Loading...
Appendix H - Greenhouse Gas (GHG) Analysis ImpactAppendix H Greenhouse Gas Analysis Impact Urban Crossroads, 2021 Travertine SPA Draft EIR SCH# 201811023 Technical Appendices October 2023 Lly URBAI%1 CROSSROADS Travertine Specific Plan GREENHOUSE GAS ANALYSIS CITY OF LA QUINTA PREPARED BY: Haseeb Qureshi hqureshi@urbanxroads.com Alyssa Tamase atamase@urbanxroads.com OCTOBER 13, 2021 12188-05 GHG Report Travertine Specific Plan Greenhouse Gas Analysis TABLE OF CONTENTS TABLE OF CONTENTS 2 APPENDICES 3 LIST OF EXHIBITS 3 LIST OF TABLES 3 LIST OF ABBREVIATED TERMS 5 EXECUTIVE SUMMARY 1 ES.1 Summary of Findings 1 ES.2 Standard Regulatory Requirements 1 ES.3 Standard Regulatory Requirements 2 ES.4 Project Design Features (PDF) 2 1 INTRODUCTION 4 1.1 Site Location 4 1.2 Project Description 4 2 CLIMATE CHANGE SETTING 8 2.1 Introduction to Global Climate Change (GCC) 8 2.2 Global Climate Change Defined 8 2.3 GHGs 8 2.4 Global Warming Potential 15 2.5 GHG Emissions Inventories 15 2.6 Effects of Climate Change in California 16 2.7 Regulatory Setting 18 2.8 Discussion on Establishment of Significance Thresholds 38 3 PROJECT GREENHOUSE GAS IMPACT 41 3.1 Introduction 41 3.2 Standards of Significance 41 3.3 Methodology 41 3.4 Life -Cycle Analysis Not Required 42 3.5 Construction Emissions 42 3.6 Operational Emissions 53 3.7 Service Population 55 3.8 Emissions Summary 55 3.9 Greenhouse Gas Emissions Findings and Recommendations 56 4 REFERENCES 63 5 CERTIFICATIONS 67 12188-05 GHG Report ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDICES APPENDIX 3.1: CALEEMOD PHASE A CRUSHING EMISSIONS MODEL OUTPUTS APPENDIX 3.2: CALEEMOD PHASE A GRADING & TANK CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.3: CALEEMOD WELL #1 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.4: CALEEMOD WELL #2 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.5: CALEEMOD WELL #3 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.6: CALEEMOD WELL #4 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.7: CALEEMOD WELL #5 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.8: CALEEMOD WELL #6 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.9: CALEEMOD WELL #7 CONSTRUCTION EMISSIONS MODEL OUTPUTS APPENDIX 3.10: APPENDIX 3.11: APPENDIX 3.12: APPENDIX 3.13: APPENDIX 3.14: APPENDIX 3.15: APPENDIX 3.16: APPENDIX 3.17: APPENDIX 3.18: APPENDIX 3.19: APPENDIX 3.20: APPENDIX 3.21: APPENDIX 3.22: APPENDIX 3.23: APPENDIX 3.24: CALEEMOD WELL #8 CONSTRUCTION EMISSIONS MODEL OUTPUTS CALEEMOD WELL #9 CONSTRUCTION EMISSIONS MODEL OUTPUTS CALEEMOD SUBSTATION CONSTRUCTION EMISSIONS MODEL OUTPUTS CALEEMOD PHASE B CRUSHING EMISSIONS MODEL OUTPUTS CALEEMOD PHASE B GRADING EMISSIONS MODEL OUTPUTS CALEEMOD PHASE 1 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS CALEEMOD PHASE 2 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS CALEEMOD PHASE 3 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS CALEEMOD PHASE 1 OPERATIONAL EMISSIONS MODEL OUTPUTS CALEEMOD PHASE 2 OPERATIONAL EMISSIONS MODEL OUTPUTS CALEEMOD PHASE 3 OPERATIONAL EMISSIONS MODEL OUTPUTS RCEM MADISON AVENUE WITH WATER LINE EMISSIONS MODEL OUTPUTS RCEM AVENUE 62 WITH WATER LINE EMISSIONS MODEL OUTPUTS RCEM JEFFERSON WITH WATER LINE EMISSIONS MODEL OUTPUTS EMFAC2017 OUTPUTS LIST OF EXHIBITS EXHIBIT 1-A: LOCATION MAP 5 EXHIBIT 1-B: SITE PLAN 6 EXHIBIT 2-A: SUMMARY OF PROJECTED GLOBAL WARMING IMPACT, 2070-2099 (AS COMPARED WITH 1961-1990) 14 LIST OF TABLES TABLE ES -1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS 1 TABLE 2-1: GHGS 9 TABLE 2-2: GWP AND ATMOSPHERIC LIFETIME OF SELECT GHGS 15 TABLE 2-3: TOP GHG PRODUCING COUNTRIES AND THE EUROPEAN UNION 16 TABLE 3-1: CONSTRUCTION DURATION (1 OF 3) 44 TABLE 3-1: CONSTRUCTION DURATION (2 OF 3) 45 TABLE 3-1: CONSTRUCTION DURATION (3 OF 3) 46 TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (1 OF 7) 46 TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (2 OF 7) 47 TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (3 OF 7) 48 TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (4 OF 7) 49 TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (5 OF 7) 50 12188-05 GHG Report ( URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (6 OF 7) 51 TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (7 OF 7) 52 TABLE 3-3: AMORTIZED ANNUAL CONSTRUCTION EMISSIONS (1 OF 2) 52 TABLE 3-3: AMORTIZED ANNUAL CONSTRUCTION EMISSIONS (2 OF 2) 53 TABLE 3-4: PROJECT GHG EMISSIONS 55 TABLE 3-5: 2017 SCOPING PLAN CONSISTENCY SUMMARY 57 12188-05 GHG Report iv ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis LIST OF ABBREVIATED TERMS Percent (1) Reference °C Degrees Celsius °F Degrees Fahrenheit 2017 Scoping Plan Final 2017 Scoping Plan Update AB Assembly Bill AB 32 Global Warming Solutions Act of 2006 AB 1493 Pavley Fuel Efficiency Standards AB 1881 California Water Conservation in Landscaping Act of 2006 ACE Affordable Clean Energy Rule Annex I Industrialized Nations APA Administrative Procedure Act AQIA Orange Corporate Yard Affordable Housing Air Quality Impact Analysis BACT Best Available Control Technology BAU Business As Usual CF4 Tetrafluoromethane C2 F6 Hexafluoroethane C2H6 Ethane C2H2F4 1,1,1,2-Tetrafluroethane C2H4F2 Ethylidene Fluoride CH3CF2 1,1-Difluoroethane CAA Federal Clean Air Act CaIEEMod California Emissions Estimator Model CaIEPA California Environmental Protection Agency CALFIRE California Department of Forestry and Fire Protection CALGAPS California LBNL GHG Analysis of Policies Spreadsheet CALGreen CCR, Title 24, Part 11: California Green Building Standards Code CalRecycle California Recycling Market Development Act CaISTA California State Transportation Agency Caltrans California Department of Transportation CAPCOA California Air Pollution Control Officers Association CARB California Air Resource Board CBSC California Building Standards Commission CDFA California Department of Food and Agriculture 12188-05 GHG Report v ey URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis CEC California Energy Commission CCR California Code of Regulations CEQA California Environmental Quality Act CEQA Guidelines 2019 CEQA Statute and Guidelines CF4 Tetrafluoromethane CFC Chlorofluorocarbons CFR Code of Federal Regulations CH4 Methane CHF3 Carbon Trifluoride/Fluoroform CHF3 Carbon Trifluoride City City of La Quinta CN Neighborhood Commercial CNRA 2009 2009 California Climate Adaption Strategy CO Carbon Monoxide CO2 Carbon Dioxide CO2e Carbon Dioxide Equivalent Convention U.N.'s Framework Convention on Climate Change COP Conference of the Parties CPUC California Public Utilities Commission CT Tourist Commercial CTC California Transportation Commission DOF Department of Finance DWR Department of Water Resources EMFAC EMissions FACtor Model EPA Environmental Protection Agency EV Electric Vehicles FSOR Final Statement of Reasons GC Golf Course GCC Global Climate Change Gg Gigagram GHG Greenhouse Gas GHGA Greenhouse Gas Analysis GO -Biz Governor's Office of Business and Economic Development GWP Global Warming Potential H2O Water HDT Heavy -Duty Trucks HFC Hydrofluorocarbons (Bank Infrastructure and Economic Development Bank 12188-05 GHG Report vi ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis IPCC Intergovernmental Panel on Climate Change ISO Independent System Operator lbs Pounds LBNL Lawrence Berkeley National Laboratory LCA Life -Cycle Analysis LCFS Low Carbon Fuel Standard LEV-III Low -Emission Vehicle Program MD Medium -Duty Passenger Cars MDR Medium Density Residential MFR Multiple -Family Residential MMR Mandatory Reporting Rule MMTCO2e Million Metric Ton of Carbon Dioxide Equivalent mpg Miles Per Gallon MT/yr Metric Tons Per Year MTCO2e Metric Ton of Carbon Dioxide Equivalent MTCO2e/yr Metric Ton of Carbon Dioxide Equivalent Per Year MW Megawatts MWELO Model Water Efficient Landscape Ordinance MWh Megawatt Per Hour NHTSA National Highway Traffic Safety Administration NIOSH National Institute for Occupational Safety and Health N20 Nitrogen Dioxide/Nitrous Oxide NDC Nationally Determined Contributions NF3 Nitrogen Trifluoride NIOSH National Institute for Occupational Safety and Health NOx Nitrogen Oxides Non -Annex I Developing Nations OAL Office of Administrative Law PFC Perfluorocarbons ppb Parts Per Billion ppm Parts Per Million ppt Parts Per Trillion Project Travertine Specific Plan RL Low Density Residential RMH Medium -High Density Residential RPS Renewable Portfolio Standard SAR Second Assessment Report SB Senate Bill 12188-05 GHG Report VI1 ey URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis SB 32 California Global Warming Solutions Act of 2006 SB 350 Clean Energy and Pollution Reduction Act of 2015 SB 375 Sustainable Communities and Climate Protection Action of 2008 SB 1078 Renewable Portfolio Standards SB 1368 Statewide Retail Provider Emissions Performance Standards SCAQMD South Coast Air Quality Management District SCE Southern California Edison SF6 Sulfur Hexaflouride SGC Strategic Growth Council SLPS Short -Lived Climate Pollutant Strategy SWRCB State Water Resource Control Board Title 20 CCR Title 20: Appliance Energy Efficiency Standards Title 24 CCR Title 24 Part 6: California's Energy Efficiency Standards for Residential and Nonresidential Buildings U.N. United Nations U.S. United States U.S. Court U.S. Supreme Court UNFCCC United Nations' Framework Convention on Climate Change VFP Vehicle Fueling Position VMT Vehicle Miles Traveled WRI World Resources Institute ZE/NZE Zero and Near -Zero Emissions 12188-05 GHG Report VIII ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report ix ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis EXECUTIVE SUMMARY ES.1 SUMMARY OF FINDINGS The results of this Travertine Specific Plan Greenhouse Gas Analysis (GHGA) are summarized below based on the significance criteria in Section 3 of this report consistent with Appendix G of the California Environmental Quality Act (CEQA) Guidelines (1). Table ES -1 shows that the Project would result in less than significant greenhouse gas (GHG) impacts under CEQA. TABLE ES -1: SUMMARY OF CEQA SIGNIFICANCE FINDINGS Analysis Report Section Significance Findings Unmitigated Mitigated GHG Impact #1: Would the Project generate direct or indirect GHG emission that would result in a significant impact on the environment? 3.9 Potentially Significant Significant and Unavoidable GHG Impact #2: Would the Project conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of GHGs? 3.9 Less Than Significant n/a ES.2 STANDARD REGULATORY REQUIREMENTS The Project would be required to comply with regulations imposed by the State of California and the South Coast Air Quality Management District (SCAQMD) aimed at the reduction of air pollutant emissions. Those that are directly and indirectly applicable to the Project and that would assist in the reduction of GHG emissions include: • Global Warming Solutions Act of 2006 (Assembly Bill (AB) 32) (2). • Regional GHG Emissions Reduction Targets/Sustainable Communities Strategies (Senate Bill (SB) 375) (3). • Pavley Fuel Efficiency Standards (AB 1493). Establishes fuel efficiency ratings for new vehicles (4). • California Building Energy Efficiency Standards (Title 24, Part 6 of California Code of Regulations (CCR)). Establishes energy efficiency requirements for new construction (5). • Appliance Energy Efficiency Standards (Title 20 CCR). Establishes energy efficiency requirements for appliances (6). • Low Carbon Fuel Standard (LCFS). Requires carbon content of fuel sold in California to be 10 percent (%) less by 2020 (7). • California Water Conservation in Landscaping Act of 2006 (AB 1881). Requires local agencies to adopt the Department of Water Resources updated Water Efficient Landscape Ordinance or equivalent by January 1, 2010 to ensure efficient landscapes in new development and reduced water waste in existing landscapes (8). 12188-05 GHG Report 1 ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis • Statewide Retail Provider Emissions Performance Standards (SB 1368). Requires energy generators to achieve performance standards for GHG emissions (9). • Renewable Portfolio Standards (SB 1078 — also referred to as RPS). Requires electric corporations to increase the amount of energy obtained from eligible renewable energy resources to 20 % by 2010 and 33% by 2020 (10). • California Global Warming Solutions Act of 2006 (SB 32). Requires the state to reduce statewide GHG emissions to 40% below 1990 levels by 2030, a reduction target that was first introduced in Executive Order B-30-15 (11). Promulgated regulations that will affect the Project's emissions are accounted for in the Project's GHG calculations provided in this report. In particular, AB 1493, LCFS, and RPS, and therefore are accounted for in the Project's emission calculations. ES.3 STANDARD REGULATORY REQUIREMENTS South Coast Air Quality Management District (SCAQMD) Rules that are currently applicable during construction and operational activity for this Project include but are not limited to Rule 445 (Wood Burning Devices) (12). As such, credit for Rule 445 have been taken. SCAQMD RULE 445 Rule 445 is intended to reduce the emission of particulate matter from wood -burning devices (12). The Project is required to comply with SCAQMD Rule 445, which prohibits the use of wood burning stoves and fireplaces in new development (12). ES.4 PROJECT DESIGN FEATURES (PDF) Energy-saving and sustainable design features and operational programs would be incorporated. The Project also incorporates and expresses the following design features and attributes promoting energy efficiency and sustainability. Because these features/attributes are integral to the Project, and/or are regulatory requirements, they are not considered to be mitigation measures. • To reduce water demands and associated energy use, subsequent development proposals within the Project site would be required to implement a Water Conservation Strategy and demonstrate a minimum 20% reduction in indoor' and outdoor water usage. • In order to reduce the amount of waste disposed at landfills, the Project would be required to implement a 50% waste diversion as required by AB 939. 1 Reduction of 20% indoor water usage is consistent with the current CalGreen Building Code performance standards (see section 4.303.1) for residential and non-residential land uses. The outdoor watering reduction will be a requirement that is in the Specific Plan. 12188-05 GHG Report 2 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report 3 ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 1 INTRODUCTION This report presents the results of the GHGA prepared by Urban Crossroads, Inc., for the proposed Travertine Specific Plan (Project). The purpose of this GHGA is to evaluate Project - related construction and operational emissions and determine the level of GHG impacts as a result of constructing and operating the proposed Project. 1.1 SITE LOCATION The proposed Travertine Specific Plan Project is generally located south of the hypothetical westerly extension of Avenue 60 and west of the hypothetical southerly extension of Madison Street in the City of La Quinta, as shown on Exhibit 1-A. Bureau of Land Management land is located adjacent to the Project's southern boundary, Martinez Mountain is located to the southwest, and existing residential homes are located north and east of the Project site. 1.2 PROJECT DESCRIPTION At buildout, the proposed mixed-use Project consists of approximately 758 single family detached residential homes, 442 duplex residential units, a 100 -room resort hotel, and a golf course (12 holes). The preliminary land use plan for the proposed Project is shown on Exhibit 1- B. The Project is anticipated to be constructed in phases with the total development for each phase summarized below: • Phase 1 (2026) — 530 single family detached residential homes, 74 duplex residential units, and a golf course (12 holes). • Phase 2 (2029) —143 single family detached residential homes, and 163 duplex residential units. • Phase 3 (2031) —85 single family detached residential homes, 205 duplex residential units, and a 100 -room resort hotel. • Full Project Buildout —758 single family detached residential homes, 442 duplex residential units, a 100 -room resort hotel and a golf course (12 holes) The Travertine Project is proposed to be served by two access points: 1) the southerly extension of South Jefferson as a Modified Secondary, south of Avenue 58, and 2) the westerly extension of Avenue 62 as a Modified Secondary, west of Monroe Street. An emergency vehicle access (EVA) is provided via Madison Street, from the northerly boundary of the Project's Planning Area 18 to Avenue 60. 12188-05 GHG Report 4 ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Quarry At La Ouaita Fazio Ln`' '14 EXHIBIT 1-A: LOCATION MAP 581h Ave Cord Mountain Regional Park Aracena 4 alus'a4 Andalusia Country C lub Trilogy AI La Qumra t, s a i 2557.1 Rustic CanYonO� F1sh Tri Arc halo to Site. Sources: Esri, HERE, Garmin, intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster Nt., Ordnance Survey, Esri Japan, METI, Esri Chino (Hong Kong), (c) OpenStreetMap contributors, and the GIS 12188-05 GHG Report 5 `, URBAN CRQSSROADS Travertine Specific Plan Greenhouse Gas Analysis EXHIBIT 1-B: SITE PLAN Coral Mountain Efa IP PA -3 1 PA -5 ! } Ili 8sF: 2 CwNlwrliva+4ak, PHASE 1-A E401111411a440140 h.. Low! 1 .•c Arr., PA lyd Vw Ami D Imp Lew Omr11 Aniin+wl 234 1 5-1 3Ache Tarps A aIty T rt+ -1 Limn 1'Rl.• 19 7.9 73 .. .-I. lama I WI 442 11 R] 143 ►i.. 17 tar Elqiilw1141.4wali 32.2 IS41 rae taw t7poly 1A.aIdd1A 211.7 134_3 Ache 211 la7 Ill., : Ill. 1.1 11 a 394 We Hew* ilarde»41 ftp 1-7-4-3 dalia 14 1.1 A3 taw MEW Rewi rl4b 249 1S-4.5 ids' 0149 ELAM1iiral.dla 27.1 13-A 21 44 : 9 19 (lira times lt.a..rsa. Owe kart 4a.rW Wil : 20 maw I.4 Think 3311 94 Ai 14 111 Pii:tS F: 141 Com uucsiabfSal}i M iced i x Arm Drat} stupe 7FrM I/ra.i¢ T�YhK1 Pala Lila. 3 C.O. 1Mwnry Rewkab.l Ha 1 Shu dWac lair RMay ROM id 11.7 Ii -&S 1-1-1.34the 1.4 31 7 3.2 41 lurAT ila.dd I.3 2 +-1 73 04,111 14-1 -134911t Moban Aadq RaHmlYl 141 di -UMW lar Oar*kaiioril 122.4 IA-43blac 9 3.6 74 HA XL 26 CwUwteBlaa10hl 14,7 II , For WI/4M. 117 LI 966 Coral Mountain Efa IP PA -3 1 PA -5 ! } Ili 8sF: 2 CwNlwrliva+4ak, PHASE 3 roa.rlctkersalr, h.. Low! 1 .•c Arr., (5.•.+d) 114.1+ T.rgi I.rs.l . ..er 9_11- 154.18aT 7i 77 .. .-I. 20.1 151341rac R] 143 ►i.. 3141 I3-i3brri J 11a Ill., : Ill. Al KO 394 ate 4 PA -16 PA -10 PA -19 WATER rAbtiAs _ -J 11l'DISP111 Sr VA .43409111 6t 12188-05 GHG Report 6 ey URBAN CROSSROADS PHASE 3 roa.rlctkersalr, [. r,c. 14.E h. LAW I'm tarn Bradt. u..ar n....n t .I.. ►i.. x....t' .r. [k • KO l4.Man Slaw.RaiiAmr :5 9 1 5-1 5 LIL. 305 I len. raa.iry l..1.lrenal :4.4 1 3.1 5 e6,. ac : 9 1.5 (lira times lt.a..rsa. 1 1 1 R.. w T.wh 111.; 14 111 119 ate 4 PA -16 PA -10 PA -19 WATER rAbtiAs _ -J 11l'DISP111 Sr VA .43409111 6t 12188-05 GHG Report 6 ey URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report 7 ��► URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 2 CLIMATE CHANGE SETTING 2.1 INTRODUCTION TO GLOBAL CLIMATE CHANGE (GCC) GCC is defined as the change in average meteorological conditions on the earth with respect to temperature, precipitation, and storms. The majority of scientists believe that the climate shift taking place since the Industrial Revolution is occurring at a quicker rate and magnitude than in the past. Scientific evidence suggests that GCC is the result of increased concentrations of GHGs in the earth's atmosphere, including carbon dioxide (CO2), methane (CH4), nitrous oxide (N20), and fluorinated gases. The majority of scientists believe that this increased rate of climate change is the result of GHGs resulting from human activity and industrialization over the past 200 years. An individual project like the proposed Project evaluated in this GHGA cannot generate enough GHG emissions to affect a discernible change in global climate. However, the proposed Project may participate in the potential for GCC by its incremental contribution of GHGs combined with the cumulative increase of all other sources of GHGs, which when taken together constitute potential influences on GCC. Because these changes may have serious environmental consequences, Section 3.0 will evaluate the potential for the proposed Project to have a significant effect upon the environment as a result of its potential contribution to the greenhouse effect. 2.2 GLOBAL CLIMATE CHANGE DEFINED GCC refers to the change in average meteorological conditions on the earth with respect to temperature, wind patterns, precipitation and storms. Global temperatures are regulated by naturally occurring atmospheric gases such as water vapor, CO2, N20, CH4, hydrofluorocarbons (HFCs), perfluorocarbons (PFCs), and sulfur hexafluoride (SF6). These particular gases are important due to their residence time (duration they stay) in the atmosphere, which ranges from 10 years to more than 100 years. These gases allow solar radiation into the earth's atmosphere, but prevent radioactive heat from escaping, thus warming the earth's atmosphere. GCC can occur naturally as it has in the past with the previous ice ages. Gases that trap heat in the atmosphere are often referred to as GHGs. GHGs are released into the atmosphere by both natural and anthropogenic activity. Without the natural GHG effect, the earth's average temperature would be approximately 61 degrees Fahrenheit (°F) cooler than it is currently. The cumulative accumulation of these gases in the earth's atmosphere is considered to be the cause for the observed increase in the earth's temperature. 2.3 GHGs 2.3.1 GHGs AND HEALTH EFFECTS GHGs trap heat in the atmosphere, creating a GHG effect that results in global warming and climate change. Many gases demonstrate these properties and as discussed in Table 2-1. For the purposes of this analysis, emissions of CO2, CH4, and N20 were evaluated (see Table 3-1 later in this report) because these gases are the primary contributors to GCC from development projects. 12188-05 GHG Report 8 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Although there are other substances such as fluorinated gases that also contribute to GCC, these fluorinated gases were not evaluated as their sources are not well-defined and do not contain accepted emissions factors or methodology to accurately calculate these gases. TABLE 2-1: GHGS GHGs Description Sources Health Effects Water Water is the most abundant, important, and variable GHG in The main source of water vapor is There are no known direct health effects related to the atmosphere. Water vapor is evaporation from water vapor at this time. It not considered a pollutant; in the oceans should be noted however the atmosphere it maintains a (approximately that when some pollutants climate necessary for life. 85%). Other sources react with water vapor, the Changes in its concentration are include evaporation reaction forms a transport primarily considered to be a from other water mechanism for some of result of climate feedbacks bodies, sublimation these pollutants to enter the related to the warming of the (change from solid to human body through water atmosphere rather than a direct result of industrialization. A climate feedback is an indirect, or secondary, change, either positive or negative, that occurs within the climate system in response to a forcing mechanism. The feedback loop in which water is involved is critically important to projecting future climate change. gas) from sea ice and snow, and transpiration from plant leaves. vapor. As the temperature of the atmosphere rises, more water is evaporated from ground storage (rivers, oceans, reservoirs, soil). Because the air is warmer, the relative humidity can be higher (in essence, the air is able to 'hold' more water when it is warmer), leading to more water vapor in the atmosphere. As a GHG, the higher concentration of water vapor is then able to absorb more thermal indirect energy radiated from the Earth, thus further warming the atmosphere. The warmer atmosphere can then hold more water vapor and so on and so on. This is referred to as a "positive feedback loop." The extent to which this positive feedback loop will continue is 12188-05 GHG Report 9 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis GHGs Description Sources Health Effects unknown as there are also dynamics that hold the positive feedback loop in check. As an example, when water vapor increases in the atmosphere, more of it will eventually condense into clouds, which are more able to reflect incoming solar radiation (thus allowing less energy to reach the earth's surface and heat it up) (13). CO2 CO2 is an odorless and colorless CO2 is emitted from Outdoor levels of CO2 are not GHG. Since the industrial natural and high enough to result in revolution began in the mid- manmade sources. negative health effects. 1700s, the sort of human activity Natural sources that increases GHG emissions include: the According to the National has increased dramatically in decomposition of Institute for Occupational scale and distribution. Data dead organic matter; Safety and Health (NIOSH) from the past 50 years suggests respiration of high concentrations of CO2 a corollary increase in levels and concentrations. As an example, prior to the industrial revolution, CO2 concentrations were fairly stable at 280 parts per million (ppm). Today, they are around bacteria, plants, animals and fungus; evaporation from oceans; and volcanic outgassing. Anthropogenic can result in health effects such as: headaches, dizziness, restlessness, difficulty breathing, sweating, increased heart 370 ppm, an increase of more sources include: the rate, increased cardiac than 30%. Left unchecked, the concentration of CO2 in the atmosphere is projected to increase to a minimum of 540 burning of coal, oil, natural gas, and wood. CO2 is naturally removed output, increased blood pressure, coma, asphyxia, and/or convulsions. It should ppm by 2100 as a direct result of from the air by be noted that current anthropogenic sources (14). photosynthesis, dissolution into ocean water, transfer to soils and ice caps, and chemical weathering of carbonate rocks (15). concentrations of CO2 in the earth's atmosphere are estimated to be approximately 370 ppm, the actual reference exposure level (level at which adverse health effects typically occur) is at exposure levels of 5,000 ppm averaged over 10 hours in a 40 -hour workweek and short-term reference exposure levels of 30,000 ppm averaged over a 15 minute period (16). 12188-05 GHG Report 10 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis GHGs Description Sources Health Effects CH4 CH4 is an extremely effective absorber of radiation, although its atmospheric concentration is less than CO2and its lifetime in the atmosphere is brief (10-12 years), compared to other GHGs. CH4 has both natural and anthropogenic sources. It is released as part of the biological processes in low oxygen environments, such as in swamplands or in rice production (at the roots of the plants). Over the last 50 years, human activities such as growing rice, raising cattle, using natural gas, and mining coal have added to the atmospheric concentration of CH4. Other anthropocentric sources include fossil -fuel combustion and biomass burning (17). CH4 is extremely reactive with oxidizers, halogens, and other halogen -containing compounds. Exposure to high levels of CH4 can cause asphyxiation, loss of consciousness, headache and dizziness, nausea and vomiting, weakness, loss of coordination, and an increased breathing rate. N20 N20, also known as laughing gas, is a colorless GHG. Concentrations of N20 also began to rise at the beginning of the industrial revolution. In 1998, the global concentration was 314 parts per billion (ppb). N20 is produced by microbial processes in soil and water, including those reactions which occur in fertilizer containing nitrogen. In addition to agricultural sources, some industrial processes (fossil fuel -fired power plants, nylon production, nitric acid production, and vehicle emissions) also contribute to its atmospheric load. It is used as an aerosol spray propellant, i.e., in whipped cream bottles. It is also N20 can cause dizziness, euphoria, and sometimes slight hallucinations. In small doses, it is considered harmless. However, in some cases, heavy and extended use can cause Olney's Lesions (brain damage) (18). 12188-05 GHG Report 11 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis GHGs Description Sources Health Effects used in potato chip bags to keep chips fresh. It is used in rocket engines and in race cars. N20 can be transported into the stratosphere, be deposited on the earth's surface, and be converted to other compounds by chemical reaction (18). Chlorofluorocarbons CFCs are gases formed CFCs have no natural In confined indoor locations, (CFCs) synthetically by replacing all source but were first working with CFC -113 or hydrogen atoms in CH4 or ethane synthesized in 1928. They were used for other CFCs is thought to result in death by cardiac (C2H6) with chlorine and/or refrigerants, aerosol arrhythmia (heart frequency fluorine atoms. CFCs are propellants and too high or too low) or nontoxic, nonflammable, insoluble and chemically unreactive in the troposphere (the level of air at the earth's surface). cleaning solvents. Due to the discovery that they are able to destroy stratospheric ozone, a global effort to halt their production was undertaken and was extremely successful, so much so that levels of the major CFCs are now remaining steady or declining. However, their long atmospheric lifetimes mean that some of the CFCs will remain in the atmosphere for over asphyxiation. 100 years (19). 12188-05 GHG Report 12 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis GHGs Description Sources Health Effects HFCs HFCs are synthetic, man-made chemicals that are used as a substitute for CFCs. Out of all the GHGs, they are one of three groups with the highest global warming potential (GWP). The HFCs with the largest measured atmospheric abundances are (in order), fluoroform (CHF3), 1,1,1,2-tetrafluoroethane (CH2FCF), and 1,1-difluoroethane (CH3CF2). Prior to 1990, the only significant emissions were of CHF3. CH2FCF emissions are increasing due to its use as a refrigerant. HFCs are manmade for applications such as automobile air conditioners and refrigerants. No health effects are known to result from exposure to HFCs. PFCs PFCs have stable molecular structures and do not break down through chemical processes in the lower atmosphere. High-energy ultraviolet rays, which occur about 60 kilometers above earth's surface, are able to destroy the compounds. Because of this, PFCs have very long lifetimes, between 10,000 and 50,000 years. Two common PFCs are tetrafluoromethane (CF4) and hexafluoroethane (C2F6). The EPA estimates that concentrations of CF4 in the atmosphere are over 70 parts per trillion (ppt). The two main sources of PFCs are primary aluminum production and semiconductor manufacture. No health effects are known to result from exposure to PFCs. SF6 SF6 is an inorganic, odorless, colorless, nontoxic, nonflammable gas. It also has the highest GWP of any gas evaluated (23,900) (20). The EPA indicates that concentrations in the 1990s were about 4 ppt. SF6 is used for insulation in electric power transmission and distribution equipment, in the magnesium industry, in semiconductor manufacturing, and as a tracer gas for leak detection. In high concentrations in confined areas, the gas presents the hazard of suffocation because it displaces the oxygen needed for breathing. 12188-05 GHG Report 13 (2) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis GHGs Description Sources Health Effects Nitrogen Trifluoride NF3 is a colorless gas with a NF3 is used in Long-term or repeated (NF3) distinctly moldy odor. The World industrial processes exposure may affect the liver Resources Institute (WRI) and is produced in and kidneys and may cause indicates that NF3 has a 100 -year GWP of 17,200 (21). the manufacturing of semiconductors, Liquid Crystal Display fluorosis (22). (LCD) panels, types of solar panels, and chemical lasers. The potential health effects related directly to the emissions of CO2, CH4, and N20 as they relate to development projects such as the proposed Project are still being debated in the scientific community. Their cumulative effects to GCC have the potential to cause adverse effects to human health. Increases in Earth's ambient temperatures would result in more intense heat waves, causing more heat -related deaths. Scientists also purport that higher ambient temperatures would increase disease survival rates and result in more widespread disease. Climate change will likely cause shifts in weather patterns, potentially resulting in devastating droughts and food shortages in some areas (23). Exhibit 2-A presents the potential impacts of global warming (24). EXHIBIT 2-A: SUMMARY OF PROJECTED GLOBAL WARMING IMPACT, 2070-2099 (As COMPARED WITH 1961-1990) Higher Emissions Scenario Medium - High Emissions Scenario Lower Emissions Scenario 13"F 12 11 Higher 10 Warming Range (8-10.5°F) Medium Warming Range (5.5-8°F) Lower Warming Range (3-5.5°F) • 90% loss in Sierra snowpack • 22-30 inches of sea level rise 3-4 times as many heat wave days in major urban centers 4-6 times as many heat -related deaths in major urban centers 2.5 times more critically dry years lb20% increase in energy demand • 70-80% loss in Sierra snowpack • 14-22 inches of sea level rise • 2.5-4 times as many heat wave days in major urban centers • 2-6 times as many heat -related deaths in major urban centers • 75-85% increase in days conducive to ozone formation* • 2-2.5 times more critically dry years • 10% increase in electricity demand • 30% decrease in forest yields (pine) • 55% increase in the expected risk of large wildfires • 30-60% loss in Sierra snowpack • 6-14 inches of sea level rise • 2-2.5 times as many heat wave days in major urban centers • 2-3 times as many heat -related deaths in major urban centers • 25-35% increase in days conducive to ozone formation* • Up to 1.5 times more critically dry years • 3-6% increase in electricity demand • 7-14%decrease in forest yields (pine) • 10-35% increase in the risk of large wildfires " For high ozone locations in Los Angeles (Riverside) and the San Joaquin Valley (Visalia) Source: Barbara H. Allen -Diaz. "Climate change affects us all." University of California, Agriculture and Natural Resources, 2009. 12188-05 GHG Report 14 (_mo)URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 2.4 GLOBAL WARMING POTENTIAL GHGs have varying GWP values. GWP of a GHG indicates the amount of warming a gas causes over a given period of time and represents the potential of a gas to trap heat in the atmosphere. CO2 is utilized as the reference gas for GWP, and thus has a GWP of 1. CO2 equivalent (CO2e) is a term used for describing the difference GHGs in a common unit. CO2e signifies the amount of CO2 which would have the equivalent GWP. The atmospheric lifetime and GWP of selected GHGs are summarized at Table 2-2. As shown in the table below, GWP for the Second Assessment Report (SAR), the Intergovernmental Panel on Climate Change (IPCC)'s scientific and socio-economic assessment on climate change, range from 1 for CO2 to 23,900 for SF6 and GWP for the IPCC's 5th Assessment Report range from 1 for CO2 to 23,500 for SF6 (25). TABLE 2-2: GWP AND ATMOSPHERIC LIFETIME OF SELECT GHGS Gas Atmospheric Lifetime (years) Global Warming Potential (100 -year time horizon) 2nd SAR 5th SAR CO2 See* 1 1 CH4 12 .4 21 28 N20 121 310 265 HFC -23 222 11,700 12,400 HFC -134a 13.4 1,300 1,300 HFC -152a 1.5 140 138 SF6 3,200 23,900 23,500 *As per Appendix 8.A. of IPCC's 5th Assessment Report, no single lifetime can be given. Source: Table 2.14 of the IPCC Fourth Assessment Report, 2007 2.5 GHG EMISSIONS INVENTORIES 2.5.1 GLOBAL Worldwide anthropogenic GHG emissions are tracked by the IPCC for industrialized nations (referred to as Annex I) and developing nations (referred to as Non -Annex I). Human GHG emissions data for Annex I nations are available through 2017. Based on the latest available data, the sum of these emissions totaled approximately 29,216,501 gigagram (Gg) CO2e2 (26) (27) as summarized on Table 2-3. 2 The global emissions are the sum of Annex I and non -Annex I countries, without counting Land -Use, Land -Use Change and Forestry (LULUCF). For countries without 2017 data, the United Nations' Framework Convention on Climate Change (UNFCCC) data for the most recent year were used. United Nations Framework Convention on Climate Change, "Annex I Parties — GHG total without LULUCF," The most recent GHG emissions for China and India are from 2014. 12188-05 GHG Report 15 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 2.5.2 UNITED STATES As noted in Table 2-3, the United States, as a single country, was the number two producer of GHG emissions in 2017. TABLE 2-3: TOP GHG PRODUCING COUNTRIES AND THE EUROPEAN UNION 3 Emitting Countries GHG Emissions (Gg COze) China 11,911,710 United States 6,456,718 European Union (28 -member countries) 4,323,163 India 3,079,810 Russian Federation 2,155,470 Japan 1,289,630 Total 29,216,501 2.5.3 STATE OF CALIFORNIA California has significantly slowed the rate of growth of GHG emissions due to the implementation of energy efficiency programs as well as adoption of strict emission controls, but is still a substantial contributor to the United States (U.S.) emissions inventory total (28). The California Air Resource Board (CARB) compiles GHG inventories for the State of California. Based upon the 2019 GHG inventory data (i.e., the latest year for which data are available) for the 2000- 2017 GHG emissions period, California emitted an average 424.1 million metric tons of CO2e per year (MMTCO2e/yr) (29). 2.6 EFFECTS OF CLIMATE CHANGE IN CALIFORNIA 2.6.1 PUBLIC HEALTH Higher temperatures may increase the frequency, duration, and intensity of conditions conducive to air pollution formation. For example, days with weather conducive to ozone formation could increase from 25 to 35% under the lower warming range to 75 to 85% under the medium warming range. In addition, if global background ozone levels increase as predicted in some scenarios, it may become impossible to meet local air quality standards. Air quality could be further compromised by increases in wildfires, which emit fine particulate matter that can travel long distances, depending on wind conditions. The Climate Scenarios report indicates that large wildfires could become up to 55% more frequent if GHG emissions are not significantly reduced. In addition, under the higher warming range scenario, there could be up to 100 more days per year with temperatures above 90°F in Los Angeles and 95°F in Sacramento by 2100. This is a large increase over historical patterns and approximately twice the increase projected if temperatures 3 Used http://unfccc.int data for Annex I countries. Consulted the CAIT Climate Data Explorer in https://www.climatewatchdata.orq site to reference Non -Annex I countries of China and India. 12188-05 GHG Report 16 Lei URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis remain within or below the lower warming range. Rising temperatures could increase the risk of death from dehydration, heat stroke/exhaustion, heart attack, stroke, and respiratory distress caused by extreme heat. 2.6.2 WATER RESOURCES A vast network of man-made reservoirs and aqueducts captures and transports water throughout the state from northern California rivers and the Colorado River. The current distribution system relies on Sierra Nevada snowpack to supply water during the dry spring and summer months. Rising temperatures, potentially compounded by decreases in precipitation, could severely reduce spring snowpack, increasing the risk of summer water shortages. If temperatures continue to increase, more precipitation could fall as rain instead of snow, and the snow that does fall could melt earlier, reducing the Sierra Nevada spring snowpack by as much as 70 to 90%. Under the lower warming range scenario, snowpack losses could be only half as large as those possible if temperatures were to rise to the higher warming range. How much snowpack could be lost depends in part on future precipitation patterns, the projections for which remain uncertain. However, even under the wetter climate projections, the loss of snowpack could pose challenges to water managers and hamper hydropower generation, which could adversely affect winter tourism. Under the lower warming range, the ski season at lower elevations could be reduced by as much as a month. If temperatures reach the higher warming range and precipitation declines, there might be many years with insufficient snow for skiing and snowboarding. The State's water supplies are also at risk from rising sea levels. An influx of saltwater could degrade California's estuaries, wetlands, and groundwater aquifers. Saltwater intrusion caused by rising sea levels is a major threat to the quality and reliability of water within the southern edge of the Sacramento/San Joaquin River Delta — a major fresh water supply. 2.6.3 AGRICULTURE Increased temperatures could cause widespread changes to the agriculture industry reducing the quantity and quality of agricultural products statewide. First, California farmers could possibly lose as much as 25% of the water supply needed. Although higher CO2 levels can stimulate plant production and increase plant water -use efficiency, California's farmers could face greater water demand for crops and a less reliable water supply as temperatures rise. Crop growth and development could change, as could the intensity and frequency of pest and disease outbreaks. Rising temperatures could aggravate ozone pollution, which makes plants more susceptible to disease and pests and interferes with plant growth. Plant growth tends to be slow at low temperatures, increasing with rising temperatures up to a threshold. However, faster growth can result in less -than -optimal development for many crops, so rising temperatures could worsen the quantity and quality of yield for a number of California's agricultural products. Products likely to be most affected include wine grapes, fruits and nuts. In addition, continued GCC could shift the ranges of existing invasive plants and weeds and alter competition patterns with native plants. Range expansion could occur in many species while 12188-05 GHG Report 17 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis range contractions may be less likely in rapidly evolving species with significant populations already established. Should range contractions occur, new or different weed species could fill the emerging gaps. Continued GCC could alter the abundance and types of many pests, lengthen pests' breeding season, and increase pathogen growth rates. 2.6.4 FORESTS AND LANDSCAPES GCC has the potential to intensify the current threat to forests and landscapes by increasing the risk of wildfire and altering the distribution and character of natural vegetation. If temperatures rise into the medium warming range, the risk of large wildfires in California could increase by as much as 55%, which is almost twice the increase expected if temperatures stay in the lower warming range. However, since wildfire risk is determined by a combination of factors, including precipitation, winds, temperature, and landscape and vegetation conditions, future risks will not be uniform throughout the state. In contrast, wildfires in northern California could increase by up to 90% due to decreased precipitation. Moreover, continued GCC has the potential to alter natural ecosystems and biological diversity within the state. For example, alpine and subalpine ecosystems could decline by as much as 60 to 80% by the end of the century as a result of increasing temperatures. The productivity of the state's forests has the potential to decrease as a result of GCC. Rising Sea Levels Rising sea levels, more intense coastal storms, and warmer water temperatures could increasingly threaten the state's coastal regions. Under the higher warming range scenario, sea level is anticipated to rise 22 to 35 inches by 2100. Elevations of this magnitude would inundate low-lying coastal areas with saltwater, accelerate coastal erosion, threaten vital levees and inland water systems, and disrupt wetlands and natural habitats. Under the lower warming range scenario, sea level could rise 12-14 inches. 2.7 REGULATORY SETTING 2.7.1 INTERNATIONAL Climate change is a global issue involving GHG emissions from all around the world; therefore, countries such as the ones discussed below have made an effort to reduce GHGs. In 1988, the United Nations (U.N.) and the World Meteorological Organization established the IPCC to assess the scientific, technical and socioeconomic information relevant to understanding the scientific basis of risk of human -induced climate change, its potential impacts, and options for adaptation and mitigation. UNITED NATION'S FRAMEWORK CONVENTION ON CLIMATE CHANGE (CONVENTION) On March 21, 1994, the U.S. joined a number of countries around the world in signing the Convention. Under the Convention, governments gather and share information on GHG emissions, national policies, and best practices; launch national strategies for addressing GHG 12188-05 GHG Report 18 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis emissions and adapting to expected impacts, including the provision of financial and technological support to developing countries; and cooperate in preparing for adaptation to the impacts of climate change. INTERNATIONAL CLIMATE CHANGE TREATIES The Kyoto Protocol is an international agreement linked to the Convention. The major feature of the Kyoto Protocol is that it sets binding targets for 37 industrialized countries and the European community for reducing GHG emissions at an average of 5% against 1990 levels over the five-year period 2008-2012. The Convention (as discussed above) encouraged industrialized countries to stabilize emissions; however, the Protocol commits them to do so. Developed countries have contributed more emissions over the last 150 years; therefore, the Protocol places a heavier burden on developed nations under the principle of "common but differentiated responsibilities." In 2001, President George W. Bush indicated that he would not submit the treaty to the U.S. Senate for ratification, which effectively ended American involvement in the Kyoto Protocol. In December 2009, international leaders met in Copenhagen to address the future of international climate change commitments post -Kyoto. No binding agreement was reached in Copenhagen; however, the Committee identified the long-term goal of limiting the maximum global average temperature increase to no more than 2 degrees Celsius (°C) above pre -industrial levels, subject to a review in 2015. The UN Climate Change Committee held additional meetings in Durban, South Africa in November 2011; Doha, Qatar in November 2012; and Warsaw, Poland in November 2013. The meetings are gradually gaining consensus among participants on individual climate change issues. On September 23, 2014 more than 100 Heads of State and Government and leaders from the private sector and civil society met at the Climate Summit in New York hosted by the U.N. At the Summit, heads of government, business and civil society announced actions in areas that would have the greatest impact on reducing emissions, including climate finance, energy, transport, industry, agriculture, cities, forests, and building resilience. Parties to the U.N. Framework Convention on Climate Change (UNFCCC) reached a landmark agreement on December 12, 2015 in Paris, charting a fundamentally new course in the two - decade -old global climate effort. Culminating a four-year negotiating round, the new treaty ends the strict differentiation between developed and developing countries that characterized earlier efforts, replacing it with a common framework that commits all countries to put forward their best efforts and to strengthen them in the years ahead. This includes, for the first time, requirements that all parties report regularly on their emissions and implementation efforts and undergo international review. The agreement and a companion decision by parties were the key outcomes of the conference, known as the 21st session of the UNFCCC Conference of the Parties (COP) 21. Together, the Paris Agreement and the accompanying COP decision: • Reaffirm the goal of limiting global temperature increase well below 2°C, while urging efforts to limit the increase to 1.5 degrees; 12188-05 GHG Report 19 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis • Establish binding commitments by all parties to make "nationally determined contributions" (NDCs), and to pursue domestic measures aimed at achieving them; • Commit all countries to report regularly on their emissions and "progress made in implementing and achieving" their NDCs, and to undergo international review; • Commit all countries to submit new NDCs every five years, with the clear expectation that they will "represent a progression" beyond previous ones; • Reaffirm the binding obligations of developed countries under the UNFCCC to support the efforts of developing countries, while for the first time encouraging voluntary contributions by developing countries too; • Extend the current goal of mobilizing $100 billion a year in support by 2020 through 2025, with a new, higher goal to be set for the period after 2025; • Extend a mechanism to address "loss and damage" resulting from climate change, which explicitly will not "involve or provide a basis for any liability or compensation;" • Require parties engaging in international emissions trading to avoid "double counting;" and • Call for a new mechanism, similar to the Clean Development Mechanism under the Kyoto Protocol, enabling emission reductions in one country to be counted toward another country's NDC (C2ES 2015a) (30). On November 4, 2019, the Trump administration formally notified the U.N. that the United States would withdraw from the Paris Agreement. It should be noted that withdrawal would be effective one year after notification in 2020. 2.7.2 NATIONAL Prior to the last decade, there have been no concrete federal regulations of GHGs or major planning for climate change adaptation. The following are actions regarding the federal government, GHGs, and fuel efficiency. GHG ENDANGERMENT In Massachusetts v. Environmental Protection Agency (EPA) 549 U.S. 497 (2007), decided on April 2, 2007, the United States Supreme Court (U.S. Court) found that four GHGs, including CO2, are air pollutants subject to regulation under Section 202(a)(1) of the Federal Clean Air Act (CAA). The Court held that the EPA Administrator must determine whether emissions of GHGs from new motor vehicles cause or contribute to air pollution, which may reasonably be anticipated to endanger public health or welfare, or whether the science is too uncertain to make a reasoned decision. On December 7, 2009, the EPA Administrator signed two distinct findings regarding GHGs under section 202(a) of the CAA: • Endangerment Finding: The Administrator finds that the current and projected concentrations of the six key well -mixed GHGs— CO2, CH4, N20, HFCs, PFCs, and SF6—in the atmosphere threaten the public health and welfare of current and future generations. • Cause or Contribute Finding: The Administrator finds that the combined emissions of these well - mixed GHGs from new motor vehicles and new motor vehicle engines contribute to the GHG pollution, which threatens public health and welfare. 12188-05 GHG Report 20 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis These findings do not impose requirements on industry or other entities. However, this was a prerequisite for implementing GHG emissions standards for vehicles, as discussed in the section "Clean Vehicles" below. After a lengthy legal challenge, the U.S. Court declined to review an Appeals Court ruling that upheld the EPA Administrator's findings (31). CLEAN VEHICLES Congress first passed the Corporate Average Fuel Economy law in 1975 to increase the fuel economy of cars and light duty trucks. The law has become more stringent over time. On May 19, 2009, President Obama put in motion a new national policy to increase fuel economy for all new cars and trucks sold in the U.S. On April 1, 2010, the EPA and the Department of Transportation's National Highway Traffic Safety Administration (NHTSA) announced a joint final rule establishing a national program that would reduce GHG emissions and improve fuel economy for new cars and trucks sold in the U.S. The first phase of the national program applies to passenger cars, light-duty trucks, and medium - duty (MD) passenger vehicles, covering model years 2012 through 2016. They require these vehicles to meet an estimated combined average emissions level of 250 grams of CO2 per mile, equivalent to 35.5 miles per gallon (mpg) if the automobile industry were to meet this CO2 level solely through fuel economy improvements. Together, these standards would cut CO2 emissions by an estimated 960 million metric tons and 1.8 billion barrels of oil over the lifetime of the vehicles sold under the program (model years 2012-2016). The EPA and the NHTSA issued final rules on a second -phase joint rulemaking establishing national standards for light-duty vehicles for model years 2017 through 2025 in August 2012. The new standards for model years 2017 through 2025 apply to passenger cars, light-duty trucks, and MD passenger vehicles. The final standards are projected to result in an average industry fleetwide level of 163 grams/mile of CO2 in model year 2025, which is equivalent to 54.5 mpg if achieved exclusively through fuel economy improvements. The EPA and the U.S. Department of Transportation issued final rules for the first national standards to reduce GHG emissions and improve fuel efficiency of heavy-duty trucks (HDT) and buses on September 15, 2011, effective November 14, 2011. For combination tractors, the agencies are proposing engine and vehicle standards that begin in the 2014 model year and achieve up to a 20% reduction in CO2 emissions and fuel consumption by the 2018 model year. For HDT and vans, the agencies are proposing separate gasoline and diesel truck standards, which phase in starting in the 2014 model year and achieve up to a 10% reduction for gasoline vehicles and a 15% reduction for diesel vehicles by the 2018 model year (12 and 17% respectively if accounting for air conditioning leakage). Lastly, for vocational vehicles, the engine and vehicle standards would achieve up to a 10% reduction in fuel consumption and CO2 emissions from the 2014 to 2018 model years. On April 2, 2018, the EPA signed the Mid-term Evaluation Final Determination, which finds that the model year 2022-2025 GHG standards are not appropriate and should be revised (32). This Final Determination serves to initiate a notice to further consider appropriate standards for model year 2022-2025 light-duty vehicles. On August 24, 2018, the EPA and NHTSA published a 12188-05 GHG Report 21 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis proposal to freeze the model year 2020 standards through model year 2026 and to revoke California's waiver under the CAA to establish more stringent standards (33). MANDATORY REPORTING OF GHGs The Consolidated Appropriations Act of 2008, passed in December 2007, requires the establishment of mandatory GHG reporting requirements. On September 22, 2009, the EPA issued the Final Mandatory Reporting of GHGs Rule, which became effective January 1, 2010. The rule requires reporting of GHG emissions from large sources and suppliers in the U.S. and is intended to collect accurate and timely emissions data to inform future policy decisions. Under the rule, suppliers of fossil fuels or industrial GHGs, manufacturers of vehicles and engines, and facilities that emit 25,000 metric tons per year (MT/yr) or more of GHG emissions are required to submit annual reports to the EPA. NEW SOURCE REVIEW The EPA issued a final rule on May 13, 2010, that establishes thresholds for GHGs that define when permits under the New Source Review Prevention of Significant Deterioration and Title V Operating Permit programs are required for new and existing industrial facilities. This final rule "tailors" the requirements of these CAA permitting programs to limit which facilities will be required to obtain Prevention of Significant Deterioration and Title V permits. In the preamble to the revisions to the Federal Code of Regulations, the EPA states: "This rulemaking is necessary because without it the Prevention of Significant Deterioration and Title V requirements would apply, as of January 2, 2011, at the 100 or 250 tons per year levels provided under the CAA, greatly increasing the number of required permits, imposing undue costs on small sources, overwhelming the resources of permitting authorities, and severely impairing the functioning of the programs. EPA is relieving these resource burdens by phasing in the applicability of these programs to GHG sources, starting with the largest GHG emitters. This rule establishes two initial steps of the phase-in. The rule also commits the agency to take certain actions on future steps addressing smaller sources but excludes certain smaller sources from Prevention of Significant Deterioration and Title V permitting for GHG emissions until at least April 30, 2016. ,, The EPA estimates that facilities responsible for nearly 70% of the national GHG emissions from stationary sources will be subject to permitting requirements under this rule. This includes the nation's largest GHG emitters—power plants, refineries, and cement production facilities. STANDARDS OF PERFORMANCE FOR GHG EMISSIONS FOR NEW STATIONARY SOURCES: ELECTRIC UTILITY GENERATING UNITS As required by a settlement agreement, the EPA proposed new performance standards for emissions of CO2for new, affected, fossil fuel -fired electric utility generating units on March 27, 2012. New sources greater than 25 megawatts (MW) would be required to meet an output - based standard of 1,000 pounds (lbs) of CO2 per MW -hour (MWh), based on the performance of 12188-05 GHG Report 22 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis widely used natural gas combined cycle technology. It should be noted that on February 9, 2016 the U.S. Court issued a stay of this regulation pending litigation. Additionally, the current EPA Administrator has also signed a measure to repeal the Clean Power Plan, including the CO2 standards. The Clean Power Plan was officially repealed on June 19, 2019, when the EPA issued the final Affordable Clean Energy rule (ACE). Under ACE, new state emission guidelines were established that provided existing coal-fired electric utility generating units with achievable standards. CAP -AND -TRADE Cap -and -trade refers to a policy tool where emissions are limited to a certain amount and can be traded or provides flexibility on how the emitter can comply. Successful examples in the U.S. include the Acid Rain Program and the N20 Budget Trading Program and Clean Air Interstate Rule in the northeast. There is no federal GHG cap -and -trade program currently; however, some states have joined to create initiatives to provide a mechanism for cap -and -trade. The Regional GHG Initiative is an effort to reduce GHGs among the states of Connecticut, Delaware, Maine, Maryland, Massachusetts, New Hampshire, New York, Rhode Island, and Vermont. Each state caps CO2 emissions from power plants, auctions CO2 emission allowances, and invests the proceeds in strategic energy programs that further reduce emissions, save consumers money, create jobs, and build a clean energy economy. The Initiative began in 2008 and in 2020 has retained all participating states. The Western Climate Initiative (WCI) partner jurisdictions have developed a comprehensive initiative to reduce regional GHG emissions to 15% below 2005 levels by 2020. The partners were originally California, British Columbia, Manitoba, Ontario, and Quebec. However, Manitoba and Ontario are not currently participating. California linked with Quebec's cap -and -trade system January 1, 2014, and joint offset auctions took place in 2015. While the WCI has yet to publish whether it has successfully reached the 2020 emissions goal initiative set in 2007, SB 32, requires that California, a major partner in the WCI, adopt the goal of reducing statewide GHG emissions to 40% below the 1990 level by 2030. SMARTWAY PROGRAM The SmartWay Program is a public-private initiative between the EPA, large and small trucking companies, rail carriers, logistics companies, commercial manufacturers, retailers, and other federal and state agencies. Its purpose is to improve fuel efficiency and the environmental performance (reduction of both GHG emissions and air pollution) of the goods movement supply chains. SmartWay is comprised of four components (34): 1. SmartWay Transport Partnership: A partnership in which freight carriers and shippers commit to benchmark operations, track fuel consumption, and improve performance annually. 2. SmartWay Technology Program: A testing, verification, and designation program to help freight companies identify equipment, technologies, and strategies that save fuel and lower emissions. 3. SmartWay Vehicles: A program that ranks light-duty cars and small trucks and identifies superior environmental performers with the SmartWay logo. 12188-05 GHG Report 23 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 4. SmartWay International Interests: Guidance and resources for countries seeking to develop freight sustainability programs modeled after SmartWay. SmartWay effectively refers to requirements geared towards reducing fuel consumption. Most large trucking fleets driving newer vehicles are compliant with SmartWay design requirements. Moreover, over time, all HDTs will have to comply with the CARB GHG Regulation that is designed with the SmartWay Program in mind, to reduce GHG emissions by making them more fuel- efficient. For instance, in 2015, 53 foot or longer dry vans or refrigerated trailers equipped with a combination of SmartWay-verified low -rolling resistance tires and SmartWay-verified aerodynamic devices would obtain a total of 10% or more fuel savings over traditional trailers. Through the SmartWay Technology Program, the EPA has evaluated the fuel saving benefits of various devices through grants, cooperative agreements, emissions and fuel economy testing, demonstration projects and technical literature review. As a result, the EPA has determined the following types of technologies provide fuel saving and/or emission reducing benefits when used properly in their designed applications, and has verified certain products: • Idle reduction technologies — less idling of the engine when it is not needed would reduce fuel consumption. • Aerodynamic technologies minimize drag and improve airflow over the entire tractor -trailer vehicle. Aerodynamic technologies include gap fairings that reduce turbulence between the tractor and trailer, side skirts that minimize wind under the trailer, and rear fairings that reduce turbulence and pressure drop at the rear of the trailer. • Low rolling resistance tires can roll longer without slowing down, thereby reducing the amount of fuel used. Rolling resistance (or rolling friction or rolling drag) is the force resisting the motion when a tire rolls on a surface. The wheel will eventually slow down because of this resistance. • Retrofit technologies include things such as diesel particulate filters, emissions upgrades (to a higher tier), etc., which would reduce emissions. • Federal excise tax exemptions. 2.7.3 CALIFORNIA LEGISLATIVE ACTIONS TO REDUCE GHGs The State of California legislature has enacted a series of bills that constitute the most aggressive program to reduce GHGs of any state in the nation. Some legislation such as the landmark AB 32 was specifically enacted to address GHG emissions. Other legislation such as Title 24 and Title 20 energy standards were originally adopted for other purposes such as energy and water conservation, but also provide GHG reductions. This section describes the major provisions of the legislation. 12188-05 GHG Report 24 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis AB 32 The California State Legislature enacted AB 32, which required that GHGs emitted in California be reduced to 1990 levels by the year 2020 (this goal has been met4). GHGs as defined under AB 32 include CO2, CH4, N20, HFCs, PFCs, and SF6. Since AB 32 was enacted, a seventh chemical, NF3, has also been added to the list of GHGs. The CARB is the state agency charged with monitoring and regulating sources of GHGs. AB 32 states the following: "Global warming poses a serious threat to the economic well-being, public health, natural resources, and the environment of California. The potential adverse impacts of global warming include the exacerbation of air quality problems, a reduction in the quality and supply of water to the state from the Sierra snowpack, a rise in sea levels resulting in the displacement of thousands of coastal businesses and residences, damage to marine ecosystems and the natural environment, and an increase in the incidences of infectious diseases, asthma, and other human health-related problems." SB 32 On September 8, 2016, Governor Jerry Brown signed the SB 32 and its companion bill, AB 197. SB 32 requires the state to reduce statewide GHG emissions to 40% below 1990 levels by 2030, a reduction target that was first introduced in Executive Order B-30-15. The new legislation builds upon the AB 32 goal and provides an intermediate goal to achieving S-3-05, which sets a statewide GHG reduction target of 80% below 1990 levels by 2050. AB 197 creates a legislative committee to oversee regulators to ensure that CARB not only responds to the Governor, but also the Legislature (11). CARB SCOPING PLAN UPDATE In November 2017, CARB released the Final 2017 Scoping Plan Update (2017 Scoping Plan), which identifies the State's post -2020 reduction strategy. The 2017 Scoping Plan reflects the 2030 target of a 40% reduction below 1990 levels, set by Executive Order B-30-15 and codified by SB 32. Key programs that the proposed Second Update builds upon include the Cap -and -Trade Regulation, the LCFS, and much cleaner cars, trucks and freight movement, utilizing cleaner, renewable energy, and strategies to reduce CH4 emissions from agricultural and other wastes. The 2017 Scoping Plan establishes a new emissions limit of 260 MMTCO2e for the year 2030, which corresponds to a 40% decrease in 1990 levels by 2030 (35). California's climate strategy will require contributions from all sectors of the economy, including the land base, and will include enhanced focus on zero- and near -zero -emission (ZE/NZE) vehicle technologies; continued investment in renewables, including solar roofs, wind, and other distributed generation; greater use of low carbon fuels; integrated land conservation and development strategies; coordinated efforts to reduce emissions of short-lived climate pollutants 4 Based upon the 2019 GHG inventory data (i.e., the latest year for which data are available) for the 2000-2017 GHG emissions period, California emitted an average 424.1 MMTCO2e (51). This is less than the 2020 emissions target of 431 MMTCO2e. 12188-05 GHG Report 25 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis (CH4, black carbon, and fluorinated gases); and an increased focus on integrated land use planning to support livable, transit -connected communities and conservation of agricultural and other lands. Requirements for direct GHG reductions at refineries will further support air quality co -benefits in neighborhoods, including in disadvantaged communities historically located adjacent to these large stationary sources, as well as efforts with California's local air pollution control and air quality management districts (air districts) to tighten emission limits on a broad spectrum of industrial sources. Major elements of the 2017Scoping Plan framework include: • Implementing and/or increasing the standards of the Mobile Source Strategy, which include increasing ZEV buses and trucks. • LCFS, with an increased stringency (18% by 2030). • Implementing SB 350, which expands the RPS to 50% RPS and doubles energy efficiency savings by 2030. • California Sustainable Freight Action Plan, which improves freight system efficiency, utilizes near -zero emissions technology, and deployment of zero -emission vehicles (ZEV) trucks. • Implementing the proposed Short -Lived Climate Pollutant Strategy (SLPS), which focuses on reducing CH4 and hydroflurocarbon emissions by 40% and anthropogenic black carbon emissions by 50% by year 2030. • Continued implementation of SB 375. • Post -2020 Cap -and -Trade Program that includes declining caps. • 20% reduction in GHG emissions from refineries by 2030. • Development of a Natural and Working Lands Action Plan to secure California's land base as a net carbon sink. Note, however, that the 2017 Scoping Plan Update acknowledges that: "[a]chieving net zero increases in GHG emissions, resulting in no contribution to GHG impacts, may not be feasible or appropriate for every project, however, and the inability of a project to mitigate its GHG emissions to net zero does not imply the project results in a substantial contribution to the cumulatively significant environmental impact of climate change under CEQA." In addition to the statewide strategies listed above, the Final 2017 Scoping Plan also identifies local governments as essential partners in achieving the State's long-term GHG reduction goals and identifies local actions to reduce GHG emissions. As part of the recommended actions, CARB recommends that local governments achieve a community -wide goal to achieve emissions of no more than 6 metric tons of CO2e (MTCO2e) or less per capita by 2030 and 2 MTCO2e or less per capita by 2050. For CEQA projects, CARB states that lead agencies may develop evidenced -based bright -line numeric thresholds—consistent with the 2017Scoping Plan and the State's long-term GHG goals—and projects with emissions over that amount may be required to incorporate on- site design features and mitigation measures (MM) that avoid or minimize project emissions to the degree feasible; or, a performance-based metric using a CAP or other plan to reduce GHG emissions is appropriate. 