407 139.1992 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,450.52 25,450.52 7.1083 0.0000 25,628.22 PM10 04 04 1 76 Maximum 11.1265 97.7407 139.1992 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,450.52 25,450.52 7.1083 0.0000 25,628.22 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 04 04 76 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2029 17/13/2029 5: 10: i J7/14/2029 2 •Trenching +Grading 1 r___,__. 3 :Building Construction •Building Construction :9/11/2029 :10/1/2029 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2029 17/13/2029 5: 10: i J7/14/2029 2 •Trenching +Grading 1 r___,__. 3 :Building Construction •Building Construction :9/11/2029 :10/1/2029 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker 9 0.0554 0.0229 0.3752 1.4000e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 • i 139.2442 139.2442 2.0900e- 139.2964 0.1028 0.4136 003 004 004 • 003 Total 1.8052 0.0554 0.0229 0.3752 1.4000e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 139.2442 139.2442 2.0900e- 139.2964 4 4 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2029 Mitigated Construction Off -Site 3.3 Trenching - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0554 0.0229 0.3752 1.4000e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 • i 139.2442 139.2442 2.0900e- 139.2964 0.1474 1.0605 003 004 004 • 003 Total 2.0529 0.0554 0.0229 0.3752 1.4000e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 139.2442 139.2442 2.0900e- 139.2964 50 50 003 004 004 003 3.3 Trenching - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • i 108.9737 108.9737 1.6400e- 109.0146 0.1474 0.4136 003 004 004 • 003 Total 2.0529 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 108.9737 108.9737 1.6400e- 109.0146 50 50 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 1 0.0000 • Off -Road 9 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 11.1142 1 Worker 9 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • i 108.9737 108.9737 1.6400e- 109.0146 4.4818 003 004 004 • 003 Total 4.1745 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 108.9737 108.9737 1.6400e- 109.0146 25 25 003 29 004 004 003 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.7000e- 0.1208 0.0212 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- • i 43.1815 43.1815 : 2.3100e- 43.2393 11.1142 003 004 004 003 005 003 1 003 Worker • 9.6400e- 3.9900e- 0.0653 2.4000e- 0.0335 1.5000e- 0.0336 8.8800e- 1.4000e- 9.0100e- • i 24.2164 24.2164 3.6000e- 24.2255 4.4818 003 003 004 004 003 004 003 • 004 Total 4.1745 0.0123 0.1247 0.0865 6.5000e- 0.0435 2.5000e- 0.0438 0.0118 2.3000e- 0.0120 67.3979 67.3979 2.6700e- 67.4648 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2029 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.7000e- 0.1208 0.0212 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- i 003 004 004 003 005 003 .1 J .1 .1 .1 .1 J .1 ; 9.6400e- 3.9900e- 0.0653 2.4000e- 0.0335 1.5000e- 0.0336 8.8800e- 1.4000e- 9.0100e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.1815 43.1815 : 2.3100e- 43.2393 1 003 J .1 J -I- i 24.2164 24.2164 3.6000e- 24.2255 004 Total 0.0123 0.1247 0.0865 6.5000e- 004 0.0435 2.5000e- 004 0.0438 0.0118 2.3000e- 004 0.0120 67.3979 67.3979 2.6700e- 003 67.4648 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.561225' 0.034384: 0.190884: 0.102953: 0.010631. 0.004198: 0.017138: 0.070241: 0.001423: 0.001077: 0.004368: 0.000839: 0.000640 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.561225' 0.034384: 0.190884: 0.102953: 0.010631. 0.004198: 0.017138: 0.070241: 0.001423: 0.001077: 0.004368: 0.000839: 0.000640 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #6 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 664.68 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2029 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2029 Land Use - Construction Phase - Construction of Well #6 anticipated to start and end Quarter 3 2029 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 664.68 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 11.1265 97.7388 139.1906 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 • 0.0000 ' 25,446.19 25,446.19 7.1085 0.0000 25,623.91 • • 96 96 I 21 Maximum 11.1265 97.7388 139.1906 0.2641 1.2529 4.4820 4.5255 0.1656 4.1747 4.1865 0.0000 25,446.19 25,446.19 7.1085 0.0000 25,623.91 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 96 96 21 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 11.1265 97.7388 1 139.1906 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 • 0.0000 25,446.19 25,446.19 7.1085 0.0000 25,623.91 PM10 96 96 1 21 Maximum 11.1265 97.7388 139.1906 0.2641 0.6060 4.4820 4.5255 0.0957 4.1747 4.1865 0.0000 25,446.19 25,446.19 7.1085 0.0000 25,623.91 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 96 96 21 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 0.00 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2029 17/13/2029 5: 10: i J7/14/2029 2 •Trenching +Grading 1 r___,__. 3 :Building Construction •Building Construction :9/11/2029 :10/1/2029 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 17/1/2029 17/13/2029 5: 10: i J7/14/2029 2 •Trenching +Grading 1 r___,__. 3 :Building Construction •Building Construction :9/11/2029 :10/1/2029 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7: 18.00. 0.001 0.00 15: 4.00. 2.00. 0.00: 0.00: 0.00 11.00: 5.40 : 11.00: 5.40: 11.00: 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix :HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 • 0.0000 0.0000 Off -Road •i 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • i 9,947.350 9,947.350 3.2172 10,027.77 •.11 4 4 i 98 Total 4.3399 40.5797 58.6678 0.1028 1.0605 1.9622 3.0227 0.1145 1.8052 1.9197 9,947.350 9,947.350 3.2172 10,027.77 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road 9 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 4 4 1 98 1 4.3399 .1 .1 .1 - Worker Worker •1 0.0541 0.0237 0.3031 1.2500e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 • i 124.9612 124.9612 1.8300e- 125.0070 0.4136 1.9622 003 004 004 • 003 Total 1.8499 0.0541 0.0237 0.3031 1.2500e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 124.9612 124.9612 1.8300e- 125.0070 4 4 003 98 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 • 0.0000 : 0.0000 • Off -Road 9 4.3399 40.5797 58.6678 0.1028 1.9622 1.9622 1.8052 1.8052 • 0.0000 9,947.350 9,947.350 3.2172 10,027.77 • • 4 4 1 98 Total 4.3399 40.5797 58.6678 0.1028 0.4136 1.9622 2.3758 0.0447 1.8052 1.8499 0.0000 9,947.350 9,947.350 3.2172 10,027.77 ii 4 4 98 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2029 Mitigated Construction Off -Site 3.3 Trenching - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 48.8936 .1 .1 I - Worker •1 0.0541 0.0237 0.3031 1.2500e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 • i 124.9612 124.9612 1.8300e- 125.0070 2.2314 3.2919 003 004 004 • 003 Total 0.0541 0.0237 0.3031 1.2500e- 0.1924 8.5000e- 0.1933 0.0510 7.9000e- 0.0518 124.9612 124.9612 1.8300e- 125.0070 50 50 003 004 004 003 3.3 Trenching - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 1.0605 2.2314 3.2919 0.1145 2.0529 2.1674 14,262.13 14,262.13 4.6127 14,377.45 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 50 50 1 16 1 5.7517 .1 .1 .1 - Worker Worker •1 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • 1 97.7957 97.7957 1.4400e- 97.8316 0.4136 2.2314 004 004 004 • 003 Total 2.0976 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 97.7957 97.7957 1.4400e- 97.8316 50 50 004 16 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road •u 5.7517 48.8936 66.8922 0.1474 2.2314 2.2314 2.0529 2.0529 • 0.0000 14,262.13 14,262.13 4.6127 14,377.45 • • 50 50 1 16 Total 5.7517 48.8936 66.8922 0.1474 0.4136 2.2314 2.6450 0.0447 2.0529 2.0976 0.0000 14,262.13 14,262.13 4.6127 14,377.45 ii 50 50 16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 29 .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 139.1127 1 .1 .1 .1 - Worker Worker •i 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • 1 97.7957 97.7957 1.4400e- 97.8316 4.1745 4.1745 004 004 004 • 003 Total 7.1056 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 97.7957 97.7957 1.4400e- 25 97.8316 29 004 004 004 003 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 •• i 25,383.12 25,383.12 I 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.8900e- 0.1187 0.0251 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • i 41.3447 41.3447 : 2.5700e- 41.4089 11.1142 003 004 004 003 004 003 1 003 Worker • 9.4100e- 4.1100e- 0.0527 2.2000e- 0.0335 1.5000e- 0.0336 8.8800e- 1.4000e- 9.0100e- • i 21.7324 21.7324 3.2000e- 21.7404 4.4818 003 003 004 004 003 004 003 • 004 Total 4.1745 0.0123 0.1228 0.0778 6.1000e- 0.0435 2.5000e- 0.0438 0.0118 2.4000e- 0.0120 63.0771 63.0771 2.8900e- 63.1492 25 25 004 29 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 • 0.0000 i 25,383.12 25,383.12 7.1056 25,560.76 • • 25 25 29 Total 11.1142 97.6160 139.1127 0.2634 4.4818 4.4818 4.1745 4.1745 0.0000 25,383.12 25,383.12 7.1056 25,560.76 25 25 29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2029 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.8900e- 0.1187 0.0251 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 9.4100e- 4.1100e- 0.0527 2.2000e- 0.0335 1.5000e- 0.0336 8.8800e- 1.4000e- 9.0100e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.3447 41.3447 : 2.5700e- 41.4089 1 003 J .1 J -I- i 21.7324 21.7324 3.2000e- 21.7404 004 Total 0.0123 0.1228 0.0778 6.1000e- 004 0.0435 2.5000e- 004 0.0438 0.0118 2.4000e- 004 0.0120 63.0771 63.0771 2.8900e- 003 63.1492 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.561225' 0.034384: 0.190884: 0.102953: 0.010631. 0.004198: 0.017138: 0.070241: 0.001423: 0.001077: 0.004368: 0.000839: 0.000640 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.561225' 0.034384: 0.190884: 0.102953: 0.010631. 0.004198: 0.017138: 0.070241: 0.001423: 0.001077: 0.004368: 0.000839: 0.000640 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:47 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.9: CALEEMOD WELL #7 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #7 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 643.92 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2030 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2030 Land Use - Construction Phase - Construction of Well #7 anticipated to start and end Quarter 2 2030 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 643.92 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2030 •i 9.4757 37.8587 138.9910 0.3074 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 • 0.0000 ' 29,854.74 29,854.74 0.8319 0.0000 29,875.54 PM10 • 35 35 I 17 Maximum 9.4757 37.8587 138.9910 0.3074 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 0.0000 29,854.74 29,854.74 0.8319 0.0000 29,875.54 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 35 35 17 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2030 •i 9.4757 37.8587 138.9910 0.3074 0.6060 1.1376 1.1811 0.0957 1 1.1376 1.1494 . 0.0000 .29,854.74 29,854.74 0.8319 0.0000 29,875.54 PM10 35 35 1 17 Maximum 9.4757 37.8587 138.9910 0.3074 0.6060 1.1376 1.1811 0.0957 1.1376 1.1494 0.0000 29,854.74 29,854.74 0.8319 0.0000 29,875.54 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 35 35 17 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 31.94 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 1.0200e- 0.0000 ' 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :�003 005 003 003 003 005 003 • Energy J J J .1 J J J J • J J .1 T 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J • J J .1 T Mobile •1 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J •• .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 14/1/2030 :4/12/2030 5: 10: i r -I 4 J4/13/2030 2 •Trenching +Grading :6/10/2030 Y r___r___, 3 :Building Construction •Building Construction :6/11/2030 :7/1/2030 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 14/1/2030 :4/12/2030 5: 10: i r -I 4 J4/13/2030 2 •Trenching +Grading :6/10/2030 Y r___r___, 3 :Building Construction •Building Construction :6/11/2030 :7/1/2030 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00. 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 : 0.0000 0.0000 Off -Road •1 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • i 12,014.86 12,014.86 0.2990 12,022.34 . •.11 48 48 i 03 Total 3.4304 11.2832 58.8430 0.1269 1.0605 0.3923 1.4528 0.1145 0.3923 0.5068 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 48 48 1 03 1 3.4304 .1 .1 .1 - Worker Worker •1 0.0518 0.0212 0.3537 1.3600e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 • i 135.8712 135.8712 1.9200e- 135.9192 0.4136 0.3923 003 004 004 • 003 Total 0.4369 0.0518 0.0212 0.3537 1.3600e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 135.8712 135.8712 1.9200e- 135.9192 48 48 003 03 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road •u 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • 0.0000 12,014.86 12,014.86 0.2990 12,022.34 • • 48 48 1 03 Total 3.4304 11.2832 58.8430 0.1269 0.4136 0.3923 0.8059 0.0447 0.3923 0.4369 0.0000 12,014.86 12,014.86 0.2990 12,022.34 ii 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2030 Mitigated Construction Off -Site 3.3 Trenching - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 5.1442 1 66.2475 .1 .1 .1 - Worker Worker •1 0.0518 0.0212 0.3537 1.3600e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 • i 135.8712 135.8712 1.9200e- 135.9192 1.5841 0.1145 003 004 004 • 003 Total 17,192.08 0.0518 0.0212 0.3537 1.3600e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 135.8712 135.8712 1.9200e- 135.9192 57 57 31 003 004 004 003 3.3 Trenching - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road •u 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 17,192.08 17,192.08 0.4495 17,203.32 • • 57 57 1 31 Total 5.1442 14.0338 66.2475 0.1734 1.0605 0.5236 1.5841 0.1145 0.5236 0.6381 17,192.08 17,192.08 0.4495 17,203.32 57 57 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 Worker 9 0.0406 0.0166 0.2768 1.0700e- 0.1506 6.2000e- 0.1512 0.0400 5.7000e- 0.0405 • i 106.3340 106.3340 1.5000e- 106.3715 66.2475 0.1734 003 004 004 • 003 Total 0.0447 0.0406 0.0166 0.2768 1.0700e- 003 0.1506 6.2000e- 004 0.1512 0.0400 5.7000e- 004 0.0405 106.3340 106.3340 1.5000e- 003 106.3715 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 0.0000 17,192.08 17,192.08 0.4495 17,203.32 • • 56 56 1 31 Total 5.1442 14.0338 66.2475 0.1734 0.4136 0.5236 0.9372 0.0447 0.5236 0.5682 0.0000 17,192.08 17,192.08 0.4495 17,203.32 56 56 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2030 Mitigated Construction Off -Site 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 22 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 138.9086 1 .1 .1 .1 - Worker Worker •i 0.0406 0.0166 0.2768 1.0700e- 0.1506 6.2000e- 0.1512 0.0400 5.7000e- 0.0405 • i 106.3340 106.3340 1.5000e- 106.3715 1.1374 1.1374 003 004 004 • 003 Total 0.8293 0.0406 0.0166 0.2768 1.0700e- 003 0.1506 6.2000e- 004 0.1512 0.0400 5.7000e- 004 0.0405 106.3340 106.3340 1.5000e- 003 86 106.3715 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 •• i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.6700e- 0.1199 0.0210 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- • i 43.0251 43.0251 : 2.2500e- 43.0814 9.4640 003 004 004 003 005 003 1 003 Worker • 9.0100e- 3.6800e- 0.0615 2.4000e- 0.0335 1.4000e- 0.0336 8.8800e- 1.3000e- 9.0000e- • i 23.6298 23.6298 3.3000e- 23.6381 1.1374 003 003 004 004 003 004 003 • 004 Total 1.1374 0.0117 0.1236 0.0825 6.5000e- 0.0435 2.4000e- 0.0437 0.0118 2.2000e- 0.0120 66.6549 66.6549 2.5800e- 66.7195 86 86 004 22 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 • 0.0000 i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 0.0000 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2030 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.6700e- 0.1199 0.0210 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- i 003 004 004 003 005 003 .1 J .1 .1 .1 .1 J .1 ; 9.0100e- 3.6800e- 0.0615 2.4000e- 0.0335 1.4000e- 0.0336 8.8800e- 1.3000e- 9.0000e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.0251 43.0251 : 2.2500e- 43.0814 1 003 J .1 J -I- i 23.6298 23.6298 3.3000e- 23.6381 004 Total 0.0117 0.1236 0.0825 6.5000e- 004 0.0435 2.4000e- 004 0.0437 0.0118 2.2000e- 004 0.0120 66.6549 66.6549 2.5800e- 003 66.7195 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.562310' 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071. 0.004354: 0.000825: 0.000615 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.562310' 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071. 0.004354: 0.000825: 0.000615 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:55 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #7 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 643.92 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2030 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2030 Land Use - Construction Phase - Construction of Well #7 anticipated to start and end Quarter 2 2030 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 643.92 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2030 •i 9.4756 37.8568 138.9830 0.3073 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 • 0.0000 ' 29,850.49 29,850.49 0.8321 0.0000 29,871.29 PM10 • 23 23 I 56 Maximum 9.4756 37.8568 138.9830 0.3073 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 0.0000 29,850.49 29,850.49 0.8321 0.0000 29,871.29 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 23 23 56 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2030 •i 9.4756 37.8568 138.9830 0.3073 0.6060 1.1376 1.1811 0.0957 1 1.1376 1.1494 • 0.0000 .29,850.49 29,850.49 0.8321 0.0000 29,871.29 PM10 22 22 1 56 Maximum 9.4756 37.8568 138.9830 0.3073 0.6060 1.1376 1.1811 0.0957 1.1376 1.1494 0.0000 29,850.49 29,850.49 0.8321 0.0000 29,871.29 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 22 22 56 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 31.94 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 14/1/2030 :4/12/2030 5: 10: i r -I 4 J4/13/2030 2 •Trenching +Grading :6/10/2030 Y r___r___, 3 :Building Construction •Building Construction :6/11/2030 :7/1/2030 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 14/1/2030 :4/12/2030 5: 10: i r -I 4 J4/13/2030 2 •Trenching +Grading :6/10/2030 Y r___r___, 3 :Building Construction •Building Construction :6/11/2030 :7/1/2030 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 4. 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 : Off -Road •1 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • i 12,014.86 12,014.86 0.2990 12,022.34 •.11 48 48 i 03 Total 3.4304 11.2832 58.8430 0.1269 1.0605 0.3923 1.4528 0.1145 0.3923 0.5068 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 1 1 • 1 41 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 3.4304 1 58.8430 41 Worker •1 0.0507 0.0218 0.2851 1.2200e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 • i 121.9194 121.9194 1.6800e- 121.9615 0.8059 0.0447 003 004 004 • 003 Total 12,014.86 0.0507 0.0218 0.2851 1.2200e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 121.9194 121.9194 1.6800e- 121.9615 48 48 03 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road •u 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • 0.0000 12,014.86 12,014.86 0.2990 12,022.34 • • 48 48 1 03 Total 3.4304 11.2832 58.8430 0.1269 0.4136 0.3923 0.8059 0.0447 0.3923 0.4369 0.0000 12,014.86 12,014.86 0.2990 12,022.34 ii 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2030 Mitigated Construction Off -Site 3.3 Trenching - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 Worker •1 0.0507 0.0218 0.2851 1.2200e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 • i 121.9194 121.9194 1.6800e- 121.9615 66.2475 0.1734 003 004 004 • 003 Total 0.1145 0.0507 0.0218 0.2851 1.2200e- 0.1924 7.9000e- 0.1932 0.0510 7.3000e- 0.0518 121.9194 121.9194 1.6800e- 121.9615 57 003 004 31 004 003 3.3 Trenching - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 J J J J J J J J J 1 J 1. Off -Road •u 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 17,192.08 17,192.08 0.4495 17,203.32 • • 57 57 1 31 Total 5.1442 14.0338 66.2475 0.1734 1.0605 0.5236 1.5841 0.1145 0.5236 0.6381 17,192.08 17,192.08 0.4495 17,203.32 57 57 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 5.1442 .1 .1 I - Worker •1 0.0397 0.0171 0.2231 9.6000e- 0.1506 6.2000e- 0.1512 0.0400 5.7000e- 0.0405 • i 95.4152 95.4152 1.3200e- 95.4481 0.4136 0.5236 004 004 004 • 003 Total 0.5682 0.0397 0.0171 0.2231 9.6000e- 0.1506 6.2000e- 0.1512 0.0400 5.7000e- 0.0405 95.4152 95.4152 1.3200e- 95.4481 56 56 004 31 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 J J J J J J J J J 1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 0.0000 17,192.08 17,192.08 0.4495 17,203.32 • • 56 56 1 31 Total 5.1442 14.0338 66.2475 0.1734 0.4136 0.5236 0.9372 0.0447 0.5236 0.5682 0.0000 17,192.08 17,192.08 0.4495 17,203.32 56 56 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2030 Mitigated Construction Off -Site 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 22 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 138.9086 1 .1 .1 .1 - Worker Worker •i 0.0397 0.0171 0.2231 9.6000e- 0.1506 6.2000e- 0.1512 0.0400 5.7000e- 0.0405 • i 95.4152 95.4152 1.3200e- 95.4481 1.1374 1.1374 004 004 004 • 003 Total 0.8293 0.0397 0.0171 0.2231 9.6000e- 0.1506 6.2000e- 0.1512 0.0400 5.7000e- 0.0405 95.4152 95.4152 1.3200e- 86 95.4481 22 004 004 004 003 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 •• i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling Vendor Vendor Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.8500e- 0.1179 0.0248 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- • 003 004 004 003 004 003 V 8.8100e- 3.7900e- 0.0496 2.1000e- 0.0335 1.4000e- 0.0336 8.8800e- 1.3000e- 9.0000e- • 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J 1 - i 41.2003 41.2003 : 2.5000e- 41.2627 1 003 .1 .1 .1 I - i 21.2034 21.2034 2.9000e- 21.2107 004 Total 37.7351 0.0117 0.1217 0.0744 6.0000e- 004 0.0435 2.4000e- 004 0.0437 0.0118 2.3000e- 004 0.0120 29,788.08 62.4037 62.4037 2.7900e- 003 62.4734 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 • 0.0000 i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 0.0000 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2030 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.8500e- 0.1179 0.0248 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9900e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 8.8100e- 3.7900e- 0.0496 2.1000e- 0.0335 1.4000e- 0.0336 8.8800e- 1.3000e- 9.0000e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.2003 41.2003 : 2.5000e- 41.2627 1 003 J .1 J -I- i 21.2034 21.2034 2.9000e- 21.2107 004 Total 0.0117 0.1217 0.0744 6.0000e- 004 0.0435 2.4000e- 004 0.0437 0.0118 2.3000e- 004 0.0120 62.4037 62.4037 2.7900e- 003 62.4734 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.562310' 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071. 0.004354: 0.000825: 0.000615 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.562310' 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071. 0.004354: 0.000825: 0.000615 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2 5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:54 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report LI, URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.10: CALEEMOD WELL #8 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #8 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Construction Phase - Construction of Well #8 anticipated to start and end Quarter 1 2031 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Table Name tblConstructionPhase tblConstructionPhase tblConstructionPhase tblGrading tblGrading tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics IColumn Name • NumDays i 100.00 • 15.00 r 4 • NumDays T 2.00 41.00 r • NumDays T 1.00 10.00 r • AcresOfGrading i 0.00 41.00 r • AcresOfGrading i 0.00 10.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 • UsageHours i 8.00 24.00 r 4 • UsageHours i 8.00 16.00 • CO2lntensityFactor 1270.9 623.16 • Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 9.4750 37.8584 138.9882 0.3074 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 • 0.0000 ' 29,854.39 29,854.39 0.8319 0.0000 29,875.19 PM10 • 49 49 I 12 Maximum 9.4750 37.8584 138.9882 0.3074 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 0.0000 29,854.39 29,854.39 0.8319 0.0000 29,875.19 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 49 49 12 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 • 9.4750 37.8584 138.9882 0.3074 0.6060 1.1376 1.1811 0.0957 1 1.1376 1.1494 • 0.0000 29,854.39 29,854.39 0.8319 0.0000 29,875.19 PM10 48 48 1 12 Maximum 9.4750 37.8584 138.9882 0.3074 0.6060 1.1376 1.1811 0.0957 1.1376 1.1494 0.0000 29,854.39 29,854.39 0.8319 0.0000 29,875.19 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 48 48 12 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 31.93 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2031 :1/14/2031 5: 10: i 1111512031 2 •Trenching +Grading : r___,__. 3 :Building Construction •Building Construction :3/13/2031 :4/2/2031 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2031 :1/14/2031 5: 10: i 1111512031 2 •Trenching +Grading : r___,__. 3 :Building Construction •Building Construction :3/13/2031 :4/2/2031 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 : 0.0000 0.0000 Off -Road •1 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • i 12,014.86 12,014.86 0.2990 12,022.34 . •.11 48 48 i 03 Total 3.4304 11.2832 58.8430 0.1269 1.0605 0.3923 1.4528 0.1145 0.3923 0.5068 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker 9 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 133.5033 133.5033 1.7900e- 133.5480 0.1269 0.4136 003 004 004 • 003 Total 0.3923 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 133.5033 133.5033 1.7900e- 133.5480 48 48 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 1 0.0000 • Off -Road 9 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • 0.0000 12,014.86 12,014.86 0.2990 12,022.34 • • 48 48 1 03 Total 3.4304 11.2832 58.8430 0.1269 0.4136 0.3923 0.8059 0.0447 0.3923 0.4369 0.0000 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 5.1442 .1 .1 I - Worker •1 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 133.5033 133.5033 1.7900e- 133.5480 1.0605 0.5236 003 004 004 • 003 Total 0.6381 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 133.5033 133.5033 1.7900e- 133.5480 57 57 003 31 004 004 003 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 J J J J J J J J J 1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 17,192.08 17,192.08 0.4495 17,203.32 • • 57 57 1 31 Total 5.1442 14.0338 66.2475 0.1734 1.0605 0.5236 1.5841 0.1145 0.5236 0.6381 17,192.08 17,192.08 0.4495 17,203.32 57 57 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 Worker •1 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 104.4809 104.4809 1.4000e- 104.5159 66.2475 0.1734 003 004 004 • 003 Total 0.0447 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 104.4809 104.4809 1.4000e- 104.5159 56 003 004 31 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 0.0000 17,192.08 17,192.08 0.4495 17,203.32 • • 56 56 1 31 Total 5.1442 14.0338 66.2475 0.1734 0.4136 0.5236 0.9372 0.0447 0.5236 0.5682 0.0000 17,192.08 17,192.08 0.4495 17,203.32 56 56 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 9.4640 1 Worker 9 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 104.4809 104.4809 1.4000e- 104.5159 1.1374 003 004 004 • 003 Total 1.1374 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 104.4809 104.4809 1.4000e- 104.5159 86 86 003 22 004 004 003 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 •• i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.6900e- 0.1199 0.0210 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- • i 43.0883 43.0883 : 2.2000e- 43.1432 9.4640 003 004 004 003 005 003 1 003 Worker • 8.3500e- 3.3900e- 0.0586 2.3000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- • i 23.2180 23.2180 3.1000e- 23.2258 1.1374 003 003 004 004 003 004 003 • 004 Total 1.1374 0.0110 0.1233 0.0796 6.4000e- 0.0435 2.3000e- 0.0437 0.0118 2.1000e- 0.0120 66.3063 66.3063 2.5100e- 66.3690 86 86 004 22 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 • 0.0000 i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 0.0000 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2031 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.6900e- 0.1199 0.0210 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- i 003 004 004 003 005 003 .1 J .1 .1 .1 .1 J .1 ; 8.3500e- 3.3900e- 0.0586 2.3000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.0883 43.0883 : 2.2000e- 43.1432 1 003 J .1 J -I- i 23.2180 23.2180 3.1000e- 23.2258 004 Total 0.0110 0.1233 0.0796 6.4000e- 004 0.0435 2.3000e- 004 0.0437 0.0118 2.1000e- 004 0.0120 66.3063 66.3063 2.5100e- 003 66.3690 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 '� , 1 9 I 1 1 1 1 1 I 1 1 1 1 I • 1 3 + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #8 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Construction Phase - Construction of Well #8 anticipated to start and end Quarter 1 2031 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 623.16 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 9.4750 37.8565 138.9805 0.3073 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 • 0.0000 ' 29,850.18 29,850.18 0.8321 0.0000 29,870.98 PM10 • 09 09 I 22 Maximum 9.4750 37.8565 138.9805 0.3073 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 0.0000 29,850.18 29,850.18 0.8321 0.0000 29,870.98 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 09 09 22 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 • 9.4750 37.8565 138.9805 0.3073 0.6060 1.1376 1.1811 0.0957 1 1.1376 1.1494 • 0.0000 29,850.18 29,850.18 0.8321 0.0000 29,870.98 PM10 08 08 1 21 Maximum 9.4750 37.8565 138.9805 0.3073 0.6060 1.1376 1.1811 0.0957 1.1376 1.1494 0.0000 29,850.18 29,850.18 0.8321 0.0000 29,870.98 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 08 08 21 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 31.93 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2031 :1/14/2031 5: 10: i 1111512031 2 •Trenching +Grading : r___,__. 3 :Building Construction •Building Construction :3/13/2031 :4/2/2031 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 •Site Preparation +Site Preparation 11/1/2031 :1/14/2031 5: 10: i 1111512031 2 •Trenching +Grading : r___,__. 3 :Building Construction •Building Construction :3/13/2031 :4/2/2031 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 : Off -Road •1 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • i 12,014.86 12,014.86 0.2990 12,022.34 . •.11 48 48 i 03 Total 3.4304 11.2832 58.8430 0.1269 1.0605 0.3923 1.4528 0.1145 0.3923 0.5068 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 11.2832 .1 .1 I - Worker •1 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 119.7307 119.7307 1.5600e- 119.7698 0.3923 0.8059 003 004 004 • 003 Total 0.0000 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 119.7307 119.7307 1.5600e- 119.7698 48 48 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 1 0.0000 • Off -Road 9 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • 0.0000 12,014.86 12,014.86 0.2990 12,022.34 • • 48 48 1 03 Total 3.4304 11.2832 58.8430 0.1269 0.4136 0.3923 0.8059 0.0447 0.3923 0.4369 0.0000 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 5.1442 .1 .1 I - Worker •1 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 119.7307 119.7307 1.5600e- 119.7698 1.0605 0.5236 003 004 004 • 003 Total 0.6381 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 119.7307 119.7307 1.5600e- 119.7698 57 57 003 31 004 004 003 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1.0605 0.0000 1.0605 1 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 J J J J J J J J J 1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 17,192.08 17,192.08 0.4495 17,203.32 • • 57 57 1 31 Total 5.1442 14.0338 66.2475 0.1734 1.0605 0.5236 1.5841 0.1145 0.5236 0.6381 17,192.08 17,192.08 0.4495 17,203.32 57 57 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 Worker 9 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 93.7023 93.7023 1.2200e- 93.7329 66.2475 0.1734 004 004 004 • 003 Total 0.0447 0.0368 0.0157 0.2119 9.4000e- 004 0.1506 5.9000e- 004 0.1512 0.0400 5.4000e- 004 0.0405 93.7023 93.7023 1.2200e- 003 93.7329 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •. 0.0000 : 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 0.0000 17,192.08 17,192.08 0.4495 17,203.32 • • 56 56 1 31 Total 5.1442 14.0338 66.2475 0.1734 0.4136 0.5236 0.9372 0.0447 0.5236 0.5682 0.0000 17,192.08 17,192.08 0.4495 17,203.32 56 56 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 9.4640 1 Worker 9 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 93.7023 93.7023 1.2200e- 93.7329 1.1374 004 004 004 • 003 Total 1.1374 0.0368 0.0157 0.2119 9.4000e- 004 0.1506 5.9000e- 004 0.1512 0.0400 5.4000e- 004 0.0405 93.7023 93.7023 1.2200e- 003 93.7329 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 •• i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.8700e- 0.1179 0.0249 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9800e- • i 41.2695 41.2695 : 2.4400e- 41.3304 9.4640 003 004 004 003 004 003 1 003 Worker • 8.1700e- 3.4900e- 0.0471 2.1000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- • i 20.8227 20.8227 2.7000e- 20.8295 1.1374 003 003 004 004 003 004 003 • 004 Total 1.1374 0.0110 0.1214 0.0720 6.0000e- 0.0435 2.3000e- 0.0437 0.0118 2.2000e- 0.0120 62.0923 62.0923 2.7100e- 62.1600 86 86 004 22 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 • 0.0000 i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 0.0000 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2031 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.8700e- 0.1179 0.0249 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9800e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 8.1700e- 3.4900e- 0.0471 2.1000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.2695 41.2695 : 2.4400e- 41.3304 1 003 J .1 J -I- i 20.8227 20.8227 2.7000e- 20.8295 004 Total 0.0110 0.1214 0.0720 6.0000e- 004 0.0435 2.3000e- 004 0.0437 0.0118 2.2000e- 004 0.0120 62.0923 62.0923 2.7100e- 003 62.1600 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981. 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981. 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 3:59 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.11: CALEEMOD WELL #9 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Well #9 Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Construction Phase - Construction of Well #9 anticipated to start and end Quarter 4 2031 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 623.16 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 9.4750 37.8584 138.9882 0.3074 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 • 0.0000 ' 29,854.39 29,854.39 0.8319 0.0000 29,875.19 PM10 • 49 49 I 12 Maximum 9.4750 37.8584 138.9882 0.3074 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 0.0000 29,854.39 29,854.39 0.8319 0.0000 29,875.19 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 49 49 12 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 • 9.4750 37.8584 138.9882 0.3074 0.6060 1.1376 1.1811 0.0957 1 1.1376 1.1494 • 0.0000 29,854.39 29,854.39 0.8319 0.0000 29,875.19 PM10 48 48 1 12 Maximum 9.4750 37.8584 138.9882 0.3074 0.6060 1.1376 1.1811 0.0957 1.1376 1.1494 0.0000 29,854.39 29,854.39 0.8319 0.0000 29,875.19 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 48 48 12 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 31.93 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 1.0200e- 0.0000 ' 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :�003 005 003 003 003 005 003 • Energy J J J .1 J J J J • J J .1 T 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J • J J .1 T Mobile •1 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J •• .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 •Site Preparation Site Preparation 110/1/2031 110/14/2031 1 5:• 10: I. I i 1 I 1 i r 2 :Trenching :Grading 110/15/2031 112/10/2031 1 5: 41 i r t -r r— 4---r 3 :Building Construction •Building Construction :12/11/2031 12/31/2031 5. 15. Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 •Site Preparation Site Preparation 110/1/2031 110/14/2031 1 5:• 10: I. I i 1 I 1 i r 2 :Trenching :Grading 110/15/2031 112/10/2031 1 5: 41 i r t -r r— 4---r 3 :Building Construction •Building Construction :12/11/2031 12/31/2031 5. 15. Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Site Preparation Trenching Building Construction Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length 1 9: 23.00. 0.001 0.00: 11.00: 7: 18.001 0.00i 0.00j 11.001 5.40; F r t -------- r 15: 4.00' 2.00' 0.00' Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class Hauling Vehicle Class 5.40: 20.00:LD_Mix 20.00: LD_Mix !HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40: 20.00:LD_Mix :HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 : 0.0000 0.0000 Off -Road •1 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • i 12,014.86 12,014.86 0.2990 12,022.34 •.11 48 48 i 03 Total 3.4304 11.2832 58.8430 0.1269 1.0605 0.3923 1.4528 0.1145 0.3923 0.5068 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 41 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 48 48 1 03 1 3.4304 41 Worker •1 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 133.5033 133.5033 1.7900e- 133.5480 0.4136 0.3923 003 004 004 • 003 Total 0.4369 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 133.5033 133.5033 1.7900e- 133.5480 48 48 003 03 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 • Off -Road •u 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • 0.0000 12,014.86 12,014.86 0.2990 12,022.34 • • 48 48 1 03 Total 3.4304 11.2832 58.8430 0.1269 0.4136 0.3923 0.8059 0.0447 0.3923 0.4369 0.0000 12,014.86 12,014.86 0.2990 12,022.34 ii 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 5.1442 .1 .1 I - Worker •1 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 133.5033 133.5033 1.7900e- 133.5480 1.0605 0.5236 003 004 004 • 003 Total 0.6381 0.0480 0.0195 0.3370 1.3400e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 133.5033 133.5033 1.7900e- 133.5480 57 57 003 31 004 004 003 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 •• 0.0000 : 0.0000 J J J J J J J J J 1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 17,192.08 17,192.08 0.4495 17,203.32 • • 57 57 1 31 Total 5.1442 14.0338 66.2475 0.1734 1.0605 0.5236 1.5841 0.1145 0.5236 0.6381 17,192.08 17,192.08 0.4495 17,203.32 57 57 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 Worker •1 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 104.4809 104.4809 1.4000e- 104.5159 66.2475 0.1734 003 004 004 • 003 Total 0.0447 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 104.4809 104.4809 1.4000e- 104.5159 56 003 004 31 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 0.0000 17,192.08 17,192.08 0.4495 17,203.32 • • 56 56 1 31 Total 5.1442 14.0338 66.2475 0.1734 0.4136 0.5236 0.9372 0.0447 0.5236 0.5682 0.0000 17,192.08 17,192.08 0.4495 17,203.32 56 56 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Trenching - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 22 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 138.9086 1 .1 .1 .1 - Worker Worker •i 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 104.4809 104.4809 1.4000e- 104.5159 1.1374 1.1374 003 004 004 • 003 Total 0.8293 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 104.4809 104.4809 1.4000e- 86 104.5159 22 003 004 004 003 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 •• i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.6900e- 0.1199 0.0210 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- • i 43.0883 43.0883 : 2.2000e- 43.1432 9.4640 003 004 004 003 005 003 1 003 Worker • 8.3500e- 3.3900e- 0.0586 2.3000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- • i 23.2180 23.2180 3.1000e- 23.2258 1.1374 003 003 004 004 003 004 003 • 004 Total 1.1374 0.0110 0.1233 0.0796 6.4000e- 0.0435 2.3000e- 0.0437 0.0118 2.1000e- 0.0120 66.3063 66.3063 2.5100e- 66.3690 86 86 004 22 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 • 0.0000 i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 0.0000 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2031 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.6900e- 0.1199 0.0210 4.1000e- 0.0100 1.0000e- 0.0101 2.8900e- 9.0000e- 2.9800e- i 003 004 004 003 005 003 .1 J .1 .1 .1 .1 J .1 ; 8.3500e- 3.3900e- 0.0586 2.3000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 43.0883 43.0883 : 2.2000e- 43.1432 1 003 J .1 J -I- i 23.2180 23.2180 3.1000e- 23.2258 004 Total 0.0110 0.1233 0.0796 6.4000e- 004 0.0435 2.3000e- 004 0.0437 0.0118 2.1000e- 004 0.0120 66.3063 66.3063 2.5100e- 003 66.3690 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 3 + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 •0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 4:05 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Well #9 Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Construction Phase - Construction of Well #9 anticipated to start and end Quarter 4 2031 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 623.16 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 9.4750 37.8565 138.9805 0.3073 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 • 0.0000 ' 29,850.18 29,850.18 0.8321 0.0000 29,870.98 PM10 • 09 09 I 22 Maximum 9.4750 37.8565 138.9805 0.3073 1.2529 1.1376 1.7353 0.1656 1.1376 1.1494 0.0000 29,850.18 29,850.18 0.8321 0.0000 29,870.98 11 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 09 09 22 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 • 9.4750 37.8565 138.9805 0.3073 0.6060 1.1376 1.1811 0.0957 1 1.1376 1.1494 • 0.0000 29,850.18 29,850.18 0.8321 0.0000 29,870.98 PM10 08 08 1 21 Maximum 9.4750 37.8565 138.9805 0.3073 0.6060 1.1376 1.1811 0.0957 1.1376 1.1494 0.0000 29,850.18 29,850.18 0.8321 0.0000 29,870.98 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 08 08 21 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 51.63 0.00 31.93 42.19 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 19 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 5.5400e- 1.0000e- 1.0200e- 0.0000 1 0.0000 0.0000 0.0000 0.0000 • i 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :1 003 005 003 003 003 005 003 J J J J J J J J . J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J .1 J .1 V J J J T Mobile • 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 005 003 003 003 003 003 005 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 5.5400e- 1.0000e- 11.0200e- 0.0000 1 1 0.0000 0.0000 I 0.0000 0.0000 • ' 2.1900e- 2.1900e- 1.0000e- 1 2.3300e- :: 003 005 003003 003 005 I 003 •i J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 5.5400e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2031 110/14/2031 5: 10: 2 -Trenching :Grading 11011512031 112/10/2031 1 5: 41 1 t Y r— —r ---r 3 :Building Construction :Building Construction :12/11/2031 :12/31/2031 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 -Site Preparation +Site Preparation 110/1/2031 110/14/2031 5: 10: 2 -Trenching :Grading 11011512031 112/10/2031 1 5: 41 1 t Y r— —r ---r 3 :Building Construction :Building Construction :12/11/2031 :12/31/2031 5. 15. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00: 7; 18.00. 0.00 0.00 15' 4.00' 2.00' 0.00 i 0.00 i 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 0.0000 0.0000 7) : Off -Road •1 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • i 12,014.86 12,014.86 0.2990 12,022.34 • 48 48 i 03 Total 3.4304 11.2832 58.8430 0.1269 1.0605 0.3923 1.4528 0.1145 0.3923 0.5068 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 11.2832 .1 .1 I - Worker •1 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 119.7307 119.7307 1.5600e- 119.7698 0.3923 0.8059 003 004 004 • 003 Total 0.0000 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 119.7307 119.7307 1.5600e- 119.7698 48 48 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 1 0.0000 • Off -Road 9 3.4304 11.2832 58.8430 0.1269 0.3923 0.3923 0.3923 0.3923 • 0.0000 12,014.86 12,014.86 0.2990 12,022.34 • • 48 48 1 03 Total 3.4304 11.2832 58.8430 0.1269 0.4136 0.3923 0.8059 0.0447 0.3923 0.4369 0.0000 12,014.86 12,014.86 0.2990 12,022.34 48 48 03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 5.1442 .1 .1 I - Worker •1 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 • i 119.7307 119.7307 1.5600e- 119.7698 1.0605 0.5236 003 004 004 • 003 Total 0.6381 0.0470 0.0201 0.2707 1.2000e- 0.1924 7.5000e- 0.1932 0.0510 6.9000e- 0.0517 119.7307 119.7307 1.5600e- 119.7698 57 57 003 31 004 004 003 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •i 1.0605 0.0000 1.0605 0.1145 0.0000 0.1145 •. 0.0000 : 0.0000 J J J J J J J J J 1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 17,192.08 17,192.08 0.4495 17,203.32 • • 57 57 1 31 Total 5.1442 14.0338 66.2475 0.1734 1.0605 0.5236 1.5841 0.1145 0.5236 0.6381 17,192.08 17,192.08 0.4495 17,203.32 57 57 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 31 1 Worker •1 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 93.7023 93.7023 1.2200e- 93.7329 66.2475 0.1734 004 004 004 • 003 Total 0.0447 0.0368 0.0157 0.2119 9.4000e- 004 0.1506 5.9000e- 004 0.1512 0.0400 5.4000e- 004 0.0405 93.7023 93.7023 1.2200e- 003 93.7329 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 0.4136 0.0000 0.4136 0.0447 0.0000 0.0447 •• 0.0000 : 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 5.1442 14.0338 66.2475 0.1734 0.5236 0.5236 0.5236 0.5236 • 0.0000 17,192.08 17,192.08 0.4495 17,203.32 • • 56 56 1 31 Total 5.1442 14.0338 66.2475 0.1734 0.4136 0.5236 0.9372 0.0447 0.5236 0.5682 0.0000 17,192.08 17,192.08 0.4495 17,203.32 56 56 31 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Trenching - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 22 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 138.9086 1 .1 .1 .1 - Worker Worker •i 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 93.7023 93.7023 1.2200e- 93.7329 1.1374 1.1374 004 004 004 • 003 Total 0.8293 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 93.7023 93.7023 1.2200e- 86 93.7329 22 004 004 004 003 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 •• i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor • 2.8700e- 0.1179 0.0249 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9800e- • i 41.2695 41.2695 : 2.4400e- 41.3304 9.4640 003 004 004 003 004 003 1 003 138.9086 .1 .1 I - Worker • 8.1700e- 3.4900e- 0.0471 2.1000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- • i 20.8227 20.8227 2.7000e- 20.8295 1.1374 003 003 004 004 003 004 003 • 004 Total 29,788.08 0.0110 0.1214 0.0720 6.0000e- 0.0435 2.3000e- 0.0437 0.0118 2.2000e- 0.0120 62.0923 62.0923 2.7100e- 62.1600 86 86 22 004 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 • 0.0000 i 29,788.08 29,788.08 0.8293 29,808.82 • • 86 86 22 Total 9.4640 37.7351 138.9086 0.3067 1.1374 1.1374 1.1374 1.1374 0.0000 29,788.08 29,788.08 0.8293 29,808.82 86 86 22 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2031 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling Vendor Worker Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.8700e- 0.1179 0.0249 3.9000e- 0.0100 1.0000e- 0.0101 2.8900e- 1.0000e- 2.9800e- i 003 004 004 003 004 003 .1 J .1 .1 .1 .1 J .1 ; 8.1700e- 3.4900e- 0.0471 2.1000e- 0.0335 1.3000e- 0.0336 8.8800e- 1.2000e- 9.0000e- i 003 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 J .1 J t i 41.2695 41.2695 : 2.4400e- 41.3304 1 003 J .1 J -I- i 20.8227 20.8227 2.7000e- 20.8295 004 Total 0.0110 0.1214 0.0720 6.0000e- 004 0.0435 2.3000e- 004 0.0437 0.0118 2.2000e- 004 0.0120 62.0923 62.0923 2.7100e- 003 62.1600 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces ' 0.563257' 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Asphalt Surfaces i 0 i i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 5.5400e- 1 1.0000e- i 1.0200e- 1 0.0000 1 1 0.0000 1 0.0000 i 1 0.0000 0.0000 i 2.1900e- 1 2.1900e- 1 1.0000e- 1 i 2.3300e- ': 003 I 005 I 003 I 1 003 I 003 I 005 I i 003 '� I I I I 1 1 I I I I I 1 • el. F 4. F F 4. 4. 4. F r • . F F F r Unmitigated - 5.5400e- • 1.0000e- • 1.0200e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 2.1900e- • 2.1900e- • 1.0000e- • • 2.3300e- 003 005 003 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 19 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 1.9000e-' : 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: 003 J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 J .1 .1 J .1 J .1 .1 .1 .1 J Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 0.0000 0.0000 005 005 003 : • 003 003 005 i 003 Total 5.5300e- 1.0000e- 1.0200e- 0.0000 003 003 005 003 0.0000 0.0000 • 0.0000 0.0000 Total 2.1900e- 2.1900e- 1.0000e- 0.0000 2.3300e- 0.0000 003 005 003 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 003 005 003 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 1.9000e- 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 Coating :: 003 ; J J J J J J J J • J J .1 • Consumer • 3.5400e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products 003 ; J J J J J J J J .• J J J • Landscaping • 9.0000e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 2.1900e- 2.1900e- 1.0000e- 2.3300e- 005 005 003 ; 003 003 005 003 • Total 5.5300e- 1.0000e- 1.0200e- 0.0000 0.0000 0.0000 0.0000 0.0000 2.1900e- 2.1900e- 1.0000e- 2.3300e- 003 005 003 003 003 005 003 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 19 Date: 1/5/2021 4:04 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.12: CALEEMOD SUBSTATION CONSTRUCTION EMISSIONS MODEL OUTPUTS (UNMITIGATED) 12188-05 AQ Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Substation Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population User Defined Industrial Other Asphalt Surfaces • • • • 0.80 50.00 4 User Defined Unit 1000sgft 0.02 1.13 4. 800.00 50,000.00 0 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Total Project area is 1.15 acres. Construction Phase - Construction of Substation anticipated to start Quarter 1 2024 and end Quarter 2 2025 Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Fleet Mix - CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Table Name tblConstructionPhase tblConstructionPhase tblConstructionPhase tblGrading tblLandUse tblLandUse tblLandUse tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics 1 Column Name I • NumDays i r • NumDays T r • NumDays T r • AcresOfGrading i r • LandUseSquareFeet i r • LotAcreage i r • LotAcreage i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • UsageHours i r • UsageHours i r • UsageHours i r • UsageHours i r • UsageHours i • CO2lntensityFactor • Default Value New Value 200.00 20.00 4.00 225.00 0.00 0.00 1.15 1.00 1.00 1.00 3.00 1.00 3.00 6.00 6.00 6.00 6.00 6.00 4 4 4 4 4 4 4 4 4 4 4 287.00 15.00 90.00 90.00 800.00 0.02 1.13 0.00 2.00 4.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 1270.9 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 21.3596 165.7956 165.7576 0.5128 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 • 0.0000 ' 49,617.27 49,617.27 15.6706 0.0000 50,009.04 J J J J J J J J w J J J T 97 97 i 55 e J .1 .1 J .1 J .1 .1 . .1 .1 J 2025 .1 20.1696 144.3714 162.2906 0.5125 0.2158 5.7347 5.9506 0.0582 5.2899 5.3480 • 0.0000 i 49,592.15 49,592.15 15.6614 0.0000 49,983.69 • • 50 50 10 Maximum 21.3596 165.7956 165.7576 0.5128 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 0.0000 49,617.27 49,617.27 15.6706 0.0000 50,009.04 11 0.00 0.00 Reduction 97 97 55 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 21.3596 165.7956 165.7576 0.5128 3.4567 6.6730 7.7744 1.5198 6.1553 6.2135 • 0.0000 49,617.27 49,617.27 15.6706 0.0000 50,009.04 96 96 1 55 J J J J J J J J w J J J T 2025 •i 20.1696 144.3714 162.2906 0.5125 0.2158 5.7347 5.9506 0.0582 5.2899 5.3480 • 0.0000 i 49,592.15 49,592.15 15.6614 0.0000 49,983.69 Total PM2.5 50 50 10 Maximum 21.3596 165.7956 165.7576 0.5128 3.4567 6.6730 7.7744 1.5198 6.1553 6.2135 0.0000 49,6167.27 49,6167.27 15.6706 0.0000 50,0 59.04 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 54.05 0.00 23.94 56.97 0.00 10.58 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 22 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day r Area 4 0.0499 5.0000e- 5.1700e- 0.0000 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy 9� 005 003 005 005 005 005 : 005 . J J J J J J J J • J J J J J J J J J J J 4 J J J T •I Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total f J J J .1 J J J J 4 J J J T 5.0000e- Mobile 0.0000 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 2.0000e- Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 005 003 005 005 005 005 005 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 0.0499 5.0000e- ' 5.1700e- 0.0000 1 : 2.0000e- 2.0000e- I 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •1 005 003 I 005 005 005 005 : 005 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Grading •Graders Grading [Off -Highway Trucks Grading [Plate Compactors Grading :Rubber Tired Dozers Grading :Scrapers Grading +Skid Steer Loaders Grading :Sweepers/Scrubbers Grading +Tractors/Loaders/Backhoes Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction [Air Compressors :Cranes :Excavators :Forklifts :Generator Sets :Graders Building Construction :Off -Highway Trucks Building Construction :Other Construction Equipment Building Construction :Plate Compactors Building Construction :Rollers Building Construction :Rubber Tired Dozers Building Construction [Scrapers Building Construction +Skid Steer Loaders Building Construction +Tractors/Loaders/Backhoes Building Construction :Trenchers Building Construction :Welders 1' 26 1 1 2 1 1 0 1 2 3 1 1 1 28 5 1 2 1 2 1 4 1 1 1 0' 8.00' 187' 0.41 8.00i 402 0.38 8.001 8' 0.43 8.001 247' 0.40 8.001 367' 0.48 8.001 65' 0.37 8.001 64' 0.46 7.001 97' 0.37 8.001 78' 0.48 8.001 231 0.29 8.001 158' 0.38 8.001 89' 0.20 8.001 84' 0.74 8.001 187' 0.41 8.001 402' 0.38 8.001 172' 0.42 8.001 8' 0.43 8.001 80' 0.38 8.001 247' 0.40 8.001 367' 0.48 8.001 65' 0.37 8.001 97' 0.37 8.001 78' 0.50 r 8.00: 46' 0.45 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Demolition Grading Building Construction Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length 1 17: 43.00. 0.00: 0.00: 11.00: 33: 83.00. 0.00i 0.00: 11.00: 5.40: + r 54' 21.00' 8.00' 0.00' Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class 5.40: 20.00:LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Off -Road 4 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 • 19,112.574 19,112.574 6.181419,267.10 .11 • 8 8 i 96 Total 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Worker 9 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 308.3489 308.3489 6.1500e- 308.5026 53.5705 0.1975 003 003 003 • 003 Total 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 308.3489 308.3489 6.1500e- 308.5026 48 003 003 96 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 • 0.0000 119,112.574 19,112.574 6.1814 19,267.10 • • 8 8 96 Total 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 0.0000 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 3.3 Grading - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 18 1 Worker 9 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 308.3489 308.3489 6.1500e- 308.5026 104.7398 0.3945 003 003 003 • 003 Total 3.4247 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 308.3489 308.3489 6.1500e- 308.5026 87 003 003 18 003 003 3.3 Grading - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 7.0826 0.0000 7.0826 3.4247 0.0000 3.4247 •• 0.0000 : 0.0000 • Off -Road •u 15.7672 115.8856 104.7398 0.3945 4.3138 4.3138 3.9695 3.9695 • 38,176.01 38,176.01 12.3393 38,484.50 • • 87 87 1 18 Total 15.7672 115.8856 104.7398 0.3945 7.0826 4.3138 11.3964 3.4247 3.9695 7.3942 38,176.01 38,176.01 12.3393 38,484.50 87 87 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 595.1851 595.1851 0.0119 595.4817 0.3945 2.7622 003 003 003 • 7.0760 Total 3.9695 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 595.1851 595.1851 0.0119 595.4817 86 86 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 2.7622 0.0000 2.7622 1.3357 0.0000 1.3357 •• 0.0000 : 0.0000 • Off -Road .1 15.7672 115.8856 104.7398 0.3945 4.3138 4.3138 3.9695 3.9695 • 0.0000 38,176.01 38,176.01 12.3393 38,484.50 86 86 1 18 • • Total 15.7672 115.8856 104.7398 0.3945 2.7622 4.3138 7.0760 1.3357 3.9695 5.3051 0.0000 38,176.01 38,176.01 12.3393 38,484.50 86 86 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 21.2801 1 Worker 9 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 595.1851 595.1851 0.0119 595.4817 6.6716 003 003 003 • Total 6.1540 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 595.1851 595.1851 0.0119 595.4817 47 47 003 90 003 003 3.4 Building Construction - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 21.2801 165.2586 165.1826 0.5096 i 6.6716 6.6716 6.1540 6.1540 •. i 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 Total 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0120 0.5047 0.0964 1.6800e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 • i 177.6660 177.6660: 0.0107 177.9324 21.2801 003 004 004 165.1826 .1 .1 I - Worker 9 0.0674 0.0323 0.4785 1.5100e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 150.5890 150.5890 3.0000e- 150.6641 6.6716 003 003 004 • 003 Total 49,289.02 0.0794 0.5369 0.5749 3.1900e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 328.2550 328.2550 0.0137 328.5965 46 46 90 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 • 0.0000 i 49,289.02 49,289.02 15.6570 49,680.44 • • 46 46 90 Total 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 0.0000 49,289.02 49,289.02 15.6570 49,680.44 46 46 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 14 1 1 • i Vendor •i 0.0120 0.5047 0.0964 1.6800e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 • i 177.6660 177.6660 : 0.0107 177.9324 161.7538 003 004 004 .1 .1 I - Worker 9 0.0674 0.0323 0.4785 1.5100e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 150.5890 150.5890 3.0000e- 150.6641 5.2886 5.2886 003 003 004 • 003 Total 15.6484 0.0794 0.5369 0.5749 3.1900e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 328.2550 328.2550 0.0137 27 328.5965 14 003 003 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 20.0943 143.8423 161.7538 i 0.5094 5.7333 5.7333 5.2886 5.2886 • i 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 Total 20.0943 143.8423 161.7538 0.5094 5.7333 5.7333 5.2886 5.2886 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0117 0.4998 0.0930 1.6700e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 • i 176.4260 176.4260 : 0.0104 176.6853 20.0943 003 004 004 Worker 9 0.0637 0.0294 0.4438 1.4500e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 • i 144.5563 144.5563 2.7200e- 144.6243 5.7333 003 004 004 • 003 Total 5.2886 0.0753 0.5292 0.5368 3.1200e- 0.2158 1.4100e- 0.2172 0.0582 1.3100e- 0.0595 320.9823 320.9823 0.0131 321.3096 27 27 003 14 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 20.0943 143.8423 161.7538 i 0.5094 5.7333 5.7333 5.2886 5.2886 • 0.0000 i 49,271.17 49,271.17 15.6484 49,662.38 • • 27 27 14 Total 20.0943 143.8423 161.7538 0.5094 5.7333 5.7333 5.2886 5.2886 0.0000 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 Vendor .1 •i 0.0117 0.4998 0.0930 1.6700e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 i i 176.4260 176.4260 : 0.0104 176.6853 003 004 004 J .1 .1 .1 .1 J .1 J Worker 9 0.0637 0.0294 0.4438 1.4500e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 i i 144.5563 144.5563 2.7200e- 144.6243 003 004 004 • 003 Total 0.0753 0.5292 0.5368 3.1200e- 0.2158 1.4100e- 0.2172 0.0582 1.3100e- 0.0595 320.9823 320.9823 0.0131 321.3096 003 003 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 i 0.0000 '� 9 I 1 1 1 1 1 1 1 1 1 1 1 1 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Other Asphalt Surfaces User Defined Industrial; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 5.40 T 0.00 r 5.40 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces User Defined Industrial 2 12.50 r 4 • 12.50 4.20 -• 4.20 5.40 T 0.00 r 5.40 • 0.00 0.00 0.00 • 0 -r r 0.00 0.00 • 0 0 0 r r 0 0 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 18 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 : 0.0000 • i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated :� • i 1 I I 1 I I I 1 , I 1 1 1 .1. } } 4. } } 4. } 4. r • . } 4. } r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt 0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 i Surfaces i -. User Defined 0 • Industrial i J J .1 J .1 .1 J .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • .1 .1 J 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt i 0 .1 Surfaces i . F. 4 User Defined I0 • Industrial 1 . 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J .1 .1 .• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . • i 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0499 i 5.0000e- i 5.1700e- : 0.0000 1 i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • i 0.0111 i 0.0111 i 3.0000e- i i 0.0118 9 1 005 1 003 1 1 1 005 1 005 1 1 005 005 . ' 1 1 005 1 1 •1 I 1 1 1 1 1 1 1 1 1 1 1 I. 1. 1. 1. 1. 4. 1. 4. 1. r 4. 1. 1. r Unmitigated • 0.0499 • 5.0000e- • 5.1700e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0111 • 0.0111 • 3.0000e- • • 0.0118 005 003 005 005 005 005 005 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: J J J J J J J J . J J .1 T Consumer 9 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products J J J J J J J J . J J J T Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Mitigated 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day I Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Coating :: .1 J Consumer •i 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products .1 J Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 : • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day I Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 22 Date: 1/5/2021 4:40 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Summer Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Substation Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population User Defined Industrial Other Asphalt Surfaces • • • • 0.80 50.00 4 User Defined Unit 1000sgft 0.02 1.13 4. 800.00 50,000.00 0 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Total Project area is 1.15 acres. Construction Phase - Construction of Substation anticipated to start Quarter 1 2024 and end Quarter 2 2025 Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Fleet Mix - CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Table Name tblConstructionPhase tblConstructionPhase tblConstructionPhase tblGrading tblLandUse tblLandUse tblLandUse tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics 1 Column Name • NumDays i r • NumDays T r • NumDays T r • AcresOfGrading i r • LandUseSquareFeet i r • LotAcreage i r • LotAcreage i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • • OffRoadEquipmentUnitAmount i r • UsageHours i r • UsageHours i r • UsageHours i r • UsageHours i r • UsageHours i • CO2lntensityFactor • Default Value New Value 200.00 20.00 4.00 225.00 0.00 0.00 1.15 1.00 1.00 1.00 3.00 1.00 3.00 6.00 6.00 6.00 6.00 6.00 4 4 4 4 4 4 4 4 4 4 4 287.00 15.00 90.00 90.00 800.00 0.02 1.13 0.00 2.00 4.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 1270.9 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 21.3580 165.7886 165.6847 0.5125 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 • 0.0000 ' 49,594.10 49,594.10 15.6715 0.0000 49,985.88 PM10 20 20 I 89 e J .1 .1 J .1 J .1 .1 . .1 .1 J 2025 .1 20.1683 144.3643 162.2236 0.5123 0.2158 5.7348 5.9506 0.0582 5.2899 5.3481 • 0.0000 i 49,569.70 49,569.70 15.6623 0.0000 49,961.26 • • 63 63 34 Maximum 21.3580 165.7886 165.6847 0.5125 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 0.0000 49,594.10 49,594.10 15.6715 0.0000 49,985.88 11 49,985.88 0.00 1 20 20 20 20 89 88 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 21.3580 165.7886 165.6847 0.5125 3.4567 6.6730 7.7744 1.5198 6.1553 6.2135 • 0.0000 49,594.10 49,594.10 15.6715 0.0000 49,985.88 PM10 20 20 1 88 Total J J J J J J J J w J J J T 2025 •i 20.1683 144.3643 162.2236 0.5123 0.2158 5.7348 5.9506 0.0582 5.2899 5.3481 • 0.0000 i 49,569.70 49,569.70 15.6623 0.0000 49,961.26 • 63 63 33 Maximum 21.3580 165.7886 165.6847 0.5125 3.4567 6.6730 7.7744 1.5198 6.1553 6.2135 0.0000 49,594.10 49,594.10 15.6715 0.0000 49,985.88 0.00 1 20 20 88 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 54.05 0.00 23.94 56.97 0.00 10.58 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 22 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day r Area 4 0.0499 5.0000e- 5.1700e- 0.0000 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy 9� 005 003 005 005 005 005 : 005 . J J J J J J J J • J J J J J J J J J J J 4 J J J T •I Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total f J J J .1 J J J J 4 J J J T 5.0000e- Mobile 0.0000 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 2.0000e- Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 005 003 005 005 005 005 005 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 0.0499 5.0000e- ' 5.1700e- 0.0000 1 : 2.0000e- 2.0000e- I 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •1 005 003 I 005 005 005 005 : 005 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Grading •Graders Grading [Off -Highway Trucks Grading [Plate Compactors Grading :Rubber Tired Dozers Grading :Scrapers Grading +Skid Steer Loaders Grading :Sweepers/Scrubbers Grading +Tractors/Loaders/Backhoes Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction [Air Compressors :Cranes :Excavators :Forklifts :Generator Sets :Graders Building Construction :Off -Highway Trucks Building Construction :Other Construction Equipment Building Construction :Plate Compactors Building Construction :Rollers Building Construction :Rubber Tired Dozers Building Construction [Scrapers Building Construction +Skid Steer Loaders Building Construction +Tractors/Loaders/Backhoes Building Construction :Trenchers Building Construction :Welders 1' 26 1 1 2 1 1 0 1 2 3 1 1 1 28 5 1 2 1 2 1 4 1 1 1 0' 8.00' 187' 0.41 8.00i 402 0.38 8.001 8' 0.43 8.001 247' 0.40 8.001 367' 0.48 8.001 65' 0.37 8.001 64' 0.46 7.001 97' 0.37 8.001 78' 0.48 8.001 231 0.29 8.001 158' 0.38 8.001 89' 0.20 8.001 84' 0.74 8.001 187' 0.41 8.001 402' 0.38 8.001 172' 0.42 8.001 8' 0.43 8.001 80' 0.38 8.001 247' 0.40 8.001 367' 0.48 8.001 65' 0.37 8.001 97' 0.37 8.001 78' 0.50 r 8.00: 46' 0.45 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition Grading Building Construction 17; 43.00. 0.00: 33: 83.00• 0.00: - 1- ,- 54: 54: 21.00' 8.00' 0.00 i 0.00: 0.00' 11.00: 5.40: 11.00: 5.40: 11.00: 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Off -Road 4 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 • 19,112.574 19,112.574 6.181419,267.10 .11 • 8 8 i 96 Total 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 19,112.57 48 19,112.57 48 6.1814 19,267.10 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 96 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 1 0.0000 0.0000 : 0.0000 0.0000 Worker •1 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 276.7574 276.7574 5.4000e- 276.8924 2.1518 003 003 003 • 003 Total 1.9796 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 276.7574 276.7574 5.4000e- 276.8924 48 48 003 96 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 • 0.0000 119,112.574 19,112.574 6.1814 19,267.10 • • 8 8 96 Total 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 0.0000 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Construction Off -Site 3.3 Grading - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 15.7672 1 Worker •1 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 276.7574 276.7574 5.4000e- 276.8924 7.0826 4.3138 003 003 003 • 003 Total 7.3942 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 276.7574 276.7574 5.4000e- 276.8924 87 87 003 18 003 003 003 3.3 Grading - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 7.0826 0.0000 7.0826 3.4247 0.0000 3.4247 •• 0.0000 : 0.0000 • Off -Road •u 15.7672 115.8856 104.7398 0.3945 4.3138 4.3138 3.9695 3.9695 • 38,176.01 38,176.01 12.3393 38,484.50 • • 87 87 1 18 Total 15.7672 115.8856 104.7398 0.3945 7.0826 4.3138 11.3964 3.4247 3.9695 7.3942 38,176.01 38,176.01 12.3393 38,484.50 87 87 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 534.2061 534.2061 0.0104 534.4667 115.8856 104.7398 003 003 003 • 2.7622 Total 7.0760 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 534.2061 534.2061 0.0104 534.4667 003 86 003 18 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 2.7622 0.0000 2.7622 1.3357 0.0000 1.3357 •• 0.0000 : 0.0000 • Off -Road 9 15.7672 115.8856 104.7398 0.3945 4.3138 4.3138 3.9695 3.9695 • 0.0000 38,176.01 38,176.01 12.3393 38,484.50 86 86 1 18 • • Total 15.7672 115.8856 104.7398 0.3945 2.7622 4.3138 7.0760 1.3357 3.9695 5.3051 0.0000 38,176.01 38,176.01 12.3393 38,484.50 86 86 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2024 Unmitigated Construction On -Site i ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 21.2801 1 Worker 9 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 534.2061 534.2061 0.0104 534.4667 6.6716 003 003 003 • Total 6.1540 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 534.2061 534.2061 0.0104 534.4667 47 47 003 90 003 003 3.4 Building Construction - 2024 Unmitigated Construction On -Site i ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 • i 49,289.02 49,289.02 15.6570 49,680.44 • • 47 47 90 Total 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0128 0.4967 0.1129 1.6100e- 0.0401 4.4000e- 0.0406 0.0116 4.2000e- 0.0120 • i 169.9168 169.9168: 0.0119 170.2133 21.2801 003 004 004 Worker 9 0.0651 0.0333 0.3891 1.3600e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 135.1606 135.1606 2.6400e- 135.2265 6.6716 003 003 004 • 003 Total 6.1540 0.0779 0.5300 0.5021 2.9700e- 0.2158 1.4400e- 0.2173 0.0582 1.3400e- 0.0595 305.0774 305.0774 0.0145 305.4399 46 46 003 90 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 • 0.0000 i 49,289.02 49,289.02 15.6570 49,680.44 • • 46 46 90 Total 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 0.0000 49,289.02 49,289.02 15.6570 49,680.44 46 46 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 14 1 1 • i Vendor •i 0.0128 0.4967 0.1129 1.6100e- 0.0401 4.4000e- 0.0406 0.0116 4.2000e- 0.0120 • i 169.9168 169.9168 : 0.0119 170.2133 161.7538 003 004 004 Worker 9 0.0651 0.0333 0.3891 1.3600e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 135.1606 135.1606 2.6400e- 135.2265 5.7333 003 003 004 • 003 Total 49,271.17 0.0779 0.5300 0.5021 2.9700e- 0.2158 1.4400e- 0.2173 0.0582 1.3400e- 0.0595 305.0774 305.0774 0.0145 305.4399 27 27 14 003 003 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 20.0943 143.8423 161.7538 i 0.5094 5.7333 5.7333 5.2886 5.2886 • i 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 Total 20.0943 143.8423 161.7538 0.5094 5.7333 5.7333 5.2886 5.2886 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 14 1 1 i 20.0943 • ; .1 J .1 .1 .1 .1 J .1 7 J .1 J 1 - Vendor Vendor •i 0.0124 0.4918 0.1092 1.6000e- 0.0401 4.3000e- 0.0406 0.0116 4.1000e- 0.0120 • i 168.7794 168.7794 : 0.0115 169.0680 003 004 004 5.7333 V .1 .1 .1 I - Worker 9 0.0616 0.0303 0.3606 1.3000e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 • i 129.7542 129.7542 2.3900e- 129.8140 0.0000 49,271.17 003 004 004 • 003 Total 49,662.38 0.0741 0.5221 0.4698 2.9000e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 298.5336 298.5336 0.0139 298.8820 14 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road i 20.0943 143.8423 161.7538 i 0.5094 5.7333 5.7333 5.2886 5.2886 • 0.0000 i 49,271.17 49,271.17 15.6484 49,662.38 • • 27 27 14 Total 20.0943 143.8423 161.7538 0.5094 5.7333 5.7333 5.2886 5.2886 0.0000 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 .1 .1 J .1 .1 .1 .1 J 7 J .1 J t Vendor •i 0.0124 0.4918 0.1092 1.6000e- 0.0401 4.3000e- 0.0406 0.0116 4.1000e- 0.0120 i i 168.7794 168.7794 : 0.0115 169.0680 003 004 004 .1 J .1 .1 .1 .1 J .1 ; J .1 J -I- Worker Worker •i 0.0616 0.0303 0.3606 1.3000e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 i i 129.7542 129.7542 2.3900e- 129.8140 003 004 004 • 003 Total 0.0741 0.5221 0.4698 2.9000e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 298.5336 298.5336 0.0139 298.8820 003 003 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 i 0.0000 '� 9 I 1 1 1 1 1 1 1 1 1 1 1 1 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Other Asphalt Surfaces User Defined Industrial; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 5.40 T 0.00 r 5.40 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces User Defined Industrial 2 12.50 r 4 • 12.50 4.20 -• 4.20 5.40 T 0.00 r 5.40 • 0.00 0.00 0.00 • 0 t r 0.00 0.00 • 0 0 0 r r 0 0 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 18 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 : 0.0000 • i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated :� • i 1 I I 1 I I I 1 , I 1 1 1 .1. } } 4. } } 4. } 4. r • . } 4. } r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt 0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 i Surfaces i -. User Defined 0 • Industrial i J J .1 J .1 .1 J .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • .1 .1 J 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt i 0 .1 Surfaces i . F. 4 User Defined I0 • Industrial 1 . 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J .1 .1 .• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . • i 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0499 i 5.0000e- i 5.1700e- : 0.0000 1 i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • i 0.0111 i 0.0111 i 3.0000e- i i 0.0118 9 1 005 1 003 1 1 1 005 1 005 1 1 005 005 . ' 1 1 005 1 1 •1 I 1 1 1 1 1 1 1 1 1 1 1 I. 1. 1. 1. 1. 4. 1. 4. 1. r 4. 1. 1. r Unmitigated • 0.0499 • 5.0000e- • 5.1700e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0111 • 0.0111 • 3.0000e- • • 0.0118 005 003 005 005 005 005 005 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: J J J J J J J J . J J .1 T Consumer 9 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products J J J J J J J J . J J J T Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 22 6.2 Area by SubCategory Mitigated Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Coating :: .1 J Consumer •i 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products .1 J Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 : • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 22 Date: 1/5/2021 4:39 PM Travertine Specific Plan (Substation Construction - Unmitigated) - Riverside -Salton Sea County, Winter Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.13: CALEEMOD PHASE B CRUSHING EMISSIONS MODEL OUTPUTS 12188-05 AQ Report URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Phase B Crushing - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Phase B Crushing anticipated to start Quarter 1 of 2025 and end Quarter 2 of 2027 Off-road Equipment - Type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. This model assumed use of Sandvik QJ331 which has a horsepower of 350. Trips and VMT - Crushing activities will occur anywhere onsite within the grading limits. Demolition - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblConstructionPhase tblConstructionPhase tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics tblTripsAndVMT • NumDays r Y • Y PhaseEndDate HorsePower Y• OffRoadEquipmentType Y• OffRoadEquipmentUnitAmount YF • OffRoadEquipmentUnitAmount r YF • OffRoadEquipmentUnitAmount r 4 1- CO2lntensityFactor 500.00 3/1/2027 85.00 1.00 3.00 2.00 1270.9 Y f f HaulingTripNumber 99,553.00 585.00 6/28/2027 350.00 Crushing/Proc. Equipment 0.00 0.00 0.00 706.2 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •4 .1; .1 2026 •i 2027 •i 1.0732 4.5158 5.1720 0.0243 1 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 • 0.0000 J .1 .1 .1 .1 J .1 .1 le 1.0727 4.5154 5.1677 0.0243 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 • 0.0000 J .1 .1 .1 .1 J .1 .1 le 1.0722 4.5151 5.1639 0.0243 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 • 0.0000 • ' 2,756.951 2,756.951 0.0967 1 0.0000 2,759.368 4 4 i 5 .1 .1 .1 i 2,756.198 2,756.198 0.0967 0.0000 2,758.615 9 9 2 .1 .1 .1 2,755.539 2,755.539 0.0966 0.0000 2,757.955 9 9 1 5 Maximum 1 1.0732 4.5158 5.1720 0.0243 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 0.0000 2,756.951 4 2,756.951 4 0.0967 0.0000 2,759.368 5 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 1.0732 4.5158 5.1720 1 0.0243 1 14.4769 1 0.1446 14.6215 1 2.1948 0.1446 2.3394 • 0.0000 i 2,756.951 2,756.951 0.0967 1 0.0000 2,759.368 •1. 4 4 5 J J J .1 J J J J . J J J 2026 •i 1.0727 4.5154 5.1677 0.0243 14.4769 0.1446 14.6215 2.1948 0.1446 2.3394 • 0.0000 i 2,756.198 2,756.198 0.0967 0.0000 2,758.615 9 9 2 J J J J J J J J . J J J 2027 •i 1.0722 4.5151 5.1639 0.0243 14.4769 0.1446 14.6215 2.1948 0.1446 2.3394 • 0.0000 i 2,755.539 2,755.539 0.0966 0.0000 2,757.955 9 9 5 • • Maximum 1.0732 4.5158 5.1720 0.0243 14.4769 0.1446 14.6215 2.1948 0.1446 2.3394 0.0000 2,756.951 2,756.951 0.0967 0.0000 2,759.368 4 4 5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.96 0.00 60.72 60.93 0.00 59.40 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 18 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 10.9849 4.3000e- 0.0471 0.0000 I : 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- I 0.1079 0.1013 0.1013 2.6000e- 1 0.1079 9004 1 004 004 004 004 : 004 9004 004 004 004 004 ; J .1 .1 J .1 J .1 .1 .1 .1 J Energy •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J .1 J .1 .1 J .1 J .1 .1 .1 .1 J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total Mobile 10.9849 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.0000 0.1013 0.1013 2.6000e- 0.0000 0.1079 0.1013 0.1013 004 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9849 4.3000e- 1 0.0471 0.0000 I 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 1 0.1079 9004 004 004 004 004 ; 004 J J J .1 J J J J w J J .1 Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J w J J J Mobile 9 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 i 0.0000 Total 10.9849 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :4/1/2025 :6/28/2027 585: Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type i Demolition :Concrete/Industrial Saws Demolition :Crushing/Proc. Equipment Demolition Demolition :Excavators :Rubber Tired Dozers Amount 0 1 0 IUsage Hours I Horse Power I Load Factor 0: 8.001 81: 0.73 8.001 350: 0.78 8.001 158: 0.38 r 8.00: 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 1' 3.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix .HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Demolition - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust 9 37.0559 0.0000 1 37.0559 5.6106 i 0.0000 5.6106 • 0.0000 0.0000 f J J J J J J J J ; J J J T Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • i 2,736.300 2,736.300 0.0963 2,738.707 • 5 5 9 Total 1.0641 4.5116 5.1086 0.0241 37.0559 0.1445 37.2004 5.6106 0.1445 5.7551 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 18 3.2 Demolition - 2025 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 1 9 1 Worker • 9.0900e- 4.1900e- 0.0634 2.1000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- • i 20.6509 20.6509 3.9000e- 20.6606 5.1086 0.0241 003 003 004 004 003 004 003 • 004 Total 2.1881 9.0900e- 4.1900e- 0.0634 2.1000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 20.6509 20.6509 3.9000e- 20.6606 003 003 5 004 004 9 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.4518 0.0000 I 14.4518 2.1881 1 0.0000 2.1881 •• i 0.0000 : 0.0000 • Off -Road •u 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 0.0000 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 14.4518 0.1445 14.5963 2.1881 0.1445 2.3326 0.0000 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 18 3.2 Demolition - 2025 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 3.2 Demolition - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 9 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 5.1086 1 37.0559 41 Worker • 9.0900e- 4.1900e- 0.0634 2.1000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- • i 20.6509 20.6509 3.9000e- 20.6606 0.1445 5.7551 003 003 004 004 003 004 003 • 004 Total 0.0963 9.0900e- 4.1900e- 0.0634 2.1000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 20.6509 20.6509 3.9000e- 5 20.6606 003 003 004 004 003 004 003 004 3.2 Demolition - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 37.0559 0.0000 37.0559 1 5.6106 1 0.0000 5.6106 •• 0.0000 : 0.0000 • Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 37.0559 0.1445 37.2004 5.6106 0.1445 5.7551 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 18 3.2 Demolition - 2026 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 1 9 1 Worker • 8.6200e- 3.8400e- 0.0591 2.0000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- • i 19.8985 19.8985 3.5000e- 19.9073 5.1086 0.0241 003 003 004 004 003 004 003 • 004 Total 2.1881 8.6200e- 3.8400e- 0.0591 2.0000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- 19.8985 19.8985 3.5000e- 19.9073 003 003 5 004 004 9 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.4518 0.0000 I 14.4518 2.1881 1 0.0000 2.1881 •• i 0.0000 : 0.0000 • Off -Road •u 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 0.0000 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 14.4518 0.1445 14.5963 2.1881 0.1445 2.3326 0.0000 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 18 3.2 Demolition - 2026 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 3.2 Demolition - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 9 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 5.1086 1 37.0559 41 Worker • 8.6200e- 3.8400e- 0.0591 2.0000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- • i 19.8985 19.8985 3.5000e- 19.9073 0.1445 5.7551 003 003 004 004 003 004 003 • 004 Total 0.0963 8.6200e- 3.8400e- 0.0591 2.0000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- 19.8985 19.8985 3.5000e- 5 19.9073 003 003 004 004 003 004 003 004 3.2 Demolition - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 37.0559 0.0000 37.0559 1 5.6106 1 0.0000 5.6106 •• 0.0000 : 0.0000 • Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 37.0559 0.1445 37.2004 5.6106 0.1445 5.7551 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 18 3.2 Demolition - 2027 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 9 41 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 5.1086 1 14.4518 41 .1 .1 .1 I - Worker • 8.1500e- 3.5300e- 0.0553 1.9000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- • i 19.2395 19.2395 3.2000e- 19.2476 0.1445 2.3326 003 003 004 004 003 004 003 • 004 Total 0.0963 8.1500e- 3.5300e- 0.0553 1.9000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- 19.2395 19.2395 3.2000e- 5 19.2476 003 003 004 004 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 14.4518 0.0000 I 14.4518 2.1881 1 0.0000 2.1881 •• 0.0000 : 0.0000 • Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 0.0000 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 14.4518 0.1445 14.5963 2.1881 0.1445 2.3326 0.0000 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 18 3.2 Demolition - 2027 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 I - Worker • 8.1500e- 3.5300e- 0.0553 1.9000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- i i 19.2395 19.2395 3.2000e- 19.2476 003 003 004 004 003 004 003 • 004 Total 8.1500e- 3.5300e- 0.0553 1.9000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- 19.2395 19.2395 3.2000e- 19.2476 003 003 004 004 003 004 003 004 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9849 1 4.3000e- i 0.0471 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • ei. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9849 • 4.3000e- • 0.0471 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 18 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8400 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0471 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8400 1 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 18 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Phase B Crushing - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Phase B Crushing anticipated to start Quarter 1 of 2025 and end Quarter 2 of 2027 Off-road Equipment - Type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. This model assumed use of Sandvik QJ331 which has a horsepower of 350. Trips and VMT - Crushing activities will occur anywhere onsite within the grading limits. Demolition - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblConstructionPhase tblConstructionPhase tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics tblTripsAndVMT • NumDays r Y • Y PhaseEndDate HorsePower Y• OffRoadEquipmentType Y• OffRoadEquipmentUnitAmount Y• OffRoadEquipmentUnitAmount YF • OffRoadEquipmentUnitAmount r 4 1- CO2lntensityFactor 500.00 3/1/2027 85.00 1.00 3.00 2.00 1270.9 Y f f HaulingTripNumber 99,553.00 585.00 6/28/2027 350.00 Crushing/Proc. Equipment 0.00 0.00 0.00 706.2 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 1.0729 4.5159 5.1601 0.0243 1 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 • 0.0000 ' 2,754.836 2,754.836 0.0966 1 0.0000 2,757.252 •1 ; 8 8 I 8 7 7 9 J .1 .1 .1 .1 J .1 .1 le .1 .1 .1 2026 •i 1.0725 4.5155 5.1566 0.0243 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 • 0.0000 i 2,754.161 2,754.161 0.0966 0.0000 2,756.576 7 7 9 • J .1 .1 .1 .1 J .1 .1 le .1 .1 .1 2027 •i 1.0720 4.5152 5.1534 0.0242 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 • 0.0000 2,753.569 2,753.569 0.0966 0.0000 2,755.984 1.0729 • 5 5 i 0 Maximum 1.0729 4.5159 5.1601 0.0243 37.0810 0.1446 37.2256 5.6173 0.1446 5.7619 0.0000 2,754.836 2,754.836 0.0966 0.0000 2,757.252 11 8 8 8 8 8 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 1.0729 4.5159 1 5.1601 1 0.0243 1 14.4769 1 0.1446 14.6215 1 2.1948 0.1446 2.3394 • 0.0000 i 2,754.836 2,754.836 0.0966 1 0.0000 2,757.252 •1 . 8 8 8 J J J .1 J J J J w J J J 2026 •i 1.0725 4.5155 5.1566 0.0243 14.4769 0.1446 14.6215 2.1948 0.1446 2.3394 • 0.0000 i 2,754.161 2,754.161 0.0966 0.0000 2,756.576 7 7 9 J J J J J J J J w J J J 2027 •i 1.0720 4.5152 5.1534 0.0242 14.4769 0.1446 14.6215 2.1948 0.1446 2.3394 • 0.0000 i 2,753.569 2,753.569 0.0966 0.0000 2,755.984 5 5 0 • Maximum 1.0729 4.5159 5.1601 0.0243 14.4769 0.1446 14.6215 2.1948 0.1446 2.3394 0.0000 2,754.836 2,754.836 0.0966 0.0000 2,757.252 1 8 8 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.96 0.00 60.72 60.93 0.00 59.40 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 18 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 10.9849 4.3000e- 0.0471 0.0000 I : 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- I 0.1079 0.1013 0.1013 2.6000e- 1 0.1079 9004 1 004 004 004 004 : 004 9004 004 004 004 004 ; J .1 .1 J .1 J .1 .1 .1 .1 J Energy •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J .1 J .1 .1 J .1 J .1 .1 .1 .1 J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total Mobile 10.9849 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.0000 0.1013 0.1013 2.6000e- 0.0000 0.1079 0.1013 0.1013 004 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area •i 10.9849 4.3000e- 1 0.0471 0.0000 I 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 1 0.1079 9004 004 004 004 004 ; 004 J J J .1 J J J J w J J .1 Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J w J J J Mobile 9 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 i 0.0000 Total 10.9849 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :4/1/2025 :6/28/2027 585: Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type i Demolition :Concrete/Industrial Saws Demolition :Crushing/Proc. Equipment Demolition Demolition :Excavators :Rubber Tired Dozers Amount 0 1 0 IUsage Hours I Horse Power I Load Factor 0: 8.001 81: 0.73 8.001 350: 0.78 8.001 158: 0.38 r 8.00: 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 1' 3.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix .HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Demolition - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust 9 37.0559 0.0000 1 37.0559 5.6106 i 0.0000 5.6106 • 0.0000 0.0000 f J J J J J J J J ; J J J T Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • i 2,736.300 2,736.300 0.0963 2,738.707 • 5 5 9 Total 1.0641 4.5116 5.1086 0.0241 37.0559 0.1445 37.2004 5.6106 0.1445 5.7551 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 18 3.2 Demolition - 2025 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 1 9 1 Worker • 8.8000e- 4.3300e- 0.0515 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- • i 18.5363 18.5363 3.4000e- 18.5449 5.1086 0.0241 003 003 004 004 003 004 003 • 004 Total 2.1881 8.8000e- 4.3300e- 0.0515 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 18.5363 18.5363 3.4000e- 18.5449 003 003 5 004 004 9 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.4518 0.0000 I 14.4518 2.1881 1 0.0000 2.1881 •• i 0.0000 : 0.0000 • Off -Road •u 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 0.0000 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 14.4518 0.1445 14.5963 2.1881 0.1445 2.3326 0.0000 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 18 3.2 Demolition - 2025 Mitigated Construction Off -Site Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Demolition - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 9 1 1 • 1 1.0641 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 37.0559 1 Worker • 8.8000e- 4.3300e- 0.0515 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- • i 18.5363 18.5363 3.4000e- 18.5449 0.1445 5.7551 003 003 004 004 003 004 003 • 004 Total 0.0963 8.8000e- 4.3300e- 0.0515 1.9000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7900e- 18.5363 18.5363 3.4000e- 5 18.5449 003 003 004 004 003 004 003 004 3.2 Demolition - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 37.0559 0.0000 37.0559 1 5.6106 1 0.0000 5.6106 •• 0.0000 : 0.0000 • Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 37.0559 0.1445 37.2004 5.6106 0.1445 5.7551 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 18 3.2 Demolition - 2026 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 9 1 1 • 1 1.0641 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 14.4518 1 Worker • 8.3700e- 3.9600e- 0.0480 1.8000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- • i 17.8612 17.8612 3.1000e- 17.8690 0.1445 2.3326 003 003 004 004 003 004 003 • 004 Total 0.0963 8.3700e- 3.9600e- 0.0480 1.8000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- 17.8612 17.8612 3.1000e- 5 17.8690 003 003 004 004 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 14.4518 0.0000 I 14.4518 2.1881 1 0.0000 2.1881 •• 0.0000 : 0.0000 • Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 0.0000 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 14.4518 0.1445 14.5963 2.1881 0.1445 2.3326 0.0000 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 18 3.2 Demolition - 2026 Mitigated Construction Off -Site Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Demolition - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 9 1 1 • 1 1.0641 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 : 0.0000 0.0000 37.0559 1 Worker • 8.3700e- 3.9600e- 0.0480 1.8000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- • i 17.8612 17.8612 3.1000e- 17.8690 0.1445 5.7551 003 003 004 004 003 004 003 • 004 Total 0.0963 8.3700e- 3.9600e- 0.0480 1.8000e- 0.0251 1.4000e- 0.0252 6.6600e- 1.3000e- 6.7800e- 17.8612 17.8612 3.1000e- 5 17.8690 003 003 004 004 003 004 003 004 3.2 Demolition - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 37.0559 0.0000 37.0559 1 5.6106 1 0.0000 5.6106 •• 0.0000 : 0.0000 • Off -Road 9 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 37.0559 0.1445 37.2004 5.6106 0.1445 5.7551 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 18 3.2 Demolition - 2027 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 9 1 1.0641 .1 .1 I - Worker • 7.9400e- 3.6400e- 0.0448 1.7000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- • i 17.2690 17.2690 2.8000e- 17.2761 14.4518 0.1445 003 003 004 004 003 004 003 • 004 Total 2.3326 7.9400e- 3.6400e- 0.0448 1.7000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- 17.2690 17.2690 2.8000e- 17.2761 003 003 004 9 004 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 14.4518 0.0000 I 14.4518 2.1881 1 0.0000 2.1881 •• i 0.0000 : 0.0000 • Off -Road •u 1.0641 4.5116 5.1086 0.0241 0.1445 0.1445 0.1445 0.1445 • 0.0000 2,736.300 2,736.300 0.0963 2,738.707 • • 5 5 1 9 Total 1.0641 4.5116 5.1086 0.0241 14.4518 0.1445 14.5963 2.1881 0.1445 2.3326 0.0000 2,736.300 2,736.300 0.0963 2,738.707 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 18 3.2 Demolition - 2027 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker • 7.9400e- 3.6400e- 0.0448 1.7000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- i i 17.2690 17.2690 2.8000e- 17.2761 003 003 004 004 003 004 003 • 004 Total 7.9400e- 3.6400e- 0.0448 1.7000e- 0.0251 1.3000e- 0.0252 6.6600e- 1.2000e- 6.7800e- 17.2690 17.2690 2.8000e- 17.2761 003 003 004 004 003 004 003 004 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i i I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9849 1 4.3000e- i 0.0471 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • el. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9849 • 4.3000e- • 0.0471 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 18 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8400 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0471 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2 5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8400 1 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9849 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 18 Date: 1/5/2021 4:59 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.14: CALEEMOD PHASE B GRADING EMISSIONS MODEL OUTPUTS 12188-05 AQ Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Phase B Grading - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Phase B Grading anticipated to start Quarter 1 of 2026 and end Quarter 4 of 2027 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming Maximum Daily Disturbed Acreage of 5 acres. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblAreaCoating tblConstructionPhase tblGrading tblOffRoadEquipment tblProjectCharacteristics 1 Column Name • Area_Parking i • • NumDays • • AcresOfGrading r • • ▪ OffRoadEquipmentUnitAmount r • • CO2lntensityFactor Default Value New Value 1209576 775.00 1,827.00 2.00 1270.9 1214016 522.00 2,610.00 0.00 706.2 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •4 3.4418 33.2137 26.4735 0.0728 11.4919 1.3325 12.8245 3.9272 1.2259 5.1531 • 0.0000 ' 7,053.363 7,053.363 2.2407 0.0000 7,109.379 0 0 I 5 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2027 .1 3.4388 33.2116 26.4482 0.0728 11.4919 1.3325 12.8244 3.9272 1.2259 5.1531 • 0.0000 i 7,048.969 7,048.969 2.2405 0.0000 7,104.9811 Total • 7 7 Maximum 3.4418 33.2137 26.4735 0.0728 11.4919 1.3325 12.8245 3.9272 1.2259 5.1531 0.0000 7,053.363 7,053.363 2.2407 0.0000 7,109.379 2.7846 0.0000 7,053.363 7,053.363 2.2407 0.0000 7,109.379 Reduction 1 0 0 5 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 3.4418 33.2137 26.4735 0.0728 4.5839 1.3325 5.9165 1.5587 1.2259 2.7846 • 0.0000 7,053.363 7,053.363 2.2407 0.0000 7,109.379 PM10 0 0 1 5 Total J J J .1 J J J J . J J J T 2027 •i 3.4388 33.2116 26.4482 0.0728 4.5839 1.3325 5.9164 1.5587 1.2259 2.7846 • 0.0000 i 7,048.969 7,048.969 2.2405 0.0000 7,104.9811 7 7 • Maximum 3.4418 33.2137 26.4735 0.0728 4.5839 1.3325 5.9165 1.5587 1.2259 2.7846 0.0000 7,053.363 7,053.363 2.2407 0.0000 7,109.379 Reduction 1 0 0 5 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.11 0.00 53.87 60.31 0.00 45.96 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 15 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9989 4.3000e- I 0.0471 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 Area IP' •i 10.9989 4.3000e- 0.0471 0.0000 1 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 Energy 9� 004 004 004 004 004 : 004 . J J J .1 J J J J 4 J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • f J J J .1 J J J J 4 J J J T Mobile 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.7000e- 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9989 4.3000e- I 0.0471 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 9J .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Grading •Grading :1/1/2026 :12/31/2027 5: 522: Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 2610 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Grading Grading Grading Grading Grading Offroad Equipment Type I Amount :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers 2 2 1 1 2 1- Grading :Tractors/Loaders/Backhoes 0: Usage Hours I Horse Power I Load Factor 8.001 212: 0.43 t -1- 8.001 8.00 i 158: 0.38 -1- 8.001 187: 0.41 t -1- 8.001 8.00 i 247: 0.40 -1- 8.001 367: 0.48 t 8.00 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Grading 8' 20.00' 0.00' 0.00' 11.00 5.40' 20.00:LD_Mix :HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Grading - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust :i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 : 0.0000 0.0000 Off -Road •1 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 i 0 • Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 1 0 41 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 26.0793 1 4.4166 41 Worker •1 0.0574 0.0256 0.3942 1.3300e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 • i 132.6565 132.6565 2.3600e- 132.7155 1.2251 2.7394 003 004 004 • 003 Total 2.2383 0.0574 0.0256 0.3942 1.3300e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 132.6565 132.6565 2.3600e- 6 132.7155 0 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 1 .J J J J .1 J J .1 .1 J 1. Off -Road .1 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2026 Mitigated Construction Off -Site 3.2 Grading - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 • 1 41 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 33.1881 1 0.0715 41 Worker •1 0.0574 0.0256 0.3942 1.3300e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 • i 132.6565 132.6565 2.3600e- 132.7155 3.8828 1.2251 003 004 004 • 003 Total 6,920.706 0.0574 0.0256 0.3942 1.3300e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 132.6565 132.6565 2.3600e- 132.7155 6 0 003 004 004 003 3.2 Grading - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 • Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0544 0.0235 0.3689 1.2900e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 • i 128.2632 128.2632 2.1600e- 128.3171 26.0793 0.0715 003 004 004 • 003 Total 1.5143 0.0544 0.0235 0.3689 1.2900e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 128.2632 128.2632 2.1600e- 128.3171 6 003 004 0 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Grading - 2027 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 J .1 .1 .1 .1 .1 .1 J Worker 9 0.0544 0.0235 0.3689 1.2900e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 i i 128.2632 128.2632 2.1600e- 128.3171 003 004 004 • 003 Total 0.0544 0.0235 0.3689 1.2900e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 128.2632 128.2632 2.1600e- 128.3171 003 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i 1 . I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9989 1 4.3000e- i 0.0471 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • el. F 1. F F 4. 4. 1. F r • . F F F r Unmitigated - 10.9989 • 4.3000e- • 0.0471 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 15 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8541 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8541 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 15 Date: 1/5/2021 5:06 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Summer 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Phase B Grading - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Phase B Grading anticipated to start Quarter 1 of 2026 and end Quarter 4 of 2027 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming Maximum Daily Disturbed Acreage of 5 acres. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblAreaCoating tblConstructionPhase tblGrading tblOffRoadEquipment tblProjectCharacteristics 1 Column Name Area_Parking • • • • Default Value New Value NumDays AcresOfGrading OffRoadEquipmentUnitAmount CO2lntensityFactor 1209576 775.00 1,827.00 2.00 1270.9 1214016 522.00 2,610.00 0.00 706.2 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •4 3.4402 33.2145 26.3991 0.0727 11.4919 1.3325 12.8245 3.9272 1.2259 5.1531 • 0.0000 ' 7,039.781 7,039.781 2.2404 0.0000 7,095.790 2 2 I 5 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2027 .1 3.4373 33.2124 26.3782 0.0726 11.4919 1.3325 12.8244 3.9272 1.2259 5.1531 • 0.0000 i 7,035.833 7,035.833 2.2402 0.0000 7,091.838 2 2 0 • 2 2 0 Maximum 3.4402 33.2145 26.3991 0.0727 11.4919 1.3325 12.8245 3.9272 1.2259 5.1531 0.0000 7,039.781 7,039.781 2.2404 0.0000 7,095.790 0.0000 7,095.790 0.00 0.00 0.00 0.00 0.00 Reduction 2 2 2 2 5 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 3.4402 33.2145 26.3991 0.0727 4.5839 1.3325 5.9165 1.5587 1.2259 2.7846 • 0.0000 7,039.781 7,039.781 2.2404 0.0000 7,095.790 2 2 1 5 J J J .1 J J J J . J J J T 2027 •i 3.4373 33.2124 26.3782 0.0726 4.5839 1.3325 5.9164 1.5587 1.2259 2.7846 • 0.0000 i 7,035.833 7,035.833 2.2402 0.0000 7,091.838 2 2 0 • • Total Maximum 3.4402 33.2145 26.3991 0.0727 4.5839 1.3325 5.9165 1.5587 1.2259 2.7846 0.0000 7,039.781 7,039.781 2.2404 0.0000 7,095.790 0.00 0.00 0.00 0.00 0.00 Reduction 2 2 5 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.11 0.00 53.87 60.31 0.00 45.96 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 15 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 10.9989 4.3000e- I 0.0471 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 Area IP' •i 10.9989 4.3000e- 0.0471 0.0000 1 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 Energy 9� 004 004 004 004 004 : 004 . J J J .1 J J J J 4 J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • f J J J .1 J J J J 4 J J J T Mobile 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total 1.7000e- 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 004 004 004 004 004 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area 4 10.9989 4.3000e- I 0.0471 0.0000 1 1 1.7000e- 1.7000e- ' 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 1 0.1079 •1 004 I 004 004 004 004 : 004 9J .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 10.9989 4.3000e- 0.0471 0.0000 0.0000 1.7000e- 1.7000e- 0.0000 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e- 0.0000 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Grading •Grading :1/1/2026 :12/31/2027 5: 522: Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 2610 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Grading Grading Grading Grading Grading Offroad Equipment Type I Amount :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers 2 2 1 1 2 1- Grading :Tractors/Loaders/Backhoes 0: Usage Hours I Horse Power I Load Factor 8.001 212: 0.43 t -1- 8.001 8.00 i 158: 0.38 -1- 8.001 187: 0.41 t -1- 8.001 8.00 i 247: 0.40 -1- 8.001 367: 0.48 t 8.00 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Grading 8' 20.00' 0.00' 0.00' 11.00 5.40' 20.00:LD_Mix :HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Grading - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust :i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 : 0.0000 0.0000 Off -Road •1 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 i 0 • Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker 9 0.0558 0.0264 0.3198 1.1900e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 • i 119.0747 119.0747 2.0800e- 119.1265 26.0793 0.0715 003 004 004 • 003 Total 1.5143 0.0558 0.0264 0.3198 1.1900e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 119.0747 119.0747 2.0800e- 119.1265 6 003 004 0 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •1 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 1 .J J J J .1 J J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 15 3.2 Grading - 2026 Mitigated Construction Off -Site Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Total .1 .1 I - Worker •1 0.0558 0.0264 0.3198 1.1900e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 • i 119.0747 119.0747 2.0800e- 119.1265 0.0715 11.3246 003 004 004 • 003 Total 1.2251 0.0558 0.0264 0.3198 1.1900e- 0.1673 9.1000e- 0.1683 0.0444 8.4000e- 0.0452 119.0747 119.0747 2.0800e- 119.1265 6 6 003 004 004 003 3.2 Grading - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 •• 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 • Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Grading - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 3.3844 .1 .1 I - Worker •1 0.0529 0.0243 0.2989 1.1500e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 • i 115.1267 115.1267 1.8900e- 115.1740 4.4166 1.3316 003 004 004 • 003 Total 2.7394 0.0529 0.0243 0.2989 1.1500e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 115.1267 115.1267 1.8900e- 115.1740 6 6 003 0 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 15 3.2 Grading - 2027 Mitigated Construction Off -Site Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 J .1 .1 .1 .1 .1 .1 J Worker •1 0.0529 0.0243 0.2989 1.1500e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 • i 115.1267 115.1267 1.8900e- 115.1740 003 004 004 • 003 Total 0.0529 0.0243 0.2989 1.1500e- 0.1673 8.6000e- 0.1682 0.0444 7.9000e- 0.0452 115.1267 115.1267 1.8900e- 115.1740 003 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated � •� 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 ', 1 9 I 1 1 1 1 1 I 1 • 1 1 1 I 1 I. + + + 4. I. 4. + + ,. 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 : 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non -Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces ' 0.558300' 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 5.1 Mitigation Measures Energy 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 •• i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ::. i 1 e1- + + + + + + + + r v + + + r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces 10 •i 1 . I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 •.0000 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Other Non- Asphalt Surfaces i 0 1 i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.9989 1 4.3000e- i 0.0471 1 0.0000 1 1 1.7000e- 1 1.7000e- 1 1 1.7000e- 1.7000e- • i 0.1013 1 0.1013 1 2.6000e- 1 i 0.1079 '� I 004 I I 004 I 004 I I 004 004 1 I 004 I 1 '� I I I I 1 I I 1 1 I 1 • ei• F F F F F F F F r • . F F F r Unmitigated - 10.9989 • 4.3000e- • 0.0471 • 0.0000 • • 1.7000e- • 1.7000e- • • 1.7000e- • 1.7000e- • • 0.1013 • 0.1013 • 2.6000e- • • 0.1079 004 004 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 15 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 3.8541 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 Coating ::: J .1 .1 J .1 J .1 .1 • .1 .1 J Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products : J .1 .1 J .1 J .1 .1 • .1 .1 J Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • i 0.1013 0.1013 2.6000e- 0.1079 0.0000 0.0000 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 003 004 004 004 004 004 1.7000e- 1.7000e- 1.7000e- 1.7000e- 4.3000e- 0.1013 0.1013 2.6000e- 1.7000e- 0.1079 1.7000e- 004 0.1013 0.1013 004 004 0.1079 004 004 004 004 004 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 3.8541 1 0.0000 1 0.0000 I 1 0.0000 0.0000 • 0.0000 1 1 0.0000 Coating :: ; J J J J J J J J • J J .1 • Consumer •i 7.1405 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products ; J J J J J J J J .• J J .1 • Landscaping • 4.3400e- 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- • 0.1013 0.1013 2.6000e- 0.1079 003 004 004 004 004 004 : • 004 Total 10.9990 4.3000e- 0.0471 0.0000 1.7000e- 1.7000e- 1.7000e- 1.7000e- 0.1013 0.1013 2.6000e. 0.1079 004 004 004 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 15 Date: 1/5/2021 5:05 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Winter 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.15: CALEEMOD PHASE 1 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan - Phase 1 (Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Golf Course Apartments Low Rise Single Family Housing • • • • • • 12.00 74.00 530.00 a 4 a 21. • • Hole Dwelling Unit Dwelling Unit 46.20 14.80 4. 228.10 64,282.00 74,000.00 954,000.00 0 212 1516 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Total Project Area (Phase 1) is approximately 289 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 1 Physical Construction anticipated to start Quarter 3 of 2025 and end Quarter 4 2028 Off-road Equipment - Hours are based on an 8 -hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. On -road Fugitive Dust - TEST Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating • • Y EF_Nonresidential_Exterior EF_Non residential_I nterior EF_Parking EF_Residential_Exterior EF_Residential_Interior 250.00 250.00 250.00 250.00 250.00 50.00 50.00 50.00 50.00 50.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblAreaCoating • Area Residential_ Exterior • 693900 3088243 tblAreaCoating • Area_Residential_Interior i 2081700 9264729 r tblConstDustMitigation : • WaterUnpavedRoadMoistureContent i 0 0.5 r tblConstDustMitigation • • WaterUnpavedRoadVehicleSpeed i 0 40 r tblConstructionPhase • NumDays T 180.00 50.00 r tblConstructionPhase • NumDays T 465.00 50.00 r tblConstructionPhase • NumDays T 4,650.00 800.00 r 4 tblConstructionPhase • NumDays T 330.00 55.00 r tblEnergyUse • LightingElect i 810.36 0.00 • r tblEnergyUse • LightingElect T 1,608.84 0.00 r 4 tblEnergyUse • NT24E i 3,172.76 0.00 r 4 tblEnergyUse • NT24E i 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 • r 4 tblEnergyUse • T24NG T 9,544.50 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear i 82.00 0.00 • r 4 tblFireplaces • FireplaceDayYear i 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • NumberGas T 59.20 0.00 r 4 tblFireplaces • NumberGas T424.00 0.00 tblFireplaces • NumberNoFireplace • 7.40 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblFireplaces • NumberNoFireplace • 53.00 0.00 tblFireplaces • NumberWood i 7.40 0.00 r tblFireplaces • NumberWood T 53.00 0.00 r tblGrading • AcresOfGrading i 175.00 250.00 r tblGrading • AcresOfGrading i 100.00 250.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r 4 tblLandUse • LotAcreage i 4.63 14.80 r tblLandUse • LotAcreage i 172.08 228.10 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 685.44 r 4 tblSolidWaste • SolidWasteGenerationRate T 34.04 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 1.60 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 621.56 0.00 • r 4 tblVehicleTrips • CC TL T 4.20 0.00 r 4 tblVehicleTrips • CC_TTP T 48.00 0.00 r 4 tblVehicleTrips • CNW_TL T 5.40 0.00 r 4 tblVehicleTrips • CNW_TTP T 19.00 0.00 • r 4 tblVehicleTrips • CW T 12.50 0.00 r 4 tblVehicleTrips • CW_TTP T 33.00 0.00 r 4 tblVehicleTrips • DV_TP T 11.00 0.00 • tblVehicleTrips • DV • 39.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblVehicleTrips • DV_TP • 11.00 0.00 tblVehicleTrips • HO_TL i 4.50 0.00 r tblVehicleTrips • HO_TL T 4.50 0.00 r tblVehicleTrips • HO_TTP T 40.60 0.00 r tblVehicleTrips • HO_TTP T 40.60 0.00 r tblVehicleTrips • HS_TL T 3.50 0.00 • r tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r tblVehicleTrips • HS_TTP T 19.20 0.00 • r tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW TTP T 40.20 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PB_TP T 9.00 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 • r 4 tblVehicleTrips • PR_TP T 86.00 0.00 r 4 tblVehicleTrips • PR_TP T 52.00 0.00 r 4 tblVehicleTrips • PR TP T 86.00 0.00 • r 4 tblVehicleTrips • ST TR T 7.16 0.00 r 4 tblVehicleTrips • ST T 40.63 0.00 r 4 tblVehicleTrips • ST_TR T 9.91 0.00 r 4 tblVehicleTrips • SU TR T 6.07 0.00 r 4 tblVehicleTrips • SU T 39.53 0.00 r 4 tblVehicleTrips • SU T 8.62 0.00 r 4 tblVehicleTrips • WD_TR T 6.59 0.00 • tblVehicleTrips • WD • 35.74 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblVehicleTrips • WD • 9.52 0.00 tblWater • IndoorWaterUseRate } 4,821,397.90 0.00 tblWater • IndoorWaterUseRate v 34,531,633.58 0.00 tblWater • OutdoorWaterUseRate v 3,039,576.93 0.00 tblWater • OutdoorWaterUseRate v 99,814,205.40 0.00 tblWater • OutdoorWaterUseRate T 21,769,942.91 0.00 r tblWoodstoves • NumberCatalytic T 3.70 0.00 r 4 tblWoodstoves • NumberCatalytic T 26.50 0.00 tblWoodstoves • NumberNoncatalytic } 3.70 0.00 tblWoodstoves • NumberNoncatalytic v 26.50 0.00 tblWoodstoves • WoodstoveDayYear v 82.00 0.00 tblWoodstoves • WoodstoveDayYear f 82.00 0.00 tblWoodstoves • WoodstoveWoodMass i 999.60 0.00 r tblWoodstoves • WoodstoveWoodMass • 999.60 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •1 3.4936 35.7495 26.5020 0.0774 1 23.5194 1.4891 25.0085 : 10.5432 1.3700 11.9132 • 0.0000 7,627.694 7,627.694 2.2409 : 0.0000 7,658.573 9 i i '1 ,I le 2026 •i 3.0658 26.2213 22.9472 0.0766 1 2.6436 0.8820 3.5256 ' 0.7098 0.8225 1.5322 • 0.0000 i 7,548.767 7,548.767 1.2293 1 0.0000 7,579.501 :� 8 8 2 2027 •i 22.8888 27.7412 25.9918 0.0833 3.0954 0.9523 4.0477 0.8296 0.8926 1.7222 • 0.0000 i 8,201.509 8,201.509 1.2501 0.0000 8,232.763 •1 8 8 4 le 2028 .1 23.7916 36.2727 40.4570 0.1064 3.2209 1.3704 4.5912 0.8629 1.2773 2.1401 • 0.0000 i 10,431.69 10,431.69 1.9598 0.0000 10,480.69 • • 51 51 00 Maximum 23.7916 36.2727 40.4570 0.1064 23.5194 1.4891 25.0085 10.5432 1.3700 11.9132 0.0000 10,431.69 10,431.69 2.2409 0.0000 10,480.69 11 51 51 00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 3.4936 35.7495 26.5020 0.0774 1 9.2644 1.4891 10.7536 : 4.1362 1.3700 5.5062 • 0.0000 ' 7,627.694 7,627.694 2.2409 1 0.0000 7,658.573 PM10 9 i 1 '1 ,l J le J 2026 •i 3.0658 26.2213 22.9472 0.0766 1 2.6436 0.8820 3.5256 ' 0.7098 0.8225 1.5322 • 0.0000 i 7,548.767 7,548.767 1.2293 1 0.0000 7,579.501 :� 8 8 2 2027 •i 22.8888 27.7412 25.9918 0.0833 3.0954 0.9523 4.0477 0.8296 0.8926 1.7222 • 0.0000 i 8,201.509 8,201.509 1.2501 0.0000 8,232.763 •1 8 8 4 2028 .1 23.7916 36.2727 40.4570 0.1064 3.2209 1.3704 4.5912 0.8629 1.2773 2.1401 • 0.0000 i 10,431.69 10,431.69 1.9598 0.0000 10,480.69 • • 51 51 00 Maximum 23.7916 36.2727 40.4570 0.1064 9.2644 1.4891 10.7536 4.1362 1.3700 5.5062 0.0000 10,431.69 10,431.69 2.2409 0.0000 10,480.69 11 51 51 00 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 43.89 0.00 38.35 49.49 0.00 37.02 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 37 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 62.7138 0.5735 ' 49.7848 2.6300e- 1 : 0.2762 0.2762 0.2762 0.2762 • 0.0000 i 89.7282 89.7282 0.0859 1 0.0000 91.8765 89.7282 89.7282 0.0859 1 0.0000 91.8765 .1 003 .1 •1 003 J .1 .1 J .1 J .1 .1 1r .1 .1 J Energy •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 1. J .1 .1 J .1 J .1 .1 1r .1 .1 J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total Mobile 62.7138 0.5735 49.7848 2.6300e- 0.0000 0.2762 0.2762 0.0000 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 89.7282 89.7282 0.0859 0.0000 91.8765 003 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area 9 62.7138 0.5735 , 49.7848 2.6300e- 1 0.2762 0.2762 0.2762 0.2762 • 0.0000 89.7282 89.7282 0.0859 1 0.0000 91.8765 •1 003 J J J .1 J J J J w J J J 1. Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J w J J J 1. Mobile 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 Total 62.7138 0.5735 49.7848 2.6300e- 0.0000 0.2762 0.2762 0.0000 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 17/1/2025 19/8/2025 1 51 501 i ri - 4 � � 2 -Grading :Grading ,9/9/2025 111/17/2025 1 51 501 i ri - 4 4 � 3 -Building Construction :Building Construction 111/18/2025 112/11/2028 1 51 8001 i r1 4 i 4 -Architectural Coating :Architectural Coating 19/7/2027 112/11/2028 1 51 3301 5 -Paving -Paving 9/26/2028 12/11/2028 5. 55: Acres of Grading (Site Preparation Phase): 250 Acres of Grading (Grading Phase): 250 Acres of Paving: 0 Residential Indoor: 2,081,700; Residential Outdoor: 693,900; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 17/1/2025 19/8/2025 1 51 501 i ri - 4 � � 2 -Grading :Grading ,9/9/2025 111/17/2025 1 51 501 i ri - 4 4 � 3 -Building Construction :Building Construction 111/18/2025 112/11/2028 1 51 8001 i r1 4 i 4 -Architectural Coating :Architectural Coating 19/7/2027 112/11/2028 1 51 3301 5 -Paving -Paving 9/26/2028 12/11/2028 5. 55: Acres of Grading (Site Preparation Phase): 250 Acres of Grading (Grading Phase): 250 Acres of Paving: 0 Residential Indoor: 2,081,700; Residential Outdoor: 693,900; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Site Preparation Grading Building Construction Architectural Coating Paving • • • Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class 7: 18.00 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix J HDT_Mix -i ' - 8: 20.00. 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix 1 HDT_Mix 9: 271.00• 75.001 0.00: 11.00: 5.40: 20.00: LD_Mix i HDT_Mix 1: 54.00• 0.00 0.00: 11.00 : 5.40' 20.00: LD Mix i HDT Mix 6: 15.00' 0.00' 0.00' 11.00: 5.40: 20.00:LD Mix Hauling Vehicle Class T HHDT HHDT HHDT HHDT 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •i 23.3688 0.0000 23.3688 10.5032 0.0000 10.5032 •• 0.0000 0.0000 Ir J J J J J J J J ; J J J T Off -Road •i 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 5,513.954 5,513.954 1.7833 5,558.537 •.11 0 0 i 1 Total 3.4390 35.7243 17.4082 0.0569 23.3688 1.4883 24.8570 10.5032 1.3692 11.8724 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 1 1 Worker •1 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 123.9054 123.9054 2.3300e- 123.9637 17.4082 0.0569 003 004 004 • 003 Total 4.0963 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 123.9054 123.9054 2.3300e- 123.9637 0 003 004 1 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1 9.1138 0.0000 I 9.1138 4.0963 0.0000 4.0963 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road 9 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 1 Total 3.4390 35.7243 17.4082 0.0569 9.1138 1.4883 10.6021 4.0963 1.3692 5.4655 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2025 Mitigated Construction Off -Site 3.3 Grading - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 123.9054 123.9054 2.3300e- 123.9637 26.0793 0.0715 003 004 004 • 003 Total 3.8828 0.0546 0.0252 0.3804 1.2400e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 123.9054 123.9054 2.3300e- 123.9637 6 003 004 0 004 003 3.3 Grading - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 1 0.0000 3.8828 •• i 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 • i 137.6727 137.6727 2.5900e- 137.7374 26.0793 0.0715 003 004 004 • 003 Total 1.5143 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 137.6727 137.6727 2.5900e- 137.7374 6 003 004 0 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 • 1 • • 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 • i 137.6727 137.6727 2.5900e- 137.7374 0.0430 003 004 004 • 003 Total 0.8074 0.0606 0.0280 0.4227 1.3800e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 137.6727 137.6727 2.5900e- 137.7374 3 003 004 8 004 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1093 4.6856 0.8719 0.0157 0.3762 3.9100e- 0.3801 0.1084 3.7400e- 0.1121 • i 1,653.993 1,653.993: 0.0973 1,656.425 • • 003 003 9 9 I 1 Worker 9 0.8213 0.3788 5.7275 0.0187 2.2674 0.0127 2.2801 0.6014 0.0117 0.6131 • 1,865.464 1,865.464 0.0351 1,866.342 2.1808 • 4 4 i 1 Total 0.9307 5.0644 6.5994 0.0344 2.6436 0.0167 2.6603 0.7098 0.0155 0.7252 4,135.806 3,519.458 3,519.458 0.1324 3,522.767 3 3 8 3 3 1 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1093 4.6856 0.8719 0.0157 0.3762 3.9100e- 0.3801 0.1084 3.7400e- 0.1121 • i 1,653.993 1,653.993: 0.0973 1,656.425 • • 003 003 9 9 I 1 Worker 9 0.8213 0.3788 5.7275 0.0187 2.2674 0.0127 2.2801 0.6014 0.0117 0.6131 • 1,865.464 1,865.464 0.0351 1,866.342 2.1808 • 4 4 i 1 Total 0.9307 5.0644 6.5994 0.0344 2.6436 0.0167 2.6603 0.7098 0.0155 0.7252 4,135.806 3,519.458 3,519.458 0.1324 3,522.767 3 3 8 3 3 1 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 •• i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1067 4.6402 0.8459 0.0156 0.3762 3.8500e- 0.3801 0.1084 3.6800e- 0.1120 • i 1,643.036 1,643.036: 0.0945 1,645.399 • • 003 003 5 5 1 7 Worker •1 0.7783 0.3469 5.3412 0.0180 2.2674 0.0123 2.2797 0.6014 0.0114 0.6128 • 1,797.495 1,797.495 0.0320 1,798.294 2.1808 • 1 1 1 7 Total 0.8851 4.9871 6.1871 0.0336 2.6436 0.0162 2.6598 0.7098 0.0150 0.7248 4,135.806 3,440.531 3,440.531 0.1265 3,443.694 3 3 8 5 5 4 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2026 Mitigated Construction Off -Site 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1067 4.6402 0.8459 0.0156 0.3762 3.8500e- 0.3801 0.1084 3.6800e- 0.1120 • i 1,643.036 1,643.036: 0.0945 1,645.399 • • 003 003 5 5 1 7 Worker •1 0.7783 0.3469 5.3412 0.0180 2.2674 0.0123 2.2797 0.6014 0.0114 0.6128 • 1,797.495 1,797.495 0.0320 1,798.294 2.1808 • 1 1 1 7 Total 0.8851 4.9871 6.1871 0.0336 2.6436 0.0162 2.6598 0.7098 0.0150 0.7248 4,135.806 3,440.531 3,440.531 0.1265 3,443.694 3 3 8 5 5 4 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 •• i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.1046 4.5977 0.8247 0.0155 0.3762 3.8000e- 0.3800 0.1084 3.6300e- 0.1120 • i 1,633.733 1,633.733: 0.0918 1,636.028 • • 003 003 0 0 1 6 Worker 9 0.7366 0.3186 4.9987 0.0174 2.2674 0.0117 2.2791 0.6014 0.0108 0.6122 • 1,737.965 1,737.965 0.0292 1,738.696 2.1808 • 9 9 1 2 Total 0.8412 4.9162 5.8234 0.0329 2.6436 0.0155 2.6591 0.7098 0.0144 0.7242 4,135.806 3,371.698 3,371.698 0.1210 3,374.724 3 3 8 9 9 7 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2027 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1046 4.5977 0.8247 0.0155 0.3762 3.8000e- 0.3800 0.1084 3.6300e- 0.1120 • i 1,633.733 1,633.733: 0.0918 1,636.028 • • 003 003 0 0 1 6 Worker 9 0.7366 0.3186 4.9987 0.0174 2.2674 0.0117 2.2791 0.6014 0.0108 0.6122 • 1,737.965 1,737.965 0.0292 1,738.696 2.1808 • 9 9 1 2 Total 0.8412 4.9162 5.8234 0.0329 2.6436 0.0155 2.6591 0.7098 0.0144 0.7242 4,135.806 3,371.698 3,371.698 0.1210 3,374.724 3 3 8 9 9 7 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 •• i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1029 4.5614 0.8094 0.0154 0.3762 3.7600e- 0.3800 0.1084 3.5900e- 0.1119 • i 1,626.108 1,626.108: 0.0891 1,628.336 2.1808 003 003 5 5 1 7 Worker •1 0.6957 0.2935 4.7005 0.0169 2.2674 0.0109 2.2782 0.6014 9.9800e- 0.6114 • 1,686.051 1,686.051 0.0268 1,686.722 0.8658 003 • 2 2 1 2 Total 0.8074 0.7985 4.8549 5.5099 0.0323 2.6436 0.0146 2.6582 0.7098 0.0136 0.7233 3,312.159 3,312.159 0.1160 3,315.058 3 3 8 8 8 9 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 I 1.1028 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2028 Mitigated Construction Off -Site 3.5 Architectural Coating - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.1029 4.5614 0.8094 0.0154 0.3762 3.7600e- 0.3800 0.1084 3.5900e- 0.1119 • i 1,626.108 1,626.108: 0.0891 1,628.336 003 003 5 5 1 7 Worker •1 0.6957 0.2935 4.7005 0.0169 2.2674 0.0109 2.2782 0.6014 9.9800e- 0.6114 • 1,686.051 1,686.051 0.0268 1,686.722 Total 19.7201 003 • 2 2 1 2 Total 0.7985 4.8549 5.5099 0.0323 2.6436 0.0146 2.6582 0.7098 0.0136 0.7233 375.7758 3,312.159 3,312.159 0.1160 3,315.058 8 8 9 3.5 Architectural Coating - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating •i 19.4923 0.0000 0.0000 1 0.0000 0.0000 •. 0.0000 : 0.0000 • Off -Road 9 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 375.2641 375.2641 0.0205 375.7758 003 • Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 003 1 1 • 1 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 2.4122 1 Worker •1 0.1468 0.0635 0.9961 3.4700e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 • i 346.3105 346.3105 5.8200e- 346.4561 0.0687 003 003 003 • 003 Total 375.2641 0.1468 0.0635 0.9961 3.4700e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 346.3105 346.3105 5.8200e- 346.4561 003 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 19.4923 1 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 0.0000 i 375.2641 375.2641 0.0205 375.7758 003 Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2027 Mitigated Construction Off -Site 3.5 Architectural Coating - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Off -Road •u 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Total .1 .1 .1 .1 - Worker Worker •1 0.1468 0.0635 0.9961 3.4700e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 • i 346.3105 346.3105 5.8200e- 346.4561 3.9600e- 003 003 003 • 003 Total 0.0687 0.1468 0.0635 0.9961 3.4700e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 346.3105 346.3105 5.8200e- 346.4561 003 003 003 003 3.5 Architectural Coating - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating : 19.4923 1 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 375.2641 375.2641 0.0205 375.7758 003 Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 003 1 1 • 1 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 2.4122 1 Worker •1 0.1386 0.0585 0.9366 3.3700e- 0.4518 2.1600e- 0.4540 0.1198 1.9900e- 0.1218 • i 335.9659 335.9659 5.3500e- 336.0996 0.0687 003 003 003 • 003 Total 375.2641 0.1386 0.0585 0.9366 3.3700e- 003 0.4518 2.1600e- 003 0.4540 0.1198 1.9900e- 003 0.1218 335.9659 335.9659 5.3500e- 003 336.0996 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 19.4923 1 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 0.0000 i 375.2641 375.2641 0.0205 375.7758 003 Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2028 Mitigated Construction Off -Site 3.6 Paving - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker •1 0.1386 0.0585 0.9366 3.3700e- 0.4518 2.1600e- 0.4540 0.1198 1.9900e- 0.1218 • i 335.9659 335.9659 5.3500e- 336.0996 14.5780 0.0228 003 003 003 • 003 Total 0.1386 0.0585 0.9366 3.3700e- 003 0.4518 2.1600e- 003 0.4540 0.1198 1.9900e- 003 0.1218 335.9659 335.9659 5.3500e- 003 336.0996 3.6 Paving - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 •• i 2,206.745 2,206.745 : 0.7137 2,224.587 2 2 1 8 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2,206.745 0.7137 2,224.587 2 2 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.6 Paving - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker •1 0.0385 0.0162 0.2602 9.4000e- 0.1255 6.0000e- 0.1261 0.0333 5.5000e- 0.0338 • i 93.3239 93.3239 1.4900e- 93.3610 14.5780 0.0228 004 004 004 • 003 Total 0.0385 0.0162 0.2602 9.4000e- 004 0.1255 6.0000e- 004 0.1261 0.0333 5.5000e- 004 0.0338 93.3239 93.3239 1.4900e- 003 93.3610 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 • 0.0000 i 2,206.745 i 2,206.745 : 0.7137 2,224.587 2 2 1 8 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2,206.745 0.7137 2,224.587 2 2 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.6 Paving - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0385 0.0162 0.2602 9.4000e- 0.1255 6.0000e- 0.1261 0.0333 5.5000e- 0.0338 i i 93.3239 93.3239 1.4900e- 93.3610 004 004 004 • 003 Total 0.0385 0.0162 0.2602 9.4000e- 004 0.1255 6.0000e- 004 0.1261 0.0333 5.5000e- 004 0.0338 93.3239 93.3239 1.4900e- 003 93.3610 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 i i 0.0000 '� • 1 9 I 1 1 1 1 1 1 1 1 1 1 I • 1 3 F 4 1 4. F 4. + 4. r 4. 4. F r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 0.00 0.00 T 0.00 nr Golf Course ; 0.00 0.00 0.00 T Single Family Housing ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I 1 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Travertine Specific Page 32 of 37 Date: 1/6/2021 2:51 PM Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer I LDA I LDT1 I LDT2 Apartments Low Rise • 0.559901t 0.0345581 0.1904871 0.103878 r Golf Course • ▪ 0.559901 r r 0.0345581 0.190487: 0.1038781 1• 1. 1 - Land Land Use Single Family Housing MDV : 0.559901: 0.034558: 0.190487: 0.103878: LHD1 LHD2 MHD HHD 0.0110411 0.004260 0.011041: 0.004260 1• 1• 0.0172281 0.070227 0.017228: 0.070227: UBUS I MCY 0.0014221 0.0010881 0.0043851 0.000853. 0.000671 OBUS SBUS I MH 0.0014221 0.0010881 0.0043851 0.000853. 0.000671 1- 0.011041' • 0.011041' 0.004260' 0.017228' 0.070227' 0.001422' 0.001088' 0.004385' 0.000853' 0.000671 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 i i 0.0000 1 0.0000 i 1 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated a• i 1 I I 1 1 1 1 1 1 I 1 I. } 4 4. } } 4. } 4. r • . } 4. 4. r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Single Family Housing 1 0 •i f -. I0 • i f -r i 0 1 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 1 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • .1 .1 .1 .1 .1 .1 .1 .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Single Family Housing 0 .1 11 i . f -. I0 • f - I0 • 1 0.0000 0.0000 0.0000 1 0.0000 i 0.0000 i 0.0000 1 1 1 0.0000 0.0000 J J J J J J J J 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 J J .1 .1 J J J J .. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . • • . 0.0000 0.0000 1 0.0000 0.0000 J J J 1. 0.0000 0.0000 0.0000 0.0000 J J .1 1. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail CaIEEMod Version: CaIEEMod.2O16.3.2 Page 34 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day • • Ib/day Mitigated �� 62.7138 0.5735 49.7848 2.6300e- 1 0.2762 1 0.2762 1 1 0.2762 ; 0.2762 : 0.0000 i 89.7282 1 89.7282 1 0.0859 1 0.0000 1 91.8765 i I 1 003 1 1 1 1 1 i 1 1 1 '111 1 1 1 1 1 . 1 I 1 fT } } } 4- 4- 4.} } } . } 4.} } Unmitigated •. 62.7138 • 0.5735 • 49.7848 • 2.6300e- . • 0.2762 • 0.2762 • • 0.2762 • 0.2762 • 0.0000 • 89.7282 • 89.7282 • 0.0859 • 0.0000 • 91.8765 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 37 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 39.2165 0.0000 0.0000 0.0000 0.00000.0000 i 0.0000 Coating :: . I Consumer •1 22.0025 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 1.4948 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 I i 89.7282 89.7282 0.0859 91.8765 003 • Total 62.7138 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 37 6.2 Area by SubCategory Mitigated Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 39.2165 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: . I • Consumer •i 22.0025 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 1.4948 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 I i 89.7282 89.7282 0.0859 91.8765 003 • Total 62.7138 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 003 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan - Phase 1 (Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Golf Course Apartments Low Rise Single Family Housing • • • • • • 12.00 74.00 530.00 a 4 a 21. • • Hole Dwelling Unit Dwelling Unit 46.20 14.80 4. 228.10 64,282.00 74,000.00 954,000.00 0 212 1516 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Total Project Area (Phase 1) is approximately 289 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 1 Physical Construction anticipated to start Quarter 3 of 2025 and end Quarter 4 2028 Off-road Equipment - Hours are based on an 8 -hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. On -road Fugitive Dust - TEST Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating • • Y EF_Nonresidential_Exterior EF_Non residential_I nterior EF_Parking EF_Residential_Exterior EF_Residential_Interior 250.00 250.00 250.00 250.00 250.00 50.00 50.00 50.00 50.00 50.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblAreaCoating • Area Residential_ Exterior • 693900 3088243 tblAreaCoating • Area_Residential_Interior i 2081700 9264729 r tblConstDustMitigation : • WaterUnpavedRoadMoistureContent i 0 0.5 r tblConstDustMitigation • • WaterUnpavedRoadVehicleSpeed i 0 40 r tblConstructionPhase • NumDays T 180.00 50.00 r tblConstructionPhase • NumDays T 465.00 50.00 r tblConstructionPhase • NumDays T 4,650.00 800.00 r 4 tblConstructionPhase • NumDays T 330.00 55.00 r tblEnergyUse • LightingElect i 810.36 0.00 • r tblEnergyUse • LightingElect T 1,608.84 0.00 r 4 tblEnergyUse • NT24E i 3,172.76 0.00 r 4 tblEnergyUse • NT24E i 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 • r 4 tblEnergyUse • T24NG T 9,544.50 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear i 82.00 0.00 • r 4 tblFireplaces • FireplaceDayYear i 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • NumberGas T 59.20 0.00 r 4 tblFireplaces • NumberGas T424.00 0.00 tblFireplaces • NumberNoFireplace • 7.40 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblFireplaces • NumberNoFireplace • 53.00 0.00 tblFireplaces • NumberWood i 7.40 0.00 r tblFireplaces • NumberWood T 53.00 0.00 r tblGrading • AcresOfGrading i 175.00 250.00 r tblGrading • AcresOfGrading i 100.00 250.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r 4 tblLandUse • LotAcreage i 4.63 14.80 r tblLandUse • LotAcreage i 172.08 228.10 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 685.44 r 4 tblSolidWaste • SolidWasteGenerationRate T 34.04 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 1.60 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 621.56 0.00 • r 4 tblVehicleTrips • CC TL T 4.20 0.00 r 4 tblVehicleTrips • CC_TTP T 48.00 0.00 r 4 tblVehicleTrips • CNW_TL T 5.40 0.00 r 4 tblVehicleTrips • CNW_TTP T 19.00 0.00 • r 4 tblVehicleTrips • CW T 12.50 0.00 r 4 tblVehicleTrips • CW_TTP T 33.00 0.00 r 4 tblVehicleTrips • DV_TP T 11.00 0.00 • tblVehicleTrips • DV • 39.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblVehicleTrips • DV_TP • 11.00 0.00 tblVehicleTrips • HO_TL i 4.50 0.00 r tblVehicleTrips • HO_TL T 4.50 0.00 r tblVehicleTrips • HO_TTP T 40.60 0.00 r tblVehicleTrips • HO_TTP T 40.60 0.00 r tblVehicleTrips • HS_TL T 3.50 0.00 • r tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r tblVehicleTrips • HS_TTP T 19.20 0.00 • r tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW TTP T 40.20 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PB_TP T 9.00 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 • r 4 tblVehicleTrips • PR_TP T 86.00 0.00 r 4 tblVehicleTrips • PR_TP T 52.00 0.00 r 4 tblVehicleTrips • PR TP T 86.00 0.00 • r 4 tblVehicleTrips • ST TR T 7.16 0.00 r 4 tblVehicleTrips • ST T 40.63 0.00 r 4 tblVehicleTrips • ST_TR T 9.91 0.00 r 4 tblVehicleTrips • SU TR T 6.07 0.00 r 4 tblVehicleTrips • SU T 39.53 0.00 r 4 tblVehicleTrips • SU T 8.62 0.00 r 4 tblVehicleTrips • WD_TR T 6.59 0.00 • tblVehicleTrips • WD • 35.74 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblVehicleTrips tblWater tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • WD TR • 9.52 0.00 • IndoorWaterUseRate } 4,821,397.90 0.00 • • IndoorWaterUseRate v 34,531,633.58 0.00 • OutdoorWaterUseRate v 3,039,576.93 0.00 • OutdoorWaterUseRate v 99,814,205.40 0.00 • OutdoorWaterUseRate T 21,769,942.91 0.00 r • NumberCatalytic T 3.70 0.00 r 4 • NumberCatalytic T 26.50 0.00 • NumberNoncatalytic } 3.70 0.00 • • NumberNoncatalytic v 26.50 0.00 • WoodstoveDayYear v 82.00 0.00 • r 4 • WoodstoveDayYear T 82.00 0.00 • WoodstoveWoodMass i 999.60 0.00 r • WoodstoveWoodMass •999.60 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i 3.4918 35.7503 26.4227 0.0748 1 23.5194 1.4891 25.0085 10.5432 1.3700 11.9132 • 0.0000 ' 7,364.990 7,364.990 2.2406 1 0.0000 7,396.037 .1 .1 1 . 3 3 I 6 e J .1 .1 .1 .1 .1 .1 .1 le .1 .1 .1 2026 •1 3.0503 26.1569 22.0894 0.0741 1 2.6436 0.8821 3.5257 0.7098 0.8226 1.5324 • 0.0000 i 7,293.964 7,293.964 1.2361 1 0.0000 7,324.866 .1 44 4 6 2027 •i 22.8722 27.6773 25.0023 0.0805 3.0954 0.9524 4.0478 0.8296 0.8928 1.7224 • 0.0000 i 7,917.986 7,917.986 1.2562 0.0000 7,949.390 '1 3 3 6 2028 •i 23.7768 36.2081 39.4776 0.1035 3.2209 1.3705 4.5913 0.8629 1.2774 2.1403 • 0.0000 i 10,145.47 10,145.47 1.9656 0.0000 10,194.61 • • 44 44 48 Maximum 23.7768 36.2081 39.4776 0.1035 23.5194 1.4891 25.0085 10.5432 1.3700 11.9132 0.0000 10,145.47 10,145.47 2.2406 0.0000 10,194.61 11 44 44 48 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2025 •i .1 .1 2026 •1 .1 2027 •i '1 2028 •i 3.4918 35.7503 26.4227 0.0748 1 9.2644 1.4891 10.7536 4.1362 1.3700 5.5062 • 0.0000 1 1 . e J .1 .1 .1 .1 .1 .1 .1 3.0503 26.1569 22.0894 0.0741 1 2.6436 0.8821 3.5257 0.7098 0.8226 1.5324 • 0.0000 22.8722 27.6773 25.0023 0.0805 3.0954 0.9524 4.0478 0.8296 0.8928 1.7224 • 0.0000 23.7768 36.2081 39.4776 0.1035 3.2209 1.3705 4.5913 0.8629 1.2774 2.1403 • 0.0000 • ' 7,364.990 7,364.990 2.2406 1 0.0000 7,396.037 3 3 1 i 6 .1 .1 .1 i 7,293.964 7,293.964 1.2361 1 0.0000 7,324.866 4 4 6 i 7,917.986 7,917.986 1.2562 0.0000 7,949.390 3 3 6 i 10,145.47 10,145.47 1.9656 0.0000 10,194.61 44 44 48 Maximum 1 23.7768 36.2081 39.4776 0.1035 9.2644 1.4891 10.7536 4.1362 1.3700 5.5062 0.0000 10,145.47 44 10,145.47 44 2.2406 0.0000 10,194.61 48 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 43.89 0.00 38.35 49.49 0.00 37.02 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 37 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 62.7138 0.5735 ' 49.7848 2.6300e- 1 : 0.2762 0.2762 0.2762 0.2762 • 0.0000 i 89.7282 89.7282 0.0859 1 0.0000 91.8765 89.7282 89.7282 0.0859 1 0.0000 91.8765 .1 003 .1 •1 003 J .1 .1 J .1 J .1 .1 1r .1 .1 J Energy •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 1. J .1 .1 J .1 J .1 .1 1r .1 .1 J Mobile •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 Total Mobile 62.7138 0.5735 49.7848 2.6300e- 0.0000 0.2762 0.2762 0.0000 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 89.7282 89.7282 0.0859 0.0000 91.8765 003 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area 9 62.7138 0.5735 , 49.7848 2.6300e- 1 0.2762 0.2762 0.2762 0.2762 • 0.0000 89.7282 89.7282 0.0859 1 0.0000 91.8765 •1 003 J J J .1 J J J J w J J J 1. Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J w J J J 1. Mobile 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 Total 62.7138 0.5735 49.7848 2.6300e- 0.0000 0.2762 0.2762 0.0000 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 17/1/2025 19/8/2025 1 51 501 i ri - 4 � � 2 -Grading :Grading ,9/9/2025 111/17/2025 1 51 501 i ri - 4 4 � 3 -Building Construction :Building Construction 111/18/2025 112/11/2028 1 51 8001 i r1 4 i 4 -Architectural Coating :Architectural Coating 19/7/2027 112/11/2028 1 51 3301 5 -Paving -Paving 9/26/2028 12/11/2028 5. 55: Acres of Grading (Site Preparation Phase): 250 Acres of Grading (Grading Phase): 250 Acres of Paving: 0 Residential Indoor: 2,081,700; Residential Outdoor: 693,900; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 17/1/2025 19/8/2025 1 51 501 i ri - 4 � � 2 -Grading :Grading ,9/9/2025 111/17/2025 1 51 501 i ri - 4 4 � 3 -Building Construction :Building Construction 111/18/2025 112/11/2028 1 51 8001 i r1 4 i 4 -Architectural Coating :Architectural Coating 19/7/2027 112/11/2028 1 51 3301 5 -Paving -Paving 9/26/2028 12/11/2028 5. 55: Acres of Grading (Site Preparation Phase): 250 Acres of Grading (Grading Phase): 250 Acres of Paving: 0 Residential Indoor: 2,081,700; Residential Outdoor: 693,900; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Grading Building Construction Architectural Coating Paving • 7; 18.00: -i 8; 20.00. -i 9; 271.00. -i 1; 54.00. 4- 6' 15.00' O.00 0.00, 75.00 0.00, r 0.00' 0.00: 0.001 0.001 0.00: 0.00' 11.00: 11.00: 11.00: 5.40: 20.00: LD_Mix I HDT_Mix 5.40: 20.00:LD_Mix i HDT_Mix 5.40: 20.00:LD_Mix iHDT_Mix 11.00' 5.40: 20.00: LD_Mix iHDT_Mix 11.00' 5.40' 20.00: LD_Mix HHDT HHDT HHDT HHDT 'HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Fugitive Dust •i 23.3688 0.0000 23.3688 10.5032 0.0000 10.5032 •• 0.0000 0.0000 Off -Road •i 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 5,513.954 5,513.954 1.7833 5,558.537 • 0 0 i 1 Total 3.4390 35.7243 17.4082 0.0569 23.3688 1.4883 24.8570 10.5032 1.3692 11.8724 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 1 1 Worker •1 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 111.2179 111.2179 2.0500e- 111.2691 17.4082 0.0569 003 004 004 • 003 Total 4.0963 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 111.2179 111.2179 2.0500e- 111.2691 0 003 004 1 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1 9.1138 0.0000 I 9.1138 4.0963 0.0000 4.0963 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road 9 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 1 Total 3.4390 35.7243 17.4082 0.0569 9.1138 1.4883 10.6021 4.0963 1.3692 5.4655 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2025 Mitigated Construction Off -Site 3.3 Grading - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 • i 111.2179 111.2179 2.0500e- 111.2691 26.0793 0.0715 003 004 004 • 003 Total 3.8828 0.0528 0.0260 0.3091 1.1200e- 0.1506 8.5000e- 0.1515 0.0400 7.8000e- 0.0407 111.2179 111.2179 2.0500e- 111.2691 6 003 004 0 004 003 3.3 Grading - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 1 0.0000 3.8828 •• i 0.0000 : 0.0000 1 .J J J J J J J J J J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 • i 123.5754 123.5754 2.2800e- 123.6324 26.0793 0.0715 003 004 004 • 003 Total 1.5143 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 123.5754 123.5754 2.2800e- 123.6324 6 003 004 0 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 1 0.0000 1.5143 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 • 1 • • 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 • i 123.5754 123.5754 2.2800e- 123.6324 0.0430 003 004 004 • 003 Total 0.8074 0.0587 0.0289 0.3434 1.2400e- 0.1673 9.4000e- 0.1683 0.0444 8.7000e- 0.0453 123.5754 123.5754 2.2800e- 123.6324 3 003 004 8 004 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1165 4.6103 1.0240 0.0150 0.3762 4.0500e- 0.3803 0.1084 3.8700e- 0.1122 • i 1,582.307 1,582.307: 0.1082 1,585.012 • • 003 003 0 0 1 3 Worker •1 0.7953 0.3911 4.6530 0.0168 2.2674 0.0127 2.2801 0.6014 0.0117 0.6131 • 1,674.447 1,674.447 0.0309 1,675.218 2.1808 • 1 1 1 5 Total 0.9117 5.0014 5.6769 0.0318 2.6436 0.0168 2.6604 0.7098 0.0156 0.7254 4,135.806 3,256.754 3,256.754 0.1391 3,260.230 3 3 8 0 0 8 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1165 4.6103 1.0240 0.0150 0.3762 4.0500e- 0.3803 0.1084 3.8700e- 0.1122 • i 1,582.307 1,582.307: 0.1082 1,585.012 • • 003 003 0 0 1 3 Worker •1 0.7953 0.3911 4.6530 0.0168 2.2674 0.0127 2.2801 0.6014 0.0117 0.6131 • 1,674.447 1,674.447 0.0309 1,675.218 2.1808 • 1 1 1 5 Total 0.9117 5.0014 5.6769 0.0318 2.6436 0.0168 2.6604 0.7098 0.0156 0.7254 4,135.806 3,256.754 3,256.754 0.1391 3,260.230 3 3 8 0 0 8 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 •• i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1138 4.5646 0.9956 0.0149 0.3762 3.9800e- 0.3802 0.1084 3.8000e- 0.1122 • i 1,572.266 1,572.266: 0.1052 1,574.895 • • 003 003 6 6 1 3 Worker •1 0.7557 0.3581 4.3336 0.0162 2.2674 0.0123 2.2797 0.6014 0.0114 0.6128 • 1,613.461 1,613.461 0.0281 1,614.164 2.1808 • 6 6 i 5 Total 0.8695 4.9227 5.3293 0.0311 2.6436 0.0163 2.6599 0.7098 0.0152 0.7249 4,135.806 3,185.728 3,185.728 0.1333 3,189.059 3 3 8 1 1 8 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2026 Mitigated Construction Off -Site 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1138 4.5646 0.9956 0.0149 0.3762 3.9800e- 0.3802 0.1084 3.8000e- 0.1122 • i 1,572.266 1,572.266: 0.1052 1,574.895 • • 003 003 6 6 1 3 Worker •1 0.7557 0.3581 4.3336 0.0162 2.2674 0.0123 2.2797 0.6014 0.0114 0.6128 • 1,613.461 1,613.461 0.0281 1,614.164 2.1808 • 6 6 i 5 Total 0.8695 4.9227 5.3293 0.0311 2.6436 0.0163 2.6599 0.7098 0.0152 0.7249 4,135.806 3,185.728 3,185.728 0.1333 3,189.059 3 3 8 1 1 8 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 •• i 4,108.236 4,108.236 I 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.1116 4.5216 0.9726 0.0148 0.3762 3.9200e- 0.3801 0.1084 3.7400e- 0.1121 • i 1,563.677 1,563.677: 0.1021 1,566.230 • • 003 003 8 8 I 1 Worker 9 0.7170 0.3287 4.0503 0.0156 2.2674 0.0117 2.2791 0.6014 0.0108 0.6122 • 1,559.966 1,559.966 0.0257 1,560.608 2.1808 • 2 2 1 1 Total 0.8285 4.8503 5.0229 0.0304 2.6436 0.0156 2.6592 0.7098 0.0145 0.7243 4,135.806 3,123.644 3,123.644 0.1278 3,126.838 3 3 8 0 0 2 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2027 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.1116 4.5216 0.9726 0.0148 0.3762 3.9200e- 0.3801 0.1084 3.7400e- 0.1121 • i 1,563.677 1,563.677: 0.1021 1,566.230 • • 003 003 8 8 I 1 Worker 9 0.7170 0.3287 4.0503 0.0156 2.2674 0.0117 2.2791 0.6014 0.0108 0.6122 • 1,559.966 1,559.966 0.0257 1,560.608 2.1808 • 2 2 1 1 Total 0.8285 4.8503 5.0229 0.0304 2.6436 0.0156 2.6592 0.7098 0.0145 0.7243 4,135.806 3,123.644 3,123.644 0.1278 3,126.838 3 3 8 0 0 2 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 1 0.8658 0.8658 1 0.8074 0.8074 •• i 4,108.236 4,108.236 i 1.1028 1 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1098 4.4852 0.9560 0.0147 0.3762 3.8700e- 0.3801 0.1084 3.7000e- 0.1121 • i 1,556.674 1,556.674: 0.0990 1,559.150 2.1808 003 003 1 1 I 1 Worker 9 0.6783 0.3027 3.8031 0.0152 2.2674 0.0109 2.2782 0.6014 9.9800e- 0.6114 • 1,513.259 1,513.259 0.0236 1,513.849 0.8658 003 • 9 9 i 3 Total 0.8074 0.7881 4.7879 4.7590 0.0299 2.6436 0.0147 2.6583 0.7098 0.0137 0.7234 3,069.934 3,069.934 0.1226 3,072.999 3 3 8 0 0 3 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 I 1.1028 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2028 Mitigated Construction Off -Site 3.5 Architectural Coating - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1098 4.4852 0.9560 0.0147 0.3762 3.8700e- 0.3801 0.1084 3.7000e- 0.1121 • i 1,556.674 1,556.674 : 0.0990 1,559.150 003 003 003 1 1 I 1 Worker •1 0.6783 0.3027 3.8031 0.0152 2.2674 0.0109 2.2782 0.6014 9.9800e- 0.6114 • 1,513.259 1,513.259 0.0236 1,513.849 003 • 9 9 1 3 Total 2.4122 0.7881 4.7879 4.7590 0.0299 2.6436 0.0147 2.6583 0.7098 0.0137 0.7234 0.0205 3,069.934 3,069.934 0.1226 3,072.999 003 0 0 3 3.5 Architectural Coating - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating : 19.4923 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 • Off -Road 9 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 375.2641 375.2641 0.0205 375.7758 003 • Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling Vendor Vendor Worker Worker -1 •1 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 1 1 • 1 1 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.1429 0.0655 0.8071 3.1200e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 • 003 003 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 .1 .1 .1 .1 - i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 .1 .1 - i 310.8420 310.8420 5.1200e- 310.9699 003 Total Total 0.1429 0.0655 0.8071 3.1200e- 003 0.4518 2.3300e- 003 0.4541 0.1198 2.1400e- 003 0.1220 0.0000 310.8420 310.8420 5.1200e- 003 310.9699 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 19.4923 1 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 0.0000 i 375.2641 375.2641 0.0205 375.7758 003 Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2027 Mitigated Construction Off -Site 3.5 Architectural Coating - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker •1 0.1429 0.0655 0.8071 3.1200e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 • i 310.8420 310.8420 5.1200e- 310.9699 Total 19.7201 003 003 003 • 003 Total 0.1429 0.0655 0.8071 3.1200e- 0.4518 2.3300e- 0.4541 0.1198 2.1400e- 0.1220 375.7758 310.8420 310.8420 5.1200e- 310.9699 003 003 003 003 3.5 Architectural Coating - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating : 19.4923 1 0.0000 0.0000 1 0.0000 0.0000 •• i 0.0000 : 0.0000 1 .J J J J J J J J 1 J 1. Off -Road 9 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 375.2641 375.2641 0.0205 375.7758 003 Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker •1 0.1352 0.0603 0.7578 3.0200e- 0.4518 2.1600e- 0.4540 0.1198 1.9900e- 0.1218 • i 301.5352 301.5352 4.7000e- 301.6526 2.4122 3.9600e- 003 003 003 • 003 Total 0.1352 0.0603 0.7578 3.0200e- 0.4518 2.1600e- 0.4540 0.1198 1.9900e- 0.1218 301.5352 301.5352 4.7000e- 301.6526 003 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 19.4923 1 0.0000 0.0000 1 0.0000 0.0000 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.2278 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 • 0.0000 i 375.2641 375.2641 0.0205 375.7758 003 Total 19.7201 1.5273 2.4122 3.9600e- 0.0687 0.0687 0.0687 0.0687 0.0000 375.2641 375.2641 0.0205 375.7758 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2028 Mitigated Construction Off -Site 3.6 Paving - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker •1 0.1352 0.0603 0.7578 3.0200e- 0.4518 2.1600e- 0.4540 0.1198 1.9900e- 0.1218 • i 301.5352 301.5352 4.7000e- 301.6526 14.5780 0.0228 003 003 003 • 003 Total 0.1352 0.0603 0.7578 3.0200e- 0.4518 2.1600e- 0.4540 0.1198 1.9900e- 0.1218 301.5352 301.5352 4.7000e- 301.6526 2 003 003 8 003 003 3.6 Paving - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 •• i 2,206.745 2,206.745 : 0.7137 2,224.587 2 2 1 8 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 2,206.745 2,206.745 0.7137 2,224.587 2 2 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.6 Paving - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker •1 0.0375 0.0168 0.2105 8.4000e- 0.1255 6.0000e- 0.1261 0.0333 5.5000e- 0.0338 • i 83.7598 83.7598 1.3000e- 83.7924 14.5780 0.0228 004 004 004 • 003 Total 0.0375 0.0168 0.2105 8.4000e- 004 0.1255 6.0000e- 004 0.1261 0.0333 5.5000e- 004 0.0338 83.7598 83.7598 1.3000e- 003 83.7924 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 • 0.0000 i 2,206.745 i 2,206.745 : 0.7137 2,224.587 2 2 1 8 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 0.9152 8.5816 14.5780 0.0228 0.4185 0.4185 0.3850 0.3850 0.0000 2,206.745 2,206.745 0.7137 2,224.587 2 2 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.6 Paving - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 Vendor .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 1• Worker 9 0.0375 0.0168 0.2105 8.4000e- 0.1255 6.0000e- 0.1261 0.0333 5.5000e- 0.0338 i i 83.7598 83.7598 1.3000e- 83.7924 004 004 004 • 003 Total 0.0375 0.0168 0.2105 8.4000e- 004 0.1255 6.0000e- 004 0.1261 0.0333 5.5000e- 004 0.0338 83.7598 83.7598 1.3000e- 003 83.7924 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 i i 0.0000 '� • 1 9 I 1 1 1 1 1 1 1 1 1 1 I • 1 3 F 4 1 4. F 4. + 4. r 4. 4. F r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 0.00 0.00 T 0.00 nr Golf Course ; 0.00 0.00 0.00 T Single Family Housing ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I 1 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Travertine Page 32 of 37 Date: 1/6/2021 2:51 PM Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter I LDA I LDT1 I LDT2 Apartments Low Rise • 0.559901t 0.0345581 0.1904871 0.103878 r i 11 i Golf Course • 0.559901; 0.034558 : 0.190487 0.103878 E E 1 - Land Land Use Single Family Housing MDV 0.559901 • 0.034558: 0.190487: 0.103878 LHD1 LH D2 MHD HHD 0.0110411 0.004260 0.0110411 0.004260 E E 0.0172281 0.070227 UBUS I MCY 0.0014221 0.0010881 0.0043851 0.000853. 0.000671 OBUS SBUS I MH 0.0172281 0.0702271 0.0014221 0.0010881 0.0043851 0.000853+ 0.000671 E E E I- 0.011041' • 0.011041' 0.004260' 0.017228' 0.070227' 0.001422' 0.001088' 0.004385' 0.000853' 0.000671 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 i 0.0000 1 0.0000 1 1 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated a• i 1 I I 1 I 1 1 I 1 1 1 I 1 I. } 4 4. 4 } 4. 4 4. r • . } 4. 4. r NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Single Family Housing 1 0 •i f -. I0 • i f -r i 0 1 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 1 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • .1 .1 .1 .1 .1 .1 .1 .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Single Family Housing 0 .1 11 i . f -. I0 • f - I0 • 1 0.0000 0.0000 0.0000 1 0.0000 i 0.0000 i 0.0000 1 1 1 0.0000 0.0000 J J J J J J J J 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 J J .1 .1 J J J J .. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . • • . 0.0000 0.0000 1 0.0000 0.0000 J J J 1. 0.0000 0.0000 0.0000 0.0000 J J .1 1. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail CaIEEMod Version: CaIEEMod.2O16.3.2 Page 34 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day • • Ib/day Mitigated �� 62.7138 0.5735 49.7848 2.6300e- 1 0.2762 1 0.2762 1 1 0.2762 ; 0.2762 : 0.0000 i 89.7282 1 89.7282 1 0.0859 1 0.0000 1 91.8765 i I 1 003 1 1 1 1 1 i 1 1 1 '111 1 1 1 1 1 . 1 I 1 fT } } } 4- 4- 4.} } } . } 4.} } Unmitigated •. 62.7138 • 0.5735 • 49.7848 • 2.6300e- . • 0.2762 • 0.2762 • • 0.2762 • 0.2762 • 0.0000 • 89.7282 • 89.7282 • 0.0859 • 0.0000 • 91.8765 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 37 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 39.2165 0.0000 0.0000 0.0000 0.00000.0000 i 0.0000 Coating :: . I Consumer •1 22.0025 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 1.4948 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 I i 89.7282 89.7282 0.0859 91.8765 003 • Total 62.7138 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 37 6.2 Area by SubCategory Mitigated Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 39.2165 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: . I • Consumer •i 22.0025 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 1.4948 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 I i 89.7282 89.7282 0.0859 91.8765 003 • Total 62.7138 0.5735 49.7848 2.6300e- 0.2762 0.2762 0.2762 0.2762 0.0000 89.7282 89.7282 0.0859 0.0000 91.8765 003 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 37 Date: 1/6/2021 2:51 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.16: CALEEMOD PHASE 2 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSS R OA D5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan - Phase 2 (Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Apartments Low Rise Single Family Housing • • • • 163.00 143.00 4 Dwelling Unit Dwelling Unit 20.10 60.00 4. 163,000.00 257,400.00 442 388 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 643.92 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2030 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2030 Land Use - Total Project Area (Phase 2) is approximately 80.10 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 2 Physical Construction anticipated to start Quarter 1 of 2029 and end Quarter 4 2030 Off-road Equipment - Hours are based on an 8 -hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating • EF_Nonresidential_Exterior 250.00 • 50.00 • tblArchitecturalCoating • EF_Nonresidential_Interior 250.00 T 50.00 • tblArchitecturalCoating • EF_Parking 250.00 T 50.00 tblArchitecturalCoating • EF_Residential_Exterior 250.00 T 50.00 tblArchitecturalCoating • EF_Residential_Interior 250.00 T 50.00 Y i 1 tblAreaCoating • Area_Residential_Exterior 283770 1305121 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblAreaCoating • Area Residential_ Interior • 851310 3915364 tblConstructionPhase • NumDays i 60.00 30.00 r tblConstructionPhase • NumDays T 155.00 30.00 r tblConstructionPhase • NumDays T 1,550.00 450.00 r tblConstructionPhase • NumDays T 110.00 175.00 r tblConstructionPhase • NumDays i 110.00 35.00 • r tblEnergyUse • LightingElect i 810.36 0.00 r 4 tblEnergyUse • LightingElect i 1,608.84 0.00 r tblEnergyUse • NT24E i 3,172.76 0.00 • r tblEnergyUse • NT24E T 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 r 4 tblEnergyUse • T24NG i 9,544.50 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 • r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • NumberGas T 130.40 0.00 r 4 tblFireplaces • NumberGas T 114.40 0.00 r 4 tblFireplaces • NumberNoFireplace T 16.30 0.00 r 4 tblFireplaces • NumberNoFireplace T14.30 0.00 tblFireplaces • NumberWood • 16.30 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblFireplaces • NumberWood • 14.30 0.00 tblGrading • AcresOfGrading i 105.00 150.00 r tblGrading • AcresOfGrading i 60.00 150.00 r tblLandUse • LotAcreage i 10.19 20.10 r tblLandUse • LotAcreage i 46.43 60.00 r tblLandUse • Population T 466.00 442.00 r tblLandUse • Population T 409.00 388.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 643.92 r 4 tblSolidWaste • SolidWasteGenerationRate T 74.98 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 159.08 0.00 r 4 tblVehicleTrips • DV T 11.00 0.00 r 4 tblVehicleTrips • DV_TP T 11.00 0.00 r 4 tblVehicleTrips • HO_TL T 4.50 0.00 • r 4 tblVehicleTrips • HO_TL T 4.50 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 • r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 • tblVehicleTrips • HW • 11.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • HW TL • 11.00 0.00 • HW TTP i 40.20 0.00 r r • HW TTP T 40.20 0.00 r r • T 3.00 0.00 PB_TP r r • T 3.00 0.00 PB_TP r r • T 86.00 0.00 PR_TP r r • PR TP T 86.00 0.00 r r 4 • ST TR T 7.16 0.00 r r • ST TR T 9.91 0.00 r r • T 6.07 0.00 SU_TR r r 4 • SU TR T 8.62 0.00 r r 4 • WD TR T 6.59 0.00 r r 4 • WD TR T 9.52 0.00 r r 4 • IndoorWaterUseRate T 10,620,106.18 0.00 r 4 • IndoorWaterUseRate T 9,317,025.66 0.00 r 4 • OutdoorWaterUseRate T 6,695,284.33 0.00 r 4 • OutdoorWaterUseRate T 5,873,777.05 0.00 r 4 • NumberCatalytic T 8.15 0.00 r 4 • NumberCatalytic T 7.15 0.00 r 4 • NumberNoncatalytic T 8.15 0.00 r 4 • NumberNoncatalytic T 7.15 0.00 r 4 • WoodstoveDayYear T 82.00 0.00 r 4 • WoodstoveDayYear T 82.00 0.00 r 4 • WoodstoveWoodMass T 999.60 0.00 • WoodstoveWoodMass •999.60 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 3.4824 35.7423 26.4056 0.0727 23.5194 1.4889 25.0083 10.5432 1.3698 11.9130 • 0.0000 ' 7,041.788 7,041.788 2.2401 0.0000 7,097.791 PM10 5 5 1 3 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2030 .1 19.2797 21.1130 37.9361 0.1025 1.9895 0.6616 2.6511 0.5315 0.6609 1.1924 • 0.0000 i 9,807.819 9,807.819 0.3853 0.0000 9,817.452 • • 9 9 2 Maximum 19.2797 35.7423 37.9361 0.1025 23.5194 1.4889 25.0083 10.5432 1.3698 11.9130 0.0000 9,807.819 9,807.819 2.2401 0.0000 9,817.452 11 9,817.452 0.00 1 9 9 9 9 2 2 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 3.4824 35.7423 26.4056 0.0727 9.2644 1.4889 1 10.7534 4.1362 1.3698 5.5060 • 0.0000 7,041.788 7,041.788 2.2401 0.0000 7,097.791 PM10 4 4 i 3 Total J J J J J J J J w J J J T 2030 •i 19.2797 21.1130 37.9361 0.1025 1.9895 0.6616 2.6511 0.5315 0.6609 1.1924 • 0.0000 i 9,807.819 9,807.819 0.3853 0.0000 9,817.452 • 9 9 2 Maximum 19.2797 35.7423 37.9361 0.1025 9.2644 1.4889 10.7534 4.1362 1.3698 5.5060 0.0000 9,807.819 9,807.819 2.2401 0.0000 9,817.452 0.00 1 9 9 2 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 55.88 0.00 51.54 57.85 0.00 48.89 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 28 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 26.3229 0.2903 25.1787 1.3300e- 1 0.1400 0.1400 0.1400 0.1400 • 0.0000 i 45.4570 45.4570 0.0433 1 0.0000 46.5397 45.4570 45.4570 0.0433 1 0.0000 46.5397 :� 003 •1003 J J J J J J J J 4 J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 ff .1 J J .1 J J J J . J J .1 T Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 26.3229 0.2903 25.1787 1.3300e- 0.0000 0.1400 0.1400 0.0000 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 0.0433 0.0000 46.5397 003 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 26.3229 0.2903 ' 25.1787 1.3300e- 1 1 0.1400 0.1400 ' 0.1400 0.1400 • 0.0000 45.4570 45.4570 0.0433 1 0.0000 46.5397 •1003 •i J J J J 1 J .1 J • J•J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 Total 26.3229 0.2903 25.1787 1.3300e- 0.0000 0.1400 0.1400 0.0000 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 11/1/2029 12/9/2029 1 51 301 i ri - 4 � � 2 -Grading :Grading 12/10/2029 13/23/2029 1 51 301 i ri - - 4 � 3 -Building Construction :Building Construction 13/24/2029 112/13/2030 1 51 4501 i ri - � 4 � 4 -Architectural Coating :Architectural Coating 14/13/2030 112/13/2030 1 51 1751 5 -Paving -Paving 10/27/2030 12/13/2030 5. 35: Acres of Grading (Site Preparation Phase): 150 Acres of Grading (Grading Phase): 150 Acres of Paving: 0 Residential Indoor: 851,310; Residential Outdoor: 283,770; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 11/1/2029 12/9/2029 1 51 301 i ri - 4 � � 2 -Grading :Grading 12/10/2029 13/23/2029 1 51 301 i ri - - 4 � 3 -Building Construction :Building Construction 13/24/2029 112/13/2030 1 51 4501 i ri - � 4 � 4 -Architectural Coating :Architectural Coating 14/13/2030 112/13/2030 1 51 1751 5 -Paving -Paving 10/27/2030 12/13/2030 5. 35: Acres of Grading (Site Preparation Phase): 150 Acres of Grading (Grading Phase): 150 Acres of Paving: 0 Residential Indoor: 851,310; Residential Outdoor: 283,770; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Site Preparation Grading Building Construction Architectural Coating Paving • • • Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class 7: 18.00 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix J HDT_Mix -i ' - 8: 20.00. 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix 1 HDT_Mix 9: 169.001 33.001 0.00: 11.00: 5.40: 20.00: LD_Mix i HDT_Mix 1' 34.001 0.00 0.00: 11.00: 5.40' 20.00:LD Mix iHDT Mix 6: 15.00' 0.00' 0.00' 11.00: 5.40: 20.00:LD Mix Hauling Vehicle Class T HHDT HHDT HHDT HHDT :HDT_Mix HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •: 23.3688 0.0000 23.3688 10.5032 0.0000 10.5032 •• 0.0000 0.0000 Ir J J J J J J J J ; J J J T Off -Road •i 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 5,513.954 5,513.954 1.7833 5,558.537 •.11 0 0 i 1 Total 3.4390 35.7243 17.4082 0.0569 23.3688 1.4883 24.8570 10.5032 1.3692 11.8724 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 1 1 Worker •1 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • i 108.9737 108.9737 1.6400e- 109.0146 17.4082 0.0569 003 004 004 • 003 Total 4.0963 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 108.9737 108.9737 1.6400e- 109.0146 0 003 004 1 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1 9.1138 0.0000 I 9.1138 4.0963 0.0000 4.0963 •• i 0.0000 1 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road 9 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 1 Total 3.4390 35.7243 17.4082 0.0569 9.1138 1.4883 10.6021 4.0963 1.3692 5.4655 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2029 Mitigated Construction Off -Site 3.3 Grading - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 33.1881 .1 .1 .1 - Worker Worker •1 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • i 108.9737 108.9737 1.6400e- 109.0146 1.3316 12.6562 003 004 004 • 003 Total 0.0434 0.0180 0.2936 1.0900e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 108.9737 108.9737 1.6400e- 109.0146 6 6 003 004 004 003 3.3 Grading - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 • Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 3.3844 1 26.0793 .1 .1 .1 - Worker Worker •1 0.0482 0.0200 0.3263 1.2100e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 • i 121.0819 121.0819 1.8200e- 121.1273 5.7482 1.5143 003 004 004 • 003 Total 6,920.706 0.0482 0.0200 0.3263 1.2100e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 121.0819 121.0819 1.8200e- 121.1273 6 6 0 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 1 .J J J J .1 J J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 8 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 16.7602 1 .1 .1 .1 - Worker Worker •i 0.0482 0.0200 0.3263 1.2100e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 • i 121.0819 121.0819 1.8200e- 121.1273 0.8074 0.8074 003 004 004 • 003 Total 1.1028 0.0482 0.0200 0.3263 1.2100e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 121.0819 121.0819 1.8200e- 3 121.1273 8 003 004 004 003 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 • i 4,108.236 4,108.236 I 1.1028 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.0446 1.9925 0.3502 6.7400e- 0.1655 1.6300e- 0.1672 0.0477 1.5600e- 0.0492 • i 712.4952 712.4952: 0.0381 713.4483 2.1808 003 003 003 Worker 9 0.4072 0.1686 2.7569 0.0103 1.4140 6.2800e- 1.4203 0.3751 5.7700e- 0.3808 • 1,023.141 1,023.141 0.0154 1,023.525 0.8658 003 003 • 8 8 1 6 Total 0.8074 0.4518 2.1611 3.1071 0.0170 1.5795 7.9100e- 1.5874 0.4227 7.3300e- 0.4301 1,735.637 1,735.637 0.0535 1,736.973 3 3 8 003 003 1 1 9 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.0446 1.9925 0.3502 6.7400e- 0.1655 1.6300e- 0.1672 0.0477 1.5600e- 0.0492 • i 712.4952 712.4952: 0.0381 713.4483 10.6716 003 003 003 Worker 9 0.4072 0.1686 2.7569 0.0103 1.4140 6.2800e- 1.4203 0.3751 5.7700e- 0.3808 • 1,023.141 1,023.141 0.0154 1,023.525 0.2948 0.2948 003 003 • 8 8 1 6 Total 0.4518 2.1611 3.1071 0.0170 1.5795 7.9100e- 1.5874 0.4227 7.3300e- 0.4301 1,735.637 1,735.637 0.0535 1,736.973 3 3 7 003 003 1 1 9 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0441 1.9790 0.3456 6.7200e- 0.1655 1.6200e- 0.1671 0.0477 1.5400e- 0.0492 • i 709.9145 709.9145: 0.0371 710.8423 10.6716 003 003 003 0.0508 .1 .1 I - Worker •1 0.3807 0.1554 2.5986 0.0100 1.4140 5.8300e- 1.4198 0.3751 5.3600e- 0.3804 • i 998.3577 998.3577 0.0141 998.7104 0.2948 003 003 • 0.0000 Total 4,778.302 0.4248 2.1344 2.9442 0.0167 1.5795 7.4500e- 003 1.5869 0.4227 6.9000e- 003 0.4296 1,708.272 2 1,708.272 2 0.0512 1,709.552 7 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • 0.0000 i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 0.0000 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2030 Mitigated Construction Off -Site 3.5 Architectural Coating - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 Off -Road •u 41 Vendor •i 0.0441 1.9790 0.3456 6.7200e- 0.1655 1.6200e- 0.1671 0.0477 1.5400e- 0.0492 • i 709.9145 709.9145: 0.0371 710.8423 003 • 003 003 003 41 .1 .1 .1 I - Worker •1 0.3807 0.1554 2.5986 0.0100 1.4140 5.8300e- 1.4198 0.3751 5.3600e- 0.3804 • i 998.3577 998.3577 0.0141 998.7104 2.3970 3.9600e- 003 003 • 0.0271 Total 0.4248 2.1344 2.9442 0.0167 1.5795 7.4500e- 003 1.5869 0.4227 6.9000e- 003 0.4296 1,708.272 2 1,708.272 2 0.0512 1,709.552 7 3.5 Architectural Coating - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 15.0317 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 • Off -Road •u 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 375.2641 375.2641 0.0152 375.6438 003 • Total 15.2060 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 375.2641 375.2641 0.0152 375.6438 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling Vendor Vendor Worker Worker -1 •1 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 1 1 • 1 1 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0766 0.0313 0.5228 2.0100e- 0.2845 1.1700e- 0.2856 0.0755 1.0800e- 0.0765 • 003 003 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 .1 .1 .1 .1 - i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 .1 - i 200.8530 200.8530 2.8400e- 200.9240 003 Total 15.2060 0.0766 0.0313 0.5228 2.0100e- 003 0.2845 1.1700e- 003 0.2856 0.0755 1.0800e- 003 0.0765 375.2641 200.8530 200.8530 2.8400e- 003 375.6438 200.9240 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 15.0317 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 0.0000 i 375.2641 375.2641 0.0152 375.6438 003 • Total 15.2060 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 0.0000 375.2641 375.2641 0.0152 375.6438 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2030 Mitigated Construction Off -Site 3.6 Paving - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling Vendor Vendor Worker Worker •1 •1 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 1 1 • 1 1 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0766 0.0313 0.5228 2.0100e- 0.2845 1.1700e- 0.2856 0.0755 1.0800e- 0.0765 • 003 003 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 .1 .1 .1 .1 - i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 .1 .1 - i 200.8530 200.8530 2.8400e- 200.9240 003 Total • 0.0766 0.0313 0.5228 2.0100e- 003 0.2845 1.1700e- 003 0.2856 0.0755 1.0800e- 003 0.0765 0.3306 200.8530 200.8530 2.8400e- 003 0.3306 200.9240 3.6 Paving - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • 2,656.516 2,656.516 I 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 2,656.516 2,656.516 0.1245 2,659.630 ii 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.6 Paving - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0338 0.0138 0.2307 8.9000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 • i 88.6116 88.6116 1.2500e- 88.6429 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 004 004 004 • 003 Total 15.8495 0.0338 0.0138 0.2307 8.9000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 0.1245 88.6116 88.6116 1.2500e- 88.6429 004 004 8 004 2 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • 0.0000 2,656.516 2,656.516 1 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 0.0000 2,656.516 2,656.516 0.1245 2,659.630 ii 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.6 Paving - 2030 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 1 Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0338 0.0138 0.2307 8.9000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 i i 88.6116 88.6116 1.2500e- 88.6429 004 004 004 • 003 Total 0.0338 0.0138 0.2307 8.9000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 88.6116 88.6116 1.2500e- 88.6429 004 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 : 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 1 1 • 1 1 1 I 1 I. + + + 4. + 4. + 4. r 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Apartments Low Rise Single Family Housing; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 0.00 T 0.00 r 0.00 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Land UseLDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY I I I I I I I I I I I I SBUS MH Apartments Low Rise • 0.562310; 0.034239 0.191194 0.102231 0.010280 0.004149 0.017053 0.070255 0.001423 0.001071 0.004354 0.000825: 0.000615 4E E E E E E E E E E 1. Single Family Housing : 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071: 0.004354: 0.000825: 0.000615 • L J Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Single Family Housing 2 0.00 r 4 0.00 0.00 T 0.00 0.00 T 0.00 r 0.00 • 0.00 0.00 0.00 • 0 t r 0.00 0.00 0 0 0 r r 0 0 4.4 Fleet Mix Land UseLDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY I I I I I I I I I I I I SBUS MH Apartments Low Rise • 0.562310; 0.034239 0.191194 0.102231 0.010280 0.004149 0.017053 0.070255 0.001423 0.001071 0.004354 0.000825: 0.000615 4E E E E E E E E E E 1. Single Family Housing : 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071: 0.004354: 0.000825: 0.000615 • L J CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 24 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 : 0.0000 • i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated :� • i 1 I I 1 I I I 1 , I 1 1 1 .1. } } 4. } } 4. } 4. r • . } 4. } r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low i 0 • Rise i f -. Single Family 1 0 • Housing i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J J .1 J .1 .1 J .1 .1. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 - 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low 1 0 :1 Rise i . r -. Single Family I0 • Housing 1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J .1 .1 •• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . • i 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 26.3229 i 0.2903 i 25.1787 i 1.3300e- 1 i 0.1400 1 0.1400 i i 0.1400 : 0.1400 � 0.0000 i 45.4570 i 45.4570 i 0.0433 i 0.0000 i 46.5397 '� I 1 1 003 1 1 1 1 1 1 i 1 1 '1 I 1 1 1 1 1 1 1 1 1 1 1 1 • :I• 4. 1. 1. + 1. 4. 1. 1. r 1. 4. 1. r Unmitigated •• 26.3229 • 0.2903 • 25.1787 • 1.3300e- • • 0.1400 • 0.1400 • • 0.1400 • 0.1400 • 0.0000 • 45.4570 • 45.4570 • 0.0433 • 0.0000 • 46.5397 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i Coating ': f' Consumer •i Products .1 f Hearth f Landscaping 16.5733 1 0.0000 0.0000 0.0000 0.0000 i J J J J J J J J ; 8.9966 1 0.0000 0.0000 0.0000 0.0000 J J J J J J J J . 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J .• 9 0.7531 0.2903 25.1787 1.3300e- 0.1400 0.1400 0.1400 0.1400 003 • ; • • 0.0000 • • 0.0000 1 I J J .1 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 J J J i 45.4570 45.4570 0.0433 0.0000 T 0.0000 T 0.0000 T 46.5397 Total 26.3229 0.2903 25.1787 1.3300e- 003 0.1400 0.1400 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 28 6.2 Area by SubCategory Mitigated Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 16.5733 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: e J .1 .1 J .1 J .1 .1 ; .1 .1 J Consumer •i 8.9966 1 0.0000 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 Products :: Hearth •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.7531 0.2903 25.1787 1.3300e- 0.1400 0.1400 0.1400 0.1400 • i 45.4570 45.4570 0.0433 46.5397 003 • Total 26.3229 0.2903 25.1787 1.3300e- 0.1400 0.1400 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 003 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 28 Date: 1/6/2021 3:01 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type I Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan - Phase 2 (Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Apartments Low Rise Single Family Housing • • • • 163.00 143.00 4 Dwelling Unit Dwelling Unit 20.10 60.00 4. 163,000.00 257,400.00 442 388 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 643.92 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2030 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2030 Land Use - Total Project Area (Phase 2) is approximately 80.10 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 2 Physical Construction anticipated to start Quarter 1 of 2029 and end Quarter 4 2030 Off-road Equipment - Hours are based on an 8 -hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating • EF_Nonresidential_Exterior 250.00 • 50.00 • tblArchitecturalCoating • EF_Nonresidential_Interior 250.00 T 50.00 • tblArchitecturalCoating • EF_Parking 250.00 T 50.00 tblArchitecturalCoating • EF_Residential_Exterior 250.00 T 50.00 tblArchitecturalCoating • EF_Residential_Interior 250.00 T 50.00 Y i 1 tblAreaCoating • Area_Residential_Exterior 283770 1305121 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblAreaCoating • Area Residential_ Interior • 851310 3915364 tblConstructionPhase • NumDays i 60.00 30.00 r tblConstructionPhase • NumDays T 155.00 30.00 r tblConstructionPhase • NumDays T 1,550.00 450.00 r tblConstructionPhase • NumDays T 110.00 175.00 r tblConstructionPhase • NumDays i 110.00 35.00 • r tblEnergyUse • LightingElect i 810.36 0.00 r 4 tblEnergyUse • LightingElect i 1,608.84 0.00 r tblEnergyUse • NT24E i 3,172.76 0.00 • r tblEnergyUse • NT24E T 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 r 4 tblEnergyUse • T24NG i 9,544.50 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 • r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • NumberGas T 130.40 0.00 r 4 tblFireplaces • NumberGas T 114.40 0.00 r 4 tblFireplaces • NumberNoFireplace T 16.30 0.00 r 4 tblFireplaces • NumberNoFireplace T 14.30 0.00 • tblFireplaces • NumberWood • 16.30 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblFireplaces • NumberWood • 14.30 0.00 tblGrading • AcresOfGrading i 105.00 150.00 r tblGrading • AcresOfGrading i 60.00 150.00 r tblLandUse • LotAcreage i 10.19 20.10 r tblLandUse • LotAcreage i 46.43 60.00 r tblLandUse • Population T 466.00 442.00 r tblLandUse • Population T 409.00 388.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 643.92 r 4 tblSolidWaste • SolidWasteGenerationRate T 74.98 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 159.08 0.00 r 4 tblVehicleTrips • DV T 11.00 0.00 r 4 tblVehicleTrips • DV_TP T 11.00 0.00 r 4 tblVehicleTrips • HO_TL T 4.50 0.00 • r 4 tblVehicleTrips • HO_TL T 4.50 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 • r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 • tblVehicleTrips • HW • 11.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • HW TL • 11.00 0.00 • HW TTP i 40.20 0.00 r r • HW TTP T 40.20 0.00 r r • T 3.00 0.00 PB_TP r r • T 3.00 0.00 PB_TP r r • T 86.00 0.00 PR_TP r r • PR TP T 86.00 0.00 r r 4 • ST TR T 7.16 0.00 r r • ST TR T 9.91 0.00 r r • T 6.07 0.00 SU_TR r r 4 • SU TR T 8.62 0.00 r r 4 • WD TR T 6.59 0.00 r r 4 • T 9.52 0.00 WD_TR r r 4 • IndoorWaterUseRate T 10,620,106.18 0.00 r 4 • IndoorWaterUseRate T 9,317,025.66 0.00 r 4 • OutdoorWaterUseRate T 6,695,284.33 0.00 r 4 • OutdoorWaterUseRate T 5,873,777.05 0.00 r 4 • NumberCatalytic T 8.15 0.00 r 4 • NumberCatalytic T 7.15 0.00 r 4 • NumberNoncatalytic T 8.15 0.00 r 4 • NumberNoncatalytic T 7.15 0.00 r 4 • WoodstoveDayYear T 82.00 0.00 r 4 • WoodstoveDayYear T 82.00 0.00 r 4 • WoodstoveWoodMass T 999.60 0.00 • WoodstoveWoodMass •999.60 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •4 3.4814 35.7428 26.3428 0.0726 23.5194 1.4889 25.0083 10.5432 1.3698 11.9130 • 0.0000 ' 7,029.368 7,029.368 2.2399 0.0000 7,085.365 PM10 5 5 i 7 f J .1 .1 J .1 J .1 .1 le .1 .1 J 2030 .1 19.2718 21.0855 37.3500 0.1008 1.9895 0.6617 2.6511 0.5315 0.6610 1.1924 • 0.0000 i 9,645.471 9,645.471 0.3871 0.0000 9,655.149 • • 6 6 7 Maximum 19.2718 35.7428 37.3500 0.1008 23.5194 1.4889 25.0083 10.5432 1.3698 11.9130 0.0000 9,645.471 9,645.471 2.2399 0.0000 9,655.149 11 9,655.149 0.00 1 6 6 5 5 7 7 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 3.4814 35.7428 26.3428 0.0726 9.2644 1.4889 1 10.7534 4.1362 1.3698 5.5060 • 0.0000 7,029.368 7,029.368 2.2399 0.0000 7,085.365 PM10 4 4 1 7 Total J J J J J J J J . J J J T 2030 •i 19.2718 21.0855 37.3500 0.1008 1.9895 0.6617 2.6511 0.5315 0.6610 1.1924 • 0.0000 i 9,645.471 9,645.471 0.3871 0.0000 9,655.149 • 5 5 7 Maximum 19.2718 35.7428 37.3500 0.1008 9.2644 1.4889 10.7534 4.1362 1.3698 5.5060 0.0000 9,645.471 9,645.471 2.2399 0.0000 9,655.149 0.00 1 5 5 7 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 55.88 0.00 51.54 57.85 0.00 48.89 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 28 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 26.3229 0.2903 25.1787 1.3300e- 1 0.1400 0.1400 0.1400 0.1400 • 0.0000 i 45.4570 45.4570 0.0433 1 0.0000 46.5397 45.4570 45.4570 0.0433 1 0.0000 46.5397 :� 003 •1003 J J J J J J J J 4 J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 ff .1 J J .1 J J J J . J J .1 T Mobile 0.0000 0.0000 0.0000 0.0000 0.0000 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 26.3229 0.2903 25.1787 1.3300e- 0.0000 0.1400 0.1400 0.0000 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 0.0433 0.0000 46.5397 003 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 26.3229 0.2903 ' 25.1787 1.3300e- 1 1 0.1400 0.1400 ' 0.1400 0.1400 • 0.0000 45.4570 45.4570 0.0433 1 0.0000 46.5397 •1003 •i J J J J 1 J .1 J • J•J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 Total 26.3229 0.2903 25.1787 1.3300e- 0.0000 0.1400 0.1400 0.0000 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 11/1/2029 12/9/2029 1 51 301 i ri - 4 � � 2 -Grading :Grading 12/10/2029 13/23/2029 1 51 301 i ri - - 4 � 3 -Building Construction :Building Construction 13/24/2029 112/13/2030 1 51 4501 i ri - � 4 � 4 -Architectural Coating :Architectural Coating 14/13/2030 112/13/2030 1 51 1751 5 -Paving -Paving 10/27/2030 12/13/2030 5. 35: Acres of Grading (Site Preparation Phase): 150 Acres of Grading (Grading Phase): 150 Acres of Paving: 0 Residential Indoor: 851,310; Residential Outdoor: 283,770; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 -Site Preparation +Site Preparation 11/1/2029 12/9/2029 1 51 301 i ri - 4 � � 2 -Grading :Grading 12/10/2029 13/23/2029 1 51 301 i ri - - 4 � 3 -Building Construction :Building Construction 13/24/2029 112/13/2030 1 51 4501 i ri - � 4 � 4 -Architectural Coating :Architectural Coating 14/13/2030 112/13/2030 1 51 1751 5 -Paving -Paving 10/27/2030 12/13/2030 5. 35: Acres of Grading (Site Preparation Phase): 150 Acres of Grading (Grading Phase): 150 Acres of Paving: 0 Residential Indoor: 851,310; Residential Outdoor: 283,770; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class Hauling Vehicle Class Site Preparation Grading Building Construction Architectural Coating Paving • • • 7: 18.00 0.001 0.00: 11.00: 5.40: -i , 8: 20.00. 0.001 0.00: 11.00:5.40: -i , 9: 169.00. 