12188-05 GHG Report 26 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis According to research conducted by the Lawrence Berkeley National Laboratory (LBNL) and supported by CARB, California, under its existing and proposed GHG reduction policies, could achieve the 2030 goals under SB 32. The research utilized a new, validated model known as the California LBNL GHG Analysis of Policies Spreadsheet (CALGAPS), which simulates GHG and criteria pollutant emissions in California from 2010 to 2050 in accordance to existing and future GHG-reducing policies. The CALGAPS model showed that by 2030, emissions could range from 211 to 428 MTCO2e per year (MTCO2e/yr), indicating that "even if all modeled policies are not implemented, reductions could be sufficient to reduce emissions 40% below the 1990 level [of SB 32]." CALGAPS analyzed emissions through 2050 even though it did not generally account for policies that might be put in place after 2030. Although the research indicated that the emissions would not meet the State's 80% reduction goal by 2050, various combinations of policies could allow California's cumulative emissions to remain very low through 2050 (36) (37). CAP -AND -TRADE PROGRAM The 2017 Scoping Plan identifies a Cap -and -Trade Program as one of the key strategies for California to reduce GHG emissions. According to CARB, a cap -and -trade program will help put California on the path to meet its goal of achieving a 40% reduction in GHG emissions from 1990 levels by 2030. Under cap -and -trade, an overall limit on GHG emissions from capped sectors is established, and facilities subject to the cap will be able to trade permits to emit GHGs within the overall limit. CARB adopted a California Cap -and -Trade Program pursuant to its authority under AB 32. The Cap -and -Trade Program is designed to reduce GHG emissions from regulated entities by more than 16% between 2013 and 2020, and by an additional 40% by 2030. The statewide cap for GHG emissions from the capped sectors (e.g., electricity generation, petroleum refining, and cement production) commenced in 2013 and will decline over time, achieving GHG emission reductions throughout the program's duration. Covered entities that emit more than 25.000 MTCO2e/yr must comply with the Cap -and -Trade Program. Triggering of the 25.000 MTCO2e/yr "inclusion threshold" is measured against a subset of emissions reported and verified under the California Regulation for the Mandatory Reporting of GHG Emissions (Mandatory Reporting Rule or "MRR"). Under the Cap -and -Trade Program, CARB issues allowances equal to the total amount of allowable emissions over a given compliance period and distributes these to regulated entities. Covered entities are allocated free allowances in whole or part (if eligible), and may buy allowances at auction, purchase allowances from others, or purchase offset credits. Each covered entity with a compliance obligation is required to surrender "compliance instruments" for each MTCO2e of GHG they emit. There also are requirements to surrender compliance instruments covering 30% of the prior year's compliance obligation by November of each year (38). The Cap -and -Trade Program provides a firm cap, which provides the highest certainty of achieving the 2030 target. An inherent feature of the Cap -and -Trade program is that it does not guarantee GHG emissions reductions in any discrete location or by any particular source. Rather, 12188-05 GHG Report 27 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis GHG emissions reductions are only guaranteed on an accumulative basis. As summarized by CARB in the First Update to the Climate Change Scoping Plan: "The Cap -and -Trade Regulation gives companies the flexibility to trade allowances with others or take steps to cost-effectively reduce emissions at their own facilities. Companies that emit more have to turn in more allowances or other compliance instruments. Companies that can cut their GHG emissions have to turn in fewer allowances. But as the cap declines, aggregate emissions must be reduced. In other words, a covered entity theoretically could increase its GHG emissions every year and still comply with the Cap -and -Trade Program if there is a reduction in GHG emissions from other covered entities. Such a focus on aggregate GHG emissions is considered appropriate because climate change is a global phenomenon, and the effects of GHG emissions are considered cumulative." (39) The Cap -and -Trade Program covered approximately 80% of California's GHG emissions (35). The Cap -and -Trade Program covers the GHG emissions associated with electricity consumed in California, whether generated in-state or imported. Accordingly, GHG emissions associated with CEQA projects' electricity usage are covered by the Cap -and -Trade Program. The Cap -and -Trade Program also covers fuel suppliers (natural gas and propane fuel providers and transportation fuel providers) to address emissions from such fuels and from combustion of other fossil fuels not directly covered at large sources in the Program's first compliance period. The Cap -and -Trade Program covers the GHG emissions associated with the combustion of transportation fuels in California, whether refined in-state or imported. SB 375 Passing the Senate on August 30, 2008, SB 375 was signed by the Governor on September 30, 2008. According to SB 375, the transportation sector is the largest contributor of GHG emissions, which emits over 40% of the total GHG emissions in California. SB 375 states, "Without improved land use and transportation policy, California will not be able to achieve the goals of AB 32." SB 375 does the following: it (1) requires metropolitan planning organizations to include sustainable community strategies in their regional transportation plans for reducing GHG emissions, (2) aligns planning for transportation and housing, and (3) creates specified incentives for the implementation of the strategies. Concerning CEQA, SB 375, as codified in Public Resources Code Section 21159.28, states that CEQA findings for certain projects are not required to reference, describe, or discuss (1) growth inducing impacts, or (2) any project -specific or cumulative impacts from cars and light-duty truck trips generated by the project on global warming or the regional transportation network, if the project: 1. Is in an area with an approved sustainable communities strategy or an alternative planning strategy that the CARB accepts as achieving the GHG emission reduction targets. 2. Is consistent with that strategy (in designation, density, building intensity, and applicable policies). 3. Incorporates the MMs required by an applicable prior environmental document. 12188-05 GHG Report 28 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis AB 1493 California AB 1493, enacted on July 22, 2002, required CARB to develop and adopt regulations that reduce GHGs emitted by passenger vehicles and light duty trucks. Implementation of the regulation was delayed by lawsuits filed by automakers and by the EPA's denial of an implementation waiver. The EPA subsequently granted the requested waiver in 2009, which was upheld by the U.S. District Court for the District of Columbia in 2011. The standards phase in during the 2009 through 2016 model years. When fully phased in, the near-term (2009-2012) standards will result in about a 22% reduction compared with the 2002 fleet, and the mid-term (2013-2016) standards will result in about a 30% reduction. Several technologies stand out as providing significant reductions in emissions at favorable costs. These include discrete variable valve lift or camless valve actuation to optimize valve operation rather than relying on fixed valve timing and lift as has historically been done; turbocharging to boost power and allow for engine downsizing; improved multi -speed transmissions; and improved air conditioning systems that operate optimally, leak less, and/or use an alternative refrigerant. The second phase of the implementation for the Pavley bill was incorporated into Amendments to the Low -Emission Vehicle Program (LEV 111) or the Advanced Clean Cars program. The Advanced Clean Car program combines the control of smog -causing pollutants and GHG emissions into a single coordinated package of requirements for model years 2017 through 2025. The regulation will reduce GHGs from new cars by 34% from 2016 levels by 2025. The new rules will clean up gasoline and diesel -powered cars, and deliver increasing numbers of zero -emission technologies, such as full battery electric cars, newly emerging plug-in hybrid electric vehicles (EV) and hydrogen fuel cell cars. The package will also ensure adequate fueling infrastructure is available for the increasing numbers of hydrogen fuel cell vehicles planned for deployment in California. CLEAN ENERGY AND POLLUTION REDUCTION ACT OF 2015 (SB 350) In October 2015, the legislature approved, and the Governor signed SB 350, which reaffirms California's commitment to reducing its GHG emissions and addressing climate change. Key provisions include an increase in the RPS, higher energy efficiency requirements for buildings, initial strategies towards a regional electricity grid, and improved infrastructure for EV charging stations. Provisions for a 50% reduction in the use of petroleum statewide were removed from the Bill because of opposition and concern that it would prevent the Bill's passage. Specifically, SB 350 requires the following to reduce statewide GHG emissions: • Increase the amount of electricity procured from renewable energy sources from 33% to 50% by 2030, with interim targets of 40% by 2024, and 25% by 2027. • Double the energy efficiency in existing buildings by 2030. This target will be achieved through the California Public Utilities Commission (CPUC), the California Energy Commission (CEC), and local publicly owned utilities. • Reorganize the Independent System Operator (ISO) to develop more regional electrify transmission markets and to improve accessibility in these markets, which will facilitate the growth of renewable energy markets in the western United States. 12188-05 GHG Report 29 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 2.7.3.1 EXECUTIVE ORDERS RELATED TO GHG EMISSIONS California's Executive Branch has taken several actions to reduce GHGs through the use of Executive Orders. Although not regulatory, they set the tone for the state and guide the actions of state agencies. EXECUTIVE ORDER B-55-18 AND SB 100 Executive Order B-55-18 and SB 100. SB 100 and Executive Order B-55-18 were signed by Governor Brown on September 10, 2018. Under the existing RPS, 25% of retail sales are required to be from renewable sources by December 31, 2016, 33% by December 31, 2020, 40% by December 31, 2024, 45% by December 31, 2027, and 50% by December 31, 2030. SB 100 raises California's RPS requirement to 50% renewable resources target by December 31, 2026, and to achieve a 60% target by December 31, 2030. SB 100 also requires that retail sellers and local publicly owned electric utilities procure a minimum quantity of electricity products from eligible renewable energy resources so that the total kilowatt hours (kWh) of those products sold to their retail end-use customers achieve 44% of retail sales by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. In addition to targets under AB 32 and SB 32, Executive Order B-55-18 establishes a carbon neutrality goal for the state of California by 2045; and sets a goal to maintain net negative emissions thereafter. The Executive Order directs the California Natural Resources Agency (CNRA), California Environmental Protection Agency (CaIEPA), the California Department of Food and Agriculture (CDFA), and CARB to include sequestration targets in the Natural and Working Lands Climate Change Implementation Plan consistent with the carbon neutrality goal. EXECUTIVE ORDER 5-3-05 Former California Governor Arnold Schwarzenegger announced on June 1, 2005, through Executive Order S-3-05, the following reduction targets for GHG emissions: • By 2010, reduce GHG emissions to 2000 levels. • By 2020, reduce GHG emissions to 1990 levels. • By 2050, reduce GHG emissions to 80% below 1990 levels. The 2050 reduction goal represents what some scientists believe is necessary to reach levels that will stabilize the climate. The 2020 goal was established to be a mid-term target. Because this is an executive order, the goals are not legally enforceable for local governments or the private sector. EXECUTIVE ORDER 5-01-07 (LCFS) The Governor signed Executive Order S-01-07 on January 18, 2007. The order mandates that a statewide goal shall be established to reduce the carbon intensity of California's transportation fuels by at least 10% by 2020. The CARB adopted the LCFS on April 23, 2009. The LCFS was challenged in the U.S. District Court in Fresno in 2011. The court's ruling issued on December 29, 2011, included a preliminary injunction against CARB's implementation of the rule. The Ninth Circuit Court of Appeals stayed the injunction on April 23, 2012, pending final ruling on 12188-05 GHG Report 30 Lei URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis appeal, allowing CARB to continue to implement and enforce the regulation. The Ninth Circuit Court's decision, filed September 18, 2013, vacated the preliminary injunction. In essence, the court held that LCFS adopted by CARB were not in conflict with federal law. On August 8, 2013, the Fifth District Court of Appeal (California) ruled CARB failed to comply with CEQA and the Administrative Procedure Act (APA) when adopting regulations for LCFS. In a partially published opinion, the Court of Appeal reversed the trial court's judgment and directed issuance of a writ of mandate setting aside Resolution 09-31 and two executive orders of CARB approving LCFS regulations promulgated to reduce GHG emissions. However, the court tailored its remedy to protect the public interest by allowing the LCFS regulations to remain operative while CARB complies with the procedural requirements it failed to satisfy. To address the Court ruling, CARB was required to bring a new LCFS regulation to the Board for consideration in February 2015. The proposed LCFS regulation was required to contain revisions to the 2010 LCFS as well as new provisions designed to foster investments in the production of the low -carbon intensity fuels, offer additional flexibility to regulated parties, update critical technical information, simplify and streamline program operations, and enhance enforcement. On November 16, 2015 the Office of Administrative Law (OAL) approved the Final Rulemaking Package. The new LCFS regulation became effective on January 1, 2016. In 2018, the CARB approved amendments to the regulation, which included strengthening the carbon intensity benchmarks through 2030 in compliance with the SB 32 GHG emissions reduction target for 2030. The amendments included crediting opportunities to promote zero emission vehicle adoption, alternative jet fuel, carbon capture and sequestration, and advanced technologies to achieve deep decarbonization in the transportation sector (40). EXECUTIVE ORDER S-13-08 Executive Order S-13-08 states that "climate change in California during the next century is expected to shift precipitation patterns, accelerate sea level rise and increase temperatures, thereby posing a serious threat to California's economy, to the health and welfare of its population and to its natural resources." Pursuant to the requirements in the Order, the 2009 California Climate Adaptation Strategy (CNRA 2009) was adopted, which is the "...first statewide, multi -sector, region -specific, and information -based climate change adaptation strategy in the United States." Objectives include analyzing risks of climate change in California, identifying and exploring strategies to adapt to climate change, and specifying a direction for future research. EXECUTIVE ORDER B-30-15 On April 29, 2015, Governor Edmund G. Brown Jr. issued an executive order to establish a California GHG reduction target of 40% below 1990 levels by 2030. The Governor's executive order aligns California's GHG reduction targets with those of leading international governments ahead of the U.N. Climate Change Conference in Paris late 2015. The Order sets a new interim statewide GHG emission reduction target to reduce GHG emissions to 40% below 1990 levels by 2030 in order to ensure California meets its target of reducing GHG emissions to 80% below 1990 levels by 2050 and directs CARB to update the Climate Change Scoping Plan to express the 2030 target in terms of MMTCO2e. The Order also requires the state's climate adaptation plan to be 12188-05 GHG Report 31 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis updated every three years, and for the State to continue its climate change research program, among other provisions. As with Executive Order S-3-05, this Order is not legally enforceable for local governments and the private sector. Legislation that would update AB 32 to make post 2020 targets and requirements a mandate is in process in the State Legislature. 2.7.3.2 CALIFORNIA REGULATIONS AND BUILDING CODES California has a long history of adopting regulations to improve energy efficiency in new and remodeled buildings. These regulations have kept California's energy consumption relatively flat even with rapid population growth. TITLE 20 CCR CCR, Title 20: Division 2, Chapter 4, Article 4, Sections 1601-1608: Appliance Efficiency Regulations regulates the sale of appliances in California. The Appliance Efficiency Regulations include standards for both federally regulated appliances and non -federally regulated appliances. 23 categories of appliances are included in the scope of these regulations. The standards within these regulations apply to appliances that are sold or offered for sale in California, except those sold wholesale in California for final retail sale outside the state and those designed and sold exclusively for use in recreational vehicles or other mobile equipment (CEC 2012). TITLE 24 CCR CCR Title 24 Part 6: California's Energy Efficiency Standards for Residential and Nonresidential Buildings, was first adopted in 1978 in response to a legislative mandate to reduce California's energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. Energy efficient buildings require less electricity; therefore, increased energy efficiency reduces fossil fuel consumption and decreases GHG emissions. The 2019 version of Title 24 was adopted by the CEC and became effective on January 1, 2020. The CEC indicates that the 2019 Title 24 standards will require solar photovoltaic systems for new homes, establish requirements for newly constructed healthcare facilities, encourage demand responsive technologies for residential buildings, update indoor and outdoor lighting for nonresidential buildings. The CEC anticipates that single-family homes built with the 2019 standards will use approximately 7% less energy compared to the residential homes built under the 2016 standards. Additionally, after implementation of solar photovoltaic systems, homes built under the 2019 standards will use about 53% less energy than homes built under the 2016 standards. Nonresidential buildings will use approximately 30% less energy due to lighting upgrades (41). CCR, Title 24, Part 11: California Green Building Standards Code (CALGreen) is a comprehensive and uniform regulatory code for all residential, commercial, and school buildings that went in effect on January 1, 2011, and is administered by the (CBSC). CALGreen is updated on a regular basis, with the most recent approved update consisting of the 2019 California Green Building Code Standards that have become effective on January 1, 2020. Local jurisdictions are permitted to adopt more stringent requirements, as state law provides methods for local enhancements. 12188-05 GHG Report 32 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis CALGreen recognizes that many jurisdictions have developed existing construction and demolition ordinances and defers to them as the ruling guidance provided, they establish a minimum 65% diversion requirement. The code also provides exemptions for areas not served by construction and demolition recycling infrastructure. The State Building Code provides the minimum standard that buildings must meet in order to be certified for occupancy, which is generally enforced by the local building official. 2019 CALGreen standards are applicable to the Project and require (42): • Short-term bicycle parking. If the new project or an additional alteration is anticipated to generate visitor traffic, provide permanently anchored bicycle racks within 200 feet of the visitors' entrance, readily visible to passers-by, for 5% of new visitor motorized vehicle parking spaces being added, with a minimum of one two -bike capacity rack (5.106.4.1.1). • Long-term bicycle parking. For new buildings with tenant spaces that have 10 or more tenant -occupants, provide secure bicycle parking for 5% of the tenant -occupant vehicular parking spaces with a minimum of one bicycle parking facility (5.106.4.1.2). • Designated parking. In new projects or additions to alterations that add 10 or more vehicular parking spaces, provide designated parking for any combination of low -emitting, fuel-efficient and carpool/van pool vehicles as shown in Table 5.106.5.2 (5.106.5.2). • Construction waste management. Recycle and/or salvage for reuse a minimum of 65% of the nonhazardous construction and demolition waste in accordance with Section 5.408.1.1. 5.405.1.2, or 5.408.1.3; or meet a local construction and demolition waste management ordinance, whichever is more stringent (5.408.1). • Excavated soil and land clearing debris. 100% of trees, stumps, rocks and associated vegetation and soils resulting primarily from land clearing shall be reused or recycled. For a phase project, such material may be stockpiled on site until the storage site is developed (5.408.3). • Recycling by Occupants. Provide readily accessible areas that serve the entire building and are identified for the depositing, storage and collection of non -hazardous materials for recycling, including (at a minimum) paper, corrugated cardboard, glass, plastics, organic waste, and metals or meet a lawfully enacted local recycling ordinance, if more restrictive (5.410.1). • Water conserving plumbing fixtures and fittings. Plumbing fixtures (water closets and urinals) and fittings (faucets and showerheads) shall comply with the following: o Water Closets. The effective flush volume of all water closets shall not exceed 1.28 gallons per flush (5.303.3.1) o Urinals. The effective flush volume of wall -mounted urinals shall not exceed 0.125 gallons per flush (5.303.3.2.1). The effective flush volume of floor -mounted or other urinals shall not exceed 0.5 gallons per flush (5.303.3.2.2). o Showerheads. Single showerheads shall have a minimum flow rate of not more than 1.8 gallons per minute and 80 psi (5.303.3.3.1). When a shower is served by more than one showerhead, the combine flow rate of all showerheads and/or other shower outlets controlled by a single valve shall not exceed 1.8 gallons per minute at 80 psi (5.303.3.3.2). o Faucets and fountains. Nonresidential lavatory faucets shall have a maximum flow rate of note more than 0.5 gallons per minute at 60 psi (5.303.3.4.1). Kitchen 12188-05 GHG Report 33 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis faucets shall have a maximum flow rate of not more than 1.8 gallons per minute of 60 psi (5.303.3.4.2). Wash fountains shall have a maximum flow rate of not more than 1.8 gallons per minute (5.303.3.4.3). Metering faucets shall not deliver more than 0.20 gallons per cycle (5.303.3.4.4). Metering faucets for wash fountains shall have a maximum flow rate not more than 0.20 gallons per cycle (5.303.3.4.5). • Outdoor portable water use in landscaped areas. Nonresidential developments shall comply with a local water efficient landscape ordinance or the current California Department of Water Resources' Model Water Efficient (MWELO), whichever is more stringent (5.304.1). • Water meters. Separate submeters or metering devices shall be installed for new buildings or additions in excess of 50,000 sf or for excess consumption where any tenant within a new building or within an addition that is project to consume more than 1,000 gal/day (5.303.1.1 and 5.303.1.2). • Outdoor water use in rehabilitated landscape projects equal or greater than 2,500 sf. Rehabilitated landscape projects with an aggregate landscape area equal to or greater than 2,500 sf requiring a building or landscape permit (5.304.3). • Commissioning. For new buildings 10,000 sf and over, building commissioning shall be included in the design and construction processes of the building project to verify that the building systems and components meet the owner's or owner representative's project requirements (5.410.2). MWELO The MWELO was required by AB 1881, the Water Conservation Act. The bill required local agencies to adopt a local landscape ordinance at least as effective in conserving water as the Model Ordinance by January 1, 2010. Governor Brown's Drought Executive Order of April 1, 2015 (Executive Order B-29-15) directed Department of Water Resources (DWR) to update the Ordinance through expedited regulation. The California Water Commission approved the revised Ordinance on July 15, 2015 effective December 15, 2015. New development projects that include landscape areas of 500 sf or more are subject to the Ordinance. The update requires: • More efficient irrigation systems; • Incentives for graywater usage; • Improvements in on-site stormwater capture; • Limiting the portion of landscapes that can be planted with high water use plants; and • Reporting requirements for local agencies. CARB REFRIGERANT MANAGEMENT PROGRAM CARB adopted a regulation in 2009 to reduce refrigerant GHG emissions from stationary sources through refrigerant leak detection and monitoring, leak repair, system retirement and retrofitting, reporting and recordkeeping, and proper refrigerant cylinder use, sale, and disposal. The regulation is set forth in sections 95380 to 95398 of Title 17, CCR. The rules implementing the regulation establish a limit on statewide GHG emissions from stationary facilities with refrigeration systems with more than 50 lbs of a high GWP refrigerant. The refrigerant management program is designed to (1) reduce emissions of high -GWP GHG refrigerants from 12188-05 GHG Report 34 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis leaky stationary, non-residential refrigeration equipment; (2) reduce emissions from the installation and servicing of refrigeration and air-conditioning appliances using high -GWP refrigerants; and (3) verify GHG emission reductions. TRACTOR -TRAILER GHG REGULATION The tractors and trailers subject to this regulation must either use EPA SmartWay certified tractors and trailers or retrofit their existing fleet with SmartWay verified technologies. The regulation applies primarily to owners of 53 -foot or longer box -type trailers, including both dry - van and refrigerated -van trailers, and owners of the HD tractors that pull them on California highways. These owners are responsible for replacing or retrofitting their affected vehicles with compliant aerodynamic technologies and low rolling resistance tires. Sleeper cab tractors model year 2011 and later must be SmartWay certified. All other tractors must use SmartWay verified low rolling resistance tires. There are also requirements for trailers to have low rolling resistance tires and aerodynamic devices. PHASE 1 AND 2 HEAVY-DUTY VEHICLE GHG STANDARDS CARB has adopted a new regulation for GHG emissions from HDTs and engines sold in California. It establishes GHG emission limits on truck and engine manufacturers and harmonizes with the EPA rule for new trucks and engines nationally. Existing HD vehicle regulations in California include engine criteria emission standards, tractor -trailer GHG requirements to implement SmartWay strategies (i.e., the Heavy -Duty Tractor -Trailer GHG Regulation), and in -use fleet retrofit requirements such as the Truck and Bus Regulation. In September 2011, the EPA adopted their new rule for HDTs and engines. The EPA rule has compliance requirements for new compression and spark ignition engines, as well as trucks from Class 2b through Class 8. Compliance requirements begin with model year 2014 with stringency levels increasing through model year 2018. The rule organizes truck compliance into three groupings, which include a) HD pickups and vans; b) vocational vehicles; and c) combination tractors. The EPA rule does not regulate trailers. CARB staff has worked jointly with the EPA and the NHTSA on the next phase of federal GHG emission standards for medium -duty trucks (MDT) and HDT vehicles, called federal Phase 2. The federal Phase 2 standards were built on the improvements in engine and vehicle efficiency required by the Phase 1 emission standards and represent a significant opportunity to achieve further GHG reductions for 2018 and later model year HDT vehicles, including trailers. But as discussed above, the EPA and NHTSA have proposed to roll back GHG and fuel economy standards for cars and light-duty trucks, which suggests a similar rollback of Phase 2 standards for MDT and HDT vehicles may be pursued. SB 97 AND THE CEQA GUIDELINES UPDATE Passed in August 2007, SB 97 added Section 21083.05 to the Public Resources Code. The code states "(a) On or before July 1, 2009, the OPR shall prepare, develop, and transmit to the Resources Agency guidelines for the mitigation of GHG emissions or the effects of GHG emissions as required by this division, including, but not limited to, effects associated with transportation or energy consumption. (b) On or before January 1, 2010, the Resources Agency shall certify and 12188-05 GHG Report 35 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis adopt guidelines prepared and developed by the OPR pursuant to subdivision (a)." Section 21097 was also added to the Public Resources Code. It provided CEQA protection until January 1, 2010 for transportation projects funded by the Highway Safety, Traffic Reduction, Air Quality, and Port Security Bond Act of 2006 or projects funded by the Disaster Preparedness and Flood Prevention Bond Act of 2006, in stating that the failure to analyze adequately the effects of GHGs would not violate CEQA. On December 28, 2018, the Natural Resources Agency announced the OAL approved the amendments to the CEQA Guidelines for implementing the CEQA. The CEQA Amendments provide guidance to public agencies regarding the analysis and mitigation of the effects of GHG emissions in CEQA documents. The CEQA Amendments fit within the existing CEQA framework by amending existing CEQA Guidelines to reference climate change. Section 15064.3 was added the CEQA Guidelines and states that in determining the significance of a project's GHG emissions, the lead agency should focus its analysis on the reasonably foreseeable incremental contribution of the project's emissions to the effects of climate change. A project's incremental contribution may be cumulatively considerable even if it appears relatively small compared to statewide, national or global emissions. The agency's analysis should consider a timeframe that is appropriate for the project. The agency's analysis also must reasonably reflect evolving scientific knowledge and state regulatory schemes. Additionally, a lead agency may use a model or methodology to estimate GHG emissions resulting from a project. The lead agency has discretion to select the model or methodology it considers most appropriate to enable decision makers to intelligently take into account the project's incremental contribution to climate change. The lead agency must support its selection of a model or methodology with substantial evidence. The lead agency should explain the limitations of the particular model or methodology selected for use (43). 2.7.4 REGIONAL The project is within the South Coast Air Basin (SCAB), which is under the jurisdiction of the SCAQM D. SCAQMD SCAQMD is the agency responsible for air quality planning and regulation in the SCAB. The SCAQMD addresses the impacts to climate change of projects subject to SCAQMD permit as a lead agency if they are the only agency having discretionary approval for the project and acts as a responsible agency when a land use agency must also approve discretionary permits for the project. The SCAQMD acts as an expert commenting agency for impacts to air quality. This expertise carries over to GHG emissions, so the agency helps local land use agencies through the development of models and emission thresholds that can be used to address GHG emissions. In 2008, SCAQMD formed a Working Group to identify GHG emissions thresholds for land use projects that could be used by local lead agencies in the SCAB. The Working Group developed several different options that are contained in the SCAQMD Draft Guidance Document — Interim CEQA GHG Significance Threshold, that could be applied by lead agencies. The working group has not provided additional guidance since release of the interim guidance in 2008. The SCAQMD 12188-05 GHG Report 36 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Board has not approved the thresholds; however, the Guidance Document provides substantial evidence supporting the approaches to significance of GHG emissions that can be considered by the lead agency in adopting its own threshold. The current interim thresholds consist of the following tiered approach: • Tier 1 consists of evaluating whether or not the project qualifies for any applicable exemption under CEQA. • Tier 2 consists of determining whether the project is consistent with a GHG reduction plan. If a project is consistent with a qualifying local GHG reduction plan, it does not have significant GHG emissions. • Tier 3 consists of screening values, which the lead agency can choose, but must be consistent with all projects within its jurisdiction. A project's construction emissions are averaged over 30 years and are added to the project's operational emissions. If a project's emissions are below one of the following screening thresholds, then the project is less than significant: o Residential and Commercial land use: 3,000 MTCO2e/yr o Industrial land use: 10,000 MTCO2e/yr o Based on land use type: residential: 3,500 MTCO2e/yr; commercial: 1,400 MTCO2e/yr; or mixed use: 3,000 MTCO2e/yr • Tier 4 has the following options: o Option 1: Reduce Business -as -Usual (BAU) emissions by a certain percentage; this percentage is currently undefined. o Option 2: Early implementation of applicable AB 32 Scoping Plan measures o Option 3: 2020 target for service populations (SP), which includes residents and employees: 4.8 MTCO2e/SP per year for projects and 6.6 MTCO2e per SP per year for plans; o Option 3, 2035 target: 3.0 MTCO2e/SP per year for projects and 4.1 MTCO2e per service population per year for plans • Tier 5 involves mitigation offsets to achieve target significance threshold. The SCAQMD's interim thresholds used the Executive Order S -3 -05 -year 2050 goal as the basis for the Tier 3 screening level. Achieving the Executive Order's objective would contribute to worldwide efforts to cap CO2 concentrations at 450 ppm, thus stabilizing global climate. SCAQMD only has authority over GHG emissions from development projects that include air quality permits. At this time, it is unknown if the project would include stationary sources of emissions subject to SCAQMD permits. Notwithstanding, if the Project requires a stationary permit, it would be subject to the applicable SCAQMD regulations. SCAQMD Regulation XXVII, adopted in 2009 includes the following rules: • Rule 2700 defines terms and post GWPs. • Rule 2701, SoCal Climate Solutions Exchange, establishes a voluntary program to encourage, quantify, and certify voluntary, high quality certified GHG emission reductions in the SCAQMD. 12188-05 GHG Report 37 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis • Rule 2702, GHG Reduction Program created a program to produce GHG emission reductions within the SCAQMD. The SCAQMD will fund projects through contracts in response to requests for proposals or purchase reductions from other parties. 2.8 DISCUSSION ON ESTABLISHMENT OF SIGNIFICANCE THRESHOLDS The SCAQMD defines the SP as the total residents and employees associated with a Project. The origin of the SP is based on CARB's 2008 Scoping Plan. The 2008 Scoping Plan identified that based on the GHG emissions inventories for the state, the people of California generate approximately 14 tons of GHG emissions per capita and would need to reduce annual emissions to approximately 10 tons per capita in order to meet the GHG reduction target of AB 32. Because people who live in California generally work in California, the SP metric did not include employees. As CEQA significance thresholds were being determined by air districts, the air districts considered applying this efficiency metric to their air district boundaries. Consistent with methodology provided by the Regional Targets Advisory Committee (RTAC) as part of the SB 375 target setting discussions, the definition of SP was amended to include employees in addition to residents. This is because the transportation sector is the primary source of project -related GHG emissions; and unlike the state as a whole, people who work in one county/air district may not live in the same county/ air district boundary. Also, people who live in a county/air district boundary would also have other trip ends such as school, parks, and retail uses. As such, the air district/county boundary as a whole did not take into account other users within the site. Relevant to the proposed Project, the SCAQMD Tier 4 Option 3 is to utilize an efficiency target. The SCAQMD has proposed targets for project -level and plan -level analysis. At the September 2010 working group meeting the SCAQMD recommended a project -level efficiency target of 4.8 MTCO2e/SP as a target. The calculations behind this option are based on the same inventory calculated by CARB. The 4.8 MT/SP target is based on the same statewide 2020 GHG inventory in the CARB Scoping Plan, i.e., 295,530,000 MTCO2e/yr. To derive the project level SP of 4.8 metric ton, SCAQMD took the 2020 statewide GHG reduction target for land use only (295,530,000 MTCO2e/yr) and divided it by the total 2020 statewide population plus the total statewide employment for land use only (44,135,923 + 17,064,489) (i.e., (295,530,000 MTCO2e/yr)/(44,135,923 + 17,064,489) = 4.8 MTCO2e/yr). Thus, SCAQMD's threshold is another metric for assessing compliance with AB 32, just based on using numbers attributable to certain sectors and trying to break down the analysis to a finer grain based on a per person methodology associated with land use -related sectors. This approach is a widely accepted screening threshold used by numerous cities in the basin and is based on the SCAQMD staff's proposed GHG screening threshold for stationary source emissions for non -industrial projects, as described in the SCAQMD's Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans. The SCAQMD's Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans identifies a screening threshold to determine whether additional analysis is required (44). As noted by the SCAQMD: "...the...screening level for stationary sources is based on an emission capture rate of 90 percent for all new or modified projects...the policy objective of [SCAQMD's] 12188-05 GHG Report 38 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis recommended interim GHG significance threshold proposal is to achieve an emission capture rate of 90 percent of all new or modified stationary source projects. A GHG significance threshold based on a 90 percent emission capture rate may be more appropriate to address the long-term adverse impacts associated with global climate change because most projects will be required to implement GHG reduction measures. Further, a 90 percent emission capture rate sets the emission threshold low enough to capture a substantial fraction of future stationary source projects that will be constructed to accommodate future statewide population and economic growth, while setting the emission threshold high enough to exclude small projects that will in aggregate contribute a relatively small fraction of the cumulative statewide GHG emissions. This assertion is based on the fact that [SCAQMD] staff estimates that these GHG emissions would account for slightly less than one percent of future 2050 statewide GHG emissions target (85 [MMTCO2e/yr]). In addition, these small projects may be subject to future applicable GHG control regulations that would further reduce their overall future contribution to the statewide GHG inventory. Finally, these small sources are already subject to [Best Available Control Technology] (BACT) for criteria pollutants and are more likely to be single -permit facilities, so they are more likely to have few opportunities readily available to reduce GHG emissions from other parts of their facility." (44) Although the SCAQMD's draft significance criteria have not been adopted, the City has determined that the SCAQMD's project -level efficiency threshold methodology can be used to set an appropriate significance criterion by which to determine whether the project emits a significant amount of GHG. As previously noted, the 2017 Scoping Plan identifies a reduction target of 80% below 1990 levels by 2050. As such, the appropriate reduction target for 2050 would be 0.96 MTCO2e/yr. For analysis purposes herein, the SP threshold for the Project's buildout year of 2031 was calculated by linear interpolation between the 2020 target of 4.8 MTCO2e/yr and the 2050 target of 0.96 MTCO2e/yr. As such, the target for the Project's buildout year of 2031 is 2.78 MTCO2e/yr. 12188-05 GHG Report 39 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report 40 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 3 PROJECT GREENHOUSE GAS IMPACT 3.1 INTRODUCTION The Project has been evaluated to determine if it will result in a significant GHG impact. The significance of these potential impacts is described in the following section. 3.2 STANDARDS OF SIGNIFICANCE The criteria used to determine the significance of potential Project -related GHG impacts are taken from the CEQA Guidelines (14 California Code of Regulations §§15000, et seq.). Based on these thresholds, a project would result in a significant impact related to GHG if it would (45): • Generate GHG emissions, either directly or indirectly, that may have a significant impact on the environment? • Conflict with an applicable plan, policy or regulation adopted for the purpose of reducing the emissions of GHGs? 3.3 METHODOLOGY 3.3.1 CALEEMoD On October 17, 2017, the SCAQMD, in conjunction with the California Air Pollution Control Officers Association (CAPCOA) and other California air districts, released the latest version of the CaIEEMod Version 2016.3.2. The purpose of this model is to calculate construction -source and operational -source criteria pollutant and GHG emissions from direct and indirect sources; and quantify applicable air quality and GHG reductions achieved from mitigation measures (46). Accordingly, the latest version of CaIEEMod has been used for this Project to determine GHG emissions. Output from the model runs for construction and operational activity are provided in Appendices 3.1 through 3.20. CaIEEMod includes GHG emissions from the following source categories: construction, area, energy, mobile, waste, water. 3.3.2 ROAD CONSTRUCTION EMISSIONS MODEL (RCEM) Project specific sources resulting from Madison Avenue, Avenue 62, and Jefferson construction activities are estimated utilizing the most recent RCEM Version 9.0. RCEM was developed by the Sacramento Metropolitan Air Quality Management District as part of their CEQA Guidelines and Tools to analyze new road construction, road widening, bridge/overpass construction, and other linear projects. Although the CaIEEMod is typically utilized for land use development projects in this region, the SCAQMD has identified the RCEM as an acceptable emissions modeling program when the use of CaIEEMod is not appropriate, as is the case with projects such as this. Based on the nature of the project, emissions associated with the construction of the Madison Avenue, Avenue 62, and Jefferson are considered within the scope of this assessments. GHG outputs from the model runs are provided in Appendices 3.21 through 3.23. 5 The specific RCEM option for new road construction was utilized for analysis of this Project. Subsequent subphases and equipment list are 12188-05 GHG Report 41 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 3.3.3 EMISSION FACTORS MODEL (EMFAC) On August 19, 2019, the EPA approved the 2017 version of the EMFAC web database for use in State Implementation Plan and transportation conformity analyses. EMFAC2017 is a mathematical model that was developed to calculate emission rates, fuel consumption, vehicle miles traveled (VMT) from motor vehicles that operate on highways, freeways, and local roads in California and is commonly used by the CARB to project changes in future emissions from on - road mobile sources (47). This GHGA utilizes annual EMFAC2017 emission factors in order to derive vehicle emissions associated with Project operational activities. Because the EMFAC2017 emission rates are associated with vehicle fuel types while CaIEEMod vehicle emission factors are aggregated to include all fuel types for each individual vehicle class, the EMFAC2017 emission rates for different fuel types of a vehicle class are averaged by activity or by population and activity to derive CaIEEMod emission factors. The equations applied to obtain CaIEEMod vehicle emission factors for each emission type are detailed in CaIEEMod User's Guide Appendix A: Calculation Details for CaIEEMod (48). EMFAC2017 emission rates utilized in this analysis can be found in Appendix 3.24 of this report. 3.4 LIFE -CYCLE ANALYSIS NOT REQUIRED A full life -cycle analysis (LCA) for construction and operational activity is not included in this analysis due to the lack of consensus guidance on LCA methodology at this time (49). Life -cycle analysis (i.e., assessing economy -wide GHG emissions from the processes in manufacturing and transporting all raw materials used in the project development, infrastructure and on-going operations) depends on emission factors or econometric factors that are not well established for all processes. At this time, an LCA would be extremely speculative and thus has not been prepared. Additionally, the SCAQMD recommends analyzing direct and indirect project GHG emissions generated within California and not life -cycle emissions because the life -cycle effects from a project could occur outside of California, might not be very well understood or documented, and would be challenging to mitigate (50). Additionally, the science to calculate life cycle emissions is not yet established or well defined; therefore, SCAQMD has not recommended, and is not requiring, life -cycle emissions analysis. 3.5 CONSTRUCTION EMISSIONS Project construction actvities would generate CO2 and CH4 emissions The report Travertine Specific Plan Air Quality Impact Analysis Report (AQIA) (Urban Crossroads, Inc.) contains detailed information regarding Project construction activities (51). As discussed in the AQIA, Construction related emissions are expected from the following construction activities: part of the defaults in that model and were therefore used in the analysis. 12188-05 GHG Report 42 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 3.5.1 CONSTRUCTION ACTIVITIES Construction activities associated with the Project will result in emissions of VOCs, NOx, SOx, CO, Mho, and PM2.s. Construction related emissions are expected from the following construction activities: PHASE A GRADING ACTIVITIES • Crushing • Madison EVA with Water Line o Grubbing/Land Clearing o Grading/Excavation o Drainage/Utilities/Sub-Grade o Paving • Grading & Tank Construction • Avenue 62 with Water Line o Grubbing/Land Clearing o Grading/Excavation o Drainage/Utilities/Sub-Grade o Paving WATER WELL CONSTRUCTION (WELLS #1-9) • Site Preparation • Trenching • Building Construction SUBSTATION CONSTRUCTION • Demolition • Grading • Building Construction PHASE B GRADING ACTIVITIES • Crushing • Grading • Jefferson with Water Line o Grubbing/Land Clearing o Grading/Excavation o Drainage/Utilities/Sub-Grade o Paving 12188-05 GHG Report 43 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis PHYSICAL CONSTRUCTION (PHASES 1 THROUGH 3) • Site Preparation • Grading • Building Construction • Paving • Architectural Coating 3.5.2 CONSTRUCTION DURATION The construction schedule utilized in the analysis, shown in Table 3-1, represents a "worst-case" analysis scenario should construction occur any time after the respective dates since emission factors for construction decrease as time passes and the analysis year increases due to emission regulations becoming more stringent. The duration of construction activity and associated equipment represents a reasonable approximation of the expected construction fleet as required per CEQA Guidelines (52). TABLE 3-1: CONSTRUCTION DURATION (1 OF 3) Phase Subphase Start Date End Date Days Phase A Grading Activities Crushing Demolition 07/01/2023 12/27/2024 390 Madison Avenue with Water Line Grubbing/Land Clearing 01/01/2024 01/19/2024 15 Grading/Excavation 01/20/2024 04/01/2024 51 Drainage/Utilities/Sub-Grade 04/02/2024 06/04/2024 46 Paving 06/05/2024 07/02/2024 20 Grading & Tank Construction Grading 10/01/2023 09/29/2025 521 Avenue 62 with Water Line Grubbing/Land Clearing 07/01/2024 08/06/2024 27 Grading/Excavation 08/07/2024 12/30/2024 104 Drainage/Utilities/Sub-Grade 12/31/2024 05/07/2025 92 Paving 05/08/2025 07/01/2025 39 Well Construction Well #1 Site Preparation 10/01/2025 10/14/2025 10 Trenching 10/15/2025 12/10/2025 41 Building Construction 12/11/2025 12/31/2025 15 Well #2 Site Preparation 07/01/2026 07/14/2026 10 Trenching 07/15/2026 09/09/2026 41 Building Construction 09/10/2026 09/30/2026 15 Well #3 Site Preparation 04/01/2027 04/14/2027 10 Trenching 04/15/2027 06/10/2027 41 Building Construction 06/11/2027 07/01/2027 15 12188-05 GHG Report 44 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-1: CONSTRUCTION DURATION (2 OF 3) Phase Subphase Start Date End Date Days Well Construction Well #4 Site Preparation 01/01/2028 01/14/2028 10 Trenching 01/15/2028 03/13/2028 41 Building Construction 03/14/2028 04/03/2028 15 Well #5 Site Preparation 10/01/2028 10/13/2028 10 Trenching 10/14/2028 12/08/2028 40 Building Construction 12/09/2028 12/29/2028 15 Well #6 Site Preparation 07/01/2029 07/13/2029 10 Trenching 07/14/2029 09/10/2029 41 Building Construction 09/11/2029 10/01/2029 15 Well #7 Site Preparation 04/01/2030 04/12/2030 10 Trenching 04/13/2030 06/10/2030 41 Building Construction 06/11/2030 07/01/2030 15 Well #8 Site Preparation 01/01/2031 01/14/2031 10 Trenching 01/15/2031 03/12/2031 41 Building Construction 03/13/2031 04/02/2031 15 Well #9 Site Preparation 10/01/2031 10/14/2031 10 Trenching 10/15/2031 12/10/2031 41 Building Construction 12/11/2031 12/31/2031 15 Substation Construction Substation Construction Demolition 01/01/2024 01/19/2024 15 Grading 01/20/2024 05/24/2024 90 Building Construction 05/25/2024 07/01/2025 287 Phase B Grading Activities Crushing Demolition 04/01/2025 06/28/2027 585 Grading Grading 01/01/2026 12/31/2027 522 Jefferson with Water Line Grubbing/Land Clearing 04/01/2026 06/11/2026 52 Grading/Excavation 06/12/2026 03/31/2027 209 Drainage/Utilities/Sub-Grade 04/01/2027 12/12/2027 182 Paving 12/13/2027 03/30/2028 79 12188-05 GHG Report 45 0 URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-1: CONSTRUCTION DURATION (3 OF 3) Phase Subphase Start Date End Date Days Physical Construction (2029) Phase 1 (2026-2029) Site Preparation 07/01/2025 09/08/2025 50 Grading 09/09/2025 11/17/2025 50 Building Construction 11/18/2025 12/11/2028 800 Paving 09/26/2028 12/11/2028 55 Architectural Coating 09/07/2027 12/11/2028 330 Phase 2 (2029-2031) Site Preparation 01/01/2029 02/09/2029 30 Grading 02/10/2029 03/23/2029 30 Building Construction 03/24/2029 12/13/2030 450 Paving 10/27/2030 12/13/2030 35 Architectural Coating 4/13/2030 12/13/2030 175 Phase 3 (2031-2033) Site Preparation 01/01/2031 02/18/2031 35 Grading 02/19/2031 04/08/2031 35 Building Construction 04/09/2031 12/28/2032 450 Paving 11/03/2032 12/28/2032 40 Architectural Coating 03/24/2032 12/28/2032 200 3.5.3 CONSTRUCTION EQUIPMENT Site specific construction fleet may vary due to specific project needs at the time of construction. The associated construction equipment was generally based on CaIEEMod defaults. A detailed summary of construction equipment assumptions by phase is provided at Table 3-2. TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (1 OF 7) Phase Subphase Equipment Type Quantity Hours Per Day Phase A Grading Activities Crushing Demolition Crushing/Processing Equipment 1 8 Madison Avenue with Water Line Grubbing/Land Clearing Crawler Tractors 1 8 Excavators 1 8 Signal Boards 2 8 12188-05 GHG Report 46 LURBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (2 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Phase A Grading Activities Madison Avenue with Water Line Grading/Excavation Crawler Tractors 1 8 Excavators 3 8 Off -Highway Tractors 1 8 Rollers 2 8 Rubber Tired Loaders 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Drainage/Utilities/ Sub -Grade Air Compressors 1 8 Generator Sets 1 8 Graders 1 8 Plate Compactors 1 8 Pumps 1 8 Rough Terrain Forklifts 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Paving Pavers 1 8 Paving Equipment 1 8 Rollers 3 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Grading & Tank Construction Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 12188-05 GHG Report 47 ['moi URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (3 OF 7) Phase Subphase Equipment Type Quantity Hours Per Day Phase A Grading Activities Avenue 62 with Water Line Grubbing/Land Clearing Crawler Tractors 1 8 Excavators 1 8 Signal Boards 2 8 Grading/Excavation Crawler Tractors 1 8 Excavators 3 8 Off -Highway Tractors 1 8 Rollers 2 8 Rubber Tired Loaders 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Drainage/Utilities/ Sub -Grade Air Compressors 1 8 Generator Sets 1 8 Graders 1 8 Plate Compactors 1 8 Pumps 1 8 Rough Terrain Forklifts 1 8 Scrapers 2 8 Signal Boards 2 8 Paving Pavers 1 8 Paving Equipment 1 8 Rollers 3 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Well Construction Wells #1-9 Site Preparation Bore/Drill Rig 1 16 Other Construction 6 16 Aerial Lift 1 16 Tractors/Loaders/ Backhoes 1 16 12188-05 GHG Report 48 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (4 OF 7) Phase Subphase Equipment Type Quantity Hours Per Day Well Construction Wells #1-9 Trenching Bore/Drill Rig 1 24 Other Construction Equipment 7 24 Pump 1 24 Generator Sets 1 24 Aerial Lift 1 24 Tractors/Loaders/ Backhoes 1 24 Dumpers/Tenders 1 24 Off -Highway Truck 1 24 Building Construction Bore/Drill Rig 1 24 Other Construction Equipment 4 24 Aerial Lift 1 24 Off -Highway Truck 1 24 Substation Construction Substation Construction Demolition Off -Highway Trucks 13 8 Rubber Tired Dozers 1 8 Grader 1 8 Excavator 2 8 Grading Off -Highway Trucks 26 8 Rubber Tired Dozers 1 8 Grader 1 8 Scraper 2 8 Plate Compactor 1 8 Skid Steer 1 8 Sweeper/Scrubber 1 8 12188-05 GHG Report 49 tmoi URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (5 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Substation Construction Substation Construction Building construction Off -Highway Trucks 28 8 Air Compressor 1 8 Generator 1 8 Rubber Tired Dozers 1 8 Grader 1 8 Scraper 2 8 Compactor 1 8 Tractors/Loaders/ Backhoes 4 8 Excavator 3 8 Skid Steer 1 8 Forklift 1 8 Trencher 1 8 Crane 2 8 Other Construction Equipment 5 8 Rollers 2 8 Phase B Grading Activities Crushing Demolition Crushing/Processing Equipment 1 8 Grading Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 Jefferson with Water Line Grubbing/Land Clearing Crawler Tractors 1 8 Excavators 1 8 Signal Boards 2 8 12188-05 GHG Report 50 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (6 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Phase B Grading Activities Jefferson with Water Line Grading/Excavation Crawler Tractors 1 8 Excavators 3 8 Off -Highway Tractors 1 8 Rollers 2 8 Rubber Tired Loaders 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Drainage/Utilities/ Sub -Grade Air Compressors 1 8 Generator Sets 1 8 Graders 1 8 Plate Compactors 1 8 Pumps 1 8 Rough Terrain Forklifts 1 8 Scrapers 2 8 Signal Boards 2 8 Tractors/Loaders/ Backhoes 2 8 Paving Pavers 1 8 Paving Equipment 1 8 Rollers 3 8 Signal Boards 2 8 Tractors/Loaders/ 2 8 Physical Construction Phases 1-3 Site Preparation Crawler Tractors 4 8 Rubber Tired Dozers 3 8 12188-05 GHG Report 51 [^moi URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-2: CONSTRUCTION EQUIPMENT ASSUMPTIONS (7 OF 7) Phase J_ Subphase Equipment Type Quantity Hours Per Day Physical Construction Phases 1-3 Grading Crawler Tractors 2 8 Excavators 2 8 Graders 1 8 Rubber Tired Dozers 1 8 Scrapers 2 8 Building Construction Cranes 1 8 Crawler Tractors 3 8 Forklifts 3 8 Generator Sets 1 8 Welders 1 8 Paving Pavers 2 8 Paving Equipment 2 8 Rollers 2 8 Architectural Coating Air Compressors 1 8 3.5.4 CONSTRUCTION EMISSIONS SUMMARY For construction phase Project emissions, GHGs are quantified and amortized over the life of the Project. To amortize the emissions over the life of the Project, the SCAQMD recommends calculating the total GHG emissions for the construction activities, dividing it by a 30 -year project life then adding that number to the annual operational phase GHG emissions (53). As such, construction emissions were amortized over a 30 -year period and added to the annual operational phase GHG emissions. The amortized construction emissions are presented in Table 3-3. TABLE 3-3: AMORTIZED ANNUAL CONSTRUCTION EMISSIONS (1 OF 2) Construction Activities Emissions (MT/yr) CO2 CH4 N20 Total COze6 Phase A Grading Activities Crushing 487.60 0.02 0.00 488.06 Madison Avenue with Water Line 421.19 0.01 0.01 386.15 Grading & Tank Construction 1,666.85 0.53 0.00 1,680.09 Avenue 62 with Water line 829.53 0.02 0.01 760.56 6 CaIEEMod reports the most common GHGs emitted which include CO2, CH4, and N20. These GHGs are then converted into the CO2e by multiplying the individual GHG by the GWP. 12188-05 GHG Report 52 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-3: AMORTIZED ANNUAL CONSTRUCTION EMISSIONS (2 OF 2) Construction Activities Emissions (MT/yr) CO2 CH4 N20 Total CO2e7 Well Construction Well #1 486.31 0.15 0.00 490.03 Well #2 486.20 0.15 0.00 489.92 Well #3 486.11 0.15 0.00 489.82 Well #4 486.02 0.15 0.00 489.74 Well #5 479.51 0.15 0.00 483.17 Well #6 485.95 0.15 0.00 489.67 Well #7 579.72 0.02 0.00 580.11 Well #8 579.68 0.02 0.00 580.06 Well #9 579.68 0.02 0.00 580.06 Substation Construction Substation Construction 8,168.60 2.59 0.00 8,233.25 Phase B Grading Activities Crushing 730.97 0.03 0.00 731.61 Grading 1,667.09 0.53 0.00 1,680.35 Jefferson with Water Line 1,713.78 0.45 0.02 1,570.94 Physical Construction Phase 1 3,104.47 0.56 0.00 3,118.42 Phase 2 1,506.49 0.19 0.00 1,511.26 Phase 3 1,956.93 0.07 0.00 1,958.79 Total Construction Emissions 26,902.67 5.93 0.04 26,792.06 Amortized Construction Emissions (MTCO2e) 896.76 0.20 0.00 893.07 3.6 OPERATIONAL EMISSIONS Operational activities associated with the proposed Project will result in emissions of CO2, CH4, and N20 from the following primary sources: • Area Source Emissions • Energy Source Emissions • Mobile Source Emissions • Water Supply, Treatment, and Distribution • Solid Waste CaIEEMod reports the most common GHGs emitted which include CO2, CH4, and N20. These GHGs are then converted into the CO2e by multiplying the individual GHG by the GWP. 12188-05 GHG Report 53 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 3.6.1 AREA SOURCE EMISSIONS LANDSCAPE MAINTENANCE EQUIPMENT Landscape maintenance equipment would generate emissions from fuel combustion and evaporation of unburned fuel. Equipment in this category would include lawnmowers, shedders/grinders, blowers, trimmers, chain saws, and hedge trimmers used to maintain the landscaping of the Project. The emissions associated with landscape maintenance equipment were calculated based on assumptions provided in CaIEEMod. 3.6.2 ENERGY SOURCE EMISSIONS COMBUSTION EMISSIONS ASSOCIATED WITH NATURAL GAS AND ELECTRICITY GHGs are emitted from buildings as a result of activities for which electricity and natural gas are typically used as energy sources. Combustion of any type of fuel emits CO2 and other GHGs directly into the atmosphere; these emissions are considered direct emissions associated with a building; the building energy use emissions do not include street lighting'. GHGs are also emitted during the generation of electricity from fossil fuels; these emissions are considered to be indirect emissions. Unless otherwise noted, CaIEEMod default parameters were used. TITLE 24 ENERGY EFFICIENCY STANDARDS California's Energy Efficiency Standards for Residential and Nonresidential Buildings was first adopted in 1978 in response to a legislative mandate to reduce California's energy consumption. The standards are updated periodically to allow consideration and possible incorporation of new energy efficient technologies and methods. Energy efficient buildings require less electricity. The 2019 version of Title 24 was adopted by the CEC and became effective on January 1, 2020. The CEC anticipates that residential buildings will use approximately 53% less energy and nonresidential buildings will use approximately 30% less energy (41). The CaIEEMod defaults for Title 24 — Electricity, Title 24 — Natural Gas, and Lighting Energy were reduced by 30% for nonresidential uses and 53% for residential uses in order to reflect consistency with the 2019 Title 24 standard. 3.6.3 MOBILE SOURCE EMISSIONS The Project related operational air quality impacts derive primarily from vehicle trips generated by the Project. Trip characteristics available from the Travertine Specific Plan Traffic Phasing Analysis report were utilized in this analysis (54). 3.6.4 WATER SUPPLY, TREATMENT AND DISTRIBUTION Indirect GHG emissions result from the production of electricity used to convey, treat and distribute water and wastewater. The amount of electricity required to convey, treat and distribute water depends on the volume of water as well as the sources of the water. CaIEEMod $ The CaIEEMod emissions inventory model does not include indirect emission related to street lighting. Indirect emissions related to street lighting are expected to be negligible and cannot be accurately quantified at this time as there is insufficient information as to the number and type of street lighting that would occur. 12188-05 GHG Report 54 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis default parameters were used to estimate GHG emissions associated with water supply, treatment and distribution for the Project scenario. 3.6.5 SOLID WASTE Residential land uses will result in the generation and disposal of solid waste. A large percentage of this waste will be diverted from landfills by a variety of means, such as reducing the amount of waste generated, recycling, and/or composting. The remainder of the waste not diverted will be disposed of at a landfill. GHG emissions from landfills are associated with the anaerobic breakdown of material. GHG emissions associated with the disposal of solid waste associated with the proposed Project were calculated by CaIEEMod using default parameters. 3.7 SERVICE POPULATION Based on information provided in the Travertine Specific Plan Traffic Phasing Analysis report, it is anticipated that the Project would generate approximately 3,250 residents and 450 employees for the buildout of the Project (54). 3.8 EMISSIONS SUMMARY As shown on Table 3-4, the Project would result in 5.05 MTCO2e/SP per year compared to the threshold of 2.78 MTCO2e/SP per year and thus would exceed the SCAQMD/City's screening threshold. As such, Project -related emissions would have a potential significant direct or indirect impact on GHG and climate change. It should be noted that over time, emissions associated with the Project would be reduced through compliance with applicable state mandates for new development and new vehicle tailpipe emission standards (e.g., solar, carbon neutral, and EV requirements). TABLE 3-4: PROJECT GHG EMISSIONS Emission Source Emissions (MT/yr) CO2 CI -14 N20 Total CO2e Annual construction -related emissions amortized over 30 years 896.76 0.20 0.00 893.07 Area Source 959.74 0.03 0.02 965.70 Energy Source 6,741.68 0.15 0.05 6,760.15 Mobile Source 7,801.40 0.31 0.00 7,809.22 Waste 233.15 13.78 0.00 577.61 Water Usage 1,588.28 2.67 0.07 1,675.64 Total CO2e (All Sources) 18,681.38 Service Population 3,700 Total CO2e/Service Population 5.05 Screening Threshold (CO2e) 2.78 Threshold Exceeded? YES 12188-05 GHG Report 55 URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis City of La Quinta Climate Action Plan (CAP) The Project is located within the corporate limits of the City of La Quinta, which has adopted a GHG Reduction Plan. Section V of this plan includes community -wide implementation actions that are to be applied to all new development projects. The community -wide measures include: (1) reducing energy consumption which will already take place through IID's requirement to meet statewide mandates, compliance with Title 24 energy efficiency standards which require reducing energy demand and incorporating photovoltaic solar, (2) retrofitting existing structures and upgrading existing electric, natural gas appliances, light fixtures, and windows, which would reduce indirect GHG emissions, (3) implementation of statewide mandates to reduce emissions from the transportation sector through compliance with applicable fuel standards and electric vehicle (EV) requirements, and (4) reducing emissions associated with waste by reducing the waste stream and through diversion achieved via recycling, composting, and donation programs. The CAP also includes several recommended energy efficiency measures, transportation measures, and waste reduction measures at a policy level that will be encouraged for new development. 3.9 GREENHOUSE GAS EMISSIONS FINDINGS AND RECOMMENDATIONS GHG Impact #1: The Project would generate direct or indirect GHG emissions that would result in a significant impact on the environment. The Project would result in 5.05 MTCO2e/SP per year in 2031 as summarized in Table 3-4 (presented previously). As such, the Project total GHG emissions would exceed the screening threshold of 2.78 MTCO2e/SP per year. Thus, Project -related emissions would have a potential significant direct or indirect impact on GHG and climate change. GHG Impact #2: The Project would not conflict with any applicable plan, policy or regulation of an agency adopted for the purpose of reducing the emissions of GHG. GHG emissions reduction plans, policies and regulations applicable to the Project include SB 32 (including related 2017Scoping Plan elements). Project consistency with SB 32 is evaluated in the following discussion. SB 32/2017SCOPING PLAN CONSISTENCY The 2017 Scoping Plan reflects the 2030 target of a 40% reduction below 1990 levels, set by Executive Order B-30-15 and codified by SB 32. Table 3-5 summarizes the project's consistency with the 2017 Scoping Plan. As summarized, the project will not conflict with any of the provisions of the 2017 Scoping Plan and in fact supports seven of the action categories. 12188-05 GHG Report 56 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis TABLE 3-5: 2017 SCOPING PLAN CONSISTENCY SUMMARY9 Action Responsible Parties Consistency Implement SB 350 by 2030 Increase the Renewables Portfolio Standard to 50% of retail sales by 2030 and ensure grid reliability. CPUC, CEC, CARB Consistent. The Project would use energy from Southern California Edison (SCE). SCE has committed to diversify its portfolio of energy sources by increasing energy from wind and solar sources. The Project would not interfere with or obstruct SCE energy source diversification efforts. Establish annual targets for statewide energy efficiency savings and demand reduction that will achieve a cumulative doubling of statewide energy efficiency savings in electricity and natural gas end uses by 2030. Consistent. The Project would be designed and constructed to implement the energy efficiency measures and would include several measures designed to reduce energy consumption. The Project would not interfere with or obstruct policies or strategies to establish annual targets for statewide energy efficiency savings and demand reduction. Reduce GHG emissions in the electricity sector through the implementation of the above measures and other actions as modeled in Integrated Resource Planning (IRP) to meet GHG emissions reductions planning targets in the IRP process. Load- serving entities and publicly- owned utilities meet GHG emissions reductions planning targets through a combination of measures as described in IRPs. Consistent. The proposed Project would be designed and constructed to implement the energy efficiency measures, where applicable by including several measures designed to reduce energy consumption. The proposed Project includes energy efficient field lighting and fixtures that meet the current Title 24 Standards throughout the Project Site and would be a modern development with energy efficient boilers, heaters, and air conditioning systems. Implement Mobile Source Strategy (Cleaner Technology and Fuels) At least 1.5 million zero emission and plug- in hybrid light-duty EV by 2025. CARB, California State Transportation Agency (CaISTA), Strategic Growth Council (SGC), California Department of Transportation (Caltrans), CEC, OPR, Local Agencies Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB zero emission and plug-in hybrid light-duty EV 2025 targets. At least 4.2 million zero emission and plug- in hybrid light-duty EV by 2030. Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB zero emission and plug-in hybrid light-duty EV 2030 targets. Further increase GHG stringency on all light-duty vehicles beyond existing Advanced Clean cars regulations. Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB efforts to further increase GHG stringency on all light-duty vehicles beyond existing Advanced Clean cars regulations. 9 Measures can be found at the following link: https://www.arb.ca.gov/cc/scopingplan/scoping_plan_2017.pdf 12188-05 GHG Report 57 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Action Responsible Parties Consistency Medium and Heavy Duty GHG Phase 2. Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB efforts to implement Medium- and Heavy -Duty GHG Phase 2 Innovative Clean Transit: Transition to a suite of to -be -determined innovative clean transit options. Assumed 20% of new urban buses purchased beginning in 2018 will be zero emission buses with the penetration of zero -emission technology ramped up to 100% of new sales in 2030. Also, new natural gas buses, starting in 2018, and diesel buses, starting in 2020, meet the optional heavy-duty low-NOx standard. Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB efforts improve transit -source emissions. Last Mile Delivery: New regulation that would result in the use of low NOx or cleaner engines and the deployment of increasing numbers of zero -emission trucks primarily for class 3-7 last mile delivery trucks in California. This measure assumes ZEVs comprise 2.5% of new Class 3-7 truck sales in local fleets starting in 2020, increasing to 10% in 2025 and remaining flat through 2030. Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB efforts to improve last mile delivery emissions. Further reduce vehicle miles traveled (VMT) through continued implementation of SB 375 and regional Sustainable Communities Strategies; forthcoming statewide implementation of SB 743; and potential additional VMT reduction strategies not specified in the Mobile Source Strategy but included in the document "Potential VMT Reduction Strategies for Discussion." Consistent. This Project would not obstruct or interfere with implementation of SB 375 and would therefore not conflict with this measure. Increase stringency of SB 375 Sustainable Communities Strategy (2035 targets). CARB Consistent. This is a CARB Mobile Source Strategy. The Project would not obstruct or interfere with CARB efforts to Increase stringency of SB 375 Sustainable Communities Strategy (2035 targets). 12188-05 GHG Report 58 moi URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Action Responsible Parties Consistency Harmonize project performance with emissions reductions and increase competitiveness of transit and active transportation modes (e.g. via guideline documents, funding programs, project selection, etc.). Ca ISTA, SGC, OPR, CARB, Governor's Office of Business and Economic Development (GO- Biz), California Infrastructure and Economic Development Bank (IBank), Department of Finance (DOF), California Transportation Commission (CTC), Caltrans Consistent. The Project would not obstruct or interfere with agency efforts to harmonize transportation facility project performance with emissions reductions and increase competitiveness of transit and active transportation modes. By 2019, develop pricing policies to support low-GHG transportation (e.g. low -emission vehicle zones for heavy duty, road user, parking pricing, transit discounts). Ca ISTA, Caltrans, CTC, OPR, SGC, CARB Consistent. The Project would not obstruct or interfere with agency efforts to develop pricing policies to support low - GHG transportation. Implement California Sustainable Freight Action Plan Improve freight system efficiency. Ca ISTA, CaIEPA, CNRA, CARB, Caltrans, CEC, GO -Biz Consistent. This measure would apply to all trucks accessing the Project site, this may include existing trucks or new trucks that are part of the statewide goods movement sector. The Project would not obstruct or interfere with agency efforts to Improve freight system efficiency. Deploy over 100,000 freight vehicles and equipment capable of zero emission operation and maximize both zero and near zero emission freight vehicles and equipment powered by renewable energy by 2030. Consistent. The Project would not obstruct or interfere with agency efforts to deploy over 100,000 freight vehicles and equipment capable of zero emission operation and maximize both zero and near -zero emission freight vehicles and equipment powered by renewable energy by 2030. Adopt a Low Carbon Fuel Standard with a Carbon Intensity reduction of 18%. CARB Consistent. When adopted, this measure would apply to all fuel purchased and used by the Project in the state. The Project would not obstruct or interfere with agency efforts to adopt a Low Carbon 12188-05 GHG Report 59 tmoi URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Action Responsible Parties Consistency Fuel Standard with a Carbon Intensity reduction of 18%. Implement the Short -Lived Climate Pollutant Strategy (SLPS) by 2030 40% reduction in methane and hydrofluorocarbon emissions below 2013 levels. CARB, CalRecycle, CDFA, SWRCB, Local Air Districts Consistent. The Project would be required to comply with this measure and reduce any Project -source SLPS emissions accordingly. The Project would not obstruct or interfere agency efforts to reduce SLPS emissions. 