33.001 0.00: 11.00: 5.40: -i , 1; 34.00 0.001 0.00: 11.00: 5.40: + r * - 6: 15.00' 0.00' 0.00' 20.00:LD_Mix IHDT_Mix 20.00: LD_Mix 1HDT_Mix 20.00: LD_Mix 20.00: LD_Mix HDT Mix HDT Mix HHDT HHDT HHDT HHDT 11.00: 5.40: 20.00:LD_Mix 'HDT Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •i 23.3688 0.0000 23.3688 10.5032 0.0000 10.5032 •• 0.0000 0.0000 Off -Road •i 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 5,513.954 5,513.954 1.7833 5,558.537 •.11 0 0 i 1 Total 3.4390 35.7243 17.4082 0.0569 23.3688 1.4883 24.8570 10.5032 1.3692 11.8724 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 1 1 Worker •1 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • 1 97.7957 97.7957 1.4400e- 97.8316 17.4082 0.0569 004 004 004 • 003 Total 4.0963 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 97.7957 97.7957 1.4400e- 97.8316 0 004 004 1 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 1 9.1138 0.0000 I 9.1138 4.0963 0.0000 4.0963 •• i 0.0000 1 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road 9 3.4390 35.7243 17.4082 0.0569 1.4883 1.4883 1.3692 1.3692 • 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 1 Total 3.4390 35.7243 17.4082 0.0569 9.1138 1.4883 10.6021 4.0963 1.3692 5.4655 0.0000 5,513.954 5,513.954 1.7833 5,558.537 0 0 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2029 Mitigated Construction Off -Site 3.3 Grading - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 .1 .1 .1 - Vendor Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 33.1881 .1 .1 .1 - Worker Worker •1 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 • 1 97.7957 97.7957 1.4400e- 97.8316 1.3316 12.6562 004 004 004 • 003 Total 0.0424 0.0185 0.2372 9.8000e- 0.1506 6.7000e- 0.1513 0.0400 6.1000e- 0.0406 97.7957 97.7957 1.4400e- 97.8316 6 6 004 004 004 003 3.3 Grading - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road •u 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 6,920.706 6,920.706 2.2383 6,976.664 6 6 1 0 • Total 3.3844 33.1881 26.0793 0.0715 11.3246 1.3316 12.6562 3.8828 1.2251 5.1079 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0 1 Worker •1 0.0471 0.0206 0.2635 1.0900e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 • i 108.6619 108.6619 1.5900e- 108.7017 26.0793 0.0715 003 004 004 • 003 Total 1.5143 0.0471 0.0206 0.2635 1.0900e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 108.6619 108.6619 1.5900e- 108.7017 6 003 004 0 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 1 .J J J J .1 J J .1 .1 J 1. Off -Road 9 3.3844 33.1881 26.0793 0.0715 1.3316 1.3316 1.2251 1.2251 • 0.0000 6,920.706 6,920.706 2.2383 6,976.664 • • 6 6 1 0 Total 3.3844 33.1881 26.0793 0.0715 4.4166 1.3316 5.7482 1.5143 1.2251 2.7394 0.0000 6,920.706 6,920.706 2.2383 6,976.664 6 6 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 8 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 16.7602 1 .1 .1 .1 - Worker Worker •i 0.0471 0.0206 0.2635 1.0900e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 • i 108.6619 108.6619 1.5900e- 108.7017 0.8074 0.8074 003 004 004 • 003 Total 1.1028 0.0471 0.0206 0.2635 1.0900e- 0.1673 7.4000e- 0.1681 0.0444 6.8000e- 0.0451 108.6619 108.6619 1.5900e- 3 108.7017 8 003 004 004 003 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 • i 4,108.236 4,108.236 I 1.1028 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0476 1.9589 0.4141 6.4600e- 0.1655 1.6800e- 0.1672 0.0477 1.6000e- 0.0493 • i 682.1880 682.1880: 0.0423 683.2464 2.1808 003 003 003 Worker 9 0.3977 0.1738 2.2268 9.2000e- 1.4140 6.2800e- 1.4203 0.3751 5.7700e- 0.3808 • i 918.1928 918.1928 0.0135 918.5297 0.8658 003 003 003 • Total 0.8074 0.4453 2.1327 2.6409 0.0157 1.5795 7.9600e- 1.5875 0.4227 7.3700e- 0.4301 1,600.380 1,600.380 0.0558 1,601.776 3 3 8 003 003 8 8 1 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 • 0.0000 i 4,108.236 4,108.236 i 1.1028 4,135.806 • • 3 3 8 Total 2.1808 21.2342 16.7602 0.0430 0.8658 0.8658 0.8074 0.8074 0.0000 4,108.236 4,108.236 1.1028 4,135.806 3 3 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0476 1.9589 0.4141 6.4600e- 0.1655 1.6800e- 0.1672 0.0477 1.6000e- 0.0493 • i 682.1880 682.1880: 0.0423 683.2464 10.6716 003 003 003 Worker 9 0.3977 0.1738 2.2268 9.2000e- 1.4140 6.2800e- 1.4203 0.3751 5.7700e- 0.3808 • i 918.1928 918.1928 0.0135 918.5297 0.2948 0.2948 003 003 003 • 0.2948 Total 0.4453 2.1327 2.6409 0.0157 1.5795 7.9600e- 1.5875 0.4227 7.3700e- 0.4301 1,600.380 1,600.380 0.0558 1,601.776 3 3 7 003 003 8 8 1 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • i 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0471 1.9454 0.4092 6.4300e- 0.1655 1.6600e- 0.1672 0.0477 1.5800e- 0.0493 • i 679.8045 679.8045: 0.0412 680.8343 10.6716 003 003 003 Worker 9 0.3723 0.1601 2.0949 8.9700e- 1.4140 5.8300e- 1.4198 0.3751 5.3600e- 0.3804 • i 895.8426 895.8426 0.0124 896.1519 0.2948 0.2948 003 003 003 • 0.2948 Total 0.0000 0.4194 2.1055 2.5041 0.0154 1.5795 7.4900e- 1.5870 0.4227 6.9400e- 0.4297 1,575.647 1,575.647 0.0536 1,576.986 3 3 7 003 003 1 1 1 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • 0.0000 i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 0.0000 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2030 Mitigated Construction Off -Site 3.5 Architectural Coating - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0471 1.9454 0.4092 6.4300e- 0.1655 1.6600e- 0.1672 0.0477 1.5800e- 0.0493 • i 679.8045 679.8045 : 0.0412 680.8343 003 003 003 Worker •1 0.3723 0.1601 2.0949 8.9700e- 1.4140 5.8300e- 1.4198 0.3751 5.3600e- 0.3804 • i 895.8426 895.8426 0.0124 896.1519 Total 15.2060 003 003 003 • 2.3970 Total 0.4194 2.1055 2.5041 0.0154 1.5795 7.4900e- 1.5870 0.4227 6.9400e- 0.4297 375.6438 1,575.647 1,575.647 0.0536 1,576.986 003 003 1 1 1 3.5 Architectural Coating - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating •i 15.0317 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 1 0.0000 • Off -Road 9 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 375.2641 375.2641 0.0152 375.6438 003 • Total 15.2060 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 375.2641 375.2641 0.0152 375.6438 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0749 0.0322 0.4215 1.8100e- 0.2845 1.1700e- 0.2856 0.0755 1.0800e- 0.0765 • i 180.2287 180.2287 2.4900e- 180.2909 3.9600e- 003 003 003 • 003 Total 0.0271 0.0749 0.0322 0.4215 1.8100e- 0.2845 1.1700e- 0.2856 0.0755 1.0800e- 0.0765 180.2287 180.2287 2.4900e- 180.2909 003 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 15.0317 0.0000 0.0000 1 0.0000 0.0000 •• i 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 0.0000 i 375.2641 375.2641 0.0152 375.6438 003 • Total 15.2060 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 0.0000 375.2641 375.2641 0.0152 375.6438 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2030 Mitigated Construction Off -Site 3.6 Paving - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Total 1 Worker •1 0.0749 0.0322 0.4215 1.8100e- 0.2845 1.1700e- 0.2856 0.0755 1.0800e- 0.0765 • i 180.2287 180.2287 2.4900e- 180.2909 0.0281 003 003 003 • 003 Total 0.3306 0.0749 0.0322 0.4215 1.8100e- 0.2845 1.1700e- 0.2856 0.0755 1.0800e- 0.0765 180.2287 180.2287 2.4900e- 180.2909 8 8 003 003 003 003 3.6 Paving - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 •• i 2,656.516 2,656.516 : 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 2,656.516 2,656.516 0.1245 2,659.630 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.6 Paving - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Paving 1 Worker 9 0.0330 0.0142 0.1859 8.0000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 • i 79.5127 79.5127 1.1000e- 79.5401 1.3845 7.1202 004 004 004 • 003 Total 0.3306 0.0330 0.0142 0.1859 8.0000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 79.5127 79.5127 1.1000e- 79.5401 004 8 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • 0.0000 2,656.516 i 2,656.516 1 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 0.0000 2,656.516 2,656.516 0.1245 2,659.630 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.6 Paving - 2030 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 1 Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0330 0.0142 0.1859 8.0000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 i i 79.5127 79.5127 1.1000e- 79.5401 004 004 004 • 003 Total 0.0330 0.0142 0.1859 8.0000e- 0.1255 5.2000e- 0.1260 0.0333 4.8000e- 0.0338 79.5127 79.5127 1.1000e- 79.5401 004 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 : 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 1 1 • 1 1 1 I 1 I. + + + 4. + 4. + 4. r 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Apartments Low Rise Single Family Housing; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 0.00 T 0.00 r 0.00 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Land UseLDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY I I I I I I I I I I I I SBUS MH Apartments Low Rise • 0.562310; 0.034239 0.191194 0.102231 0.010280 0.004149 0.017053 0.070255 0.001423 0.001071 0.004354 0.000825: 0.000615 4E E E E E E E E E E 1. Single Family Housing : 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071: 0.004354: 0.000825: 0.000615 • J L J Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Single Family Housing 2 0.00 r 4 0.00 0.00 T 0.00 0.00 T 0.00 r 0.00 • 0.00 0.00 0.00 • 0 t r 0.00 0.00 0 0 0 r r 0 0 4.4 Fleet Mix Land UseLDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY I I I I I I I I I I I I SBUS MH Apartments Low Rise • 0.562310; 0.034239 0.191194 0.102231 0.010280 0.004149 0.017053 0.070255 0.001423 0.001071 0.004354 0.000825: 0.000615 4E E E E E E E E E E 1. Single Family Housing : 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071: 0.004354: 0.000825: 0.000615 • J L J CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 24 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 : 0.0000 • i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated :� • i 1 I I 1 I I I 1 , I 1 1 1 .1. } } 4. } } 4. } 4. r • . } 4. } r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low 0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i Rise i f -. Single Family 1 0 • Housing i i J J .1 J .1 .1 J .1 .1. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • J J J 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low 1 0 :1 Rise i . r -. Single Family I0 • Housing 1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J .1 .1 •• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . • i 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 26.3229 i 0.2903 i 25.1787 i 1.3300e- 1 i 0.1400 1 0.1400 i i 0.1400 : 0.1400 � 0.0000 i 45.4570 i 45.4570 i 0.0433 i 0.0000 i 46.5397 '� I 1 1 003 1 1 1 1 1 1 i 1 1 '1 I 1 1 1 1 1 1 1 1 1 1 1 1 • :I• 4. 1. 1. + 1. 4. 1. 1. r 1. 4. 1. r Unmitigated •• 26.3229 • 0.2903 • 25.1787 • 1.3300e- • • 0.1400 • 0.1400 • • 0.1400 • 0.1400 • 0.0000 • 45.4570 • 45.4570 • 0.0433 • 0.0000 • 46.5397 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i Coating ': f' Consumer •i Products .1 f Hearth f Landscaping 16.5733 1 0.0000 0.0000 0.0000 0.0000 i J J J J J J J J ; 8.9966 1 0.0000 0.0000 0.0000 0.0000 J J J J J J J J . 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J .• 9 0.7531 0.2903 25.1787 1.3300e- 0.1400 0.1400 0.1400 0.1400 003 • ; • • 0.0000 • • 0.0000 1 I J J .1 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 J J J i 45.4570 45.4570 0.0433 0.0000 T 0.0000 T 0.0000 T 46.5397 Total 26.3229 0.2903 25.1787 1.3300e- 003 0.1400 0.1400 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 28 6.2 Area by SubCategory Mitigated Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 16.5733 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: e J .1 .1 J .1 J .1 .1 ; .1 .1 J Consumer •i 8.9966 1 0.0000 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 Products :: Hearth •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.7531 0.2903 25.1787 1.3300e- 0.1400 0.1400 0.1400 0.1400 • i 45.4570 45.4570 0.0433 46.5397 003 • Total 26.3229 0.2903 25.1787 1.3300e- 0.1400 0.1400 0.1400 0.1400 0.0000 45.4570 45.4570 0.0433 0.0000 46.5397 003 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 28 Date: 1/6/2021 3:00 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.17: CALEEMOD PHASE 3 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 AQ Report Lei URBAN CROSS R OA D5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan - Phase 3 (Construction - Unmitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Hotel Apartments Low Rise Single Family Housing • • • • • • 100.00 205.00 85.00 a 4 a 21. • • Room Dwelling Unit Dwelling Unit 38.30 25.90 4. 29.40 261,712.00 205,000.00 153,000.00 0 556 230 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 602.41 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2032 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2032 Land Use - Total Project Area (Phase 3) is approximately 93.5 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 3 Physical Construction anticipated to start Quarter 1 of 2031 and end Quarter 4 2032 Off-road Equipment - Hours are based on an 8 -hour workday Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating Column Name • EF — Nonresidential —Exterior 1- • EF— Nonresidential —Interior 1- • EF_Parking 1- • EF — Residential —Exterior • i EF Residential Interior • Default Value New Value 250.00 250.00 250.00 250.00 tblArchitecturalCoating 250.00 50.00 50.00 50.00 50.00 50.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblAreaCoating • Area Residential_ Exterior • 241650 1132441 tblAreaCoating • Area_Residential_Interior i 724950 3397322 r tblConstructionPhase • NumDays T 60.00 35.00 r tblConstructionPhase • NumDays T 155.00 35.00 r tblConstructionPhase • NumDays T 1,550.00 450.00 r tblConstructionPhase • NumDays T 110.00 200.00 r tblConstructionPhase • NumDays T 110.00 40.00 r 4 tblEnergyUse • LightingElect i 810.36 0.00 r tblEnergyUse • LightingElect i 5.44 0.00 • r tblEnergyUse • LightingElect T 1,608.84 0.00 r 4 tblEnergyUse • NT24E i 3,172.76 0.00 r 4 tblEnergyUse • NT24E i 6.23 0.00 r 4 tblEnergyUse • NT24E i 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 4.86 0.00 r 4 tblEnergyUse • NT24NG T 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 6.47 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 • r 4 tblEnergyUse • T24NG i 9,544.50 0.00 r 4 tblEnergyUse • T24NG i 55.15 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 • tblFireplaces • FireplaceWoodMass • 457.60 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblFireplaces • FireplaceWoodMass • 457.60 0.00 tblFireplaces • NumberGas i 164.00 0.00 r tblFireplaces • NumberGas T 68.00 0.00 r tblFireplaces • NumberNoFireplace T 20.50 0.00 r tblFireplaces • NumberNoFireplace T 8.50 0.00 r tblFireplaces • NumberWood T 20.50 0.00 r tblFireplaces • NumberWood T 8.50 0.00 r 4 tblGrading • AcresOfGrading i 122.50 175.00 r tblGrading • AcresOfGrading i 70.00 175.00 • r tblLandUse • LandUseSquareFeet T 145,200.00 261,712.00 r 4 tblLandUse • LotAcreage i 3.33 38.30 r 4 tblLandUse • LotAcreage i 12.81 25.90 r 4 tblLandUse • LotAcreage i 27.60 29.40 r 4 tblLandUse • Population T 586.00 556.00 r 4 tblLandUse • Population T 243.00 230.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 • r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 • r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 602.41 r 4 tblSolidWaste • SolidWasteGenerationRate T 94.30 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 54.75 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 94.30 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 0.00 • tblVehicleTrips • CC_TTP • 61.60 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblVehicleTrips • CNW_TL • 5.40 0.00 tblVehicleTrips • CNW_TTP i 19.00 0.00 r tblVehicleTrips • CW TL T 12.50 0.00 r tblVehicleTrips • CW_TTP T 19.40 0.00 r tblVehicleTrips • DV_TP T 11.00 0.00 r tblVehicleTrips • DV TP T 38.00 0.00 • r tblVehicleTrips • DV_TP T 11.00 0.00 r 4 tblVehicleTrips • HO_TL T 4.50 0.00 r tblVehicleTrips • HO_TL T 4.50 0.00 • r tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HW TL T 11.00 0.00 • r 4 tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 • r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PB T 4.00 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PR_TP T 86.00 0.00 r 4 tblVehicleTrips • PR_TP T 58.00 0.00 r 4 tblVehicleTrips • PR T 86.00 0.00 r 4 tblVehicleTrips • ST TR T 7.16 0.00 • tblVehicleTrips • ST • 8.19 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWater tblWater tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • • • ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR IndoorWaterUseRate IndoorWaterUseRate IndoorWaterUseRate OutdoorWaterUseRate OutdoorWaterUseRate OutdoorWaterUseRate NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic WoodstoveDayYear WoodstoveDayYear WoodstoveWoodMass WoodstoveWoodMass 9.91 6.07 5.95 8.62 6.59 8.17 9.52 13,356,575.25 2,536,677.00 5,538,092.18 8,420,449.62 281,853.00 3,491,405.94 10.25 4.25 10.25 4.25 82.00 82.00 999.60 999.60 • • 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 3.8206 16.6713 22.5077 0.0828 23.5194 0.6185 24.1379 10.5432 0.6185 11.1617 • 0.0000 ' 8,437.149 8,437.149 0.3366 0.0000 8,445.565 PM10 5 5 i 5 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2032 .1 21.7770 23.6285 40.0133 0.1185 3.3915 0.6670 4.0586 0.9080 0.6660 1.5740 • 0.0000 111,456.682 11,456.682 0.4354 0.0000 11,467.567 • • 8 8 0 Maximum 21.7770 23.6285 40.0133 0.1185 23.5194 0.6670 24.1379 10.5432 0.6660 11.1617 0.0000 11,456.68 11,456.68 0.4354 0.0000 11,467.56 11 11,467.56 0.00 1 28 28 28 28 70 70 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 3.8206 16.6713 22.5077 0.0828 9.2644 0.6185 1 9.8830 4.1362 0.6185 4.7547 • 0.0000 8,437.149 8,437.149 0.3366 0.0000 8,445.565 PM10 • 5 5 1 5 Total J J J J J J J J w J J J T 2032 •i 21.7770 23.6285 40.0133 0.1185 3.3915 1 0.6670 1 4.0586 0.9080 0.6660 1.5740 . 0.0000 i 11,456.68 11,456.682 0.4354 0.0000 11,467.567 28 8 0 • Maximum 21.7770 23.6285 40.0133 0.1185 9.2644 0.6670 9.8830 4.1362 0.6660 4.7547 0.0000 11,456.68 11,456.68 0.4354 0.0000 11,467.56 0.00 1 28 28 70 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.97 0.00 50.56 55.95 0.00 50.31 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 30 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 30.0186 0.2752 23.8723 1.2600e- 1 0.1327 0.1327 0.1327 0.1327 • 0.0000T.1021 43.1021 0.0411 1 0.0000 44.1296 :� 003 J J J J J J J J • J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J J .1 J J J J • J J .1 T Mobile •I 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.2752 30.0186 0.2752 23.8723 1.2600e- 0.0000 0.1327 0.1327 0.0000 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 30.0186 0.2752 I 23.8723 1.2600e- 1 1 0.1327 0.1327 ' 0.1327 0.1327 • 0.0000 i 43.1021 43.1021 0.0411 1 0.0000 44.1296 •1003 • 9J .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 30.0186 0.2752 23.8723 1.2600e- 0.0000 0.1327 0.1327 0.0000 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 •Site Preparation +Site Preparation 11/1/2031 :2/18/2031 : 5: 35: i ri - 4 � � 2 :Grading :Grading 12/19/2031 :4/8/2031 : 5� 357 i ri - - 4 � 3 :Building Construction :Building Construction ,4/9/2031 :12/28/2032 1 5: 4507 i ri - � 4 � 4 •Architectural Coating :Architectural Coating 13/24/2032 :12/28/2032 : 5: 2007 5 :Paving :Paving 11/3/2032 12/28/2032 5. 40: Acres of Grading (Site Preparation Phase): 175 Acres of Grading (Grading Phase): 175 Acres of Paving: 0 Residential Indoor: 724,950; Residential Outdoor: 241,650; Non -Residential Indoor: 392,568; Non -Residential Outdoor: 130,856; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 •Site Preparation +Site Preparation 11/1/2031 :2/18/2031 : 5: 35: i ri - 4 � � 2 :Grading :Grading 12/19/2031 :4/8/2031 : 5� 357 i ri - - 4 � 3 :Building Construction :Building Construction ,4/9/2031 :12/28/2032 1 5: 4507 i ri - � 4 � 4 •Architectural Coating :Architectural Coating 13/24/2032 :12/28/2032 : 5: 2007 5 :Paving :Paving 11/3/2032 12/28/2032 5. 40: Acres of Grading (Site Preparation Phase): 175 Acres of Grading (Grading Phase): 175 Acres of Paving: 0 Residential Indoor: 724,950; Residential Outdoor: 241,650; Non -Residential Indoor: 392,568; Non -Residential Outdoor: 130,856; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Grading Building Construction Architectural Coating Paving • 7: 18.00: -i 8: 20.00: -i 9: 288.00. -i 1 ; 58.00 4- 6: 15.00' 0.001 0.00 74.001 0.001 r 0.00' 0.00: 0.001 0.00: 0.00: 0.00' 11.00: 11.00: 5.40: 20.00: LD_Mix I HDT_Mix 11.00: 5.40: 20.00: LD_Mix iHDT_Mix 11.00' 5.40: 20.00: LD_Mix iHDT_Mix 5.40 : 20.00: LD_Mix HDT_Mix 11.00' 5.40' 20.00 : LD_Mix HHDT HHDT HHDT HHDT 'HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •i 23.3688 0.0000 23.3688 10.5032 0.0000 10.5032 : 0.0000 0.0000 Off -Road •i 3.4362 16.6560 14.6733 0.0700 0.6180 0.6180 0.6180 0.6180 • 6,625.655 6,625.655 0.30476,633.274 • 9 9 i 5 Total 3.4362 16.6560 14.6733 0.0700 23.3688 0.6180 23.9867 10.5032 0.6180 11.1212 6,625.655 6,625.655 0.3047 6,633.274 9 9 5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 5 1 Worker •1 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 104.4809 104.4809 1.4000e- 104.5159 14.6733 0.0700 003 004 004 • 003 Total 4.0963 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 104.4809 104.4809 1.4000e- 104.5159 9 003 004 5 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 9.1138 0.0000 I 9.1138 4.0963 0.0000 4.0963 •• 0.0000 : 0.0000 • Off -Road 9 3.4362 16.6560 14.6733 0.0700 0.6180 0.6180 0.6180 0.6180 • 0.0000 6,625.655 6,625.655 0.3047 6,633.274 • • 9 9 1 5 Total 3.4362 16.6560 14.6733 0.0700 9.1138 0.6180 9.7318 4.0963 0.6180 4.7142 0.0000 6,625.655 6,625.655 0.3047 6,633.274 9 9 5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Grading - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 8 1 Worker •1 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 104.4809 104.4809 1.4000e- 104.5159 22.2146 0.0816 003 004 004 • 003 Total 3.8828 0.0376 0.0153 0.2637 1.0500e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 104.4809 104.4809 1.4000e- 104.5159 7 003 004 8 004 003 3.3 Grading - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 •• 0.0000 : 0.0000 • Off -Road •u 3.7788 15.3402 22.2146 0.0816 0.5786 0.5786 0.5786 0.5786 • 8,321.059 8,321.059 0.3351 8,329.436 • • 7 7 1 8 Total 3.7788 15.3402 22.2146 0.0816 11.3246 0.5786 11.9032 3.8828 0.5786 4.4614 8,321.059 8,321.059 0.3351 8,329.436 7 7 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 3.7788 1 22.2146 .1 .1 .1 - Worker Worker •1 0.0418 0.0169 0.2931 1.1600e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 • i 116.0899 116.0899 1.5500e- 116.1287 4.9952 1.5143 003 004 004 • 003 Total 8,321.059 0.0418 0.0169 0.2931 1.1600e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 116.0899 116.0899 1.5500e- 116.1287 7 7 8 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 • Off -Road 9 3.7788 15.3402 22.2146 0.0816 0.5786 0.5786 0.5786 0.5786 • 0.0000 8,321.059 8,321.059 0.3351 8,329.436 • • 7 7 1 8 Total 3.7788 15.3402 22.2146 0.0816 4.4166 0.5786 4.9952 1.5143 0.5786 2.0929 0.0000 8,321.059 8,321.059 0.3351 8,329.436 7 7 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Total 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 0.0508 1 0.2948 .1 .1 1• Worker 9 0.0418 0.0169 0.2931 1.1600e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 • i 116.0899 116.0899 1.5500e- 116.1287 0.2948 003 004 004 • 003 Total 0.0418 0.0169 0.2931 1.1600e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 116.0899 116.0899 1.5500e- 3 116.1287 7 003 004 004 003 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • i 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0995 4.4374 0.7783 0.0151 0.3712 3.6200e- 0.3748 0.1069 3.4600e- 0.1104 • i 1,594.266 1,594.266: 0.0813 1,596.298 10.6716 003 003 9 9 I 6 Worker 9 0.6014 0.2440 4.2199 0.0168 2.4096 9.3700e- 2.4190 0.6391 8.6200e- 0.6478 • 1,671.694 1,671.694 0.0224 1,672.253 0.2948 0.2948 003 003 • 0 0 i 7 Total 0.0000 0.7009 4.6814 4.9982 0.0318 2.7808 0.0130 2.7938 0.7460 0.0121 0.7581 3,265.960 3,265.960 0.1037 3,268.552 3 3 7 8 8 3 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • 0.0000 i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 0.0000 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0995 4.4374 0.7783 0.0151 0.3712 3.6200e- 0.3748 0.1069 3.4600e- 0.1104 • i 1,594.266 1,594.266: 0.0813 1,596.298 10.6716 003 003 9 9 I 6 Worker 9 0.6014 0.2440 4.2199 0.0168 2.4096 9.3700e- 2.4190 0.6391 8.6200e- 0.6478 • 1,671.694 1,671.694 0.0224 1,672.253 0.2948 0.2948 003 003 • 0 0 i 7 Total 0.7009 4.6814 4.9982 0.0318 2.7808 0.0130 2.7938 0.7460 0.0121 0.7581 3,265.960 3,265.960 0.1037 3,268.552 3 3 7 8 8 3 3.4 Building Construction - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • i 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0989 4.4124 0.7744 0.0151 0.3712 3.5800e- 0.3747 0.1069 3.4200e- 0.1103 • i 1,591.653 1,591.653: 0.0795 1,593.641 10.6716 003 003 3 3 I 7 Worker 9 0.5582 0.2254 3.9893 0.0164 2.4096 8.7400e- 2.4184 0.6391 8.0400e- 0.6472 • 1,639.403 1,639.403 0.0206 1,639.918 0.2948 0.2948 003 003 • 2 2 1 8 Total 0.0000 0.6571 4.6378 4.7637 0.0315 2.7808 0.0123 2.7931 0.7460 0.0115 0.7575 3,231.056 3,231.056 0.1002 3,233.560 3 3 7 5 5 5 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • 0.0000 i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 0.0000 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2032 Mitigated Construction Off -Site 3.5 Architectural Coating - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0989 4.4124 0.7744 0.0151 0.3712 3.5800e- 0.3747 0.1069 3.4200e- 0.1103 • i 1,591.653 1,591.653 : 0.0795 1,593.641 003 003 3 3 I 7 Worker •1 0.5582 0.2254 3.9893 0.0164 2.4096 8.7400e- 2.4184 0.6391 8.0400e- 0.6472 • 1,639.403 1,639.403 0.0206 1,639.918 Total 17.4400 003 003 • 2 2 1 8 Total 0.6571 4.6378 4.7637 0.0315 2.7808 0.0123 2.7931 0.7460 0.0115 0.7575 375.6438 3,231.056 3,231.056 0.1002 3,233.560 5 5 5 3.5 Architectural Coating - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating : 17.2657 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 • Off -Road 9 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 375.2641 375.2641 0.0152 375.6438 003 • Total 17.4400 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 375.2641 375.2641 0.0152 375.6438 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling Vendor Vendor Worker Worker -1 •1 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 1 1 • 1 1 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.1124 0.0454 0.8034 3.3100e- 0.4853 1.7600e- 0.4870 0.1287 1.6200e- 0.1303 • 003 003 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 .1 .1 .1 .1 - i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 .1 .1 - i 330.1576 330.1576 4.1500e- 330.2614 003 Total 003 • 0.1124 0.0454 0.8034 3.3100e- 003 0.4853 1.7600e- 003 0.4870 0.1287 1.6200e- 003 0.1303 0.0271 330.1576 330.1576 4.1500e- 003 375.2641 330.2614 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 17.2657 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 0.0000 i 375.2641 375.2641 0.0152 375.6438 003 • Total 17.4400 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 0.0000 375.2641 375.2641 0.0152 375.6438 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.5 Architectural Coating - 2032 Mitigated Construction Off -Site 3.6 Paving - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Paving 9 1 Worker 9 0.1124 0.0454 0.8034 3.3100e- 0.4853 1.7600e- 0.4870 0.1287 1.6200e- 0.1303 • i 330.1576 330.1576 4.1500e- 330.2614 1.3845 7.1202 003 003 003 • 003 Total 0.3306 0.1124 0.0454 0.8034 3.3100e- 0.4853 1.7600e- 0.4870 0.1287 1.6200e- 0.1303 ii 330.1576 330.1576 4.1500e- 330.2614 003 8 003 003 003 3.6 Paving - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • i 2,656.516 2,656.516 : 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 2,656.516 2,656.516 0.1245 2,659.630 ii 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.6 Paving - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • i 0.0000 1 0.0000 : 0.0000 0.0000 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • • • .1 .1 .1 .1 - Worker Worker •1 0.0291 0.0117 0.2078 8.6000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 • i 85.3856 85.3856 1.0700e- 85.4124 7.1202 15.8495 004 004 004 • 003 Total 0.3306 0.0291 0.0117 0.2078 8.6000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 85.3856 85.3856 1.0700e- 85.4124 004 8 004 2 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • 0.0000 2,656.516 i 2,656.516 I 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 0.0000 2,656.516 2,656.516 0.1245 2,659.630 ii 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 3.6 Paving - 2032 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 J .1 . J .1 .1 .1 - Vendor Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 .1 1• Worker 9 0.0291 0.0117 0.2078 8.6000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 i i 85.3856 85.3856 1.0700e- 85.4124 004 004 004 • 003 Total 0.0291 0.0117 0.2078 8.6000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 85.3856 85.3856 1.0700e- 85.4124 004 004 004 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 : 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 1 1 • 1 1 1 I 1 3 4. 4 1 4. F 4. + 4. r 4. 4. 4. r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Land Use FH -W or C -W H -S or C -C Apartments Low Rise Hotel Single Family Housing Miles Trip % Trip Purpose % H -O or C -NW H -W or C -WI H -S or C -C H -O or C -NW Primary Diverted Pass -by ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 0.00 0.00 T 0.00 nr Hotel ; 0.00 0.00 0.00 T Single Family Housing ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I 1 4.3 Trip Type Information Land Use FH -W or C -W H -S or C -C Apartments Low Rise Hotel Single Family Housing Miles Trip % Trip Purpose % H -O or C -NW H -W or C -WI H -S or C -C H -O or C -NW Primary Diverted Pass -by ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer LHD2 MHD HHD OBUS UBUS I MCY Apartments Low Rise • 0.564007+ 0.0340131 0.1916541 0.1012941 0.0097341 0.004084 i 0.0169091 0.070106 i 0.0014241 0.001067 0.0043361 0.000797. 0.000576 4 i i i i i i i i i i i + Hotel • 0.564007; 0.034013 : 0.191654 0.101294 0.0097341 0.004084 0.016909 1 0.070106 1 0.001424 0.001067 1 0.004336 1 0.000797. 0.000576 1• 1. 1. 1. 1. 1. 1. 1. 1. 1. 1• Land Use ILDA I LDT1 I LDT2 MDV LH D1 SBUS I MH Single Family Housing • 0.564007. 0.034013: 0.191654 0.101294 0.009734: 0.004084: 0.016909: 0.070106: 0.001424: 0.001067: 0.004336: 0.000797: 0.000576 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 i i 0.0000 1 0.0000 i 1 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ;i1 1 1 1 1 1• i 11 1 I. } 4 4. } } 4. } 4. r • . } 4. 4. r NaturalGas - 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Apartments Low Rise Hotel Single Family Housing 1 0 •i f -. I0 • i f -r i 0 1 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 1 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • .1 .1 .1 .1 .1 .1 .1 .1 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Hotel Single Family Housing 0 .1 11 i . f -. I0 • f - I0 • 1 0.0000 0.0000 0.0000 1 0.0000 i 0.0000 i 0.0000 1 1 1 0.0000 0.0000 J J J J J J J J 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 J J .1 .1 J J J J .. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . • • . 0.0000 0.0000 1 0.0000 0.0000 J J J 1. 0.0000 0.0000 0.0000 0.0000 J J .1 1. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 30.0186 1 0.2752 i 23.8723 1 1.2600e- 1 1 0.1327 1 0.1327 1 1 0.1327 0.1327 : 0.0000 i 43.1021 1 43.1021 1 0.0411 i 0.0000 1 44.1296 9 i i I 003 I i i i i 1 i i i 9I 1 I I 1 I 1 I 1 I 1 1 • ei• + I. I. + 4. 4. I. + r • 1. 1. + + r Unmitigated •• 30.0186 • 0.2752 • 23.8723 • 1.2600e- • • 0.1327 • 0.1327 • • 0.1327 • 0.1327 • 0.0000 • 43.1021 • 43.1021 • 0.0411 • 0.0000 • 44.1296 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 30 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 16.0421 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 i 0.0000 Coating :1: Consumer •i 13.2618 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 :I I Landscaping •i 0.7147 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 • i 43.1021 43.1021 0.0411 44.1296 003 • Total 30.0186 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 30 6.2 Area by SubCategory Mitigated Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 16.0421 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: I J J j ., Consumer •i 13.2618 1 0.0000 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 Products :: Hearth •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.7147 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 • i 43.1021 43.1021 0.0411 44.1296 003 • Total 30.0186 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 30 Date: 1/6/2021 3:11 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Summer Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type I Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan - Phase 3 (Construction - Unmitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Hotel Apartments Low Rise Single Family Housing • • • • • • 100.00 205.00 85.00 a 4 a 21. • • Room Dwelling Unit Dwelling Unit 38.30 25.90 4. 29.40 261,712.00 205,000.00 153,000.00 0 556 230 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 602.41 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2032 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2032 Land Use - Total Project Area (Phase 3) is approximately 93.5 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 3 Physical Construction anticipated to start Quarter 1 of 2031 and end Quarter 4 2032 Off-road Equipment - Hours are based on an 8 -hour workday Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating Column Name • EF — Nonresidential —Exterior 1- • EF— Nonresidential —Interior 1- • EF_Parking 1- • EF — Residential —Exterior • i EF Residential Interior • Default Value New Value 250.00 250.00 250.00 250.00 tblArchitecturalCoating 250.00 50.00 50.00 50.00 50.00 50.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblAreaCoating • Area Residential_ Exterior • 241650 1132441 tblAreaCoating • Area_Residential_Interior i 724950 3397322 r tblConstructionPhase • NumDays T 60.00 35.00 r tblConstructionPhase • NumDays T 155.00 35.00 r tblConstructionPhase • NumDays T 1,550.00 450.00 r tblConstructionPhase • NumDays T 110.00 200.00 r tblConstructionPhase • NumDays T 110.00 40.00 r 4 tblEnergyUse • LightingElect i 810.36 0.00 r tblEnergyUse • LightingElect i 5.44 0.00 • r tblEnergyUse • LightingElect T 1,608.84 0.00 r 4 tblEnergyUse • NT24E i 3,172.76 0.00 r 4 tblEnergyUse • NT24E i 6.23 0.00 r 4 tblEnergyUse • NT24E i 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 4.86 0.00 r 4 tblEnergyUse • NT24NG T 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 6.47 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 • r 4 tblEnergyUse • T24NG i 9,544.50 0.00 r 4 tblEnergyUse • T24NG i 55.15 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 • tblFireplaces • FireplaceWoodMass • 457.60 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblFireplaces • FireplaceWoodMass • 457.60 0.00 tblFireplaces • NumberGas i 164.00 0.00 r tblFireplaces • NumberGas T 68.00 0.00 r tblFireplaces • NumberNoFireplace T 20.50 0.00 r tblFireplaces • NumberNoFireplace T 8.50 0.00 r tblFireplaces • NumberWood T 20.50 0.00 r tblFireplaces • NumberWood T 8.50 0.00 r 4 tblGrading • AcresOfGrading i 122.50 175.00 r tblGrading • AcresOfGrading i 70.00 175.00 • r tblLandUse • LandUseSquareFeet T 145,200.00 261,712.00 r 4 tblLandUse • LotAcreage i 3.33 38.30 r 4 tblLandUse • LotAcreage i 12.81 25.90 r 4 tblLandUse • LotAcreage i 27.60 29.40 r 4 tblLandUse • Population T 586.00 556.00 r 4 tblLandUse • Population T 243.00 230.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 • r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 • r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 602.41 r 4 tblSolidWaste • SolidWasteGenerationRate T 94.30 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 54.75 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 94.30 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 0.00 • tblVehicleTrips • CC_TTP • 61.60 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblVehicleTrips • CNW_TL • 5.40 0.00 tblVehicleTrips • CNW_TTP i 19.00 0.00 r tblVehicleTrips • CW TL T 12.50 0.00 r tblVehicleTrips • CW_TTP T 19.40 0.00 r tblVehicleTrips • DV_TP T 11.00 0.00 r tblVehicleTrips • DV TP T 38.00 0.00 • r tblVehicleTrips • DV_TP T 11.00 0.00 r 4 tblVehicleTrips • HO_TL T 4.50 0.00 r tblVehicleTrips • HO_TL T 4.50 0.00 • r tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HW TL T 11.00 0.00 • r 4 tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 • r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PB T 4.00 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PR_TP T 86.00 0.00 • r 4 tblVehicleTrips • PR_TP T 58.00 0.00 r 4 tblVehicleTrips • PR T 86.00 0.00 r 4 tblVehicleTrips • ST TR T 7.16 0.00 • tblVehicleTrips • ST • 8.19 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWater tblWater tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • • • ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR IndoorWaterUseRate IndoorWaterUseRate IndoorWaterUseRate OutdoorWaterUseRate OutdoorWaterUseRate OutdoorWaterUseRate NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic WoodstoveDayYear WoodstoveDayYear WoodstoveWoodMass WoodstoveWoodMass 9.91 6.07 5.95 8.62 6.59 8.17 9.52 13,356,575.25 2,536,677.00 5,538,092.18 8,420,449.62 281,853.00 3,491,405.94 10.25 4.25 10.25 4.25 82.00 82.00 999.60 999.60 • • 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 3.8197 16.6717 22.4500 0.0827 23.5194 0.6185 24.1379 10.5432 0.6185 11.1617 • 0.0000 ' 8,425.173 8,425.173 0.3364 0.0000 8,433.584 J J J J J J J J w J J J T 3 3 i 4 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2032 .1 21.7697 23.5625 39.1624 0.1157 3.3915 0.6671 4.0586 0.9080 0.6661 1.5741 • 0.0000 111,177.263 11,177.263 0.4407 0.0000 11,188.280 • • 1 1 9 Maximum 21.7697 23.5625 39.1624 0.1157 23.5194 0.6671 24.1379 10.5432 0.6661 11.1617 0.0000 11,177.26 11,177.26 0.4407 0.0000 11,188.28 11 0.00 0.00 Reduction 31 31 31 31 09 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2031 •i 3.8197 16.6717 22.4500 0.0827 9.2644 0.6185 1 9.8830 4.1362 0.6185 4.7547 • 0.0000 8,425.173 8,425.173 0.3364 0.0000 8,433.584 3 3 1 4 J J J J J J J J w J J J T 2032 •i 21.7697 23.5625 39.1624 0.1157 3.3915 1 0.6671 4.0586 0.9080 0.6661 1.5741 . 0.0000 111,177.263 11,177.263 0.4407 0.0000 11,188.280 Total PM2.5 • 1 1 9 Maximum 21.7697 23.5625 39.1624 0.1157 9.2644 0.6671 9.8830 4.1362 0.6661 4.7547 0.0000 11,177.26 11,177.26 0.4407 0.0000 11,188.28 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 31 31 09 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.97 0.00 50.56 55.95 0.00 50.31 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 30 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 30.0186 0.2752 23.8723 1.2600e- 1 0.1327 0.1327 0.1327 0.1327 • 0.0000 1 43.1021 43.1021 0.0411 1 0.0000 44.1296 :� 003 J J J J J J J J • J J J T Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J J .1 J .1 J .1 • J J .1 T Mobile •I 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.2752 30.0186 0.2752 23.8723 1.2600e- 0.0000 0.1327 0.1327 0.0000 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 003 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 30.0186 0.2752 I 23.8723 1.2600e- 1 1 0.1327 0.1327 ' 0.1327 0.1327 • 0.0000 i 43.1021 43.1021 0.0411 1 0.0000 44.1296 •1003 • 9J J J .1 1 J J J • J J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 30.0186 0.2752 23.8723 1.2600e- 0.0000 0.1327 0.1327 0.0000 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 •Site Preparation +Site Preparation 11/1/2031 :2/18/2031 : 5: 35: i ri - 4 � � 2 :Grading :Grading 12/19/2031 :4/8/2031 : 5� 357 i ri - - 4 � 3 :Building Construction :Building Construction ,4/9/2031 :12/28/2032 1 5: 4507 i ri - � 4 � 4 •Architectural Coating :Architectural Coating 13/24/2032 :12/28/2032 : 5: 2007 5 :Paving :Paving '11/3/2032 '12/28/2032 5' 40: Acres of Grading (Site Preparation Phase): 175 Acres of Grading (Grading Phase): 175 Acres of Paving: 0 Residential Indoor: 724,950; Residential Outdoor: 241,650; Non -Residential Indoor: 392,568; Non -Residential Outdoor: 130,856; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 •Site Preparation +Site Preparation 11/1/2031 :2/18/2031 : 5: 35: i ri - 4 � � 2 :Grading :Grading 12/19/2031 :4/8/2031 : 5� 357 i ri - - 4 � 3 :Building Construction :Building Construction ,4/9/2031 :12/28/2032 1 5: 4507 i ri - � 4 � 4 •Architectural Coating :Architectural Coating 13/24/2032 :12/28/2032 : 5: 2007 5 :Paving :Paving '11/3/2032 '12/28/2032 5' 40: Acres of Grading (Site Preparation Phase): 175 Acres of Grading (Grading Phase): 175 Acres of Paving: 0 Residential Indoor: 724,950; Residential Outdoor: 241,650; Non -Residential Indoor: 392,568; Non -Residential Outdoor: 130,856; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Grading Building Construction Architectural Coating Paving • 7: 18.00: -i 8: 20.00 • -i 9: 288.00 • -i 1 ; 58.00 • 4- 6• 15.00' 0.001 0.00 74.001 0.001 r 0.00' 0.00: 0.001 0.00: 0.00: 0.00' 11.00: 11.00: 5.40: 20.00: LD_Mix I HDT_Mix 11.00: 5.40: 20.00: LD_Mix iHDT_Mix 11.00' 5.40: 20.00: LD_Mix iHDT_Mix 5.40 : 20.00: LD_Mix HDT_Mix 11.00' 5.40' 20.00 : LD_Mix HHDT HHDT HHDT HHDT •HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •i 23.3688 0.0000 23.3688 10.5032 0.0000 10.5032 : 0.0000 0.0000 Off -Road •i 3.4362 16.6560 14.6733 0.0700 0.6180 0.6180 0.6180 0.6180 • 6,625.655 6,625.655 0.30476,633.274 • 9 9 i 5 Total 3.4362 16.6560 14.6733 0.0700 23.3688 0.6180 23.9867 10.5032 0.6180 11.1212 6,625.655 6,625.655 0.3047 6,633.274 9 9 5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 5 1 Worker •1 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 93.7023 93.7023 1.2200e- 93.7329 14.6733 0.0700 004 004 004 • 003 Total 4.0963 0.0368 0.0157 0.2119 9.4000e- 004 0.1506 5.9000e- 004 0.1512 0.0400 5.4000e- 004 0.0405 93.7023 93.7023 1.2200e- 003 93.7329 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 9.1138 0.0000 I 9.1138 4.0963 0.0000 4.0963 •• 0.0000 : 0.0000 • Off -Road 9 3.4362 16.6560 14.6733 0.0700 0.6180 0.6180 0.6180 0.6180 • 0.0000 6,625.655 6,625.655 0.3047 6,633.274 • • 9 9 1 5 Total 3.4362 16.6560 14.6733 0.0700 9.1138 0.6180 9.7318 4.0963 0.6180 4.7142 0.0000 6,625.655 6,625.655 0.3047 6,633.274 9 9 5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Grading - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 8 1 Worker •1 0.0368 0.0157 0.2119 9.4000e- 0.1506 5.9000e- 0.1512 0.0400 5.4000e- 0.0405 • i 93.7023 93.7023 1.2200e- 93.7329 22.2146 0.0816 004 004 004 • 003 Total 3.8828 0.0368 0.0157 0.2119 9.4000e- 004 0.1506 5.9000e- 004 0.1512 0.0400 5.4000e- 004 0.0405 93.7023 93.7023 1.2200e- 003 93.7329 3.3 Grading - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •i 11.3246 0.0000 11.3246 3.8828 0.0000 3.8828 •• 0.0000 : 0.0000 • Off -Road 9 3.7788 15.3402 22.2146 0.0816 0.5786 0.5786 0.5786 0.5786 • 8,321.059 8,321.059 0.3351 8,329.436 • • 7 7 1 8 Total 3.7788 15.3402 22.2146 0.0816 11.3246 0.5786 11.9032 3.8828 0.5786 4.4614 8,321.059 8,321.059 0.3351 8,329.436 7 7 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 8 1 Worker •1 0.0409 0.0174 0.2354 1.0400e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 • i 104.1137 104.1137 1.3600e- 104.1476 22.2146 0.0816 003 004 004 • 003 Total 1.5143 0.0409 0.0174 0.2354 1.0400e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 104.1137 104.1137 1.3600e- 104.1476 7 003 004 8 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 4.4166 0.0000 I 4.4166 1.5143 0.0000 1.5143 •• 0.0000 : 0.0000 • Off -Road 9 3.7788 15.3402 22.2146 0.0816 0.5786 0.5786 0.5786 0.5786 • 0.0000 8,321.059 8,321.059 0.3351 8,329.436 • • 7 7 1 8 Total 3.7788 15.3402 22.2146 0.0816 4.4166 0.5786 4.9952 1.5143 0.5786 2.0929 0.0000 8,321.059 8,321.059 0.3351 8,329.436 7 7 8 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 Total 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 0.0508 1 0.2948 .1 .1 .1 - Worker Worker •i 0.0409 0.0174 0.2354 1.0400e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 • i 104.1137 104.1137 1.3600e- 104.1476 0.2948 003 004 004 • 003 Total 0.0409 0.0174 0.2354 1.0400e- 0.1673 6.5000e- 0.1680 0.0444 6.0000e- 0.0450 104.1137 104.1137 1.3600e- 3 104.1476 7 003 004 004 003 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • i 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.1063 4.3635 0.9203 0.0145 0.3712 3.7000e- 0.3749 0.1069 3.5400e- 0.1104 • i 1,526.972 1,526.972: 0.0901 1,529.225 10.6716 003 003 4 4 I 9 Worker 9 0.5886 0.2512 3.3896 0.0150 2.4096 9.3700e- 2.4190 0.6391 8.6200e- 0.6478 • 1,499.236 1,499.236 0.0196 1,499.725 0.2948 0.2948 003 003 • 5 5 1 8 Total 0.0000 0.6949 4.6147 4.3099 0.0295 2.7808 0.0131 2.7938 0.7460 0.0122 0.7582 3,026.208 3,026.208 0.1097 3,028.951 3 3 7 9 9 7 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • 0.0000 i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 0.0000 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.1063 4.3635 0.9203 0.0145 0.3712 3.7000e- 0.3749 0.1069 3.5400e- 0.1104 • i 1,526.972 1,526.972: 0.0901 1,529.225 10.6716 003 003 4 4 I 9 Worker 9 0.5886 0.2512 3.3896 0.0150 2.4096 9.3700e- 2.4190 0.6391 8.6200e- 0.6478 • 1,499.236 1,499.236 0.0196 1,499.725 0.2948 0.2948 003 003 • 5 5 i 8 Total 0.6949 4.6147 4.3099 0.0295 2.7808 0.0131 2.7938 0.7460 0.0122 0.7582 3,026.208 3,026.208 0.1097 3,028.951 3 3 7 9 9 7 3.4 Building Construction - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • i 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •, 0.1057 4.3382 0.9163 0.0144 0.3712 3.6600e- 0.3748 0.1069 3.5000e- 0.1104 • i 1,524.467 1,524.467: 0.0882 1,526.671 10.6716 003 003 8 8 I 9 Worker 9 0.5469 0.2320 3.1972 0.0147 2.4096 8.7400e- 2.4184 0.6391 8.0400e- 0.6472 • 1,470.086 1,470.086 0.0180 1,470.536 0.2948 0.2948 003 003 • 2 2 1 3 Total 0.0000 0.6526 4.5702 4.1135 0.0291 2.7808 0.0124 2.7932 0.7460 0.0115 0.7576 2,994.554 2,994.554 0.1062 2,997.208 3 3 7 0 0 2 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 • 0.0000 i 4,778.302 4,778.302 0.1903 4,783.058 • • 3 3 7 Total 2.1540 10.6716 15.9919 0.0508 0.2948 0.2948 0.2948 0.2948 0.0000 4,778.302 4,778.302 0.1903 4,783.058 3 3 7 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2032 Mitigated Construction Off -Site 3.5 Architectural Coating - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor 9 0.1057 4.3382 0.9163 0.0144 0.3712 3.6600e- 0.3748 0.1069 3.5000e- 0.1104 • i 1,524.467 1,524.467 : 0.0882 1,526.671 003 003 8 8 I 9 Worker 9 0.5469 0.2320 3.1972 0.0147 2.4096 8.7400e- 2.4184 0.6391 8.0400e- 0.6472 • 1,470.086 1,470.086 0.0180 1,470.536 Total 17.4400 003 003 • 2 2 1 3 Total 0.6526 4.5702 4.1135 0.0291 2.7808 0.0124 2.7932 0.7460 0.0115 0.7576 375.6438 2,994.554 2,994.554 0.1062 2,997.208 0 0 2 3.5 Architectural Coating - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating •i 17.2657 0.0000 0.0000 1 0.0000 0.0000 •. 0.0000 : 0.0000 • Off -Road 9 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 375.2641 375.2641 0.0152 375.6438 003 • Total 17.4400 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 375.2641 375.2641 0.0152 375.6438 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling Vendor Vendor Worker Worker -1 •1 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 1 1 • 1 1 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.1102 0.0467 0.6439 2.9600e- 0.4853 1.7600e- 0.4870 0.1287 1.6200e- 0.1303 • 003 003 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 1 1 .1 .1 .1 .1 - i 0.0000 0.0000 : 0.0000 0.0000 1 .1 .1 .1 .1 - i 296.0590 296.0590 3.6300e- 296.1497 003 Total 003 • 0.1102 0.0467 0.6439 2.9600e- 003 0.4853 1.7600e- 003 0.4870 0.1287 1.6200e- 003 0.1303 0.0271 296.0590 296.0590 3.6300e- 003 375.2641 296.1497 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Archit. Coating -i 17.2657 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 : 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road •u 0.1743 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 • 0.0000 i 375.2641 375.2641 0.0152 375.6438 003 • Total 17.4400 1.1417 2.3970 3.9600e- 0.0271 0.0271 0.0271 0.0271 0.0000 375.2641 375.2641 0.0152 375.6438 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.5 Architectural Coating - 2032 Mitigated Construction Off -Site 3.6 Paving - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Paving 9 1 Worker •1 0.1102 0.0467 0.6439 2.9600e- 0.4853 1.7600e- 0.4870 0.1287 1.6200e- 0.1303 • i 296.0590 296.0590 3.6300e- 296.1497 1.3845 7.1202 003 003 003 • 003 Total 0.3306 0.1102 0.0467 0.6439 2.9600e- 0.4853 1.7600e- 0.4870 0.1287 1.6200e- 0.1303 ii 296.0590 296.0590 3.6300e- 296.1497 003 8 003 003 003 3.6 Paving - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • i 2,656.516 2,656.516 : 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 2,656.516 2,656.516 0.1245 2,659.630 ii 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.6 Paving - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0285 0.0121 0.1665 7.7000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 • i 76.5670 76.5670 9.4000e- 76.5904 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 004 004 004 • 004 Total 15.8495 0.0285 0.0121 0.1665 7.7000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 0.1245 76.5670 76.5670 9.4000e- 76.5904 004 004 8 004 2 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 • 0.0000 2,656.516 2,656.516 1 0.1245 2,659.630 8 8 1 2 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • • • 0.0000 0.0000 Total 1.3845 7.1202 15.8495 0.0281 0.3306 0.3306 0.3306 0.3306 0.0000 2,656.516 2,656.516 0.1245 2,659.630 ii 8 8 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 3.6 Paving - 2032 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 J .1 . J .1 .1 .1 - Vendor Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 Worker 9 0.0285 0.0121 0.1665 7.7000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 i i 76.5670 76.5670 9.4000e- 76.5904 004 004 004 • 004 Total 0.0285 0.0121 0.1665 7.7000e- 0.1255 4.6000e- 0.1260 0.0333 4.2000e- 0.0337 76.5670 76.5670 9.4000e- 76.5904 004 004 004 004 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •'i 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 : 0.0000 0.0000 i 0.0000 0.0000 0.0000 i i 0.0000 , 1 9 I 1 1 1 1 1 1 1 • 1 1 1 I 1 3 4. 4 1 4. F 4. + 4. r 4. 4. 4. r Unmitigated - 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Land Use FH -W or C -W H -S or C -C Apartments Low Rise Hotel Single Family Housing Miles Trip % Trip Purpose % H -O or C -NW H -W or C -WI H -S or C -C H -O or C -NW Primary Diverted Pass -by ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 0.00 0.00 T 0.00 nr Hotel ; 0.00 0.00 0.00 T Single Family Housing ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I 1 4.3 Trip Type Information Land Use FH -W or C -W H -S or C -C Apartments Low Rise Hotel Single Family Housing Miles Trip % Trip Purpose % H -O or C -NW H -W or C -WI H -S or C -C H -O or C -NW Primary Diverted Pass -by ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ T 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter LHD2 MHD HHD OBUS UBUS I MCY Apartments Low Rise • 0.564007+ 0.0340131 0.1916541 0.1012941 0.0097341 0.004084 i 0.0169091 0.070106 i 0.0014241 0.001067 0.0043361 0.000797. 0.000576 4 i i i i i i i i i i i + Hotel • 0.564007; 0.034013 : 0.191654 0.101294 0.0097341 0.004084 0.016909 1 0.070106 1 0.001424 0.001067 1 0.004336 1 0.000797. 0.000576 1• 1. 1. 1. 1. 1. 1. 1. 1. 1. 1• Land Use ILDA I LDT1 I LDT2 MDV LH D1 SBUS I MH Single Family Housing • 0.564007. 0.034013: 0.191654 0.101294 0.009734: 0.004084: 0.016909: 0.070106: 0.001424: 0.001067: 0.004336: 0.000797: 0.000576 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 i 0.0000 1 0.0000 1 1 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated ;i1 1 1 1 1 1 1 1• i 11 1 I. } 4 4. 4 } 4. 4 4. r • . } 4. 4. r NaturalGas - 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr Ib/day Ib/day Apartments Low Rise Hotel Single Family Housing i 0 •i f -. I0 • i f -r i 0 1 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 1 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • .1 .1 .1 .1 .1 .1 .1 .1 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Hotel Single Family Housing 0 .1 11 i . f -. I0 • f - I0 • 1 0.0000 0.0000 0.0000 1 0.0000 i 0.0000 i 0.0000 1 1 1 0.0000 0.0000 J J J J J J J J 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 J J .1 .1 J J J J .. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 . • • . 0.0000 0.0000 1 0.0000 0.0000 J J J 1. 0.0000 0.0000 0.0000 0.0000 J J .1 1. 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 30.0186 1 0.2752 i 23.8723 1 1.2600e- 1 1 0.1327 1 0.1327 1 1 0.1327 0.1327 : 0.0000 i 43.1021 1 43.1021 1 0.0411 i 0.0000 1 44.1296 9 i i I 003 I i i i i 1 i i i 9I 1 I I 1 I 1 I 1 I 1 1 • ei• + I. I. + 4. 4. I. + r • 1. 1. + + r Unmitigated •• 30.0186 • 0.2752 • 23.8723 • 1.2600e- • • 0.1327 • 0.1327 • • 0.1327 • 0.1327 • 0.0000 • 43.1021 • 43.1021 • 0.0411 • 0.0000 • 44.1296 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 30 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory Ib/day Ib/day Architectural •i 16.0421 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 i 0.0000 Coating :1: Consumer •i 13.2618 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 :I I Landscaping •i 0.7147 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 • i 43.1021 43.1021 0.0411 44.1296 003 • Total 30.0186 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 30 6.2 Area by SubCategory Mitigated Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 16.0421 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: l J J j ., Consumer •i 13.2618 1 0.0000 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 Products :: Hearth •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.7147 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 • i 43.1021 43.1021 0.0411 44.1296 003 • Total 30.0186 0.2752 23.8723 1.2600e- 0.1327 0.1327 0.1327 0.1327 0.0000 43.1021 43.1021 0.0411 0.0000 44.1296 003 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 30 Date: 1/6/2021 3:10 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Winter Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type I Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.18: CALEEMOD SUBSTATION CONSTRUCTION EMISSIONS MODEL OUTPUTS (MITIGATED) 12188-05 AQ Report L,, URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Travertine Specific Plan (Substation Construction - Mitigated) Riverside -Salton Sea County, Summer 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population User Defined Industrial Other Asphalt Surfaces • • • • 0.80 50.00 4 User Defined Unit 1000sgft 0.02 1.13 4. 800.00 50,000.00 0 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Total Project area is 1.15 acres. Construction Phase - Construction of Substation anticipated to start Quarter 1 2024 and end Quarter 2 2025 Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Tier 4 for all equipment >150 HP Fleet Mix - 1 Column Name I tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 2.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 5.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 • 3.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated } 0.00 67.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 5.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 3.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 4.00 tblConstEquipMitigation Y • Tier No Change T• Tier 4 Final tblConstEquipMitigation Y • Tier No Change T Tier 4 Final 4 1 1 tblConstEquipMitigation • Tier No Change Tier 4 Final Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer tblConstEquipMitigation • Tier • 4 1- tblConstEquipMitigation • Tier i r tblConstEquipMitigation • Tier i r tblConstEquipMitigation • Tier i r tblConstructionPhase • NumDays T r tblConstructionPhase • NumDays T r tblConstructionPhase • NumDays T r tblGrading • AcresOfGrading i r tblLandUse • LandUseSquareFeet i r tblLandUse • LotAcreage i r tblLandUse • LotAcreage i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i tblProjectCharacteristics • CO2lntensityFactor • No Change No Change No Change No Change 200.00 20.00 4.00 225.00 0.00 0.00 1.15 1.00 1.00 1.00 3.00 1.00 3.00 6.00 6.00 6.00 6.00 6.00 1270.9 • • Tier 4 Final Tier 4 Final Tier 4 Final Tier 4 Final 287.00 15.00 90.00 90.00 800.00 0.02 1.13 0.00 2.00 4.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 21.3596 165.7956 165.7576 0.5128 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 • 0.0000 ' 49,617.27 49,617.27 15.6706 0.0000 50,009.04 • J J J J J J J J w J J J T 97 97 i 55 e J .1 .1 J .1 J .1 .1 . .1 .1 J 2025 .1 20.1696 144.3714 162.2906 0.5125 0.2158 5.7347 5.9506 0.0582 5.2899 5.3480 • 0.0000 i 49,592.15 49,592.15 15.6614 0.0000 49,983.69 • • 50 50 10 Maximum 21.3596 165.7956 165.7576 0.5128 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 0.0000 49,617.27 49,617.27 15.6706 0.0000 50,009.04 11 0.00 0.00 Reduction 97 97 55 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 7.8087 43.7997 251.5880 0.5128 3.4567 1.6998 4.2297 1.5198 1.6418 2.2826 • 0.0000 49,617.27 49,617.27 15.6706 0.0000 50,009.04 96 96 1 55 • J J J J J J J J w J J J T 2025 7.6717 42.6144 251.4794 0.5125 0.2158 1.5739 1 1.7897 0.0582 1.5238 1.5819 • 0.0000 i 49,592.15 49,592.15 15.6614 0.0000 49,983.69 Total PM2.5 50 50 10 Maximum 7.8087 43.7997 251.5880 0.5128 3.4567 1.6998 4.2297 1.5198 1.6418 2.2826 0.0000 49,6167.27 49,6167.27 15.6706 0.0000 50,0 59.04 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 62.72 72.14 -53.35 0.00 54.05 73.62 66.64 56.97 72.34 70.11 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 22 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day r Area 4 0.0499 5.0000e- 5.1700e- 0.0000 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy 9� 005 003 005 005 005 005 : 005 . J J J J J J J J • J J J J J J J J J J J 4 J J J T •I Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total f J J J .1 J J J J 4 J J J T 5.0000e- Mobile 0.0000 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 2.0000e- Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 005 003 005 005 005 005 005 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 0.0499 5.0000e- ' 5.1700e- 0.0000 1 : 2.0000e- 2.0000e- I 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •1 005 003 I 005 005 005 005 : 005 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Grading •Graders Grading [Off -Highway Trucks Grading [Plate Compactors Grading :Rubber Tired Dozers Grading :Scrapers Grading +Skid Steer Loaders Grading :Sweepers/Scrubbers Grading +Tractors/Loaders/Backhoes Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction [Air Compressors :Cranes :Excavators :Forklifts :Generator Sets :Graders Building Construction :Off -Highway Trucks Building Construction :Other Construction Equipment Building Construction :Plate Compactors Building Construction :Rollers Building Construction :Rubber Tired Dozers Building Construction [Scrapers Building Construction +Skid Steer Loaders Building Construction +Tractors/Loaders/Backhoes Building Construction :Trenchers Building Construction :Welders 1: 8.00' 187' 26 8.00T 402 1 8.001 8' 1 8.001 247' 2 8.001 367 1 8.001 65' 1 8.001 64' 0 7.001 97' 1 8.001 78' 2 8.001 231: 3 8.001 158' 1 8.001 89' 1 8.001 84' 1 8.001 187' 28 8.001 402 5 8.001 172' 1 8.001 8' 2 8.001 80' 1 8.001 247' 2 8.001 367 ' 1 8.001 65' ' 4 8.001 97' 1 '4 1 8.001 78' I- r 0' 8.00' 46' 0.41 0.38 0.43 0.40 0.48 0.37 0.46 0.37 0.48 0.29 0.38 0.20 0.74 0.41 0.38 0.42 0.43 0.38 0.40 0.48 0.37 0.37 0.50 0.45 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Phase Name Offroad Equipment Count Demolition Grading Building Construction Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length 1 17: 43.00. 0.00: 0.00: 11.00: 33: 83.00. 0.00i 0.00: 11.00: 5.40: + r 54' 21.00' 8.00' 0.00' Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class 5.40: 20.00:LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Off -Road •i 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 • 19,112.574 19,112.574 6.1814 19,267.10 • 8 8 i 96 Total 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 Worker •1 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 308.3489 308.3489 6.1500e- 308.5026 91.6994 0.1975 003 003 003 • 003 Total 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 308.3489 308.3489 6.1500e- 308.5026 48 003 003 96 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.4143 10.4618 91.6994 0.1975 0.3219 0.3219 0.3219 0.3219 • 0.0000 119,112.574 19,112.574 6.1814 19,267.10 • • 8 8 96 Total 2.4143 10.4618 91.6994 0.1975 0.3219 0.3219 0.3219 0.3219 0.0000 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site 3.3 Grading - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 18 1 Worker •1 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 308.3489 308.3489 6.1500e- 308.5026 104.7398 0.3945 003 003 003 • 003 Total 3.4247 0.1381 0.0660 0.9798 3.0900e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 308.3489 308.3489 6.1500e- 308.5026 87 003 003 18 003 003 3.3 Grading - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 7.0826 0.0000 7.0826 3.4247 0.0000 3.4247 •• 0.0000 : 0.0000 • Off -Road •u 15.7672 115.8856 104.7398 0.3945 4.3138 4.3138 3.9695 3.9695 • 38,176.01 38,176.01 12.3393 38,484.50 • • 87 87 1 18 Total 15.7672 115.8856 104.7398 0.3945 7.0826 4.3138 11.3964 3.4247 3.9695 7.3942 38,176.01 38,176.01 12.3393 38,484.50 87 87 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 18 1 Worker •1 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 595.1851 595.1851 0.0119 595.4817 178.1011 0.3945 003 003 003 • 0.7691 Total 1.3357 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 595.1851 595.1851 0.0119 595.4817 86 003 003 18 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 2.7622 0.0000 2.7622 1.3357 1 0.0000 1.3357 •• i 0.0000 : 0.0000 1 .J J J J J J J J 1 J 1. Off -Road 9 5.0363 23.3198 178.1011 0.3945 0.7691 0.7691 0.7591 0.7591 • 0.0000 38,176.01 38,176.01 12.3393 38,484.50 • • 86 86 1 18 Total 5.0363 23.3198 178.1011 0.3945 2.7622 0.7691 3.5313 1.3357 0.7591 2.0948 0.0000 38,176.01 38,176.01 12.3393 38,484.50 86 86 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.3 Grading - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 21.2801 1 Worker 9 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 595.1851 595.1851 0.0119 595.4817 6.6716 003 003 003 • Total 6.1540 0.2665 0.1275 1.8912 5.9700e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 595.1851 595.1851 0.0119 595.4817 47 47 003 90 003 003 3.4 Building Construction - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 21.2801 165.2586 165.1826 0.5096 i 6.6716 6.6716 6.1540 6.1540 •. i 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 Total 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •i 0.0120 0.5047 0.0964 1.6800e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 • i 177.6660 177.6660 : 0.0107 177.9324 • • 003 004 004 90 .1 .1 I - Worker •1 0.0674 0.0323 0.4785 1.5100e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 150.5890 150.5890 3.0000e- 150.6641 43.2628 251.0130 003 003 004 • 003 Total 1.6983 0.0794 0.5369 0.5749 3.1900e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 328.2550 328.2550 0.0137 328.5965 003 46 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 7.7292 43.2628 251.0130 i 0.5096 i 1.6983 1.6983 i 1.6405 1.6405 • 0.0000 i 49,289.02 49,289.02 15.6570 49,680.44 • • 46 46 90 Total 7.7292 43.2628 251.0130 0.5096 1.6983 1.6983 1.6405 1.6405 0.0000 49,289.02 49,289.02 15.6570 49,680.44 46 46 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 14 1 1 • i .1 J .1 .1 .1 .1 J .1 7 J .1 J t Vendor •i 0.0120 0.5047 0.0964 1.6800e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 • i 177.6660 177.6660 : 0.0107 177.9324 161.7538 003 004 004 V .1 .1 .1 I - Worker 9 0.0674 0.0323 0.4785 1.5100e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 150.5890 150.5890 3.0000e- 150.6641 5.2886 5.2886 003 003 004 • 003 Total 15.6484 0.0794 0.5369 0.5749 3.1900e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 328.2550 328.2550 0.0137 27 328.5965 14 003 003 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 20.0943 143.8423 161.7538 i 0.5094 5.7333 5.7333 5.2886 5.2886 • i 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 Total 20.0943 143.8423 161.7538 0.5094 5.7333 5.7333 5.2886 5.2886 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0117 0.4998 0.0930 1.6700e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 • i 176.4260 176.4260: 0.0104 176.6853 7.5964 003 004 004 Worker 9 0.0637 0.0294 0.4438 1.4500e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 • i 144.5563 144.5563 2.7200e- 144.6243 1.5725 003 004 004 • 003 Total 1.5225 0.0753 0.5292 0.5368 3.1200e- 0.2158 1.4100e- 0.2172 0.0582 1.3100e- 0.0595 320.9823 320.9823 0.0131 321.3096 27 27 003 14 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 7.5964 42.0853 250.9425 0.5094 1.5725 1.5725 1.5225 1.5225 • 0.0000 i 49,271.17 49,271.17 15.6484 49,662.38 • • 27 27 14 Total 7.5964 42.0853 250.9425 0.5094 1.5725 1.5725 1.5225 1.5225 0.0000 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 Vendor .1 •i 0.0117 0.4998 0.0930 1.6700e- 0.0401 4.2000e- 0.0406 0.0116 4.0000e- 0.0120 i i 176.4260 176.4260 : 0.0104 176.6853 003 004 004 J .1 .1 .1 .1 .1 .1 J Worker 9 0.0637 0.0294 0.4438 1.4500e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 i i 144.5563 144.5563 2.7200e- 144.6243 003 004 004 • 003 Total 0.0753 0.5292 0.5368 3.1200e- 0.2158 1.4100e- 0.2172 0.0582 1.3100e- 0.0595 320.9823 320.9823 0.0131 321.3096 003 003 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 i 0.0000 '� 9 I 1 1 1 1 1 1 1 1 1 1 1 1 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Other Asphalt Surfaces User Defined Industrial; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 5.40 T 0.00 r 5.40 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces User Defined Industrial 2 12.50 r 4 • 12.50 4.20 -• 4.20 5.40 T 0.00 r 5.40 • 0.00 0.00 0.00 • 0 -r r 0.00 0.00 • 0 0 0 r r 0 0 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 18 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 : 0.0000 • i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated :� • i 1 I I 1 I I I 1 , I 1 1 1 .1. } } 4. } } 4. } 4. r • . } 4. } r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt 0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 i Surfaces i -. User Defined 0 • Industrial i J J .1 J .1 .1 J .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • .1 .1 J 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt i 0 .1 Surfaces i . F. 4 User Defined I0 • Industrial 1 . 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J .1 .1 .• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . • i 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0499 i 5.0000e- i 5.1700e- : 0.0000 1 i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • i 0.0111 i 0.0111 i 3.0000e- i i 0.0118 9 1 005 1 003 1 1 1 005 1 005 1 1 005 005 . ' 1 1 005 1 1 •1 I 1 1 1 1 1 1 1 1 1 1 1 I. 1. 1. 1. 1. 4. 1. 4. 1. r 4. 1. 1. r Unmitigated • 0.0499 • 5.0000e- • 5.1700e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0111 • 0.0111 • 3.0000e- • • 0.0118 005 003 005 005 005 005 005 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: J J J J J J J J . J J .1 T Consumer 9 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products J J J J J J J J . J J J T Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 22 6.2 Area by SubCategory Mitigated Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day I Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Coating :: .1 J Consumer •i 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products .1 J Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 : • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day I Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Summer Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Travertine Specific Plan (Substation Construction - Mitigated) Riverside -Salton Sea County, Winter 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population User Defined Industrial Other Asphalt Surfaces • • • • 0.80 50.00 4 User Defined Unit 1000sgft 0.02 1.13 4. 800.00 50,000.00 0 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Total Project area is 1.15 acres. Construction Phase - Construction of Substation anticipated to start Quarter 1 2024 and end Quarter 2 2025 Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Tier 4 for all equipment >150 HP Fleet Mix - 1 Column Name I tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 2.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 5.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 • 3.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated } 0.00 67.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 5.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T • 3.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 4.00 tblConstEquipMitigation Y• Tier No Change T Tier 4 Final tblConstEquipMitigation Y • Tier No Change T Tier 4 Final 4 1 1 tblConstEquipMitigation • Tier No Change Tier 4 Final Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter tblConstEquipMitigation • Tier • 4 1- tblConstEquipMitigation • Tier i r tblConstEquipMitigation • Tier i r tblConstEquipMitigation • Tier i r tblConstructionPhase • NumDays T r tblConstructionPhase • NumDays T r tblConstructionPhase • NumDays T r tblGrading • AcresOfGrading i r tblLandUse • LandUseSquareFeet i r tblLandUse • LotAcreage i r tblLandUse • LotAcreage i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i tblProjectCharacteristics • CO2lntensityFactor • No Change No Change No Change No Change 200.00 20.00 4.00 225.00 0.00 0.00 1.15 1.00 1.00 1.00 3.00 1.00 3.00 6.00 6.00 6.00 6.00 6.00 1270.9 • • Tier 4 Final Tier 4 Final Tier 4 Final Tier 4 Final 287.00 15.00 90.00 90.00 800.00 0.02 1.13 0.00 2.00 4.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 21.3580 165.7886 165.6847 0.5125 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 • 0.0000 ' 49,594.10 49,594.10 15.6715 0.0000 49,985.88 J J J J J J J J w J J J T 20 20 I 89 e J .1 .1 J .1 J .1 .1 . .1 .1 J 2025 •1 20.1683 144.3643 162.2236 0.5123 0.2158 5.7348 5.9506 0.0582 5.2899 5.3481 • 0.0000 i 49,569.70 49,569.70 15.6623 0.0000 49,961.26 • • 63 63 34 Maximum 21.3580 165.7886 165.6847 0.5125 7.7770 6.6730 12.0948 3.6089 6.1553 7.5820 0.0000 49,594.10 49,594.10 15.6715 0.0000 49,985.88 11 0.00 0.00 Reduction 20 20 20 20 89 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2024 •i 7.8071 43.7928 251.5151 0.5125 3.4567 1.6998 4.2297 1.5198 1.6418 2.2826 • 0.0000 49,594.10 49,594.10 15.6715 0.0000 49,985.88 20 20 1 88 J J J J J J J J w J J J T 2025 •i 7.6704 42.6073 251.4123 0.5123 0.2158 1.5739 1 1.7898 0.0582 1.5238 1.5820 . 0.0000 i 49,569.70 49,569.70 15.6623 0.0000 49,961.26 Total PM2.5 63 63 33 Maximum 7.8071 43.7928 251.5151 0.5125 3.4567 1.6998 4.2297 1.5198 1.6418 2.2826 0.0000 49,594.10 49,594.10 15.6715 0.0000 49,985.88 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 20 20 88 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 62.73 72.14 -53.37 0.00 54.05 73.62 66.64 56.97 72.34 70.11 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 22 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day r Area 4 0.0499 5.0000e- 5.1700e- 0.0000 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy 9� 005 003 005 005 005 005 : 005 . J J J J J J J J • J J J J J J J J J J J 4 J J J T •I Energy 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total f J J J .1 J J J J 4 J J J T 5.0000e- Mobile 0.0000 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 2.0000e- Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 005 003 005 005 005 005 005 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area 4 0.0499 5.0000e- ' 5.1700e- 0.0000 1 : 2.0000e- 2.0000e- I 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 1 0.0118 •1 005 003 I 005 005 005 005 : 005 •iJ .1 J .1 1 J .1 J • .1 J .1 Energy •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 . J J J J J J J J • J J J Mobile •I 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 Total 0.0499 5.0000e- 5.1700e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0000 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Num Days Num Days Week 1 :Demolition :Demolition 11/1/2024 11/19/2024 5: 15: 2 :Grading :Grading 11/20/2024 15/24/2024 1 5: 90: t r___.___, 3 :Building Construction •Building Construction :5/25/2024 :7/1/2025 5. 287. Phase Number Phase Name Phase Type Start Date End Date Phase Description Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Offroad Equipment Type :Concrete/Industrial Saws :Excavators :Graders :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers :Tractors/Loaders/Backhoes • Amount 0 2 1 13 0 1 IUsage Hours I Horse Power I Load Factor 1- 0: 8.001 81: 0.73 t -I- 8.001 8.001 158: 0.38 8.001 187: 0.41 t -I- 8.001 8.001 402: 0.38 8.001 172: 0.42 8.001 247: 0.40 t 8.00: 97 : 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Grading •Graders Grading [Off -Highway Trucks Grading [Plate Compactors Grading :Rubber Tired Dozers Grading :Scrapers Grading +Skid Steer Loaders Grading :Sweepers/Scrubbers Grading +Tractors/Loaders/Backhoes Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction [Air Compressors :Cranes :Excavators :Forklifts :Generator Sets :Graders Building Construction :Off -Highway Trucks Building Construction :Other Construction Equipment Building Construction :Plate Compactors Building Construction :Rollers Building Construction :Rubber Tired Dozers Building Construction [Scrapers Building Construction +Skid Steer Loaders Building Construction +Tractors/Loaders/Backhoes Building Construction :Trenchers Building Construction :Welders 1' 26 1 1 2 1 1 0 1 2 3 1 1 1 28 5 1 2 1 2 1 4 1 1 1 0' 8.00' 187' 0.41 8.00i 402 0.38 8.001 8' 0.43 8.001 247' 0.40 8.001 367' 0.48 8.001 65' 0.37 8.001 64' 0.46 7.001 97' 0.37 8.001 78' 0.48 8.001 231 0.29 8.001 158' 0.38 8.001 89' 0.20 8.001 84' 0.74 8.001 187' 0.41 8.001 402' 0.38 8.001 172' 0.42 8.001 8' 0.43 8.001 80' 0.38 8.001 247' 0.40 8.001 367' 0.48 8.001 65' 0.37 8.001 97' 0.37 8.001 78' 0.50 r 8.00: 46' 0.45 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Phase Name Offroad Equipment Count Demolition Grading Building Construction Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length 1 17: 43.00. 0.00: 0.00: 11.00: 33: 83.00. 0.00i 0.00: 11.00: 5.40: + r 54' 21.00' 8.00' 0.00' Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class 5.40: 20.00:LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area 3.2 Demolition - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category Ib/day Ib/day Off -Road •i 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 • 19,112.574 19,112.574 6.1814 19,267.10 • 8 8 i 96 Total 7.8715 57.3512 53.5705 0.1975 2.1518 2.1518 1.9796 1.9796 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 2.4143 1 Worker 9 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 276.7574 276.7574 5.4000e- 276.8924 0.3219 003 003 003 • 003 Total 0.3219 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 276.7574 276.7574 5.4000e- 276.8924 48 48 003 96 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road -i 2.4143 10.4618 91.6994 0.1975 0.3219 0.3219 0.3219 0.3219 • 0.0000 i 19,112.57 19,112.57 6.1814 19,267.10 • • 48 48 96 Total 2.4143 10.4618 91.6994 0.1975 0.3219 0.3219 0.3219 0.3219 0.0000 19,112.57 19,112.57 6.1814 19,267.10 48 48 96 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 22 3.2 Demolition - 2024 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Mitigated Construction Off -Site 3.3 Grading - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 • • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 15.7672 1 Worker •1 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 • i 276.7574 276.7574 5.4000e- 276.8924 7.0826 4.3138 003 003 003 • 003 Total 7.3942 0.1334 0.0682 0.7968 2.7800e- 0.3598 2.0600e- 0.3618 0.0954 1.8900e- 0.0973 276.7574 276.7574 5.4000e- 276.8924 87 87 003 18 003 003 003 3.3 Grading - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust -i 7.0826 0.0000 7.0826 3.4247 0.0000 3.4247 •• 0.0000 : 0.0000 • Off -Road •u 15.7672 115.8856 104.7398 0.3945 4.3138 4.3138 3.9695 3.9695 • 38,176.01 38,176.01 12.3393 38,484.50 • • 87 87 1 18 Total 15.7672 115.8856 104.7398 0.3945 7.0826 4.3138 11.3964 3.4247 3.9695 7.3942 38,176.01 38,176.01 12.3393 38,484.50 87 87 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 1 18 1 Worker •1 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 534.2061 534.2061 0.0104 534.4667 178.1011 0.3945 003 003 003 • 0.7691 Total 1.3357 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 534.2061 534.2061 0.0104 534.4667 86 003 003 18 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Fugitive Dust •I 2.7622 0.0000 2.7622 1.3357 1 0.0000 1.3357 •• i 0.0000 : 0.0000 • Off -Road 9 5.0363 23.3198 178.1011 0.3945 0.7691 0.7691 0.7591 0.7591 • 0.0000 38,176.01 38,176.01 12.3393 38,484.50 • • 86 86 1 18 Total 5.0363 23.3198 178.1011 0.3945 2.7622 0.7691 3.5313 1.3357 0.7591 2.0948 0.0000 38,176.01 38,176.01 12.3393 38,484.50 86 86 18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.3 Grading - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2024 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 ' 0.0000 J 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : i 0.0000 0.0000 : 0.0000 0.0000 21.2801 1 Worker 9 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 • i 534.2061 534.2061 0.0104 534.4667 6.6716 003 003 003 • Total 6.1540 0.2574 0.1317 1.5380 5.3600e- 0.6944 3.9700e- 0.6984 0.1842 3.6600e- 0.1879 534.2061 534.2061 0.0104 534.4667 47 47 003 90 003 003 3.4 Building Construction - 2024 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 21.2801 165.2586 165.1826 0.5096 i 6.6716 6.6716 6.1540 6.1540 •. i 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 Total 21.2801 165.2586 165.1826 0.5096 6.6716 6.6716 6.1540 6.1540 49,289.02 49,289.02 15.6570 49,680.44 47 47 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2024 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0128 0.4967 0.1129 1.6100e- 0.0401 4.4000e- 0.0406 0.0116 4.2000e- 0.0120 • i 169.9168 169.9168: 0.0119 170.2133 • • 003 004 004 Worker •1 0.0651 0.0333 0.3891 1.3600e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 135.1606 135.1606 2.6400e- 135.2265 7.7292 003 003 004 • 003 Total 0.0779 0.5300 0.5021 2.9700e- 0.2158 1.4400e- 0.2173 0.0582 1.3400e- 0.0595 49,680.44 305.0774 305.0774 0.0145 305.4399 003 003 46 46 003 90 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 7.7292 43.2628 251.0130 0.5096 1.6983 1.6983 i 1.6405 1.6405 • 0.0000 i 49,289.02 49,289.02 15.6570 49,680.44 • • 46 46 90 Total 7.7292 43.2628 251.0130 0.5096 1.6983 1.6983 1.6405 1.6405 0.0000 49,289.02 49,289.02 15.6570 49,680.44 46 46 90 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2024 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 14 1 1 • i .1 J .1 .1 J .1 J .1 7 J .1 J t Vendor •i 0.0128 0.4967 0.1129 1.6100e- 0.0401 4.4000e- 0.0406 0.0116 4.2000e- 0.0120 • i 169.9168 169.9168 : 0.0119 170.2133 161.7538 003 004 004 V Worker 9 0.0651 0.0333 0.3891 1.3600e- 0.1757 1.0000e- 0.1767 0.0466 9.2000e- 0.0475 • i 135.1606 135.1606 2.6400e- 135.2265 5.2886 5.2886 003 003 004 • 003 Total 15.6484 0.0779 0.5300 0.5021 2.9700e- 0.2158 1.4400e- 0.2173 0.0582 1.3400e- 0.0595 305.0774 305.0774 0.0145 27 305.4399 14 003 003 003 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 20.0943 143.8423 161.7538 i 0.5094 5.7333 5.7333 5.2886 5.2886 • i 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 Total 20.0943 143.8423 161.7538 0.5094 5.7333 5.7333 5.2886 5.2886 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • i 0.0000 1 0.0000 J 0.0000 0.0000 Vendor •1 0.0124 0.4918 0.1092 1.6000e- 0.0401 4.3000e- 0.0406 0.0116 4.1000e- 0.0120 • i 168.7794 168.7794: 0.0115 169.0680 7.5964 003 004 004 Worker 9 0.0616 0.0303 0.3606 1.3000e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 • i 129.7542 129.7542 2.3900e- 129.8140 1.5725 003 004 004 • 003 Total 1.5225 0.0741 0.5221 0.4698 2.9000e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 298.5336 298.5336 0.0139 298.8820 27 27 003 14 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 7.5964 42.0853 250.9425 0.5094 1.5725 1.5725 1.5225 1.5225 • 0.0000 i 49,271.17 49,271.17 15.6484 49,662.38 • • 27 27 14 Total 7.5964 42.0853 250.9425 0.5094 1.5725 1.5725 1.5225 1.5225 0.0000 49,271.17 49,271.17 15.6484 49,662.38 27 27 14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : i 0.0000 1 0.0000 : 0.0000 0.0000 1 .1 .1 J .1 .1 .1 .1 J 7 J .1 J t Vendor •i 0.0124 0.4918 0.1092 1.6000e- 0.0401 4.3000e- 0.0406 0.0116 4.1000e- 0.0120 i i 168.7794 168.7794 : 0.0115 169.0680 003 004 004 .1 J .1 .1 .1 .1 J .1 ; J .1 J -I- Worker Worker •i 0.0616 0.0303 0.3606 1.3000e- 0.1757 9.9000e- 0.1767 0.0466 9.1000e- 0.0475 i i 129.7542 129.7542 2.3900e- 129.8140 003 004 004 • 003 Total 0.0741 0.5221 0.4698 2.9000e- 0.2158 1.4200e- 0.2173 0.0582 1.3200e- 0.0595 298.5336 298.5336 0.0139 298.8820 003 003 003 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 : i 0.0000 1 0.0000 1 0.0000 1 i 0.0000 '� 9 I 1 1 1 1 1 1 1 1 1 1 1 1 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated - 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • : 0.0000 . 0.0000 . 0.0000 : . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Other Asphalt Surfaces User Defined Industrial; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • Total I 0.00 I 0.00 5.40 T 0.00 r 5.40 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334' 0.035376 ' 0.188722 ' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892 ' 0.000789 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces User Defined Industrial 2 12.50 r 4 • 12.50 4.20 -• 4.20 5.40 T 0.00 r 5.40 • 0.00 0.00 0.00 • 0 -r r 0.00 0.00 • 0 0 0 r r 0 0 4.4 Fleet Mix Other User Land Use I LDA LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS rMH Asphalt Surfaces • 0.554334' 0.035376 01.188722 01.108173 01.012711 01.004530 01.017449 01.070039 01.001415 01.001123 01.004446 0.000892 0.000789 E E F E E E E E E F 1. Defined Industrial • 0.554334' 0.035376 ' 0.188722 ' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892 ' 0.000789 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 18 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas 4 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 : 0.0000 • i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 Mitigated :� • i 1 I I 1 I I I 1 , I 1 1 1 .1. } } 4. } } 4. } 4. r • . } 4. } r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt 0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 i Surfaces i -. User Defined 0 • Industrial i J J .1 J .1 .1 J .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • .1 .1 J 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Other Asphalt i 0 .1 Surfaces i . F. 4 User Defined I0 • Industrial 1 . 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J .1 .1 .• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . • i 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 I 0.0000 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 0.0499 i 5.0000e- i 5.1700e- : 0.0000 1 i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • i 0.0111 i 0.0111 i 3.0000e- i i 0.0118 9 1 005 1 003 1 1 1 005 1 005 1 1 005 005 . ' 1 1 005 1 1 •1 I 1 1 1 1 1 1 1 1 1 1 1 I. 1. 1. 1. 1. 4. 1. 4. 1. r 4. 1. 1. r Unmitigated • 0.0499 • 5.0000e- • 5.1700e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0111 • 0.0111 • 3.0000e- • • 0.0118 005 003 005 005 005 005 005 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Coating :: J J J J J J J J . J J .1 T Consumer 9 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products J J J J J J J J . J J J T Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 22 6.2 Area by SubCategory Mitigated Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day I Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 0.0146' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Coating :: .1 J Consumer •i 0.0348 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products .1 J Landscaping • 4.8000e- 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • i 0.0111 0.0111 3.0000e- 0.0118 004 005 003 005 005 005 005 : • 005 Total 0.0499 5.0000e- 5.1700e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0111 0.0111 3.0000e- 0.0118 005 003 005 005 005 005 005 7.0 Water Detail 7.1 Mitigation Measures Water 8.0 Waste Detail 8.1 Mitigation Measures Waste 9.0 Operational Offroad Equipment Type Number I Hours/Day I Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 22 Date: 1/5/2021 4:51 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Winter Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.19: CALEEMOD PHASE 1 OPERATIONAL EMISSIONS MODEL OUTPUTS 12188-05 AQ Report URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer Travertine Specific Plan - Phase 1 (Operations) Riverside -Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course • 35.00 + Acre ; 35.00 12.00 + Hole ; 46.20 I. Apartments Low Rise • 74.00 + Dwelling Unit ; 14.80 74,000.00 + 201 r Single Family Housing • 530.00 • Dwelling Unit 228.10 954,000.00 1436 1,524,600.00 64,282.00 0 f 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 726.95 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2026 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2026 Operational Year Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 53% less energy for residential uses. Water Mitigation - Waste Mitigation - 1 Column Name tblConstructionPhase • NumDays •} 400.00 0.00 tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 1,608.84 T• 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T 4,485.92 tblEnergyUse Y T24NG • 24,566.15 T 11,546.09 tblFireplaces Y NumberGas 59.20 T• 74.00 • tblFireplaces Y NumberGas 424.00 T • 530.00 tblFireplaces Y• NumberNoFireplace 7.40 T 0.00 4 1 1 tblFireplaces • NumberNoFireplace 53.00 0.00 • Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblFireplaces • NumberWood • 7.40 0.00 tblFireplaces • NumberWood i 53.00 0.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 4.63 14.80 r tblLandUse • LotAcreage i 172.08 228.10 • r tblLandUse • Population T 212.00 201.00 r 4 tblLandUse • Population T 1,516.00 1,436.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 726.95 r 4 tblVehicleEF • HHD T 0.89 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.07 0.00 r 4 tblVehicleEF • HHD T 2.00 10.40 r 4 tblVehicleEF • HHD T 0.43 0.19 r 4 tblVehicleEF • HHD T 1.46 1.3780e-003 r 4 tblVehicleEF • HHD T 5,902.49 1,611.91 r 4 tblVehicleEF • HHD T 1,386.05 1,148.48 r 4 tblVehicleEF • HHD T 4.77 0.01 r 4 tblVehicleEF • HHD T 16.75 8.36 r 4 tblVehicleEF • HHD T 0.86 1.83 r 4 tblVehicleEF • HHD T 20.25 2.33 r 4 tblVehicleEF • HHD T 4.0010e-003 3.0970e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 tblVehicleEF • HHD • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 5.0390e-003 0.03 tblVehicleEF • HHD i 4.3000e-005 0.00 r tblVehicleEF • HHD T 3.8280e-003 2.9630e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8540e-003 8.9690e-003 r tblVehicleEF • HHD T 4.8210e-003 0.02 r tblVehicleEF • HHD T 4.0000e-005 0.00 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r tblVehicleEF • HHD T 2.1710e-003 6.0000e-006 r tblVehicleEF • HHD T 0.53 0.70 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.4900e-004 1.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.06 0.02 r 4 tblVehicleEF • HHD T 0.01 0.01 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 2.1710e-003 6.0000e-006 r 4 tblVehicleEF • HHD T 0.61 0.80 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.4900e-004 1.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.84 0.04 r 4 tblVehicleEF • HHD T 0.03 0.01 tblVehicleEF • HHD • 0.06 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 1.45 10.27 tblVehicleEF • HHD i 0.43 0.19 r tblVehicleEF • HHD T 1.39 1.3390e-003 r tblVehicleEF • HHD T 6,253.17 1,590.95 r tblVehicleEF • HHD T 1,386.05 1,148.48 r tblVehicleEF • HHD T 4.77 0.01 r tblVehicleEF • HHD T 17.28 7.95 r 4 tblVehicleEF • HHD T 0.81 1.73 r tblVehicleEF • HHD T 20.25 2.33 r tblVehicleEF • HHD T 3.3730e-003 2.7470e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 5.0390e-003 0.03 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 3.2270e-003 2.6280e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8540e-003 8.9690e-003 r 4 tblVehicleEF • HHD T 4.8210e-003 0.02 r 4 tblVehicleEF • HHD T 4.0000e-005 0.00 r 4 tblVehicleEF • HHD T 1.3600e-004 1.0000e-006 r 4 tblVehicleEF • HHD T 2.4530e-003 8.0000e-006 r 4 tblVehicleEF • HHD T 0.50 0.75 r 4 tblVehicleEF • HHD T 7.9000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5100e-004 2.0000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 tblVehicleEF • HHD • 0.06 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 0.01 0.01 tblVehicleEF • HHD i 7.0000e-005 0.00 r tblVehicleEF • HHD T 1.3600e-004 1.0000e-006 r tblVehicleEF • HHD T 2.4530e-003 8.0000e-006 r tblVehicleEF • HHD T 0.57 0.85 r tblVehicleEF • HHD T 7.9000e-005 0.00 r tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5100e-004 2.0000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.96 0.03 r 4 tblVehicleEF • HHD T 0.03 8.5700e-004 r 4 tblVehicleEF • HHD T 0.07 0.00 r 4 tblVehicleEF • HHD T 2.75 10.57 r 4 tblVehicleEF • HHD T 0.43 0.16 r 4 tblVehicleEF • HHD T 1.48 1.4640e-003 r 4 tblVehicleEF • HHD T 5,418.23 1,638.19 r 4 tblVehicleEF • HHD T 1,386.05 1,141.19 r 4 tblVehicleEF • HHD T 4.77 0.01 r 4 tblVehicleEF • HHD T 16.00 8.91 r 4 tblVehicleEF • HHD T 0.86 1.85 r 4 tblVehicleEF • HHD T 20.25 2.33 r 4 tblVehicleEF • HHD T 4.8670e-003 3.5590e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 5.0390e-003 0.03 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 tblVehicleEF • HHD • 4.6570e-003 3.4050e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 0.03 0.03 tblVehicleEF • HHD i 8.8540e-003 8.9470e-003 r tblVehicleEF • HHD T 4.8210e-003 0.02 r tblVehicleEF • HHD T 4.0000e-005 0.00 r tblVehicleEF • HHD T 5.1000e-005 0.00 r tblVehicleEF • HHD T 2.2330e-003 5.0000e-006 r tblVehicleEF • HHD T 0.57 0.65 r 4 tblVehicleEF • HHD T 3.5000e-005 0.00 r tblVehicleEF • HHD T 0.04 0.02 r tblVehicleEF • HHD T 1.6000e-004 2.1000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 0.01 0.01 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 r 4 tblVehicleEF • HHD T 2.2330e-003 5.0000e-006 r 4 tblVehicleEF • HHD T 0.66 0.73 r 4 tblVehicleEF • HHD T 3.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.02 r 4 tblVehicleEF • HHD T 1.6000e-004 2.1000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • LDA T 2.5910e-003 1.4670e-003 r 4 tblVehicleEF • LDA T 2.9440e-003 0.03 r 4 tblVehicleEF • LDA i 0.43 0.55 r 4 tblVehicleEF • LDA 0.76 1.71 r r 4 tblVehicleEF • LDA 207.76 239.05 • r tblVehicleEF • LDA • 48.28 48.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 0.03 0.02 tblVehicleEF • LDA i 0.04 0.14 r tblVehicleEF • LDA T 1.4700e-003 1.1830e-003 r tblVehicleEF • LDA T 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.04 0.07 r 4 tblVehicleEF • LDA T 0.08 0.08 r tblVehicleEF • LDA T 0.03 0.05 r tblVehicleEF • LDA T 6.4920e-003 5.2540e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.14 r 4 tblVehicleEF • LDA T 2.0800e-003 2.2760e-003 r 4 tblVehicleEF • LDA T 4.9500e-004 4.5800e-004 r 4 tblVehicleEF • LDA T 0.04 0.07 r 4 tblVehicleEF • LDA T 0.08 0.08 r 4 tblVehicleEF • LDA T 0.03 0.05 r 4 tblVehicleEF • LDA T 9.4440e-003 7.6520e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.15 r 4 tblVehicleEF • LDA T 2.9310e-003 1.7240e-003 r 4 tblVehicleEF • LDA T 2.5500e-003 0.03 r 4 tblVehicleEF • LDA T 0.52 0.72 r 4 tblVehicleEF • LDA T 0.66 1.76 r 4 tblVehicleEF • LDA T 226.16 264.80 r 4 tblVehicleEF • LDA T 48.28 48.14 tblVehicleEF • LDA • 0.03 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 0.04 0.14 tblVehicleEF • LDA i 1.4700e-003 1.1830e-003 r tblVehicleEF • LDA T 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.07 0.15 r tblVehicleEF • LDA T 0.09 0.10 r 4 tblVehicleEF • LDA T 0.05 0.10 r tblVehicleEF • LDA T 7.3340e-003 6.1450e-003 r tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.13 r 4 tblVehicleEF • LDA T 2.2650e-003 2.5210e-003 r 4 tblVehicleEF • LDA T 4.9300e-004 4.5800e-004 r 4 tblVehicleEF • LDA T 0.07 0.15 r 4 tblVehicleEF • LDA T 0.09 0.10 r 4 tblVehicleEF • LDA T 0.05 0.10 r 4 tblVehicleEF • LDA T 0.01 8.9550e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.14 r 4 tblVehicleEF • LDA T 2.5020e-003 1.3000e-003 r 4 tblVehicleEF • LDA T 3.0230e-003 0.04 r 4 tblVehicleEF • LDA T 0.40 0.46 r 4 tblVehicleEF • LDA T 0.77 1.98 r 4 tblVehicleEF • LDA T 202.67 222.22 r 4 tblVehicleEF • LDA T 48.28 48.61 r 4 tblVehicleEF • LDA T 0.03 0.02 tblVehicleEF • LDA • 0.04 0.14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 1.4700e-003 1.1830e-003 tblVehicleEF • LDA i 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.03 0.03 r tblVehicleEF • LDA T 0.08 0.08 r tblVehicleEF • LDA T 0.02 0.03 r 4 tblVehicleEF • LDA T 6.2740e-003 4.7180e-003 r tblVehicleEF • LDA T 0.04 0.21 r tblVehicleEF • LDA T 0.04 0.16 r 4 tblVehicleEF • LDA T 2.0280e-003 2.1160e-003 r 4 tblVehicleEF • LDA T 4.9500e-004 4.6300e-004 r 4 tblVehicleEF • LDA T 0.03 0.03 r 4 tblVehicleEF • LDA T 0.08 0.08 r 4 tblVehicleEF • LDA T 0.02 0.03 r 4 tblVehicleEF • LDA T 9.1250e-003 6.8680e-003 r 4 tblVehicleEF • LDA T 0.04 0.21 r 4 tblVehicleEF • LDA T 0.04 0.17 r 4 tblVehicleEF • LDT1 T 6.7140e-003 4.6930e-003 r 4 tblVehicleEF • LDT1 T 9.6900e-003 0.05 r 4 tblVehicleEF • LDT1 T 0.90 1.10 r 4 tblVehicleEF • LDT1 T 1.99 1.90 r 4 tblVehicleEF • LDT1 T 265.91 296.80 r 4 tblVehicleEF • LDT1 T 62.08 59.06 r 4 tblVehicleEF • LDT1 T 0.08 0.08 r 4 tblVehicleEF • LDT1 T 0.12 0.19 tblVehicleEF • LDT1 • 2.0200e-003 1.6850e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT1 • 2.9840e-003 2.0130e-003 tblVehicleEF • LDT1 i 1.8590e-003 1.5500e-003 r tblVehicleEF • LDT1 T 2.7440e-003 1.8510e-003 r tblVehicleEF • LDT1 T 0.15 0.19 r tblVehicleEF • LDT1 T 0.24 0.18 r tblVehicleEF • LDT1 T 0.10 0.13 r tblVehicleEF • LDT1 T 0.02 0.02 r 4 tblVehicleEF • LDT1 T 0.15 0.55 r tblVehicleEF • LDT1 T 0.13 0.23 r tblVehicleEF • LDT1 T 2.6690e-003 2.8260e-003 r 4 tblVehicleEF • LDT1 T 6.5500e-004 5.6200e-004 r 4 tblVehicleEF • LDT1 T 0.15 0.19 r 4 tblVehicleEF • LDT1 T 0.24 0.18 r 4 tblVehicleEF • LDT1 T 0.10 0.13 r 4 tblVehicleEF • LDT1 T 0.02 0.03 r 4 tblVehicleEF • LDT1 T 0.15 0.55 r 4 tblVehicleEF • LDT1 T 0.14 0.25 r 4 tblVehicleEF • LDT1 T 7.5770e-003 5.4420e-003 r 4 tblVehicleEF • LDT1 T 8.4040e-003 0.04 r 4 tblVehicleEF • LDT1 T 1.09 1.42 r 4 tblVehicleEF • LDT1 T 1.75 1.96 r 4 tblVehicleEF • LDT1 T 289.00 324.57 r 4 tblVehicleEF • LDT1 T 62.08 59.09 r 4 tblVehicleEF • LDT1 T 0.08 0.08 r 4 tblVehicleEF • LDT1 T 0.11 0.20 r 4 tblVehicleEF • LDT1 T 2.0200e-003 1.6850e-003 tblVehicleEF • LDT1 • 2.9840e-003 2.0130e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LDT1 • 1.8590e-003 1.5500e-003 tblVehicleEF • LDT1 r 2.7440e-003 1.8510e-003 I- 4 tblVehicleEF • LDT1 r 0.29 0.38 I- 4 tblVehicleEF • LDT1 r 0.29 0.23 I- 4 tblVehicleEF • LDT1 r 0.19 0.24 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.15 0.58 I- 4 tblVehicleEF • LDT1 r 0.11 0.21 I- 4 tblVehicleEF • LDT1 r 2.9030e-003 3.0900e-003 I- 4 tblVehicleEF • LDT1 r 6.5100e-004 5.6300e-004 I- 4 tblVehicleEF • LDT1 r 0.29 0.38 I- 4 tblVehicleEF • LDT1 r 0.29 0.23 I- 4 tblVehicleEF • LDT1 r 0.19 0.24 I- 4 tblVehicleEF • LDT1 r 0.03 0.03 I- 4 tblVehicleEF • LDT1 r 0.15 0.58 I- 4 tblVehicleEF • LDT1 r 0.12 0.23 I- 4 tblVehicleEF • LDT1 r 6.4660e-003 4.2130e-003 I- 4 tblVehicleEF • LDT1 r 9.9350e-003 0.06 I- 4 tblVehicleEF • LDT1 r 0.85 0.93 I- 4 tblVehicleEF • LDT1 r 2.03 2.21 I- 4 tblVehicleEF • LDT1 r 258.94 278.68 I- 4 tblVehicleEF • LDT1 r 62.08 59.69 I- 4 tblVehicleEF • LDT1 r 0.08 0.08 I- 4 tblVehicleEF • LDT1 r 0.12 0.20 I- 4 tblVehicleEF • LDT1 r 2.0200e-003 1.6850e-003 I- 4 tblVehicleEF • LDT1 r 2.9840e-003 2.0130e-003 tblVehicleEF • LDT1 • 1.8590e-003 1.5500e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LDT1 • 2.7440e-003 1.8510e-003 tblVehicleEF • LDT1 r 0.12 0.07 I- 4 tblVehicleEF • LDT1 r 0.26 0.16 I- 4 tblVehicleEF • LDT1 r 0.09 0.06 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.17 0.62 I- 4 tblVehicleEF • LDT1 r 0.13 0.26 I- 4 tblVehicleEF • LDT1 r 2.5990e-003 2.6530e-003 I- 4 tblVehicleEF • LDT1 r 6.5600e-004 5.6800e-004 I- 4 tblVehicleEF • LDT1 r 0.12 0.07 I- 4 tblVehicleEF • LDT1 r 0.26 0.16 I- 4 tblVehicleEF • LDT1 r 0.09 0.06 I- 4 tblVehicleEF • LDT1 r 0.02 0.03 I- 4 tblVehicleEF • LDT1 r 0.17 0.62 I- 4 tblVehicleEF • LDT1 r 0.15 0.29 I- 4 tblVehicleEF • LDT2 r 3.8050e-003 3.0020e-003 I- 4 tblVehicleEF • LDT2 r 4.1980e-003 0.05 I- 4 tblVehicleEF • LDT2 r 0.59 0.81 I- 4 tblVehicleEF • LDT2 r 1.02 2.20 I- 4 tblVehicleEF • LDT2 r 296.34 306.27 I- 4 tblVehicleEF • LDT2 r 68.35 61.33 I- 4 tblVehicleEF • LDT2 r 0.05 0.05 I- 4 tblVehicleEF • LDT2 r 0.07 0.19 I- 4 tblVehicleEF • LDT2 r 1.6040e-003 1.3260e-003 I- 4 tblVehicleEF • LDT2 r 2.4020e-003 1.6380e-003 I- 4 tblVehicleEF • LDT2 r 1.4750e-003 1.2200e-003 tblVehicleEF • LDT2 • 2.2080e-003 1.5060e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.06 0.12 tblVehicleEF • LDT2 i 0.09 0.11 r tblVehicleEF • LDT2 T 0.05 0.10 r tblVehicleEF • LDT2 T 9.4380e-003 0.01 r tblVehicleEF • LDT2 T 0.06 0.37 r tblVehicleEF • LDT2 T 0.06 0.20 r tblVehicleEF • LDT2 T 2.9670e-003 2.9160e-003 r 4 tblVehicleEF • LDT2 T 7.0000e-004 5.8400e-004 r tblVehicleEF • LDT2 T 0.06 0.12 r tblVehicleEF • LDT2 T 0.09 0.11 r 4 tblVehicleEF • LDT2 T 0.05 0.10 r 4 tblVehicleEF • LDT2 T 0.01 0.02 r 4 tblVehicleEF • LDT2 T 0.06 0.37 r 4 tblVehicleEF • LDT2 T 0.06 0.22 r 4 tblVehicleEF • LDT2 T 4.3090e-003 3.4980e-003 r 4 tblVehicleEF • LDT2 T 3.6500e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.72 1.06 r 4 tblVehicleEF • LDT2 T 0.91 2.26 r 4 tblVehicleEF • LDT2 T 322.41 332.25 r 4 tblVehicleEF • LDT2 T 68.35 61.36 r 4 tblVehicleEF • LDT2 T 0.05 0.06 r 4 tblVehicleEF • LDT2 T 0.07 0.21 r 4 tblVehicleEF • LDT2 T 1.6040e-003 1.3260e-003 r 4 tblVehicleEF • LDT2 T 2.4020e-003 1.6380e-003 r 4 tblVehicleEF • LDT2 T 1.4750e-003 1.2200e-003 r 4 tblVehicleEF • LDT2 T 2.2080e-003 1.5060e-003 tblVehicleEF • LDT2 • 0.11 0.25 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.10 0.14 tblVehicleEF • LDT2 i 0.08 0.18 r tblVehicleEF • LDT2 T 0.01 0.01 r tblVehicleEF • LDT2 T 0.06 0.39 r tblVehicleEF • LDT2 T 0.05 0.19 r tblVehicleEF • LDT2 T 3.2300e-003 3.1630e-003 r tblVehicleEF • LDT2 T 6.9800e-004 5.8400e-004 r 4 tblVehicleEF • LDT2 T 0.11 0.25 r tblVehicleEF • LDT2 T 0.10 0.14 r tblVehicleEF • LDT2 T 0.08 0.18 r 4 tblVehicleEF • LDT2 T 0.02 0.02 r 4 tblVehicleEF • LDT2 T 0.06 0.39 r 4 tblVehicleEF • LDT2 T 0.05 0.21 r 4 tblVehicleEF • LDT2 T 3.6580e-003 2.6800e-003 r 4 tblVehicleEF • LDT2 T 4.3280e-003 0.05 r 4 tblVehicleEF • LDT2 T 0.55 0.68 r 4 tblVehicleEF • LDT2 T 1.05 2.56 r 4 tblVehicleEF • LDT2 T 288.45 289.30 r 4 tblVehicleEF • LDT2 T 68.35 62.03 r 4 tblVehicleEF • LDT2 T 0.05 0.06 r 4 tblVehicleEF • LDT2 T 0.07 0.21 r 4 tblVehicleEF • LDT2 T 1.6040e-003 1.3260e-003 r 4 tblVehicleEF • LDT2 T 2.4020e-003 1.6380e-003 r 4 tblVehicleEF • LDT2 T 1.4750e-003 1.2200e-003 r 4 tblVehicleEF • LDT2 T 2.2080e-003 1.5060e-003 r 4 tblVehicleEF • LDT2 T 0.04 0.05 tblVehicleEF • LDT2 • 0.09 0.10 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.04 0.05 tblVehicleEF • LDT2 i 9.0750e-003 0.01 r tblVehicleEF • LDT2 T 0.07 0.41 r tblVehicleEF • LDT2 T 0.06 0.23 r tblVehicleEF • LDT2 T 2.8880e-003 2.7540e-003 r tblVehicleEF • LDT2 T 7.0100e-004 5.9100e-004 r tblVehicleEF • LDT2 T 0.04 0.05 r 4 tblVehicleEF • LDT2 T 0.09 0.10 r tblVehicleEF • LDT2 T 0.04 0.05 r tblVehicleEF • LDT2 T 0.01 0.02 r 4 tblVehicleEF • LDT2 T 0.07 0.42 r 4 tblVehicleEF • LDT2 T 0.06 0.26 r 4 tblVehicleEF • LHD1 T 4.4680e-003 4.6210e-003 r 4 tblVehicleEF • LHD1 T 6.2590e-003 2.7820e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r 4 tblVehicleEF • LHD1 T 0.14 0.18 r 4 tblVehicleEF • LHD1 T 0.61 0.35 r 4 tblVehicleEF • LHD1 T 1.83 0.86 r 4 tblVehicleEF • LHD1 T 9.20 8.76 r 4 tblVehicleEF • LHD1 T 578.27 599.19 r 4 tblVehicleEF • LHD1 i 27.68 10.43 r 4 tblVehicleEF • LHD1 i 0.08 0.06 r 4 tblVehicleEF • LHD1 T 1.46 0.63 r 4 tblVehicleEF • LHD1 T 0.82 0.26 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9050e-003 tblVehicleEF • LHD1 • 0.01 6.2850e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 6.9300e-004 2.0300e-004 tblVehicleEF • LHD1 i 9.0000e-004 8.7500e-004 r tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r tblVehicleEF • LHD1 T 0.01 5.9930e-003 r tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r tblVehicleEF • LHD1 T 3.3330e-003 3.3930e-003 r tblVehicleEF • LHD1 T 0.09 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r tblVehicleEF • LHD1 T 1.7170e-003 1.6200e-003 r tblVehicleEF • LHD1 T 0.06 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.19 0.05 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r 4 tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1100e-004 1.0300e-004 r 4 tblVehicleEF • LHD1 T 3.3330e-003 3.3930e-003 r 4 tblVehicleEF • LHD1 T 0.09 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.03 r 4 tblVehicleEF • LHD1 T 1.7170e-003 1.6200e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.04 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.21 0.06 r 4 tblVehicleEF • LHD1 T 4.4680e-003 4.6280e-003 r 4 tblVehicleEF • LHD1 T 6.3560e-003 2.8130e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r 4 tblVehicleEF • LHD1 T 0.14 0.18 tblVehicleEF • LHD1 • 0.62 0.36 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 1.74 0.84 tblVehicleEF • LHD1 i 9.20 8.76 r tblVehicleEF • LHD1 T 578.27 599.20 r tblVehicleEF • LHD1 T 27.68 10.38 r tblVehicleEF • LHD1 T 0.08 0.06 r tblVehicleEF • LHD1 T 1.38 0.59 r tblVehicleEF • LHD1 T 0.79 0.25 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r tblVehicleEF • LHD1 T 0.01 9.9050e-003 r tblVehicleEF • LHD1 T 0.01 6.2850e-003 r 4 tblVehicleEF • LHD1 T 6.9300e-004 2.0300e-004 r 4 tblVehicleEF • LHD1 T 9.0000e-004 8.7500e-004 r 4 tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r 4 tblVehicleEF • LHD1 T 0.01 5.9930e-003 r 4 tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r 4 tblVehicleEF • LHD1 T 6.2030e-003 6.7860e-003 r 4 tblVehicleEF • LHD1 T 0.11 0.08 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 3.1990e-003 3.0010e-003 r 4 tblVehicleEF • LHD1 T 0.06 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.38 r 4 tblVehicleEF • LHD1 T 0.18 0.05 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r 4 tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1000e-004 1.0300e-004 r 4 tblVehicleEF • LHD1 T 6.2030e-003 6.7860e-003 tblVehicleEF • LHD1 • 0.11 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 0.02 0.03 tblVehicleEF • LHD1 i 3.1990e-003 3.0010e-003 r tblVehicleEF • LHD1 T 0.07 0.04 r tblVehicleEF • LHD1 T 0.30 0.38 r tblVehicleEF • LHD1 T 0.20 0.06 r tblVehicleEF • LHD1 T 4.4680e-003 4.6070e-003 r tblVehicleEF • LHD1 T 6.2530e-003 2.7340e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r tblVehicleEF • LHD1 T 0.14 0.18 r tblVehicleEF • LHD1 T 0.61 0.35 r 4 tblVehicleEF • LHD1 T 1.83 0.91 r 4 tblVehicleEF • LHD1 T 9.20 8.76 r 4 tblVehicleEF • LHD1 T 578.27 599.18 r 4 tblVehicleEF • LHD1 T 27.68 10.51 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 1.44 0.64 r 4 tblVehicleEF • LHD1 T 0.81 0.27 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9050e-003 r 4 tblVehicleEF • LHD1 T 0.01 6.2850e-003 r 4 tblVehicleEF • LHD1 T 6.9300e-004 2.0300e-004 r 4 tblVehicleEF • LHD1 T 9.0000e-004 8.7500e-004 r 4 tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r 4 tblVehicleEF • LHD1 T 0.01 5.9930e-003 r 4 tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r 4 tblVehicleEF • LHD1 T 2.8770e-003 1.4580e-003 tblVehicleEF • LHD1 • 0.10 0.06 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 0.02 0.02 tblVehicleEF • LHD1 i 1.5600e-003 8.3600e-004 r tblVehicleEF • LHD1 T 0.06 0.03 r tblVehicleEF • LHD1 T 0.32 0.39 r tblVehicleEF • LHD1 T 0.19 0.05 r tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1100e-004 1.0400e-004 r tblVehicleEF • LHD1 T 2.8770e-003 1.4580e-003 r tblVehicleEF • LHD1 T 0.10 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.03 r 4 tblVehicleEF • LHD1 T 1.5600e-003 8.3600e-004 r 4 tblVehicleEF • LHD1 T 0.07 0.04 r 4 tblVehicleEF • LHD1 T 0.32 0.39 r 4 tblVehicleEF • LHD1 T 0.21 0.06 r 4 tblVehicleEF • LHD2 T 2.9220e-003 3.5280e-003 r 4 tblVehicleEF • LHD2 T 2.5090e-003 2.5650e-003 r 4 tblVehicleEF • LHD2 T 4.8920e-003 8.8440e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.15 r 4 tblVehicleEF • LHD2 T 0.28 0.32 r 4 tblVehicleEF • LHD2 T 0.91 0.61 r 4 tblVehicleEF • LHD2 T 14.09 13.34 r 4 tblVehicleEF • LHD2 T 578.63 615.62 r 4 tblVehicleEF • LHD2 T 22.17 8.61 r 4 tblVehicleEF • LHD2 T 0.09 0.08 r 4 tblVehicleEF • LHD2 T 0.77 0.85 tblVehicleEF • LHD2 • 0.37 0.21 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 1.1940e-003 1.2960e-003 tblVehicleEF • LHD2 i 0.01 0.01 r tblVehicleEF • LHD2 T 9.0990e-003 0.01 r tblVehicleEF • LHD2 T 3.4300e-004 1.2200e-004 r tblVehicleEF • LHD2 T 1.1420e-003 1.2400e-003 r tblVehicleEF • LHD2 T 2.7080e-003 2.6540e-003 r tblVehicleEF • LHD2 T 8.6950e-003 9.6200e-003 r 4 tblVehicleEF • LHD2 T 3.1500e-004 1.1200e-004 r tblVehicleEF • LHD2 T 1.0830e-003 2.5280e-003 r tblVehicleEF • LHD2 T 0.03 0.05 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 6.0400e-004 1.2670e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.04 r 4 tblVehicleEF • LHD2 T 0.06 0.25 r 4 tblVehicleEF • LHD2 T 0.07 0.04 r 4 tblVehicleEF • LHD2 T 1.3700e-004 1.2800e-004 r 4 tblVehicleEF • LHD2 T 5.6220e-003 5.9530e-003 r 4 tblVehicleEF • LHD2 T 2.3800e-004 8.5000e-005 r 4 tblVehicleEF • LHD2 T 1.0830e-003 2.5280e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.05 r 4 tblVehicleEF • LHD2 T 0.02 0.02 r 4 tblVehicleEF • LHD2 T 6.0400e-004 1.2670e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.05 r 4 tblVehicleEF • LHD2 T 0.06 0.25 r 4 tblVehicleEF • LHD2 T 0.07 0.05 r 4 tblVehicleEF • LHD2 T 2.9220e-003 3.5330e-003 tblVehicleEF • LHD2 • 2.5300e-003 2.5810e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 4.7440e-003 8.6420e-003 tblVehicleEF • LHD2 i 0.12 0.15 r tblVehicleEF • LHD2 T 0.28 0.32 r tblVehicleEF • LHD2 T 0.87 0.59 r tblVehicleEF • LHD2 T 14.09 13.34 r tblVehicleEF • LHD2 T 578.63 615.63 r tblVehicleEF • LHD2 T 22.17 8.58 r 4 tblVehicleEF • LHD2 T 0.09 0.08 r tblVehicleEF • LHD2 T 0.73 0.80 r tblVehicleEF • LHD2 T 0.36 0.21 r 4 tblVehicleEF • LHD2 T 1.1940e-003 1.2960e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 9.0990e-003 0.01 r 4 tblVehicleEF • LHD2 T 3.4300e-004 1.2200e-004 r 4 tblVehicleEF • LHD2 T 1.1420e-003 1.2400e-003 r 4 tblVehicleEF • LHD2 T 2.7080e-003 2.6540e-003 r 4 tblVehicleEF • LHD2 T 8.6950e-003 9.6200e-003 r 4 tblVehicleEF • LHD2 T 3.1500e-004 1.1200e-004 r 4 tblVehicleEF • LHD2 T 2.0360e-003 5.0590e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.06 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 1.1130e-003 2.3110e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.04 r 4 tblVehicleEF • LHD2 T 0.06 0.26 r 4 tblVehicleEF • LHD2 T 0.06 0.04 r 4 tblVehicleEF • LHD2 T 1.3700e-004 1.2800e-004 tblVehicleEF • LHD2 • 5.6220e-003 5.9530e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LHD2 • 2.3700e-004 8.5000e-005 tblVehicleEF • LHD2 r 2.0360e-003 5.0590e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.06 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 1.1130e-003 2.3110e-003 I- 4 tblVehicleEF • LHD2 r 0.04 0.05 I- 4 tblVehicleEF • LHD2 r 0.06 0.26 I- 4 tblVehicleEF • LHD2 r 0.07 0.05 I- 4 tblVehicleEF • LHD2 r 2.9220e-003 3.5170e-003 I- 4 tblVehicleEF • LHD2 r 2.5060e-003 2.5390e-003 I- 4 tblVehicleEF • LHD2 r 4.9180e-003 9.2210e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.15 I- 4 tblVehicleEF • LHD2 r 0.28 0.32 I- 4 tblVehicleEF • LHD2 r 0.92 0.64 I- 4 tblVehicleEF • LHD2 r 14.09 13.34 I- 4 tblVehicleEF • LHD2 r 578.63 615.62 I- 4 tblVehicleEF • LHD2 r 22.17 8.67 I- 4 tblVehicleEF • LHD2 r 0.09 0.08 I- 4 tblVehicleEF • LHD2 r 0.76 0.86 I- 4 tblVehicleEF • LHD2 r 0.37 0.22 I- 4 tblVehicleEF • LHD2 r 1.1940e-003 1.2960e-003 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 9.0990e-003 0.01 I- 4 tblVehicleEF • LHD2 r 3.4300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 1.1420e-003 1.2400e-003 I- 4 tblVehicleEF • LHD2 r 2.7080e-003 2.6540e-003 tblVehicleEF • LHD2 • 8.6950e-003 9.6200e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LHD2 • 3.1500e-004 1.1200e-004 tblVehicleEF • LHD2 r 8.3200e-004 1.0630e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.05 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 5.1600e-004 6.6000e-004 I- 4 tblVehicleEF • LHD2 r 0.04 0.04 I- 4 tblVehicleEF • LHD2 r 0.06 0.27 I- 4 tblVehicleEF • LHD2 r 0.07 0.04 I- 4 tblVehicleEF • LHD2 r 1.3700e-004 1.2800e-004 I- 4 tblVehicleEF • LHD2 r 5.6220e-003 5.9530e-003 I- 4 tblVehicleEF • LHD2 r 2.3800e-004 8.6000e-005 I- 4 tblVehicleEF • LHD2 r 8.3200e-004 1.0630e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.05 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 5.1600e-004 6.6000e-004 I- 4 tblVehicleEF • LHD2 r 0.04 0.05 I- 4 tblVehicleEF • LHD2 r 0.06 0.27 I- 4 tblVehicleEF • LHD2 r 0.07 0.05 I- 4 tblVehicleEF • MCY r 0.44 0.33 I- 4 tblVehicleEF • MCY r 0.15 0.23 I- 4 tblVehicleEF • MCY r 18.06 18.12 I- 4 tblVehicleEF • MCY r 9.75 8.38 I- 4 tblVehicleEF • MCY r 168.56 209.59 I- 4 tblVehicleEF • MCY r 44.20 58.03 I- 4 tblVehicleEF • MCY r 1.11 1.10 I- 4 tblVehicleEF • MCY r 0.31 0.26 tblVehicleEF • MCY • 1.9930e-003 2.1060e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 3.2040e-003 2.8580e-003 tblVehicleEF • MCY i 1.8600e-003 1.9650e-003 r tblVehicleEF • MCY T 3.0040e-003 2.6780e-003 r tblVehicleEF • MCY T 1.68 2.46 r tblVehicleEF • MCY T 0.80 0.96 r tblVehicleEF • MCY T 0.90 1.35 r tblVehicleEF • MCY T 2.09 2.15 r 4 tblVehicleEF • MCY T 0.51 1.63 r tblVehicleEF • MCY T 2.02 1.70 r tblVehicleEF • MCY T 2.0420e-003 2.0740e-003 r 4 tblVehicleEF • MCY T 6.6100e-004 5.7400e-004 r 4 tblVehicleEF • MCY T 1.68 2.46 r 4 tblVehicleEF • MCY T 0.80 0.96 r 4 tblVehicleEF • MCY T 0.90 1.35 r 4 tblVehicleEF • MCY T 2.61 2.69 r 4 tblVehicleEF • MCY T 0.51 1.63 r 4 tblVehicleEF • MCY T 2.20 1.85 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.13 0.22 r 4 tblVehicleEF • MCY T 18.75 20.01 r 4 tblVehicleEF • MCY T 9.09 8.32 r 4 tblVehicleEF • MCY T 168.56 212.69 r 4 tblVehicleEF • MCY T 44.20 57.67 r 4 tblVehicleEF • MCY T 0.97 0.97 r 4 tblVehicleEF • MCY T 0.29 0.25 r 4 tblVehicleEF • MCY T 1.9930e-003 2.1060e-003 tblVehicleEF • MCY • 3.2040e-003 2.8580e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 1.8600e-003 1.9650e-003 tblVehicleEF • MCY i 3.0040e-003 2.6780e-003 r tblVehicleEF • MCY T 3.34 5.06 r tblVehicleEF • MCY T 1.20 1.67 r tblVehicleEF • MCY T 2.06 3.05 r tblVehicleEF • MCY T 2.08 2.19 r tblVehicleEF • MCY T 0.51 1.72 r 4 tblVehicleEF • MCY T 1.82 1.62 r tblVehicleEF • MCY T 2.0530e-003 2.1050e-003 r tblVehicleEF • MCY T 6.4400e-004 5.7100e-004 r 4 tblVehicleEF • MCY T 3.34 5.06 r 4 tblVehicleEF • MCY T 1.20 1.67 r 4 tblVehicleEF • MCY T 2.06 3.05 r 4 tblVehicleEF • MCY T 2.60 2.73 r 4 tblVehicleEF • MCY T 0.51 1.72 r 4 tblVehicleEF • MCY T 1.98 1.77 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.15 0.26 r 4 tblVehicleEF • MCY T 17.65 18.20 r 4 tblVehicleEF • MCY T 9.75 9.26 r 4 tblVehicleEF • MCY T 168.56 209.86 r 4 tblVehicleEF • MCY T 44.20 60.20 r 4 tblVehicleEF • MCY T 1.11 1.18 r 4 tblVehicleEF • MCY T 0.31 0.27 r 4 tblVehicleEF • MCY T 1.9930e-003 2.1060e-003 r 4 tblVehicleEF • MCY T 3.2040e-003 2.8580e-003 tblVehicleEF • MCY • 1.8600e-003 1.9650e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 3.0040e-003 2.6780e-003 tblVehicleEF • MCY i 1.57 1.02 r tblVehicleEF • MCY T 0.98 0.76 r tblVehicleEF • MCY T 0.71 0.41 r tblVehicleEF • MCY T 2.09 2.20 r tblVehicleEF • MCY T 0.58 1.82 r tblVehicleEF • MCY T 2.03 1.93 r 4 tblVehicleEF • MCY T 2.0360e-003 2.0770e-003 r tblVehicleEF • MCY T 6.6100e-004 5.9600e-004 r tblVehicleEF • MCY T 1.57 1.02 r 4 tblVehicleEF • MCY T 0.98 0.76 r 4 tblVehicleEF • MCY T 0.71 0.41 r 4 tblVehicleEF • MCY T 2.60 2.74 r 4 tblVehicleEF • MCY T 0.58 1.82 r 4 tblVehicleEF • MCY T 2.21 2.10 r 4 tblVehicleEF • MDV T 7.4730e-003 3.4060e-003 r 4 tblVehicleEF • MDV T 0.01 0.06 r 4 tblVehicleEF • MDV T 0.92 0.85 r 4 tblVehicleEF • MDV T 2.00 2.41 r 4 tblVehicleEF • MDV T 413.91 375.65 r 4 tblVehicleEF • MDV T 94.54 75.79 r 4 tblVehicleEF • MDV T 0.10 0.06 r 4 tblVehicleEF • MDV T 0.18 0.24 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 tblVehicleEF • MDV • 2.1540e-003 1.5090e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.10 0.16 tblVehicleEF • MDV i 0.17 0.14 r tblVehicleEF • MDV T 0.09 0.13 r tblVehicleEF • MDV T 0.02 0.01 r tblVehicleEF • MDV T 0.10 0.42 r tblVehicleEF • MDV T 0.14 0.25 r tblVehicleEF • MDV T 4.1430e-003 3.5760e-003 r 4 tblVehicleEF • MDV T 9.8000e-004 7.2200e-004 r tblVehicleEF • MDV T 0.10 0.16 r tblVehicleEF • MDV T 0.17 0.14 r 4 tblVehicleEF • MDV T 0.09 0.13 r 4 tblVehicleEF • MDV T 0.03 0.02 r 4 tblVehicleEF • MDV T 0.10 0.42 r 4 tblVehicleEF • MDV T 0.16 0.28 r 4 tblVehicleEF • MDV T 8.4690e-003 3.9840e-003 r 4 tblVehicleEF • MDV T 9.1600e-003 0.05 r 4 tblVehicleEF • MDV T 1.13 1.10 r 4 tblVehicleEF • MDV T 1.76 2.46 r 4 tblVehicleEF • MDV T 449.29 402.44 r 4 tblVehicleEF • MDV T 94.54 75.82 r 4 tblVehicleEF • MDV T 0.09 0.06 r 4 tblVehicleEF • MDV T 0.17 0.25 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 r 4 tblVehicleEF • MDV T 2.1540e-003 1.5090e-003 tblVehicleEF • MDV • 0.19 0.32 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.19 0.17 tblVehicleEF • MDV i 0.16 0.23 r tblVehicleEF • MDV T 0.02 0.02 r tblVehicleEF • MDV T 0.10 0.44 r tblVehicleEF • MDV T 0.12 0.24 r tblVehicleEF • MDV T 4.5000e-003 3.8310e-003 r tblVehicleEF • MDV T 9.7500e-004 7.2200e-004 r 4 tblVehicleEF • MDV T 0.19 0.32 r tblVehicleEF • MDV T 0.19 0.18 r tblVehicleEF • MDV T 0.16 0.23 r 4 tblVehicleEF • MDV T 0.03 0.02 r 4 tblVehicleEF • MDV T 0.10 0.44 r 4 tblVehicleEF • MDV T 0.14 0.26 r 4 tblVehicleEF • MDV T 7.1840e-003 3.0350e-003 r 4 tblVehicleEF • MDV T 0.01 0.06 r 4 tblVehicleEF • MDV T 0.86 0.72 r 4 tblVehicleEF • MDV T 2.04 2.81 r 4 tblVehicleEF • MDV T 403.16 358.17 r 4 tblVehicleEF • MDV T 94.54 76.58 r 4 tblVehicleEF • MDV T 0.10 0.06 r 4 tblVehicleEF • MDV T 0.18 0.25 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 r 4 tblVehicleEF • MDV T 2.1540e-003 1.5090e-003 r 4 tblVehicleEF • MDV T 0.08 0.06 tblVehicleEF • MDV • 0.18 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.07 0.06 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.12 0.47 I- 4 tblVehicleEF • MDV r 0.15 0.29 I- 4 tblVehicleEF • MDV r 4.0350e-003 3.4090e-003 I- 4 tblVehicleEF • MDV r 9.8100e-004 7.2900e-004 I- 4 tblVehicleEF • MDV r 0.08 0.06 I- 4 tblVehicleEF • MDV r 0.18 0.13 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.03 0.02 I- 4 tblVehicleEF • MDV r 0.12 0.47 I- 4 tblVehicleEF • MDV r 0.16 0.32 I- 4 tblVehicleEF • MH r 0.02 2.8780e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 1.38 0.28 I- 4 tblVehicleEF • MH r 4.62 0.00 I- 4 tblVehicleEF • MH r 990.51 903.23 I- 4 tblVehicleEF • MH r 56.68 0.00 I- 4 tblVehicleEF • MH r 1.21 3.53 I- 4 tblVehicleEF • MH r 0.73 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 I- 4 tblVehicleEF • MH r 0.03 0.11 I- 4 tblVehicleEF • MH r 9.0000e-004 0.00 I- 4 tblVehicleEF • MH r 3.2420e-003 4.0000e-003 I- 4 tblVehicleEF • MH r 0.03 0.11 I- 4 tblVehicleEF • MH r 8.2800e-004 0.00 tblVehicleEF • MH • 1.20 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MH • 0.07 0.00 tblVehicleEF • MH i 0.44 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.27 0.00 r tblVehicleEF • MH T 9.8110e-003 8.5390e-003 r tblVehicleEF • MH T 6.4700e-004 0.00 r 4 tblVehicleEF • MH T 1.20 0.00 r tblVehicleEF • MH T 0.07 0.00 r tblVehicleEF • MH T 0.44 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.30 0.00 r 4 tblVehicleEF • MH T 0.02 2.8780e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 1.42 0.28 r 4 tblVehicleEF • MH T 4.30 0.00 r 4 tblVehicleEF • MH T 990.51 903.23 r 4 tblVehicleEF • MH T 56.68 0.00 r 4 tblVehicleEF • MH T 1.13 3.33 r 4 tblVehicleEF • MH T 0.70 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.03 0.11 r 4 tblVehicleEF • MH T 9.0000e-004 0.00 r 4 tblVehicleEF • MH T 3.2420e-003 4.0000e-003 r 4 tblVehicleEF • MH T 0.03 0.11 tblVehicleEF • MH • 8.2800e-004 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MH • 2.18 0.00 tblVehicleEF • MH i 0.08 0.00 r tblVehicleEF • MH T 0.83 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.26 0.00 r tblVehicleEF • MH T 9.8120e-003 8.5390e-003 r 4 tblVehicleEF • MH T 6.4200e-004 0.00 r tblVehicleEF • MH T 2.18 0.00 r tblVehicleEF • MH T 0.08 0.00 r 4 tblVehicleEF • MH T 0.83 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.29 0.00 r 4 tblVehicleEF • MH T 0.02 2.8780e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 1.38 0.28 r 4 tblVehicleEF • MH T 4.65 0.00 r 4 tblVehicleEF • MH T 990.51 903.23 r 4 tblVehicleEF • MH T 56.68 0.00 r 4 tblVehicleEF • MH T 1.20 3.58 r 4 tblVehicleEF • MH T 0.73 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.03 0.11 r 4 tblVehicleEF • MH T 9.0000e-004 0.00 r 4 tblVehicleEF • MH T 3.2420e-003 4.0000e-003 tblVehicleEF • MH • 0.03 0.11 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MH • 8.2800e-004 0.00 MH• i 1.16 0.00 r MH• T 0.08 0.00 r MH• T 0.42 0.00 r MH• T 0.06 0.06 r MH• T 0.02 0.00 r • MH T 0.28 0.00 r 4 • MH T 9.8110e-003 8.5390e-003 r • MH T 6.4800e-004 0.00 r • MH T 1.16 0.00 r 4 MH• T 0.08 0.00 r 4 MH• T 0.42 0.00 r 4 MH• T 0.08 0.07 r 4 MH• T 0.02 0.00 r 4 MH• T 0.30 0.00 r 4 • MHD T 0.02 4.7640e-003 r 4 • MHD T 1.9370e-003 1.8380e-003 r 4 • MHD T 0.04 0.01 r 4 • MHD T 0.31 0.43 r 4 • MHD T 0.17 0.22 r 4 • MHD T 4.06 1.30 r 4 • MHD T 149.43 68.75 r 4 • MHD T 1,051.15 975.21 r 4 • MHD T 52.99 11.84 r 4 • MHD T 0.40 0.36 r 4 • MHD T 0.44 0.84 • MHD • 11.47 1.55 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 8.9000e-005 2.4300e-004 tblVehicleEF • MHD i 2.6760e-003 8.7310e-003 r tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r tblVehicleEF • MHD T 8.5000e-005 2.3300e-004 r tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r tblVehicleEF • MHD T 1.2700e-003 1.2000e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 6.7900e-004 6.1000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.25 0.06 r 4 tblVehicleEF • MHD T 1.4360e-003 6.5300e-004 r 4 tblVehicleEF • MHD T 0.01 9.3540e-003 r 4 tblVehicleEF • MHD T 6.0100e-004 1.1700e-004 r 4 tblVehicleEF • MHD T 1.2700e-003 1.2000e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.7900e-004 6.1000e-004 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.27 0.07 r 4 tblVehicleEF • MHD T 0.01 4.5190e-003 r 4 tblVehicleEF • MHD T 1.9560e-003 1.8630e-003 r 4 tblVehicleEF • MHD T 0.04 0.01 tblVehicleEF • MHD • 0.23 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 0.17 0.23 tblVehicleEF • MHD i 3.88 1.26 r tblVehicleEF • MHD T 158.28 68.62 r tblVehicleEF • MHD T 1,051.15 975.21 r tblVehicleEF • MHD T 52.99 11.77 r tblVehicleEF • MHD T 0.41 0.35 r tblVehicleEF • MHD T 0.41 0.79 r 4 tblVehicleEF • MHD T 11.45 1.55 r tblVehicleEF • MHD T 7.5000e-005 2.0800e-004 r tblVehicleEF • MHD T 2.6760e-003 8.7310e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r 4 tblVehicleEF • MHD T 7.2000e-005 1.9900e-004 r 4 tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r 4 tblVehicleEF • MHD T 2.4430e-003 2.4030e-003 r 4 tblVehicleEF • MHD T 0.04 0.04 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.2730e-003 1.1260e-003 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.15 r 4 tblVehicleEF • MHD T 0.24 0.06 r 4 tblVehicleEF • MHD T 1.5200e-003 6.5200e-004 r 4 tblVehicleEF • MHD T 0.01 9.3540e-003 r 4 tblVehicleEF • MHD T 5.9800e-004 1.1700e-004 r 4 tblVehicleEF • MHD T 2.4430e-003 2.4030e-003 r 4 tblVehicleEF • MHD T 0.04 0.04 tblVehicleEF • MHD • 0.03 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 1.2730e-003 1.1260e-003 tblVehicleEF • MHD i 0.02 0.02 r tblVehicleEF • MHD T 0.02 0.15 r tblVehicleEF • MHD T 0.26 0.06 r tblVehicleEF • MHD T 0.02 5.1010e-003 r tblVehicleEF • MHD T 1.9210e-003 1.7950e-003 r tblVehicleEF • MHD T 0.04 0.01 r 4 tblVehicleEF • MHD T 0.43 0.53 r tblVehicleEF • MHD T 0.16 0.22 r tblVehicleEF • MHD T 4.12 1.38 r 4 tblVehicleEF • MHD T 137.20 68.93 r 4 tblVehicleEF • MHD T 1,051.15 975.20 r 4 tblVehicleEF • MHD T 52.99 11.97 r 4 tblVehicleEF • MHD T 0.38 0.37 r 4 tblVehicleEF • MHD T 0.43 0.85 r 4 tblVehicleEF • MHD T 11.47 1.56 r 4 tblVehicleEF • MHD T 1.0800e-004 2.9200e-004 r 4 tblVehicleEF • MHD T 2.6760e-003 8.7310e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r 4 tblVehicleEF • MHD T 1.0300e-004 2.7900e-004 r 4 tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r 4 tblVehicleEF • MHD T 8.8300e-004 5.0200e-004 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 5.2400e-004 3.1000e-004 tblVehicleEF • MHD • 0.02 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 0.02 0.15 tblVehicleEF • MHD i 0.25 0.06 r tblVehicleEF • MHD T 1.3210e-003 6.5500e-004 r tblVehicleEF • MHD T 0.01 9.3540e-003 r tblVehicleEF • MHD T 6.0200e-004 1.1800e-004 r tblVehicleEF • MHD T 8.8300e-004 5.0200e-004 r tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 5.2400e-004 3.1000e-004 r tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 0.02 0.15 r 4 tblVehicleEF • MHD T 0.28 0.07 r 4 tblVehicleEF • OBUS T 0.01 7.9360e-003 r 4 tblVehicleEF • OBUS T 3.9930e-003 2.9380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.57 r 4 tblVehicleEF • OBUS T 0.27 0.32 r 4 tblVehicleEF • OBUS T 4.82 1.66 r 4 tblVehicleEF • OBUS T 70.92 84.28 r 4 tblVehicleEF • OBUS T 1,082.83 1,209.92 r 4 tblVehicleEF • OBUS T 68.56 15.40 r 4 tblVehicleEF • OBUS T 0.14 0.35 r 4 tblVehicleEF • OBUS T 0.35 0.70 r 4 tblVehicleEF • OBUS T 2.00 1.00 r 4 tblVehicleEF • OBUS T 1.3000e-005 1.1400e-004 r 4 tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 tblVehicleEF • OBUS • 9.3200e-004 1.5600e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • OBUS • 1.2000e-005 1.0900e-004 • OBUS i 2.0160e-003 7.4440e-003 r • OBUS T 8.5700e-004 1.4400e-004 r • OBUS T 1.9950e-003 2.3080e-003 r • OBUS T 0.02 0.02 r • OBUS T 0.03 0.05 r • OBUS T 8.8300e-004 9.7200e-004 r 4 • OBUS T 0.02 0.02 r • OBUS T 0.05 0.16 r • OBUS T 0.30 0.08 r 4 • OBUS T 6.8900e-004 8.0100e-004 r 4 • OBUS T 0.01 0.01 r 4 • OBUS T 7.7000e-004 1.5200e-004 r 4 • OBUS T 1.9950e-003 2.3080e-003 r 4 • OBUS T 0.02 0.02 r 4 • OBUS T 0.04 0.06 r 4 • OBUS T 8.8300e-004 9.7200e-004 r 4 • OBUS T 0.03 0.02 r 4 • OBUS T 0.05 0.16 r 4 • OBUS T 0.33 0.09 r 4 • OBUS T 0.01 8.0120e-003 r 4 • OBUS T 4.0630e-003 2.9830e-003 r 4 • OBUS T 0.02 0.02 r 4 • OBUS T 0.24 0.56 r 4 • OBUS T 0.28 0.32 r 4 • OBUS T 4.51 1.59 • OBUS • 74.13 83.29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 1,082.83 1,209.93 tblVehicleEF • OBUS i 68.56 15.27 r tblVehicleEF • OBUS T 0.14 0.33 r tblVehicleEF • OBUS T 0.32 0.66 r tblVehicleEF • OBUS T 1.97 0.99 r tblVehicleEF • OBUS T 1.1000e-005 1.0200e-004 r tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 r 4 tblVehicleEF • OBUS T 9.3200e-004 1.5600e-004 r tblVehicleEF • OBUS T 1.0000e-005 9.7000e-005 r tblVehicleEF • OBUS T 2.0160e-003 7.4440e-003 r 4 tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 3.6940e-003 4.5380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6690e-003 1.7830e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • OBUS T 7.1900e-004 7.9200e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.6500e-004 1.5100e-004 r 4 tblVehicleEF • OBUS T 3.6940e-003 4.5380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 1.6690e-003 1.7830e-003 r 4 tblVehicleEF • OBUS T 0.03 0.02 tblVehicleEF • OBUS • 0.05 0.17 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.32 0.09 tblVehicleEF • OBUS i 0.01 7.8280e-003 r tblVehicleEF • OBUS T 3.9760e-003 2.8620e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.57 r tblVehicleEF • OBUS T 0.27 0.31 r tblVehicleEF • OBUS T 4.87 1.79 r 4 tblVehicleEF • OBUS T 66.48 85.65 r tblVehicleEF • OBUS T 1,082.83 1,209.91 r tblVehicleEF • OBUS T 68.56 15.62 r 4 tblVehicleEF • OBUS T 0.13 0.37 r 4 tblVehicleEF • OBUS T 0.34 0.72 r 4 tblVehicleEF • OBUS T 2.00 1.01 r 4 tblVehicleEF • OBUS T 1.5000e-005 1.3200e-004 r 4 tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 r 4 tblVehicleEF • OBUS T 9.3200e-004 1.5600e-004 r 4 tblVehicleEF • OBUS T 1.5000e-005 1.2600e-004 r 4 tblVehicleEF • OBUS T 2.0160e-003 7.4440e-003 r 4 tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 1.6700e-003 1.0190e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.04 r 4 tblVehicleEF • OBUS T 8.0300e-004 5.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.30 0.09 tblVehicleEF • OBUS • 6.4600e-004 8.1400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.01 0.01 tblVehicleEF • OBUS i 7.7100e-004 1.5500e-004 r tblVehicleEF • OBUS T 1.6700e-003 1.0190e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.04 0.06 r tblVehicleEF • OBUS T 8.0300e-004 5.2500e-004 r tblVehicleEF • OBUS T 0.03 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.33 0.09 r tblVehicleEF • SBUS T 0.80 0.06 r 4 tblVehicleEF • SBUS T 7.8570e-003 4.1910e-003 r 4 tblVehicleEF • SBUS T 0.06 4.5040e-003 r 4 tblVehicleEF • SBUS T 7.94 2.35 r 4 tblVehicleEF • SBUS T 0.49 0.28 r 4 tblVehicleEF • SBUS T 6.18 0.50 r 4 tblVehicleEF • SBUS T 1,101.78 339.03 r 4 tblVehicleEF • SBUS T 1,079.52 1,050.37 r 4 tblVehicleEF • SBUS T 56.53 3.78 r 4 tblVehicleEF • SBUS T 7.02 3.34 r 4 tblVehicleEF • SBUS T 3.01 4.00 r 4 tblVehicleEF • SBUS T 11.88 1.00 r 4 tblVehicleEF • SBUS T 5.4270e-003 3.3000e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r 4 tblVehicleEF • SBUS T 5.1930e-003 3.1570e-003 tblVehicleEF • SBUS • 2.6790e-003 2.6220e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 0.02 0.02 tblVehicleEF • SBUS i 5.4000e-004 3.5000e-005 r tblVehicleEF • SBUS i 5.8490e-003 1.4310e-003 r tblVehicleEF • SBUS i 0.04 6.2400e-003 r tblVehicleEF • SBUS i 0.93 0.26 r tblVehicleEF • SBUS i 2.8420e-003 6.1200e-004 r tblVehicleEF • SBUS i 0.09 0.07 r 4 tblVehicleEF • SBUS i 0.02 0.04 r tblVehicleEF • SBUS i 0.35 0.02 r tblVehicleEF • SBUS T 0.01 3.2280e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 6.7300e-004 3.7000e-005 r 4 tblVehicleEF • SBUS T 5.8490e-003 1.4310e-003 r 4 tblVehicleEF • SBUS T 0.04 6.2400e-003 r 4 tblVehicleEF • SBUS T 1.35 0.37 r 4 tblVehicleEF • SBUS T 2.8420e-003 6.1200e-004 r 4 tblVehicleEF • SBUS T 0.10 0.08 r 4 tblVehicleEF • SBUS T 0.02 0.04 r 4 tblVehicleEF • SBUS T 0.38 0.03 r 4 tblVehicleEF • SBUS T 0.80 0.06 r 4 tblVehicleEF • SBUS T 7.9670e-003 4.2130e-003 r 4 tblVehicleEF • SBUS T 0.05 3.9280e-003 r 4 tblVehicleEF • SBUS T 7.85 2.32 r 4 tblVehicleEF • SBUS T 0.50 0.28 r 4 tblVehicleEF • SBUS T 4.48 0.39 r 4 tblVehicleEF • SBUS T1,150.67 346.42 tblVehicleEF • SBUS • 1,079.52 1,050.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 56.53 3.59 tblVehicleEF • SBUS i 7.25 3.40 r tblVehicleEF • SBUS i 2.83 3.77 r tblVehicleEF • SBUS i 11.85 1.00 r tblVehicleEF • SBUS i 4.5750e-003 2.7900e-003 r tblVehicleEF • SBUS T 0.01 0.01 r tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r tblVehicleEF • SBUS T 4.3770e-003 2.6690e-003 r tblVehicleEF • SBUS T 2.6790e-003 2.6220e-003 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.4000e-004 3.5000e-005 r 4 tblVehicleEF • SBUS T 0.01 2.8080e-003 r 4 tblVehicleEF • SBUS T 0.04 6.9550e-003 r 4 tblVehicleEF • SBUS T 0.93 0.26 r 4 tblVehicleEF • SBUS T 5.1940e-003 1.1060e-003 r 4 tblVehicleEF • SBUS T 0.09 0.07 r 4 tblVehicleEF • SBUS T 0.02 0.04 r 4 tblVehicleEF • SBUS T 0.29 0.02 r 4 tblVehicleEF • SBUS T 0.01 3.2980e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 6.4400e-004 3.6000e-005 r 4 tblVehicleEF • SBUS T 0.01 2.8080e-003 r 4 tblVehicleEF • SBUS T 0.04 6.9550e-003 r 4 tblVehicleEF • SBUS T 1.35 0.37 r 4 tblVehicleEF • SBUS T 5.1940e-003 1.1060e-003 tblVehicleEF • SBUS • 0.10 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • SBUS • 0.02 0.04 • SBUS i 0.32 0.02 r • SBUS T 0.80 0.06 r • SBUS T 7.8240e-003 4.1550e-003 r • SBUS T 0.06 5.3140e-003 r • SBUS T 8.07 2.40 r • SBUS T 0.49 0.28 r 4 • SBUS T 6.53 0.66 r • SBUS T 1,034.26 328.83 r • SBUS T 1,079.52 1,050.37 r 4 • SBUS T 56.53 4.05 r 4 • SBUS T 6.71 3.24 r 4 • SBUS T 2.98 4.07 r 4 • SBUS T 11.89 1.01 r 4 • SBUS T 6.6040e-003 4.0040e-003 r 4 • SBUS T 0.01 0.01 r 4 • SBUS T 0.02 0.02 r 4 • SBUS T 5.8800e-004 3.8000e-005 r 4 • SBUS T 6.3180e-003 3.8310e-003 r 4 • SBUS T 2.6790e-003 2.6220e-003 r 4 • SBUS T 0.02 0.02 r 4 • SBUS T 5.4000e-004 3.5000e-005 r 4 • SBUS T 4.9510e-003 6.2500e-004 r 4 • SBUS T 0.04 6.0080e-003 r 4 • SBUS T 0.94 0.26 r 4 • SBUS T 2.7180e-003 3.3500e-004 • SBUS • 0.09 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .SBUS • 0.02 0.05 tblVehicleEF • SBUS r 0.36 0.03 I- 4 tblVehicleEF • SBUS r 0.01 3.1320e-003 I- 4 tblVehicleEF • SBUS r 0.01 0.01 I- 4 tblVehicleEF • SBUS r 6.7900e-004 4.0000e-005 I- 4 tblVehicleEF • SBUS r 4.9510e-003 6.2500e-004 I- 4 tblVehicleEF • SBUS r 0.04 6.0080e-003 I- 4 tblVehicleEF • SBUS r 1.36 0.37 I- 4 tblVehicleEF • SBUS r 2.7180e-003 3.3500e-004 I- 4 tblVehicleEF • SBUS r 0.10 0.08 I- 4 tblVehicleEF • SBUS r 0.02 0.05 I- 4 tblVehicleEF • SBUS r 0.40 0.03 I- 4 tblVehicleEF • UBUS r 1.18 4.36 I- 4 tblVehicleEF • UBUS r 0.07 0.00 I- 4 tblVehicleEF • UBUS r 6.51 34.12 I- 4 tblVehicleEF • UBUS r 12.06 0.00 I- 4 tblVehicleEF • UBUS 1,758.87 1,515.24 I- 4 tblVehicleEF • UBUS r 150.95 0.00 I- 4 tblVehicleEF • UBUS r 2.89 0.34 I- 4 tblVehicleEF • UBUS r 12.11 0.00 I- 4 tblVehicleEF • UBUS r 0.49 0.08 I- 4 tblVehicleEF • UBUS r 0.01 0.03 I- 4 tblVehicleEF • UBUS r 0.03 4.3040e-003 I- 4 tblVehicleEF • UBUS r 1.5480e-003 0.00 I- 4 tblVehicleEF • UBUS r 0.21 0.03 I- 4 tblVehicleEF • UBUS r 3.0000e-003 6.8250e-003 tblVehicleEF • UBUS • 0.03 4.1170e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 1.4230e-003 0.00 tblVehicleEF • UBUS i 7.9490e-003 0.00 r tblVehicleEF • UBUS T 0.09 0.00 r tblVehicleEF • UBUS T 4.1220e-003 0.00 r tblVehicleEF • UBUS T 0.31 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.99 0.00 r 4 tblVehicleEF • UBUS T 9.0980e-003 0.00 r tblVehicleEF • UBUS T 1.7290e-003 0.00 r tblVehicleEF • UBUS T 7.9490e-003 0.00 r 4 tblVehicleEF • UBUS T 0.09 0.00 r 4 tblVehicleEF • UBUS T 4.1220e-003 0.00 r 4 tblVehicleEF • UBUS T 1.51 4.46 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.09 0.00 r 4 tblVehicleEF • UBUS T 1.18 4.36 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 6.56 34.12 r tblVehicleEF • UBUS T 10.37 0.00 r tblVehicleEF • UBUS T 1,758.87 1,515.24 r tblVehicleEF • UBUS T 150.95 0.00 r 4 tblVehicleEF • UBUS T 2.69 0.34 r 4 tblVehicleEF • UBUS T 12.03 0.00 r 4 tblVehicleEF • UBUS T 0.49 0.08 r 4 tblVehicleEF • UBUS T 0.01 0.03 r 4 tblVehicleEF • UBUS T 0.03 4.3040e-003 tblVehicleEF • UBUS • 1.5480e-003 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 0.21 0.03 tblVehicleEF • UBUS i 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.03 4.1170e-003 r tblVehicleEF • UBUS T 1.4230e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r tblVehicleEF • UBUS T 0.11 0.00 r tblVehicleEF • UBUS T 8.1050e-003 0.00 r 4 tblVehicleEF • UBUS T 0.31 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.91 0.00 r 4 tblVehicleEF • UBUS T 9.0990e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6990e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.11 0.00 r 4 tblVehicleEF • UBUS T 8.1050e-003 0.00 r 4 tblVehicleEF • UBUS T 1.52 4.46 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.99 0.00 r 4 tblVehicleEF • UBUS T 1.18 4.36 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 6.50 34.12 r 4 tblVehicleEF • UBUS T 12.26 0.00 r 4 tblVehicleEF • UBUS T 1,758.87 1,515.24 r 4 tblVehicleEF • UBUS T 150.95 0.00 r 4 tblVehicleEF • UBUS T 2.86 0.34 r 4 tblVehicleEF • UBUS T 12.11 0.00 tblVehicleEF • UBUS • 0.49 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips • UBUS • 0.01 0.03 • UBUS i 0.03 4.3040e-003 r • UBUS T 1.5480e-003 0.00 r • UBUS T 0.21 0.03 r • UBUS T 3.0000e-003 6.8250e-003 r • UBUS T 0.03 4.1170e-003 r • UBUS T 1.4230e-003 0.00 r 4 • UBUS T 6.9620e-003 0.00 r • UBUS T 0.10 0.00 r • UBUS T 3.7030e-003 0.00 r 4 • UBUS T 0.31 0.07 r 4 • UBUS T 0.03 0.00 r 4 • UBUS T 1.00 0.00 r 4 • UBUS T 9.0980e-003 0.00 r 4 • UBUS T 1.7320e-003 0.00 r 4 • UBUS T 6.9620e-003 0.00 r 4 • UBUS T 0.10 0.00 r 4 • UBUS T 3.7030e-003 0.00 r 4 • UBUS T 1.51 4.46 r 4 • UBUS T 0.03 0.00 r 4 • UBUS T 1.10 0.00 r 4 • T 4.20 8.70 CC_TL r r 4 • CNW TL T 5.40 8.70 r r 4 • CW TL T 12.50 8.70 r r 4 • HO TL T 4.50 8.70 r r 4 • HO TL T 4.50 8.70 • HS TL • 3.50 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • HS_TL • • HW TL HW TL ST_TR ST TR ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic • 3.50 8.70 i 11.00 8.70 r i 11.00 8.70 r i 7.16 8.08 r i 40.63 17.90 r i 9.91 9.48 r i 6.07 6.23 r i 39.53 T 17.00 r i 8.62 8.49 r i 6.59 7.26 r i 35.74 T 27.33 r i 9.52 T 9.38 r i 3.70 T 0.00 r i 26.50 T 0.00 r T 3.70 T 0.00 r • f 26.50 0.00 2.0 Emissions Summary ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 50 of 58 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Area •4 34.3122 10.5928 1 54.0519 0.0666 1 1.0863 1.0863 1.0863 1.0863 • 0.0000 ' 12,880.32 12,880.32 0.3311 1 0.2345 12,958.48 ; 9; 41 41 I 09 J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Energy •i 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 • i 3,253.345 3,253.345 0.0624 0.0596 3,272.679 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 • 9 9 0 ir J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Mobile .1 14.1593 31.1032 124.7240 0.3764 35.0144 0.3534 35.3678 9.3576 0.3333 9.6910 • 39,785.76 39,785.76 1.4180 39,821.21 J J J J J J J J J J J • 60 60 i 58 Total 48.7697 44.2444 179.8603 0.4592 35.0144 1.6458 36.6602 9.3576 1.6257 10.9833 0.0000 55,919.43 55,919.43 1.8115 0.2941 56,052.37 55,919.43 1.8115 0.2941 56,052.37 Il 60 60 60 56 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area i 34.3122 1 10.5928 54.0519 0.0666 1 1.0863 1.0863 1 1.0863 1.0863 • 0.0000 12,880.32 12,880.32 0.3311 1 0.2345 12,958.48 •1 ; 41 41 09 J J J .1 J J J J w J J J Energy •i 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 • 3,253.345 3,253.345 0.0624 0.0596 3,272.679 ■ 9 9 0 J J J J J J J J J J J Mobile •• 14.1593 31.1032 124.7240 1 0.3764 35.0144 1 0.3534 35.3678 9.3576 1 0.3333 9.6910 • 39,785.76 39,785.76 1.4180 39,821.21 • 60 60 58 Total 48.7697 44.2444 179.8603 0.4592 35.0144 1.6458 36.6602 9.3576 1.6257 10.9833 0.0000 55,919.43 55,919.43 1.8115 0.2941 56,052.37 Il 60 60 56 CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :1/1/2024 :12/31/2023• 0' Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers • 0 0 IUsage Hours I Horse Power I Load Factor 1- 0' 8.001 81' 8.001 158' i 8.00 247' 0.73 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00' 5.40' 20.00'LD Mix 'HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer 3.1 Mitigation Measures Construction 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 Annual VMT CH4 N20 CO2e Category Ib/day Ib/day 461.11 Mitigated •i 14.1593 i 31.1032 i 124.7240 i 0.3764 35.0144 i 0.3534 1 35.3678 1 9.3576 i 0.3333 9.6910 i 39,785.76 39,785.76 1.4180 i i 39,821.21 ,i i i i 1 : 1 60 1 60 1 i 58 Unmitigated • 14.1593 • 31.1032 • 124.7240 • 0.3764 • 35.0144 • 0.3534 • 35.3678 • 9.3576 • 0.3333 • 9.6910 • • 39,785.76 . 39,785.76 . 1.4180 • 39,821.21 60 60 58 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 537.47 ; 597.68 461.11 • 1,504,675 • 1,504,675 Golf Course ; 328.00 214.74 - T 203.95 • 576,073 Y • 576,073 Other Asphalt Surfaces ; 0.00 0.00 0.00 Single Family Housing ; 4,970.55 5,023.18 T 4501.93 • 13,808,248 • 13,808,248 Total I 5,836.02 5,835.60 5,166.98 i 15,888,996 1 15,888,996 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip % Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing r 8.70 8.70 8.70 8.70 12.50 8.70 4.20 -r -r 8.70 40.20 8.70 33.00 19.20 48.00 5.40 1 0.00 0.00 8.70 8.70 40.20 19.20 40.60 • 86 11 3 T r r 19.00 • • 52 T r r r 39 9 0.00 • 0 40.60 • 86 0 0 11 3 4.4 Fleet Mix Land Use Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 5.0 Energy Detail ILDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH • 0.556393v 0.035040 i 0.1893821 0.106465 i 0.012088 i 0.0044301 0.0174051 0.0702081 0.0014201 0.00111E: 0.0044291 0.000881: 0.000745 i i i i i i i i i i + • • 0.5563931 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.00111 Ei 0.004429 0.000881. 0.000745 i i i i i i i i i i + • 0.5563931 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.00111 Ei 0.004429 0.000881. 0.000745 E E F E E E E E F E E • 0.556393 • 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.00111 E: 0.004429: 0.000881: 0.000745 L • ' J A L ' ' ' J l L ' Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day I I I NaturalGas -I 0.2982 2.5485 I 1.0845 I I 0.0163 I I 1 I 0.2061 I I 0.2061 I I I 0.2061 0.2061 •13,253.345 13,253.345 0.0624 I 0.0596 i 3,272.679 Mitigated ;: I I 1 1 1 1 I 1 • 1 9 I 9 1 I I I 1 1 1 1 I 1 1 I I 1 0 :I. F + 1• + F 4. + 4. r I. 4. 4. 4. r NaturalGas . 0.2982 • 2.5485 • 1.0845 • 0.0163 . • 0.2061 • 0.2061 • 0.2061 0.2061 • . 3,253.345 . 3,253.345 . 0.0624 • 0.0596 . 3,272.679 Unmitigated 9 9 0 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single FamilyI Housing I 2131.99 • 003 i ; I . r -. I0 .I I . I . I• 7 I0 .I I I. 4 25521.4 ■I 1 . I 0.0230 0.1965 0.0836 1 1.2500e- : 0.0159 0.0159 1 : 0.0159 0.0159 • I 1 1 I . I 1 1 1 J J J J J J J J • 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 I 1 0.0000 0.0000 • I 1 1 1 1 1 J J J J J J J J v 0.0000 0.0000 0.0000 0.0000 I I 0.0000 I 0.0000 I I 0.0000 0.0000 • J J J J J J J J . 0.2752 2.3520 1.0008 0.0150 0.1902 0.1902 0.1902 0.1902 • . . 250.8229 250.8229 4.8100e- 4.6000e- 003 003 J J J 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 I 0.0000 I 0.0000 0.0000 J J J 3,002.523 3,002.523 0.0576 0.0551 0 0 252.3134 I 0.0000 • 0.0000 3,020.365 5 Total 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 3,253.345 9 3,253.345 9 0.0624 0.0597 3,272.679 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing : 2.13199 •i 1 ;1 f �I i 0 •i f �I : 0 •i •� i f 4 : 25.5214 • 1 i 0.0230 0.1965 0.0836 : 1.2500e- 0.0159 0.0159 1 : 0.0159 0.0159 1 003 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • I J J J J J J J J . 0.2752 2.3520 1.0008 0.0150 0.1902 0.1902 0.1902 0.1902 • . i 250.8229 250.8229 4.8100e- 4.6000e- 252.3134 003 003 i J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 J i 3,002.523 3,002.523 0.0576 0.0551 3,020.365 0 0 5 Total 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 3,253.345 9 3,253.345 9 0.0624 0.0597 3,272.679 0 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 34.3122 : 10.5928 : 54.0519 : 0.0666 i i 1.0863 i 1.0863 i : 1.0863 1.0863 0.0000 12,880.32 12,880.32 0.3311 0.2345 i 12,958.48 .48 1 41 1 41 11 099 I 1 1 1 1 1 1 1 1 1 1 • • I. 1. 4. 1. 1. 4. 1. 4. 4. r 4. 1. e Unmitigated •• 34.3122 • 10.5928 • 54.0519 • 0.0666 . • 1.0863 • 1.0863 • . 1.0863 • 1.0863 • 0.0000 12,880.32 . 12,880.32 . 0.3311 • 0.2345 • 12,958.48 41 41 09 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 9.1020 1 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: J J J J J J Consumer •1 22.5425 0.0000 0.0000 I 0.0000 0.0000 • 0.0000 0.0000 Products :: : Hearth •1 1.1725 1 10.0193 4.2635 1 0.0640 1 1 0.8101 0.8101 0.8101 0.8101 • 0.0000 12,790.58 12,790.581 0.2452 0.2345 12,866.59 •I • 82 82 63 Landscaping •i 1.4952 0.5735 49.7883 2.6300e- 0.2763 0.2763 0.2763 0.2763 • 89.7359 89.7359 0.0860 91.8846 003 Total 34.3122 10.5928 54.0519 0.0666 1.0863 1.0863 1.0863 1.0863 0.0000 12,880.32 12,880.32 0.3311 0.2345 12,958.48 41 41 09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 58 6.2 Area by SubCategory Mitigated Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 9.1020 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: : I • Consumer •i 22.5425 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •i 1.1725 10.0193 4.2635 0.0640 0.8101 0.8101 0.8101 0.8101 • 0.0000 i 12,790.58 12,790.58 0.2452 0.2345 12,866.59 9: 82 82 63 J .1 .1 .1 .1.1..1 .1 J Landscaping •i 1.4952 0.5735 49.7883 2.6300e- 0.2763 0.2763 0.2763 0.2763 I i 89.7359 89.7359 0.0860 91.8846 003 • Total 34.3122 10.5928 54.0519 0.0666 1.0863 1.0863 1.0863 1.0863 0.0000 12,880.32 12,880.32 0.3311 0.2345 12,958.48 41 41 09 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 58 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Summer Institute Recycling and Composting Services 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter Travertine Specific Plan - Phase 1 (Operations) Riverside -Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course • 35.00 + Acre ; 35.00 12.00 + Hole ; 46.20 I. Apartments Low Rise • 74.00 + Dwelling Unit ; 14.80 74,000.00 + 201 r Single Family Housing • 530.00 • Dwelling Unit 228.10 954,000.00 1436 1,524,600.00 64,282.00 0 f 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 726.95 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2026 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2026 Operational Year Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 53% less energy for residential uses. Water Mitigation - Waste Mitigation - 1 Column Name tblConstructionPhase • NumDays •} 400.00 0.00 tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 1,608.84 T• 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T 4,485.92 tblEnergyUse Y T24NG • 24,566.15 T 11,546.09 tblFireplaces Y NumberGas 59.20 T• 74.00 • tblFireplaces Y NumberGas 424.00 T • 530.00 tblFireplaces Y• NumberNoFireplace 7.40 T 0.00 4 1 1 tblFireplaces • NumberNoFireplace 53.00 0.00 • Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblFireplaces • NumberWood • 7.40 0.00 tblFireplaces • NumberWood i 53.00 0.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 4.63 14.80 r tblLandUse • LotAcreage i 172.08 228.10 • r tblLandUse • Population T 212.00 201.00 r 4 tblLandUse • Population T 1,516.00 1,436.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 726.95 r 4 tblVehicleEF • HHD T 0.89 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.07 0.00 r 4 tblVehicleEF • HHD T 2.00 10.40 r 4 tblVehicleEF • HHD T 0.43 0.19 r 4 tblVehicleEF • HHD T 1.46 1.3780e-003 r 4 tblVehicleEF • HHD T 5,902.49 1,611.91 r 4 tblVehicleEF • HHD T 1,386.05 1,148.48 r 4 tblVehicleEF • HHD T 4.77 0.01 r 4 tblVehicleEF • HHD T 16.75 8.36 r 4 tblVehicleEF • HHD T 0.86 1.83 r 4 tblVehicleEF • HHD T 20.25 2.33 r 4 tblVehicleEF • HHD T 4.0010e-003 3.0970e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 tblVehicleEF • HHD • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 5.0390e-003 0.03 tblVehicleEF • HHD i 4.3000e-005 0.00 r tblVehicleEF • HHD T 3.8280e-003 2.9630e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8540e-003 8.9690e-003 r tblVehicleEF • HHD T 4.8210e-003 0.02 r tblVehicleEF • HHD T 4.0000e-005 0.00 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r tblVehicleEF • HHD T 2.1710e-003 6.0000e-006 r tblVehicleEF • HHD T 0.53 0.70 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.4900e-004 1.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.06 0.02 r 4 tblVehicleEF • HHD T 0.01 0.01 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 2.1710e-003 6.0000e-006 r 4 tblVehicleEF • HHD T 0.61 0.80 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.4900e-004 1.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.84 0.04 r 4 tblVehicleEF • HHD T 0.03 0.01 tblVehicleEF • HHD • 0.06 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 1.45 10.27 tblVehicleEF • HHD i 0.43 0.19 r tblVehicleEF • HHD T 1.39 1.3390e-003 r tblVehicleEF • HHD T 6,253.17 1,590.95 r tblVehicleEF • HHD T 1,386.05 1,148.48 r tblVehicleEF • HHD T 4.77 0.01 r tblVehicleEF • HHD T 17.28 7.95 r 4 tblVehicleEF • HHD T 0.81 1.73 r tblVehicleEF • HHD T 20.25 2.33 r tblVehicleEF • HHD T 3.3730e-003 2.7470e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 5.0390e-003 0.03 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 3.2270e-003 2.6280e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8540e-003 8.9690e-003 r 4 tblVehicleEF • HHD T 4.8210e-003 0.02 r 4 tblVehicleEF • HHD T 4.0000e-005 0.00 r 4 tblVehicleEF • HHD T 1.3600e-004 1.0000e-006 r 4 tblVehicleEF • HHD T 2.4530e-003 8.0000e-006 r 4 tblVehicleEF • HHD T 0.50 0.75 r 4 tblVehicleEF • HHD T 7.9000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5100e-004 2.0000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 tblVehicleEF • HHD • 0.06 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 0.01 0.01 tblVehicleEF • HHD i 7.0000e-005 0.00 r tblVehicleEF • HHD T 1.3600e-004 1.0000e-006 r tblVehicleEF • HHD T 2.4530e-003 8.0000e-006 r tblVehicleEF • HHD T 0.57 0.85 r tblVehicleEF • HHD T 7.9000e-005 0.00 r tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5100e-004 2.0000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.96 0.03 r 4 tblVehicleEF • HHD T 0.03 8.5700e-004 r 4 tblVehicleEF • HHD T 0.07 0.00 r 4 tblVehicleEF • HHD T 2.75 10.57 r 4 tblVehicleEF • HHD T 0.43 0.16 r 4 tblVehicleEF • HHD T 1.48 1.4640e-003 r 4 tblVehicleEF • HHD T 5,418.23 1,638.19 r 4 tblVehicleEF • HHD T 1,386.05 1,141.19 r 4 tblVehicleEF • HHD T 4.77 0.01 r 4 tblVehicleEF • HHD T 16.00 8.91 r 4 tblVehicleEF • HHD T 0.86 1.85 r 4 tblVehicleEF • HHD T 20.25 2.33 r 4 tblVehicleEF • HHD T 4.8670e-003 3.5590e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 5.0390e-003 0.03 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 tblVehicleEF • HHD • 4.6570e-003 3.4050e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 0.03 0.03 tblVehicleEF • HHD i 8.8540e-003 8.9470e-003 r tblVehicleEF • HHD T 4.8210e-003 0.02 r tblVehicleEF • HHD T 4.0000e-005 0.00 r tblVehicleEF • HHD T 5.1000e-005 0.00 r tblVehicleEF • HHD T 2.2330e-003 5.0000e-006 r tblVehicleEF • HHD T 0.57 0.65 r 4 tblVehicleEF • HHD T 3.5000e-005 0.00 r tblVehicleEF • HHD T 0.04 0.02 r tblVehicleEF • HHD T 1.6000e-004 2.1000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 0.01 0.01 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 r 4 tblVehicleEF • HHD T 2.2330e-003 5.0000e-006 r 4 tblVehicleEF • HHD T 0.66 0.73 r 4 tblVehicleEF • HHD T 3.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.02 r 4 tblVehicleEF • HHD T 1.6000e-004 2.1000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • LDA T 2.5910e-003 1.4670e-003 r 4 tblVehicleEF • LDA T 2.9440e-003 0.03 r 4 tblVehicleEF • LDA i 0.43 0.55 r 4 tblVehicleEF • LDA 0.76 1.71 r r 4 tblVehicleEF • LDA 207.76 239.05 • r tblVehicleEF • LDA • 48.28 48.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 0.03 0.02 tblVehicleEF • LDA i 0.04 0.14 r tblVehicleEF • LDA T 1.4700e-003 1.1830e-003 r tblVehicleEF • LDA T 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.04 0.07 r 4 tblVehicleEF • LDA T 0.08 0.08 r tblVehicleEF • LDA T 0.03 0.05 r tblVehicleEF • LDA T 6.4920e-003 5.2540e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.14 r 4 tblVehicleEF • LDA T 2.0800e-003 2.2760e-003 r 4 tblVehicleEF • LDA T 4.9500e-004 4.5800e-004 r 4 tblVehicleEF • LDA T 0.04 0.07 r 4 tblVehicleEF • LDA T 0.08 0.08 r 4 tblVehicleEF • LDA T 0.03 0.05 r 4 tblVehicleEF • LDA T 9.4440e-003 7.6520e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.15 r 4 tblVehicleEF • LDA T 2.9310e-003 1.7240e-003 r 4 tblVehicleEF • LDA T 2.5500e-003 0.03 r 4 tblVehicleEF • LDA T 0.52 0.72 r 4 tblVehicleEF • LDA T 0.66 1.76 r 4 tblVehicleEF • LDA T 226.16 264.80 r 4 tblVehicleEF • LDA T 48.28 48.14 tblVehicleEF • LDA • 0.03 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 0.04 0.14 tblVehicleEF • LDA i 1.4700e-003 1.1830e-003 r tblVehicleEF • LDA T 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.07 0.15 r tblVehicleEF • LDA T 0.09 0.10 r 4 tblVehicleEF • LDA T 0.05 0.10 r tblVehicleEF • LDA T 7.3340e-003 6.1450e-003 r tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.13 r 4 tblVehicleEF • LDA T 2.2650e-003 2.5210e-003 r 4 tblVehicleEF • LDA T 4.9300e-004 4.5800e-004 r 4 tblVehicleEF • LDA T 0.07 0.15 r 4 tblVehicleEF • LDA T 0.09 0.10 r 4 tblVehicleEF • LDA T 0.05 0.10 r 4 tblVehicleEF • LDA T 0.01 8.9550e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.14 r 4 tblVehicleEF • LDA T 2.5020e-003 1.3000e-003 r 4 tblVehicleEF • LDA T 3.0230e-003 0.04 r 4 tblVehicleEF • LDA T 0.40 0.46 r 4 tblVehicleEF • LDA T 0.77 1.98 r 4 tblVehicleEF • LDA T 202.67 222.22 r 4 tblVehicleEF • LDA T 48.28 48.61 r 4 tblVehicleEF • LDA T 0.03 0.02 tblVehicleEF • LDA • 0.04 0.14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 1.4700e-003 1.1830e-003 tblVehicleEF • LDA i 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.03 0.03 r tblVehicleEF • LDA T 0.08 0.08 r tblVehicleEF • LDA T 0.02 0.03 r 4 tblVehicleEF • LDA T 6.2740e-003 4.7180e-003 r tblVehicleEF • LDA T 0.04 0.21 r tblVehicleEF • LDA T 0.04 0.16 r 4 tblVehicleEF • LDA T 2.0280e-003 2.1160e-003 r 4 tblVehicleEF • LDA T 4.9500e-004 4.6300e-004 r 4 tblVehicleEF • LDA T 0.03 0.03 r 4 tblVehicleEF • LDA T 0.08 0.08 r 4 tblVehicleEF • LDA T 0.02 0.03 r 4 tblVehicleEF • LDA T 9.1250e-003 6.8680e-003 r 4 tblVehicleEF • LDA T 0.04 0.21 r 4 tblVehicleEF • LDA T 0.04 0.17 r 4 tblVehicleEF • LDT1 T 6.7140e-003 4.6930e-003 r 4 tblVehicleEF • LDT1 T 9.6900e-003 0.05 r 4 tblVehicleEF • LDT1 T 0.90 1.10 r 4 tblVehicleEF • LDT1 T 1.99 1.90 r 4 tblVehicleEF • LDT1 T 265.91 296.80 r 4 tblVehicleEF • LDT1 T 62.08 59.06 r 4 tblVehicleEF • LDT1 T 0.08 0.08 r 4 tblVehicleEF • LDT1 T 0.12 0.19 tblVehicleEF • LDT1 • 2.0200e-003 1.6850e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT1 • 2.9840e-003 2.0130e-003 tblVehicleEF • LDT1 i 1.8590e-003 1.5500e-003 r tblVehicleEF • LDT1 T 2.7440e-003 1.8510e-003 r tblVehicleEF • LDT1 T 0.15 0.19 r tblVehicleEF • LDT1 T 0.24 0.18 r tblVehicleEF • LDT1 T 0.10 0.13 r tblVehicleEF • LDT1 T 0.02 0.02 r 4 tblVehicleEF • LDT1 T 0.15 0.55 r tblVehicleEF • LDT1 T 0.13 0.23 r tblVehicleEF • LDT1 T 2.6690e-003 2.8260e-003 r 4 tblVehicleEF • LDT1 T 6.5500e-004 5.6200e-004 r 4 tblVehicleEF • LDT1 T 0.15 0.19 r 4 tblVehicleEF • LDT1 T 0.24 0.18 r 4 tblVehicleEF • LDT1 T 0.10 0.13 r 4 tblVehicleEF • LDT1 T 0.02 0.03 r 4 tblVehicleEF • LDT1 T 0.15 0.55 r 4 tblVehicleEF • LDT1 T 0.14 0.25 r 4 tblVehicleEF • LDT1 T 7.5770e-003 5.4420e-003 r 4 tblVehicleEF • LDT1 T 8.4040e-003 0.04 r 4 tblVehicleEF • LDT1 T 1.09 1.42 r 4 tblVehicleEF • LDT1 T 1.75 1.96 r 4 tblVehicleEF • LDT1 T 289.00 324.57 r 4 tblVehicleEF • LDT1 T 62.08 59.09 r 4 tblVehicleEF • LDT1 T 0.08 0.08 r 4 tblVehicleEF • LDT1 T 0.11 0.20 r 4 tblVehicleEF • LDT1 T 2.0200e-003 1.6850e-003 tblVehicleEF • LDT1 • 2.9840e-003 2.0130e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LDT1 • 1.8590e-003 1.5500e-003 tblVehicleEF • LDT1 r 2.7440e-003 1.8510e-003 I- 4 tblVehicleEF • LDT1 r 0.29 0.38 I- 4 tblVehicleEF • LDT1 r 0.29 0.23 I- 4 tblVehicleEF • LDT1 r 0.19 0.24 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.15 0.58 I- 4 tblVehicleEF • LDT1 r 0.11 0.21 I- 4 tblVehicleEF • LDT1 r 2.9030e-003 3.0900e-003 I- 4 tblVehicleEF • LDT1 r 6.5100e-004 5.6300e-004 I- 4 tblVehicleEF • LDT1 r 0.29 0.38 I- 4 tblVehicleEF • LDT1 r 0.29 0.23 I- 4 tblVehicleEF • LDT1 r 0.19 0.24 I- 4 tblVehicleEF • LDT1 r 0.03 0.03 I- 4 tblVehicleEF • LDT1 r 0.15 0.58 I- 4 tblVehicleEF • LDT1 r 0.12 0.23 I- 4 tblVehicleEF • LDT1 r 6.4660e-003 4.2130e-003 I- 4 tblVehicleEF • LDT1 r 9.9350e-003 0.06 I- 4 tblVehicleEF • LDT1 r 0.85 0.93 I- 4 tblVehicleEF • LDT1 r 2.03 2.21 I- 4 tblVehicleEF • LDT1 r 258.94 278.68 I- 4 tblVehicleEF • LDT1 r 62.08 59.69 I- 4 tblVehicleEF • LDT1 r 0.08 0.08 I- 4 tblVehicleEF • LDT1 r 0.12 0.20 I- 4 tblVehicleEF • LDT1 r 2.0200e-003 1.6850e-003 I- 4 tblVehicleEF • LDT1 r 2.9840e-003 2.0130e-003 tblVehicleEF • LDT1 • 1.8590e-003 1.5500e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LDT1 • 2.7440e-003 1.8510e-003 tblVehicleEF • LDT1 r 0.12 0.07 I- 4 tblVehicleEF • LDT1 r 0.26 0.16 I- 4 tblVehicleEF • LDT1 r 0.09 0.06 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.17 0.62 I- 4 tblVehicleEF • LDT1 r 0.13 0.26 I- 4 tblVehicleEF • LDT1 r 2.5990e-003 2.6530e-003 I- 4 tblVehicleEF • LDT1 r 6.5600e-004 5.6800e-004 I- 4 tblVehicleEF • LDT1 r 0.12 0.07 I- 4 tblVehicleEF • LDT1 r 0.26 0.16 I- 4 tblVehicleEF • LDT1 r 0.09 0.06 I- 4 tblVehicleEF • LDT1 r 0.02 0.03 I- 4 tblVehicleEF • LDT1 r 0.17 0.62 I- 4 tblVehicleEF • LDT1 r 0.15 0.29 I- 4 tblVehicleEF • LDT2 r 3.8050e-003 3.0020e-003 I- 4 tblVehicleEF • LDT2 r 4.1980e-003 0.05 I- 4 tblVehicleEF • LDT2 r 0.59 0.81 I- 4 tblVehicleEF • LDT2 r 1.02 2.20 I- 4 tblVehicleEF • LDT2 r 296.34 306.27 I- 4 tblVehicleEF • LDT2 r 68.35 61.33 I- 4 tblVehicleEF • LDT2 r 0.05 0.05 I- 4 tblVehicleEF • LDT2 r 0.07 0.19 I- 4 tblVehicleEF • LDT2 r 1.6040e-003 1.3260e-003 I- 4 tblVehicleEF • LDT2 r 2.4020e-003 1.6380e-003 I- 4 tblVehicleEF • LDT2 r 1.4750e-003 1.2200e-003 tblVehicleEF • LDT2 • 2.2080e-003 1.5060e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.06 0.12 tblVehicleEF • LDT2 i 0.09 0.11 r tblVehicleEF • LDT2 T 0.05 0.10 r tblVehicleEF • LDT2 T 9.4380e-003 0.01 r tblVehicleEF • LDT2 T 0.06 0.37 r tblVehicleEF • LDT2 T 0.06 0.20 r tblVehicleEF • LDT2 T 2.9670e-003 2.9160e-003 r 4 tblVehicleEF • LDT2 T 7.0000e-004 5.8400e-004 r tblVehicleEF • LDT2 T 0.06 0.12 r tblVehicleEF • LDT2 T 0.09 0.11 r 4 tblVehicleEF • LDT2 T 0.05 0.10 r 4 tblVehicleEF • LDT2 T 0.01 0.02 r 4 tblVehicleEF • LDT2 T 0.06 0.37 r 4 tblVehicleEF • LDT2 T 0.06 0.22 r 4 tblVehicleEF • LDT2 T 4.3090e-003 3.4980e-003 r 4 tblVehicleEF • LDT2 T 3.6500e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.72 1.06 r 4 tblVehicleEF • LDT2 T 0.91 2.26 r 4 tblVehicleEF • LDT2 T 322.41 332.25 r 4 tblVehicleEF • LDT2 T 68.35 61.36 r 4 tblVehicleEF • LDT2 T 0.05 0.06 r 4 tblVehicleEF • LDT2 T 0.07 0.21 r 4 tblVehicleEF • LDT2 T 1.6040e-003 1.3260e-003 r 4 tblVehicleEF • LDT2 T 2.4020e-003 1.6380e-003 r 4 tblVehicleEF • LDT2 T 1.4750e-003 1.2200e-003 r 4 tblVehicleEF • LDT2 T 2.2080e-003 1.5060e-003 tblVehicleEF • LDT2 • 0.11 0.25 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.10 0.14 tblVehicleEF • LDT2 i 0.08 0.18 r tblVehicleEF • LDT2 T 0.01 0.01 r tblVehicleEF • LDT2 T 0.06 0.39 r tblVehicleEF • LDT2 T 0.05 0.19 r tblVehicleEF • LDT2 T 3.2300e-003 3.1630e-003 r tblVehicleEF • LDT2 T 6.9800e-004 5.8400e-004 r 4 tblVehicleEF • LDT2 T 0.11 0.25 r tblVehicleEF • LDT2 T 0.10 0.14 r tblVehicleEF • LDT2 T 0.08 0.18 r 4 tblVehicleEF • LDT2 T 0.02 0.02 r 4 tblVehicleEF • LDT2 T 0.06 0.39 r 4 tblVehicleEF • LDT2 T 0.05 0.21 r 4 tblVehicleEF • LDT2 T 3.6580e-003 2.6800e-003 r 4 tblVehicleEF • LDT2 T 4.3280e-003 0.05 r 4 tblVehicleEF • LDT2 T 0.55 0.68 r 4 tblVehicleEF • LDT2 T 1.05 2.56 r 4 tblVehicleEF • LDT2 T 288.45 289.30 r 4 tblVehicleEF • LDT2 T 68.35 62.03 r 4 tblVehicleEF • LDT2 T 0.05 0.06 r 4 tblVehicleEF • LDT2 T 0.07 0.21 r 4 tblVehicleEF • LDT2 T 1.6040e-003 1.3260e-003 r 4 tblVehicleEF • LDT2 T 2.4020e-003 1.6380e-003 r 4 tblVehicleEF • LDT2 T 1.4750e-003 1.2200e-003 r 4 tblVehicleEF • LDT2 T 2.2080e-003 1.5060e-003 r 4 tblVehicleEF • LDT2 T 0.04 0.05 tblVehicleEF • LDT2 • 0.09 0.10 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.04 0.05 tblVehicleEF • LDT2 i 9.0750e-003 0.01 r tblVehicleEF • LDT2 T 0.07 0.41 r tblVehicleEF • LDT2 T 0.06 0.23 r tblVehicleEF • LDT2 T 2.8880e-003 2.7540e-003 r tblVehicleEF • LDT2 T 7.0100e-004 5.9100e-004 r tblVehicleEF • LDT2 T 0.04 0.05 r 4 tblVehicleEF • LDT2 T 0.09 0.10 r tblVehicleEF • LDT2 T 0.04 0.05 r tblVehicleEF • LDT2 T 0.01 0.02 r 4 tblVehicleEF • LDT2 T 0.07 0.42 r 4 tblVehicleEF • LDT2 T 0.06 0.26 r 4 tblVehicleEF • LHD1 T 4.4680e-003 4.6210e-003 r 4 tblVehicleEF • LHD1 T 6.2590e-003 2.7820e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r 4 tblVehicleEF • LHD1 T 0.14 0.18 r 4 tblVehicleEF • LHD1 T 0.61 0.35 r 4 tblVehicleEF • LHD1 T 1.83 0.86 r 4 tblVehicleEF • LHD1 T 9.20 8.76 r 4 tblVehicleEF • LHD1 T 578.27 599.19 r 4 tblVehicleEF • LHD1 T 27.68 10.43 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 1.46 0.63 r 4 tblVehicleEF • LHD1 T 0.82 0.26 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9050e-003 tblVehicleEF • LHD1 • 0.01 6.2850e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 6.9300e-004 2.0300e-004 tblVehicleEF • LHD1 i 9.0000e-004 8.7500e-004 r tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r tblVehicleEF • LHD1 T 0.01 5.9930e-003 r tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r tblVehicleEF • LHD1 T 3.3330e-003 3.3930e-003 r tblVehicleEF • LHD1 T 0.09 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r tblVehicleEF • LHD1 T 1.7170e-003 1.6200e-003 r tblVehicleEF • LHD1 T 0.06 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.19 0.05 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r 4 tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1100e-004 1.0300e-004 r 4 tblVehicleEF • LHD1 T 3.3330e-003 3.3930e-003 r 4 tblVehicleEF • LHD1 T 0.09 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.03 r 4 tblVehicleEF • LHD1 T 1.7170e-003 1.6200e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.04 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.21 0.06 r 4 tblVehicleEF • LHD1 T 4.4680e-003 4.6280e-003 r 4 tblVehicleEF • LHD1 T 6.3560e-003 2.8130e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r 4 tblVehicleEF • LHD1 T 0.14 0.18 tblVehicleEF • LHD1 • 0.62 0.36 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 1.74 0.84 tblVehicleEF • LHD1 i 9.20 8.76 r tblVehicleEF • LHD1 T 578.27 599.20 r tblVehicleEF • LHD1 T 27.68 10.38 r tblVehicleEF • LHD1 T 0.08 0.06 r tblVehicleEF • LHD1 T 1.38 0.59 r tblVehicleEF • LHD1 T 0.79 0.25 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r tblVehicleEF • LHD1 T 0.01 9.9050e-003 r tblVehicleEF • LHD1 T 0.01 6.2850e-003 r 4 tblVehicleEF • LHD1 T 6.9300e-004 2.0300e-004 r 4 tblVehicleEF • LHD1 T 9.0000e-004 8.7500e-004 r 4 tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r 4 tblVehicleEF • LHD1 T 0.01 5.9930e-003 r 4 tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r 4 tblVehicleEF • LHD1 T 6.2030e-003 6.7860e-003 r 4 tblVehicleEF • LHD1 T 0.11 0.08 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 3.1990e-003 3.0010e-003 r 4 tblVehicleEF • LHD1 T 0.06 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.38 r 4 tblVehicleEF • LHD1 T 0.18 0.05 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r 4 tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1000e-004 1.0300e-004 r 4 tblVehicleEF • LHD1 T 6.2030e-003 6.7860e-003 tblVehicleEF • LHD1 • 0.11 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 0.02 0.03 tblVehicleEF • LHD1 i 3.1990e-003 3.0010e-003 r tblVehicleEF • LHD1 T 0.07 0.04 r tblVehicleEF • LHD1 T 0.30 0.38 r tblVehicleEF • LHD1 T 0.20 0.06 r tblVehicleEF • LHD1 T 4.4680e-003 4.6070e-003 r tblVehicleEF • LHD1 T 6.2530e-003 2.7340e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r tblVehicleEF • LHD1 T 0.14 0.18 r tblVehicleEF • LHD1 T 0.61 0.35 r 4 tblVehicleEF • LHD1 T 1.83 0.91 r 4 tblVehicleEF • LHD1 T 9.20 8.76 r 4 tblVehicleEF • LHD1 T 578.27 599.18 r 4 tblVehicleEF • LHD1 T 27.68 10.51 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 1.44 0.64 r 4 tblVehicleEF • LHD1 T 0.81 0.27 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9050e-003 r 4 tblVehicleEF • LHD1 T 0.01 6.2850e-003 r 4 tblVehicleEF • LHD1 T 6.9300e-004 2.0300e-004 r 4 tblVehicleEF • LHD1 T 9.0000e-004 8.7500e-004 r 4 tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r 4 tblVehicleEF • LHD1 T 0.01 5.9930e-003 r 4 tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r 4 tblVehicleEF • LHD1 T 2.8770e-003 1.4580e-003 tblVehicleEF • LHD1 • 0.10 0.06 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 0.02 0.02 tblVehicleEF • LHD1 i 1.5600e-003 8.3600e-004 r tblVehicleEF • LHD1 T 0.06 0.03 r tblVehicleEF • LHD1 T 0.32 0.39 r tblVehicleEF • LHD1 T 0.19 0.05 r tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1100e-004 1.0400e-004 r tblVehicleEF • LHD1 T 2.8770e-003 1.4580e-003 r tblVehicleEF • LHD1 T 0.10 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.03 r 4 tblVehicleEF • LHD1 T 1.5600e-003 8.3600e-004 r 4 tblVehicleEF • LHD1 T 0.07 0.04 r 4 tblVehicleEF • LHD1 T 0.32 0.39 r 4 tblVehicleEF • LHD1 T 0.21 0.06 r 4 tblVehicleEF • LHD2 T 2.9220e-003 3.5280e-003 r 4 tblVehicleEF • LHD2 T 2.5090e-003 2.5650e-003 r 4 tblVehicleEF • LHD2 T 4.8920e-003 8.8440e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.15 r 4 tblVehicleEF • LHD2 T 0.28 0.32 r 4 tblVehicleEF • LHD2 T 0.91 0.61 r 4 tblVehicleEF • LHD2 T 14.09 13.34 r 4 tblVehicleEF • LHD2 T 578.63 615.62 r 4 tblVehicleEF • LHD2 T 22.17 8.61 r 4 tblVehicleEF • LHD2 T 0.09 0.08 r 4 tblVehicleEF • LHD2 T 0.77 0.85 tblVehicleEF • LHD2 • 0.37 0.21 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 1.1940e-003 1.2960e-003 tblVehicleEF • LHD2 i 0.01 0.01 r tblVehicleEF • LHD2 T 9.0990e-003 0.01 r tblVehicleEF • LHD2 T 3.4300e-004 1.2200e-004 r tblVehicleEF • LHD2 T 1.1420e-003 1.2400e-003 r tblVehicleEF • LHD2 T 2.7080e-003 2.6540e-003 r tblVehicleEF • LHD2 T 8.6950e-003 9.6200e-003 r 4 tblVehicleEF • LHD2 T 3.1500e-004 1.1200e-004 r tblVehicleEF • LHD2 T 1.0830e-003 2.5280e-003 r tblVehicleEF • LHD2 T 0.03 0.05 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 6.0400e-004 1.2670e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.04 r 4 tblVehicleEF • LHD2 T 0.06 0.25 r 4 tblVehicleEF • LHD2 T 0.07 0.04 r 4 tblVehicleEF • LHD2 T 1.3700e-004 1.2800e-004 r 4 tblVehicleEF • LHD2 T 5.6220e-003 5.9530e-003 r 4 tblVehicleEF • LHD2 T 2.3800e-004 8.5000e-005 r 4 tblVehicleEF • LHD2 T 1.0830e-003 2.5280e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.05 r 4 tblVehicleEF • LHD2 T 0.02 0.02 r 4 tblVehicleEF • LHD2 T 6.0400e-004 1.2670e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.05 r 4 tblVehicleEF • LHD2 T 0.06 0.25 r 4 tblVehicleEF • LHD2 T 0.07 0.05 r 4 tblVehicleEF • LHD2 T 2.9220e-003 3.5330e-003 tblVehicleEF • LHD2 • 2.5300e-003 2.5810e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 4.7440e-003 8.6420e-003 tblVehicleEF • LHD2 i 0.12 0.15 r tblVehicleEF • LHD2 T 0.28 0.32 r tblVehicleEF • LHD2 T 0.87 0.59 r tblVehicleEF • LHD2 T 14.09 13.34 r tblVehicleEF • LHD2 T 578.63 615.63 r tblVehicleEF • LHD2 T 22.17 8.58 r 4 tblVehicleEF • LHD2 T 0.09 0.08 r tblVehicleEF • LHD2 T 0.73 0.80 r tblVehicleEF • LHD2 T 0.36 0.21 r 4 tblVehicleEF • LHD2 T 1.1940e-003 1.2960e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 9.0990e-003 0.01 r 4 tblVehicleEF • LHD2 T 3.4300e-004 1.2200e-004 r 4 tblVehicleEF • LHD2 T 1.1420e-003 1.2400e-003 r 4 tblVehicleEF • LHD2 T 2.7080e-003 2.6540e-003 r 4 tblVehicleEF • LHD2 T 8.6950e-003 9.6200e-003 r 4 tblVehicleEF • LHD2 T 3.1500e-004 1.1200e-004 r 4 tblVehicleEF • LHD2 T 2.0360e-003 5.0590e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.06 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 1.1130e-003 2.3110e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.04 r 4 tblVehicleEF • LHD2 T 0.06 0.26 r 4 tblVehicleEF • LHD2 T 0.06 0.04 r 4 tblVehicleEF • LHD2 T 1.3700e-004 1.2800e-004 tblVehicleEF • LHD2 • 5.6220e-003 5.9530e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 2.3700e-004 8.5000e-005 tblVehicleEF • LHD2 r 2.0360e-003 5.0590e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.06 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 1.1130e-003 2.3110e-003 I- 4 tblVehicleEF • LHD2 r 0.04 0.05 I- 4 tblVehicleEF • LHD2 r 0.06 0.26 I- 4 tblVehicleEF • LHD2 r 0.07 0.05 I- 4 tblVehicleEF • LHD2 r 2.9220e-003 3.5170e-003 I- 4 tblVehicleEF • LHD2 r 2.5060e-003 2.5390e-003 I- 4 tblVehicleEF • LHD2 r 4.9180e-003 9.2210e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.15 I- 4 tblVehicleEF • LHD2 r 0.28 0.32 I- 4 tblVehicleEF • LHD2 r 0.92 0.64 I- 4 tblVehicleEF • LHD2 r 14.09 13.34 I- 4 tblVehicleEF • LHD2 r 578.63 615.62 I- 4 tblVehicleEF • LHD2 r 22.17 8.67 I- 4 tblVehicleEF • LHD2 r 0.09 0.08 I- 4 tblVehicleEF • LHD2 r 0.76 0.86 I- 4 tblVehicleEF • LHD2 r 0.37 0.22 I- 4 tblVehicleEF • LHD2 r 1.1940e-003 1.2960e-003 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 9.0990e-003 0.01 I- 4 tblVehicleEF • LHD2 r 3.4300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 1.1420e-003 1.2400e-003 I- 4 tblVehicleEF • LHD2 r 2.7080e-003 2.6540e-003 tblVehicleEF • LHD2 • 8.6950e-003 9.6200e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LHD2 • 3.1500e-004 1.1200e-004 tblVehicleEF • LHD2 r 8.3200e-004 1.0630e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.05 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 5.1600e-004 6.6000e-004 I- 4 tblVehicleEF • LHD2 r 0.04 0.04 I- 4 tblVehicleEF • LHD2 r 0.06 0.27 I- 4 tblVehicleEF • LHD2 r 0.07 0.04 I- 4 tblVehicleEF • LHD2 r 1.3700e-004 1.2800e-004 I- 4 tblVehicleEF • LHD2 r 5.6220e-003 5.9530e-003 I- 4 tblVehicleEF • LHD2 r 2.3800e-004 8.6000e-005 I- 4 tblVehicleEF • LHD2 r 8.3200e-004 1.0630e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.05 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 5.1600e-004 6.6000e-004 I- 4 tblVehicleEF • LHD2 r 0.04 0.05 I- 4 tblVehicleEF • LHD2 r 0.06 0.27 I- 4 tblVehicleEF • LHD2 r 0.07 0.05 I- 4 tblVehicleEF • MCY r 0.44 0.33 I- 4 tblVehicleEF • MCY r 0.15 0.23 I- 4 tblVehicleEF • MCY r 18.06 18.12 I- 4 tblVehicleEF • MCY r 9.75 8.38 I- 4 tblVehicleEF • MCY r 168.56 209.59 I- 4 tblVehicleEF • MCY r 44.20 58.03 I- 4 tblVehicleEF • MCY r 1.11 1.10 I- 4 tblVehicleEF • MCY r 0.31 0.26 tblVehicleEF • MCY • 1.9930e-003 2.1060e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 3.2040e-003 2.8580e-003 tblVehicleEF • MCY i 1.8600e-003 1.9650e-003 r tblVehicleEF • MCY T 3.0040e-003 2.6780e-003 r tblVehicleEF • MCY T 1.68 2.46 r tblVehicleEF • MCY T 0.80 0.96 r tblVehicleEF • MCY T 0.90 1.35 r tblVehicleEF • MCY T 2.09 2.15 r 4 tblVehicleEF • MCY T 0.51 1.63 r tblVehicleEF • MCY T 2.02 1.70 r tblVehicleEF • MCY T 2.0420e-003 2.0740e-003 r 4 tblVehicleEF • MCY T 6.6100e-004 5.7400e-004 r 4 tblVehicleEF • MCY T 1.68 2.46 r 4 tblVehicleEF • MCY T 0.80 0.96 r 4 tblVehicleEF • MCY T 0.90 1.35 r 4 tblVehicleEF • MCY T 2.61 2.69 r 4 tblVehicleEF • MCY T 0.51 1.63 r 4 tblVehicleEF • MCY T 2.20 1.85 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.13 0.22 r 4 tblVehicleEF • MCY T 18.75 20.01 r 4 tblVehicleEF • MCY T 9.09 8.32 r 4 tblVehicleEF • MCY T 168.56 212.69 r 4 tblVehicleEF • MCY T 44.20 57.67 r 4 tblVehicleEF • MCY T 0.97 0.97 r 4 tblVehicleEF • MCY T 0.29 0.25 r 4 tblVehicleEF • MCY T 1.9930e-003 2.1060e-003 tblVehicleEF • MCY • 3.2040e-003 2.8580e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 1.8600e-003 1.9650e-003 tblVehicleEF • MCY i 3.0040e-003 2.6780e-003 r tblVehicleEF • MCY T 3.34 5.06 r tblVehicleEF • MCY T 1.20 1.67 r tblVehicleEF • MCY T 2.06 3.05 r tblVehicleEF • MCY T 2.08 2.19 r tblVehicleEF • MCY T 0.51 1.72 r 4 tblVehicleEF • MCY T 1.82 1.62 r tblVehicleEF • MCY T 2.0530e-003 2.1050e-003 r tblVehicleEF • MCY T 6.4400e-004 5.7100e-004 r 4 tblVehicleEF • MCY T 3.34 5.06 r 4 tblVehicleEF • MCY T 1.20 1.67 r 4 tblVehicleEF • MCY T 2.06 3.05 r 4 tblVehicleEF • MCY T 2.60 2.73 r 4 tblVehicleEF • MCY T 0.51 1.72 r 4 tblVehicleEF • MCY T 1.98 1.77 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.15 0.26 r 4 tblVehicleEF • MCY T 17.65 18.20 r 4 tblVehicleEF • MCY T 9.75 9.26 r 4 tblVehicleEF • MCY T 168.56 209.86 r 4 tblVehicleEF • MCY T 44.20 60.20 r 4 tblVehicleEF • MCY T 1.11 1.18 r 4 tblVehicleEF • MCY T 0.31 0.27 r 4 tblVehicleEF • MCY T 1.9930e-003 2.1060e-003 r 4 tblVehicleEF • MCY T 3.2040e-003 2.8580e-003 tblVehicleEF • MCY • 1.8600e-003 1.9650e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 3.0040e-003 2.6780e-003 tblVehicleEF • MCY i 1.57 1.02 r tblVehicleEF • MCY T 0.98 0.76 r tblVehicleEF • MCY T 0.71 0.41 r tblVehicleEF • MCY T 2.09 2.20 r tblVehicleEF • MCY T 0.58 1.82 r tblVehicleEF • MCY T 2.03 1.93 r 4 tblVehicleEF • MCY T 2.0360e-003 2.0770e-003 r tblVehicleEF • MCY T 6.6100e-004 5.9600e-004 r tblVehicleEF • MCY T 1.57 1.02 r 4 tblVehicleEF • MCY T 0.98 0.76 r 4 tblVehicleEF • MCY T 0.71 0.41 r 4 tblVehicleEF • MCY T 2.60 2.74 r 4 tblVehicleEF • MCY T 0.58 1.82 r 4 tblVehicleEF • MCY T 2.21 2.10 r 4 tblVehicleEF • MDV T 7.4730e-003 3.4060e-003 r 4 tblVehicleEF • MDV T 0.01 0.06 r 4 tblVehicleEF • MDV T 0.92 0.85 r 4 tblVehicleEF • MDV T 2.00 2.41 r 4 tblVehicleEF • MDV T 413.91 375.65 r 4 tblVehicleEF • MDV T 94.54 75.79 r 4 tblVehicleEF • MDV T 0.10 0.06 r 4 tblVehicleEF • MDV T 0.18 0.24 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 tblVehicleEF • MDV • 2.1540e-003 1.5090e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MDV • 0.10 0.16 tblVehicleEF • MDV i 0.17 0.14 r tblVehicleEF • MDV T 0.09 0.13 r tblVehicleEF • MDV T 0.02 0.01 r tblVehicleEF • MDV T 0.10 0.42 r tblVehicleEF • MDV T 0.14 0.25 r tblVehicleEF • MDV T 4.1430e-003 3.5760e-003 r 4 tblVehicleEF • MDV T 9.8000e-004 7.2200e-004 r tblVehicleEF • MDV T 0.10 0.16 r tblVehicleEF • MDV T 0.17 0.14 r 4 tblVehicleEF • MDV T 0.09 0.13 r 4 tblVehicleEF • MDV T 0.03 0.02 r 4 tblVehicleEF • MDV T 0.10 0.42 r 4 tblVehicleEF • MDV T 0.16 0.28 r 4 tblVehicleEF • MDV T 8.4690e-003 3.9840e-003 r 4 tblVehicleEF • MDV T 9.1600e-003 0.05 r 4 tblVehicleEF • MDV T 1.13 1.10 r 4 tblVehicleEF • MDV T 1.76 2.46 r 4 tblVehicleEF • MDV T 449.29 402.44 r 4 tblVehicleEF • MDV T 94.54 75.82 r 4 tblVehicleEF • MDV T 0.09 0.06 r 4 tblVehicleEF • MDV T 0.17 0.25 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 r 4 tblVehicleEF • MDV T 2.1540e-003 1.5090e-003 tblVehicleEF • MDV • 0.19 0.32 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MDV • 0.19 0.17 tblVehicleEF • MDV i 0.16 0.23 r tblVehicleEF • MDV T 0.02 0.02 r tblVehicleEF • MDV T 0.10 0.44 r tblVehicleEF • MDV T 0.12 0.24 r tblVehicleEF • MDV T 4.5000e-003 3.8310e-003 r tblVehicleEF • MDV T 9.7500e-004 7.2200e-004 r 4 tblVehicleEF • MDV T 0.19 0.32 r tblVehicleEF • MDV T 0.19 0.18 r tblVehicleEF • MDV T 0.16 0.23 r 4 tblVehicleEF • MDV T 0.03 0.02 r 4 tblVehicleEF • MDV T 0.10 0.44 r 4 tblVehicleEF • MDV T 0.14 0.26 r 4 tblVehicleEF • MDV T 7.1840e-003 3.0350e-003 r 4 tblVehicleEF • MDV T 0.01 0.06 r 4 tblVehicleEF • MDV T 0.86 0.72 r 4 tblVehicleEF • MDV T 2.04 2.81 r 4 tblVehicleEF • MDV T 403.16 358.17 r 4 tblVehicleEF • MDV T 94.54 76.58 r 4 tblVehicleEF • MDV T 0.10 0.06 r 4 tblVehicleEF • MDV T 0.18 0.25 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 r 4 tblVehicleEF • MDV T 2.1540e-003 1.5090e-003 r 4 tblVehicleEF • MDV T 0.08 0.06 tblVehicleEF • MDV • 0.18 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MDV • 0.07 0.06 • MDV r 0.02 0.01 • I- 4 • MDV r 0.12 0.47 I- 4 • MDV r 0.15 0.29 I- 4 • MDV r 4.0350e-003 3.4090e-003 I- 4 • MDV r 9.8100e-004 7.2900e-004 I- 4 • MDVr 0.08 0.06 I- 4 • MDV r 0.18 0.13 I- 4 • MDVr 0.07 0.06 • I- 4 • MDV r 0.03 0.02 I- 4 • MDVr 0.12 0.47 • I- 4 • MDV r 0.16 0.32 I- 4 • MH r 0.02 2.8780e-003 I- 4 MH• r 0.02 0.00 I- 4 MH• r 1.38 0.28 I- 4 • M Hr 4.62 0.00 I- 4 • MH r 990.51 903.23 I- 4 • M Hr 56.68 0.00 • I- 4 MH• r 1.21 3.53 I- 4 MH• r 0.73 0.00 I- 4 MH• r 0.01 0.02 I- 4 MH• r 0.03 0.11 I- 4 • MHr 9.0000e-004 0.00 I- 4 • MH r 3.2420e-003 4.0000e-003 I- 4 • MHr 0.03 0.11 • I- 4 • MH r 8.2800e-004 0.00 • MH • 1.20 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 0.07 0.00 tblVehicleEF • MH i 0.44 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.27 0.00 r tblVehicleEF • MH T 9.8110e-003 8.5390e-003 r tblVehicleEF • MH T 6.4700e-004 0.00 r 4 tblVehicleEF • MH T 1.20 0.00 r tblVehicleEF • MH T 0.07 0.00 r tblVehicleEF • MH T 0.44 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.30 0.00 r 4 tblVehicleEF • MH T 0.02 2.8780e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 1.42 0.28 r 4 tblVehicleEF • MH T 4.30 0.00 r 4 tblVehicleEF • MH T 990.51 903.23 r 4 tblVehicleEF • MH T 56.68 0.00 r 4 tblVehicleEF • MH T 1.13 3.33 r 4 tblVehicleEF • MH T 0.70 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.03 0.11 r 4 tblVehicleEF • MH T 9.0000e-004 0.00 r 4 tblVehicleEF • MH T 3.2420e-003 4.0000e-003 r 4 tblVehicleEF • MH T 0.03 0.11 tblVehicleEF • MH • 8.2800e-004 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 2.18 0.00 tblVehicleEF • MH i 0.08 0.00 r tblVehicleEF • MH T 0.83 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.26 0.00 r tblVehicleEF • MH T 9.8120e-003 8.5390e-003 r 4 tblVehicleEF • MH T 6.4200e-004 0.00 r tblVehicleEF • MH T 2.18 0.00 r tblVehicleEF • MH T 0.08 0.00 r 4 tblVehicleEF • MH T 0.83 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.29 0.00 r 4 tblVehicleEF • MH T 0.02 2.8780e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 1.38 0.28 r 4 tblVehicleEF • MH T 4.65 0.00 r 4 tblVehicleEF • MH T 990.51 903.23 r 4 tblVehicleEF • MH T 56.68 0.00 r 4 tblVehicleEF • MH T 1.20 3.58 r 4 tblVehicleEF • MH T 0.73 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.03 0.11 r 4 tblVehicleEF • MH T 9.0000e-004 0.00 r 4 tblVehicleEF • MH T 3.2420e-003 4.0000e-003 tblVehicleEF • MH • 0.03 0.11 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 8.2800e-004 0.00 tblVehicleEF • MH i 1.16 0.00 r tblVehicleEF • MH T 0.08 0.00 r tblVehicleEF • MH T 0.42 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.28 0.00 r 4 tblVehicleEF • MH T 9.8110e-003 8.5390e-003 r tblVehicleEF • MH T 6.4800e-004 0.00 r tblVehicleEF • MH T 1.16 0.00 r 4 tblVehicleEF • MH T 0.08 0.00 r 4 tblVehicleEF • MH T 0.42 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.30 0.00 r 4 tblVehicleEF • MHD T 0.02 4.7640e-003 r 4 tblVehicleEF • MHD T 1.9370e-003 1.8380e-003 r 4 tblVehicleEF • MHD T 0.04 0.01 r 4 tblVehicleEF • MHD T 0.31 0.43 r 4 tblVehicleEF • MHD T 0.17 0.22 r 4 tblVehicleEF • MHD T 4.06 1.30 r 4 tblVehicleEF • MHD T 149.43 68.75 r 4 tblVehicleEF • MHD T 1,051.15 975.21 r 4 tblVehicleEF • MHD T 52.99 11.84 r 4 tblVehicleEF • MHD T 0.40 0.36 r 4 tblVehicleEF • MHD T 0.44 0.84 tblVehicleEF • MHD • 11.47 1.55 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 8.9000e-005 2.4300e-004 tblVehicleEF • MHD i 2.6760e-003 8.7310e-003 r tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r tblVehicleEF • MHD T 8.5000e-005 2.3300e-004 r tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r tblVehicleEF • MHD T 1.2700e-003 1.2000e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 6.7900e-004 6.1000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.25 0.06 r 4 tblVehicleEF • MHD T 1.4360e-003 6.5300e-004 r 4 tblVehicleEF • MHD T 0.01 9.3540e-003 r 4 tblVehicleEF • MHD T 6.0100e-004 1.1700e-004 r 4 tblVehicleEF • MHD T 1.2700e-003 1.2000e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.7900e-004 6.1000e-004 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.27 0.07 r 4 tblVehicleEF • MHD T 0.01 4.5190e-003 r 4 tblVehicleEF • MHD T 1.9560e-003 1.8630e-003 r 4 tblVehicleEF • MHD T 0.04 0.01 tblVehicleEF • MHD • 0.23 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 0.17 0.23 tblVehicleEF • MHD i 3.88 1.26 r tblVehicleEF • MHD T 158.28 68.62 r tblVehicleEF • MHD T 1,051.15 975.21 r tblVehicleEF • MHD T 52.99 11.77 r tblVehicleEF • MHD T 0.41 0.35 r tblVehicleEF • MHD T 0.41 0.79 r 4 tblVehicleEF • MHD T 11.45 1.55 r tblVehicleEF • MHD T 7.5000e-005 2.0800e-004 r tblVehicleEF • MHD T 2.6760e-003 8.7310e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r 4 tblVehicleEF • MHD T 7.2000e-005 1.9900e-004 r 4 tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r 4 tblVehicleEF • MHD T 2.4430e-003 2.4030e-003 r 4 tblVehicleEF • MHD T 0.04 0.04 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.2730e-003 1.1260e-003 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.15 r 4 tblVehicleEF • MHD T 0.24 0.06 r 4 tblVehicleEF • MHD T 1.5200e-003 6.5200e-004 r 4 tblVehicleEF • MHD T 0.01 9.3540e-003 r 4 tblVehicleEF • MHD T 5.9800e-004 1.1700e-004 r 4 tblVehicleEF • MHD T 2.4430e-003 2.4030e-003 r 4 tblVehicleEF • MHD T 0.04 0.04 tblVehicleEF • MHD • 0.03 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 1.2730e-003 1.1260e-003 tblVehicleEF • MHD i 0.02 0.02 r tblVehicleEF • MHD T 0.02 0.15 r tblVehicleEF • MHD T 0.26 0.06 r tblVehicleEF • MHD T 0.02 5.1010e-003 r tblVehicleEF • MHD T 1.9210e-003 1.7950e-003 r tblVehicleEF • MHD T 0.04 0.01 r 4 tblVehicleEF • MHD T 0.43 0.53 r tblVehicleEF • MHD T 0.16 0.22 r tblVehicleEF • MHD T 4.12 1.38 r 4 tblVehicleEF • MHD T 137.20 68.93 r 4 tblVehicleEF • MHD T 1,051.15 975.20 r 4 tblVehicleEF • MHD T 52.99 11.97 r 4 tblVehicleEF • MHD T 0.38 0.37 r 4 tblVehicleEF • MHD T 0.43 0.85 r 4 tblVehicleEF • MHD T 11.47 1.56 r 4 tblVehicleEF • MHD T 1.0800e-004 2.9200e-004 r 4 tblVehicleEF • MHD T 2.6760e-003 8.7310e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r 4 tblVehicleEF • MHD T 1.0300e-004 2.7900e-004 r 4 tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r 4 tblVehicleEF • MHD T 8.8300e-004 5.0200e-004 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 5.2400e-004 3.1000e-004 tblVehicleEF • MHD • 0.02 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 0.02 0.15 tblVehicleEF • MHD i 0.25 0.06 r tblVehicleEF • MHD T 1.3210e-003 6.5500e-004 r tblVehicleEF • MHD T 0.01 9.3540e-003 r tblVehicleEF • MHD T 6.0200e-004 1.1800e-004 r tblVehicleEF • MHD T 8.8300e-004 5.0200e-004 r tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 5.2400e-004 3.1000e-004 r tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 0.02 0.15 r 4 tblVehicleEF • MHD T 0.28 0.07 r 4 tblVehicleEF • OBUS T 0.01 7.9360e-003 r 4 tblVehicleEF • OBUS T 3.9930e-003 2.9380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.57 r 4 tblVehicleEF • OBUS T 0.27 0.32 r 4 tblVehicleEF • OBUS T 4.82 1.66 r 4 tblVehicleEF • OBUS T 70.92 84.28 r 4 tblVehicleEF • OBUS T 1,082.83 1,209.92 r 4 tblVehicleEF • OBUS T 68.56 15.40 r 4 tblVehicleEF • OBUS T 0.14 0.35 r 4 tblVehicleEF • OBUS T 0.35 0.70 r 4 tblVehicleEF • OBUS T 2.00 1.00 r 4 tblVehicleEF • OBUS T 1.3000e-005 1.1400e-004 r 4 tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 tblVehicleEF • OBUS • 9.3200e-004 1.5600e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 1.2000e-005 1.0900e-004 tblVehicleEF • OBUS i 2.0160e-003 7.4440e-003 r tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r tblVehicleEF • OBUS T 1.9950e-003 2.3080e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.03 0.05 r tblVehicleEF • OBUS T 8.8300e-004 9.7200e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.30 0.08 r 4 tblVehicleEF • OBUS T 6.8900e-004 8.0100e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.7000e-004 1.5200e-004 r 4 tblVehicleEF • OBUS T 1.9950e-003 2.3080e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.8300e-004 9.7200e-004 r 4 tblVehicleEF • OBUS T 0.03 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.33 0.09 r 4 tblVehicleEF • OBUS T 0.01 8.0120e-003 r 4 tblVehicleEF • OBUS T 4.0630e-003 2.9830e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.56 r 4 tblVehicleEF • OBUS T 0.28 0.32 r 4 tblVehicleEF • OBUS T 4.51 1.59 tblVehicleEF • OBUS • 74.13 83.29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 1,082.83 1,209.93 tblVehicleEF • OBUS i 68.56 15.27 r tblVehicleEF • OBUS T 0.14 0.33 r tblVehicleEF • OBUS T 0.32 0.66 r tblVehicleEF • OBUS T 1.97 0.99 r tblVehicleEF • OBUS T 1.1000e-005 1.0200e-004 r tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 r 4 tblVehicleEF • OBUS T 9.3200e-004 1.5600e-004 r tblVehicleEF • OBUS T 1.0000e-005 9.7000e-005 r tblVehicleEF • OBUS T 2.0160e-003 7.4440e-003 r 4 tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 3.6940e-003 4.5380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6690e-003 1.7830e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • OBUS T 7.1900e-004 7.9200e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.6500e-004 1.5100e-004 r 4 tblVehicleEF • OBUS T 3.6940e-003 4.5380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 1.6690e-003 1.7830e-003 r 4 tblVehicleEF • OBUS T 0.03 0.02 tblVehicleEF • OBUS • 0.05 0.17 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.32 0.09 tblVehicleEF • OBUS i 0.01 7.8280e-003 r tblVehicleEF • OBUS T 3.9760e-003 2.8620e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.57 r tblVehicleEF • OBUS T 0.27 0.31 r tblVehicleEF • OBUS T 4.87 1.79 r 4 tblVehicleEF • OBUS T 66.48 85.65 r tblVehicleEF • OBUS T 1,082.83 1,209.91 r tblVehicleEF • OBUS T 68.56 15.62 r 4 tblVehicleEF • OBUS T 0.13 0.37 r 4 tblVehicleEF • OBUS T 0.34 0.72 r 4 tblVehicleEF • OBUS T 2.00 1.01 r 4 tblVehicleEF • OBUS T 1.5000e-005 1.3200e-004 r 4 tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 r 4 tblVehicleEF • OBUS T 9.3200e-004 1.5600e-004 r 4 tblVehicleEF • OBUS T 1.5000e-005 1.2600e-004 r 4 tblVehicleEF • OBUS T 2.0160e-003 7.4440e-003 r 4 tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 1.6700e-003 1.0190e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.04 r 4 tblVehicleEF • OBUS T 8.0300e-004 5.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.30 0.09 tblVehicleEF • OBUS • 6.4600e-004 8.1400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.01 0.01 tblVehicleEF • OBUS i 7.7100e-004 1.5500e-004 r tblVehicleEF • OBUS T 1.6700e-003 1.0190e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.04 0.06 r tblVehicleEF • OBUS T 8.0300e-004 5.2500e-004 r tblVehicleEF • OBUS T 0.03 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.33 0.09 r tblVehicleEF • SBUS T 0.80 0.06 r 4 tblVehicleEF • SBUS T 7.8570e-003 4.1910e-003 r 4 tblVehicleEF • SBUS T 0.06 4.5040e-003 r 4 tblVehicleEF • SBUS T 7.94 2.35 r 4 tblVehicleEF • SBUS T 0.49 0.28 r 4 tblVehicleEF • SBUS T 6.18 0.50 r 4 tblVehicleEF • SBUS T 1,101.78 339.03 r 4 tblVehicleEF • SBUS T 1,079.52 1,050.37 r 4 tblVehicleEF • SBUS T 56.53 3.78 r 4 tblVehicleEF • SBUS T 7.02 3.34 r 4 tblVehicleEF • SBUS T 3.01 4.00 r 4 tblVehicleEF • SBUS T 11.88 1.00 r 4 tblVehicleEF • SBUS T 5.4270e-003 3.3000e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r 4 tblVehicleEF • SBUS T 5.1930e-003 3.1570e-003 tblVehicleEF • SBUS • 2.6790e-003 2.6220e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 0.02 0.02 tblVehicleEF • SBUS i 5.4000e-004 3.5000e-005 r tblVehicleEF • SBUS i 5.8490e-003 1.4310e-003 r tblVehicleEF • SBUS i 0.04 6.2400e-003 r tblVehicleEF • SBUS i 0.93 0.26 r tblVehicleEF • SBUS i 2.8420e-003 6.1200e-004 r tblVehicleEF • SBUS i 0.09 0.07 r 4 tblVehicleEF • SBUS i 0.02 0.04 r tblVehicleEF • SBUS i 0.35 0.02 r tblVehicleEF • SBUS i 0.01 3.2280e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 6.7300e-004 3.7000e-005 r 4 tblVehicleEF • SBUS T 5.8490e-003 1.4310e-003 r 4 tblVehicleEF • SBUS T 0.04 6.2400e-003 r 4 tblVehicleEF • SBUS T 1.35 0.37 r 4 tblVehicleEF • SBUS T 2.8420e-003 6.1200e-004 r 4 tblVehicleEF • SBUS T 0.10 0.08 r 4 tblVehicleEF • SBUS T 0.02 0.04 r 4 tblVehicleEF • SBUS T 0.38 0.03 r 4 tblVehicleEF • SBUS T 0.80 0.06 r 4 tblVehicleEF • SBUS T 7.9670e-003 4.2130e-003 r 4 tblVehicleEF • SBUS T 0.05 3.9280e-003 r 4 tblVehicleEF • SBUS T 7.85 2.32 r 4 tblVehicleEF • SBUS T 0.50 0.28 r 4 tblVehicleEF • SBUS T 4.48 0.39 r 4 tblVehicleEF • SBUS T1,150.67 346.42 tblVehicleEF • SBUS • 1,079.52 1,050.