50% reduction in black carbon emissions below 2013 levels. By 2019, develop regulations and programs to support organic waste landfill reduction goals in the SLCP and SB 1383. CARB, California Recycling Market Development Act (CalRecycle), CDFA, California State Water Resource Control Board (SWRCB), Local Air Districts Consistent. The Project would implement waste reduction and recycling measures consistent with State and City requirements. The Project would not obstruct or interfere agency efforts to support organic waste landfill reduction goals in the SLCP and SB 1383. Implement the post -2020 Cap -and -Trade Program with declining annual caps. CARB Consistent. The Project would be required to comply with any applicable Cap -and - Trade Program provisions. The Project would not obstruct or interfere agency efforts to implement the post -2020 Cap - and -Trade Program. By 2018, develop Integrated Natural and Working Lands Implementation Plan to secure California's land base as a net carbon sink Protect land from conversion through conservation easements and other incentives. CNRA, Departments Within CDFA, CaIEPA, CARB Consistent. The Project would not obstruct or interfere agency efforts to protect land from conversion through conservation easements and other incentives. Increase the long-term resilience of carbon storage in the land base and enhance sequestration capacity Consistent. The Project site is vacant disturbed property and does not comprise an area that would effectively provide for carbon sequestration. The Project would not obstruct or interfere agency efforts to increase the long-term resilience of carbon storage in the land base and enhance sequestration capacity. 12188-05 GHG Report 60 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis Action Responsible Parties Consistency Utilize wood and agricultural products to increase the amount of carbon stored in the natural and built environments Consistent. Where appropriate, Project designs will incorporate wood or wood products. The Project would not obstruct or interfere agency efforts to encourage use of wood and agricultural products to increase the amount of carbon stored in the natural and built environments. Establish scenario projections to serve as the foundation for the Implementation Plan Consistent. The Project would not obstruct or interfere agency efforts to establish scenario projections to serve as the foundation for the Implementation Plan. Establish a carbon accounting framework for natural and working lands as described in SB 859 by 2018 CARB Consistent. The Project would not obstruct or interfere agency efforts to establish a carbon accounting framework for natural and working lands as described in SB 859 by 2018. Implement Forest Carbon Plan CN RA, California Department of Forestry and Fire Protection (CALFIRE), CaIEPA and Departments Within Consistent. The Project would not obstruct or interfere agency efforts to implement the Forest Carbon Plan. Identify and expand funding and financing mechanisms to support GHG reductions across all sectors. State Agencies & Local Agencies Consistent. The Project would not obstruct or interfere agency efforts to identify and expand funding and financing mechanisms to support GHG reductions across all sectors. As shown above, the Project would not conflict with any of the 2017 Scoping Plan elements as any regulations adopted would apply directly or indirectly to the Project. Further, recent studies show that the State's existing and proposed regulatory framework will allow the State to reduce its GHG emissions level to 40% below 1990 levels by 2030 (36). 12188-05 GHG Report 61 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report 62 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 4 REFERENCES 1. State of California. 2019 CEQA California Environmental Quality Act. 2019. 2. Air Resources Board. Assembly Bill 32: Global Warming Solutions Act. [Online] 2006. http://www.arb.ca.gov/cc/ab32/ab32.htm. 3. -. Sustainable Communities. [Online] 2008. http://www.arb.ca.gov/cc/sb375/sb375.htm. 4. -. Clean Car Standards - Pavley, Assembly Bill 1493. [Online] September 24, 2009. http://www.arb.ca.gov/cc/ccms/ccms.htm. 5. Building Standards Commission. California Building Standards Code (Title 24, California Code of Regulations). [Online] http://www.bsc.ca.gov/codes.aspx. 6. California Energy Commission. California Code of Regulations, TITLE 20, Division 2. [Online] September 3, 2013. http://www.energy.ca.gov/reports/title20/index.html. 7. Air Resources Board. Title 17 - California Code of Regulation. [Online] 2010. http://www.arb.ca.gov/regs/regs-17.htm. 8. Department of Water Resources. Updated Model Water Efficient Landscape Ordinance AB 1881. [Online] 2006. [Cited: November 13, 2013.] http://www.water.ca.gov/wateruseefficiency/landscapeordinance/updatedOrd_history.cfm. 9. California Energy Commission. SB 1368 Emission Performance Standards. [Online] September 29, 2006. http://www.energy.ca.gov/emission_standards/. 10. -. Renewables Portfolio Standard (RPS). [Online] 2002. http://www.energy.ca.gov/portfolio/. 11. California Legislative Information. Senate Bill No. 32. [Online] September 8, 2016. https://leginfo.legislature.ca.gov/faces/billNavClient.xhtml?bill_id=201520160SB32. 12. South Coast Air Quality Management District. RULE 445. Wood -Burning Devices. [Online] http://www.agmd.gov/docs/default-source/rule-book/rule-iv/rule-445.pdf. 13. National Oceanic and Atmospheric Administration. Greenhouse Gases - Water Vapor. NOAA National Centers For Environmental Information. [Online] https://www. ncdc.noaa.gov/monitoring- references/faq/greenhouse-gases.php?section=watervapor. 14. Climate Change 2007: The Physical Science Basis. Contribution of Working Group I to the Fourth Assessment Report. International Panel on Climate Change. 4, 2007. 15. The Carbon Cycle and Climate Change. Bennington, Bret J. 1, s.l. : Brooks/Cole. ISBN 1 3: 978-0-495- 73855-8. 16. The National Institute for Occupational Safety and Health. Carbon Dioxide. Centers for Disease Control and Prevention. [Online] https://www.cdc.gov/niosh/npg/npgd0103.html. 17. National Oceanic and Atmospheric Administration. Greenhouse Gases - Methane. NOAA National Centers for Environmental Information. [Online] https://www.ncdc.noaa.gov/monitoring- references/faq/greenhouse-gases.php?section=methane. 18. World Resources Institute. Climate Analysis Indicator Tool (CAIT). [Online] http://cait.wri.org. 19. National Oceanic and Atmospheric Administration. Greenhouse Gases - Chlorofluorocarbons. NOAA National Centers For Environmental Information. [Online] https://www. ncdc.noaa.gov/monitoring- references/faq/greenhouse-gases.php?section=chlorofluorocarbons. 12188-05 GHG Report 63 (? URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 20. United States Environmental Protection Agency. Regulation for Reducting Sulfur Hexafluoride Emissions from Gas Insulated Switchgear. Environmental Protection Agency. [Online] May 7, 2014. https://www.epa.gov/sites/production/files/2016-02/documents/mehl-arb-presentation-2014- wkshp.pdf. 21. World Resources Institute. Nitrogen Trifluoride Now Required in GHG Protocol Greenhouse Gas Emissions Inventory. [Online] May 22, 2013. https://www.wri.org/blog/2013/05/nitrogen- trifluoride-now-required-ghg-protocol-greenhouse-gas-emissions-inventories. 22. National Center for Biotechnology Information. Nitrogen Trifluoride. PubChem Compound Database. [Online] https://pubchem.ncbi.nlm.nih.gov/compound/24553 . 23. American Lung Association. Climate Change. [Online] http://www.lung.org/our-initiatives/healthy- air/outdoor/climate-change/. 24. Barbara H. Allen -Diaz. Climate change affects us all. University of California Agriculture and Natural Resources. [Online] April 1, 2009. http://calag.ucanr.edu/Archive/?article=ca.v063n02p51. 25. Intergovernmental Panel on Climate Change. Climate Change 2013 The Physical Science Basis - Working Group 1 Contribution to the Fifth Assessment Report of the Intergovernmental Panel on Climate Change. AR5 Climate Change 2013: The Physical Science Basis. [Online] September 2013. https://www.ipcc.ch/site/assets/uploads/2018/02/WG1AR5_all_final.pdf. 26. United Nations. GHG Profiles - Annex 1. [Online] http://di.unfccc.int/ghg_profile_annexl. 27. -. GHG Profiles - Non -Annex I. [Online] http://di.unfccc.int/ghg_profile_non_annexl. 28. World Resources Institute. Climate Analysis Indicator Tool (CAIT). [Online] http://cait.wri.org. 29. Air Resources Board. 2019 GHG Inventory. California Greenhouse Gas Emission Inventory2000-2017 Edition. [Online] [Cited: September 19, 2019.] http://www.arb.ca.gov/cc/inventory/data/data.htm. 30. Center for Climate and Energy Solutions (C2ES). Outcomes of the U.N. Climate Change Conference. Center for Climate and Energy Solutions (C2ES). [Online] 2015. http://www.c2es.org/international/negotiations/cop21-paris/summary. 31. Agency, United States Environmental Protection. Endangerment and Cause or Contribute Findings for Greenhouse Gases under the Section 202(a) of the Clean Air Act. United States Environmental Protection Agency. [Online] https://www.epa.gov/ghgemissions/endangerment-and-cause-or- contribute-findings-greenhouse-gases-under-section-202a-clean. 32. Federal Register. Mid -Term Evaluation of Greenhouse Gas Emissions Standards for Model Year 2022-2025 Light -Duty Vehicles. [Online] April 13, 2018. https://www.federa l register.gov/docu ments/2018/04/13/2018-07364/m id -term -evaluation -of - greenhouse -gas -emissions -standards -for -model -year -2022 -2025 -light-duty. 33. Environmental Protection Agency. The Safer Affordable Fuel -Efficient Vehicles Rule for Model Years 2021-2026 Passenger Cars and Light Trucks. [Online] August 24, 2018. https://www. regu latio ns.gov/docu ment?D=E PA -H Q -OAR -2018-0283-0756. 34. United States Environmental Protection Agency. SmartWay. [Online] https://www.epa.gov/smartway/learn-about-smartway. 35. California Air Resources Board. California's 2017 Climate Change Scoping Plan . [Online] 2017. https://ww3.arb.ca.gov/cc/scopingplan/scoping_plan_2017_es.pdf. 36. Lawrence Berkeley National Laboratory. California's Policies Can Significantly Cut Greenhouse Gas Emissions through 2030. Lawrence Berkeley National Laboratory. [Online] January 22, 2015. 12188-05 GHG Report 64 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis http://newscenter.lbl.gov/2015/01/22/californias-policies-can-significantly-cut-greenhouse-gas- emissions-2030/. 37. Ernest Orlando Lawrence Berkeley National Laboratory. Modeling California policy impacts on greenhouse gas emissions. [Online] 2015. https://eaei.lbl.gov/sites/all/files/IbnI-7008e.pdf. 38. California Air Resources Board. Legal Disclaimer & User's Notice. [Online] April 2019. https://ww3.arb.ca.gov/cc/capandtrade/capandtrade/ct_reg_unofficial.pdf. 39. -. Climate Change Scoping Plan. [Online] 2014. https://ww3.arb.ca.gov/cc/scopingplan/2013_update/first_update_climate_change_scoping_plan.p df. 40. -. Low Carbon Fuel Standard. [Online] December 2019. https://ww3.arb.ca.gov/fuels/Icfs/Icfs.htm. 41. The California Energy Commission. 2019 Building Energy Efficiency Standards . California Energy Commission. [Online] 2018. https://www.energy.ca.gov/titl e24/2019sta nda rds/documents/2018_Titl e_24_2019_Bu i Id i ng_Sta n d a rds_FAQ. pdf. 42. Department of General Services. Building Standards Commission. CALGreen. [Online] https://www.dgs.ca.gov/BSC/Resources/Page-Content/Building-Standards-Commission-Resources- List-Folder/CALGreen. 43. Association of Environmental Professionals. 2018 CEQA California Environmental Quality Act. 2018. 44. South Coast Air Quality Management District. Interim CEQA GHG Significance Threshold for Stationary Sources, Rules and Plans. [Online] http://www.agmd.gov/home/rules- compliance/ceqa/air-quality-analysis-handbook/ghg-significance-thresholds. 45. State of California. 2019 CEQA California Environmental Quality Act. 2019. 46. California Air Pollution Control Officers Association (CAPCOA). California Emissions Estimator Model (CaIEEMod). [Online] September 2016. www.caleemod.com. 47. California Department of Transportation. EMFAC Software. [Online] http://www.dot.ca.gov/hq/env/air/pages/emfac.htm. 48. California Air Pollution Control Officers Association (CAPCOA). Appendix A: Calculation Details for CaIEEMod. CaIEEMod. [Online] October 2017. http://www.agmd.gov/docs/default- source/caleemod/02_appendix-a2016-3-2.pdf?sfvrsn=6. 49. California Natural Resources Agency. Final Statement of Reasons for Regulatory Action, Amendments to the State CEQA Guidelines Addressing Analysis and Mitigation of Greenhouse Gas Emissions Pursuant to SB97. [Online] December 2009. 50. Minutes for the GHG CEQA Significance. South Coast Air Quality Managment District. 2008. 51. Urban Crossroads, Inc. Travertine Specific Plan Air Quality Impact Analysis Report. 2020. 52. State of California. 2019 CEQA California Environmental Quality Act. 2019. 53. South Coast Air Quality Management District. Greenhouse Gas CEQA Significance Threshold Stakeholder Working Group #13. [Powerpoint] Diamond Bar : s.n., 2009. 54. Urban Crossroads, Inc. Travertine Specific Plan Traffic Phasing Analysis. 2020. 55. Air Resources Board. 2019 GHG Inventory. California Greenhouse Gas Emission Inventory2000-2017 Edition. [Online] [Cited: September 19, 2019.] http://www.arb.ca.gov/cc/inventory/data/data.htm. 12188-05 GHG Report 65 I?i URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report 66 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis 5 CERTIFICATIONS The contents of this GHG study report represent an accurate depiction of the GHG impacts associated with the proposed Travertine Specific Plan Project. The information contained in this GHG report is based on the best available data at the time of preparation. If you have any questions, please contact me directly at hqureshi@urbanxroads.com. Haseeb Qureshi Associate Principal URBAN CROSSROADS, INC. hqureshi@urbanxroads.com EDUCATION Master of Science in Environmental Studies California State University, Fullerton • May 2010 Bachelor of Arts in Environmental Analysis and Design University of California, Irvine • June 2006 PROFESSIONAL AFFILIATIONS AEP—Association of Environmental Planners AWMA — Air and Waste Management Association ASTM — American Society for Testing and Materials PROFESSIONAL CERTIFICATIONS Environmental Site Assessment — American Society for Testing and Materials • June 2013 Planned Communities and Urban InfilI — Urban Land Institute • June 2011 Indoor Air Quality and Industrial Hygiene — EMSL Analytical • April 2008 Principles of Ambient Air Monitoring — CARB • August 2007 AB2588 Regulatory Standards — Trinity Consultants • November 2006 Air Dispersion Modeling — Lakes Environmental • June 2006 12188-05 GHG Report 67 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report 68 (_mo) URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.1: CALEEMOD PHASE A CRUSHING EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Phase A Crushing - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 768.47 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2024 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2024 Land Use - Construction Phase - Phase A Crushing anticipated to start Quarter 3 of 2023 and end Quarter 4 of 2024 Off-road Equipment - Type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. This model assumed use of Sandvik QJ331 which has a horsepower of 350. Trips and VMT - Crushing activities will occur anywhere onsite within the grading limits. Demolition - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblConstructionPhase tblConstructionPhase tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics tblTripsAndVMT • NumDays 500.00 • 390.00 Y t T • PhaseEndDate 5/30/2025 12/27/2024 • Y• HorsePower r 85.00 T• 350.00 r Y t T • OffRoadEquipmentType Crushing/Proc. Equipment Y t T • OffRoadEquipmentUnitAmount 1.00 0.00 Y t T • OffRoadEquipmentUnitAmount 3.00 • 0.00 Y t T • OffRoadEquipmentUnitAmount 2.00 0.00 Y t T • CO2lntensityFactor 1270.9 768.47 Y 1 1. • HaulingTripNumber 68,419.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 20 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2023 •i 0.0770 0.3844 0.3371 1.5800e- 2.4847 0.0132 2.4978 0.3764 0.0132 0.3895 • 0.0000 i 162.5626 162.5626 6.2700e- 0.0000 162.7194 J J J J J J J J . J J J T 003 003 1r J .1 .1 J .1 J .1 .1 .1 .1 J 2024 •i 0.1463 0.6748 0.6724 3.1600e- 4.9693 0.0219 4.9912 0.7528 0.0219 0.7747 • 0.0000 i 325.0387 325.0387 0.0120 0.0000 325.3379 Maximum 003 0.6748 • 3.1600e- Maximum 0.1463 0.6748 0.6724 3.1600e- 4.9693 0.0219 4.9912 0.7528 0.0219 0.7747 0.0000 325.0387 325.0387 0.0120 0.0000 325.3379 11 Reduction 003 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2023 •i 0.0770 0.3844 0.3371 1.5800e- 0.9700 0.0132 1 0.9831 0.1471 0.0132 0.1602 • 0.0000 i 162.5624 162.5624 6.2700e- 0.0000 162.7192 003 ; 003 J J J J J J J J . J J J T 2024 •i 0.1463 0.6748 0.6724 3.1600e- 1.9400 0.0219 1.9619 0.2941 0.0219 0.3160 • 0.0000 i 325.0383 325.0383 0.0120 0.0000 325.3376 Total 003 PM2.5 Total Maximum 0.1463 0.6748 0.6724 3.1600e- 1.9400 0.0219 1.9619 0.2941 0.0219 0.3160 0.0000 325.0383 325.0383 0.0120 0.0000 325.3376 0.00 0.00 0.00 0.00 003 0.00 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.96 0.00 60.68 60.93 0.00 59.10 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 7-1-2023 9-30-2023 0.2332 0.2332 2 10-1-2023 12-31-2023 0.2332 0.2332 3 1-1-2024 3-31-2024 0.2053 0.2053 4 4-1-2024 6-30-2024 0.2053 0.2053 5 7-1-2024 9-30-2024 0.2076 0.2076 el J J J .1 J .1 J .1 4 J J J T Highest 0.2332 0.2332 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area •i 2.0043 4.0000e- 4.2500e- 0.0000 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 i 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 9005 003 005 005 005 005 003 003 005 I 003 f� J J J .1 J J J J V J J .1 T Energy 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 el J J J .1 J .1 J .1 4 J J J T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J .1 .1 J .1 J .1 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0043 4.0000e- 4.2500e- 0.0000 0.0000 2.0000e- 2.0000e- 0.0000 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 20 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 •1 •1 2.0043 4.0000e- 1 4.2500e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 9 005 003 1 005 005 005 005 V 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 i 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 003 003 005 1 i 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 2.0043 4.0000e- 005 4.2500e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :7/1/2023 :12/27/2024 5: 390: Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 0 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount I Usage Hours I Horse Power I Load Factor Demolition Demolition Demolition Demolition :Concrete/Industrial Saws :Crushing/Proc. Equipment :Excavators :Rubber Tired Dozers 1 0 1- 0: 8.001 8.001 8.001 8.00: 81: 350: 158: 247: 0.73 0.78 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 1' 3.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix .HDT Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 20 3.2 Demolition - 2023 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 2.4830 0.0000 2.4830 0.3760 0.0000 0.3760 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.0764 0.3840 0.3330 1.5600e- 0.0131 0.0131 0.0131 0.0131 • 0.0000 i 161.3515 161.3515 6.2500e- 0.0000 161.5076 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • 003 Total 0.0764 0.3840 0.3330 1.5600e- 2.4830 0.0131 2.4962 0.3760 0.0131 0.3891 0.0000 161.3515 161.3515 6.2500e- 0.0000 161.5076 1.6000e- 1.0000e- 1.6100e- 4.3000e- 003 4.3000e- 0.0000 1.2111 1.2111 3.0000e- 0.0000 1.2118 003 004 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J Worker • 5.9000e- 3.5000e- 4.0700e- 1.0000e- 1.6000e- 1.0000e- 1.6100e- 4.3000e- 1.0000e- 4.3000e- • 0.0000 i 1.2111 1.2111 3.0000e- 0.0000 1.2118 004 004 003 005 003 005 003 004 005 004 : 005 Total 5.9000e- 3.5000e- 4.0700e- 1.0000e- 1.6000e- 1.0000e- 1.6100e- 4.3000e- 1.0000e- 4.3000e- 0.0000 1.2111 1.2111 3.0000e- 0.0000 1.2118 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 20 3.2 Demolition - 2023 Mitigated Construction On -Site Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.9684 0.0000 0.9684 0.1466 0.0000 0.1466 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.0764 0.3840 0.3330 1.5600e- 0.0131 0.0131 0.0131 0.0131 • 0.0000 i 161.3513 161.3513 6.2500e- 0.0000 161.5074 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • 003 Total 0.0764 0.3840 0.3330 1.5600e- 0.9684 0.0131 0.9815 0.1466 0.0131 0.1598 0.0000 161.3513 161.3513 6.2500e- 0.0000 161.5074 1.6000e- 1.0000e- 1.6100e- 4.3000e- 003 4.3000e- 0.0000 1.2111 1.2111 3.0000e- 0.0000 1.2118 003 004 003 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J Worker • 5.9000e- 3.5000e- 4.0700e- 1.0000e- 1.6000e- 1.0000e- 1.6100e- 4.3000e- 1.0000e- 4.3000e- • 0.0000 i 1.2111 1.2111 3.0000e- 0.0000 1.2118 004 004 003 005 003 005 003 004 005 004 : 005 Total 5.9000e- 3.5000e- 4.0700e- 1.0000e- 1.6000e- 1.0000e- 1.6100e- 4.3000e- 1.0000e- 4.3000e- 0.0000 1.2111 1.2111 3.0000e- 0.0000 1.2118 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 20 3.2 Demolition - 2024 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 4.9661 0.0000 4.9661 0.7519 0.0000 0.7519 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Off -Road •i 0.1452 0.6741 0.6647 3.1300e- 0.0219 0.0219 0.0219 0.0219 • 0.0000 i 322.7029 322.7029 0.0119 0.0000 323.0010 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.1452 0.6741 0.6647 3.1300e- 4.9661 0.0219 4.9880 0.7519 0.0219 0.7738 0.0000 322.7029 322.7029 0.0119 0.0000 323.0010 3.2100e- 2.0000e- 3.2300e- 8.5000e- 003 8.7000e- 0.0000 2.3358 2.3358 5.0000e- 0.0000 2.3369 - 003 004 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J V Worker • 1.1200e- 6.4000e- 7.6100e- 3.0000e- 3.2100e- 2.0000e- 3.2300e- 8.5000e- 2.0000e- 8.7000e- • 0.0000 i 2.3358 2.3358 5.0000e- 0.0000 2.3369 003 004 003 005 003 005 003 004 005 004 : 005 Total 1.1200e- 6.4000e- 7.6100e- 3.0000e- 3.2100e- 2.0000e- 3.2300e- 8.5000e- 2.0000e- 8.7000e- 0.0000 2.3358 2.3358 5.0000e- 0.0000 2.3369 - 003 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 20 3.2 Demolition - 2024 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 1.9368 0.0000 1.9368 0.2933 0.0000 0.2933 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Off -Road •i 0.1452 0.6741 0.6647 3.1300e- 0.0219 0.0219 0.0219 0.0219 • 0.0000 i 322.7025 322.7025 0.0119 0.0000 323.0006 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 : 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.1452 0.6741 0.6647 3.1300e- 1.9368 0.0219 1.9587 0.2933 0.0219 0.3152 0.0000 322.7025 322.7025 0.0119 0.0000 323.0006 3.2100e- 2.0000e- 3.2300e- 8.5000e- 003 8.7000e- 0.0000 2.3358 2.3358 5.0000e- 0.0000 2.3369 - 003 004 003 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 : 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J V Worker • 1.1200e- 6.4000e- 7.6100e- 3.0000e- 3.2100e- 2.0000e- 3.2300e- 8.5000e- 2.0000e- 8.7000e- • 0.0000 i 2.3358 2.3358 5.0000e- 0.0000 2.3369 003 004 003 005 003 005 003 004 005 004 : 005 Total 1.1200e- 6.4000e- 7.6100e- 3.0000e- 3.2100e- 2.0000e- 3.2300e- 8.5000e- 2.0000e- 8.7000e- 0.0000 2.3358 2.3358 5.0000e- 0.0000 2.3369 - 003 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 ; 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 •� I I I • 1 1 Unmitigated . 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.551648. 0.035769; 0.187848; 0.110184: 0.013450: 0.004660: 0.017552: 0.070120: 0.001413: 0.001134: 0.004476: 0.000905: 0.000840 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.551648. 0.035769; 0.187848; 0.110184: 0.013450: 0.004660: 0.017552: 0.070120: 0.001413: 0.001134: 0.004476: 0.000905: 0.000840 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 12 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity Mitigated •i 1 1 1 1 1, 0.0000 1 0.0000 1 ; 0.0000 'I I 1 1 1 1 1 1 1 9 1 .1 1 .1 1 .1 Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 Unmitigated .� 1 1 1 1 1 1 1 1 NaturalGas •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 Mitigated .� 1 1 1 1 1 1 1 1 NaturalGas . 0.0000 i 0.0000 : 0.0000 • 0.0000 i • 0.0000 • 0.0000 i • 0.0000 0.0000 • 0.0000 Unmitigated 0.0000 • • ▪ 0.0000 0.0000 • • 0.0000 • 0.0000 0.0000 0.0000 0 .0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Non- 0 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Asphalt Surfaces i 1 i ; 0.0000 0.0000 1 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Non- Asphalt Surfaces 10 .i i i 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •i i i 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •u i i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 2.0043 i 4.0000e- i 4.2500e- i 0.0000 : i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • 0.0000 i 8.2700e- i 8.2700e- i 2.0000e- i 0.0000 ! 8.8100e- 9 1 005 1 003 1 1 1 005 1 005 1 1 005 1 1 005 ; ' 003 1 003 005 i 003 •1 I 1 1 1 1 1 1 I • 1 I 1 • I. 1. 1. F 1. 4. 1. 4. F r . 4. 1. 1. r Unmitigated • 2.0043 • 4.0000e- • 4.2500e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0000 • 8.2700e- • 8.2700e- • 2.0000e- • 0.0000 • 8.8100e- 005 003 005 005 005 005 003 003 005 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7008 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: J J .1 .1 J J J .1 . J J .1 T Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products J J J .1 J J J .1 . J J J T Landscaping • 3.9000e- 4.0000e- 4.2500e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 i 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 003 Total 2.0043 4.0000e- 4.2500e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 20 6.2 Area by SubCategory Mitigated Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7008' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: .1 J Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products .1 J Landscaping • 3.9000e- 4.0000e- 4.2500e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 1 003 Total 2.0043 4.0000e- 4.2500e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •I 0.0000 : 0.0000 : 0.0000 . 0.0000 'I I 1 0.0000 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- 10 / 0 •i Asphalt Surfaces I 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 18 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 19 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces 1 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 20 Date: 1/5/2021 2:55 PM Travertine Specific Plan (Phase A Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.2: CALEEMOD PHASE A GRADING & TANK CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Phase A Grading - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Construction Phase - Phase A Grading anticipated to start Quarter 4 of 2023 and end Quarter 3 of 2025 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming Maximum Daily Disturbed Acreage of 5 acres. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblAreaCoating tblConstructionPhase tblGrading tblOffRoadEquipment tblProjectCharacteristics 1 Column Name Area_Parking • • • • Default Value New Value NumDays AcresOfGrading OffRoadEquipmentUnitAmount CO2lntensityFactor 1209576 775.00 1,823.50 2.00 1270.9 1214016 521.00 2,605.00 0.00 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 23 2.1 Overall Construction Unmitigated Construction Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2023 •i 0.1290 1.3562 0.9260 2.3700e- 1 1.5824 0.0543 1.6367 0.2582 0.0500 0.3081 • 0.0000 i 208.2065 208.2065 0.0661 1 0.0000 209.8594 .1003 .1 ; 003 . J .1 .1 J .1 J .1 .1 .1 .1 J 2024 •i 0.5025 5.1102 3.6741 9.5400e- 2.1918 0.2059 2.3977 0.5885 0.1895 0.7780 • 0.0000 i 838.4906 838.4906 0.2664 0.0000 845.1511 003 J .1 .1 J .1 J .1 .1 .1 .1 J 2025 •i 0.3335 3.2221 2.5648 7.0600e- 1.9814 0.1293 2.1107 0.4745 0.1189 0.5934 • 0.0000 i 620.1550 620.1550 0.1972 0.0000 625.0842 5.1102 003 9.5400e- • 0.2059 Maximum 0.5025 5.1102 3.6741 9.5400e- 2.1918 0.2059 2.3977 0.5885 0.1895 0.7780 0.0000 838.4906 838.4906 0.2664 0.0000 845.1511 1 003 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2023 .i 0.1290 1 1.3562 : 0.9260 2.3700e- 1 0.6204 1 0.0543 0.6747 , 0.1016 1 0.0500 0.1515 • 0.0000 i 208.2063 208.2063 1 0.0661 1 0.0000 209.8592 •1003 ; J J J .1 J J J J w J J .1 2024 •i 0.5025 5.1102 3.6741 9.5400e- 0.8679 0.2059 1.0739 0.2330 0.1895 0.4225 • 0.0000 i 838.4897 838.4897 0.2664 0.0000 845.1501 003 . J J J .1 J J J J . J J .1 2025 •i 0.3335 3.2221 2.5648 7.0600e- 0.7825 0.1293 0.9117 0.1876 0.1189 0.3066 • 0.0000 i 620.1542 620.1542 0.1972 0.0000 625.0835 003 . • Maximum 0.5025 5.1102 3.6741 9.5400e- 0.8679 0.2059 1.0739 0.2330 0.1895 0.4225 0.0000 838.4897 838.4897 0.2664 0.0000 845.1501 1 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Quarter ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e 6-30-2024 1.3926 1.3926 4 7-1-2024 PM10 PM10 Total PM2.5 PM2.5 Total 1.4079 1.4079 6 1-1-2025 3-31-2025 1.1784 Percent 0.00 0.00 0.00 0.00 60.55 0.00 56.71 60.47 0.00 47.57 0.00 0.00 0.00 0.00 0.00 0.00 Reduction Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 10-1-2023 12-31-2023 1.5016 1.5016 2 1-1-2024 3-31-2024 1.3926 1.3926 3 4-1-2024 6-30-2024 1.3926 1.3926 4 7-1-2024 9-30-2024 1.4079 1.4079 5 10-1-2024 12-31-2024 1.4079 1.4079 6 1-1-2025 3-31-2025 1.1784 1.1784 7 4-1-2025 6-30-2025 1.1915 1.1915 8 7-1-2025 9-30-2025 1.1915 1.1915 Highest 1.5016 1.5016 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 23 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,l •1 ,l •1 • • 2.0069 4.0000e- 1 4.2400e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 9 005 003 1 005 005 005 005 V 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 • 9 1 1 1 • V 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 003 003 005 1 i 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0069 4.0000e- 005 4.2400e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 23 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,l •1 ,l •1 •1 •1 2.0069 4.0000e- 1 4.2400e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 9 005 003 1 005 005 005 005 V 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 i 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 003 003 005 I i 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 2.0069 4.0000e- 005 4.2400e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Grading :Grading :10/1/2023 :9/29/2025 521 : Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 2605 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Grading Grading Grading Grading Grading Grading IOffroad Equipment Type :Crawler Tractors ; i 1 :Excavators ; i 1 :Graders ; i 1 :Rubber Tired Dozers ; i 1 :Scrapers ; :Tractors/Loaders/Backhoes • Amount 2 2 1 1 2 0: Usage Hours I Horse Power I Load Factor 8.001 212: 0.43 I _ 8.001 158: 0.38 8.001 187: 0.41 8.001 247: 0.40 I _ 8.001 367: 0.48 r 8.00 97: 0.37 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Grading 8' 20.00' 0.00' 0.00' 11.00 5.40' 20.00:LD_Mix :HDT_Mix ,HHDT 3.1 Mitigation Measures Construction Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Grading - 2023 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 1.5770 0.0000 1.5770 0.2567 0.0000 0.2567 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Off -Road •i 0.1270 1.3550 0.9125 2.3200e- 0.0543 0.0543 0.0499 0.0499 • 0.0000 i 204.1694 204.1694 0.0660 0.0000 205.8202 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.1270 1.3550 0.9125 2.3200e- 1.5770 0.0543 1.6313 0.2567 0.0499 0.3067 0.0000 204.1694 204.1694 0.0660 0.0000 205.8202 5.3500e- 3.0000e- 5.3800e- 1.4200e- 003 1.4500e- 0.0000 4.0371 4.0371 8.0000e- 0.0000 4.0392 - 003 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker • 1.9800e- 1.1800e- 1 0.0136 4.0000e- 5.3500e- 3.0000e- 5.3800e- 1.4200e- 3.0000e- 1.4500e- • 0.0000 i 4.0371 4.0371 8.0000e- 0.0000 4.0392 003 003 005 003 005 003 003 005 003 • 005 Total 1.9800e- 1.1800e- 0.0136 4.0000e- 5.3500e- 3.0000e- 5.3800e- 1.4200e- 3.0000e- 1.4500e- 0.0000 4.0371 4.0371 8.0000e- 0.0000 4.0392 - 003 003 005 003 005 003 003 005 003 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 23 3.2 Grading - 2023 Mitigated Construction On -Site Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.6150 0.0000 0.6150 0.1001 0.0000 0.1001 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Off -Road •i 0.1270 1.3550 0.9125 2.3200e- 0.0543 0.0543 0.0499 0.0499 • 0.0000 i 204.1691 204.1691 0.0660 0.0000 205.8200 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.1270 1.3550 0.9125 2.3200e- 0.6150 0.0543 0.6693 0.1001 0.0499 0.1501 0.0000 204.1691 204.1691 0.0660 0.0000 205.8200 5.3500e- 3.0000e- 5.3800e- 1.4200e- 003 1.4500e- 0.0000 4.0371 4.0371 8.0000e- 0.0000 4.0392 - 003 003 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J V Worker • 1.9800e- 1.1800e- 1 0.0136 4.0000e- 5.3500e- 3.0000e- 5.3800e- 1.4200e- 3.0000e- 1.4500e- • 0.0000 i 4.0371 4.0371 8.0000e- 0.0000 4.0392 003 003 005 003 005 003 003 005 003 • 005 Total 1.9800e- 1.1800e- 0.0136 4.0000e- 5.3500e- 3.0000e- 5.3800e- 1.4200e- 3.0000e- 1.4500e- 0.0000 4.0371 4.0371 8.0000e- 0.0000 4.0392 - 003 003 005 003 005 003 003 005 003 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Grading - 2024 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 2.1702 0.0000 2.1702 0.5828 0.0000 0.5828 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •1 0.4950 5.1059 3.6230 9.3700e- 0.2058 0.2058 0.1894 0.1894 • 0.0000 i 822.7991 822.7991 0.2661 0.0000 829.4518 -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.4950 5.1059 3.6230 9.3700e- 2.1702 0.2058 2.3760 0.5828 0.1894 0.7721 0.0000 822.7991 822.7991 0.2661 0.0000 829.4518 0.0216 1.3000e- 0.0217 5.7200e- 003 5.8400e- 0.0000 15.6916 15.6916 3.1000e- 0.0000 15.6993 003 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker • 7.5100e- 4.3000e- 0.0511 1.7000e- 0.0216 1.3000e- 0.0217 5.7200e- 1.2000e- 5.8400e- • 0.0000 i 15.6916 15.6916 3.1000e- 0.0000 15.6993 003 003 004 004 003 004 003 : • 004 Total 7.5100e- 4.3000e- 0.0511 1.7000e- 0.0216 1.3000e- 0.0217 5.7200e- 1.2000e- 5.8400e- 0.0000 15.6916 15.6916 3.1000e- 0.0000 15.6993 003 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 23 3.2 Grading - 2024 Mitigated Construction On -Site Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.8464 0.0000 0.8464 0.2273 0.0000 0.2273 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J -I- Off -Road •1 0.4950 5.1059 3.6230 9.3700e- 0.2058 0.2058 0.1894 0.1894 • 0.0000 i 822.7981 822.7981 0.2661 0.0000 829.4508 Off-Road -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.4950 5.1059 3.6230 9.3700e- 0.8464 0.2058 1.0522 0.2273 0.1894 0.4166 0.0000 822.7981 822.7981 0.2661 0.0000 829.4508 0.0216 1.3000e- 0.0217 5.7200e- 003 5.8400e- 0.0000 15.6916 15.6916 3.1000e- 0.0000 15.6993 003 003 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J Worker • 7.5100e- 4.3000e- 0.0511 1.7000e- 0.0216 1.3000e- 0.0217 5.7200e- 1.2000e- 5.8400e- • 0.0000 i 15.6916 15.6916 3.1000e- 0.0000 15.6993 003 003 004 004 003 004 003 : • 004 Total 7.5100e- 4.3000e- 0.0511 1.7000e- 0.0216 1.3000e- 0.0217 5.7200e- 1.2000e- 5.8400e- 0.0000 15.6916 15.6916 3.1000e- 0.0000 15.6993 003 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Grading - 2025 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 1.9654 0.0000 1.9654 0.4702 0.0000 0.4702 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.3283 3.2193 2.5297 6.9300e- 0.1292 0.1292 0.1188 0.1188 • 0.0000 i 609.0009 609.0009 0.1970 0.0000 613.9249 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.3283 3.2193 2.5297 6.9300e- 1.9654 0.1292 2.0946 0.4702 0.1188 0.5891 0.0000 609.0009 609.0009 0.1970 0.0000 613.9249 0.0160 9.0000e- 0.0161 4.2400e- 003 4.3200e- 0.0000 11.1541 11.1541 2.1000e- 0.0000 11.1593 003 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker • 5.2600e- 2.8900e- 1 0.0351 1.2000e- 0.0160 9.0000e- 0.0161 4.2400e- 8.0000e- 4.3200e- • 0.0000 i 11.1541 11.1541 2.1000e- 0.0000 11.1593 • 003 003 004 005 003 005 003 : 004 Total 5.2600e- 2.8900e- 0.0351 1.2000e- 0.0160 9.0000e- 0.0161 4.2400e- 8.0000e- 4.3200e- 0.0000 11.1541 11.1541 2.1000e- 0.0000 11.1593 003 003 004 005 003 005 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 23 3.2 Grading - 2025 Mitigated Construction On -Site Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.7665 0.0000 0.7665 0.1834 0.0000 0.1834 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.3283 3.2192 2.5297 6.9300e- 0.1292 0.1292 0.1188 0.1188 • 0.0000 i 609.0001 609.0001 0.1970 0.0000 613.9242 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.3283 3.2192 2.5297 6.9300e- 0.7665 0.1292 0.8957 0.1834 0.1188 0.3022 0.0000 609.0001 609.0001 0.1970 0.0000 613.9242 0.0160 9.0000e- 0.0161 4.2400e- 003 4.3200e- 0.0000 11.1541 11.1541 2.1000e- 0.0000 11.1593 003 003 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker • 5.2600e- 2.8900e- 1 0.0351 1.2000e- 0.0160 9.0000e- 0.0161 4.2400e- 8.0000e- 4.3200e- • 0.0000 i 11.1541 11.1541 2.1000e- 0.0000 11.1593 • 003 003 004 005 003 005 003 : 004 Total 5.2600e- 2.8900e- 0.0351 1.2000e- 0.0160 9.0000e- 0.0161 4.2400e- 8.0000e- 4.3200e- 0.0000 11.1541 11.1541 2.1000e- 0.0000 11.1593 003 003 004 005 003 005 003 004 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 ; 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 •� I I I • 1 1 Unmitigated . 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.554334. 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.554334. 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 15 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 Mitigated •1 1 1 1 1 1 1 1• 1 19• 1 .1 1 .1 1 .1 1 Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 Unmitigated ;�1 1 1 1 1 1 1 • • NaturalGas •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 Mitigated ;� NaturalGas . 0.0000 i 0.0000 : 0.0000 • 0.0000 i • 0.0000 • 0.0000 i • 0.0000 0.0000 • 0.0000 Unmitigated •• 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr tons/yr MT/yr Other Non- 0 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Asphalt Surfaces i 1 i ; 0.0000 0.0000 1 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Non- Asphalt Surfaces 10 .i i i 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •i i i 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •u i i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 2.0069 i 4.0000e- i 4.2400e- : 0.0000 1 i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • 0.0000 i 8.2700e- i 8.2700e- i 2.0000e- i 0.0000 ! 8.8100e- 9 1 005 1 003 1 1 1 005 1 005 1 1 005 1 1 005 ; ' 003 1 003 005 i 003 •1 I 1 1 1 1 1 1 I • 1 I 1 I. 1. 1. 1. 1. 4. 1. 4. 1. r 4. 1. 1. r Unmitigated • 2.0069 • 4.0000e- • 4.2400e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0000 • 8.2700e- • 8.2700e- • 2.0000e- • 0.0000 • 8.8100e- 005 003 005 005 005 005 003 003 005 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 0.7034 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: J J .1 .1 J .1 J .1 . J J .1 T Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products J J J .1 J J J .1 . J J J T Landscaping • 3.9000e- 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 i 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 003 Total 2.0069 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 23 6.2 Area by SubCategory Mitigated Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7034' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: .1 J Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products .1 J Landscaping • 3.9000e- 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 1 003 Total 2.0069 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •I 0.0000 : 0.0000 : 0.0000 . 0.0000 'I I 1 0.0000 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- I0 / 0 •i Asphalt Surfaces I 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 21 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 22 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces 1 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 23 Date: 1/6/2021 9:08 AM Travertine Specific Plan (Phase A Grading - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.3: CALEEMOD WELL #1 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #1 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Construction Phase - Construction of Well #1 anticipated to start and end Quarter 4 2025 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Table Name tblConstructionPhase tblConstructionPhase tblConstructionPhase tblGrading tblGrading tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics IColumn Name • NumDays i 100.00 • 15.00 r 4 • NumDays T 2.00 41.00 r • NumDays T 1.00 10.00 r • AcresOfGrading i 0.00 41.00 r • AcresOfGrading i 0.00 10.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 2.00 0.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 • UsageHours i 8.00 24.00 r 4 • UsageHours i 8.00 16.00 • CO2lntensityFactor 1270.9 747.71 • Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2025 •i 0.2244 1.9390 2.7175 5.5500e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 • 0.0000 i 486.3112 486.3112 0.1488 0.0000 490.0311 003 003 003 003 • Total Maximum 0.2244 1.9390 2.7175 5.5500e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 0.0000 486.3112 486.3112 0.1488 0.0000 490.0311 11 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2025 • 0.2244 1.9390 2.7175 5.5500e- 0.0149 0.0892 0.1040 2.2800e- 1 0.0824 0.0847 • 0.0000 i 486.3106 486.3106 0.1488 0.0000 490.0305 003 003 PM10 Total Maximum 0.2244 1.9390 2.7175 5.5500e- 0.0149 0.0892 0.1040 2.2800e- 0.0824 0.0847 0.0000 486.3106 486.3106 0.1488 0.0000 490.0305 43.84 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 13.69 43.84 0.00 2.06 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter I Start Date I End Date I Maximum Unmitigated ROG + NOX (tons/quarter) I Maximum Mitigated ROG + NOX (tons/quarter) Highest 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area •i 1.0000e- 0.0000 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •: 003 005004 004 004 ,i J J J .1 J J J J 4 J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 fi J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 fl J J J .1 J J J J 4 J J J T Waste 9 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J J J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2025 110/14/2025i 5: 10: 1 + 1 i � 2 'Trenching :Grading ;10/15/2025 112/10/2025 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :12/11/2025 '12/31/2025 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 •1 •1 1.0000e- 0.0000 1 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9003 005 1 1 9 11 1 1 . .1 .1 .1 .1 .1 .1 .1 .1 . 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 11 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 004 .1 .1 .1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i i i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2025 110/14/2025i 5: 10: 1 + 1 i � 2 'Trenching :Grading ;10/15/2025 112/10/2025 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :12/11/2025 '12/31/2025 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2025 110/14/2025i 5: 10: 1 + 1 i � 2 'Trenching :Grading ;10/15/2025 112/10/2025 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :12/11/2025 '12/31/2025 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation Site Preparation Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Trenching Trenching Trenching Trenching Trenching Trenching :Aerial Lifts :Bore/Drill Rigs :Graders 1 :Other Construction Equipment +Tractors/Loaders/Backhoes :Aerial Lifts :Bore/Drill Rigs :Cranes : Dumpers/Tenders :Forklifts :Generator Sets :Off -Highway Trucks :Other Construction Equipment :Pumps +Tractors/Loaders/Backhoes :Aerial Lifts :Bore/Drill Rigs +Concrete/Industrial Saws :Off -Highway Trucks :Other Construction Equipment :Rubber Tired Dozers 1 16.001 1 16.001 0 8.001 6 16.001 1 16.001 1 ' 1 24.001 1 24.001 0 4.001 1 24.001 0 6.001 1 24.001 ' 1 24.001 7 24.001 1 24.001 2 24.001 1 24.001 1 24.001 0 8.001 1 24.001 4 24.001 0 1.001 1- Trenching :Tractors/Loaders/Backhoes 0: 6.00 63: 221: 187: 172: 97: 63: 221: 231: 16: 89: 84: 402: 172: 84: 97: 63: 221: 81: 402: 172: 247: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 0.37 0.31 0.50 0.73 0.38 0.42 0.40 97 : 0.37 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Building Construction Trenching • 9: 23.00. 0.00: 0.00: 11.00: 15; 4.00. 2.001 0.00: 11.00: 5.40; f r 7' 18.00' 0.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 i 45.1204 45.1204 0.0146 0.0000 45.4852 .11 004 003 003 003 003 • Total 0.0217 0.2029 0.2933 5.1000e- 5.3000e- 9.8100e- 0.0151 5.7000e- 9.0300e- 9.6000e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 3.1000e- 1.7000e- 2.0800e- 1.0000e- 9.5000e- 1.0000e- 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 004 004 003 005 004 005 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.6612 0.6612 1.0000e- 0.0000 0.6615 005 Total J J J J J .1 .1 J . 3.1000e- 004 1.7000e- 004 2.0800e- 003 1.0000e- 005 9.5000e- 004 1.0000e- 005 9.5000e- 004 2.5000e- 004 0.0000 2.6000e- 004 0.0000 0.6612 0.6612 1.0000e- 005 0.0000 0.6615 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 003 003 • • Total 0.0217 0.2029 0.2933 5.1000e- 2.0700e- 9.8100e- 0.0119 2.2000e- 9.0300e- 9.2500e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 ii 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2025 Mitigated Construction Off -Site 3.3 Trenching - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 1 1 • 1 003 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 3.1000e- 1.7000e- 2.0800e- 1.0000e- 9.5000e- 1.0000e- 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 i 0.6612 0.6612 1.0000e- 0.0000 0.6615 1.3713 3.0200e- 004 004 003 005 004 005 004 004 004 • 005 Total 2.3500e- 3.1000e- 1.7000e- 2.0800e- 1.0000e- 9.5000e- 1.0000e- 9.5000e- 2.5000e- 0.0000 2.6000e- 0.0000 0.6612 0.6612 1.0000e- 0.0000 0.6615 003 004 004 003 005 004 005 004 004 004 005 3.3 Trenching - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 • Total 0.1179 1.0023 1.3713 3.0200e- 0.0217 0.0457 0.0675 2.3500e- 0.0421 0.0444 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 1.0000e- 5.5000e- 6.6700e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- • 0.0000 i 2.1216 2.1216 4.0000e- 0.0000 2.1226 003 • • 003 004 003 005 003 005 003 004 005 004 • 005 Total 0.1179 1.0000e- 5.5000e- 6.6700e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- 0.0000 2.1216 2.1216 4.0000e- 0.0000 2.1226 003 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 003 • • Total 0.1179 1.0023 1.3713 3.0200e- 8.4800e- 0.0457 0.0542 9.2000e- 0.0421 0.0430 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 ii 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 • 1 Worker • 1.0000e- 5.5000e- 6.6700e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- • 0.0000 i 2.1216 2.1216 4.0000e- 0.0000 2.1226 0.0834 003 004 003 005 003 005 003 004 005 004 • 005 Total 1.0000e- 5.5000e- 6.6700e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- 0.0000 2.1216 2.1216 4.0000e- 0.0000 2.1226 003 003 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0434 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7039 172.7039 0.0484 1 0.0000 173.9125 003 • Total 0.0834 0.7321 1.0434 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7039 172.7039 0.0484 0.0000 173.9125 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.4000e- 1.9000e- 0.0000 7.0000e- 0.0000 8.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2946 0.2946 : 2.0000e- 0.0000 0.2951 003 • 005 004 004 005 005 005 005 • 1 005 Worker • 8.0000e- 4.0000e- 5.4000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1725 0.1725 0.0000 0.0000 0.1726 0.0834 005 005 004 004 004 005 005 • 1.0433 Total 1.0000e- 9.8000e- 7.3000e- 0.0000 3.2000e- 0.0000 3.3000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4671 0.4671 2.0000e- 0.0000 0.4677 003 004 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0433 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7037 172.7037 0.0484 1 0.0000 173.9123 003 • Total 0.0834 0.7321 1.0433 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7037 172.7037 0.0484 0.0000 173.9123 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2025 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.4000e- 1.9000e- 0.0000 7.0000e- 0.0000 8.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2946 0.2946 : 2.0000e- 0.0000 0.2951 005 004 004 005 005 005 005 • 1 005 Worker • 8.0000e- 4.0000e- 5.4000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1725 0.1725 0.0000 0.0000 0.1726 005 005 004 004 004 005 005 • Total 1.0000e- 9.8000e- 7.3000e- 0.0000 3.2000e- 0.0000 3.3000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4671 0.4671 2.0000e- 0.0000 0.4677 004 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I i 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.554334. 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.554334. 0.035376: 0.188722: 0.108173: 0.012711: 0.004530: 0.017449: 0.070039: 0.001415: 0.001123: 0.004446: 0.000892: 0.000789 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 Mitigated :1 1 1 1 1 1 1 1 • Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 1 1 .1 .1 .1 .1 • ▪ 0.0000 : 1 11 1 1 1 Unmitigated i i i • 1 .1 • NaturalGas .1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 i 1 i 1 1 i 1 1• :1. I- 4- 1- 1- 1- 4- 4-} r 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 . i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 Ir J .1 .1 J .1 J .1 .1 . .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- i 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 1. Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J 1. Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:14 PM Travertine Specific Plan (Well #1 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.4: CALEEMOD WELL #2 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #2 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 726.95 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2026 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2026 Land Use - Construction Phase - Construction of Well #2 anticipated to start and end Quarter 3 2026 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 726.95 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2026 •i 0.2243 1.9390 2.7168 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 • 0.0000 i 486.2017 486.2017 0.1488 0.0000 489.9214 003 003 003 003 • Total Maximum 0.2243 1.9390 2.7168 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 0.0000 486.2017 486.2017 0.1488 0.0000 489.9214 11 0.00 2.07 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2026 •i 0.2243 1.9390 2.7168 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 1 0.0824 0.0847 • 0.0000 i 486.2011 486.2011 0.1488 0.0000 489.9208 003 003 PM10 Total Maximum 0.2243 1.9390 2.7168 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 0.0824 0.0847 0.0000 486.2011 486.2011 0.1488 0.0000 489.9208 43.84 0.00 2.07 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 13.69 43.84 0.00 2.07 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 7-1-2026 9-30-2026 2.1556 2.1556 Fugitive PM2.5 Exhaust PM2.5 Highest 2.1556 2.1556 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr r Area 4 1.0000e- 0.0000 1 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 9 003 I 0051 004 004 1 004 f' J J J .1 J J J J v J J .1 T Energy •i 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 1 1 9 fi J J J J J J J J V J J .1 T Mobile •i 0.0000 0.0000 I 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation 17/1/2026 :7/14/2026i 5: 10: 1 + i i � 2 'Trenching :Grading 17/15/2026 :9/9/2026 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :9/10/2026 '9/30/2026 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ': ,I ,I •1 •1 •1 1.0000e- 0.0000 : 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 003 I 0051 ; le 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation 17/1/2026 :7/14/2026i 5: 10: 1 + i i � 2 'Trenching :Grading 17/15/2026 :9/9/2026 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :9/10/2026 '9/30/2026 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation 17/1/2026 :7/14/2026i 5: 10: 1 + i i � 2 'Trenching :Grading 17/15/2026 :9/9/2026 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :9/10/2026 '9/30/2026 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 i 45.1204 45.1204 0.0146 0.0000 45.4852 .11 004 003 003 003 003 • Total 0.0217 0.2029 0.2933 5.1000e- 5.3000e- 9.8100e- 0.0151 5.7000e- 9.0300e- 9.6000e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 3.0000e- 1.6000e- 1.9400e- 1.0000e- 9.5000e- 1.0000e- 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 004 004 003 005 004 005 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.6371 0.6371 1.0000e- 0.0000 0.6374 005 Total J J J J J .1 .1 J . 3.0000e- 004 1.6000e- 004 1.9400e- 003 1.0000e- 005 9.5000e- 004 1.0000e- 005 9.5000e- 004 2.5000e- 004 0.0000 2.6000e- 004 0.0000 0.6371 0.6371 1.0000e- 005 0.0000 0.6374 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J J J J J .1 .1 J . .1 .1 J t Off -Road .1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 003 003 • • Total 0.0217 0.2029 0.2933 5.1000e- 2.0700e- 9.8100e- 0.0119 2.2000e- 9.0300e- 9.2500e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 ii 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2026 Mitigated Construction Off -Site 3.3 Trenching - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 1 1 • 1 003 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 3.0000e- 1.6000e- 1.9400e- 1.0000e- 9.5000e- 1.0000e- 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 i 0.6371 0.6371 1.0000e- 0.0000 0.6374 1.3713 3.0200e- 004 004 003 005 004 005 004 004 004 • 005 Total 2.3500e- 3.0000e- 1.6000e- 1.9400e- 1.0000e- 9.5000e- 1.0000e- 9.5000e- 2.5000e- 0.0000 2.6000e- 0.0000 0.6371 0.6371 1.0000e- 0.0000 0.6374 003 004 004 003 005 004 005 004 004 004 005 3.3 Trenching - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 • Total 0.1179 1.0023 1.3713 3.0200e- 0.0217 0.0457 0.0675 2.3500e- 0.0421 0.0444 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 9.5000e- 5.0000e- 6.2200e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- • 0.0000 i 2.0443 2.0443 4.0000e- 0.0000 2.0452 003 • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1179 9.5000e- 5.0000e- 6.2200e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- 0.0000 2.0443 2.0443 4.0000e- 0.0000 2.0452 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road •i 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 003 • • Total 0.1179 1.0023 1.3713 3.0200e- 8.4800e- 0.0457 0.0542 9.2000e- 0.0421 0.0430 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 ii 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2026 Mitigated Construction Off -Site 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0834 1 Worker • 9.5000e- 5.0000e- 6.2200e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- • 0.0000 i 2.0443 2.0443 4.0000e- 0.0000 2.0452 0.0336 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.0313 9.5000e- 5.0000e- 6.2200e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 2.0000e- 8.2000e- 0.0000 2.0443 2.0443 4.0000e- 0.0000 2.0452 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road - 0.0834 0.7321 1.0434 1.9800e- , 0.0336 0.0336 1 0.0313 0.0313 • 0.0000 i 172.7039 172.7039 0.0484 0.0000 173.9125 003 • Total 0.0834 0.7321 1.0434 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7039 172.7039 0.0484 0.0000 173.9125 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.3000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2927 0.2927 : 2.0000e- 0.0000 0.2932 003 • 005 004 004 005 005 005 005 • 1 005 Worker • 8.0000e- 4.0000e- 5.1000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1662 0.1662 0.0000 0.0000 0.1663 0.0834 005 005 004 004 004 005 005 • 1.0433 Total 1.0000e- 9.7000e- 6.9000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4589 0.4589 2.0000e- 0.0000 0.4594 003 004 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0433 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7037 172.7037 0.0484 1 0.0000 173.9123 003 • Total 0.0834 0.7321 1.0433 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7037 172.7037 0.0484 0.0000 173.9123 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2026 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.3000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2927 0.2927 : 2.0000e- 0.0000 0.2932 005 004 004 005 005 005 005 • 1 005 Worker • 8.0000e- 4.0000e- 5.1000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1662 0.1662 0.0000 0.0000 0.1663 005 005 004 004 004 005 005 • Total 1.0000e- 9.7000e- 6.9000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4589 0.4589 2.0000e- 0.0000 0.4594 004 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I i 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.556393. 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.001115: 0.004429: 0.000881: 0.000745 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.556393. 0.035040: 0.189382: 0.106465: 0.012088: 0.004430: 0.017405: 0.070208: 0.001420: 0.001115: 0.004429: 0.000881: 0.000745 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 Mitigated :1 1 • Electricity •i 1 1 i 0.0000 0.0000 i 0.0000 0.0000 • ▪ 0.0000 Unmitigated :11 1 1 • NaturalGas .1 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 0.0000 i 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 1 i 1 1 i 1 i .1 } } } } } } } 4. r • 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000 e - I i'1 003i :005i : 004 1 004 i i 004 1 i i i ' .i. } 4. } } 4. 4. 4. } T • . } } } Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number 1 Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1. MT/yr Other Asphalt Surfaces I0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number 1 Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:24 PM Travertine Specific Plan (Well #2 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.5: CALEEMOD WELL #3 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #3 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Construction of Well #3 anticipated to start and end Quarter 2 2027 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 706.2 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2027 •i 0.2242 1.9389 2.7163 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 • 0.0000 i 486.1057 486.1057 0.1488 0.0000 489.8253 003 003 003 003 • Total Maximum 0.2242 1.9389 2.7163 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 0.0000 486.1057 486.1057 0.1488 0.0000 489.8253 11 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2027 • 0.2242 1.9389 1 2.7162 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 1 0.0824 0.0847 • 0.0000 i 486.1051 486.1051 0.1488 0.0000 489.8247 003 003 PM10 Total Maximum 0.2242 1.9389 2.7162 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 0.0824 0.0847 0.0000 486.1051 486.1051 0.1488 0.0000 489.8247 43.84 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 13.69 43.84 0.00 2.06 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 4-1-2027 6-30-2027 2.1165 2.1165 2 7-1-2027 9-30-2027 0.0389 0.0389 CH4 N20 Highest 2.1165 2.1165 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area 4 1.0000e- 0.0000 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •: 003 005004 004 i 004 ;i J J J J J J J J V J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 f' J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;4/1/2027 :4/14/2027i 5: 10: 1 + 1 i � 2 'Trenching :Grading ;4/15/2027 :6/10/2027 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :6/11/2027 '7/1/2027 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ': ,I ,I •1 •1 •1 1.0000e- 0.0000 : 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 003 I 0051 ; le 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;4/1/2027 :4/14/2027i 5: 10: 1 + 1 i � 2 'Trenching :Grading ;4/15/2027 :6/10/2027 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :6/11/2027 '7/1/2027 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;4/1/2027 :4/14/2027i 5: 10: 1 + 1 i � 2 'Trenching :Grading ;4/15/2027 :6/10/2027 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :6/11/2027 '7/1/2027 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 i 45.1204 45.1204 0.0146 0.0000 45.4852 .11 004 003 003 003 003 • Total 0.0217 0.2029 0.2933 5.1000e- 5.3000e- 9.8100e- 0.0151 5.7000e- 9.0300e- 9.6000e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.8000e- 1.4000e- 1.8100e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.6160 0.6160 1.0000e- 0.0000 0.6163 005 Total J J J J J .1 .1 J . 2.8000e- 004 1.4000e- 004 1.8100e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.6000e- 004 0.0000 0.6160 0.6160 1.0000e- 005 0.0000 0.6163 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 003 003 • • Total 0.0217 0.2029 0.2933 5.1000e- 2.0700e- 9.8100e- 0.0119 2.2000e- 9.0300e- 9.2500e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 ii 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2027 Mitigated Construction Off -Site 3.3 Trenching - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 1 1 • 1 003 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.8000e- 1.4000e- 1.8100e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 i 0.6160 0.6160 1.0000e- 0.0000 0.6163 1.3713 3.0200e- 004 004 003 005 004 004 004 004 • 005 Total 2.3500e- 2.8000e- 1.4000e- 1.8100e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- 0.0000 0.6160 0.6160 1.0000e- 0.0000 0.6163 003 004 004 003 005 004 004 004 004 005 3.3 Trenching - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 • Total 0.1179 1.0023 1.3713 3.0200e- 0.0217 0.0457 0.0675 2.3500e- 0.0421 0.0444 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 9.0000e- 4.6000e- 5.8100e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.9766 1.9766 3.0000e- 0.0000 1.9774 003 • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1179 9.0000e- 4.6000e- 5.8100e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.9766 1.9766 3.0000e- 0.0000 1.9774 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road .1 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 003 • • Total 0.1179 1.0023 1.3713 3.0200e- 8.4800e- 0.0457 0.0542 9.2000e- 0.0421 0.0430 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 ii 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2027 Mitigated Construction Off -Site 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 • 1 Worker • 9.0000e- 4.6000e- 5.8100e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.9766 1.9766 3.0000e- 0.0000 1.9774 0.0834 004 004 003 005 003 005 003 004 005 004 • 005 Total 9.0000e- 4.6000e- 5.8100e- 2.0000e- 3.0400e- 2.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.9766 1.9766 3.0000e- 0.0000 1.9774 003 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0434 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7039 172.7039 0.0484 1 0.0000 173.9125 003 • Total 0.0834 0.7321 1.0434 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7039 172.7039 0.0484 0.0000 173.9125 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.2000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2911 0.2911 : 2.0000e- 0.0000 0.2915 005 004 004 005 005 005 005 • 1 005 Worker • 7.0000e- 4.0000e- 4.7000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1607 0.1607 0.0000 0.0000 0.1608 Total 005 005 004 004 004 005 005 • 0.0834 Total 1.0433 9.0000e- 9.6000e- 6.5000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4518 0.4518 2.0000e- 0.0000 0.4523 005 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0433 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7037 172.7037 0.0484 1 0.0000 173.9123 003 • Total 0.0834 0.7321 1.0433 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7037 172.7037 0.0484 0.0000 173.9123 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2027 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.2000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2911 0.2911 : 2.0000e- 0.0000 0.2915 005 004 004 005 005 005 005 • 1 005 J .1 .1 .1 .1 J .1 J Worker • 7.0000e- 4.0000e- 4.7000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1607 0.1607 0.0000 0.0000 0.1608 005 005 004 004 004 005 005 • Total 9.0000e- 9.6000e- 6.5000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4518 0.4518 2.0000e- 0.0000 0.4523 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I i 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.558300. 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.558300. 0.034770: 0.189987: 0.105037: 0.011525: 0.004337: 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 Mitigated :1 1 • Electricity •i 1 1 i 0.0000 0.0000 i 0.0000 0.0000 • ▪ 0.0000 Unmitigated :11 1 1 • NaturalGas .1 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 0.0000 i 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 1 i 1 1 i 1 i .1 } } } } } } } 4. r • 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000 e - I i'1 003i :005i : 004 1 004 i i 004 1 i i i ' .i. } 4. } } 4. 4. 4. } T • . } } } Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:31 PM Travertine Specific Plan (Well #3 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.6: CALEEMOD WELL #4 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #4 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Construction Phase - Construction of Well #4 anticipated to start and end Quarter 1 2028 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 685.44 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2028 •i 0.2242 1.9388 2.7158 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 • 0.0000 i 486.0220 486.0220 0.1488 0.0000 489.7415 003 003 003 003 • Total Maximum 0.2242 1.9388 2.7158 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 0.0000 486.0220 486.0220 0.1488 0.0000 489.7415 11 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2028 •i 0.2242 1.9388 2.7158 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 1 0.0824 0.0847 • 0.0000 i 486.0214 486.0214 0.1488 0.0000 489.7409 003 003 PM10 Total Maximum 0.2242 1.9388 2.7158 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 0.0824 0.0847 0.0000 486.0214 486.0214 0.1488 0.0000 489.7409 43.84 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 13.69 43.84 0.00 2.06 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2028 3-31-2028 2.0777 2.0777 2 4-1-2028 6-30-2028 0.1166 0.1166 CH4 N20 Highest 2.0777 2.0777 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area 4 1.0000e- 0.0000 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •: 003 005004 004 i 004 ;i J J J J J J J J V J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 f' J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;1/1/2028 11/14/2028i 5: 10: 1 + i i � 2 'Trenching :Grading ;1/15/2028 13/13/2028 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :3/14/2028 '4/3/2028 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ': ,I ,I •1 •1 •1 1.0000e- 0.0000 : 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 003 I 0051 ; le 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;1/1/2028 11/14/2028i 5: 10: 1 + i i � 2 'Trenching :Grading ;1/15/2028 13/13/2028 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :3/14/2028 '4/3/2028 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;1/1/2028 11/14/2028i 5: 10: 1 + i i � 2 'Trenching :Grading ;1/15/2028 13/13/2028 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :3/14/2028 '4/3/2028 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 i 45.1204 45.1204 0.0146 0.0000 45.4852 .11 004 003 003 003 003 • Total 0.0217 0.2029 0.2933 5.1000e- 5.3000e- 9.8100e- 0.0151 5.7000e- 9.0300e- 9.6000e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.6000e- 1.3000e- 1.7000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.5976 0.5976 1.0000e- 0.0000 0.5978 005 Total J J J J J .1 .1 J . 2.6000e- 004 1.3000e- 004 1.7000e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.6000e- 004 0.0000 0.5976 0.5976 1.0000e- 005 0.0000 0.5978 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 003 003 • • Total 0.0217 0.2029 0.2933 5.1000e- 2.0700e- 9.8100e- 0.0119 2.2000e- 9.0300e- 9.2500e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 ii 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2028 Mitigated Construction Off -Site 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 1 1 • 1 003 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.6000e- 1.3000e- 1.7000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 i 0.5976 0.5976 1.0000e- 0.0000 0.5978 1.3713 3.0200e- 004 004 003 005 004 004 004 004 • 005 Total 2.3500e- 2.6000e- 1.3000e- 1.7000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- 0.0000 0.5976 0.5976 1.0000e- 0.0000 0.5978 003 004 004 003 005 004 004 004 004 005 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 • Total 0.1179 1.0023 1.3713 3.0200e- 0.0217 0.0457 0.0675 2.3500e- 0.0421 0.0444 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 8.5000e- 4.3000e- 5.4600e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.9175 1.9175 3.0000e- 0.0000 1.9182 003 • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1179 8.5000e- 4.3000e- 5.4600e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.9175 1.9175 3.0000e- 0.0000 1.9182 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 003 • • Total 0.1179 1.0023 1.3713 3.0200e- 8.4800e- 0.0457 0.0542 9.2000e- 0.0421 0.0430 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 ii 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2028 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 • 1 Worker • 8.5000e- 4.3000e- 5.4600e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.9175 1.9175 3.0000e- 0.0000 1.9182 0.0834 004 004 003 005 003 005 003 004 005 004 • 005 Total 8.5000e- 4.3000e- 5.4600e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.9175 1.9175 3.0000e- 0.0000 1.9182 003 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0434 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7039 172.7039 0.0484 1 0.0000 173.9125 003 • Total 0.0834 0.7321 1.0434 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7039 172.7039 0.0484 0.0000 173.9125 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.1000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2898 0.2898 : 2.0000e- 0.0000 0.2902 003 • 005 004 004 005 005 005 005 • 1 005 Worker • 7.0000e- 3.0000e- 4.4000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1559 0.1559 0.0000 0.0000 0.1560 0.0834 005 005 004 004 004 005 005 • 1.0433 Total 9.0000e- 9.4000e- 6.2000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4456 0.4456 2.0000e- 0.0000 0.4461 003 005 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0433 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7037 172.7037 0.0484 1 0.0000 173.9123 003 • Total 0.0834 0.7321 1.0433 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7037 172.7037 0.0484 0.0000 173.9123 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.1000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2898 0.2898 : 2.0000e- 0.0000 0.2902 005 004 004 005 005 005 005 • 1 005 J .1 .1 .1 .1 J .1 J Worker • 7.0000e- 3.0000e- 4.4000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1559 0.1559 0.0000 0.0000 0.1560 005 005 004 004 004 005 005 • Total 9.0000e- 9.4000e- 6.2000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4456 0.4456 2.0000e- 0.0000 0.4461 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I i 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.559901. 0.034558: 0.190487: 0.103878: 0.011041: 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.559901. 0.034558: 0.190487: 0.103878: 0.011041: 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 Mitigated :1 1 • Electricity •i 1 1 i 0.0000 0.0000 i 0.0000 0.0000 • ▪ 0.0000 Unmitigated :11 1 1 • NaturalGas .1 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 0.0000 i 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 1 i 1 1 i 1 i .1 } } } } } } } 4. r • 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' .I- } 4. } } 4. 4. 4. } T • . } } } Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt Surfaces i 0 / 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number 1 Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1. MT/yr Other Asphalt Surfaces I0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number 1 Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:38 PM Travertine Specific Plan (Well #4 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.7: CALEEMOD WELL #5 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #5 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Construction Phase - Construction of Well #5 anticipated to start and end Quarter 4 2028 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 40.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 40.