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 56.53 3.59 tblVehicleEF • SBUS i 7.25 3.40 r tblVehicleEF • SBUS i 2.83 3.77 r tblVehicleEF • SBUS i 11.85 1.00 r tblVehicleEF • SBUS i 4.5750e-003 2.7900e-003 r tblVehicleEF • SBUS T 0.01 0.01 r tblVehicleEF • SBUS i 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r tblVehicleEF • SBUS T 4.3770e-003 2.6690e-003 r tblVehicleEF • SBUS T 2.6790e-003 2.6220e-003 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.4000e-004 3.5000e-005 r 4 tblVehicleEF • SBUS T 0.01 2.8080e-003 r 4 tblVehicleEF • SBUS T 0.04 6.9550e-003 r 4 tblVehicleEF • SBUS T 0.93 0.26 r 4 tblVehicleEF • SBUS T 5.1940e-003 1.1060e-003 r 4 tblVehicleEF • SBUS T 0.09 0.07 r 4 tblVehicleEF • SBUS T 0.02 0.04 r 4 tblVehicleEF • SBUS T 0.29 0.02 r 4 tblVehicleEF • SBUS T 0.01 3.2980e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 6.4400e-004 3.6000e-005 r 4 tblVehicleEF • SBUS T 0.01 2.8080e-003 r 4 tblVehicleEF • SBUS T 0.04 6.9550e-003 r 4 tblVehicleEF • SBUS T 1.35 0.37 r 4 tblVehicleEF • SBUS T 5.1940e-003 1.1060e-003 tblVehicleEF • SBUS • 0.10 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • SBUS • 0.02 0.04 • SBUS i 0.32 0.02 r • SBUS T 0.80 0.06 r • SBUS T 7.8240e-003 4.1550e-003 r • SBUS T 0.06 5.3140e-003 r • SBUS T 8.07 2.40 r • SBUS T 0.49 0.28 r 4 • SBUS T 6.53 0.66 r • SBUS T 1,034.26 328.83 r • SBUS T 1,079.52 1,050.37 r 4 • SBUS T 56.53 4.05 r 4 • SBUS T 6.71 3.24 r 4 • SBUS T 2.98 4.07 r 4 • SBUS T 11.89 1.01 r 4 • SBUS T 6.6040e-003 4.0040e-003 r 4 • SBUS T 0.01 0.01 r 4 • SBUS T 0.02 0.02 r 4 • SBUS T 5.8800e-004 3.8000e-005 r 4 • SBUS T 6.3180e-003 3.8310e-003 r 4 • SBUS T 2.6790e-003 2.6220e-003 r 4 • SBUS T 0.02 0.02 r 4 • SBUS T 5.4000e-004 3.5000e-005 r 4 • SBUS T 4.9510e-003 6.2500e-004 r 4 • SBUS T 0.04 6.0080e-003 r 4 • SBUS T 0.94 0.26 r 4 • SBUS T 2.7180e-003 3.3500e-004 • SBUS • 0.09 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .SBUS • 0.02 0.05 tblVehicleEF • SBUS r 0.36 0.03 I- 4 tblVehicleEF • SBUS r 0.01 3.1320e-003 I- 4 tblVehicleEF • SBUS r 0.01 0.01 I- 4 tblVehicleEF • SBUS r 6.7900e-004 4.0000e-005 I- 4 tblVehicleEF • SBUS r 4.9510e-003 6.2500e-004 I- 4 tblVehicleEF • SBUS r 0.04 6.0080e-003 I- 4 tblVehicleEF • SBUS r 1.36 0.37 I- 4 tblVehicleEF • SBUS r 2.7180e-003 3.3500e-004 I- 4 tblVehicleEF • SBUS r 0.10 0.08 I- 4 tblVehicleEF • SBUS r 0.02 0.05 I- 4 tblVehicleEF • SBUS r 0.40 0.03 I- 4 tblVehicleEF • UBUS r 1.18 4.36 I- 4 tblVehicleEF • UBUS r 0.07 0.00 I- 4 tblVehicleEF • UBUS r 6.51 34.12 I- 4 tblVehicleEF • UBUS r 12.06 0.00 I- 4 tblVehicleEF • UBUS 1,758.87 1,515.24 I- 4 tblVehicleEF • UBUS r 150.95 0.00 I- 4 tblVehicleEF • UBUS r 2.89 0.34 I- 4 tblVehicleEF • UBUS r 12.11 0.00 I- 4 tblVehicleEF • UBUS r 0.49 0.08 I- 4 tblVehicleEF • UBUS r 0.01 0.03 I- 4 tblVehicleEF • UBUS r 0.03 4.3040e-003 I- 4 tblVehicleEF • UBUS r 1.5480e-003 0.00 I- 4 tblVehicleEF • UBUS r 0.21 0.03 I- 4 tblVehicleEF • UBUS r 3.0000e-003 6.8250e-003 tblVehicleEF • UBUS • 0.03 4.1170e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • UBUS • 1.4230e-003 0.00 • UBUS i 7.9490e-003 0.00 r • UBUS T 0.09 0.00 r • UBUS T 4.1220e-003 0.00 r • UBUS T 0.31 0.07 r • UBUS T 0.02 0.00 r • UBUS T 0.99 0.00 r 4 • UBUS T 9.0980e-003 0.00 r • UBUS T 1.7290e-003 0.00 r • UBUS T 7.9490e-003 0.00 r 4 • UBUS T 0.09 0.00 r 4 • UBUS T 4.1220e-003 0.00 r 4 • UBUS T 1.51 4.46 r 4 • UBUS T 0.02 0.00 r 4 • UBUS T 1.09 0.00 r 4 • UBUS T 1.18 4.36 r 4 • UBUS T 0.07 0.00 r 4 • UBUS T 6.56 34.12 r • UBUS T 10.37 0.00 r • UBUS T 1,758.87 1,515.24 r • UBUS T 150.95 0.00 r 4 • UBUS T 2.69 0.34 r 4 • UBUS T 12.03 0.00 r 4 • UBUS T 0.49 0.08 r 4 • UBUS T 0.01 0.03 r 4 • UBUS T 0.03 4.3040e-003 • UBUS • 1.5480e-003 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 0.21 0.03 tblVehicleEF • UBUS i 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.03 4.1170e-003 r tblVehicleEF • UBUS T 1.4230e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r tblVehicleEF • UBUS T 0.11 0.00 r tblVehicleEF • UBUS T 8.1050e-003 0.00 r 4 tblVehicleEF • UBUS T 0.31 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.91 0.00 r 4 tblVehicleEF • UBUS T 9.0990e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6990e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.11 0.00 r 4 tblVehicleEF • UBUS T 8.1050e-003 0.00 r 4 tblVehicleEF • UBUS T 1.52 4.46 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.99 0.00 r 4 tblVehicleEF • UBUS T 1.18 4.36 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 6.50 34.12 r 4 tblVehicleEF • UBUS T 12.26 0.00 r 4 tblVehicleEF • UBUS T 1,758.87 1,515.24 r 4 tblVehicleEF • UBUS T 150.95 0.00 r 4 tblVehicleEF • UBUS T 2.86 0.34 r 4 tblVehicleEF • UBUS T 12.11 0.00 tblVehicleEF • UBUS • 0.49 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 0.01 0.03 tblVehicleEF • UBUS i 0.03 4.3040e-003 r tblVehicleEF • UBUS T 1.5480e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.03 4.1170e-003 r tblVehicleEF • UBUS T 1.4230e-003 0.00 r 4 tblVehicleEF • UBUS T 6.9620e-003 0.00 r tblVehicleEF • UBUS T 0.10 0.00 r tblVehicleEF • UBUS T 3.7030e-003 0.00 r 4 tblVehicleEF • UBUS T 0.31 0.07 r 4 tblVehicleEF • UBUS T 0.03 0.00 r 4 tblVehicleEF • UBUS T 1.00 0.00 r 4 tblVehicleEF • UBUS T 9.0980e-003 0.00 r 4 tblVehicleEF • UBUS T 1.7320e-003 0.00 r 4 tblVehicleEF • UBUS T 6.9620e-003 0.00 r 4 tblVehicleEF • UBUS T 0.10 0.00 r 4 tblVehicleEF • UBUS T 3.7030e-003 0.00 r 4 tblVehicleEF • UBUS T 1.51 4.46 r 4 tblVehicleEF • UBUS T 0.03 0.00 r 4 tblVehicleEF • UBUS T 1.10 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 8.70 r 4 tblVehicleTrips • CNW_TL T 5.40 8.70 • r 4 tblVehicleTrips • CW_TL T 12.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 • tblVehicleTrips • HS_TL • 3.50 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • HS_TL • • HW TL HW TL ST_TR ST TR ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic • 3.50 8.70 i 11.00 8.70 r i 11.00 8.70 r i 7.16 8.08 r i 40.63 17.90 r i 9.91 9.48 r i 6.07 6.23 r i 39.53 T 17.00 r i 8.62 8.49 r i 6.59 7.26 r i 35.74 T 27.33 r i 9.52 T 9.38 r i 3.70 T 0.00 r i 26.50 T 0.00 r T 3.70 T 0.00 r • f 26.50 0.00 2.0 Emissions Summary ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 50 of 58 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day Area •4 34.3122 10.5928 54.0519 0.0666 1 1.0863 1.0863 1.0863 1.0863 • 0.0000 ' 12,880.32 12,880.32 0.3311 1 0.2345 12,958.48 ; •1 ; 41 41 I 09 .1 J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Energy •i 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 • i 3,253.345 3,253.345 0.0624 0.0596 3,272.679 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 • 9 9 0 ir J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Mobile .1 10.6440 33.2028 99.7756 0.3407 35.0128 0.3541 35.3669 9.3570 0.3340 9.6910 • 35,983.41 35,983.41 1.3825 36,017.97 J J J J J J J J w J J J • 26 26 1 49 Total 45.2543 46.3440 154.9119 0.4235 35.0128 1.6465 36.6593 9.3570 1.6264 10.9834 0.0000 52,117.08 52,117.08 1.7760 0.2941 52,249.13 52,117.08 1.7760 0.2941 52,249.13 Il 27 27 27 47 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area i 34.3122 1 10.5928 54.0519 0.0666 1 1.0863 1.0863 1 1.0863 1.0863 • 0.0000 12,880.32 12,880.32 0.3311 1 0.2345 12,958.48 •1 ; 41 41 09 J J J .1 J J J J w J J J Energy •i 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 • 3,253.345 3,253.345 0.0624 0.0596 3,272.679 ■ 9 9 0 J J J J J J J J w J J J Mobile •i 10.6440 33.2028 99.7756 0.3407 35.0128 1 0.3541 35.3669 9.3570 1 0.3340 9.6910 • 35,983.41 35,983.41 1.3825 36,017.97 26 26 49 Total 45.2543 46.3440 154.9119 0.4235 35.0128 1.6465 36.6593 9.3570 1.6264 10.9834 0.0000 52,117.08 52,117.08 1.7760 0.2941 52,249.13 Il 27 27 47 CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :1/1/2024 :12/31/2023• 0' Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers • 0 0 IUsage Hours I Horse Power I Load Factor 1- 0' 8.001 81' 8.001 158' i 8.00 247' 0.73 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00' 5.40' 20.00'LD Mix 'HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter 3.1 Mitigation Measures Construction 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 10.6440 i 33.2028 i 99.7756 i 0.3407 35.0128 i 0.3541 1 35.3669 1 9.3570 1 0.3340 9.6910 : i 35,983.41 1 35,983.41 1 1.3825 i i 36,017.97 ,i i i i 1 : i 26 1 26 1 i 49 .i• } } } } } } 4 4. r • . } } } r Unmitigated • 10.6440 • 33.2028 • 99.7756 • 0.3407 • 35.0128 • 0.3541 • 35.3669 • 9.3570 • 0.3340 • 9.6910 • • 35,983.41 • 35,983.41 • 1.3825 • 36,017.97 26 26 49 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 537.47 ; 597.68 461.11 • 1,504,675 • 1,504,675 Golf Course ; 328.00 214.74 - T 203.95 • 576,073 Y • 576,073 Other Asphalt Surfaces ; 0.00 0.00 0.00 Single Family Housing ; 4,970.55 5,023.18 T 4501.93 • 13,808,248 • 13,808,248 Total I 5,836.02 5,835.60 5,166.98 i 15,888,996 1 15,888,996 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter Land Use Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing LH -W or C -W r 8.70 Miles Trip % Trip Purpose % H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by 8.70 12.50 8.70 8.70 8.70 4.20 8.70 -r -r 8.70 8.70 5.40 8.70 40.20 33.00 0.00 40.20 19.20 48.00 0.00 19.20 T 40.60 19.00 0.00 40.60 • • • • • • • 86 11 3 52 0 39 9 ✓ r 0 0 86 11 3 4.4 Fleet Mix Land Use Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 5.0 Energy Detail ILDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH • 0.556393v 0.035040 i 0.1893821 0.106465 i 0.012088 i 0.0044301 0.0174051 0.0702081 0.0014201 0.00111E: 0.0044291 0.000881: 0.000745 i i i i i i i i i i + • • 0.5563931 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.00111E1 0.0044291 0.000881. 0.000745 i i i i i i i i i i i + • 0.5563931 0.035040 0.189382 0.106465 0.012088 0.004430 0.017405 0.070208 0.001420 0.001115 0.004429 0.000881. 0.000745 E E F E E E E E E E E • 0.556393 • 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.00111 E: 0.004429: 0.000881: 0.000745 L • ' J A L ' ' ' J l L ' Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day 1 1 1 1 1 1 NaturalGas -1 0.2982 2.5485 1 1.0845 1 1 0.0163 1 1 1 1 0.2061 1 1 0.2061 1 1 1 0.2061 0.2061 •1 3,253.345 1 3,253.345 0.0624 1 0.0596 i 3,272.679 Mitigated ;: 1 1 1 1 1 1 • 1 9 9 1 1 1 1 1 1 1 1 1 1 1 1 1 0 :I. F + 1• + 1. 4. + 4. r I. 4. 4. 4. r NaturalGas . 0.2982 • 2.5485 • 1.0845 • 0.0163 . • 0.2061 • 0.2061 • 0.2061 0.2061 • . 3,253.345 . 3,253.345 . 0.0624 • 0.0596 . 3,272.679 Unmitigated 9 9 0 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family1 Housing 1 2131.99 • i ; 1 . r -. I0 .1 i • 1 . I- 7 I0 .1 1 . I- 4 J 25521.4 ■1 1 . 1 0.0230 0.1965 0.0836 1 1.2500e- : 0.0159 0.0159 1 : 0.0159 0.0159 • 003 . 1 1 1 1 J J J J J J J J • 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 1 1 0.0000 0.0000 • 1 1 1 1 1 1 J J J J J J J J v 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • . J J J J J J J . 0.2752 2.3520 1.0008 0.0150 0.1902 0.1902 0.1902 0.1902 • . . 250.8229 250.8229 4.8100e- 4.6000e- 003 003 J J J 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 1 0.0000 1 0.0000 0.0000 J J J 3,002.523 3,002.523 0.0576 0.0551 0 0 252.3134 1 0.0000 • 0.0000 3,020.365 5 Total 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 3,253.345 9 3,253.345 9 0.0624 0.0597 3,272.679 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing : 2.13199 •i 1 ;1 f �I i 0 •i f �I : 0 •i •� i f 4 : 25.5214 • 1 i 0.0230 0.1965 0.0836 : 1.2500e- 0.0159 0.0159 1 : 0.0159 0.0159 1 003 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • I J J J J J J J J . 0.2752 2.3520 1.0008 0.0150 0.1902 0.1902 0.1902 0.1902 • . i 250.8229 250.8229 4.8100e- 4.6000e- 252.3134 003 003 i J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 J i 3,002.523 3,002.523 0.0576 0.0551 3,020.365 0 0 5 Total 0.2982 2.5485 1.0845 0.0163 0.2061 0.2061 0.2061 0.2061 3,253.345 9 3,253.345 9 0.0624 0.0597 3,272.679 0 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated •i 34.3122 : 10.5928 : 54.0519 : 0.0666 i i 1.0863 i 1.0863 i : 1.0863 1.0863 0.0000 12,880.32 12,880.32 0.3311 0.2345 i 12,958.48 .48 1 41 1 41 11 099 I 1 1 1 1 1 1 1 1 1 1 • • I. 1. 4. 1. 1. 4. 1. 4. 4. r 4. 1. e Unmitigated •• 34.3122 • 10.5928 • 54.0519 • 0.0666 . • 1.0863 • 1.0863 • . 1.0863 • 1.0863 • 0.0000 12,880.32 . 12,880.32 . 0.3311 • 0.2345 • 12,958.48 41 41 09 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 9.1020 1 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 I 0.0000 Coating :: J J J J J J Consumer •1 22.5425 0.0000 0.0000 I 0.0000 0.0000 • 0.0000 0.0000 Products :: : Hearth •1 1.1725 1 10.0193 4.2635 1 0.0640 1 1 0.8101 0.8101 0.8101 0.8101 • 0.0000 12,790.58 12,790.581 0.2452 0.2345 12,866.59 •I • 82 82 63 Landscaping •i 1.4952 0.5735 49.7883 2.6300e- 0.2763 0.2763 0.2763 0.2763 • 89.7359 89.7359 0.0860 91.8846 003 Total 34.3122 10.5928 54.0519 0.0666 1.0863 1.0863 1.0863 1.0863 0.0000 12,880.32 12,880.32 0.3311 0.2345 12,958.48 41 41 09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 58 6.2 Area by SubCategory Mitigated Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 9.1020 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: : I • Consumer •i 22.5425 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •i 1.1725 10.0193 4.2635 0.0640 0.8101 0.8101 0.8101 0.8101 • 0.0000 i 12,790.58 12,790.58 0.2452 0.2345 12,866.59 9: 82 82 63 J .1 .1 .1 .1.1..1 .1 J Landscaping •i 1.4952 0.5735 49.7883 2.6300e- 0.2763 0.2763 0.2763 0.2763 I i 89.7359 89.7359 0.0860 91.8846 003 • Total 34.3122 10.5928 54.0519 0.0666 1.0863 1.0863 1.0863 1.0863 0.0000 12,880.32 12,880.32 0.3311 0.2345 12,958.48 41 41 09 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 58 Date: 1/6/2021 4:53 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Winter Institute Recycling and Composting Services 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.20: CALEEMOD PHASE 2 OPERATIONAL EMISSIONS MODEL OUTPUTS 12188-05 AQ Report LI, URBAN CROSS R OA D5 CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer Travertine Specific Plan - Phase 2 (Operations) Riverside -Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course • 35.00 + Acre ; 35.00 12.00 + Hole ; 46.20 I. Apartments Low Rise • 237.00 + Dwelling Unit ; 34.90 237,000.00 + 642 r Single Family Housing • 673.00 • Dwelling Unit 288.10 1,211,400.00 1824 1,524,600.00 64,282.00 0 f 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 664.68 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2029 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2029 Operational Year Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 53% less energy for residential uses. Water Mitigation - Waste Mitigation - 1 Column Name tblConstructionPhase • NumDays } 500.00 • 0.00 tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 1,608.84 T• 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T 4,485.92 tblEnergyUse Y T24NG • 24,566.15 T 11,546.09 tblFireplaces Y NumberGas 189.60 T• 237.00 • tblFireplaces Y• NumberGas 538.40 T 673.00 tblFireplaces Y• NumberNoFireplace 23.70 T 0.00 4 1 1 tblFireplaces • NumberNoFireplace 67.30 0.00 • Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblFireplaces • NumberWood • 23.70 0.00 tblFireplaces • NumberWood i 67.30 0.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 14.81 34.90 r tblLandUse • LotAcreage i 218.51 288.10 • r tblLandUse • Population T 678.00 642.00 r 4 tblLandUse • Population T 1,925.00 1,824.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 664.68 r 4 tblVehicleEF • HHD T 0.80 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 1.95 10.45 r 4 tblVehicleEF • HHD T 0.44 0.20 r 4 tblVehicleEF • HHD T 1.58 1.8620e-003 r 4 tblVehicleEF • HHD T 5,742.47 1,527.02 r 4 tblVehicleEF • HHD T 1,373.32 1,061.63 r 4 tblVehicleEF • HHD T 5.03 0.02 r 4 tblVehicleEF • HHD T 16.30 8.39 r 4 tblVehicleEF • HHD T 0.77 1.76 r 4 tblVehicleEF • HHD T 20.20 2.34 r 4 tblVehicleEF • HHD T 3.1760e-003 3.0820e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 tblVehicleEF • HHD • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 4.9030e-003 0.03 tblVehicleEF • HHD i 5.1000e-005 0.00 r tblVehicleEF • HHD T 3.0390e-003 2.9490e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8490e-003 8.9650e-003 r tblVehicleEF • HHD T 4.6910e-003 0.02 r tblVehicleEF • HHD T 4.7000e-005 0.00 r 4 tblVehicleEF • HHD T 7.6000e-005 1.0000e-006 r tblVehicleEF • HHD T 2.1880e-003 1.4000e-005 r tblVehicleEF • HHD T 0.52 0.71 r 4 tblVehicleEF • HHD T 4.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5200e-004 5.5000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.9550e-003 r 4 tblVehicleEF • HHD T 7.6000e-005 0.00 r 4 tblVehicleEF • HHD T 7.6000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.1880e-003 1.4000e-005 r 4 tblVehicleEF • HHD T 0.59 0.81 r 4 tblVehicleEF • HHD T 4.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5200e-004 5.5000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.75 0.04 r 4 tblVehicleEF • HHD T 0.03 0.01 tblVehicleEF • HHD • 0.06 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 1.42 10.31 tblVehicleEF • HHD i 0.44 0.20 r tblVehicleEF • HHD T 1.51 1.8100e-003 r tblVehicleEF • HHD T 6,083.64 1,507.13 r tblVehicleEF • HHD i 1,373.32 1,061.63 r tblVehicleEF • HHD T 5.03 0.02 r tblVehicleEF • HHD T 16.83 7.97 r 4 tblVehicleEF • HHD T 0.73 1.66 r tblVehicleEF • HHD T 20.19 2.34 r tblVehicleEF • HHD T 2.6780e-003 2.7360e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.9030e-003 0.03 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 r 4 tblVehicleEF • HHD T 2.5620e-003 2.6170e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8490e-003 8.9650e-003 r 4 tblVehicleEF • HHD T 4.6910e-003 0.02 r 4 tblVehicleEF • HHD T 4.7000e-005 0.00 r 4 tblVehicleEF • HHD i 1.4500e-004 1.0000e-006 r 4 tblVehicleEF • HHD i 2.4690e-003 1.7000e-005 r 4 tblVehicleEF • HHD T 0.49 0.75 r 4 tblVehicleEF • HHD T 8.3000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5400e-004 5.7000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 tblVehicleEF • HHD • 0.06 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 0.01 9.9550e-003 tblVehicleEF • HHD i 7.5000e-005 0.00 r tblVehicleEF • HHD T 1.4500e-004 1.0000e-006 r tblVehicleEF • HHD T 2.4690e-003 1.7000e-005 r tblVehicleEF • HHD T 0.56 0.85 r tblVehicleEF • HHD T 8.3000e-005 1.0000e-006 r tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5400e-004 5.7000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.86 0.03 r 4 tblVehicleEF • HHD T 0.03 8.5100e-004 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 2.69 10.62 r 4 tblVehicleEF • HHD T 0.43 0.16 r 4 tblVehicleEF • HHD T 1.60 1.9780e-003 r 4 tblVehicleEF • HHD T 5,271.34 1,551.56 r 4 tblVehicleEF • HHD T 1,373.32 1,053.71 r 4 tblVehicleEF • HHD T 5.03 0.02 r 4 tblVehicleEF • HHD T 15.58 8.94 r 4 tblVehicleEF • HHD T 0.76 1.78 r 4 tblVehicleEF • HHD T 20.20 2.34 r 4 tblVehicleEF • HHD T 3.8640e-003 3.5450e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.9030e-003 0.03 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 tblVehicleEF • HHD • 3.6970e-003 3.3910e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 0.03 0.03 tblVehicleEF • HHD i 8.8490e-003 8.9410e-003 r tblVehicleEF • HHD T 4.6910e-003 0.02 r tblVehicleEF • HHD T 4.7000e-005 0.00 r tblVehicleEF • HHD T 5.2000e-005 0.00 r tblVehicleEF • HHD T 2.2360e-003 1.2000e-005 r tblVehicleEF • HHD T 0.56 0.65 r 4 tblVehicleEF • HHD T 3.7000e-005 0.00 r tblVehicleEF • HHD T 0.04 0.02 r tblVehicleEF • HHD T 1.6500e-004 5.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.9550e-003 r 4 tblVehicleEF • HHD T 7.6000e-005 0.00 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 2.2360e-003 1.2000e-005 r 4 tblVehicleEF • HHD T 0.64 0.74 r 4 tblVehicleEF • HHD T 3.7000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.02 r 4 tblVehicleEF • HHD T 1.6500e-004 5.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • LDA T 2.0740e-003 1.1190e-003 r 4 tblVehicleEF • LDA T 2.1460e-003 0.03 r 4 tblVehicleEF • LDA i 0.37 0.49 r 4 tblVehicleEF • LDA 0.62 1.54 r r 4 tblVehicleEF • LDA 188.41 225.89 • r tblVehicleEF • LDA • 43.48 45.28 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 0.03 0.02 tblVehicleEF • LDA i 0.03 0.12 r tblVehicleEF • LDA T 1.1870e-003 9.5200e-004 r tblVehicleEF • LDA T 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.07 r tblVehicleEF • LDA T 0.02 0.05 r tblVehicleEF • LDA T 5.1920e-003 3.8270e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 1.8860e-003 2.1030e-003 r 4 tblVehicleEF • LDA T 4.4500e-004 4.2200e-004 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.07 r 4 tblVehicleEF • LDA T 0.02 0.05 r 4 tblVehicleEF • LDA T 7.5550e-003 5.5800e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.12 r 4 tblVehicleEF • LDA T 2.3460e-003 1.3150e-003 r 4 tblVehicleEF • LDA T 1.8580e-003 0.02 r 4 tblVehicleEF • LDA T 0.45 0.64 r 4 tblVehicleEF • LDA T 0.54 1.59 r 4 tblVehicleEF • LDA T 205.09 250.22 r 4 tblVehicleEF • LDA T 43.48 45.34 tblVehicleEF • LDA • 0.02 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 0.03 0.13 tblVehicleEF • LDA i 1.1870e-003 9.5200e-004 r tblVehicleEF • LDA T 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.06 0.13 r tblVehicleEF • LDA T 0.07 0.09 r 4 tblVehicleEF • LDA T 0.05 0.09 r tblVehicleEF • LDA T 5.8650e-003 4.4740e-003 r tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.03 0.10 r 4 tblVehicleEF • LDA T 2.0530e-003 2.3300e-003 r 4 tblVehicleEF • LDA T 4.4300e-004 4.2200e-004 r 4 tblVehicleEF • LDA T 0.06 0.13 r 4 tblVehicleEF • LDA T 0.07 0.09 r 4 tblVehicleEF • LDA T 0.05 0.09 r 4 tblVehicleEF • LDA T 8.5370e-003 6.5260e-003 r 4 tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 2.0040e-003 9.9000e-004 r 4 tblVehicleEF • LDA T 2.2030e-003 0.03 r 4 tblVehicleEF • LDA T 0.34 0.41 r 4 tblVehicleEF • LDA T 0.63 1.79 r 4 tblVehicleEF • LDA T 183.79 209.99 r 4 tblVehicleEF • LDA T 43.48 45.74 r 4 tblVehicleEF • LDA T 0.03 0.02 tblVehicleEF • LDA • 0.03 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 1.1870e-003 9.5200e-004 tblVehicleEF • LDA i 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.03 0.02 r tblVehicleEF • LDA T 0.07 0.07 r tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 5.0180e-003 3.4370e-003 r tblVehicleEF • LDA T 0.03 0.19 r tblVehicleEF • LDA T 0.03 0.13 r 4 tblVehicleEF • LDA T 1.8390e-003 1.9550e-003 r 4 tblVehicleEF • LDA T 4.4500e-004 4.2600e-004 r 4 tblVehicleEF • LDA T 0.03 0.02 r 4 tblVehicleEF • LDA T 0.07 0.07 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 7.3010e-003 5.0080e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.14 r 4 tblVehicleEF • LDT1 T 4.8960e-003 3.2050e-003 r 4 tblVehicleEF • LDT1 T 6.7680e-003 0.04 r 4 tblVehicleEF • LDT1 T 0.70 0.85 r 4 tblVehicleEF • LDT1 T 1.47 1.72 r 4 tblVehicleEF • LDT1 T 243.69 282.02 r 4 tblVehicleEF • LDT1 T 56.79 55.93 r 4 tblVehicleEF • LDT1 T 0.06 0.05 r 4 tblVehicleEF • LDT1 T 0.08 0.16 tblVehicleEF • LDT1 • 1.5930e-003 1.3180e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT1 • 2.5160e-003 1.6410e-003 tblVehicleEF • LDT1 i 1.4650e-003 1.2120e-003 r tblVehicleEF • LDT1 T 2.3140e-003 1.5080e-003 r tblVehicleEF • LDT1 T 0.12 0.14 r tblVehicleEF • LDT1 T 0.19 0.14 r tblVehicleEF • LDT1 T 0.08 0.10 r tblVehicleEF • LDT1 T 0.01 0.01 r 4 tblVehicleEF • LDT1 T 0.12 0.45 r tblVehicleEF • LDT1 T 0.09 0.17 r tblVehicleEF • LDT1 T 2.4440e-003 2.6260e-003 r 4 tblVehicleEF • LDT1 T 5.9300e-004 5.2100e-004 r 4 tblVehicleEF • LDT1 T 0.12 0.15 r 4 tblVehicleEF • LDT1 T 0.19 0.14 r 4 tblVehicleEF • LDT1 T 0.08 0.10 r 4 tblVehicleEF • LDT1 T 0.02 0.02 r 4 tblVehicleEF • LDT1 T 0.12 0.45 r 4 tblVehicleEF • LDT1 T 0.10 0.18 r 4 tblVehicleEF • LDT1 T 5.5210e-003 3.7170e-003 r 4 tblVehicleEF • LDT1 T 5.8670e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.85 1.10 r 4 tblVehicleEF • LDT1 T 1.30 1.77 r 4 tblVehicleEF • LDT1 T 264.97 308.22 r 4 tblVehicleEF • LDT1 T 56.79 55.97 r 4 tblVehicleEF • LDT1 T 0.06 0.06 r 4 tblVehicleEF • LDT1 T 0.08 0.17 r 4 tblVehicleEF • LDT1 T 1.5930e-003 1.3180e-003 tblVehicleEF • LDT1 • 2.5160e-003 1.6410e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LDT1 • 1.4650e-003 1.2120e-003 tblVehicleEF • LDT1 r 2.3140e-003 1.5080e-003 I- 4 tblVehicleEF • LDT1 r 0.23 0.30 I- 4 tblVehicleEF • LDT1 r 0.23 0.18 I- 4 tblVehicleEF • LDT1 r 0.15 0.19 I- 4 tblVehicleEF • LDT1 r 0.01 0.02 I- 4 tblVehicleEF • LDT1 r 0.12 0.47 I- 4 tblVehicleEF • LDT1 r 0.08 0.16 I- 4 tblVehicleEF • LDT1 r 2.6590e-003 2.8700e-003 I- 4 tblVehicleEF • LDT1 r 5.9000e-004 5.2100e-004 I- 4 tblVehicleEF • LDT1 r 0.23 0.30 I- 4 tblVehicleEF • LDT1 r 0.23 0.18 I- 4 tblVehicleEF • LDT1 r 0.15 0.19 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.12 0.47 I- 4 tblVehicleEF • LDT1 r 0.09 0.17 I- 4 tblVehicleEF • LDT1 r 4.7170e-003 2.8730e-003 I- 4 tblVehicleEF • LDT1 r 6.9460e-003 0.04 I- 4 tblVehicleEF • LDT1 r 0.65 0.72 I- 4 tblVehicleEF • LDT1 r 1.50 1.99 I- 4 tblVehicleEF • LDT1 r 237.25 264.92 I- 4 tblVehicleEF • LDT1 r 56.79 56.47 I- 4 tblVehicleEF • LDT1 r 0.06 0.06 I- 4 tblVehicleEF • LDT1 r 0.08 0.17 I- 4 tblVehicleEF • LDT1 r 1.5930e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 2.5160e-003 1.6410e-003 tblVehicleEF • LDT1 • 1.4650e-003 1.2120e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LDT1 • 2.3140e-003 1.5080e-003 tblVehicleEF • LDT1 r 0.10 0.06 I- 4 tblVehicleEF • LDT1 r 0.20 0.13 I- 4 tblVehicleEF • LDT1 r 0.07 0.05 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.14 0.50 I- 4 tblVehicleEF • LDT1 r 0.09 0.19 I- 4 tblVehicleEF • LDT1 r 2.3790e-003 2.4660e-003 I- 4 tblVehicleEF • LDT1 r 5.9400e-004 5.2600e-004 I- 4 tblVehicleEF • LDT1 r 0.10 0.06 I- 4 tblVehicleEF • LDT1 r 0.20 0.13 I- 4 tblVehicleEF • LDT1 r 0.07 0.05 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.14 0.50 I- 4 tblVehicleEF • LDT1 r 0.10 0.21 I- 4 tblVehicleEF • LDT2 r 3.1110e-003 2.3190e-003 I- 4 tblVehicleEF • LDT2 r 3.1670e-003 0.04 I- 4 tblVehicleEF • LDT2 r 0.52 0.71 I- 4 tblVehicleEF • LDT2 r 0.86 2.03 I- 4 tblVehicleEF • LDT2 r 271.93 286.59 I- 4 tblVehicleEF • LDT2 r 62.41 57.16 I- 4 tblVehicleEF • LDT2 r 0.04 0.04 I- 4 tblVehicleEF • LDT2 r 0.05 0.16 I- 4 tblVehicleEF • LDT2 r 1.3400e-003 1.1340e-003 I- 4 tblVehicleEF • LDT2 r 2.1390e-003 1.4120e-003 I- 4 tblVehicleEF • LDT2 r 1.2320e-003 1.0440e-003 tblVehicleEF • LDT2 • 1.9660e-003 1.2980e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.05 0.11 tblVehicleEF • LDT2 i 0.08 0.10 r tblVehicleEF • LDT2 T 0.04 0.09 r tblVehicleEF • LDT2 T 7.7230e-003 8.7740e-003 r tblVehicleEF • LDT2 T 0.05 0.33 r tblVehicleEF • LDT2 T 0.04 0.16 r tblVehicleEF • LDT2 T 2.7230e-003 2.6680e-003 r 4 tblVehicleEF • LDT2 T 6.3800e-004 5.3200e-004 r tblVehicleEF • LDT2 T 0.05 0.11 r tblVehicleEF • LDT2 T 0.08 0.10 r 4 tblVehicleEF • LDT2 T 0.04 0.09 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.34 r 4 tblVehicleEF • LDT2 T 0.05 0.18 r 4 tblVehicleEF • LDT2 T 3.5240e-003 2.7030e-003 r 4 tblVehicleEF • LDT2 T 2.7640e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.64 0.92 r 4 tblVehicleEF • LDT2 T 0.77 2.09 r 4 tblVehicleEF • LDT2 T 295.86 310.75 r 4 tblVehicleEF • LDT2 T 62.41 57.21 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.05 0.17 r 4 tblVehicleEF • LDT2 T 1.3400e-003 1.1340e-003 r 4 tblVehicleEF • LDT2 T 2.1390e-003 1.4120e-003 r 4 tblVehicleEF • LDT2 T 1.2320e-003 1.0440e-003 r 4 tblVehicleEF • LDT2 T 1.9660e-003 1.2980e-003 tblVehicleEF • LDT2 • 0.09 0.23 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.09 0.12 tblVehicleEF • LDT2 i 0.07 0.16 r tblVehicleEF • LDT2 T 8.7430e-003 0.01 r tblVehicleEF • LDT2 T 0.05 0.35 r tblVehicleEF • LDT2 T 0.04 0.15 r tblVehicleEF • LDT2 T 2.9630e-003 2.8930e-003 r tblVehicleEF • LDT2 T 6.3600e-004 5.3300e-004 r 4 tblVehicleEF • LDT2 T 0.09 0.23 r tblVehicleEF • LDT2 T 0.09 0.12 r tblVehicleEF • LDT2 T 0.07 0.16 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.35 r 4 tblVehicleEF • LDT2 T 0.04 0.17 r 4 tblVehicleEF • LDT2 T 2.9910e-003 2.0690e-003 r 4 tblVehicleEF • LDT2 T 3.2640e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.49 0.60 r 4 tblVehicleEF • LDT2 T 0.88 2.36 r 4 tblVehicleEF • LDT2 T 264.67 270.81 r 4 tblVehicleEF • LDT2 T 62.41 57.80 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.05 0.17 r 4 tblVehicleEF • LDT2 T 1.3400e-003 1.1340e-003 r 4 tblVehicleEF • LDT2 T 2.1390e-003 1.4120e-003 r 4 tblVehicleEF • LDT2 T 1.2320e-003 1.0440e-003 r 4 tblVehicleEF • LDT2 T 1.9660e-003 1.2980e-003 r 4 tblVehicleEF • LDT2 T 0.04 0.04 tblVehicleEF • LDT2 • 0.08 0.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.03 0.04 tblVehicleEF • LDT2 i 7.4260e-003 7.9030e-003 r tblVehicleEF • LDT2 T 0.06 0.37 r tblVehicleEF • LDT2 T 0.04 0.19 r tblVehicleEF • LDT2 T 2.6500e-003 2.5220e-003 r tblVehicleEF • LDT2 T 6.3800e-004 5.3800e-004 r tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.08 0.09 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.06 0.38 r 4 tblVehicleEF • LDT2 T 0.05 0.21 r 4 tblVehicleEF • LHD1 T 4.0180e-003 4.2260e-003 r 4 tblVehicleEF • LHD1 T 4.4710e-003 2.1010e-003 r 4 tblVehicleEF • LHD1 T 0.01 8.8380e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.45 0.26 r 4 tblVehicleEF • LHD1 T 1.58 0.81 r 4 tblVehicleEF • LHD1 T 9.14 8.43 r 4 tblVehicleEF • LHD1 T 562.56 567.96 r 4 tblVehicleEF • LHD1 T 26.03 9.80 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 1.07 0.42 r 4 tblVehicleEF • LHD1 T 0.70 0.22 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9470e-003 tblVehicleEF • LHD1 • 9.3040e-003 5.2130e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 6.2000e-004 1.9500e-004 tblVehicleEF • LHD1 i 8.5200e-004 9.0500e-004 r tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r tblVehicleEF • LHD1 T 2.9370e-003 2.9530e-003 r tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r tblVehicleEF • LHD1 T 1.5480e-003 1.4420e-003 r tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.35 r 4 tblVehicleEF • LHD1 T 0.15 0.04 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r 4 tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.9000e-004 9.7000e-005 r 4 tblVehicleEF • LHD1 T 2.9370e-003 2.9530e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.5480e-003 1.4420e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.35 r 4 tblVehicleEF • LHD1 T 0.17 0.05 r 4 tblVehicleEF • LHD1 T 4.0180e-003 4.2330e-003 r 4 tblVehicleEF • LHD1 T 4.5270e-003 2.1190e-003 r 4 tblVehicleEF • LHD1 T 0.01 8.6350e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 tblVehicleEF • LHD1 • 0.45 0.26 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 1.51 0.79 tblVehicleEF • LHD1 i 9.14 8.43 r tblVehicleEF • LHD1 T 562.56 567.97 r tblVehicleEF • LHD1 T 26.03 9.77 r tblVehicleEF • LHD1 T 0.08 0.05 r tblVehicleEF • LHD1 T 1.00 0.39 r tblVehicleEF • LHD1 T 0.68 0.22 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r tblVehicleEF • LHD1 T 0.01 9.9470e-003 r tblVehicleEF • LHD1 T 9.3040e-003 5.2130e-003 r 4 tblVehicleEF • LHD1 T 6.2000e-004 1.9500e-004 r 4 tblVehicleEF • LHD1 T 8.5200e-004 9.0500e-004 r 4 tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r 4 tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r 4 tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r 4 tblVehicleEF • LHD1 T 5.4640e-003 5.9000e-003 r 4 tblVehicleEF • LHD1 T 0.09 0.07 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 2.8600e-003 2.6450e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.36 r 4 tblVehicleEF • LHD1 T 0.15 0.04 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r 4 tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.8800e-004 9.7000e-005 r 4 tblVehicleEF • LHD1 T 5.4640e-003 5.9000e-003 tblVehicleEF • LHD1 • 0.09 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 0.02 0.02 tblVehicleEF • LHD1 i 2.8600e-003 2.6450e-003 r tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.28 0.36 r tblVehicleEF • LHD1 T 0.16 0.04 r tblVehicleEF • LHD1 T 4.0180e-003 4.2140e-003 r tblVehicleEF • LHD1 T 4.4680e-003 2.0700e-003 r 4 tblVehicleEF • LHD1 T 0.01 9.2180e-003 r tblVehicleEF • LHD1 T 0.13 0.17 r tblVehicleEF • LHD1 T 0.45 0.26 r 4 tblVehicleEF • LHD1 T 1.59 0.86 r 4 tblVehicleEF • LHD1 T 9.14 8.43 r 4 tblVehicleEF • LHD1 T 562.56 567.96 r 4 tblVehicleEF • LHD1 T 26.03 9.88 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 1.05 0.42 r 4 tblVehicleEF • LHD1 T 0.70 0.23 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9470e-003 r 4 tblVehicleEF • LHD1 T 9.3040e-003 5.2130e-003 r 4 tblVehicleEF • LHD1 T 6.2000e-004 1.9500e-004 r 4 tblVehicleEF • LHD1 T 8.5200e-004 9.0500e-004 r 4 tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r 4 tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r 4 tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r 4 tblVehicleEF • LHD1 T 2.4840e-003 1.2590e-003 tblVehicleEF • LHD1 • 0.09 0.05 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 0.01 0.02 tblVehicleEF • LHD1 i 1.4000e-003 7.5100e-004 r tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.30 0.37 r tblVehicleEF • LHD1 T 0.15 0.04 r tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.9000e-004 9.8000e-005 r tblVehicleEF • LHD1 T 2.4840e-003 1.2590e-003 r tblVehicleEF • LHD1 T 0.09 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.4000e-003 7.5100e-004 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.17 0.05 r 4 tblVehicleEF • LHD2 T 2.6430e-003 3.1370e-003 r 4 tblVehicleEF • LHD2 T 1.8530e-003 2.0460e-003 r 4 tblVehicleEF • LHD2 T 3.6750e-003 6.9830e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.20 0.25 r 4 tblVehicleEF • LHD2 T 0.85 0.54 r 4 tblVehicleEF • LHD2 T 13.84 13.00 r 4 tblVehicleEF • LHD2 T 568.17 579.28 r 4 tblVehicleEF • LHD2 T 21.64 7.76 r 4 tblVehicleEF • LHD2 T 0.08 0.07 r 4 tblVehicleEF • LHD2 T 0.42 0.60 tblVehicleEF • LHD2 • 0.30 0.18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 1.0990e-003 1.3650e-003 tblVehicleEF • LHD2 i 0.01 0.01 r tblVehicleEF • LHD2 T 7.2020e-003 9.4750e-003 r tblVehicleEF • LHD2 T 3.5100e-004 1.1200e-004 r tblVehicleEF • LHD2 T 1.0510e-003 1.3060e-003 r tblVehicleEF • LHD2 T 2.7100e-003 2.6750e-003 r tblVehicleEF • LHD2 T 6.8800e-003 9.0540e-003 r 4 tblVehicleEF • LHD2 T 3.2200e-004 1.0300e-004 r tblVehicleEF • LHD2 T 9.1500e-004 2.1100e-003 r tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 5.2400e-004 1.0970e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.03 r 4 tblVehicleEF • LHD2 T 1.3500e-004 1.2400e-004 r 4 tblVehicleEF • LHD2 T 5.5200e-003 5.5960e-003 r 4 tblVehicleEF • LHD2 T 2.3100e-004 7.7000e-005 r 4 tblVehicleEF • LHD2 T 9.1500e-004 2.1100e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.02 0.02 r 4 tblVehicleEF • LHD2 T 5.2400e-004 1.0970e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.04 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.04 r 4 tblVehicleEF • LHD2 T 2.6430e-003 3.1420e-003 tblVehicleEF • LHD2 • 1.8660e-003 2.0570e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 3.5810e-003 6.8240e-003 tblVehicleEF • LHD2 i 0.12 0.14 r tblVehicleEF • LHD2 T 0.20 0.25 r tblVehicleEF • LHD2 T 0.82 0.52 r tblVehicleEF • LHD2 T 13.84 13.00 r tblVehicleEF • LHD2 T 568.17 579.28 r tblVehicleEF • LHD2 T 21.64 7.73 r 4 tblVehicleEF • LHD2 T 0.08 0.07 r tblVehicleEF • LHD2 T 0.40 0.56 r tblVehicleEF • LHD2 T 0.29 0.18 r 4 tblVehicleEF • LHD2 T 1.0990e-003 1.3650e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 7.2020e-003 9.4750e-003 r 4 tblVehicleEF • LHD2 T 3.5100e-004 1.1200e-004 r 4 tblVehicleEF • LHD2 T 1.0510e-003 1.3060e-003 r 4 tblVehicleEF • LHD2 T 2.7100e-003 2.6750e-003 r 4 tblVehicleEF • LHD2 T 6.8800e-003 9.0540e-003 r 4 tblVehicleEF • LHD2 T 3.2200e-004 1.0300e-004 r 4 tblVehicleEF • LHD2 T 1.7160e-003 4.2180e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.05 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 9.6100e-004 1.9690e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.03 r 4 tblVehicleEF • LHD2 T 1.3500e-004 1.2400e-004 tblVehicleEF • LHD2 • 5.5200e-003 5.5960e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LHD2 • 2.3000e-004 7.7000e-005 tblVehicleEF • LHD2 r 1.7160e-003 4.2180e-003 I- 4 tblVehicleEF • LHD2 r 0.02 0.05 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 9.6100e-004 1.9690e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.05 0.21 I- 4 tblVehicleEF • LHD2 r 0.05 0.04 I- 4 tblVehicleEF • LHD2 r 2.6430e-003 3.1280e-003 I- 4 tblVehicleEF • LHD2 r 1.8510e-003 2.0290e-003 I- 4 tblVehicleEF • LHD2 r 3.6910e-003 7.2810e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.14 I- 4 tblVehicleEF • LHD2 r 0.20 0.24 I- 4 tblVehicleEF • LHD2 r 0.86 0.57 I- 4 tblVehicleEF • LHD2 r 13.84 13.00 I- 4 tblVehicleEF • LHD2 r 568.17 579.27 I- 4 tblVehicleEF • LHD2 r 21.64 7.81 I- 4 tblVehicleEF • LHD2 r 0.08 0.07 I- 4 tblVehicleEF • LHD2 r 0.42 0.61 I- 4 tblVehicleEF • LHD2 r 0.30 0.19 I- 4 tblVehicleEF • LHD2 r 1.0990e-003 1.3650e-003 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 7.2020e-003 9.4750e-003 I- 4 tblVehicleEF • LHD2 r 3.5100e-004 1.1200e-004 I- 4 tblVehicleEF • LHD2 r 1.0510e-003 1.3060e-003 I- 4 tblVehicleEF • LHD2 r 2.7100e-003 2.6750e-003 tblVehicleEF • LHD2 • 6.8800e-003 9.0540e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LHD2 • 3.2200e-004 1.0300e-004 tblVehicleEF • LHD2 r 6.9700e-004 8.7600e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.04 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 4.5100e-004 5.8200e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.03 I- 4 tblVehicleEF • LHD2 r 0.05 0.22 I- 4 tblVehicleEF • LHD2 r 0.05 0.03 I- 4 tblVehicleEF • LHD2 r 1.3500e-004 1.2400e-004 I- 4 tblVehicleEF • LHD2 r 5.5200e-003 5.5960e-003 I- 4 tblVehicleEF • LHD2 r 2.3100e-004 7.7000e-005 I- 4 tblVehicleEF • LHD2 r 6.9700e-004 8.7600e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.04 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 4.5100e-004 5.8200e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.05 0.22 I- 4 tblVehicleEF • LHD2 r 0.05 0.04 I- 4 tblVehicleEF • MCY r 0.44 0.32 I- 4 tblVehicleEF • MCY r 0.15 0.23 I- 4 tblVehicleEF • MCY r 17.59 17.71 I- 4 tblVehicleEF • MCY r 9.79 8.42 I- 4 tblVehicleEF • MCY r 169.21 209.47 I- 4 tblVehicleEF • MCY r 43.23 57.28 I- 4 tblVehicleEF • MCY r 1.11 1.10 I- 4 tblVehicleEF • MCY r 0.31 0.26 tblVehicleEF • MCY • 2.0660e-003 2.1680e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 3.1790e-003 2.8440e-003 tblVehicleEF • MCY i 1.9270e-003 2.0220e-003 r tblVehicleEF • MCY T 2.9740e-003 2.6590e-003 r tblVehicleEF • MCY T 1.67 2.44 r tblVehicleEF • MCY T 0.78 0.93 r tblVehicleEF • MCY T 0.89 1.33 r tblVehicleEF • MCY T 2.07 2.13 r 4 tblVehicleEF • MCY T 0.46 1.46 r tblVehicleEF • MCY T 1.99 1.68 r tblVehicleEF • MCY T 2.0410e-003 2.0730e-003 r 4 tblVehicleEF • MCY T 6.5100e-004 5.6700e-004 r 4 tblVehicleEF • MCY T 1.67 2.44 r 4 tblVehicleEF • MCY T 0.78 0.93 r 4 tblVehicleEF • MCY T 0.89 1.33 r 4 tblVehicleEF • MCY T 2.59 2.67 r 4 tblVehicleEF • MCY T 0.46 1.46 r 4 tblVehicleEF • MCY T 2.16 1.83 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.13 0.21 r 4 tblVehicleEF • MCY T 18.28 19.52 r 4 tblVehicleEF • MCY T 9.09 8.30 r 4 tblVehicleEF • MCY T 169.21 212.46 r 4 tblVehicleEF • MCY T 43.23 56.84 r 4 tblVehicleEF • MCY T 0.96 0.97 r 4 tblVehicleEF • MCY T 0.29 0.25 r 4 tblVehicleEF • MCY T 2.0660e-003 2.1680e-003 tblVehicleEF • MCY • 3.1790e-003 2.8440e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 1.9270e-003 2.0220e-003 tblVehicleEF • MCY i 2.9740e-003 2.6590e-003 r tblVehicleEF • MCY T 3.32 5.02 r tblVehicleEF • MCY T 1.17 1.64 r tblVehicleEF • MCY T 2.03 3.02 r tblVehicleEF • MCY T 2.06 2.16 r tblVehicleEF • MCY T 0.46 1.55 r 4 tblVehicleEF • MCY T 1.79 1.60 r tblVehicleEF • MCY T 2.0510e-003 2.1020e-003 r tblVehicleEF • MCY T 6.3300e-004 5.6300e-004 r 4 tblVehicleEF • MCY T 3.32 5.02 r 4 tblVehicleEF • MCY T 1.17 1.64 r 4 tblVehicleEF • MCY T 2.03 3.02 r 4 tblVehicleEF • MCY T 2.58 2.71 r 4 tblVehicleEF • MCY T 0.46 1.55 r 4 tblVehicleEF • MCY T 1.95 1.75 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.15 0.25 r 4 tblVehicleEF • MCY T 17.21 17.77 r 4 tblVehicleEF • MCY T 9.82 9.33 r 4 tblVehicleEF • MCY T 169.21 209.71 r 4 tblVehicleEF • MCY T 43.23 59.48 r 4 tblVehicleEF • MCY T 1.11 1.17 r 4 tblVehicleEF • MCY T 0.31 0.27 r 4 tblVehicleEF • MCY T 2.0660e-003 2.1680e-003 r 4 tblVehicleEF • MCY T 3.1790e-003 2.8440e-003 tblVehicleEF • MCY • 1.9270e-003 2.0220e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 2.9740e-003 2.6590e-003 tblVehicleEF • MCY i 1.55 1.02 r tblVehicleEF • MCY T 0.93 0.73 r tblVehicleEF • MCY T 0.69 0.40 r tblVehicleEF • MCY T 2.06 2.17 r tblVehicleEF • MCY T 0.53 1.64 r tblVehicleEF • MCY T 2.01 1.91 r 4 tblVehicleEF • MCY T 2.0350e-003 2.0750e-003 r tblVehicleEF • MCY T 6.5200e-004 5.8900e-004 r tblVehicleEF • MCY T 1.55 1.02 r 4 tblVehicleEF • MCY T 0.93 0.73 r 4 tblVehicleEF • MCY T 0.69 0.40 r 4 tblVehicleEF • MCY T 2.58 2.72 r 4 tblVehicleEF • MCY T 0.53 1.64 r 4 tblVehicleEF • MCY T 2.18 2.08 r 4 tblVehicleEF • MDV T 5.7640e-003 2.4810e-003 r 4 tblVehicleEF • MDV T 7.7500e-003 0.04 r 4 tblVehicleEF • MDV T 0.76 0.71 r 4 tblVehicleEF • MDV T 1.57 2.14 r 4 tblVehicleEF • MDV T 377.40 348.85 r 4 tblVehicleEF • MDV T 85.98 69.93 r 4 tblVehicleEF • MDV T 0.08 0.04 r 4 tblVehicleEF • MDV T 0.13 0.19 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 tblVehicleEF • MDV • 1.9690e-003 1.2970e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.09 0.14 tblVehicleEF • MDV i 0.15 0.12 r tblVehicleEF • MDV T 0.08 0.12 r tblVehicleEF • MDV T 0.01 9.5140e-003 r tblVehicleEF • MDV T 0.09 0.38 r tblVehicleEF • MDV T 0.10 0.19 r tblVehicleEF • MDV T 3.7760e-003 3.2490e-003 r 4 tblVehicleEF • MDV T 8.8600e-004 6.5100e-004 r tblVehicleEF • MDV T 0.09 0.15 r tblVehicleEF • MDV T 0.15 0.12 r 4 tblVehicleEF • MDV T 0.08 0.12 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.38 r 4 tblVehicleEF • MDV T 0.11 0.21 r 4 tblVehicleEF • MDV T 6.5170e-003 2.8950e-003 r 4 tblVehicleEF • MDV T 6.7340e-003 0.04 r 4 tblVehicleEF • MDV T 0.93 0.93 r 4 tblVehicleEF • MDV T 1.39 2.19 r 4 tblVehicleEF • MDV T 409.68 373.27 r 4 tblVehicleEF • MDV T 85.98 69.97 r 4 tblVehicleEF • MDV T 0.07 0.05 r 4 tblVehicleEF • MDV T 0.12 0.20 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 r 4 tblVehicleEF • MDV T 1.9690e-003 1.2970e-003 tblVehicleEF • MDV • 0.18 0.29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.17 0.15 tblVehicleEF • MDV i 0.15 0.21 r tblVehicleEF • MDV T 0.02 0.01 r tblVehicleEF • MDV T 0.09 0.39 r tblVehicleEF • MDV T 0.09 0.18 r tblVehicleEF • MDV T 4.1010e-003 3.4760e-003 r tblVehicleEF • MDV T 8.8300e-004 6.5100e-004 r 4 tblVehicleEF • MDV T 0.18 0.30 r tblVehicleEF • MDV T 0.17 0.15 r tblVehicleEF • MDV T 0.15 0.21 r 4 tblVehicleEF • MDV T 0.02 0.02 r 4 tblVehicleEF • MDV T 0.09 0.40 r 4 tblVehicleEF • MDV T 0.10 0.20 r 4 tblVehicleEF • MDV T 5.5450e-003 2.2100e-003 r 4 tblVehicleEF • MDV T 7.9810e-003 0.05 r 4 tblVehicleEF • MDV T 0.71 0.60 r 4 tblVehicleEF • MDV T 1.61 2.49 r 4 tblVehicleEF • MDV T 367.53 332.90 r 4 tblVehicleEF • MDV T 85.98 70.62 r 4 tblVehicleEF • MDV T 0.07 0.05 r 4 tblVehicleEF • MDV T 0.13 0.20 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 r 4 tblVehicleEF • MDV T 1.9690e-003 1.2970e-003 r 4 tblVehicleEF • MDV T 0.07 0.06 tblVehicleEF • MDV • 0.16 0.11 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.07 0.06 tblVehicleEF • MDV r 0.01 8.5740e-003 I- 4 tblVehicleEF • MDV r 0.11 0.42 I- 4 tblVehicleEF • MDV r 0.11 0.22 I- 4 tblVehicleEF • MDV r 3.6770e-003 3.1010e-003 I- 4 tblVehicleEF • MDV r 8.8700e-004 6.5800e-004 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.16 0.11 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.11 0.42 I- 4 tblVehicleEF • MDV r 0.12 0.25 I- 4 tblVehicleEF • MH r 9.2740e-003 2.6410e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 0.68 0.25 I- 4 tblVehicleEF • MH r 3.97 0.00 I- 4 tblVehicleEF • MH r 980.17 872.47 I- 4 tblVehicleEF • MH r 56.32 0.00 I- 4 tblVehicleEF • MH r 0.96 3.19 I- 4 tblVehicleEF • MH r 0.67 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 I- 4 tblVehicleEF • MH r 0.02 0.10 I- 4 tblVehicleEF • MH r 8.2700e-004 0.00 I- 4 tblVehicleEF • MH r 3.2360e-003 4.0000e-003 I- 4 tblVehicleEF • MH r 0.02 0.09 I- 4 tblVehicleEF • MH r 7.6000e-004 0.00 tblVehicleEF • MH • 0.99 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MH • 0.05 0.00 tblVehicleEF • MH i 0.37 0.00 r tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.24 0.00 r tblVehicleEF • MH T 9.6990e-003 8.2480e-003 r tblVehicleEF • MH T 6.3200e-004 0.00 r 4 tblVehicleEF • MH T 0.99 0.00 r tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.37 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.26 0.00 r 4 tblVehicleEF • MH T 9.4580e-003 2.6410e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.69 0.25 r 4 tblVehicleEF • MH T 3.71 0.00 r 4 tblVehicleEF • MH T 980.17 872.47 r 4 tblVehicleEF • MH T 56.32 0.00 r 4 tblVehicleEF • MH T 0.90 3.01 r 4 tblVehicleEF • MH T 0.65 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.02 0.10 r 4 tblVehicleEF • MH T 8.2700e-004 0.00 r 4 tblVehicleEF • MH T 3.2360e-003 4.0000e-003 r 4 tblVehicleEF • MH T 0.02 0.09 tblVehicleEF • MH • 7.6000e-004 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MH • 1.80 0.00 tblVehicleEF • MH i 0.06 0.00 r tblVehicleEF • MH T 0.71 0.00 r tblVehicleEF • MH T 0.04 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.23 0.00 r tblVehicleEF • MH T 9.7000e-003 8.2480e-003 r 4 tblVehicleEF • MH T 6.2800e-004 0.00 r tblVehicleEF • MH T 1.80 0.00 r tblVehicleEF • MH T 0.06 0.00 r 4 tblVehicleEF • MH T 0.71 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.25 0.00 r 4 tblVehicleEF • MH T 9.2620e-003 2.6410e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.68 0.25 r 4 tblVehicleEF • MH T 4.00 0.00 r 4 tblVehicleEF • MH T 980.17 872.47 r 4 tblVehicleEF • MH T 56.32 0.00 r 4 tblVehicleEF • MH T 0.95 3.23 r 4 tblVehicleEF • MH T 0.67 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.02 0.10 r 4 tblVehicleEF • MH T 8.2700e-004 0.00 r 4 tblVehicleEF • MH T 3.2360e-003 4.0000e-003 tblVehicleEF • MH • 0.02 0.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MH • 7.6000e-004 0.00 MH• i 0.93 0.00 r MH• T 0.06 0.00 r MH• T 0.35 0.00 r MH• T 0.03 0.06 r MH• T 0.02 0.00 r MH• T 0.24 0.00 r 4 • MH T 9.6990e-003 8.2480e-003 r • MH T 6.3300e-004 0.00 r MH• T 0.93 0.00 r 4 MH• T 0.06 0.00 r 4 MH• T 0.35 0.00 r 4 MH• T 0.05 0.06 r 4 MH• T 0.02 0.00 r 4 • MH T 0.27 0.00 r 4 • MHD T 0.02 4.9600e-003 r 4 • MHD T 1.5610e-003 1.3430e-003 r 4 • MHD T 0.03 0.01 r 4 • MHD T 0.31 0.44 r 4 • MHD T 0.14 0.16 r 4 • MHD T 3.45 1.18 r 4 • MHD T 147.83 64.38 r 4 • MHD T 1,042.82 936.73 r 4 • MHD T 52.76 11.60 r 4 • MHD T 0.39 0.32 r 4 • MHD T 0.40 0.79 • MHD • 11.32 1.53 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 6.2000e-005 1.5800e-004 tblVehicleEF • MHD i 2.6360e-003 8.6670e-003 r tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r tblVehicleEF • MHD T 6.0000e-005 1.5100e-004 r tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r tblVehicleEF • MHD T 1.1490e-003 1.1170e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 6.3900e-004 5.9000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.22 0.06 r 4 tblVehicleEF • MHD T 1.4210e-003 6.1200e-004 r 4 tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r 4 tblVehicleEF • MHD T 5.8800e-004 1.1500e-004 r 4 tblVehicleEF • MHD T 1.1490e-003 1.1170e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.3900e-004 5.9000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.24 0.06 r 4 tblVehicleEF • MHD T 0.01 4.7050e-003 r 4 tblVehicleEF • MHD T 1.5740e-003 1.3600e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 tblVehicleEF • MHD • 0.23 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 0.14 0.16 tblVehicleEF • MHD i 3.30 1.15 r tblVehicleEF • MHD T 156.58 64.16 r tblVehicleEF • MHD T 1,042.82 936.73 r tblVehicleEF • MHD T 52.76 11.55 r tblVehicleEF • MHD T 0.40 0.31 r tblVehicleEF • MHD T 0.37 0.74 r 4 tblVehicleEF • MHD T 11.31 1.53 r tblVehicleEF • MHD T 5.2000e-005 1.3600e-004 r tblVehicleEF • MHD T 2.6360e-003 8.6670e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r 4 tblVehicleEF • MHD T 5.0000e-005 1.3000e-004 r 4 tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r 4 tblVehicleEF • MHD T 2.2030e-003 2.2320e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.1740e-003 1.0650e-003 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.21 0.06 r 4 tblVehicleEF • MHD T 1.5040e-003 6.1000e-004 r 4 tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r 4 tblVehicleEF • MHD T 5.8500e-004 1.1400e-004 r 4 tblVehicleEF • MHD T 2.2030e-003 2.2320e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 tblVehicleEF • MHD • 0.03 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 1.1740e-003 1.0650e-003 tblVehicleEF • MHD i 0.02 0.01 r tblVehicleEF • MHD T 0.02 0.14 r tblVehicleEF • MHD T 0.23 0.06 r tblVehicleEF • MHD T 0.02 5.3100e-003 r tblVehicleEF • MHD T 1.5510e-003 1.3120e-003 r tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.43 0.53 r tblVehicleEF • MHD T 0.14 0.15 r tblVehicleEF • MHD T 3.51 1.25 r 4 tblVehicleEF • MHD T 135.73 64.68 r 4 tblVehicleEF • MHD T 1,042.82 936.72 r 4 tblVehicleEF • MHD T 52.76 11.73 r 4 tblVehicleEF • MHD T 0.37 0.34 r 4 tblVehicleEF • MHD T 0.39 0.80 r 4 tblVehicleEF • MHD T 11.33 1.54 r 4 tblVehicleEF • MHD T 7.6000e-005 1.8800e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.6670e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r 4 tblVehicleEF • MHD T 7.2000e-005 1.8000e-004 r 4 tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r 4 tblVehicleEF • MHD T 7.6900e-004 4.6100e-004 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 4.9200e-004 3.0900e-004 tblVehicleEF • MHD • 0.02 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 0.02 0.14 tblVehicleEF • MHD i 0.22 0.06 r tblVehicleEF • MHD T 1.3070e-003 6.1500e-004 r tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r tblVehicleEF • MHD T 5.8900e-004 1.1600e-004 r tblVehicleEF • MHD T 7.6900e-004 4.6100e-004 r tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 4.9200e-004 3.0900e-004 r tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.24 0.07 r 4 tblVehicleEF • OBUS T 0.01 7.6410e-003 r 4 tblVehicleEF • OBUS T 3.0890e-003 2.0650e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.58 r 4 tblVehicleEF • OBUS T 0.21 0.21 r 4 tblVehicleEF • OBUS T 4.35 1.49 r 4 tblVehicleEF • OBUS T 74.93 84.84 r 4 tblVehicleEF • OBUS T 1,073.88 1,127.70 r 4 tblVehicleEF • OBUS T 67.73 13.97 r 4 tblVehicleEF • OBUS T 0.15 0.37 r 4 tblVehicleEF • OBUS T 0.31 0.69 r 4 tblVehicleEF • OBUS T 2.00 1.06 r 4 tblVehicleEF • OBUS T 1.4000e-005 1.2100e-004 r 4 tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 tblVehicleEF • OBUS • 9.7400e-004 1.5400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 1.3000e-005 1.1600e-004 tblVehicleEF • OBUS i 2.0120e-003 7.7610e-003 r tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r tblVehicleEF • OBUS T 1.9410e-003 2.1170e-003 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.03 0.05 r tblVehicleEF • OBUS T 8.7000e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.28 0.07 r 4 tblVehicleEF • OBUS T 7.2700e-004 8.0600e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.5300e-004 1.3800e-004 r 4 tblVehicleEF • OBUS T 1.9410e-003 2.1170e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.7000e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.30 0.08 r 4 tblVehicleEF • OBUS T 0.01 7.7200e-003 r 4 tblVehicleEF • OBUS T 3.1380e-003 2.0930e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.57 r 4 tblVehicleEF • OBUS T 0.21 0.21 r 4 tblVehicleEF • OBUS T 4.07 1.42 tblVehicleEF • OBUS • 78.40 83.82 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 1,073.88 1,127.70 tblVehicleEF • OBUS i 67.73 13.86 r tblVehicleEF • OBUS T 0.16 0.35 r tblVehicleEF • OBUS T 0.29 0.65 r tblVehicleEF • OBUS T 1.98 1.06 r tblVehicleEF • OBUS T 1.1000e-005 1.0800e-004 r tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 r 4 tblVehicleEF • OBUS T 9.7400e-004 1.5400e-004 r tblVehicleEF • OBUS T 1.1000e-005 1.0300e-004 r tblVehicleEF • OBUS T 2.0120e-003 7.7610e-003 r 4 tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r 4 tblVehicleEF • OBUS T 3.5960e-003 4.1590e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6320e-003 1.6440e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.26 0.07 r 4 tblVehicleEF • OBUS T 7.6000e-004 7.9700e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4900e-004 1.3700e-004 r 4 tblVehicleEF • OBUS T 3.5960e-003 4.1590e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 1.6320e-003 1.6440e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 tblVehicleEF • OBUS • 0.05 0.16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.29 0.08 tblVehicleEF • OBUS i 0.01 7.5280e-003 r tblVehicleEF • OBUS T 3.0740e-003 2.0150e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.59 r tblVehicleEF • OBUS T 0.21 0.21 r tblVehicleEF • OBUS T 4.40 1.60 r 4 tblVehicleEF • OBUS T 70.15 86.24 r tblVehicleEF • OBUS T 1,073.88 1,127.69 r tblVehicleEF • OBUS T 67.73 14.17 r 4 tblVehicleEF • OBUS T 0.14 0.40 r 4 tblVehicleEF • OBUS T 0.31 0.71 r 4 tblVehicleEF • OBUS T 2.00 1.07 r 4 tblVehicleEF • OBUS T 1.7000e-005 1.4000e-004 r 4 tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 r 4 tblVehicleEF • OBUS T 9.7400e-004 1.5400e-004 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.3400e-004 r 4 tblVehicleEF • OBUS T 2.0120e-003 7.7610e-003 r 4 tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r 4 tblVehicleEF • OBUS T 1.5870e-003 9.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.03 0.04 r 4 tblVehicleEF • OBUS T 7.8200e-004 4.9500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.28 0.08 tblVehicleEF • OBUS • 6.8100e-004 8.1900e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.01 0.01 tblVehicleEF • OBUS i 7.5400e-004 1.4000e-004 r tblVehicleEF • OBUS T 1.5870e-003 9.2500e-004 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.04 0.06 r tblVehicleEF • OBUS T 7.8200e-004 4.9500e-004 r tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.30 0.09 r tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 6.1410e-003 3.7560e-003 r 4 tblVehicleEF • SBUS T 0.05 5.1390e-003 r 4 tblVehicleEF • SBUS T 8.03 2.67 r 4 tblVehicleEF • SBUS T 0.40 0.26 r 4 tblVehicleEF • SBUS T 5.88 0.57 r 4 tblVehicleEF • SBUS T 1,077.74 333.40 r 4 tblVehicleEF • SBUS T 1,068.66 1,005.50 r 4 tblVehicleEF • SBUS T 57.11 4.22 r 4 tblVehicleEF • SBUS T 5.34 2.95 r 4 tblVehicleEF • SBUS T 2.17 3.27 r 4 tblVehicleEF • SBUS T 11.69 1.17 r 4 tblVehicleEF • SBUS T 3.0670e-003 2.5210e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r 4 tblVehicleEF • SBUS T 2.9340e-003 2.4120e-003 tblVehicleEF • SBUS • 2.6740e-003 2.5930e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 0.01 0.02 tblVehicleEF • SBUS i 6.2800e-004 4.5000e-005 r tblVehicleEF • SBUS i 6.4510e-003 1.8200e-003 r tblVehicleEF • SBUS i 0.04 7.9830e-003 r tblVehicleEF • SBUS i 0.95 0.29 r tblVehicleEF • SBUS i 3.1450e-003 7.8100e-004 r tblVehicleEF • SBUS i 0.07 0.06 r 4 tblVehicleEF • SBUS i 0.02 0.05 r tblVehicleEF • SBUS i 0.34 0.03 r tblVehicleEF • SBUS T 0.01 3.1780e-003 r 4 tblVehicleEF • SBUS T 0.01 9.6480e-003 r 4 tblVehicleEF • SBUS T 6.7400e-004 4.2000e-005 r 4 tblVehicleEF • SBUS T 6.4510e-003 1.8200e-003 r 4 tblVehicleEF • SBUS T 0.04 7.9830e-003 r 4 tblVehicleEF • SBUS T 1.37 0.41 r 4 tblVehicleEF • SBUS T 3.1450e-003 7.8100e-004 r 4 tblVehicleEF • SBUS T 0.08 0.07 r 4 tblVehicleEF • SBUS T 0.02 0.05 r 4 tblVehicleEF • SBUS T 0.37 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 6.2200e-003 3.7790e-003 r 4 tblVehicleEF • SBUS T 0.05 4.4810e-003 r 4 tblVehicleEF • SBUS T 7.96 2.64 r 4 tblVehicleEF • SBUS T 0.41 0.26 r 4 tblVehicleEF • SBUS T 4.27 0.44 r 4 tblVehicleEF • SBUS T1,125.04 338.86 tblVehicleEF • SBUS • 1,068.66 1,005.51 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 57.11 4.01 tblVehicleEF • SBUS i 5.51 3.00 r tblVehicleEF • SBUS i 2.04 3.08 r tblVehicleEF • SBUS i 11.66 1.17 r tblVehicleEF • SBUS i 2.5850e-003 2.1340e-003 r tblVehicleEF • SBUS T 0.01 0.01 r tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r tblVehicleEF • SBUS T 2.4730e-003 2.0420e-003 r tblVehicleEF • SBUS T 2.6740e-003 2.5930e-003 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.2800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 0.01 3.5710e-003 r 4 tblVehicleEF • SBUS T 0.04 8.8000e-003 r 4 tblVehicleEF • SBUS T 0.95 0.29 r 4 tblVehicleEF • SBUS T 5.7080e-003 1.3980e-003 r 4 tblVehicleEF • SBUS T 0.07 0.06 r 4 tblVehicleEF • SBUS T 0.02 0.05 r 4 tblVehicleEF • SBUS T 0.28 0.02 r 4 tblVehicleEF • SBUS T 0.01 3.2290e-003 r 4 tblVehicleEF • SBUS T 0.01 9.6480e-003 r 4 tblVehicleEF • SBUS T 6.4700e-004 4.0000e-005 r 4 tblVehicleEF • SBUS T 0.01 3.5710e-003 r 4 tblVehicleEF • SBUS T 0.04 8.8000e-003 r 4 tblVehicleEF • SBUS T 1.37 0.42 r 4 tblVehicleEF • SBUS T 5.7080e-003 1.3980e-003 tblVehicleEF • SBUS • 0.08 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 0.02 0.05 tblVehicleEF • SBUS i 0.31 0.03 r tblVehicleEF • SBUS i 0.81 0.07 r tblVehicleEF • SBUS i 6.1170e-003 3.7170e-003 r tblVehicleEF • SBUS i 0.06 6.0630e-003 r tblVehicleEF • SBUS i 8.13 2.71 r tblVehicleEF • SBUS i 0.40 0.26 r 4 tblVehicleEF • SBUS i 6.24 0.75 r tblVehicleEF • SBUS i 1,012.43 325.87 • r tblVehicleEF • SBUS i 1,068.66 1,005.50 r 4 tblVehicleEF • SBUS i 57.11 4.53 r 4 tblVehicleEF • SBUS T 5.11 2.89 r 4 tblVehicleEF • SBUS T 2.15 3.32 r 4 tblVehicleEF • SBUS T 11.70 1.18 r 4 tblVehicleEF • SBUS T 3.7320e-003 3.0540e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r 4 tblVehicleEF • SBUS T 3.5700e-003 2.9220e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5930e-003 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.2800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 5.3930e-003 7.9200e-004 r 4 tblVehicleEF • SBUS T 0.04 7.7170e-003 r 4 tblVehicleEF • SBUS T 0.95 0.29 r 4 tblVehicleEF • SBUS T 2.9940e-003 4.3200e-004 tblVehicleEF • SBUS • 0.07 0.06 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .SBUS • 0.03 0.06 tblVehicleEF • SBUS r 0.35 0.03 I- 4 tblVehicleEF • SBUS r 9.9440e-003 3.1060e-003 I- 4 tblVehicleEF • SBUS r 0.01 9.6480e-003 I- 4 tblVehicleEF • SBUS r 6.8000e-004 4.5000e-005 I- 4 tblVehicleEF • SBUS r 5.3930e-003 7.9200e-004 I- 4 tblVehicleEF • SBUS r 0.04 7.7170e-003 I- 4 tblVehicleEF • SBUS r 1.38 0.41 I- 4 tblVehicleEF • SBUS r 2.9940e-003 4.3200e-004 I- 4 tblVehicleEF • SBUS r 0.08 0.07 I- 4 tblVehicleEF • SBUS r 0.03 0.06 I- 4 tblVehicleEF • SBUS r 0.39 0.04 I- 4 tblVehicleEF • UBUS r 1.04 4.47 I- 4 tblVehicleEF • UBUS r 0.07 0.00 I- 4 tblVehicleEF • UBUS r 5.44 34.93 I- 4 tblVehicleEF • UBUS r 10.69 0.00 I- 4 tblVehicleEF • UBUS 1,722.08 1,546.23 I- 4 tblVehicleEF • UBUS r 150.93 0.00 I- 4 tblVehicleEF • UBUS r 1.69 0.35 I- 4 tblVehicleEF • UBUS r 11.90 0.00 I- 4 tblVehicleEF • UBUS r 0.48 0.08 I- 4 tblVehicleEF • UBUS r 0.01 0.03 I- 4 tblVehicleEF • UBUS r 0.01 5.1020e-003 I- 4 tblVehicleEF • UBUS r 1.5820e-003 0.00 I- 4 tblVehicleEF • UBUS r 0.21 0.03 I- 4 tblVehicleEF • UBUS r 3.0000e-003 6.8250e-003 tblVehicleEF • UBUS • 0.01 4.8810e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 1.4540e-003 0.00 tblVehicleEF • UBUS i 7.0030e-003 0.00 r tblVehicleEF • UBUS T 0.07 0.00 r tblVehicleEF • UBUS T 3.8230e-003 0.00 r tblVehicleEF • UBUS T 0.17 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.92 0.00 r 4 tblVehicleEF • UBUS T 8.5500e-003 0.00 r tblVehicleEF • UBUS T 1.7050e-003 0.00 r tblVehicleEF • UBUS T 7.0030e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.8230e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.00 0.00 r 4 tblVehicleEF • UBUS T 1.04 4.47 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.47 34.93 r 4 tblVehicleEF • UBUS T 9.24 0.00 r 4 tblVehicleEF • UBUS T 1,722.08 1,546.23 r 4 tblVehicleEF • UBUS T 150.93 0.00 r 4 tblVehicleEF • UBUS T 1.57 0.35 r 4 tblVehicleEF • UBUS T 11.83 0.00 r 4 tblVehicleEF • UBUS T 0.48 0.08 r 4 tblVehicleEF • UBUS T 0.01 0.03 r 4 tblVehicleEF • UBUS T 0.01 5.1020e-003 tblVehicleEF • UBUS • 1.5820e-003 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 0.21 0.03 tblVehicleEF • UBUS i 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.01 4.8810e-003 r tblVehicleEF • UBUS T 1.4540e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r tblVehicleEF • UBUS T 0.09 0.00 r tblVehicleEF • UBUS T 7.4330e-003 0.00 r 4 tblVehicleEF • UBUS T 0.17 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.84 0.00 r 4 tblVehicleEF • UBUS T 8.5510e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6790e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.09 0.00 r 4 tblVehicleEF • UBUS T 7.4330e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.92 0.00 r 4 tblVehicleEF • UBUS T 1.04 4.47 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 5.44 34.93 r 4 tblVehicleEF • UBUS T 10.91 0.00 r 4 tblVehicleEF • UBUS T 1,722.08 1,546.23 r 4 tblVehicleEF • UBUS T 150.93 0.00 r 4 tblVehicleEF • UBUS T 1.68 0.35 r 4 tblVehicleEF • UBUS T 11.91 0.00 tblVehicleEF • UBUS • 0.48 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 0.01 0.03 tblVehicleEF • UBUS i 0.01 5.1020e-003 r tblVehicleEF • UBUS T 1.5820e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.01 4.8810e-003 r tblVehicleEF • UBUS T 1.4540e-003 0.00 r 4 tblVehicleEF • UBUS T 5.7830e-003 0.00 r tblVehicleEF • UBUS T 0.08 0.00 r tblVehicleEF • UBUS T 3.3500e-003 0.00 r 4 tblVehicleEF • UBUS T 0.17 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.93 0.00 r 4 tblVehicleEF • UBUS T 8.5500e-003 0.00 r 4 tblVehicleEF • UBUS T 1.7090e-003 0.00 r 4 tblVehicleEF • UBUS T 5.7830e-003 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 3.3500e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.01 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 8.70 r 4 tblVehicleTrips • CNW_TL T 5.40 8.70 • r 4 tblVehicleTrips • CW_TL T 12.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 • tblVehicleTrips • HS_TL • 3.50 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • • • • HS_TL HW TL HW TL ST_TR ST TR ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic 3.50 11.00 11.00 7.16 40.63 9.91 6.07 39.53 8.62 6.59 35.74 9.52 11.85 33.65 11.85 • • 4 4 4 4 4 4 33.65 8.70 8.70 8.70 8.07 16.91 9.48 6.23 16.06 8.50 7.26 25.83 9.38 0.00 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 50 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 : 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 61 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day r Area •i 48.2635 15.9593 81.4333 0.1003 1 1.6367 1.6367 1.6367 1.6367 • 0.0000 i 19,405.78 19,405.78 0.4988 1 0.3533 19,523.53 Ml J J J J J J .1 J •• .1 J .1 Energy 9; 11 11 36 •I 0 0 2 J J J J J J J J 4 J J J T J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.4231 3.6158 1.5387 0.0231 0.2923 0.2923 0.2923 0.2923 • i 4,615.949 4,615.949 0.0885 0.0846 4,643.379 0 0 2 73 73 i 96 Total f J J J .1 J J J J . J J .1 T 66.6189 Mobile •i 17.9323 41.9531 163.2354 0.5041 50.9121 0.4660 51.3780 13.6031 0.4401 14.0432 • i 54,127.99 54,127.99 1.8557 54,174.38 0.6275 50.9121 • 53.3071 • 73 73 96 0.0000 Total 78,149.72 66.6189 61.5282 246.2074 0.6275 50.9121 2.3950 53.3071 13.6031 2.3691 15.9722 0.0000 78,149.72 78,149.72 2.4430 0.4379 78,341.30 74 74 24 74 74 24 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 48.2635 15.9593 ' 81.4333 0.1003 1 : 1.6367 1.6367 I 1.6367 1.6367 • 0.0000 19,405.781 19,405.781 0.4988 1 0.3533 19,523.53 •II 1 1 I 36 .1 Ml J J J J J J .1 J •• .1 J .1 Energy •i 0.4231 3.6158 1.5387 0.0231 0.2923 0.2923 0.2923 0.2923 • i 4,615.949 4,615.949 0.0885 0.0846 4,643.379 •I 0 0 2 . J .1 J .1 .1 J .1 J • .1 J .1 Mobile •i 17.9323 41.9531 163.2354 0.5041 50.9121 0.4660 51.3780 13.6031 0.4401 14.0432 • 54,127.99 54,127.99 1.855754,174.38 73 73 i 96 Total 66.6189 61.5282 246.2074 0.6275 50.9121 2.3950 53.3071 13.6031 2.3691 15.9722 0.0000 78,149.72 78,149.72 2.4430 0.4379 78,341.30 74 74 24 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :11/21/2026 :11/20/2026• 0' Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers • 0 0 IUsage Hours I Horse Power I Load Factor 1- 0' 8.001 81' 8.001 158' t 8.00 247' 0.73 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00' 5.40' 20.00'LD Mix 'HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 3.1 Mitigation Measures Construction 3.2 Demolition - 2026 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 I i t Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 61 3.2 Demolition - 2026 Mitigated Construction On -Site Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 4.1 Mitigation Measures Mobile Page 55 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 Annual VMT CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4� 17.9323 1 41.9531 1 163.2354 1 0.5041 1 50.9121 1 0.4660 1 51.3780 1 13.6031 1 0.4401 14.0432 54,127.99 54,127.99 1.8557 i 54,174.38 1• •1 I 1 1 1 1 1 1 1 1 73 73 1 11 1 1 1 96 a + + + + + + + + r l• + + + r Unmitigated •• 17.9323 • 41.9531 • 163.2354 • 0.5041 • 50.9121 • 0.4660 • 51.3780 • 13.6031 • 0.4401 • 14.0432 • • 54,127.99 • 54,127.99 • 1.8557 • • 54,174.38 73 73 96 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 2 1,720.67 1,913.42 1476.20 • 4,817,104 • 4,817,104 T Golf Course + 310.00 202.96 192.75 • 544,459 • 544,459 Other Asphalt Surfaces ; 0.00 0.00 T 0.00 • Single Family Housing ; 6,312.34 ; 6,379.17 5717.20 • 17,535,735 • 17,535,735 Total I 8,343.00 I 8,495.54 7,386.16 I 22,897,298 1 22,897,298 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing r 8.70 8.70 12.50 8.70 8.70 8.70 4.20 -r -r 8.70 40.20 8.70 33.00 5.40 1 0.00 8.70 8.70 40.20 19.20 40.60 48.00 0.00 T 19.00 0.00 19.20 40.60 • • • • • 86 11 3 52 39 9 0 86 0 ▪ 11 0 3 4.4 Fleet Mix Land Use Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing MDV LHD1 LHD2 MHD HHD OBUS UBUS I MCY • 0.561225v 0.0343841 0.1908841 0.102953 i 0.010631 1 0.004198 i 0.017138 i 0.070241 1 0.001423 i 0.0010771 0.004368 i 0.000839' 0.000640 1� � � � 1 4i i i i i t i i i i t + • 0.5612251 0.034384 0.1908841 0.102953 0.010631 0.004198 0.017138 0.070241 0.001423 0.001077 0.004368 0.000839' 0.000640 1� 1 1 � � 1 4i i i i i t i i i i t + 0.5612251 0.034384 0.190884 0.102953 0.010631 0.004198 0.017138 0.070241 0.001423 0.001077 0.004368 0.000839' 0.000640 v � 1 1 1 1 1 E E E E E E E E E E E 0.561225• 0.034384: 0.190884' 0.102953' 0.010631' 0.004198' 0.017138' 0.070241' 0.001423' 0.001077' 0.004368' 0.000839' 0.000640 I LDA I LDT1 I LDT2 SBUS I MH 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day I I I NaturalGas 4 0.4231 1 3.6158 I I 1.5387 I I 0.0231 1 1 I 0.2923 1 I 0.2923 1 I I 0.2923 0.2923 + 1 4,615.949 14,615.949 I 0.0885 I 0.0846 i 4,643.379 Mitigated ;: I 1 1 I 1 1 I 1 . 0 1 0 1 1 1 2 I 1 1 I 1 1 I 1 ' 1 1 I 1 I. F + 1 + 4. 4.+ 4.,. I. 4. 4. 4. r NaturalGas • 0.4231 • 3.6158 • 1.5387 • 0.0231 • 0.2923 • 0.2923 • 0.2923 • 0.2923 • . 4,615.949 • 4,615.949 • 0.0885 • 0.0846 • 4,643.379 Unmitigated 0 0 2 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family1 Housing 1 6828.15 • 003 i ; 1 . r -. 10 .1 I . 1 . 1 0 .1 1 I- 4 J 32407.4 ■1 1 . I 0.0736 0.6293 0.2678 : 4.0200e- : 0.0509 0.0509 1 : 0.0509 0.0509 • 1 1 1 1 1 1 1 J J J J J J J •J 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 I : 0.0000 0.0000 • 1 1 1 1 1 1 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 1 0.0000 I I 0.0000 0.0000 • J J J J J J J 0.3495 2.9866 1.2709 0.0191 0.2415 0.2415 0.2415 0.2415 • . . 803.3112 803.3112 0.0154 0.0147 J J 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 J J J 3,812.637 3,812.637 0.0731 0.0699 7 7 808.0849 0.0000 0.0000 3,835.294 3 Total 0.4231 3.6158 1.5387 0.0231 0.2924 0.2924 0.2924 0.2924 4,615.948 9 4,615.948 9 0.0885 0.0846 4,643.379 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 1 6.82815 •i i ;1 f �I 10 f �I : 0 •i •� i f 4 1 32.4074 • 1 i 0.0736 0.6293 : 0.2678 : 4.0200e- 0.0509 0.05090.0509 0.0509 1 1 003 1 1 1 .1 .1 .1 .1 .1 .1 .1 .1 7 9 0.0000 0.0000 ' 0.0000 : 0.0000 0.0000 0.0000 I : 0.0000 0.0000 • J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 6 1 J J J J J J J J . 0.3495 2.9866 1.2709 0.0191 0.2415 0.2415 0.2415 0.2415 • ; i 803.3112 803.3112 0.0154 0.0147 808.0849 .1 .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 .1 i 3,812.637 3,812.637 0.0731 0.0699 3,835.294 7 7 3 Total 0.4231 3.6158 1.5387 0.0231 0.2924 0.2924 0.2924 0.2924 4,615.948 9 4,615.948 9 0.0885 0.0846 4,643.379 2 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4 48.2635 15.9593 1 81.4333 0.1003 i i 1.6367 i 1.6367 i i 1.6367 1.6367 . 0.0000 i 19,405.78 119,405.7811 0.4988 0.3533 � 19,523.53 1 i i 1 1 i i 11 1 i i 36 '1 i 1 1 1 1 1 • I. + 4. F + 4. 1. 4. 4. r 4. F F Unmitigated •• 48.2635 • 15.9593 • 81.4333 • 0.1003 1.6367 • 1.6367 • 1.6367 • 1.6367 • 0.0000 .19,405.781.19,405.781. 0.4988 • 0.3533 • 19,523.53 1 1 36 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural 4 12.7055 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 1 0.0000 Coating :1 1 • J J J V J Consumer •1 31.5391 : 0.0000 0.0000 0.0000 0.0000 • J J 0.0000 0.0000 Products :1 •i J J J J J J J J V J J J Hearth •1 1.7665 15.0953 6.4235 1 0.0964 1 1.2205 1.2205 1.2205 1.2205 • 0.0000 19,270.58 19,270.581 0.3694 0.3533 19,385.10 •1 : 82 82 37 . .1 .1 .1 .1 .1 .1 .1 .1 . .1 .1 .1 Landscaping •i 2.2524 0.8640 75.0098 3.9600e- 0.4162 0.4162 0.4162 0.4162 • 135.1929 135.1929 0.1295 138.4299 003 . . Total 48.2635 15.9593 81.4333 0.1003 1.6367 1.6367 1.6367 1.6367 0.0000 19,405.78 19,405.78 0.4988 0.3533 19,523.53 11 11 36 CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 61 6.2 Area by SubCategory Mitigated Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 12.7055 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: : ,I Consumer •i 31.5391 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •i 1.7665 15.0953 6.4235 0.0964 1.2205 1.2205 1.2205 1.2205 • 0.0000 i 19,270.58 19,270.58 0.3694 0.3533 19,385.10 9: 82 82 37 1. Landscaping •i 2.2524 0.8640 75.0098 3.9600e- 0.4162 0.4162 0.4162 0.4162 I i 135.1929 135.1929 0.1295 138.4299 003 • Total 48.2635 15.9593 81.4333 0.1003 1.6367 1.6367 1.6367 1.6367 0.0000 19,405.78 19,405.78 0.4988 0.3533 19,523.53 11 11 36 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Summer Institute Recycling and Composting Services 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter Travertine Specific Plan - Phase 2 (Operations) Riverside -Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course • 35.00 + Acre ; 35.00 12.00 + Hole ; 46.20 I. Apartments Low Rise • 237.00 + Dwelling Unit ; 34.90 237,000.00 + 642 r Single Family Housing • 673.00 • Dwelling Unit 288.10 1,211,400.00 1824 1,524,600.00 64,282.00 0 f 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 664.68 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2029 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2029 Operational Year Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 53% less energy for residential uses. Water Mitigation - Waste Mitigation - 1 Column Name tblConstructionPhase • NumDays } 500.00 • 0.00 tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 1,608.84 T• 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T 4,485.92 tblEnergyUse Y T24NG • 24,566.15 T 11,546.09 tblFireplaces Y NumberGas 189.60 T• 237.00 • tblFireplaces Y• NumberGas 538.40 T 673.00 tblFireplaces Y• NumberNoFireplace 23.70 T 0.00 4 1 1 tblFireplaces • NumberNoFireplace 67.30 0.00 • Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblFireplaces • NumberWood • 23.70 0.00 tblFireplaces • NumberWood i 67.30 0.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 14.81 34.90 r tblLandUse • LotAcreage i 218.51 288.10 • r tblLandUse • Population T 678.00 642.00 r 4 tblLandUse • Population T 1,925.00 1,824.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 664.68 r 4 tblVehicleEF • HHD T 0.80 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 1.95 10.45 r 4 tblVehicleEF • HHD T 0.44 0.20 r 4 tblVehicleEF • HHD T 1.58 1.8620e-003 r 4 tblVehicleEF • HHD T 5,742.47 1,527.02 r 4 tblVehicleEF • HHD T 1,373.32 1,061.63 r 4 tblVehicleEF • HHD T 5.03 0.02 r 4 tblVehicleEF • HHD T 16.30 8.39 r 4 tblVehicleEF • HHD T 0.77 1.76 r 4 tblVehicleEF • HHD T 20.20 2.34 r 4 tblVehicleEF • HHD T 3.1760e-003 3.0820e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 tblVehicleEF • HHD • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 4.9030e-003 0.03 tblVehicleEF • HHD i 5.1000e-005 0.00 r tblVehicleEF • HHD T 3.0390e-003 2.9490e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8490e-003 8.9650e-003 r tblVehicleEF • HHD T 4.6910e-003 0.02 r tblVehicleEF • HHD T 4.7000e-005 0.00 r 4 tblVehicleEF • HHD T 7.6000e-005 1.0000e-006 r tblVehicleEF • HHD T 2.1880e-003 1.4000e-005 r tblVehicleEF • HHD T 0.52 0.71 r 4 tblVehicleEF • HHD T 4.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5200e-004 5.5000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.9550e-003 r 4 tblVehicleEF • HHD T 7.6000e-005 0.00 r 4 tblVehicleEF • HHD T 7.6000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.1880e-003 1.4000e-005 r 4 tblVehicleEF • HHD T 0.59 0.81 r 4 tblVehicleEF • HHD T 4.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5200e-004 5.5000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.75 0.04 r 4 tblVehicleEF • HHD T 0.03 0.01 tblVehicleEF • HHD • 0.06 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 1.42 10.31 tblVehicleEF • HHD i 0.44 0.20 r tblVehicleEF • HHD T 1.51 1.8100e-003 r tblVehicleEF • HHD T 6,083.64 1,507.13 r tblVehicleEF • HHD T 1,373.32 1,061.63 r tblVehicleEF • HHD T 5.03 0.02 r tblVehicleEF • HHD T 16.83 7.97 r 4 tblVehicleEF • HHD T 0.73 1.66 r tblVehicleEF • HHD T 20.19 2.34 r tblVehicleEF • HHD T 2.6780e-003 2.7360e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.9030e-003 0.03 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 r 4 tblVehicleEF • HHD T 2.5620e-003 2.6170e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8490e-003 8.9650e-003 r 4 tblVehicleEF • HHD T 4.6910e-003 0.02 r 4 tblVehicleEF • HHD T 4.7000e-005 0.00 r 4 tblVehicleEF • HHD T 1.4500e-004 1.0000e-006 r 4 tblVehicleEF • HHD T 2.4690e-003 1.7000e-005 r 4 tblVehicleEF • HHD T 0.49 0.75 r 4 tblVehicleEF • HHD T 8.3000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5400e-004 5.7000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 tblVehicleEF • HHD • 0.06 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 0.01 9.9550e-003 tblVehicleEF • HHD i 7.5000e-005 0.00 r tblVehicleEF • HHD T 1.4500e-004 1.0000e-006 r tblVehicleEF • HHD T 2.4690e-003 1.7000e-005 r tblVehicleEF • HHD T 0.56 0.85 r tblVehicleEF • HHD T 8.3000e-005 1.0000e-006 r tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5400e-004 5.7000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.86 0.03 r 4 tblVehicleEF • HHD T 0.03 8.5100e-004 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 2.69 10.62 r 4 tblVehicleEF • HHD T 0.43 0.16 r 4 tblVehicleEF • HHD T 1.60 1.9780e-003 r 4 tblVehicleEF • HHD T 5,271.34 1,551.56 r 4 tblVehicleEF • HHD T 1,373.32 1,053.71 r 4 tblVehicleEF • HHD T 5.03 0.02 r 4 tblVehicleEF • HHD T 15.58 8.94 r 4 tblVehicleEF • HHD T 0.76 1.78 r 4 tblVehicleEF • HHD T 20.20 2.34 r 4 tblVehicleEF • HHD T 3.8640e-003 3.5450e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.9030e-003 0.03 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 tblVehicleEF • HHD • 3.6970e-003 3.3910e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 0.03 0.03 tblVehicleEF • HHD i 8.8490e-003 8.9410e-003 r tblVehicleEF • HHD T 4.6910e-003 0.02 r tblVehicleEF • HHD T 4.7000e-005 0.00 r tblVehicleEF • HHD T 5.2000e-005 0.00 r tblVehicleEF • HHD T 2.2360e-003 1.2000e-005 r tblVehicleEF • HHD T 0.56 0.65 r 4 tblVehicleEF • HHD T 3.7000e-005 0.00 r tblVehicleEF • HHD T 0.04 0.02 r tblVehicleEF • HHD T 1.6500e-004 5.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.9550e-003 r 4 tblVehicleEF • HHD T 7.6000e-005 0.00 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 2.2360e-003 1.2000e-005 r 4 tblVehicleEF • HHD T 0.64 0.74 r 4 tblVehicleEF • HHD T 3.7000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.02 r 4 tblVehicleEF • HHD T 1.6500e-004 5.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • LDA T 2.0740e-003 1.1190e-003 r 4 tblVehicleEF • LDA T 2.1460e-003 0.03 r 4 tblVehicleEF • LDA i 0.37 0.49 r 4 tblVehicleEF • LDA 0.62 1.54 r r 4 tblVehicleEF • LDA 188.41 225.89 • r tblVehicleEF • LDA • 43.48 45.28 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 0.03 0.02 tblVehicleEF • LDA i 0.03 0.12 r tblVehicleEF • LDA T 1.1870e-003 9.5200e-004 r tblVehicleEF • LDA T 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.07 r tblVehicleEF • LDA T 0.02 0.05 r tblVehicleEF • LDA T 5.1920e-003 3.8270e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 1.8860e-003 2.1030e-003 r 4 tblVehicleEF • LDA T 4.4500e-004 4.2200e-004 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.07 r 4 tblVehicleEF • LDA T 0.02 0.05 r 4 tblVehicleEF • LDA T 7.5550e-003 5.5800e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.12 r 4 tblVehicleEF • LDA T 2.3460e-003 1.3150e-003 r 4 tblVehicleEF • LDA T 1.8580e-003 0.02 r 4 tblVehicleEF • LDA T 0.45 0.64 r 4 tblVehicleEF • LDA T 0.54 1.59 r 4 tblVehicleEF • LDA T 205.09 250.22 r 4 tblVehicleEF • LDA T 43.48 45.34 tblVehicleEF • LDA • 0.02 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 0.03 0.13 tblVehicleEF • LDA i 1.1870e-003 9.5200e-004 r tblVehicleEF • LDA T 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.06 0.13 r tblVehicleEF • LDA T 0.07 0.09 r 4 tblVehicleEF • LDA T 0.05 0.09 r tblVehicleEF • LDA T 5.8650e-003 4.4740e-003 r tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.03 0.10 r 4 tblVehicleEF • LDA T 2.0530e-003 2.3300e-003 r 4 tblVehicleEF • LDA T 4.4300e-004 4.2200e-004 r 4 tblVehicleEF • LDA T 0.06 0.13 r 4 tblVehicleEF • LDA T 0.07 0.09 r 4 tblVehicleEF • LDA T 0.05 0.09 r 4 tblVehicleEF • LDA T 8.5370e-003 6.5260e-003 r 4 tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 2.0040e-003 9.9000e-004 r 4 tblVehicleEF • LDA T 2.2030e-003 0.03 r 4 tblVehicleEF • LDA T 0.34 0.41 r 4 tblVehicleEF • LDA T 0.63 1.79 r 4 tblVehicleEF • LDA T 183.79 209.99 r 4 tblVehicleEF • LDA T 43.48 45.74 r 4 tblVehicleEF • LDA T 0.03 0.02 tblVehicleEF • LDA • 0.03 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 1.1870e-003 9.5200e-004 tblVehicleEF • LDA i 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.03 0.02 r tblVehicleEF • LDA T 0.07 0.07 r tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 5.0180e-003 3.4370e-003 r tblVehicleEF • LDA T 0.03 0.19 r tblVehicleEF • LDA T 0.03 0.13 r 4 tblVehicleEF • LDA T 1.8390e-003 1.9550e-003 r 4 tblVehicleEF • LDA T 4.4500e-004 4.2600e-004 r 4 tblVehicleEF • LDA T 0.03 0.02 r 4 tblVehicleEF • LDA T 0.07 0.07 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 7.3010e-003 5.0080e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.14 r 4 tblVehicleEF • LDT1 T 4.8960e-003 3.2050e-003 r 4 tblVehicleEF • LDT1 T 6.7680e-003 0.04 r 4 tblVehicleEF • LDT1 T 0.70 0.85 r 4 tblVehicleEF • LDT1 T 1.47 1.72 r 4 tblVehicleEF • LDT1 T 243.69 282.02 r 4 tblVehicleEF • LDT1 T 56.79 55.93 r 4 tblVehicleEF • LDT1 T 0.06 0.05 r 4 tblVehicleEF • LDT1 T 0.08 0.16 tblVehicleEF • LDT1 • 1.5930e-003 1.3180e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT1 • 2.5160e-003 1.6410e-003 tblVehicleEF • LDT1 i 1.4650e-003 1.2120e-003 r tblVehicleEF • LDT1 T 2.3140e-003 1.5080e-003 r tblVehicleEF • LDT1 T 0.12 0.14 r tblVehicleEF • LDT1 T 0.19 0.14 r tblVehicleEF • LDT1 T 0.08 0.10 r tblVehicleEF • LDT1 T 0.01 0.01 r 4 tblVehicleEF • LDT1 T 0.12 0.45 r tblVehicleEF • LDT1 T 0.09 0.17 r tblVehicleEF • LDT1 T 2.4440e-003 2.6260e-003 r 4 tblVehicleEF • LDT1 T 5.9300e-004 5.2100e-004 r 4 tblVehicleEF • LDT1 T 0.12 0.15 r 4 tblVehicleEF • LDT1 T 0.19 0.14 r 4 tblVehicleEF • LDT1 T 0.08 0.10 r 4 tblVehicleEF • LDT1 T 0.02 0.02 r 4 tblVehicleEF • LDT1 T 0.12 0.45 r 4 tblVehicleEF • LDT1 T 0.10 0.18 r 4 tblVehicleEF • LDT1 T 5.5210e-003 3.7170e-003 r 4 tblVehicleEF • LDT1 T 5.8670e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.85 1.10 r 4 tblVehicleEF • LDT1 T 1.30 1.77 r 4 tblVehicleEF • LDT1 T 264.97 308.22 r 4 tblVehicleEF • LDT1 T 56.79 55.97 r 4 tblVehicleEF • LDT1 T 0.06 0.06 r 4 tblVehicleEF • LDT1 T 0.08 0.17 r 4 tblVehicleEF • LDT1 T 1.5930e-003 1.3180e-003 tblVehicleEF • LDT1 • 2.5160e-003 1.6410e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LDT1 • 1.4650e-003 1.2120e-003 tblVehicleEF • LDT1 r 2.3140e-003 1.5080e-003 I- 4 tblVehicleEF • LDT1 r 0.23 0.30 I- 4 tblVehicleEF • LDT1 r 0.23 0.18 I- 4 tblVehicleEF • LDT1 r 0.15 0.19 I- 4 tblVehicleEF • LDT1 r 0.01 0.02 I- 4 tblVehicleEF • LDT1 r 0.12 0.47 I- 4 tblVehicleEF • LDT1 r 0.08 0.16 I- 4 tblVehicleEF • LDT1 r 2.6590e-003 2.8700e-003 I- 4 tblVehicleEF • LDT1 r 5.9000e-004 5.2100e-004 I- 4 tblVehicleEF • LDT1 r 0.23 0.30 I- 4 tblVehicleEF • LDT1 r 0.23 0.18 I- 4 tblVehicleEF • LDT1 r 0.15 0.19 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.12 0.47 I- 4 tblVehicleEF • LDT1 r 0.09 0.17 I- 4 tblVehicleEF • LDT1 r 4.7170e-003 2.8730e-003 I- 4 tblVehicleEF • LDT1 r 6.9460e-003 0.04 I- 4 tblVehicleEF • LDT1 r 0.65 0.72 I- 4 tblVehicleEF • LDT1 r 1.50 1.99 I- 4 tblVehicleEF • LDT1 r 237.25 264.92 I- 4 tblVehicleEF • LDT1 r 56.79 56.47 I- 4 tblVehicleEF • LDT1 r 0.06 0.06 I- 4 tblVehicleEF • LDT1 r 0.08 0.17 I- 4 tblVehicleEF • LDT1 r 1.5930e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 2.5160e-003 1.6410e-003 tblVehicleEF • LDT1 • 1.4650e-003 1.2120e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LDT1 • 2.3140e-003 1.5080e-003 tblVehicleEF • LDT1 r 0.10 0.06 I- 4 tblVehicleEF • LDT1 r 0.20 0.13 I- 4 tblVehicleEF • LDT1 r 0.07 0.05 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.14 0.50 I- 4 tblVehicleEF • LDT1 r 0.09 0.19 I- 4 tblVehicleEF • LDT1 r 2.3790e-003 2.4660e-003 I- 4 tblVehicleEF • LDT1 r 5.9400e-004 5.2600e-004 I- 4 tblVehicleEF • LDT1 r 0.10 0.06 I- 4 tblVehicleEF • LDT1 r 0.20 0.13 I- 4 tblVehicleEF • LDT1 r 0.07 0.05 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.14 0.50 I- 4 tblVehicleEF • LDT1 r 0.10 0.21 I- 4 tblVehicleEF • LDT2 r 3.1110e-003 2.3190e-003 I- 4 tblVehicleEF • LDT2 r 3.1670e-003 0.04 I- 4 tblVehicleEF • LDT2 r 0.52 0.71 I- 4 tblVehicleEF • LDT2 r 0.86 2.03 I- 4 tblVehicleEF • LDT2 r 271.93 286.59 I- 4 tblVehicleEF • LDT2 r 62.41 57.16 I- 4 tblVehicleEF • LDT2 r 0.04 0.04 I- 4 tblVehicleEF • LDT2 r 0.05 0.16 I- 4 tblVehicleEF • LDT2 r 1.3400e-003 1.1340e-003 I- 4 tblVehicleEF • LDT2 r 2.1390e-003 1.4120e-003 I- 4 tblVehicleEF • LDT2 r 1.2320e-003 1.0440e-003 tblVehicleEF • LDT2 • 1.9660e-003 1.2980e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.05 0.11 tblVehicleEF • LDT2 i 0.08 0.10 r tblVehicleEF • LDT2 T 0.04 0.09 r tblVehicleEF • LDT2 T 7.7230e-003 8.7740e-003 r tblVehicleEF • LDT2 T 0.05 0.33 r tblVehicleEF • LDT2 T 0.04 0.16 r tblVehicleEF • LDT2 T 2.7230e-003 2.6680e-003 r 4 tblVehicleEF • LDT2 T 6.3800e-004 5.3200e-004 r tblVehicleEF • LDT2 T 0.05 0.11 r tblVehicleEF • LDT2 T 0.08 0.10 r 4 tblVehicleEF • LDT2 T 0.04 0.09 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.34 r 4 tblVehicleEF • LDT2 T 0.05 0.18 r 4 tblVehicleEF • LDT2 T 3.5240e-003 2.7030e-003 r 4 tblVehicleEF • LDT2 T 2.7640e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.64 0.92 r 4 tblVehicleEF • LDT2 T 0.77 2.09 r 4 tblVehicleEF • LDT2 T 295.86 310.75 r 4 tblVehicleEF • LDT2 T 62.41 57.21 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.05 0.17 r 4 tblVehicleEF • LDT2 T 1.3400e-003 1.1340e-003 r 4 tblVehicleEF • LDT2 T 2.1390e-003 1.4120e-003 r 4 tblVehicleEF • LDT2 T 1.2320e-003 1.0440e-003 r 4 tblVehicleEF • LDT2 T 1.9660e-003 1.2980e-003 tblVehicleEF • LDT2 • 0.09 0.23 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.09 0.12 tblVehicleEF • LDT2 i 0.07 0.16 r tblVehicleEF • LDT2 T 8.7430e-003 0.01 r tblVehicleEF • LDT2 T 0.05 0.35 r tblVehicleEF • LDT2 T 0.04 0.15 r tblVehicleEF • LDT2 T 2.9630e-003 2.8930e-003 r tblVehicleEF • LDT2 T 6.3600e-004 5.3300e-004 r 4 tblVehicleEF • LDT2 T 0.09 0.23 r tblVehicleEF • LDT2 T 0.09 0.12 r tblVehicleEF • LDT2 T 0.07 0.16 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.35 r 4 tblVehicleEF • LDT2 T 0.04 0.17 r 4 tblVehicleEF • LDT2 T 2.9910e-003 2.0690e-003 r 4 tblVehicleEF • LDT2 T 3.2640e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.49 0.60 r 4 tblVehicleEF • LDT2 T 0.88 2.36 r 4 tblVehicleEF • LDT2 T 264.67 270.81 r 4 tblVehicleEF • LDT2 T 62.41 57.80 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.05 0.17 r 4 tblVehicleEF • LDT2 T 1.3400e-003 1.1340e-003 r 4 tblVehicleEF • LDT2 T 2.1390e-003 1.4120e-003 r 4 tblVehicleEF • LDT2 T 1.2320e-003 1.0440e-003 r 4 tblVehicleEF • LDT2 T 1.9660e-003 1.2980e-003 r 4 tblVehicleEF • LDT2 T 0.04 0.04 tblVehicleEF • LDT2 • 0.08 0.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.03 0.04 tblVehicleEF • LDT2 i 7.4260e-003 7.9030e-003 r tblVehicleEF • LDT2 T 0.06 0.37 r tblVehicleEF • LDT2 T 0.04 0.19 r tblVehicleEF • LDT2 T 2.6500e-003 2.5220e-003 r tblVehicleEF • LDT2 T 6.3800e-004 5.3800e-004 r tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.08 0.09 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.06 0.38 r 4 tblVehicleEF • LDT2 T 0.05 0.21 r 4 tblVehicleEF • LHD1 T 4.0180e-003 4.2260e-003 r 4 tblVehicleEF • LHD1 T 4.4710e-003 2.1010e-003 r 4 tblVehicleEF • LHD1 T 0.01 8.8380e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.45 0.26 r 4 tblVehicleEF • LHD1 T 1.58 0.81 r 4 tblVehicleEF • LHD1 T 9.14 8.43 r 4 tblVehicleEF • LHD1 T 562.56 567.96 r 4 tblVehicleEF • LHD1 T 26.03 9.80 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 1.07 0.42 r 4 tblVehicleEF • LHD1 T 0.70 0.22 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9470e-003 tblVehicleEF • LHD1 • 9.3040e-003 5.2130e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 6.2000e-004 1.9500e-004 tblVehicleEF • LHD1 i 8.5200e-004 9.0500e-004 r tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r tblVehicleEF • LHD1 T 2.9370e-003 2.9530e-003 r tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r tblVehicleEF • LHD1 T 1.5480e-003 1.4420e-003 r tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.35 r 4 tblVehicleEF • LHD1 T 0.15 0.04 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r 4 tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.9000e-004 9.7000e-005 r 4 tblVehicleEF • LHD1 T 2.9370e-003 2.9530e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.5480e-003 1.4420e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.35 r 4 tblVehicleEF • LHD1 T 0.17 0.05 r 4 tblVehicleEF • LHD1 T 4.0180e-003 4.2330e-003 r 4 tblVehicleEF • LHD1 T 4.5270e-003 2.1190e-003 r 4 tblVehicleEF • LHD1 T 0.01 8.6350e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 tblVehicleEF • LHD1 • 0.45 0.26 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 1.51 0.79 tblVehicleEF • LHD1 i 9.14 8.43 r tblVehicleEF • LHD1 T 562.56 567.97 r tblVehicleEF • LHD1 T 26.03 9.77 r tblVehicleEF • LHD1 T 0.08 0.05 r tblVehicleEF • LHD1 T 1.00 0.39 r tblVehicleEF • LHD1 T 0.68 0.22 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r tblVehicleEF • LHD1 T 0.01 9.9470e-003 r tblVehicleEF • LHD1 T 9.3040e-003 5.2130e-003 r 4 tblVehicleEF • LHD1 T 6.2000e-004 1.9500e-004 r 4 tblVehicleEF • LHD1 T 8.5200e-004 9.0500e-004 r 4 tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r 4 tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r 4 tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r 4 tblVehicleEF • LHD1 T 5.4640e-003 5.9000e-003 r 4 tblVehicleEF • LHD1 T 0.09 0.07 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 2.8600e-003 2.6450e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.36 r 4 tblVehicleEF • LHD1 T 0.15 0.04 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r 4 tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.8800e-004 9.7000e-005 r 4 tblVehicleEF • LHD1 T 5.4640e-003 5.9000e-003 tblVehicleEF • LHD1 • 0.09 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 0.02 0.02 tblVehicleEF • LHD1 i 2.8600e-003 2.6450e-003 r tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.28 0.36 r tblVehicleEF • LHD1 T 0.16 0.04 r tblVehicleEF • LHD1 T 4.0180e-003 4.2140e-003 r tblVehicleEF • LHD1 T 4.4680e-003 2.0700e-003 r 4 tblVehicleEF • LHD1 T 0.01 9.2180e-003 r tblVehicleEF • LHD1 T 0.13 0.17 r tblVehicleEF • LHD1 T 0.45 0.26 r 4 tblVehicleEF • LHD1 T 1.59 0.86 r 4 tblVehicleEF • LHD1 T 9.14 8.43 r 4 tblVehicleEF • LHD1 T 562.56 567.96 r 4 tblVehicleEF • LHD1 T 26.03 9.88 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 1.05 0.42 r 4 tblVehicleEF • LHD1 T 0.70 0.23 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9470e-003 r 4 tblVehicleEF • LHD1 T 9.3040e-003 5.2130e-003 r 4 tblVehicleEF • LHD1 T 6.2000e-004 1.9500e-004 r 4 tblVehicleEF • LHD1 T 8.5200e-004 9.0500e-004 r 4 tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r 4 tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r 4 tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r 4 tblVehicleEF • LHD1 T 2.4840e-003 1.2590e-003 tblVehicleEF • LHD1 • 0.09 0.05 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 0.01 0.02 tblVehicleEF • LHD1 i 1.4000e-003 7.5100e-004 r tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.30 0.37 r tblVehicleEF • LHD1 T 0.15 0.04 r tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.9000e-004 9.8000e-005 r tblVehicleEF • LHD1 T 2.4840e-003 1.2590e-003 r tblVehicleEF • LHD1 T 0.09 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.4000e-003 7.5100e-004 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.17 0.05 r 4 tblVehicleEF • LHD2 T 2.6430e-003 3.1370e-003 r 4 tblVehicleEF • LHD2 T 1.8530e-003 2.0460e-003 r 4 tblVehicleEF • LHD2 T 3.6750e-003 6.9830e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.20 0.25 r 4 tblVehicleEF • LHD2 T 0.85 0.54 r 4 tblVehicleEF • LHD2 T 13.84 13.00 r 4 tblVehicleEF • LHD2 T 568.17 579.28 r 4 tblVehicleEF • LHD2 T 21.64 7.76 r 4 tblVehicleEF • LHD2 T 0.08 0.07 r 4 tblVehicleEF • LHD2 T 0.42 0.60 tblVehicleEF • LHD2 • 0.30 0.18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • LHD2 • 1.0990e-003 1.3650e-003 • LHD2 i 0.01 0.01 r • LHD2 T 7.2020e-003 9.4750e-003 r • LHD2 T 3.5100e-004 1.1200e-004 r • LHD2 T 1.0510e-003 1.3060e-003 r • LHD2 T 2.7100e-003 2.6750e-003 r • LHD2 T 6.8800e-003 9.0540e-003 r 4 • LHD2 T 3.2200e-004 1.0300e-004 r • LHD2 T 9.1500e-004 2.1100e-003 r • LHD2 T 0.02 0.04 r 4 • LHD2 T 0.01 0.02 r 4 • LHD2 T 5.2400e-004 1.0970e-003 r 4 • LHD2 T 0.03 0.03 r 4 • LHD2 T 0.05 0.21 r 4 • LHD2 T 0.05 0.03 r 4 • LHD2 T 1.3500e-004 1.2400e-004 r 4 • LHD2 T 5.5200e-003 5.5960e-003 r 4 • LHD2 T 2.3100e-004 7.7000e-005 r 4 • LHD2 T 9.1500e-004 2.1100e-003 r 4 • LHD2 T 0.02 0.04 r 4 • LHD2 T 0.02 0.02 r 4 • LHD2 T 5.2400e-004 1.0970e-003 r 4 • LHD2 T 0.03 0.04 r 4 • LHD2 T 0.05 0.21 r 4 • LHD2 T 0.05 0.04 r 4 • LHD2 T 2.6430e-003 3.1420e-003 • LHD2 • 1.8660e-003 2.0570e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 3.5810e-003 6.8240e-003 tblVehicleEF • LHD2 i 0.12 0.14 r tblVehicleEF • LHD2 T 0.20 0.25 r tblVehicleEF • LHD2 T 0.82 0.52 r tblVehicleEF • LHD2 T 13.84 13.00 r tblVehicleEF • LHD2 T 568.17 579.28 r tblVehicleEF • LHD2 T 21.64 7.73 r 4 tblVehicleEF • LHD2 T 0.08 0.07 r tblVehicleEF • LHD2 T 0.40 0.56 r tblVehicleEF • LHD2 T 0.29 0.18 r 4 tblVehicleEF • LHD2 T 1.0990e-003 1.3650e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 7.2020e-003 9.4750e-003 r 4 tblVehicleEF • LHD2 T 3.5100e-004 1.1200e-004 r 4 tblVehicleEF • LHD2 T 1.0510e-003 1.3060e-003 r 4 tblVehicleEF • LHD2 T 2.7100e-003 2.6750e-003 r 4 tblVehicleEF • LHD2 T 6.8800e-003 9.0540e-003 r 4 tblVehicleEF • LHD2 T 3.2200e-004 1.0300e-004 r 4 tblVehicleEF • LHD2 T 1.7160e-003 4.2180e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.05 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 9.6100e-004 1.9690e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.03 r 4 tblVehicleEF • LHD2 T 1.3500e-004 1.2400e-004 tblVehicleEF • LHD2 • 5.5200e-003 5.5960e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 2.3000e-004 7.7000e-005 tblVehicleEF • LHD2 r 1.7160e-003 4.2180e-003 I- 4 tblVehicleEF • LHD2 r 0.02 0.05 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 9.6100e-004 1.9690e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.05 0.21 I- 4 tblVehicleEF • LHD2 r 0.05 0.04 I- 4 tblVehicleEF • LHD2 r 2.6430e-003 3.1280e-003 I- 4 tblVehicleEF • LHD2 r 1.8510e-003 2.0290e-003 I- 4 tblVehicleEF • LHD2 r 3.6910e-003 7.2810e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.14 I- 4 tblVehicleEF • LHD2 r 0.20 0.24 I- 4 tblVehicleEF • LHD2 r 0.86 0.57 I- 4 tblVehicleEF • LHD2 r 13.84 13.00 I- 4 tblVehicleEF • LHD2 r 568.17 579.27 I- 4 tblVehicleEF • LHD2 r 21.64 7.81 I- 4 tblVehicleEF • LHD2 r 0.08 0.07 I- 4 tblVehicleEF • LHD2 r 0.42 0.61 I- 4 tblVehicleEF • LHD2 r 0.30 0.19 I- 4 tblVehicleEF • LHD2 r 1.0990e-003 1.3650e-003 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 7.2020e-003 9.4750e-003 I- 4 tblVehicleEF • LHD2 r 3.5100e-004 1.1200e-004 I- 4 tblVehicleEF • LHD2 r 1.0510e-003 1.3060e-003 I- 4 tblVehicleEF • LHD2 r 2.7100e-003 2.6750e-003 tblVehicleEF • LHD2 • 6.8800e-003 9.0540e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • LHD2 • 3.2200e-004 1.0300e-004 • LHD2 r 6.9700e-004 8.7600e-004 • I- 4 • LHD2 r 0.02 0.04 I- 4 • LHD2 r 0.01 0.02 I- 4 • LHD2 r 4.5100e-004 5.8200e-004 I- 4 • LHD2 r 0.03 0.03 I- 4 • LHD2r 0.05 0.22 I- 4 • LHD2 r 0.05 0.03 I- 4 • LHD2r 1.3500e-004 1.2400e-004 • I- 4 • LHD2 r 5.5200e-003 5.5960e-003 I- 4 • LHD2r 2.3100e-004 7.7000e-005 • I- 4 • LHD2 r 6.9700e-004 8.7600e-004 I- 4 • LHD2 r 0.02 0.04 I- 4 • LHD2 r 0.02 0.02 I- 4 • LHD2 r 4.5100e-004 5.8200e-004 I- 4 • LHD2r 0.03 0.04 I- 4 • LHD2 r 0.05 0.22 I- 4 • LHD2r 0.05 0.04 • I- 4 • MCY r 0.44 0.32 I- 4 • MCY r 0.15 0.23 I- 4 • MCY r 17.59 17.71 I- 4 • MCY r 9.79 8.42 I- 4 • MCYr 169.21 209.47 I- 4 • MCY r 43.23 57.28 I- 4 • MCYr 1.11 1.10 • I- 4 • MCY r 0.31 0.26 • MCY • 2.0660e-003 2.1680e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 3.1790e-003 2.8440e-003 tblVehicleEF • MCY i 1.9270e-003 2.0220e-003 r tblVehicleEF • MCY T 2.9740e-003 2.6590e-003 r tblVehicleEF • MCY T 1.67 2.44 r tblVehicleEF • MCY T 0.78 0.93 r tblVehicleEF • MCY T 0.89 1.33 r tblVehicleEF • MCY T 2.07 2.13 r 4 tblVehicleEF • MCY T 0.46 1.46 r tblVehicleEF • MCY T 1.99 1.68 r tblVehicleEF • MCY T 2.0410e-003 2.0730e-003 r 4 tblVehicleEF • MCY T 6.5100e-004 5.6700e-004 r 4 tblVehicleEF • MCY T 1.67 2.44 r 4 tblVehicleEF • MCY T 0.78 0.93 r 4 tblVehicleEF • MCY T 0.89 1.33 r 4 tblVehicleEF • MCY T 2.59 2.67 r 4 tblVehicleEF • MCY T 0.46 1.46 r 4 tblVehicleEF • MCY T 2.16 1.83 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.13 0.21 r 4 tblVehicleEF • MCY T 18.28 19.52 r 4 tblVehicleEF • MCY T 9.09 8.30 r 4 tblVehicleEF • MCY T 169.21 212.46 r 4 tblVehicleEF • MCY T 43.23 56.84 r 4 tblVehicleEF • MCY T 0.96 0.97 r 4 tblVehicleEF • MCY T 0.29 0.25 r 4 tblVehicleEF • MCY T 2.0660e-003 2.1680e-003 tblVehicleEF • MCY • 3.1790e-003 2.8440e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 1.9270e-003 2.0220e-003 tblVehicleEF • MCY i 2.9740e-003 2.6590e-003 r tblVehicleEF • MCY T 3.32 5.02 r tblVehicleEF • MCY T 1.17 1.64 r tblVehicleEF • MCY T 2.03 3.02 r tblVehicleEF • MCY T 2.06 2.16 r tblVehicleEF • MCY T 0.46 1.55 r 4 tblVehicleEF • MCY T 1.79 1.60 r tblVehicleEF • MCY T 2.0510e-003 2.1020e-003 r tblVehicleEF • MCY T 6.3300e-004 5.6300e-004 r 4 tblVehicleEF • MCY T 3.32 5.02 r 4 tblVehicleEF • MCY T 1.17 1.64 r 4 tblVehicleEF • MCY T 2.03 3.02 r 4 tblVehicleEF • MCY T 2.58 2.71 r 4 tblVehicleEF • MCY T 0.46 1.55 r 4 tblVehicleEF • MCY T 1.95 1.75 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.15 0.25 r 4 tblVehicleEF • MCY T 17.21 17.77 r 4 tblVehicleEF • MCY T 9.82 9.33 r 4 tblVehicleEF • MCY T 169.21 209.71 r 4 tblVehicleEF • MCY T 43.23 59.48 r 4 tblVehicleEF • MCY T 1.11 1.17 r 4 tblVehicleEF • MCY T 0.31 0.27 r 4 tblVehicleEF • MCY T 2.0660e-003 2.1680e-003 r 4 tblVehicleEF • MCY T 3.1790e-003 2.8440e-003 tblVehicleEF • MCY • 1.9270e-003 2.0220e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 2.9740e-003 2.6590e-003 tblVehicleEF • MCY i 1.55 1.02 r tblVehicleEF • MCY T 0.93 0.73 r tblVehicleEF • MCY T 0.69 0.40 r tblVehicleEF • MCY T 2.06 2.17 r tblVehicleEF • MCY T 0.53 1.64 r tblVehicleEF • MCY T 2.01 1.91 r 4 tblVehicleEF • MCY T 2.0350e-003 2.0750e-003 r tblVehicleEF • MCY T 6.5200e-004 5.8900e-004 r tblVehicleEF • MCY T 1.55 1.02 r 4 tblVehicleEF • MCY T 0.93 0.73 r 4 tblVehicleEF • MCY T 0.69 0.40 r 4 tblVehicleEF • MCY T 2.58 2.72 r 4 tblVehicleEF • MCY T 0.53 1.64 r 4 tblVehicleEF • MCY T 2.18 2.08 r 4 tblVehicleEF • MDV T 5.7640e-003 2.4810e-003 r 4 tblVehicleEF • MDV T 7.7500e-003 0.04 r 4 tblVehicleEF • MDV T 0.76 0.71 r 4 tblVehicleEF • MDV T 1.57 2.14 r 4 tblVehicleEF • MDV T 377.40 348.85 r 4 tblVehicleEF • MDV T 85.98 69.93 r 4 tblVehicleEF • MDV T 0.08 0.04 r 4 tblVehicleEF • MDV T 0.13 0.19 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 tblVehicleEF • MDV • 1.9690e-003 1.2970e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MDV • 0.09 0.14 tblVehicleEF • MDV i 0.15 0.12 r tblVehicleEF • MDV T 0.08 0.12 r tblVehicleEF • MDV T 0.01 9.5140e-003 r tblVehicleEF • MDV T 0.09 0.38 r tblVehicleEF • MDV T 0.10 0.19 r tblVehicleEF • MDV T 3.7760e-003 3.2490e-003 r 4 tblVehicleEF • MDV T 8.8600e-004 6.5100e-004 r tblVehicleEF • MDV T 0.09 0.15 r tblVehicleEF • MDV T 0.15 0.12 r 4 tblVehicleEF • MDV T 0.08 0.12 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.38 r 4 tblVehicleEF • MDV T 0.11 0.21 r 4 tblVehicleEF • MDV T 6.5170e-003 2.8950e-003 r 4 tblVehicleEF • MDV T 6.7340e-003 0.04 r 4 tblVehicleEF • MDV T 0.93 0.93 r 4 tblVehicleEF • MDV T 1.39 2.19 r 4 tblVehicleEF • MDV T 409.68 373.27 r 4 tblVehicleEF • MDV T 85.98 69.97 r 4 tblVehicleEF • MDV T 0.07 0.05 r 4 tblVehicleEF • MDV T 0.12 0.20 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 r 4 tblVehicleEF • MDV T 1.9690e-003 1.2970e-003 tblVehicleEF • MDV • 0.18 0.29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MDV • 0.17 0.15 tblVehicleEF • MDV i 0.15 0.21 r tblVehicleEF • MDV T 0.02 0.01 r tblVehicleEF • MDV T 0.09 0.39 r tblVehicleEF • MDV T 0.09 0.18 r tblVehicleEF • MDV T 4.1010e-003 3.4760e-003 r tblVehicleEF • MDV T 8.8300e-004 6.5100e-004 r 4 tblVehicleEF • MDV T 0.18 0.30 r tblVehicleEF • MDV T 0.17 0.15 r tblVehicleEF • MDV T 0.15 0.21 r 4 tblVehicleEF • MDV T 0.02 0.02 r 4 tblVehicleEF • MDV T 0.09 0.40 r 4 tblVehicleEF • MDV T 0.10 0.20 r 4 tblVehicleEF • MDV T 5.5450e-003 2.2100e-003 r 4 tblVehicleEF • MDV T 7.9810e-003 0.05 r 4 tblVehicleEF • MDV T 0.71 0.60 r 4 tblVehicleEF • MDV T 1.61 2.49 r 4 tblVehicleEF • MDV T 367.53 332.90 r 4 tblVehicleEF • MDV T 85.98 70.62 r 4 tblVehicleEF • MDV T 0.07 0.05 r 4 tblVehicleEF • MDV T 0.13 0.20 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 r 4 tblVehicleEF • MDV T 1.9690e-003 1.2970e-003 r 4 tblVehicleEF • MDV T 0.07 0.06 tblVehicleEF • MDV • 0.16 0.11 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .MDV • 0.07 0.06 tblVehicleEF • MDV r 0.01 8.5740e-003 I- 4 tblVehicleEF • MDV r 0.11 0.42 I- 4 tblVehicleEF • MDV r 0.11 0.22 I- 4 tblVehicleEF • MDV r 3.6770e-003 3.1010e-003 I- 4 tblVehicleEF • MDV r 8.8700e-004 6.5800e-004 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.16 0.11 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.11 0.42 I- 4 tblVehicleEF • MDV r 0.12 0.25 I- 4 tblVehicleEF • MH r 9.2740e-003 2.6410e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 0.68 0.25 I- 4 tblVehicleEF • MH r 3.97 0.00 I- 4 tblVehicleEF • MH r 980.17 872.47 I- 4 tblVehicleEF • MH r 56.32 0.00 I- 4 tblVehicleEF • MH r 0.96 3.19 I- 4 tblVehicleEF • MH r 0.67 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 I- 4 tblVehicleEF • MH r 0.02 0.10 I- 4 tblVehicleEF • MH r 8.2700e-004 0.00 I- 4 tblVehicleEF • MH r 3.2360e-003 4.0000e-003 I- 4 tblVehicleEF • MH r 0.02 0.09 I- 4 tblVehicleEF • MH r 7.6000e-004 0.00 tblVehicleEF • MH • 0.99 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 0.05 0.00 tblVehicleEF • MH i 0.37 0.00 r tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.24 0.00 r tblVehicleEF • MH T 9.6990e-003 8.2480e-003 r tblVehicleEF • MH T 6.3200e-004 0.00 r 4 tblVehicleEF • MH T 0.99 0.00 r tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.37 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.26 0.00 r 4 tblVehicleEF • MH T 9.4580e-003 2.6410e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.69 0.25 r 4 tblVehicleEF • MH T 3.71 0.00 r 4 tblVehicleEF • MH T 980.17 872.47 r 4 tblVehicleEF • MH T 56.32 0.00 r 4 tblVehicleEF • MH T 0.90 3.01 r 4 tblVehicleEF • MH T 0.65 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.02 0.10 r 4 tblVehicleEF • MH T 8.2700e-004 0.00 r 4 tblVehicleEF • MH T 3.2360e-003 4.0000e-003 r 4 tblVehicleEF • MH T 0.02 0.09 tblVehicleEF • MH • 7.6000e-004 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 1.80 0.00 tblVehicleEF • MH i 0.06 0.00 r tblVehicleEF • MH T 0.71 0.00 r tblVehicleEF • MH T 0.04 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.23 0.00 r tblVehicleEF • MH T 9.7000e-003 8.2480e-003 r 4 tblVehicleEF • MH T 6.2800e-004 0.00 r tblVehicleEF • MH T 1.80 0.00 r tblVehicleEF • MH T 0.06 0.00 r 4 tblVehicleEF • MH T 0.71 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.25 0.00 r 4 tblVehicleEF • MH T 9.2620e-003 2.6410e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.68 0.25 r 4 tblVehicleEF • MH T 4.00 0.00 r 4 tblVehicleEF • MH T 980.17 872.47 r 4 tblVehicleEF • MH T 56.32 0.00 r 4 tblVehicleEF • MH T 0.95 3.23 r 4 tblVehicleEF • MH T 0.67 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.02 0.10 r 4 tblVehicleEF • MH T 8.2700e-004 0.00 r 4 tblVehicleEF • MH T 3.2360e-003 4.0000e-003 tblVehicleEF • MH • 0.02 0.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 7.6000e-004 0.00 tblVehicleEF • MH i 0.93 0.00 r tblVehicleEF • MH T 0.06 0.00 r tblVehicleEF • MH T 0.35 0.00 r tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.24 0.00 r 4 tblVehicleEF • MH T 9.6990e-003 8.2480e-003 r tblVehicleEF • MH T 6.3300e-004 0.00 r tblVehicleEF • MH T 0.93 0.00 r 4 tblVehicleEF • MH T 0.06 0.00 r 4 tblVehicleEF • MH T 0.35 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.27 0.00 r 4 tblVehicleEF • MHD T 0.02 4.9600e-003 r 4 tblVehicleEF • MHD T 1.5610e-003 1.3430e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.31 0.44 r 4 tblVehicleEF • MHD T 0.14 0.16 r 4 tblVehicleEF • MHD T 3.45 1.18 r 4 tblVehicleEF • MHD T 147.83 64.38 r 4 tblVehicleEF • MHD T 1,042.82 936.73 r 4 tblVehicleEF • MHD T 52.76 11.60 r 4 tblVehicleEF • MHD T 0.39 0.32 r 4 tblVehicleEF • MHD T 0.40 0.79 tblVehicleEF • MHD • 11.32 1.53 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 6.2000e-005 1.5800e-004 tblVehicleEF • MHD i 2.6360e-003 8.6670e-003 r tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r tblVehicleEF • MHD T 6.0000e-005 1.5100e-004 r tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r tblVehicleEF • MHD T 1.1490e-003 1.1170e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 6.3900e-004 5.9000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.22 0.06 r 4 tblVehicleEF • MHD T 1.4210e-003 6.1200e-004 r 4 tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r 4 tblVehicleEF • MHD T 5.8800e-004 1.1500e-004 r 4 tblVehicleEF • MHD T 1.1490e-003 1.1170e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.3900e-004 5.9000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.24 0.06 r 4 tblVehicleEF • MHD T 0.01 4.7050e-003 r 4 tblVehicleEF • MHD T 1.5740e-003 1.3600e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 tblVehicleEF • MHD • 0.23 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 0.14 0.16 tblVehicleEF • MHD i 3.30 1.15 r tblVehicleEF • MHD T 156.58 64.16 r tblVehicleEF • MHD T 1,042.82 936.73 r tblVehicleEF • MHD T 52.76 11.55 r tblVehicleEF • MHD T 0.40 0.31 r tblVehicleEF • MHD T 0.37 0.74 r 4 tblVehicleEF • MHD T 11.31 1.53 r tblVehicleEF • MHD T 5.2000e-005 1.3600e-004 r tblVehicleEF • MHD T 2.6360e-003 8.6670e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r 4 tblVehicleEF • MHD T 5.0000e-005 1.3000e-004 r 4 tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r 4 tblVehicleEF • MHD T 2.2030e-003 2.2320e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.1740e-003 1.0650e-003 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.21 0.06 r 4 tblVehicleEF • MHD T 1.5040e-003 6.1000e-004 r 4 tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r 4 tblVehicleEF • MHD T 5.8500e-004 1.1400e-004 r 4 tblVehicleEF • MHD T 2.2030e-003 2.2320e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 tblVehicleEF • MHD • 0.03 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 1.1740e-003 1.0650e-003 tblVehicleEF • MHD i 0.02 0.01 r tblVehicleEF • MHD T 0.02 0.14 r tblVehicleEF • MHD T 0.23 0.06 r tblVehicleEF • MHD T 0.02 5.3100e-003 r tblVehicleEF • MHD T 1.5510e-003 1.3120e-003 r tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.43 0.53 r tblVehicleEF • MHD T 0.14 0.15 r tblVehicleEF • MHD T 3.51 1.25 r 4 tblVehicleEF • MHD T 135.73 64.68 r 4 tblVehicleEF • MHD T 1,042.82 936.72 r 4 tblVehicleEF • MHD T 52.76 11.73 r 4 tblVehicleEF • MHD T 0.37 0.34 r 4 tblVehicleEF • MHD T 0.39 0.80 r 4 tblVehicleEF • MHD T 11.33 1.54 r 4 tblVehicleEF • MHD T 7.6000e-005 1.8800e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.6670e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r 4 tblVehicleEF • MHD T 7.2000e-005 1.8000e-004 r 4 tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r 4 tblVehicleEF • MHD T 7.6900e-004 4.6100e-004 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 4.9200e-004 3.0900e-004 tblVehicleEF • MHD • 0.02 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 0.02 0.14 tblVehicleEF • MHD i 0.22 0.06 r tblVehicleEF • MHD T 1.3070e-003 6.1500e-004 r tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r tblVehicleEF • MHD T 5.8900e-004 1.1600e-004 r tblVehicleEF • MHD T 7.6900e-004 4.6100e-004 r tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 4.9200e-004 3.0900e-004 r tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.24 0.07 r 4 tblVehicleEF • OBUS T 0.01 7.6410e-003 r 4 tblVehicleEF • OBUS T 3.0890e-003 2.0650e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.58 r 4 tblVehicleEF • OBUS T 0.21 0.21 r 4 tblVehicleEF • OBUS T 4.35 1.49 r 4 tblVehicleEF • OBUS T 74.93 84.84 r 4 tblVehicleEF • OBUS T 1,073.88 1,127.70 r 4 tblVehicleEF • OBUS T 67.73 13.97 r 4 tblVehicleEF • OBUS T 0.15 0.37 r 4 tblVehicleEF • OBUS T 0.31 0.69 r 4 tblVehicleEF • OBUS T 2.00 1.06 r 4 tblVehicleEF • OBUS T 1.4000e-005 1.2100e-004 r 4 tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 tblVehicleEF • OBUS • 9.7400e-004 1.5400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 1.3000e-005 1.1600e-004 tblVehicleEF • OBUS i 2.0120e-003 7.7610e-003 r tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r tblVehicleEF • OBUS T 1.9410e-003 2.1170e-003 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.03 0.05 r tblVehicleEF • OBUS T 8.7000e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.28 0.07 r 4 tblVehicleEF • OBUS T 7.2700e-004 8.0600e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.5300e-004 1.3800e-004 r 4 tblVehicleEF • OBUS T 1.9410e-003 2.1170e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.7000e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.30 0.08 r 4 tblVehicleEF • OBUS T 0.01 7.7200e-003 r 4 tblVehicleEF • OBUS T 3.1380e-003 2.0930e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.57 r 4 tblVehicleEF • OBUS T 0.21 0.21 r 4 tblVehicleEF • OBUS T 4.07 1.42 tblVehicleEF • OBUS • 78.40 83.82 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 1,073.88 1,127.70 tblVehicleEF • OBUS i 67.73 13.86 r tblVehicleEF • OBUS T 0.16 0.35 r tblVehicleEF • OBUS T 0.29 0.65 r tblVehicleEF • OBUS T 1.98 1.06 r tblVehicleEF • OBUS T 1.1000e-005 1.0800e-004 r tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 r 4 tblVehicleEF • OBUS T 9.7400e-004 1.5400e-004 r tblVehicleEF • OBUS T 1.1000e-005 1.0300e-004 r tblVehicleEF • OBUS T 2.0120e-003 7.7610e-003 r 4 tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r 4 tblVehicleEF • OBUS T 3.5960e-003 4.1590e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6320e-003 1.6440e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.26 0.07 r 4 tblVehicleEF • OBUS T 7.6000e-004 7.9700e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4900e-004 1.3700e-004 r 4 tblVehicleEF • OBUS T 3.5960e-003 4.1590e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 1.6320e-003 1.6440e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 tblVehicleEF • OBUS • 0.05 0.16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.29 0.08 tblVehicleEF • OBUS i 0.01 7.5280e-003 r tblVehicleEF • OBUS T 3.0740e-003 2.0150e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.59 r tblVehicleEF • OBUS T 0.21 0.21 r tblVehicleEF • OBUS T 4.40 1.60 r 4 tblVehicleEF • OBUS T 70.15 86.24 r tblVehicleEF • OBUS T 1,073.88 1,127.69 r tblVehicleEF • OBUS T 67.73 14.17 r 4 tblVehicleEF • OBUS T 0.14 0.40 r 4 tblVehicleEF • OBUS T 0.31 0.71 r 4 tblVehicleEF • OBUS T 2.00 1.07 r 4 tblVehicleEF • OBUS T 1.7000e-005 1.4000e-004 r 4 tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 r 4 tblVehicleEF • OBUS T 9.7400e-004 1.5400e-004 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.3400e-004 r 4 tblVehicleEF • OBUS T 2.0120e-003 7.7610e-003 r 4 tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r 4 tblVehicleEF • OBUS T 1.5870e-003 9.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.03 0.04 r 4 tblVehicleEF • OBUS T 7.8200e-004 4.9500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.28 0.08 tblVehicleEF • OBUS • 6.8100e-004 8.1900e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.01 0.01 tblVehicleEF • OBUS i 7.5400e-004 1.4000e-004 r tblVehicleEF • OBUS T 1.5870e-003 9.2500e-004 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.04 0.06 r tblVehicleEF • OBUS T 7.8200e-004 4.9500e-004 r tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.30 0.09 r tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 6.1410e-003 3.7560e-003 r 4 tblVehicleEF • SBUS T 0.05 5.1390e-003 r 4 tblVehicleEF • SBUS T 8.03 2.67 r 4 tblVehicleEF • SBUS T 0.40 0.26 r 4 tblVehicleEF • SBUS T 5.88 0.57 r 4 tblVehicleEF • SBUS T 1,077.74 333.40 r 4 tblVehicleEF • SBUS T 1,068.66 1,005.50 r 4 tblVehicleEF • SBUS T 57.11 4.22 r 4 tblVehicleEF • SBUS T 5.34 2.95 r 4 tblVehicleEF • SBUS T 2.17 3.27 r 4 tblVehicleEF • SBUS T 11.69 1.17 r 4 tblVehicleEF • SBUS T 3.0670e-003 2.5210e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r 4 tblVehicleEF • SBUS T 2.9340e-003 2.4120e-003 tblVehicleEF • SBUS • 2.6740e-003 2.5930e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 0.01 0.02 tblVehicleEF • SBUS i 6.2800e-004 4.5000e-005 r tblVehicleEF • SBUS i 6.4510e-003 1.8200e-003 r tblVehicleEF • SBUS i 0.04 7.9830e-003 r tblVehicleEF • SBUS i 0.95 0.29 r tblVehicleEF • SBUS i 3.1450e-003 7.8100e-004 r tblVehicleEF • SBUS i 0.07 0.06 r 4 tblVehicleEF • SBUS i 0.02 0.05 r tblVehicleEF • SBUS i 0.34 0.03 r tblVehicleEF • SBUS T 0.01 3.1780e-003 r 4 tblVehicleEF • SBUS T 0.01 9.6480e-003 r 4 tblVehicleEF • SBUS T 6.7400e-004 4.2000e-005 r 4 tblVehicleEF • SBUS T 6.4510e-003 1.8200e-003 r 4 tblVehicleEF • SBUS T 0.04 7.9830e-003 r 4 tblVehicleEF • SBUS T 1.37 0.41 r 4 tblVehicleEF • SBUS T 3.1450e-003 7.8100e-004 r 4 tblVehicleEF • SBUS T 0.08 0.07 r 4 tblVehicleEF • SBUS T 0.02 0.05 r 4 tblVehicleEF • SBUS T 0.37 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 6.2200e-003 3.7790e-003 r 4 tblVehicleEF • SBUS T 0.05 4.4810e-003 r 4 tblVehicleEF • SBUS T 7.96 2.64 r 4 tblVehicleEF • SBUS T 0.41 0.26 r 4 tblVehicleEF • SBUS T 4.27 0.44 r 4 tblVehicleEF • SBUS T1,125.04 338.86 tblVehicleEF • SBUS • 1,068.66 1,005.51 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • SBUS • 57.11 4.01 • SBUS i 5.51 3.00 r • SBUS i 2.04 3.08 r • SBUS i 11.66 1.17 r • SBUS T 2.5850e-003 2.1340e-003 r • SBUS T 0.01 0.01 r • SBUS T 0.01 0.02 r 4 • SBUS T 6.8300e-004 4.9000e-005 r • SBUS T 2.4730e-003 2.0420e-003 r • SBUS T 2.6740e-003 2.5930e-003 r 4 • SBUS T 0.01 0.02 r 4 • SBUS T 6.2800e-004 4.5000e-005 r 4 • SBUS T 0.01 3.5710e-003 r 4 • SBUS T 0.04 8.8000e-003 r 4 • SBUS T 0.95 0.29 r 4 • SBUS T 5.7080e-003 1.3980e-003 r 4 • SBUS T 0.07 0.06 r 4 • SBUS T 0.02 0.05 r 4 • SBUS T 0.28 0.02 r 4 • SBUS T 0.01 3.2290e-003 r 4 • SBUS T 0.01 9.6480e-003 r 4 • SBUS T 6.4700e-004 4.0000e-005 r 4 • SBUS T 0.01 3.5710e-003 r 4 • SBUS T 0.04 8.8000e-003 r 4 • SBUS T 1.37 0.42 r 4 • SBUS T 5.7080e-003 1.3980e-003 • SBUS • 0.08 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 0.02 0.05 tblVehicleEF • SBUS i 0.31 0.03 r tblVehicleEF • SBUS i 0.81 0.07 r tblVehicleEF • SBUS i 6.1170e-003 3.7170e-003 r tblVehicleEF • SBUS i 0.06 6.0630e-003 r tblVehicleEF • SBUS i 8.13 2.71 r tblVehicleEF • SBUS i 0.40 0.26 r 4 tblVehicleEF • SBUS i 6.24 0.75 r tblVehicleEF • SBUS i 1,012.43 325.87 • r tblVehicleEF • SBUS i 1,068.66 1,005.50 r 4 tblVehicleEF • SBUS i 57.11 4.53 r 4 tblVehicleEF • SBUS T 5.11 2.89 r 4 tblVehicleEF • SBUS T 2.15 3.32 r 4 tblVehicleEF • SBUS T 11.70 1.18 r 4 tblVehicleEF • SBUS T 3.7320e-003 3.0540e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r 4 tblVehicleEF • SBUS T 3.5700e-003 2.9220e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5930e-003 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.2800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 5.3930e-003 7.9200e-004 r 4 tblVehicleEF • SBUS T 0.04 7.7170e-003 r 4 tblVehicleEF • SBUS T 0.95 0.29 r 4 tblVehicleEF • SBUS T 2.9940e-003 4.3200e-004 tblVehicleEF • SBUS • 0.07 0.06 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .SBUS • 0.03 0.06 tblVehicleEF • SBUS r 0.35 0.03 I- 4 tblVehicleEF • SBUS r 9.9440e-003 3.1060e-003 I- 4 tblVehicleEF • SBUS r 0.01 9.6480e-003 I- 4 tblVehicleEF • SBUS r 6.8000e-004 4.5000e-005 I- 4 tblVehicleEF • SBUS r 5.3930e-003 7.9200e-004 I- 4 tblVehicleEF • SBUS r 0.04 7.7170e-003 I- 4 tblVehicleEF • SBUS r 1.38 0.41 I- 4 tblVehicleEF • SBUS r 2.9940e-003 4.3200e-004 I- 4 tblVehicleEF • SBUS r 0.08 0.07 I- 4 tblVehicleEF • SBUS r 0.03 0.06 I- 4 tblVehicleEF • SBUS r 0.39 0.04 I- 4 tblVehicleEF • UBUS r 1.04 4.47 I- 4 tblVehicleEF • UBUS r 0.07 0.00 I- 4 tblVehicleEF • UBUS r 5.44 34.93 I- 4 tblVehicleEF • UBUS r 10.69 0.00 I- 4 tblVehicleEF • UBUS 1,722.08 1,546.23 I- 4 tblVehicleEF • UBUS r 150.93 0.00 I- 4 tblVehicleEF • UBUS r 1.69 0.35 I- 4 tblVehicleEF • UBUS r 11.90 0.00 I- 4 tblVehicleEF • UBUS r 0.48 0.08 I- 4 tblVehicleEF • UBUS r 0.01 0.03 I- 4 tblVehicleEF • UBUS r 0.01 5.1020e-003 I- 4 tblVehicleEF • UBUS r 1.5820e-003 0.00 I- 4 tblVehicleEF • UBUS r 0.21 0.03 I- 4 tblVehicleEF • UBUS r 3.0000e-003 6.8250e-003 tblVehicleEF • UBUS • 0.01 4.8810e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 1.4540e-003 0.00 tblVehicleEF • UBUS i 7.0030e-003 0.00 r tblVehicleEF • UBUS T 0.07 0.00 r tblVehicleEF • UBUS T 3.8230e-003 0.00 r tblVehicleEF • UBUS T 0.17 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.92 0.00 r 4 tblVehicleEF • UBUS T 8.5500e-003 0.00 r tblVehicleEF • UBUS T 1.7050e-003 0.00 r tblVehicleEF • UBUS T 7.0030e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.8230e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.00 0.00 r 4 tblVehicleEF • UBUS T 1.04 4.47 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.47 34.93 r 4 tblVehicleEF • UBUS T 9.24 0.00 r 4 tblVehicleEF • UBUS T 1,722.08 1,546.23 r 4 tblVehicleEF • UBUS T 150.93 0.00 r 4 tblVehicleEF • UBUS T 1.57 0.35 r 4 tblVehicleEF • UBUS T 11.83 0.00 r 4 tblVehicleEF • UBUS T 0.48 0.08 r 4 tblVehicleEF • UBUS T 0.01 0.03 r 4 tblVehicleEF • UBUS T 0.01 5.1020e-003 tblVehicleEF • UBUS • 1.5820e-003 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 0.21 0.03 tblVehicleEF • UBUS i 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.01 4.8810e-003 r tblVehicleEF • UBUS T 1.4540e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r tblVehicleEF • UBUS T 0.09 0.00 r tblVehicleEF • UBUS T 7.4330e-003 0.00 r 4 tblVehicleEF • UBUS T 0.17 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.84 0.00 r 4 tblVehicleEF • UBUS T 8.5510e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6790e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.09 0.00 r 4 tblVehicleEF • UBUS T 7.4330e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.92 0.00 r 4 tblVehicleEF • UBUS T 1.04 4.47 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 5.44 34.93 r 4 tblVehicleEF • UBUS T 10.91 0.00 r 4 tblVehicleEF • UBUS T 1,722.08 1,546.23 r 4 tblVehicleEF • UBUS T 150.93 0.00 r 4 tblVehicleEF • UBUS T 1.68 0.35 r 4 tblVehicleEF • UBUS T 11.91 0.00 tblVehicleEF • UBUS • 0.48 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 0.01 0.03 tblVehicleEF • UBUS i 0.01 5.1020e-003 r tblVehicleEF • UBUS T 1.5820e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.01 4.8810e-003 r tblVehicleEF • UBUS T 1.4540e-003 0.00 r 4 tblVehicleEF • UBUS T 5.7830e-003 0.00 r tblVehicleEF • UBUS T 0.08 0.00 r tblVehicleEF • UBUS T 3.3500e-003 0.00 r 4 tblVehicleEF • UBUS T 0.17 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.93 0.00 r 4 tblVehicleEF • UBUS T 8.5500e-003 0.00 r 4 tblVehicleEF • UBUS T 1.7090e-003 0.00 r 4 tblVehicleEF • UBUS T 5.7830e-003 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 3.3500e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.01 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 8.70 r 4 tblVehicleTrips • CNW_TL T 5.40 8.70 • r 4 tblVehicleTrips • CW_TL T 12.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 • tblVehicleTrips • HS_TL • 3.50 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • • • • HS_TL HW TL HW TL ST_TR ST TR ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic 3.50 11.00 11.00 7.16 40.63 9.91 6.07 39.53 8.62 6.59 35.74 9.52 11.85 33.65 11.85 • • 4 4 4 4 4 4 33.65 8.70 8.70 8.70 8.07 16.91 9.48 6.23 16.06 8.50 7.26 25.83 9.38 0.00 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 50 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2026 •i 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 : 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 61 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter Mitigated Operational ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Ib/day r Area •i 48.2635 15.9593 81.4333 0.1003 1 1.6367 1.6367 1.6367 1.6367 • 0.0000 i 19,405.781 19,405.781 0.4988 1 0.3533 19,523.53 MI J J J J J J .1 J • .1 J .1 Energy ;� 1 1 36 •I 0 0 2 J J J .1 J J J J 4 J J J T J .1 J .1 .1 J .1 J • .1 J .1 Energy •i 0.4231 3.6158 1.5387 0.0231 0.2923 0.2923 0.2923 0.2923 • i 4,615.949 4,615.949 0.0885 0.0846 4,643.379 0 0 2 84 84 i 28 Total f J J J .1 J J J J . J J .1 T 62.1449 Mobile •i 13.4583 44.8765 131.2548 0.4564 50.9094 0.4670 51.3764 13.6022 0.4410 14.0432 • i 48,919.28 48,919.28 1.7858 48,963.93 0.5798 50.9094 2.3960 53.3054 • 84 84 28 0.0000 Total 72,941.01 62.1449 64.4517 214.2268 0.5798 50.9094 2.3960 53.3054 13.6022 2.3700 15.9722 0.0000 72,941.01 72,941.01 2.3731 0.4379 73,130.84 84 84 56 84 84 56 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N2O CO2e Category Ib/day Ib/day Area •i 48.2635 15.9593 ' 81.4333 0.1003 1 : 1.6367 1.6367 I 1.6367 1.6367 • 0.0000 19,405.781 19,405.781 0.4988 1 0.3533 19,523.53 •II 1 1 I 36 .1 MI J J J J J J .1 J • .1 J .1 Energy •i 0.4231 3.6158 1.5387 0.0231 0.2923 0.2923 0.2923 0.2923 • i 4,615.949 4,615.949 0.0885 0.0846 4,643.379 •I 0 0 2 . J .1 J .1 .1 J .1 J • .1 J .1 Mobile •i 13.4583 44.8765 131.2548 0.4564 50.9094 0.4670 51.3764 13.6022 0.4410 14.0432 • 48,919.28 48,919.28 1.785848,963.93 84 84 i 28 Total 62.1449 64.4517 214.2268 0.5798 50.9094 2.3960 53.3054 13.6022 2.3700 15.9722 0.0000 72,941.01 72,941.01 2.3731 0.4379 73,130.84 84 84 56 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :11/21/2026 :11/20/2026• 0' Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers • 0 0 IUsage Hours I Horse Power I Load Factor 1- 0' 8.001 81' 8.001 158' t 8.00 247' 0.73 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00' 5.40' 20.00'LD Mix 'HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 3.1 Mitigation Measures Construction 3.2 Demolition - 2026 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 I i t Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 61 3.2 Demolition - 2026 Mitigated Construction On -Site Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 4.1 Mitigation Measures Mobile Page 55 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4� 13.4583 1 44.8765 1 131.2548 1 0.4564 1 50.9094 1 0.4670 1 51.3764 1 13.6022 1 0.4410 14.0432 •i 48,919.28 48,919.28 1.7858 i 48,963.93 11 •1 84 84 1 1 1 1 28 • a + + + + + + + + r l• + + + r Unmitigated •. 13.4583 . 44.8765 . 131.2548 • 0.4564 . 50.9094 • 0.4670 • 51.3764 . 13.6022 • 0.4410 . 14.0432 • . 48,919.28 • 48,919.28 • 1.7858 . • 48,963.93 84 84 28 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 2 1,720.67 1,913.42 1476.20 • 4,817,104 • 4,817,104 T Golf Course + 310.00 202.96 192.75 • 544,459 • 544,459 Other Asphalt Surfaces ; 0.00 0.00 T 0.00 • Single Family Housing ; 6,312.34 ; 6,379.17 5717.20 • 17,535,735 • 17,535,735 Total I 8,343.00 I 8,495.54 7,386.16 I 22,897,298 1 22,897,298 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip % Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing r 8.70 8.70 12.50 8.70 8.70 8.70 4.20 -r -r 8.70 40.20 8.70 33.00 5.40 1 0.00 8.70 8.70 40.20 19.20 40.60 48.00 0.00 T 19.00 0.00 19.20 40.60 • • • • • 86 11 3 52 39 9 0 86 0 ▪ 11 0 3 4.4 Fleet Mix Land Use Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing MDV LHD1 LHD2 MHD HHD OBUS UBUS I MCY • 0.561225v 0.0343841 0.1908841 0.102953 i 0.010631 1 0.004198 i 0.017138 i 0.070241 1 0.001423 i 0.0010771 0.004368 i 0.000839' 0.000640 1� � � � 1 4i i i i i t i i i i t + • 0.5612251 0.034384 0.1908841 0.102953 0.010631 0.004198 0.017138 0.070241 0.001423 0.001077 0.004368 0.000839' 0.000640 1� 1 1 � � 1 4i i i i i t i i i i t + 0.5612251 0.034384 0.190884 0.102953 0.010631 0.004198 0.017138 0.070241 0.001423 0.001077 0.004368 0.000839' 0.000640 v � 1 1 1 1 1 E E E E E E E E E E E 0.561225• 0.034384: 0.190884' 0.102953' 0.010631' 0.004198' 0.017138' 0.070241' 0.001423' 0.001077' 0.004368' 0.000839' 0.000640 I LDA I LDT1 I LDT2 SBUS I MH 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day 1 1 1 1 NaturalGas •1 0.4231 1 3.6158 1 1 1.5387 1 1 0.0231 1 1 1 0.2923 1 1 0.2923 1 1 1 1 1 0.2923 0.2923 + 1 4,615.949 � 4,615.949 � 0.0885 � 0.0846 i 4,643.379 Mitigated ;i1 1. 1 1 0 1 0 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 I. F + 1• + 4. 4. + 4. r I. 4. 4. 4. r NaturalGas • 0.4231 • 3.6158 • 1.5387 • 0.0231 • 0.2923 • 0.2923 • 0.2923 • 0.2923 • . 4,615.949 • 4,615.949 • 0.0885 • 0.0846 • 4,643.379 Unmitigated 0 0 2 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family1 Housing 1 6828.15 • 003 i ; 1 . r -. I0 .1 i • 1 . 1 0 .1 1 . I- 4 J 32407.4 ■1 1 . 1 0.0736 0.6293 0.2678 : 4.0200e- : 0.0509 0.0509 1 : 0.0509 0.0509 • 1 1 1 1 1 1 1 J J J J J J J •J 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 1 : 0.0000 0.0000 • 1 1 1 1 1 1 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • . J J J J J J J 0.3495 2.9866 1.2709 0.0191 0.2415 0.2415 0.2415 0.2415 • . . 803.3112 803.3112 0.0154 0.0147 J J 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 J J J 3,812.637 3,812.637 0.0731 0.0699 7 7 808.0849 0.0000 0.0000 3,835.294 3 Total 0.4231 3.6158 1.5387 0.0231 0.2924 0.2924 0.2924 0.2924 4,615.948 9 4,615.948 9 0.0885 0.0846 4,643.379 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 1 6.82815 •i i ;1 f �I 10 f �I : 0 •i •� i f 4 1 32.4074 • 1 i 0.0736 0.6293 : 0.2678 : 4.0200e- 0.0509 0.05090.0509 0.0509 1 1 003 1 1 1 .1 .1 .1 .1 .1 .1 .1 .1 7 9 0.0000 0.0000 ' 0.0000 : 0.0000 0.0000 0.0000 I : 0.0000 0.0000 • J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 6 1 J J J J J J J J . 0.3495 2.9866 1.2709 0.0191 0.2415 0.2415 0.2415 0.2415 • ; i 803.3112 803.3112 0.0154 0.0147 808.0849 .1 .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 .1 i 3,812.637 3,812.637 0.0731 0.0699 3,835.294 7 7 3 Total 0.4231 3.6158 1.5387 0.0231 0.2924 0.2924 0.2924 0.2924 4,615.948 9 4,615.948 9 0.0885 0.0846 4,643.379 2 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4 48.2635 15.9593 : 81.4333 0.1003 i i 1.6367 i 1.6367 i i 1.6367 1.6367 . 0.0000 i 19,405.78 : 19,405.78 0.4988 0.3533 � 19,523.53 •1 i 1i i1 1 1 1i i 11 11 i i 36 • I. + 4. F + 4. 1. 4. 4. r I. 4. + + Unmitigated •• 48.2635 • 15.9593 • 81.4333 • 0.1003 1.6367 • 1.6367 • 1.6367 • 1.6367 • 0.0000 .19,405.781.19,405.781. 0.4988 • 0.3533 • 19,523.53 1 1 36 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural Coating :: •� Consumer •i Products :: •i Hearth •I •1 . Landscaping •i 4 12.7055 : 0.0000 0.0000 0.0000 0.0000 i .1 .1 .1 V 31.5391 : 0.0000 0.0000 0.0000 0.0000 J J J J J J J J V 1.7665 15.0953 6.4235 1 0.0964 1 1.2205 1.2205 1.2205 1.2205 .1 .1 .1 .1 .1 .1 .1 .1 . 2.2524 0.8640 75.0098 3.9600e- 0.4162 0.4162 0.4162 0.4162 003 • • • 0.0000 : • . . 0.0000 i 0.0000 i .1 .1 J 0.0000 0.0000 J J J 19,270.58 19,270.581 0.3694 0.3533 19,385.10 82 82 37 .1 .1 .1 135.1929 135.1929 0.1295 138.4299 Total 48.2635 15.9593 81.4333 0.1003 1.6367 1.6367 1.6367 1.6367 0.0000 19,405.78 11 19,405.78 11 0.4988 0.3533 19,523.53 36 CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 61 6.2 Area by SubCategory Mitigated Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 12.7055 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: : ,I Consumer •i 31.5391 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •i 1.7665 15.0953 6.4235 0.0964 1.2205 1.2205 1.2205 1.2205 • 0.0000 i 19,270.58 19,270.58 0.3694 0.3533 19,385.10 9: 82 82 37 1. Landscaping •i 2.2524 0.8640 75.0098 3.9600e- 0.4162 0.4162 0.4162 0.4162 I i 135.1929 135.1929 0.1295 138.4299 003 • Total 48.2635 15.9593 81.4333 0.1003 1.6367 1.6367 1.6367 1.6367 0.0000 19,405.78 19,405.78 0.4988 0.3533 19,523.53 11 11 36 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 61 Date: 1/6/2021 4:57 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Winter Institute Recycling and Composting Services 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.21: CALEEMOD PHASE 3 OPERATIONAL EMISSIONS MODEL OUTPUTS 12188-05 AQ Report URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer Travertine Specific Plan - Phase 3 (Operations) Riverside -Salton Sea County, Summer 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course Hotel Apartments Low Rise Single Family Housing • • • • • 35.00 12.00 100.00 442.00 758.00 a 4 a 4 a 4 4 Acre Hole Room Dwelling Unit 35.00 46.20 38.30 60.80 Dwelling Unit 317.50 1,524,600.00 0 64,282.00 0 261,712.00 0 442,000.00 1198 1,364,400.00 2054 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% less energy for residential uses Water Mitigation - Waste Mitigation - Table Name Column Name Default Value New Value tblConstructionPhase • NumDays 500.00 • 0.00 r tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 5.44 T• 3.81 tblEnergyUse Y • LightingElect 1,608.84 T 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 • tblEnergyUse Y T24E 6.47 T 4.53 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T• 4,485.92 tblEnergyUse Y• T24NG 55.15 T 38.61 tblEnergyUse Y• T24NG 24,566.15 T 11,546.09 Y 1 1 tblFireplaces • NumberGas 353.60 442.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblFireplaces • NumberGas • 606.40 758.00 tblFireplaces • NumberNoFireplace i 44.20 0.00 r tblFireplaces • NumberNoFireplace T 75.80 0.00 r tblFireplaces • NumberWood T 44.20 0.00 r tblFireplaces • NumberWood T 75.80 0.00 r tblLandUse • LandUseSquareFeet i 0.00 64,282.00 • r tblLandUse • LandUseSquareFeet T 145,200.00 261,712.00 r 4 tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 3.33 38.30 • r tblLandUse • LotAcreage i 27.63 60.80 r 4 tblLandUse • LotAcreage i 246.10 317.50 r 4 tblLandUse • Population T 1,264.00 1,198.00 r 4 tblLandUse • Population T 2,168.00 2,054.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 • r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 623.16 r 4 tblVehicleEF • HHD T 0.75 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 1.93 10.48 r 4 tblVehicleEF • HHD T 0.45 0.21 r 4 tblVehicleEF • HHD T 1.67 2.2240e-003 r 4 tblVehicleEF • HHD T 5,686.40 1,476.79 r 4 tblVehicleEF • HHD T 1,373.71 1,021.53 r 4 tblVehicleEF • HHD T 5.25 0.02 tblVehicleEF • HHD • 16.13 8.41 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 0.76 1.81 tblVehicleEF • HHD i 20.16 2.34 r tblVehicleEF • HHD T 2.7210e-003 3.0730e-003 r tblVehicleEF • HHD T 0.06 0.06 r tblVehicleEF • HHD T 0.04 0.04 r tblVehicleEF • HHD T 4.8640e-003 0.02 r tblVehicleEF • HHD T 5.7000e-005 0.00 r 4 tblVehicleEF • HHD T 2.6030e-003 2.9400e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8460e-003 8.9630e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 8.2000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.2700e-003 2.1000e-005 r 4 tblVehicleEF • HHD T 0.51 0.71 r 4 tblVehicleEF • HHD T 4.8000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 1.5900e-004 8.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.5730e-003 r 4 tblVehicleEF • HHD T 8.0000e-005 0.00 r 4 tblVehicleEF • HHD T 8.2000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.2700e-003 2.1000e-005 r 4 tblVehicleEF • HHD T 0.59 0.81 r 4 tblVehicleEF • HHD T 4.8000e-005 1.0000e-006 tblVehicleEF • HHD • 0.08 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 1.5900e-004 8.9000e-005 tblVehicleEF • HHD i 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.70 0.04 r tblVehicleEF • HHD T 0.03 0.01 r tblVehicleEF • HHD T 0.05 0.00 r tblVehicleEF • HHD T 1.40 10.35 r tblVehicleEF • HHD T 0.46 0.21 r 4 tblVehicleEF • HHD T 1.60 2.1620e-003 r tblVehicleEF • HHD T 6,024.24 1,457.52 r tblVehicleEF • HHD T 1,373.71 1,021.53 r 4 tblVehicleEF • HHD T 5.25 0.02 r 4 tblVehicleEF • HHD T 16.65 7.99 r 4 tblVehicleEF • HHD T 0.72 1.71 r 4 tblVehicleEF • HHD T 20.16 2.34 r 4 tblVehicleEF • HHD T 2.2940e-003 2.7280e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.8640e-003 0.02 r 4 tblVehicleEF • HHD T 5.7000e-005 0.00 r 4 tblVehicleEF • HHD T 2.1950e-003 2.6100e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8460e-003 8.9630e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 1.5500e-004 2.0000e-006 r 4 tblVehicleEF • HHD T 2.5580e-003 2.6000e-005 tblVehicleEF • HHD • 0.48 0.75 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 8.7000e-005 1.0000e-006 tblVehicleEF • HHD i 0.05 0.02 r tblVehicleEF • HHD T 1.6100e-004 9.2000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.06 0.01 r tblVehicleEF • HHD T 0.01 9.5730e-003 r tblVehicleEF • HHD T 7.8000e-005 0.00 r 4 tblVehicleEF • HHD T 1.5500e-004 2.0000e-006 r tblVehicleEF • HHD T 2.5580e-003 2.6000e-005 r tblVehicleEF • HHD T 0.56 0.86 r 4 tblVehicleEF • HHD T 8.7000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.6100e-004 9.2000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.81 0.03 r 4 tblVehicleEF • HHD T 0.03 8.3700e-004 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 2.66 10.65 r 4 tblVehicleEF • HHD T 0.45 0.17 r 4 tblVehicleEF • HHD T 1.70 2.3630e-003 r 4 tblVehicleEF • HHD T 5,219.86 1,500.30 r 4 tblVehicleEF • HHD T 1,373.71 1,013.27 r 4 tblVehicleEF • HHD T 5.25 0.02 r 4 tblVehicleEF • HHD T 15.41 8.96 r 4 tblVehicleEF • HHD T 0.76 1.83 r 4 tblVehicleEF • HHD T 20.16 2.34 tblVehicleEF • HHD • 3.3110e-003 3.5340e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • HHD • 0.06 0.06 tblVehicleEF • HHD i 0.04 0.04 r tblVehicleEF • HHD T 4.8640e-003 0.02 r tblVehicleEF • HHD T 5.7000e-005 0.00 r tblVehicleEF • HHD T 3.1670e-003 3.3820e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8460e-003 8.9370e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r tblVehicleEF • HHD T 5.2000e-005 0.00 r tblVehicleEF • HHD T 5.5000e-005 0.00 r 4 tblVehicleEF • HHD T 2.3120e-003 1.9000e-005 r 4 tblVehicleEF • HHD T 0.55 0.65 r 4 tblVehicleEF • HHD T 3.9000e-005 0.00 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 1.7200e-004 9.6000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.5730e-003 r 4 tblVehicleEF • HHD T 8.0000e-005 0.00 r 4 tblVehicleEF • HHD T 5.5000e-005 0.00 r 4 tblVehicleEF • HHD T 2.3120e-003 1.9000e-005 r 4 tblVehicleEF • HHD T 0.64 0.74 r 4 tblVehicleEF • HHD T 3.9000e-005 0.00 r 4 tblVehicleEF • HHD i 0.08 0.02 r 4 tblVehicleEF • HHD 1.7200e-004 9.6000e-005 r r 4 tblVehicleEF • HHD 0.03 1.0000e-006 • r tblVehicleEF • LDA • 1.8430e-003 1.0230e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 1.7440e-003 0.02 tblVehicleEF • LDA i 0.34 0.48 r tblVehicleEF • LDA T 0.54 1.47 r tblVehicleEF • LDA T 180.10 223.31 r tblVehicleEF • LDA T 41.06 43.92 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r 4 tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.04 r 4 tblVehicleEF • LDA T 4.6130e-003 3.4090e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.10 r 4 tblVehicleEF • LDA T 1.8020e-003 2.0520e-003 r 4 tblVehicleEF • LDA T 4.1900e-004 4.0400e-004 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.04 r 4 tblVehicleEF • LDA T 6.7130e-003 4.9720e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 2.0860e-003 1.2030e-003 tblVehicleEF • LDA • 1.5090e-003 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 0.41 0.63 tblVehicleEF • LDA i 0.48 1.52 r tblVehicleEF • LDA T 196.09 247.40 r tblVehicleEF • LDA T 41.06 43.98 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.02 0.12 r tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r 4 tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r 4 tblVehicleEF • LDA T 0.05 0.11 r 4 tblVehicleEF • LDA T 0.07 0.08 r 4 tblVehicleEF • LDA T 0.04 0.08 r 4 tblVehicleEF • LDA T 5.2150e-003 3.9860e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.09 r 4 tblVehicleEF • LDA T 1.9630e-003 2.2740e-003 r 4 tblVehicleEF • LDA T 4.1800e-004 4.0400e-004 r 4 tblVehicleEF • LDA T 0.05 0.11 r 4 tblVehicleEF • LDA T 0.07 0.08 r 4 tblVehicleEF • LDA T 0.04 0.08 r 4 tblVehicleEF • LDA T 7.5910e-003 5.8180e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.10 r 4 tblVehicleEF • LDA T 1.7790e-003 9.0500e-004 r 4 tblVehicleEF • LDA T 1.7900e-003 0.03 tblVehicleEF • LDA • 0.32 0.40 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDA • 0.55 1.69 tblVehicleEF • LDA i 175.64 207.59 r tblVehicleEF • LDA T 41.06 44.36 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.03 0.12 r tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r 4 tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 4.4550e-003 3.0610e-003 r 4 tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.02 0.11 r 4 tblVehicleEF • LDA T 1.7570e-003 1.9080e-003 r 4 tblVehicleEF • LDA T 4.1900e-004 4.0800e-004 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 6.4830e-003 4.4620e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.12 r 4 tblVehicleEF • LDT1 T 3.9640e-003 2.6260e-003 r 4 tblVehicleEF • LDT1 T 5.1520e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.59 0.75 tblVehicleEF • LDT1 • 1.18 1.63 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT1 • 233.76 278.63 tblVehicleEF • LDT1 i 53.90 54.33 r tblVehicleEF • LDT1 T 0.05 0.04 r tblVehicleEF • LDT1 T 0.06 0.15 r tblVehicleEF • LDT1 T 1.3730e-003 1.1910e-003 r tblVehicleEF • LDT1 T 2.2030e-003 1.4330e-003 r tblVehicleEF • LDT1 T 1.2620e-003 1.0950e-003 r 4 tblVehicleEF • LDT1 T 2.0250e-003 1.3180e-003 r tblVehicleEF • LDT1 T 0.09 0.12 r tblVehicleEF • LDT1 T 0.15 0.12 r 4 tblVehicleEF • LDT1 T 0.07 0.09 r 4 tblVehicleEF • LDT1 T 9.8180e-003 0.01 r 4 tblVehicleEF • LDT1 T 0.10 0.38 r 4 tblVehicleEF • LDT1 T 0.07 0.14 r 4 tblVehicleEF • LDT1 T 2.3430e-003 2.5600e-003 r 4 tblVehicleEF • LDT1 T 5.5900e-004 4.9900e-004 r 4 tblVehicleEF • LDT1 T 0.09 0.12 r 4 tblVehicleEF • LDT1 T 0.15 0.12 r 4 tblVehicleEF • LDT1 T 0.07 0.09 r 4 tblVehicleEF • LDT1 T 0.01 0.02 r 4 tblVehicleEF • LDT1 T 0.10 0.38 r 4 tblVehicleEF • LDT1 T 0.08 0.15 r 4 tblVehicleEF • LDT1 T 4.4760e-003 3.0490e-003 r 4 tblVehicleEF • LDT1 T 4.4670e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.72 0.97 r 4 tblVehicleEF • LDT1 T 1.04 1.68 tblVehicleEF • LDT1 • 254.30 304.46 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LDT1 • 53.90 54.38 tblVehicleEF • LDT1 r 0.05 0.04 I- 4 tblVehicleEF • LDT1 r 0.06 0.15 I- 4 tblVehicleEF • LDT1 r 1.3730e-003 1.1910e-003 I- 4 tblVehicleEF • LDT1 r 2.2030e-003 1.4330e-003 I- 4 tblVehicleEF • LDT1 r 1.2620e-003 1.0950e-003 I- 4 tblVehicleEF • LDT1 r 2.0250e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 0.18 0.25 I- 4 tblVehicleEF • LDT1 r 0.18 0.15 I- 4 tblVehicleEF • LDT1 r 0.13 0.16 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.10 0.40 I- 4 tblVehicleEF • LDT1 r 0.06 0.13 I- 4 tblVehicleEF • LDT1 r 2.5500e-003 2.7970e-003 I- 4 tblVehicleEF • LDT1 r 5.5600e-004 5.0000e-004 I- 4 tblVehicleEF • LDT1 r 0.18 0.25 I- 4 tblVehicleEF • LDT1 r 0.18 0.15 I- 4 tblVehicleEF • LDT1 r 0.13 0.16 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.10 0.40 I- 4 tblVehicleEF • LDT1 r 0.07 0.14 I- 4 tblVehicleEF • LDT1 r 3.8140e-003 2.3510e-003 I- 4 tblVehicleEF • LDT1 r 5.2920e-003 0.04 I- 4 tblVehicleEF • LDT1 r 0.55 0.63 I- 4 tblVehicleEF • LDT1 r 1.20 1.88 I- 4 tblVehicleEF • LDT1 r 227.49 261.79 tblVehicleEF • LDT1 • 53.90 54.83 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT1 • 0.05 0.04 tblVehicleEF LDT1r 0.07 0.15 I- 4 tblVehicleEF • LDT1 r 1.3730e-003 1.1910e-003 I- 4 tblVehicleEF • LDT1 r 2.2030e-003 1.4330e-003 I- 4 tblVehicleEF • LDT1 r 1.2620e-003 1.0950e-003 I- 4 tblVehicleEF • LDT1 r 2.0250e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 0.08 0.05 I- 4 tblVehicleEF • LDT1 r 0.16 0.11 I- 4 tblVehicleEF • LDT1 r 0.06 0.04 I- 4 tblVehicleEF • LDT1 r 9.4480e-003 9.3700e-003 I- 4 tblVehicleEF • LDT1 r 0.11 0.43 I- 4 tblVehicleEF • LDT1 r 0.07 0.16 I- 4 tblVehicleEF • LDT1 r 2.2800e-003 2.4050e-003 I- 4 tblVehicleEF • LDT1 r 5.5900e-004 5.0400e-004 I- 4 tblVehicleEF • LDT1 r 0.08 0.05 I- 4 tblVehicleEF • LDT1 r 0.16 0.11 I- 4 tblVehicleEF • LDT1 r 0.06 0.04 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.11 0.43 I- 4 tblVehicleEF • LDT1 r 0.08 0.18 I- 4 tblVehicleEF • LDT2 r 2.8010e-003 2.1080e-003 I- 4 tblVehicleEF • LDT2 r 2.6400e-003 0.03 I- 4 tblVehicleEF • LDT2 r 0.49 0.68 I- 4 tblVehicleEF • LDT2 r 0.77 1.95 I- 4 tblVehicleEF • LDT2 r 261.59 280.82 I- 4 tblVehicleEF • LDT2 r 59.37 55.04 tblVehicleEF • LDT2 • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 0.04 0.15 tblVehicleEF • LDT2 i 1.1950e-003 1.0750e-003 r tblVehicleEF • LDT2 T 1.9260e-003 1.2680e-003 r tblVehicleEF • LDT2 T 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.04 0.10 r tblVehicleEF • LDT2 T 0.07 0.09 r 4 tblVehicleEF • LDT2 T 0.04 0.08 r tblVehicleEF • LDT2 T 6.9570e-003 7.8510e-003 r tblVehicleEF • LDT2 T 0.05 0.31 r 4 tblVehicleEF • LDT2 T 0.04 0.14 r 4 tblVehicleEF • LDT2 T 2.6190e-003 2.5810e-003 r 4 tblVehicleEF • LDT2 T 6.0600e-004 5.0600e-004 r 4 tblVehicleEF • LDT2 T 0.04 0.10 r 4 tblVehicleEF • LDT2 T 0.07 0.09 r 4 tblVehicleEF • LDT2 T 0.04 0.08 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.31 r 4 tblVehicleEF • LDT2 T 0.04 0.16 r 4 tblVehicleEF • LDT2 T 3.1750e-003 2.4590e-003 r 4 tblVehicleEF • LDT2 T 2.3130e-003 0.03 r 4 tblVehicleEF • LDT2 T 0.61 0.89 r 4 tblVehicleEF • LDT2 T 0.69 2.00 r 4 tblVehicleEF • LDT2 T 284.69 304.46 r 4 tblVehicleEF • LDT2 T 59.37 55.09 r 4 tblVehicleEF • LDT2 T 0.03 0.04 tblVehicleEF • LDT2 • 0.04 0.15 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 1.1950e-003 1.0750e-003 tblVehicleEF • LDT2 i 1.9260e-003 1.2680e-003 r tblVehicleEF • LDT2 T 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.09 0.21 r tblVehicleEF • LDT2 T 0.08 0.11 r tblVehicleEF • LDT2 T 0.07 0.15 r 4 tblVehicleEF • LDT2 T 7.8810e-003 9.1400e-003 r tblVehicleEF • LDT2 T 0.05 0.32 r tblVehicleEF • LDT2 T 0.03 0.13 r 4 tblVehicleEF • LDT2 T 2.8510e-003 2.7980e-003 r 4 tblVehicleEF • LDT2 T 6.0500e-004 5.0600e-004 r 4 tblVehicleEF • LDT2 T 0.09 0.21 r 4 tblVehicleEF • LDT2 T 0.08 0.11 r 4 tblVehicleEF • LDT2 T 0.07 0.15 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.32 r 4 tblVehicleEF • LDT2 T 0.03 0.15 r 4 tblVehicleEF • LDT2 T 2.6900e-003 1.8800e-003 r 4 tblVehicleEF • LDT2 T 2.7200e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.46 0.57 r 4 tblVehicleEF • LDT2 T 0.79 2.26 r 4 tblVehicleEF • LDT2 T 254.53 265.40 r 4 tblVehicleEF • LDT2 T 59.37 55.65 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.04 0.16 tblVehicleEF • LDT2 • 1.1950e-003 1.0750e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LDT2 • 1.9260e-003 1.2680e-003 tblVehicleEF • LDT2 i 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 0.07 0.08 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 6.6820e-003 7.0720e-003 r 4 tblVehicleEF • LDT2 T 0.06 0.35 r tblVehicleEF • LDT2 T 0.04 0.17 r tblVehicleEF • LDT2 T 2.5480e-003 2.4390e-003 r 4 tblVehicleEF • LDT2 T 6.0600e-004 5.1100e-004 r 4 tblVehicleEF • LDT2 T 0.03 0.04 r 4 tblVehicleEF • LDT2 T 0.07 0.08 r 4 tblVehicleEF • LDT2 T 0.03 0.04 r 4 tblVehicleEF • LDT2 T 9.7420e-003 0.01 r 4 tblVehicleEF • LDT2 T 0.06 0.35 r 4 tblVehicleEF • LDT2 T 0.04 0.18 r 4 tblVehicleEF • LHD1 T 3.7520e-003 4.0090e-003 r 4 tblVehicleEF • LHD1 T 3.3780e-003 1.7990e-003 r 4 tblVehicleEF • LHD1 T 9.4800e-003 7.7110e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.34 0.21 r 4 tblVehicleEF • LHD1 T 1.41 0.78 r 4 tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.85 r 4 tblVehicleEF • LHD1 T 25.04 9.45 tblVehicleEF • LHD1 • 0.07 0.05 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • LHD1 • 0.84 0.31 • LHD1 i 0.62 0.20 r • LHD1 T 8.4800e-004 9.6300e-004 r • LHD1 T 0.01 9.9660e-003 r • LHD1 T 8.1000e-003 4.7170e-003 r • LHD1 T 5.7100e-004 1.8900e-004 r • LHD1 T 8.1100e-004 9.2100e-004 r 4 • LHD1 T 2.6230e-003 2.4910e-003 r • LHD1 T 7.7360e-003 4.4930e-003 r • LHD1 T 5.2500e-004 1.7400e-004 r 4 • LHD1 T 2.6210e-003 2.6940e-003 r 4 • LHD1 T 0.07 0.05 r 4 • LHD1 T 0.01 0.02 r 4 • LHD1 T 1.4090e-003 1.3400e-003 r 4 • LHD1 T 0.04 0.02 r 4 • LHD1 T 0.24 0.32 r 4 • LHD1 T 0.13 0.04 r 4 • LHD1 T 9.0000e-005 8.0000e-005 r 4 • LHD1 T 5.3930e-003 5.3920e-003 r 4 • LHD1 T 2.7600e-004 9.4000e-005 r 4 • LHD1 T 2.6210e-003 2.6940e-003 r 4 • LHD1 T 0.07 0.05 r 4 • LHD1 T 0.02 0.02 r 4 • LHD1 T 1.4090e-003 1.3400e-003 r 4 • LHD1 T 0.05 0.03 r 4 • LHD1 T 0.24 0.32 • LHD1 • 0.14 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 3.7520e-003 4.0150e-003 tblVehicleEF • LHD1 i 3.4150e-003 1.8130e-003 r tblVehicleEF • LHD1 T 9.1210e-003 7.5330e-003 r tblVehicleEF • LHD1 T 0.13 0.17 r tblVehicleEF • LHD1 T 0.35 0.21 r tblVehicleEF • LHD1 T 1.35 0.76 r tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.86 r tblVehicleEF • LHD1 T 25.04 9.41 r tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.79 0.29 r 4 tblVehicleEF • LHD1 T 0.60 0.20 r 4 tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9660e-003 r 4 tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r 4 tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 r 4 tblVehicleEF • LHD1 T 8.1100e-004 9.2100e-004 r 4 tblVehicleEF • LHD1 T 2.6230e-003 2.4910e-003 r 4 tblVehicleEF • LHD1 T 7.7360e-003 4.4930e-003 r 4 tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r 4 tblVehicleEF • LHD1 T 4.8780e-003 5.3810e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 2.5900e-003 2.4440e-003 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r 4 tblVehicleEF • LHD1 T 0.24 0.33 tblVehicleEF • LHD1 • 0.12 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 9.0000e-005 8.0000e-005 tblVehicleEF • LHD1 i 5.3930e-003 5.3920e-003 r tblVehicleEF • LHD1 T 2.7500e-004 9.3000e-005 r tblVehicleEF • LHD1 T 4.8780e-003 5.3810e-003 r tblVehicleEF • LHD1 T 0.08 0.06 r tblVehicleEF • LHD1 T 0.02 0.02 r tblVehicleEF • LHD1 T 2.5900e-003 2.4440e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.24 0.33 r tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 3.7520e-003 3.9970e-003 r 4 tblVehicleEF • LHD1 T 3.3750e-003 1.7740e-003 r 4 tblVehicleEF • LHD1 T 9.4930e-003 8.0420e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.34 0.20 r 4 tblVehicleEF • LHD1 T 1.42 0.82 r 4 tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.85 r 4 tblVehicleEF • LHD1 T 25.04 9.53 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.83 0.32 r 4 tblVehicleEF • LHD1 T 0.62 0.21 r 4 tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9660e-003 r 4 tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r 4 tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 tblVehicleEF • LHD1 • 8.1100e-004 9.2100e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD1 • 2.6230e-003 2.4910e-003 tblVehicleEF • LHD1 i 7.7360e-003 4.4930e-003 r tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r tblVehicleEF • LHD1 T 2.1750e-003 1.1390e-003 r tblVehicleEF • LHD1 T 0.08 0.05 r tblVehicleEF • LHD1 T 0.01 0.02 r tblVehicleEF • LHD1 T 1.2660e-003 7.0100e-004 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r tblVehicleEF • LHD1 T 0.26 0.34 r tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 9.0000e-005 8.0000e-005 r 4 tblVehicleEF • LHD1 T 5.3930e-003 5.3920e-003 r 4 tblVehicleEF • LHD1 T 2.7600e-004 9.4000e-005 r 4 tblVehicleEF • LHD1 T 2.1750e-003 1.1390e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.2660e-003 7.0100e-004 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.26 0.34 r 4 tblVehicleEF • LHD1 T 0.14 0.04 r 4 tblVehicleEF • LHD2 T 2.5040e-003 2.9180e-003 r 4 tblVehicleEF • LHD2 T 1.6180e-003 1.8840e-003 r 4 tblVehicleEF • LHD2 T 3.1090e-003 5.9870e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.17 0.22 r 4 tblVehicleEF • LHD2 T 0.83 0.51 tblVehicleEF • LHD2 • 13.70 12.78 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 563.18 562.93 tblVehicleEF • LHD2 i 21.41 7.29 r tblVehicleEF • LHD2 T 0.07 0.07 r tblVehicleEF • LHD2 T 0.28 0.47 r tblVehicleEF • LHD2 T 0.26 0.16 r tblVehicleEF • LHD2 T 1.0390e-003 1.3950e-003 r tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 6.3610e-003 9.3060e-003 r tblVehicleEF • LHD2 T 3.5700e-004 1.0800e-004 r tblVehicleEF • LHD2 T 9.9400e-004 1.3350e-003 r 4 tblVehicleEF • LHD2 T 2.7110e-003 2.6860e-003 r 4 tblVehicleEF • LHD2 T 6.0760e-003 8.8920e-003 r 4 tblVehicleEF • LHD2 T 3.2900e-004 9.9000e-005 r 4 tblVehicleEF • LHD2 T 8.3600e-004 1.8870e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 4.8700e-004 1.0020e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.04 0.18 r 4 tblVehicleEF • LHD2 T 0.04 0.03 r 4 tblVehicleEF • LHD2 T 1.3300e-004 1.2200e-004 r 4 tblVehicleEF • LHD2 T 5.4710e-003 5.4350e-003 r 4 tblVehicleEF • LHD2 T 2.2800e-004 7.2000e-005 r 4 tblVehicleEF • LHD2 T 8.3600e-004 1.8870e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.02 tblVehicleEF • LHD2 • 4.8700e-004 1.0020e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 0.03 0.04 tblVehicleEF • LHD2 i 0.04 0.18 r tblVehicleEF • LHD2 T 0.05 0.03 r tblVehicleEF • LHD2 T 2.5040e-003 2.9220e-003 r tblVehicleEF • LHD2 T 1.6280e-003 1.8930e-003 r tblVehicleEF • LHD2 T 3.0410e-003 5.8500e-003 r tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.17 0.22 r tblVehicleEF • LHD2 T 0.79 0.49 r tblVehicleEF • LHD2 T 13.70 12.78 r 4 tblVehicleEF • LHD2 T 563.18 562.93 r 4 tblVehicleEF • LHD2 T 21.41 7.26 r 4 tblVehicleEF • LHD2 T 0.07 0.07 r 4 tblVehicleEF • LHD2 T 0.26 0.44 r 4 tblVehicleEF • LHD2 T 0.26 0.16 r 4 tblVehicleEF • LHD2 T 1.0390e-003 1.3950e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 6.3610e-003 9.3060e-003 r 4 tblVehicleEF • LHD2 T 3.5700e-004 1.0800e-004 r 4 tblVehicleEF • LHD2 T 9.9400e-004 1.3350e-003 r 4 tblVehicleEF • LHD2 T 2.7110e-003 2.6860e-003 r 4 tblVehicleEF • LHD2 T 6.0760e-003 8.8920e-003 r 4 tblVehicleEF • LHD2 T 3.2900e-004 9.9000e-005 r 4 tblVehicleEF • LHD2 T 1.5680e-003 3.7670e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.01 tblVehicleEF • LHD2 • 8.9000e-004 1.7830e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .LHD2 • 0.03 0.03 tblVehicleEF • LHD2 r 0.04 0.18 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 1.3300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 5.4710e-003 5.4350e-003 I- 4 tblVehicleEF • LHD2 r 2.2800e-004 7.2000e-005 I- 4 tblVehicleEF • LHD2 r 1.5680e-003 3.7670e-003 I- 4 tblVehicleEF • LHD2 r 0.02 0.04 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 8.9000e-004 1.7830e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.04 0.18 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 2.5040e-003 2.9090e-003 I- 4 tblVehicleEF • LHD2 r 1.6160e-003 1.8690e-003 I- 4 tblVehicleEF • LHD2 r 3.1200e-003 6.2420e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.14 I- 4 tblVehicleEF • LHD2 r 0.17 0.22 I- 4 tblVehicleEF • LHD2 r 0.84 0.54 I- 4 tblVehicleEF • LHD2 r 13.70 12.78 I- 4 tblVehicleEF • LHD2 r 563.18 562.93 I- 4 tblVehicleEF • LHD2 r 21.41 7.34 I- 4 tblVehicleEF • LHD2 r 0.07 0.07 I- 4 tblVehicleEF • LHD2 r 0.28 0.48 I- 4 tblVehicleEF • LHD2 r 0.26 0.17 I- 4 tblVehicleEF • LHD2 r 1.0390e-003 1.3950e-003 tblVehicleEF • LHD2 • 0.01 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • LHD2 • 6.3610e-003 9.3060e-003 tblVehicleEF • LHD2 r 3.5700e-004 1.0800e-004 I- 4 tblVehicleEF • LHD2 r 9.9400e-004 1.3350e-003 I- 4 tblVehicleEF • LHD2 r 2.7110e-003 2.6860e-003 I- 4 tblVehicleEF • LHD2 r 6.0760e-003 8.8920e-003 I- 4 tblVehicleEF • LHD2 r 3.2900e-004 9.9000e-005 I- 4 tblVehicleEF • LHD2 r 6.3400e-004 7.7700e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.03 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 4.1900e-004 5.3600e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.03 I- 4 tblVehicleEF • LHD2 r 0.04 0.19 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 1.3300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 5.4710e-003 5.4350e-003 I- 4 tblVehicleEF • LHD2 r 2.2800e-004 7.3000e-005 I- 4 tblVehicleEF • LHD2 r 6.3400e-004 7.7700e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.03 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 4.1900e-004 5.3600e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.04 0.19 I- 4 tblVehicleEF • LHD2 r 0.05 0.03 I- 4 tblVehicleEF • MCY r 0.45 0.34 I- 4 tblVehicleEF • MCY r 0.14 0.22 I- 4 tblVehicleEF • MCY r 17.40 17.70 tblVehicleEF • MCY • 9.82 8.43 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 170.70 212.58 tblVehicleEF • MCY i 42.70 56.87 r tblVehicleEF • MCY T 1.11 1.10 r tblVehicleEF • MCY T 0.31 0.26 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r 4 tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r tblVehicleEF • MCY T 1.67 2.44 r tblVehicleEF • MCY T 0.76 0.93 r 4 tblVehicleEF • MCY T 0.88 1.33 r 4 tblVehicleEF • MCY T 2.09 2.22 r 4 tblVehicleEF • MCY T 0.44 1.39 r 4 tblVehicleEF • MCY T 1.97 1.67 r 4 tblVehicleEF • MCY T 2.0540e-003 2.1040e-003 r 4 tblVehicleEF • MCY T 6.4500e-004 5.6300e-004 r 4 tblVehicleEF • MCY T 1.67 2.44 r 4 tblVehicleEF • MCY T 0.76 0.93 r 4 tblVehicleEF • MCY T 0.88 1.33 r 4 tblVehicleEF • MCY T 2.62 2.79 r 4 tblVehicleEF • MCY T 0.44 1.39 r 4 tblVehicleEF • MCY T 2.15 1.82 r 4 tblVehicleEF • MCY T 0.45 0.34 r 4 tblVehicleEF • MCY T 0.13 0.21 r 4 tblVehicleEF • MCY T 18.08 19.49 r 4 tblVehicleEF • MCY T 9.09 8.30 tblVehicleEF • MCY • 170.70 215.54 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 42.70 56.39 tblVehicleEF • MCY i 0.96 0.97 r tblVehicleEF • MCY T 0.29 0.25 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r 4 tblVehicleEF • MCY T 3.31 5.01 r tblVehicleEF • MCY T 1.16 1.64 r tblVehicleEF • MCY T 2.02 3.01 r 4 tblVehicleEF • MCY T 2.08 2.26 r 4 tblVehicleEF • MCY T 0.44 1.47 r 4 tblVehicleEF • MCY T 1.78 1.59 r 4 tblVehicleEF • MCY T 2.0640e-003 2.1330e-003 r 4 tblVehicleEF • MCY T 6.2700e-004 5.5800e-004 r 4 tblVehicleEF • MCY T 3.31 5.01 r 4 tblVehicleEF • MCY T 1.16 1.64 r 4 tblVehicleEF • MCY T 2.02 3.01 r 4 tblVehicleEF • MCY T 2.61 2.83 r 4 tblVehicleEF • MCY T 0.44 1.47 r 4 tblVehicleEF • MCY T 1.94 1.74 r 4 tblVehicleEF • MCY T 0.45 0.34 r 4 tblVehicleEF • MCY T 0.15 0.25 r 4 tblVehicleEF • MCY T 17.03 17.76 r 4 tblVehicleEF • MCY T 9.85 9.37 r 4 tblVehicleEF • MCY T 170.70 212.80 tblVehicleEF • MCY • 42.70 59.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MCY • 1.10 1.18 tblVehicleEF • MCY i 0.31 0.27 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r tblVehicleEF • MCY T 1.53 1.02 r 4 tblVehicleEF • MCY T 0.91 0.72 r tblVehicleEF • MCY T 0.68 0.40 r tblVehicleEF • MCY T 2.09 2.26 r 4 tblVehicleEF • MCY T 0.50 1.56 r 4 tblVehicleEF • MCY T 1.99 1.89 r 4 tblVehicleEF • MCY T 2.0480e-003 2.1060e-003 r 4 tblVehicleEF • MCY T 6.4600e-004 5.8500e-004 r 4 tblVehicleEF • MCY T 1.53 1.02 r 4 tblVehicleEF • MCY T 0.91 0.72 r 4 tblVehicleEF • MCY T 0.68 0.40 r 4 tblVehicleEF • MCY T 2.62 2.84 r 4 tblVehicleEF • MCY T 0.50 1.56 r 4 tblVehicleEF • MCY T 2.17 2.06 r 4 tblVehicleEF • MDV T 5.0520e-003 2.2020e-003 r 4 tblVehicleEF • MDV T 6.4290e-003 0.04 r 4 tblVehicleEF • MDV T 0.70 0.68 r 4 tblVehicleEF • MDV T 1.36 2.02 r 4 tblVehicleEF • MDV T 360.73 340.15 r 4 tblVehicleEF • MDV T 81.27 66.88 tblVehicleEF • MDV • 0.07 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 0.11 0.16 tblVehicleEF • MDV i 1.2760e-003 1.0590e-003 r tblVehicleEF • MDV T 1.9750e-003 1.2720e-003 r tblVehicleEF • MDV T 1.1750e-003 9.7600e-004 r tblVehicleEF • MDV T 1.8160e-003 1.1690e-003 r tblVehicleEF • MDV T 0.09 0.14 r tblVehicleEF • MDV T 0.14 0.11 r 4 tblVehicleEF • MDV T 0.08 0.11 r tblVehicleEF • MDV T 0.01 8.3160e-003 r tblVehicleEF • MDV T 0.09 0.34 r 4 tblVehicleEF • MDV T 0.09 0.17 r 4 tblVehicleEF • MDV T 3.6090e-003 3.1280e-003 r 4 tblVehicleEF • MDV T 8.3500e-004 6.1500e-004 r 4 tblVehicleEF • MDV T 0.09 0.14 r 4 tblVehicleEF • MDV T 0.14 0.11 r 4 tblVehicleEF • MDV T 0.08 0.11 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.35 r 4 tblVehicleEF • MDV T 0.09 0.18 r 4 tblVehicleEF • MDV T 5.7180e-003 2.5720e-003 r 4 tblVehicleEF • MDV T 5.5960e-003 0.04 r 4 tblVehicleEF • MDV T 0.85 0.88 r 4 tblVehicleEF • MDV T 1.21 2.07 r 4 tblVehicleEF • MDV T 391.68 363.81 r 4 tblVehicleEF • MDV T 81.27 66.93 r 4 tblVehicleEF • MDV T 0.06 0.04 tblVehicleEF • MDV • 0.10 0.17 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 1.2760e-003 1.0590e-003 tblVehicleEF • MDV i 1.9750e-003 1.2720e-003 r tblVehicleEF • MDV T 1.1750e-003 9.7600e-004 r tblVehicleEF • MDV T 1.8160e-003 1.1690e-003 r tblVehicleEF • MDV T 0.17 0.28 r tblVehicleEF • MDV T 0.16 0.14 r tblVehicleEF • MDV T 0.14 0.20 r 4 tblVehicleEF • MDV T 0.01 9.6740e-003 r tblVehicleEF • MDV T 0.09 0.36 r tblVehicleEF • MDV T 0.08 0.15 r 4 tblVehicleEF • MDV T 3.9200e-003 3.3450e-003 r 4 tblVehicleEF • MDV T 8.3300e-004 6.1500e-004 r 4 tblVehicleEF • MDV T 0.17 0.28 r 4 tblVehicleEF • MDV T 0.16 0.14 r 4 tblVehicleEF • MDV T 0.14 0.20 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.36 r 4 tblVehicleEF • MDV T 0.08 0.17 r 4 tblVehicleEF • MDV T 4.8560e-003 1.9610e-003 r 4 tblVehicleEF • MDV T 6.6210e-003 0.04 r 4 tblVehicleEF • MDV T 0.65 0.57 r 4 tblVehicleEF • MDV T 1.40 2.35 r 4 tblVehicleEF • MDV T 351.17 324.72 r 4 tblVehicleEF • MDV T 81.27 67.53 r 4 tblVehicleEF • MDV T 0.06 0.04 r 4 tblVehicleEF • MDV T 0.11 0.18 tblVehicleEF • MDV • 1.2760e-003 1.0590e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MDV • 1.9750e-003 1.2720e-003 tblVehicleEF • MDV r 1.1750e-003 9.7600e-004 I- 4 tblVehicleEF • MDV r 1.8160e-003 1.1690e-003 I- 4 tblVehicleEF • MDV r 0.07 0.05 I- 4 tblVehicleEF • MDV r 0.15 0.10 I- 4 tblVehicleEF • MDV r 0.06 0.05 I- 4 tblVehicleEF • MDV r 0.01 7.4960e-003 I- 4 tblVehicleEF • MDV r 0.10 0.38 I- 4 tblVehicleEF • MDV r 0.09 0.19 I- 4 tblVehicleEF • MDV r 3.5120e-003 2.9860e-003 I- 4 tblVehicleEF • MDV r 8.3600e-004 6.2000e-004 I- 4 tblVehicleEF • MDV r 0.07 0.05 I- 4 tblVehicleEF • MDV r 0.15 0.11 I- 4 tblVehicleEF • MDV r 0.06 0.06 I- 4 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.10 0.39 I- 4 tblVehicleEF • MDV r 0.10 0.21 I- 4 tblVehicleEF • MH r 6.6110e-003 2.6010e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 0.43 0.24 I- 4 tblVehicleEF • MH r 3.68 0.00 I- 4 tblVehicleEF • MH r 981.76 860.97 I- 4 tblVehicleEF • MH r 56.11 0.00 I- 4 tblVehicleEF • MH r 0.84 3.03 I- 4 tblVehicleEF • MH r 0.64 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 tblVehicleEF • MH • 0.02 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MH • 7.9300e-004 0.00 tblVehicleEF • MH i 3.2320e-003 4.0000e-003 r tblVehicleEF • MH T 0.02 0.08 r tblVehicleEF • MH T 7.2900e-004 0.00 r tblVehicleEF • MH T 0.86 0.00 r tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.33 0.00 r 4 tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.01 0.00 r tblVehicleEF • MH T 0.22 0.00 r 4 tblVehicleEF • MH T 9.7130e-003 8.1390e-003 r 4 tblVehicleEF • MH T 6.2500e-004 0.00 r 4 tblVehicleEF • MH T 0.86 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.33 0.00 r 4 tblVehicleEF • MH T 0.04 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.24 0.00 r 4 tblVehicleEF • MH T 6.7390e-003 2.6010e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.44 0.24 r 4 tblVehicleEF • MH T 3.44 0.00 r 4 tblVehicleEF • MH T 981.76 860.97 r 4 tblVehicleEF • MH T 56.11 0.00 r 4 tblVehicleEF • MH T 0.78 2.86 r 4 tblVehicleEF • MH T 0.61 0.00 tblVehicleEF • MH • 0.01 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF MH• • 0.02 0.08 • MH i 7.9300e-004 0.00 r • MH T 3.2320e-003 4.0000e-003 r MH• T 0.02 0.08 r • MH T 7.2900e-004 0.00 r MH• T 1.56 0.00 r MH• T 0.05 0.00 r 4 MH• T 0.63 0.00 r MH• T 0.03 0.06 r MH• T 0.01 0.00 r 4 • MH T 0.21 0.00 r 4 • MH T 9.7130e-003 8.1390e-003 r 4 • MH T 6.2100e-004 0.00 r 4 MH• T 1.56 0.00 r 4 MH• T 0.05 0.00 r 4 MH• T 0.63 0.00 r 4 MH• T 0.04 0.06 r 4 MH• T 0.01 0.00 r 4 • MH T 0.23 0.00 r 4 • MH T 6.5990e-003 2.6010e-003 r 4 MH• T 0.02 0.00 r 4 MH• T 0.43 0.24 r 4 MH• T 3.72 0.00 r 4 MH• T 981.76 860.97 r 4 MH• T 56.11 0.00 r 4 MH• T 0.83 3.07 • MH • 0.63 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MH • 0.01 0.02 tblVehicleEF • MH i 0.02 0.08 r tblVehicleEF • MH T 7.9300e-004 0.00 r tblVehicleEF • MH T 3.2320e-003 4.0000e-003 r tblVehicleEF • MH T 0.02 0.08 r tblVehicleEF • MH T 7.2900e-004 0.00 r tblVehicleEF • MH T 0.78 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.31 0.00 r tblVehicleEF • MH T 0.03 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.22 0.00 r 4 tblVehicleEF • MH T 9.7130e-003 8.1390e-003 r 4 tblVehicleEF • MH T 6.2600e-004 0.00 r 4 tblVehicleEF • MH T 0.78 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.31 0.00 r 4 tblVehicleEF • MH T 0.04 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.25 0.00 r 4 tblVehicleEF • MHD T 0.02 5.0880e-003 r 4 tblVehicleEF • MHD T 1.4740e-003 1.1650e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.32 0.44 r 4 tblVehicleEF • MHD T 0.13 0.13 r 4 tblVehicleEF • MHD T 3.20 1.13 tblVehicleEF • MHD • 146.07 61.93 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 1,045.79 919.26 tblVehicleEF • MHD i 53.04 11.54 r tblVehicleEF • MHD T 0.38 0.31 r tblVehicleEF • MHD T 0.40 0.80 r tblVehicleEF • MHD T 11.18 1.52 r tblVehicleEF • MHD T 5.0000e-005 1.2100e-004 r tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r tblVehicleEF • MHD T 4.8000e-005 1.1600e-004 r tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 r 4 tblVehicleEF • MHD T 6.4500e-004 1.2400e-004 r 4 tblVehicleEF • MHD T 1.1110e-003 1.1030e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 6.3000e-004 5.9400e-004 r 4 tblVehicleEF • MHD T 0.02 9.5340e-003 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.20 0.06 r 4 tblVehicleEF • MHD T 1.4040e-003 5.8900e-004 r 4 tblVehicleEF • MHD T 0.01 8.8280e-003 r 4 tblVehicleEF • MHD T 5.8600e-004 1.1400e-004 r 4 tblVehicleEF • MHD T 1.1110e-003 1.1030e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.3000e-004 5.9400e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 tblVehicleEF • MHD • 0.01 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 0.22 0.06 tblVehicleEF • MHD i 0.02 4.8250e-003 r tblVehicleEF • MHD T 1.4840e-003 1.1800e-003 r tblVehicleEF • MHD T 0.03 0.01 r tblVehicleEF • MHD T 0.23 0.37 r tblVehicleEF • MHD T 0.14 0.14 r tblVehicleEF • MHD T 3.05 1.10 r 4 tblVehicleEF • MHD T 154.72 61.67 r tblVehicleEF • MHD T 1,045.79 919.26 r tblVehicleEF • MHD T 53.04 11.48 r 4 tblVehicleEF • MHD T 0.39 0.29 r 4 tblVehicleEF • MHD T 0.38 0.76 r 4 tblVehicleEF • MHD T 11.17 1.52 r 4 tblVehicleEF • MHD T 4.2000e-005 1.0500e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r 4 tblVehicleEF • MHD T 4.0000e-005 1.0000e-004 r 4 tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 r 4 tblVehicleEF • MHD T 6.4500e-004 1.2400e-004 r 4 tblVehicleEF • MHD T 2.1280e-003 2.2020e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.1460e-003 1.0590e-003 r 4 tblVehicleEF • MHD T 0.02 9.5880e-003 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.20 0.05 tblVehicleEF • MHD • 1.4860e-003 5.8700e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 0.01 8.8280e-003 tblVehicleEF • MHD i 5.8400e-004 1.1400e-004 r tblVehicleEF • MHD T 2.1280e-003 2.2020e-003 r tblVehicleEF • MHD T 0.04 0.03 r tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 1.1460e-003 1.0590e-003 r tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r tblVehicleEF • MHD T 0.22 0.06 r tblVehicleEF • MHD T 0.02 5.4470e-003 r 4 tblVehicleEF • MHD T 1.4660e-003 1.1380e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.44 0.54 r 4 tblVehicleEF • MHD T 0.13 0.13 r 4 tblVehicleEF • MHD T 3.25 1.20 r 4 tblVehicleEF • MHD T 134.12 62.28 r 4 tblVehicleEF • MHD T 1,045.79 919.26 r 4 tblVehicleEF • MHD T 53.04 11.66 r 4 tblVehicleEF • MHD T 0.36 0.32 r 4 tblVehicleEF • MHD T 0.40 0.82 r 4 tblVehicleEF • MHD T 11.19 1.52 r 4 tblVehicleEF • MHD T 6.1000e-005 1.4300e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r 4 tblVehicleEF • MHD T 5.8000e-005 1.3700e-004 r 4 tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 tblVehicleEF • MHD • 6.4500e-004 1.2400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • MHD • 7.3100e-004 4.5200e-004 tblVehicleEF • MHD i 0.03 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 4.8500e-004 3.1600e-004 r tblVehicleEF • MHD T 0.02 9.4380e-003 r tblVehicleEF • MHD T 0.02 0.13 r tblVehicleEF • MHD T 0.21 0.06 r 4 tblVehicleEF • MHD T 1.2920e-003 5.9200e-004 r tblVehicleEF • MHD T 0.01 8.8280e-003 r tblVehicleEF • MHD T 5.8700e-004 1.1500e-004 r 4 tblVehicleEF • MHD T 7.3100e-004 4.5200e-004 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 4.8500e-004 3.1600e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.13 r 4 tblVehicleEF • MHD T 0.23 0.06 r 4 tblVehicleEF • OBUS T 0.01 7.4950e-003 r 4 tblVehicleEF • OBUS T 2.8460e-003 1.8580e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.58 r 4 tblVehicleEF • OBUS T 0.19 0.19 r 4 tblVehicleEF • OBUS T 4.19 1.43 r 4 tblVehicleEF • OBUS T 74.12 83.68 r 4 tblVehicleEF • OBUS T 1,078.21 1,095.16 r 4 tblVehicleEF • OBUS T 67.43 13.39 tblVehicleEF • OBUS • 0.15 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.29 0.73 tblVehicleEF • OBUS i 1.98 1.08 r tblVehicleEF • OBUS T 1.4000e-005 1.2200e-004 r tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r tblVehicleEF • OBUS T 1.3000e-005 1.1600e-004 r tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r tblVehicleEF • OBUS T 1.9420e-003 2.1200e-003 r tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 8.7400e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.27 0.07 r 4 tblVehicleEF • OBUS T 7.1900e-004 7.9500e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4800e-004 1.3200e-004 r 4 tblVehicleEF • OBUS T 1.9420e-003 2.1200e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.7400e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • OBUS T 0.01 7.5750e-003 tblVehicleEF • OBUS • 2.8900e-003 1.8830e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.02 0.01 tblVehicleEF • OBUS i 0.24 0.57 r tblVehicleEF • OBUS T 0.20 0.19 r tblVehicleEF • OBUS T 3.92 1.37 r tblVehicleEF • OBUS T 77.54 82.67 r tblVehicleEF • OBUS T 1,078.21 1,095.17 r tblVehicleEF • OBUS T 67.43 13.28 r 4 tblVehicleEF • OBUS T 0.16 0.36 r tblVehicleEF • OBUS T 0.27 0.69 r tblVehicleEF • OBUS T 1.96 1.08 r 4 tblVehicleEF • OBUS T 1.1000e-005 1.0800e-004 r 4 tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r 4 tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r 4 tblVehicleEF • OBUS T 1.1000e-005 1.0300e-004 r 4 tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 3.5950e-003 4.1620e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6350e-003 1.6400e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.26 0.07 r 4 tblVehicleEF • OBUS T 7.5200e-004 7.8600e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4300e-004 1.3100e-004 tblVehicleEF • OBUS • 3.5950e-003 4.1620e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 0.02 0.02 tblVehicleEF • OBUS i 0.04 0.06 r tblVehicleEF • OBUS T 1.6350e-003 1.6400e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.28 0.08 r tblVehicleEF • OBUS T 0.01 7.3830e-003 r 4 tblVehicleEF • OBUS T 2.8310e-003 1.8140e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.59 r 4 tblVehicleEF • OBUS T 0.19 0.18 r 4 tblVehicleEF • OBUS T 4.24 1.54 r 4 tblVehicleEF • OBUS T 69.39 85.07 r 4 tblVehicleEF • OBUS T 1,078.21 1,095.16 r 4 tblVehicleEF • OBUS T 67.43 13.57 r 4 tblVehicleEF • OBUS T 0.14 0.40 r 4 tblVehicleEF • OBUS T 0.29 0.75 r 4 tblVehicleEF • OBUS T 1.98 1.09 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.4000e-004 r 4 tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r 4 tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.3400e-004 r 4 tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 1.5720e-003 9.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 tblVehicleEF • OBUS • 0.03 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • OBUS • 7.8300e-004 4.9700e-004 tblVehicleEF • OBUS i 0.02 0.01 r tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.27 0.08 r tblVehicleEF • OBUS T 6.7400e-004 8.0800e-004 r tblVehicleEF • OBUS T 0.01 0.01 r tblVehicleEF • OBUS T 7.4800e-004 1.3400e-004 r 4 tblVehicleEF • OBUS T 1.5720e-003 9.2500e-004 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 7.8300e-004 4.9700e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 5.0770e-003 3.3990e-003 r 4 tblVehicleEF • SBUS T 0.05 5.6130e-003 r 4 tblVehicleEF • SBUS T 8.06 2.89 r 4 tblVehicleEF • SBUS T 0.35 0.25 r 4 tblVehicleEF • SBUS T 5.67 0.62 r 4 tblVehicleEF • SBUS T 1,064.74 328.32 r 4 tblVehicleEF • SBUS T 1,062.83 974.47 r 4 tblVehicleEF • SBUS T 56.88 4.53 r 4 tblVehicleEF • SBUS T 4.37 2.65 r 4 tblVehicleEF • SBUS T 1.74 2.75 r 4 tblVehicleEF • SBUS T 11.65 1.31 tblVehicleEF • SBUS • 1.9460e-003 2.0090e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 0.01 0.01 tblVehicleEF • SBUS i 8.3200e-003 0.02 r tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r tblVehicleEF • SBUS T 1.8620e-003 1.9220e-003 r tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r tblVehicleEF • SBUS T 7.9470e-003 0.01 r tblVehicleEF • SBUS T 6.9000e-004 5.1000e-005 r 4 tblVehicleEF • SBUS T 6.6820e-003 2.1060e-003 r tblVehicleEF • SBUS T 0.04 9.2560e-003 r tblVehicleEF • SBUS T 0.96 0.31 r 4 tblVehicleEF • SBUS T 3.2520e-003 9.0500e-004 r 4 tblVehicleEF • SBUS T 0.06 0.05 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.33 0.03 r 4 tblVehicleEF • SBUS T 0.01 3.1310e-003 r 4 tblVehicleEF • SBUS T 0.01 9.3590e-003 r 4 tblVehicleEF • SBUS T 6.6800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 6.6820e-003 2.1060e-003 r 4 tblVehicleEF • SBUS T 0.04 9.2560e-003 r 4 tblVehicleEF • SBUS T 1.38 0.45 r 4 tblVehicleEF • SBUS T 3.2520e-003 9.0500e-004 r 4 tblVehicleEF • SBUS T 0.07 0.06 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.36 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 5.1370e-003 3.4230e-003 tblVehicleEF • SBUS • 0.04 4.8940e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 7.99 2.87 tblVehicleEF • SBUS i 0.35 0.25 r tblVehicleEF • SBUS i 4.12 0.48 r tblVehicleEF • SBUS i 1,111.32 332.27 r tblVehicleEF • SBUS i 1,062.83 974.48 r tblVehicleEF • SBUS i 56.88 4.30 r tblVehicleEF • SBUS T 4.51 2.67 r 4 tblVehicleEF • SBUS T 1.63 2.58 r tblVehicleEF • SBUS T 11.63 1.30 r tblVehicleEF • SBUS T 1.6410e-003 1.7030e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 8.3200e-003 0.02 r 4 tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r 4 tblVehicleEF • SBUS T 1.5700e-003 1.6300e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r 4 tblVehicleEF • SBUS T 7.9470e-003 0.01 r 4 tblVehicleEF • SBUS T 6.9000e-004 5.1000e-005 r 4 tblVehicleEF • SBUS T 0.01 4.1320e-003 r 4 tblVehicleEF • SBUS T 0.04 0.01 r 4 tblVehicleEF • SBUS T 0.95 0.31 r 4 tblVehicleEF • SBUS T 5.8870e-003 1.6130e-003 r 4 tblVehicleEF • SBUS T 0.06 0.05 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.28 0.03 r 4 tblVehicleEF • SBUS T 0.01 3.1690e-003 r 4 tblVehicleEF • SBUS T 0.01 9.3600e-003 tblVehicleEF • SBUS • 6.4200e-004 4.3000e-005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • SBUS • 0.01 4.1320e-003 tblVehicleEF • SBUS i 0.04 0.01 r tblVehicleEF • SBUS i 1.38 0.45 r tblVehicleEF • SBUS i 5.8870e-003 1.6130e-003 r tblVehicleEF • SBUS i 0.07 0.06 r tblVehicleEF • SBUS i 0.02 0.06 r tblVehicleEF • SBUS i 0.30 0.03 r 4 tblVehicleEF • SBUS i 0.81 0.07 r tblVehicleEF • SBUS i 5.0590e-003 3.3580e-003 r tblVehicleEF • SBUS i 0.06 6.6220e-003 r 4 tblVehicleEF • SBUS i 8.15 2.93 r 4 tblVehicleEF • SBUS i 0.35 0.24 r 4 tblVehicleEF • SBUS i 6.02 0.82 r 4 tblVehicleEF • SBUS i 1,000.40 322.88 r 4 tblVehicleEF • SBUS i 1,062.83 974.47 r 4 tblVehicleEF • SBUS T 56.88 4.87 r 4 tblVehicleEF • SBUS T 4.18 2.61 r 4 tblVehicleEF • SBUS T 1.72 2.79 r 4 tblVehicleEF • SBUS T 11.66 1.31 r 4 tblVehicleEF • SBUS T 2.3680e-003 2.4310e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 8.3200e-003 0.02 r 4 tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r 4 tblVehicleEF • SBUS T 2.2660e-003 2.3260e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r 4 tblVehicleEF • SBUS T 7.9470e-003 0.01 tblVehicleEF • SBUS • 6.9000e-004 5.1000e-005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF .SBUS • 5.5380e-003 9.1500e-004 tblVehicleEF • SBUS r 0.04 8.9670e-003 I- 4 tblVehicleEF • SBUS r 0.96 0.31 I- 4 tblVehicleEF • SBUS r 3.0800e-003 5.0400e-004 I- 4 tblVehicleEF • SBUS r 0.06 0.05 I- 4 tblVehicleEF • SBUS r 0.03 0.07 I- 4 tblVehicleEF • SBUS r 0.34 0.03 I- 4 tblVehicleEF • SBUS r 9.8300e-003 3.0800e-003 I- 4 tblVehicleEF • SBUS r 0.01 9.3590e-003 I- 4 tblVehicleEF • SBUS r 6.7400e-004 4.8000e-005 I- 4 tblVehicleEF • SBUS r 5.5380e-003 9.1500e-004 I- 4 tblVehicleEF • SBUS r 0.04 8.9670e-003 I- 4 tblVehicleEF • SBUS r 1.39 0.45 I- 4 tblVehicleEF • SBUS r 3.0800e-003 5.0400e-004 I- 4 tblVehicleEF • SBUS r 0.07 0.06 I- 4 tblVehicleEF • SBUS r 0.03 0.07 I- 4 tblVehicleEF • SBUS r 0.38 0.04 I- 4 tblVehicleEF • UBUS r 0.97 4.48 I- 4 tblVehicleEF • UBUS r 0.06 0.00 I- 4 tblVehicleEF • UBUS r 5.05 34.99 I- 4 tblVehicleEF • UBUS r 10.05 0.00 I- 4 tblVehicleEF • UBUS 1,711.56 1,549.85 I- 4 tblVehicleEF • UBUS r 150.01 0.00 I- 4 tblVehicleEF • UBUS r 1.36 0.35 I- 4 tblVehicleEF • UBUS r 11.86 0.00 I- 4 tblVehicleEF • UBUS r 0.48 0.08 tblVehicleEF • UBUS • 0.01 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 0.01 5.6300e-003 tblVehicleEF • UBUS i 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r tblVehicleEF • UBUS T 1.4600e-003 0.00 r tblVehicleEF • UBUS T 6.5200e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r tblVehicleEF • UBUS T 3.6650e-003 0.00 r tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.86 0.00 r 4 tblVehicleEF • UBUS T 8.4010e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6830e-003 0.00 r 4 tblVehicleEF • UBUS T 6.5200e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.6650e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.94 0.00 r 4 tblVehicleEF • UBUS T 0.98 4.48 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.07 34.99 r 4 tblVehicleEF • UBUS T 8.68 0.00 r 4 tblVehicleEF • UBUS T 1,711.56 1,549.85 r 4 tblVehicleEF • UBUS T 150.01 0.00 tblVehicleEF • UBUS • 1.26 0.35 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 11.79 0.00 tblVehicleEF • UBUS i 0.48 0.08 r tblVehicleEF • UBUS T 0.01 0.03 r tblVehicleEF • UBUS T 0.01 5.6300e-003 r tblVehicleEF • UBUS T 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r 4 tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r tblVehicleEF • UBUS T 1.4600e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 7.0900e-003 0.00 r 4 tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.79 0.00 r 4 tblVehicleEF • UBUS T 8.4010e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6600e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 7.0900e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.86 0.00 r 4 tblVehicleEF • UBUS T 0.97 4.48 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.04 34.99 tblVehicleEF • UBUS • 10.26 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleEF • UBUS • 1,711.56 1,549.85 tblVehicleEF • UBUS i 150.01 0.00 r tblVehicleEF • UBUS T 1.35 0.35 r tblVehicleEF • UBUS T 11.86 0.00 r tblVehicleEF • UBUS T 0.48 0.08 r tblVehicleEF • UBUS T 0.01 0.03 r tblVehicleEF • UBUS T 0.01 5.6300e-003 r 4 tblVehicleEF • UBUS T 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r 4 tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r 4 tblVehicleEF • UBUS T 1.4600e-003 0.00 r 4 tblVehicleEF • UBUS T 5.1800e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.1580e-003 0.00 r 4 tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.87 0.00 r 4 tblVehicleEF • UBUS T 8.4000e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6870e-003 0.00 r 4 tblVehicleEF • UBUS T 5.1800e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.1580e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.95 0.00 tblVehicleTrips • CC • 4.20 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer tblVehicleTrips • CC TL • 4.20 8.70 tblVehicleTrips • CNW_TL i 5.40 8.70 r tblVehicleTrips • CNW_TL T 5.40 8.70 r tblVehicleTrips • CW T 12.50 8.70 r tblVehicleTrips • CW_TL T 12.50 8.70 r tblVehicleTrips • HO_TL T 4.50 8.70 • r tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HS_TL T 3.50 8.70 r tblVehicleTrips • HS_TL T 3.50 8.70 • r tblVehicleTrips • HW T 11.00 8.70 r 4 tblVehicleTrips • HW T 11.00 8.70 r 4 tblVehicleTrips • ST T 7.16 7.90 r 4 tblVehicleTrips • ST TR T 40.63 11.95 r 4 tblVehicleTrips • ST T 8.19 8.30 r 4 tblVehicleTrips • ST T 9.91 9.33 r 4 tblVehicleTrips • SU_TR T 6.07 6.10 • r 4 tblVehicleTrips • SU T 39.53 11.35 r 4 tblVehicleTrips • SU T 5.95 6.71 r 4 tblVehicleTrips • SU TR T 8.62 8.36 • r 4 tblVehicleTrips • WD TR T 6.59 7.11 r 4 tblVehicleTrips • WD T 35.74 18.25 r 4 tblVehicleTrips • WD_TR T 8.17 9.67 r 4 tblVehicleTrips • WD_TR T 9.52 9.23 • r 4 tblWoodstoves • NumberCatalytic T 22.10 0.00 r 4 tblWoodstoves • NumberCatalytic T 37.90 0.00 r 4 tblWoodstoves • NumberNoncatalytic T22.10 0.00 tblWoodstoves • NumberNoncatalytic • 37.90 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 2.0 Emissions Summary Page 50 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •I • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 62 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 67.5209 21.0443 1 107.2254 0.1323 I 2.1585 2.1585 2.1585 2.1585 • 0.0000 ' 25,590.05 25,590.05 0.6570 I 0.4659 25,745.31 25,590.05 25,590.05 0.6570 1 0.4659 25,745.31 9 96 96 I 71 J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Energy •i 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 • i 9,459.253 9,459.253 0.1813 0.1734 9,515.465 J J J 3 3 0 •i 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 • ir J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Mobile .1 22.6503 56.0930 213.9183 0.6573 68.4927 0.5846 69.0773 18.2982 0.5521 18.8503 • 71,227.21 71,227.21 2.4064 71,287.37 3 3 0 • 99 99 i 98 Total • 22.6503 1 56.0930 213.9183 1 0.6573 i 68.4927 1 0.5846 69.0773 1 18.2982 0.5521 18.8503 • 91.0383 84.7304 325.6414 0.8369 68.4927 3.3422 71.8349 18.2982 3.3097 21.6079 0.0000 106,276.5 106,276.5 3.2447 0.6393 106,548.1 3.3097 21.6079 0.0000 106,276.5 106,276.5 3.2447 0.6393 106,548.1 329 329 619 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2 5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 67.5209 21.0443 107.2254 0.1323 I 2.1585 1 2.1585 2.1585 2.1585 • 0.0000 25,590.05 25,590.05 0.6570 1 0.4659 25,745.31 96 96 71 J J J .1 J J J J w J J J Energy •i 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 • 9,459.253 9,459.253 0.1813 0.1734 9,515.465 ■ 3 3 0 J J J J J J J J . J J J Mobile • 22.6503 1 56.0930 213.9183 1 0.6573 i 68.4927 1 0.5846 69.0773 1 18.2982 0.5521 18.8503 • 71,227.21 71,227.211 2.4064 71,287.37 99 99 98 Total 91.0383 84.7304 325.6414 0.8369 68.4927 3.3422 71.8349 18.2982 3.3097 21.6079 0.0000 106,276.5 106,276.5 3.2447 0.6393 106,548.1 329 329 619 CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :3/3/2029 :3/2/2029• 0' Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers • 0 0 IUsage Hours I Horse Power I Load Factor 1- 0' 8.001 81' 8.001 158' t 8.00 247' 0.73 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00' 5.40' 20.00'LD Mix 'HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 3.1 Mitigation Measures Construction 3.2 Demolition - 2029 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 I i t Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 62 3.2 Demolition - 2029 Mitigated Construction On -Site Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 4.1 Mitigation Measures Mobile Page 56 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4� 22.6503 1 56.0930 1 213.9183 1 0.6573 1 68.4927 1 0.5846 1 69.0773 1 18.2982 1 0.5521 18.8503 71,227.21 71,227.21 2.4064 i 71,287.37 1• 11 •1 99 99 1 1 1 1 98 • a I- + } F 1 F + } r l• + } + r Unmitigated •. 22.6503 . 56.0930 . 213.9183 • 0.6573 . 68.4927 • 0.5846 • 69.0773 . 18.2982 • 0.5521 . 18.8503 • . 71,227.21 • 71,227.21 • 2.4064 . • 71,287.37 99 1 99 1 1 98 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 2 3,140.72 3,492.55 2694.48 • 8,792,610 • 8,792,610 T Golf Course + 219.00 143.38 136.17 • 384,634 • 384,634 Hotel + 967.00 - 830.21 T 670.50 • 1,936,054 • 1,936,054 Other Asphalt Surfaces ; 0.00 ; 0.00 t0.00 • • T Y 1 Single Family Housing + 6,994.29 7,068.35 6334.91 • 19,430,241 • 19,430,241 Total I 11,321.01 I 11,534.49 9,836.06 I 30,543,539 1 30,543,539 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip % Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing ▪ 8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 ▪ 8.70 8.70 8.70 33.00 i 48.00 19.00 • 52 39 9 ▪ 8.70 8.70 8.70 19.40 61.60 19.00 • 58 38 4 • + -r t r r ▪ 12.50 4.20 5.40 0.00 l 0.00 0.00 • 0 0 0 h t - Y 1- -r r r r • • 8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 4.4 Fleet Mix Land Use I LDA I LDT1LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise ; 0.563257v 0.034111 0.191453 0.101691 0.009981 0.004112 0.016979 0.070176: 0.001424 0.001067 0.004344 0.000811: 0.000594 r i i i i ii i i i i + Golf Course • 0.563257' 0.0341111 0.1914531 0.1016911 0.0099811 0.004112i 0.0169791 0.0701761 0.0014241 0.0010671 0.0043441 0.000811: 0.000594 i --- 1 i 1 i 1 i 1 i 1 i 1 i 1 i 1 i 1 i i + Hotel • 0.563257v 0.0341111 0.1914531 0.1016911 0.0099811 0.0041121 0.016979 1 0.0701761 0.001424 0.001067 0.004344 0.000811 : 0.000594 i --- 1 i 1 i 1 i 1 i 1i 1 i 1 i 1 i 1 i i + Other Asphalt Surfaces • 0.563257' 0.034111 0.1914531 0.101691 0.009981 0.004112 0.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 r 1 Single Family Housing ▪ 0.563257; 0.034111:E 0.191453:E 0.101691; 0.009981; 0.004112; 0.016979; 0.070176; 0.001424; 0.001067; 0.004344; 0.000811; 0.000594 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas .; 0.8671 i 7.5931 i 4.4976 : 0.0473 i i 0.5991 1 0.5991 i i 0.5991 0.5991 •i 9,459.253 9,459.253 0.1813 0.1734 i 9,515.465 Mitigated ;i1 , i 3 1 3 1 1 1 0 1 1 1 1 I. F + 1 + 4. 4. + 4. ,. I. 4. 4. 4. r NaturalGas . 0.8671 • 7.5931 • 4.4976 • 0.0473 • 0.5991 • 0.5991 • 0.5991 0.5991 • . 9,459.253 . 9,459.253 . 0.1813 • 0.1734 . 9,515.465 Unmitigated 3 3 0 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing 1 12734.3 • i ; • F -. 10 •u 1 • 1 r 7 131168.8 • . I- 7 10 •i 1 I- 7 1 36500.5 ■ i . 0.1373 1.1736 0.4994 : 7.4900e- 0.0949 0.0949 1 : 0.0949 0.0949 003 J J J J J J J J • 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 i 1 i i 1 i ' J J J J J J J J 0.3361 1 3.0558 2.5668 1 0.0183 0.2322 0.2322 I : 0.2322 0.2322 1 1 J J J J J J J J v 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v 0.3936 3.3638 1.4314 0.0215 0.2720 0.2720 0.2720 0.2720 • •0.0000 • . • ` •0.0000 • . • . 1,498.158 1,498.158 0.0287 0.02751,507.061 5 5 J J J 0.0000 0.0000 0.0000 0.0000 J J J 3,666.920 3,666.920 1 0.0703 0.0672 4 4 J J J 0.0000 0.0000 0.0000 0.0000 J J J 4,294.174 4,294.174 0.0823 0.0787 5 5 i 3 0.0000 3,688.711 1 0.0000 4,319.692 i 6 Total 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 9,459.253 4 9,459.253 4 0.1813 0.1734 9,515.465 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing 1 12.7343 • i 1- -. 10 • i 1- 4 i 31.1688 • 1 1- 4 : 0 • i i f 4 i 36.5005 • i i 0.1373 1.1736 0.4994 1 7.4900e- 1 0.0949 0.0949 1 1 0.0949 0.0949 • 1 003: J J J J J J J J 7 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 • 1 1 1 1 1 1 1 1 J .1 .1 J .1 .1 J .1 .1. 0.3361 3.0558 2.5668 1 0.0183 1 0.2322 0.2322 1 1 0.2322 0.2322 . 1 1 1 . J .1 .1 J .1 J J .1 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 6 J .1 .1 J .1 .1 J .1 . 0.3936 3.3638 1.4314 0.0215 0.2720 0.2720 0.2720 0.2720 • 1,498.158 1,498.158 0.0287 0.0275 1,507.061 5 5 1 3 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 3,666.920 3,666.920 0.0703 0.0672 3,688.7111 4 4 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 4,294.174 4,294.174 0.0823 0.0787 4,319.692 5 5 i 6 Total 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 9,459.253 4 9,459.253 4 0.1813 0.1734 9,515.465 0 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4 67.5209 21.0443 107.2254i 0.1323 i i 2.1585 i 2.1585 i i 2.1585 2.1585 : 0.0000 i 25,590.05: 25,590.05: 0.6570 : 0.4659 i 25,745.31 •1 11� � 11 11 196 i 96 1 i 71 ' • I. + 4.F + 4. + 4.4. r I. 4. 1. e r Unmitigated •• 67.5209 • 21.0443 • 107.2254 • 0.1323 • 2.1585 • 2.1585 • 2.1585 • 2.1585 • 0.0000 . 25,590.05 . 25,590.05 . 0.6570 • 0.4659 • 25,745.31 96 96 71 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural 4 17.4358 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 I 0.0000 Coating :: •1 i • i Consumer •1 44.8009 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •1 2.3294 1 19.9059 1 8.4706 0.1271 1.6094 1.6094 1 1.6094 1.6094 • 0.0000 25,411.764 25,411.764 0.4871 0.4659 25,562.77 •1 • 7 7 41 Landscaping •i 2.9548 1.1384 98.7548 5.2300e- 0.5491 0.5491 0.5491 0.5491 • 178.2949 178.2949 0.1699 182.5430 003 Total 67.5209 21.0443 107.2254 0.1323 2.1585 2.1585 2.1585 2.1585 0.0000 25,590.05 25,590.05 0.6570 0.4659 25,745.31 96 96 71 CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 62 6.2 Area by SubCategory Mitigated Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 17.4358 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: e .1 .1 .1 .1 .1 .1 .1 .1 ; .1 .1 J Consumer •1 44.8009 : 0.0000 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 Products :: Hearth •1 2.3294 19.9059 8.4706 0.1271 : 1.6094 1.6094 1.6094 1.6094 • 0.0000 125,411.764 25,411.764 0.4871 0.4659 25,562.77 •1 1 ; 7 7 41 Landscaping •1 2.9548 1.1384 98.7548 5.2300e- 0.5491 0.5491 0.5491 0.5491 • 1 178.2949 178.2949 0.1699 182.5430 003 • Total 67.5209 21.0443 107.2254 0.1323 2.1585 2.1585 2.1585 2.1585 0.0000 25,590.05 25,590.05 0.6570 0.4659 25,745.31 96 96 71 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Page 62 of 62 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Summer Institute Recycling and Composting Services 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter Travertine Specific Plan - Phase 3 (Operations) Riverside -Salton Sea County, Winter 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course Hotel Apartments Low Rise Single Family Housing • • • • • 35.00 12.00 100.00 442.00 758.00 a 4 a 4 a 4 4 Acre Hole Room Dwelling Unit 35.00 46.20 38.30 60.80 Dwelling Unit 317.50 1,524,600.00 0 64,282.00 0 261,712.00 0 442,000.00 1198 1,364,400.00 2054 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% less energy for residential uses Water Mitigation - Waste Mitigation - Table Name Column Name Default Value New Value tblConstructionPhase • NumDays 500.00 • 0.00 r tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 5.44 T• 3.81 tblEnergyUse Y • LightingElect 1,608.84 T 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 • tblEnergyUse Y T24E 6.47 T 4.53 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T• 4,485.92 tblEnergyUse Y• T24NG 55.15 T 38.61 tblEnergyUse Y• T24NG 24,566.15 T 11,546.09 Y 1 1 tblFireplaces • NumberGas 353.60 442.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblFireplaces • NumberGas • 606.40 758.00 tblFireplaces • NumberNoFireplace i 44.20 0.00 r tblFireplaces • NumberNoFireplace T 75.80 0.00 r tblFireplaces • NumberWood T 44.20 0.00 r tblFireplaces • NumberWood T 75.80 0.00 r tblLandUse • LandUseSquareFeet i 0.00 64,282.00 • r tblLandUse • LandUseSquareFeet T 145,200.00 261,712.00 r 4 tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 3.33 38.30 • r tblLandUse • LotAcreage i 27.63 60.80 r 4 tblLandUse • LotAcreage i 246.10 317.50 r 4 tblLandUse • Population T 1,264.00 1,198.00 r 4 tblLandUse • Population T 2,168.00 2,054.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 • r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 623.16 r 4 tblVehicleEF • HHD T 0.75 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 1.93 10.48 r 4 tblVehicleEF • HHD T 0.45 0.21 r 4 tblVehicleEF • HHD T 1.67 2.2240e-003 r 4 tblVehicleEF • HHD T 5,686.40 1,476.79 r 4 tblVehicleEF • HHD T 1,373.71 1,021.53 r 4 tblVehicleEF • HHD T 5.25 0.02 tblVehicleEF • HHD • 16.13 8.41 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 0.76 1.81 tblVehicleEF • HHD i 20.16 2.34 r tblVehicleEF • HHD T 2.7210e-003 3.0730e-003 r tblVehicleEF • HHD T 0.06 0.06 r tblVehicleEF • HHD T 0.04 0.04 r tblVehicleEF • HHD T 4.8640e-003 0.02 r tblVehicleEF • HHD T 5.7000e-005 0.00 r 4 tblVehicleEF • HHD T 2.6030e-003 2.9400e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8460e-003 8.9630e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 8.2000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.2700e-003 2.1000e-005 r 4 tblVehicleEF • HHD T 0.51 0.71 r 4 tblVehicleEF • HHD T 4.8000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 1.5900e-004 8.