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 685.44 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2028 •i 0.2213 1.9144 2.6822 5.4700e- 0.0307 0.0881 0.1188 3.9900e- 0.0814 0.0854 • 0.0000 i 479.5060 479.5060 0.1467 0.0000 483.1732 003 003 003 003 • Total Maximum 0.2213 1.9144 2.6822 5.4700e- 0.0307 0.0881 0.1188 3.9900e- 0.0814 0.0854 0.0000 479.5060 479.5060 0.1467 0.0000 483.1732 11 0.00 2.05 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2028 • 0.2213 1.9144 2.6822 5.4700e- 0.0146 0.0881 0.1026 2.2400e- 1 0.0814 0.0837 • 0.0000 i 479.5054 479.5054 0.1467 0.0000 483.1726 003 003 PM10 Total Maximum 0.2213 1.9144 2.6822 5.4700e- 0.0146 0.0881 0.1026 2.2400e- 0.0814 0.0837 0.0000 479.5054 479.5054 0.1467 0.0000 483.1726 43.86 0.00 2.05 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.60 0.00 13.61 43.86 0.00 2.05 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter I Start Date I End Date I Maximum Unmitigated ROG + NOX (tons/quarter) I Maximum Mitigated ROG + NOX (tons/quarter) Highest 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area •i 1.0000e- 0.0000 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •1 003 005004 004 004 ,i J J J .1 J J J J 4 J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 fi J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 fl J J J .1 J J J J 4 J J J T Waste 9 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J J J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2028 110/13/2028i 5: 10: 1 + i 1 , , 2 'Trenching :Grading ;10/14/2028 112/8/2028 : 5: 40: 1 + i 4 -1- I_ 3 'Building Construction :Building Construction :12/9/2028 '12/29/2028 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 •1 •1 1.0000e- 0.0000 1 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9003 005 1 1 9 11 1 1 . .1 .1 .1 .1 .1 .1 .1 .1 . 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 11 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 004 .1 .1 .1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i i i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2028 110/13/2028i 5: 10: 1 + i 1 , , 2 'Trenching :Grading ;10/14/2028 112/8/2028 : 5: 40: 1 + i 4 -1- I_ 3 'Building Construction :Building Construction :12/9/2028 '12/29/2028 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2028 110/13/2028i 5: 10: 1 + i 1 , , 2 'Trenching :Grading ;10/14/2028 112/8/2028 : 5: 40: 1 + i 4 -1- I_ 3 'Building Construction :Building Construction :12/9/2028 '12/29/2028 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00. 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 i 45.1204 45.1204 0.0146 0.0000 45.4852 .11 004 003 003 003 003 • Total 0.0217 0.2029 0.2933 5.1000e- 5.3000e- 9.8100e- 0.0151 5.7000e- 9.0300e- 9.6000e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.6000e- 1.3000e- 1.7000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.5976 0.5976 1.0000e- 0.0000 0.5978 005 Total J J J J J .1 .1 J . 2.6000e- 004 1.3000e- 004 1.7000e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.6000e- 004 0.0000 0.5976 0.5976 1.0000e- 005 0.0000 0.5978 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 003 003 • • Total 0.0217 0.2029 0.2933 5.1000e- 2.0700e- 9.8100e- 0.0119 2.2000e- 9.0300e- 9.2500e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 ii 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2028 Mitigated Construction Off -Site 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 1 1 • 1 1 1 • 1 .1 .1 J 1. J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.6000e- 1.3000e- 1.7000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 i 0.5976 0.5976 1.0000e- 0.0000 0.5978 0.1150 0.9779 004 004 003 005 004 004 004 004 • 005 Total 0.0446 2.6000e- 1.3000e- 1.7000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- 0.0000 0.5976 0.5976 1.0000e- 0.0000 0.5978 004 004 003 005 004 004 004 004 005 3.3 Trenching - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0212 0.0000 0.0212 2.2900e- 0.0000 2.2900e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1150 0.9779 1.3378 2.9500e- 0.0446 0.0446 0.0411 0.0411 • 0.0000 258.7678 258.7678 0.0837 0.0000 260.8601 003 • • Total 0.1150 0.9779 1.3378 2.9500e- 0.0212 0.0446 0.0658 2.2900e- 0.0411 0.0434 0.0000 258.7678 258.7678 0.0837 0.0000 260.8601 ii 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 .1 .1 J 1. 1 Worker • 8.3000e- 4.2000e- 5.3300e- 2.0000e- 2.9600e- 1.0000e- 2.9800e- 7.9000e- 1.0000e- 8.0000e- • 0.0000 i 1.8707 1.8707 3.0000e- 0.0000 1.8714 003 • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1150 8.3000e- 4.2000e- 5.3300e- 2.0000e- 2.9600e- 1.0000e- 2.9800e- 7.9000e- 1.0000e- 8.0000e- 0.0000 1.8707 1.8707 3.0000e- 0.0000 1.8714 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.2700e- 0.0000 8.2700e- 8.9000e- 0.0000 8.9000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1150 0.9779 1.3378 2.9500e- 0.0446 0.0446 0.0411 0.0411 • 0.0000 258.7675 258.7675 0.0837 0.0000 260.8598 003 • • Total 0.1150 0.9779 1.3378 2.9500e- 8.2700e- 0.0446 0.0529 8.9000e- 0.0411 0.0420 0.0000 258.7675 258.7675 0.0837 0.0000 260.8598 ii 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2028 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 • 1 Worker • 8.3000e- 4.2000e- 5.3300e- 2.0000e- 2.9600e- 1.0000e- 2.9800e- 7.9000e- 1.0000e- 8.0000e- • 0.0000 i 1.8707 1.8707 3.0000e- 0.0000 1.8714 0.0834 004 004 003 005 003 005 003 004 005 004 • 005 Total 8.3000e- 4.2000e- 5.3300e- 2.0000e- 2.9600e- 1.0000e- 2.9800e- 7.9000e- 1.0000e- 8.0000e- 0.0000 1.8707 1.8707 3.0000e- 0.0000 1.8714 003 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0434 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7039 172.7039 0.0484 1 0.0000 173.9125 003 • Total 0.0834 0.7321 1.0434 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7039 172.7039 0.0484 0.0000 173.9125 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.1000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2898 0.2898 : 2.0000e- 0.0000 0.2902 003 • 005 004 004 005 005 005 005 • 1 005 Worker • 7.0000e- 3.0000e- 4.4000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1559 0.1559 0.0000 0.0000 0.1560 0.0834 005 005 004 004 004 005 005 • 1.0433 Total 9.0000e- 9.4000e- 6.2000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4456 0.4456 2.0000e- 0.0000 0.4461 003 005 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0433 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7037 172.7037 0.0484 1 0.0000 173.9123 003 • Total 0.0834 0.7321 1.0433 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7037 172.7037 0.0484 0.0000 173.9123 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.1000e- 1.8000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2898 0.2898 : 2.0000e- 0.0000 0.2902 005 004 004 005 005 005 005 • 1 005 J .1 .1 .1 .1 J .1 J Worker • 7.0000e- 3.0000e- 4.4000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1559 0.1559 0.0000 0.0000 0.1560 005 005 004 004 004 005 005 • Total 9.0000e- 9.4000e- 6.2000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4456 0.4456 2.0000e- 0.0000 0.4461 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •; 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9I I 1 I 1 1 I 1 1 1 1 1 • I. + + + + + 4. + 4. ,. 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.559901. 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.559901. 0.034558: 0.190487: 0.103878: 0.011041. 0.004260: 0.017228: 0.070227: 0.001422: 0.001088: 0.004385: 0.000853: 0.000671 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 Mitigated :1 1 1 1 1 1 1 1 • Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 1 1 .1 .1 .1 .1 • ▪ 0.0000 : 1 11 1 1 1 Unmitigated i i i • 1 .1 • NaturalGas .1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 i 1 i 1 1 i 1 1• :1. I- 4- 1- 1- 1- 4- 4-} r 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 . i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 . .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 Ir J .1 .1 J .1 J .1 .1 . .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- i 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 1. Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J 1. Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:43 PM Travertine Specific Plan (Well #5 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.8: CALEEMOD WELL #6 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #6 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 664.68 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2029 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2029 Land Use - Construction Phase - Construction of Well #6 anticipated to start and end Quarter 3 2029 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 664.68 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2029 •i 0.2241 1.9388 2.7153 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 • 0.0000 i 485.9487 485.9487 0.1488 0.0000 489.6681 003 003 003 003 • Total Maximum 0.2241 1.9388 2.7153 5.5400e- 0.0314 0.0892 0.1205 4.0600e- 0.0824 0.0865 0.0000 485.9487 485.9487 0.1488 0.0000 489.6681 11 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2029 • 0.2241 1.9388 2.7153 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 1 0.0824 0.0847 • 0.0000 i 485.9481 485.9481 0.1488 0.0000 489.6675 003 003 PM10 Total Maximum 0.2241 1.9388 2.7153 5.5400e- 0.0149 0.0892 0.1040 2.2800e- 0.0824 0.0847 0.0000 485.9481 485.9481 0.1488 0.0000 489.6675 43.84 0.00 2.06 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 13.68 43.84 0.00 2.06 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 7-1-2029 9-30-2029 2.1393 2.1393 Fugitive PM2.5 Exhaust PM2.5 Highest 2.1393 2.1393 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr r Area 4 1.0000e- 0.0000 1 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 9 003 I 0051 004 004 1 004 f' J J J .1 J J J J v J J .1 T Energy •i 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 1 1 9 fi J J J J J J J J V J J .1 T Mobile •i 0.0000 0.0000 I 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation 17/1/2029 17/13/2029i 5: 10: 1 + i i � 2 'Trenching :Grading 17/14/2029 19/10/2029 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :9/11/2029 '10/1/2029 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ': ,I ,I •1 •1 •1 1.0000e- 0.0000 : 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 003 I 0051 ; le 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation 17/1/2029 17/13/2029i 5: 10: 1 + i i � 2 'Trenching :Grading 17/14/2029 19/10/2029 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :9/11/2029 '10/1/2029 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation 17/1/2029 17/13/2029i 5: 10: 1 + i i � 2 'Trenching :Grading 17/14/2029 19/10/2029 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :9/11/2029 '10/1/2029 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 i 45.1204 45.1204 0.0146 0.0000 45.4852 .11 004 003 003 003 003 • Total 0.0217 0.2029 0.2933 5.1000e- 5.3000e- 9.8100e- 0.0151 5.7000e- 9.0300e- 9.6000e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.5000e- 1.2000e- 1.6000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.5815 0.5815 1.0000e- 0.0000 0.5817 005 Total J J J J J .1 .1 J . 2.5000e- 004 1.2000e- 004 1.6000e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.6000e- 004 0.0000 0.5815 0.5815 1.0000e- 005 0.0000 0.5817 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0217 0.2029 0.2933 5.1000e- 9.8100e- 9.8100e- 9.0300e- 9.0300e- • 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 004 003 003 003 003 • • Total 0.0217 0.2029 0.2933 5.1000e- 2.0700e- 9.8100e- 0.0119 2.2000e- 9.0300e- 9.2500e- 0.0000 45.1204 45.1204 0.0146 0.0000 45.4852 ii 004 003 003 004 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2029 Mitigated Construction Off -Site 3.3 Trenching - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 1 1 • 1 003 J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.5000e- 1.2000e- 1.6000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- • 0.0000 i 0.5815 0.5815 1.0000e- 0.0000 0.5817 1.3713 3.0200e- 004 004 003 005 004 004 004 004 • 005 Total 2.3500e- 2.5000e- 1.2000e- 1.6000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.6000e- 0.0000 0.5815 0.5815 1.0000e- 0.0000 0.5817 003 004 004 003 005 004 004 004 004 005 3.3 Trenching - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 • Total 0.1179 1.0023 1.3713 3.0200e- 0.0217 0.0457 0.0675 2.3500e- 0.0421 0.0444 0.0000 265.2370 265.2370 0.0858 0.0000 267.3816 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 8.0000e- 3.9000e- 5.1300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.8657 1.8657 3.0000e- 0.0000 1.8664 003 • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1179 8.0000e- 3.9000e- 5.1300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.8657 1.8657 3.0000e- 0.0000 1.8664 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road .1 0.1179 1.0023 1.3713 3.0200e- 0.0457 0.0457 0.0421 0.0421 • 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 003 • • Total 0.1179 1.0023 1.3713 3.0200e- 8.4800e- 0.0457 0.0542 9.2000e- 0.0421 0.0430 0.0000 265.2367 265.2367 0.0858 0.0000 267.3813 ii 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 • 1 Worker • 8.0000e- 3.9000e- 5.1300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.8657 1.8657 3.0000e- 0.0000 1.8664 0.0834 004 004 003 005 003 005 003 004 005 004 • 005 Total 8.0000e- 3.9000e- 5.1300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.8657 1.8657 3.0000e- 0.0000 1.8664 003 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0434 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7039 172.7039 0.0484 1 0.0000 173.9125 003 • Total 0.0834 0.7321 1.0434 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7039 172.7039 0.0484 0.0000 173.9125 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2886 0.2886 : 2.0000e- 0.0000 0.2890 003 • 005 004 004 005 005 005 005 • 1 005 Worker • 6.0000e- 3.0000e- 4.2000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1517 0.1517 0.0000 0.0000 0.1517 0.0834 005 005 004 004 004 005 005 • 1.0433 Total 8.0000e- 9.3000e- 5.9000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4402 0.4402 2.0000e- 0.0000 0.4407 003 005 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0834 0.7321 1 1.0433 1.9800e- 0.0336 0.0336 1 0.0313 0.0313 •• 0.0000 i 172.7037 172.7037 0.0484 1 0.0000 173.9123 003 • Total 0.0834 0.7321 1.0433 1.9800e- 0.0336 0.0336 0.0313 0.0313 0.0000 172.7037 172.7037 0.0484 0.0000 173.9123 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2029 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2886 0.2886 : 2.0000e- 0.0000 0.2890 005 004 004 005 005 005 005 • 1 005 J .1 .1 .1 .1 J .1 J Worker • 6.0000e- 3.0000e- 4.2000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1517 0.1517 0.0000 0.0000 0.1517 005 005 004 004 004 005 005 • Total 8.0000e- 9.3000e- 5.9000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4402 0.4402 2.0000e- 0.0000 0.4407 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I i 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.561225. 0.034384: 0.190884: 0.102953: 0.010631: 0.004198: 0.017138: 0.070241: 0.001423: 0.001077: 0.004368: 0.000839: 0.000640 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.561225. 0.034384: 0.190884: 0.102953: 0.010631: 0.004198: 0.017138: 0.070241: 0.001423: 0.001077: 0.004368: 0.000839: 0.000640 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 Mitigated :1 1 • Electricity •i 1 1 i 0.0000 0.0000 i 0.0000 0.0000 • ▪ 0.0000 Unmitigated :11 1 1 • NaturalGas .1 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 0.0000 i 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 1 i 1 1 i 1 i .1 } } } } } } } 4. r • 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt Surfaces i 0 / 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:48 PM Travertine Specific Plan (Well #6 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.9: CALEEMOD WELL #7 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #7 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 643.92 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2030 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2030 Land Use - Construction Phase - Construction of Well #7 anticipated to start and end Quarter 2 2030 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 1 Column Name tblConstructionPhase • NumDays i 100.00 • 15.00 r 4 tblConstructionPhase • NumDays T 2.00 41.00 r tblConstructionPhase • NumDays T 1.00 10.00 r tblGrading • AcresOfGrading i 0.00 41.00 r tblGrading • AcresOfGrading i 0.00 10.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 24.00 r 4 tblOffRoadEquipment • UsageHours i 8.00 16.00 tblProjectCharacteristics • CO2lntensityFactor 1270.9 643.92 • Table Name Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2030 •i 0.1947 0.6285 2.7010 6.5200e- 0.0314 0.0212 0.0526 4.0600e- 0.0212 0.0253 • 0.0000 i 579.7226 579.7226 0.0154 0.0000 580.1079 003 003 003 003 • Total Maximum 0.1947 0.6285 2.7010 6.5200e- 0.0314 0.0212 0.0526 4.0600e- 0.0212 0.0253 0.0000 579.7226 579.7226 0.0154 0.0000 580.1079 11 0.00 7.03 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2030 • 0.1947 0.6285 1 2.7010 6.5200e- 0.0149 0.0212 0.0361 2.2800e- 0.0212 0.0235 • 0.0000 i 579.7219 579.7219 0.0154 0.0000 580.1072 003 003 PM10 Total Maximum 0.1947 0.6285 2.7010 6.5200e- 0.0149 0.0212 0.0361 2.2800e- 0.0212 0.0235 0.0000 579.7219 579.7219 0.0154 0.0000 580.1072 43.84 0.00 7.03 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 31.37 43.84 0.00 7.03 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 4-1-2030 6-30-2030 0.8068 0.8068 2 7-1-2030 9-30-2030 0.0169 0.0169 CH4 N20 Highest 0.8068 0.8068 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area 4 1.0000e- 0.0000 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •: 003 005004 004 i 004 ;i J J J J J J J J V J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 f' J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;4/1/2030 14/12/2030i 5: 10: 1 + i i � 2 'Trenching :Grading ;4/13/2030 16/10/2030 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :6/11/2030 '7/1/2030 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ': ,I ,I •1 •1 •1 1.0000e- 0.0000 : 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 003 I 0051 ; le 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;4/1/2030 14/12/2030i 5: 10: 1 + i i � 2 'Trenching :Grading ;4/13/2030 16/10/2030 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :6/11/2030 '7/1/2030 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;4/1/2030 14/12/2030i 5: 10: 1 + i i � 2 'Trenching :Grading ;4/13/2030 16/10/2030 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :6/11/2030 '7/1/2030 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00. 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0172 0.0564 0.2942 6.3000e- 1.9600e- 1.9600e- 1.9600e- 1.9600e- • 0.0000 i 54.4985 54.4985 1.3600e- 0.0000 54.5324 .11 004 003 003 003 003 • 003 Total 0.0172 0.0564 0.2942 6.3000e- 5.3000e- 1.9600e- 7.2600e- 5.7000e- 1.9600e- 2.5300e- 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 004 003 003 003 004 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.3000e- 1.1000e- 1.5000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.5673 0.5673 1.0000e- 0.0000 0.5675 005 Total J .J J J J .1 .1 J . 2.3000e- 004 1.1000e- 004 1.5000e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.5000e- 004 0.0000 0.5673 0.5673 1.0000e- 005 0.0000 0.5675 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 i 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J .J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0172 0.0564 0.2942 6.3000e- 1.9600e- 1.9600e- 1.9600e- 1.9600e- • 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 004 003 003 003 003 ; • • 003 Total 0.0172 0.0564 0.2942 6.3000e- 2.0700e- 1.9600e- 4.0300e- 2.2000e- 1.9600e- 2.1800e- 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 ii 004 003 003 003 004 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2030 Mitigated Construction Off -Site 3.3 Trenching - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 1 1 • 1 003 ; J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.3000e- 1.1000e- 1.5000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- • 0.0000 i 0.5673 0.5673 1.0000e- 0.0000 0.5675 0.2877 1.3581 004 004 003 005 004 004 004 004 • 005 Total 0.0325 2.3000e- 1.1000e- 1.5000e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- 0.0000 0.5673 0.5673 1.0000e- 0.0000 0.5675 003 004 004 003 005 004 003 004 004 004 005 3.3 Trenching - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 319.7262 319.7262 8.3600e- 0.0000 319.9351 003 ; 003 • Total 0.1055 0.2877 1.3581 3.5600e- 0.0217 0.0107 0.0325 2.3500e- 0.0107 0.0131 0.0000 319.7262 319.7262 8.3600e- 0.0000 319.9351 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 7.5000e- 3.6000e- 4.8300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.8204 1.8204 3.0000e- 0.0000 1.8210 003 ; • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1055 7.5000e- 3.6000e- 4.8300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.8204 1.8204 3.0000e- 0.0000 1.8210 004 004 003 005 003 005 003 004 005 004 003 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 319.7258 319.7258 8.3600e- 0.0000 319.9348 003 ; • • 003 Total 0.1055 0.2877 1.3581 3.5600e- 8.4800e- 0.0107 0.0192 9.2000e- 0.0107 0.0117 0.0000 319.7258 319.7258 8.3600e- 0.0000 319.9348 ii 003 003 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2030 Mitigated Construction Off -Site 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0710 1 Worker • 7.5000e- 3.6000e- 4.8300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.8204 1.8204 3.0000e- 0.0000 1.8210 8.5300e. 004 004 003 005 003 005 003 004 005 004 • 005 Total 8.5300e- 7.5000e- 3.6000e- 4.8300e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.8204 1.8204 3.0000e- 0.0000 1.8210 003 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0710 0.2830 1.0418 2.3000e- 8.5300e- 8.5300e- 8.5300e- 8.5300e- • 0.0000 i 202.6748 202.6748 5.6400e- 0.0000 202.8158 003 003 003 003 003 ; • 003 Total 0.0710 0.2830 1.0418 2.3000e. 8.5300e. 8.5300e. 8.5300e- 8.5300e- 0.0000 202.6748 202.6748 5.6400e- 0.0000 202.8158 003 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker • • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 I 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 005 004 004 005 005 005 005 • V 6.0000e- 3.0000e- 3.9000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 005 005 004 004 004 005 005 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.2875 0.2875 : 2.0000e- 0.0000 0.2879 1 005 i 0.1480 0.1480 0.0000 0.0000 0.1481 Total 0.2830 8.0000e- 005 9.3000e- 004 5.6000e- 004 0.0000 3.2000e- 004 0.0000 3.2000e- 004 9.0000e- 005 0.0000 9.0000e- 005 0.0000 0.4355 0.4355 2.0000e- 005 0.0000 0.4360 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road i 0.0710 0.2830 1.0418 2.3000e- 8.5300e- 8.5300e- 8.5300e- 8.5300e- • 0.0000 i 202.6745 i 202.6745 5.6400e- 0.0000 202.8156 003 003 003 003 003 ; • 003 Total 0.0710 0.2830 1.0418 2.3000e. 8.5300e. 8.5300e. 8.5300e- 8.5300e- 0.0000 202.6745 202.6745 5.6400e- 0.0000 202.8156 003 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2030 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2875 0.2875 : 2.0000e- 0.0000 0.2879 005 004 004 005 005 005 005 • 1 005 Worker • 6.0000e- 3.0000e- 3.9000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1480 0.1480 0.0000 0.0000 0.1481 005 005 004 004 004 005 005 • Total 8.0000e- 9.3000e- 5.6000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4355 0.4355 2.0000e- 0.0000 0.4360 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •; 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9I I 1 I 1 1 I 1 1 1 1 1 • I. + + + + + 4. + 4. ,. 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071. 0.004354: 0.000825: 0.000615 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071. 0.004354: 0.000825: 0.000615 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 Mitigated :1 1 1 1 1 1 1 1 • Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 1 1 .1 .1 .1 .1 • ▪ 0.0000 : 1 11 1 1 1 Unmitigated i i i • 1 .1 • NaturalGas .1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 i 1 i 1 1 i 1 1• :1. I- 4- 1- 1- 1- 4- 4-} r 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 . i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt Surfaces i 0 / 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 3:56 PM Travertine Specific Plan (Well #7 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.10: CALEEMOD WELL #8 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #8 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Construction Phase - Construction of Well #8 anticipated to start and end Quarter 1 2031 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Table Name tblConstructionPhase tblConstructionPhase tblConstructionPhase tblGrading tblGrading tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics IColumn Name • NumDays i 100.00 • 15.00 r 4 • NumDays T 2.00 41.00 r • NumDays T 1.00 10.00 r • AcresOfGrading i 0.00 41.00 r • AcresOfGrading i 0.00 10.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 • UsageHours i 8.00 24.00 r 4 • UsageHours i 8.00 16.00 • CO2lntensityFactor 1270.9 623.16 • Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2031 •i 0.1946 0.6285 2.7007 6.5200e- 0.0314 0.0212 0.0526 4.0600e- 0.0212 0.0253 • 0.0000 i 579.6782 579.6782 0.0154 0.0000 580.0634 003 003 003 003 • Total Maximum 0.1946 0.6285 2.7007 6.5200e- 0.0314 0.0212 0.0526 4.0600e- 0.0212 0.0253 0.0000 579.6782 579.6782 0.0154 0.0000 580.0634 11 0.00 7.07 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2031 • 0.1946 0.6285 1 2.7007 6.5200e- 0.0149 0.0212 0.0361 2.2800e- 0.0212 0.0235 • 0.0000 i 579.6776 579.6776 0.0154 0.0000 580.0627 003 003 PM10 Total Maximum 0.1946 0.6285 2.7007 6.5200e- 0.0149 0.0212 0.0361 2.2800e- 0.0212 0.0235 0.0000 579.6776 579.6776 0.0154 0.0000 580.0627 43.84 0.00 7.07 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 31.37 43.84 0.00 7.07 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2031 3-31-2031 0.7866 0.7866 2 4-1-2031 6-30-2031 0.0338 0.0338 CH4 N20 Highest 0.7866 0.7866 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area 4 1.0000e- 0.0000 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •: 003 005004 004 i 004 ;i J J J J J J J J V J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 f' J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 f J J J .1 J J J J V J J J T Waste • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J .1 J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;1/1/2031 :1/14/2031i 5: 10: 1 + i i � 2 'Trenching :Grading ;1/15/2031 :3/12/2031 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :3/13/2031 '4/2/2031 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ': ,I ,I •1 •1 •1 1.0000e- 0.0000 : 9.0000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 003 I 0051 ; le 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;1/1/2031 :1/14/2031i 5: 10: 1 + i i � 2 'Trenching :Grading ;1/15/2031 :3/12/2031 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :3/13/2031 '4/2/2031 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;1/1/2031 :1/14/2031i 5: 10: 1 + i i � 2 'Trenching :Grading ;1/15/2031 :3/12/2031 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :3/13/2031 '4/2/2031 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00: LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0172 0.0564 0.2942 6.3000e- 1.9600e- 1.9600e- 1.9600e- 1.9600e- • 0.0000 i 54.4985 54.4985 1.3600e- 0.0000 54.5324 .11 004 003 003 003 003 • 003 Total 0.0172 0.0564 0.2942 6.3000e- 5.3000e- 1.9600e- 7.2600e- 5.7000e- 1.9600e- 2.5300e- 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 004 003 003 003 004 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.2000e- 1.0000e- 1.4300e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.5573 0.5573 1.0000e- 0.0000 0.5575 005 Total J .J J J J .1 .1 J . 2.2000e- 004 1.0000e- 004 1.4300e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.5000e- 004 0.0000 0.5573 0.5573 1.0000e- 005 0.0000 0.5575 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 i 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J .J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0172 0.0564 0.2942 6.3000e- 1.9600e- 1.9600e- 1.9600e- 1.9600e- • 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 004 003 003 003 003 ; • • 003 Total 0.0172 0.0564 0.2942 6.3000e- 2.0700e- 1.9600e- 4.0300e- 2.2000e- 1.9600e- 2.1800e- 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 ii 004 003 003 003 004 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 1 1 • 1 003 ; J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.2000e- 1.0000e- 1.4300e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- • 0.0000 i 0.5573 0.5573 1.0000e- 0.0000 0.5575 0.2877 1.3581 004 004 003 005 004 004 004 004 • 005 Total 0.0325 2.2000e- 1.0000e- 1.4300e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- 0.0000 0.5573 0.5573 1.0000e- 0.0000 0.5575 003 004 004 003 005 004 003 004 004 004 005 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 319.7262 319.7262 8.3600e- 0.0000 319.9351 003 ; 003 • Total 0.1055 0.2877 1.3581 3.5600e- 0.0217 0.0107 0.0325 2.3500e- 0.0107 0.0131 0.0000 319.7262 319.7262 8.3600e- 0.0000 319.9351 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 003 003 004 004 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.7882 1.7882 2.0000e- 0.0000 1.7888 003 ; • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1055 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.7882 1.7882 2.0000e- 0.0000 1.7888 004 004 003 005 003 005 003 004 005 004 003 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 319.7258 319.7258 8.3600e- 0.0000 319.9348 003 ; • • 003 Total 0.1055 0.2877 1.3581 3.5600e- 8.4800e- 0.0107 0.0192 9.2000e- 0.0107 0.0117 0.0000 319.7258 319.7258 8.3600e- 0.0000 319.9348 ii 003 003 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0710 1 Worker • 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.7882 1.7882 2.0000e- 0.0000 1.7888 8.5300e. 004 004 003 005 003 005 003 004 005 004 • 005 Total 8.5300e- 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.7882 1.7882 2.0000e- 0.0000 1.7888 003 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0710 0.2830 1.0418 2.3000e- 8.5300e- 8.5300e- 8.5300e- 8.5300e- • 0.0000 i 202.6748 202.6748 5.6400e- 0.0000 202.8158 003 003 003 003 003 ; • 003 Total 0.0710 0.2830 1.0418 2.3000e. 8.5300e. 8.5300e. 8.5300e- 8.5300e- 0.0000 202.6748 202.6748 5.6400e- 0.0000 202.8158 003 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2880 0.2880 : 2.0000e- 0.0000 0.2884 0.0710 005 004 004 005 005 005 005 • 1 005 Worker • 6.0000e- 3.0000e- 3.7000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1454 0.1454 0.0000 0.0000 0.1454 8.5300e. 005 005 004 004 004 005 005 • Total 8.5300e- 8.0000e- 9.3000e- 5.4000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4334 0.4334 2.0000e- 0.0000 0.4338 003 005 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0710 0.2830 1.0418 2.3000e- 8.5300e- 8.5300e- 8.5300e- 8.5300e- • 0.0000 i 202.6745 i 202.6745 5.6400e- 0.0000 202.8156 003 003 003 003 003 ; • 003 Total 0.0710 0.2830 1.0418 2.3000e. 8.5300e. 8.5300e. 8.5300e- 8.5300e- 0.0000 202.6745 202.6745 5.6400e- 0.0000 202.8156 003 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2031 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2880 0.2880 : 2.0000e- 0.0000 0.2884 005 004 004 005 005 005 005 • 1 005 J .1 .1 .1 .1 J .1 J Worker • 6.0000e- 3.0000e- 3.7000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1454 0.1454 0.0000 0.0000 0.1454 005 005 004 004 004 005 005 • Total 8.0000e- 9.3000e- 5.4000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4334 0.4334 2.0000e- 0.0000 0.4338 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 :I. + + + 4. I. 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces + 0.00 0.00 0.00 • • Total I 0.00 0.00 0.00 I i 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces : 0.563257• 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces : 0.563257• 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 Mitigated :1 1 • Electricity •i 1 1 i 0.0000 0.0000 i 0.0000 0.0000 • ▪ 0.0000 Unmitigated :11 1 1 • NaturalGas .1 0.0000 i 0.0000 i 0.0000 1 0.0000 i 0.0000 0.0000 i 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 1 i 1 1 i 1 i .1 } } } } } } } 4. r • 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt Surfaces i 0 / 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 4:00 PM Travertine Specific Plan (Well #8 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.11: CALEEMOD WELL #9 CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Well #9 Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces • • 10.00 1000sgft 0.23 10, 000.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Construction Phase - Construction of Well #9 anticipated to start and end Quarter 4 2031 Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Table Name tblConstructionPhase tblConstructionPhase tblConstructionPhase tblGrading tblGrading tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics IColumn Name • NumDays i 100.00 • 15.00 r 4 • NumDays T 2.00 41.00 r • NumDays T 1.00 10.00 r • AcresOfGrading i 0.00 41.00 r • AcresOfGrading i 0.00 10.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 1.00 0.00 r • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 • • OffRoadEquipmentUnitAmount i 2.00 • 0.00 r 4 • UsageHours i 8.00 24.00 r 4 • UsageHours i 8.00 16.00 • CO2lntensityFactor 1270.9 623.16 • Default Value New Value 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 25 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2031 •i 0.1946 0.6285 2.7007 6.5200e- 0.0314 0.0212 0.0526 4.0600e- 0.0212 0.0253 • 0.0000 i 579.6782 579.6782 0.0154 0.0000 580.0634 003 003 003 003 • Total Maximum 0.1946 0.6285 2.7007 6.5200e- 0.0314 0.0212 0.0526 4.0600e- 0.0212 0.0253 0.0000 579.6782 579.6782 0.0154 0.0000 580.0634 11 0.00 7.07 0.00 003 0.00 0.00 0.00 003 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2031 • 0.1946 0.6285 1 2.7007 6.5200e- 0.0149 0.0212 0.0361 2.2800e- 0.0212 0.0235 • 0.0000 i 579.6776 579.6776 0.0154 0.0000 580.0627 003 003 PM10 Total Maximum 0.1946 0.6285 2.7007 6.5200e- 0.0149 0.0212 0.0361 2.2800e- 0.0212 0.0235 0.0000 579.6776 579.6776 0.0154 0.0000 580.0627 43.84 0.00 7.07 0.00 003 0.00 0.00 0.00 003 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 52.63 0.00 31.37 43.84 0.00 7.07 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter I Start Date I End Date I Maximum Unmitigated ROG + NOX (tons/quarter) I Maximum Mitigated ROG + NOX (tons/quarter) Highest 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area •i 1.0000e- 0.0000 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- •1 003 005004 004 004 ,i J J J .1 J J J J 4 J J J T Energy •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 9 1 1 i 9 1 fi J J J J .1 J J V J J .1 T Mobile •i 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 fl J J J .1 J J J J 4 J J J T Waste 9 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 f J J J J J J J J 4 J J J T Water • 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 25 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2031 :10/14/2031i , 5: 10: 1 + i i � , 2 'Trenching :Grading ;10/15/2031 :12/10/2031 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :12/11/2031 '12/31/2031 r 5' 15' ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 •1 •1 1.0000e- 0.0000 1 9.0000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9003 005 1 1 9 11 1 1 . .1 .1 .1 .1 .1 .1 .1 .1 . 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 11 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 1.8000e- 1.8000e- 0.0000 1 0.0000 1.9000e- 004 004 1 004 .1 .1 .1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i i i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 1.0000e- 003 0.0000 9.0000e- 005 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 004 1.8000e- 004 0.0000 0.0000 1.9000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2031 :10/14/2031i , 5: 10: 1 + i i � , 2 'Trenching :Grading ;10/15/2031 :12/10/2031 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :12/11/2031 '12/31/2031 r 5' 15' ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Site Preparation +Site Preparation ;10/1/2031 :10/14/2031i , 5: 10: 1 + i i � , 2 'Trenching :Grading ;10/15/2031 :12/10/2031 : 5: 41: 1 + i _ - 3 'Building Construction :Building Construction :12/11/2031 '12/31/2031 r 5' 15' CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 10 Acres of Grading (Grading Phase): 0 Acres of Paving: 0.23 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating - sqft) OffRoad Equipment Amount I Usage Hours I Horse Power I Load Factor CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Type Site Preparation Site Preparation Site Preparation Site Preparation :Aerial Lifts :Bore/Drill Rigs :Graders 1 16.001 i j 1 16.001 i i 0 8.001 i i 4 :Other Construction Equipment ; 6 16.001 172: I. i ... ; Site Preparation +Tractors/Loaders/Backhoes ; 1 16.001 97: Trenching :Aerial Lifts ; 1 24.001 63: I. i ; Trenching :Bore/Drill Rigs ; 1 24.001 221: I. i y ; Trenching :Concrete/Industrial Saws ; 0 8.001 81: i y i 4 Trenching +Off -Highway Trucks ; 1 24.001 402: i• i y ; Trenching :Other Construction Equipment ; 4 24.001 172: I. i y ; Trenching :Rubber Tired Dozers ; 0 1.001 247: I. i y ; Trenching +Tractors/Loaders/Backhoes ; 0 6.001 97: I. i y ; Building Construction :Aerial Lifts ; 1 24.001 63: I. i y ; Building Construction :Bore/Drill Rigs ; 1 24.001 221: I. i ; Building Construction :Cranes ; 0 4.001 231: I. i y ; Building Construction :Dumpers/Tenders ; 1 24.001 16: I. i y ; Building Construction :Forklifts ; 0 6.001 89: Building Construction :Generator Sets ; 1 24.001 84: Building Construction :Off -Highway Trucks ; 1 24.001 402: I. i ; Building Construction :Other Construction Equipment ; 7 24.001 172: I. i y ; Building Construction :Pumps ; 1 24.001 84: Building Construction :Tractors/Loaders/Backhoes 2: 24.00: 97: 0.37 63: 221: 187: 0.31 0.50 0.41 0.42 0.37 0.31 0.50 0.73 0.38 0.42 0.40 0.37 0.31 0.50 0.29 0.38 0.20 0.74 0.38 0.42 0.74 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Site Preparation Trenching Building Construction 9: 23.00. 0.00: 0.00: 11.00: 7; 18.00. 0.00: 0.00: 11.00: 5.40; F r t -------- r 15' 4.00' 2.00' 0.00' 5.40: 20.00: LD_Mix 20.00: LD_Mix HDT_Mix HDT_Mix HHDT HHDT 11.00' 5.40' 20.00:LD_Mix 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 Cote Category tons/yr MT/yr Fugitive Dust •i 5.3000e- 0.0000 5.3000e- 5.7000e- 0.0000 5.7000e- • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 003 003 004 004 Off -Road •1 0.0172 0.0564 0.2942 6.3000e- 1.9600e- 1.9600e- 1.9600e- 1.9600e- • 0.0000 i 54.4985 54.4985 1.3600e- 0.0000 54.5324 .11 004 003 003 003 003 • 003 Total 0.0172 0.0564 0.2942 6.3000e- 5.3000e- 1.9600e- 7.2600e- 5.7000e- 1.9600e- 2.5300e- 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 004 003 003 003 004 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 ; 2.2000e- 1.0000e- 1.4300e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- • 0.0000 004 004 003 005 004 004 004 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 0.5573 0.5573 1.0000e- 0.0000 0.5575 005 Total J .J J J J .1 .1 J . 2.2000e- 004 1.0000e- 004 1.4300e- 003 1.0000e- 005 9.5000e- 004 0.0000 9.5000e- 004 2.5000e- 004 0.0000 2.5000e- 004 0.0000 0.5573 0.5573 1.0000e- 005 0.0000 0.5575 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 2.0700e- 0.0000 2.0700e- 2.2000e- 0.0000 2.2000e- • 0.0000 0.0000 i 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 J .J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0172 0.0564 0.2942 6.3000e- 1.9600e- 1.9600e- 1.9600e- 1.9600e- • 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 004 003 003 003 003 ; • • 003 Total 0.0172 0.0564 0.2942 6.3000e- 2.0700e- 1.9600e- 4.0300e- 2.2000e- 1.9600e- 2.1800e- 0.0000 54.4985 54.4985 1.3600e- 0.0000 54.5324 ii 004 003 003 003 004 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 1 1 • 1 003 ; J Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 2.2000e- 1.0000e- 1.4300e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- • 0.0000 i 0.5573 0.5573 1.0000e- 0.0000 0.5575 0.2877 1.3581 004 004 003 005 004 004 004 004 • 005 Total 0.0325 2.2000e- 1.0000e- 1.4300e- 1.0000e- 9.5000e- 0.0000 9.5000e- 2.5000e- 0.0000 2.5000e- 0.0000 0.5573 0.5573 1.0000e- 0.0000 0.5575 003 004 004 003 005 004 003 004 004 004 005 3.3 Trenching - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.0217 0.0000 0.0217 2.3500e- 0.0000 2.3500e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 319.7262 319.7262 8.3600e- 0.0000 319.9351 003 ; 003 • Total 0.1055 0.2877 1.3581 3.5600e- 0.0217 0.0107 0.0325 2.3500e- 0.0107 0.0131 0.0000 319.7262 319.7262 8.3600e- 0.0000 319.9351 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 .1 .1 I - Worker • 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.7882 1.7882 2.0000e- 0.0000 1.7888 003 ; • • 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1055 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.7882 1.7882 2.0000e- 0.0000 1.7888 004 004 003 005 003 005 003 004 005 004 003 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 8.4800e- 0.0000 8.4800e- 9.2000e- 0.0000 9.2000e- • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 003 003 004 004 • Off -Road 9 0.1055 0.2877 1.3581 3.5600e- 0.0107 0.0107 0.0107 0.0107 • 0.0000 319.7258 319.7258 8.3600e- 0.0000 319.9348 003 ; • • 003 Total 0.1055 0.2877 1.3581 3.5600e- 8.4800e- 0.0107 0.0192 9.2000e- 0.0107 0.0117 0.0000 319.7258 319.7258 8.3600e- 0.0000 319.9348 ii 003 003 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Trenching - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1.0418 1 Worker • 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- • 0.0000 i 1.7882 1.7882 2.0000e- 0.0000 1.7888 8.5300e. 004 004 003 005 003 005 003 004 005 004 • 005 Total 202.6748 6.9000e- 3.3000e- 4.5900e- 2.0000e- 3.0400e- 1.0000e- 3.0500e- 8.1000e- 1.0000e- 8.2000e- 0.0000 1.7882 1.7882 2.0000e- 0.0000 1.7888 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0710 0.2830 1.0418 2.3000e- 8.5300e- 8.5300e- 8.5300e- 8.5300e- • 0.0000 i 202.6748 202.6748 5.6400e- 0.0000 202.8158 003 003 003 003 003 ; • 003 Total 0.0710 0.2830 1.0418 2.3000e. 8.5300e. 8.5300e. 8.5300e- 8.5300e- 0.0000 202.6748 202.6748 5.6400e- 0.0000 202.8158 003 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2880 0.2880 : 2.0000e- 0.0000 0.2884 0.0710 005 004 004 005 005 005 005 • 1 005 Worker • 6.0000e- 3.0000e- 3.7000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1454 0.1454 0.0000 0.0000 0.1454 8.5300e. 005 005 004 004 004 005 005 • Total 8.5300e- 8.0000e- 9.3000e- 5.4000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4334 0.4334 2.0000e- 0.0000 0.4338 003 005 004 004 004 004 005 005 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0710 0.2830 1.0418 2.3000e- 8.5300e- 8.5300e- 8.5300e- 8.5300e- • 0.0000 i 202.6745 i 202.6745 5.6400e- 0.0000 202.8156 003 003 003 003 003 ; • 003 Total 0.0710 0.2830 1.0418 2.3000e. 8.5300e. 8.5300e. 8.5300e- 8.5300e- 0.0000 202.6745 202.6745 5.6400e- 0.0000 202.8156 003 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2031 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 ' 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 2.0000e- 9.0000e- 1.7000e- 0.0000 7.0000e- 0.0000 7.0000e- 2.0000e- 0.0000 2.0000e- • 0.0000 i 0.2880 0.2880 : 2.0000e- 0.0000 0.2884 005 004 004 005 005 005 005 • 1 005 J .1 .1 .1 .1 J .1 J Worker • 6.0000e- 3.0000e- 3.7000e- 0.0000 2.5000e- 0.0000 2.5000e- 7.0000e- 0.0000 7.0000e- • 0.0000 i 0.1454 0.1454 0.0000 0.0000 0.1454 005 005 004 004 004 005 005 • Total 8.0000e- 9.3000e- 5.4000e- 0.0000 3.2000e- 0.0000 3.2000e- 9.0000e- 0.0000 9.0000e- 0.0000 0.4334 0.4334 2.0000e- 0.0000 0.4338 005 004 004 004 004 005 005 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •; 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9I I 1 I 1 1 I 1 1 1 1 1 • I. + + + + + 4. + 4. ,. 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 Annual VMT Other Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.563257• 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Asphalt Surfaces • 0.563257• 0.034111: 0.191453: 0.101691: 0.009981: 0.004112: 0.016979: 0.070176: 0.001424: 0.001067: 0.004344: 0.000811: 0.000594 5.0 Energy Detail Historical Enerav Use: N CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 Mitigated :1 1 1 1 1 1 1 1 • Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 1 1 .1 .1 .1 .1 • ▪ 0.0000 : 1 11 1 1 1 Unmitigated i i i • 1 .1 • NaturalGas .1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • ▪ 0.0000 Mitigated :1 ' 1 1 1 1 1 1 i 1 i 1 1 i 1 1• :1. I- 4- 1- 1- 1- 4- 4-} r 0.0000 0.0000 0.0000 NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 0.0000 • 0.0000 0.0000 Unmitigated 1 1 1 4- 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 } 0.0000 • 0.0000 0.0000 i i r 0.0000 0.0000 0.0000 0.0000 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 i 4 0.0000 •0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 . i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated 5.3 Energy by Land Use - Electricity Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 ; i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces I 0 •u i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total Total CO2 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area ROG I NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated .; 1.0000e- 1 0.0000 1 9.0000e- 1 0.0000 1 0.0000 1 0.0000 i 1 0.0000 0.0000 0.0000 i 1.8000e- 1.8000e- 1 0.0000 0.0000 1.9000e- •1 003 I I 005 I : 1 : i 004 ,� i i i i 1 1 1 1 : i 004 1 004 1 1 ' Unmitigated - 1.0000e- • 0.0000 • 9.0000e- • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 • 1.8000e- • 1.8000e- • 0.0000 • 0.0000 • 1.9000e- 003 005 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 25 6.2 Area by SubCategory Unmitigated Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004: J .1 .1 J .1 J .1 .1 .1 .1 J Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 J .1 .1 J .1 J .1 .1 1. .1 .1 J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 0.0000 0.0000 0.0000 0.0000 005 005 : • 004 004 1 004 Total 1.0100e- 0.0000 9.0000e- 0.0000 004 004 004 0.0000 0.0000 • 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 0.0000 003 005 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 004 004 005 004 Mitigated 7.0 Water Detail ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 I CO2e Subcategory tons/yr MT/yr Architectural •i 3.5000e- 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 004 ; J J J J J J J J •• J J .1 Consumer • 6.5000e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Products 004 ; J J J J J J J J •• J J J Landscaping • 1.0000e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 005 005 ; 004 004 004 • Total 1.0100e- 0.0000 9.0000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1.8000e- 1.8000e- 0.0000 0.0000 1.9000e- 003 005 004 004 004 7.0 Water Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.1 Mitigation Measures Water 7.2 Water by Land Use Unmitigated Total CO2 CH4 N20 CO2e Category MT/yr Mitigated :: 0.0000 1 0.0000 1 0.0000 1 0.0000 'I I 1 I eI• + + r Unmitigated . 0.0000 : 0.0000 . 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt I0 / 0 �i Surfaces i i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 22 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Other Asphalt Surfaces i 0 / 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 23 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Asphalt Surfaces i 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 25 Date: 1/5/2021 4:06 PM Travertine Specific Plan (Well #9 Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.12: CALEEMOD SUBSTATION CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Substation Construction - Mitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population User Defined Industrial Other Asphalt Surfaces • • • • 0.80 50.00 4 User Defined Unit 1000sgft 0.02 1.13 4. 800.00 50,000.00 0 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 747.71 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2025 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2025 Land Use - Total Project area is 1.15 acres. Construction Phase - Construction of Substation anticipated to start Quarter 1 2024 and end Quarter 2 2025 Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Based on information provided by the Project Applicant. Off-road Equipment - Equipment based on information provided in by the Project Applicant. Trips and VMT - Grading - It is assumed that 1 acre will be disturbed per day Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Tier 4 for all equipment >150 HP Fleet Mix - 1 Column Name I tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 2.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 5.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated 0.00 • 3.00 Y t T tblConstEquipMitigation • NumberOfEquipmentMitigated } 0.00 67.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 5.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T • 3.00 tblConstEquipMitigation Y• NumberOfEquipmentMitigated F 0.00 T 4.00 tblConstEquipMitigation Y• Tier No Change T Tier 4 Final tblConstEquipMitigation Y • Tier No Change T Tier 4 Final 4 1 1 tblConstEquipMitigation • Tier No Change Tier 4 Final Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual tblConstEquipMitigation • Tier • 4 1- tblConstEquipMitigation • Tier i r tblConstEquipMitigation • Tier i r tblConstEquipMitigation • Tier i r tblConstructionPhase • NumDays T r tblConstructionPhase • NumDays T r tblConstructionPhase • NumDays T r tblGrading • AcresOfGrading i r tblLandUse • LandUseSquareFeet i r tblLandUse • LotAcreage i r tblLandUse • LotAcreage i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i r tblOffRoadEquipment • UsageHours i tblProjectCharacteristics • CO2lntensityFactor • No Change No Change No Change No Change 200.00 20.00 4.00 225.00 0.00 0.00 1.15 1.00 1.00 1.00 3.00 1.00 3.00 6.00 6.00 6.00 6.00 6.00 1270.9 • • Tier 4 Final Tier 4 Final Tier 4 Final Tier 4 Final 287.00 15.00 90.00 90.00 800.00 0.02 1.13 0.00 2.00 4.00 0.00 0.00 0.00 8.00 8.00 8.00 8.00 8.00 747.71 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 26 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2024 •i 2.4564 18.6667 18.2014 0.0597 0.3688 0.7343 1.1031 0.1675 0.6768 0.8443 • 0.0000 ' 5,245.174 5,245.174 1.6623 0.0000 5,286.731 J J J J J J J J w J J .1 T 7 7 i 0 e J .1 .1 J .1 J .1 .1 . .1 .1 J 2025 •1 1.3106 9.3842 10.5452 0.0333 0.0138 0.3728 0.3866 3.7300e- 0.3438 0.3476 • 0.0000 i 2,923.435 2,923.435 0.9235 0.0000 2,946.523 Maximum 003 • 7 7 8 Maximum 2.4564 18.6667 18.2014 0.0597 0.3688 0.7343 1.1031 0.1675 0.6768 0.8443 0.0000 5,245.174 5,245.174 1.6623 0.0000 5,286.731 0.00 1 0.00 Reduction 5 5 7 7 0 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2024 •i 0.8688 4.5729 28.5263 0.0597 0.1744 0.1707 0.3450 0.0735 1 0.1656 0.2391 • 0.0000 5,245.168 5,245.168 1.6623 0.0000 5,286.724 5 5 1 7 J J J J J J J J w J J .1 T 2025 •i 0.4982 2.7700 16.3425 0.0333 0.0138 0.1023 0.1161 3.7300e- 0.0991 0.1028 • 0.0000 i 2,923.432 2,923.432 0.9235 0.0000 2,946.520 Total 003 ; 3 3 3 Maximum 0.8688 4.5729 28.5263 0.0597 0.1744 0.1707 0.3450 0.0735 0.1656 0.2391 0.0000 5,245.168 5,245.168 1.6623 0.0000 5,286.724 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 5 5 7 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 63.71 73.82 -56.08 0.00 50.82 75.34 69.04 54.91 74.07 71.32 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2024 3-31-2024 3.8393 0.8279 2 4-1-2024 6-30-2024 5.0197 1.2364 3 7-1-2024 9-30-2024 6.1494 1.6957 4 10-1-2024 12-31-2024 6.1491 1.6954 5 1-1-2025 3-31-2025 5.2885 1.6161 6 4-1-2025 6-30-2025 5.3476 1.6343 7 7-1-2025 9-30-2025 0.0588 0.0180 0.0000 9.1000e- 004 Highest 6.1494 1.6957 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water ;l e1 •i el • 4 9.0600e- 0.0000 1 4.7000e- 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 9003 9 : I 004 J J J .1 J J J J 4 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 9 1 1 1 9 J J J J J J J J V 0.0000 0.0000 I 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J V 9 1 0.0000 0.0000 0.0000 0.0000 J J J J J J J J V 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 ' 9.1000e- 9.1000e- 0.0000 1 0.0000 004 004 J J J i 0.0000 0.0000 0.0000 1 0.0000 i J J .1 i 0.0000 0.0000 0.0000 1 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 9.7000e- i 004 T 0.0000 T 0.0000 T 0.0000 T 0.0000 Total 9.0600e- 003 0.0000 4.7000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9.1000e- 004 9.1000e- 004 0.0000 0.0000 9.7000e- 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 26 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition ;1/1/2024 11/19/2024i 5: 15: 1 + i i � 2 :Grading :Grading ;1/20/2024 15/24/2024 : 5: 90: 1 + i _ - 3 :Building Construction :Building Construction :5/25/2024 '7/1/2025 r 5' 287' • ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i 9.0600e- 0.0000 4.7000e- 0.0000 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 '� 1 003 004 .: i . •i 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 . .1 1 1 • , l. •1 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 le •1 0.0000 0.0000 0.0000 0.0000 • 0.0000 le •1 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 9.1000e- 9.1000e- 0.0000 1 0.0000 9.7000e- 004 004 I 004 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 I i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total PM2.5 9.0600e- 003 0.0000 4.7000e- 004 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9.1000e- 004 9.1000e- 004 0.0000 0.0000 9.7000e- 004 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition ;1/1/2024 11/19/2024i 5: 15: 1 + i i � 2 :Grading :Grading ;1/20/2024 15/24/2024 : 5: 90: 1 + i _ - 3 :Building Construction :Building Construction :5/25/2024 '7/1/2025 r 5' 287' • ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition ;1/1/2024 11/19/2024i 5: 15: 1 + i i � 2 :Grading :Grading ;1/20/2024 15/24/2024 : 5: 90: 1 + i _ - 3 :Building Construction :Building Construction :5/25/2024 '7/1/2025 r 5' 287' • CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Site Preparation Phase): 0 Acres of Grading (Grading Phase): 90 Acres of Paving: 1.13 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Demolition Demolition Demolition Demolition Demolition Demolition Demolition Grading Grading Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Offroad Equipment Type I Amount I Usage Hours I Horse Power I Load Factor :Concrete/Industrial Saws ; 0 8.00: 81: 0.73 -+ ; :Excavators ; 2; 8.00; 158: 0.38 -+ ; :Graders ; 1 ; 8.00; 187: 0.41 :Off -Highway Trucks ; 13? 8.00! 402: 0.38 :Other Construction Equipment ; 0? 8.00! 172: 0.42 :Rubber Tired Dozers ; 1? 8.00! 247: 0.40 +Tractors/Loaders/Backhoes ; 0? 8.00! 97: 0.37 -+ ; :Graders ; 1 ; 8.00! 187: 0.41 :Off -Highway Trucks ; 26? 8.00! 402: 0.38 -+ ; :Plate Compactors ; 1 I 8.00; 8: 0.43 :Rubber Tired Dozers ; 1? 8.00! 247: 0.40 -+ ; :Scrapers ; 2; 8.00; 367: 0.48 :Skid Steer Loaders ; 1? 8.00! 65: 0.37 :Sweepers/Scrubbers ; 1? 8.00! 64: 0.46 +Tractors/Loaders/Backhoes ; 0? 7.00! 97: 0.37 -+ ; :Air Compressors ; 1 I 8.00; 78: 0.48 + :Cranes 2; 8.00! 231: 0.29 i• r 1. :Excavators 3: 8.00: 158: 0.38 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction :Forklifts :Generator Sets :Graders :Off -Highway Trucks :Other Construction Equipment :Plate Compactors :Rollers :Rubber Tired Dozers [Scrapers :Skid Steer Loaders +Tractors/Loaders/Backhoes 1 1' 1 :Trenchers :Welders 0: 8.00' 89' 0.20 • 8.001 84: 0.74 8.001 187' 0.41 8.001 402: 0.38 8.001 172: 0.42 8.001 8: 0.43 8.001 80: 0.38 8.001 247' 0.40 8.001 367' 0.48 8.001 65: 0.37 8.001 97' 0.37 I 8.001 78: 0.50 r ' 8.00: 46: 0.45 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition Grading Building Construction 17: 43.00. 0.001 33: 83.00• 0.001 - 1- ,- 54' 54' 21.00: 8.00' 0.00: o.00: 4. 0.00' 11.00: 5.40: 11.00: 5.40: 11.00' 5.40' 20.00: LD_Mix 20.00: LD_Mix 20.00 : LD_Mix 1 HDTMix 1 HDT_Mix HHDT HHDT 'HDT_Mix 'HHDT 3.1 Mitigation Measures Construction Use Cleaner Engines for Construction Equipment Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 26 3.2 Demolition - 2024 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0590 0.4301 0.4018 1.4800e- 0.0161 0.0161 0.0149 0.0149 • 0.0000 i 130.0398 130.0398 0.0421 0.0000 131.0912 MT/yr 003 • -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 Total 0.0590 0.4301 0.4018 1.4800e- J .1 J J J .1 .1 J . .1 .1 J 0.0161 0.0161 0.0149 0.0149 0.0000 130.0398 130.0398 0.0421 0.0000 131.0912 6.2900e- 2.0000e- 2.6500e- 2.0000e- 003 7.0000e- 1.0000e- 7.2000e- 0.0000 1.9315 1.9315 4.0000e- 0.0000 1.9325 004 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J Worker • 9.2000e- 5.3000e- 6.2900e- 2.0000e- 2.6500e- 2.0000e- 2.6700e- 7.0000e- 1.0000e- 7.2000e- • 0.0000 i 1.9315 1.9315 4.0000e- 0.0000 1.9325 004 004 003 005 003 005 003 004 005 004 : • 005 Total 9.2000e- 5.3000e- 6.2900e- 2.0000e- 2.6500e- 2.0000e- 2.6700e- 7.0000e- 1.0000e- 7.2000e- 0.0000 1.9315 1.9315 4.0000e- 0.0000 1.9325 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 26 3.2 Demolition - 2024 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0181 0.0785 0.6877 1.4800e- 2.4100e- 2.4100e- 2.4100e- 2.4100e- • 0.0000 i 130.0396 130.0396 0.0421 0.0000 131.0911 MT/yr 003 003 003 003 003 ; • -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 Total 0.0181 0.0785 0.6877 1.4800e- J J J J J J J J . J J J V 2.4100e- 2.4100e- 2.4100e- 2.4100e- 0.0000 130.0396 130.0396 0.0421 0.0000 131.0911 6.2900e- 2.0000e- 2.6500e- 2.0000e- 003 7.0000e- 003 003 0.0000 003 003 4.0000e- 0.0000 1.9325 004 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J . J J J V Worker • 9.2000e- 5.3000e- 6.2900e- 2.0000e- 2.6500e- 2.0000e- 2.6700e- 7.0000e- 1.0000e- 7.2000e- • 0.0000 i 1.9315 1.9315 4.0000e- 0.0000 1.9325 004 004 003 005 003 005 003 004 005 004 : • 005 Total 9.2000e- 5.3000e- 6.2900e- 2.0000e- 2.6500e- 2.0000e- 2.6700e- 7.0000e- 1.0000e- 7.2000e- 0.0000 1.9315 1.9315 4.0000e- 0.0000 1.9325 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2024 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.3187 0.0000 0.3187 0.1541 0.0000 0.1541 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Off -Road •i 0.7095 5.2149 4.7133 0.0178 0.1941 0.1941 0.1786 0.1786 • 0.0000 i 1,558.471 1,558.471 0.5037 0.0000 1,571.064 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 • 6 6 9 Total 0.7095 5.2149 4.7133 0.0178 0.3187 0.1941 0.5128 0.1541 0.1786 0.3327 0.0000 1,558.471 1,558.471 0.5037 0.0000 1,571.064 0.0307 1.8000e- 0.0309 8.1600e- 1.6000e- 8.3300e- 0.0000 22.3695 22.3695 4.4000e- 0.0000 22.3804 6 6 003 9 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J V Worker 9 0.0107 6.1200e- 0.0729 2.5000e- 0.0307 1.8000e- 0.0309 8.1600e- 1.6000e- 8.3300e- • 0.0000 i 22.3695 22.3695 4.4000e- 0.0000 22.3804 003 004 004 003 004 003 : 004 Total 0.0107 6.1200e- 0.0729 2.5000e- 0.0307 1.8000e- 0.0309 8.1600e- 1.6000e- 8.3300e- 0.0000 22.3695 22.3695 4.4000e- 0.0000 22.3804 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2024 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.1243 0.0000 0.1243 0.0601 0.0000 0.0601 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •1 0.2266 1.0494 8.0145 0.0178 0.0346 0.0346 0.0342 0.0342 • 0.0000 i 1,558.469 1,558.469 0.5037 0.0000 1,571.063 -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 • 7 7 0 Total 0.2266 1.0494 8.0145 0.0178 0.1243 0.0346 0.1589 0.0601 0.0342 0.0943 0.0000 1,558.469 1,558.469 0.5037 0.0000 1,571.063 0.0307 1.8000e- 0.0309 8.1600e- 1.6000e- 8.3300e- 0.0000 22.3695 22.3695 4.4000e- 0.0000 22.3804 7 7 003 0 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker •u 0.0107 6.1200e- 0.0729 2.5000e- 0.0307 1.8000e- 0.0309 8.1600e- 1.6000e- 8.3300e- • 0.0000 i 22.3695 22.3695 4.4000e- 0.0000 22.3804 003 004 004 003 004 003 : 004 Total 0.0107 6.1200e- 0.0729 2.5000e- 0.0307 1.8000e- 0.0309 8.1600e- 1.6000e- 8.3300e- 0.0000 22.3695 22.3695 4.4000e- 0.0000 22.3804 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2024 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 1.6705 12.9728 12.9668 0.0400 0.5237 0.5237 0.4831 0.4831 • 0.0000 3,510.068 3,510.068 1.1150 0.0000 3,537.943 J J J J J J J J m J J J V • 7 7 i 6 Total 004 003 004 003 005 1 003 004 1 005 004 • 004 1.6705 12.9728 12.9668 0.0400 0.5237 0.5237 004 0.4831 0.4831 0.0000 3,510.068 3,510.068 1.1150 0.0000 3,537.943 1.1000e- 0.0168 4.5000e- 1.0000e- 4.6000e- 0.0000 22.2936 22.2936 9.9000e- 0.0000 22.3184 7 7 004 6 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J V Vendor • 9.6000e- 0.0396 8.1900e- 1.3000e- 3.1100e- 3.0000e- 1 3.1400e- 9.0000e- i 3.0000e- 9.3000e- • 0.0000 i 12.4205 12.4205 8.0000e- 0.0000 12.4404 004 003 004 003 005 1 003 004 1 005 004 • 004 J .J J J J .1 .1 J . .1 .1 J r Worker • 4.7300e- 2.7000e- 0.0322 1.1000e- 0.0136 8.0000e- 0.0136 3.6000e- 7.0000e- 3.6700e- • 0.0000 i 9.8731 9.8731 1.9000e- 0.0000 9.8780 003 003 004 005 003 005 003 : 004 Total 5.6900e- 0.0423 0.0404 2.4000e- 0.0167 1.1000e- 0.0168 4.5000e- 1.0000e- 4.6000e- 0.0000 22.2936 22.2936 9.9000e- 0.0000 22.3184 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2024 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 0.6067 3.3961 19.7045 0.0400 0.1333 0.1333 0.1288 0.1288 • 0.0000 3,510.064 3,510.064 1.1150 0.0000 3,537.939 J J J J J J J J m J J J V • 5 5 1 4 Total 004 003 004 003 005 1 003 004 1 005 004 • 004 0.6067 3.3961 19.7045 0.0400 0.1333 0.1333 004 0.1288 0.1288 0.0000 3,510.064 3,510.064 1.1150 0.0000 3,537.939 1.1000e- 0.0168 4.5000e- 1.0000e- 4.6000e- 0.0000 22.2936 22.2936 9.9000e- 0.0000 22.3184 5 5 004 4 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J V Vendor • 9.6000e- 0.0396 8.1900e- 1.3000e- 3.1100e- 3.0000e- 1 3.1400e- 9.0000e- i 3.0000e- 9.3000e- • 0.0000 i 12.4205 12.4205 8.0000e- 0.0000 12.4404 004 003 004 003 005 1 003 004 1 005 004 • 004 J J J J J .1 .1 J . .1 .1 J r Worker • 4.7300e- 2.7000e- 0.0322 1.1000e- 0.0136 8.0000e- 0.0136 3.6000e- 7.0000e- 3.6700e- • 0.0000 i 9.8731 9.8731 1.9000e- 0.0000 9.8780 003 003 004 005 003 005 003 : 004 Total 5.6900e- 0.0423 0.0404 2.4000e- 0.0167 1.1000e- 0.0168 4.5000e- 1.0000e- 4.6000e- 0.0000 22.2936 22.2936 9.9000e- 0.0000 22.3184 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2025 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 1.3061 9.3498 10.5140 0.0331 0.3727 0.3727 0.3438 0.3438 • 0.0000 2,905.373 2,905.373 0.9227 0.0000 2,928.442 J J J J J J J J m J J J V • 6 6 i 1 Total 004 003 004 003 005 1 003 004 1 005 004 • 004 1.3061 9.3498 10.5140 0.0331 0.3727 0.3727 004 0.3438 0.3438 0.0000 2,905.373 2,905.373 0.9227 0.0000 2,928.442 9.0000e- 0.0139 3.7200e- 9.0000e- 3.8100e- 0.0000 18.0621 18.0621 7.9000e- 0.0000 18.0817 6 6 004 1 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J V Vendor • 7.8000e- 0.0324 6.5500e- 1.1000e- 2.5700e- 3.0000e- 1 2.6000e- 7.4000e- i 3.0000e- 7.7000e- • 0.0000 i 10.2139 10.2139 6.4000e- 0.0000 10.2300 004 003 004 003 005 1 003 004 1 005 004 • 004 J .J J J J J J J . J .1 J r Worker • 3.7000e- 2.0400e- 0.0247 9.0000e- 0.0112 6.0000e- 0.0113 2.9800e- 6.0000e- 3.0400e- • 0.0000 i 7.8481 7.8481 1.5000e- 0.0000 7.8518 • 003 003 005 005 003 005 003 : 004 Total 4.4800e- 0.0345 0.0312 2.0000e 0.0138 9.0000e- 0.0139 3.7200e- 9.0000e- 3.8100e- 0.0000 18.0621 18.0621 7.9000e- 0.0000 18.0817 003 004 005 003 005 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2025 Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 0.4938 2.7355 16.3113 0.0331 0.1022 0.1022 0.0990 0.0990 • 0.0000 2,905.370 2,905.370 0.9227 0.0000 2,928.438 J J J J J J J J m J J J V • 2 2 i 6 Total 004 003 004 003 005 1 003 004 1 005 004 • 004 0.4938 2.7355 16.3113 0.0331 0.1022 0.1022 004 0.0990 0.0990 0.0000 2,905.370 2,905.370 0.9227 0.0000 2,928.438 9.0000e- 0.0139 3.7200e- 9.0000e- 3.8100e- 0.0000 18.0621 18.0621 7.9000e- 0.0000 18.0817 2 2 004 6 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling -1 .0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J V Vendor • 7.8000e- 0.0324 6.5500e- 1.1000e- 2.5700e- 3.0000e- 1 2.6000e- 7.4000e- i 3.0000e- 7.7000e- • 0.0000 i 10.2139 10.2139 6.4000e- 0.0000 10.2300 004 003 004 003 005 1 003 004 1 005 004 • 004 J .J J J J .1 .1 J . J .1 J r Worker • 3.7000e- 2.0400e- 0.0247 9.0000e- 0.0112 6.0000e- 0.0113 2.9800e- 6.0000e- 3.0400e- • 0.0000 i 7.8481 7.8481 1.5000e- 0.0000 7.8518 003 003 005 005 003 005 003 : • 004 Total 4.4800e- 0.0345 0.0312 2.0000e- 0.0138 9.0000e- 0.0139 3.7200e- 9.0000e- 3.8100e- 0.0000 18.0621 18.0621 7.9000e- 0.0000 18.0817 003 004 005 003 005 003 004 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated �� 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 •1 I I I • I � a F + } } + F + F r I• + } + r Unmitigated . 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Other Asphalt Surfaces User Defined Industrial ; 0.00 0.00 + 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 12.50 0.00 4.20 5.40 L• 0.00 1 1 4.3 Trip Type Information 4.4 Fleet Mix Miles Trip % Trip Purpose Land Use H -W or C -W H -S or C -C I H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Asphalt Surfaces 12.50 4.20 5.40 L• 0.00 0.00 0.00 • 0 0 0 r rt T ,}. 1- -rr r User Defined Industrial 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual Land Use Other Asphalt Surfaces User Defined Industrial I LDA I LDT1 I LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS I MCY 0.554334+ 0.0353761 0.188722: i 0.108173: i 0.012711: i 0.004530: i 0.017449: i 0.070039: i 0.001415: I i 0.0011231 0.004446: i 0.000892' 0.000789 } I • 0.554334. 0.035376' 0.188722' 0.108173' 0.012711' 0.004530' 0.017449' 0.070039' 0.001415' 0.001123' 0.004446' 0.000892' 0.000789 SBUS I MH 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 Mitigated 9 1 1 1 1 1 1 1 1 . 1 1 1 1 1 .1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 . J J J J J J J J 7 J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 : 0.0000 Unmitigated .� 1 1 1 1 1 1 1 1 . 1 1 i 1 1 .1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 . J J J J J • J J J J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 NaturalGas •1 0.0000 0.0000 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 Mitigated 9 1 1 1 1 1 1 1 1 . 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 1 NaturalGas • 0.0000 ' 0.0000 ' 0.0000 • 0.0000 ' • 0.0000 • 0.0000 ' • 0.0000 ' 0.0000 • 0.0000 0.0000 • 0.0000 • 0.0000 ' 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt 0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i Surfaces i 4 User Defined 0 • Industrial i J J .1 J .1 .1 J .1 ; 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 . .1 .1 J i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Asphalt i 0 .1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Surfaces i . F. 4 J J .1 J J J .1 .1 .• J J .1 - User Defined I0 • 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Industrial 1 . . Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt i 0 • Surfaces i r 4 User Defined i 0 • Industrial i i 0.0000 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Asphalt i 0 .i Surfaces i . ■ F. User Defined I0 • Industrial 1 . i 0.0000 0.0000 0.0000 J J 0.0000 1 0.0000 0.0000 0.0000 r 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 9.0600e- i 0.0000 i 4.7000e- i 0.0000 1 i 0.0000 1 0.0000 i i 0.0000 1 0.0000 •• 0.0000 i 9.1000e- i 9.1000e- i 0.0000 i 0.0000 i 9.7000e- �1 003 1 1 004 1 1 1 1 1 1 . ' 004 1 004 1 1 i 004 '� 1 1 1 1 1 1 1 1 I 1 • :I• 4. I. 4. 4. I. 4. I. 4. r • 1. F 1. r Unmitigated •• 9.0600e- • 0.0000 • 4.7000e- • 0.0000 . • 0.0000 • 0.0000 • . 0.0000 • 0.0000 • 0.0000 • 9.1000e- • 9.1000e- • 0.0000 • 0.0000 • 9.7000e- 003 004 004 004 004 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 2.6700e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :1 003 J J .1 .1 J .1 J .1 .• J J .1 T Consumer • 6.3600e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 003 f J J J .1 J .1 J .1 • J J J T Landscaping • 4.0000e- 0.0000 4.7000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 9.1000e- 9.1000e- 0.0000 0.0000 9.7000e- 005 004 : • 004 004 004 Total 9.0700e- 0.0000 4.7000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9.1000e- 9.1000e- 0.0000 0.0000 9.7000e- 003 004 004 004 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 26 6.2 Area by SubCategory Mitigated Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 2.6700e-' : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 003 .1 .1 J Consumer • 6.3600e- 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products 003 .1 J Landscaping • 4.0000e- 0.0000 4.7000e- 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 9.1000e- 9.1000e- 0.0000 0.0000 9.7000e- 005 004 • 004 004 1 004 Total 9.0700e- 0.0000 4.7000e- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 9.1000e- 9.1000e- 0.0000 0.0000 9.7000e- 003 004 004 004 004 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •i 0.0000 : 0.0000 : 0.0000 . 0.0000 '� 0.0000 'I I 1 0.0000 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Asphalt I0 / 0 •i Surfaces I h 4 User Defined I0 / 0 •i Industrial I I 0.0000 0.0000 0.0000 0.0000 .1 .1 T 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 24 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Asphalt i 0 / 0 •i Surfaces i r 4 User Defined i 0 / 0 •i Industrial i i 0.0000 0.0000 0.0000 0.0000 J J 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 8.2 Waste by Land Use Unmitigated Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons MT/yr Other Asphalt i 0 •i Surfaces i 1 • I- - User Defined 10 • Industrial i i 0.0000 0.0000 0.0000 0.0000 J J 0.0000 0.0000 0.0000 0.0000 0.0000 r 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons MT/yr Other Asphalt i 0 •i Surfaces i i r User Defined 1 0 • Industrial i i 0.0000 0.0000 0.0000 .1 0.0000 0.0000 0.0000 0.0000 r 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 26 Date: 1/5/2021 4:52 PM Travertine Specific Plan (Substation Construction - Mitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.13: CALEEMOD PHASE B CRUSHING EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Phase B Crushing - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Phase B Crushing anticipated to start Quarter 1 of 2025 and end Quarter 2 of 2027 Off-road Equipment - Type of crusher will be a mobile unit, anticipated to consist of Sandvik QJ331, Anaconda TD516, or similar. This model assumed use of Sandvik QJ331 which has a horsepower of 350. Trips and VMT - Crushing activities will occur anywhere onsite within the grading limits. Demolition - Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblConstructionPhase tblConstructionPhase tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tblOffRoadEquipment tbI ProjectCharacteristics tblTripsAndVMT • NumDays r Y • Y PhaseEndDate HorsePower 500.00 3/1/2027 85.00 T T • OffRoadEquipmentType T r • ▪ OffRoadEquipmentUnitAmount 1.00 T • ▪ OffRoadEquipmentUnitAmount 3.00 T • ▪ OffRoadEquipmentUnitAmount 2.00 T • CO2lntensityFactor 1270.9 T Y • • HaulingTripNumber 99,553.00 585.00 6/28/2027 350.00 Crushing/Proc. Equipment 0.00 0.00 0.00 706.2 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 23 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2025 •i 0.1056 0.4448 0.5085 2.3900e- 1 3.6524 0.0142 3.6667 0.5533 0.0142 0.5675 • 0.0000 i 246.2085 246.2085 8.6400e- 1 0.0000 246.4244 :1 003 003 003 J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 2026 •i 0.1399 0.5893 0.6733 3.1700e- 4.8390 0.0189 4.8579 0.7330 0.0189 0.7519 • 0.0000 i 326.1130 326.1130 0.0114 0.0000 326.3990 003 003 003 ; • 003 ir J .1 .1 .1 .1 J .1 .1 V .1 .1 .1 2027 •i 0.0680 0.2867 0.3274 1.5400e- 2.3546 9.1800e- 2.3638 0.3567 9.1800e- 0.3659 • 0.0000 i 158.6484 158.6484 5.5600e- 0.0000 158.7875 0.6733 003 003 003 • 003 Maximum 0.1399 0.5893 0.6733 3.1700e- 4.8390 0.0189 4.8579 0.7330 0.0189 0.7519 0.0000 326.1130 326.1130 0.0114 0.0000 326.3990 11 003 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2025 4 0.1056 0.4448 : 0.5085 2.3900e- 1 1.4259 , 0.0142 1.4402 , 0.2162 0.0142 0.2304 • 0.0000 i 246.2082 246.2082 8.6400e- 1 0.0000 246.4241 •1 003 • 003 J J J .1 J J J J w J J .1 2026 •i 0.1399 0.5893 0.6733 3.1700e- 1.8892 0.0189 1.9081 0.2864 0.0189 0.3053 • 0.0000 i 326.1127 326.1127 0.0114 0.0000 326.3986 003 J J J .1 J J J J . J J .1 2027 •i 0.0680 0.2867 0.3274 1.5400e- 0.9193 9.1800e- 0.9284 0.1394 9.1800e- 0.1485 • 0.0000 i 158.6482 158.6482 5.5600e- 0.0000 158.7873 003 003 003 ; • 003 Maximum 0.1399 0.5893 0.6733 3.1700e- 1.8892 0.0189 1.9081 0.2864 0.0189 0.3053 0.0000 326.1127 326.1127 0.0114 0.0000 326.3986 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Quarter ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e 12-31-2025 0.1836 0.1836 4 1-1-2026 PM10 PM10 Total PM2.5 PM2.5 Total 0.1816 0.1816 6 7-1-2026 9-30-2026 0.1836 Percent 0.00 0.00 0.00 0.00 60.96 0.00 60.72 60.93 0.00 59.40 0.00 0.00 0.00 0.00 0.00 0.00 Reduction Highest 0.1836 0.1836 Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 4-1-2025 6-30-2025 0.1816 0.1816 2 7-1-2025 9-30-2025 0.1836 0.1836 3 10-1-2025 12-31-2025 0.1836 0.1836 4 1-1-2026 3-31-2026 0.1796 0.1796 5 4-1-2026 6-30-2026 0.1816 0.1816 6 7-1-2026 9-30-2026 0.1836 0.1836 7 10-1-2026 12-31-2026 0.1836 0.1836 8 1-1-2027 3-31-2027 0.1796 0.1796 9 4-1-2027 6-30-2027 0.1776 0.1776 Highest 0.1836 0.1836 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 23 2.2 Overall Operational Unmitigated Operational Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 • • 2.0043 4.0000e- 1 4.2400e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 9 005 003 1 005 005 005 005 V 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 • 9 1 1 1 • V 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 003 003 005 1 i 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 2.0043 4.0000e- 005 4.2400e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 23 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 •1 •1 2.0043 4.0000e- 1 4.2400e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 9 005 003 1 005 005 005 005 V 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 003 003 005 I i 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 2.0043 4.0000e- 005 4.2400e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :4/1/2025 :6/28/2027 585: Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 0 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount I Usage Hours I Horse Power I Load Factor Demolition Demolition Demolition Demolition :Concrete/Industrial Saws :Crushing/Proc. Equipment :Excavators :Rubber Tired Dozers 1 0 1- 0: 8.001 8.001 8.001 8.00: 81: 350: 158: 247: 0.73 0.78 0.38 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 1' 3.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix .HDT Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 23 3.2 Demolition - 2025 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 3.6500 0.0000 3.6500 0.5527 0.0000 0.5527 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J -I- Off -Road •i 0.1048 0.4444 0.5032 2.3700e- 0.0142 0.0142 0.0142 0.0142 • 0.0000 i 244.5095 244.5095 8.6000e- 0.0000 244.7246 Off-Road •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • 003 Total 0.1048 0.4444 0.5032 2.3700e- 3.6500 0.0142 3.6642 0.5527 0.0142 0.5669 0.0000 244.5095 244.5095 8.6000e- 0.0000 244.7246 2.4300e- 1.0000e- 2.4500e- 6.5000e- 003 6.6000e- 0.0000 1.6990 1.6990 3.0000e- 0.0000 1.6998- 003 004 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J Worker • 8.0000e- 4.4000e- 5.3400e- 2.0000e- 2.4300e- 1.0000e- 2.4500e- 6.5000e- 1.0000e- 6.6000e- • 0.0000 i 1.6990 1.6990 3.0000e- 0.0000 1.6998 • 004 004 003 005 003 005 003 004 005 004 : 005 Total 8.0000e- 4.4000e- 5.3400e- 2.0000e- 2.4300e- 1.0000e- 2.4500e- 6.5000e- 1.0000e- 6.6000e- 0.0000 1.6990 1.6990 3.0000e- 0.0000 1.6998- 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 23 3.2 Demolition - 2025 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 1.4235 0.0000 1.4235 0.2155 0.0000 0.2155 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J -I- Off -Road •i 0.1048 0.4444 0.5032 2.3700e- 0.0142 0.0142 0.0142 0.0142 • 0.0000 i 244.5092 244.5092 8.6000e- 0.0000 244.7243 Off-Road •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • 003 Total 0.1048 0.4444 0.5032 2.3700e- 1.4235 0.0142 1.4377 0.2155 0.0142 0.2298 0.0000 244.5092 244.5092 8.6000e- 0.0000 244.7243 2.4300e- 1.0000e- 2.4500e- 6.5000e- 003 6.6000e- 0.0000 1.6990 1.6990 3.0000e- 0.0000 1.6998- 003 004 003 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J Worker • 8.0000e- 4.4000e- 5.3400e- 2.0000e- 2.4300e- 1.0000e- 2.4500e- 6.5000e- 1.0000e- 6.6000e- • 0.0000 i 1.6990 1.6990 3.0000e- 0.0000 1.6998 • 004 004 003 005 003 005 003 004 005 004 : 005 Total 8.0000e- 4.4000e- 5.3400e- 2.0000e- 2.4300e- 1.0000e- 2.4500e- 6.5000e- 1.0000e- 6.6000e- 0.0000 1.6990 1.6990 3.0000e- 0.0000 1.6998- 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 23 3.2 Demolition - 2026 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 4.8358 0.0000 4.8358 0.7322 0.0000 0.7322 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Off -Road •i 0.1389 0.5888 0.6667 3.1400e- 0.0189 0.0189 0.0189 0.0189 • 0.0000 i 323.9441 323.9441 0.0114 0.0000 324.2291 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.1389 0.5888 0.6667 3.1400e- 4.8358 0.0189 4.8547 0.7322 0.0189 0.7510 0.0000 323.9441 323.9441 0.0114 0.0000 324.2291 3.2200e- 2.0000e- 3.2400e- 8.6000e- 003 8.7000e- 0.0000 2.1690 2.1690 4.0000e- 0.0000 2.1699 003 004 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J . J J J V Worker • 1.0100e- 5.3000e- 6.5900e- 2.0000e- 3.2200e- 2.0000e- 3.2400e- 8.6000e- 2.0000e- 8.7000e- • 0.0000 i 2.1690 2.1690 4.0000e- 0.0000 2.1699 003 004 003 005 003 005 003 004 005 004 : • 005 Total 1.0100e- 5.3000e- 6.5900e- 2.0000e- 3.2200e- 2.0000e- 3.2400e- 8.6000e- 2.0000e- 8.7000e- 0.0000 2.1690 2.1690 4.0000e- 0.0000 2.1699 003 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 23 3.2 Demolition - 2026 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 1.8860 0.0000 1.8860 0.2856 0.0000 0.2856 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J -I- Off -Road •i 0.1389 0.5888 0.6667 3.1400e- 0.0189 0.0189 0.0189 0.0189 • 0.0000 i 323.9437 323.9437 0.0114 0.0000 324.2287 Off-Road •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.1389 0.5888 0.6667 3.1400e- 1.8860 0.0189 1.9048 0.2856 0.0189 0.3044 0.0000 323.9437 323.9437 0.0114 0.0000 324.2287 3.2200e- 2.0000e- 3.2400e- 8.6000e- 003 8.7000e- 0.0000 2.1690 2.1690 4.0000e- 0.0000 2.1699- 003 004 003 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J . .1 .1 J Worker • 1.0100e- 5.3000e- 6.5900e- 2.0000e- 3.2200e- 2.0000e- 3.2400e- 8.6000e- 2.0000e- 8.7000e- • 0.0000 i 2.1690 2.1690 4.0000e- 0.0000 2.1699 003 004 003 005 003 005 003 004 005 004 : 005 Total 1.0100e- 5.3000e- 6.5900e- 2.0000e- 3.2200e- 2.0000e- 3.2400e- 8.6000e- 2.0000e- 8.7000e- 0.0000 2.1690 2.1690 4.0000e- 0.0000 2.1699- 003 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 23 3.2 Demolition - 2027 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 2.3531 0.0000 2.3531 0.3563 0.0000 0.3563 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J 1 - Off -Road Off -Road •i 0.0676 0.2865 0.3244 1.5300e- 9.1700e- 9.1700e- 9.1700e- 9.1700e- • 0.0000 i 157.6280 157.6280 5.5500e- 0.0000 157.7666 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 003 003 003 003 • 003 Total 0.0676 0.2865 0.3244 1.5300e- 2.3531 9.1700e- 2.3622 0.3563 9.1700e- 0.3654 0.0000 157.6280 157.6280 5.5500e- 0.0000 157.7666 1.5700e- 1.0000e- 1.5800e- 4.2000e- 003 4.2000e- 003 1.0204 1.0204 003 0.0000 1.0209 003 004 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J V Worker • 4.6000e- 2.4000e- 3.0000e- 1.0000e- 1.5700e- 1.0000e- 1.5800e- 4.2000e- 1.0000e- 4.2000e- • 0.0000 i 1.0204 1.0204 2.0000e- 0.0000 1.0209 004 004 003 005 003 005 003 004 005 004 : 005 Total 4.6000e- 2.4000e- 3.0000e- 1.0000e- 1.5700e- 1.0000e- 1.5800e- 4.2000e- 1.0000e- 4.2000e- 0.0000 1.0204 1.0204 2.0000e- 0.0000 1.0209 004 004 003 005 003 005 003 004 005 004 005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 23 3.2 Demolition - 2027 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction On -Site Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.9177 0.0000 0.9177 0.1390 0.0000 0.1390 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 .1 .1 J .1 ; J .1 J 1 - Off -Road Off -Road •i 0.0676 0.2865 0.3244 1.5300e- 9.1700e- 9.1700e- 9.1700e- 9.1700e- • 0.0000 i 157.6278 157.6278 5.5500e- 0.0000 157.7665 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 003 003 003 003 • 003 Total 0.0676 0.2865 0.3244 1.5300e- 0.9177 9.1700e- 0.9269 0.1390 9.1700e- 0.1481 0.0000 157.6278 157.6278 5.5500e- 0.0000 157.7665 1.5700e- 1.0000e- 1.5800e- 4.2000e- 003 4.2000e- 003 1.0204 1.0204 003 0.0000 1.0209 003 004 003 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J V Worker • 4.6000e- 2.4000e- 3.0000e- 1.0000e- 1.5700e- 1.0000e- 1.5800e- 4.2000e- 1.0000e- 4.2000e- • 0.0000 i 1.0204 1.0204 2.0000e- 0.0000 1.0209 004 004 003 005 003 005 003 004 005 004 : 005 Total 4.6000e- 2.4000e- 3.0000e- 1.0000e- 1.5700e- 1.0000e- 1.5800e- 4.2000e- 1.0000e- 4.2000e- 0.0000 1.0204 1.0204 2.0000e- 0.0000 1.0209 004 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 0.0000 ; 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 •� I I I • 1 1 Unmitigated . 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.558300. 0.034770; 0.189987; 0.105037: 0.011525: 0.004337; 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.558300. 0.034770; 0.189987; 0.105037: 0.011525: 0.004337; 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 15 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity Mitigated •i 1 1 1 1 1, 0.0000 1, 0.0000 1 : 0.0000 'I I 1 1 1 1 I 1 I 'I I I 1 I 1 1 1 I 'I J J J J J .1 Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 Unmitigated .� 1 1 1 1 1 1 1 1 •I 1 1 1 1 1 1 1 1 NaturalGas •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 Mitigated .� I 1 1 1 1 1 1 1 NaturalGas . 0.0000 i 0.0000 : 0.0000 • 0.0000 i • 0.0000 • 0.0000 i • 0.0000 0.0000 • 0.0000 Unmitigated 0.0000 0.0000 • • ▪ 0.0000 • 0.0000 0.0000 • ▪ 0.0000 • • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use .,Land kBTU/yr tons/yr MT/yr Other Non- 0 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Asphalt Surfaces i 1 i ; 0.0000 0.0000 1 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Non- Asphalt Surfaces 10 .i i i 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •i i i 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •u i i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 2.0043 i 4.0000e- i 4.2400e- : 0.0000 1 i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • 0.0000 i 8.2700e- i 8.2700e- i 2.0000e- i 0.0000 ! 8.8100e- 9 1 005 1 003 1 1 1 005 1 005 1 1 005 1 1 005 ; ' 003 1 003 005 i 003 •1 I 1 1 1 1 1 1 I • 1 I 1 I. 1. 1. 1. 1. 4. 1. 4. 1. r 4. 1. 1. r Unmitigated • 2.0043 • 4.0000e- • 4.2400e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0000 • 8.2700e- • 8.2700e- • 2.0000e- • 0.0000 • 8.8100e- 005 003 005 005 005 005 003 003 005 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7008 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: J J .1 .1 J .1 J .1 . J J .1 T Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products J J J .1 J J J .1 . J J J T Landscaping • 3.9000e- 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 i 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 003 Total 2.0043 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 23 6.2 Area by SubCategory Mitigated Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7008' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: .1 J Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products .1 J Landscaping • 3.9000e- 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 1 003 Total 2.0043 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •I 0.0000 : 0.0000 : 0.0000 . 0.0000 'I I 1 0.0000 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- I0 / 0 •i Asphalt Surfaces I 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 21 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 22 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces 1 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 23 Date: 1/5/2021 5:00 PM Travertine Specific Plan (Phase B Crushing - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.14: CALEEMOD PHASE B GRADING EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan (Phase B Grading - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Non -Asphalt Surfaces • • 462.80 Acre 462.80 20,159, 568.00 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 706.2 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2027 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2027 Land Use - Construction Phase - Phase B Grading anticipated to start Quarter 1 of 2026 and end Quarter 4 of 2027 Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming Maximum Daily Disturbed Acreage of 5 acres. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Energy Use - Construction Off-road Equipment Mitigation - Rule 403 Table Name tblAreaCoating tblConstructionPhase tblGrading tblOffRoadEquipment tblProjectCharacteristics 1 Column Name Area_Parking • • • • Default Value New Value NumDays AcresOfGrading OffRoadEquipmentUnitAmount CO2lntensityFactor 1209576 775.00 1,827.00 2.00 1270.9 1214016 522.00 2,610.00 0.00 706.2 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 20 2.1 Overall Construction Unmitigated Construction Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2026 •i 0.4484 4.3346 3.4473 9.4900e- 2.1913 0.1739 2.3652 0.5871 0.1600 0.7471 • 0.0000 i 833.7857 833.7857 0.2652 0.0000 840.4167 003 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2027 •i 0.4480 4.3343 3.4445 9.4800e- 2.1913 0.1739 2.3652 0.5871 0.1600 0.7471 • 0.0000 i 833.3066 833.3066 0.2652 0.0000 839.9370 Total 003 • PM2.5 Maximum 0.4484 4.3346 3.4473 9.4900e- 2.1913 0.1739 2.3652 0.5871 0.1600 0.7471 0.0000 833.7857 833.7857 0.2652 0.0000 840.4167 840.4157 0.00 0.00 0.00 003 003 0.00 Reduction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2026 •i 0.4484 4.3346 3.4473 9.4900e- 0.8677 0.1739 1.0416 0.2325 0.1600 0.3924 • 0.0000 i 833.7848 833.7848 0.2652 0.0000 840.4157 003 J J J J J J J J w J J J T 2027 •i 0.4480 4.3343 3.4445 9.4800e- 0.8677 0.1739 1.0416 0.2325 0.1600 0.3924 • 0.0000 i 833.3056 833.3056 0.2652 0.0000 839.9360 Total 003 PM2.5 Total Maximum 0.4484 4.3346 3.4473 9.4900e- 0.8677 0.1739 1.0416 0.2325 0.1600 0.3924 0.0000 833.7848 833.7848 0.2652 0.0000 840.4157 0.00 0.00 0.00 0.00 003 0.00 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 60.40 0.00 55.96 60.41 0.00 47.47 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2026 3-31-2026 1.1782 1.1782 2 4-1-2026 6-30-2026 1.1913 1.1913 3 7-1-2026 9-30-2026 1.2044 1.2044 4 10-1-2026 12-31-2026 1.2044 1.2044 5 1-1-2027 3-31-2027 1.1780 1.1780 6 4-1-2027 6-30-2027 1.1911 1.1911 7 7-1-2027 9-30-2027 1.2042 1.2042 0.0000 8.2700e- 003 Highest 1.2044 1.2044 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water e1 •i el f • 4 2.0069 4.0000e- 1 4.2400e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- 9 005 003 1 005 005 005 005 .1 a J J J J J J J v 9 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 9 1 1 1 9 J J J J J J J J V 0.0000 0.0000 I 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J V 9 1 0.0000 0.0000 0.0000 0.0000 J J J J J J J J V 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 003 003 005 I J J i 0.0000 0.0000 0.0000 1 0.0000 i J J .1 i 0.0000 0.0000 0.0000 1 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 8.8100e- i 003 T 0.0000 T 0.0000 T 0.0000 T 0.0000 Total 2.0069 4.0000e- 005 4.2400e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 20 2.2 Overall Operational Mitigated Operational Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,I •1 ,I •1 •1 •1 2.0069 4.0000e- 1 4.2400e- 0.0000 1 1 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 9 005 003 1 005 005 005 005 V 0.0000 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 i 1 . 9 1 1 1 • . 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • ' 8.2700e- 8.2700e- 2.0000e- 1 0.0000 8.8100e- 003 003 005 1 i 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 2.0069 4.0000e- 005 4.2400e- 003 0.0000 0.0000 2.0000e- 005 2.0000e- 005 0.0000 2.0000e- 005 2.0000e- 005 0.0000 8.2700e- 003 8.2700e- 003 2.0000e- 005 0.0000 8.8100e- 003 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Grading :Grading :1/1/2026 :12/31/2027 5: 522: Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 2610 Acres of Paving: 462.8 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Grading Grading Grading Grading Grading Grading IOffroad Equipment Type I Amount :Crawler Tractors ; i 1 :Excavators ; i 1 :Graders ; i 1 :Rubber Tired Dozers ; i 1 :Scrapers ; :Tractors/Loaders/Backhoes • 2 2 1 1 2 0: Usage Hours I Horse Power I Load Factor 8.001 212: 0.43 I _ 8.001 158: 0.38 8.001 187: 0.41 8.001 247: 0.40 I _ 8.001 367: 0.48 r 8.00 97: 0.37 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Grading 8' 20.00' 0.00' 0.00' 11.00 5.40' 20.00:LD_Mix .HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Grading - 2026 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 2.1698 0.0000 2.1698 0.5814 0.0000 0.5814 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.4417 4.3311 3.4034 9.3300e- 0.1738 0.1738 0.1599 0.1599 • 0.0000 i 819.3259 819.3259 0.2650 0.0000 825.9506 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.4417 4.3311 3.4034 9.3300e- 2.1698 0.1738 2.3436 0.5814 0.1599 0.7413 0.0000 819.3259 819.3259 0.2650 0.0000 825.9506 0.0215 1.2000e- 0.0216 5.7000e- 003 5.8100e- 0.0000 14.4598 14.4598 2.5000e- 0.0000 14.4662 003 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker • 6.7100e- 3.5700e- 0.0440 1.6000e- 0.0215 1.2000e- 0.0216 5.7000e- 1.1000e- 5.8100e- • 0.0000 i 14.4598 14.4598 2.5000e- 0.0000 14.4662 003 003 004 004 003 004 003 : 004 Total 6.7100e- 3.5700e- 0.0440 1.6000e- 0.0215 1.2000e- 0.0216 5.7000e- 1.1000e- 5.8100e- 0.0000 14.4598 14.4598 2.5000e- 0.0000 14.4662 003 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 20 3.2 Grading - 2026 Mitigated Construction On -Site Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.8462 0.0000 0.8462 0.2268 0.0000 0.2268 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J -I- Off -Road •i 0.4417 4.3310 3.4033 9.3300e- 0.1738 0.1738 0.1599 0.1599 • 0.0000 i 819.3249 819.3249 0.2650 0.0000 825.9496 Off-Road •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.4417 4.3310 3.4033 9.3300e- 0.8462 0.1738 1.0200 0.2268 0.1599 0.3866 0.0000 819.3249 819.3249 0.2650 0.0000 825.9496 0.0215 1.2000e- 0.0216 5.7000e- 003 5.8100e- 0.0000 14.4598 14.4598 2.5000e- 0.0000 14.4662 003 003 Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 •• 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J Worker • 6.7100e- 3.5700e- 0.0440 1.6000e- 0.0215 1.2000e- 0.0216 5.7000e- 1.1000e- 5.8100e- • 0.0000 i 14.4598 14.4598 2.5000e- 0.0000 14.4662 003 003 004 004 003 004 003 : 004 Total 6.7100e- 3.5700e- 0.0440 1.6000e- 0.0215 1.2000e- 0.0216 5.7000e- 1.1000e- 5.8100e- 0.0000 14.4598 14.4598 2.5000e- 0.0000 14.4662 003 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Grading - 2027 Unmitigated Construction On -Site Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 2.1698 0.0000 2.1698 0.5814 0.0000 0.5814 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.4417 4.3311 3.4034 9.3300e- 0.1738 0.1738 0.1599 0.1599 • 0.0000 i 819.3259 819.3259 0.2650 0.0000 825.9506 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.4417 4.3311 3.4034 9.3300e- 2.1698 0.1738 2.3436 0.5814 0.1599 0.7413 0.0000 819.3259 819.3259 0.2650 0.0000 825.9506 0.0215 1.1000e- 0.0216 5.7000e- 003 5.8100e- 0.0000 13.9807 13.9807 2.3000e- 0.0000 13.9865 003 003 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J .1 J m J J J V Worker • 6.3600e- 3.2700e- 0.0411 1.5000e- 0.0215 1.1000e- 0.0216 5.7000e- 1.0000e- 5.8100e- • 0.0000 i 13.9807 13.9807 2.3000e- 0.0000 13.9865 003 003 004 004 003 004 003 : 004 Total 6.3600e- 3.2700e- 0.0411 1.5000e- 0.0215 1.1000e- 0.0216 5.7000e- 1.0000e- 5.8100e- 0.0000 13.9807 13.9807 2.3000e- 0.0000 13.9865 003 003 004 004 003 004 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 20 3.2 Grading - 2027 Mitigated Construction On -Site Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.8462 0.0000 0.8462 0.2268 0.0000 0.2268 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 J .1 .1 J .1 J .1 ; J .1 J t Off -Road •i 0.4417 4.3310 3.4033 9.3300e- 0.1738 0.1738 0.1599 0.1599 • 0.0000 i 819.3249 819.3249 0.2650 0.0000 825.9496 •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 003 • J J J J J J J J m J J J Total 0.4417 4.3310 3.4033 9.3300e- 0.8462 0.1738 1.0200 0.2268 0.1599 0.3866 0.0000 819.3249 819.3249 0.2650 0.0000 825.9496 0.0215 1.1000e- 0.0216 5.7000e- 003 5.8100e- 0.0000 13.9807 13.9807 2.3000e- 0.0000 13.9865 003 003 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J V Worker • 6.3600e- 3.2700e- 0.0411 1.5000e- 0.0215 1.1000e- 0.0216 5.7000e- 1.0000e- 5.8100e- • 0.0000 i 13.9807 13.9807 2.3000e- 0.0000 13.9865 003 003 004 004 003 004 003 : 004 Total 6.3600e- 3.2700e- 0.0411 1.5000e- 0.0215 1.1000e- 0.0216 5.7000e- 1.0000e- 5.8100e- 0.0000 13.9807 13.9807 2.3000e- 0.0000 13.9865 003 003 004 004 003 004 003 004 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 4.1 Mitigation Measures Mobile 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated �� 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 •1 I I I • I 1 Unmitigated . 0.0000 : 0.0000 : 0.0000 . 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 : 0.0000 • 0.0000 : 0.0000 . 0.0000 . 0.0000 : 0.0000 . 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Ave age Daily Trip Rate Trip Purpose % Unmitigated H -W or C -W Mitigated Land Use H -W or C -W Weekday Saturday Sunday Diverted Annual VMT Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 Annual VMT Other Non -Asphalt Surfaces ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I I 4.3 Trip Type Information 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.558300. 0.034770; 0.189987; 0.105037: 0.011525: 0.004337; 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Other Non Asphalt Surfaces 12.50 4.20 5.40 • 0.00 0.00 0.00 0 0 0 4.4 Fleet Mix Land Use I LDA I LDT1 I LDT2 I MDV I LHD1 I LHD2 I MHD I HHD I OBUS I UBUS I MCY I SBUS I MH Other Non -Asphalt Surfaces • 0.558300. 0.034770; 0.189987; 0.105037: 0.011525: 0.004337; 0.017323: 0.070222: 0.001421: 0.001101: 0.004405: 0.000867: 0.000705 CaIEEMod Version: CaIEEMod.2016.3.2 5.0 Energy Detail Page 12 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity Mitigated •i 1 1 1 1 1, 0.0000 1 0.0000 1 ; 0.0000 'I I 1 1 1 1 I 1 I 'I I I 1 I 1 1 1 I 'I J J J J J J .1 Electricity •i 1 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 Unmitigated .� 1 1 1 1 1 1 1 1 •I 1 1 1 1 1 1 1 1 NaturalGas •1 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 Mitigated .� I 1 1 1 1 1 1 1 NaturalGas . 0.0000 i 0.0000 : 0.0000 • 0.0000 i • 0.0000 • 0.0000 i • 0.0000 0.0000 • 0.0000 Unmitigated 0.0000 0.0000 • • • ▪ 0.0000 • 0.0000 0.0000 • ▪ 0.0000 • • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4- 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Use ..Land kBTU/yr tons/yr MT/yr Other Non- 0 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Asphalt Surfaces i 1 i ; 0.0000 0.0000 1 Total Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Other Non- Asphalt Surfaces 10 .i i i 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •i i i 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Other Non- Asphalt Surfaces 10 •u i i 0.0000 1 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 2.0069 i 4.0000e- i 4.2400e- i 0.0000 : i 2.0000e- i 2.0000e- i i 2.0000e- : 2.0000e- • 0.0000 i 8.2700e- i 8.2700e- i 2.0000e- i 0.0000 ! 8.8100e- 9 1 005 1 003 1 1 1 005 1 005 1 1 005 1 1 005 ; ' 003 1 003 005 i 003 •1 I 1 1 1 1 1 1 I • 1 I 1 • I. 1. 1. F 1. 4. 1. 4. F r . 4. 1. 1. r Unmitigated • 2.0069 • 4.0000e- • 4.2400e- • 0.0000 . • 2.0000e- • 2.0000e- • . 2.0000e- • 2.0000e- • 0.0000 • 8.2700e- • 8.2700e- • 2.0000e- • 0.0000 • 8.8100e- 005 003 005 005 005 005 003 003 005 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7034 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: J J .1 .1 J J J .1 . J J .1 T Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products J J J .1 J J J .1 . J J J T Landscaping • 3.9000e- 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 i 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 003 Total 2.0069 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 20 6.2 Area by SubCategory Mitigated Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 0.7034' : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: .1 J Consumer •i 1.3031 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Products .1 J Landscaping • 3.9000e- 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- • 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 004 005 003 005 005 005 005 • 003 003 005 1 003 Total 2.0069 4.0000e- 4.2400e- 0.0000 2.0000e- 2.0000e- 2.0000e- 2.0000e- 0.0000 8.2700e- 8.2700e- 2.0000e- 0.0000 8.8100e- 005 003 005 005 005 005 003 003 005 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •I 0.0000 : 0.0000 : 0.0000 . 0.0000 'I I 1 0.0000 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- 10 / 0 •i Asphalt Surfaces I 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 18 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Other Non- Asphalt Surfaces i 0 / 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 19 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces i 0 •i i i 0.0000 0.0000 0.0000 0.0000 Total 11 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Other Non- Asphalt Surfaces 1 0 •i 1 i 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 20 Date: 1/5/2021 5:07 PM Travertine Specific Plan (Phase B Grading - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.15: CALEEMOD PHASE 1 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan - Phase 1 (Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Golf Course Apartments Low Rise Single Family Housing • • • • • • 12.00 74.00 530.00 a 4 a 21. • • Hole Dwelling Unit Dwelling Unit 46.20 14.80 4. 228.10 64,282.00 74,000.00 954,000.00 0 212 1516 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 685.44 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2028 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2028 Land Use - Total Project Area (Phase 1) is approximately 289 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 1 Physical Construction anticipated to start Quarter 3 of 2025 and end Quarter 4 2028 Off-road Equipment - Hours are based on an 8 -hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. On -road Fugitive Dust - TEST Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating • • Y EF_Nonresidential_Exterior EF_Non residential_I nterior EF_Parking EF_Residential_Exterior EF_Residential_Interior 250.00 250.00 250.00 250.00 250.00 50.00 50.00 50.00 50.00 50.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblAreaCoating • Area Residential_ Exterior • 693900 3088243 tblAreaCoating • Area_Residential_Interior i 2081700 9264729 r tblConstDustMitigation : • WaterUnpavedRoadMoistureContent i 0 0.5 r tblConstDustMitigation • • WaterUnpavedRoadVehicleSpeed i 0 40 r tblConstructionPhase • NumDays T 180.00 50.00 r tblConstructionPhase • NumDays T 465.00 50.00 r tblConstructionPhase • NumDays T 4,650.00 800.00 r 4 tblConstructionPhase • NumDays T 330.00 55.00 r tblEnergyUse • LightingElect i 810.36 0.00 • r tblEnergyUse • LightingElect T 1,608.84 0.00 r 4 tblEnergyUse • NT24E i 3,172.76 0.00 r 4 tblEnergyUse • NT24E i 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 • r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 • r 4 tblEnergyUse • T24NG T 9,544.50 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear i 82.00 0.00 • r 4 tblFireplaces • FireplaceDayYear i 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • NumberGas T 59.20 0.00 r 4 tblFireplaces • NumberGas T424.00 0.00 tblFireplaces • NumberNoFireplace • 7.40 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblFireplaces • NumberNoFireplace • 53.00 0.00 tblFireplaces • NumberWood i 7.40 0.00 r tblFireplaces • NumberWood T 53.00 0.00 r tblGrading • AcresOfGrading i 175.00 250.00 r tblGrading • AcresOfGrading i 100.00 250.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r 4 tblLandUse • LotAcreage i 4.63 14.80 r tblLandUse • LotAcreage i 172.08 228.10 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 685.44 r 4 tblSolidWaste • SolidWasteGenerationRate T 34.04 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 1.60 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 621.56 0.00 • r 4 tblVehicleTrips • CC TL T 4.20 0.00 r 4 tblVehicleTrips • CC_TTP T 48.00 0.00 r 4 tblVehicleTrips • CNW_TL T 5.40 0.00 r 4 tblVehicleTrips • CNW_TTP T 19.00 0.00 • r 4 tblVehicleTrips • CW T 12.50 0.00 r 4 tblVehicleTrips • CW_TTP T 33.00 0.00 r 4 tblVehicleTrips • DV_TP T 11.00 0.00 • tblVehicleTrips • DV • 39.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblVehicleTrips • DV_TP • 11.00 0.00 tblVehicleTrips • HO_TL i 4.50 0.00 r tblVehicleTrips • HO_TL T 4.50 0.00 r tblVehicleTrips • HO_TTP T 40.60 0.00 r tblVehicleTrips • HO_TTP T 40.60 0.00 r tblVehicleTrips • HS_TL T 3.50 0.00 • r tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r tblVehicleTrips • HS_TTP T 19.20 0.00 • r tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW TTP T 40.20 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PB_TP T 9.00 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 • r 4 tblVehicleTrips • PR_TP T 86.00 0.00 r 4 tblVehicleTrips • PR_TP T 52.00 0.00 r 4 tblVehicleTrips • PR TP T 86.00 0.00 • r 4 tblVehicleTrips • ST TR T 7.16 0.00 r 4 tblVehicleTrips • ST T 40.63 0.00 r 4 tblVehicleTrips • ST_TR T 9.91 0.00 r 4 tblVehicleTrips • SU TR T 6.07 0.00 • r 4 tblVehicleTrips • SU T 39.53 0.00 r 4 tblVehicleTrips • SU T 8.62 0.00 r 4 tblVehicleTrips • WD_TR T 6.59 0.00 • tblVehicleTrips • WD • 35.74 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblVehicleTrips tblWater tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • WD TR • 9.52 0.00 IndoorWaterUseRate i 4,821,397.90 0.00 r • IndoorWaterUseRate r 34,531,633.58 0.00 • OutdoorWaterUseRate v 3,039,576.93 0.00 • OutdoorWaterUseRate v 99,814,205.40 0.00 • OutdoorWaterUseRate T 21,769,942.91 0.00 r • NumberCatalytic T 3.70 0.00 r • NumberCatalytic T 26.50 0.00 NumberNoncatalytic } 3.70 0.00 • NumberNoncatalytic v 26.50 0.00 • WoodstoveDayYear v 82.00 0.00 r • WoodstoveDayYear T 82.00 0.00 ▪ WoodstoveWoodMass i 999.60 0.00 r • WoodstoveWoodMass •999.60 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 43 2.1 Overall Construction Unmitigated Construction Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2025 •i .1003 .1 2026 •1 .1 .1 2027 •i '1 2028 •1 0.2216 2.1453 1.4660 4.4800e- 1 0.9168 0.0847 1.0014 0.3729 0.0781 0.4510 • 0.0000 1 . e J .1 .1 .1 .1 .1 .1 .1 0.3898 3.4237 2.9026 9.7700e- 1 0.3394 0.1151 0.4545 0.0913 0.1073 0.1986 • 0.0000 003 1.2185 3.4810 2.9980 9.9900e- 0.3580 0.1180 0.4760 0.0962 0.1102 0.2064 • 0.0000 003 2.8249 3.6420 3.4646 0.0106 0.3779 0.1285 0.5065 0.1014 0.1203 0.2217 • 0.0000 • i 395.6069 395.6069 0.1093 1 0.0000 398.3384 1 .1 .1 .1 i 873.2913 873.2913 0.1457 1 0.0000 876.9344 i 892.1798 892.1798 0.1461 0.0000 895.8316 i 943.3992 943.3992 0.1569 0.0000 947.3205 Maximum 1 2.8249 3.6420 3.4646 0.0106 0.9168 0.1285 1.0014 0.3729 0.1203 0.4510 0.0000 943.3992 943.3992 0.1569 0.0000 947.3205 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 43 2.1 Overall Construction Mitigated Construction Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2025 •i .1003 .1 2026 •1 .1003 .1 2027 •i .1 , 2028 •1 0.2216 2.1453 1.4660 4.4800e- 1 0.3877 0.0847 0.4724 0.1535 0.0781 0.2316 • 0.0000 1 . 0.3898 3.4237 2.9026 9.7700e- 1 0.3394 0.1151 0.4545 0.0913 0.1073 0.1986 • 0.0000 1.2185 3.4810 2.9980 9.9900e- 0.3580 0.1180 0.4760 0.0962 0.1102 0.2064 • 0.0000 003 .1 .1 2.8249 3.6419 3.4646 0.0106 0.3779 0.1285 0.5065 0.1014 0.1203 0.2217 • 0.0000 • i 395.6065 395.6065 0.1093 1 0.0000 1 398.3380 1 i 873.2907 873.2907 0.1457 1 0.0000 876.9338 i 892.1792 892.1792 0.1461 0.0000 895.8310 i 943.3985 943.3985 0.1569 0.0000 947.3199 Maximum 1 2.8249 3.6419 3.4646 0.0106 0.3877 0.1285 0.5065 0.1535 0.1203 0.2316 0.0000 943.3985 943.3985 0.1569 0.0000 947.3199 Quarter ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e 3-31-2026 0.9388 0.9388 4 4-1-2026 PM10 PM10 Total PM2.5 PM2.5 Total 0.9623 0.9623 6 10-1-2026 12-31-2026 0.9597 Percent 0.00 0.00 0.00 0.00 26.56 0.00 21.70 33.15 0.00 20.36 0.00 0.00 0.00 0.00 0.00 0.00 Reduction Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 7-1-2025 9-30-2025 1.2691 1.2691 2 10-1-2025 12-31-2025 1.0893 1.0893 3 1-1-2026 3-31-2026 0.9388 0.9388 4 4-1-2026 6-30-2026 0.9518 0.9518 5 7-1-2026 9-30-2026 0.9623 0.9623 6 10-1-2026 12-31-2026 0.9597 0.9597 7 1-1-2027 3-31-2027 0.9352 0.9352 8 4-1-2027 6-30-2027 0.9481 0.9481 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 9 7-1-2027 9-30-2027 1.1424 1.1424 10 10-1-2027 12-31-2027 1.6609 1.6609 11 1-1-2028 3-31-2028 1.6391 1.6391 12 4-1-2028 6-30-2028 1.6417 1.6417 13 7-1-2028 9-30-2028 1.6768 1.6768 • 0.0000 . . 0.0000 . 0.0000 . 0.0000 . 0.0000 i 7.3260 7.3260 7.0200e- : 0.0000 003 J J J i 0.0000 0.0000 0.0000 i 0.0000 J J .1 i 0.0000 0.0000 0.0000 1 0.0000 J J .1 i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 Highest 1.6768 1.6768 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •IM. •i • fl •i f • V • 4 11.3070 0.0516 i 4.4806 2.4000e- : 0.0249 0.0249 : 0.0249 0.0249 9I 004 I1 9 1 i 1 J J .1 J J J J V 0.0000 0.0000 i 0.0000 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 J J J .1 J J J J V 0.0000 0.0000 ' 0.0000 0.0000 1 0.0000 0.0000 0.0000 I 0.0000 0.0000 0.0000 J J J .1 J J J J V 0.0000 0.0000 0.0000 0.0000 J J J J J J J J V 0.0000 0.0000 0.0000 0.0000 • 0.0000 . . 0.0000 . 0.0000 . 0.0000 . 0.0000 i 7.3260 7.3260 7.0200e- : 0.0000 003 J J J i 0.0000 0.0000 0.0000 i 0.0000 J J .1 i 0.0000 0.0000 0.0000 1 0.0000 J J .1 i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 7.5014 T 0.0000 T 0.0000 T 0.0000 T 0.0000 Total 11.3070 0.0516 4.4806 2.4000e- 004 0.0000 0.0249 0.0249 0.0000 0.0249 0.0249 0.0000 7.3260 7.3260 7.0200e- 003 0.0000 7.5014 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 43 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,l •i ,i •1 • • 11.3070 0.0516 4.4806 2.4000e- 1 1 0.0249 0.0249 0.0249 0.0249 • 0.0000 91 004 9. le 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 . 9 11 . J J J J J J J J le 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 7.3260 7.3260 7.0200e- 1 0.0000 7.5014 0031 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 1 J J J i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 11.3070 0.0516 4.4806 2.4000e- 004 0.0000 0.0249 0.0249 0.0000 0.0249 0.0249 0.0000 7.3260 7.3260 7.0200e- 003 0.0000 7.5014 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 2 3 4 5 :Site Preparation :Grading -Building Construction :Architectural Coating :Paving :Site Preparation :Grading 17/1/2025 19/8/2025 9/9/2025 111/17/2025 14 4 :Building Construction 111/18/2025 112/11/2028 : 5: 800: ' 44 T :Architectural Coating 9/7/2027 112/11/2028 ' 5: 330: 4 4 - :Paying -Paving :9/26/2028 :12/11/2028 5' 55' 5' 50: 4 T 5: 50: Acres of Grading (Site Preparation Phase): 250 Acres of Grading (Grading Phase): 250 Acres of Paving: 0 Residential Indoor: 2,081,700; Residential Outdoor: 693,900; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Site Preparation Grading Building Construction Architectural Coating Paving • • • Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class 7: 18.00 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix J HDT_Mix -i ' - 8: 20.00. 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix 1 HDT_Mix 9: 271.00• 75.001 0.00: 11.00: 5.40: 20.00: LD_Mix i HDT_Mix 1: 54.00• 0.00 0.00: 11.00 : 5.40' 20.00: LD Mix i HDT Mix 6: 15.00' 0.00' 0.00' 11.00: 5.40: 20.00:LD Mix Hauling Vehicle Class HHDT HHDT HHDT HHDT 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.5842 0.0000 0.5842 0.2626 0.0000 0.2626 •. 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Ir J J J J J J J J ; J J J T Off -Road •i 0.0860 0.8931 0.4352 1.4200e- 0.0372 0.0372 0.0342 0.0342 • 0.0000 i 125.0544 125.0544 0.0405 0.0000 126.0655 003 • Total 0.0860 0.8931 0.4352 1.4200e- 0.5842 0.0372 0.6214 0.2626 0.0342 0.2968 0.0000 125.0544 125.0544 0.0405 0.0000 126.0655 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 125.0542 125.0542 0.0405 0.0000 126.0654 1 Worker • 1.2200e- 6.7000e- 8.1400e- 3.0000e- 3.7000e- 2.0000e- 3.7200e- 9.8000e- 2.0000e- 1.0000e- • 0.0000 i 2.5873 2.5873 5.0000e- 0.0000 2.5885 Total 0.0860 003 004 003 005 003 005 003 004 005 003 • 005 Total 0.2279 1.2200e- 6.7000e- 8.1400e- 3.0000e- 3.7000e- 2.0000e- 3.7200e- 9.8000e- 2.0000e- 1.0000e- 0.0000 2.5873 2.5873 5.0000e- 0.0000 2.5885 003 004 003 005 003 005 003 004 005 003 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 0.2279 0.0000 0.2279 0.1024 0.0000 0.1024 • 0.0000 0.0000 i 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J J .1 J 1. Off -Road .1 0.0860 0.8931 0.4352 1.4200e- 0.0372 0.0372 0.0342 0.0342 • 0.0000 125.0542 125.0542 0.0405 0.0000 126.0654 003 • • Total 0.0860 0.8931 0.4352 1.4200e- 0.2279 0.0372 0.2651 0.1024 0.0342 0.1366 0.0000 125.0542 125.0542 0.0405 0.0000 126.0654 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2025 Mitigated Construction Off -Site 3.3 Grading - 2025 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 J .J J J J .1 .1 J 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 156.9590 156.9590 0.0508 0.0000 158.2281 1 Worker • 1.2200e- 6.7000e- 8.1400e- 3.0000e- 3.7000e- 2.0000e- 3.7200e- 9.8000e- 2.0000e- 1.0000e- • 0.0000 i 2.5873 2.5873 5.0000e- 0.0000 2.5885 Total 0.0846 003 004 003 005 003 005 003 004 005 003 • 005 Total 0.2831 1.2200e- 6.7000e- 8.1400e- 3.0000e- 3.7000e- 2.0000e- 3.7200e- 9.8000e- 2.0000e- 1.0000e- 0.0000 2.5873 2.5873 5.0000e- 0.0000 2.5885 003 004 003 005 003 005 003 004 005 003 005 3.3 Grading - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust -i 1 0.2831 0.0000 0.2831 0.0971 0.0000 0.0971 • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 J .J J J J .1 .1 J .1 .1 J 1. Off -Road .1 0.0846 0.8297 0.6520 1.7900e- 0.0333 0.0333 0.0306 0.0306 • 0.0000 156.9590 156.9590 0.0508 0.0000 158.2281 003 • • Total 0.0846 0.8297 0.6520 1.7900e- 0.2831 0.0333 0.3164 0.0971 0.0306 0.1277 0.0000 156.9590 156.9590 0.0508 0.0000 158.2281 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 J .J J J J .1 .1 J 1 1 • 1 Off -Road 9 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 • • 1 Worker • 1.3500e- 7.5000e- 9.0400e- 3.0000e- 4.1100e- 2.0000e- 4.1400e- 1.0900e- 2.0000e- 1.1100e- • 0.0000 i 2.8748 2.8748 5.0000e- 0.0000 2.8761 0.8297 0.6520 003 004 003 005 003 005 003 003 005 003 • 005 Total 0.1437 1.3500e- 7.5000e- 9.0400e- 3.0000e- 4.1100e- 2.0000e- 4.1400e- 1.0900e- 2.0000e- 1.1100e- 0.0000 2.8748 2.8748 5.0000e- 0.0000 2.8761 003 004 003 005 003 005 003 003 005 003 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 1 0.1104 0.0000 0.1104 0.0379 0.0000 0.0379 • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 J .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.0846 0.8297 0.6520 1.7900e- 0.0333 0.0333 0.0306 0.0306 • 0.0000 156.9588 156.9588 0.0508 0.0000 158.2279 003 • • Total 0.0846 0.8297 0.6520 1.7900e- 0.1104 0.0333 0.1437 0.0379 0.0306 0.0685 0.0000 156.9588 156.9588 0.0508 0.0000 158.2279 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 • 1 004 • 1 1 • 1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 1.3500e- 7.5000e- 9.0400e- 3.0000e- 4.1100e- 2.0000e- 4.1400e- 1.0900e- 2.0000e- 1.1100e- • 0.0000 i 2.8748 2.8748 5.0000e- 0.0000 2.8761 6.9000e. 003 004 003 005 003 005 003 003 005 003 • 005 Total 0.0129 1.3500e- 7.5000e- 9.0400e- 3.0000e- 4.1100e- 2.0000e- 4.1400e- 1.0900e- 2.0000e- 1.1100e- 0.0000 2.8748 2.8748 5.0000e- 0.0000 2.8761 003 004 003 005 003 005 003 003 005 003 005 3.4 Building Construction - 2025 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0349 0.3398 0.2682 6.9000e- 0.0139 0.0139 0.0129 0.0129 • 0.0000 i 59.6309 59.6309 0.0160 0.0000 60.0311 004 • Total 0.0349 0.3398 0.2682 6.9000e. 0.0139 0.0139 0.0129 0.0129 0.0000 59.6309 59.6309 0.0160 0.0000 60.0311 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2025 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 1.7900e- 0.0748 0.0151 2.5000e- 5.9400e- 6.0000e- 6.0000e- 1.7100e- 6.0000e- 1.7700e- • 0.0000 i 23.5706 23.5706 : 1.4800e- 0.0000 23.6076 004 • 003 004 003 005 003 003 005 003 1 003 Worker •i 0.0118 6.4700e- 0.0784 2.8000e- 0.0357 2.0000e- 0.0359 9.4700e- 1.9000e- 9.6600e- • 0.0000 i 24.9300 24.9300 4.6000e- 0.0000 24.9415 0.0349 003 004 004 003 004 003 • 004 Total 0.0135 0.0813 0.0935 5.3000e- 0.0416 2.6000e- 0.0419 0.0112 2.5000e- 0.0114 0.0000 48.5006 48.5006 1.9400e- 0.0000 48.5492 004 004 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0349 0.3398 0.2682 6.9000e- 0.0139 0.0139 0.0129 0.0129 • 0.0000 i 59.6308 i 59.6308 0.0160 0.0000 60.0310 004 • Total 0.0349 0.3398 0.2682 6.9000e. 0.0139 0.0139 0.0129 0.0129 0.0000 59.6308 59.6308 0.0160 0.0000 60.0310 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2025 Mitigated Construction Off -Site 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling Vendor Vendor Worker • •i 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 1.7900e- 0.0748 0.0151 2.5000e- 5.9400e- 6.0000e- 6.0000e- 1.7100e- 6.0000e- 1.7700e- • 0.0000 003 004 003 005 003 003 005 003 V 0.0118 6.4700e- 0.0784 2.8000e- 0.0357 2.0000e- 0.0359 9.4700e- 1.9000e- 9.6600e- • 0.0000 003 004 004 003 004 003 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 23.5706 23.5706 : 1.4800e- 0.0000 23.6076 1 003 i 24.9300 24.9300 4.6000e- 0.0000 24.9415 004 Total 003 • 0.0135 0.0813 0.0935 5.3000e- 004 0.0416 2.6000e- 004 0.0419 0.0112 2.5000e- 004 0.0114 0.0000 48.5006 48.5006 1.9400e- 003 0.0000 48.5492 3.4 Building Construction - 2026 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road .1 0.2846 2.7711 2.1872 5.6100e- i 0.1130 I 0.1130 0.1054 0.1054 • 0.0000 i 486.3643 486.3643 0.1306 0.0000 489.6283 003 • Total 0.2846 2.7711 2.1872 5.6100e. 0.1130 0.1130 0.1054 0.1054 0.0000 486.3643 486.3643 0.1306 0.0000 489.6283 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2026 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •i 0.0143 0.6043 0.1197 1.9900e- 0.0484 5.1000e- 0.0489 0.0140 4.9000e- 0.0145 • 0.0000 i 190.9963 190.9963 : 0.0117 0.0000 191.2897 003 • 003 004 004 Worker 9 0.0909 0.0483 0.5957 2.1700e- 0.2910 1.6100e- 0.2926 0.0773 1.4800e- 0.0788 • 0.0000 i 195.9306 195.9306 3.4300e- 0.0000 196.0164 0.2846 003 003 003 • 003 Total 0.1052 0.6526 0.7154 4.1600e- 0.3394 2.1200e- 0.3415 0.0913 1.9700e- 0.0932 0.0000 386.9270 386.9270 0.0152 0.0000 387.3062 003 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2846 2.7711 2.1872 5.6100e- i 0.1130 I 0.1130 0.1054 0.1054 • 0.0000 i 486.3637 486.3637 0.1306 0.0000 489.6277 003 • Total 0.2846 2.7711 2.1872 5.6100e. 0.1130 0.1130 0.1054 0.1054 0.0000 486.3637 486.3637 0.1306 0.0000 489.6277 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2026 Mitigated Construction Off -Site 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •i 0.0143 0.6043 0.1197 1.9900e- 0.0484 5.1000e- 0.0489 0.0140 4.9000e- 0.0145 • 0.0000 i 190.9963 190.9963: 0.0117 0.0000 191.2897 003 • 003 004 004 Worker 9 0.0909 0.0483 0.5957 2.1700e- 0.2910 1.6100e- 0.2926 0.0773 1.4800e- 0.0788 • 0.0000 i 195.9306 195.9306 3.4300e- 0.0000 196.0164 0.2846 003 003 003 • 003 Total 0.1052 0.6526 0.7154 4.1600e- 0.3394 2.1200e- 0.3415 0.0913 1.9700e- 0.0932 0.0000 386.9270 386.9270 0.0152 0.0000 387.3062 003 003 003 003 3.4 Building Construction - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.2846 2.7711 2.1872 5.6100e- i 0.1130 I 0.1130 0.1054 0.1054 • 0.0000 i 486.3643 486.3643 0.1306 0.0000 489.6283 003 • Total 0.2846 2.7711 2.1872 5.6100e. 0.1130 0.1130 0.1054 0.1054 0.0000 486.3643 486.3643 0.1306 0.0000 489.6283 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0140 0.5986 0.1168 1.9800e- 0.0484 5.0000e- 0.0489 0.0140 4.8000e- 0.0145 • 0.0000 i 189.9305 189.9305: 0.0114 0.0000 190.2154 0.2846 003 004 004 Worker 9 0.0862 0.0444 0.5570 2.0900e- 0.2910 1.5300e- 0.2925 0.0773 1.4000e- 0.0787 • 0.0000 i 189.4381 189.4381 3.1300e- 0.0000 189.5165 0.1130 003 003 003 • 003 Total 0.1054 0.1001 0.6430 0.6738 4.0700e- 0.3394 2.0300e- 0.3414 0.0913 1.8800e- 0.0931 0.0000 379.3686 379.3686 0.0145 0.0000 379.7318 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.2846 2.7711 2.1872 5.6100e- , 0.1130 0.1130 0.1054 0.1054 • 0.0000 i 486.3637 486.3637 0.1306 0.0000 489.6277 003 • Total 0.2846 2.7711 2.1872 5.6100e. 0.1130 0.1130 0.1054 0.1054 0.0000 486.3637 486.3637 0.1306 0.0000 489.6277 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2027 Mitigated Construction Off -Site 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •i 0.0140 0.5986 0.1168 1.9800e- 0.0484 5.0000e- 0.0489 0.0140 4.8000e- 0.0145 • 0.0000 i 189.9305 189.9305: 0.0114 0.0000 190.2154 0.2682 003 004 004 Worker 9 0.0862 0.0444 0.5570 2.0900e- 0.2910 1.5300e- 0.2925 0.0773 1.4000e- 0.0787 • 0.0000 i 189.4381 189.4381 3.1300e- 0.0000 189.5165 0.1065 003 003 003 • 003 Total 0.0993 0.1001 0.6430 0.6738 4.0700e- 0.3394 2.0300e- 0.3414 0.0913 1.8800e- 0.0931 0.0000 379.3686 379.3686 0.0145 0.0000 379.7318 003 003 003 3.4 Building Construction - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.2682 2.6118 2.0615 5.2900e- 0.1065 0.1065 0.0993 0.0993 •• 0.0000 i 458.4123 458.4123 0.1231 0.0000 461.4887 003 • Total 0.2682 2.6118 2.0615 5.2900e. 0.1065 0.1065 0.0993 0.0993 0.0000 458.4123 458.4123 0.1231 0.0000 461.4887 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 • Vendor •i 0.0130 0.5596 0.1081 1.8600e- 0.0456 4.7000e- 0.0461 0.0132 4.5000e- 0.0136 • 0.0000 i 178.1932 178.1932: 0.0104 0.0000 178.4538 2.0615 003 004 004 Worker •1 0.0768 0.0385 0.4931 1.9100e- 0.2742 1.3300e- 0.2756 0.0728 1.2300e- 0.0741 • 0.0000 i 173.2097 173.2097 2.7100e- 0.0000 173.2775 0.1065 003 003 003 • 003 Total 458.4118 0.0897 0.5981 0.6012 3.7700e- 0.3199 1.8000e- 0.3217 0.0860 1.6800e- 0.0877 0.0000 351.4029 351.4029 0.0131 0.0000 351.7313 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.2682 2.6118 2.0615 5.2900e- 0.1065 0.1065 0.0993 0.0993 •• 0.0000 i 458.4118 458.4118 0.1231 0.0000 461.4882 003 • Total 0.2682 2.6118 2.0615 5.2900e. 0.1065 0.1065 0.0993 0.0993 0.0000 458.4118 458.4118 0.1231 0.0000 461.4882 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2028 Mitigated Construction Off -Site 3.5 Architectural Coating - 2027 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 Off -Road • 9.5700e- 0.0642 0.1013 1.7000e- 2.8800e- 2.8800e- 2.8800e- 2.8800e- • 0.0000 1 1 • Vendor •i 0.0130 0.5596 0.1081 1.8600e- 0.0456 4.7000e- 0.0461 0.0132 4.5000e- 0.0136 • 0.0000 i 178.1932 178.1932 : 0.0104 0.0000 178.4538 004 003 004 004 Worker •1 0.0768 0.0385 0.4931 1.9100e- 0.2742 1.3300e- 0.2756 0.0728 1.2300e- 0.0741 • 0.0000 i 173.2097 173.2097 2.7100e- 0.0000 173.2775 0.0642 0.1013 003 003 003 • 003 Total 2.8800e- 0.0897 0.5981 0.6012 3.7700e- 0.3199 1.8000e- 0.3217 0.0860 1.6800e- 0.0877 0.0000 351.4029 351.4029 0.0131 0.0000 351.7313 003 003 003 003 003 003 3.5 Architectural Coating - 2027 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating 71 0.8187 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road • 9.5700e- 0.0642 0.1013 1.7000e- 2.8800e- 2.8800e- 2.8800e- 2.8800e- • 0.0000 14.2982 14.2982 7.8000e- 0.0000 14.3177 003 004 003 003 003 003 ; • 004 Total 0.8283 0.0642 0.1013 1.7000e- 2.8800e- 2.8800e- 2.8800e- 2.8800e- 0.0000 14.2982 14.2982 7.8000e- 0.0000 14.3177 004 003 003 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2027 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 Off -Road • 1 Worker • 5.5200e- 2.8400e- 0.0357 1.3000e- 0.0187 1.0000e- 0.0188 4.9600e- 9.0000e- 5.0500e- • 0.0000 i 12.1487 12.1487 2.0000e- 0.0000 12.1538 003 004 003 003 003 003 ; • 004 003 003 004 004 003 005 003 • 004 Total 0.1013 5.5200e- 2.8400e- 0.0357 1.3000e- 0.0187 1.0000e- 0.0188 4.9600e- 9.0000e- 5.0500e- 0.0000 12.1487 12.1487 2.0000e- 0.0000 12.1538 004 003 003 003 004 003 004 003 005 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating 71 0.8187 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road • 9.5700e- 0.0642 0.1013 1.7000e- 2.8800e- 2.8800e- 2.8800e- 2.8800e- • 0.0000 14.2982 14.2982 7.8000e- 0.0000 14.3177 003 004 003 003 003 003 ; • 004 Total 0.8283 0.0642 0.1013 1.7000e- 2.8800e- 2.8800e- 2.8800e- 2.8800e- 0.0000 14.2982 14.2982 7.8000e- 0.0000 14.3177 ii 004 003 003 003 003 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2027 Mitigated Construction Off -Site 3.5 Architectural Coating - 2028 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 J .J J J J J .1 J . 1 Off -Road 9 • ; .1 J J .1 .1 .1 J .1 7 J .1 J -I- Vendor Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 004 003 003 003 003 ; • 1 .1 J .1 .1 .1 .1 J .1 ; J .1 J -I- Worker Worker • 5.5200e- 2.8400e- 0.0357 1.3000e- 0.0187 1.0000e- 0.0188 4.9600e- 9.0000e- 5.0500e- • 0.0000 i 12.1487 12.1487 2.0000e- 0.0000 12.1538 0.2967 4.9000e- 003 003 004 004 003 005 003 • 004 Total 5.5200e- 2.8400e- 0.0357 1.3000e- 0.0187 1.0000e- 0.0188 4.9600e- 9.0000e- 5.0500e- 0.0000 12.1487 12.1487 2.0000e- 0.0000 12.1538 003 003 003 004 003 004 003 005 003 004 3.5 Architectural Coating - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating •i 2.3976 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 i 0.0000 : 0.0000 1 0.0000 0.0000 J .J J J J J .1 J . .1 J J t Off -Road 9 0.0280 0.1879 0.2967 4.9000e- 8.4500e- 8.4500e- 8.4500e- 8.4500e- • 0.0000 41.8734 41.8734 2.2800e- 0.0000 41.9305 004 003 003 003 003 ; • 003 Total 2.4256 0.1879 0.2967 4.9000e- 8.4500e- 8.4500e- 8.4500e- 8.4500e- 0.0000 41.8734 41.8734 2.2800e- 0.0000 41.9305 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 • 1 Off -Road 9 .1 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 004 003 003 003 003 ; • 1 Worker •1 0.0153 7.6700e- 0.0983 3.8000e- 0.0547 2.7000e- 0.0549 0.0145 2.4000e- 0.0148 • 0.0000 i 34.5141 34.5141 5.4000e- 0.0000 34.5276 2.4256 0.1879 003 004 004 004 • 004 Total 8.4500e- 0.0153 7.6700e- 0.0983 3.8000e- 0.0547 2.7000e- 0.0549 0.0145 2.4000e- 0.0148 0.0000 34.5141 34.5141 5.4000e- 0.0000 34.5276 003 003 003 003 004 004 003 004 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating -i 2.3976 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.0280 0.1879 0.2967 4.9000e- 8.4500e- 8.4500e- 8.4500e- 8.4500e- • 0.0000 41.8733 41.8733 2.2800e- 0.0000 41.9304 004 003 003 003 003 ; • 003 Total 2.4256 0.1879 0.2967 4.9000e- 8.4500e- 8.4500e- 8.4500e- 8.4500e- 0.0000 41.8733 41.8733 2.2800e- 0.0000 41.9304 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2028 Mitigated Construction Off -Site 3.6 Paving - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0252 0.2360 0.4009 6.3000e- 0.0115 0.0115 0.0106 0.0106 • 0.0000 1 1 • 1 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker •1 0.0153 7.6700e- 0.0983 3.8000e- 0.0547 2.7000e- 0.0549 0.0145 2.4000e- 0.0148 • 0.0000 i 34.5141 34.5141 5.4000e- 0.0000 34.5276 Paving 9 003 004 004 004 • 004 Total 0.0153 7.6700e- 0.0983 3.8000e- 0.0547 2.7000e- 0.0549 0.0145 2.4000e- 0.0148 0.0000 34.5141 34.5141 5.4000e- 0.0000 34.5276 ii 003 004 004 004 004 3.6 Paving - 2028 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0252 0.2360 0.4009 6.3000e- 0.0115 0.0115 0.0106 0.0106 • 0.0000 55.0530 i 55.0530 : 0.0178 1 0.0000 55.4981 004 J .1 J J J .1 .1 J .1 .1 J 1. Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0252 0.2360 0.4009 6.3000e- 0.0115 0.0115 0.0106 0.0106 0.0000 55.0530 55.0530 0.0178 0.0000 55.4981 ii 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.6 Paving - 2028 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 004 1 Worker • 9.5000e- 4.8000e- 6.1000e- 2.0000e- 3.3900e- 2.0000e- 3.4100e- 9.0000e- 2.0000e- 9.2000e- • 0.0000 i 2.1435 2.1435 3.0000e- 0.0000 2.1443 Paving 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.0000 9.5000e- 4.8000e- 6.1000e- 2.0000e- 3.3900e- 2.0000e- 3.4100e- 9.0000e- 2.0000e- 9.2000e- 0.0000 2.1435 2.1435 3.0000e- 0.0000 2.1443 0.0000 55.4980 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0252 0.2360 0.4009 6.3000e- 0.0115 0.0115 0.0106 0.0106 •• 0.0000 55.0529 i 55.0529 : 0.0178 0.0000 55.4980 004 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0252 0.2360 0.4009 6.3000e- 0.0115 0.0115 0.0106 0.0106 0.0000 55.0529 55.0529 0.0178 0.0000 55.4980 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.6 Paving - 2028 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Ir J J J J J J J J 7 J J J t Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 .1 J .1 .1 .1 .1 J .1 ; J .1 J t Worker • 9.5000e- 4.8000e- 6.1000e- 2.0000e- 3.3900e- 2.0000e- 3.4100e- 9.0000e- 2.0000e- 9.2000e- • 0.0000 i 2.1435 2.1435 3.0000e- 0.0000 2.1443 004 004 003 005 003 005 003 004 005 004 • 005 Total 9.5000e- 4.8000e- 6.1000e- 2.0000e- 3.3900e- 2.0000e- 3.4100e- 9.0000e- 2.0000e- 9.2000e- 0.0000 2.1435 2.1435 3.0000e- 0.0000 2.1443 004 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 : 0.0000 : 0.0000 i 0.0000 i 0.0000 9 I 1 1 1 I 1 1 1 1 I 1 I 1 . 1 1 1 I 9 I 1 1 1 1 1 I 1 • 3 4. 4 1 4. F 4. + 4. r 4. 4. 4. r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 0.00 0.00 T 0.00 nr Golf Course ; 0.00 0.00 0.00 T Single Family Housing ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I 1 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual LH D2 MHD HHD OBUS UBUS I MCY Apartments Low Rise • 0.559901 r 0.0345581 0.1904871 0.1038781 0.0110411 0.0042601 0.0172281 0.0702271 0.0014221 0.0010881 0.0043851 0.000853: 0.000671 • i I I I I I I I I I I i i i i i i i + Golf Course • 0.559901; 0.0345581 0.1904871 0.1038781 0.0110411 0.0042601 0.0172281 0.0702271 0.0014221 0.0010881 0.0043851 0.000853 0.000671 } I I I 1 1 1 1 1 1 1 1• 1. 1. 1. 1. 1. 1. 1. 1. 1. 1• Land Use I LDA I LDT1 I LDT2 MDV LH D1 SBUS I MH Single Family Housing • 0.559901 • 0.034558: 0.190487: 0.103878: 0.011041' 0.004260: 0.017228 0.070227 0.001422 0.001088 0.004385: 0.000853 0.000671 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 : 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 i 0.0000 Mitigated .� 1 1 1 1 1 1 1 1 . 1 1 1 1 1 .1 1 1 1 1 1 1 1 1 • 1 1 1 1 1 J J J J J J J J 7 J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 : 0.0000 Unmitigated : 1 1 1 1 1 1 1 1 . 1 1 1 1 1 .1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 . J J J J J J J J 7 J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 NaturalGas •1 0.0000 0.0000 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 11 0.0000 Mitigated 9 1 1 1 1 1 1 1 1 . 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 1 a} } } } } 4.} } r • } } 4 r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low 1 0 •i 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Rise i 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 f -. J J J J J J J J 7 J J J Golf Course 10 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 f 4 J.1 .1 .1 .1 .1 .1 .1 .1 ; .1 .1 .1 Single Family i 0 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Housing 1 . 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low Rise Golf Course Single Family Housing 1 0 •u 1 i f -. 10 • f - i 0 •• i : 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 ' 1 0.0000 0.0000 1 J J J .1 J J J J 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 J J .1 J J J J .1 . 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 •0.0000 • 0.0000 . 0.0000 0.0000 0.0000 0.0000 J J J 0.0000 0.0000 0.0000 0.0000 J J .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 _ 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Golf Course Single Family Housing 1 0 •i i r 4 i 0 • i i r -r i 0 • 1 i 0.0000 0.0000 1 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 J J 0.0000 0.0000 J J 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Golf Course Single Family Housing i 0 •1 i . i r -r i 0 • i i h 7 i 0 • 1 : i 0.0000 0.0000 J J 0.0000 0.0000 J J 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 T 0.0000 T 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 11.3070 1 0.0516 i 4.4806 1 2.4000e- 1 1 0.0249 1 0.0249 i 1 0.0249 0.0249 : 0.0000 i 7.3260 i 7.3260 1 7.0200e- i 0.0000 1 7.5014 9I 004 003 1 9I 1 I I 1 I 1 1 1 I 1 1 ei• F F F F 4. 4. F F r • . F F F r Unmitigated •• 11.3070 • 0.0516 • 4.4806 • 2.4000e- • • 0.0249 • 0.0249 • • 0.0249 • 0.0249 • 0.0000 • 7.3260 • 7.3260 • 7.0200e- • 0.0000 • 7.5014 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 43 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Subcategory tons/yr MT/yr Architectural •i 7.1570 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: . i Consumer •1 4.0155 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 .1 J .1 J Landscaping •i 0.1345 0.0516 4.4806 2.4000e- 0.0249 0.0249 0.0249 0.0249 • 0.0000 i 7.3260 7.3260 7.0200e- 0.0000 7.5014 004 : • 003 Total 11.3070 0.0516 4.4806 2.4000e- 0.0249 0.0249 0.0249 0.0249 0.0000 7.3260 7.3260 7.0200e- 0.0000 7.5014 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 43 6.2 Area by SubCategory Mitigated Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 7.1570 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: : i Consumer •i 4.0155 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.1345 0.0516 4.4806 2.4000e- 0.0249 0.0249 0.0249 0.0249 • 0.0000 i 7.3260 7.3260 7.0200e- 0.0000 7.5014 004 : • 003 Total 11.3070 0.0516 4.4806 2.4000e- 0.0249 0.0249 0.0249 0.0249 0.0000 7.3260 7.3260 7.0200e- 0.0000 7.5014 004 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •i 0.0000 : 0.0000 : 0.0000 . 0.0000 eI- F 1 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low Rise Golf Course I- Single Family Housing 1 0 / 0 •i i 1• r i I0 / 0 .i 4 I 0 / 0 •u i 0.0000 1 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 .1 J T 0.0000 i 0.0000 1 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 40 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low i 0 / 0 •i 0.0000 1 0.0000 : 0.0000 0.0000 Rise i I i •1 Golf Course I- i 0 / 0 • 0.0000 0.0000 0.0000 0.0000 i i • Single Family 1 0 / 0 • 0.0000 0.0000 0.0000 0.0000 Housing i i Total 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Category/Year Page 41 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.2 Waste by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Land Use MT/yr 1 MT/yr Mitigated •i 0.0000 : 0.0000 : 0.0000 . 0.0000 eI- F 1 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 8.2 Waste by Land Use Unmitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise Golf Course I- Single Family Housing 1 0 •i i 1• r i I0 .i 4 1 0 •u i 1 0.0000 1 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 .1 J T 0.0000 i 0.0000 1 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Mitigated Page 42 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low i 0 •i 0.0000 1 0.0000 : 0.0000 0.0000 Rise i I i 1 Golf Course i 0 0.0000 0.0000 0.0000 0.0000 i i Single Family 1 0 • 0.0000 0.0000 0.0000 0.0000 Housing 1 i Total 11 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number CaIEEMod Version: CaIEEMod.2016.3.2 11.0 Vegetation Page 43 of 43 Date: 1/6/2021 2:54 PM Travertine Specific Plan - Phase 1 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.16: CALEEMOD PHASE 2 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan - Phase 2 (Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Apartments Low Rise Single Family Housing • • • • 163.00 143.00 4 Dwelling Unit Dwelling Unit 20.10 60.00 4. 163,000.00 257,400.00 442 388 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 643.92 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2030 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2030 Land Use - Total Project Area (Phase 2) is approximately 80.10 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 2 Physical Construction anticipated to start Quarter 1 of 2029 and end Quarter 4 2030 Off-road Equipment - Hours are based on an 8 -hour workday. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name Column Name Default Value New Value tblArchitecturalCoating • EF_Nonresidential_Exterior 250.00 • 50.00 • tblArchitecturalCoating • EF_Nonresidential_Interior 250.00 T 50.00 • tblArchitecturalCoating • EF_Parking 250.00 T 50.00 tblArchitecturalCoating • EF_Residential_Exterior 250.00 T 50.00 tblArchitecturalCoating • EF_Residential_Interior 250.00 T 50.00 Y i 1 tblAreaCoating • Area_Residential_Exterior 283770 1305121 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblAreaCoating • Area Residential_ Interior • 851310 3915364 tblConstructionPhase • NumDays i 60.00 30.00 r tblConstructionPhase • NumDays T 155.00 30.00 r tblConstructionPhase • NumDays T 1,550.00 450.00 r tblConstructionPhase • NumDays T 110.00 175.00 r tblConstructionPhase • NumDays i 110.00 35.00 • r tblEnergyUse • LightingElect i 810.36 0.00 r 4 tblEnergyUse • LightingElect i 1,608.84 0.00 r tblEnergyUse • NT24E i 3,172.76 0.00 • r tblEnergyUse • NT24E T 6,155.97 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 r 4 tblEnergyUse • T24NG i 9,544.50 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 • r 4 tblFireplaces • FireplaceHourDay T 3.00 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • FireplaceWoodMass T 457.60 0.00 r 4 tblFireplaces • NumberGas T 130.40 0.00 r 4 tblFireplaces • NumberGas T 114.40 0.00 r 4 tblFireplaces • NumberNoFireplace T 16.30 0.00 r 4 tblFireplaces • NumberNoFireplace T 14.30 0.00 • tblFireplaces • NumberWood • 16.30 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblFireplaces • NumberWood • 14.30 0.00 tblGrading • AcresOfGrading i 105.00 150.00 r tblGrading • AcresOfGrading i 60.00 150.00 r tblLandUse • LotAcreage i 10.19 20.10 r tblLandUse • LotAcreage i 46.43 60.00 r tblLandUse • Population T 466.00 442.00 r tblLandUse • Population T 409.00 388.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 643.92 r 4 tblSolidWaste • SolidWasteGenerationRate T 74.98 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 159.08 0.00 r 4 tblVehicleTrips • DV T 11.00 0.00 r 4 tblVehicleTrips • DV_TP T 11.00 0.00 r 4 tblVehicleTrips • HO_TL T 4.50 0.00 • r 4 tblVehicleTrips • HO_TL T 4.50 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 • r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 • tblVehicleTrips • HW • 11.00 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • HW TL • 11.00 0.00 • HW TTP i 40.20 0.00 r r • HW TTP T 40.20 0.00 r r • T 3.00 0.00 PB_TP r r • T 3.00 0.00 PB_TP r r • T 86.00 0.00 PR_TP r r • PR TP T 86.00 0.00 r r 4 • ST TR T 7.16 0.00 r r • ST TR T 9.91 0.00 r r • T 6.07 0.00 SU_TR r r 4 • SU TR T 8.62 0.00 r r 4 • WD TR T 6.59 0.00 r r 4 • T 9.52 0.00 WD_TR r r 4 • IndoorWaterUseRate T 10,620,106.18 0.00 r 4 • IndoorWaterUseRate T 9,317,025.66 0.00 r 4 • OutdoorWaterUseRate T 6,695,284.33 0.00 r 4 • OutdoorWaterUseRate T 5,873,777.05 0.00 r 4 • NumberCatalytic T 8.15 0.00 r 4 • NumberCatalytic T 7.15 0.00 r 4 • NumberNoncatalytic T 8.15 0.00 r 4 • NumberNoncatalytic T 7.15 0.00 r 4 • WoodstoveDayYear T 82.00 0.00 r 4 • WoodstoveDayYear T 82.00 0.00 r 4 • WoodstoveWoodMass T 999.60 0.00 • WoodstoveWoodMass •999.60 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 33 2.1 Overall Construction Unmitigated Construction Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2029 •i 0.3641 3.3861 2.6188 7.8900e- 0.6812 0.1301 0.8114 0.2589 0.1208 0.3797 • 0.0000 i 696.3209 696.3209 0.1602 0.0000 700.3264 J J J J J J J J . J J J T 003 e J .1 .1 .1 .1 J .1 .1 .1 .1 .1 2030 .1 1.6777 1.8226 2.8424 9.3100e- 0.2201 0.0459 0.2660 0.0589 0.0458 0.1047 • 0.0000 i 810.1663 810.1663 0.0307 0.0000 810.9344 Maximum 003 3.3861 • 9.3100e- Maximum 1.6777 3.3861 2.8424 9.3100e- 0.6812 0.1301 0.8114 0.2589 0.1208 0.3797 0.0000 810.1663 810.1663 0.1602 0.0000 810.9344 0.00 1 003 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2029 •i 0.3641 3.3861 2.6188 7.8900e- 0.3638 0.1301 1 0.4939 0.1273 0.1208 0.2481 • 0.0000 i 696.3202 696.3202 0.1602 0.0000 700.3258 003 J J J J J J J J . J J J T 2030 •i 1.6777 1.8226 2.8424 9.3100e- 0.2201 0.0459 0.2660 0.0589 0.0458 0.1047 • 0.0000 i 810.1656 810.1656 0.0307 0.0000 810.9337 Total 003 PM2.5 Total Maximum 1.6777 3.3861 2.8424 9.3100e- 0.3638 0.1301 0.4939 0.1273 0.1208 0.2481 0.0000 810.1656 810.1656 0.1602 0.0000 810.9337 0.00 0.00 0.00 0.00 003 0.00 Reduction ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 35.22 0.00 29.47 41.42 0.00 27.17 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2029 3-31-2029 1.1842 1.1842 2 4-1-2029 6-30-2029 0.8459 0.8459 3 7-1-2029 9-30-2029 0.8552 0.8552 4 10-1-2029 12-31-2029 0.8541 0.8541 5 1-1-2030 3-31-2030 0.4934 0.4934 6 4-1-2030 6-30-2030 0.9643 0.9643 7 7-1-2030 9-30-2030 1.0462 1.0462 0.0000 3.7114 Highest 1.1842 1.1842 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water ,l •i f' •i el •i e • 4 4.7343 0.0261 2.2661 1.2000e- 1 1 0.0126 0.0126 0.0126 0.0126 9I 9 004 1 1 J J J .1 J J J J v 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 9 1 1 9 J J J 1 J J .1 J V 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J V 1 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J 4 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 i 3.7114 3.7114 3.5400e- 1 0.0000 003 J J .1 i 0.0000 0.0000 0.0000 1 0.0000 i J J J i 0.0000 0.0000 0.0000 1 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 3.7998 T 0.0000 T 0.0000 T 0.0000 T 0.0000 Total 4.7343 0.0261 2.2661 1.2000e- 004 0.0000 0.0126 0.0126 0.0000 0.0126 0.0126 0.0000 3.7114 3.7114 3.5400e- 003 0.0000 3.7998 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 33 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,l •i ,i •1 • • 4.7343 0.0261 2.2661 1.2000e- 1 1 0.0126 0.0126 0.0126 0.0126 • 0.0000 9 004 1 1 9 . . 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 . 9 11 . J J J J J J J J le 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 3.7114 3.7114 3.5400e- 1 0.0000 3.7998 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i i J J J i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 4.7343 0.0261 2.2661 1.2000e- 004 0.0000 0.0126 0.0126 0.0000 0.0126 0.0126 0.0000 3.7114 3.7114 3.5400e- 003 0.0000 3.7998 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 2 3 4 5 :Site Preparation :Grading -Building Construction :Architectural Coating :Paving :Site Preparation :Grading :Building Construction :Architectural Coating :Paving 11/1/2029 :2/9/2029 5 4 2/10/2029 3/23/2029 5 30: 14 4 3/24/2029 :12/13/2030 : 5: 450: 4 T 4/13/2030 :12/13/2030 : 5 175 4 -'r4 10/27/2030 :12/13/2030 5 35 30: Acres of Grading (Site Preparation Phase): 150 Acres of Grading (Grading Phase): 150 Acres of Paving: 0 Residential Indoor: 851,310; Residential Outdoor: 283,770; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Site Preparation Grading Building Construction Architectural Coating Paving • • • Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class 7: 18.00 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix J HDT_Mix -i ' - 8: 20.00. 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix 1 HDT_Mix 9: 169.00• 33.001 0.00: 11.00: 5.40: 20.00: LD_Mix i HDT_Mix 1: 34.00• 0.00 0.00: 11.00 : 5.40' 20.00: LD Mix i HDT Mix 6: 15.00' 0.00' 0.00' 11.00: 5.40: 20.00:LD Mix Hauling Vehicle Class HHDT HHDT HHDT HHDT 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.3505 0.0000 0.3505 0.1576 0.0000 0.1576 •• 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Ir J J J J J J J J ; J J J T Off -Road •i 0.0516 0.5359 0.2611 8.5000e- 0.0223 0.0223 0.0205 0.0205 • 0.0000 i 75.0326 75.0326 0.0243 0.0000 75.6393 004 • Total 0.0516 0.5359 0.2611 8.5000e- 0.3505 0.0223 0.3729 0.1576 0.0205 0.1781 0.0000 75.0326 75.0326 0.0243 0.0000 75.6393 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 5.8000e- 2.9000e- 3.7500e- 2.0000e- 2.2200e- 1.0000e- 2.2300e- 5.9000e- 1.0000e- 6.0000e- • 0.0000 i 1.3652 1.3652 2.0000e- 0.0000 1.3657 Total 004 004 003 005 003 005 003 004 005 004 • 005 Total 8.5000e- 5.8000e- 2.9000e- 3.7500e- 2.0000e- 2.2200e- 1.0000e- 2.2300e- 5.9000e- 1.0000e- 6.0000e- 0.0000 1.3652 1.3652 2.0000e- 0.0000 1.3657 004 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •1 0.1367 0.0000 0.1367 0.0614 0.0000 0.0614 • 0.0000 0.0000 i 0.0000 : 0.0000 0.0000 0.0000 • Off -Road 9 0.0516 0.5359 0.2611 8.5000e- 0.0223 0.0223 0.0205 0.0205 • 0.0000 75.0325 75.0325 0.0243 0.0000 75.6392 004 • • Total 0.0516 0.5359 0.2611 8.5000e- 0.1367 0.0223 0.1590 0.0614 0.0205 0.0820 0.0000 75.0325 75.0325 0.0243 0.0000 75.6392 004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2029 Mitigated Construction Off -Site 3.3 Grading - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 • 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 94.1754 94.1754 0.0305 0.0000 94.9369 1 Worker • 5.8000e- 2.9000e- 3.7500e- 2.0000e- 2.2200e- 1.0000e- 2.2300e- 5.9000e- 1.0000e- 6.0000e- • 0.0000 i 1.3652 1.3652 2.0000e- 0.0000 1.3657 Total 004 004 003 005 003 005 003 004 005 004 • 005 Total 1.0700e- 5.8000e- 2.9000e- 3.7500e- 2.0000e- 2.2200e- 1.0000e- 2.2300e- 5.9000e- 1.0000e- 6.0000e- 0.0000 1.3652 1.3652 2.0000e- 0.0000 1.3657 003 004 004 003 005 003 005 003 004 005 004 005 3.3 Grading - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 0.1699 0.0000 0.1699 0.0582 0.0000 0.0582 • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 • Off -Road 9 0.0508 0.4978 0.3912 1.0700e- 0.0200 0.0200 0.0184 0.0184 • 0.0000 94.1754 94.1754 0.0305 0.0000 94.9369 003 • • Total 0.0508 0.4978 0.3912 1.0700e- 0.1699 0.0200 0.1898 0.0582 0.0184 0.0766 0.0000 94.1754 94.1754 0.0305 0.0000 94.9369 ii 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 Off -Road 9 0.0508 0.4978 0.3912 1.0700e- 0.0200 0.0200 0.0184 0.0184 • 0.0000 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 • 1 Worker • 6.5000e- 3.2000e- 4.1700e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.7000e- • 0.0000 i 1.5168 1.5168 2.0000e- 0.0000 1.5174 Total 0.0508 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.0663 6.5000e- 3.2000e- 4.1700e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.7000e- 0.0000 1.5168 1.5168 2.0000e- 0.0000 1.5174 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 0.0663 0.0000 0.0663 0.0227 0.0000 0.0227 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 • Off -Road 9 0.0508 0.4978 0.3912 1.0700e- 0.0200 0.0200 0.0184 0.0184 • 0.0000 94.1753 94.1753 0.0305 0.0000 94.9367 003 • • Total 0.0508 0.4978 0.3912 1.0700e- 0.0663 0.0200 0.0862 0.0227 0.0184 0.0411 0.0000 94.1753 94.1753 0.0305 0.0000 94.9367 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.2192 1 Worker • 6.5000e- 3.2000e- 4.1700e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.7000e- • 0.0000 i 1.5168 1.5168 2.0000e- 0.0000 1.5174 0.0870 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.0812 6.5000e- 3.2000e- 4.1700e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.7000e- 0.0000 1.5168 1.5168 2.0000e- 0.0000 1.5174 004 004 003 005 003 005 003 004 005 004 005 3.4 Building Construction - 2029 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.2192 2.1340 1.6844 4.3200e- 0.0870 0.0870 0.0812 0.0812 • 0.0000 i 374.5564 374.5564 0.1006 0.0000 377.0701 003 • Total 0.2192 2.1340 1.6844 4.3200e. 0.0870 0.0870 0.0812 0.0812 0.0000 374.5564 374.5564 0.1006 0.0000 377.0701 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2029 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 J 0.0000 0.0000 0.0000 Vendor • 4.5900e- 0.1997 0.0382 6.7000e- 0.0164 1.7000e- 0.0166 4.7400e- 1.6000e- 4.8900e- • 0.0000 i 63.7992 63.7992 : 3.6400e- 0.0000 63.8902 0.2192 003 004 004 003 004 003 1 003 Worker •i 0.0367 0.0181 0.2360 9.5000e- 0.1397 6.3000e- 0.1404 0.0371 5.8000e- 0.0377 • 0.0000 i 85.8753 85.8753 1.2700e- 0.0000 85.9070 0.0870 004 004 004 • 003 Total 0.0812 0.0413 0.2178 0.2742 1.6200e- 0.1562 8.0000e- 0.1569 0.0419 7.4000e- 0.0426 0.0000 149.6745 149.6745 4.9100e- 0.0000 149.7972 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.2192 2.1340 1.6844 4.3200e- 0.0870 0.0870 0.0812 0.0812 • 0.0000 i 374.5560 374.5560 0.1006 0.0000 377.0696 003 • Total 0.2192 2.1340 1.6844 4.3200e. 0.0870 0.0870 0.0812 0.0812 0.0000 374.5560 374.5560 0.1006 0.0000 377.0696 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2029 Mitigated Construction Off -Site 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 4.5900e- 0.1997 0.0382 6.7000e- 0.0164 1.7000e- 0.0166 4.7400e- 1.6000e- 4.8900e- • 0.0000 i 63.7992 63.7992 : 3.6400e- 0.0000 63.8902 003 • 003 004 004 003 004 003 1 003 Worker •i 0.0367 0.0181 0.2360 9.5000e- 0.1397 6.3000e- 0.1404 0.0371 5.8000e- 0.0377 • 0.0000 i 85.8753 85.8753 1.2700e- 0.0000 85.9070 0.2682 1.3286 004 004 004 • 003 Total 0.0367 0.0413 0.2178 0.2742 1.6200e- 0.1562 8.0000e- 0.1569 0.0419 7.4000e- 0.0426 0.0000 149.6745 149.6745 4.9100e- 0.0000 149.7972 003 004 004 003 3.4 Building Construction - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2682 1 1.3286 1.9910 6.3300e- 0.0367 0.0367 0.0367 0.0367 •• 0.0000 i 539.6830 i 539.6830 0.0215 0.0000 540.2202 003 • Total 0.2682 1.3286 1.9910 6.3300e. 0.0367 0.0367 0.0367 0.0367 0.0000 539.6830 539.6830 0.0215 0.0000 540.2202 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 5.6200e- 0.2457 0.0468 8.2000e- 0.0203 2.0000e- 0.0205 5.8700e- 1.9000e- 6.0600e- • 0.0000 i 78.7526 78.7526 : 4.3900e- 0.0000 78.8624 003 • 003 004 004 003 004 003 1 003 Worker •i 0.0426 0.0206 0.2752 1.1500e- 0.1731 7.3000e- 0.1738 0.0460 6.7000e- 0.0466 • 0.0000 i 103.7973 103.7973 1.4400e- 0.0000 103.8333 0.2682 1.3286 003 004 004 • 003 Total 0.0367 0.0482 0.2663 0.3219 1.9700e- 0.1934 9.3000e- 0.1944 0.0518 8.6000e- 0.0527 0.0000 182.5499 182.5499 5.8300e- 0.0000 182.6957 003 004 004 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2682 1 1.3286 1.9910 6.3300e- 0.0367 0.0367 0.0367 0.0367 •• 0.0000 i 539.6823 i 539.6823 0.0215 0.0000 540.2195 003 • Total 0.2682 1.3286 1.9910 6.3300e. 0.0367 0.0367 0.0367 0.0367 0.0000 539.6823 539.6823 0.0215 0.0000 540.2195 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2030 Mitigated Construction Off -Site 3.5 Architectural Coating - 2030 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J I 1 • 1 Off -Road .1 1 1 • 1 Vendor • 5.6200e- 0.2457 0.0468 8.2000e- 0.0203 2.0000e- 0.0205 5.8700e- 1.9000e- 6.0600e- • 0.0000 i 78.7526 78.7526 : 4.3900e- 0.0000 78.8624 004 003 003 003 003 ; • 003 004 004 003 004 003 1 003 41 Worker •i 0.0426 0.0206 0.2752 1.1500e- 0.1731 7.3000e- 0.1738 0.0460 6.7000e- 0.0466 • 0.0000 i 103.7973 103.7973 1.4400e- 0.0000 103.8333 0.2097 3.5000e- 003 004 004 • 003 Total 0.0482 0.2663 0.3219 1.9700e- 0.1934 9.3000e- 0.1944 0.0518 8.6000e- 0.0527 0.0000 182.5499 182.5499 5.8300e- 0.0000 182.6957 003 003 003 003 004 004 003 3.5 Architectural Coating - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating •i 1.3153 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road .1 0.0153 0.0999 0.2097 3.5000e- 2.3700e- 2.3700e- 2.3700e- 2.3700e- • 0.0000 29.7880 29.7880 1.2100e- 0.0000 29.8181 004 003 003 003 003 ; • 003 Total 1.3305 0.0999 0.2097 3.5000e- 2.3700e- 2.3700e- 2.3700e- 2.3700e- 0.0000 29.7880 29.7880 1.2100e- 0.0000 29.8181 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 J .J J J J .1 .1 J . 