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.5730e-003 r 4 tblVehicleEF • HHD T 8.0000e-005 0.00 r 4 tblVehicleEF • HHD T 8.2000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.2700e-003 2.1000e-005 r 4 tblVehicleEF • HHD T 0.59 0.81 r 4 tblVehicleEF • HHD T 4.8000e-005 1.0000e-006 tblVehicleEF • HHD • 0.08 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 1.5900e-004 8.9000e-005 tblVehicleEF • HHD i 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.70 0.04 r tblVehicleEF • HHD T 0.03 0.01 r tblVehicleEF • HHD T 0.05 0.00 r tblVehicleEF • HHD T 1.40 10.35 r tblVehicleEF • HHD T 0.46 0.21 r 4 tblVehicleEF • HHD T 1.60 2.1620e-003 r tblVehicleEF • HHD T 6,024.24 1,457.52 r tblVehicleEF • HHD T 1,373.71 1,021.53 r 4 tblVehicleEF • HHD T 5.25 0.02 r 4 tblVehicleEF • HHD T 16.65 7.99 r 4 tblVehicleEF • HHD T 0.72 1.71 r 4 tblVehicleEF • HHD T 20.16 2.34 r 4 tblVehicleEF • HHD T 2.2940e-003 2.7280e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.8640e-003 0.02 r 4 tblVehicleEF • HHD T 5.7000e-005 0.00 r 4 tblVehicleEF • HHD T 2.1950e-003 2.6100e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8460e-003 8.9630e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 1.5500e-004 2.0000e-006 r 4 tblVehicleEF • HHD T 2.5580e-003 2.6000e-005 tblVehicleEF • HHD • 0.48 0.75 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 8.7000e-005 1.0000e-006 tblVehicleEF • HHD i 0.05 0.02 r tblVehicleEF • HHD T 1.6100e-004 9.2000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.06 0.01 r tblVehicleEF • HHD T 0.01 9.5730e-003 r tblVehicleEF • HHD T 7.8000e-005 0.00 r 4 tblVehicleEF • HHD T 1.5500e-004 2.0000e-006 r tblVehicleEF • HHD T 2.5580e-003 2.6000e-005 r tblVehicleEF • HHD T 0.56 0.86 r 4 tblVehicleEF • HHD T 8.7000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.6100e-004 9.2000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.81 0.03 r 4 tblVehicleEF • HHD T 0.03 8.3700e-004 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 2.66 10.65 r 4 tblVehicleEF • HHD T 0.45 0.17 r 4 tblVehicleEF • HHD T 1.70 2.3630e-003 r 4 tblVehicleEF • HHD T 5,219.86 1,500.30 r 4 tblVehicleEF • HHD T 1,373.71 1,013.27 r 4 tblVehicleEF • HHD T 5.25 0.02 r 4 tblVehicleEF • HHD T 15.41 8.96 r 4 tblVehicleEF • HHD T 0.76 1.83 r 4 tblVehicleEF • HHD T 20.16 2.34 tblVehicleEF • HHD • 3.3110e-003 3.5340e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • HHD • 0.06 0.06 tblVehicleEF • HHD i 0.04 0.04 r tblVehicleEF • HHD T 4.8640e-003 0.02 r tblVehicleEF • HHD T 5.7000e-005 0.00 r tblVehicleEF • HHD T 3.1670e-003 3.3820e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8460e-003 8.9370e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r tblVehicleEF • HHD T 5.2000e-005 0.00 r tblVehicleEF • HHD T 5.5000e-005 0.00 r 4 tblVehicleEF • HHD T 2.3120e-003 1.9000e-005 r 4 tblVehicleEF • HHD T 0.55 0.65 r 4 tblVehicleEF • HHD T 3.9000e-005 0.00 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 1.7200e-004 9.6000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.5730e-003 r 4 tblVehicleEF • HHD T 8.0000e-005 0.00 r 4 tblVehicleEF • HHD T 5.5000e-005 0.00 r 4 tblVehicleEF • HHD T 2.3120e-003 1.9000e-005 r 4 tblVehicleEF • HHD T 0.64 0.74 r 4 tblVehicleEF • HHD T 3.9000e-005 0.00 r 4 tblVehicleEF • HHD i 0.08 0.02 r 4 tblVehicleEF • HHD 1.7200e-004 9.6000e-005 r r 4 tblVehicleEF • HHD 0.03 1.0000e-006 • r tblVehicleEF • LDA • 1.8430e-003 1.0230e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 1.7440e-003 0.02 tblVehicleEF • LDA i 0.34 0.48 r tblVehicleEF • LDA T 0.54 1.47 r tblVehicleEF • LDA T 180.10 223.31 r tblVehicleEF • LDA T 41.06 43.92 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r 4 tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.04 r 4 tblVehicleEF • LDA T 4.6130e-003 3.4090e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.10 r 4 tblVehicleEF • LDA T 1.8020e-003 2.0520e-003 r 4 tblVehicleEF • LDA T 4.1900e-004 4.0400e-004 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.04 r 4 tblVehicleEF • LDA T 6.7130e-003 4.9720e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 2.0860e-003 1.2030e-003 tblVehicleEF • LDA • 1.5090e-003 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 0.41 0.63 tblVehicleEF • LDA i 0.48 1.52 r tblVehicleEF • LDA T 196.09 247.40 r tblVehicleEF • LDA T 41.06 43.98 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.02 0.12 r tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r 4 tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r 4 tblVehicleEF • LDA T 0.05 0.11 r 4 tblVehicleEF • LDA T 0.07 0.08 r 4 tblVehicleEF • LDA T 0.04 0.08 r 4 tblVehicleEF • LDA T 5.2150e-003 3.9860e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.09 r 4 tblVehicleEF • LDA T 1.9630e-003 2.2740e-003 r 4 tblVehicleEF • LDA T 4.1800e-004 4.0400e-004 r 4 tblVehicleEF • LDA T 0.05 0.11 r 4 tblVehicleEF • LDA T 0.07 0.08 r 4 tblVehicleEF • LDA T 0.04 0.08 r 4 tblVehicleEF • LDA T 7.5910e-003 5.8180e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.10 r 4 tblVehicleEF • LDA T 1.7790e-003 9.0500e-004 r 4 tblVehicleEF • LDA T 1.7900e-003 0.03 tblVehicleEF • LDA • 0.32 0.40 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDA • 0.55 1.69 tblVehicleEF • LDA i 175.64 207.59 r tblVehicleEF • LDA T 41.06 44.36 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.03 0.12 r tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r 4 tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 4.4550e-003 3.0610e-003 r 4 tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.02 0.11 r 4 tblVehicleEF • LDA T 1.7570e-003 1.9080e-003 r 4 tblVehicleEF • LDA T 4.1900e-004 4.0800e-004 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 6.4830e-003 4.4620e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.12 r 4 tblVehicleEF • LDT1 T 3.9640e-003 2.6260e-003 r 4 tblVehicleEF • LDT1 T 5.1520e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.59 0.75 tblVehicleEF • LDT1 • 1.18 1.63 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT1 • 233.76 278.63 tblVehicleEF • LDT1 i 53.90 54.33 r tblVehicleEF • LDT1 T 0.05 0.04 r tblVehicleEF • LDT1 T 0.06 0.15 r tblVehicleEF • LDT1 T 1.3730e-003 1.1910e-003 r tblVehicleEF • LDT1 T 2.2030e-003 1.4330e-003 r tblVehicleEF • LDT1 T 1.2620e-003 1.0950e-003 r 4 tblVehicleEF • LDT1 T 2.0250e-003 1.3180e-003 r tblVehicleEF • LDT1 T 0.09 0.12 r tblVehicleEF • LDT1 T 0.15 0.12 r 4 tblVehicleEF • LDT1 T 0.07 0.09 r 4 tblVehicleEF • LDT1 T 9.8180e-003 0.01 r 4 tblVehicleEF • LDT1 T 0.10 0.38 r 4 tblVehicleEF • LDT1 T 0.07 0.14 r 4 tblVehicleEF • LDT1 T 2.3430e-003 2.5600e-003 r 4 tblVehicleEF • LDT1 T 5.5900e-004 4.9900e-004 r 4 tblVehicleEF • LDT1 T 0.09 0.12 r 4 tblVehicleEF • LDT1 T 0.15 0.12 r 4 tblVehicleEF • LDT1 T 0.07 0.09 r 4 tblVehicleEF • LDT1 T 0.01 0.02 r 4 tblVehicleEF • LDT1 T 0.10 0.38 r 4 tblVehicleEF • LDT1 T 0.08 0.15 r 4 tblVehicleEF • LDT1 T 4.4760e-003 3.0490e-003 r 4 tblVehicleEF • LDT1 T 4.4670e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.72 0.97 r 4 tblVehicleEF • LDT1 T 1.04 1.68 tblVehicleEF • LDT1 • 254.30 304.46 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LDT1 • 53.90 54.38 tblVehicleEF • LDT1 r 0.05 0.04 I- 4 tblVehicleEF • LDT1 r 0.06 0.15 I- 4 tblVehicleEF • LDT1 r 1.3730e-003 1.1910e-003 I- 4 tblVehicleEF • LDT1 r 2.2030e-003 1.4330e-003 I- 4 tblVehicleEF • LDT1 r 1.2620e-003 1.0950e-003 I- 4 tblVehicleEF • LDT1 r 2.0250e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 0.18 0.25 I- 4 tblVehicleEF • LDT1 r 0.18 0.15 I- 4 tblVehicleEF • LDT1 r 0.13 0.16 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.10 0.40 I- 4 tblVehicleEF • LDT1 r 0.06 0.13 I- 4 tblVehicleEF • LDT1 r 2.5500e-003 2.7970e-003 I- 4 tblVehicleEF • LDT1 r 5.5600e-004 5.0000e-004 I- 4 tblVehicleEF • LDT1 r 0.18 0.25 I- 4 tblVehicleEF • LDT1 r 0.18 0.15 I- 4 tblVehicleEF • LDT1 r 0.13 0.16 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.10 0.40 I- 4 tblVehicleEF • LDT1 r 0.07 0.14 I- 4 tblVehicleEF • LDT1 r 3.8140e-003 2.3510e-003 I- 4 tblVehicleEF • LDT1 r 5.2920e-003 0.04 I- 4 tblVehicleEF • LDT1 r 0.55 0.63 I- 4 tblVehicleEF • LDT1 r 1.20 1.88 I- 4 tblVehicleEF • LDT1 r 227.49 261.79 tblVehicleEF • LDT1 • 53.90 54.83 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LDT1 • 0.05 0.04 tblVehicleEF • LDT1 r 0.07 0.15 I- 4 tblVehicleEF • LDT1 r 1.3730e-003 1.1910e-003 I- 4 tblVehicleEF • LDT1 r 2.2030e-003 1.4330e-003 I- 4 tblVehicleEF • LDT1 r 1.2620e-003 1.0950e-003 I- 4 tblVehicleEF • LDT1 r 2.0250e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 0.08 0.05 I- 4 tblVehicleEF • LDT1 r 0.16 0.11 I- 4 tblVehicleEF • LDT1 r 0.06 0.04 I- 4 tblVehicleEF • LDT1 r 9.4480e-003 9.3700e-003 I- 4 tblVehicleEF • LDT1 r 0.11 0.43 I- 4 tblVehicleEF • LDT1 r 0.07 0.16 I- 4 tblVehicleEF • LDT1 r 2.2800e-003 2.4050e-003 I- 4 tblVehicleEF • LDT1 r 5.5900e-004 5.0400e-004 I- 4 tblVehicleEF • LDT1 r 0.08 0.05 I- 4 tblVehicleEF • LDT1 r 0.16 0.11 I- 4 tblVehicleEF • LDT1 r 0.06 0.04 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.11 0.43 I- 4 tblVehicleEF • LDT1 r 0.08 0.18 I- 4 tblVehicleEF • LDT2 r 2.8010e-003 2.1080e-003 I- 4 tblVehicleEF • LDT2 r 2.6400e-003 0.03 I- 4 tblVehicleEF • LDT2 r 0.49 0.68 I- 4 tblVehicleEF • LDT2 r 0.77 1.95 I- 4 tblVehicleEF • LDT2 r 261.59 280.82 I- 4 tblVehicleEF • LDT2 r 59.37 55.04 tblVehicleEF • LDT2 • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 0.04 0.15 tblVehicleEF • LDT2 i 1.1950e-003 1.0750e-003 r tblVehicleEF • LDT2 T 1.9260e-003 1.2680e-003 r tblVehicleEF • LDT2 T 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.04 0.10 r tblVehicleEF • LDT2 T 0.07 0.09 r 4 tblVehicleEF • LDT2 T 0.04 0.08 r tblVehicleEF • LDT2 T 6.9570e-003 7.8510e-003 r tblVehicleEF • LDT2 T 0.05 0.31 r 4 tblVehicleEF • LDT2 T 0.04 0.14 r 4 tblVehicleEF • LDT2 T 2.6190e-003 2.5810e-003 r 4 tblVehicleEF • LDT2 T 6.0600e-004 5.0600e-004 r 4 tblVehicleEF • LDT2 T 0.04 0.10 r 4 tblVehicleEF • LDT2 T 0.07 0.09 r 4 tblVehicleEF • LDT2 T 0.04 0.08 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.31 r 4 tblVehicleEF • LDT2 T 0.04 0.16 r 4 tblVehicleEF • LDT2 T 3.1750e-003 2.4590e-003 r 4 tblVehicleEF • LDT2 T 2.3130e-003 0.03 r 4 tblVehicleEF • LDT2 T 0.61 0.89 r 4 tblVehicleEF • LDT2 T 0.69 2.00 r 4 tblVehicleEF • LDT2 T 284.69 304.46 r 4 tblVehicleEF • LDT2 T 59.37 55.09 r 4 tblVehicleEF • LDT2 T 0.03 0.04 tblVehicleEF • LDT2 • 0.04 0.15 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 1.1950e-003 1.0750e-003 tblVehicleEF • LDT2 i 1.9260e-003 1.2680e-003 r tblVehicleEF • LDT2 T 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.09 0.21 r tblVehicleEF • LDT2 T 0.08 0.11 r tblVehicleEF • LDT2 T 0.07 0.15 r 4 tblVehicleEF • LDT2 T 7.8810e-003 9.1400e-003 r tblVehicleEF • LDT2 T 0.05 0.32 r tblVehicleEF • LDT2 T 0.03 0.13 r 4 tblVehicleEF • LDT2 T 2.8510e-003 2.7980e-003 r 4 tblVehicleEF • LDT2 T 6.0500e-004 5.0600e-004 r 4 tblVehicleEF • LDT2 T 0.09 0.21 r 4 tblVehicleEF • LDT2 T 0.08 0.11 r 4 tblVehicleEF • LDT2 T 0.07 0.15 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.32 r 4 tblVehicleEF • LDT2 T 0.03 0.15 r 4 tblVehicleEF • LDT2 T 2.6900e-003 1.8800e-003 r 4 tblVehicleEF • LDT2 T 2.7200e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.46 0.57 r 4 tblVehicleEF • LDT2 T 0.79 2.26 r 4 tblVehicleEF • LDT2 T 254.53 265.40 r 4 tblVehicleEF • LDT2 T 59.37 55.65 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.04 0.16 tblVehicleEF • LDT2 • 1.1950e-003 1.0750e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LDT2 • 1.9260e-003 1.2680e-003 tblVehicleEF • LDT2 i 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 0.07 0.08 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 6.6820e-003 7.0720e-003 r 4 tblVehicleEF • LDT2 T 0.06 0.35 r tblVehicleEF • LDT2 T 0.04 0.17 r tblVehicleEF • LDT2 T 2.5480e-003 2.4390e-003 r 4 tblVehicleEF • LDT2 T 6.0600e-004 5.1100e-004 r 4 tblVehicleEF • LDT2 T 0.03 0.04 r 4 tblVehicleEF • LDT2 T 0.07 0.08 r 4 tblVehicleEF • LDT2 T 0.03 0.04 r 4 tblVehicleEF • LDT2 T 9.7420e-003 0.01 r 4 tblVehicleEF • LDT2 T 0.06 0.35 r 4 tblVehicleEF • LDT2 T 0.04 0.18 r 4 tblVehicleEF • LHD1 T 3.7520e-003 4.0090e-003 r 4 tblVehicleEF • LHD1 T 3.3780e-003 1.7990e-003 r 4 tblVehicleEF • LHD1 T 9.4800e-003 7.7110e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.34 0.21 r 4 tblVehicleEF • LHD1 T 1.41 0.78 r 4 tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.85 r 4 tblVehicleEF • LHD1 T 25.04 9.45 tblVehicleEF • LHD1 • 0.07 0.05 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 0.84 0.31 tblVehicleEF • LHD1 i 0.62 0.20 r tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r tblVehicleEF • LHD1 T 0.01 9.9660e-003 r tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 r tblVehicleEF • LHD1 T 8.1100e-004 9.2100e-004 r 4 tblVehicleEF • LHD1 T 2.6230e-003 2.4910e-003 r tblVehicleEF • LHD1 T 7.7360e-003 4.4930e-003 r tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r 4 tblVehicleEF • LHD1 T 2.6210e-003 2.6940e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 1.4090e-003 1.3400e-003 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r 4 tblVehicleEF • LHD1 T 0.24 0.32 r 4 tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 9.0000e-005 8.0000e-005 r 4 tblVehicleEF • LHD1 T 5.3930e-003 5.3920e-003 r 4 tblVehicleEF • LHD1 T 2.7600e-004 9.4000e-005 r 4 tblVehicleEF • LHD1 T 2.6210e-003 2.6940e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.4090e-003 1.3400e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.24 0.32 tblVehicleEF • LHD1 • 0.14 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 3.7520e-003 4.0150e-003 tblVehicleEF • LHD1 i 3.4150e-003 1.8130e-003 r tblVehicleEF • LHD1 T 9.1210e-003 7.5330e-003 r tblVehicleEF • LHD1 T 0.13 0.17 r tblVehicleEF • LHD1 T 0.35 0.21 r tblVehicleEF • LHD1 T 1.35 0.76 r tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.86 r tblVehicleEF • LHD1 T 25.04 9.41 r tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.79 0.29 r 4 tblVehicleEF • LHD1 T 0.60 0.20 r 4 tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9660e-003 r 4 tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r 4 tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 r 4 tblVehicleEF • LHD1 T 8.1100e-004 9.2100e-004 r 4 tblVehicleEF • LHD1 T 2.6230e-003 2.4910e-003 r 4 tblVehicleEF • LHD1 T 7.7360e-003 4.4930e-003 r 4 tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r 4 tblVehicleEF • LHD1 T 4.8780e-003 5.3810e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 2.5900e-003 2.4440e-003 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r 4 tblVehicleEF • LHD1 T 0.24 0.33 tblVehicleEF • LHD1 • 0.12 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD1 • 9.0000e-005 8.0000e-005 tblVehicleEF • LHD1 i 5.3930e-003 5.3920e-003 r tblVehicleEF • LHD1 T 2.7500e-004 9.3000e-005 r tblVehicleEF • LHD1 T 4.8780e-003 5.3810e-003 r tblVehicleEF • LHD1 T 0.08 0.06 r tblVehicleEF • LHD1 T 0.02 0.02 r tblVehicleEF • LHD1 T 2.5900e-003 2.4440e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.24 0.33 r tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 3.7520e-003 3.9970e-003 r 4 tblVehicleEF • LHD1 T 3.3750e-003 1.7740e-003 r 4 tblVehicleEF • LHD1 T 9.4930e-003 8.0420e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.34 0.20 r 4 tblVehicleEF • LHD1 T 1.42 0.82 r 4 tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.85 r 4 tblVehicleEF • LHD1 T 25.04 9.53 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.83 0.32 r 4 tblVehicleEF • LHD1 T 0.62 0.21 r 4 tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9660e-003 r 4 tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r 4 tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 tblVehicleEF • LHD1 • 8.1100e-004 9.2100e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • LHD1 • 2.6230e-003 2.4910e-003 • LHD1 i 7.7360e-003 4.4930e-003 r • LHD1 T 5.2500e-004 1.7400e-004 r • LHD1 T 2.1750e-003 1.1390e-003 r • LHD1 T 0.08 0.05 r • LHD1 T 0.01 0.02 r • LHD1 T 1.2660e-003 7.0100e-004 r 4 • LHD1 T 0.04 0.02 r • LHD1 T 0.26 0.34 r • LHD1 T 0.13 0.04 r 4 • LHD1 T 9.0000e-005 8.0000e-005 r 4 • LHD1 T 5.3930e-003 5.3920e-003 r 4 • LHD1 T 2.7600e-004 9.4000e-005 r 4 • LHD1 T 2.1750e-003 1.1390e-003 r 4 • LHD1 T 0.08 0.05 r 4 • LHD1 T 0.02 0.02 r 4 • LHD1 T 1.2660e-003 7.0100e-004 r 4 • LHD1 T 0.05 0.03 r 4 • LHD1 T 0.26 0.34 r 4 • LHD1 T 0.14 0.04 r 4 • LHD2 T 2.5040e-003 2.9180e-003 r 4 • LHD2 T 1.6180e-003 1.8840e-003 r 4 • LHD2 T 3.1090e-003 5.9870e-003 r 4 • LHD2 T 0.12 0.14 r 4 • LHD2 T 0.17 0.22 r 4 • LHD2 T 0.83 0.51 • LHD2 • 13.70 12.78 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 563.18 562.93 tblVehicleEF • LHD2 i 21.41 7.29 r tblVehicleEF • LHD2 T 0.07 0.07 r tblVehicleEF • LHD2 T 0.28 0.47 r tblVehicleEF • LHD2 T 0.26 0.16 r tblVehicleEF • LHD2 T 1.0390e-003 1.3950e-003 r tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 6.3610e-003 9.3060e-003 r tblVehicleEF • LHD2 T 3.5700e-004 1.0800e-004 r tblVehicleEF • LHD2 T 9.9400e-004 1.3350e-003 r 4 tblVehicleEF • LHD2 T 2.7110e-003 2.6860e-003 r 4 tblVehicleEF • LHD2 T 6.0760e-003 8.8920e-003 r 4 tblVehicleEF • LHD2 T 3.2900e-004 9.9000e-005 r 4 tblVehicleEF • LHD2 T 8.3600e-004 1.8870e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 4.8700e-004 1.0020e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.04 0.18 r 4 tblVehicleEF • LHD2 T 0.04 0.03 r 4 tblVehicleEF • LHD2 T 1.3300e-004 1.2200e-004 r 4 tblVehicleEF • LHD2 T 5.4710e-003 5.4350e-003 r 4 tblVehicleEF • LHD2 T 2.2800e-004 7.2000e-005 r 4 tblVehicleEF • LHD2 T 8.3600e-004 1.8870e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.02 tblVehicleEF • LHD2 • 4.8700e-004 1.0020e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • LHD2 • 0.03 0.04 tblVehicleEF • LHD2 i 0.04 0.18 r tblVehicleEF • LHD2 T 0.05 0.03 r tblVehicleEF • LHD2 T 2.5040e-003 2.9220e-003 r tblVehicleEF • LHD2 T 1.6280e-003 1.8930e-003 r tblVehicleEF • LHD2 T 3.0410e-003 5.8500e-003 r tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.17 0.22 r tblVehicleEF • LHD2 T 0.79 0.49 r tblVehicleEF • LHD2 T 13.70 12.78 r 4 tblVehicleEF • LHD2 T 563.18 562.93 r 4 tblVehicleEF • LHD2 T 21.41 7.26 r 4 tblVehicleEF • LHD2 T 0.07 0.07 r 4 tblVehicleEF • LHD2 T 0.26 0.44 r 4 tblVehicleEF • LHD2 T 0.26 0.16 r 4 tblVehicleEF • LHD2 T 1.0390e-003 1.3950e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 6.3610e-003 9.3060e-003 r 4 tblVehicleEF • LHD2 T 3.5700e-004 1.0800e-004 r 4 tblVehicleEF • LHD2 T 9.9400e-004 1.3350e-003 r 4 tblVehicleEF • LHD2 T 2.7110e-003 2.6860e-003 r 4 tblVehicleEF • LHD2 T 6.0760e-003 8.8920e-003 r 4 tblVehicleEF • LHD2 T 3.2900e-004 9.9000e-005 r 4 tblVehicleEF • LHD2 T 1.5680e-003 3.7670e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.01 tblVehicleEF • LHD2 • 8.9000e-004 1.7830e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LHD2 • 0.03 0.03 tblVehicleEF • LHD2 r 0.04 0.18 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 1.3300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 5.4710e-003 5.4350e-003 I- 4 tblVehicleEF • LHD2 r 2.2800e-004 7.2000e-005 I- 4 tblVehicleEF • LHD2 r 1.5680e-003 3.7670e-003 I- 4 tblVehicleEF • LHD2 r 0.02 0.04 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 8.9000e-004 1.7830e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.04 0.18 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 2.5040e-003 2.9090e-003 I- 4 tblVehicleEF • LHD2 r 1.6160e-003 1.8690e-003 I- 4 tblVehicleEF • LHD2 r 3.1200e-003 6.2420e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.14 I- 4 tblVehicleEF • LHD2 r 0.17 0.22 I- 4 tblVehicleEF • LHD2 r 0.84 0.54 I- 4 tblVehicleEF • LHD2 r 13.70 12.78 I- 4 tblVehicleEF • LHD2 r 563.18 562.93 I- 4 tblVehicleEF • LHD2 r 21.41 7.34 I- 4 tblVehicleEF • LHD2 r 0.07 0.07 I- 4 tblVehicleEF • LHD2 r 0.28 0.48 I- 4 tblVehicleEF • LHD2 r 0.26 0.17 I- 4 tblVehicleEF • LHD2 r 1.0390e-003 1.3950e-003 tblVehicleEF • LHD2 • 0.01 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .LHD2 • 6.3610e-003 9.3060e-003 tblVehicleEF • LHD2 r 3.5700e-004 1.0800e-004 I- 4 tblVehicleEF • LHD2 r 9.9400e-004 1.3350e-003 I- 4 tblVehicleEF • LHD2 r 2.7110e-003 2.6860e-003 I- 4 tblVehicleEF • LHD2 r 6.0760e-003 8.8920e-003 I- 4 tblVehicleEF • LHD2 r 3.2900e-004 9.9000e-005 I- 4 tblVehicleEF • LHD2 r 6.3400e-004 7.7700e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.03 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 4.1900e-004 5.3600e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.03 I- 4 tblVehicleEF • LHD2 r 0.04 0.19 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 1.3300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 5.4710e-003 5.4350e-003 I- 4 tblVehicleEF • LHD2 r 2.2800e-004 7.3000e-005 I- 4 tblVehicleEF • LHD2 r 6.3400e-004 7.7700e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.03 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 4.1900e-004 5.3600e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.04 0.19 I- 4 tblVehicleEF • LHD2 r 0.05 0.03 I- 4 tblVehicleEF • MCY r 0.45 0.34 I- 4 tblVehicleEF • MCY r 0.14 0.22 I- 4 tblVehicleEF • MCY r 17.40 17.70 tblVehicleEF • MCY • 9.82 8.43 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 170.70 212.58 tblVehicleEF • MCY i 42.70 56.87 r tblVehicleEF • MCY T 1.11 1.10 r tblVehicleEF • MCY T 0.31 0.26 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r 4 tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r tblVehicleEF • MCY T 1.67 2.44 r tblVehicleEF • MCY T 0.76 0.93 r 4 tblVehicleEF • MCY T 0.88 1.33 r 4 tblVehicleEF • MCY T 2.09 2.22 r 4 tblVehicleEF • MCY T 0.44 1.39 r 4 tblVehicleEF • MCY T 1.97 1.67 r 4 tblVehicleEF • MCY T 2.0540e-003 2.1040e-003 r 4 tblVehicleEF • MCY T 6.4500e-004 5.6300e-004 r 4 tblVehicleEF • MCY T 1.67 2.44 r 4 tblVehicleEF • MCY T 0.76 0.93 r 4 tblVehicleEF • MCY T 0.88 1.33 r 4 tblVehicleEF • MCY T 2.62 2.79 r 4 tblVehicleEF • MCY T 0.44 1.39 r 4 tblVehicleEF • MCY T 2.15 1.82 r 4 tblVehicleEF • MCY T 0.45 0.34 r 4 tblVehicleEF • MCY T 0.13 0.21 r 4 tblVehicleEF • MCY T 18.08 19.49 r 4 tblVehicleEF • MCY T 9.09 8.30 tblVehicleEF • MCY • 170.70 215.54 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 42.70 56.39 tblVehicleEF • MCY i 0.96 0.97 r tblVehicleEF • MCY T 0.29 0.25 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r 4 tblVehicleEF • MCY T 3.31 5.01 r tblVehicleEF • MCY T 1.16 1.64 r tblVehicleEF • MCY T 2.02 3.01 r 4 tblVehicleEF • MCY T 2.08 2.26 r 4 tblVehicleEF • MCY T 0.44 1.47 r 4 tblVehicleEF • MCY T 1.78 1.59 r 4 tblVehicleEF • MCY T 2.0640e-003 2.1330e-003 r 4 tblVehicleEF • MCY T 6.2700e-004 5.5800e-004 r 4 tblVehicleEF • MCY T 3.31 5.01 r 4 tblVehicleEF • MCY T 1.16 1.64 r 4 tblVehicleEF • MCY T 2.02 3.01 r 4 tblVehicleEF • MCY T 2.61 2.83 r 4 tblVehicleEF • MCY T 0.44 1.47 r 4 tblVehicleEF • MCY T 1.94 1.74 r 4 tblVehicleEF • MCY T 0.45 0.34 r 4 tblVehicleEF • MCY T 0.15 0.25 r 4 tblVehicleEF • MCY T 17.03 17.76 r 4 tblVehicleEF • MCY T 9.85 9.37 r 4 tblVehicleEF • MCY T 170.70 212.80 tblVehicleEF • MCY • 42.70 59.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MCY • 1.10 1.18 tblVehicleEF • MCY i 0.31 0.27 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r tblVehicleEF • MCY T 1.53 1.02 r 4 tblVehicleEF • MCY T 0.91 0.72 r tblVehicleEF • MCY T 0.68 0.40 r tblVehicleEF • MCY T 2.09 2.26 r 4 tblVehicleEF • MCY T 0.50 1.56 r 4 tblVehicleEF • MCY T 1.99 1.89 r 4 tblVehicleEF • MCY T 2.0480e-003 2.1060e-003 r 4 tblVehicleEF • MCY T 6.4600e-004 5.8500e-004 r 4 tblVehicleEF • MCY T 1.53 1.02 r 4 tblVehicleEF • MCY T 0.91 0.72 r 4 tblVehicleEF • MCY T 0.68 0.40 r 4 tblVehicleEF • MCY T 2.62 2.84 r 4 tblVehicleEF • MCY T 0.50 1.56 r 4 tblVehicleEF • MCY T 2.17 2.06 r 4 tblVehicleEF • MDV T 5.0520e-003 2.2020e-003 r 4 tblVehicleEF • MDV T 6.4290e-003 0.04 r 4 tblVehicleEF • MDV T 0.70 0.68 r 4 tblVehicleEF • MDV T 1.36 2.02 r 4 tblVehicleEF • MDV T 360.73 340.15 r 4 tblVehicleEF • MDV T 81.27 66.88 tblVehicleEF • MDV • 0.07 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MDV • 0.11 0.16 tblVehicleEF • MDV i 1.2760e-003 1.0590e-003 r tblVehicleEF • MDV T 1.9750e-003 1.2720e-003 r tblVehicleEF • MDV T 1.1750e-003 9.7600e-004 r tblVehicleEF • MDV T 1.8160e-003 1.1690e-003 r tblVehicleEF • MDV T 0.09 0.14 r tblVehicleEF • MDV T 0.14 0.11 r 4 tblVehicleEF • MDV T 0.08 0.11 r tblVehicleEF • MDV T 0.01 8.3160e-003 r tblVehicleEF • MDV T 0.09 0.34 r 4 tblVehicleEF • MDV T 0.09 0.17 r 4 tblVehicleEF • MDV T 3.6090e-003 3.1280e-003 r 4 tblVehicleEF • MDV T 8.3500e-004 6.1500e-004 r 4 tblVehicleEF • MDV T 0.09 0.14 r 4 tblVehicleEF • MDV T 0.14 0.11 r 4 tblVehicleEF • MDV T 0.08 0.11 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.35 r 4 tblVehicleEF • MDV T 0.09 0.18 r 4 tblVehicleEF • MDV T 5.7180e-003 2.5720e-003 r 4 tblVehicleEF • MDV T 5.5960e-003 0.04 r 4 tblVehicleEF • MDV T 0.85 0.88 r 4 tblVehicleEF • MDV T 1.21 2.07 r 4 tblVehicleEF • MDV T 391.68 363.81 r 4 tblVehicleEF • MDV T 81.27 66.93 r 4 tblVehicleEF • MDV T 0.06 0.04 tblVehicleEF • MDV • 0.10 0.17 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MDV • 1.2760e-003 1.0590e-003 tblVehicleEF • MDV i 1.9750e-003 1.2720e-003 r tblVehicleEF • MDV T 1.1750e-003 9.7600e-004 r tblVehicleEF • MDV T 1.8160e-003 1.1690e-003 r tblVehicleEF • MDV T 0.17 0.28 r tblVehicleEF • MDV T 0.16 0.14 r tblVehicleEF • MDV T 0.14 0.20 r 4 tblVehicleEF • MDV T 0.01 9.6740e-003 r tblVehicleEF • MDV T 0.09 0.36 r tblVehicleEF • MDV T 0.08 0.15 r 4 tblVehicleEF • MDV T 3.9200e-003 3.3450e-003 r 4 tblVehicleEF • MDV T 8.3300e-004 6.1500e-004 r 4 tblVehicleEF • MDV T 0.17 0.28 r 4 tblVehicleEF • MDV T 0.16 0.14 r 4 tblVehicleEF • MDV T 0.14 0.20 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.36 r 4 tblVehicleEF • MDV T 0.08 0.17 r 4 tblVehicleEF • MDV T 4.8560e-003 1.9610e-003 r 4 tblVehicleEF • MDV T 6.6210e-003 0.04 r 4 tblVehicleEF • MDV T 0.65 0.57 r 4 tblVehicleEF • MDV T 1.40 2.35 r 4 tblVehicleEF • MDV T 351.17 324.72 r 4 tblVehicleEF • MDV T 81.27 67.53 r 4 tblVehicleEF • MDV T 0.06 0.04 r 4 tblVehicleEF • MDV T 0.11 0.18 tblVehicleEF • MDV • 1.2760e-003 1.0590e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF .MDV • 1.9750e-003 1.2720e-003 tblVehicleEF • MDV r 1.1750e-003 9.7600e-004 I- 4 tblVehicleEF • MDV r 1.8160e-003 1.1690e-003 I- 4 tblVehicleEF • MDV r 0.07 0.05 I- 4 tblVehicleEF • MDV r 0.15 0.10 I- 4 tblVehicleEF • MDV r 0.06 0.05 I- 4 tblVehicleEF • MDV r 0.01 7.4960e-003 I- 4 tblVehicleEF • MDV r 0.10 0.38 I- 4 tblVehicleEF • MDV r 0.09 0.19 I- 4 tblVehicleEF • MDV r 3.5120e-003 2.9860e-003 I- 4 tblVehicleEF • MDV r 8.3600e-004 6.2000e-004 I- 4 tblVehicleEF • MDV r 0.07 0.05 I- 4 tblVehicleEF • MDV r 0.15 0.11 I- 4 tblVehicleEF • MDV r 0.06 0.06 I- 4 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.10 0.39 I- 4 tblVehicleEF • MDV r 0.10 0.21 I- 4 tblVehicleEF • MH r 6.6110e-003 2.6010e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 0.43 0.24 I- 4 tblVehicleEF • MH r 3.68 0.00 I- 4 tblVehicleEF • MH r 981.76 860.97 I- 4 tblVehicleEF • MH r 56.11 0.00 I- 4 tblVehicleEF • MH r 0.84 3.03 I- 4 tblVehicleEF • MH r 0.64 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 tblVehicleEF • MH • 0.02 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 7.9300e-004 0.00 tblVehicleEF • MH i 3.2320e-003 4.0000e-003 r tblVehicleEF • MH T 0.02 0.08 r tblVehicleEF • MH T 7.2900e-004 0.00 r tblVehicleEF • MH T 0.86 0.00 r tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.33 0.00 r 4 tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.01 0.00 r tblVehicleEF • MH T 0.22 0.00 r 4 tblVehicleEF • MH T 9.7130e-003 8.1390e-003 r 4 tblVehicleEF • MH T 6.2500e-004 0.00 r 4 tblVehicleEF • MH T 0.86 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.33 0.00 r 4 tblVehicleEF • MH T 0.04 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.24 0.00 r 4 tblVehicleEF • MH T 6.7390e-003 2.6010e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.44 0.24 r 4 tblVehicleEF • MH T 3.44 0.00 r 4 tblVehicleEF • MH T 981.76 860.97 r 4 tblVehicleEF • MH T 56.11 0.00 r 4 tblVehicleEF • MH T 0.78 2.86 r 4 tblVehicleEF • MH T 0.61 0.00 tblVehicleEF • MH • 0.01 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MH • 0.02 0.08 tblVehicleEF • MH i 7.9300e-004 0.00 r tblVehicleEF • MH T 3.2320e-003 4.0000e-003 r tblVehicleEF • MH T 0.02 0.08 r tblVehicleEF • MH T 7.2900e-004 0.00 r tblVehicleEF • MH T 1.56 0.00 r tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.63 0.00 r tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.21 0.00 r 4 tblVehicleEF • MH T 9.7130e-003 8.1390e-003 r 4 tblVehicleEF • MH T 6.2100e-004 0.00 r 4 tblVehicleEF • MH T 1.56 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.63 0.00 r 4 tblVehicleEF • MH T 0.04 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.23 0.00 r 4 tblVehicleEF • MH T 6.5990e-003 2.6010e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.43 0.24 r 4 tblVehicleEF • MH T 3.72 0.00 r 4 tblVehicleEF • MH T 981.76 860.97 r 4 tblVehicleEF • MH T 56.11 0.00 r 4 tblVehicleEF • MH T 0.83 3.07 tblVehicleEF • MH • 0.63 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF MH• • 0.01 0.02 MH• i 0.02 0.08 r • MH T 7.9300e-004 0.00 r • MH T 3.2320e-003 4.0000e-003 r MH• T 0.02 0.08 r • MH T 7.2900e-004 0.00 r MH• T 0.78 0.00 r 4 MH• T 0.05 0.00 r MH• T 0.31 0.00 r MH• T 0.03 0.06 r 4 MH• T 0.01 0.00 r 4 MH• T 0.22 0.00 r 4 • MH T 9.7130e-003 8.1390e-003 r 4 • MH T 6.2600e-004 0.00 r 4 MH• T 0.78 0.00 r 4 MH• T 0.05 0.00 r 4 MH• T 0.31 0.00 r 4 MH• T 0.04 0.06 r 4 MH• T 0.01 0.00 r 4 • MH T 0.25 0.00 r 4 • MHD T 0.02 5.0880e-003 r 4 • MHD T 1.4740e-003 1.1650e-003 r 4 • MHD T 0.03 0.01 r 4 • MHD T 0.32 0.44 r 4 • MHD T 0.13 0.13 r 4 • MHD T 3.20 1.13 • MHD • 146.07 61.93 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 1,045.79 919.26 tblVehicleEF • MHD i 53.04 11.54 r tblVehicleEF • MHD T 0.38 0.31 r tblVehicleEF • MHD T 0.40 0.80 r tblVehicleEF • MHD T 11.18 1.52 r tblVehicleEF • MHD T 5.0000e-005 1.2100e-004 r tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r tblVehicleEF • MHD T 4.8000e-005 1.1600e-004 r tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 r 4 tblVehicleEF • MHD T 6.4500e-004 1.2400e-004 r 4 tblVehicleEF • MHD T 1.1110e-003 1.1030e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 6.3000e-004 5.9400e-004 r 4 tblVehicleEF • MHD T 0.02 9.5340e-003 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.20 0.06 r 4 tblVehicleEF • MHD T 1.4040e-003 5.8900e-004 r 4 tblVehicleEF • MHD T 0.01 8.8280e-003 r 4 tblVehicleEF • MHD T 5.8600e-004 1.1400e-004 r 4 tblVehicleEF • MHD T 1.1110e-003 1.1030e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.3000e-004 5.9400e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 tblVehicleEF • MHD • 0.01 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 0.22 0.06 tblVehicleEF • MHD i 0.02 4.8250e-003 r tblVehicleEF • MHD T 1.4840e-003 1.1800e-003 r tblVehicleEF • MHD T 0.03 0.01 r tblVehicleEF • MHD T 0.23 0.37 r tblVehicleEF • MHD T 0.14 0.14 r tblVehicleEF • MHD T 3.05 1.10 r 4 tblVehicleEF • MHD T 154.72 61.67 r tblVehicleEF • MHD T 1,045.79 919.26 r tblVehicleEF • MHD T 53.04 11.48 r 4 tblVehicleEF • MHD T 0.39 0.29 r 4 tblVehicleEF • MHD T 0.38 0.76 r 4 tblVehicleEF • MHD T 11.17 1.52 r 4 tblVehicleEF • MHD T 4.2000e-005 1.0500e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r 4 tblVehicleEF • MHD T 4.0000e-005 1.0000e-004 r 4 tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 r 4 tblVehicleEF • MHD T 6.4500e-004 1.2400e-004 r 4 tblVehicleEF • MHD T 2.1280e-003 2.2020e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.1460e-003 1.0590e-003 r 4 tblVehicleEF • MHD T 0.02 9.5880e-003 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.20 0.05 tblVehicleEF • MHD • 1.4860e-003 5.8700e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 0.01 8.8280e-003 tblVehicleEF • MHD i 5.8400e-004 1.1400e-004 r tblVehicleEF • MHD T 2.1280e-003 2.2020e-003 r tblVehicleEF • MHD T 0.04 0.03 r tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 1.1460e-003 1.0590e-003 r tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r tblVehicleEF • MHD T 0.22 0.06 r tblVehicleEF • MHD T 0.02 5.4470e-003 r 4 tblVehicleEF • MHD T 1.4660e-003 1.1380e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.44 0.54 r 4 tblVehicleEF • MHD T 0.13 0.13 r 4 tblVehicleEF • MHD T 3.25 1.20 r 4 tblVehicleEF • MHD T 134.12 62.28 r 4 tblVehicleEF • MHD T 1,045.79 919.26 r 4 tblVehicleEF • MHD T 53.04 11.66 r 4 tblVehicleEF • MHD T 0.36 0.32 r 4 tblVehicleEF • MHD T 0.40 0.82 r 4 tblVehicleEF • MHD T 11.19 1.52 r 4 tblVehicleEF • MHD T 6.1000e-005 1.4300e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r 4 tblVehicleEF • MHD T 5.8000e-005 1.3700e-004 r 4 tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 tblVehicleEF • MHD • 6.4500e-004 1.2400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • MHD • 7.3100e-004 4.5200e-004 tblVehicleEF • MHD i 0.03 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 4.8500e-004 3.1600e-004 r tblVehicleEF • MHD T 0.02 9.4380e-003 r tblVehicleEF • MHD T 0.02 0.13 r tblVehicleEF • MHD T 0.21 0.06 r 4 tblVehicleEF • MHD T 1.2920e-003 5.9200e-004 r tblVehicleEF • MHD T 0.01 8.8280e-003 r tblVehicleEF • MHD T 5.8700e-004 1.1500e-004 r 4 tblVehicleEF • MHD T 7.3100e-004 4.5200e-004 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 4.8500e-004 3.1600e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.13 r 4 tblVehicleEF • MHD T 0.23 0.06 r 4 tblVehicleEF • OBUS T 0.01 7.4950e-003 r 4 tblVehicleEF • OBUS T 2.8460e-003 1.8580e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.58 r 4 tblVehicleEF • OBUS T 0.19 0.19 r 4 tblVehicleEF • OBUS T 4.19 1.43 r 4 tblVehicleEF • OBUS T 74.12 83.68 r 4 tblVehicleEF • OBUS T 1,078.21 1,095.16 r 4 tblVehicleEF • OBUS T 67.43 13.39 tblVehicleEF • OBUS • 0.15 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.29 0.73 tblVehicleEF • OBUS i 1.98 1.08 r tblVehicleEF • OBUS T 1.4000e-005 1.2200e-004 r tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r tblVehicleEF • OBUS T 1.3000e-005 1.1600e-004 r tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r tblVehicleEF • OBUS T 1.9420e-003 2.1200e-003 r tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 8.7400e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.27 0.07 r 4 tblVehicleEF • OBUS T 7.1900e-004 7.9500e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4800e-004 1.3200e-004 r 4 tblVehicleEF • OBUS T 1.9420e-003 2.1200e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.7400e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • OBUS T 0.01 7.5750e-003 tblVehicleEF • OBUS • 2.8900e-003 1.8830e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.02 0.01 tblVehicleEF • OBUS i 0.24 0.57 r tblVehicleEF • OBUS T 0.20 0.19 r tblVehicleEF • OBUS T 3.92 1.37 r tblVehicleEF • OBUS T 77.54 82.67 r tblVehicleEF • OBUS T 1,078.21 1,095.17 r tblVehicleEF • OBUS T 67.43 13.28 r 4 tblVehicleEF • OBUS T 0.16 0.36 r tblVehicleEF • OBUS T 0.27 0.69 r tblVehicleEF • OBUS T 1.96 1.08 r 4 tblVehicleEF • OBUS T 1.1000e-005 1.0800e-004 r 4 tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r 4 tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r 4 tblVehicleEF • OBUS T 1.1000e-005 1.0300e-004 r 4 tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 3.5950e-003 4.1620e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6350e-003 1.6400e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.26 0.07 r 4 tblVehicleEF • OBUS T 7.5200e-004 7.8600e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4300e-004 1.3100e-004 tblVehicleEF • OBUS • 3.5950e-003 4.1620e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 0.02 0.02 tblVehicleEF • OBUS i 0.04 0.06 r tblVehicleEF • OBUS T 1.6350e-003 1.6400e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.28 0.08 r tblVehicleEF • OBUS T 0.01 7.3830e-003 r 4 tblVehicleEF • OBUS T 2.8310e-003 1.8140e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.59 r 4 tblVehicleEF • OBUS T 0.19 0.18 r 4 tblVehicleEF • OBUS T 4.24 1.54 r 4 tblVehicleEF • OBUS T 69.39 85.07 r 4 tblVehicleEF • OBUS T 1,078.21 1,095.16 r 4 tblVehicleEF • OBUS T 67.43 13.57 r 4 tblVehicleEF • OBUS T 0.14 0.40 r 4 tblVehicleEF • OBUS T 0.29 0.75 r 4 tblVehicleEF • OBUS T 1.98 1.09 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.4000e-004 r 4 tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r 4 tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.3400e-004 r 4 tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 1.5720e-003 9.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 tblVehicleEF • OBUS • 0.03 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • OBUS • 7.8300e-004 4.9700e-004 tblVehicleEF • OBUS i 0.02 0.01 r tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.27 0.08 r tblVehicleEF • OBUS T 6.7400e-004 8.0800e-004 r tblVehicleEF • OBUS T 0.01 0.01 r tblVehicleEF • OBUS T 7.4800e-004 1.3400e-004 r 4 tblVehicleEF • OBUS T 1.5720e-003 9.2500e-004 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 7.8300e-004 4.9700e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 5.0770e-003 3.3990e-003 r 4 tblVehicleEF • SBUS T 0.05 5.6130e-003 r 4 tblVehicleEF • SBUS T 8.06 2.89 r 4 tblVehicleEF • SBUS T 0.35 0.25 r 4 tblVehicleEF • SBUS T 5.67 0.62 r 4 tblVehicleEF • SBUS T 1,064.74 328.32 r 4 tblVehicleEF • SBUS T 1,062.83 974.47 r 4 tblVehicleEF • SBUS T 56.88 4.53 r 4 tblVehicleEF • SBUS T 4.37 2.65 r 4 tblVehicleEF • SBUS T 1.74 2.75 r 4 tblVehicleEF • SBUS T 11.65 1.31 tblVehicleEF • SBUS • 1.9460e-003 2.0090e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 0.01 0.01 tblVehicleEF • SBUS i 8.3200e-003 0.02 r tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r tblVehicleEF • SBUS T 1.8620e-003 1.9220e-003 r tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r tblVehicleEF • SBUS T 7.9470e-003 0.01 r tblVehicleEF • SBUS T 6.9000e-004 5.1000e-005 r 4 tblVehicleEF • SBUS T 6.6820e-003 2.1060e-003 r tblVehicleEF • SBUS T 0.04 9.2560e-003 r tblVehicleEF • SBUS T 0.96 0.31 r 4 tblVehicleEF • SBUS T 3.2520e-003 9.0500e-004 r 4 tblVehicleEF • SBUS T 0.06 0.05 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.33 0.03 r 4 tblVehicleEF • SBUS T 0.01 3.1310e-003 r 4 tblVehicleEF • SBUS T 0.01 9.3590e-003 r 4 tblVehicleEF • SBUS T 6.6800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 6.6820e-003 2.1060e-003 r 4 tblVehicleEF • SBUS T 0.04 9.2560e-003 r 4 tblVehicleEF • SBUS T 1.38 0.45 r 4 tblVehicleEF • SBUS T 3.2520e-003 9.0500e-004 r 4 tblVehicleEF • SBUS T 0.07 0.06 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.36 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 5.1370e-003 3.4230e-003 tblVehicleEF • SBUS • 0.04 4.8940e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 7.99 2.87 tblVehicleEF • SBUS i 0.35 0.25 r tblVehicleEF • SBUS i 4.12 0.48 r tblVehicleEF • SBUS i 1,111.32 332.27 r tblVehicleEF • SBUS i 1,062.83 974.48 r tblVehicleEF • SBUS i 56.88 4.30 r tblVehicleEF • SBUS T 4.51 2.67 r 4 tblVehicleEF • SBUS T 1.63 2.58 r tblVehicleEF • SBUS T 11.63 1.30 r tblVehicleEF • SBUS T 1.6410e-003 1.7030e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 8.3200e-003 0.02 r 4 tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r 4 tblVehicleEF • SBUS T 1.5700e-003 1.6300e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r 4 tblVehicleEF • SBUS T 7.9470e-003 0.01 r 4 tblVehicleEF • SBUS T 6.9000e-004 5.1000e-005 r 4 tblVehicleEF • SBUS T 0.01 4.1320e-003 r 4 tblVehicleEF • SBUS T 0.04 0.01 r 4 tblVehicleEF • SBUS T 0.95 0.31 r 4 tblVehicleEF • SBUS T 5.8870e-003 1.6130e-003 r 4 tblVehicleEF • SBUS T 0.06 0.05 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.28 0.03 r 4 tblVehicleEF • SBUS T 0.01 3.1690e-003 r 4 tblVehicleEF • SBUS T 0.01 9.3600e-003 tblVehicleEF • SBUS • 6.4200e-004 4.3000e-005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • SBUS • 0.01 4.1320e-003 tblVehicleEF • SBUS i 0.04 0.01 r tblVehicleEF • SBUS T 1.38 0.45 r tblVehicleEF • SBUS T 5.8870e-003 1.6130e-003 r tblVehicleEF • SBUS T 0.07 0.06 r tblVehicleEF • SBUS T 0.02 0.06 r tblVehicleEF • SBUS T 0.30 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r tblVehicleEF • SBUS T 5.0590e-003 3.3580e-003 r tblVehicleEF • SBUS T 0.06 6.6220e-003 r 4 tblVehicleEF • SBUS T 8.15 2.93 r 4 tblVehicleEF • SBUS T 0.35 0.24 r 4 tblVehicleEF • SBUS T 6.02 0.82 r 4 tblVehicleEF • SBUS T 1,000.40 322.88 r 4 tblVehicleEF • SBUS T 1,062.83 974.47 r 4 tblVehicleEF • SBUS T 56.88 4.87 r 4 tblVehicleEF • SBUS T 4.18 2.61 r 4 tblVehicleEF • SBUS T 1.72 2.79 r 4 tblVehicleEF • SBUS T 11.66 1.31 r 4 tblVehicleEF • SBUS T 2.3680e-003 2.4310e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 8.3200e-003 0.02 r 4 tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r 4 tblVehicleEF • SBUS T 2.2660e-003 2.3260e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r 4 tblVehicleEF • SBUS T 7.9470e-003 0.01 tblVehicleEF • SBUS • 6.9000e-004 5.1000e-005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • SBUS • 5.5380e-003 9.1500e-004 • SBUS r 0.04 8.9670e-003 • I- 4 • SBUS r 0.96 0.31 I- 4 • SBUS r 3.0800e-003 5.0400e-004 I- 4 • SBUS r 0.06 0.05 I- 4 • SBUS r 0.03 0.07 I- 4 • SBUSr 0.34 0.03 I- 4 • SBUS r 9.8300e-003 3.0800e-003 I- 4 • SBUSr 0.01 9.3590e-003 • I- 4 • SBUS r 6.7400e-004 4.8000e-005 I- 4 • SBUSr 5.5380e-003 9.1500e-004 • I- 4 • SBUS r 0.04 8.9670e-003 I- 4 • SBUS r 1.39 0.45 I- 4 • SBUS r 3.0800e-003 5.0400e-004 I- 4 • SBUS r 0.07 0.06 I- 4 • SBUSr 0.03 0.07 I- 4 • SBUS r 0.38 0.04 I- 4 • UBUSr 0.97 4.48 • I- 4 • UBUS r 0.06 0.00 I- 4 • UBUS r 5.05 34.99 I- 4 • UBUS r 10.05 0.00 I- 4 • UBUS 1,711.56 1,549.85 I- 4 • UBUSr 150.01 0.00 I- 4 • UBUS r 1.36 0.35 I- 4 • UBUSr 11.86 0.00 • I- 4 • UBUS r 0.48 0.08 • UBUS • 0.01 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 0.01 5.6300e-003 tblVehicleEF • UBUS i 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r tblVehicleEF • UBUS T 1.4600e-003 0.00 r tblVehicleEF • UBUS T 6.5200e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r tblVehicleEF • UBUS T 3.6650e-003 0.00 r tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.86 0.00 r 4 tblVehicleEF • UBUS T 8.4010e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6830e-003 0.00 r 4 tblVehicleEF • UBUS T 6.5200e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.6650e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.94 0.00 r 4 tblVehicleEF • UBUS T 0.98 4.48 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.07 34.99 r 4 tblVehicleEF • UBUS T 8.68 0.00 r 4 tblVehicleEF • UBUS T 1,711.56 1,549.85 r 4 tblVehicleEF • UBUS T 150.01 0.00 tblVehicleEF • UBUS • 1.26 0.35 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 11.79 0.00 tblVehicleEF • UBUS i 0.48 0.08 r tblVehicleEF • UBUS T 0.01 0.03 r tblVehicleEF • UBUS T 0.01 5.6300e-003 r tblVehicleEF • UBUS T 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r 4 tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r tblVehicleEF • UBUS T 1.4600e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 7.0900e-003 0.00 r 4 tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.79 0.00 r 4 tblVehicleEF • UBUS T 8.4010e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6600e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 7.0900e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.86 0.00 r 4 tblVehicleEF • UBUS T 0.97 4.48 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.04 34.99 tblVehicleEF • UBUS • 10.26 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleEF • UBUS • 1,711.56 1,549.85 tblVehicleEF • UBUS i 150.01 0.00 r tblVehicleEF • UBUS T 1.35 0.35 r tblVehicleEF • UBUS T 11.86 0.00 r tblVehicleEF • UBUS T 0.48 0.08 r tblVehicleEF • UBUS T 0.01 0.03 r tblVehicleEF • UBUS T 0.01 5.6300e-003 r 4 tblVehicleEF • UBUS T 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r 4 tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r 4 tblVehicleEF • UBUS T 1.4600e-003 0.00 r 4 tblVehicleEF • UBUS T 5.1800e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.1580e-003 0.00 r 4 tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.87 0.00 r 4 tblVehicleEF • UBUS T 8.4000e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6870e-003 0.00 r 4 tblVehicleEF • UBUS T 5.1800e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.1580e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.95 0.00 tblVehicleTrips • CC • 4.20 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter tblVehicleTrips • CC TL • 4.20 8.70 tblVehicleTrips • CNW_TL i 5.40 8.70 r tblVehicleTrips • CNW_TL T 5.40 8.70 r tblVehicleTrips • CW T 12.50 8.70 r tblVehicleTrips • CW_TL T 12.50 8.70 r tblVehicleTrips • HO_TL T 4.50 8.70 • r tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HS_TL T 3.50 8.70 r tblVehicleTrips • HS_TL T 3.50 8.70 • r tblVehicleTrips • HW T 11.00 8.70 r 4 tblVehicleTrips • HW T 11.00 8.70 r 4 tblVehicleTrips • ST T 7.16 7.90 r 4 tblVehicleTrips • ST TR T 40.63 11.95 r 4 tblVehicleTrips • ST T 8.19 8.30 r 4 tblVehicleTrips • ST T 9.91 9.33 r 4 tblVehicleTrips • SU_TR T 6.07 6.10 • r 4 tblVehicleTrips • SU T 39.53 11.35 r 4 tblVehicleTrips • SU T 5.95 6.71 r 4 tblVehicleTrips • SU TR T 8.62 8.36 • r 4 tblVehicleTrips • WD TR T 6.59 7.11 r 4 tblVehicleTrips • WD T 35.74 18.25 r 4 tblVehicleTrips • WD_TR T 8.17 9.67 r 4 tblVehicleTrips • WD_TR T 9.52 9.23 • r 4 tblWoodstoves • NumberCatalytic T 22.10 0.00 r 4 tblWoodstoves • NumberCatalytic T 37.90 0.00 r 4 tblWoodstoves • NumberNoncatalytic T22.10 0.00 tblWoodstoves • NumberNoncatalytic • 37.90 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 2.0 Emissions Summary Page 50 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 2.1 Overall Construction (Maximum Daily Emission) Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year Ib/day Ib/day 2029 •I • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 62 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 67.5209 21.0443 107.2254 0.1323 1 2.1585 2.1585 2.1585 2.1585 • 0.0000 ' 25,590.05 25,590.05 0.6570 1 0.4659 25,745.31 25,590.05 25,590.05 0.6570 1 0.4659 25,745.31 •1 • 96 96 I 71 .1 J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Energy .1 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 1 i 9,459.253 9,459.253 0.1813 0.1734 9,515.465 J J J 3 3 0 •i 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 . ir J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 Mobile .1 17.0158 60.0675 172.0748 0.5948 68.4889 0.5859 69.0748 18.2968 0.5534 18.8502 • 64,311.207 64,311.207 2.2963 64,368.61 3 3 0 • 2 2 1 49 Total •i 17.0158 1 60.0675 172.0748 1 0.5948 i 68.4889 1 0.5859 69.0748 1 18.2968 1 0.5534 18.8502 • 85.4038 88.7048 283.7978 0.7744 68.4889 3.3435 71.8323 18.2968 3.3110 21.6078 0.0000 99,360.52 99,360.52 3.1346 0.6393 99,629.39 18.2968 3.3110 21.6078 0.0000 99,360.52 99,360.52 3.1346 0.6393 99,629.39 02 02 70 Mitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2 5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Area •i 67.5209 21.0443 107.2254 0.1323 I 2.1585 1 2.1585 2.1585 2.1585 • 0.0000 25,590.05 25,590.05 0.6570 1 0.4659 25,745.31 96 96 71 J J J .1 J J J J w J J J Energy •i 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 . 9,459.253 9,459.253 0.1813 0.1734 9,515.465 ■ 3 3 0 J J J J J J J J . J J J Mobile •i 17.0158 1 60.0675 172.0748 1 0.5948 i 68.4889 1 0.5859 69.0748 1 18.2968 1 0.5534 18.8502 • 64,311.207164,311.2071 2.2963 i 64,368.61 , 2 2 49 Total 85.4038 88.7048 283.7978 0.7744 68.4889 3.3435 71.8323 18.2968 3.3110 21.6078 0.0000 99,360.52 99,360.52 3.1346 0.6393 99,629.39 02 02 70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Worker Trip Number Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :3/3/2029 :3/2/2029• 0' Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers • 0 0 IUsage Hours I Horse Power I Load Factor 1- 0' 8.001 81' 8.001 158' t 8.00 247' 0.73 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00' 5.40' 20.00'LD Mix 'HDT Mix HHDT CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 3.1 Mitigation Measures Construction 3.2 Demolition - 2029 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 i i t Vendor .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Worker .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 62 3.2 Demolition - 2029 Mitigated Construction On -Site Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 4.1 Mitigation Measures Mobile Page 56 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4� 17.0158 1 60.0675 1 172.0748 1 0.5948 1 68.4889 1 0.5859 1 69.0748 1 18.2968 1 0.5534 18.8502 2.2963 i 64,368.61 •i64,311.207164,311.2071 11 i i i i i i i i • 2 •1 I 1 1 1 1 1 1 1 • 1 2 1 1 1 1 49 e1- + + + + + + + + r l• + + + r Unmitigated •. 17.0158 . 60.0675 . 172.0748 • 0.5948 . 68.4889 • 0.5859 • 69.0748 . 18.2968 • 0.5534 . 18.8502 • . 64,311.20 .64,311.207. 2.2963 . • 64,368.61 72 2 49 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 2 3,140.72 3,492.55 2694.48 • 8,792,610 • 8,792,610 T Golf Course + 219.00 143.38 136.17 • 384•,634 • 384,634 Hotel + 967.00 - 830.21 T 670.50 • 1,936,054 • 1,936,054 Other Asphalt Surfaces ; 0.00 ; 0.00 t0.00 • • T Y 1 Single Family Housing + 6,994.29 7,068.35 6334.91 • 19,430,241 • 19,430,241 Total I 11,321.01 I 11,534.49 9,836.06 I 30,543,539 1 30,543,539 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip % Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing ▪ 8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 ▪ 8.70 8.70 8.70 33.00 i 48.00 19.00 • 52 39 9 ▪ 8.70 8.70 8.70 19.40 61.60 19.00 • 58 38 4 • + -r t r r ▪ 12.50 4.20 5.40 0.00 I 0.00 0.00 • 0 0 0 h t - Y 1- -r r r r • • 8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 4.4 Fleet Mix Land Use I LDA I LDT1LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise ; 0.563257v 0.034111 0.191453 0.101691 0.009981 0.004112 0.016979 0.070176: 0.001424 0.001067 0.004344 0.000811: 0.000594 r i i i i ii i i i i + Golf Course • 0.563257' 0.0341111 0.1914531 0.1016911 0.0099811 0.004112i 01.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 i --- 1 i 1 i 1 i 1 i 1 i 1 i 1 i 1 i i + Hotel • 0.563257' 0.034111 0.1914531 0.101691 0.009981 0.004112i 0.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 i --- 1 i 1 i 1 i 1 i 1i 1 i 1 i 1 i 1 i i + Other Asphalt Surfaces • 0.563257' 0.034111 0.1914531 0.101691 0.009981 0.004112 0.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 r 1 Single Family Housing ▪ 0.563257; 0.034111:E 0.191453:E 0.101691; 0.009981; 0.004112; 0.016979; 0.070176; 0.001424; 0.001067; 0.004344; 0.000811; 0.000594 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day NaturalGas .; 0.8671 i 7.5931 i 4.4976 : 0.0473 i i 0.5991 1 0.5991 i i 0.5991 0.5991 •i 9,459.253 9,459.253 0.1813 0.1734 i 9,515.465 Mitigated ;i1 , i 3 1 3 1 1 1 0 1 1 1 1 I. F + 1 + 4. 4. + 4. ,. I. 4. 4. 4. r NaturalGas . 0.8671 • 7.5931 • 4.4976 • 0.0473 • 0.5991 • 0.5991 • 0.5991 0.5991 • . 9,459.253 . 9,459.253 . 0.1813 • 0.1734 . 9,515.465 Unmitigated 3 3 0 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing 1 12734.3 • i ; • F -. 10 •u 1 • 1 r 7 131168.8 • ; I- 7 10 •i 1 I- 7 1 36500.5 ■ i . 0.1373 1.1736 0.4994 : 7.4900e- 0.0949 0.0949 1 : 0.0949 0.0949 003 J J J J J J J J • 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 i 1 i i 1 i ' J J J J J J J J 0.3361 1 3.0558 2.5668 1 0.0183 0.2322 0.2322 I : 0.2322 0.2322 i i J J J J J J J J v 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J v 0.3936 3.3638 1.4314 0.0215 0.2720 0.2720 0.2720 0.2720 • •0.0000 • . • •0.0000 • . • . 1,498.158 1,498.158 0.0287 0.02751,507.061 5 5 J J J 0.0000 0.0000 0.0000 0.0000 J J J 3,666.920 3,666.920 1 0.0703 0.0672 4 4 J J J 0.0000 0.0000 0.0000 0.0000 J J J 4,294.174 4,294.174 0.0823 0.0787 5 5 i 3 0.0000 3,688.7111 0.0000 4,319.692 i 6 Total 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 9,459.253 4 9,459.253 4 0.1813 0.1734 9,515.465 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 5.2 Energy by Land Use - NaturalGas Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr Ib/day Ib/day Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing 1 12.7343 • i 1- -. 10 • i 1- 4 i 31.1688 • 1 1- 4 : 0 • i i f 4 i 36.5005 • i i 0.1373 1.1736 0.4994 1 7.4900e- 1 0.0949 0.0949 1 1 0.0949 0.0949 • 1 003: J J J J J J J J 7 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 • 1 1 1 1 1 1 1 1 J .1 .1 J .1 .1 J .1 .1. 0.3361 3.0558 2.5668 1 0.0183 1 0.2322 0.2322 1 1 0.2322 0.2322 . 1 1 1 . J .1 .1 J .1 J J .1 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 6 J .1 .1 J .1 .1 J .1 . 0.3936 3.3638 1.4314 0.0215 0.2720 0.2720 0.2720 0.2720 • 1,498.158 1,498.158 0.0287 0.0275 1,507.061 5 5 1 3 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 3,666.920 3,666.920 0.0703 0.0672 3,688.7111 4 4 J J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 4,294.174 4,294.174 0.0823 0.0787 4,319.692 5 5 i 6 Total 0.8671 7.5931 4.4976 0.0473 0.5991 0.5991 0.5991 0.5991 9,459.253 4 9,459.253 4 0.1813 0.1734 9,515.465 0 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category Ib/day Ib/day Mitigated 4 67.5209 21.0443 107.2254i 0.1323 i i 2.1585 i 2.1585 i i 2.1585 2.1585 : 0.0000 i 25,590.05: 25,590.05: 0.6570 : 0.4659 i 25,745.31 •1 11� � 11 11 196 i 96 1 i 71 ' • I. + 4.F + 4. + 4.4. r I. 4. 1. e r Unmitigated •• 67.5209 • 21.0443 • 107.2254 • 0.1323 • 2.1585 • 2.1585 • 2.1585 • 2.1585 • 0.0000 . 25,590.05 . 25,590.05 . 0.6570 • 0.4659 • 25,745.31 96 96 71 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural 4 17.4358 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 I 0.0000 Coating :: •1 i • i Consumer •1 44.8009 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 Products :: Hearth •1 2.3294 1 19.9059 1 8.4706 0.1271 1.6094 1.6094 1 1.6094 1.6094 • 0.0000 25,411.764 25,411.764 0.4871 0.4659 25,562.77 •1 • 7 7 41 Landscaping •i 2.9548 1.1384 98.7548 5.2300e- 0.5491 0.5491 0.5491 0.5491 • 178.2949 178.2949 0.1699 182.5430 003 Total 67.5209 21.0443 107.2254 0.1323 2.1585 2.1585 2.1585 2.1585 0.0000 25,590.05 25,590.05 0.6570 0.4659 25,745.31 96 96 71 CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 62 6.2 Area by SubCategory Mitigated Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory Ib/day Ib/day Architectural •i 17.4358 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 Coating :: e .1 .1 .1 .1 .1 .1 .1 .1 ; .1 .1 J Consumer •1 44.8009 : 0.0000 0.0000 1 0.0000 0.0000 I 0.0000 0.0000 Products :: Hearth •1 2.3294 19.9059 8.4706 0.1271 : 1.6094 1.6094 1.6094 1.6094 • 0.0000 125,411.764 25,411.764 0.4871 0.4659 25,562.77 •1 1 ; 7 7 41 Landscaping •1 2.9548 1.1384 98.7548 5.2300e- 0.5491 0.5491 0.5491 0.5491 • 1 178.2949 178.2949 0.1699 182.5430 003 • Total 67.5209 21.0443 107.2254 0.1323 2.1585 2.1585 2.1585 2.1585 0.0000 25,590.05 25,590.05 0.6570 0.4659 25,745.31 96 96 71 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Page 62 of 62 Date: 1/6/2021 5:01 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Winter Institute Recycling and Composting Services 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.22: RCEM MADISON AVENUE WITH WATER LINE EMISSIONS MODEL OUTPUTS 12188-05 AQ Report Lei URBAN CROSS R OA D5 Road Construction Emissions Model, Version 9.0.0 Daily Emission Estimates for -> Madison EVA & Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N20 (lbs/day) CO2e (lbs/day) Grubbing/Land Clearing 0.82 7.01 7.63 50.33 0.33 50.00 10.69 0.29 Grading/Excavation 3.95 37.82 38.34 51.64 1.64 50.00 11.87 1.47 Drainage/Utilities/Sub-Grade 3.41 32.76 32.34 51.36 1.36 50.00 11.64 1.24 Paving 1.32 17.54 12.23 0.63 0.63 0.00 0.55 0.55 10.40 10.40 10.40 0.00 0.02 0.09 0.07 0.03 1,748.50 8,373.12 6,934.74 2,869.20 0.43 2.47 1.56 0.74 0.04 0.11 0.09 0.05 1,771.33 8,466.33 7,000.41 2,903.59 Maximum (pounds/day) 3.95 37.82 38.34 51.64 1.64 50.00 11.87 1.47 10.40 0.09 8,373.12 2.47 0.11 8,466.33 Total (tons/construction project) 0.20 1.98 1.93 2.89 0.08 2.81 0.66 0.07 0.58 0.00 421.19 0.11 0.01 425.66 Notes: Project Start Year -> Project Length (months) -> Total Project Area (acres) -> Maximum Area Disturbed/Day (acres) -> Water Truck Used? -> Phase 2024 6 5 5 Yes dust emissions shown in columns J and K. by summing CO2e estimates over all GHGs. Total Material Imported/Exported Volume (yda/day) Daily VMT (miles/day) Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing Grading/Excavation Drainage/Utilities/Sub-Grade Paving 0 0 0 0 0 0 0 0 0 0 280 40 0 0 760 40 0 0 680 40 0 0 520 40 PM10 and PM2.5 estimates assume 50% control of fugitive dust from wale 'ng and associated dust control measures H a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated Total Emission Estimates by Phase for -> Madison EVA & Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Protect Phases (Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) N0x (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) CH4 (tons/phase) N20 (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.01 0.05 0.05 0.33 0.00 0.33 0.07 0.00 Grading/Excavation 0.10 1.00 1.01 1.36 0.04 1.32 0.31 0.04 Drainage/Utilities/Sub-Grade 0.08 0.76 0.75 1.19 0.03 1.16 0.27 0.03 Paving 0.01 0.17 0.12 0.01 0.01 0.00 0.01 0.01 0.07 0.27 0.24 0.00 0.00 0.00 0.00 0.00 11.54 221.05 160.19 28.41 0.00 0.07 0.04 0.01 0.00 0.00 0.00 0.00 10.61 202.77 146.70 26.08 Maximum (tons/phase) 0.10 1.00 1.01 1.36 0.04 1.32 0.31 0.04 0.27 0.00 221.05 0.07 0.00 202.77 Total (tons/construction project) 0.20 1.98 1.93 2.89 0.08 2.81 0.66 0.07 0.58 0.00 421.19 0.11 0.01 386.15 PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and 020, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. The CO2e emissions are reported as metric tons per phase. Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.23: RCEM AVENUE 62 WITH WATER LINE EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS Road Construction Emissions Model, Version 9.0.0 Daily Emission Estimates for ->Avenue 62&Water Llne Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N20 (lbs/day) CO2e (Ibs/day) Grubbing/Land Clearing 0.75 6.54 7.26 50.31 0.31 50.00 10.67 0.27 Grading/Excavation 3.89 37.44 37.97 51.62 1.62 50.00 11.85 1.45 Drainage/Utilities/Sub-Grade 3.03 30.93 27.92 51.13 1.13 50.00 11.43 1.03 Paving 1.18 17.04 10.99 0.55 0.55 0.00 0.48 0.48 10.40 10.40 10.40 0.00 0.02 0.09 0.07 0.03 1,644.51 8,296.47 6,812.70 2,779.02 0.42 2.46 1.55 0.73 0.04 0.10 0.09 0.05 1,666.68 8,389.22 6,877.22 2,812.66 Maximum (pounds/day) 3.89 37.44 37.97 51.62 1.62 50.00 11.85 1.45 10.40 0.09 8,296.47 2.46 0.10 8,389.22 Total (tons/construction project) 0.38 3.83 3.61 5.76 0.15 5.61 1.30 0.14 1.17 0.01 829.53 0.22 0.01 838.37 Notes: Project Start Year -> Project Length (months) -> Total Project Area (acres) -> Maximum Area Disturbed/Day (acres) -> Water Truck Used? -> Phase 2024 12 5 5 Yes dust emissions shown in columns J and K. by summing CO2e estimates over all GHGs. Total Material Imported/Exported Volume (yd'/day) Daily VMT (miles/day) Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing Grading/Excavation Drainage/Utilities/Sub-Grade Paving 0 0 0 0 0 0 0 0 0 0 200 40 0 0 720 40 0 0 600 40 0 0 480 40 PM10 and PM2.5 estimates assume 50% control of fugitive dust from wale 'ng and associated dust control measures 0 a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated Total Emission Estimates by Phase for -> Avenue 62 &Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Protect Phases (Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) NOx (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) CH4 (tons/phase) N20 (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.01 0.09 0.10 0.66 0.00 0.66 0.14 0.00 Grading/Excavation 0.21 1.98 2.01 2.73 0.09 2.64 0.63 0.08 Drainage/Utilities/Sub-Grade 0.14 1.43 1.29 2.36 0.05 2.31 0.53 0.05 Paving 0.02 0.34 0.22 0.01 0.01 0.00 0.01 0.01 0.14 0.55 0.48 0.00 0.00 0.00 0.00 0.00 21.71 438.05 314.75 55.02 0.01 0.13 0.07 0.01 0.00 0.01 0.00 0.00 19.96 401.84 288.24 50.52 Maximum (tons/phase) 0.21 1.98 2.01 2.73 0.09 2.64 0.63 0.08 0.55 0.00 438.05 0.13 0.01 401.84 Total (tons/construction project) 0.38 3.83 3.61 5.76 0.15 5.61 1.30 0.14 1.17 0.01 829.53 0.22 0.01 760.56 PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures 0 a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. The CO2e emissions are reported as metric tons per phase. Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.24: RCEM JEFFERSON WITH WATER LINE EMISSIONS MODEL OUTPUTS 12188-05 AQ Report [_moi URBAN CROSSROADS Road Construction Emissions Model, Version 9.0.0 Daily Emission Estimates for -> Jefferson Construction with Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N20 (lbs/day) CO2e (lbs/day) Grubbing/Land Clearing 0.87 7.58 7.38 50.33 0.33 50.00 10.69 0.29 Grading/Excavation 3.69 37.02 33.50 51.43 1.43 50.00 11.67 1.27 Drainage/Utilities/Sub-Grade 3.21 31.98 28.99 51.19 1.19 50.00 11.48 1.08 Paving 1.35 17.99 12.06 0.60 0.60 0.00 0.52 0.52 10.40 10.40 10.40 0.00 0.02 0.09 0.07 0.03 1,880.94 8,501.00 7,029.59 2,965.46 0.44 2.48 1.57 0.75 0.04 0.11 0.09 0.05 1,904.24 8,594.38 7,094.96 2,999.66 Maximum (pounds/day) 3.69 37.02 33.50 51.43 1.43 50.00 11.67 1.27 10.40 0.09 8,501.00 2.48 0.11 8,594.38 Total (tons/construction project) 0.76 7.77 6.89 11.50 0.29 11.20 2.59 0.26 2.33 0.02 1,713.78 0.45 0.02 1,731.65 Notes: Project Start Year -> Project Length (months) -> Total Project Area (acres) -> Maximum Area Disturbed/Day (acres) -> Water Truck Used? -> Phase 2026 24 5 5 Yes dust emissions shown in columns J and K. by summing CO2e estimates over all GHGs. Total Material Imported/Exported Volume (yd'/day) Daily VMT (miles/day) Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing Grading/Excavation Drainage/Utilities/Sub-Grade Paving 0 0 0 0 0 0 0 0 0 0 360 40 0 0 880 40 0 0 760 40 0 0 600 40 PM10 and PM2.5 estimates assume 50% control of fugitive dust from wale 'ng and associated dust control measures if a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated Total Emission Estimates by Phase for -> Jefferson Construction with Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Protect Phases (Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) NOx (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) C114 (tons/phase) N20 (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.02 0.20 0.19 1.31 0.01 1.30 0.28 0.01 Grading/Excavation 0.39 3.91 3.54 5.44 0.15 5.29 1.23 0.13 Drainage/Utilities/Sub-Grade 0.30 2.95 2.68 4.73 0.11 4.62 1.06 0.10 Paving 0.05 0.71 0.47 0.02 0.02 0.00 0.02 0.02 0.27 1.10 0.96 0.00 0.00 0.01 0.01 0.00 48.83 898.64 649.53 116.78 0.01 0.26 0.14 0.03 0.00 0.01 0.01 0.00 44.85 824.20 594.73 107.16 Maximum (tons/phase) 0.39 3.91 3.54 5.44 0.15 5.29 1.23 0.13 1.10 0.01 898.64 0.26 0.01 824.20 Total (tons/construction project) 0.76 7.77 6.89 11.50 0.29 11.20 2.59 0.26 2.33 0.02 1713.78 0.45 0.02 1,570.94 PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. The CO2e emissions are reported as metric tons per phase. Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.25: EMFAC2017 OUTPUTS 12188-05 AQ Report URBAN CROSSROADS EMFAC2017 Derived CaIEEMod Annual Emission Rates: Year 20261'2 Season Pollutant LDA LDT1 LDT2 MDV LHDT1 LHDT2 MHDT HHDT OBUS UBUS MCY SBUS MH Annual CH4_IDLEX 0 0 0 0 0.0046207 0.003527603 0.004764067 0.033561004 0.0079359 0 0 0.0585304 0 Annual CH4_RUNEX 0.0014673 0.0046933 0.0030016 0.0034064 0.0027825 0.002564939 0.001838434 0.011680765 0.0029383 4.3642252 0.3254528 0.0041912 0.0028781 Annual CH4_STREX 0.0327251 0.0484789 0.0469195 0.0552762 0.0109571 0.008843628 0.012112005 1.08352E-07 0.0173851 0 0.2275712 0.0045044 0 Annual CO_IDLEX 0 0 0 0 0.1767822 0.146980785 0.432201925 10.40346631 0.5675233 0 0 2.3534099 0 Annual CO_RUNEX 0.5464662 1.0985159 0.8134817 0.8497054 0.3529685 0.322337058 0.22371075 0.193265161 0.3153532 34.118003 18.120226 0.2775967 0.2764364 Annual CO_STREX 1.7087819 1.9026028 2.2026594 2.4068139 0.8599254 0.605324677 1.296458175 0.001377721 1.6638886 0 8.3834168 0.4987033 0 Annual CO2_NBIO_IDLEX 0 0 0 0 8.7594614 13.34171116 68.75314357 1611.91289 84.282856 0 0 339.03436 0 Annual CO2_NBIO RUNEX 239.049 296.79758 306.2662 375.6539 599.19164 615.6240243 975.2071719 1148.479066 1209.9211 1515.2419 209.58602 1050.371 903.23223 Annual CO2_NBIO_STREX 48.087511 59.063099 61.327903 75.790091 10.425275 8.612539162 11.83563287 0.010156005 15.401362 0 58.029411 3.7764288 0 Annual NOX_IDLEX 0 0 0 0 0.0584716 0.081925678 0.358686181 8.359348765 0.3499853 0 0 3 3352082 0 Annual NOX_RUNEX 0.0237268 0.0780161 0.0548059 0.0624697 0.6294043 0.847365833 0.837433083 1.832348019 0.7026114 0.3420506 1.1007331 4.0047937 3.5288535 Annual NOX_STREX' 0.1363013 0.1923512 0.1942762 0.2360008 0.2594083 0.213619709 1.553112903 2.33308116 0.9981819 0 0.2556228 1.001747 0 Annual PM1O_IDLEX 0 0 0 0 0.0009147 0.001295958 0.000243126 0.003096587 0.0001144 0 0 0.0033002 0 Annual PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061532888 0.13034 0.0750313 0.01176 0.7448002 0.13034 Annual PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099049 0.010614123 0.012000003 0.035875043 0.012 0.0272998 0.004 0.0104884 0.016 Annual PM1O_RUNEX 0.0011828 0.0016848 0.0013258 0.0013309 0.0062847 0.010066821 0.008731216 0.025912243 0.0077949 0.0043037 0.0021058 0.0229171 0.1102668 Annual PM10_STREX 0.0015625 0.002013 0.0016376 0.0016412 0.0002033 0.000122088 0.000129892 1.0535E-07 0.0001561 0 0.0028583 3.834E-05 0 Annual PM25_IDLEX 0 0 0 0 0.0008751 0.001239896 0.000232608 0.00296263 0.0001095 0 0 0.0031574 0 Annual PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026371238 0.05586 0.0321563 0.00504 0.3192001 0.05586 Annual PM25_PMTW 0.002 0.002 0.002 0.002 0.0024762 0.002653531 0.003000001 0.008968761 0.003 0.0068249 0.001 0.0026221 0.004 Annual PM25_RUNEX 0.001089 0.0015503 0.0012203 0.0012268 0.0059929 0.009619738 0.008346381 0.024791281 0.0074436 0.0041175 0.001965 0.0219119 0.1054967 Annual PM25_STREX 0.0014367 0.0018509 0.0015057 0.001509 0.0001869 0.000112255 0.000119431 9.68654E-08 0.0001436 0 0.0026776 3.525E-05 0 Annual ROG_DIURN 0.0737387 0.1859314 0.1232773 0.1567781 0.003393 0.002527749 0.001199681 3.04218E-07 0.0023083 0 2.4552419 0.0014311 0 Annual ROG_HTSK 0.0831414 0.1772212 0.1120016 0.1403543 0.0643101 0.050233092 0.03069597 5.85205E-06 0.0159746 0 0.9570696 0.0062403 0 Annual ROG_IDLEX 0 0 0 0 0.018926 0.016677183 0.021466787 0.703542911 0.0465577 0 0 0.2556471 0 Annual ROG_RESTL 0.0548174 0.1272339 0.097403 0.1282236 0.0016204 0.001266535 0.000609642 1.60039E-07 0.0009724 0 1.3511534 0.0006122 0 Annual ROG_RUNEX 0.0052538 0.0197889 0.0116965 0.013499 0.0323986 0.039166466 0.013199497 0.018701407 0.0169748 0.069753 2.1545665 0.0703957 0.061963 Annual ROG_RUNLS 0.1864236 0.549716 0.3697686 0.4207607 0.3712251 0.254307016 0.141760045 1.94194E-05 0.1637716 0 1.6286214 0.038863 0 Annual ROG_STREX 0.1386651 0.2256081 0.2042856 0.254718 0.0524792 0.042834769 0.060525647 5.57286E-07 0.0813577 0 1.6991526 0.0236428 0 Annual S02_IDLEX 0 0 0 0 8.48E-05 0.0001278 0.000653327 0.015203548 0.0008014 0 0 0.0032279 0 Annual S02_RUNEX 0.0022758 0.0028257 0.0029157 0.0035759 0.0058367 0.005953169 0.009353894 0.010781637 0.0117373 0 0.002074 0.0100655 0.0085388 Annual S02_STREX 0.0004578 0.0005623 0.0005839 0.0007216 0.0001032 8.52281E-05 0.000117123 1.00502E-07 0.0001524 0 0.0005742 3.737E-05 0 Annual TOG DIURN 0.0739002 0.1863401 0.1235481 0.1571226 0.003393 0.002527749 0.001199681 3.04218E-07 0.0023083 0 2.4552419 0.0014311 0 Annual TOG_HTSK 0.0833239 0.1776109 0.1122478 0.1406628 0.0643101 0.050233092 0.03069597 5.85205E-06 0.0159746 0 0.9570696 0.0062403 0 Annual TOG_IDLEX 0 0 0 0 0.0264372 0.022692008 0.029640642 0.801818506 0.0606162 0 0 0.3664064 0 Annual TOG_RESTL 0.0549377 0.1275137 0.0976171 0.1285054 0.0016204 0.001266535 0.000609642 1.60039E-07 0.0009724 0 1.3511534 0.0006122 0 Annual TOG RUNEX 0.0076523 0.0289194 0.0170646 0.0196634 0.0391348 0.045792673 0.017279754 0.032180844 0.0230693 4.4620874 2.6908313 0.0816303 0.0705408 Annual TOG_RUNLS 0.1868337 0.5509254 0.3705821 0.4216864 0.3712251 0.254307016 0.141760045 1.94194E-05 0.1637716 0 1.6286214 0.038863 0 Annual TOG_STREX 0.1521245 0.2475065 0.2241143 0.2794418 0.0574581 0.04689868 0.066267965 6.10158E-07 0.0890764 0 1.8501275 0.0258859 0 Summer CH4_IDLEX 0 0 0 0 0.0046278 0.003533295 0.004519033 0.035550753 0.0080124 0 0 0.0585903 0 Summer CH4_RUNEX 0.0017238 0.0054421 0.003498 0.0039836 0.0028131 0.002580556 0.001862868 0.01168095 0.0029827 4.3642252 0.3298426 0.004213 0.0028781 Summer CH4_STREX 0.0303427 0.0447776 0.0433993 0.0510984 0.0107061 0.008642237 0.011850673 1.05526E-07 0.0168541 0 0.2171027 0.0039276 0 Summer CO_IDLEX 0 0 0 0 0.1767822 0.146980785 0.365017256 10.2680186 0.5625081 0 0 2.3196964 0 Summer CO_RUNEX 0.7163866 1.4183305 1.0576327 1.1046412 0.356508 0.323973139 0.226351946 0.193354535 0.3197623 34.118003 20.007292 0.279151 0.2764364 Summer CO_STREX 1.7606826 1.9569463 2.2582832 2.463921 0.8365154 0.58882212 1.260037997 0.001339015 1.589309 0 8.317885 0.3872219 0 Summer CO2_NBIO_IDLEX 0 0 0 0 8.7594614 13.34171116 68.62317246 1590.95288 83.289694 0 0 346.4231 0 Summer CO2_NBIO RUNEX 264.80446 324.56734 332.25059 402.43666 599.19787 615.6268806 975.2118008 1148.479212 1209.9289 1515.2419 212.69352 1050.3738 903.23223 Summer CO2_NBIO_STREX 48.13593 59.093262 61.364956 75.816232 10.383831 8.582840884 11.77297915 0.010094606 15.274361 0 57.670573 3.5894867 0 Summer NOX_IDLEX 0 0 0 0 0.0584716 0.081925678 0.348178529 7.946854415 0.3325089 0 0 3.4013647 0 Summer NOX_RUNEX 0.0244089 0.0794437 0.0560733 0.0639618 0.5934017 0.799811416 0.787111733 1.731958174 0.6579459 0.3420075 0.969651 3.7685592 3.3308279 Summer NOX_STREX' 0.1439255 0.2028364 0.2050732 0.2490462 0.2546228 0.20967824 1.550815626 2.333081106 0.9944142 0 0.2470827 0.9994302 0 Summer PM1O_IDLEX 0 0 0 0 0.0009147 0.001295958 0.000208077 0.002746966 0.0001017 0 0 0.0027902 0 Summer PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061532888 0.13034 0.0750313 0.01176 0.7448002 0.13034 Summer PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099049 0.010614123 0.012000003 0.035875043 0.012 0.0272998 0.004 0.0104884 0.016 Summer PM1O_RUNEX 0.0011828 0.0016848 0.0013258 0.0013309 0.0062847 0.010066821 0.008731216 0.025912243 0.0077949 0.0043037 0.0021058 0.0229171 0.1102668 Summer PM10_STREX 0.0015625 0.002013 0.0016376 0.0016412 0.0002033 0.000122088 0.000129892 1.0535E-07 0.0001561 0 0.0028583 3.834E-05 0 Summer PM25_IDLEX 0 0 0 0 0.0008751 0.001239896 0.000199076 0.002628134 9.728E-05 0 0 0.0026695 0 Summer PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026371238 0.05586 0.0321563 0.00504 0.3192001 0.05586 Summer PM25_PMTW 0.002 0.002 0.002 0.002 0.0024762 0.002653531 0.003000001 0.008968761 0.003 0.0068249 0.001 0.0026221 0.004 Summer PM25_RUNEX 0.001089 0.0015503 0.0012203 0.0012268 0.0059929 0.009619738 0.008346381 0.024791281 0.0074436 0.0041175 0.001965 0.0219119 0.1054967 Summer PM25_STREX 0.0014367 0.0018509 0.0015057 0.001509 0.0001869 0.000112255 0.000119431 9.68654E-08 0.0001436 0 0.0026776 3.525E-05 0 Summer ROG_DIURN 0.1504957 0.3803588 0.2511015 0.3191656 0.0067856 0.005058613 0.002402859 6.06487E-07 0.0045384 0 5.0584748 0.0028078 0 Summer ROG_HTSK 0.1039477 0.2344218 0.1416801 0.1748117 0.0805236 0.062504853 0.03795749 8.18777E-06 0.0182627 0 1.6658056 0.0069551 0 Summer ROG_IDLEX 0 0 0 0 0.018926 0.016677183 0.020752652 0.745514448 0.0479293 0 0 0.2556813 0 Summer ROG_RESTL 0.1014691 0.2386149 0.1763293 0.2302215 0.0030014 0.002311005 0.001125629 3.06276E-07 0.0017829 0 3.0532454 0.0011057 0 Summer ROG_RUNEX 0.0061447 0.0230642 0.0136412 0.015796 0.0325412 0.039227451 0.013302086 0.018702319 0.0171721 0.069753 2.185908 0.0704796 0.061963 Summer ROG_RUNLS 0.1939614 0.5796853 0.3873081 0.440328 0.383574 0.263853536 0.147907105 1.99425E-05 0.1679901 0 1.7175721 0.0383158 0 Summer ROG_STREX 0.1282359 0.2088018 0.1888547 0.2354647 0.051187 0.041779976 0.059058384 5.43776E-07 0.0787401 0 1.6225524 0.0205934 0 Summer S02_IDLEX 0 0 0 0 8.48E-05 0.0001278 0.000652257 0.015005675 0.000792 0 0 0.0032977 0 Summer S02_RUNEX 0.002521 0.0030901 0.0031631 0.0038309 0.0058368 0.005953197 0.00935394 0.010781638 0.0117374 0 0.0021048 0.0100655 0.0085388 Summer S02_STREX 0.0004583 0.0005626 0.0005842 0.0007218 0.0001028 8.49342E-05 0.000116503 9.98943E-08 0.0001512 0 0.0005707 3.552E-05 0 Summer TOG DIURN 0.1508253 0.3811949 0.251653 0.3198669 0.0067856 0.005058613 0.002402859 6.06487E-07 0.0045384 0 5.0584748 0.0028078 0 Summer TOG_HTSK 0.1041761 0.2349374 0.1419915 0.1751961 0.0805236 0.062504853 0.03795749 8.18777E-06 0.0182627 0 1.6658056 0.0069551 0 Summer TOG_IDLEX 0 0 0 0 0.0264372 0.022692008 0.028515532 0.849640337 0.0621778 0 0 0.3664452 0 Summer TOG_RESTL 0.1016914 0.2391394 0.1767167 0.2307274 0.0030014 0.002311005 0.001125629 3.06276E-07 0.0017829 0 3.0532454 0.0011057 0 Summer TOG RUNEX 0.0089551 0.0337083 0.0199079 0.0230216 0.0393429 0.045881662 0.017429452 0.032182174 0.0233573 4.4620874 2.7300107 0.0817527 0.0705408 Summer TOG_RUNLS 0.1943881 0.5809606 0.3881602 0.4412967 0.383574 0.263853536 0.147907105 1.99425E-05 0.1679901 0 1.7175721 0.0383158 0 Summer TOG_STREX 0.140683 0.229069 0.2071856 0.2583198 0.0560433 0.045743815 0.064661497 5.95366E-07 0.0862105 0 1.7667073 0.0225472 0 Winter CH4_IDLEX 0 0 0 0 0.0046073 0.003516995 0.005101007 0.029984222 0.0078275 0 0 0.0584498 0 Winter CH4_RUNEX 0.0013001 0.0042129 0.0026797 0.0030353 0.0027338 0.002539051 0.001795126 0.000857002 0.0028617 4.3642252 0.3300815 0.0041547 0.0028781 Winter CH4_STREX 0.0371419 0.0553918 0.0534104 0.0629653 0.0114277 0.009221412 0.012642756 1.13993E-07 0.0182712 0 0.2572359 0.0053141 0 Winter CO_IDLEX 0 0 0 0 0.1767822 0.146980785 0.526185615 10.57432526 0.5744491 0 0 2.3999667 0 Winter CO_RUNEX 0.4563957 0.9302412 0.6844665 0.7152031 0.3475312 0.319743629 0.219190462 0.160039118 0.3079472 34.118003 18.196175 0.2750872 0.2764364 Winter CO_STREX 1.9819247 2.2110393 2.5644125 2.8064682 0.9086327 0.639642031 1.377402883 0.001463737 1.7909187 0 9.2636384 0.6601301 0 Winter CO2_NBIO_IDLEX 0 0 0 0 8.7594614 13.34171116 68.92593549 1638.189538 85.654366 0 0 328.83086 0 Winter CO2_NBIO RUNEX 222.21681 278.67955 289.30016 358.16777 599.18207 615.6194838 975.1992177 1141.193163 1209.9079 1515.2419 209.85529 1050.3664 903.23223 Winter CO2_NBIO_STREX 48.605863 59.686924 62.025999 76.576857 10.510677 8.673624988 11.97377924 0.010292437 15.617404 0 60.198842 4.0467024 0 Winter NOX_IDLEX 0 0 0 0 0.0584716 0.081925678 0.373195778 8.913171387 0.3741195 0 0 3.2438492 0 Winter NOX_RUNEX 0.0241536 0.0800493 0.0560396 0.0638186 0.6406748 0.861241668 0.851927576 1.85450864 0.7172679 0.3420607 1.1786069 4.0670518 3.5780078 Winter NOX_STREX' 0.1448623 0.2045146 0.2064939 0.2508829 0.271682 0.223727353 1.558658163 2.33308129 1.0074337 0 0.2721941 1.0057987 0 Winter PM10_IDLEX 0 0 0 0 0.0009147 0.001295958 0.000291526 0.00355905 0.000132 0 0 0.0040045 0 Winter PM10_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061387001 0.13034 0.0750313 0.01176 0.7448002 0.13034 Winter PM10_PMTW 0.008 0.008 0.008 0.008 0.0099049 0.010614123 0.012000003 0.035789978 0.012 0.0272998 0.004 0.0104884 0.016 Winter PM10_RUNEX 0.0011828 0.0016848 0.0013258 0.0013309 0.0062847 0.010066821 0.008731216 0.025900336 0.0077949 0.0043037 0.0021058 0.0229171 0.1102668 Winter PM10_STREX 0.0015625 0.002013 0.0016376 0.0016412 0.0002033 0.000122088 0.000129892 1.0535E-07 0.0001561 0 0.0028583 3.834E-05 0 Winter PM25_IDLEX 0 0 0 0 0.0008751 0.001239896 0.000278915 0.003405087 0.0001263 0 0 0.0038312 0 Winter PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026308715 0.05586 0.0321563 0.00504 0.3192001 0.05586 Winter PM25_PMTW 0.002 0.002 0.002 0.002 0.0024762 0.002653531 0.003000001 0.008947494 0.003 0.0068249 0.001 0.0026221 0.004 Winter PM25_RUNEX 0.001089 0.0015503 0.0012203 0.0012268 0.0059929 0.009619738 0.008346381 0.024779889 0.0074436 0.0041175 0.001965 0.0219119 0.1054967 Winter PM25_STREX 0.0014367 0.0018509 0.0015057 0.001509 0.0001869 0.000112255 0.000119431 9.68654E-08 0.0001436 0 0.0026776 3.525E-05 0 Winter ROG_DIURN 0.0287379 0.073938 0.0473884 0.0597653 0.0014583 0.001062974 0.00050163 1.26136E-07 0.0010195 0 1.0198084 0.0006248 0 Winter ROG_HTSK 0.077271 0.161466 0.1035221 0.1303225 0.0613144 0.047184857 0.028605074 5.15383E-06 0.0153058 0 0.761325 0.0060078 0 Winter ROG_IDLEX 0 0 0 0 0.018926 0.016677183 0.022471508 0.645552076 0.0446635 0 0 0.2556 0 Winter ROG_RESTL 0.025653 0.0591522 0.0469282 0.0623325 0.0008363 0.000660047 0.000310466 7.56654E-08 0.0005248 0 0.4052687 0.0003349 0 Winter ROG_RUNEX 0.0047176 0.0178452 0.0105306 0.0121459 0.0321784 0.039066818 0.013016479 0.018199691 0.0166373 0.069753 2.1956484 0.0702529 0.061963 Winter ROG_RUNLS 0.20645 0.6181825 0.4147419 0.4697042 0.391783 0.268976896 0.150709903 2.09312E-05 0.1716239 0 1.8210062 0.0466214 0 Winter ROG_STREX 0.1593156 0.2599609 0.2349563 0.2930535 0.0549213 0.044827945 0.063458061 5.84286E-07 0.085734 0 1.9318914 0.0279329 0 Winter S02_IDLEX 0 0 0 0 8.48E-05 0.0001278 0.000654739 0.015476802 0.0008143 0 0 0.0031315 0 Winter S02 RUNEX 0.0021155 0.0026532 0.0027542 0.0034094 0.0058366 0.005953124 0.009353815 0.010781634 0.0117372 0 0.0020767 0.0100654 0.0085388 Winter S02_STREX 0.0004628 0.0005683 0.0005905 0.0007291 0.000104 8.58326E-05 0.00011849 1.01852E-07 0.0001545 0 0.0005957 4.005E-05 0 Winter TOG DIURN 0.0288009 0.0741006 0.0474925 0.0598967 0.0014583 0.001062974 0.00050163 1.26136E-07 0.0010195 0 1.0198084 0.0006248 0 Winter TOG_HTSK 0.0774406 0.1618211 0.1037496 0.130609 0.0613144 0.047184857 0.028605074 5.15383E-06 0.0153058 0 0.761325 0.0060078 0 Winter TOG_IDLEX 0 0 0 0 0.0264372 0.022692008 0.031221409 0.734911898 0.0584598 0 0 0.3663526 0 Winter TOG_RESTL 0.0257094 0.0592824 0.0470314 0.0624696 0.0008363 0.000660047 0.000310466 7.56654E-08 0.0005248 0 0.4052687 0.0003349 0 Winter TOG RUNEX 0.0068684 0.0260775 0.0153598 0.0176851 0.0388135 0.045647267 0.017012695 0.02073877 0.0225769 4.4620874 2.7409195 0.0814218 0.0705408 Winter TOG_RUNLS 0.2069042 0.6195425 0.4156543 0.4707376 0.391783 0.268976896 0.150709903 2.09312E-05 0.1716239 0 1.8210062 0.0466214 0 Winter TOG STREX 0.1747794 0.2851937 0.257762 0.3214983 0.0601319 0.049080957 0.069478589 6.39719E-07 0.093868 0 2.103491 0.030583 0 1 Source: California Air Resources Board. EMFAC2017 Web Database. https://www.arb.ca.gov/emfac/1017/, California Air Pollution Control Officers Association (CAPCOA). 2017, November. California Emissions Estimator Model User's Guide, Version 2016.3.2, Appendix A. 2 Unless otherwise noted, per CaIEEMod methodology, the calculated CaIEEMod emission rates are derived from the emission rates obtained using the EMFAC2017 Web Database for the Rivereside (55) region. 3 Because EMFAC2017 provides vehicle trips data for MHDT and HHDT diesel trucks, the formula provided in Appendix A of the CaIEEMod User's Guide in calculating the NO x STREX emission rates are utilized. EMFAC2017 Derived CaIEEMod Annual Emission Rates: Year 20291'2 Season Pollutant LDA LDT1 LDT2 MDV LHDT1 LHDT2 MHDT HHDT OBUS UBUS MCY SBUS MH Annual CH4_IDLEX 0 0 0 0 0.0042262 0.003136834 0.004959772 0.033808638 0.0076408 0 0 0.0665561 0 Annual CH4_RUNEX 0.0011186 0.0032049 0.002319 0.0024809 0.0021011 0.002046399 0.001342913 0.012556502 0.0020649 4.4662477 0.32327 0.0037562 0.0026406 Annual CH4_STREX 0.026671 0.0377064 0.0387947 0.0437914 0.0088381 0.006982849 0.011692448 1.09845E-07 0.015974 0 0.2254275 0.005139 0 Annual CO_IDLEX 0 0 0 0 0.1743257 0.141886778 0.437198772 10.44980053 0.5794847 0 0 2.6681824 0 Annual CO_RUNEX 0.490689 0.8496854 0.708041 0.7130889 0.2586154 0.246581569 0.156640819 0.199357355 0.2097513 34.928508 17.709565 0.260562 0.2482625 Annual CO_STREX 1.5430522 1.7155662 2.0322598 2.1398255 0.8110161 0.538925234 1.17886307 0.00186199 1.4904101 0 8.416702 0.5675561 0 Annual CO2_NBIO_IDLEX 0 0 0 0 8.4250376 12.99888829 64.38193521 1527.021792 84.837104 0 0 333.40432 0 Annual CO2_NBIO RUNEX 225.89036 282.0231 286.58725 348.85054 567.96254 579.2763273 936.7275058 1061.632085 1127.6983 1546.2285 209.47169 1005.5035 872.46628 Annual CO2_NBIO_STREX 45.28276 55.927999 57.158561 69.934519 9.8036922 7.756959053 11.60312714 0.015395552 13.972954 0 57.277956 4.2185617 0 Annual NOX_IDLEX 0 0 0 0 0.052165 0.074638234 0.324154807 8.386568644 0.371365 0 0 2.9536424 0 Annual NOX_RUNEX 0.0197879 0.0542914 0.0417786 0.0446268 0.4173516 0.595942719 0.791397581 1.7586336 0.6923577 0.3506754 1.0976466 3.2710458 3.1886257 Annual N0X_STREX' 0.1195369 0.1602905 0.1609909 0.1857936 0.2205796 0.178973628 1.532969722 2.338776261 1.0619505 0 0.2557104 1.1735196 0 Annual PM1O_IDLEX 0 0 0 0 0.0009462 0.001365049 0.000157956 0.00308232 0.000121 0 0 0.0025206 0 Annual PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061511078 0.13034 0.0750313 0.01176 0.7448002 0.13034 Annual PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099466 0.010701751 0.012000003 0.035860935 0.012 0.0272998 0.004 0.0103701 0.016 Annual PM1O_RUNEX 0.0009523 0.0013176 0.001134 0.0011213 0.0052134 0.009475065 0.008666707 0.025179279 0.0081267 0.0051021 0.0021681 0.0186849 0.0955713 Annual PM10_STREX 0.0013202 0.0016405 0.0014119 0.0014111 0.0001949 0.000112293 0.000131604 1.69294E-07 0.0001537 0 0.0028435 4.856E-05 0 Annual PM25_IDLEX 0 0 0 0 0.0009053 0.001305997 0.000151123 0.002948981 0.0001158 0 0 0.0024115 0 Annual PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026361891 0.05586 0.0321563 0.00504 0.3192001 0.05586 Annual PM25_PMTW 0.002 0.002 0.002 0.002 0.0024866 0.002675438 0.003000001 0.008965234 0.003 0.0068249 0.001 0.0025925 0.004 Annual PM25_RUNEX 0.0008764 0.0012117 0.001044 0.0010333 0.0049683 0.009054104 0.008284112 0.024090022 0.0077611 0.0048814 0.0020221 0.0178602 0.0914369 Annual PM25_STREX 0.0012139 0.0015084 0.0012982 0.0012975 0.0001792 0.000103249 0.000121005 1.55659E-07 0.0001414 0 0.0026587 4.465E-05 0 Annual ROG_DIURN 0.0623876 0.1446999 0.1107462 0.1448516 0.0029528 0.002110438 0.001117034 6.67448E-07 0.0021175 0 2.4402717 0.00182 0 Annual ROG_HTSK 0.0706861 0.1382274 0.0973547 0.1228354 0.0559936 0.041151512 0.028400878 1.35565E-05 0.0148915 0 0.9344234 0.0079829 0 Annual ROG_IDLEX 0 0 0 0 0.0173987 0.015359493 0.021732803 0.706375221 0.0464496 0 0 02888257 0 Annual ROG_RESTL 0.0468525 0.1021963 0.088615 0.1189309 0.0014417 0.001097406 0.000590398 3.61335E-07 0.0009079 0 1.3330492 0.0007807 0 Annual ROG_RUNEX 0.0038274 0.0130569 0.0087745 0.0095144 0.0257244 0.0329521 0.010566081 0.018368116 0.0128472 0.0717276 2.1319451 0.0598156 0.0568501 Annual ROG_RUNLS 0.1732956 0.4464005 0.3337643 0.3762798 0.3480611 0.206439407 0.130041186 5.49469E-05 0.1580258 0 1.4627728 0.0497301 0 Annual ROG_STREX 0.1097372 0.1677127 0.1641395 0.1945792 0.0415208 0.033322363 0.056715716 5.64458E-07 0.0741799 0 1.679559 0.0270584 0 Annual S02_IDLEX 0 0 0 0 8.152E-05 0.00012439 0.000612025 0.014399113 0.0008062 0 0 0.0031775 0 Annual S02_RUNEX 0.0021033 0.0026257 0.0026685 0.0032491 0.0055303 0.005595689 0.008992335 0.009955159 0.010926 0 0.0020729 0.0096483 0.0082479 Annual S02_STREX 0.0004216 0.0005207 0.0005322 0.0006511 9.702E-05 7.67614E-05 0.000114822 1.52351E-07 0.0001383 0 0.0005668 4.175E-05 0 Annual TOG DIURN 0.0626478 0.1453066 0.1112102 0.1454587 0.0029528 0.002110438 0.001117034 6.67448E-07 0.0021175 0 2.4402717 0.00182 0 Annual TOG_HTSK 0.0709822 0.1388074 0.0977631 0.1233507 0.0559936 0.041151512 0.028400878 1.35565E-05 0.0148915 0 0.9344234 0.0079829 0 Annual TOG_IDLEX 0 0 0 0 0.0241684 0.02068871 0.030130507 0.805159299 0.060096 0 0 0.4149915 0 Annual TOG_RESTL 0.0470484 0.1026251 0.0889866 0.1194298 0.0014417 0.001097406 0.000590398 3.61335E-07 0.0009079 0 1.3330492 0.0007807 0 Annual TOG RUNEX 0.0055801 0.0191107 0.0128042 0.0138598 0.0307592 0.038290085 0.01349983 0.032696345 0.0169792 4.5667732 2.6714701 0.069683 0.0647201 Annual TOG_RUNLS 0.1740234 0.4482754 0.3351661 0.3778601 0.3480611 0.206439407 0.130041186 5.49469E-05 0.1580258 0 1.4627728 0.0497301 0 Annual TOG_STREX 0.1205329 0.1842119 0.1802872 0.2137214 0.0454601 0.036483793 0.06209657 6.1801E-07 0.0812176 0 1.8292355 0.0296255 0 Summer CH4_IDLEX 0 0 0 0 0.0042326 0.00314179 0.004704579 0.035817815 0.0077205 0 0 0.0666366 0 Summer CH4_RUNEX 0.0013148 0.0037167 0.0027031 0.002895 0.0021194 0.002057002 0.001360363 0.012556769 0.0020929 4.4662477 0.327653 0.0037793 0.0026406 Summer CH4_STREX 0.0247494 0.0348614 0.0359064 0.0405054 0.0086349 0.006823594 0.011445362 1.0698E-07 0.0154884 0 0.2149344 0.0044811 0 Summer CO_IDLEX 0 0 0 0 0.1743257 0.141886778 0.368316007 10.31398717 0.5741855 0 0 2.6392057 0 Summer CO_RUNEX 0.6435656 1.0999597 0.9213426 0.9270857 0.2607751 0.24763252 0.158282019 0.199486271 0.2121854 34.928508 19.522097 0.2622346 0.2482625 Summer CO_STREX 1.5939073 1.7687121 2.0868192 2.1943452 0.7890501 0.524324314 1.145743353 0.001809678 1.4236974 0 8.3040954 0.4406832 0 Summer CO2_NBIO_IDLEX 0 0 0 0 8.4250376 12.99888829 64.15852394 1507.125338 83.82109 0 0 338.86181 0 Summer CO2_NBIO RUNEX 250.21982 308.21521 310.74718 373.2699 567.96627 579.2781566 936.7303916 1061.632295 1127.7027 1546.2285 212.46054 1005.5066 872.46628 Summer CO2_NBIO_STREX 45.337913 55.971586 57.205011 69.97239 9.7654377 7.731057407 11.54601491 0.015312587 13.859198 0 56.843853 4.0057442 0 Summer NOX_IDLEX 0 0 0 0 0.052165 0.074638234 0.312572359 7.971818613 03528025 0 0 2.9971587 0 Summer NOX_RUNEX 0.0203763 0.0554 0.0427724 0.0457166 0.3939877 0.562876703 0.744707208 1.662245027 0.6500043 0.3506507 0.9671581 3.0772117 3.0096662 Summer NOX_STREX' 0.1262251 0.169101 0.1699636 0.1961034 0.2165332 0.175687733 1.53069217 2.338776209 1.0584195 0 0.2472675 1.1708769 0 Summer PM1O_IDLEX 0 0 0 0 0.0009462 0.001365049 0.000136231 0.002735548 0.0001076 0 0 0.002134 0 Summer PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061511078 0.13034 0.0750313 0.01176 0.7448002 0.13034 Summer PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099466 0.010701751 0.012000003 0.035860935 0.012 0.0272998 0.004 0.0103701 0.016 Summer PM1O_RUNEX 0.0009523 0.0013176 0.001134 0.0011213 0.0052134 0.009475065 0.008666707 0.025179279 0.0081267 0.0051021 0.0021681 0.0186849 0.0955713 Summer PM10_STREX 0.0013202 0.0016405 0.0014119 0.0014111 0.0001949 0.000112293 0.000131604 1.69294E-07 0.0001537 0 0.0028435 4.856E-05 0 Summer PM25_IDLEX 0 0 0 0 0.0009053 0.001305997 0.000130337 0.002617209 0.0001029 0 0 0.0020416 0 Summer PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026361891 0.05586 0.0321563 0.00504 0.3192001 0.05586 Summer PM25_PMTW 0.002 0.002 0.002 0.002 0.0024866 0.002675438 0.003000001 0.008965234 0.003 0.0068249 0.001 0.0025925 0.004 Summer PM25_RUNEX 0.0008764 0.0012117 0.001044 0.0010333 0.0049683 0.009054104 0.008284112 0.024090022 0.0077611 0.0048814 0.0020221 0.0178602 0.0914369 Summer PM25_STREX 0.0012139 0.0015084 0.0012982 0.0012975 0.0001792 0.000103249 0.000121005 1.55659E-07 0.0001414 0 0.0026587 4.465E-05 0 Summer ROG_DIURN 0.1272549 0.2957263 0.2254169 0.2946906 0.0058999 0.004217863 0.002232336 1.32972E-06 0.0041589 0 5.0183555 0.0035708 0 Summer ROG_HTSK 0.0875822 0.1795319 0.122543 0.153963 0.069621 0.050018706 0.034305581 1.74554E-05 0.0168969 0 1.6396474 0.0088004 0 Summer ROG_IDLEX 0 0 0 0 0.0173987 0.015359493 0.020999016 0.748537263 0.0478896 0 0 0.2891135 0 Summer ROG_RESTL 0.0864414 0.1894957 0.1595484 0.2131746 0.0026446 0.001969399 0.001065169 6.61639E-07 0.001644 0 3.0199539 0.0013983 0 Summer ROG_RUNEX 0.0044736 0.0151976 0.0102175 0.0110694 0.0257965 0.032989998 0.010632027 0.018369451 0.0129527 0.0717276 2.1630613 0.0599049 0.0568501 Summer ROG_RUNLS 0.1804602 0.4699819 0.3494223 0.3935936 0.3589355 0.213886565 0.135213438 5.65043E-05 0.1619529 0 1.5492692 0.0490811 0 Summer ROG_STREX 0.1015076 0.1551741 0.1517449 0.1797986 0.0404969 0.032500665 0.055340813 5.50774E-07 0.0717932 0 1.6027878 0.0235684 0 Summer S02_IDLEX 0 0 0 0 8.152E-05 0.00012439 0.000610069 0.01421137 0.0007966 0 0 0.0032291 0 Summer S02_RUNEX 0.0023299 0.0028696 0.0028934 0.0034765 0.0055303 0.005595707 0.008992363 0.009955161 0.010926 0 0.0021025 0.0096484 0.0082479 Summer S02_STREX 0.0004221 0.0005211 0.0005326 0.0006515 9.664E-05 7.65051E-05 0.000114257 1.5153E-07 0.0001371 0 0.0005625 3.964E-05 0 Summer TOG DIURN 0.1277857 0.2969664 0.2263612 0.2959258 0.0058999 0.004217863 0.002232336 1.32972E-06 0.0041589 0 5.0183555 0.0035708 0 Summer TOG_HTSK 0.0879492 0.1802854 0.1230571 0.154609 0.069621 0.050018706 0.034305581 1.74554E-05 0.0168969 0 1.6396474 0.0088004 0 Summer TOG_IDLEX 0 0 0 0 0.0241684 0.02068871 0.028971804 0.853208652 0.0617353 0 0 0.4153192 0 Summer TOG_RESTL 0.0868022 0.1902903 0.160217 0.2140684 0.0026446 0.001969399 0.001065169 6.61639E-07 0.001644 0 3.0199539 0.0013983 0 Summer TOG RUNEX 0.006526 0.0222444 0.0149166 0.0161361 0.0308645 0.038345386 0.013596058 0.032698293 0.0171332 4.5667732 2.7104846 0.0698133 0.0647201 Summer TOG_RUNLS 0.1812181 0.4719558 0.3508899 0.3952467 0.3589355 0.213886565 0.135213438 5.65043E-05 0.1619529 0 1.5492692 0.0490811 0 Summer TOG STREX 0.1114937 0.1704398 0.1666732 0.1974868 0.0443391 0.035584138 0.060591225 6.03028E-07 0.0786046 0 1.7456128 0.0258045 0 Winter CH4_IDLEX 0 0 0 0 0.0042142 0.003127623 0.005310177 0.030103736 0.007528 0 0 0.0664473 0 Winter CH4_RUNEX 0.0009904 0.0028729 0.0020687 0.0022102 0.0020705 0.002028718 0.001312073 0.000850817 0.0020152 4.4662477 0.3274439 0.0037174 0.0026406 Winter CH4_STREX 0.0302393 0.0429963 0.0441202 0.0498271 0.0092182 0.007280802 0.01219591 1.15564E-07 0.0167837 0 0.2543615 0.0060627 0 Winter CO_IDLEX 0 0 0 0 0.1743257 0.141886778 0.533569963 10.6186063 05868026 0 0 2.7081978 0 Winter CO_RUNEX 0.4096165 0.7176243 0.5952159 0.5998727 0.2552076 0.244901715 0.153824684 0.160752408 0.2055734 34.928508 17.772317 0.2578615 0.2482625 Winter CO_STREX 1.7859049 1.989071 2.3629586 2.490877 0.8565817 0.569216212 1.252463708 0.001978241 1.6039964 0 9.3341533 0.75127 0 Winter CO2_NBIO_IDLEX 0 0 0 0 8.4250376 12.99888829 64.68386402 1551.560839 86.24017 0 0 325.86778 0 Winter CO2_NBIO RUNEX 209.98898 264.92352 270.81008 332.90359 567.95662 579.2733947 936.7225322 1053.705576 1127.6909 1546.2285 209.70686 1005.4986 872.46628 Winter CO2_NBIO_STREX 45.744357 56.472901 57.795714 70.621992 9.8823932 7.810170068 11.72901302 0.01557991 14.16639 0 59.48447 4.5262425 0 Winter NOX_IDLEX 0 0 0 0 0.052165 0.074638234 0.340148613 8.941981027 0.396999 0 0 2.8935485 0 Winter NOX_RUNEX 0.0201346 0.0556301 0.0426943 0.0455672 0.4247338 0.605580584 0.804353289 1.780656522 0.7053417 0.3506812 1.1749448 3.3226903 3.2330384 Winter NOX_STREX' 0.1270461 0.1704066 0.171107 0.197492 0.2310014 0.187431443 1.538467396 2.338776387 1.0706214 0 0.272139 1.1781412 0 Winter PM10_IDLEX 0 0 0 0 0.0009462 0.001365049 0.000187958 0.00354459 0.0001397 0 0 0.0030544 0 Winter PM10_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061344868 0.13034 0.0750313 0.01176 0.7448002 0.13034 Winter PM10_PMTW 0.008 0.008 0.008 0.008 0.0099466 0.010701751 0.012000003 0.035764019 0.012 0.0272998 0.004 0.0103701 0.016 Winter PM10_RUNEX 0.0009523 0.0013176 0.001134 0.0011213 0.0052134 0.009475065 0.008666707 0.025167866 0.0081267 0.0051021 0.0021681 0.0186849 0.0955713 Winter PM10_STREX 0.0013202 0.0016405 0.0014119 0.0014111 0.0001949 0.000112293 0.000131604 1.69294E-07 0.0001537 0 0.0028435 4.856E-05 0 Winter PM25_IDLEX 0 0 0 0 0.0009053 0.001305997 0.000179827 0.003391252 0.0001336 0 0 0.0029223 0 Winter PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026290658 0.05586 0.0321563 0.00504 0.3192001 0.05586 Winter PM25_PMTW 0.002 0.002 0.002 0.002 0.0024866 0.002675438 0.003000001 0.008941005 0.003 0.0068249 0.001 0.0025925 0.004 Winter PM25_RUNEX 0.0008764 0.0012117 0.001044 0.0010333 0.0049683 0.009054104 0.008284112 0.024079102 0.0077611 0.0048814 0.0020221 0.0178602 0.0914369 Winter PM25_STREX 0.0012139 0.0015084 0.0012982 0.0012975 0.0001792 0.000103249 0.000121005 1.55659E-07 0.0001414 0 0.0026587 4.465E-05 0 Winter ROG_DIURN 0.0242 0.0570548 0.0423862 0.0551007 0.0012586 0.000876302 0.000460843 2.73471E-07 0.0009249 0 1.0161289 0.000792 0 Winter ROG_HTSK 0.0658189 0.1266145 0.090079 0.113755 0.0536548 0.03888537 0.026670095 1.23909E-05 0.0142814 0 0.7336101 0.0077169 0 Winter ROG_IDLEX 0 0 0 0 0.0173987 0.015359493 0.022765328 0.648125189 0.044461 0 0 0.2884282 0 Winter ROG_RESTL 0.0220176 0.048241 0.0430061 0.0579197 0.0007511 0.0005822 0.000309306 1.83557E-07 0.0004952 0 0.4001611 0.000432 0 Winter ROG_RUNEX 0.0034369 0.0117696 0.007903 0.0085738 0.0256055 0.032889522 0.010447859 0.017955716 0.0126581 0.0717276 2.1690312 0.0596634 0.0568501 Winter ROG_RUNLS 0.1927237 0.5021034 0.374775 0.4208736 0.3674932 0.218425841 0.138427278 5.90258E-05 0.1657653 0 1.6434641 0.0594465 0 Winter ROG_STREX 0.1259979 0.1930454 0.1886885 0.2237522 0.0434502 0.034870826 0.059463542 5.91805E-07 0.0781702 0 1.9056065 0.0319682 0 Winter S02_IDLEX 0 0 0 0 8.152E-05 0.00012439 0.00061466 0.014658377 0.0008194 0 0 0.0031063 0 Winter S02 RUNEX 0.0019553 0.0024665 0.0025216 0.0031006 0.0055302 0.00559566 0.008992286 0.009955155 0.0109259 0 0.0020752 0.0096483 0.0082479 Winter S02_STREX 0.0004259 0.0005258 0.0005381 0.0006575 9.779E-05 7.7288E-05 0.000116068 1.54176E-07 0.0001402 0 0.0005886 4.479E-05 0 Winter TOG DIURN 0.0243012 0.0572942 0.0425639 0.0553318 0.0012586 0.000876302 0.000460843 2.73471E-07 0.0009249 0 1.0161289 0.000792 0 Winter TOG_HTSK 0.0660945 0.1271458 0.0904567 0.1142322 0.0536548 0.03888537 0.026670095 1.23909E-05 0.0142814 0 0.7336101 0.0077169 0 Winter TOG_IDLEX 0 0 0 0 0.0241684 0.02068871 0.031758637 0.737841191 0.0578322 0 0 0.414539 0 Winter TOG_RESTL 0.02211 0.0484436 0.0431866 0.0581629 0.0007511 0.0005822 0.000309306 1.83557E-07 0.0004952 0 0.4001611 0.000432 0 Winter TOG RUNEX 0.0050084 0.0172263 0.0115284 0.0124828 0.0305858 0.038198772 0.013327321 0.020470233 0.0167032 4.5667732 2.7171439 0.0694609 0.0647201 Winter TOG_RUNLS 0.1935331 0.5042122 0.376349 0.4226413 0.3674932 0.218425841 0.138427278 5.90258E-05 0.1657653 0 1.6434641 0.0594465 0 Winter TOG STREX 0.1383933 0.2120368 0.2072513 0.2457645 0.0475725 0.038179165 0.065105093 6.47952E-07 0.0855865 0 2.0753833 0.0350012 0 1 Source: California Air Resources Board. EMFAC2017 Web Database. https://www.arb.ca.gov/emfac/1017/, California Air Pollution Control Officers Association (CAPCOA). 