1 Off -Road 9 • ; .1 J J .1 .1 .1 J .1 7 J .1 J -I- Vendor Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 004 003 003 003 003 ; • 1 .1 J .1 .1 .1 .1 J .1 . J .1 J -I- Worker Worker • 6.0200e- 2.9200e- 0.0389 1.6000e- 0.0245 1.0000e- 0.0246 6.5000e- 9.0000e- 6.5900e- • 0.0000 i 14.6763 14.6763 2.0000e- 0.0000 14.6814 0.2097 3.5000e- 003 003 004 004 003 005 003 • 004 Total 6.0200e- 2.9200e- 0.0389 1.6000e- 0.0245 1.0000e- 0.0246 6.5000e- 9.0000e- 6.5900e- 0.0000 14.6763 14.6763 2.0000e- 0.0000 14.6814 003 003 003 004 003 004 003 005 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating •i 1.3153 1 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 J .J J J J .1 .1 J . .1 .1 J t Off -Road 9 0.0153 0.0999 0.2097 3.5000e- 2.3700e- 2.3700e- 2.3700e- 2.3700e- • 0.0000 29.7879 29.7879 1.2100e- 0.0000 29.8181 004 003 003 003 003 ; • 003 Total 1.3305 0.0999 0.2097 3.5000e- 2.3700e- 2.3700e- 2.3700e- 2.3700e- 0.0000 29.7879 29.7879 1.2100e- 0.0000 29.8181 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2030 Mitigated Construction Off -Site 3.6 Paving - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0242 0.1246 0.2774 4.9000e- 5.7900e- 5.7900e- 5.7900e- 5.7900e- • 0.0000 i 42.1742 42.1742 : 1.9800e- 1 0.0000 42.2236 1 • ; .1 J J .1 .1 .1 J .1 7 J .1 J -I- Vendor Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 J .1 .1 J J .1 .1 J . .1 .1 J t 1 9 .1 J .1 .1 .1 .1 J .1 . J .1 J -I- Worker Worker • 6.0200e- 2.9200e- 0.0389 1.6000e- 0.0245 1.0000e- 0.0246 6.5000e- 9.0000e- 6.5900e- • 0.0000 i 14.6763 14.6763 2.0000e- 0.0000 14.6814 Total 003 003 004 004 003 005 003 • 004 Total 4.9000e- 6.0200e- 2.9200e- 0.0389 1.6000e- 0.0245 1.0000e- 0.0246 6.5000e- 9.0000e- 6.5900e- 0.0000 14.6763 14.6763 2.0000e- 0.0000 14.6814 004 003 003 003 004 003 004 003 005 003 004 3.6 Paving - 2030 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0242 0.1246 0.2774 4.9000e- 5.7900e- 5.7900e- 5.7900e- 5.7900e- • 0.0000 i 42.1742 42.1742 : 1.9800e- 1 0.0000 42.2236 004 003 003 003 003 • 1 003 J .1 .1 J J .1 .1 J . .1 .1 J t Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0242 0.1246 0.2774 4.9000e- 5.7900e. 5.7900e- 5.7900e- 5.7900e- 0.0000 42.1742 42.1742 1.9800e- 0.0000 42.2236 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.6 Paving - 2030 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling Vendor Vendor Worker Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J J .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 .1 J .1 .1 .1 .1 J .1 . 5.3000e- 2.6000e- 3.4300e- 1.0000e- 2.1600e- 1.0000e- 2.1700e- 5.7000e- 1.0000e- 5.8000e- • 0.0000 004 004 003 005 003 005 003 004 005 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 J .1 J -I- i 1.2950 1.2950 2.0000e- 0.0000 1.2954 005 Total 5.3000e- 004 2.6000e- 004 3.4300e- 003 1.0000e- 005 2.1600e- 003 1.0000e- 005 2.1700e- 003 5.7000e- 004 1.0000e- 005 5.8000e- 004 0.0000 1.2950 1.2950 2.0000e- 005 0.0000 1.2954 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road i 0.0242 0.1246 0.2774 4.9000e- 5.7900e- 5.7900e- 5.7900e- 5.7900e- • 0.0000 42.1741 42.1741 : 1.9800e- 1 0.0000 42.2235 004 003 003 003 003 • 1 003 J .1 .1 J J .1 .1 J . .1 .1 J t Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0242 0.1246 0.2774 4.9000e- 5.7900e. 5.7900e- 5.7900e- 5.7900e- 0.0000 42.1741 42.1741 1.9800e- 0.0000 42.2235 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.6 Paving - 2030 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 5.3000e- 2.6000e- 3.4300e- 1.0000e- 2.1600e- 1.0000e- 2.1700e- 5.7000e- 1.0000e- 5.8000e- • 0.0000 i 1.2950 1.2950 2.0000e- 0.0000 1.2954 004 004 003 005 003 005 003 004 005 004 • 005 Total 5.3000e- 2.6000e- 3.4300e- 1.0000e- 2.1600e- 1.0000e- 2.1700e- 5.7000e- 1.0000e- 5.8000e- 0.0000 1.2950 1.2950 2.0000e- 0.0000 1.2954 004 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 : 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 : 0.0000 : 0.0000 i 0.0000 i 0.0000 9 I 1 1 II 1 I 1 1 I 1 I . 1 1 1 I 9 I 1 1 1 1 1 I 1 • I. + + + 4. + 4. + 4. r 4. 4. + r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Miles Unmitigated Mitigated Land Use Trip Purpose % Weekday Saturday H -W or C -W Sunday H -O or C -NW Annual VMT Annual VMT Apartments Low Rise Single Family Housing; ; 0.00 0.00 0.00 0.00 0.00 T 0.00 • • Total I 0.00 I 0.00 0.00 T 0.00 r 0.00 • 0.00 0.00 0 0 r r 0 0 I I 4.3 Trip Type Information 4.4 Fleet Mix Land UseLDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY I I I I I I I I I I I I SBUS MH Apartments Low Rise • 0.562310; 0.034239 0.191194 0.102231 0.010280 0.004149 0.017053 0.070255 0.001423 0.001071 0.004354 0.000825: 0.000615 4E E E E E E E E E E 1. Single Family Housing : 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071: 0.004354: 0.000825: 0.000615 • L J Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Single Family Housing 2 0.00 r 4 0.00 0.00 T 0.00 0.00 T 0.00 r 0.00 • 0.00 0.00 0.00 • 0 t r 0.00 0.00 0 0 0 r r 0 0 4.4 Fleet Mix Land UseLDA LDT1 LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY I I I I I I I I I I I I SBUS MH Apartments Low Rise • 0.562310; 0.034239 0.191194 0.102231 0.010280 0.004149 0.017053 0.070255 0.001423 0.001071 0.004354 0.000825: 0.000615 4E E E E E E E E E E 1. Single Family Housing : 0.562310. 0.034239: 0.191194: 0.102231: 0.010280: 0.004149: 0.017053: 0.070255: 0.001423: 0.001071: 0.004354: 0.000825: 0.000615 • L J CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity 4 1 i 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 Mitigated j 1 1 1 1 1 1 1 1 • � 1 1 1 :1 1 J 1 J J J J J 7 1 J J1 T Electricity 91 i 1 i i 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 Unmitigated ,�I I I I I I 1 1 • 1 i I :1 J J J J J J J J ; 1 J J T NaturalGas 9 0.0000 1 0.0000 1 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 1 0.0000 Mitigated j I I I I I I 1 1 . 1 i i NaturalGas • 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 0.0000 • 0.0000 • 0.0000 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low i 0 • Rise i f -. Single Family 1 0 • Housing i i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 J J .1 J .1 .1 J .1 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 - 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low 1 0 •u Rise i . r -r Single Family I0 • Housing 1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 J J .1 J J J J .1 .• 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 - 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low i 0 • Rise i r 4 Single Family 1 0 • Housing i i 0.0000 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low i 0 •1 Rise i . i P. Single Family i 0 • Housing i : 0.0000 0.0000 0.0000 J J 0.0000 1 0.0000 0.0000 0.0000 r 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 4.7343 i 0.0261 i 2.2661 i 1.2000e- 1 i 0.0126 i 0.0126 i i 0.0126 : 0.0126 •• 0.0000 i 3.7114 i 3.7114 i 3.5400e- i 0.0000 i 3.7998 9I 004 . 003 1 '1 I 1 1 1 1 1 1 1 1 1 1 1 • :I• 4. 1. 1. + 1. 4. 1. 1. r 1. 4. 1. r Unmitigated • 4.7343 • 0.0261 • 2.2661 • 1.2000e- • • 0.0126 • 0.0126 • • 0.0126 • 0.0126 • 0.0000 • 3.7114 • 3.7114 • 3.5400e- • 0.0000 • 3.7998 004 1 1 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 3.0246 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: i ; 1 it J J J J J J J J ; J J .1 T Consumer •i 1.6419 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :1 J J J J J J J J . J J J T Hearth 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 . 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 • f J J J .1 J J J J .• J J J T Landscaping •i 0.0678 0.0261 2.2661 1.2000e- 0.0126 0.0126 0.0126 0.0126 • 0.0000 i 3.7114 3.7114 3.5400e- 0.0000 3.7998 • 004 003 Total 4.7343 0.0261 2.2661 1.2000e- 0.0126 0.0126 0.0126 0.0126 0.0000 3.7114 3.7114 3.5400e- 0.0000 3.7998 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 33 6.2 Area by SubCategory Mitigated Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 3.0246 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: : i Consumer •i 1.6419 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .1 .1 Landscaping •i 0.0678 0.0261 2.2661 1.2000e- 0.0126 0.0126 0.0126 0.0126 • 0.0000 i 3.7114 3.7114 3.5400e- 0.0000 3.7998 004 : • 003 Total 4.7343 0.0261 2.2661 1.2000e- 0.0126 0.0126 0.0126 0.0126 0.0000 3.7114 3.7114 3.5400e- 0.0000 3.7998 004 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •i 0.0000 : 0.0000 : 0.0000 . 0.0000 '� 0.0000 'I I 1 0.0000 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low 1 0 / 0 •i Rise I h Z Single Family 1 0 / 0 •i Housing I I 0.0000 0.0000 0.0000 0.0000 .1 .1 T 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 31 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Apartments Low i 0 / 0 •i Rise 1 i r - Single Family i 0 / 0 •i Housing 1 i 0.0000 0.0000 0.0000 0.0000 J J 0.0000 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste Category/Year Total CO2 CH4 N20 CO2e MT/yr Mitigated •: 0.0000 i 0.0000 i 0.0000 1 0.0000 el• F FI. r Unmitigated - 0.0000 : 0.0000 . 0.0000 : 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Unmitigated Page 32 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low i 0 •i Rise 1 i I- - Single Family 1 0 • Housing 1 i 0.0000 0.0000 0.0000 0.0000 J J 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 .1 0.0000 0.0000 0.0000 ilTotal 0.0000 0.0000 0.0000 0.0000 Mitigated 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise Single Family Housing i 0 •i i . i r I 0 • 1 : i 0.0000 0.0000 0.0000 .1 0.0000 0.0000 0.0000 0.0000 r 0.0000 Total 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 33 Date: 1/6/2021 3:02 PM Travertine Specific Plan - Phase 2 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.17: CALEEMOD PHASE 3 PHYSICAL CONSTRUCTION EMISSIONS MODEL OUTPUTS 12188-05 GHG Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 Page 1 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan - Phase 3 (Construction - Unmitigated) Riverside -Salton Sea County, Annual 1.0 Project Characteristics 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Hotel Apartments Low Rise Single Family Housing • • • • • • 100.00 205.00 85.00 a 4 a 21. • • Room Dwelling Unit Dwelling Unit 38.30 25.90 4. 29.40 261,712.00 205,000.00 153,000.00 0 556 230 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 602.41 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2032 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2032 Land Use - Total Project Area (Phase 3) is approximately 93.5 acres. Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Phase 3 Physical Construction anticipated to start Quarter 1 of 2031 and end Quarter 4 2032 Off-road Equipment - Hours are based on an 8 -hour workday Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Off-road Equipment - Off-road Equipment - Crawler Tractors used in lieu of Tractors/Loaders/Backhoes. Grading - Assuming 5 acres graded per day. Architectural Coating - Rule 1113 Vehicle Trips - Construction Run Only. Vehicle Emission Factors - Vehicle Emission Factors - Vehicle Emission Factors - Woodstoves - Construction Run Only. Energy Use - Construction Run Only. Water And Wastewater - Construction Run Only. Solid Waste - Construction Run Only. Construction Off-road Equipment Mitigation - Rule 403 Table Name tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating tblArchitecturalCoating Column Name • EF — Nonresidential —Exterior 1- • EF— Nonresidential —Interior 1- • EF_Parking 1- • EF — Residential —Exterior • i EF Residential Interior • Default Value New Value 250.00 250.00 250.00 250.00 tblArchitecturalCoating 250.00 50.00 50.00 50.00 50.00 50.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblAreaCoating • Area Residential_ Exterior • 241650 1132441 tblAreaCoating • Area_Residential_Interior i 724950 3397322 r tblConstructionPhase • NumDays T 60.00 35.00 r tblConstructionPhase • NumDays T 155.00 35.00 r tblConstructionPhase • NumDays T 1,550.00 450.00 r tblConstructionPhase • NumDays T 110.00 200.00 r tblConstructionPhase • NumDays T 110.00 40.00 r 4 tblEnergyUse • LightingElect i 810.36 0.00 r tblEnergyUse • LightingElect i 5.44 0.00 • r tblEnergyUse • LightingElect T 1,608.84 0.00 r 4 tblEnergyUse • NT24E i 3,172.76 0.00 r 4 tblEnergyUse • NT24E i 6.23 0.00 r 4 tblEnergyUse • NT24E i 6,155.97 0.00 • r 4 tblEnergyUse • NT24NG i 6,030.00 0.00 r 4 tblEnergyUse • NT24NG i 4.86 0.00 r 4 tblEnergyUse • NT24NG T 6,030.00 0.00 r 4 tblEnergyUse • T24E i 877.14 0.00 r 4 tblEnergyUse • T24E i 6.47 0.00 r 4 tblEnergyUse • T24E i 951.67 0.00 • r 4 tblEnergyUse • T24NG i 9,544.50 0.00 r 4 tblEnergyUse • T24NG i 55.15 0.00 r 4 tblEnergyUse • T24NG T 24,566.15 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceDayYear T 82.00 0.00 r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 r 4 tblFireplaces • FireplaceHourDay i 3.00 0.00 • tblFireplaces • FireplaceWoodMass • 457.60 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblFireplaces • FireplaceWoodMass • 457.60 0.00 tblFireplaces • NumberGas i 164.00 0.00 r tblFireplaces • NumberGas T 68.00 0.00 r tblFireplaces • NumberNoFireplace T 20.50 0.00 r tblFireplaces • NumberNoFireplace T 8.50 0.00 r tblFireplaces • NumberWood T 20.50 0.00 r tblFireplaces • NumberWood T 8.50 0.00 r 4 tblGrading • AcresOfGrading i 122.50 175.00 r tblGrading • AcresOfGrading i 70.00 175.00 • r tblLandUse • LandUseSquareFeet T 145,200.00 261,712.00 r 4 tblLandUse • LotAcreage i 3.33 38.30 r 4 tblLandUse • LotAcreage i 12.81 25.90 r 4 tblLandUse • LotAcreage i 27.60 29.40 r 4 tblLandUse • Population T 586.00 556.00 r 4 tblLandUse • Population T 243.00 230.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 • r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 4.00 0.00 r 4 tblOffRoadEquipment • UsageHours i 6.00 8.00 • r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblOffRoadEquipment • UsageHours i 7.00 8.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 602.41 r 4 tblSolidWaste • SolidWasteGenerationRate T 94.30 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 54.75 0.00 r 4 tblSolidWaste • SolidWasteGenerationRate T 94.30 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 0.00 • tblVehicleTrips • CC_TTP • 61.60 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblVehicleTrips • CNW_TL • 5.40 0.00 tblVehicleTrips • CNW_TTP i 19.00 0.00 r tblVehicleTrips • CW TL T 12.50 0.00 r tblVehicleTrips • CW_TTP T 19.40 0.00 r tblVehicleTrips • DV_TP T 11.00 0.00 r tblVehicleTrips • DV TP T 38.00 0.00 • r tblVehicleTrips • DV_TP T 11.00 0.00 r 4 tblVehicleTrips • HO_TL T 4.50 0.00 r tblVehicleTrips • HO_TL T 4.50 0.00 • r tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HO_TTP T 40.60 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TL T 3.50 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HS_TTP T 19.20 0.00 r 4 tblVehicleTrips • HW TL T 11.00 0.00 • r 4 tblVehicleTrips • HW T 11.00 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 r 4 tblVehicleTrips • HW_TTP T 40.20 0.00 • r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PB T 4.00 0.00 r 4 tblVehicleTrips • PB_TP T 3.00 0.00 r 4 tblVehicleTrips • PR_TP T 86.00 0.00 • r 4 tblVehicleTrips • PR_TP T 58.00 0.00 r 4 tblVehicleTrips • PR T 86.00 0.00 r 4 tblVehicleTrips • ST TR T 7.16 0.00 • tblVehicleTrips • ST • 8.19 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWater tblWater tblWater tblWater tblWater tblWater tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • • • ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR IndoorWaterUseRate IndoorWaterUseRate IndoorWaterUseRate OutdoorWaterUseRate OutdoorWaterUseRate OutdoorWaterUseRate NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic WoodstoveDayYear WoodstoveDayYear WoodstoveWoodMass WoodstoveWoodMass 9.91 6.07 5.95 8.62 6.59 8.17 9.52 13,356,575.25 2,536,677.00 5,538,092.18 8,420,449.62 281,853.00 3,491,405.94 10.25 4.25 10.25 4.25 82.00 82.00 999.60 999.60 • • 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 36 2.1 Overall Construction Unmitigated Construction Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2031 •i 0.3946 2.0272 2.6036 0.0104 0.8739 0.0504 0.9242 0.3234 0.0503 0.3737 • 0.0000 i 923.4442 923.4442 0.0358 0.0000 924.3393 e J .1 .1 J .1 J .1 .1 le .1 .1 J 2032 .1 2.1394 2.2445 3.2457 0.0117 0.4044 0.0493 0.4537 0.1085 0.0492 0.1577 • 0.0000 i 1,033.490 1,033.490 0.0383 0.0000 1,034.447 PM2.5 0 0 8 2 2 0 • 2.1394 Maximum 2.1394 2.2445 3.2457 0.0117 0.8739 0.0504 0.9242 0.3234 0.0503 0.3737 0.0000 1,033.490 1,033.490 0.0383 0.0000 1,034.447 0.00 1 0.00 Reduction 2 2 0 0 0 8 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2031 •1 0.3946 2.0272 2.6036 0.0104 0.5035 0.0504 1 0.5539 0.1698 1 0.0503 0.2201 • 0.0000 i 923.4434 923.4434 0.0358 0.0000 924.3386 PM10 J J J J J J J J . J J J T 2032 •i 2.1394 2.2445 3.2456 0.0117 0.4044 0.0493 0.4537 0.1085 0.0492 0.1577 • 0.0000 i 1,033.489 1,033.489 0.0383 0.0000 1,034.447 PM2.5 Total 2 2 0 Maximum 2.1394 2.2445 3.2456 0.0117 0.5035 0.0504 0.5539 0.1698 0.0503 0.2201 0.0000 1,033.489 1,033.489 0.0383 0.0000 1,034.447 0.00 1 0.00 0.00 0.00 Reduction 2 2 0 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 28.97 0.00 26.88 35.56 0.00 28.90 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) 1 1-1-2031 3-31-2031 0.6333 0.6333 2 4-1-2031 6-30-2031 0.5945 0.5945 3 7-1-2031 9-30-2031 0.5983 0.5983 4 10-1-2031 12-31-2031 0.5959 0.5959 5 1-1-2032 3-31-2032 0.6401 0.6401 6 4-1-2032 6-30-2032 1.1980 1.1980 7 7-1-2032 9-30-2032 1.2111 1.2111 0.0000 3.5191 Highest 1.2111 1.2111 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water ,l •i f' •i fl f • 4 5.4123 0.0248 2.1485 1.1000e- 1 1 0.0119 0.0119 0.0119 0.0119 9I 9 004 1 1 J J J .1 J J J J v 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 9 1 1 9 J J J 1 J J .1 J V 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 J J J J J J J J V 9 1 0.0000 0.0000 0.0000 0.0000 J J J .1 J J J J 4 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 i 3.5191 3.5191 3.3600e- 1 0.0000 003 J J .1 i 0.0000 0.0000 0.0000 1 0.0000 i J J J i 0.0000 0.0000 0.0000 1 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 3.6030 T 0.0000 T 0.0000 T 0.0000 T 0.0000 Total 5.4123 0.0248 2.1485 1.1000e- 004 0.0000 0.0119 0.0119 0.0000 0.0119 0.0119 0.0000 3.5191 3.5191 3.3600e- 003 0.0000 3.6030 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 36 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,l •i ,i •1 • • 5.4123 0.0248 2.1485 1.1000e- 1 1 0.0119 0.0119 0.0119 0.0119 • 0.0000 9 004 1 1 9 . le 0.0000 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 9 1 1 . 9 11 . J J J J J J J J le 0.0000 0.0000 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 0.0000 0.0000 . 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 3.5191 3.5191 3.3600e- 1 0.0000 3.6030 003 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i i J J J i 0.0000 0.0000 0.0000 1 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total Total 5.4123 0.0248 2.1485 1.1000e- 004 0.0000 0.0119 0.0119 0.0000 0.0119 0.0119 0.0000 3.5191 3.5191 3.3600e- 003 0.0000 3.6030 3.0 Construction Detail Construction Phase ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction 3.0 Construction Detail Construction Phase CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 2 3 4 5 :Site Preparation :Grading -Building Construction :Architectural Coating :Paving :Site Preparation :Grading 11/1/2031 :2/18/2031 2/19/2031 :4/8/2031 5: 35: 1 4 5: 35: , 4 - :Building Construction 4/9/2031 :12/28/2032 : 5: 450: 4 -,- :Architectural :Architectural Coating 13/24/2032 :12/28/2032 : 5: 200 T 4 4 - Paving 11/3/2032 :12/28/2032 5 40 Acres of Grading (Site Preparation Phase): 175 Acres of Grading (Grading Phase): 175 Acres of Paving: 0 Residential Indoor: 724,950; Residential Outdoor: 241,650; Non -Residential Indoor: 392,568; Non -Residential Outdoor: 130,856; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Site Preparation Site Preparation Site Preparation Grading Grading Grading Grading Grading Grading Building Construction Building Construction Building Construction Building Construction Building Construction Building Construction Architectural Coating Paving Paving Offroad Equipment Type :Crawler Tractors :Rubber Tired Dozers +Tractors/Loaders/Backhoes :Crawler Tractors :Excavators :Graders :Rubber Tired Dozers :Scrapers +Tractors/Loaders/Backhoes :Cranes :Crawler Tractors :Forklifts :Generator Sets +Tractors/Loaders/Backhoes :Welders :Air Compressors :Pavers :Paving Equipment Amount 4 3 0 2 2 1 1 2 0 1 3 3 1 0 1 1 2 2 1- Paving :Rollers 2' Usage Hours I Horse Power I Load Factor 8.001 212' 8.001 247' 8.001 97' 8.001 212' 8.001 158' 8.001 187' 8.001 247' 8.001 367' 8.001 97' I 8.001 231: 8.001 212' 8.001 89' 8.001 84' 8.001 97' 8.001 46' 8.001 78' 8.001 130' 8.001 132' i 8.00 80' 0.43 0.40 0.37 0.43 0.38 0.41 0.40 0.48 0.37 0.29 0.43 0.20 0.74 0.37 0.45 0.48 0.42 0.36 0.38 Trips and VMT CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Phase Name Offroad Equipment Count Site Preparation Grading Building Construction Architectural Coating Paving • • • Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Vendor Class Vehicle Class 7: 18.00 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix J HDT_Mix -i ' - 8: 20.00. 0.001 0.00: 11.00: 5.40: 20.00: LD_Mix 1 HDT_Mix 9: 288.00• 74.001 0.00: 11.00: 5.40: 20.00: LD_Mix i HDT_Mix 1: 58.00• 0.00 0.00: 11.00 : 5.40' 20.00: LD Mix i HDT Mix 6: 15.00' 0.00' 0.00' 11.00: 5.40: 20.00:LD Mix Hauling Vehicle Class HHDT HHDT HHDT HHDT 'HDT_Mix :HHDT 3.1 Mitigation Measures Construction Water Exposed Area 3.2 Site Preparation - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •i 0.4090 0.0000 0.4090 0.1838 0.0000 0.1838 •. 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Ir J J J J J J J J ; J J J T Off -Road •i 0.0601 0.2915 0.2568 1.2200e- 0.0108 0.0108 0.0108 0.0108 • 0.0000 i 105.1871 105.1871 4.8400e- 0.0000 105.3081 .11 003 : • 003 Total 0.0601 0.2915 0.2568 1.2200e- 0.4090 0.0108 0.4198 0.1838 0.0108 0.1946 0.0000 105.1871 105.1871 4.8400e- 0.0000 105.3081 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 J J J J J .1 .1 J 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 105.1870 105.1870 4.8400e- 0.0000 105.3080 1 Worker • 5.9000e- 2.8000e- 3.9200e- 2.0000e- 2.5900e- 1.0000e- 2.6000e- 6.9000e- 1.0000e- 7.0000e- • 0.0000 i 1.5265 1.5265 2.0000e- 0.0000 1.5270 Total 004 004 003 005 003 005 003 004 005 004 • 005 Total 1.2200e- 5.9000e- 2.8000e- 3.9200e- 2.0000e- 2.5900e- 1.0000e- 2.6000e- 6.9000e- 1.0000e- 7.0000e- 0.0000 1.5265 1.5265 2.0000e- 0.0000 1.5270 003 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 1 0.1595 0.0000 I 0.1595 0.0717 0.0000 0.0717 • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.0601 0.2915 0.2568 1.2200e- 0.0108 0.0108 0.0108 0.0108 • 0.0000 105.1870 105.1870 4.8400e- 0.0000 105.3080 003 ; • • 003 Total 0.0601 0.2915 0.2568 1.2200e- 0.1595 0.0108 0.1703 0.0717 0.0108 0.0825 0.0000 105.1870 105.1870 4.8400e- 0.0000 105.3080 ii 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.2 Site Preparation - 2031 Mitigated Construction Off -Site 3.3 Grading - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 Off -Road 9 0.0661 0.2685 0.3888 1.4300e- 0.0101 0.0101 0.0101 0.0101 • 0.0000 1 1 • 1 Vendor 9 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 5.9000e- 2.8000e- 3.9200e- 2.0000e- 2.5900e- 1.0000e- 2.6000e- 6.9000e- 1.0000e- 7.0000e- • 0.0000 i 1.5265 1.5265 2.0000e- 0.0000 1.5270 Total 0.0661 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1982 5.9000e- 2.8000e- 3.9200e- 2.0000e- 2.5900e- 1.0000e- 2.6000e- 6.9000e- 1.0000e- 7.0000e- 0.0000 1.5265 1.5265 2.0000e- 0.0000 1.5270 004 004 003 005 003 005 003 004 005 004 005 3.3 Grading - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 0.1982 0.0000 0.1982 0.0680 0.0000 0.0680 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.0661 0.2685 0.3888 1.4300e- 0.0101 0.0101 0.0101 0.0101 • 0.0000 132.1029 132.1029 5.3200e- 0.0000 132.2359 003 ; 003 • Total 0.0661 0.2685 0.3888 1.4300e- 0.1982 0.0101 0.2083 0.0680 0.0101 0.0781 0.0000 132.1029 132.1029 5.3200e- 0.0000 132.2359 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 .J J J J .1 .1 J 1 1 • 1 Off -Road .1 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 003 ; • • 1 Worker • 6.6000e- 3.2000e- 4.3500e- 2.0000e- 2.8800e- 1.0000e- 2.8900e- 7.6000e- 1.0000e- 7.8000e- • 0.0000 i 1.6961 1.6961 2.0000e- 0.0000 1.6967 0.0661 0.2685 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.0101 6.6000e- 3.2000e- 4.3500e- 2.0000e- 2.8800e- 1.0000e- 2.8900e- 7.6000e- 1.0000e- 7.8000e- 0.0000 1.6961 1.6961 2.0000e- 0.0000 1.6967 004 004 003 005 003 005 003 004 005 004 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Fugitive Dust •I 0.0773 0.0000 0.0773 0.0265 0.0000 0.0265 • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 1 .J J J J .1 .1 J .1 .1 J 1. Off -Road .1 0.0661 0.2685 0.3888 1.4300e- 0.0101 0.0101 0.0101 0.0101 • 0.0000 132.1028 132.1028 5.3200e- 0.0000 132.2358 003 ; • • 003 Total 0.0661 0.2685 0.3888 1.4300e- 0.0773 0.0101 0.0874 0.0265 0.0101 0.0366 0.0000 132.1028 132.1028 5.3200e- 0.0000 132.2358 ii 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.3 Grading - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling Vendor Vendor Worker •1 • 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 1 • 1 1 • .1 J .1 .1 .1 .1 J .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 V 6.6000e- 3.2000e- 4.3500e- 2.0000e- 2.8800e- 1.0000e- 2.8900e- 7.6000e- 1.0000e- 7.8000e- • 0.0000 004 004 003 005 003 005 003 004 005 004 • i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 J .1 J -I- i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 i 1.6961 1.6961 2.0000e- 0.0000 1.6967 005 Total 1.5272 6.6000e- 004 3.2000e- 004 4.3500e- 003 2.0000e- 005 2.8800e- 003 1.0000e- 005 2.8900e- 003 7.6000e- 004 1.0000e- 005 7.8000e- 004 0.0000 1.6961 1.6961 2.0000e- 005 0.0000 1.6967 3.4 Building Construction - 2031 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2057 1.0191 1.5272 4.8500e- 0.0282 0.0282 0.0282 0.0282 • 0.0000 i 413.9737 413.9737 0.0165 0.0000 414.3858 003 • Total 0.2057 1.0191 1.5272 4.8500e. 0.0282 0.0282 0.0282 0.0282 0.0000 413.9737 413.9737 0.0165 0.0000 414.3858 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2031 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 Total 1 1 • 1 1.0191 1 1 • 1 4.8500e. .1 .1 .1 I - Vendor • 9.7400e- 0.4227 0.0807 1.4100e- 0.0350 3.5000e- 0.0353 0.0101 3.3000e- 0.0104 • 0.0000 i 135.6725 135.6725 : 7.3700e- 0.0000 135.8568 003 003 004 004 1 003 Worker •i 0.0516 0.0248 0.3419 1.4700e- 0.2263 8.9000e- 0.2272 0.0601 8.2000e- 0.0609 • 0.0000 i 133.2853 133.2853 1.7500e- 0.0000 133.3291 413.9732 413.9732 003 004 004 • 003 Total 0.0614 0.4475 0.4226 2.8800e- 0.2612 1.2400e- 0.2625 0.0702 1.1500e- 0.0713 0.0000 268.9578 268.9578 9.1200e- 0.0000 269.1859 003 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2057 1.0191 1.5272 4.8500e- 0.0282 0.0282 0.0282 0.0282 • 0.0000 i 413.9732 413.9732 0.0165 0.0000 414.3853 003 • Total 0.2057 1.0191 1.5272 4.8500e. 0.0282 0.0282 0.0282 0.0282 0.0000 413.9732 413.9732 0.0165 0.0000 414.3853 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2031 Mitigated Construction Off -Site 3.4 Building Construction - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor • 9.7400e- 0.4227 0.0807 1.4100e- 0.0350 3.5000e- 0.0353 0.0101 3.3000e- 0.0104 • 0.0000 i 135.6725 135.6725 : 7.3700e- 0.0000 135.8568 003 • 003 003 004 004 1 003 Worker •i 0.0516 0.0248 0.3419 1.4700e- 0.2263 8.9000e- 0.2272 0.0601 8.2000e- 0.0609 • 0.0000 i 133.2853 133.2853 1.7500e- 0.0000 133.3291 0.2789 003 004 004 • 003 Total 0.0614 0.4475 0.4226 2.8800e- 0.2612 1.2400e- 0.2625 0.0702 1.1500e- 0.0713 0.0000 268.9578 268.9578 9.1200e- 0.0000 269.1859 003 003 003 003 003 3.4 Building Construction - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2789 1 1.3820 2.0710 6.5800e- 0.0382 0.0382 0.0382 0.0382 • 0.0000 i 561.3570 561.3570 0.0224 0.0000 561.9158 003 • Total 0.2789 1.3820 2.0710 6.5800e. 0.0382 0.0382 0.0382 0.0382 0.0000 561.3570 561.3570 0.0224 0.0000 561.9158 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 1 • 1 Vendor •i 0.0131 0.5698 0.1089 1.9200e- 0.0474 4.7000e- 0.0479 0.0137 4.5000e- 0.0141 • 0.0000 i 183.6731 183.6731 : 9.7800e- 0.0000 183.9177 2.0710 003 004 004 I 003 Worker 9 0.0650 0.0311 0.4375 1.9600e- 0.3068 1.1300e- 0.3080 0.0815 1.0400e- 0.0825 • 0.0000 i 177.2303 177.2303 2.1800e- 0.0000 177.2849 0.0382 003 003 003 • 003 Total 561.3563 0.0781 0.6009 0.5464 3.8800e- 0.3543 1.6000e- 0.3559 0.0952 1.4900e- 0.0967 0.0000 360.9034 360.9034 0.0120 0.0000 361.2026 003 003 003 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.2789 1.3820 2.0710 6.5800e- 0.0382 0.0382 0.0382 0.0382 • 0.0000 i 561.3563 561.3563 0.0224 0.0000 561.9151 003 • Total 0.2789 1.3820 2.0710 6.5800e. 0.0382 0.0382 0.0382 0.0382 0.0000 561.3563 561.3563 0.0224 0.0000 561.9151 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.4 Building Construction - 2032 Mitigated Construction Off -Site 3.5 Architectural Coating - 2032 Unmitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 J .1 J J J .1 .1 J 1 1 • 1 Vendor •i 0.0131 0.5698 0.1089 1.9200e- 0.0474 4.7000e- 0.0479 0.0137 4.5000e- 0.0141 • 0.0000 i 183.6731 183.6731 : 9.7800e- 0.0000 183.9177 34.0434 34.0434 1.3800e- 0.0000 34.0778 003 004 004 I 003 Worker •1 0.0650 0.0311 0.4375 1.9600e- 0.3068 1.1300e- 0.3080 0.0815 1.0400e- 0.0825 • 0.0000 i 177.2303 177.2303 2.1800e- 0.0000 177.2849 Total 003 003 003 • 003 Total 4.0000e- 0.0781 0.6009 0.5464 3.8800e- 0.3543 1.6000e- 0.3559 0.0952 1.4900e- 0.0967 0.0000 360.9034 360.9034 0.0120 0.0000 361.2026 004 003 003 003 003 003 003 3.5 Architectural Coating - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating •i 1.7266 0.0000 0.0000 1 0.0000 0.0000 •• 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 J .1 J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.0174 0.1142 0.2397 4.0000e- 2.7100e- 2.7100e- 2.7100e- 2.7100e- • 0.0000 34.0434 34.0434 1.3800e- 0.0000 34.0778 004 003 003 003 003 ; • 003 Total 1.7440 0.1142 0.2397 4.0000e- 2.7100e- 2.7100e- 2.7100e- 2.7100e- 0.0000 34.0434 34.0434 1.3800e- 0.0000 34.0778 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category MT/yr tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 J 0.0000 0.0000 0.0000 Vendor -1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 Off -Road 9 1 Worker •1 0.0101 4.8300e- 0.0680 3.0000e- 0.0477 1.8000e- 0.0479 0.0127 1.6000e- 0.0128 • 0.0000 i 27.5616 27.5616 3.4000e- 0.0000 27.5701 004 003 003 003 003 ; • 003 003 004 004 004 • 004 Total 0.1142 0.0101 4.8300e- 0.0680 3.0000e- 0.0477 1.8000e- 0.0479 0.0127 1.6000e- 0.0128 0.0000 27.5616 27.5616 3.4000e- 0.0000 27.5701 004 003 003 004 004 003 004 003 004 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Archit. Coating •i 1.7266 , 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 0.0000 : 0.0000 1 0.0000 0.0000 J J J J J .1 .1 J .1 .1 J 1. Off -Road 9 0.0174 0.1142 0.2397 4.0000e- 2.7100e- 2.7100e- 2.7100e- 2.7100e- • 0.0000 34.0433 34.0433 1.3800e- 0.0000 34.0778 004 003 003 003 003 ; • 003 Total 1.7440 0.1142 0.2397 4.0000e- 2.7100e- 2.7100e- 2.7100e- 2.7100e- 0.0000 34.0433 34.0433 1.3800e- 0.0000 34.0778 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.5 Architectural Coating - 2032 Mitigated Construction Off -Site 3.6 Paving - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0277 0.1424 0.3170 5.6000e- 6.6100e- 6.6100e- 6.6100e- 6.6100e- • 0.0000 i 48.1990 48.1990 : 2.2600e- 1 0.0000 48.2555 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker •1 0.0101 4.8300e- 0.0680 3.0000e- 0.0477 1.8000e- 0.0479 0.0127 1.6000e- 0.0128 • 0.0000 i 27.5616 27.5616 3.4000e- 0.0000 27.5701 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • 003 004 004 004 • 004 Total 0.0101 4.8300e- 0.0680 3.0000e- 0.0477 1.8000e- 0.0479 0.0127 1.6000e- 0.0128 0.0000 27.5616 27.5616 3.4000e- 0.0000 27.5701 ii 003 004 004 003 004 003 004 3.6 Paving - 2032 Unmitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road •i 0.0277 0.1424 0.3170 5.6000e- 6.6100e- 6.6100e- 6.6100e- 6.6100e- • 0.0000 i 48.1990 48.1990 : 2.2600e- 1 0.0000 48.2555 004 003 003 003 003 • 1 003 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0277 0.1424 0.3170 5.6000e- 6.6100e- 6.6100e- 6.6100e- 6.6100e- 0.0000 48.1990 48.1990 2.2600e- 0.0000 48.2555 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.6 Paving - 2032 Unmitigated Construction Off -Site Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 0.0000 : 0.0000 i 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 0.0277 0.1424 0.3170 5.6000e- 6.6100e- 6.6100e- 6.6100e- 6.6100e- • 0.0000 i 48.1990 48.1990 : 2.2600e- 0.0000 48.2555 1 1 • 1 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 • .1 J .1 .1 .1 .1 J .1 41 J Worker • 5.2000e- 2.5000e- 3.5200e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.6000e- • 0.0000 i 1.4256 1.4256 2.0000e- 0.0000 1.4260 i 0.0000 0.0000 0.0000 0.0000 0.0000 004 004 003 005 003 005 003 004 005 004 • 005 Total 0.1424 5.2000e- 2.5000e- 3.5200e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.6000e- 0.0000 1.4256 1.4256 2.0000e- 0.0000 1.4260 004 004 003 005 003 005 003 004 005 004 003 005 Mitigated Construction On -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 9 0.0277 0.1424 0.3170 5.6000e- 6.6100e- 6.6100e- 6.6100e- 6.6100e- • 0.0000 i 48.1990 48.1990 : 2.2600e- 0.0000 48.2555 004 003 003 003 003 • 1 003 • Paving 9 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0277 0.1424 0.3170 5.6000e- 6.6100e- 6.6100e- 6.6100e- 6.6100e- 0.0000 48.1990 48.1990 2.2600e- 0.0000 48.2555 ii 004 003 003 003 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 3.6 Paving - 2032 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 J 0.0000 0.0000 ] 0.0000 0.0000 • 0.0000 i 0.0000 ' 0.0000 J 0.0000 0.0000 0.0000 Vendor •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 Worker • 5.2000e- 2.5000e- 3.5200e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.6000e- • 0.0000 i 1.4256 1.4256 2.0000e- 0.0000 1.4260 004 004 003 005 003 005 003 004 005 004 • 005 Total 5.2000e- 2.5000e- 3.5200e- 2.0000e- 2.4700e- 1.0000e- 2.4800e- 6.6000e- 1.0000e- 6.6000e- 0.0000 1.4256 1.4256 2.0000e- 0.0000 1.4260 004 004 003 005 003 005 003 004 005 004 005 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 1 0.0000 i 0.0000 i 0.0000 0.0000 • 0.0000 i 0.0000 1 0.0000 1 0.0000 1 0.0000 i 0.0000 9 1 1 1 1 1 1 1 1• 1 1 1 1 9 I 1 1 1 1 1 1 1 1 1 1 1 1 • 1 3 F 4 1 4. F 4. + 4. r 4. 4. 4 r Unmitigated • 0.0000 : 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 : 0.0000 • 0.0000 • 0.0000 : 0.0000 • 0.0000 4.2 Trip Summary Information 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Hotel Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 0.00 0.00 T 0.00 nr Hotel ; 0.00 0.00 0.00 T Single Family Housing ; 0.00 0.00 0.00 • • Total I 0.00 I 0.00 0.00 I 1 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Hotel Single Family Housing ▪ 0.00 0.00 • - T ▪ 0.00 0.00 ✓ -r 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 • 0 0.00 0.00 0.00 • 0 t • • 0.00 0.00 0.00 • 0 0 0 0 0 0 0 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual LH D2 MHD HHD OBUS UBUS I MCY Apartments Low Rise • 0.564007+ 0.0340131 0.1916541 0.1012941 0.0097341 0.0040841 0.0169091 0.0701061 0.0014241 0.0010671 0.0043361 0.000797. 0.000576 • i I I I I I I I I I I i i i i i i i i i i + Hotel • 0.564007; 0.0340131 0.1916541 0.1012941 0.0097341 0.0040841 0.0169091 0.0701061 0.0014241 0.0010671 0.0043361 0.000797. 0.000576 } I I I 1 1 1 1 1 1 1 1• 1. 1. 1. 1. 1. 1. 1. 1. 1. 1• Land Use ILDA I LDT1 I LDT2 MDV LH D1 SBUS I MH Single Family Housing • 0.564007. 0.034013: 0.191654: 0.101294: 0.009734: 0.004084: 0.016909: 0.070106: 0.001424: 0.001067: 0.004336: 0.000797: 0.000576 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 : 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 i 0.0000 Mitigated .� 1 1 1 1 1 1 1 1 . 1 1 1 1 1 .1 1 1 1 1 1 1 1 1 • 1 1 1 1 1 . J J 1 J J J J J 7 J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 1 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 : 0.0000 Unmitigated : 1 1 1 1 1 1 1 1 . 1 1 1 1 1 .1 1 1 1 1 1 1 1 1 . 1 1 1 1 1 . J J J J J J J J 7 J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 NaturalGas •1 0.0000 0.0000 0.0000 1 0.0000 1 1 0.0000 1 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 11 0.0000 Mitigated 9 1 1 1 1 1 1 1 1 . 1 1 1 1 1 1 1 1 1 1 1 1 . 1 1 1 1 a} } } } } 4.} } r • } } 4 r NaturalGas . 0.0000 • 0.0000 • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • • 0.0000 • 0.0000 • 0.0000 0.0000 • 0.0000 • 0.0000 • 0.0000 • 0.0000 Unmitigated CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use ' kBTU/yr tons/yr MT/yr Apartments Low Rise Hotel Single Family Housing i 0 •i f -. I0 • • 1 • I' -I i 0 1 i 0.0000 0.0000 1 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 0.0000 1 J J J J J J J J 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 I 0.0000 • .1 .1 .1 .1 .1 .1 .1 .1 . 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 I 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 f 7 J J J .1 J J J J 0.0000 0.0000 I0 • 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low 0 .1 0.0000 0.0000 0.0000 1 0.0000 i 0.0000 i 0.0000 1 1 0.0000 0.0000 . 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 Rise 11 i f 7 J J J .1 J J J J J J J Hotel I0 • 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 f - J J .1 .1 J J J J .• J J .1 Single Family I0 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Housing 1 • Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Mitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Hotel Single Family Housing 1 0 •i i r -r i 0 • i i r i i 0 • i i 0.0000 0.0000 1 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 Total Total 0.0000 0.0000 0.0000 0.0000 Mitigated 6.0 Area Detail Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Hotel Single Family Housing i 0 •i i . i • r -. i 0 • i i • h 7 i 0 • i : 0.0000 0.0000 0.0000 J J 0.0000 0.0000 0.0000 .1 .1 0.0000 0.0000 0.0000 0.0000 T 0.0000 T 0.0000 Total 0.0000 0.0000 0.0000 0.0000 6.0 Area Detail CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 6.1 Mitigation Measures Area ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 5.4123 1 0.0248 i 2.1485 1 1.1000e- 1 1 0.0119 1 0.0119 i 1 0.0119 0.0119 : 0.0000 i 3.5191 1 3.5191 1 3.3600e- i 0.0000 1 3.6030 9I I I 004 I 1 1 • 1 1 I 003 I I 9 I 1 I I 1 I 1 1 1 I 1 1 ei• F F F F 4. 4. F F r • . F F F r Unmitigated •• 5.4123 • 0.0248 • 2.1485 • 1.1000e- • • 0.0119 • 0.0119 • • 0.0119 • 0.0119 • 0.0000 • 3.5191 • 3.5191 • 3.3600e- • 0.0000 • 3.6030 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 36 6.2 Area by SubCategory Unmitigated Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 2.9277 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: . Consumer •1 2.4203 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth •1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.0643 0.0248 2.1485 1.1000e- 0.0119 0.0119 0.0119 0.0119 • 0.0000 i 3.5191 3.5191 3.3600e- 0.0000 3.6030 004 : • 003 Total 5.4123 0.0248 2.1485 1.1000e- 0.0119 0.0119 0.0119 0.0119 0.0000 3.5191 3.5191 3.3600e- 0.0000 3.6030 004 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 36 6.2 Area by SubCategory Mitigated Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural 6i 2.9277 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating ::. Consumer •i 2.4203 0.0000 0.0000 1 0.0000 0.0000 6 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth 61 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Landscaping •i 0.0643 0.0248 2.1485 1.1000e- 0.0119 0.0119 0.0119 0.0119 • 0.0000 i 3.5191 3.5191 3.3600e- 0.0000 3.6030 004 : • 003 Total 5.4123 0.0248 2.1485 1.1000e- 0.0119 0.0119 0.0119 0.0119 0.0000 3.5191 3.5191 3.3600e- 0.0000 3.6030 004 003 7.0 Water Detail 7.1 Mitigation Measures Water CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •i 0.0000 : 0.0000 : 0.0000 . 0.0000 eI- F 1 Total Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low Rise Hotel I- Single Family Housing 1 0 / 0 •i i 1• r i I0 / 0 .i I • Z I 0 / 0 •u i 0.0000 I 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 J J T 0.0000 i 0.0000 1 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 33 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low i 0 / 0 •i 0.0000 1 0.0000 : 0.0000 0.0000 Rise i I i •1 Hotel I- i 0 / 0 • 0.0000 0.0000 0.0000 0.0000 i i • Single Family 1 0 / 0 • 0.0000 0.0000 0.0000 0.0000 Housing 1 i Total 0.0000 0.0000 0.0000 0.0000 8.0 Waste Detail 8.1 Mitigation Measures Waste CaIEEMod Version: CaIEEMod.2016.3.2 Category/Year Page 34 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 8.2 Waste by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Land Use MT/yr 1 MT/yr Mitigated •i 0.0000 : 0.0000 : 0.0000 . 0.0000 eI- F 1 Unmitigated • 0.0000 : 0.0000 • 0.0000 : 0.0000 8.2 Waste by Land Use Unmitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise Hotel Hotel I- Single Family Housing 1 0 •i i 1• r i I0 .i I • Z 1 0 •u i 0.0000 1 0.0000 0.0000 0.0000 .1 .1 -I- 0.0000 0.0000 0.0000 0.0000 J J T 0.0000 i 0.0000 1 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Mitigated Page 35 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low i 0 •i 0.0000 1 0.0000 : 0.0000 0.0000 Rise i I i 1 Hotel i 0 • 0.0000 0.0000 0.0000 0.0000 i i Single Family 1 0 • 0.0000 0.0000 0.0000 0.0000 Housing 1 i Total 11 0.0000 0.0000 0.0000 0.0000 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Equipment Type Number CaIEEMod Version: CaIEEMod.2016.3.2 11.0 Vegetation Page 36 of 36 Date: 1/6/2021 3:12 PM Travertine Specific Plan - Phase 3 (Construction - Unmitigated) - Riverside -Salton Sea County, Annual Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.18: CALEEMOD PHASE 1 OPERATIONAL EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual Travertine Specific Plan - Phase 1 (Operations) Riverside -Salton Sea County, Annual 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course • 35.00 + Acre ; 35.00 12.00 + Hole ; 46.20 I. Apartments Low Rise • 74.00 + Dwelling Unit ; 14.80 74,000.00 + 201 r Single Family Housing • 530.00 • Dwelling Unit 228.10 954,000.00 1436 1,524,600.00 64,282.00 0 f 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 726.95 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2026 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2026 Operational Year Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 53% less energy for residential uses. Water Mitigation - Waste Mitigation - 1 Column Name tblConstructionPhase • NumDays •} 400.00 0.00 tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 1,608.84 T• 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T 4,485.92 tblEnergyUse Y T24NG • 24,566.15 T 11,546.09 tblFireplaces Y NumberGas 59.20 T• 74.00 • tblFireplaces Y NumberGas 424.00 T • 530.00 tblFireplaces Y• NumberNoFireplace 7.40 T 0.00 4 1 1 tblFireplaces • NumberNoFireplace 53.00 0.00 • Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblFireplaces • NumberWood • 7.40 0.00 tblFireplaces • NumberWood i 53.00 0.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 4.63 14.80 r tblLandUse • LotAcreage i 172.08 228.10 • r tblLandUse • Population T 212.00 201.00 r 4 tblLandUse • Population T 1,516.00 1,436.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 726.95 r 4 tblVehicleEF • HHD T 0.89 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.07 0.00 r 4 tblVehicleEF • HHD T 2.00 10.40 r 4 tblVehicleEF • HHD T 0.43 0.19 r 4 tblVehicleEF • HHD T 1.46 1.3780e-003 r 4 tblVehicleEF • HHD T 5,902.49 1,611.91 r 4 tblVehicleEF • HHD T 1,386.05 1,148.48 r 4 tblVehicleEF • HHD T 4.77 0.01 r 4 tblVehicleEF • HHD T 16.75 8.36 r 4 tblVehicleEF • HHD T 0.86 1.83 r 4 tblVehicleEF • HHD T 20.25 2.33 r 4 tblVehicleEF • HHD T 4.0010e-003 3.0970e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 tblVehicleEF • HHD • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • HHD • 5.0390e-003 0.03 • HHD i 4.3000e-005 0.00 r • HHD T 3.8280e-003 2.9630e-003 r • HHD T 0.03 0.03 r • HHD T 8.8540e-003 8.9690e-003 r • HHD T 4.8210e-003 0.02 r • HHD T 4.0000e-005 0.00 r 4 • HHD T 7.2000e-005 0.00 r • HHD T 2.1710e-003 6.0000e-006 r • HHD T 0.53 0.70 r 4 • HHD T 4.3000e-005 0.00 r 4 • HHD T 0.04 0.02 r 4 • HHD T 1.4900e-004 1.9000e-005 r 4 • HHD T 0.03 1.0000e-006 r 4 • HHD T 0.06 0.02 r 4 • HHD T 0.01 0.01 r 4 • HHD T 7.2000e-005 0.00 r 4 • HHD T 7.2000e-005 0.00 r 4 • HHD T 2.1710e-003 6.0000e-006 r 4 • HHD T 0.61 0.80 r 4 • HHD T 4.3000e-005 0.00 r 4 • HHD T 0.08 0.03 r 4 • HHD T 1.4900e-004 1.9000e-005 r 4 • HHD T 0.03 1.0000e-006 r 4 • HHD T 0.84 0.04 r 4 • HHD T 0.03 0.01 • HHD • 0.06 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 1.45 10.27 tblVehicleEF • HHD i 0.43 0.19 r tblVehicleEF • HHD T 1.39 1.3390e-003 r tblVehicleEF • HHD T 6,253.17 1,590.95 r tblVehicleEF • HHD T 1,386.05 1,148.48 r tblVehicleEF • HHD T 4.77 0.01 r tblVehicleEF • HHD T 17.28 7.95 r 4 tblVehicleEF • HHD T 0.81 1.73 r tblVehicleEF • HHD T 20.25 2.33 r tblVehicleEF • HHD T 3.3730e-003 2.7470e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 5.0390e-003 0.03 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 r 4 tblVehicleEF • HHD T 3.2270e-003 2.6280e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8540e-003 8.9690e-003 r 4 tblVehicleEF • HHD T 4.8210e-003 0.02 r 4 tblVehicleEF • HHD T 4.0000e-005 0.00 r 4 tblVehicleEF • HHD T 1.3600e-004 1.0000e-006 r 4 tblVehicleEF • HHD T 2.4530e-003 8.0000e-006 r 4 tblVehicleEF • HHD T 0.50 0.75 r 4 tblVehicleEF • HHD T 7.9000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5100e-004 2.0000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 tblVehicleEF • HHD • 0.06 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 0.01 0.01 tblVehicleEF • HHD i 7.0000e-005 0.00 r tblVehicleEF • HHD T 1.3600e-004 1.0000e-006 r tblVehicleEF • HHD T 2.4530e-003 8.0000e-006 r tblVehicleEF • HHD T 0.57 0.85 r tblVehicleEF • HHD T 7.9000e-005 0.00 r tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5100e-004 2.0000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.96 0.03 r 4 tblVehicleEF • HHD T 0.03 8.5700e-004 r 4 tblVehicleEF • HHD T 0.07 0.00 r 4 tblVehicleEF • HHD T 2.75 10.57 r 4 tblVehicleEF • HHD T 0.43 0.16 r 4 tblVehicleEF • HHD T 1.48 1.4640e-003 r 4 tblVehicleEF • HHD T 5,418.23 1,638.19 r 4 tblVehicleEF • HHD T 1,386.05 1,141.19 r 4 tblVehicleEF • HHD T 4.77 0.01 r 4 tblVehicleEF • HHD T 16.00 8.91 r 4 tblVehicleEF • HHD T 0.86 1.85 r 4 tblVehicleEF • HHD T 20.25 2.33 r 4 tblVehicleEF • HHD T 4.8670e-003 3.5590e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 5.0390e-003 0.03 r 4 tblVehicleEF • HHD T 4.3000e-005 0.00 tblVehicleEF • HHD • 4.6570e-003 3.4050e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 0.03 0.03 tblVehicleEF • HHD i 8.8540e-003 8.9470e-003 r tblVehicleEF • HHD T 4.8210e-003 0.02 r tblVehicleEF • HHD T 4.0000e-005 0.00 r tblVehicleEF • HHD T 5.1000e-005 0.00 r tblVehicleEF • HHD T 2.2330e-003 5.0000e-006 r tblVehicleEF • HHD T 0.57 0.65 r 4 tblVehicleEF • HHD T 3.5000e-005 0.00 r tblVehicleEF • HHD T 0.04 0.02 r tblVehicleEF • HHD T 1.6000e-004 2.1000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 0.01 0.01 r 4 tblVehicleEF • HHD T 7.2000e-005 0.00 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 r 4 tblVehicleEF • HHD T 2.2330e-003 5.0000e-006 r 4 tblVehicleEF • HHD T 0.66 0.73 r 4 tblVehicleEF • HHD T 3.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.02 r 4 tblVehicleEF • HHD T 1.6000e-004 2.1000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • LDA T 2.5910e-003 1.4670e-003 r 4 tblVehicleEF • LDA T 2.9440e-003 0.03 r 4 tblVehicleEF • LDA i 0.43 0.55 r 4 tblVehicleEF • LDA 0.76 1.71 r r 4 tblVehicleEF • LDA 207.76 239.05 • r tblVehicleEF • LDA • 48.28 48.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 0.03 0.02 tblVehicleEF • LDA i 0.04 0.14 r tblVehicleEF • LDA T 1.4700e-003 1.1830e-003 r tblVehicleEF • LDA T 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.04 0.07 r 4 tblVehicleEF • LDA T 0.08 0.08 r tblVehicleEF • LDA T 0.03 0.05 r tblVehicleEF • LDA T 6.4920e-003 5.2540e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.14 r 4 tblVehicleEF • LDA T 2.0800e-003 2.2760e-003 r 4 tblVehicleEF • LDA T 4.9500e-004 4.5800e-004 r 4 tblVehicleEF • LDA T 0.04 0.07 r 4 tblVehicleEF • LDA T 0.08 0.08 r 4 tblVehicleEF • LDA T 0.03 0.05 r 4 tblVehicleEF • LDA T 9.4440e-003 7.6520e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.15 r 4 tblVehicleEF • LDA T 2.9310e-003 1.7240e-003 r 4 tblVehicleEF • LDA T 2.5500e-003 0.03 r 4 tblVehicleEF • LDA T 0.52 0.72 r 4 tblVehicleEF • LDA T 0.66 1.76 r 4 tblVehicleEF • LDA T 226.16 264.80 r 4 tblVehicleEF • LDA T 48.28 48.14 tblVehicleEF • LDA • 0.03 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 0.04 0.14 tblVehicleEF • LDA i 1.4700e-003 1.1830e-003 r tblVehicleEF • LDA T 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.07 0.15 r tblVehicleEF • LDA T 0.09 0.10 r 4 tblVehicleEF • LDA T 0.05 0.10 r tblVehicleEF • LDA T 7.3340e-003 6.1450e-003 r tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.13 r 4 tblVehicleEF • LDA T 2.2650e-003 2.5210e-003 r 4 tblVehicleEF • LDA T 4.9300e-004 4.5800e-004 r 4 tblVehicleEF • LDA T 0.07 0.15 r 4 tblVehicleEF • LDA T 0.09 0.10 r 4 tblVehicleEF • LDA T 0.05 0.10 r 4 tblVehicleEF • LDA T 0.01 8.9550e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.04 0.14 r 4 tblVehicleEF • LDA T 2.5020e-003 1.3000e-003 r 4 tblVehicleEF • LDA T 3.0230e-003 0.04 r 4 tblVehicleEF • LDA T 0.40 0.46 r 4 tblVehicleEF • LDA T 0.77 1.98 r 4 tblVehicleEF • LDA T 202.67 222.22 r 4 tblVehicleEF • LDA T 48.28 48.61 r 4 tblVehicleEF • LDA T 0.03 0.02 tblVehicleEF • LDA • 0.04 0.14 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 1.4700e-003 1.1830e-003 tblVehicleEF • LDA i 2.1900e-003 1.5630e-003 r tblVehicleEF • LDA T 1.3530e-003 1.0890e-003 r tblVehicleEF • LDA T 2.0140e-003 1.4370e-003 r tblVehicleEF • LDA T 0.03 0.03 r tblVehicleEF • LDA T 0.08 0.08 r tblVehicleEF • LDA T 0.02 0.03 r 4 tblVehicleEF • LDA T 6.2740e-003 4.7180e-003 r tblVehicleEF • LDA T 0.04 0.21 r tblVehicleEF • LDA T 0.04 0.16 r 4 tblVehicleEF • LDA T 2.0280e-003 2.1160e-003 r 4 tblVehicleEF • LDA T 4.9500e-004 4.6300e-004 r 4 tblVehicleEF • LDA T 0.03 0.03 r 4 tblVehicleEF • LDA T 0.08 0.08 r 4 tblVehicleEF • LDA T 0.02 0.03 r 4 tblVehicleEF • LDA T 9.1250e-003 6.8680e-003 r 4 tblVehicleEF • LDA T 0.04 0.21 r 4 tblVehicleEF • LDA T 0.04 0.17 r 4 tblVehicleEF • LDT1 T 6.7140e-003 4.6930e-003 r 4 tblVehicleEF • LDT1 T 9.6900e-003 0.05 r 4 tblVehicleEF • LDT1 T 0.90 1.10 r 4 tblVehicleEF • LDT1 T 1.99 1.90 r 4 tblVehicleEF • LDT1 T 265.91 296.80 r 4 tblVehicleEF • LDT1 T 62.08 59.06 r 4 tblVehicleEF • LDT1 T 0.08 0.08 r 4 tblVehicleEF • LDT1 T 0.12 0.19 tblVehicleEF • LDT1 • 2.0200e-003 1.6850e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 2.9840e-003 2.0130e-003 tblVehicleEF • LDT1 i 1.8590e-003 1.5500e-003 r tblVehicleEF • LDT1 T 2.7440e-003 1.8510e-003 r tblVehicleEF • LDT1 T 0.15 0.19 r tblVehicleEF • LDT1 T 0.24 0.18 r tblVehicleEF • LDT1 T 0.10 0.13 r tblVehicleEF • LDT1 T 0.02 0.02 r 4 tblVehicleEF • LDT1 T 0.15 0.55 r tblVehicleEF • LDT1 T 0.13 0.23 r tblVehicleEF • LDT1 T 2.6690e-003 2.8260e-003 r 4 tblVehicleEF • LDT1 T 6.5500e-004 5.6200e-004 r 4 tblVehicleEF • LDT1 T 0.15 0.19 r 4 tblVehicleEF • LDT1 T 0.24 0.18 r 4 tblVehicleEF • LDT1 T 0.10 0.13 r 4 tblVehicleEF • LDT1 T 0.02 0.03 r 4 tblVehicleEF • LDT1 T 0.15 0.55 r 4 tblVehicleEF • LDT1 T 0.14 0.25 r 4 tblVehicleEF • LDT1 T 7.5770e-003 5.4420e-003 r 4 tblVehicleEF • LDT1 T 8.4040e-003 0.04 r 4 tblVehicleEF • LDT1 T 1.09 1.42 r 4 tblVehicleEF • LDT1 T 1.75 1.96 r 4 tblVehicleEF • LDT1 T 289.00 324.57 r 4 tblVehicleEF • LDT1 T 62.08 59.09 r 4 tblVehicleEF • LDT1 T 0.08 0.08 r 4 tblVehicleEF • LDT1 T 0.11 0.20 r 4 tblVehicleEF • LDT1 T 2.0200e-003 1.6850e-003 tblVehicleEF • LDT1 • 2.9840e-003 2.0130e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 1.8590e-003 1.5500e-003 tblVehicleEF • LDT1 r 2.7440e-003 1.8510e-003 I- 4 tblVehicleEF • LDT1 r 0.29 0.38 I- 4 tblVehicleEF • LDT1 r 0.29 0.23 I- 4 tblVehicleEF • LDT1 r 0.19 0.24 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.15 0.58 I- 4 tblVehicleEF • LDT1 r 0.11 0.21 I- 4 tblVehicleEF • LDT1 r 2.9030e-003 3.0900e-003 I- 4 tblVehicleEF • LDT1 r 6.5100e-004 5.6300e-004 I- 4 tblVehicleEF • LDT1 r 0.29 0.38 I- 4 tblVehicleEF • LDT1 r 0.29 0.23 I- 4 tblVehicleEF • LDT1 r 0.19 0.24 I- 4 tblVehicleEF • LDT1 r 0.03 0.03 I- 4 tblVehicleEF • LDT1 r 0.15 0.58 I- 4 tblVehicleEF • LDT1 r 0.12 0.23 I- 4 tblVehicleEF • LDT1 r 6.4660e-003 4.2130e-003 I- 4 tblVehicleEF • LDT1 r 9.9350e-003 0.06 I- 4 tblVehicleEF • LDT1 r 0.85 0.93 I- 4 tblVehicleEF • LDT1 r 2.03 2.21 I- 4 tblVehicleEF • LDT1 r 258.94 278.68 I- 4 tblVehicleEF • LDT1 r 62.08 59.69 I- 4 tblVehicleEF • LDT1 r 0.08 0.08 I- 4 tblVehicleEF • LDT1 r 0.12 0.20 I- 4 tblVehicleEF • LDT1 r 2.0200e-003 1.6850e-003 I- 4 tblVehicleEF • LDT1 r 2.9840e-003 2.0130e-003 tblVehicleEF • LDT1 • 1.8590e-003 1.5500e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .LDT1 • 2.7440e-003 1.8510e-003 tblVehicleEF • LDT1 r 0.12 0.07 I- 4 tblVehicleEF • LDT1 r 0.26 0.16 I- 4 tblVehicleEF • LDT1 r 0.09 0.06 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.17 0.62 I- 4 tblVehicleEF • LDT1 r 0.13 0.26 I- 4 tblVehicleEF • LDT1 r 2.5990e-003 2.6530e-003 I- 4 tblVehicleEF • LDT1 r 6.5600e-004 5.6800e-004 I- 4 tblVehicleEF • LDT1 r 0.12 0.07 I- 4 tblVehicleEF • LDT1 r 0.26 0.16 I- 4 tblVehicleEF • LDT1 r 0.09 0.06 I- 4 tblVehicleEF • LDT1 r 0.02 0.03 I- 4 tblVehicleEF • LDT1 r 0.17 0.62 I- 4 tblVehicleEF • LDT1 r 0.15 0.29 I- 4 tblVehicleEF • LDT2 r 3.8050e-003 3.0020e-003 I- 4 tblVehicleEF • LDT2 r 4.1980e-003 0.05 I- 4 tblVehicleEF • LDT2 r 0.59 0.81 I- 4 tblVehicleEF • LDT2 r 1.02 2.20 I- 4 tblVehicleEF • LDT2 r 296.34 306.27 I- 4 tblVehicleEF • LDT2 r 68.35 61.33 I- 4 tblVehicleEF • LDT2 r 0.05 0.05 I- 4 tblVehicleEF • LDT2 r 0.07 0.19 I- 4 tblVehicleEF • LDT2 r 1.6040e-003 1.3260e-003 I- 4 tblVehicleEF • LDT2 r 2.4020e-003 1.6380e-003 I- 4 tblVehicleEF • LDT2 r 1.4750e-003 1.2200e-003 tblVehicleEF • LDT2 • 2.2080e-003 1.5060e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.06 0.12 tblVehicleEF • LDT2 i 0.09 0.11 r tblVehicleEF • LDT2 T 0.05 0.10 r tblVehicleEF • LDT2 T 9.4380e-003 0.01 r tblVehicleEF • LDT2 T 0.06 0.37 r tblVehicleEF • LDT2 T 0.06 0.20 r tblVehicleEF • LDT2 T 2.9670e-003 2.9160e-003 r 4 tblVehicleEF • LDT2 T 7.0000e-004 5.8400e-004 r tblVehicleEF • LDT2 T 0.06 0.12 r tblVehicleEF • LDT2 T 0.09 0.11 r 4 tblVehicleEF • LDT2 T 0.05 0.10 r 4 tblVehicleEF • LDT2 T 0.01 0.02 r 4 tblVehicleEF • LDT2 T 0.06 0.37 r 4 tblVehicleEF • LDT2 T 0.06 0.22 r 4 tblVehicleEF • LDT2 T 4.3090e-003 3.4980e-003 r 4 tblVehicleEF • LDT2 T 3.6500e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.72 1.06 r 4 tblVehicleEF • LDT2 T 0.91 2.26 r 4 tblVehicleEF • LDT2 T 322.41 332.25 r 4 tblVehicleEF • LDT2 T 68.35 61.36 r 4 tblVehicleEF • LDT2 T 0.05 0.06 r 4 tblVehicleEF • LDT2 T 0.07 0.21 r 4 tblVehicleEF • LDT2 T 1.6040e-003 1.3260e-003 r 4 tblVehicleEF • LDT2 T 2.4020e-003 1.6380e-003 r 4 tblVehicleEF • LDT2 T 1.4750e-003 1.2200e-003 r 4 tblVehicleEF • LDT2 T 2.2080e-003 1.5060e-003 tblVehicleEF • LDT2 • 0.11 0.25 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.10 0.14 tblVehicleEF • LDT2 i 0.08 0.18 r tblVehicleEF • LDT2 T 0.01 0.01 r tblVehicleEF • LDT2 T 0.06 0.39 r tblVehicleEF • LDT2 T 0.05 0.19 r tblVehicleEF • LDT2 T 3.2300e-003 3.1630e-003 r tblVehicleEF • LDT2 T 6.9800e-004 5.8400e-004 r 4 tblVehicleEF • LDT2 T 0.11 0.25 r tblVehicleEF • LDT2 T 0.10 0.14 r tblVehicleEF • LDT2 T 0.08 0.18 r 4 tblVehicleEF • LDT2 T 0.02 0.02 r 4 tblVehicleEF • LDT2 T 0.06 0.39 r 4 tblVehicleEF • LDT2 T 0.05 0.21 r 4 tblVehicleEF • LDT2 T 3.6580e-003 2.6800e-003 r 4 tblVehicleEF • LDT2 T 4.3280e-003 0.05 r 4 tblVehicleEF • LDT2 T 0.55 0.68 r 4 tblVehicleEF • LDT2 T 1.05 2.56 r 4 tblVehicleEF • LDT2 T 288.45 289.30 r 4 tblVehicleEF • LDT2 T 68.35 62.03 r 4 tblVehicleEF • LDT2 T 0.05 0.06 r 4 tblVehicleEF • LDT2 T 0.07 0.21 r 4 tblVehicleEF • LDT2 T 1.6040e-003 1.3260e-003 r 4 tblVehicleEF • LDT2 T 2.4020e-003 1.6380e-003 r 4 tblVehicleEF • LDT2 T 1.4750e-003 1.2200e-003 r 4 tblVehicleEF • LDT2 T 2.2080e-003 1.5060e-003 r 4 tblVehicleEF • LDT2 T 0.04 0.05 tblVehicleEF • LDT2 • 0.09 0.10 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.04 0.05 tblVehicleEF • LDT2 i 9.0750e-003 0.01 r tblVehicleEF • LDT2 T 0.07 0.41 r tblVehicleEF • LDT2 T 0.06 0.23 r tblVehicleEF • LDT2 T 2.8880e-003 2.7540e-003 r tblVehicleEF • LDT2 T 7.0100e-004 5.9100e-004 r tblVehicleEF • LDT2 T 0.04 0.05 r 4 tblVehicleEF • LDT2 T 0.09 0.10 r tblVehicleEF • LDT2 T 0.04 0.05 r tblVehicleEF • LDT2 T 0.01 0.02 r 4 tblVehicleEF • LDT2 T 0.07 0.42 r 4 tblVehicleEF • LDT2 T 0.06 0.26 r 4 tblVehicleEF • LHD1 T 4.4680e-003 4.6210e-003 r 4 tblVehicleEF • LHD1 T 6.2590e-003 2.7820e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r 4 tblVehicleEF • LHD1 T 0.14 0.18 r 4 tblVehicleEF • LHD1 T 0.61 0.35 r 4 tblVehicleEF • LHD1 T 1.83 0.86 r 4 tblVehicleEF • LHD1 T 9.20 8.76 r 4 tblVehicleEF • LHD1 T 578.27 599.19 r 4 tblVehicleEF • LHD1 T 27.68 10.43 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 1.46 0.63 r 4 tblVehicleEF • LHD1 T 0.82 0.26 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9050e-003 tblVehicleEF • LHD1 • 0.01 6.2850e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 6.9300e-004 2.0300e-004 tblVehicleEF • LHD1 i 9.0000e-004 8.7500e-004 r tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r tblVehicleEF • LHD1 T 0.01 5.9930e-003 r tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r tblVehicleEF • LHD1 T 3.3330e-003 3.3930e-003 r tblVehicleEF • LHD1 T 0.09 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r tblVehicleEF • LHD1 T 1.7170e-003 1.6200e-003 r tblVehicleEF • LHD1 T 0.06 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.19 0.05 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r 4 tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1100e-004 1.0300e-004 r 4 tblVehicleEF • LHD1 T 3.3330e-003 3.3930e-003 r 4 tblVehicleEF • LHD1 T 0.09 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.03 r 4 tblVehicleEF • LHD1 T 1.7170e-003 1.6200e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.04 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.21 0.06 r 4 tblVehicleEF • LHD1 T 4.4680e-003 4.6280e-003 r 4 tblVehicleEF • LHD1 T 6.3560e-003 2.8130e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r 4 tblVehicleEF • LHD1 T 0.14 0.18 tblVehicleEF • LHD1 • 0.62 0.36 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 1.74 0.84 tblVehicleEF • LHD1 i 9.20 8.76 r tblVehicleEF • LHD1 T 578.27 599.20 r tblVehicleEF • LHD1 T 27.68 10.38 r tblVehicleEF • LHD1 T 0.08 0.06 r tblVehicleEF • LHD1 T 1.38 0.59 r tblVehicleEF • LHD1 T 0.79 0.25 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r tblVehicleEF • LHD1 T 0.01 9.9050e-003 r tblVehicleEF • LHD1 T 0.01 6.2850e-003 r 4 tblVehicleEF • LHD1 T 6.9300e-004 2.0300e-004 r 4 tblVehicleEF • LHD1 T 9.0000e-004 8.7500e-004 r 4 tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r 4 tblVehicleEF • LHD1 T 0.01 5.9930e-003 r 4 tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r 4 tblVehicleEF • LHD1 T 6.2030e-003 6.7860e-003 r 4 tblVehicleEF • LHD1 T 0.11 0.08 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 3.1990e-003 3.0010e-003 r 4 tblVehicleEF • LHD1 T 0.06 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.38 r 4 tblVehicleEF • LHD1 T 0.18 0.05 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r 4 tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1000e-004 1.0300e-004 r 4 tblVehicleEF • LHD1 T 6.2030e-003 6.7860e-003 tblVehicleEF • LHD1 • 0.11 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 0.02 0.03 tblVehicleEF • LHD1 i 3.1990e-003 3.0010e-003 r tblVehicleEF • LHD1 T 0.07 0.04 r tblVehicleEF • LHD1 T 0.30 0.38 r tblVehicleEF • LHD1 T 0.20 0.06 r tblVehicleEF • LHD1 T 4.4680e-003 4.6070e-003 r tblVehicleEF • LHD1 T 6.2530e-003 2.7340e-003 r 4 tblVehicleEF • LHD1 T 0.01 0.01 r tblVehicleEF • LHD1 T 0.14 0.18 r tblVehicleEF • LHD1 T 0.61 0.35 r 4 tblVehicleEF • LHD1 T 1.83 0.91 r 4 tblVehicleEF • LHD1 T 9.20 8.76 r 4 tblVehicleEF • LHD1 T 578.27 599.18 r 4 tblVehicleEF • LHD1 T 27.68 10.51 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 1.44 0.64 r 4 tblVehicleEF • LHD1 T 0.81 0.27 r 4 tblVehicleEF • LHD1 T 9.4100e-004 9.1500e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9050e-003 r 4 tblVehicleEF • LHD1 T 0.01 6.2850e-003 r 4 tblVehicleEF • LHD1 T 6.9300e-004 2.0300e-004 r 4 tblVehicleEF • LHD1 T 9.0000e-004 8.7500e-004 r 4 tblVehicleEF • LHD1 T 2.5870e-003 2.4760e-003 r 4 tblVehicleEF • LHD1 T 0.01 5.9930e-003 r 4 tblVehicleEF • LHD1 T 6.3700e-004 1.8700e-004 r 4 tblVehicleEF • LHD1 T 2.8770e-003 1.4580e-003 tblVehicleEF • LHD1 • 0.10 0.06 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 0.02 0.02 tblVehicleEF • LHD1 i 1.5600e-003 8.3600e-004 r tblVehicleEF • LHD1 T 0.06 0.03 r tblVehicleEF • LHD1 T 0.32 0.39 r tblVehicleEF • LHD1 T 0.19 0.05 r tblVehicleEF • LHD1 T 9.1000e-005 8.5000e-005 r tblVehicleEF • LHD1 T 5.6560e-003 5.8370e-003 r 4 tblVehicleEF • LHD1 T 3.1100e-004 1.0400e-004 r tblVehicleEF • LHD1 T 2.8770e-003 1.4580e-003 r tblVehicleEF • LHD1 T 0.10 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.03 r 4 tblVehicleEF • LHD1 T 1.5600e-003 8.3600e-004 r 4 tblVehicleEF • LHD1 T 0.07 0.04 r 4 tblVehicleEF • LHD1 T 0.32 0.39 r 4 tblVehicleEF • LHD1 T 0.21 0.06 r 4 tblVehicleEF • LHD2 T 2.9220e-003 3.5280e-003 r 4 tblVehicleEF • LHD2 T 2.5090e-003 2.5650e-003 r 4 tblVehicleEF • LHD2 T 4.8920e-003 8.8440e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.15 r 4 tblVehicleEF • LHD2 T 0.28 0.32 r 4 tblVehicleEF • LHD2 T 0.91 0.61 r 4 tblVehicleEF • LHD2 T 14.09 13.34 r 4 tblVehicleEF • LHD2 T 578.63 615.62 r 4 tblVehicleEF • LHD2 T 22.17 8.61 r 4 tblVehicleEF • LHD2 T 0.09 0.08 r 4 tblVehicleEF • LHD2 T 0.77 0.85 tblVehicleEF • LHD2 • 0.37 0.21 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 1.1940e-003 1.2960e-003 tblVehicleEF • LHD2 i 0.01 0.01 r tblVehicleEF • LHD2 T 9.0990e-003 0.01 r tblVehicleEF • LHD2 T 3.4300e-004 1.2200e-004 r tblVehicleEF • LHD2 T 1.1420e-003 1.2400e-003 r tblVehicleEF • LHD2 T 2.7080e-003 2.6540e-003 r tblVehicleEF • LHD2 T 8.6950e-003 9.6200e-003 r 4 tblVehicleEF • LHD2 T 3.1500e-004 1.1200e-004 r tblVehicleEF • LHD2 T 1.0830e-003 2.5280e-003 r tblVehicleEF • LHD2 T 0.03 0.05 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 6.0400e-004 1.2670e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.04 r 4 tblVehicleEF • LHD2 T 0.06 0.25 r 4 tblVehicleEF • LHD2 T 0.07 0.04 r 4 tblVehicleEF • LHD2 T 1.3700e-004 1.2800e-004 r 4 tblVehicleEF • LHD2 T 5.6220e-003 5.9530e-003 r 4 tblVehicleEF • LHD2 T 2.3800e-004 8.5000e-005 r 4 tblVehicleEF • LHD2 T 1.0830e-003 2.5280e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.05 r 4 tblVehicleEF • LHD2 T 0.02 0.02 r 4 tblVehicleEF • LHD2 T 6.0400e-004 1.2670e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.05 r 4 tblVehicleEF • LHD2 T 0.06 0.25 r 4 tblVehicleEF • LHD2 T 0.07 0.05 r 4 tblVehicleEF • LHD2 T 2.9220e-003 3.5330e-003 tblVehicleEF • LHD2 • 2.5300e-003 2.5810e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 4.7440e-003 8.6420e-003 tblVehicleEF • LHD2 i 0.12 0.15 r tblVehicleEF • LHD2 T 0.28 0.32 r tblVehicleEF • LHD2 T 0.87 0.59 r tblVehicleEF • LHD2 T 14.09 13.34 r tblVehicleEF • LHD2 T 578.63 615.63 r tblVehicleEF • LHD2 T 22.17 8.58 r 4 tblVehicleEF • LHD2 T 0.09 0.08 r tblVehicleEF • LHD2 T 0.73 0.80 r tblVehicleEF • LHD2 T 0.36 0.21 r 4 tblVehicleEF • LHD2 T 1.1940e-003 1.2960e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 9.0990e-003 0.01 r 4 tblVehicleEF • LHD2 T 3.4300e-004 1.2200e-004 r 4 tblVehicleEF • LHD2 T 1.1420e-003 1.2400e-003 r 4 tblVehicleEF • LHD2 T 2.7080e-003 2.6540e-003 r 4 tblVehicleEF • LHD2 T 8.6950e-003 9.6200e-003 r 4 tblVehicleEF • LHD2 T 3.1500e-004 1.1200e-004 r 4 tblVehicleEF • LHD2 T 2.0360e-003 5.0590e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.06 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 1.1130e-003 2.3110e-003 r 4 tblVehicleEF • LHD2 T 0.04 0.04 r 4 tblVehicleEF • LHD2 T 0.06 0.26 r 4 tblVehicleEF • LHD2 T 0.06 0.04 r 4 tblVehicleEF • LHD2 T 1.3700e-004 1.2800e-004 tblVehicleEF • LHD2 • 5.6220e-003 5.9530e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .LHD2 • 2.3700e-004 8.5000e-005 tblVehicleEF • LHD2 r 2.0360e-003 5.0590e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.06 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 1.1130e-003 2.3110e-003 I- 4 tblVehicleEF • LHD2 r 0.04 0.05 I- 4 tblVehicleEF • LHD2 r 0.06 0.26 I- 4 tblVehicleEF • LHD2 r 0.07 0.05 I- 4 tblVehicleEF • LHD2 r 2.9220e-003 3.5170e-003 I- 4 tblVehicleEF • LHD2 r 2.5060e-003 2.5390e-003 I- 4 tblVehicleEF • LHD2 r 4.9180e-003 9.2210e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.15 I- 4 tblVehicleEF • LHD2 r 0.28 0.32 I- 4 tblVehicleEF • LHD2 r 0.92 0.64 I- 4 tblVehicleEF • LHD2 r 14.09 13.34 I- 4 tblVehicleEF • LHD2 r 578.63 615.62 I- 4 tblVehicleEF • LHD2 r 22.17 8.67 I- 4 tblVehicleEF • LHD2 r 0.09 0.08 I- 4 tblVehicleEF • LHD2 r 0.76 0.86 I- 4 tblVehicleEF • LHD2 r 0.37 0.22 I- 4 tblVehicleEF • LHD2 r 1.1940e-003 1.2960e-003 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 9.0990e-003 0.01 I- 4 tblVehicleEF • LHD2 r 3.4300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 1.1420e-003 1.2400e-003 I- 4 tblVehicleEF • LHD2 r 2.7080e-003 2.6540e-003 tblVehicleEF • LHD2 • 8.6950e-003 9.6200e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .LHD2 • 3.1500e-004 1.1200e-004 tblVehicleEF • LHD2 r 8.3200e-004 1.0630e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.05 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 5.1600e-004 6.6000e-004 I- 4 tblVehicleEF • LHD2 r 0.04 0.04 I- 4 tblVehicleEF • LHD2 r 0.06 0.27 I- 4 tblVehicleEF • LHD2 r 0.07 0.04 I- 4 tblVehicleEF • LHD2 r 1.3700e-004 1.2800e-004 I- 4 tblVehicleEF • LHD2 r 5.6220e-003 5.9530e-003 I- 4 tblVehicleEF • LHD2 r 2.3800e-004 8.6000e-005 I- 4 tblVehicleEF • LHD2 r 8.3200e-004 1.0630e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.05 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 5.1600e-004 6.6000e-004 I- 4 tblVehicleEF • LHD2 r 0.04 0.05 I- 4 tblVehicleEF • LHD2 r 0.06 0.27 I- 4 tblVehicleEF • LHD2 r 0.07 0.05 I- 4 tblVehicleEF • MCY r 0.44 0.33 I- 4 tblVehicleEF • MCY r 0.15 0.23 I- 4 tblVehicleEF • MCY r 18.06 18.12 I- 4 tblVehicleEF • MCY r 9.75 8.38 I- 4 tblVehicleEF • MCY r 168.56 209.59 I- 4 tblVehicleEF • MCY r 44.20 58.03 I- 4 tblVehicleEF • MCY r 1.11 1.10 I- 4 tblVehicleEF • MCY r 0.31 0.26 tblVehicleEF • MCY • 1.9930e-003 2.1060e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 3.2040e-003 2.8580e-003 tblVehicleEF • MCY i 1.8600e-003 1.9650e-003 r tblVehicleEF • MCY T 3.0040e-003 2.6780e-003 r tblVehicleEF • MCY T 1.68 2.46 r tblVehicleEF • MCY T 0.80 0.96 r tblVehicleEF • MCY T 0.90 1.35 r tblVehicleEF • MCY T 2.09 2.15 r 4 tblVehicleEF • MCY T 0.51 1.63 r tblVehicleEF • MCY T 2.02 1.70 r tblVehicleEF • MCY T 2.0420e-003 2.0740e-003 r 4 tblVehicleEF • MCY T 6.6100e-004 5.7400e-004 r 4 tblVehicleEF • MCY T 1.68 2.46 r 4 tblVehicleEF • MCY T 0.80 0.96 r 4 tblVehicleEF • MCY T 0.90 1.35 r 4 tblVehicleEF • MCY T 2.61 2.69 r 4 tblVehicleEF • MCY T 0.51 1.63 r 4 tblVehicleEF • MCY T 2.20 1.85 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.13 0.22 r 4 tblVehicleEF • MCY T 18.75 20.01 r 4 tblVehicleEF • MCY T 9.09 8.32 r 4 tblVehicleEF • MCY T 168.56 212.69 r 4 tblVehicleEF • MCY T 44.20 57.67 r 4 tblVehicleEF • MCY T 0.97 0.97 r 4 tblVehicleEF • MCY T 0.29 0.25 r 4 tblVehicleEF • MCY T 1.9930e-003 2.1060e-003 tblVehicleEF • MCY • 3.2040e-003 2.8580e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 1.8600e-003 1.9650e-003 tblVehicleEF • MCY i 3.0040e-003 2.6780e-003 r tblVehicleEF • MCY T 3.34 5.06 r tblVehicleEF • MCY T 1.20 1.67 r tblVehicleEF • MCY T 2.06 3.05 r tblVehicleEF • MCY T 2.08 2.19 r tblVehicleEF • MCY T 0.51 1.72 r 4 tblVehicleEF • MCY T 1.82 1.62 r tblVehicleEF • MCY T 2.0530e-003 2.1050e-003 r tblVehicleEF • MCY T 6.4400e-004 5.7100e-004 r 4 tblVehicleEF • MCY T 3.34 5.06 r 4 tblVehicleEF • MCY T 1.20 1.67 r 4 tblVehicleEF • MCY T 2.06 3.05 r 4 tblVehicleEF • MCY T 2.60 2.73 r 4 tblVehicleEF • MCY T 0.51 1.72 r 4 tblVehicleEF • MCY T 1.98 1.77 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.15 0.26 r 4 tblVehicleEF • MCY T 17.65 18.20 r 4 tblVehicleEF • MCY T 9.75 9.26 r 4 tblVehicleEF • MCY T 168.56 209.86 r 4 tblVehicleEF • MCY T 44.20 60.20 r 4 tblVehicleEF • MCY T 1.11 1.18 r 4 tblVehicleEF • MCY T 0.31 0.27 r 4 tblVehicleEF • MCY T 1.9930e-003 2.1060e-003 r 4 tblVehicleEF • MCY T 3.2040e-003 2.8580e-003 tblVehicleEF • MCY • 1.8600e-003 1.9650e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 3.0040e-003 2.6780e-003 tblVehicleEF • MCY i 1.57 1.02 r tblVehicleEF • MCY T 0.98 0.76 r tblVehicleEF • MCY T 0.71 0.41 r tblVehicleEF • MCY T 2.09 2.20 r tblVehicleEF • MCY T 0.58 1.82 r tblVehicleEF • MCY T 2.03 1.93 r 4 tblVehicleEF • MCY T 2.0360e-003 2.0770e-003 r tblVehicleEF • MCY T 6.6100e-004 5.9600e-004 r tblVehicleEF • MCY T 1.57 1.02 r 4 tblVehicleEF • MCY T 0.98 0.76 r 4 tblVehicleEF • MCY T 0.71 0.41 r 4 tblVehicleEF • MCY T 2.60 2.74 r 4 tblVehicleEF • MCY T 0.58 1.82 r 4 tblVehicleEF • MCY T 2.21 2.10 r 4 tblVehicleEF • MDV T 7.4730e-003 3.4060e-003 r 4 tblVehicleEF • MDV T 0.01 0.06 r 4 tblVehicleEF • MDV T 0.92 0.85 r 4 tblVehicleEF • MDV T 2.00 2.41 r 4 tblVehicleEF • MDV T 413.91 375.65 r 4 tblVehicleEF • MDV T 94.54 75.79 r 4 tblVehicleEF • MDV T 0.10 0.06 r 4 tblVehicleEF • MDV T 0.18 0.24 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 tblVehicleEF • MDV • 2.1540e-003 1.5090e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MDV • 0.10 0.16 tblVehicleEF • MDV i 0.17 0.14 r tblVehicleEF • MDV T 0.09 0.13 r tblVehicleEF • MDV T 0.02 0.01 r tblVehicleEF • MDV T 0.10 0.42 r tblVehicleEF • MDV T 0.14 0.25 r tblVehicleEF • MDV T 4.1430e-003 3.5760e-003 r 4 tblVehicleEF • MDV T 9.8000e-004 7.2200e-004 r tblVehicleEF • MDV T 0.10 0.16 r tblVehicleEF • MDV T 0.17 0.14 r 4 tblVehicleEF • MDV T 0.09 0.13 r 4 tblVehicleEF • MDV T 0.03 0.02 r 4 tblVehicleEF • MDV T 0.10 0.42 r 4 tblVehicleEF • MDV T 0.16 0.28 r 4 tblVehicleEF • MDV T 8.4690e-003 3.9840e-003 r 4 tblVehicleEF • MDV T 9.1600e-003 0.05 r 4 tblVehicleEF • MDV T 1.13 1.10 r 4 tblVehicleEF • MDV T 1.76 2.46 r 4 tblVehicleEF • MDV T 449.29 402.44 r 4 tblVehicleEF • MDV T 94.54 75.82 r 4 tblVehicleEF • MDV T 0.09 0.06 r 4 tblVehicleEF • MDV T 0.17 0.25 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 r 4 tblVehicleEF • MDV T 2.1540e-003 1.5090e-003 tblVehicleEF • MDV • 0.19 0.32 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MDV • 0.19 0.17 tblVehicleEF • MDV i 0.16 0.23 r tblVehicleEF • MDV T 0.02 0.02 r tblVehicleEF • MDV T 0.10 0.44 r tblVehicleEF • MDV T 0.12 0.24 r tblVehicleEF • MDV T 4.5000e-003 3.8310e-003 r tblVehicleEF • MDV T 9.7500e-004 7.2200e-004 r 4 tblVehicleEF • MDV T 0.19 0.32 r tblVehicleEF • MDV T 0.19 0.18 r tblVehicleEF • MDV T 0.16 0.23 r 4 tblVehicleEF • MDV T 0.03 0.02 r 4 tblVehicleEF • MDV T 0.10 0.44 r 4 tblVehicleEF • MDV T 0.14 0.26 r 4 tblVehicleEF • MDV T 7.1840e-003 3.0350e-003 r 4 tblVehicleEF • MDV T 0.01 0.06 r 4 tblVehicleEF • MDV T 0.86 0.72 r 4 tblVehicleEF • MDV T 2.04 2.81 r 4 tblVehicleEF • MDV T 403.16 358.17 r 4 tblVehicleEF • MDV T 94.54 76.58 r 4 tblVehicleEF • MDV T 0.10 0.06 r 4 tblVehicleEF • MDV T 0.18 0.25 r 4 tblVehicleEF • MDV T 1.6280e-003 1.3310e-003 r 4 tblVehicleEF • MDV T 2.3420e-003 1.6410e-003 r 4 tblVehicleEF • MDV T 1.4990e-003 1.2270e-003 r 4 tblVehicleEF • MDV T 2.1540e-003 1.5090e-003 r 4 tblVehicleEF • MDV T 0.08 0.06 tblVehicleEF • MDV • 0.18 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .MDV • 0.07 0.06 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.12 0.47 I- 4 tblVehicleEF • MDV r 0.15 0.29 I- 4 tblVehicleEF • MDV r 4.0350e-003 3.4090e-003 I- 4 tblVehicleEF • MDV r 9.8100e-004 7.2900e-004 I- 4 tblVehicleEF • MDV r 0.08 0.06 I- 4 tblVehicleEF • MDV r 0.18 0.13 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.03 0.02 I- 4 tblVehicleEF • MDV r 0.12 0.47 I- 4 tblVehicleEF • MDV r 0.16 0.32 I- 4 tblVehicleEF • MH r 0.02 2.8780e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 1.38 0.28 I- 4 tblVehicleEF • MH r 4.62 0.00 I- 4 tblVehicleEF • MH r 990.51 903.23 I- 4 tblVehicleEF • MH r 56.68 0.00 I- 4 tblVehicleEF • MH r 1.21 3.53 I- 4 tblVehicleEF • MH r 0.73 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 I- 4 tblVehicleEF • MH r 0.03 0.11 I- 4 tblVehicleEF • MH r 9.0000e-004 0.00 I- 4 tblVehicleEF • MH r 3.2420e-003 4.0000e-003 I- 4 tblVehicleEF • MH r 0.03 0.11 I- 4 tblVehicleEF • MH r 8.2800e-004 0.00 tblVehicleEF • MH • 1.20 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 0.07 0.00 tblVehicleEF • MH i 0.44 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.27 0.00 r tblVehicleEF • MH T 9.8110e-003 8.5390e-003 r tblVehicleEF • MH T 6.4700e-004 0.00 r 4 tblVehicleEF • MH T 1.20 0.00 r tblVehicleEF • MH T 0.07 0.00 r tblVehicleEF • MH T 0.44 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.30 0.00 r 4 tblVehicleEF • MH T 0.02 2.8780e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 1.42 0.28 r 4 tblVehicleEF • MH T 4.30 0.00 r 4 tblVehicleEF • MH T 990.51 903.23 r 4 tblVehicleEF • MH T 56.68 0.00 r 4 tblVehicleEF • MH T 1.13 3.33 r 4 tblVehicleEF • MH T 0.70 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.03 0.11 r 4 tblVehicleEF • MH T 9.0000e-004 0.00 r 4 tblVehicleEF • MH T 3.2420e-003 4.0000e-003 r 4 tblVehicleEF • MH T 0.03 0.11 tblVehicleEF • MH • 8.2800e-004 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 2.18 0.00 tblVehicleEF • MH i 0.08 0.00 r tblVehicleEF • MH T 0.83 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.26 0.00 r tblVehicleEF • MH T 9.8120e-003 8.5390e-003 r 4 tblVehicleEF • MH T 6.4200e-004 0.00 r tblVehicleEF • MH T 2.18 0.00 r tblVehicleEF • MH T 0.08 0.00 r 4 tblVehicleEF • MH T 0.83 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.29 0.00 r 4 tblVehicleEF • MH T 0.02 2.8780e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 1.38 0.28 r 4 tblVehicleEF • MH T 4.65 0.00 r 4 tblVehicleEF • MH T 990.51 903.23 r 4 tblVehicleEF • MH T 56.68 0.00 r 4 tblVehicleEF • MH T 1.20 3.58 r 4 tblVehicleEF • MH T 0.73 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.03 0.11 r 4 tblVehicleEF • MH T 9.0000e-004 0.00 r 4 tblVehicleEF • MH T 3.2420e-003 4.0000e-003 tblVehicleEF • MH • 0.03 0.11 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 8.2800e-004 0.00 tblVehicleEF • MH i 1.16 0.00 r tblVehicleEF • MH T 0.08 0.00 r tblVehicleEF • MH T 0.42 0.00 r tblVehicleEF • MH T 0.06 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.28 0.00 r 4 tblVehicleEF • MH T 9.8110e-003 8.5390e-003 r tblVehicleEF • MH T 6.4800e-004 0.00 r tblVehicleEF • MH T 1.16 0.00 r 4 tblVehicleEF • MH T 0.08 0.00 r 4 tblVehicleEF • MH T 0.42 0.00 r 4 tblVehicleEF • MH T 0.08 0.07 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.30 0.00 r 4 tblVehicleEF • MHD T 0.02 4.7640e-003 r 4 tblVehicleEF • MHD T 1.9370e-003 1.8380e-003 r 4 tblVehicleEF • MHD T 0.04 0.01 r 4 tblVehicleEF • MHD T 0.31 0.43 r 4 tblVehicleEF • MHD T 0.17 0.22 r 4 tblVehicleEF • MHD T 4.06 1.30 r 4 tblVehicleEF • MHD T 149.43 68.75 r 4 tblVehicleEF • MHD T 1,051.15 975.21 r 4 tblVehicleEF • MHD T 52.99 11.84 r 4 tblVehicleEF • MHD T 0.40 0.36 r 4 tblVehicleEF • MHD T 0.44 0.84 tblVehicleEF • MHD • 11.47 1.55 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 8.9000e-005 2.4300e-004 tblVehicleEF • MHD i 2.6760e-003 8.7310e-003 r tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r tblVehicleEF • MHD T 8.5000e-005 2.3300e-004 r tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r tblVehicleEF • MHD T 1.2700e-003 1.2000e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 6.7900e-004 6.1000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.25 0.06 r 4 tblVehicleEF • MHD T 1.4360e-003 6.5300e-004 r 4 tblVehicleEF • MHD T 0.01 9.3540e-003 r 4 tblVehicleEF • MHD T 6.0100e-004 1.1700e-004 r 4 tblVehicleEF • MHD T 1.2700e-003 1.2000e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.7900e-004 6.1000e-004 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.27 0.07 r 4 tblVehicleEF • MHD T 0.01 4.5190e-003 r 4 tblVehicleEF • MHD T 1.9560e-003 1.8630e-003 r 4 tblVehicleEF • MHD T 0.04 0.01 tblVehicleEF • MHD • 0.23 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 0.17 0.23 tblVehicleEF • MHD i 3.88 1.26 r tblVehicleEF • MHD T 158.28 68.62 r tblVehicleEF • MHD T 1,051.15 975.21 r tblVehicleEF • MHD T 52.99 11.77 r tblVehicleEF • MHD T 0.41 0.35 r tblVehicleEF • MHD T 0.41 0.79 r 4 tblVehicleEF • MHD T 11.45 1.55 r tblVehicleEF • MHD T 7.5000e-005 2.0800e-004 r tblVehicleEF • MHD T 2.6760e-003 8.7310e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r 4 tblVehicleEF • MHD T 7.2000e-005 1.9900e-004 r 4 tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r 4 tblVehicleEF • MHD T 2.4430e-003 2.4030e-003 r 4 tblVehicleEF • MHD T 0.04 0.04 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.2730e-003 1.1260e-003 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.15 r 4 tblVehicleEF • MHD T 0.24 0.06 r 4 tblVehicleEF • MHD T 1.5200e-003 6.5200e-004 r 4 tblVehicleEF • MHD T 0.01 9.3540e-003 r 4 tblVehicleEF • MHD T 5.9800e-004 1.1700e-004 r 4 tblVehicleEF • MHD T 2.4430e-003 2.4030e-003 r 4 tblVehicleEF • MHD T 0.04 0.04 tblVehicleEF • MHD • 0.03 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 1.2730e-003 1.1260e-003 tblVehicleEF • MHD i 0.02 0.02 r tblVehicleEF • MHD T 0.02 0.15 r tblVehicleEF • MHD T 0.26 0.06 r tblVehicleEF • MHD T 0.02 5.1010e-003 r tblVehicleEF • MHD T 1.9210e-003 1.7950e-003 r tblVehicleEF • MHD T 0.04 0.01 r 4 tblVehicleEF • MHD T 0.43 0.53 r tblVehicleEF • MHD T 0.16 0.22 r tblVehicleEF • MHD T 4.12 1.38 r 4 tblVehicleEF • MHD T 137.20 68.93 r 4 tblVehicleEF • MHD T 1,051.15 975.20 r 4 tblVehicleEF • MHD T 52.99 11.97 r 4 tblVehicleEF • MHD T 0.38 0.37 r 4 tblVehicleEF • MHD T 0.43 0.85 r 4 tblVehicleEF • MHD T 11.47 1.56 r 4 tblVehicleEF • MHD T 1.0800e-004 2.9200e-004 r 4 tblVehicleEF • MHD T 2.6760e-003 8.7310e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3000e-004 r 4 tblVehicleEF • MHD T 1.0300e-004 2.7900e-004 r 4 tblVehicleEF • MHD T 2.5570e-003 8.3460e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.1900e-004 r 4 tblVehicleEF • MHD T 8.8300e-004 5.0200e-004 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 5.2400e-004 3.1000e-004 tblVehicleEF • MHD • 0.02 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 0.02 0.15 tblVehicleEF • MHD i 0.25 0.06 r tblVehicleEF • MHD T 1.3210e-003 6.5500e-004 r tblVehicleEF • MHD T 0.01 9.3540e-003 r tblVehicleEF • MHD T 6.0200e-004 1.1800e-004 r tblVehicleEF • MHD T 8.8300e-004 5.0200e-004 r tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 5.2400e-004 3.1000e-004 r tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 0.02 0.15 r 4 tblVehicleEF • MHD T 0.28 0.07 r 4 tblVehicleEF • OBUS T 0.01 7.9360e-003 r 4 tblVehicleEF • OBUS T 3.9930e-003 2.9380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.57 r 4 tblVehicleEF • OBUS T 0.27 0.32 r 4 tblVehicleEF • OBUS T 4.82 1.66 r 4 tblVehicleEF • OBUS T 70.92 84.28 r 4 tblVehicleEF • OBUS T 1,082.83 1,209.92 r 4 tblVehicleEF • OBUS T 68.56 15.40 r 4 tblVehicleEF • OBUS T 0.14 0.35 r 4 tblVehicleEF • OBUS T 0.35 0.70 r 4 tblVehicleEF • OBUS T 2.00 1.00 r 4 tblVehicleEF • OBUS T 1.3000e-005 1.1400e-004 r 4 tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 tblVehicleEF • OBUS • 9.3200e-004 1.5600e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 1.2000e-005 1.0900e-004 tblVehicleEF • OBUS i 2.0160e-003 7.4440e-003 r tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r tblVehicleEF • OBUS T 1.9950e-003 2.3080e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.03 0.05 r tblVehicleEF • OBUS T 8.8300e-004 9.7200e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.30 0.08 r 4 tblVehicleEF • OBUS T 6.8900e-004 8.0100e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.7000e-004 1.5200e-004 r 4 tblVehicleEF • OBUS T 1.9950e-003 2.3080e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.8300e-004 9.7200e-004 r 4 tblVehicleEF • OBUS T 0.03 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.33 0.09 r 4 tblVehicleEF • OBUS T 0.01 8.0120e-003 r 4 tblVehicleEF • OBUS T 4.0630e-003 2.9830e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.56 r 4 tblVehicleEF • OBUS T 0.28 0.32 r 4 tblVehicleEF • OBUS T 4.51 1.59 tblVehicleEF • OBUS • 74.13 83.29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 1,082.83 1,209.93 tblVehicleEF • OBUS i 68.56 15.27 r tblVehicleEF • OBUS T 0.14 0.33 r tblVehicleEF • OBUS T 0.32 0.66 r tblVehicleEF • OBUS T 1.97 0.99 r tblVehicleEF • OBUS T 1.1000e-005 1.0200e-004 r tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 r 4 tblVehicleEF • OBUS T 9.3200e-004 1.5600e-004 r tblVehicleEF • OBUS T 1.0000e-005 9.7000e-005 r tblVehicleEF • OBUS T 2.0160e-003 7.4440e-003 r 4 tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 3.6940e-003 4.5380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6690e-003 1.7830e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • OBUS T 7.1900e-004 7.9200e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.6500e-004 1.5100e-004 r 4 tblVehicleEF • OBUS T 3.6940e-003 4.5380e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 1.6690e-003 1.7830e-003 r 4 tblVehicleEF • OBUS T 0.03 0.02 tblVehicleEF • OBUS • 0.05 0.17 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.32 0.09 tblVehicleEF • OBUS i 0.01 7.8280e-003 r tblVehicleEF • OBUS T 3.9760e-003 2.8620e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.57 r tblVehicleEF • OBUS T 0.27 0.31 r tblVehicleEF • OBUS T 4.87 1.79 r 4 tblVehicleEF • OBUS T 66.48 85.65 r tblVehicleEF • OBUS T 1,082.83 1,209.91 r tblVehicleEF • OBUS T 68.56 15.62 r 4 tblVehicleEF • OBUS T 0.13 0.37 r 4 tblVehicleEF • OBUS T 0.34 0.72 r 4 tblVehicleEF • OBUS T 2.00 1.01 r 4 tblVehicleEF • OBUS T 1.5000e-005 1.3200e-004 r 4 tblVehicleEF • OBUS T 2.1260e-003 7.7950e-003 r 4 tblVehicleEF • OBUS T 9.3200e-004 1.5600e-004 r 4 tblVehicleEF • OBUS T 1.5000e-005 1.2600e-004 r 4 tblVehicleEF • OBUS T 2.0160e-003 7.4440e-003 r 4 tblVehicleEF • OBUS T 8.5700e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 1.6700e-003 1.0190e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.04 r 4 tblVehicleEF • OBUS T 8.0300e-004 5.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.30 0.09 tblVehicleEF • OBUS • 6.4600e-004 8.1400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.01 0.01 tblVehicleEF • OBUS i 7.7100e-004 1.5500e-004 r tblVehicleEF • OBUS T 1.6700e-003 1.0190e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.04 0.06 r tblVehicleEF • OBUS T 8.0300e-004 5.2500e-004 r tblVehicleEF • OBUS T 0.03 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.33 0.09 r tblVehicleEF • SBUS T 0.80 0.06 r 4 tblVehicleEF • SBUS T 7.8570e-003 4.1910e-003 r 4 tblVehicleEF • SBUS T 0.06 4.5040e-003 r 4 tblVehicleEF • SBUS T 7.94 2.35 r 4 tblVehicleEF • SBUS T 0.49 0.28 r 4 tblVehicleEF • SBUS T 6.18 0.50 r 4 tblVehicleEF • SBUS T 1,101.78 339.03 r 4 tblVehicleEF • SBUS T 1,079.52 1,050.37 r 4 tblVehicleEF • SBUS T 56.53 3.78 r 4 tblVehicleEF • SBUS T 7.02 3.34 r 4 tblVehicleEF • SBUS T 3.01 4.00 r 4 tblVehicleEF • SBUS T 11.88 1.00 r 4 tblVehicleEF • SBUS T 5.4270e-003 3.3000e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r 4 tblVehicleEF • SBUS T 5.1930e-003 3.1570e-003 tblVehicleEF • SBUS • 2.6790e-003 2.6220e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 0.02 0.02 tblVehicleEF • SBUS i 5.4000e-004 3.5000e-005 r tblVehicleEF • SBUS i 5.8490e-003 1.4310e-003 r tblVehicleEF • SBUS i 0.04 6.2400e-003 r tblVehicleEF • SBUS i 0.93 0.26 r tblVehicleEF • SBUS i 2.8420e-003 6.1200e-004 r tblVehicleEF • SBUS i 0.09 0.07 r 4 tblVehicleEF • SBUS i 0.02 0.04 r tblVehicleEF • SBUS i 0.35 0.02 r tblVehicleEF • SBUS T 0.01 3.2280e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 6.7300e-004 3.7000e-005 r 4 tblVehicleEF • SBUS T 5.8490e-003 1.4310e-003 r 4 tblVehicleEF • SBUS T 0.04 6.2400e-003 r 4 tblVehicleEF • SBUS T 1.35 0.37 r 4 tblVehicleEF • SBUS T 2.8420e-003 6.1200e-004 r 4 tblVehicleEF • SBUS T 0.10 0.08 r 4 tblVehicleEF • SBUS T 0.02 0.04 r 4 tblVehicleEF • SBUS T 0.38 0.03 r 4 tblVehicleEF • SBUS T 0.80 0.06 r 4 tblVehicleEF • SBUS T 7.9670e-003 4.2130e-003 r 4 tblVehicleEF • SBUS T 0.05 3.9280e-003 r 4 tblVehicleEF • SBUS T 7.85 2.32 r 4 tblVehicleEF • SBUS T 0.50 0.28 r 4 tblVehicleEF • SBUS T 4.48 0.39 r 4 tblVehicleEF • SBUS T1,150.67 346.42 tblVehicleEF • SBUS • 1,079.52 1,050.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 56.53 3.59 tblVehicleEF • SBUS i 7.25 3.40 r tblVehicleEF • SBUS i 2.83 3.77 r tblVehicleEF • SBUS i 11.85 1.00 r tblVehicleEF • SBUS i 4.5750e-003 2.7900e-003 r tblVehicleEF • SBUS T 0.01 0.01 r tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r tblVehicleEF • SBUS T 4.3770e-003 2.6690e-003 r tblVehicleEF • SBUS T 2.6790e-003 2.6220e-003 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.4000e-004 3.5000e-005 r 4 tblVehicleEF • SBUS T 0.01 2.8080e-003 r 4 tblVehicleEF • SBUS T 0.04 6.9550e-003 r 4 tblVehicleEF • SBUS T 0.93 0.26 r 4 tblVehicleEF • SBUS T 5.1940e-003 1.1060e-003 r 4 tblVehicleEF • SBUS T 0.09 0.07 r 4 tblVehicleEF • SBUS T 0.02 0.04 r 4 tblVehicleEF • SBUS T 0.29 0.02 r 4 tblVehicleEF • SBUS T 0.01 3.2980e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 6.4400e-004 3.6000e-005 r 4 tblVehicleEF • SBUS T 0.01 2.8080e-003 r 4 tblVehicleEF • SBUS T 0.04 6.9550e-003 r 4 tblVehicleEF • SBUS T 1.35 0.37 r 4 tblVehicleEF • SBUS T 5.1940e-003 1.1060e-003 tblVehicleEF • SBUS • 0.10 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 0.02 0.04 tblVehicleEF • SBUS i 0.32 0.02 r tblVehicleEF • SBUS i 0.80 0.06 r tblVehicleEF • SBUS i 7.8240e-003 4.1550e-003 r tblVehicleEF • SBUS i 0.06 5.3140e-003 r tblVehicleEF • SBUS i 8.07 2.40 r tblVehicleEF • SBUS i 0.49 0.28 r 4 tblVehicleEF • SBUS i 6.53 0.66 r tblVehicleEF • SBUS i 1,034.26 328.83 • r tblVehicleEF • SBUS i 1,079.52 1,050.37 r 4 tblVehicleEF • SBUS T 56.53 4.05 r 4 tblVehicleEF • SBUS T 6.71 3.24 r 4 tblVehicleEF • SBUS T 2.98 4.07 r 4 tblVehicleEF • SBUS T 11.89 1.01 r 4 tblVehicleEF • SBUS T 6.6040e-003 4.0040e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.8800e-004 3.8000e-005 r 4 tblVehicleEF • SBUS T 6.3180e-003 3.8310e-003 r 4 tblVehicleEF • SBUS T 2.6790e-003 2.6220e-003 r 4 tblVehicleEF • SBUS T 0.02 0.02 r 4 tblVehicleEF • SBUS T 5.4000e-004 3.5000e-005 r 4 tblVehicleEF • SBUS T 4.9510e-003 6.2500e-004 r 4 tblVehicleEF • SBUS T 0.04 6.0080e-003 r 4 tblVehicleEF • SBUS T 0.94 0.26 r 4 tblVehicleEF • SBUS T 2.7180e-003 3.3500e-004 tblVehicleEF • SBUS • 0.09 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 0.02 0.05 tblVehicleEF • SBUS r 0.36 0.03 I- 4 tblVehicleEF • SBUS r 0.01 3.1320e-003 I- 4 tblVehicleEF • SBUS r 0.01 0.01 I- 4 tblVehicleEF • SBUS r 6.7900e-004 4.0000e-005 I- 4 tblVehicleEF • SBUS r 4.9510e-003 6.2500e-004 I- 4 tblVehicleEF • SBUS r 0.04 6.0080e-003 I- 4 tblVehicleEF • SBUS r 1.36 0.37 I- 4 tblVehicleEF • SBUS r 2.7180e-003 3.3500e-004 I- 4 tblVehicleEF • SBUS r 0.10 0.08 I- 4 tblVehicleEF • SBUS r 0.02 0.05 I- 4 tblVehicleEF • SBUS r 0.40 0.03 I- 4 tblVehicleEF • UBUS r 1.18 4.36 I- 4 tblVehicleEF • UBUS r 0.07 0.00 I- 4 tblVehicleEF • UBUS r 6.51 34.12 I- 4 tblVehicleEF • UBUS r 12.06 0.00 I- 4 tblVehicleEF • UBUS 1,758.87 1,515.24 I- 4 tblVehicleEF • UBUS r 150.95 0.00 I- 4 tblVehicleEF • UBUS r 2.89 0.34 I- 4 tblVehicleEF • UBUS r 12.11 0.00 I- 4 tblVehicleEF • UBUS r 0.49 0.08 I- 4 tblVehicleEF • UBUS r 0.01 0.03 I- 4 tblVehicleEF • UBUS r 0.03 4.3040e-003 I- 4 tblVehicleEF • UBUS r 1.5480e-003 0.00 I- 4 tblVehicleEF • UBUS r 0.21 0.03 I- 4 tblVehicleEF • UBUS r 3.0000e-003 6.8250e-003 tblVehicleEF • UBUS • 0.03 4.1170e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • UBUS • 1.4230e-003 0.00 • UBUS i 7.9490e-003 0.00 r • UBUS T 0.09 0.00 r • UBUS T 4.1220e-003 0.00 r • UBUS T 0.31 0.07 r • UBUS T 0.02 0.00 r • UBUS T 0.99 0.00 r 4 • UBUS T 9.0980e-003 0.00 r • UBUS T 1.7290e-003 0.00 r • UBUS T 7.9490e-003 0.00 r 4 • UBUS T 0.09 0.00 r 4 • UBUS T 4.1220e-003 0.00 r 4 • UBUS T 1.51 4.46 r 4 • UBUS T 0.02 0.00 r 4 • UBUS T 1.09 0.00 r 4 • UBUS T 1.18 4.36 r 4 • UBUS T 0.07 0.00 r 4 • UBUS T 6.56 34.12 r • UBUS T 10.37 0.00 r • UBUS T 1,758.87 1,515.24 r • UBUS T 150.95 0.00 r 4 • UBUS T 2.69 0.34 r 4 • UBUS T 12.03 0.00 r 4 • UBUS T 0.49 0.08 r 4 • UBUS T 0.01 0.03 r 4 • UBUS T 0.03 4.3040e-003 • UBUS • 1.5480e-003 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 0.21 0.03 tblVehicleEF • UBUS i 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.03 4.1170e-003 r tblVehicleEF • UBUS T 1.4230e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r tblVehicleEF • UBUS T 0.11 0.00 r tblVehicleEF • UBUS T 8.1050e-003 0.00 r 4 tblVehicleEF • UBUS T 0.31 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.91 0.00 r 4 tblVehicleEF • UBUS T 9.0990e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6990e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.11 0.00 r 4 tblVehicleEF • UBUS T 8.1050e-003 0.00 r 4 tblVehicleEF • UBUS T 1.52 4.46 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.99 0.00 r 4 tblVehicleEF • UBUS T 1.18 4.36 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 6.50 34.12 r 4 tblVehicleEF • UBUS T 12.26 0.00 r 4 tblVehicleEF • UBUS T 1,758.87 1,515.24 r 4 tblVehicleEF • UBUS T 150.95 0.00 r 4 tblVehicleEF • UBUS T 2.86 0.34 r 4 tblVehicleEF • UBUS T 12.11 0.00 tblVehicleEF • UBUS • 0.49 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 0.01 0.03 tblVehicleEF • UBUS i 0.03 4.3040e-003 r tblVehicleEF • UBUS T 1.5480e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.03 4.1170e-003 r tblVehicleEF • UBUS T 1.4230e-003 0.00 r 4 tblVehicleEF • UBUS T 6.9620e-003 0.00 r tblVehicleEF • UBUS T 0.10 0.00 r tblVehicleEF • UBUS T 3.7030e-003 0.00 r 4 tblVehicleEF • UBUS T 0.31 0.07 r 4 tblVehicleEF • UBUS T 0.03 0.00 r 4 tblVehicleEF • UBUS T 1.00 0.00 r 4 tblVehicleEF • UBUS T 9.0980e-003 0.00 r 4 tblVehicleEF • UBUS T 1.7320e-003 0.00 r 4 tblVehicleEF • UBUS T 6.9620e-003 0.00 r 4 tblVehicleEF • UBUS T 0.10 0.00 r 4 tblVehicleEF • UBUS T 3.7030e-003 0.00 r 4 tblVehicleEF • UBUS T 1.51 4.46 r 4 tblVehicleEF • UBUS T 0.03 0.00 r 4 tblVehicleEF • UBUS T 1.10 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 8.70 r 4 tblVehicleTrips • CNW_TL T 5.40 8.70 • r 4 tblVehicleTrips • CW_TL T 12.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 • tblVehicleTrips • HS_TL • 3.50 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • HS_TL • • • • • • • • • • HW TL HW TL ST_TR ST TR ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic • 3.50 8.70 i 11.00 8.70 r i 11.00 8.70 r i 7.16 8.08 r i 40.63 17.90 r i 9.91 9.48 r i 6.07 6.23 r i 39.53 T 17.00 r i 8.62 8.49 r i 6.59 7.26 r i 35.74 T 27.33 r i 9.52 T 9.38 r i 3.70 T 0.00 r i 26.50 T 0.00 r i 3.70 T 0.00 r • f 26.50 0.00 2.0 Emissions Summary Quarter I Start Date I End Date Maximum Unmitigated ROG + NOX (tons/quarter) I Maximum Mitigated ROG + NOX (tons/quarter) I Highest I ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction Quarter I Start Date I End Date Maximum Unmitigated ROG + NOX (tons/quarter) I Maximum Mitigated ROG + NOX (tons/quarter) I Highest I CaIEEMod Version: CaIEEMod.2016.3.2 Page 50 of 65 2.2 Overall Operational Unmitigated Operational Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i .� ,l •1 .� ,l .1 • • 5.9578 0.4624 1 4.6558 2.8600e- 1 1 0.0581 0.0581 0.0581 0.0581 • 0.0000 9 1 003 1 1 J 0.0544 0.4651 1 0.1979 2.9700e- 1 1 0.0376 0.0376 0.0376 0.0376 • 0.0000 I 003 1 i J 2.0168 5.6617 ' 18.5348 0.0623 1 6.0560 1 0.0621 6.1181 1.6207 0.0586 1.6793 • 0.0000 9I ; 0.0000 0.0000 0.0000 0.0000 • 126.7476 0.0000 0.0000 0.0000 0.0000 • 12.4849 • i 483.0671 483.0671 0.0161 1 8.7200e- 486.0696 003 1 J i 1,921.539 1,921.539 0.0655 1 0.0213 1,929.520 3 3 7 J i 5,974.965 5,974.965 0.2255 1 0.0000 5,980.603 4 4 9 i 0.0000 126.7476 7.4906 0.0000 314.0117 i 625.5100 637.9949 1.3073 0.0354 681.2382 Total 8.0290 6.5892 23.3884 0.0681 6.0560 0.1578 6.2138 1.6207 0.1543 1.7749 139.2325 9,005.081 8 9,144.314 3 9.1050 0.0655 9,391.444 1 CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 65 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i .� ,I •1 .� ,I .1 •1 •1 5.9578 0.4624 1 4.6558 2.8600e- 1 1 0.0581 0.0581 0.0581 0.0581 • 0.0000 9 1 003 1 1 V 0.0544 0.4651 1 0.1979 2.9700e- 1 1 0.0376 0.0376 0.0376 0.0376 • 0.0000 I 003 1 i . 2.0168 5.6617 ' 18.5348 0.0623 ' 6.0560 1 0.0621 6.1181 1.6207 0.0586 1.6793 • 0.0000 9I ; V 0.0000 0.0000 0.0000 0.0000 • 63.3738 V 0.0000 0.0000 0.0000 0.0000 • 12.4849 • i 483.0671 483.0671 0.0161 1 8.7200e- 486.0696 003 1 1,921.539 1,921.539 0.0655 1 0.0213 1,929.520 3 3 i 7 5,974.965 5,974.965 0.2255 ' 0.0000 5,980.603 4 4 i 9 i 0.0000 63.3738 3.7453 0.0000 157.0059 i 534.2007 546.6856 1.3036 0.0347 589.6132 Total Total 8.0290 6.5892 23.3884 0.0681 6.0560 0.1578 6.2138 1.6207 0.1543 1.7749 75.8587 8,913.772 5 8,989.631 2 5.3561 0.0647 9,142.813 3 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.52 1.01 1.69 41.17 1.15 2.65 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :1/1/2024 :12/31/2023 5• 0: Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers 0 0 1- 0: Usage Hours I Horse Power I Load Factor 8.001 81 : 0.73 I _ 8.001 158: 0.38 t 8.00 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix ,HDT Mix HHDT 3.1 Mitigation Measures Construction 4.0 Operational Detail - Mobile 4.1 Mitigation Measures Mobile CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 2.0168 i 5.6617 : 18.5348 : 0.0623 i 6.0560 : 0.0621 i 6.1181 i 1.6207 i 0.0586 1.6793 •• 0.0000 i 5,974.965 i 5,974.965 i 0.2255 i 0.0000 i 5,980.603 9 I 1 1 1 1 1 1 1 • 14 i 4 1 1 i 9 9 I 1 1 1 1 1 1 1 1 1 1 • I. + + + + + 4. + 4. r I. 4. 4. + r Unmitigated • 2.0168 • 5.6617 • 18.5348 • 0.0623 • 6.0560 • 0.0621 • 6.1181 1.6207 • 0.0586 • 1.6793 • 0.0000 • 5,974.965 • 5,974.965 • 0.2255 • 0.0000 • 5,980.603 4 4 9 4.2 Trip Summary Information 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise 8.70 8.70 8.70 i 40.20 19.20 40.60 • 86 11 3 Golf Course 8.70 8.707 8.70 r 33.00 48.00 T 19.00 • r 52 r 39 r• 9 -r T r r Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 • 0 0 0 I. * - Y t -r r r r Single Family Housing •8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 4.4 Fleet Mix Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 537.47 597.68 - T 461.11 • 1,504,675 1,504,675 Golf Course ; 328.00 214.74 203.95 576,073 • 576,073 Other Asphalt Surfaces ; 0.00 0.00 T 0.00• • Single Family Housing ; 4,970.55 5,023.18 4501.93 • 13,808,248 • 13,808,248 Total I 5,836.02 I 5,835.60 5,166.98 I 15,888,996 I 15,888,996 4.3 Trip Type Information Miles Trip % Trip Purpose % Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise 8.70 8.70 8.70 i 40.20 19.20 40.60 • 86 11 3 Golf Course 8.70 8.707 8.70 r 33.00 48.00 T 19.00 • r 52 r 39 r• 9 -r T r r Other Asphalt Surfaces 12.50 4.20 5.40 0.00 0.00 0.00 • 0 0 0 I. * - Y t -r r r r Single Family Housing •8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 4.4 Fleet Mix CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual LHD2 MHD HHD OBUS UBUS I MCY Apartments Low Rise • 0.556393+ 0.0350401 0.189382 i 0.106465 i 0.0120881 0.0044301 0.0174051 0.0702081 0.0014201 0.0011151 0.0044291 0.000881. 0.000745 } 1 1 1 1 1 1 1 1 1 1 • i i i i i i i i i i i + Golf Course • ▪ 0.5563931 0.0350401 0.1893821 0.1064651 0.0120881 0.0044301 0.0174051 0.0702081 0.0014201 0.0011151 0.0044291 0.000881. 0.000745 } 1 1 1 1 1 1 1 1 1 1 i i i i i i i i i i i + Other Asphalt Surfaces • ▪ 0.556393; 0.0350401 0.1893821 0.1064651 0.0120881 0.0044301 0.0174051 0.0702081 0.0014201 0.0011151 0.0044291 0.000881. 0.000745 } I I I 1 1 1 1 1 1 1 1• 1. 1. 1. 1. 1. 1. 1. 1. 1. 1• Land Use I LDA I LDT1 I LDT2 MDV LHD1 SBUS I MH Single Family Housing • 0.556393. 0.035040: 0.189382: 0.106465: 0.012088' 0.004430' 0.017405' 0.070208' 0.001420' 0.001115: 0.004429' 0.000881' 0.000745 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr I 1 1 1 1 1 1 1 1 Electricity •1 I 1 1 1 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 11,382.911411,382.91141 0.0552 1 0.0114 1 1,387.692 Mitigated •1 I 1 1 1 1 1 1 1 . 1 I 1 1 1 0 •1 1 1 1 1 1 1 1 • 1 1 1 1 1 • J J J J J J J J 7 J J J T 1 1 1 1 1 1 1 1 1 1 1 1 1 Electricity •1 I 1 I I 1 0.0000 1 0.0000 1 1 0.0000 0.0000 • 0.0000 1 1,382.911 11,382.91141 0.0552 0.0114 1 1,387.692 Unmitigated •1 1 I I I I I I I • � 4 1 I I 1 0 •1 I 1 I 1 1 I 1 • 1 1 1 I 1 • J J J J J J J J 7 J J 1 T 1 1 1 1 1 1 1 1 1 1 1 1 NaturalGas •1 0.0544 1 0.4651 0.1979 1 2.9700e- 1 1 0.0376 1 0.0376 1 1 0.0376 0.0376 • 0.0000 1 538.6279 1 538.6279 1 0.0103 9.8700e- 1 541.8287 Mitigated •1 1 I 1 003 I I I I • � I I 003 1 I 1 1 1 1 1 1 1 • 1 1 1 :i•} 4 4 4 4 } 4 4 r - 4 } 4 r NaturalGas . 0.0544 • 0.4651 • 0.1979 • 2.9700e- • • 0.0376 • 0.0376 • • 0.0376 • 0.0376 • 0.0000 • 538.6279 • 538.6279 • 0.0103 • 9.8700e- • 541.8287 Unmitigated 003 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 1 778178 • f -I 10 • i f -r : 0 i i f 4 1 9.31533e • 1 +006 i 4.2000e- 0.0359 0.0153 : 2.3000e- 2.9000e- 2.9000e- 1 : 2.9000e- 2.9000e- • 0.0000 003 1 004 003 003 1 003 003 J J J J J J J J 7 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 ' : 0.0000 0.0000 • 0.0000 1 .1 J .1 .1 .1 .1 .1 .1 7 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 .1 .1 .1 .1 .1 .1 .1 .1 . 0.0502 0.4292 0.1827 2.7400e- 0.0347 0.0347 0.0347 0.0347 • 0.0000 003 i 41.5266 41.5266 8.0000e- 7.6000e- 41.7733 004 004 i J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 497.1014 497.1014 9.5300e- 9.1100e- 500.0554 003 003 Total 0.0544 0.4651 0.1979 2.9700e- 003 0.0376 0.0376 0.0376 0.0376 0.0000 538.6279 538.6279 0.0103 9.8700e- 003 541.8287 CaIEEMod Version: CaIEEMod.2016.3.2 Page 56 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 1 778178 • h 4 10 • i : 0 i i f 4 1 9.31533e • 1 +006 i 4.2000e- 0.0359 0.0153 : 2.3000e- 2.9000e- 2.9000e- 1 : 2.9000e- 2.9000e- • 0.0000 003 1 004 003 003 1 1 003 003 • .1 .1 .1 .1 .1 .1 .1 .1 7 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 : 0.0000 0.0000 • 0.0000 1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 • 0.0000 1 .1 .1 .1 .1 .1 .1 .1 .1 V 0.0502 0.4292 0.1827 2.7400e- 0.0347 0.0347 0.0347 0.0347 • 0.0000 003 i 41.5266 41.5266 8.0000e- 7.6000e- 41.7733 004 004 I .1 .1 .1 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 .1 i 497.1014 497.1014 9.5300e- 9.1100e- 500.0554 003 003 Total 0.0544 0.4651 0.1979 2.9700e- 003 0.0376 0.0376 0.0376 0.0376 0.0000 538.6279 538.6279 0.0103 9.8700e- 003 541.8287 CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing i 293476 • i r 4 10 • i i r i i 0 i r 4 i 3.90048e • 1 +006 i 96.7704 3.8600e- 8.0000e- 97.1050 003 004 i J J r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 1,286.140 0.0513 0.0106 1,290.587 9 0 Total 1,382.911 4 0.0552 0.0114 1,387.692 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 1 293476 • i r 4 i 0 • i i r i i 0 i r 4 i 3.90048e • 1 +006 i 96.7704 3.8600e- 8.0000e- 97.1050 003 004 i J J r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 1,286.140 0.0513 0.0106 1,290.587 9 0 Total 1,382.911 4 0.0552 0.0114 1,387.692 0 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •i 5.9578 i 0.4624 i 4.6558 i 2.8600e- i 0.0581 i 0.0581 i 0.0581 0.0581 : 0.0000 i 483.0671 : 483.0671 i 0.0161 : 8.7200e- i 486.0696 •� 1 1 003 . 003 i 1 '� 1 1 1 • � • I. 1. 4. 1. 1. 4. + 4. 4. r I. 4. F F r Unmitigated • 5.9578 • 0.4624 • 4.6558 • 2.8600e- • • 0.0581 • 0.0581 0.0581 0.0581 • 0.0000 • 483.0671 • 483.0671 • 0.0161 • 8.7200e- • 486.0696 003 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i Coating :: •I Consumer •i Products :: •i Hearth •1 •I . Landscaping •i 1.6611 1 : 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 1 1 1 • i i i .1.1 .1 4.1140 : 0.0000 0.0000 I 0.0000 0.0000 • 0.0000 J J J J J J J J V 0.0481 0.4108 0.1748 2.6200e- 1 0.0332 0.0332 0.0332 0.0332 • 0.0000 003 • J J J .1 J J J J V 0.1346 0.0516 4.4810 2.4000e- 0.0249 0.0249 0.0249 0.0249 • 0.0000 004 • 0.0000 0.0000 0.0000 1 0.0000 0.0000 i .1 .1 .1 0.0000 0.0000 0.0000 I 0.0000 0.0000 J J J 475.7405 1 475.7405 9.1200e- 8.7200e- 478.5676 003 003 J J J 7.3266 7.3266 7.0200e- 0.0000 7.5021 003 Total 5.9578 0.4624 4.6558 2.8600e- 003 0.0581 0.0581 0.0581 0.0581 0.0000 483.0671 483.0671 0.0161 8.7200e- 003 486.0696 CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 65 6.2 Area by SubCategory Mitigated Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 1.6611 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: : i Consumer •i 4.1140 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth •i 0.0481 0.4108 0.1748 2.6200e- 0.0332 0.0332 0.0332 0.0332 • 0.0000 i 475.7405 475.7405 9.1200e- 8.7200e- 478.5676 .1 003 : 003 003 Landscaping •i 0.1346 0.0516 4.4810 2.4000e- 0.0249 0.0249 0.0249 0.0249 • 0.0000 i 7.3266 7.3266 7.0200e- 0.0000 7.5021 004 : • 003 Total 5.9578 0.4624 4.6558 2.8600e- 0.0581 0.0581 0.0581 0.0581 0.0000 483.0671 483.0671 0.0161 8.7200e- 486.0696 003 003 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •i 546.6856 i 1.3036 : 0.0347 i 589.6132 I I •I I I I eI- F 1. I r Unmitigated •• 637.9949 : 1.3073 • 0.0354 : 681.2382 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low 14.8214 / • 33.3656 1 0.1584 3.9700e- 38.5088 Rise 1 3.03958 :003 I I Golf Course I 0 / . T I 365.6594 I 0.0146 3.0200e- 366.9234 99.8142 • 003 I I- 4 .1 J T Other Asphalt 1 0 / 0 •I 0.0000 I 0.0000 I 0.0000 0.0000 Surfaces I I • r J J r Single Family :34.5316 / • 238.9700 1.1343 0.0285 275.8060 Housing I 21.7699 I Total 637.9949 1.3073 0.0354 681.2382 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 62 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Institute Recycling and Composting Services Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Apartments Low : 4.8214 / • 31.1386 1 0.1583 3.9500e- 36.2740 Rise 1 2.43166 :003 i i • J * Golf Course I 0 / • 292.5275 1 0.0117 2.4100e- 293.5387 i 79.8514 : i • 003 i Other Asphalt 1 0 / 0 • 0.0000 0.0000 0.0000 0.0000 Surfaces i I- - J J Single Family 1 34.5316 / • 223.0196 1.1337 0.0283 259.8005 Housing i 17.416 : i ilTotal 546.6856 1.3036 0.0347 589.6132 8.0 Waste Detail 8.1 Mitigation Measures Waste Institute Recycling and Composting Services CaIEEMod Version: CaIEEMod.2016.3.2 Category/Year Page 63 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 8.2 Waste by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Land Use MT/yr MT/yr Mitigated •i 63.3738 i 3.7453 i 0.0000 1 157.0059 9 I I •I I 1 I I Unmitigated •• 126.7476 • 7.4906 • 0.0000 • 314.0117 8.2 Waste by Land Use Unmitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing i 34.04 • I I•i • i 1.6 .I I . I • I- i 1 0 •I I I • r i i 588.76 •• I I 6.9098 1 0.4084 : 0.0000 .1 0.3248 I 0.0192 : 0.0000 i 1 .1 .1 0.0000 i 0.0000 1 0.0000 .1 .1 119.5130 7.0630 0.0000 17.1188 * 0.8046 t 0.0000 t 296.0883 Total 126.7476 7.4906 0.0000 314.0117 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Mitigated Page 64 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators 1 Equipment Type I Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers r Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise . Golf Course I- Other Asphalt Surfaces I- Single Family Housing i 17.02 • i i i 0.8 • i 4 i 0 i • i � i 294.38 • i i 3.4549 1 0.2042 0.0000 8.5594 i J 0.1624 1 9.6000e- 0.0000 * 0.4023 003 J 0.0000 0.0000 0.0000 0.0000 J 59.7565 3.5315 0.0000 148.0442 ilTotal 63.3738 3.7453 0.0000 157.0059 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators 1 Equipment Type I Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers r Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 65 of 65 Date: 1/6/2021 4:54 PM Travertine Specific Plan - Phase 1 (Operations) - Riverside -Salton Sea County, Annual Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.19: CALEEMOD PHASE 2 OPERATIONAL EMISSIONS MODEL OUTPUTS 12188-05 GHG Report [_moi URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Travertine Specific Plan - Phase 2 (Operations) Riverside -Salton Sea County, Annual 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course • 35.00 + Acre ; 35.00 12.00 + Hole ; 46.20 I. Apartments Low Rise • 237.00 + Dwelling Unit ; 34.90 237,000.00 + 642 r Single Family Housing • 673.00 • Dwelling Unit 288.10 1,211,400.00 1824 1,524,600.00 64,282.00 0 f 0 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 664.68 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2029 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2029 Operational Year Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 53% less energy for residential uses. Water Mitigation - Waste Mitigation - 1 Column Name tblConstructionPhase • NumDays } 500.00 • 0.00 tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 1,608.84 T• 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T 4,485.92 tblEnergyUse Y T24NG • 24,566.15 T 11,546.09 tblFireplaces Y NumberGas 189.60 T• 237.00 • tblFireplaces Y• NumberGas 538.40 T 673.00 tblFireplaces Y• NumberNoFireplace 23.70 T 0.00 4 1 1 tblFireplaces • NumberNoFireplace 67.30 0.00 • Table Name Default Value New Value CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblFireplaces • NumberWood • 23.70 0.00 tblFireplaces • NumberWood i 67.30 0.00 r tblLandUse • LandUseSquareFeet T 0.00 64,282.00 r tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 14.81 34.90 r tblLandUse • LotAcreage i 218.51 288.10 • r tblLandUse • Population T 678.00 642.00 r 4 tblLandUse • Population T 1,925.00 1,824.00 r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 • r tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 664.68 r 4 tblVehicleEF • HHD T 0.80 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 1.95 10.45 r 4 tblVehicleEF • HHD T 0.44 0.20 r 4 tblVehicleEF • HHD T 1.58 1.8620e-003 r 4 tblVehicleEF • HHD T 5,742.47 1,527.02 r 4 tblVehicleEF • HHD T 1,373.32 1,061.63 r 4 tblVehicleEF • HHD T 5.03 0.02 r 4 tblVehicleEF • HHD T 16.30 8.39 r 4 tblVehicleEF • HHD T 0.77 1.76 r 4 tblVehicleEF • HHD T 20.20 2.34 r 4 tblVehicleEF • HHD T 3.1760e-003 3.0820e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 tblVehicleEF • HHD • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 4.9030e-003 0.03 tblVehicleEF • HHD i 5.1000e-005 0.00 r tblVehicleEF • HHD T 3.0390e-003 2.9490e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8490e-003 8.9650e-003 r tblVehicleEF • HHD T 4.6910e-003 0.02 r tblVehicleEF • HHD T 4.7000e-005 0.00 r 4 tblVehicleEF • HHD T 7.6000e-005 1.0000e-006 r tblVehicleEF • HHD T 2.1880e-003 1.4000e-005 r tblVehicleEF • HHD T 0.52 0.71 r 4 tblVehicleEF • HHD T 4.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5200e-004 5.5000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.9550e-003 r 4 tblVehicleEF • HHD T 7.6000e-005 0.00 r 4 tblVehicleEF • HHD T 7.6000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.1880e-003 1.4000e-005 r 4 tblVehicleEF • HHD T 0.59 0.81 r 4 tblVehicleEF • HHD T 4.5000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5200e-004 5.5000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.75 0.04 r 4 tblVehicleEF • HHD T 0.03 0.01 tblVehicleEF • HHD • 0.06 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 1.42 10.31 tblVehicleEF • HHD i 0.44 0.20 r tblVehicleEF • HHD T 1.51 1.8100e-003 r tblVehicleEF • HHD T 6,083.64 1,507.13 r tblVehicleEF • HHD i 1,373.32 1,061.63 r tblVehicleEF • HHD T 5.03 0.02 r tblVehicleEF • HHD T 16.83 7.97 r 4 tblVehicleEF • HHD T 0.73 1.66 r tblVehicleEF • HHD T 20.19 2.34 r tblVehicleEF • HHD T 2.6780e-003 2.7360e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.9030e-003 0.03 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 r 4 tblVehicleEF • HHD T 2.5620e-003 2.6170e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8490e-003 8.9650e-003 r 4 tblVehicleEF • HHD T 4.6910e-003 0.02 r 4 tblVehicleEF • HHD T 4.7000e-005 0.00 r 4 tblVehicleEF • HHD i 1.4500e-004 1.0000e-006 r 4 tblVehicleEF • HHD i 2.4690e-003 1.7000e-005 r 4 tblVehicleEF • HHD T 0.49 0.75 r 4 tblVehicleEF • HHD T 8.3000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.04 0.02 r 4 tblVehicleEF • HHD T 1.5400e-004 5.7000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 tblVehicleEF • HHD • 0.06 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 0.01 9.9550e-003 tblVehicleEF • HHD i 7.5000e-005 0.00 r tblVehicleEF • HHD T 1.4500e-004 1.0000e-006 r tblVehicleEF • HHD T 2.4690e-003 1.7000e-005 r tblVehicleEF • HHD T 0.56 0.85 r tblVehicleEF • HHD T 8.3000e-005 1.0000e-006 r tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.5400e-004 5.7000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.86 0.03 r 4 tblVehicleEF • HHD T 0.03 8.5100e-004 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 2.69 10.62 r 4 tblVehicleEF • HHD T 0.43 0.16 r 4 tblVehicleEF • HHD T 1.60 1.9780e-003 r 4 tblVehicleEF • HHD T 5,271.34 1,551.56 r 4 tblVehicleEF • HHD T 1,373.32 1,053.71 r 4 tblVehicleEF • HHD T 5.03 0.02 r 4 tblVehicleEF • HHD T 15.58 8.94 r 4 tblVehicleEF • HHD T 0.76 1.78 r 4 tblVehicleEF • HHD T 20.20 2.34 r 4 tblVehicleEF • HHD T 3.8640e-003 3.5450e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.9030e-003 0.03 r 4 tblVehicleEF • HHD T 5.1000e-005 0.00 tblVehicleEF • HHD • 3.6970e-003 3.3910e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 0.03 0.03 tblVehicleEF • HHD i 8.8490e-003 8.9410e-003 r tblVehicleEF • HHD T 4.6910e-003 0.02 r tblVehicleEF • HHD T 4.7000e-005 0.00 r tblVehicleEF • HHD T 5.2000e-005 0.00 r tblVehicleEF • HHD T 2.2360e-003 1.2000e-005 r tblVehicleEF • HHD T 0.56 0.65 r 4 tblVehicleEF • HHD T 3.7000e-005 0.00 r tblVehicleEF • HHD T 0.04 0.02 r tblVehicleEF • HHD T 1.6500e-004 5.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.9550e-003 r 4 tblVehicleEF • HHD T 7.6000e-005 0.00 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 2.2360e-003 1.2000e-005 r 4 tblVehicleEF • HHD T 0.64 0.74 r 4 tblVehicleEF • HHD T 3.7000e-005 0.00 r 4 tblVehicleEF • HHD T 0.08 0.02 r 4 tblVehicleEF • HHD T 1.6500e-004 5.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • LDA T 2.0740e-003 1.1190e-003 r 4 tblVehicleEF • LDA T 2.1460e-003 0.03 r 4 tblVehicleEF • LDA i 0.37 0.49 r 4 tblVehicleEF • LDA 0.62 1.54 r r 4 tblVehicleEF • LDA 188.41 225.89 • r tblVehicleEF • LDA • 43.48 45.28 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • LDA • 0.03 0.02 • LDA i 0.03 0.12 r • LDA T 1.1870e-003 9.5200e-004 r • LDA T 1.9140e-003 1.3200e-003 r • LDA T 1.0920e-003 8.7600e-004 r • LDA T 1.7600e-003 1.2140e-003 r • LDA T 0.03 0.06 r 4 • LDA T 0.06 0.07 r • LDA T 0.02 0.05 r • LDA T 5.1920e-003 3.8270e-003 r 4 • LDA T 0.03 0.17 r 4 • LDA T 0.03 0.11 r 4 • LDA T 1.8860e-003 2.1030e-003 r 4 • LDA T 4.4500e-004 4.2200e-004 r 4 • LDA T 0.03 0.06 r 4 • LDA T 0.06 0.07 r 4 • LDA T 0.02 0.05 r 4 • LDA T 7.5550e-003 5.5800e-003 r 4 • LDA T 0.03 0.17 r 4 • LDA T 0.03 0.12 r 4 • LDA T 2.3460e-003 1.3150e-003 r 4 • LDA T 1.8580e-003 0.02 r 4 • LDA T 0.45 0.64 r 4 • LDA T 0.54 1.59 r 4 • LDA T 205.09 250.22 r 4 • LDA T 43.48 45.34 • LDA • 0.02 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 0.03 0.13 tblVehicleEF • LDA i 1.1870e-003 9.5200e-004 r tblVehicleEF • LDA T 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.06 0.13 r tblVehicleEF • LDA T 0.07 0.09 r 4 tblVehicleEF • LDA T 0.05 0.09 r tblVehicleEF • LDA T 5.8650e-003 4.4740e-003 r tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.03 0.10 r 4 tblVehicleEF • LDA T 2.0530e-003 2.3300e-003 r 4 tblVehicleEF • LDA T 4.4300e-004 4.2200e-004 r 4 tblVehicleEF • LDA T 0.06 0.13 r 4 tblVehicleEF • LDA T 0.07 0.09 r 4 tblVehicleEF • LDA T 0.05 0.09 r 4 tblVehicleEF • LDA T 8.5370e-003 6.5260e-003 r 4 tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 2.0040e-003 9.9000e-004 r 4 tblVehicleEF • LDA T 2.2030e-003 0.03 r 4 tblVehicleEF • LDA T 0.34 0.41 r 4 tblVehicleEF • LDA T 0.63 1.79 r 4 tblVehicleEF • LDA T 183.79 209.99 r 4 tblVehicleEF • LDA T 43.48 45.74 r 4 tblVehicleEF • LDA T 0.03 0.02 tblVehicleEF • LDA • 0.03 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 1.1870e-003 9.5200e-004 tblVehicleEF • LDA i 1.9140e-003 1.3200e-003 r tblVehicleEF • LDA T 1.0920e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7600e-003 1.2140e-003 r tblVehicleEF • LDA T 0.03 0.02 r tblVehicleEF • LDA T 0.07 0.07 r tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 5.0180e-003 3.4370e-003 r tblVehicleEF • LDA T 0.03 0.19 r tblVehicleEF • LDA T 0.03 0.13 r 4 tblVehicleEF • LDA T 1.8390e-003 1.9550e-003 r 4 tblVehicleEF • LDA T 4.4500e-004 4.2600e-004 r 4 tblVehicleEF • LDA T 0.03 0.02 r 4 tblVehicleEF • LDA T 0.07 0.07 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 7.3010e-003 5.0080e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.14 r 4 tblVehicleEF • LDT1 T 4.8960e-003 3.2050e-003 r 4 tblVehicleEF • LDT1 T 6.7680e-003 0.04 r 4 tblVehicleEF • LDT1 T 0.70 0.85 r 4 tblVehicleEF • LDT1 T 1.47 1.72 r 4 tblVehicleEF • LDT1 T 243.69 282.02 r 4 tblVehicleEF • LDT1 T 56.79 55.93 r 4 tblVehicleEF • LDT1 T 0.06 0.05 r 4 tblVehicleEF • LDT1 T 0.08 0.16 tblVehicleEF • LDT1 • 1.5930e-003 1.3180e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 2.5160e-003 1.6410e-003 tblVehicleEF • LDT1 i 1.4650e-003 1.2120e-003 r tblVehicleEF • LDT1 T 2.3140e-003 1.5080e-003 r tblVehicleEF • LDT1 T 0.12 0.14 r tblVehicleEF • LDT1 T 0.19 0.14 r tblVehicleEF • LDT1 T 0.08 0.10 r tblVehicleEF • LDT1 T 0.01 0.01 r 4 tblVehicleEF • LDT1 T 0.12 0.45 r tblVehicleEF • LDT1 T 0.09 0.17 r tblVehicleEF • LDT1 T 2.4440e-003 2.6260e-003 r 4 tblVehicleEF • LDT1 T 5.9300e-004 5.2100e-004 r 4 tblVehicleEF • LDT1 T 0.12 0.15 r 4 tblVehicleEF • LDT1 T 0.19 0.14 r 4 tblVehicleEF • LDT1 T 0.08 0.10 r 4 tblVehicleEF • LDT1 T 0.02 0.02 r 4 tblVehicleEF • LDT1 T 0.12 0.45 r 4 tblVehicleEF • LDT1 T 0.10 0.18 r 4 tblVehicleEF • LDT1 T 5.5210e-003 3.7170e-003 r 4 tblVehicleEF • LDT1 T 5.8670e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.85 1.10 r 4 tblVehicleEF • LDT1 T 1.30 1.77 r 4 tblVehicleEF • LDT1 T 264.97 308.22 r 4 tblVehicleEF • LDT1 T 56.79 55.97 r 4 tblVehicleEF • LDT1 T 0.06 0.06 r 4 tblVehicleEF • LDT1 T 0.08 0.17 r 4 tblVehicleEF • LDT1 T 1.5930e-003 1.3180e-003 tblVehicleEF • LDT1 • 2.5160e-003 1.6410e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 1.4650e-003 1.2120e-003 tblVehicleEF • LDT1 r 2.3140e-003 1.5080e-003 I- 4 tblVehicleEF • LDT1 r 0.23 0.30 I- 4 tblVehicleEF • LDT1 r 0.23 0.18 I- 4 tblVehicleEF • LDT1 r 0.15 0.19 I- 4 tblVehicleEF • LDT1 r 0.01 0.02 I- 4 tblVehicleEF • LDT1 r 0.12 0.47 I- 4 tblVehicleEF • LDT1 r 0.08 0.16 I- 4 tblVehicleEF • LDT1 r 2.6590e-003 2.8700e-003 I- 4 tblVehicleEF • LDT1 r 5.9000e-004 5.2100e-004 I- 4 tblVehicleEF • LDT1 r 0.23 0.30 I- 4 tblVehicleEF • LDT1 r 0.23 0.18 I- 4 tblVehicleEF • LDT1 r 0.15 0.19 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.12 0.47 I- 4 tblVehicleEF • LDT1 r 0.09 0.17 I- 4 tblVehicleEF • LDT1 r 4.7170e-003 2.8730e-003 I- 4 tblVehicleEF • LDT1 r 6.9460e-003 0.04 I- 4 tblVehicleEF • LDT1 r 0.65 0.72 I- 4 tblVehicleEF • LDT1 r 1.50 1.99 I- 4 tblVehicleEF • LDT1 r 237.25 264.92 I- 4 tblVehicleEF • LDT1 r 56.79 56.47 I- 4 tblVehicleEF • LDT1 r 0.06 0.06 I- 4 tblVehicleEF • LDT1 r 0.08 0.17 I- 4 tblVehicleEF • LDT1 r 1.5930e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 2.5160e-003 1.6410e-003 tblVehicleEF • LDT1 • 1.4650e-003 1.2120e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 2.3140e-003 1.5080e-003 tblVehicleEF • LDT1 r 0.10 0.06 I- 4 tblVehicleEF • LDT1 r 0.20 0.13 I- 4 tblVehicleEF • LDT1 r 0.07 0.05 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.14 0.50 I- 4 tblVehicleEF • LDT1 r 0.09 0.19 I- 4 tblVehicleEF • LDT1 r 2.3790e-003 2.4660e-003 I- 4 tblVehicleEF • LDT1 r 5.9400e-004 5.2600e-004 I- 4 tblVehicleEF • LDT1 r 0.10 0.06 I- 4 tblVehicleEF • LDT1 r 0.20 0.13 I- 4 tblVehicleEF • LDT1 r 0.07 0.05 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.14 0.50 I- 4 tblVehicleEF • LDT1 r 0.10 0.21 I- 4 tblVehicleEF • LDT2 r 3.1110e-003 2.3190e-003 I- 4 tblVehicleEF • LDT2 r 3.1670e-003 0.04 I- 4 tblVehicleEF • LDT2 r 0.52 0.71 I- 4 tblVehicleEF • LDT2 r 0.86 2.03 I- 4 tblVehicleEF • LDT2 r 271.93 286.59 I- 4 tblVehicleEF • LDT2 r 62.41 57.16 I- 4 tblVehicleEF • LDT2 r 0.04 0.04 I- 4 tblVehicleEF • LDT2 r 0.05 0.16 I- 4 tblVehicleEF • LDT2 r 1.3400e-003 1.1340e-003 I- 4 tblVehicleEF • LDT2 r 2.1390e-003 1.4120e-003 I- 4 tblVehicleEF • LDT2 r 1.2320e-003 1.0440e-003 tblVehicleEF • LDT2 • 1.9660e-003 1.2980e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.05 0.11 tblVehicleEF • LDT2 i 0.08 0.10 r tblVehicleEF • LDT2 T 0.04 0.09 r tblVehicleEF • LDT2 T 7.7230e-003 8.7740e-003 r tblVehicleEF • LDT2 T 0.05 0.33 r tblVehicleEF • LDT2 T 0.04 0.16 r tblVehicleEF • LDT2 T 2.7230e-003 2.6680e-003 r 4 tblVehicleEF • LDT2 T 6.3800e-004 5.3200e-004 r tblVehicleEF • LDT2 T 0.05 0.11 r tblVehicleEF • LDT2 T 0.08 0.10 r 4 tblVehicleEF • LDT2 T 0.04 0.09 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.34 r 4 tblVehicleEF • LDT2 T 0.05 0.18 r 4 tblVehicleEF • LDT2 T 3.5240e-003 2.7030e-003 r 4 tblVehicleEF • LDT2 T 2.7640e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.64 0.92 r 4 tblVehicleEF • LDT2 T 0.77 2.09 r 4 tblVehicleEF • LDT2 T 295.86 310.75 r 4 tblVehicleEF • LDT2 T 62.41 57.21 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.05 0.17 r 4 tblVehicleEF • LDT2 T 1.3400e-003 1.1340e-003 r 4 tblVehicleEF • LDT2 T 2.1390e-003 1.4120e-003 r 4 tblVehicleEF • LDT2 T 1.2320e-003 1.0440e-003 r 4 tblVehicleEF • LDT2 T 1.9660e-003 1.2980e-003 tblVehicleEF • LDT2 • 0.09 0.23 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.09 0.12 tblVehicleEF • LDT2 i 0.07 0.16 r tblVehicleEF • LDT2 T 8.7430e-003 0.01 r tblVehicleEF • LDT2 T 0.05 0.35 r tblVehicleEF • LDT2 T 0.04 0.15 r tblVehicleEF • LDT2 T 2.9630e-003 2.8930e-003 r tblVehicleEF • LDT2 T 6.3600e-004 5.3300e-004 r 4 tblVehicleEF • LDT2 T 0.09 0.23 r tblVehicleEF • LDT2 T 0.09 0.12 r tblVehicleEF • LDT2 T 0.07 0.16 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.35 r 4 tblVehicleEF • LDT2 T 0.04 0.17 r 4 tblVehicleEF • LDT2 T 2.9910e-003 2.0690e-003 r 4 tblVehicleEF • LDT2 T 3.2640e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.49 0.60 r 4 tblVehicleEF • LDT2 T 0.88 2.36 r 4 tblVehicleEF • LDT2 T 264.67 270.81 r 4 tblVehicleEF • LDT2 T 62.41 57.80 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.05 0.17 r 4 tblVehicleEF • LDT2 T 1.3400e-003 1.1340e-003 r 4 tblVehicleEF • LDT2 T 2.1390e-003 1.4120e-003 r 4 tblVehicleEF • LDT2 T 1.2320e-003 1.0440e-003 r 4 tblVehicleEF • LDT2 T 1.9660e-003 1.2980e-003 r 4 tblVehicleEF • LDT2 T 0.04 0.04 tblVehicleEF • LDT2 • 0.08 0.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.03 0.04 tblVehicleEF • LDT2 i 7.4260e-003 7.9030e-003 r tblVehicleEF • LDT2 T 0.06 0.37 r tblVehicleEF • LDT2 T 0.04 0.19 r tblVehicleEF • LDT2 T 2.6500e-003 2.5220e-003 r tblVehicleEF • LDT2 T 6.3800e-004 5.3800e-004 r tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.08 0.09 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.06 0.38 r 4 tblVehicleEF • LDT2 T 0.05 0.21 r 4 tblVehicleEF • LHD1 T 4.0180e-003 4.2260e-003 r 4 tblVehicleEF • LHD1 T 4.4710e-003 2.1010e-003 r 4 tblVehicleEF • LHD1 T 0.01 8.8380e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.45 0.26 r 4 tblVehicleEF • LHD1 T 1.58 0.81 r 4 tblVehicleEF • LHD1 T 9.14 8.43 r 4 tblVehicleEF • LHD1 T 562.56 567.96 r 4 tblVehicleEF • LHD1 T 26.03 9.80 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 1.07 0.42 r 4 tblVehicleEF • LHD1 T 0.70 0.22 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9470e-003 tblVehicleEF • LHD1 • 9.3040e-003 5.2130e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 6.2000e-004 1.9500e-004 tblVehicleEF • LHD1 i 8.5200e-004 9.0500e-004 r tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r tblVehicleEF • LHD1 T 2.9370e-003 2.9530e-003 r tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r tblVehicleEF • LHD1 T 1.5480e-003 1.4420e-003 r tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.35 r 4 tblVehicleEF • LHD1 T 0.15 0.04 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r 4 tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.9000e-004 9.7000e-005 r 4 tblVehicleEF • LHD1 T 2.9370e-003 2.9530e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.5480e-003 1.4420e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.35 r 4 tblVehicleEF • LHD1 T 0.17 0.05 r 4 tblVehicleEF • LHD1 T 4.0180e-003 4.2330e-003 r 4 tblVehicleEF • LHD1 T 4.5270e-003 2.1190e-003 r 4 tblVehicleEF • LHD1 T 0.01 8.6350e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 tblVehicleEF • LHD1 • 0.45 0.26 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 1.51 0.79 tblVehicleEF • LHD1 i 9.14 8.43 r tblVehicleEF • LHD1 T 562.56 567.97 r tblVehicleEF • LHD1 T 26.03 9.77 r tblVehicleEF • LHD1 T 0.08 0.05 r tblVehicleEF • LHD1 T 1.00 0.39 r tblVehicleEF • LHD1 T 0.68 0.22 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r tblVehicleEF • LHD1 T 0.01 9.9470e-003 r tblVehicleEF • LHD1 T 9.3040e-003 5.2130e-003 r 4 tblVehicleEF • LHD1 T 6.2000e-004 1.9500e-004 r 4 tblVehicleEF • LHD1 T 8.5200e-004 9.0500e-004 r 4 tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r 4 tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r 4 tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r 4 tblVehicleEF • LHD1 T 5.4640e-003 5.9000e-003 r 4 tblVehicleEF • LHD1 T 0.09 0.07 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 2.8600e-003 2.6450e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.28 0.36 r 4 tblVehicleEF • LHD1 T 0.15 0.04 r 4 tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r 4 tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.8800e-004 9.7000e-005 r 4 tblVehicleEF • LHD1 T 5.4640e-003 5.9000e-003 tblVehicleEF • LHD1 • 0.09 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 0.02 0.02 tblVehicleEF • LHD1 i 2.8600e-003 2.6450e-003 r tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.28 0.36 r tblVehicleEF • LHD1 T 0.16 0.04 r tblVehicleEF • LHD1 T 4.0180e-003 4.2140e-003 r tblVehicleEF • LHD1 T 4.4680e-003 2.0700e-003 r 4 tblVehicleEF • LHD1 T 0.01 9.2180e-003 r tblVehicleEF • LHD1 T 0.13 0.17 r tblVehicleEF • LHD1 T 0.45 0.26 r 4 tblVehicleEF • LHD1 T 1.59 0.86 r 4 tblVehicleEF • LHD1 T 9.14 8.43 r 4 tblVehicleEF • LHD1 T 562.56 567.96 r 4 tblVehicleEF • LHD1 T 26.03 9.88 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 1.05 0.42 r 4 tblVehicleEF • LHD1 T 0.70 0.23 r 4 tblVehicleEF • LHD1 T 8.9100e-004 9.4600e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9470e-003 r 4 tblVehicleEF • LHD1 T 9.3040e-003 5.2130e-003 r 4 tblVehicleEF • LHD1 T 6.2000e-004 1.9500e-004 r 4 tblVehicleEF • LHD1 T 8.5200e-004 9.0500e-004 r 4 tblVehicleEF • LHD1 T 2.6110e-003 2.4870e-003 r 4 tblVehicleEF • LHD1 T 8.8860e-003 4.9680e-003 r 4 tblVehicleEF • LHD1 T 5.7000e-004 1.7900e-004 r 4 tblVehicleEF • LHD1 T 2.4840e-003 1.2590e-003 tblVehicleEF • LHD1 • 0.09 0.05 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 0.01 0.02 tblVehicleEF • LHD1 i 1.4000e-003 7.5100e-004 r tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.30 0.37 r tblVehicleEF • LHD1 T 0.15 0.04 r tblVehicleEF • LHD1 T 9.1000e-005 8.2000e-005 r tblVehicleEF • LHD1 T 5.4950e-003 5.5300e-003 r 4 tblVehicleEF • LHD1 T 2.9000e-004 9.8000e-005 r tblVehicleEF • LHD1 T 2.4840e-003 1.2590e-003 r tblVehicleEF • LHD1 T 0.09 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.4000e-003 7.5100e-004 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.30 0.37 r 4 tblVehicleEF • LHD1 T 0.17 0.05 r 4 tblVehicleEF • LHD2 T 2.6430e-003 3.1370e-003 r 4 tblVehicleEF • LHD2 T 1.8530e-003 2.0460e-003 r 4 tblVehicleEF • LHD2 T 3.6750e-003 6.9830e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.20 0.25 r 4 tblVehicleEF • LHD2 T 0.85 0.54 r 4 tblVehicleEF • LHD2 T 13.84 13.00 r 4 tblVehicleEF • LHD2 T 568.17 579.28 r 4 tblVehicleEF • LHD2 T 21.64 7.76 r 4 tblVehicleEF • LHD2 T 0.08 0.07 r 4 tblVehicleEF • LHD2 T 0.42 0.60 tblVehicleEF • LHD2 • 0.30 0.18 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 1.0990e-003 1.3650e-003 tblVehicleEF • LHD2 i 0.01 0.01 r tblVehicleEF • LHD2 T 7.2020e-003 9.4750e-003 r tblVehicleEF • LHD2 T 3.5100e-004 1.1200e-004 r tblVehicleEF • LHD2 T 1.0510e-003 1.3060e-003 r tblVehicleEF • LHD2 T 2.7100e-003 2.6750e-003 r tblVehicleEF • LHD2 T 6.8800e-003 9.0540e-003 r 4 tblVehicleEF • LHD2 T 3.2200e-004 1.0300e-004 r tblVehicleEF • LHD2 T 9.1500e-004 2.1100e-003 r tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 5.2400e-004 1.0970e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.03 r 4 tblVehicleEF • LHD2 T 1.3500e-004 1.2400e-004 r 4 tblVehicleEF • LHD2 T 5.5200e-003 5.5960e-003 r 4 tblVehicleEF • LHD2 T 2.3100e-004 7.7000e-005 r 4 tblVehicleEF • LHD2 T 9.1500e-004 2.1100e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.02 0.02 r 4 tblVehicleEF • LHD2 T 5.2400e-004 1.0970e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.04 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.04 r 4 tblVehicleEF • LHD2 T 2.6430e-003 3.1420e-003 tblVehicleEF • LHD2 • 1.8660e-003 2.0570e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 3.5810e-003 6.8240e-003 tblVehicleEF • LHD2 i 0.12 0.14 r tblVehicleEF • LHD2 T 0.20 0.25 r tblVehicleEF • LHD2 T 0.82 0.52 r tblVehicleEF • LHD2 T 13.84 13.00 r tblVehicleEF • LHD2 T 568.17 579.28 r tblVehicleEF • LHD2 T 21.64 7.73 r 4 tblVehicleEF • LHD2 T 0.08 0.07 r tblVehicleEF • LHD2 T 0.40 0.56 r tblVehicleEF • LHD2 T 0.29 0.18 r 4 tblVehicleEF • LHD2 T 1.0990e-003 1.3650e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 7.2020e-003 9.4750e-003 r 4 tblVehicleEF • LHD2 T 3.5100e-004 1.1200e-004 r 4 tblVehicleEF • LHD2 T 1.0510e-003 1.3060e-003 r 4 tblVehicleEF • LHD2 T 2.7100e-003 2.6750e-003 r 4 tblVehicleEF • LHD2 T 6.8800e-003 9.0540e-003 r 4 tblVehicleEF • LHD2 T 3.2200e-004 1.0300e-004 r 4 tblVehicleEF • LHD2 T 1.7160e-003 4.2180e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.05 r 4 tblVehicleEF • LHD2 T 0.01 0.02 r 4 tblVehicleEF • LHD2 T 9.6100e-004 1.9690e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.05 0.21 r 4 tblVehicleEF • LHD2 T 0.05 0.03 r 4 tblVehicleEF • LHD2 T 1.3500e-004 1.2400e-004 tblVehicleEF • LHD2 • 5.5200e-003 5.5960e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 2.3000e-004 7.7000e-005 tblVehicleEF • LHD2 r 1.7160e-003 4.2180e-003 I- 4 tblVehicleEF • LHD2 r 0.02 0.05 I- 4 tblVehicleEF • LHD2 r 0.02 0.02 I- 4 tblVehicleEF • LHD2 r 9.6100e-004 1.9690e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.05 0.21 I- 4 tblVehicleEF • LHD2 r 0.05 0.04 I- 4 tblVehicleEF • LHD2 r 2.6430e-003 3.1280e-003 I- 4 tblVehicleEF • LHD2 r 1.8510e-003 2.0290e-003 I- 4 tblVehicleEF • LHD2 r 3.6910e-003 7.2810e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.14 I- 4 tblVehicleEF • LHD2 r 0.20 0.24 I- 4 tblVehicleEF • LHD2 r 0.86 0.57 I- 4 tblVehicleEF • LHD2 r 13.84 13.00 I- 4 tblVehicleEF • LHD2 r 568.17 579.27 I- 4 tblVehicleEF • LHD2 r 21.64 7.81 I- 4 tblVehicleEF • LHD2 r 0.08 0.07 I- 4 tblVehicleEF • LHD2 r 0.42 0.61 I- 4 tblVehicleEF • LHD2 r 0.30 0.19 I- 4 tblVehicleEF • LHD2 r 1.0990e-003 1.3650e-003 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 7.2020e-003 9.4750e-003 I- 4 tblVehicleEF • LHD2 r 3.5100e-004 1.1200e-004 I- 4 tblVehicleEF • LHD2 r 1.0510e-003 1.3060e-003 I- 4 tblVehicleEF • LHD2 r 2.7100e-003 2.6750e-003 tblVehicleEF • LHD2 • 6.8800e-003 9.0540e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • LHD2 • 3.2200e-004 1.0300e-004 • LHD2 r 6.9700e-004 8.7600e-004 • I- 4 • LHD2 r 0.02 0.04 I- 4 • LHD2 r 0.01 0.02 I- 4 • LHD2 r 4.5100e-004 5.8200e-004 I- 4 • LHD2 r 0.03 0.03 I- 4 • LHD2r 0.05 0.22 I- 4 • LHD2 r 0.05 0.03 I- 4 • LHD2r 1.3500e-004 1.2400e-004 • I- 4 • LHD2 r 5.5200e-003 5.5960e-003 I- 4 • LHD2r 2.3100e-004 7.7000e-005 • I- 4 • LHD2 r 6.9700e-004 8.7600e-004 I- 4 • LHD2 r 0.02 0.04 I- 4 • LHD2 r 0.02 0.02 I- 4 • LHD2 r 4.5100e-004 5.8200e-004 I- 4 • LHD2r 0.03 0.04 I- 4 • LHD2 r 0.05 0.22 I- 4 • LHD2r 0.05 0.04 • I- 4 • MCY r 0.44 0.32 I- 4 • MCY r 0.15 0.23 I- 4 • MCY r 17.59 17.71 I- 4 • MCY r 9.79 8.42 I- 4 • MCYr 169.21 209.47 I- 4 • MCY r 43.23 57.28 I- 4 • MCYr 1.11 1.10 • I- 4 • MCY r 0.31 0.26 • MCY • 2.0660e-003 2.1680e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 3.1790e-003 2.8440e-003 tblVehicleEF • MCY i 1.9270e-003 2.0220e-003 r tblVehicleEF • MCY T 2.9740e-003 2.6590e-003 r tblVehicleEF • MCY T 1.67 2.44 r tblVehicleEF • MCY T 0.78 0.93 r tblVehicleEF • MCY T 0.89 1.33 r tblVehicleEF • MCY T 2.07 2.13 r 4 tblVehicleEF • MCY T 0.46 1.46 r tblVehicleEF • MCY T 1.99 1.68 r tblVehicleEF • MCY T 2.0410e-003 2.0730e-003 r 4 tblVehicleEF • MCY T 6.5100e-004 5.6700e-004 r 4 tblVehicleEF • MCY T 1.67 2.44 r 4 tblVehicleEF • MCY T 0.78 0.93 r 4 tblVehicleEF • MCY T 0.89 1.33 r 4 tblVehicleEF • MCY T 2.59 2.67 r 4 tblVehicleEF • MCY T 0.46 1.46 r 4 tblVehicleEF • MCY T 2.16 1.83 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.13 0.21 r 4 tblVehicleEF • MCY T 18.28 19.52 r 4 tblVehicleEF • MCY T 9.09 8.30 r 4 tblVehicleEF • MCY T 169.21 212.46 r 4 tblVehicleEF • MCY T 43.23 56.84 r 4 tblVehicleEF • MCY T 0.96 0.97 r 4 tblVehicleEF • MCY T 0.29 0.25 r 4 tblVehicleEF • MCY T 2.0660e-003 2.1680e-003 tblVehicleEF • MCY • 3.1790e-003 2.8440e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 1.9270e-003 2.0220e-003 tblVehicleEF • MCY i 2.9740e-003 2.6590e-003 r tblVehicleEF • MCY T 3.32 5.02 r tblVehicleEF • MCY T 1.17 1.64 r tblVehicleEF • MCY T 2.03 3.02 r tblVehicleEF • MCY T 2.06 2.16 r tblVehicleEF • MCY T 0.46 1.55 r 4 tblVehicleEF • MCY T 1.79 1.60 r tblVehicleEF • MCY T 2.0510e-003 2.1020e-003 r tblVehicleEF • MCY T 6.3300e-004 5.6300e-004 r 4 tblVehicleEF • MCY T 3.32 5.02 r 4 tblVehicleEF • MCY T 1.17 1.64 r 4 tblVehicleEF • MCY T 2.03 3.02 r 4 tblVehicleEF • MCY T 2.58 2.71 r 4 tblVehicleEF • MCY T 0.46 1.55 r 4 tblVehicleEF • MCY T 1.95 1.75 r 4 tblVehicleEF • MCY T 0.44 0.33 r 4 tblVehicleEF • MCY T 0.15 0.25 r 4 tblVehicleEF • MCY T 17.21 17.77 r 4 tblVehicleEF • MCY T 9.82 9.33 r 4 tblVehicleEF • MCY T 169.21 209.71 r 4 tblVehicleEF • MCY T 43.23 59.48 r 4 tblVehicleEF • MCY T 1.11 1.17 r 4 tblVehicleEF • MCY T 0.31 0.27 r 4 tblVehicleEF • MCY T 2.0660e-003 2.1680e-003 r 4 tblVehicleEF • MCY T 3.1790e-003 2.8440e-003 tblVehicleEF • MCY • 1.9270e-003 2.0220e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 2.9740e-003 2.6590e-003 tblVehicleEF • MCY i 1.55 1.02 r tblVehicleEF • MCY T 0.93 0.73 r tblVehicleEF • MCY T 0.69 0.40 r tblVehicleEF • MCY T 2.06 2.17 r tblVehicleEF • MCY T 0.53 1.64 r tblVehicleEF • MCY T 2.01 1.91 r 4 tblVehicleEF • MCY T 2.0350e-003 2.0750e-003 r tblVehicleEF • MCY T 6.5200e-004 5.8900e-004 r tblVehicleEF • MCY T 1.55 1.02 r 4 tblVehicleEF • MCY T 0.93 0.73 r 4 tblVehicleEF • MCY T 0.69 0.40 r 4 tblVehicleEF • MCY T 2.58 2.72 r 4 tblVehicleEF • MCY T 0.53 1.64 r 4 tblVehicleEF • MCY T 2.18 2.08 r 4 tblVehicleEF • MDV T 5.7640e-003 2.4810e-003 r 4 tblVehicleEF • MDV T 7.7500e-003 0.04 r 4 tblVehicleEF • MDV T 0.76 0.71 r 4 tblVehicleEF • MDV T 1.57 2.14 r 4 tblVehicleEF • MDV T 377.40 348.85 r 4 tblVehicleEF • MDV T 85.98 69.93 r 4 tblVehicleEF • MDV T 0.08 0.04 r 4 tblVehicleEF • MDV T 0.13 0.19 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 tblVehicleEF • MDV • 1.9690e-003 1.2970e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MDV • 0.09 0.14 tblVehicleEF • MDV i 0.15 0.12 r tblVehicleEF • MDV T 0.08 0.12 r tblVehicleEF • MDV T 0.01 9.5140e-003 r tblVehicleEF • MDV T 0.09 0.38 r tblVehicleEF • MDV T 0.10 0.19 r tblVehicleEF • MDV T 3.7760e-003 3.2490e-003 r 4 tblVehicleEF • MDV T 8.8600e-004 6.5100e-004 r tblVehicleEF • MDV T 0.09 0.15 r tblVehicleEF • MDV T 0.15 0.12 r 4 tblVehicleEF • MDV T 0.08 0.12 r 4 tblVehicleEF • MDV T 0.02 0.01 r 4 tblVehicleEF • MDV T 0.09 0.38 r 4 tblVehicleEF • MDV T 0.11 0.21 r 4 tblVehicleEF • MDV T 6.5170e-003 2.8950e-003 r 4 tblVehicleEF • MDV T 6.7340e-003 0.04 r 4 tblVehicleEF • MDV T 0.93 0.93 r 4 tblVehicleEF • MDV T 1.39 2.19 r 4 tblVehicleEF • MDV T 409.68 373.27 r 4 tblVehicleEF • MDV T 85.98 69.97 r 4 tblVehicleEF • MDV T 0.07 0.05 r 4 tblVehicleEF • MDV T 0.12 0.20 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 r 4 tblVehicleEF • MDV T 1.9690e-003 1.2970e-003 tblVehicleEF • MDV • 0.18 0.29 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MDV • 0.17 0.15 tblVehicleEF • MDV i 0.15 0.21 r tblVehicleEF • MDV T 0.02 0.01 r tblVehicleEF • MDV T 0.09 0.39 r tblVehicleEF • MDV T 0.09 0.18 r tblVehicleEF • MDV T 4.1010e-003 3.4760e-003 r tblVehicleEF • MDV T 8.8300e-004 6.5100e-004 r 4 tblVehicleEF • MDV T 0.18 0.30 r tblVehicleEF • MDV T 0.17 0.15 r tblVehicleEF • MDV T 0.15 0.21 r 4 tblVehicleEF • MDV T 0.02 0.02 r 4 tblVehicleEF • MDV T 0.09 0.40 r 4 tblVehicleEF • MDV T 0.10 0.20 r 4 tblVehicleEF • MDV T 5.5450e-003 2.2100e-003 r 4 tblVehicleEF • MDV T 7.9810e-003 0.05 r 4 tblVehicleEF • MDV T 0.71 0.60 r 4 tblVehicleEF • MDV T 1.61 2.49 r 4 tblVehicleEF • MDV T 367.53 332.90 r 4 tblVehicleEF • MDV T 85.98 70.62 r 4 tblVehicleEF • MDV T 0.07 0.05 r 4 tblVehicleEF • MDV T 0.13 0.20 r 4 tblVehicleEF • MDV T 1.3990e-003 1.1210e-003 r 4 tblVehicleEF • MDV T 2.1410e-003 1.4110e-003 r 4 tblVehicleEF • MDV T 1.2880e-003 1.0330e-003 r 4 tblVehicleEF • MDV T 1.9690e-003 1.2970e-003 r 4 tblVehicleEF • MDV T 0.07 0.06 tblVehicleEF • MDV • 0.16 0.11 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .MDV • 0.07 0.06 tblVehicleEF • MDV r 0.01 8.5740e-003 I- 4 tblVehicleEF • MDV r 0.11 0.42 I- 4 tblVehicleEF • MDV r 0.11 0.22 I- 4 tblVehicleEF • MDV r 3.6770e-003 3.1010e-003 I- 4 tblVehicleEF • MDV r 8.8700e-004 6.5800e-004 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.16 0.11 I- 4 tblVehicleEF • MDV r 0.07 0.06 I- 4 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.11 0.42 I- 4 tblVehicleEF • MDV r 0.12 0.25 I- 4 tblVehicleEF • MH r 9.2740e-003 2.6410e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 0.68 0.25 I- 4 tblVehicleEF • MH r 3.97 0.00 I- 4 tblVehicleEF • MH r 980.17 872.47 I- 4 tblVehicleEF • MH r 56.32 0.00 I- 4 tblVehicleEF • MH r 0.96 3.19 I- 4 tblVehicleEF • MH r 0.67 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 I- 4 tblVehicleEF • MH r 0.02 0.10 I- 4 tblVehicleEF • MH r 8.2700e-004 0.00 I- 4 tblVehicleEF • MH r 3.2360e-003 4.0000e-003 I- 4 tblVehicleEF • MH r 0.02 0.09 I- 4 tblVehicleEF • MH r 7.6000e-004 0.00 tblVehicleEF • MH • 0.99 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 0.05 0.00 tblVehicleEF • MH i 0.37 0.00 r tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.24 0.00 r tblVehicleEF • MH T 9.6990e-003 8.2480e-003 r tblVehicleEF • MH T 6.3200e-004 0.00 r 4 tblVehicleEF • MH T 0.99 0.00 r tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.37 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.26 0.00 r 4 tblVehicleEF • MH T 9.4580e-003 2.6410e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.69 0.25 r 4 tblVehicleEF • MH T 3.71 0.00 r 4 tblVehicleEF • MH T 980.17 872.47 r 4 tblVehicleEF • MH T 56.32 0.00 r 4 tblVehicleEF • MH T 0.90 3.01 r 4 tblVehicleEF • MH T 0.65 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.02 0.10 r 4 tblVehicleEF • MH T 8.2700e-004 0.00 r 4 tblVehicleEF • MH T 3.2360e-003 4.0000e-003 r 4 tblVehicleEF • MH T 0.02 0.09 tblVehicleEF • MH • 7.6000e-004 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 1.80 0.00 tblVehicleEF • MH i 0.06 0.00 r tblVehicleEF • MH T 0.71 0.00 r tblVehicleEF • MH T 0.04 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.23 0.00 r tblVehicleEF • MH T 9.7000e-003 8.2480e-003 r 4 tblVehicleEF • MH T 6.2800e-004 0.00 r tblVehicleEF • MH T 1.80 0.00 r tblVehicleEF • MH T 0.06 0.00 r 4 tblVehicleEF • MH T 0.71 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.25 0.00 r 4 tblVehicleEF • MH T 9.2620e-003 2.6410e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.68 0.25 r 4 tblVehicleEF • MH T 4.00 0.00 r 4 tblVehicleEF • MH T 980.17 872.47 r 4 tblVehicleEF • MH T 56.32 0.00 r 4 tblVehicleEF • MH T 0.95 3.23 r 4 tblVehicleEF • MH T 0.67 0.00 r 4 tblVehicleEF • MH T 0.01 0.02 r 4 tblVehicleEF • MH T 0.02 0.10 r 4 tblVehicleEF • MH T 8.2700e-004 0.00 r 4 tblVehicleEF • MH T 3.2360e-003 4.0000e-003 tblVehicleEF • MH • 0.02 0.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 7.6000e-004 0.00 tblVehicleEF • MH i 0.93 0.00 r tblVehicleEF • MH T 0.06 0.00 r tblVehicleEF • MH T 0.35 0.00 r tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.02 0.00 r tblVehicleEF • MH T 0.24 0.00 r 4 tblVehicleEF • MH T 9.6990e-003 8.2480e-003 r tblVehicleEF • MH T 6.3300e-004 0.00 r tblVehicleEF • MH T 0.93 0.00 r 4 tblVehicleEF • MH T 0.06 0.00 r 4 tblVehicleEF • MH T 0.35 0.00 r 4 tblVehicleEF • MH T 0.05 0.06 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.27 0.00 r 4 tblVehicleEF • MHD T 0.02 4.9600e-003 r 4 tblVehicleEF • MHD T 1.5610e-003 1.3430e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.31 0.44 r 4 tblVehicleEF • MHD T 0.14 0.16 r 4 tblVehicleEF • MHD T 3.45 1.18 r 4 tblVehicleEF • MHD T 147.83 64.38 r 4 tblVehicleEF • MHD T 1,042.82 936.73 r 4 tblVehicleEF • MHD T 52.76 11.60 r 4 tblVehicleEF • MHD T 0.39 0.32 r 4 tblVehicleEF • MHD T 0.40 0.79 tblVehicleEF • MHD • 11.32 1.53 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 6.2000e-005 1.5800e-004 tblVehicleEF • MHD i 2.6360e-003 8.6670e-003 r tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r tblVehicleEF • MHD T 6.0000e-005 1.5100e-004 r tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r tblVehicleEF • MHD T 1.1490e-003 1.1170e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 6.3900e-004 5.9000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.22 0.06 r 4 tblVehicleEF • MHD T 1.4210e-003 6.1200e-004 r 4 tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r 4 tblVehicleEF • MHD T 5.8800e-004 1.1500e-004 r 4 tblVehicleEF • MHD T 1.1490e-003 1.1170e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.3900e-004 5.9000e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.24 0.06 r 4 tblVehicleEF • MHD T 0.01 4.7050e-003 r 4 tblVehicleEF • MHD T 1.5740e-003 1.3600e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 tblVehicleEF • MHD • 0.23 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 0.14 0.16 tblVehicleEF • MHD i 3.30 1.15 r tblVehicleEF • MHD T 156.58 64.16 r tblVehicleEF • MHD T 1,042.82 936.73 r tblVehicleEF • MHD T 52.76 11.55 r tblVehicleEF • MHD T 0.40 0.31 r tblVehicleEF • MHD T 0.37 0.74 r 4 tblVehicleEF • MHD T 11.31 1.53 r tblVehicleEF • MHD T 5.2000e-005 1.3600e-004 r tblVehicleEF • MHD T 2.6360e-003 8.6670e-003 r 4 tblVehicleEF • MHD T 6.8800e-004 1.3200e-004 r 4 tblVehicleEF • MHD T 5.0000e-005 1.3000e-004 r 4 tblVehicleEF • MHD T 2.5190e-003 8.2840e-003 r 4 tblVehicleEF • MHD T 6.3300e-004 1.2100e-004 r 4 tblVehicleEF • MHD T 2.2030e-003 2.2320e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.1740e-003 1.0650e-003 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.21 0.06 r 4 tblVehicleEF • MHD T 1.5040e-003 6.1000e-004 r 4 tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r 4 tblVehicleEF • MHD T 5.8500e-004 1.1400e-004 r 4 tblVehicleEF • MHD T 2.2030e-003 2.2320e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 tblVehicleEF • MHD • 0.03 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MHD • 1.1740e-003 1.0650e-003 • MHD i 0.02 0.01 r • MHD T 0.02 0.14 r • MHD T 0.23 0.06 r • MHD T 0.02 5.3100e-003 r • MHD T 1.5510e-003 1.3120e-003 r • MHD T 0.03 0.01 r 4 • MHD T 0.43 0.53 r • MHD T 0.14 0.15 r • MHD T 3.51 1.25 r 4 • MHD T 135.73 64.68 r 4 • MHD T 1,042.82 936.72 r 4 • MHD T 52.76 11.73 r 4 • MHD T 0.37 0.34 r 4 • MHD T 0.39 0.80 r 4 • MHD T 11.33 1.54 r 4 • MHD T 7.6000e-005 1.8800e-004 r 4 • MHD T 2.6360e-003 8.6670e-003 r 4 • MHD T 6.8800e-004 1.3200e-004 r 4 • MHD T 7.2000e-005 1.8000e-004 r 4 • MHD T 2.5190e-003 8.2840e-003 r 4 • MHD T 6.3300e-004 1.2100e-004 r 4 • MHD T 7.6900e-004 4.6100e-004 r 4 • MHD T 0.03 0.03 r 4 • MHD T 0.02 0.02 r 4 • MHD T 4.9200e-004 3.0900e-004 • MHD • 0.02 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 0.02 0.14 tblVehicleEF • MHD i 0.22 0.06 r tblVehicleEF • MHD T 1.3070e-003 6.1500e-004 r tblVehicleEF • MHD T 9.9930e-003 8.9920e-003 r tblVehicleEF • MHD T 5.8900e-004 1.1600e-004 r tblVehicleEF • MHD T 7.6900e-004 4.6100e-004 r tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 4.9200e-004 3.0900e-004 r tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.14 r 4 tblVehicleEF • MHD T 0.24 0.07 r 4 tblVehicleEF • OBUS T 0.01 7.6410e-003 r 4 tblVehicleEF • OBUS T 3.0890e-003 2.0650e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.58 r 4 tblVehicleEF • OBUS T 0.21 0.21 r 4 tblVehicleEF • OBUS T 4.35 1.49 r 4 tblVehicleEF • OBUS T 74.93 84.84 r 4 tblVehicleEF • OBUS T 1,073.88 1,127.70 r 4 tblVehicleEF • OBUS T 67.73 13.97 r 4 tblVehicleEF • OBUS T 0.15 0.37 r 4 tblVehicleEF • OBUS T 0.31 0.69 r 4 tblVehicleEF • OBUS T 2.00 1.06 r 4 tblVehicleEF • OBUS T 1.4000e-005 1.2100e-004 r 4 tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 tblVehicleEF • OBUS • 9.7400e-004 1.5400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 1.3000e-005 1.1600e-004 tblVehicleEF • OBUS i 2.0120e-003 7.7610e-003 r tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r tblVehicleEF • OBUS T 1.9410e-003 2.1170e-003 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.03 0.05 r tblVehicleEF • OBUS T 8.7000e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.28 0.07 r 4 tblVehicleEF • OBUS T 7.2700e-004 8.0600e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.5300e-004 1.3800e-004 r 4 tblVehicleEF • OBUS T 1.9410e-003 2.1170e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.7000e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.30 0.08 r 4 tblVehicleEF • OBUS T 0.01 7.7200e-003 r 4 tblVehicleEF • OBUS T 3.1380e-003 2.0930e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.57 r 4 tblVehicleEF • OBUS T 0.21 0.21 r 4 tblVehicleEF • OBUS T 4.07 1.42 tblVehicleEF • OBUS • 78.40 83.82 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 1,073.88 1,127.70 tblVehicleEF • OBUS i 67.73 13.86 r tblVehicleEF • OBUS T 0.16 0.35 r tblVehicleEF • OBUS T 0.29 0.65 r tblVehicleEF • OBUS T 1.98 1.06 r tblVehicleEF • OBUS T 1.1000e-005 1.0800e-004 r tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 r 4 tblVehicleEF • OBUS T 9.7400e-004 1.5400e-004 r tblVehicleEF • OBUS T 1.1000e-005 1.0300e-004 r tblVehicleEF • OBUS T 2.0120e-003 7.7610e-003 r 4 tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r 4 tblVehicleEF • OBUS T 3.5960e-003 4.1590e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6320e-003 1.6440e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.26 0.07 r 4 tblVehicleEF • OBUS T 7.6000e-004 7.9700e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4900e-004 1.3700e-004 r 4 tblVehicleEF • OBUS T 3.5960e-003 4.1590e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 1.6320e-003 1.6440e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 tblVehicleEF • OBUS • 0.05 0.16 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.29 0.08 tblVehicleEF • OBUS i 0.01 7.5280e-003 r tblVehicleEF • OBUS T 3.0740e-003 2.0150e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.59 r tblVehicleEF • OBUS T 0.21 0.21 r tblVehicleEF • OBUS T 4.40 1.60 r 4 tblVehicleEF • OBUS T 70.15 86.24 r tblVehicleEF • OBUS T 1,073.88 1,127.69 r tblVehicleEF • OBUS T 67.73 14.17 r 4 tblVehicleEF • OBUS T 0.14 0.40 r 4 tblVehicleEF • OBUS T 0.31 0.71 r 4 tblVehicleEF • OBUS T 2.00 1.07 r 4 tblVehicleEF • OBUS T 1.7000e-005 1.4000e-004 r 4 tblVehicleEF • OBUS T 2.1220e-003 8.1270e-003 r 4 tblVehicleEF • OBUS T 9.7400e-004 1.5400e-004 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.3400e-004 r 4 tblVehicleEF • OBUS T 2.0120e-003 7.7610e-003 r 4 tblVehicleEF • OBUS T 8.9500e-004 1.4100e-004 r 4 tblVehicleEF • OBUS T 1.5870e-003 9.