2017, November. California Emissions Estimator Model User's Guide, Version 2016.3.2, Appendix A. 2 Unless otherwise noted, per CaIEEMod methodology, the calculated CaIEEMod emission rates are derived from the emission rates obtained using the EMFAC2017 Web Database for the Riverside (55) region. 3 Because EMFAC2017 provides vehicle trips data for MHDT and HHDT diesel trucks, the formula provided in Appendix A of the CaIEEMod User's Guide in calculating the NO x STREX emission rates are utilized. EMFAC2017 Derived CaIEEMod Annual Emission Rates: Year 202311'2 Season Pollutant LDA LDT1 LDT2 MDV LHDT1 LHDT2 MHDT HHDT OBUS UBUS MCY SBUS MH Annual CH4_IDLEX 0 0 0 0 0.0040086 0.002917614 0.005087623 0.033981109 0.0074953 0 0 0.0721473 0 Annual CH4_RUNEX 0.001023 0.0026264 0.0021082 0.0022024 0.0017985 0.001884141 0.001164539 0.01309217 0.0018582 4.4790433 0.3358676 0.0033989 0.0026012 Annual CH4_STREX 0.023666 0.0322949 0.0345911 0.0382959 0.0077106 0.005986785 0.011625563 1.08012E-07 0.0154052 0 0.223222 0.005613 0 Annual CO_IDLEX 0 0 0 0 0.1731281 0.139105116 0.441369397 10.48405432 0.5778579 0 0 2.8933484 0 Annual CO_RUNEX 0.4813325 0.7511279 0.679912 0.6762812 0.2056999 0.216490621 0.134620941 0.208034278 0.1860736 34.99361 17.703612 0.2463098 0.236604 Annual CO_STREX 1.4650316 1.6257162 1.947044 2.0174619 0.7803631 0.507382505 1.126883023 0.002224226 1.4343542 0 8.4341771 0.6182707 0 Annual CO2_NBI0_IDLEX 0 0 0 0 8.2252226 12.78175626 61.93000297 1476.785954 83.679943 0 0 328.32332 0 Annual CO2_NBIO RUNEX 223.31386 278.63447 280.81732 340.15102 553.85311 562.9329672 919.2589855 1021.530763 1095.1627 1549.8549 212.57649 974.47371 860.96813 Annual CO2_NBIO_STREX 43.921525 54.326355 55.03893 66.884744 9.450426 7.288668645 11.53754624 0.019052688 13.386086 0 56.865999 4.5312747 0 Annual NOX_IDLEX 0 0 0 0 0.0483603 0.070181865 0.30694614 8.408268424 0.3745136 0 0 2.6464932 0 Annual NOX_RUNEX 0.0185433 0.0427485 0.0363921 0.0378471 0.311039 0.46959816 0.802659712 1.807045338 0.7337132 0.3528036 1.1007915 2.7480207 3.0298871 Annual NOX_STREX' 0.112421 0.1454057 0.1460689 0.1648332 0.2006699 0.159486618 1.518415693 2.344077927 1.0845315 0 0.2556157 1.3065472 0 Annual PM1O_IDLEX 0 0 0 0 0.0009626 0.001395194 0.000120935 0.003073342 0.0001217 0 0 0.0020089 0 Annual PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061499087 0.13034 0.0750313 0.01176 0.7448002 0.13034 Annual PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099656 0.010745432 0.012000003 0.035853185 0.012 0.0272998 0.004 0.0102941 0.016 Annual PM1O_RUNEX 0.0008757 0.0011913 0.001075 0.0010595 0.0047167 0.00930605 0.0081495 0.023707788 0.0080329 0.00563 0.002306 0.0154941 0.083554 Annual PM10_STREX 0.0011698 0.0014332 0.0012678 0.0012716 0.0001895 0.000107637 0.000135375 2.15553E-07 0.0001571 0 0.0028253 5.577E-05 0 Annual PM25_IDLEX 0 0 0 0 0.000921 0.001334839 0.000115703 0.002940391 0.0001165 0 0 0.001922 0 Annual PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026356752 0.05586 0.0321563 0.00504 0.3192001 0.05586 Annual PM25_PMTW 0.002 0.002 0.002 0.002 0.0024914 0.002686358 0.003000001 0.008963296 0.003 0.0068249 0.001 0.0025735 0.004 Annual PM25_RUNEX 0.0008058 0.0010953 0.0009899 0.0009763 0.0044926 0.008892258 0.007788706 0.022682184 0.0076708 0.0053864 0.0021501 0.0148058 0.0799395 Annual PM25_STREX 0.0010756 0.0013177 0.0011657 0.0011692 0.0001742 9.89683E-05 0.000124472 1.98193E-07 0.0001444 0 0.0026387 5.128E-05 0 Annual ROG_DIU RN 0.0554326 0.120529 0.1027302 0.1372825 0.0026939 0.001886524 0.001103017 9.92673E-07 0.0021197 0 2.4396361 0.0021063 0 Annual ROG_HTSK 0.0630288 0.1159232 0.0883985 0.1131249 0.0509316 0.035867271 0.027452536 2.05562E-05 0.0147173 0 0.9289057 0.0092565 0 Annual ROG_IDLEX 0 0 0 0 0.0165663 0.014619209 0.022022122 0.708496207 0.0459924 0 0 0.3121881 0 Annual ROG_RESTL 0.04202 0.0876141 0.0827264 0.1127787 0.0013402 0.001002182 0.000594086 5.43797E-07 0.0009085 0 1.3298027 0.0009049 0 Annual ROG_RUNEX 0.0034093 0.0104051 0.0078511 0.0083161 0.0232467 0.031312014 0.009534285 0.017952864 0.0119239 0.0731349 2.224256 0.0512476 0.0560032 Annual ROG_RUNLS 0.1655223 0.3807308 0.3077518 0.3435649 0.3184455 0.177872463 0.126064348 8.92185E-05 0.1587898 0 1.3870967 0.0576902 0 Annual ROG_STREX 0.0955825 0.1392291 0.143965 0.1667804 0.0354075 0.028189116 0.055572845 5.57251E-07 0.0714503 0 1.6704326 0.0296101 0 Annual S02_IDLEX 0 0 0 0 7.956E-05 0.000122244 0.000588873 0.013923095 0.000795 0 0 0.0031315 0 Annual S02_RUNEX 0.0020524 0.0025602 0.0025808 0.0031278 0.0053918 0.005434578 0.008827897 0.009573203 0.0106037 0 0.0021036 0.0093595 0.0081392 Annual S02_STREX 0.0004036 0.0004992 0.0005057 0.0006146 9.352E-05 7.21273E-05 0.000114173 1.88542E-07 0.0001325 0 0.0005627 4.484E-05 0 Annual TOG DIURN 0.0557678 0.1212626 0.1033549 0.1381178 0.0026939 0.001886524 0.001103017 9.92673E-07 0.0021197 0 2.4396361 0.0021063 0 Annual TOG_HTSK 0.0634118 0.1166295 0.0889367 0.113814 0.0509316 0.035867271 0.027452536 2.05562E-05 0.0147173 0 0.9289057 0.0092565 0 Annual TOG IDLEX 0 0 0 0 0.0229339 0.019564793 0.030602806 0.807648096 0.0594323 0 0 0.4491404 0 Annual TOG_RESTL 0.042275 0.0881478 0.0832301 0.1134656 0.0013402 0.001002182 0.000594086 5.43797E-07 0.0009085 0 1.3298027 0.0009049 0 Annual TOG RUNEX 0.0049725 0.0152463 0.0114558 0.0121102 0.0275155 0.036257434 0.012041452 0.032782099 0.0156084 4.5811689 2.7908895 0.059999 0.0637559 Annual TOG_RUN LS 0.1665319 0.3830532 0.3096291 0.3456607 0.3184455 0.177872463 0.126064348 8.92185E-05 0.1587898 0 1.3870967 0.0576902 0 Annual TOG_STREX 0.1050903 0.1530785 0.1582856 0.1833705 0.0387668 0.030863534 0.06084527 6.1012E-07 0.078229 0 1.819521 0.0324194 0 Summer CH4_IDLEX 0 0 0 0 0.0040146 0.002922112 0.004825433 0.036002965 0.0075747 0 0 0.0722429 0 Summer CH4_RUNEX 0.0012031 0.0030491 0.0024586 0.0025716 0.0018129 0.001892893 0.001179591 0.013092494 0.0018833 4.4790433 0.3404345 0.003423 0.0026012 Summer CH4_STREX 0.0219642 0.0298685 0.0320161 0.0354272 0.007533 0.005849926 0.011382185 1.05194E-07 0.0149377 0 0.2127589 0.0048943 0 Summer CO_IDLEX 0 0 0 0 0.1731281 0.139105116 0.371021849 10.34793731 0.572533 0 0 2.8676919 0 Summer CO_RUNEX 0.6315639 0.974924 0.8853949 0.8796079 0.2072066 0.217324901 0.135914214 0.208191491 0.1881166 34.99361 19.493912 0.2480716 0.236604 Summer CO_STREX 1.5154966 1.6784744 2.0011416 2.0712311 0.7593066 0.493687434 1.095223666 0.002161737 1.3701506 0 8.2958109 0.4800609 0 Summer CO2_NBI0_IDLEX 0 0 0 0 8.2252226 12.78175626 61.66870038 1457.518591 82.672537 0 0 332.26853 0 Summer CO2_NBIO RUNEX 247.40346 304.4618 304.46073 363.81308 553.85572 562.9344171 919.261265 1021.531019 1095.1663 1549.8549 215.53582 974.4769 860.96813 Summer CO2_NBIO_STREX 43.980384 54.377226 55.090453 66.929271 9.4141155 7.264625146 11.48284179 0.018953593 13.276602 0 56.390543 4.2993827 0 Summer NOX_IDLEX 0 0 0 0 0.0483603 0.070181865 0.294901442 7.991915678 0.3557856 0 0 2.6720776 0 Summer NOX_RUNEX 0.0191042 0.0437305 0.0372795 0.0387873 0.2940558 0.443814459 0.755716223 1.707703065 0.6895207 0.3527826 0.9700709 2.5844088 2.859725 Summer NOX_STREX' 0.1187113 0.1534475 0.1542214 0.1739996 0.1969996 0.156568611 1.516114704 2.344077876 1.0810886 0 0.2472308 1.3036454 0 Summer PM1O_IDLEX 0 0 0 0 0.0009626 0.001395194 0.000104988 0.002728428 0.0001082 0 0 0.0017034 0 Summer PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061499087 0.13034 0.0750313 0.01176 0.7448002 0.13034 Summer PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099656 0.010745432 0.012000003 0.035853185 0.012 0.0272998 0.004 0.0102941 0.016 Summer PM1O_RUNEX 0.0008757 0.0011913 0.001075 0.0010595 0.0047167 0.00930605 0.0081495 0.023707788 0.0080329 0.00563 0.002306 0.0154941 0.083554 Summer PM10_STREX 0.0011698 0.0014332 0.0012678 0.0012716 0.0001895 0.000107637 0.000135375 2.15553E-07 0.0001571 0 0.0028253 5.577E-05 0 Summer PM25_IDLEX 0 0 0 0 0.000921 0.001334839 0.000100447 0.002610398 0.0001035 0 0 0.0016297 0 Summer PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026356752 0.05586 0.0321563 0.00504 0.3192001 0.05586 Summer PM25_PMTW 0.002 0.002 0.002 0.002 0.0024914 0.002686358 0.003000001 0.008963296 0.003 0.0068249 0.001 0.0025735 0.004 Summer PM25_RUNEX 0.0008058 0.0010953 0.0009899 0.0009763 0.0044926 0.008892258 0.007788706 0.022682184 0.0076708 0.0053864 0.0021501 0.0148058 0.0799395 Summer PM25_STREX 0.0010756 0.0013177 0.0011657 0.0011692 0.0001742 9.89683E-05 0.000124472 1.98193E-07 0.0001444 0 0.0026387 5.128E-05 0 Summer ROG_DIU RN 0.1130354 0.2461416 0.2090383 0.2792406 0.0053807 0.003767181 0.002201752 1.97703E-06 0.0041622 0 5.0141491 0.0041324 0 Summer ROG_HTSK 0.0778137 0.1487346 0.1112887 0.1428091 0.063295 0.043035007 0.032726065 2.55803E-05 0.0166562 0 1.6351229 0.0101453 0 Summer ROG_IDLEX 0 0 0 0 0.0165663 0.014619209 0.02126732 0.75079951 0.0474321 0 0 0.3126583 0 Summer ROG_RESTL 0.0774786 0.1612085 0.1487385 0.2023348 0.002444 0.001782612 0.00105948 9.78494E-07 0.0016403 0 3.0142735 0.0016134 0 Summer ROG_RUNEX 0.0039864 0.0121174 0.0091403 0.0096744 0.0232976 0.031341575 0.009587517 0.017954501 0.0120151 0.0731349 2.2568704 0.0513409 0.0560032 Summer ROG_RUNLS 0.1724971 0.400477 0.322118 0.3593614 0.3283361 0.184132264 0.130786191 9.17904E-05 0.1626772 0 1.4727419 0.0569697 0 Summer ROG_STREX 0.0884381 0.1288105 0.1331051 0.1541377 0.0345333 0.027493234 0.054225647 5.43742E-07 0.0691514 0 1.5935163 0.0257911 0 Summer S02_IDLEX 0 0 0 0 7.956E-05 0.000122244 0.000586559 0.01374134 0.0007855 0 0 0.0031688 0 Summer S02_RUNEX 0.0022737 0.0027975 0.002798 0.0033452 0.0053919 0.005434592 0.008827919 0.009573205 0.0106037 0 0.0021329 0.0093595 0.0081392 Summer S02_STREX 0.0004041 0.0004996 0.0005062 0.000615 9.316E-05 7.18894E-05 0.000113632 1.87561E-07 0.0001314 0 0.000558 4.255E-05 0 Summer TOG DIURN 0.1137189 0.2476398 0.2103095 0.2809398 0.0053807 0.003767181 0.002201752 1.97703E-06 0.0041622 0 5.0141491 0.0041324 0 Summer TOG_HTSK 0.078287 0.1496411 0.1119666 0.1436793 0.063295 0.043035007 0.032726065 2.55803E-05 0.0166562 0 1.6351229 0.0101453 0 Summer TOG IDLEX 0 0 0 0 0.0229339 0.019564793 0.029411604 0.855864419 0.0610713 0 0 0.4496756 0 Summer TOG_RESTL 0.0779475 0.1621898 0.1496434 0.2035665 0.002444 0.001782612 0.00105948 9.78494E-07 0.0016403 0 3.0142735 0.0016134 0 Summer TOG RUNEX 0.0058183 0.0177553 0.0133449 0.0141006 0.0275898 0.036300569 0.012119127 0.032784488 0.0157414 4.5811689 2.8318307 0.0601351 0.0637559 Summer TOG_RUN LS 0.1735493 0.4029199 0.3240829 0.3615535 0.3283361 0.184132264 0.130786191 9.17904E-05 0.1626772 0 1.4727419 0.0569697 0 Summer TOG_STREX 0.0972353 0.1416237 0.1463455 0.1694702 0.0378097 0.030101631 0.059370258 5.95329E-07 0.0757121 0 1.7357321 0.028238 0 Winter CH4_IDLEX 0 0 0 0 0.0039975 0.00290927 0.005447455 0.030193262 0.0073827 0 0 0.0720178 0 Winter CH4_RUNEX 0.0009055 0.0023514 0.0018799 0.0019615 0.0017743 0.001869425 0.001137941 0.000836945 0.0018136 4.4790433 0.3399501 0.0033585 0.0026012 Winter CH4_STREX 0.0268243 0.0367866 0.0393319 0.0435624 0.0080422 0.006242342 0.012122267 1.13638E-07 0.0161848 0 0.2516586 0.0066217 0 Winter CO_IDLEX 0 0 0 0 0.1731281 0.139105116 0.539796125 10.65169744 0.5852114 0 0 2.9287788 0 Winter CO_RUNEX 0.4016954 0.6329292 0.571244 0.5687445 0.2032768 0.215145404 0.132397694 0.166388299 0.1825613 34.99361 17.760232 0.2434651 0.236604 Winter CO_STREX 1.6937095 1.8825176 2.2622416 2.3463046 0.8239818 0.535755357 1.197238361 0.002363092 1.5436684 0 9.3721075 0.8184005 0 Winter CO2_NBIO_IDLEX 0 0 0 0 8.2252226 12.78175626 62.28429327 1500.300022 85.071122 0 0 322.87518 0 Winter CO2_NBIO RUNEX 207.59001 261.79039 265.39738 324.71843 553.8489 562.9306224 919.2550482 1013.272876 1095.1564 1549.8549 212.80011 974.46851 860.96813 Winter CO2_NBIO_STREX 44.356282 54.832824 55.645514 67.526752 9.5250811 7.338033949 11.65810221 0.019272892 13.572258 0 59.093972 4.8665302 0 Winter NOX_IDLEX 0 0 0 0 0.0483603 0.070181865 0.323578264 8.964881754 0.4003759 0 0 2.6111624 0 Winter NOX_RUNEX 0.018866 0.0437347 0.0371772 0.0386374 0.3164796 0.477136229 0.815404089 1.830255834 0.7468237 0.3528085 1.1780954 2.7921018 3.0721017 Winter NOX_STREX' 0.1194848 0.1545699 0.1552446 0.1752048 0.210144 0.167017019 1.523969941 2.344078051 1.0929863 0 0.2719568 1.3116222 0 Winter PM10_IDLEX 0 0 0 0 0.0009626 0.001395194 0.000142956 0.003534468 0.0001405 0 0 0.0024308 0 Winter PM10_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.06132127 0.13034 0.0750313 0.01176 0.7448002 0.13034 Winter PM10_PMTW 0.008 0.008 0.008 0.008 0.0099656 0.010745432 0.012000003 0.035749502 0.012 0.0272998 0.004 0.0102941 0.016 Winter PM10_RUNEX 0.0008757 0.0011913 0.001075 0.0010595 0.0047167 0.00930605 0.0081495 0.023696433 0.0080329 0.00563 0.002306 0.0154941 0.083554 Winter PM10_STREX 0.0011698 0.0014332 0.0012678 0.0012716 0.0001895 0.000107637 0.000135375 2.15553E-07 0.0001571 0 0.0028253 5.577E-05 0 Winter PM25_IDLEX 0 0 0 0 0.000921 0.001334839 0.000136772 0.003381569 0.0001344 0 0 0.0023256 0 Winter PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026280544 0.05586 0.0321563 0.00504 0.3192001 0.05586 Winter PM25_PMTW 0.002 0.002 0.002 0.002 0.0024914 0.002686358 0.003000001 0.008937376 0.003 0.0068249 0.001 0.0025735 0.004 Winter PM25_RUNEX 0.0008058 0.0010953 0.0009899 0.0009763 0.0044926 0.008892258 0.007788706 0.02267132 0.0076708 0.0053864 0.0021501 0.0148058 0.0799395 Winter PM25_STREX 0.0010756 0.0013177 0.0011657 0.0011692 0.0001742 9.89683E-05 0.000124472 1.98193E-07 0.0001444 0 0.0026387 5.128E-05 0 Winter ROG_DIURN 0.0214193 0.0471483 0.0392273 0.0521746 0.0011389 0.000777297 0.000452039 4.04728E-07 0.0009251 0 1.0161641 0.0009149 0 Winter ROG_HTSK 0.0586897 0.1064163 0.0817271 0.1044226 0.0486776 0.03397517 0.02589573 1.90536E-05 0.0141274 0 0.7245208 0.0089672 0 Winter ROG_IDLEX 0 0 0 0 0.0165663 0.014619209 0.023084177 0.650052647 0.0440043 0 0 0.3115389 0 Winter ROG_RESTL 0.0197364 0.0417283 0.0402 0.0548225 0.0007008 0.000536423 0.000315611 2.83559E-07 0.0004974 0 0.4000745 0.0005036 0 Winter ROG_RUNEX 0.0030609 0.0093705 0.0070721 0.0074957 0.0231619 0.031262715 0.009438444 0.01758103 0.0117597 0.0731349 2.2606684 0.0510887 0.0560032 Winter ROG_RUNLS 0.1846264 0.4283528 0.3457512 0.3847067 0.3364826 0.188307734 0.13429869 9.57074E-05 0.1665831 0 1.5631084 0.0688283 0 Winter ROG_STREX 0.1096941 0.1601229 0.1654457 0.1917259 0.0370509 0.029497649 0.058265299 5.84249E-07 0.0752937 0 1.8931229 0.034983 0 Winter S02_IDLEX 0 0 0 0 7.956E-05 0.000122244 0.000592004 0.014174091 0.0008082 0 0 0.00308 0 Winter S02 RUNEX 0.0019079 0.0024054 0.0024391 0.002986 0.0053918 0.005434555 0.008827858 0.009573198 0.0106036 0 0.0021058 0.0093594 0.0081392 Winter S02_STREX 0.0004076 0.0005038 0.0005113 0.0006205 9.426E-05 7.26158E-05 0.000115366 1.90721E-07 0.0001343 0 0.0005848 4.816E-05 0 Winter TOG DIURN 0.0215492 0.0474354 0.039466 0.0524923 0.0011389 0.000777297 0.000452039 4.04728E-07 0.0009251 0 1.0161641 0.0009149 0 Winter TOG_HTSK 0.0590463 0.1070647 0.0822246 0.1050586 0.0486776 0.03397517 0.02589573 1.90536E-05 0.0141274 0 0.7245208 0.0089672 0 Winter TOG_IDLEX 0 0 0 0 0.0229339 0.019564793 0.032276559 0.740035456 0.0571689 0 0 0.4484013 0 Winter TOG_RESTL 0.0198567 0.0419828 0.0404451 0.0551569 0.0007008 0.000536423 0.000315611 2.83559E-07 0.0004974 0 0.4000745 0.0005036 0 Winter TOG RUNEX 0.004462 0.0137302 0.0103144 0.010908 0.0273918 0.036185497 0.011901601 0.020050237 0.0153688 4.5811689 2.8359528 0.0597671 0.0637559 Winter TOG_RUNLS 0.1857526 0.4309658 0.3478602 0.3870534 0.3364826 0.188307734 0.13429869 9.57074E-05 0.1665831 0 1.5631084 0.0688283 0 Winter TOG STREX 0.1206057 0.1760508 0.181903 0.2107974 0.0405661 0.032296213 0.063793169 6.39679E-07 0.0824371 0 2.0620489 0.038302 0 1 Source: California Air Resources Board. EMFAC2017 Web Database. https://www.arb.ca.gov/emfac/1017/, California Air Pollution Control Officers Association (CAPCOA). 2017, November. California Emissions Estimator Model User's Guide, Version 2016.3.2, Appendix A. 2 Unless otherwise noted, per CaIEEMod methodology, the calculated CaIEEMod emission rates are derived from the emission rates obtained using the EMFAC2017 Web Database for the Riverisde (55) region. 3 Because EMFAC2017 provides vehicle trips data for MHDT and HHDT diesel trucks, the formula provided in Appendix A of the CaIEEMod User's Guide in calculating the NO x STREX emission rates are utilized. Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS Travertine Specific Plan Air Quality Impact Analysis APPENDIX 3.26: SCAQMD BRIEF 12188-05 AQ Report URBAN CROSSROADS S219783 IN THE SUPREME COURT OF C ALIFORNIA SIERRA CLUB, REVIVE THE SAN JOAQUIN, and LEAGUE OF WOMEN VOTERS OF FRESNO, Plaintiffs and Appellants, v. COUNTY OF FRESNO, Defendant and Respondent, and, FRIANT RANCH, L.P., Real Party in Interest and Respondent. After a Published Decision by the Court of Appeal, filed May 27, 2014 Fifth Appellate District Case No. F066798 Appeal from the Superior Court of California, County of Fresno Case No. 11 CECG00726 Honorable Rosendo A. Pena, Jr. APPLICATION OF THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT FOR LEAVE TO FILE BRIEF OF AMICUS CURIAE IN SUPPORT OF NEITHER PARTY AND [PROPOSED] BRIEF OF AMICUS CURIAE Kurt R. Wiese, General Counsel (SBN 127251) *Barbara Baird, Chief Deputy Counsel (SBN 81507) SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT 21865 Copley Drive, Diamond Bar, CA 91765 Telephone: 909-396-2302; Facsimile: 909-396-2961 Email: bbaird@agmd.gov Counsel for [Proposed] Amicus Curiae, SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT Fill ejIVRO A 'e 2015 CLERK SUPREME BURT TABLE OF CONTENTS APPLICATION FOR LEAVE TO FILE amicus curiae brief App -1 HOW THIS BRIEF WILL ASSIST THE COURT App -1 STATEMENT OF INTEREST OF AMICUS CURIAE App -3 CERTIFICATION REGARDING AUTHORSHIP & FUNDING App -4 BRIEF OF AMICUS CURIAE 1 SUMMARY OF ARGUMENT 1 ARGUMENT 2 I. RELEVANT FACTUAL AND LEGAL FRAMEWORK. 2 A. Air Quality Regulatory Background 2 B. The SCAQMD's Role Under CEQA 6 II. THIS COURT SHOULD NOT SET A HARD-AND-FAST RULE CONCERNING THE EXTENT TO WHICH AN EIR MUST CORRELATE A PROJECT'S EMISSION OF POLLUTANTS WITH RESULTING HEALTH IMPACTS 8 III. THE QUESTION OF WHETHER AN EIR CONTAINS SUFFICIENT ANALYSIS TO MEET CEQA'S REQUIREMENTS IS A MIXED QUESTION OF FACT AND LAW GOVERNED BY TWO DIFFERENT STANDARDS OF REVIEW. 16 A. Standard of Review for Feasibility Determination and Sufficiency as an Informative Document 16 B. Friant Ranch's Rationale for Rejecting the Independent Judgment Standard of Review is Unsupported by Case Law 23 IV. COURTS MUST SCRUPULOUSLY ENFORCE THE REQUIREMENTS THAT LEAD AGENCIES CONSULT WITH AND OBTAIN COMMENTS FROM AIR DISTRICTS 26 CONCLUSION 29 i TABLE OF AUTHORITIES State Cases Association of Irritated Residents v. County of Madera (2003) 107 Cal App.4th 1383 1, 9 Bakersfield Citizens for Local Control v. City of Bakersfield (2004) 124 Cal.App.4th 1184 9, 22 Berkeley Keep Jets Over the Bay v. Board of Port Commissioners (2007) 91 Cal.App.4th 1344 21, 28 Center for Biological Diversity v. County of San Bernardino (2010) 185 Cal.App.4th 866. 20 Citizens of Goleta Valley v. Bd. of Supervisors (1990) 52 Cal.3d 553 8-9 County of Amador v. El Dorado County Water Agency (1999) 76 Cal.App.4th 931 23 Crocker National Bank v. City and County of San Francisco (1989) 49 Ca1.3d 881 18 Ebbetts Pass Forest Watch v. California Dept. of Forestry & Fire Protection (2008) 43 Ca1.4th 936 21 Fall River Wild Trout Foundation v. County of Shasta, (1999) 70 Cal.App.4th 482 27, 28 Gray v. County of Madera (2008) 167 Cal.App.4th 1099 25 Laurel Heights Improvement Assn. v. Regents of the Univ of Cal. ("Laurel Heights 1") (1988) 47 Ca1.3d 376 1, 8, 19, 20, 21, 22 Natural Res. Def Council v SCAQMD, Los Angeles Superior Court No. BS110792 12 Neighbors for Smart Rail v. Exposition Metro Line (2013) 57 Ca1.4th 439 15, 20 ii State Cases (cont'd) Orange County Air Pollution Control District v. Public Util. Com. (1971) 4 Ca1.3d 945 27 Save Our Peninsula Comm. v. Monterey County Bd. of Supervisors (2001) 87 Cal.App.4th 99 19 Schenck v. County of Sonoma (2011) 198 Cal.App.4th 949 26, 27 Sierra Club v. County of Fresno (2014) 226 Cal.App.4th 704 (superseded by grant of review) 172 Cal.Rptr.3d 271 9, 23 Sierra Club v. State Bd. Of Forestry (1994) 7 Ca1.4th 1215 28 Uphold Our Heritage v. Town of Woodside (2007) 147 Cal.App.4th 587 20 Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Ca1.4th 412 1, 17, 19, 24, 25, 26 Western Oil & Gas Assn. v. Monterey Bay Unified APCD (1989) 49 Ca1.3d 408 5 California Statutes Health & Saf. Code § 39666 5 Health & Saf. Code § 40000 3 Health & Saf. Code § 40001 3 Health & Saf. Code § 40410 3 Health & Saf. Code §§ 40460, et seq 4 Health & Saf. Code § 41508 5 Health & Saf. Code §§ 42300, et seq 5 Health & Saf. Code § 44320 5 Health & Saf. Code § 44322 5 Health & Saf. Code § 44360 5 Pub. Resources Code § 20180.3 27 Pub. Resources Code § 21061 19 Pub. Resources Code § 21061.1 16 iii California Statutes (cont'd) Pub. Resources Code § 21080 6 Pub. Resources Code § 21080.5 6 Pub. Resources Code § 21083.1 26 Pub. Resources Code § 21100 27 Pub. Resources Code § 21104 6, 7 26 Pub. Resources Code §§ 21150-21154 7 Pub. Resources Code § 21151.8 25 Pub. Resources Code § 21153 6, 7, 26 California Regulations Cal. Code Regs., tit. 14, §§ 15000, et seq. ("CEQA Guidelines") CEQA Guidelines § 15050 6 CEQA Guidelines § 15051 1, 6 CEQA Guidelines § 15073 6 CEQA Guidelines § 15086 6 CEQA Guidelines § 15088.5 28 CEQA Guidelines § 15096 6 CEQA Guidelines § 15126.2 25 CEQA Guidelines § 15131 26 CEQA Guidelines § 15144 19, 24 CEQA Guidelines § 15151 9, 18, 19 CEQA Guidelines § 15204 1, 9, 21 CEQA Guidelines § 15251 6 CEQA Guidelines § 15366 7 CEQA Guidelines § 15381 6 Cal. Code Regs., tit. 17, § 60104 3 Federal Statutes 42 U.S.C. § 7401; CAA § 101 4 42 U.S.C. § 7408; CAA § 108 3 42 U.S.C. § 7409; CAA § 109 4 42U.S.C.§7410;CAA§110 4,5 42 U.S.C. § 7412; CAA § 112 5 42 U.S.C. § 7502; CAA § 172 5, 13 42 U.S.C. § 7503; CAA § 173 5, 13 42 U.S.C. § 7511a; CAA § 182 13 42 U.S.C. § 7521; CAA § 202 4 42 U.S.C. § 7543; CAA § 209 4 42 U.S.C. § 7547; CAA § 213 4 iv Rules SCAQMD Rule 1303 7 SCAQMD Rule 1401 5, 8, 9 Other Association of Environmental Professionals, 2015 CEQA Statute and Guidelines (2015) (Appendix G, "Environmental Checklist Form." 24 CARB, Health Impacts Analysis: PM Premature Death Relationship 14 CARB, Health Impacts Analysis: PM Mortality Relationship 16 CARB, Resolution 98-35, Aug. 27, 1998 8 SCAQMD, Air Quality Analysis Handbook 13 SCAQMD, Final 2012 AQMP (Feb. 2013) 3, 11 SCAQMD, Final Subsequent Mitigated Negative Declaration for: Warren E&P, Inc. WTU Central Facility, New Equipment Project (certified July 19, 2011) 14-15 SCAQMD Governing Board Agenda, February 4, 2011, Agenda Item 26, Assessment for: Re -adoption of Proposed Rule 1315 — Federal New Source Review Tracking System, 12 SCAQMD Governing Board Agenda, April 3, 2015, Agenda Item 16, Attachment A 7 SCAQMD, Health Risk Assessment Summary form 10 SCAQMD, Supplemental Guidelines for Preparing Risk Assessments for the Air Toxics "Hot Spots" Information and Assessment Act (AB2588) 10 U.S. EPA, Ground Level Ozone 11 U.S. EPA, Guideline on Ozone Monitoring Site Selection (Aug. 1998) EPA -454/R-98-002 § 5.1.2 11 U.S. EPA, Health Effects of Ozone in the General Population, Figure 9, 11 U.S. EPA, National Ambient Air Quality Standards (NAAQS) 4 U.S. EPA, Particulate Matter (PM) 4 v TO THE HONORABLE CHIEF JUSTICE AND JUSTICES OF THE SUPREME COURT: APPLICATION FOR LEAVE TO FILE AMICUS CURIAE BRIEF Pursuant to Rule 8.520(f) of the California Rules of Court, the South Coast Air Quality Management District (SCAQMD) respectfully requests leave to file the attached amicus curiae brief. Because SCAQMD's position differs from that of either party, we request leave to submit this amicus brief in support of neither party. HOW THIS BRIEF WILL ASSIST THE COURT SCAQMD's proposed amicus brief takes a position on two of the issues in this case. In both instances, its position differs from that of either party. The issues are: 1) Does the California Environmental Quality Act (CEQA) require an environmental impact report (EIR) to correlate a project's air pollution emissions with specific levels of health impacts? 2) What is the proper standard of review for determining whether an EIR provides sufficient information on the health impacts caused by a project's emission of air pollutants? This brief will assist the Court by discussing the practical realities of correlating identified air quality impacts with specific health outcomes. In short, CEQA requires agencies to provide detailed information about a project's air quality impacts that is sufficient for the public and decisionmakers to adequately evaluate the project and meaningfully understand its impacts. However, the level of analysis is governed by a rule of reason; CEQA only requires agencies to conduct analysis if it is reasonably feasible to do so. App -1 With regard to health-related air quality impacts, an analysis that correlates a project's air pollution emissions with specific levels of health impacts will be feasible in some cases but not others. Whether it is feasible depends on a variety of factors, including the nature of the project and the nature of the analysis under consideration. The feasibility of analysis may also change over time as air districts and others develop new tools for measuring projects' air quality related health impacts. Because SCAQMD has among the most sophisticated air quality modeling and health impact evaluation capability of any of the air districts in the State, it is uniquely situated to express an opinion on the extent to which the Court should hold that CEQA requires lead agencies to correlate air quality impacts with specific health outcomes. SCAQMD can also offer a unique perspective on the question of the appropriate standard of review. SCAQMD submits that the proper standard of review for determining whether an EIR is sufficient as an informational document is more nuanced than argued by either party. In our view, this is a mixed question of fact and law. It includes determining whether additional analysis is feasible, which is primarily a factual question that should be reviewed under the substantial evidence standard. However, it also involves determining whether the omission of a particular analysis renders an EIR insufficient to serve CEQA's purpose as a meaningful, informational document. If a lead agency has not determined that a requested analysis is infeasible, it is the court's role to determine whether the EIR nevertheless meets CEQA's purposes, and courts should not defer to the lead agency's conclusions regarding the legal sufficiency of an EIR's analysis. The ultimate question of whether an EIR's analysis is "sufficient" to serve CEQA's informational purposes is predominately a question of law that courts should review de novo. App -2 This brief will explain the rationale for these arguments and may assist the Court in reaching a conclusion that accords proper respect to a lead agency's factual conclusions while maintaining judicial authority over the ultimate question of what level of analysis CEQA requires. STATEMENT OF INTEREST OF AMICUS CURIAE The SCAQMD is the regional agency primarily responsible for air pollution control in the South Coast Air Basin, which consists of all of Orange County and the non -desert portions of the Los Angeles, Riverside, and San Bernardino Counties. (Health & Saf. Code § 40410; Cal. Code Regs., tit. 17, § 60104.) The SCAQMD participates in the CEQA process in several ways. Sometimes it acts as a lead agency that prepares CEQA documents for projects. Other times it acts as a responsible agency when it has permit authority over some part of a project that is undergoing CEQA review by a different lead agency. Finally, SCAQMD also acts as a commenting agency for CEQA documents that it receives because it is a public agency with jurisdiction by law over natural resources affected by the project. In all of these capacities, SCAQMD will be affected by the decision in this case. SCAQMD sometimes submits comments requesting that a lead agency perform an additional type of air quality or health impacts analysis. On the other hand, SCAQMD sometimes determines that a particular type of health impact analysis is not feasible or would not produce reliable and informative results. Thus, SCAQMD will be affected by the Court's resolution of the extent to which CEQA requires EIRs to correlate emissions and health impacts, and its resolution of the proper standard of review. App -3 CERTIFICATION REGARDING AUTHORSHIP AND FUNDING No party or counsel in the pending case authored the proposed amicus curiae brief in whole or in part, or made any monetary contribution intended to fund the preparation or submission of the brief. No person or entity other than the proposed Amicus Curiae made any monetary contribution intended to fund the preparation or submission of the brief. DATED: April 3, 2015 Respectfully submitted, SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT KURT R. WIESE, GENERAL COUNSEL BARBARA BAIRD, CHIEF DEPUTY COUNSEL By: Barbara Baird Attorneys for [proposed] Amicus Curiae SOUTH COAST AIR QUALITY MANAGEMENT DISTICT App -4 BRIEF OF AMICUS CURIAE SUMMARY OF ARGUMENT The South Coast Air Quality Management District (SCAQMD) submits that this Court should not try to establish a hard-and-fast rule concerning whether lead agencies are required to correlate emissions of air pollutants with specific health consequences in their environmental impact reports (EIR). The level of detail required in EIRs is governed by a few, core CEQA (California Environmental Quality Act) principles. As this Court has stated, "[a]n EIR must include detail sufficient to enable those who did not participate in its preparation to understand and to consider meaningfully the issues raised by the proposed project." (Laurel Heights Improvement Assn. v. Regents of the Univ of Cal. (1988) 47 Cal.3d 376, 405 ["Laurel Heights 1"]) Accordingly, "an agency must use its best efforts to find out and disclose all that it reasonably can." (Vineyard Area Citizens for Responsible Growth, Inc. v. City of Rancho Cordova (2007) 40 Cal.4th 412, 428 (quoting CEQA Guidelines § 15144)1.). However, "[a]nalysis of environmental effects need not be exhaustive, but will be judged in light of what is reasonably feasible." (Association of Irritated Residents v. County of Madera (2003) 107 Cal.App.4th 1383, 1390; CEQA Guidelines §§ 15151, 15204(a).) With regard to analysis of air quality related health impacts, EIRs must generally quantify a project's pollutant emissions, but in some cases it is not feasible to correlate these emissions to specific, quantifiable health impacts (e.g., premature mortality; hospital admissions). In such cases, a general description of the adverse health impacts resulting from the pollutants at issue may be sufficient. In other cases, due to the magnitude 1 The CEQA Guidelines are found at Cal. Code Regs., tit. 14 §§ 15000, et seq. 1 or nature of the pollution emissions, as well as the specificity of the project involved, it may be feasible to quantify health impacts. Or there may be a less exacting, but still meaningful analysis of health impacts that can feasibly be performed. In these instances, agencies should disclose those impacts. SCAQMD also submits that whether or not an EIR complies with CEQA's informational mandates by providing sufficient, feasible analysis is a mixed question of fact and law. Pertinent here, the question of whether an EIR's discussion of health impacts from air pollution is sufficient to allow the public to understand and consider meaningfully the issues involves two inquiries: (1) Is it feasible to provide the information or analysis that a commenter is requesting or a petitioner is arguing should be required?; and (2) Even if it is feasible, is the agency relying on other policy or legal considerations to justify not preparing the requested analysis? The first question of whether an analysis is feasible is primarily a question of fact that should be judged by the substantial evidence standard. The second inquiry involves evaluating CEQA's information disclosure purposes against the asserted reasons to not perform the requested analysis. For example, an agency might believe that its EIR meets CEQA's informational disclosure standards even without a particular analysis, and therefore choose not to conduct that analysis. SCAQMD submits that this is more of a legal question, which should be reviewed de novo as a question of law. ARGUMENT I. RELEVANT FACTUAL AND LEGAL FRAMEWORK. A. Air Quality Regulatory Background The South Coast Air Quality Management District (SCAQMD) is one of the local and regional air pollution control districts and air quality 2 management districts in California. The SCAQMD is the regional air pollution agency for the South Coast Air Basin, which consists of all of Orange County and the non -desert portions of Los Angeles, Riverside, and San Bernardino Counties. (Health & Saf. Code § 40410, 17 Cal. Code Reg. § 60104.) The SCAQMD also includes the Coachella Valley in Riverside County (Palm Springs area to the Salton Sea). (SCAQMD, Final 2012 AQMP (Feb. 2013), http://www.agmd.gov/home/library/clean-air-plans/air- quality-mgt-plan/final-2012-air-quality-management-plan; then follow "chapter 7" hyperlink; pp 7-1, 7-3 (last visited Apr. 1, 2015).) The SCAQMD's jurisdiction includes over 16 million residents and has the worst or nearly the worst air pollution levels in the country for ozone and fine particulate matter. (SCAQMD, Final 2012 AQMP (Feb. 2013), http://www. agmd. gov/home/library/clean-air-plans/air-quality-mgt- plan/final-2012-air-quality-management-plan; then follow "Executive Summary" hyperlink p. ES -1 (last visited Apr. 1, 2015).) Under California law, the local and regional districts are primarily responsible for controlling air pollution from all sources except motor vehicles. (Health & Saf. Code § 40000.) The California Air Resources Board (CARB), part of the California Environmental Protection Agency, is primarily responsible for controlling pollution from motor vehicles. (Id.) The air districts must adopt rules to achieve and maintain the state and federal ambient air quality standards within their jurisdictions. (Health & Saf. Code § 40001.) The federal Clean Air Act (CAA) requires the United States Environmental Protection Agency (EPA) to identify pollutants that are widely distributed and pose a threat to human health, developing a so-called "criteria" document. (42 U.S.C. § 7408; CAA § 108.) These pollutants are frequently called "criteria pollutants." EPA must then establish "national ambient air quality standards" at levels "requisite to protect public health", allowing "an adequate margin of safety." (42 U.S.C. § 7409; CAA § 109.) EPA has set standards for six identified pollutants: ozone, nitrogen dioxide, sulfur dioxide, carbon monoxide, particulate matter (PM), and lead. (U.S. EPA, National Ambient Air Quality Standards (NAAQS), http://www.epa.gov/air/criteria.html (last updated Oct. 21, 2014).)2 Under the Clean Air Act, EPA sets emission standards for motor vehicles and "nonroad engines" (mobile farm and construction equipment, marine vessels, locomotives, aircraft, etc.). (42 U.S.C. §§ 7521, 7547; CAA §§ 202, 213.) California is the only state allowed to establish emission standards for motor vehicles and most nonroad sources; however, it may only do so with EPA's approval. (42 U.S.C. §§ 7543(b), 7543(e); CAA §§ 209(b), 209(c).) Sources such as manufacturing facilities, power plants and refineries that are not mobile are often referred to as "stationary sources." The Clean Air Act charges state and local agencies with the primary responsibility to attain the national ambient air quality standards. (42 U.S.C. § 7401(a)(3); CAA § 101(a)(3).) Each state must adopt and implement a plan including enforceable measures to achieve and maintain the national ambient air quality standards. (42 U.S.C. § 7410; CAA § 110.) The SCAQMD and CARB jointly prepare portion of the plan for the South Coast Air Basin and submit it for approval by EPA. (Health & Saf. Code §§ 40460, et seq.) The Clean Air Act also requires state and local agencies to adopt a permit program requiring, among other things, that new or modified "major" stationary sources use technology to achieve the "lowest achievable emission rate," and to control minor stationary sources as 2 Particulate matter (PM) is further divided into two categories: fine particulate or PM25 (particles with a diameter of less than or equal to 2.5 microns) and coarse particulate (PM10) (particles with a diameter of 10 microns or less). (U.S. EPA, Particulate Matter (PM), http://www.epa.gov/airquality/particlepollution/ (last visited Apr. 1, 2015).) 4 needed to help attain the standards. (42 U.S.C. §§ 7502(c)(5), 7503(a)(2), 7410(a)(2)(C); CAA §§ 172(c)(5), 173(a)(2), 110(a)(2)(C).) The air districts implement these permit programs in California. (Health & Saf. Code §§ 42300, et seq.) The Clean Air Act also sets out a regulatory structure for over 100 so-called "hazardous air pollutants" calling for EPA to establish "maximum achievable control technology" (MACT) for sources of these pollutants. (42 U.S.C. § 7412(d)(2); CAA § 112(d)(2).) California refers to these pollutants as "toxic air contaminants" (TACs) which are subject to two state-required programs. The first program requires "air toxics control measures" for specific categories of sources. (Health & Saf. Code § 39666.) The other program requires larger stationary sources and sources identified by air districts to prepare "health risk assessments" for impacts of toxic air contaminants. (Health & Saf. Code §§ 44320(b), 44322, 44360.) If the health risk exceeds levels identified by the district as "significant," the facility must implement a "risk reduction plan" to bring its risk levels below "significant" levels. Air districts may adopt additional more stringent requirements than those required by state law, including requirements for toxic air contaminants. (Health & Saf. Code § 41508; Western Oil & Gas Assn. v. Monterey Bay Unified APCD (1989) 49 Ca1.3d 408, 414.) For example, SCAQMD has adopted a rule requiring new or modified sources to keep their risks below specified levels and use best available control technology (BACT) for toxics. (SCAQMD, Rule 1401- New Source Review of Toxic Air Contaminants, http: //www. agmd. gov/home/regulations/rules/scaqmd-rule-book/regulation- xiv; then follow "Rule 1401" hyperlink (last visited Apr. 1, 2015).) 5 B. The SCAQMD's Role Under CEQA The California Environmental Quality Act (CEQA) requires public agencies to perform an environmental review and appropriate analysis for projects that they implement or approve. (Pub. Resources Code § 21080(a).) The agency with primary approval authority for a particular project is generally the "lead agency" that prepares the appropriate CEQA document. (CEQA Guidelines §§ 15050, 15051.) Other agencies having a subsequent approval authority over all or part of a project are called "responsible" agencies that must determine whether the CEQA document is adequate for their use. (CEQA Guidelines §§ 15096(c), 15381.) Lead agencies must also consult with and circulate their environmental impact reports to "trustee agencies" and agencies "with jurisdiction by law" including "authority over resources which may be affected by the project." (Pub. Resources Code §§ 21104(a), 21153; CEQA Guidelines §§ 15086(a)(3), 15073(c).) The SCAQMD has a role in all these aspects of CEQA. Fulfilling its responsibilities to implement its air quality plan and adopt rules to attain the national ambient air quality standards, SCAQMD adopts a dozen or more rules each year to require pollution reductions from a wide variety of sources. The SCAQMD staff evaluates each rule for any adverse environmental impact and prepares the appropriate CEQA document. Although most rules reduce air emissions, they may have secondary environmental impacts such as use of water or energy or disposal of waste—e.g., spent catalyst from control equipment.3 3 The SCAQMD's CEQA program for its rules is a "Certified Regulatory Program" under which it prepares a "functionally equivalent" document in lieu of a negative declaration or EIR. (Pub. Resources Code § 21080.5, CEQA Guidelines § 15251(1).) 6 The SCAQMD also approves a large number of permits every year to construct new, modified, or replacement facilities that emit regulated air pollutants. The majority of these air pollutant sources have already been included in an earlier CEQA evaluation for a larger project, are currently being evaluated by a local government as lead agency, or qualify for an exemption. However, the SCAQMD sometimes acts as lead agency for major projects where the local government does not have a discretionary approval. In such cases, SCAQMD prepares and certifies a negative declaration or environmental impact report (EIR) as appropriate.4 SCAQMD evaluates perhaps a dozen such permit projects under CEQA each year. SCAQMD is often also a "responsible agency" for many projects since it must issue a permit for part of the projects (e.g., a boiler used to provide heat in a commercial building). For permit projects evaluated by another lead agency under CEQA, SCAQMD has the right to determine that the CEQA document is inadequate for its purposes as a responsible agency, but it may not do so because its permit program already requires all permitted sources to use the best available air pollution control technology. (SCAQMD, Rule 1303(a)(1) —Requirements, http://www.agmd. gov/home/regulations/rules/scaqmd-rule-book/regulation- xiii; then follow "Rule 1303" hyperlink (last visited Apr. 1, 2015).) Finally, SCAQMD receives as many as 60 or more CEQA documents each month (around 500 per year) in its role as commenting agency or an agency with "jurisdiction by law" over air quality—a natural resource affected by the project. (Pub. Resources Code §§ 21104(a), 21153; CEQA Guidelines § 15366(a)(3).) The SCAQMD staff provides comments on as many as 25 or 30 such documents each month. 4 The SCAQMD's permit projects are not included in its Certified Regulatory Program, and are evaluated under the traditional local government CEQA analysis. (Pub. Resources Code §§ 21150-21154.) 7 (SCAQMD Governing Board Agenda, Apr. 3, 2015, Agenda Item 16, Attachment A, http://www.agmd.gov/home/library/meeting-agendas- minutes/agenda?title=governing-board-meeting-agenda-april-3-2015; then follow "16. Lead Agency Projects and Environmental Documents Received by SCAQMD" hyperlink (last visited Apr. 1, 2015).) Of course, SCAQMD focuses its commenting efforts on the more significant projects. Typically, SCAQMD comments on the adequacy of air quality analysis, appropriateness of assumptions and methodology, and completeness of the recommended air quality mitigation measures. Staff may comment on the need to prepare a health risk assessment detailing the projected cancer and noncancer risks from toxic air contaminants resulting from the project, particularly the impacts of diesel particulate matter, which CARB has identified as a toxic air contaminant based on its carcinogenic effects. (California Air Resources Board, Resolution 98-35, Aug. 27, 1998, http://www.arb.ca.gov/regact/diesltac/diesltac.htm; then follow Resolution 98-35 hyperlink (last visited Apr. 1, 2015).) Because SCAQMD already requires new or modified stationary sources of toxic air contaminants to use the best available control technology for toxics and to keep their risks below specified levels, (SCAQMD Rule 1401, supra, note 15), the greatest opportunity to further mitigate toxic impacts through the CEQA process is by reducing emissions—particularly diesel emissions—from vehicles. II. THIS COURT SHOULD NOT SET A HARD-AND-FAST RULE CONCERNING THE EXTENT TO WHICH AN EIR MUST CORRELATE A PROJECT'S EMISSION OF POLLUTANTS WITH RESULTING HEALTH IMPACTS. Numerous cases hold that courts do not review the correctness of an EIR's conclusions but rather its sufficiency as an informative document. (Laurel Heights 1, supra, 47 Ca1.3d at p. 392; Citizens of Goleta Valley v. 8 Bd. of Supervisors (1990) 52 Cal.3d 553, 569; Bakersfield Citizens for Local Control v. City of Bakersfield (2004) 124 Cal.App.4th 1184, 1197.) As stated by the Court of Appeal in this case, where an EIR has addressed a topic, but the petitioner claims that the information provided about that topic is insufficient, courts must "draw[] a line that divides sufficient discussions from those that are insufficient." (Sierra Club v. County of Fresno (2014) 226 Cal.App.4th 704 (superseded by grant of review) 172 Cal.Rptr.3d 271, 290.) The Court of Appeal readily admitted that "[t]he terms themselves — sufficient and insufficient — provide little, if any, guidance as to where the line should be drawn. They are simply labels applied once the court has completed its analysis." (Id.) The CEQA Guidelines, however, provide guidance regarding what constitutes a sufficient discussion of impacts. Section 15151 states that "the sufficiency of an EIR is to be reviewed in light of what is reasonably feasible." Case law reflects this: "Analysis of environmental effects need not be exhaustive, but will be judged in light of what was reasonably feasible." (Association of Irritated Residents v. County of Madera, supra, 107 Cal.App.4th at p. 1390; see also CEQA Guidelines § 15204(a).) Applying this test, this Court cannot realistically establish a hard- and-fast rule that an analysis correlating air pollution impacts of a project to quantified resulting health impacts is always required, or indeed that it is never required. Simply put, in some cases such an analysis will be "feasible"; in some cases it will not. For example, air pollution control districts often require a proposed new source of toxic air contaminants to prepare a "health risk assessment" before issuing a permit to construct. District rules often limit the allowable cancer risk the new source may cause to the "maximally exposed individual" (worker and residence exposures). (See, e.g., SCAQMD Rule 1401(c)(8); 1401(d)(1), supra note 15.) In order to perform this analysis, it 9 is necessary to have data regarding the sources and types of air toxic contaminants, location of emission points, velocity of emissions, the meteorology and topography of the area, and the location of receptors (worker and residence). (SCAQMD, Supplemental Guidelines for Preparing Risk Assessments for the Air Toxics "Hot Spots" Information and Assessment Act (AB2588), pp. 11-16; (last visited Apr. 1, 2015) http://www.aqmd.gov/home/library/documents-support-material; "Guidelines" hyperlink; AB2588; then follow AB2588 Risk Assessment Guidelines hyperlink.) Thus, it is feasible to determine the health risk posed by a new gas station locating at an intersection in a mixed use area, where receptor locations are known. On the other hand, it may not be feasible to perform a health risk assessment for airborne toxics that will be emitted by a generic industrial building that was built on "speculation" (i.e., without knowing the future tenant(s)). Even where a health risk assessment can be prepared, however, the resulting maximum health risk value is only a calculation of risk—it does not necessarily mean anyone will contract cancer as a result of the project. In order to find the "cancer burden" or expected additional cases of cancer resulting from the project, it is also necessary to know the numbers and location of individuals living within the "zone of impact" of the project: i.e., those living in areas where the projected cancer risk from the project exceeds one in a million. (SCAQMD, Health Risk Assessment Summary form, http://www.aqmd.gov/home/forms ; filter by "AB2588" category; then "Health Risk Assessment" hyperlink (last visited Apr. 1, 2015).) The affected population is divided into bands of those exposed to at least 1 in a million risk, those exposed to at least 10 in a million risk, etc. up to those exposed at the highest levels. (Id.) This data allows agencies to calculate an approximate number of additional cancer cases expected from 10 the project. However, it is not possible to predict which particular individuals will be affected. For the so-called criteria pollutants5, such as ozone, it may be more difficult to quantify health impacts. Ozone is formed in the atmosphere from the chemical reaction of the nitrogen oxides (NO,) and volatile organic compounds (VOC) in the presence of sunlight. (U.S. EPA, Ground Level Ozone, http://www.epa.gov/airquality/ozonepollution/ (last updated Mar. 25, 2015).) It takes time and the influence of meteorological conditions for these reactions to occur, so ozone may be formed at a distance downwind from the sources. (U.S. EPA, Guideline on Ozone Monitoring Site Selection (Aug. 1998) EPA -454/R-98-002 § 5.1.2, http://www.epa.gov/ttnamtil/archive/cpreldoc.html (last visited Apr. 1, 2015).) NO„ and VOC are known as "precursors" of ozone. Scientifically, health effects from ozone are correlated with increases in the ambient level of ozone in the air a person breathes. (U.S. EPA, Health Effects of Ozone in the General Population, Figure 9, http://www.epa.gov/apti/ozonehealth/population.html#levels (last visited Apr. 1, 2015).) However, it takes a large amount of additional precursor emissions to cause a modeled increase in ambient ozone levels over an entire region. For example, the SCAQMD's 2012 AQMP showed that reducing NO, by 432 tons per day (157,680 tons/year) and reducing VOC by 187 tons per day (68,255 tons/year) would reduce ozone levels at the SCAQMD's monitor site with the highest levels by only 9 parts per billion. (South Coast Air Quality Management District, Final 2012 AQMP (February 2013), http://www.agmd.gov/home/library/clean-air-plans/air- quality-mgt-plan/final-2012-air-quality-management-plan; then follow "Appendix V: Modeling & Attainment Demonstrations" hyperlink, 5 See discussion of types of pollutants, supra, Part I.A. 11 pp. v-4-2, v-7-4, v-7-24.) SCAQMD staff does not currently know of a way to accurately quantify ozone -related health impacts caused by NO„ or VOC emissions from relatively small projects. On the other hand, this type of analysis may be feasible for projects on a regional scale with very high emissions of NO„ and VOCs, where impacts are regional. For example, in 2011 the SCAQMD performed a health impact analysis in its CEQA document for proposed Rule 1315, which authorized various newly -permitted sources to use offsets from the districts "internal bank" of emission reductions. This CEQA analysis accounted for essentially all the increases in emissions due to new or modified sources in the District between 2010 and 2030.6 The SCAQMD was able to correlate this very large emissions increase (e.g., 6,620 pounds per day NOX (1,208 tons per year), 89,180 pounds per day VOC (16,275 tons per year)) to expected health outcomes from ozone and particulate matter (e.g., 20 premature deaths per year and 89,947 school absences in the year 2030 due to ozone). (SCAQMD Governing Board Agenda, February 4, 2011, Agenda Item 26, Assessment for: Re -adoption of Proposed Rule 1315 — Federal New Source Review Tracking System (see hyperlink in fn 6) at p. 4.1-35, Table 4.1-29.) 6 (SCAQMD Governing Board Agenda, February 4, 2011, Agenda Item 26, Attachment G, Assessment for: Re -adoption of Proposed Rule 1315 — Federal New Source Review Tracking System, Vol. 1, p.4.0-6, http://www. agmd.gov/home/library/meeting-agendas- minutes/agenda?title=governing-board-meeting-agenda-february-4-2011; the follow "26. Adopt Proposed Rule 1315 — Federal New Source Review Tracking System" (last visited April 1, 2015).) The SCAQMD was able to establish the location of future NO„ and VOC emissions by assuming that new projects would be built in the same locations and proportions as existing stationary sources. This CEQA document was upheld by the Los Angeles County Superior Court in Natural Res. Def. Council v SCAQMD, Los Angeles Superior Court No. BS 110792). 12 However, a project emitting only 10 tons per year of NOx or VOC is small enough that its regional impact on ambient ozone levels may not be detected in the regional air quality models that are currently used to determine ozone levels. Thus, in this case it would not be feasible to directly correlate project emissions of VOC or NOx with specific health impacts from ozone. This is in part because ozone formation is not linearly related to emissions. Ozone impacts vary depending on the location of the emissions, the location of other precursor emissions, meteorology and seasonal impacts, and because ozone is formed some time later and downwind from the actual emission. (EPA Guideline on Ozone Monitoring Site Selection (Aug. 1998) EPA -454/R-98-002, § 5.1.2; https://www.epa.gov/ttnamti1/archive/cpreldoc.html; then search "Guideline on Ozone Monitoring Site Selection" click on pdf) (last viewed Apr. 1, 2015).) SCAQMD has set its CEQA "significance" threshold for NOx and VOC at 10 tons per year (expressed as 55 lb/day). (SCAQMD, Air Quality Analysis Handbook, http://www.agmd.gov/home/regulations/cega/air- quality-analysis-handbook; then follow "SCAQMD Air Quality Significance Thresholds" hyperlink (last visited Apr. 1, 2015).) This is because the federal Clean Air Act defines a "major" stationary source for "extreme" ozone nonattainment areas such as SCAQMD as one emitting 10 tons/year. (42 U.S.C. §§ 7511a(e), 7511a(f); CAA §§ 182(e), 182(4) Under the Clean Air Act, such sources are subject to enhanced control requirements (42 U.S.C. §§ 7502(c)(5), 7503; CAA §§ 172(c)(5), 173), so SCAQMD decided this was an appropriate threshold for making a CEQA "significance" finding and requiring feasible mitigation. Essentially, SCAQMD takes the position that a source that emits 10 tons/year of NOx or VOC would contribute cumulatively to ozone formation. Therefore, lead agencies that use SCAQMD's thresholds of significance may determine 13 that many projects have "significant" air quality impacts and must apply all feasible mitigation measures, yet will not be able to precisely correlate the project to quantifiable health impacts, unless the emissions are sufficiently high to use a regional modeling program. In the case of particulate matter (PM2.5)8, another "criteria" pollutant, SCAQMD staff is aware of two possible methods of analysis. SCAQMD used regional modeling to predict expected health impacts from its proposed Rule 1315, as mentioned above. Also, the California Air Resources Board (CARB) has developed a methodology that can predict expected mortality (premature deaths) from large amounts of PM2.5. (California Air Resources Board, Health Impacts Analysis: PM Premature Death Relationship, http://www.arb.ca.gov/research/health/pm-mort/pm- mortarch.htm (last reviewed Jan. 19, 2012).) SCAQMD used the CARB methodology to predict impacts from three very large power plants (e.g., 731-1837 lbs/day). (Final Environmental Assessment for Rule 1315, supra, pp 4.0-12, 4.1-13, 4.1-37 (e.g., 125 premature deaths in the entire SCAQMD in 2030), 4.1-39 (0.05 to 1.77 annual premature deaths from power plants.) Again, this project involved large amounts of additional PM2.5 in the District, up to 2.82 tons/day (5,650 lbs/day of PM2.5, or, or 1029 tons/year. (Id. at table 4.1-4, p. 4.1-10.) However, the primary author of the CARB methodology has reported that this PM2.5 health impact methodology is not suited for small projects and may yield unreliable results due to various uncertainties. 9 (SCAQMD, Final Subsequent Mitigated Negative Declaration for: Warren 8 SCAQMD has not attained the latest annual or 24-hour national ambient air quality standards for "PM2 5" or particulate matter less than 2.5 microns in diameter. 9 Among these uncertainties are the representativeness of the population used in the methodology, and the specific source of PM and the corresponding health impacts. (Id. at p. 2-24.) 14 E&P, Inc. WTU Central Facility, New Equipment Project (certified July 19, 2011), http://www.agmd.gov/home/library/documents-support- material/lead-agency-permit-projects/permit-proj ect-documents---year- 2011; then follow "Final Subsequent Mitigated Negative Declaration for Warren E&P Inc. WTU Central Facility, New Equipment Project" hyperlink, pp. 2-22, 2-23 (last visited Apr. 1, 2015).) Therefore, when SCAQMD prepared a CEQA document for the expansion of an existing oil production facility, with very small PM2.5 increases (3.8 lb/day) and a very small affected population, staff elected not to use the CARB methodology for using estimated PM25 emissions to derive a projected premature mortality number and explained why it would be inappropriate to do so. (Id. at pp 2-22 to 2-24.) SCAQMD staff concluded that use of this methodology for such a small source could result in unreliable findings and would not provide meaningful information. (Id. at pp. 2-23, 2-25.) This CEQA document was not challenged in court. In the above case, while it may have been technically possible to plug the data into the methodology, the results would not have been reliable or meaningful. SCAQMD believes that an agency should not be required to perform analyses that do not produce reliable or meaningful results. This Court has already held that an agency may decline to use even the "normal" "existing conditions" CEQA baseline where to do so would be misleading or without informational value. (Neighbors for Smart Rail v. Exposition Metro Line (2013) 57 Ca1.4th 439, 448, 457.) The same should be true for a decision that a particular study or analysis would not provide reliable or meaningful results.10 1° Whether a particular study would result in "informational value" is a part of deciding whether it is "feasible." CEQA defines "feasible" as "capable of being accomplished in a successful manner within a reasonable period of time, taking into account economic, environmental, social, and 15 Therefore, it is not possible to set a hard-and-fast rule on whether a correlation of air quality impacts with specific quantifiable health impacts is required in all cases. Instead, the result turns on whether such an analysis is reasonably feasible in the particular case." Moreover, what is reasonably feasible may change over time as scientists and regulatory agencies continually seek to improve their ability to predict health impacts. For example, CARB staff has been directed by its Governing Board to reassess and improve the methodology for estimating premature deaths. (California Air Resources Board, Health Impacts Analysis: PM Mortality Relationship, http://www.arb.ca.gov/research/health/pm-mort/pm-mort.htm (last reviewed Dec. 29, 2010).) This factor also counsels against setting any hard-and-fast rule in this case. III. THE QUESTION OF WHETHER AN EIR CONTAINS SUFFICIENT ANALYSIS TO MEET CEQA'S REQUIREMENTS IS A MIXED QUESTION OF FACT AND LAW GOVERNED BY TWO DIFFERENT STANDARDS OF REVIEW. A. Standard of Review for Feasibility Determination and Sufficiency as an Informative Document A second issue in this case is whether courts should review an EIR's informational sufficiency under the "substantial evidence" test as argued by Friant Ranch or the "independent judgment" test as argued by Sierra Club. technological factors." (Pub. Resources Code § 21061.1.) A study cannot be "accomplished in a successful manner" if it produces unreliable or misleading results. ' ` In this case, the lead agency did not have an opportunity to determine whether the requested analysis was feasible because the comment was non- specific. Therefore, SCAQMD suggests that this Court, after resolving the legal issues in the case, direct the Court of Appeal to remand the case to the lead agency for a determination of whether the requested analysis is feasible. Because Fresno County, the lead agency, did not seek review in this Court, it seems likely that the County has concluded that at least some level of correlation of air pollution with health impacts is feasible. 16 As this Court has explained, "a reviewing court must adjust its scrutiny to the nature of the alleged defect, depending on whether the claim is predominantly one of improper procedure or a dispute over the facts." (Vineyard Area Citizens v. City of Rancho Cordova, supra, 40 Ca1.4th at 435.) For questions regarding compliance with proper procedure or other legal questions, courts review an agency's action de novo under the "independent judgment" test. (Id.) On the other hand, courts review factual disputes only for substantial evidence, thereby "accord[ing] greater deference to the agency's substantive factual conclusions." (Id.) Here, Friant Ranch and Sierra Club agree that the case involves the question of whether an EIR includes sufficient information regarding a project's impacts. However, they disagree on the proper standard of review for answering this question: Sierra Club contends that courts use the independent judgment standard to determine whether an EIR's analysis is sufficient to meet CEQA's informational purposes,12 while Friant Ranch contends that the substantial evidence standard applies to this question. /// /// /// /// /// /// /// /// /// 12 Sierra Club acknowledges that courts use the substantial evidence standard when reviewing predicate factual issues, but argues that courts ultimately decide as a matter of law what CEQA requires. (Answering Brief, pp. 14, 23.) 17 SCAQMD submits that the issue is more nuanced than either party contends. We submit that, whether a CEQA document includes sufficient analysis to satisfy CEQA's informational mandates is a mixed question of fact and law,13 containing two levels of inquiry that should be judged by different standards.14 The state CEQA Guidelines set forth standards for the adequacy of environmental analysis. Guidelines Section 15151 states: An EIR should be prepared with a sufficient degree of analysis to provide decision makers with information which enables them to make a decision which intelligently takes account of environmental consequences. An evaluation of the environmental effects of a proposed project need not be exhaustive, but the sufficiency of an EIR is to be reviewed in light of what is reasonably feasible. Disagreement among experts does not make an EIR inadequate, but the EIR should summarize the main points of disagreement among the experts. The courts have looked not for perfection, but for adequacy, completeness, and a good -faith effort at full disclosure. In this case, the basic question is whether the underlying analysis of air quality impacts made the EIR "sufficient" as an informative document. However, whether the EIR's analysis was sufficient is judged in light of what was reasonably feasible. This represents a mixed question of fact and law that is governed by two different standards of review. 13 Friant Ranch actually states that the claim that an EIR lacks sufficient relevant information is, "most properly thought of as raising mixed questions of fact and law." (Opening Brief, p. 27.) However, the remainder of its argument claims that the court should apply the substantial evidence standard of review to all aspects of the issue. 14 Mixed questions of fact and law issues may implicate predominantly factual subordinate questions that are reviewed under the substantial evidence test even though the ultimate question may be reviewed by the independent judgment test. Crocker National Bank v. City and County of San Francisco (1989) 49 Ca1.3d 881, 888-889. 18 SCAQMD submits that an EIR's sufficiency as an informational document is ultimately a legal question that courts should determine using their independent judgment. This Court's language in Laurel Heights I supports this position. As this Court explained: "The court does not pass upon the correctness of the EIR's environmental conclusions, but only upon its sufficiency as an informative document." (Laurel Heights I, supra, 47 Ca1.3d at 392-393) (emphasis added.) As described above, the Court in Vineyard Area Citizens v. City of Rancho Cordova, supra, 40 Cal.4th at 431, also used its independent judgment to determine what level of analysis CEQA requires for water supply impacts. The Court did not defer to the lead agency's opinion regarding the law's requirements; rather, it determined for itself what level of analysis was necessary to meet "[t]he law's informational demands." (Id. at p. 432.) Further, existing case law also holds that where an agency fails to comply with CEQA's information disclosure requirements, the agency has "failed to proceed in the manner required by law." (Save Our Peninsula Comm. v. Monterey County Bd. of Supervisors (2001) 87 Cal.App.4th 99, 118.) However, whether an EIR satisfies CEQA's requirements depends in part on whether it was reasonably feasible for an agency to conduct additional or more thorough analysis. EIRs must contain "a detailed statement" of a project's impacts (Pub. Res. Code § 21061), and an agency must "use its best efforts to find out and disclose all that it reasonably can." (CEQA Guidelines § 15144.) Nevertheless, "the sufficiency of an EIR is to be reviewed in light of what is reasonably feasible." (CEQA Guidelines § 15151.) SCAQMD submits that the question of whether additional analysis or a particular study suggested by a commenter is "feasible" is generally a question of fact. Courts have already held that whether a particular alternative is "feasible" is reviewed by the substantial evidence test. 19 (Uphold Our Heritage v. Town of Woodside (2007) 147 Cal.App.4th 587, 598-99; Center for Biological Diversity v. County of San Bernardino (2010) 185 Cal.App.4th 866, 883.) Thus, if a lead agency determines that a particular study or analysis is infeasible, that decision should generally be judged by the substantial evidence standard. However, SCAQMD urges this Court to hold that lead agencies must explain the basis of any determination that a particular analysis is infeasible in the EIR itself. An EIR must discuss information, including issues related to the feasibility of particular analyses "in sufficient detail to enable meaningful participation and criticism by the public. `[W]hatever is required to be considered in an EIR must be in that formal report; what any official might have known from other writings or oral presentations cannot supply what is lacking in the report.' (Laurel Heights I, supra, 47 Cal.3d at p. 405 (quoting Santiago County Water District v. County of Orange (1981) 118 Cal.App.3d 818, 831) (discussing analysis of alternatives).) The evidence on which the determination is based should also be summarized in the EIR itself, with appropriate citations to reference materials if necessary. Otherwise commenting agencies such as SCAQMD would be forced to guess where the lead agency's evidence might be located, thus thwarting effective public participation. Moreover, if a lead agency determines that a particular study or analysis would not result in reliable or useful information and for that reason is not feasible, that determination should be judged by the substantial evidence test. (See Neighbors for Smart Rail v. Exposition Metro Line Construction Authority, supra, 57 Cal.4th 439, 448, 457: 20 whether "existing conditions" baseline would be misleading or uninformative judged by substantial evidence standard.15) If the lead agency's determination that a particular analysis or study is not feasible is supported by substantial evidence, then the agency has not violated CEQA's information disclosure provisions, since it would be infeasible to provide additional information. This Court's decisions provide precedent for such a result. For example, this Court determined that the issue of whether the EIR should have included a more detailed discussion of future herbicide use was resolved because substantial evidence supported the agency's finding that "the precise parameters of future herbicide use could not be predicted." Ebbetts Pass Forest Watch v. California Dept. of Forestry & Fire Protection (2008) 43 Cal.4th 936, 955. Of course, SCAQMD expects that courts will continue to hold lead agencies to their obligations to consult with, and not to ignore or misrepresent, the views of sister agencies having special expertise in the area of air quality. (Berkeley Keep Jets Over the Bay v. Board of Port Commissioners (2007) 91 Ca1.App.41h 1344, 1364 n.11.) In some cases, information provided by such expert agencies may establish that the purported evidence relied on by the lead agency is not in fact "substantial". (Id. at pp. 1369-1371.) In sum, courts retain ultimate responsibility to determine what CEQA requires. However, the law does not require exhaustive analysis, but only what is reasonably feasible. Agencies deserve deference for their factual determinations regarding what type of analysis is reasonably feasible. On the other hand, if a commenter requests more information, and the lead agency declines to provide it but does not determine that the 15 The substantial evidence standard recognizes that the courts "have neither the resources nor the scientific expertise" to weigh conflicting evidence on technical issues. (Laurel Heights 1, supra, 47 Cal.3d 376, 393.) 21 requested study or analysis would be infeasible, misleading or uninformative, the question becomes whether the omission of that analysis renders the EIR inadequate to satisfy CEQA's informational purposes. (Id. at pp. 1370-71.) Again, this is predominantly a question of law and should be judged by the de novo or independent judgment standard of review. Of course, this Court has recognized that a "project opponent or reviewing court can always imagine some additional study or analysis that might provide helpful information. It is not for them to design the EIR. That further study...might be helpful does not make it necessary." (Laurel Heights I, supra, 47 Ca1.3d 376, 415 – see also CEQA Guidelines § 15204(a) [CEQA "does not require a lead agency to conduct every test.. . recommended or demanded by commenters."].) Courts, then, must adjudicate whether an omission of particular information renders an EIR inadequate to serve CEQA's informational purposes.16 16 We recognize that there is case law stating that the substantial evidence standard applies to "challenges to the scope of an EIR's analysis of a topic" as well as the methodology used and the accuracy of the data relied on in the document "because these types of challenges involve factual questions." (Bakersfield Citizens for Local Control v. City of Bakersfield, supra, 124 Cal.App.4th 1184, 1198, and cases relied on therein.) However, we interpret this language to refer to situations where the question of the scope of the analysis really is factual—that is, where it involves whether further analysis is feasible, as discussed above. This interpretation is supported by the fact that the Bakersfield court expressly rejected an argument that a claimed "omission of information from the EIR should be treated as inquiries whether there is substantial evidence supporting the decision approving the project. " Bakersfield, supra, 124 Cal.App.4th at p. 1208. And the Bakersfield court ultimately decided that the lead agency must analyze the connection between the identified air pollution impacts and resulting health impacts, even though the EIR already included some discussion of air -pollution -related respiratory illnesses. Bakersfield, supra, 124 Cal.App.4th at p. 1220. Therefore, the court must not have interpreted this question as one of the "scope of the analysis" to be judged by the substantial evidence standard. 22 B. Friant Ranch's Rationale for Rejecting the Independent Judgment Standard of Review is Unsupported by Case Law. In its brief, Friant Ranch makes a distinction between cases where a required CEQA topic is not discussed at all (to be reviewed by independent judgment as a failure to proceed in the manner required by law) and cases where a topic is discussed, but the commenter claims the information provided is insufficient (to be judged by the substantial evidence test). (Opening Brief, pp. 13-17.) The Court of Appeal recognized these two types of cases, but concluded that both raised questions of law. (Sierra Club v. County of Fresno (2014) 226 Cal.App.4th 704 (superseded by grant of review) 172 Cal.Rptr.3d 271, 290.) We believe the distinction drawn by Friant Ranch is unduly narrow, and inconsistent with cases which have concluded that CEQA documents are insufficient. In many instances, CEQA's requirements are stated broadly, and the courts must interpret the law to determine what level of analysis satisfies CEQA's mandate for providing meaningful information, even though the EIR discusses the issue to some extent. For example, the CEQA Guidelines require discussion of the existing environmental baseline. In County of Amador v. El Dorado County Water Agency (1999) 76 Cal.App.4th 931, 954-955, the lead agency had discussed the environmental baseline by describing historic month-end water levels in the affected lakes. However, the court held that this was not an adequate baseline discussion because it failed to discuss the timing and amounts of past actual water releases, to allow comparison with the proposed project. The court evidently applied the independent judgment test to its decision, even though the agency discussed the issue to some extent. 23 Likewise, in Vineyard Area Citizens (2007) 40 Ca1.4th 412, this Court addressed the question of whether an EIR's analysis of water supply impacts complied with CEQA. The parties agreed that the EIR was required to analyze the effects of providing water to the development project, "and that in order to do so the EIR had, in some manner, to identify the planned sources of that water." (Vineyard Area Citizens, supra, at p. 428.) However, the parties disagreed as to the level of detail required for this analysis and "what level of uncertainty regarding the availability of water supplies can be tolerated in an EIR ...." (Id.) In other words, the EIR had analyzed water supply impacts for the project, but the petitioner claimed that the analysis was insufficient. This Court noted that neither CEQA's statutory language or the CEQA Guidelines specifically addressed the question of how precisely an EIR must discuss water supply impacts. (Id.) However, it explained that CEQA "states that `[w]hile foreseeing the unforeseeable is not possible, an agency must use its best efforts to find out and disclose all that it reasonably can.' (Id., [Guidelines § 15144].) The Court used this general principle, along with prior precedent, to elucidate four "principles for analytical adequacy" that are necessary in order to satisfy "CEQA's informational purposes." (Vineyard Area Citizens, supra, at p. 430.) The Court did not defer to the agency's determination that the EIR's analysis of water supply impacts was sufficient. Rather, this Court used its independent judgment to determine for itself the level of analysis required to satisfy CEQA's fundamental purposes. (Vineyard Area Citizens, supra, at p. 441: an EIR does not serve its purposes where it neglects to explain likely sources of water and "... leaves long term water supply considerations to later stages of the project.") 24 Similarly, the CEQA Guidelines require an analysis of noise impacts of the project. (Appendix G, "Environmental Checklist Form."17) In Gray v. County of Madera (2008) 167 Cal.App.4th 1099, 1123, the court held that the lead agency's noise impact analysis was inadequate even though it had addressed the issue and concluded that the increase would not be noticeable. If the court had been using the substantial evidence standard, it likely would have upheld this discussion. Therefore, we do not agree that the issue can be resolved on the basis suggested by Friant Ranch, which would apply the substantial evidence standard to every challenge to an analysis that addresses a required CEQA topic. This interpretation would subvert the courts' proper role in interpreting CEQA and determining what the law requires. Nor do we agree that the Court of Appeal in this case violated CEQA's prohibition on courts interpreting its provisions "in a manner which imposes procedural or substantive requirements beyond those explicitly stated in this division or in the state guidelines." (Pub. Resources Code § 21083.1.) CEQA requires an EIR to describe all significant impacts of the project on the environment. (Pub. Resources Code § 21100(b)(2); Vineyard Area Citizens, supra, at p. 428.) Human beings are part of the environment, so CEQA requires EIRs to discuss a project's significant impacts on human health. However, except in certain particular circumstances,'$ neither the CEQA statute nor Guidelines specify the precise level of analysis that agencies must undertake to satisfy the law's requirements. (see, e.g., CEQA Guidelines § 15126.2(a) [EIRs must describe "health and safety problems caused by {a project's} physical changes"1.) Accordingly, courts must interpret CEQA as a whole to '7 Association of Environmental Professionals, 2015 CEQA Statute and Guidelines (2015) p.287. 18 E.g., Pub. Resources Code § 21151.8(C)(3)(B)(iii) (requiring specific type of health risk analysis for siting schools). 25 determine whether a particular EIR is sufficient as an informational document. A court determining whether an EIR's discussion of human health impacts is legally sufficient does not constitute imposing a new substantive requirement.19 Under Friant Ranch's theory, the above - referenced cases holding a CEQA analysis inadequate would have violated the law. This is not a reasonable interpretation. IV. COURTS MUST SCRUPULOUSLY ENFORCE THE REQUIREMENTS THAT LEAD AGENCIES CONSULT WITH AND OBTAIN COMMENTS FROM AIR DISTRICTS Courts must "scrupulously enforce" CEQA's legislatively mandated requirements. (Vineyard Area Citizens, supra, 40 Ca1.4th 412, 435.) Case law has firmly established that lead agencies must consult with the relevant air pollution control district before conducting an initial study, and must provide the districts with notice of the intention to adopt a negative declaration (or EIR). (Schenck v. County of Sonoma (2011) 198 Cal.App.4th 949, 958.) As Schenck held, neither publishing the notice nor providing it to the State Clearinghouse was a sufficient substitute for sending notice directly to the air district. (Id.) Rather, courts "must be satisfied that [administrative] agencies have fully complied with the procedural requirements of CEQA, since only in this way can the important public purposes of CEQA be protected from subversion." Schenck, 198 Cal.App.4th at p. 959 (citations omitted).20 19 We submit that Public Resources Code Section 21083.1 was intended to prevent courts from, for example, holding that an agency must analyze economic impacts of a project where there are no resulting environmental impacts (see CEQA Guidelines § 15131) , or imposing new procedural requirements, such as imposing additional public notice requirements not set forth in CEQA or the Guidelines. 20 Lead agencies must consult air districts, as public agencies with jurisdiction by law over resources affected by the project, before releasing an EIR. (Pub. Resources Code §§ 21104(a); 21153.) Moreover, air 26 Lead agencies should be aware, therefore, that failure to properly seek and consider input from the relevant air district constitutes legal error which may jeopardize their project approvals. For example, the court in Fall River Wild Trout Foundation v. County of Shasta, (1999) 70 Cal.App.4th 482, 492 held that the failure to give notice to a trustee agency (Department of Fish and Game) was prejudicial error requiring reversal. The court explained that the lack of notice prevented the Department from providing any response to the CEQA document. (Id. at p. 492.) It therefore prevented relevant information from being presented to the lead agency, which was prejudicial error because it precluded informed decision-making. (Id.)21 districts should be considered "state agencies" for purposes of the requirement to consult with "trustee agencies" as set forth in Public Resources Code § 20180.3(a). This Court has long ago held that the districts are not mere "local agencies" whose regulations are superseded by those of a state agency regarding matters of statewide concern, but rather have concurrent jurisdiction over such issues. (Orange County Air Pollution Control District v. Public Util. Com. (1971) 4 Cal.3d 945, 951, 954.) Since air pollution is a matter of statewide concern, Id at 952, air districts should be entitled to trustee agency status in order to ensure that this vital concern is adequately protected during the CEQA process. 21 In Schenck, the court concluded that failure to give notice to the air district was not prejudicial, but this was partly because the trial court had already corrected the error before the case arrived at the Court of Appeal. The trial court issued a writ of mandate requiring the lead agency to give notice to the air district. The air district responded by concurring with the lead agency that air impacts were not significant. (Schenck, 198 Cal.App.4th 949, 960.) We disagree with the Schenck court that the failure to give notice to the air district would not have been prejudicial (even in the absence of the trial court writ) merely because the lead agency purported to follow the air district's published CEQA guidelines for significance. (Id., 198 Cal.App.4th at p. 960.) In the first place, absent notice to the air district, it is uncertain whether the lead agency properly followed those guidelines. Moreover, it is not realistic to expect that an air district's published guidelines would necessarily fully address all possible air-quality related issues that can arise with a CEQA project, or that those 27 Similarly, lead agencies must obtain additional information requested by expert agencies, including those with jurisdiction by law, if that information is necessary to determine a project's impacts. (Sierra Club v. State Bd. Of Forestry (1994) 7 Cal.4th 1215, 1236-37.) Approving a project without obtaining that information constitutes a failure to proceed in the manner prescribed by CEQA. (Id. at p. 1236.) Moreover, a lead agency can save significant time and money by consulting with the air district early in the process. For example, the lead agency can learn what the air district recommends as an appropriate analysis on the facts of its case, including what kinds of health impacts analysis may be available, and what models are appropriate for use. This saves the lead agency from the need to do its analysis all over again and possibly needing to recirculate the document after errors are corrected, if new significant impacts are identified. (CEQA Guidelines § 15088.5(a).) At the same time, the air district's expert input can help the lead agency properly determine whether another commenter's request for additional analysis or studies is reasonable or feasible. Finally, the air district can provide input on what mitigation measures would be feasible and effective. Therefore, we suggest that this Court provide guidance to lead agencies reminding them of the importance of consulting with the relevant air districts regarding these issues. Otherwise, their feasibility decisions may be vulnerable to air district evidence that establishes that there is no substantial evidence to support the lead agency decision not to provide specific analysis. (See Berkeley Keep Jets Over the Bay, supra, 91 Cal.App.4th 1344, 1369-1371.) guidelines would necessarily be continually modified to reflect new developments. Therefore we believe that, had the trial court not already ordered the lead agency to obtain the air district's views, the failure to give notice would have been prejudicial, as in Fall River, supra, 70 Cal.App.4th 482, 492. 28 CONCLUSION The SCAQMD respectfully requests this Court not to establish a hard-and-fast rule concerning whether CEQA requires a lead agency to correlate identified air quality impacts of a project with resulting health outcomes. Moreover, the question of whether an EIR is "sufficient as an informational document" is a mixed question of fact and law containing two levels of inquiry. Whether a particular proposed analysis is feasible is predominantly a question of fact to be judged by the substantial evidence standard of review. Where the requested analysis is feasible, but the lead agency relies on legal or policy reasons not to provide it, the question of whether the EIR is nevertheless sufficient as an informational document is predominantly a question of law to be judged by the independent judgment standard of review. DATED: April 3, 2015 Respectfully submitted, SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT KURT R. WIESE, GENERAL COUNSEL BARBARA BAIRD, CHIEF DEPUTY COUNSEL By: 7(ja-Wjtk Barbara Baird Attorneys for Amicus Curiae SOUTH COAST AIR QUALITY MANAGEMENT DISTICT CERTIFICATE OF WORD COUNT Pursuant to Rule 8.520(c)(1) of the California Rules of Court, I hereby certify that this brief contains 8,476 words, including footnotes, but excluding the Application, Table of Contents, Table of Authorities, Certificate of Service, this Certificate of Word Count, and signature blocks. I have relied on the word count of the Microsoft Word Vista program used to prepare this Certificate. DATED: April 3, 2015 Respectfully submitted, Barbara Baird 1 PROOF OF SERVICE I am employed in the County of Los Angeles, California. I am over the age of 18 years and not a party to the within action. My business address is 21865 Copley Drive, Diamond Bar, California 91765. On April 3, 2015 I served true copies of the following document(s) described as APPLICATION OF THE SOUTH COAST AIR QUALITY MANAGEMENT DISTRICT FOR LEAVE TO FILE BRIEF OF AMICUS CURIAE IN SUPPORT OF NEITHER PARTY AND [PROPOSED] BRIEF OF AMICUS CURIAE by placing a true copy of the foregoing document(s) in a sealed envelope addressed as set forth on the attached service list as follows: BY MAIL: I enclosed the document(s) in a sealed envelope or package addressed to the persons at the addresses listed in the Service List and placed the envelope for collection and mailing following our ordinary business practices. I am readily familiar with this District's practice for collection and processing of correspondence for mailing. Under that practice, the correspondence would be deposited with the United States Postal Service, with postage thereon fully prepaid at Diamond Bar, California, in the ordinary course of business. I am aware that on motion of the party served, service is presumed invalid if postal cancellation date or postage meter date is more than one day after date of deposit for mailing in affidavit. I declare under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Executed on April 3, 2015 at D mond Bar, Ca fornia. Patricia Anders , n POS -1 SERVICE LIST James G. Moose, Tiffany K. Wright, Laura M. Harris REMY MOOSE MANLEY, LLP 555 Capitol Mall, Suite 800 Sacramento, CA 95814 Bryan N. Wagner WAGNER & WAGNER 7110 N. Fresno St, Suite 340 Fresno, CA 93720 Sara Hedgpeth-Harris LAW OFFICE OF SARA HEDGPETH-HARRIS 5445 E. Lane Avenue Fresno, CA 93727 Daniel C. Cederborg Bruce B. Johnson, Jr. Zachary Stephen Redmond OFFICE OF THE FRESNO COUNTY COUNSEL 2220 Tulare Street, Suite 500 Fresno, CA 93721 Clerk of the Court California Court of Appeal Fifth Appellate District 2424 Ventura Street Fresno, CA 93721 (via U.S. Mail & Electronic Transmission) Clerk of the Court Superior Court of California County of Fresno 1130 O Street Fresno, CA 93721 POS -2 Attorneys for Real Party in Interest and Respondent Friant Ranch, L.P. Attorney for Real Party in Interest and Respondent Friant Ranch, L.P. Attorney for Plaintiffs and Appellants Sierra Club, et al Attorneys for Respondents County of Fresno Travertine Specific Plan Air Quality Impact Analysis This page intentionally left blank 12188-05 AQ Report URBAN CROSSROADS