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.03 0.04 r 4 tblVehicleEF • OBUS T 7.8200e-004 4.9500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.28 0.08 tblVehicleEF • OBUS • 6.8100e-004 8.1900e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.01 0.01 tblVehicleEF • OBUS i 7.5400e-004 1.4000e-004 r tblVehicleEF • OBUS T 1.5870e-003 9.2500e-004 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.04 0.06 r tblVehicleEF • OBUS T 7.8200e-004 4.9500e-004 r tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.30 0.09 r tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 6.1410e-003 3.7560e-003 r 4 tblVehicleEF • SBUS T 0.05 5.1390e-003 r 4 tblVehicleEF • SBUS T 8.03 2.67 r 4 tblVehicleEF • SBUS T 0.40 0.26 r 4 tblVehicleEF • SBUS T 5.88 0.57 r 4 tblVehicleEF • SBUS T 1,077.74 333.40 r 4 tblVehicleEF • SBUS T 1,068.66 1,005.50 r 4 tblVehicleEF • SBUS T 57.11 4.22 r 4 tblVehicleEF • SBUS T 5.34 2.95 r 4 tblVehicleEF • SBUS T 2.17 3.27 r 4 tblVehicleEF • SBUS T 11.69 1.17 r 4 tblVehicleEF • SBUS T 3.0670e-003 2.5210e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r 4 tblVehicleEF • SBUS T 2.9340e-003 2.4120e-003 tblVehicleEF • SBUS • 2.6740e-003 2.5930e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • SBUS • 0.01 0.02 • SBUS i 6.2800e-004 4.5000e-005 r • SBUS i 6.4510e-003 1.8200e-003 r • SBUS i 0.04 7.9830e-003 r • SBUS i 0.95 0.29 r • SBUS i 3.1450e-003 7.8100e-004 r • SBUS i 0.07 0.06 r 4 • SBUS T 0.02 0.05 r • SBUS T 0.34 0.03 r • SBUS T 0.01 3.1780e-003 r 4 • SBUS T 0.01 9.6480e-003 r 4 • SBUS T 6.7400e-004 4.2000e-005 r 4 • SBUS T 6.4510e-003 1.8200e-003 r 4 • SBUS T 0.04 7.9830e-003 r 4 • SBUS T 1.37 0.41 r 4 • SBUS T 3.1450e-003 7.8100e-004 r 4 • SBUS T 0.08 0.07 r 4 • SBUS T 0.02 0.05 r 4 • SBUS T 0.37 0.03 r 4 • SBUS T 0.81 0.07 r 4 • SBUS T 6.2200e-003 3.7790e-003 r 4 • SBUS T 0.05 4.4810e-003 r 4 • SBUS T 7.96 2.64 r 4 • SBUS T 0.41 0.26 r 4 • SBUS T 4.27 0.44 r 4 • SBUS T 1,125.04 338.86 • SBUS • 1,068.66 1,005.51 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 57.11 4.01 tblVehicleEF • SBUS i 5.51 3.00 r tblVehicleEF • SBUS i 2.04 3.08 r tblVehicleEF • SBUS i 11.66 1.17 r tblVehicleEF • SBUS T 2.5850e-003 2.1340e-003 r tblVehicleEF • SBUS T 0.01 0.01 r tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r tblVehicleEF • SBUS T 2.4730e-003 2.0420e-003 r tblVehicleEF • SBUS T 2.6740e-003 2.5930e-003 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.2800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 0.01 3.5710e-003 r 4 tblVehicleEF • SBUS T 0.04 8.8000e-003 r 4 tblVehicleEF • SBUS T 0.95 0.29 r 4 tblVehicleEF • SBUS T 5.7080e-003 1.3980e-003 r 4 tblVehicleEF • SBUS T 0.07 0.06 r 4 tblVehicleEF • SBUS T 0.02 0.05 r 4 tblVehicleEF • SBUS T 0.28 0.02 r 4 tblVehicleEF • SBUS T 0.01 3.2290e-003 r 4 tblVehicleEF • SBUS T 0.01 9.6480e-003 r 4 tblVehicleEF • SBUS T 6.4700e-004 4.0000e-005 r 4 tblVehicleEF • SBUS T 0.01 3.5710e-003 r 4 tblVehicleEF • SBUS T 0.04 8.8000e-003 r 4 tblVehicleEF • SBUS T 1.37 0.42 r 4 tblVehicleEF • SBUS T 5.7080e-003 1.3980e-003 tblVehicleEF • SBUS • 0.08 0.07 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 0.02 0.05 tblVehicleEF • SBUS i 0.31 0.03 r tblVehicleEF • SBUS i 0.81 0.07 r tblVehicleEF • SBUS i 6.1170e-003 3.7170e-003 r tblVehicleEF • SBUS i 0.06 6.0630e-003 r tblVehicleEF • SBUS i 8.13 2.71 r tblVehicleEF • SBUS i 0.40 0.26 r 4 tblVehicleEF • SBUS i 6.24 0.75 r tblVehicleEF • SBUS i 1,012.43 325.87 • r tblVehicleEF • SBUS i 1,068.66 1,005.50 r 4 tblVehicleEF • SBUS T 57.11 4.53 r 4 tblVehicleEF • SBUS T 5.11 2.89 r 4 tblVehicleEF • SBUS T 2.15 3.32 r 4 tblVehicleEF • SBUS T 11.70 1.18 r 4 tblVehicleEF • SBUS T 3.7320e-003 3.0540e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.8300e-004 4.9000e-005 r 4 tblVehicleEF • SBUS T 3.5700e-003 2.9220e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5930e-003 r 4 tblVehicleEF • SBUS T 0.01 0.02 r 4 tblVehicleEF • SBUS T 6.2800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 5.3930e-003 7.9200e-004 r 4 tblVehicleEF • SBUS T 0.04 7.7170e-003 r 4 tblVehicleEF • SBUS T 0.95 0.29 r 4 tblVehicleEF • SBUS T 2.9940e-003 4.3200e-004 tblVehicleEF • SBUS • 0.07 0.06 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .SBUS • 0.03 0.06 tblVehicleEF • SBUS r 0.35 0.03 I- 4 tblVehicleEF • SBUS r 9.9440e-003 3.1060e-003 I- 4 tblVehicleEF • SBUS r 0.01 9.6480e-003 I- 4 tblVehicleEF • SBUS r 6.8000e-004 4.5000e-005 I- 4 tblVehicleEF • SBUS r 5.3930e-003 7.9200e-004 I- 4 tblVehicleEF • SBUS r 0.04 7.7170e-003 I- 4 tblVehicleEF • SBUS r 1.38 0.41 I- 4 tblVehicleEF • SBUS r 2.9940e-003 4.3200e-004 I- 4 tblVehicleEF • SBUS r 0.08 0.07 I- 4 tblVehicleEF • SBUS r 0.03 0.06 I- 4 tblVehicleEF • SBUS r 0.39 0.04 I- 4 tblVehicleEF • UBUS r 1.04 4.47 I- 4 tblVehicleEF • UBUS r 0.07 0.00 I- 4 tblVehicleEF • UBUS r 5.44 34.93 I- 4 tblVehicleEF • UBUS r 10.69 0.00 I- 4 tblVehicleEF • UBUS 1,722.08 1,546.23 I- 4 tblVehicleEF • UBUS r 150.93 0.00 I- 4 tblVehicleEF • UBUS r 1.69 0.35 I- 4 tblVehicleEF • UBUS r 11.90 0.00 I- 4 tblVehicleEF • UBUS r 0.48 0.08 I- 4 tblVehicleEF • UBUS r 0.01 0.03 I- 4 tblVehicleEF • UBUS r 0.01 5.1020e-003 I- 4 tblVehicleEF • UBUS r 1.5820e-003 0.00 I- 4 tblVehicleEF • UBUS r 0.21 0.03 I- 4 tblVehicleEF • UBUS r 3.0000e-003 6.8250e-003 tblVehicleEF • UBUS • 0.01 4.8810e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 1.4540e-003 0.00 tblVehicleEF • UBUS i 7.0030e-003 0.00 r tblVehicleEF • UBUS T 0.07 0.00 r tblVehicleEF • UBUS T 3.8230e-003 0.00 r tblVehicleEF • UBUS T 0.17 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.92 0.00 r 4 tblVehicleEF • UBUS T 8.5500e-003 0.00 r tblVehicleEF • UBUS T 1.7050e-003 0.00 r tblVehicleEF • UBUS T 7.0030e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.8230e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.00 0.00 r 4 tblVehicleEF • UBUS T 1.04 4.47 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.47 34.93 r 4 tblVehicleEF • UBUS T 9.24 0.00 r 4 tblVehicleEF • UBUS T 1,722.08 1,546.23 r 4 tblVehicleEF • UBUS T 150.93 0.00 r 4 tblVehicleEF • UBUS T 1.57 0.35 r 4 tblVehicleEF • UBUS T 11.83 0.00 r 4 tblVehicleEF • UBUS T 0.48 0.08 r 4 tblVehicleEF • UBUS T 0.01 0.03 r 4 tblVehicleEF • UBUS T 0.01 5.1020e-003 tblVehicleEF • UBUS • 1.5820e-003 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 0.21 0.03 tblVehicleEF • UBUS i 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.01 4.8810e-003 r tblVehicleEF • UBUS T 1.4540e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r tblVehicleEF • UBUS T 0.09 0.00 r tblVehicleEF • UBUS T 7.4330e-003 0.00 r 4 tblVehicleEF • UBUS T 0.17 0.07 r tblVehicleEF • UBUS T 0.02 0.00 r tblVehicleEF • UBUS T 0.84 0.00 r 4 tblVehicleEF • UBUS T 8.5510e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6790e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.09 0.00 r 4 tblVehicleEF • UBUS T 7.4330e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.92 0.00 r 4 tblVehicleEF • UBUS T 1.04 4.47 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 5.44 34.93 r 4 tblVehicleEF • UBUS T 10.91 0.00 r 4 tblVehicleEF • UBUS T 1,722.08 1,546.23 r 4 tblVehicleEF • UBUS T 150.93 0.00 r 4 tblVehicleEF • UBUS T 1.68 0.35 r 4 tblVehicleEF • UBUS T 11.91 0.00 tblVehicleEF • UBUS • 0.48 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 0.01 0.03 tblVehicleEF • UBUS i 0.01 5.1020e-003 r tblVehicleEF • UBUS T 1.5820e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 0.01 4.8810e-003 r tblVehicleEF • UBUS T 1.4540e-003 0.00 r 4 tblVehicleEF • UBUS T 5.7830e-003 0.00 r tblVehicleEF • UBUS T 0.08 0.00 r tblVehicleEF • UBUS T 3.3500e-003 0.00 r 4 tblVehicleEF • UBUS T 0.17 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.93 0.00 r 4 tblVehicleEF • UBUS T 8.5500e-003 0.00 r 4 tblVehicleEF • UBUS T 1.7090e-003 0.00 r 4 tblVehicleEF • UBUS T 5.7830e-003 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 3.3500e-003 0.00 r 4 tblVehicleEF • UBUS T 1.23 4.57 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 1.01 0.00 r 4 tblVehicleTrips • CC_TL T 4.20 8.70 r 4 tblVehicleTrips • CNW_TL T 5.40 8.70 • r 4 tblVehicleTrips • CW_TL T 12.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HO_TL T 4.50 8.70 • tblVehicleTrips • HS_TL • 3.50 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblVehicleTrips tblWoodstoves tblWoodstoves tblWoodstoves tblWoodstoves • • • • HS_TL HW TL HW TL ST_TR ST TR ST TR SU TR SU TR SU TR WD_TR WDTR WD_TR NumberCatalytic NumberCatalytic NumberNoncatalytic NumberNoncatalytic 3.50 11.00 11.00 7.16 40.63 9.91 6.07 39.53 8.62 6.59 35.74 9.52 11.85 33.65 11.85 • • 4 4 4 4 4 4 33.65 8.70 8.70 8.70 8.07 16.91 9.48 6.23 16.06 8.50 7.26 25.83 9.38 0.00 0.00 0.00 0.00 2.0 Emissions Summary CaIEEMod Version: CaIEEMod.2016.3.2 Page 50 of 68 2.1 Overall Construction Unmitigated Construction Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2026 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2026 •i 0.0000 0.0000 0.0000 1 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 : 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 1 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio -CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Quarter I Start Date I End Date I Maximum Unmitigated ROG + NOX (tons/quarter) I Maximum Mitigated ROG + NOX (tons/quarter) Highest 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area •i 8.3498 0.6967 7.0143 4.3100e- 1 0.0875 0.0875 0.0875 0.0875 • 0.0000 i 727.7994 727.7994 0.0243 1 0.0131 732.3230 •1 003 ,I J J J .1 J J J J v J J .1 T Energy •i 0.0772 0.6599 0.2808 4.2100e- 1 0.0534 0.0534 0.0534 0.0534 • 0.0000 i 2,540.862 2,540.862 0.0922 1 0.0301 2,552.120 9003 I 3 3 7 e1J J J .1 J J J J V J J .1 T Mobile •i 2.5307 7.5786 24.1205 0.0827 1 8.7236 0.0812 8.8048 2.3340 0.0766 2.4106 • 0.0000 i 8,051.242 8,051.242 0.2928 1 0.0000 8,058.561 9 ; 8 8 7 ;l J J J .1 J J J J V J J .1 T Waste •i 0.0000 0.0000 0.0000 0.0000 • 174.2596 i 0.0000 174.2596 10.2985 0.0000 431.7208 f J J J .1 J J J J 4 J J .1 T Water • 0.0000 0.0000 0.0000 0.0000 • 18.8100 i 692.2988 711.1088 1.9622 0.0519 775.6197 Total 10.9577 8.9352 31.4155 0.0912 8.7236 0.2220 8.9456 2.3340 0.2175 2.5515 193.0697 12,012.20 12,205.27 12.6699 0.0951 12,550.34 33 29 60 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 68 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,l •i ,l •1 •1 •1 8.3498 0.6967 7.0143 4.3100e- 1 1 0.0875 0.0875 0.0875 0.0875 • 0.0000 9 003 1 1 0.0772 0.6599 0.2808 4.2100e- 1 1 0.0534 0.0534 0.0534 0.0534 • 0.0000 003 1 9i : J J J J J J J J Ir 2.5307 7.5786 24.1205 0.0827 ' 8.7236 1 0.0812 8.8048 2.3340 0.0766 2.4106 • 0.0000 9I 0.0000 0.0000 0.0000 0.0000 • 87.1298 0.0000 0.0000 0.0000 0.0000 • 18.8100 • i 727.7994 727.7994 0.0243 1 0.0131 732.3230 1 2,540.862 2,540.862 0.0922 1 0.0301 2,552.120 3 3 i 7 J J J 8,051.242 8,051.242 0.2928 ' 0.0000 8,058.561 8 8 1 7 i 0.0000 87.1298 5.1492 0.0000 215.8604 i 600.3907 619.2007 1.9582 0.0510 683.3641 Total Total 10.9577 8.9352 31.4155 0.0912 8.7236 0.2220 8.9456 2.3340 0.2175 2.5515 105.9398 11,920.29 52 12,026.23 50 7.5166 0.0942 12,242.23 00 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 45.13 0.77 1.47 40.67 0.87 2.46 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :11/21/2026 :11/20/2026 5• 0: Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours I Horse Power I Load Factor Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers 0 0 0: 8.001 8.001 8.00 81: 158: 0.73 0.38 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix ,HDT Mix HHDT 3.1 Mitigation Measures Construction CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 68 3.2 Demolition - 2026 Unmitigated Construction On -Site Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 68 3.2 Demolition - 2026 Mitigated Construction On -Site Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J .1 J . .1 .1 J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 4.1 Mitigation Measures Mobile Page 56 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated • 1 2.5307 1 7.5786 1 24.1205 0.0827 1 8.7236 0.0812 8.8048 1 2.3340 0.0766 2.4106 0.0000 8,051.242 8,051.242 0.2928 1 0.0000 i 8,058.561 1 1 1 1 1 1 1 1• 8 1 8 1 1 i 7 •1 I 1 1 1 1 1 1 1 1 1 1 a + + + + + + + + r l• + + + r Unmitigated . 2.5307 . 7.5786 . 24.1205 • 0.0827 . 8.7236 • 0.0812 • 8.8048 . 2.3340 • 0.0766 . 2.4106 • 0.0000 . 8,051.242 • 8,051.242 • 0.2928 . 0.0000 • 8,058.561 8 8 7 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise 2 1,720.67 1,913.42 1476.20 • 4,817,104 • 4,817,104 T Golf Course + 310.00 202.96 192.75 • 544,459 • 544,459 Other Asphalt Surfaces ; 0.00 0.00 T 0.00 • Single Family Housing ; 6,312.34 ; 6,379.17 5717.20 • 17,535,735 • 17,535,735 Total I 8,343.00 I 8,495.54 7,386.16 I 22,897,298 1 22,897,298 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip % Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing r 8.70 8.70 12.50 8.70 8.70 8.70 4.20 -r -r 8.70 40.20 8.70 33.00 5.40 1 0.00 8.70 8.70 40.20 19.20 40.60 48.00 0.00 T 19.00 0.00 19.20 40.60 • • • • • 86 11 3 52 39 9 0 86 0 ▪ 11 0 3 4.4 Fleet Mix Land Use Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing MDV LHD1 LHD2 MHD HHD OBUS UBUS I MCY • 0.561225v 0.0343841 0.1908841 0.102953 i 0.010631 1 0.004198 i 0.017138 i 0.070241 1 0.001423 i 0.0010771 0.004368 i 0.000839' 0.000640 1� � � � 1 4i i i i i t i i i i t + • 0.5612251 0.034384 0.1908841 0.102953 0.010631 0.004198 0.017138 0.070241 0.001423 0.001077 0.004368 0.000839' 0.000640 1� 1 1 � � 1 4i i i i i t i i i i t + 0.5612251 0.034384 0.190884 0.102953 0.010631 0.004198 0.017138 0.070241 0.001423 0.001077 0.004368 0.000839' 0.000640 v � 1 1 1 1 1 E E E E E E E E E E E 0.561225• 0.034384: 0.190884' 0.102953' 0.010631' 0.004198' 0.017138' 0.070241' 0.001423' 0.001077' 0.004368' 0.000839' 0.000640 I LDA I LDT1 I LDT2 SBUS I MH 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Electricity Mitigated • 1 1 1 1 1 0.0000 1 0.0000 : 0.0000 0.0000 • 0.0000 ' ▪ 1J J J 1 J J .1 J 111J Electricity •i 1 1 1 1 1 0.0000 1 0.0000 i : 0.0000 1 1 1 1 1 0.0000 ▪ 0.0000 Unmitigated ;i 1 1 1 1 1 9 J J J J J .1 .1 J NaturalGas 9i 0.0772 1 0.6599 1 0.2808 1 4.2100e- 1 1 0.0534 1 0.0534 1 1 0.0534 : 0.0534 • 0.0000 Mitigated 9i1 1 00311 91 1 1 1 i 1 1 1 1 I. i•} 1.} 1. 4.} 4.r 1,776.640 1,776.640 1 0.0775 2 ] 2 J J 1,776.640 i 1,776.640 1 0.0775 2 1 2 J J 764.2221 i 764.2221 1 0.0147 } 4. 0.0160 1,783.357 i 2 0.0160 1 1,783.357 i 2 } 0.0140 1 768.7635 NaturalGas . 0.0772 • 0.6599 • 0.2808 • 4.2100e- • 0.0534 • 0.0534 • 0.0534 • 0.0534 • 0.0000 • 764.2221 • 764.2221 • 0.0147 • 0.0140 • 768.7635 Unmitigated 003 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing 1 2.49227e ■1 1 +006 ;11 .1 1-1 J i 0 .1 I . r 7 i 0 i I- 4 J : 1.18287e ■1 1 +007 : i 0.0134 0.1148 1 0.0489 1 7.3000e- 9.2800e- 9.2800e- 1 1 9.2800e- 9.2800e- • 0.0000 1 004 003 003 1 1 003 003 : 1 .1 .1 .1 .1 .1 .1 .1 .• •0.0000 0.0000 ' 0.0000 1 0.0000 0.0000 0.0000 1 1 0.0000 0.0000 • 0.0000 1 . J J .1 J J J J J •J •.i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 . J .1 J J J J J .• 0.0638 0.5451 0.2319 3.4800e- 0.0441 0.0441 0.0441 0.0441 • 0.0000 003 132.9972 132.9972 2.5500e- 2.4400e- 133.7875 003 003 .1 .1 .1 0.0000 0.0000 0.0000 0.0000 0.0000 J J 0.0000 0.0000 0.0000 0.0000 0.0000 J J J 631.2249 631.2249 0.0121 0.0116 634.9760 Total 0.0772 0.6599 0.2808 4.2100e- 003 0.0534 0.0534 0.0534 0.0534 0.0000 764.2221 764.2221 0.0147 0.0140 768.7635 CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low 1 2.49227e • Rise i +0061 Golf Course 10 • i 1- 4 Other Asphalt : 0 Surfaces f 4 .1 Single Family1 1.18287e • 9 Housing 1 +007 i 0.0134 0.1148 1 0.0489 1 7.3000e- 1 9.2800e- 9.2800e- 1 1 9.2800e- 9.2800e- • 0.0000 004 I 003 003 1 1 003 003 : i 1 1 1 .1 0.0000 0.0000 ' 0.0000 1 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 • 0.0000 1 1 i • 1 1 1 .1 .1 .1 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 .1 .1 .1 .1 .1 .1 .1 . 0.0638 0.5451 0.2319 3.4800e- 0.0441 0.0441 0.0441 0.0441 • 0.0000 003 i 132.9972 132.9972 2.5500e- 2.4400e- 133.7875 003 003 1 i 0.0000 0.0000 0.0000 0.0000 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 631.2249 631.2249 0.0121 0.0116 634.9760 Total 0.0772 0.6599 0.2808 4.2100e- 003 0.0534 0.0534 0.0534 0.0534 0.0000 764.2221 764.2221 0.0147 0.0140 768.7635 CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low i 939916 •i 283.3788 0.0124 2.5600e- 284.4502 Rise i ;1 003 1 h -II J J r Golf Course 10 •1 0.0000 0.0000 0.0000 0.0000 h -II J J r Other Asphalt i 0 •i 0.0000 0.0000 0.0000 0.0000 Surfaces i •1 h 4 J J r Single Family 1 4.95288e • 1,493.261 0.0652 0.0135 1,498.907 Housing 1 +006 i 4 0 Total 1,776.640 0.0775 0.0160 1,783.357 2 2 CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low 1 939916 •i 283.3788 0.0124 2.5600e- 284.4502 Rise i ;1 003 i h -II J J r Golf Course 10 •1 0.0000 0.0000 0.0000 0.0000 h -II J J r Other Asphalt i 0 •i 0.0000 0.0000 0.0000 0.0000 Surfaces i •1 h 4 J J r Single Family 1 4.95288e • 1,493.261 0.0652 0.0135 1,498.907 Housing 1 +006 4 0 i Total 1,776.640 0.0775 0.0160 1,783.357 2 2 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 62 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 8.3498 0.6967 � 7.0143 4.3100e- i 0.0875 : 0.0875 i 0.0875 0.0875 • 0.0000 727.7994 : 727.7994 0.0243 0.0131 i 732.3230 ' 11 1 i 003 •1 1 1 1 1 1 • • :I + 4. F + 4. 1. 4. F r 4. F F r Unmitigated • 8.3498 • 0.6967 • 7.0143 • 4.3100e- • 0.0875 • 0.0875 • • 0.0875 • 0.0875 • 0.0000 • 727.7994 • 727.7994 • 0.0243 • 0.0131 • 732.3230 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural 4 2.3188 1 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: • J J J V J Consumer •i 5.7559 : 0.0000 0.0000 0.0000 0.0000 • 0.0000 J J 0.0000 0.0000 0.0000 I 0.0000 0.0000 Products :: •i J J J J J J J J V J J J Hearth •1 0.0724 1 0.6189 1 0.2634 3.9500e- 1 0.0500 1 0.0500 1 0.0500 0.0500 • 0.0000 716.7613 1 716.7613 1 0.0137 0.0131 721.0207 •1 003 : . .1 .1 .1 .1 .1 .1 .1 .1 . .1 .1 .1 Landscaping •i 0.2027 0.0778 6.7509 3.6000e- 0.0375 0.0375 0.0375 0.0375 • 0.0000 11.0380 11.0380 0.0106 0.0000 11.3023 004 . . Total 8.3498 0.6967 7.0142 4.3100e- 0.0875 0.0875 0.0875 0.0875 0.0000 727.7994 727.7994 0.0243 0.0131 732.3230 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 63 of 68 6.2 Area by SubCategory Mitigated Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 2.3188 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating ::: Consumer •1 5.7559 1 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: Hearth •i 0.0724 0.6189 0.2634 3.9500e- 1 0.0500 0.0500 0.0500 0.0500 I 0.0000 i 716.7613 716.7613 0.0137 0.0131 721.0207 '1 003 1 . Landscaping •i 0.2027 0.0778 6.7509 3.6000e- 0.0375 0.0375 0.0375 0.0375 • 0.0000 i 11.0380 11.0380 0.0106 0.0000 11.3023 004 • Total 8.3498 0.6967 7.0142 4.3100e- 0.0875 0.0875 0.0875 0.0875 0.0000 727.7994 727.7994 0.0243 0.0131 732.3230 003 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower CaIEEMod Version: CaIEEMod.2016.3.2 Page 64 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr 1 MT/yr Mitigated •i 619.2007 i 1.9582 : 0.0510 . 683.3641 'I 1 99.8142 ' 003 I Unmitigated •• 711.1088 : 1.9622 • 0.0519 : 775.6197 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Apartments Low 115.4415 / • 98.1262 1 0.5072 0.0127 114.5982 Rise 1 9.73486 ; I I I Golf Course I 0 / . T I 334.3373 I 0.0146 3.0200e- 335.6013 99.8142 ' 003 I I- 4 .1 .1 T Other Asphalt 1 0 / 0 •I 0.0000 I 0.0000 I 0.0000 0.0000 Surfaces I h 4 J J T Single Family 143.8487 / • 278.6453 1.4404 0.0361 325.4202 Housing I 27.6437 I Total 711.1088 1.9622 0.0519 775.6197 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 65 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Institute Recycling and Composting Services Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Apartments Low 115.4415 / • Rise 1 7.78789 : . Golf Course I 0 / • i 79.8514 : i • Other Asphalt 1 0 / 0 • Surfaces i I- - Single Family 143.8487 / • Housing i 22.115 : i 91.6047 1 0.5069 : 0.0127 108.0520 1 I J * 267.4698 1 0.0117 : 2.4100e- 268.4810 : 003 i 0.0000 0.0000 0.0000 0.0000 J J 260.1263 1.4396 0.0360 306.8311 ilTotal 619.2007 1.9582 0.0510 683.3641 8.0 Waste Detail 8.1 Mitigation Measures Waste Institute Recycling and Composting Services CaIEEMod Version: CaIEEMod.2016.3.2 Category/Year Page 66 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 8.2 Waste by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Land Use MT/yr 1 MT/yr Mitigated •i 87.1298 i 5.1492 i 0.0000 i 215.8604 •1 1 1 •1 1 1 1 1 Unmitigated •• 174.2596 : 10.2985 • 0.0000 : 431.7208 8.2 Waste by Land Use Unmitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise Golf Course Other Asphalt Surfaces Single Family Housing i 109.02 • 1 1 I 1.6 .1 I . I 1 0 •1 1 i 747.84 • 1 I 22.1301 1 1.3079 : 0.0000 1 1 1 1 0.3248 1 0.0192 : 0.0000 -r0.8046 1 1 0.0000 1 0.0000 1 0.0000 151.8048 8.9714 0.0000 54.8263 0.0000 376.0899 Total 174.2596 10.2984 0.0000 431.7208 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Mitigated Page 67 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators 1 Equipment Type I Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise .J Golf Course I- Other Asphalt Surfaces I- Single Family Housing i 54.51 • i i 0.8 • i 4 i 0 i • i - i 373.92 • i i 11.0650 1 0.6539 0.0000 27.4132 1 .1 0.1624 1 9.6000e- 0.0000 * 0.4023 003 J 0.0000 0.0000 0.0000 0.0000 J 75.9024 4.4857 0.0000 188.0449 ilTotal 87.1298 5.1492 0.0000 215.8604 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators 1 Equipment Type I Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type User Defined Equipment CaIEEMod Version: CaIEEMod.2016.3.2 Page 68 of 68 Date: 1/6/2021 4:58 PM Travertine Specific Plan - Phase 2 (Operations) - Riverside -Salton Sea County, Annual Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.20: CALEEMOD PHASE 3 OPERATIONAL EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS CaIEEMod Version: CaIEEMod.2016.3.2 1.0 Project Characteristics Page 1 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Travertine Specific Plan - Phase 3 (Operations) Riverside -Salton Sea County, Annual 1.1 Land Usage Land Uses Size Metric ILot Acreage IFloor Surface Area I Population Other Asphalt Surfaces Golf Course Hotel Apartments Low Rise Single Family Housing • • • • • 35.00 12.00 100.00 442.00 758.00 a 4 a 4 a 4 4 Acre Hole Room Dwelling Unit 35.00 46.20 38.30 60.80 Dwelling Unit 317.50 1,524,600.00 0 64,282.00 0 261,712.00 0 442,000.00 1198 1,364,400.00 2054 1.2 Other Project Characteristics Urbanization Urban Wind Speed (m/s) 2.4 Climate Zone 15 Utility Company Imperial Irrigation District CO2 Intensity 623.16 CH4 Intensity 0.029 (Ib/MWhr) (Ib/MWhr) 1.3 User Entered Comments & Non -Default Data Precipitation Freq (Days) 28 Operational Year 2031 N20 Intensity (Ib/MWhr) 0.006 CaIEEMod Version: CaIEEMod.2016.3.2 Page 2 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Project Characteristics - Intensity Factor adjusted to reflect the RPS for 2031 Land Use - Per the Travertine Specific Plan Phasing Plan by Urban Crossroads, Inc., the Service Population for residential uses is 3,250 (2.71 PPH) Construction Phase - Operations Run Only. Off-road Equipment - Operations Run Only. Trips and VMT - Operations Run Only. Vehicle Trips - Trip Characteristics based on information provided in the Travertine Specific Plan Traffic Phasing Plan Analysis by Urban Crossroads, Inc. Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Vehicle Emission Factors - EMFAC2017 Woodstoves - Rule 445 Area Coating - Energy Use - The project will design building shells and building components to meet 2019 Title 24 Standards which expects 30% less energy for nonresidential uses and 53% less energy for residential uses Water Mitigation - Waste Mitigation - Table Name Column Name Default Value New Value tblConstructionPhase • NumDays 500.00 • 0.00 r tblEnergyUse Y LightingElect • 810.36 T 380.87 Y tblEnergyUse • LightingElect 5.44 T• 3.81 tblEnergyUse Y • LightingElect 1,608.84 T 756.15 tblEnergyUse Y• T24E 877.14 T 412.26 • tblEnergyUse Y T24E 6.47 T 4.53 tblEnergyUse Y• T24E 951.67 T 447.28 • tblEnergyUse Y T24NG 9,544.50 T• 4,485.92 tblEnergyUse Y• T24NG 55.15 T 38.61 tblEnergyUse Y• T24NG 24,566.15 T 11,546.09 Y 1 1 tblFireplaces • NumberGas 353.60 442.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 3 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblFireplaces • NumberGas • 606.40 758.00 tblFireplaces • NumberNoFireplace i 44.20 0.00 r tblFireplaces • NumberNoFireplace T 75.80 0.00 r tblFireplaces • NumberWood T 44.20 0.00 r tblFireplaces • NumberWood T 75.80 0.00 r tblLandUse • LandUseSquareFeet i 0.00 64,282.00 • r tblLandUse • LandUseSquareFeet T 145,200.00 261,712.00 r 4 tblLandUse • LotAcreage i 83.77 46.20 r tblLandUse • LotAcreage i 3.33 38.30 • r tblLandUse • LotAcreage i 27.63 60.80 r 4 tblLandUse • LotAcreage i 246.10 317.50 r 4 tblLandUse • Population T 1,264.00 1,198.00 r 4 tblLandUse • Population T 2,168.00 2,054.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 1.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 3.00 0.00 r 4 tblOffRoadEquipment • • OffRoadEquipmentUnitAmount i 2.00 0.00 • r 4 tblProjectCharacteristics • CO2lntensityFactor T 1270.9 623.16 r 4 tblVehicleEF • HHD T 0.75 0.03 r 4 tblVehicleEF • HHD T 0.03 0.01 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 1.93 10.48 r 4 tblVehicleEF • HHD T 0.45 0.21 r 4 tblVehicleEF • HHD T 1.67 2.2240e-003 r 4 tblVehicleEF • HHD T 5,686.40 1,476.79 r 4 tblVehicleEF • HHD T 1,373.71 1,021.53 r 4 tblVehicleEF • HHD T 5.25 0.02 tblVehicleEF • HHD • 16.13 8.41 CaIEEMod Version: CaIEEMod.2016.3.2 Page 4 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 0.76 1.81 tblVehicleEF • HHD i 20.16 2.34 r tblVehicleEF • HHD T 2.7210e-003 3.0730e-003 r tblVehicleEF • HHD T 0.06 0.06 r tblVehicleEF • HHD T 0.04 0.04 r tblVehicleEF • HHD T 4.8640e-003 0.02 r tblVehicleEF • HHD T 5.7000e-005 0.00 r 4 tblVehicleEF • HHD T 2.6030e-003 2.9400e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8460e-003 8.9630e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 8.2000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.2700e-003 2.1000e-005 r 4 tblVehicleEF • HHD T 0.51 0.71 r 4 tblVehicleEF • HHD T 4.8000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 1.5900e-004 8.9000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.5730e-003 r 4 tblVehicleEF • HHD T 8.0000e-005 0.00 r 4 tblVehicleEF • HHD T 8.2000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 2.2700e-003 2.1000e-005 r 4 tblVehicleEF • HHD T 0.59 0.81 r 4 tblVehicleEF • HHD T 4.8000e-005 1.0000e-006 tblVehicleEF • HHD • 0.08 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 5 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 1.5900e-004 8.9000e-005 tblVehicleEF • HHD i 0.03 1.0000e-006 r tblVehicleEF • HHD T 0.70 0.04 r tblVehicleEF • HHD T 0.03 0.01 r tblVehicleEF • HHD T 0.05 0.00 r tblVehicleEF • HHD T 1.40 10.35 r tblVehicleEF • HHD T 0.46 0.21 r 4 tblVehicleEF • HHD T 1.60 2.1620e-003 r tblVehicleEF • HHD T 6,024.24 1,457.52 r tblVehicleEF • HHD T 1,373.71 1,021.53 r 4 tblVehicleEF • HHD T 5.25 0.02 r 4 tblVehicleEF • HHD T 16.65 7.99 r 4 tblVehicleEF • HHD T 0.72 1.71 r 4 tblVehicleEF • HHD T 20.16 2.34 r 4 tblVehicleEF • HHD T 2.2940e-003 2.7280e-003 r 4 tblVehicleEF • HHD T 0.06 0.06 r 4 tblVehicleEF • HHD T 0.04 0.04 r 4 tblVehicleEF • HHD T 4.8640e-003 0.02 r 4 tblVehicleEF • HHD T 5.7000e-005 0.00 r 4 tblVehicleEF • HHD T 2.1950e-003 2.6100e-003 r 4 tblVehicleEF • HHD T 0.03 0.03 r 4 tblVehicleEF • HHD T 8.8460e-003 8.9630e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r 4 tblVehicleEF • HHD T 5.2000e-005 0.00 r 4 tblVehicleEF • HHD T 1.5500e-004 2.0000e-006 r 4 tblVehicleEF • HHD T 2.5580e-003 2.6000e-005 tblVehicleEF • HHD • 0.48 0.75 CaIEEMod Version: CaIEEMod.2016.3.2 Page 6 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 8.7000e-005 1.0000e-006 tblVehicleEF • HHD i 0.05 0.02 r tblVehicleEF • HHD T 1.6100e-004 9.2000e-005 r tblVehicleEF • HHD T 0.03 1.0000e-006 r tblVehicleEF • HHD i 0.06 0.01 r tblVehicleEF • HHD T 0.01 9.5730e-003 r tblVehicleEF • HHD T 7.8000e-005 0.00 r 4 tblVehicleEF • HHD T 1.5500e-004 2.0000e-006 r tblVehicleEF • HHD T 2.5580e-003 2.6000e-005 r tblVehicleEF • HHD T 0.56 0.86 r 4 tblVehicleEF • HHD T 8.7000e-005 1.0000e-006 r 4 tblVehicleEF • HHD T 0.08 0.03 r 4 tblVehicleEF • HHD T 1.6100e-004 9.2000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.81 0.03 r 4 tblVehicleEF • HHD T 0.03 8.3700e-004 r 4 tblVehicleEF • HHD T 0.06 0.00 r 4 tblVehicleEF • HHD T 2.66 10.65 r 4 tblVehicleEF • HHD T 0.45 0.17 r 4 tblVehicleEF • HHD i 1.70 2.3630e-003 r 4 tblVehicleEF • HHD i 5,219.86 1,500.30 r 4 tblVehicleEF • HHD T 1,373.71 1,013.27 r 4 tblVehicleEF • HHD T 5.25 0.02 r 4 tblVehicleEF • HHD T 15.41 8.96 r 4 tblVehicleEF • HHD T 0.76 1.83 r 4 tblVehicleEF • HHD T 20.16 2.34 tblVehicleEF • HHD • 3.3110e-003 3.5340e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 7 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • HHD • 0.06 0.06 tblVehicleEF • HHD i 0.04 0.04 r tblVehicleEF • HHD T 4.8640e-003 0.02 r tblVehicleEF • HHD T 5.7000e-005 0.00 r tblVehicleEF • HHD T 3.1670e-003 3.3820e-003 r tblVehicleEF • HHD T 0.03 0.03 r tblVehicleEF • HHD T 8.8460e-003 8.9370e-003 r 4 tblVehicleEF • HHD T 4.6540e-003 0.02 r tblVehicleEF • HHD T 5.2000e-005 0.00 r tblVehicleEF • HHD T 5.5000e-005 0.00 r 4 tblVehicleEF • HHD T 2.3120e-003 1.9000e-005 r 4 tblVehicleEF • HHD T 0.55 0.65 r 4 tblVehicleEF • HHD T 3.9000e-005 0.00 r 4 tblVehicleEF • HHD T 0.05 0.02 r 4 tblVehicleEF • HHD T 1.7200e-004 9.6000e-005 r 4 tblVehicleEF • HHD T 0.03 1.0000e-006 r 4 tblVehicleEF • HHD T 0.05 0.01 r 4 tblVehicleEF • HHD T 0.01 9.5730e-003 r 4 tblVehicleEF • HHD T 8.0000e-005 0.00 r 4 tblVehicleEF • HHD T 5.5000e-005 0.00 r 4 tblVehicleEF • HHD T 2.3120e-003 1.9000e-005 r 4 tblVehicleEF • HHD T 0.64 0.74 r 4 tblVehicleEF • HHD T 3.9000e-005 0.00 r 4 tblVehicleEF • HHD i 0.08 0.02 r 4 tblVehicleEF • HHD 1.7200e-004 9.6000e-005 r r 4 tblVehicleEF • HHD 0.03 1.0000e-006 • r tblVehicleEF • LDA • 1.8430e-003 1.0230e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 8 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 1.7440e-003 0.02 tblVehicleEF • LDA i 0.34 0.48 r tblVehicleEF • LDA T 0.54 1.47 r tblVehicleEF • LDA T 180.10 223.31 r tblVehicleEF • LDA T 41.06 43.92 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r 4 tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.04 r 4 tblVehicleEF • LDA T 4.6130e-003 3.4090e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.10 r 4 tblVehicleEF • LDA T 1.8020e-003 2.0520e-003 r 4 tblVehicleEF • LDA T 4.1900e-004 4.0400e-004 r 4 tblVehicleEF • LDA T 0.03 0.06 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.04 r 4 tblVehicleEF • LDA T 6.7130e-003 4.9720e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.03 0.11 r 4 tblVehicleEF • LDA T 2.0860e-003 1.2030e-003 tblVehicleEF • LDA • 1.5090e-003 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 9 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 0.41 0.63 tblVehicleEF • LDA i 0.48 1.52 r tblVehicleEF • LDA T 196.09 247.40 r tblVehicleEF • LDA T 41.06 43.98 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.02 0.12 r tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r 4 tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r 4 tblVehicleEF • LDA T 0.05 0.11 r 4 tblVehicleEF • LDA T 0.07 0.08 r 4 tblVehicleEF • LDA T 0.04 0.08 r 4 tblVehicleEF • LDA T 5.2150e-003 3.9860e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.09 r 4 tblVehicleEF • LDA T 1.9630e-003 2.2740e-003 r 4 tblVehicleEF • LDA T 4.1800e-004 4.0400e-004 r 4 tblVehicleEF • LDA T 0.05 0.11 r 4 tblVehicleEF • LDA T 0.07 0.08 r 4 tblVehicleEF • LDA T 0.04 0.08 r 4 tblVehicleEF • LDA T 7.5910e-003 5.8180e-003 r 4 tblVehicleEF • LDA T 0.03 0.17 r 4 tblVehicleEF • LDA T 0.02 0.10 r 4 tblVehicleEF • LDA T 1.7790e-003 9.0500e-004 r 4 tblVehicleEF • LDA T 1.7900e-003 0.03 tblVehicleEF • LDA • 0.32 0.40 CaIEEMod Version: CaIEEMod.2016.3.2 Page 10 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDA • 0.55 1.69 tblVehicleEF • LDA i 175.64 207.59 r tblVehicleEF • LDA T 41.06 44.36 r tblVehicleEF • LDA T 0.02 0.02 r tblVehicleEF • LDA T 0.03 0.12 r tblVehicleEF • LDA T 1.0360e-003 8.7600e-004 r tblVehicleEF • LDA T 1.7020e-003 1.1700e-003 r 4 tblVehicleEF • LDA T 9.5300e-004 8.0600e-004 r tblVehicleEF • LDA T 1.5650e-003 1.0760e-003 r tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 4.4550e-003 3.0610e-003 r 4 tblVehicleEF • LDA T 0.03 0.18 r 4 tblVehicleEF • LDA T 0.02 0.11 r 4 tblVehicleEF • LDA T 1.7570e-003 1.9080e-003 r 4 tblVehicleEF • LDA T 4.1900e-004 4.0800e-004 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 0.06 0.06 r 4 tblVehicleEF • LDA T 0.02 0.02 r 4 tblVehicleEF • LDA T 6.4830e-003 4.4620e-003 r 4 tblVehicleEF • LDA T 0.03 0.19 r 4 tblVehicleEF • LDA T 0.03 0.12 r 4 tblVehicleEF • LDT1 T 3.9640e-003 2.6260e-003 r 4 tblVehicleEF • LDT1 T 5.1520e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.59 0.75 tblVehicleEF • LDT1 • 1.18 1.63 CaIEEMod Version: CaIEEMod.2016.3.2 Page 11 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 233.76 278.63 tblVehicleEF • LDT1 i 53.90 54.33 r tblVehicleEF • LDT1 T 0.05 0.04 r tblVehicleEF • LDT1 T 0.06 0.15 r tblVehicleEF • LDT1 T 1.3730e-003 1.1910e-003 r tblVehicleEF • LDT1 T 2.2030e-003 1.4330e-003 r tblVehicleEF • LDT1 T 1.2620e-003 1.0950e-003 r 4 tblVehicleEF • LDT1 T 2.0250e-003 1.3180e-003 r tblVehicleEF • LDT1 T 0.09 0.12 r tblVehicleEF • LDT1 T 0.15 0.12 r 4 tblVehicleEF • LDT1 T 0.07 0.09 r 4 tblVehicleEF • LDT1 T 9.8180e-003 0.01 r 4 tblVehicleEF • LDT1 T 0.10 0.38 r 4 tblVehicleEF • LDT1 T 0.07 0.14 r 4 tblVehicleEF • LDT1 T 2.3430e-003 2.5600e-003 r 4 tblVehicleEF • LDT1 T 5.5900e-004 4.9900e-004 r 4 tblVehicleEF • LDT1 T 0.09 0.12 r 4 tblVehicleEF • LDT1 T 0.15 0.12 r 4 tblVehicleEF • LDT1 T 0.07 0.09 r 4 tblVehicleEF • LDT1 T 0.01 0.02 r 4 tblVehicleEF • LDT1 T 0.10 0.38 r 4 tblVehicleEF • LDT1 T 0.08 0.15 r 4 tblVehicleEF • LDT1 T 4.4760e-003 3.0490e-003 r 4 tblVehicleEF • LDT1 T 4.4670e-003 0.03 r 4 tblVehicleEF • LDT1 T 0.72 0.97 r 4 tblVehicleEF • LDT1 T 1.04 1.68 tblVehicleEF • LDT1 • 254.30 304.46 CaIEEMod Version: CaIEEMod.2016.3.2 Page 12 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT1 • 53.90 54.38 tblVehicleEF • LDT1 r 0.05 0.04 I- 4 tblVehicleEF • LDT1 r 0.06 0.15 I- 4 tblVehicleEF • LDT1 r 1.3730e-003 1.1910e-003 I- 4 tblVehicleEF • LDT1 r 2.2030e-003 1.4330e-003 I- 4 tblVehicleEF • LDT1 r 1.2620e-003 1.0950e-003 I- 4 tblVehicleEF • LDT1 r 2.0250e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 0.18 0.25 I- 4 tblVehicleEF • LDT1 r 0.18 0.15 I- 4 tblVehicleEF • LDT1 r 0.13 0.16 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.10 0.40 I- 4 tblVehicleEF • LDT1 r 0.06 0.13 I- 4 tblVehicleEF • LDT1 r 2.5500e-003 2.7970e-003 I- 4 tblVehicleEF • LDT1 r 5.5600e-004 5.0000e-004 I- 4 tblVehicleEF • LDT1 r 0.18 0.25 I- 4 tblVehicleEF • LDT1 r 0.18 0.15 I- 4 tblVehicleEF • LDT1 r 0.13 0.16 I- 4 tblVehicleEF • LDT1 r 0.02 0.02 I- 4 tblVehicleEF • LDT1 r 0.10 0.40 I- 4 tblVehicleEF • LDT1 r 0.07 0.14 I- 4 tblVehicleEF • LDT1 r 3.8140e-003 2.3510e-003 I- 4 tblVehicleEF • LDT1 r 5.2920e-003 0.04 I- 4 tblVehicleEF • LDT1 r 0.55 0.63 I- 4 tblVehicleEF • LDT1 r 1.20 1.88 I- 4 tblVehicleEF • LDT1 r 227.49 261.79 tblVehicleEF • LDT1 • 53.90 54.83 CaIEEMod Version: CaIEEMod.2016.3.2 Page 13 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .LDT1 • 0.05 0.04 tblVehicleEF LDT1r 0.07 0.15 I- 4 tblVehicleEF • LDT1 r 1.3730e-003 1.1910e-003 I- 4 tblVehicleEF • LDT1 r 2.2030e-003 1.4330e-003 I- 4 tblVehicleEF • LDT1 r 1.2620e-003 1.0950e-003 I- 4 tblVehicleEF • LDT1 r 2.0250e-003 1.3180e-003 I- 4 tblVehicleEF • LDT1 r 0.08 0.05 I- 4 tblVehicleEF • LDT1 r 0.16 0.11 I- 4 tblVehicleEF • LDT1 r 0.06 0.04 I- 4 tblVehicleEF • LDT1 r 9.4480e-003 9.3700e-003 I- 4 tblVehicleEF • LDT1 r 0.11 0.43 I- 4 tblVehicleEF • LDT1 r 0.07 0.16 I- 4 tblVehicleEF • LDT1 r 2.2800e-003 2.4050e-003 I- 4 tblVehicleEF • LDT1 r 5.5900e-004 5.0400e-004 I- 4 tblVehicleEF • LDT1 r 0.08 0.05 I- 4 tblVehicleEF • LDT1 r 0.16 0.11 I- 4 tblVehicleEF • LDT1 r 0.06 0.04 I- 4 tblVehicleEF • LDT1 r 0.01 0.01 I- 4 tblVehicleEF • LDT1 r 0.11 0.43 I- 4 tblVehicleEF • LDT1 r 0.08 0.18 I- 4 tblVehicleEF • LDT2 r 2.8010e-003 2.1080e-003 I- 4 tblVehicleEF • LDT2 r 2.6400e-003 0.03 I- 4 tblVehicleEF • LDT2 r 0.49 0.68 I- 4 tblVehicleEF • LDT2 r 0.77 1.95 I- 4 tblVehicleEF • LDT2 r 261.59 280.82 I- 4 tblVehicleEF • LDT2 r 59.37 55.04 tblVehicleEF • LDT2 • 0.04 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 14 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 0.04 0.15 tblVehicleEF • LDT2 i 1.1950e-003 1.0750e-003 r tblVehicleEF • LDT2 T 1.9260e-003 1.2680e-003 r tblVehicleEF • LDT2 T 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.04 0.10 r tblVehicleEF • LDT2 T 0.07 0.09 r 4 tblVehicleEF • LDT2 T 0.04 0.08 r tblVehicleEF • LDT2 T 6.9570e-003 7.8510e-003 r tblVehicleEF • LDT2 T 0.05 0.31 r 4 tblVehicleEF • LDT2 T 0.04 0.14 r 4 tblVehicleEF • LDT2 T 2.6190e-003 2.5810e-003 r 4 tblVehicleEF • LDT2 T 6.0600e-004 5.0600e-004 r 4 tblVehicleEF • LDT2 T 0.04 0.10 r 4 tblVehicleEF • LDT2 T 0.07 0.09 r 4 tblVehicleEF • LDT2 T 0.04 0.08 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.31 r 4 tblVehicleEF • LDT2 T 0.04 0.16 r 4 tblVehicleEF • LDT2 T 3.1750e-003 2.4590e-003 r 4 tblVehicleEF • LDT2 T 2.3130e-003 0.03 r 4 tblVehicleEF • LDT2 T 0.61 0.89 r 4 tblVehicleEF • LDT2 T 0.69 2.00 r 4 tblVehicleEF • LDT2 T 284.69 304.46 r 4 tblVehicleEF • LDT2 T 59.37 55.09 r 4 tblVehicleEF • LDT2 T 0.03 0.04 tblVehicleEF • LDT2 • 0.04 0.15 CaIEEMod Version: CaIEEMod.2016.3.2 Page 15 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 1.1950e-003 1.0750e-003 tblVehicleEF • LDT2 i 1.9260e-003 1.2680e-003 r tblVehicleEF • LDT2 T 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.09 0.21 r tblVehicleEF • LDT2 T 0.08 0.11 r tblVehicleEF • LDT2 T 0.07 0.15 r 4 tblVehicleEF • LDT2 T 7.8810e-003 9.1400e-003 r tblVehicleEF • LDT2 T 0.05 0.32 r tblVehicleEF • LDT2 T 0.03 0.13 r 4 tblVehicleEF • LDT2 T 2.8510e-003 2.7980e-003 r 4 tblVehicleEF • LDT2 T 6.0500e-004 5.0600e-004 r 4 tblVehicleEF • LDT2 T 0.09 0.21 r 4 tblVehicleEF • LDT2 T 0.08 0.11 r 4 tblVehicleEF • LDT2 T 0.07 0.15 r 4 tblVehicleEF • LDT2 T 0.01 0.01 r 4 tblVehicleEF • LDT2 T 0.05 0.32 r 4 tblVehicleEF • LDT2 T 0.03 0.15 r 4 tblVehicleEF • LDT2 T 2.6900e-003 1.8800e-003 r 4 tblVehicleEF • LDT2 T 2.7200e-003 0.04 r 4 tblVehicleEF • LDT2 T 0.46 0.57 r 4 tblVehicleEF • LDT2 T 0.79 2.26 r 4 tblVehicleEF • LDT2 T 254.53 265.40 r 4 tblVehicleEF • LDT2 T 59.37 55.65 r 4 tblVehicleEF • LDT2 T 0.04 0.04 r 4 tblVehicleEF • LDT2 T 0.04 0.16 tblVehicleEF • LDT2 • 1.1950e-003 1.0750e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 16 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LDT2 • 1.9260e-003 1.2680e-003 tblVehicleEF • LDT2 i 1.0990e-003 9.9000e-004 r tblVehicleEF • LDT2 T 1.7710e-003 1.1660e-003 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 0.07 0.08 r tblVehicleEF • LDT2 T 0.03 0.04 r tblVehicleEF • LDT2 T 6.6820e-003 7.0720e-003 r 4 tblVehicleEF • LDT2 T 0.06 0.35 r tblVehicleEF • LDT2 T 0.04 0.17 r tblVehicleEF • LDT2 T 2.5480e-003 2.4390e-003 r 4 tblVehicleEF • LDT2 T 6.0600e-004 5.1100e-004 r 4 tblVehicleEF • LDT2 T 0.03 0.04 r 4 tblVehicleEF • LDT2 T 0.07 0.08 r 4 tblVehicleEF • LDT2 T 0.03 0.04 r 4 tblVehicleEF • LDT2 T 9.7420e-003 0.01 r 4 tblVehicleEF • LDT2 T 0.06 0.35 r 4 tblVehicleEF • LDT2 T 0.04 0.18 r 4 tblVehicleEF • LHD1 T 3.7520e-003 4.0090e-003 r 4 tblVehicleEF • LHD1 T 3.3780e-003 1.7990e-003 r 4 tblVehicleEF • LHD1 T 9.4800e-003 7.7110e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.34 0.21 r 4 tblVehicleEF • LHD1 T 1.41 0.78 r 4 tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.85 r 4 tblVehicleEF • LHD1 T 25.04 9.45 tblVehicleEF • LHD1 • 0.07 0.05 CaIEEMod Version: CaIEEMod.2016.3.2 Page 17 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 0.84 0.31 tblVehicleEF • LHD1 i 0.62 0.20 r tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r tblVehicleEF • LHD1 T 0.01 9.9660e-003 r tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 r tblVehicleEF • LHD1 T 8.1100e-004 9.2100e-004 r 4 tblVehicleEF • LHD1 T 2.6230e-003 2.4910e-003 r tblVehicleEF • LHD1 T 7.7360e-003 4.4930e-003 r tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r 4 tblVehicleEF • LHD1 T 2.6210e-003 2.6940e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 1.4090e-003 1.3400e-003 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r 4 tblVehicleEF • LHD1 T 0.24 0.32 r 4 tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 9.0000e-005 8.0000e-005 r 4 tblVehicleEF • LHD1 T 5.3930e-003 5.3920e-003 r 4 tblVehicleEF • LHD1 T 2.7600e-004 9.4000e-005 r 4 tblVehicleEF • LHD1 T 2.6210e-003 2.6940e-003 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.4090e-003 1.3400e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.24 0.32 tblVehicleEF • LHD1 • 0.14 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 18 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 3.7520e-003 4.0150e-003 tblVehicleEF • LHD1 i 3.4150e-003 1.8130e-003 r tblVehicleEF • LHD1 T 9.1210e-003 7.5330e-003 r tblVehicleEF • LHD1 T 0.13 0.17 r tblVehicleEF • LHD1 T 0.35 0.21 r tblVehicleEF • LHD1 T 1.35 0.76 r tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.86 r tblVehicleEF • LHD1 T 25.04 9.41 r tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.79 0.29 r 4 tblVehicleEF • LHD1 T 0.60 0.20 r 4 tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9660e-003 r 4 tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r 4 tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 r 4 tblVehicleEF • LHD1 T 8.1100e-004 9.2100e-004 r 4 tblVehicleEF • LHD1 T 2.6230e-003 2.4910e-003 r 4 tblVehicleEF • LHD1 T 7.7360e-003 4.4930e-003 r 4 tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r 4 tblVehicleEF • LHD1 T 4.8780e-003 5.3810e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.06 r 4 tblVehicleEF • LHD1 T 0.01 0.02 r 4 tblVehicleEF • LHD1 T 2.5900e-003 2.4440e-003 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r 4 tblVehicleEF • LHD1 T 0.24 0.33 tblVehicleEF • LHD1 • 0.12 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 19 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 9.0000e-005 8.0000e-005 tblVehicleEF • LHD1 i 5.3930e-003 5.3920e-003 r tblVehicleEF • LHD1 T 2.7500e-004 9.3000e-005 r tblVehicleEF • LHD1 T 4.8780e-003 5.3810e-003 r tblVehicleEF • LHD1 T 0.08 0.06 r tblVehicleEF • LHD1 T 0.02 0.02 r tblVehicleEF • LHD1 T 2.5900e-003 2.4440e-003 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r tblVehicleEF • LHD1 T 0.24 0.33 r tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 3.7520e-003 3.9970e-003 r 4 tblVehicleEF • LHD1 T 3.3750e-003 1.7740e-003 r 4 tblVehicleEF • LHD1 T 9.4930e-003 8.0420e-003 r 4 tblVehicleEF • LHD1 T 0.13 0.17 r 4 tblVehicleEF • LHD1 T 0.34 0.20 r 4 tblVehicleEF • LHD1 T 1.42 0.82 r 4 tblVehicleEF • LHD1 T 9.09 8.23 r 4 tblVehicleEF • LHD1 T 552.57 553.85 r 4 tblVehicleEF • LHD1 T 25.04 9.53 r 4 tblVehicleEF • LHD1 T 0.07 0.05 r 4 tblVehicleEF • LHD1 T 0.83 0.32 r 4 tblVehicleEF • LHD1 T 0.62 0.21 r 4 tblVehicleEF • LHD1 T 8.4800e-004 9.6300e-004 r 4 tblVehicleEF • LHD1 T 0.01 9.9660e-003 r 4 tblVehicleEF • LHD1 T 8.1000e-003 4.7170e-003 r 4 tblVehicleEF • LHD1 T 5.7100e-004 1.8900e-004 tblVehicleEF • LHD1 • 8.1100e-004 9.2100e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 20 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD1 • 2.6230e-003 2.4910e-003 tblVehicleEF • LHD1 i 7.7360e-003 4.4930e-003 r tblVehicleEF • LHD1 T 5.2500e-004 1.7400e-004 r tblVehicleEF • LHD1 T 2.1750e-003 1.1390e-003 r tblVehicleEF • LHD1 T 0.08 0.05 r tblVehicleEF • LHD1 T 0.01 0.02 r tblVehicleEF • LHD1 T 1.2660e-003 7.0100e-004 r 4 tblVehicleEF • LHD1 T 0.04 0.02 r tblVehicleEF • LHD1 T 0.26 0.34 r tblVehicleEF • LHD1 T 0.13 0.04 r 4 tblVehicleEF • LHD1 T 9.0000e-005 8.0000e-005 r 4 tblVehicleEF • LHD1 T 5.3930e-003 5.3920e-003 r 4 tblVehicleEF • LHD1 T 2.7600e-004 9.4000e-005 r 4 tblVehicleEF • LHD1 T 2.1750e-003 1.1390e-003 r 4 tblVehicleEF • LHD1 T 0.08 0.05 r 4 tblVehicleEF • LHD1 T 0.02 0.02 r 4 tblVehicleEF • LHD1 T 1.2660e-003 7.0100e-004 r 4 tblVehicleEF • LHD1 T 0.05 0.03 r 4 tblVehicleEF • LHD1 T 0.26 0.34 r 4 tblVehicleEF • LHD1 T 0.14 0.04 r 4 tblVehicleEF • LHD2 T 2.5040e-003 2.9180e-003 r 4 tblVehicleEF • LHD2 T 1.6180e-003 1.8840e-003 r 4 tblVehicleEF • LHD2 T 3.1090e-003 5.9870e-003 r 4 tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.17 0.22 r 4 tblVehicleEF • LHD2 T 0.83 0.51 tblVehicleEF • LHD2 • 13.70 12.78 CaIEEMod Version: CaIEEMod.2016.3.2 Page 21 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 563.18 562.93 tblVehicleEF • LHD2 i 21.41 7.29 r tblVehicleEF • LHD2 T 0.07 0.07 r tblVehicleEF • LHD2 T 0.28 0.47 r tblVehicleEF • LHD2 T 0.26 0.16 r tblVehicleEF • LHD2 T 1.0390e-003 1.3950e-003 r tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 6.3610e-003 9.3060e-003 r tblVehicleEF • LHD2 T 3.5700e-004 1.0800e-004 r tblVehicleEF • LHD2 T 9.9400e-004 1.3350e-003 r 4 tblVehicleEF • LHD2 T 2.7110e-003 2.6860e-003 r 4 tblVehicleEF • LHD2 T 6.0760e-003 8.8920e-003 r 4 tblVehicleEF • LHD2 T 3.2900e-004 9.9000e-005 r 4 tblVehicleEF • LHD2 T 8.3600e-004 1.8870e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 4.8700e-004 1.0020e-003 r 4 tblVehicleEF • LHD2 T 0.03 0.03 r 4 tblVehicleEF • LHD2 T 0.04 0.18 r 4 tblVehicleEF • LHD2 T 0.04 0.03 r 4 tblVehicleEF • LHD2 T 1.3300e-004 1.2200e-004 r 4 tblVehicleEF • LHD2 T 5.4710e-003 5.4350e-003 r 4 tblVehicleEF • LHD2 T 2.2800e-004 7.2000e-005 r 4 tblVehicleEF • LHD2 T 8.3600e-004 1.8870e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.02 tblVehicleEF • LHD2 • 4.8700e-004 1.0020e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 22 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 0.03 0.04 tblVehicleEF • LHD2 i 0.04 0.18 r tblVehicleEF • LHD2 T 0.05 0.03 r tblVehicleEF • LHD2 T 2.5040e-003 2.9220e-003 r tblVehicleEF • LHD2 T 1.6280e-003 1.8930e-003 r tblVehicleEF • LHD2 T 3.0410e-003 5.8500e-003 r tblVehicleEF • LHD2 T 0.12 0.14 r 4 tblVehicleEF • LHD2 T 0.17 0.22 r tblVehicleEF • LHD2 T 0.79 0.49 r tblVehicleEF • LHD2 T 13.70 12.78 r 4 tblVehicleEF • LHD2 T 563.18 562.93 r 4 tblVehicleEF • LHD2 T 21.41 7.26 r 4 tblVehicleEF • LHD2 T 0.07 0.07 r 4 tblVehicleEF • LHD2 T 0.26 0.44 r 4 tblVehicleEF • LHD2 T 0.26 0.16 r 4 tblVehicleEF • LHD2 T 1.0390e-003 1.3950e-003 r 4 tblVehicleEF • LHD2 T 0.01 0.01 r 4 tblVehicleEF • LHD2 T 6.3610e-003 9.3060e-003 r 4 tblVehicleEF • LHD2 T 3.5700e-004 1.0800e-004 r 4 tblVehicleEF • LHD2 T 9.9400e-004 1.3350e-003 r 4 tblVehicleEF • LHD2 T 2.7110e-003 2.6860e-003 r 4 tblVehicleEF • LHD2 T 6.0760e-003 8.8920e-003 r 4 tblVehicleEF • LHD2 T 3.2900e-004 9.9000e-005 r 4 tblVehicleEF • LHD2 T 1.5680e-003 3.7670e-003 r 4 tblVehicleEF • LHD2 T 0.02 0.04 r 4 tblVehicleEF • LHD2 T 0.01 0.01 tblVehicleEF • LHD2 • 8.9000e-004 1.7830e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 23 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • LHD2 • 0.03 0.03 tblVehicleEF • LHD2 r 0.04 0.18 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 1.3300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 5.4710e-003 5.4350e-003 I- 4 tblVehicleEF • LHD2 r 2.2800e-004 7.2000e-005 I- 4 tblVehicleEF • LHD2 r 1.5680e-003 3.7670e-003 I- 4 tblVehicleEF • LHD2 r 0.02 0.04 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 8.9000e-004 1.7830e-003 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.04 0.18 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 2.5040e-003 2.9090e-003 I- 4 tblVehicleEF • LHD2 r 1.6160e-003 1.8690e-003 I- 4 tblVehicleEF • LHD2 r 3.1200e-003 6.2420e-003 I- 4 tblVehicleEF • LHD2 r 0.12 0.14 I- 4 tblVehicleEF • LHD2 r 0.17 0.22 I- 4 tblVehicleEF • LHD2 r 0.84 0.54 I- 4 tblVehicleEF • LHD2 r 13.70 12.78 I- 4 tblVehicleEF • LHD2 r 563.18 562.93 I- 4 tblVehicleEF • LHD2 r 21.41 7.34 I- 4 tblVehicleEF • LHD2 r 0.07 0.07 I- 4 tblVehicleEF • LHD2 r 0.28 0.48 I- 4 tblVehicleEF • LHD2 r 0.26 0.17 I- 4 tblVehicleEF • LHD2 r 1.0390e-003 1.3950e-003 tblVehicleEF • LHD2 • 0.01 0.01 CaIEEMod Version: CaIEEMod.2016.3.2 Page 24 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .LHD2 • 6.3610e-003 9.3060e-003 tblVehicleEF • LHD2 r 3.5700e-004 1.0800e-004 I- 4 tblVehicleEF • LHD2 r 9.9400e-004 1.3350e-003 I- 4 tblVehicleEF • LHD2 r 2.7110e-003 2.6860e-003 I- 4 tblVehicleEF • LHD2 r 6.0760e-003 8.8920e-003 I- 4 tblVehicleEF • LHD2 r 3.2900e-004 9.9000e-005 I- 4 tblVehicleEF • LHD2 r 6.3400e-004 7.7700e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.03 I- 4 tblVehicleEF • LHD2 r 0.01 0.01 I- 4 tblVehicleEF • LHD2 r 4.1900e-004 5.3600e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.03 I- 4 tblVehicleEF • LHD2 r 0.04 0.19 I- 4 tblVehicleEF • LHD2 r 0.04 0.03 I- 4 tblVehicleEF • LHD2 r 1.3300e-004 1.2200e-004 I- 4 tblVehicleEF • LHD2 r 5.4710e-003 5.4350e-003 I- 4 tblVehicleEF • LHD2 r 2.2800e-004 7.3000e-005 I- 4 tblVehicleEF • LHD2 r 6.3400e-004 7.7700e-004 I- 4 tblVehicleEF • LHD2 r 0.02 0.03 I- 4 tblVehicleEF • LHD2 r 0.01 0.02 I- 4 tblVehicleEF • LHD2 r 4.1900e-004 5.3600e-004 I- 4 tblVehicleEF • LHD2 r 0.03 0.04 I- 4 tblVehicleEF • LHD2 r 0.04 0.19 I- 4 tblVehicleEF • LHD2 r 0.05 0.03 I- 4 tblVehicleEF • MCY r 0.45 0.34 I- 4 tblVehicleEF • MCY r 0.14 0.22 I- 4 tblVehicleEF • MCY r 17.40 17.70 tblVehicleEF • MCY • 9.82 8.43 CaIEEMod Version: CaIEEMod.2016.3.2 Page 25 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 170.70 212.58 tblVehicleEF • MCY i 42.70 56.87 r tblVehicleEF • MCY T 1.11 1.10 r tblVehicleEF • MCY T 0.31 0.26 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r 4 tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r tblVehicleEF • MCY T 1.67 2.44 r tblVehicleEF • MCY T 0.76 0.93 r 4 tblVehicleEF • MCY T 0.88 1.33 r 4 tblVehicleEF • MCY T 2.09 2.22 r 4 tblVehicleEF • MCY T 0.44 1.39 r 4 tblVehicleEF • MCY T 1.97 1.67 r 4 tblVehicleEF • MCY T 2.0540e-003 2.1040e-003 r 4 tblVehicleEF • MCY T 6.4500e-004 5.6300e-004 r 4 tblVehicleEF • MCY T 1.67 2.44 r 4 tblVehicleEF • MCY T 0.76 0.93 r 4 tblVehicleEF • MCY T 0.88 1.33 r 4 tblVehicleEF • MCY T 2.62 2.79 r 4 tblVehicleEF • MCY T 0.44 1.39 r 4 tblVehicleEF • MCY T 2.15 1.82 r 4 tblVehicleEF • MCY T 0.45 0.34 r 4 tblVehicleEF • MCY T 0.13 0.21 r 4 tblVehicleEF • MCY T 18.08 19.49 r 4 tblVehicleEF • MCY T 9.09 8.30 tblVehicleEF • MCY • 170.70 215.54 CaIEEMod Version: CaIEEMod.2016.3.2 Page 26 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MCY • 42.70 56.39 • MCY i 0.96 0.97 r • MCY T 0.29 0.25 r • MCY T 2.1370e-003 2.3060e-003 r • MCY T 3.1450e-003 2.8250e-003 r • MCY T 1.9930e-003 2.1500e-003 r • MCY T 2.9380e-003 2.6390e-003 r 4 • MCY T 3.31 5.01 r • MCY T 1.16 1.64 r • MCY T 2.02 3.01 r 4 • MCY T 2.08 2.26 r 4 • MCY T 0.44 1.47 r 4 • MCY T 1.78 1.59 r 4 • MCY T 2.0640e-003 2.1330e-003 r 4 • MCY T 6.2700e-004 5.5800e-004 r 4 • MCY T 3.31 5.01 r 4 • MCY T 1.16 1.64 r 4 • MCY T 2.02 3.01 r 4 • MCY T 2.61 2.83 r 4 • MCY T 0.44 1.47 r 4 • MCY T 1.94 1.74 r 4 • MCY T 0.45 0.34 r 4 • MCY T 0.15 0.25 r 4 • MCY T 17.03 17.76 r 4 • MCY T 9.85 9.37 r 4 • MCY T 170.70 212.80 • MCY • 42.70 59.09 CaIEEMod Version: CaIEEMod.2016.3.2 Page 27 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MCY • 1.10 1.18 tblVehicleEF • MCY i 0.31 0.27 r tblVehicleEF • MCY T 2.1370e-003 2.3060e-003 r tblVehicleEF • MCY T 3.1450e-003 2.8250e-003 r tblVehicleEF • MCY T 1.9930e-003 2.1500e-003 r tblVehicleEF • MCY T 2.9380e-003 2.6390e-003 r tblVehicleEF • MCY T 1.53 1.02 r 4 tblVehicleEF • MCY T 0.91 0.72 r tblVehicleEF • MCY T 0.68 0.40 r tblVehicleEF • MCY T 2.09 2.26 r 4 tblVehicleEF • MCY T 0.50 1.56 r 4 tblVehicleEF • MCY T 1.99 1.89 r 4 tblVehicleEF • MCY T 2.0480e-003 2.1060e-003 r 4 tblVehicleEF • MCY T 6.4600e-004 5.8500e-004 r 4 tblVehicleEF • MCY T 1.53 1.02 r 4 tblVehicleEF • MCY T 0.91 0.72 r 4 tblVehicleEF • MCY T 0.68 0.40 r 4 tblVehicleEF • MCY T 2.62 2.84 r 4 tblVehicleEF • MCY T 0.50 1.56 r 4 tblVehicleEF • MCY T 2.17 2.06 r 4 tblVehicleEF • MDV T 5.0520e-003 2.2020e-003 r 4 tblVehicleEF • MDV T 6.4290e-003 0.04 r 4 tblVehicleEF • MDV T 0.70 0.68 r 4 tblVehicleEF • MDV T 1.36 2.02 r 4 tblVehicleEF • MDV T 360.73 340.15 r 4 tblVehicleEF • MDV T 81.27 66.88 tblVehicleEF • MDV • 0.07 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 28 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MDV • 0.11 0.16 • MDV i 1.2760e-003 1.0590e-003 r • MDV T 1.9750e-003 1.2720e-003 r • MDV T 1.1750e-003 9.7600e-004 r • MDV T 1.8160e-003 1.1690e-003 r • MDV T 0.09 0.14 r • MDV T 0.14 0.11 r 4 • MDV T 0.08 0.11 r • MDV T 0.01 8.3160e-003 r • MDV T 0.09 0.34 r 4 • MDV T 0.09 0.17 r 4 • MDV T 3.6090e-003 3.1280e-003 r 4 • MDV T 8.3500e-004 6.1500e-004 r 4 • MDV T 0.09 0.14 r 4 • MDV T 0.14 0.11 r 4 • MDV T 0.08 0.11 r 4 • MDV T 0.02 0.01 r 4 • MDV T 0.09 0.35 r 4 • MDV T 0.09 0.18 r 4 • MDV T 5.7180e-003 2.5720e-003 r 4 • MDV T 5.5960e-003 0.04 r 4 • MDV T 0.85 0.88 r 4 • MDV T 1.21 2.07 r 4 • MDV T 391.68 363.81 r 4 • MDV T 81.27 66.93 r 4 • MDV T 0.06 0.04 • MDV • 0.10 0.17 CaIEEMod Version: CaIEEMod.2016.3.2 Page 29 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • MDV • 1.2760e-003 1.0590e-003 • MDV i 1.9750e-003 1.2720e-003 r • MDV T 1.1750e-003 9.7600e-004 r • MDV T 1.8160e-003 1.1690e-003 r • MDV T 0.17 0.28 r • MDV T 0.16 0.14 r • MDV T 0.14 0.20 r 4 • MDV T 0.01 9.6740e-003 r • MDV T 0.09 0.36 r • MDV T 0.08 0.15 r 4 • MDV T 3.9200e-003 3.3450e-003 r 4 • MDV T 8.3300e-004 6.1500e-004 r 4 • MDV T 0.17 0.28 r 4 • MDV T 0.16 0.14 r 4 • MDV T 0.14 0.20 r 4 • MDV T 0.02 0.01 r 4 • MDV T 0.09 0.36 r 4 • MDV T 0.08 0.17 r 4 • MDV T 4.8560e-003 1.9610e-003 r 4 • MDV T 6.6210e-003 0.04 r 4 • MDV T 0.65 0.57 r 4 • MDV T 1.40 2.35 r 4 • MDV T 351.17 324.72 r 4 • MDV T 81.27 67.53 r 4 • MDV T 0.06 0.04 r 4 • MDV T 0.11 0.18 • MDV • 1.2760e-003 1.0590e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 30 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .MDV • 1.9750e-003 1.2720e-003 tblVehicleEF • MDV r 1.1750e-003 9.7600e-004 I- 4 tblVehicleEF • MDV r 1.8160e-003 1.1690e-003 I- 4 tblVehicleEF • MDV r 0.07 0.05 I- 4 tblVehicleEF • MDV r 0.15 0.10 I- 4 tblVehicleEF • MDV r 0.06 0.05 I- 4 tblVehicleEF • MDV r 0.01 7.4960e-003 I- 4 tblVehicleEF • MDV r 0.10 0.38 I- 4 tblVehicleEF • MDV r 0.09 0.19 I- 4 tblVehicleEF • MDV r 3.5120e-003 2.9860e-003 I- 4 tblVehicleEF • MDV r 8.3600e-004 6.2000e-004 I- 4 tblVehicleEF • MDV r 0.07 0.05 I- 4 tblVehicleEF • MDV r 0.15 0.11 I- 4 tblVehicleEF • MDV r 0.06 0.06 I- 4 tblVehicleEF • MDV r 0.02 0.01 I- 4 tblVehicleEF • MDV r 0.10 0.39 I- 4 tblVehicleEF • MDV r 0.10 0.21 I- 4 tblVehicleEF • MH r 6.6110e-003 2.6010e-003 I- 4 tblVehicleEF • MH r 0.02 0.00 I- 4 tblVehicleEF • MH r 0.43 0.24 I- 4 tblVehicleEF • MH r 3.68 0.00 I- 4 tblVehicleEF • MH r 981.76 860.97 I- 4 tblVehicleEF • MH r 56.11 0.00 I- 4 tblVehicleEF • MH r 0.84 3.03 I- 4 tblVehicleEF • MH r 0.64 0.00 I- 4 tblVehicleEF • MH r 0.01 0.02 tblVehicleEF • MH • 0.02 0.08 CaIEEMod Version: CaIEEMod.2016.3.2 Page 31 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 7.9300e-004 0.00 tblVehicleEF • MH i 3.2320e-003 4.0000e-003 r tblVehicleEF • MH T 0.02 0.08 r tblVehicleEF • MH T 7.2900e-004 0.00 r tblVehicleEF • MH T 0.86 0.00 r tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.33 0.00 r 4 tblVehicleEF • MH T 0.03 0.06 r tblVehicleEF • MH T 0.01 0.00 r tblVehicleEF • MH T 0.22 0.00 r 4 tblVehicleEF • MH T 9.7130e-003 8.1390e-003 r 4 tblVehicleEF • MH T 6.2500e-004 0.00 r 4 tblVehicleEF • MH T 0.86 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.33 0.00 r 4 tblVehicleEF • MH T 0.04 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.24 0.00 r 4 tblVehicleEF • MH T 6.7390e-003 2.6010e-003 r 4 tblVehicleEF • MH T 0.02 0.00 r 4 tblVehicleEF • MH T 0.44 0.24 r 4 tblVehicleEF • MH T 3.44 0.00 r 4 tblVehicleEF • MH T 981.76 860.97 r 4 tblVehicleEF • MH T 56.11 0.00 r 4 tblVehicleEF • MH T 0.78 2.86 r 4 tblVehicleEF • MH T 0.61 0.00 tblVehicleEF • MH • 0.01 0.02 CaIEEMod Version: CaIEEMod.2016.3.2 Page 32 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF MH• • 0.02 0.08 • MH i 7.9300e-004 0.00 r • MH T 3.2320e-003 4.0000e-003 r MH• T 0.02 0.08 r • MH T 7.2900e-004 0.00 r MH• T 1.56 0.00 r MH• T 0.05 0.00 r 4 MH• T 0.63 0.00 r MH• T 0.03 0.06 r MH• T 0.01 0.00 r 4 • MH T 0.21 0.00 r 4 • MH T 9.7130e-003 8.1390e-003 r 4 • MH T 6.2100e-004 0.00 r 4 MH• T 1.56 0.00 r 4 MH• T 0.05 0.00 r 4 MH• T 0.63 0.00 r 4 MH• T 0.04 0.06 r 4 MH• T 0.01 0.00 r 4 • MH T 0.23 0.00 r 4 • MH T 6.5990e-003 2.6010e-003 r 4 MH• T 0.02 0.00 r 4 MH• T 0.43 0.24 r 4 MH• T 3.72 0.00 r 4 MH• T 981.76 860.97 r 4 MH• T 56.11 0.00 r 4 MH• T 0.83 3.07 • MH • 0.63 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 33 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MH • 0.01 0.02 tblVehicleEF • MH i 0.02 0.08 r tblVehicleEF • MH T 7.9300e-004 0.00 r tblVehicleEF • MH T 3.2320e-003 4.0000e-003 r tblVehicleEF • MH T 0.02 0.08 r tblVehicleEF • MH T 7.2900e-004 0.00 r tblVehicleEF • MH T 0.78 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r tblVehicleEF • MH T 0.31 0.00 r tblVehicleEF • MH T 0.03 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.22 0.00 r 4 tblVehicleEF • MH T 9.7130e-003 8.1390e-003 r 4 tblVehicleEF • MH T 6.2600e-004 0.00 r 4 tblVehicleEF • MH T 0.78 0.00 r 4 tblVehicleEF • MH T 0.05 0.00 r 4 tblVehicleEF • MH T 0.31 0.00 r 4 tblVehicleEF • MH T 0.04 0.06 r 4 tblVehicleEF • MH T 0.01 0.00 r 4 tblVehicleEF • MH T 0.25 0.00 r 4 tblVehicleEF • MHD T 0.02 5.0880e-003 r 4 tblVehicleEF • MHD T 1.4740e-003 1.1650e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.32 0.44 r 4 tblVehicleEF • MHD T 0.13 0.13 r 4 tblVehicleEF • MHD T 3.20 1.13 tblVehicleEF • MHD • 146.07 61.93 CaIEEMod Version: CaIEEMod.2016.3.2 Page 34 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 1,045.79 919.26 tblVehicleEF • MHD i 53.04 11.54 r tblVehicleEF • MHD T 0.38 0.31 r tblVehicleEF • MHD T 0.40 0.80 r tblVehicleEF • MHD T 11.18 1.52 r tblVehicleEF • MHD T 5.0000e-005 1.2100e-004 r tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r tblVehicleEF • MHD T 4.8000e-005 1.1600e-004 r tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 r 4 tblVehicleEF • MHD T 6.4500e-004 1.2400e-004 r 4 tblVehicleEF • MHD T 1.1110e-003 1.1030e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 6.3000e-004 5.9400e-004 r 4 tblVehicleEF • MHD T 0.02 9.5340e-003 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.20 0.06 r 4 tblVehicleEF • MHD T 1.4040e-003 5.8900e-004 r 4 tblVehicleEF • MHD T 0.01 8.8280e-003 r 4 tblVehicleEF • MHD T 5.8600e-004 1.1400e-004 r 4 tblVehicleEF • MHD T 1.1110e-003 1.1030e-003 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 6.3000e-004 5.9400e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 tblVehicleEF • MHD • 0.01 0.13 CaIEEMod Version: CaIEEMod.2016.3.2 Page 35 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 0.22 0.06 tblVehicleEF • MHD i 0.02 4.8250e-003 r tblVehicleEF • MHD T 1.4840e-003 1.1800e-003 r tblVehicleEF • MHD T 0.03 0.01 r tblVehicleEF • MHD T 0.23 0.37 r tblVehicleEF • MHD T 0.14 0.14 r tblVehicleEF • MHD T 3.05 1.10 r 4 tblVehicleEF • MHD T 154.72 61.67 r tblVehicleEF • MHD T 1,045.79 919.26 r tblVehicleEF • MHD T 53.04 11.48 r 4 tblVehicleEF • MHD T 0.39 0.29 r 4 tblVehicleEF • MHD T 0.38 0.76 r 4 tblVehicleEF • MHD T 11.17 1.52 r 4 tblVehicleEF • MHD T 4.2000e-005 1.0500e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r 4 tblVehicleEF • MHD T 4.0000e-005 1.0000e-004 r 4 tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 r 4 tblVehicleEF • MHD T 6.4500e-004 1.2400e-004 r 4 tblVehicleEF • MHD T 2.1280e-003 2.2020e-003 r 4 tblVehicleEF • MHD T 0.04 0.03 r 4 tblVehicleEF • MHD T 0.02 0.02 r 4 tblVehicleEF • MHD T 1.1460e-003 1.0590e-003 r 4 tblVehicleEF • MHD T 0.02 9.5880e-003 r 4 tblVehicleEF • MHD T 0.01 0.13 r 4 tblVehicleEF • MHD T 0.20 0.05 tblVehicleEF • MHD • 1.4860e-003 5.8700e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 36 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 0.01 8.8280e-003 tblVehicleEF • MHD i 5.8400e-004 1.1400e-004 r tblVehicleEF • MHD T 2.1280e-003 2.2020e-003 r tblVehicleEF • MHD T 0.04 0.03 r tblVehicleEF • MHD T 0.03 0.03 r tblVehicleEF • MHD T 1.1460e-003 1.0590e-003 r tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.01 0.13 r tblVehicleEF • MHD T 0.22 0.06 r tblVehicleEF • MHD T 0.02 5.4470e-003 r 4 tblVehicleEF • MHD T 1.4660e-003 1.1380e-003 r 4 tblVehicleEF • MHD T 0.03 0.01 r 4 tblVehicleEF • MHD T 0.44 0.54 r 4 tblVehicleEF • MHD T 0.13 0.13 r 4 tblVehicleEF • MHD T 3.25 1.20 r 4 tblVehicleEF • MHD T 134.12 62.28 r 4 tblVehicleEF • MHD T 1,045.79 919.26 r 4 tblVehicleEF • MHD T 53.04 11.66 r 4 tblVehicleEF • MHD T 0.36 0.32 r 4 tblVehicleEF • MHD T 0.40 0.82 r 4 tblVehicleEF • MHD T 11.19 1.52 r 4 tblVehicleEF • MHD T 6.1000e-005 1.4300e-004 r 4 tblVehicleEF • MHD T 2.6360e-003 8.1490e-003 r 4 tblVehicleEF • MHD T 7.0100e-004 1.3500e-004 r 4 tblVehicleEF • MHD T 5.8000e-005 1.3700e-004 r 4 tblVehicleEF • MHD T 2.5180e-003 7.7890e-003 tblVehicleEF • MHD • 6.4500e-004 1.2400e-004 CaIEEMod Version: CaIEEMod.2016.3.2 Page 37 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • MHD • 7.3100e-004 4.5200e-004 tblVehicleEF • MHD i 0.03 0.03 r tblVehicleEF • MHD T 0.02 0.02 r tblVehicleEF • MHD T 4.8500e-004 3.1600e-004 r tblVehicleEF • MHD T 0.02 9.4380e-003 r tblVehicleEF • MHD T 0.02 0.13 r tblVehicleEF • MHD T 0.21 0.06 r 4 tblVehicleEF • MHD T 1.2920e-003 5.9200e-004 r tblVehicleEF • MHD T 0.01 8.8280e-003 r tblVehicleEF • MHD T 5.8700e-004 1.1500e-004 r 4 tblVehicleEF • MHD T 7.3100e-004 4.5200e-004 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 0.03 0.03 r 4 tblVehicleEF • MHD T 4.8500e-004 3.1600e-004 r 4 tblVehicleEF • MHD T 0.02 0.01 r 4 tblVehicleEF • MHD T 0.02 0.13 r 4 tblVehicleEF • MHD T 0.23 0.06 r 4 tblVehicleEF • OBUS T 0.01 7.4950e-003 r 4 tblVehicleEF • OBUS T 2.8460e-003 1.8580e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.24 0.58 r 4 tblVehicleEF • OBUS T 0.19 0.19 r 4 tblVehicleEF • OBUS T 4.19 1.43 r 4 tblVehicleEF • OBUS T 74.12 83.68 r 4 tblVehicleEF • OBUS T 1,078.21 1,095.16 r 4 tblVehicleEF • OBUS T 67.43 13.39 tblVehicleEF • OBUS • 0.15 0.37 CaIEEMod Version: CaIEEMod.2016.3.2 Page 38 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.29 0.73 tblVehicleEF • OBUS i 1.98 1.08 r tblVehicleEF • OBUS T 1.4000e-005 1.2200e-004 r tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r tblVehicleEF • OBUS T 1.3000e-005 1.1600e-004 r tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r tblVehicleEF • OBUS T 1.9420e-003 2.1200e-003 r tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 8.7400e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.27 0.07 r 4 tblVehicleEF • OBUS T 7.1900e-004 7.9500e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4800e-004 1.3200e-004 r 4 tblVehicleEF • OBUS T 1.9420e-003 2.1200e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 8.7400e-004 9.0800e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • OBUS T 0.01 7.5750e-003 tblVehicleEF • OBUS • 2.8900e-003 1.8830e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 39 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.02 0.01 tblVehicleEF • OBUS i 0.24 0.57 r tblVehicleEF • OBUS T 0.20 0.19 r tblVehicleEF • OBUS T 3.92 1.37 r tblVehicleEF • OBUS T 77.54 82.67 r tblVehicleEF • OBUS T 1,078.21 1,095.17 r tblVehicleEF • OBUS T 67.43 13.28 r 4 tblVehicleEF • OBUS T 0.16 0.36 r tblVehicleEF • OBUS T 0.27 0.69 r tblVehicleEF • OBUS T 1.96 1.08 r 4 tblVehicleEF • OBUS T 1.1000e-005 1.0800e-004 r 4 tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r 4 tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r 4 tblVehicleEF • OBUS T 1.1000e-005 1.0300e-004 r 4 tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 3.5950e-003 4.1620e-003 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.03 0.05 r 4 tblVehicleEF • OBUS T 1.6350e-003 1.6400e-003 r 4 tblVehicleEF • OBUS T 0.02 0.01 r 4 tblVehicleEF • OBUS T 0.05 0.16 r 4 tblVehicleEF • OBUS T 0.26 0.07 r 4 tblVehicleEF • OBUS T 7.5200e-004 7.8600e-004 r 4 tblVehicleEF • OBUS T 0.01 0.01 r 4 tblVehicleEF • OBUS T 7.4300e-004 1.3100e-004 tblVehicleEF • OBUS • 3.5950e-003 4.1620e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 40 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 0.02 0.02 tblVehicleEF • OBUS i 0.04 0.06 r tblVehicleEF • OBUS T 1.6350e-003 1.6400e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.05 0.16 r tblVehicleEF • OBUS T 0.28 0.08 r tblVehicleEF • OBUS T 0.01 7.3830e-003 r 4 tblVehicleEF • OBUS T 2.8310e-003 1.8140e-003 r tblVehicleEF • OBUS T 0.02 0.02 r tblVehicleEF • OBUS T 0.25 0.59 r 4 tblVehicleEF • OBUS T 0.19 0.18 r 4 tblVehicleEF • OBUS T 4.24 1.54 r 4 tblVehicleEF • OBUS T 69.39 85.07 r 4 tblVehicleEF • OBUS T 1,078.21 1,095.16 r 4 tblVehicleEF • OBUS T 67.43 13.57 r 4 tblVehicleEF • OBUS T 0.14 0.40 r 4 tblVehicleEF • OBUS T 0.29 0.75 r 4 tblVehicleEF • OBUS T 1.98 1.09 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.4000e-004 r 4 tblVehicleEF • OBUS T 2.0860e-003 8.0330e-003 r 4 tblVehicleEF • OBUS T 1.0000e-003 1.5700e-004 r 4 tblVehicleEF • OBUS T 1.6000e-005 1.3400e-004 r 4 tblVehicleEF • OBUS T 1.9760e-003 7.6710e-003 r 4 tblVehicleEF • OBUS T 9.1900e-004 1.4400e-004 r 4 tblVehicleEF • OBUS T 1.5720e-003 9.2500e-004 r 4 tblVehicleEF • OBUS T 0.02 0.01 tblVehicleEF • OBUS • 0.03 0.04 CaIEEMod Version: CaIEEMod.2016.3.2 Page 41 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • OBUS • 7.8300e-004 4.9700e-004 tblVehicleEF • OBUS i 0.02 0.01 r tblVehicleEF • OBUS T 0.05 0.17 r tblVehicleEF • OBUS T 0.27 0.08 r tblVehicleEF • OBUS T 6.7400e-004 8.0800e-004 r tblVehicleEF • OBUS T 0.01 0.01 r tblVehicleEF • OBUS T 7.4800e-004 1.3400e-004 r 4 tblVehicleEF • OBUS T 1.5720e-003 9.2500e-004 r tblVehicleEF • OBUS T 0.02 0.01 r tblVehicleEF • OBUS T 0.04 0.06 r 4 tblVehicleEF • OBUS T 7.8300e-004 4.9700e-004 r 4 tblVehicleEF • OBUS T 0.02 0.02 r 4 tblVehicleEF • OBUS T 0.05 0.17 r 4 tblVehicleEF • OBUS T 0.29 0.08 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 5.0770e-003 3.3990e-003 r 4 tblVehicleEF • SBUS T 0.05 5.6130e-003 r 4 tblVehicleEF • SBUS T 8.06 2.89 r 4 tblVehicleEF • SBUS T 0.35 0.25 r 4 tblVehicleEF • SBUS T 5.67 0.62 r 4 tblVehicleEF • SBUS T 1,064.74 328.32 r 4 tblVehicleEF • SBUS T 1,062.83 974.47 r 4 tblVehicleEF • SBUS T 56.88 4.53 r 4 tblVehicleEF • SBUS T 4.37 2.65 r 4 tblVehicleEF • SBUS T 1.74 2.75 r 4 tblVehicleEF • SBUS T 11.65 1.31 tblVehicleEF • SBUS • 1.9460e-003 2.0090e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 42 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 0.01 0.01 tblVehicleEF • SBUS i 8.3200e-003 0.02 r tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r tblVehicleEF • SBUS T 1.8620e-003 1.9220e-003 r tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r tblVehicleEF • SBUS T 7.9470e-003 0.01 r tblVehicleEF • SBUS T 6.9000e-004 5.1000e-005 r 4 tblVehicleEF • SBUS T 6.6820e-003 2.1060e-003 r tblVehicleEF • SBUS T 0.04 9.2560e-003 r tblVehicleEF • SBUS T 0.96 0.31 r 4 tblVehicleEF • SBUS T 3.2520e-003 9.0500e-004 r 4 tblVehicleEF • SBUS T 0.06 0.05 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.33 0.03 r 4 tblVehicleEF • SBUS T 0.01 3.1310e-003 r 4 tblVehicleEF • SBUS T 0.01 9.3590e-003 r 4 tblVehicleEF • SBUS T 6.6800e-004 4.5000e-005 r 4 tblVehicleEF • SBUS T 6.6820e-003 2.1060e-003 r 4 tblVehicleEF • SBUS T 0.04 9.2560e-003 r 4 tblVehicleEF • SBUS T 1.38 0.45 r 4 tblVehicleEF • SBUS T 3.2520e-003 9.0500e-004 r 4 tblVehicleEF • SBUS T 0.07 0.06 r 4 tblVehicleEF • SBUS T 0.02 0.06 r 4 tblVehicleEF • SBUS T 0.36 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r 4 tblVehicleEF • SBUS T 5.1370e-003 3.4230e-003 tblVehicleEF • SBUS • 0.04 4.8940e-003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 43 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF tblVehicleEF • SBUS • 7.99 2.87 • SBUS i 0.35 0.25 r • SBUS i 4.12 0.48 r • SBUS i 1,111.32 332.27 r • SBUS i 1,062.83 974.48 r • SBUS i 56.88 4.30 r • SBUS T 4.51 2.67 r 4 • SBUS T 1.63 2.58 r • SBUS T 11.63 1.30 r • SBUS T 1.6410e-003 1.7030e-003 r 4 • SBUS T 0.01 0.01 r 4 • SBUS T 8.3200e-003 0.02 r 4 • SBUS T 7.5100e-004 5.6000e-005 r 4 • SBUS T 1.5700e-003 1.6300e-003 r 4 • SBUS T 2.6740e-003 2.5740e-003 r 4 • SBUS T 7.9470e-003 0.01 r 4 • SBUS T 6.9000e-004 5.1000e-005 r 4 • SBUS T 0.01 4.1320e-003 r 4 • SBUS T 0.04 0.01 r 4 • SBUS T 0.95 0.31 r 4 • SBUS T 5.8870e-003 1.6130e-003 r 4 • SBUS T 0.06 0.05 r 4 • SBUS T 0.02 0.06 r 4 • SBUS T 0.28 0.03 r 4 • SBUS T 0.01 3.1690e-003 r 4 • SBUS T 0.01 9.3600e-003 • SBUS • 6.4200e-004 4.3000e-005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 44 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • SBUS • 0.01 4.1320e-003 tblVehicleEF • SBUS i 0.04 0.01 r tblVehicleEF • SBUS T 1.38 0.45 r tblVehicleEF • SBUS T 5.8870e-003 1.6130e-003 r tblVehicleEF • SBUS T 0.07 0.06 r tblVehicleEF • SBUS T 0.02 0.06 r tblVehicleEF • SBUS T 0.30 0.03 r 4 tblVehicleEF • SBUS T 0.81 0.07 r tblVehicleEF • SBUS T 5.0590e-003 3.3580e-003 r tblVehicleEF • SBUS T 0.06 6.6220e-003 r 4 tblVehicleEF • SBUS T 8.15 2.93 r 4 tblVehicleEF • SBUS T 0.35 0.24 r 4 tblVehicleEF • SBUS T 6.02 0.82 r 4 tblVehicleEF • SBUS T 1,000.40 322.88 r 4 tblVehicleEF • SBUS T 1,062.83 974.47 r 4 tblVehicleEF • SBUS T 56.88 4.87 r 4 tblVehicleEF • SBUS T 4.18 2.61 r 4 tblVehicleEF • SBUS T 1.72 2.79 r 4 tblVehicleEF • SBUS T 11.66 1.31 r 4 tblVehicleEF • SBUS T 2.3680e-003 2.4310e-003 r 4 tblVehicleEF • SBUS T 0.01 0.01 r 4 tblVehicleEF • SBUS T 8.3200e-003 0.02 r 4 tblVehicleEF • SBUS T 7.5100e-004 5.6000e-005 r 4 tblVehicleEF • SBUS T 2.2660e-003 2.3260e-003 r 4 tblVehicleEF • SBUS T 2.6740e-003 2.5740e-003 r 4 tblVehicleEF • SBUS T 7.9470e-003 0.01 tblVehicleEF • SBUS • 6.9000e-004 5.1000e-005 CaIEEMod Version: CaIEEMod.2016.3.2 Page 45 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF .SBUS • 5.5380e-003 9.1500e-004 tblVehicleEF • SBUS r 0.04 8.9670e-003 I- 4 tblVehicleEF • SBUS r 0.96 0.31 I- 4 tblVehicleEF • SBUS r 3.0800e-003 5.0400e-004 I- 4 tblVehicleEF • SBUS r 0.06 0.05 I- 4 tblVehicleEF • SBUS r 0.03 0.07 I- 4 tblVehicleEF • SBUS r 0.34 0.03 I- 4 tblVehicleEF • SBUS r 9.8300e-003 3.0800e-003 I- 4 tblVehicleEF • SBUS r 0.01 9.3590e-003 I- 4 tblVehicleEF • SBUS r 6.7400e-004 4.8000e-005 I- 4 tblVehicleEF • SBUS r 5.5380e-003 9.1500e-004 I- 4 tblVehicleEF • SBUS r 0.04 8.9670e-003 I- 4 tblVehicleEF • SBUS r 1.39 0.45 I- 4 tblVehicleEF • SBUS r 3.0800e-003 5.0400e-004 I- 4 tblVehicleEF • SBUS r 0.07 0.06 I- 4 tblVehicleEF • SBUS r 0.03 0.07 I- 4 tblVehicleEF • SBUS r 0.38 0.04 I- 4 tblVehicleEF • UBUS r 0.97 4.48 I- 4 tblVehicleEF • UBUS r 0.06 0.00 I- 4 tblVehicleEF • UBUS r 5.05 34.99 I- 4 tblVehicleEF • UBUS r 10.05 0.00 I- 4 tblVehicleEF • UBUS 1,711.56 1,549.85 I- 4 tblVehicleEF • UBUS r 150.01 0.00 I- 4 tblVehicleEF • UBUS r 1.36 0.35 I- 4 tblVehicleEF • UBUS r 11.86 0.00 I- 4 tblVehicleEF • UBUS r 0.48 0.08 tblVehicleEF • UBUS • 0.01 0.03 CaIEEMod Version: CaIEEMod.2016.3.2 Page 46 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 0.01 5.6300e-003 tblVehicleEF • UBUS i 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r tblVehicleEF • UBUS T 1.4600e-003 0.00 r tblVehicleEF • UBUS T 6.5200e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r tblVehicleEF • UBUS T 3.6650e-003 0.00 r tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.86 0.00 r 4 tblVehicleEF • UBUS T 8.4010e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6830e-003 0.00 r 4 tblVehicleEF • UBUS T 6.5200e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.6650e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.94 0.00 r 4 tblVehicleEF • UBUS T 0.98 4.48 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.07 34.99 r 4 tblVehicleEF • UBUS T 8.68 0.00 r 4 tblVehicleEF • UBUS T 1,711.56 1,549.85 r 4 tblVehicleEF • UBUS T 150.01 0.00 tblVehicleEF • UBUS • 1.26 0.35 CaIEEMod Version: CaIEEMod.2016.3.2 Page 47 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 11.79 0.00 tblVehicleEF • UBUS i 0.48 0.08 r tblVehicleEF • UBUS T 0.01 0.03 r tblVehicleEF • UBUS T 0.01 5.6300e-003 r tblVehicleEF • UBUS T 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r 4 tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r tblVehicleEF • UBUS T 1.4600e-003 0.00 r tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 7.0900e-003 0.00 r 4 tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.79 0.00 r 4 tblVehicleEF • UBUS T 8.4010e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6600e-003 0.00 r 4 tblVehicleEF • UBUS T 0.01 0.00 r 4 tblVehicleEF • UBUS T 0.08 0.00 r 4 tblVehicleEF • UBUS T 7.0900e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.86 0.00 r 4 tblVehicleEF • UBUS T 0.97 4.48 r 4 tblVehicleEF • UBUS T 0.06 0.00 r 4 tblVehicleEF • UBUS T 5.04 34.99 tblVehicleEF • UBUS • 10.26 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 Page 48 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleEF • UBUS • 1,711.56 1,549.85 tblVehicleEF • UBUS i 150.01 0.00 r tblVehicleEF • UBUS T 1.35 0.35 r tblVehicleEF • UBUS T 11.86 0.00 r tblVehicleEF • UBUS T 0.48 0.08 r tblVehicleEF • UBUS T 0.01 0.03 r tblVehicleEF • UBUS T 0.01 5.6300e-003 r 4 tblVehicleEF • UBUS T 1.5880e-003 0.00 r tblVehicleEF • UBUS T 0.21 0.03 r tblVehicleEF • UBUS T 3.0000e-003 6.8250e-003 r 4 tblVehicleEF • UBUS T 9.9420e-003 5.3860e-003 r 4 tblVehicleEF • UBUS T 1.4600e-003 0.00 r 4 tblVehicleEF • UBUS T 5.1800e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.1580e-003 0.00 r 4 tblVehicleEF • UBUS T 0.13 0.07 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.87 0.00 r 4 tblVehicleEF • UBUS T 8.4000e-003 0.00 r 4 tblVehicleEF • UBUS T 1.6870e-003 0.00 r 4 tblVehicleEF • UBUS T 5.1800e-003 0.00 r 4 tblVehicleEF • UBUS T 0.07 0.00 r 4 tblVehicleEF • UBUS T 3.1580e-003 0.00 r 4 tblVehicleEF • UBUS T 1.12 4.58 r 4 tblVehicleEF • UBUS T 0.02 0.00 r 4 tblVehicleEF • UBUS T 0.95 0.00 tblVehicleTrips • CC • 4.20 8.70 CaIEEMod Version: CaIEEMod.2016.3.2 Page 49 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual tblVehicleTrips • CC TL • 4.20 8.70 tblVehicleTrips • CNW_TL i 5.40 8.70 r tblVehicleTrips • CNW_TL T 5.40 8.70 r tblVehicleTrips • CW T 12.50 8.70 r tblVehicleTrips • CW_TL T 12.50 8.70 r tblVehicleTrips • HO_TL T 4.50 8.70 • r tblVehicleTrips • HO_TL T 4.50 8.70 r 4 tblVehicleTrips • HS_TL T 3.50 8.70 r tblVehicleTrips • HS_TL T 3.50 8.70 • r tblVehicleTrips • HW T 11.00 8.70 r 4 tblVehicleTrips • HW T 11.00 8.70 r 4 tblVehicleTrips • ST T 7.16 7.90 r 4 tblVehicleTrips • ST TR T 40.63 11.95 r 4 tblVehicleTrips • ST T 8.19 8.30 r 4 tblVehicleTrips • ST T 9.91 9.33 r 4 tblVehicleTrips • SU_TR T 6.07 6.10 • r 4 tblVehicleTrips • SU T 39.53 11.35 r 4 tblVehicleTrips • SU T 5.95 6.71 r 4 tblVehicleTrips • SU TR T 8.62 8.36 • r 4 tblVehicleTrips • WD TR T 6.59 7.11 r 4 tblVehicleTrips • WD T 35.74 18.25 r 4 tblVehicleTrips • WD_TR T 8.17 9.67 r 4 tblVehicleTrips • WD_TR T 9.52 9.23 • r 4 tblWoodstoves • NumberCatalytic T 22.10 0.00 r 4 tblWoodstoves • NumberCatalytic T 37.90 0.00 r 4 tblWoodstoves • NumberNoncatalytic T22.10 0.00 tblWoodstoves • NumberNoncatalytic • 37.90 0.00 CaIEEMod Version: CaIEEMod.2016.3.2 2.0 Emissions Summary Page 50 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 2.1 Overall Construction Unmitigated Construction Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2029 •i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Year tons/yr MT/yr 2029 •I • 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Maximum 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 51 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) Highest 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive Exhaust PM10 Fugitive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e CO2e Category tons/yr MT/yr PM10 PM10 Total PM2.5 PM2.5 Total Total 15.0502 12.3598 41.4128 0.1211 Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Reduction Quarter Start Date End Date Maximum Unmitigated ROG + NOX (tons/quarter) Maximum Mitigated ROG + NOX (tons/quarter) Highest 2.2 Overall Operational Unmitigated Operational ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •i ,i ,1 •lJ •i ,� •lJ •i •1I • • 11.7196 0.9186 1 9.2352 5.6800e- 1 1 0.1154 0.1154 0.1154 0.1154 1 003 1 1 J J .1 J J J J . 0.1583 1.3857 1 0.8208 8.6300e- 1 1 0.1093 0.1093 1 0.1093 0.1093 9003 1 1 J J J J J J J . 3.1723 10.0554 I 31.3567 0.1068 I 11.6342 1 0.1009 1 11.7351 3.1123 1 0.0953 3.2077 J J J J J J J J w 1 0.0000 0.0000 1 0.0000 0.0000 J J J J J J J J . 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 • 0.0000 . • 0.0000 ; • 223.6575 • 25.6092 959.7370 959.7370 0.0320 1 0.0173 J J J 4,716.194 4,716.194 0.1766 1 0.0590 6 6 i J J J 4. 10,497.35 10,497.35 0.3762 I 0.0000 50 50 J J J 4. 0.0000 223.6575 13.2178 0.0000 J J J 4. 766.2247 791.8340 2.6660 0.0695 965.7005 T 4,738.204 5 10,506.75 94 554.1019 879.1897 Total 15.0502 12.3598 41.4128 0.1211 11.6342 0.3257 11.9599 3.1123 0.3201 3.4324 249.2667 16,939.51 13 17,188.77 80 16.4685 0.1459 17,643.95 59 CaIEEMod Version: CaIEEMod.2016.3.2 Page 52 of 69 2.2 Overall Operational Mitigated Operational Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 3.0 Construction Detail Construction Phase Phase Number ROG ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Area Energy Mobile Waste Water •1 �� •i ,l •i 11.7196 0.9186 9.2352 5.6800e- 1 1 0.1154 0.1154 0.1154 0.1154 •; 0.0000 003 1 1 9 1 1 • f .1 .1 .1 .1 .1 .1 .1 .1 . 0.1583 1.3857 0.8208 8.6300e- 1 1 0.1093 0.1093 0.1093 0.1093 • 0.0000 9 003 1 i : . 3.1723 10.0554 31.3567 0.1068 1 11.6342 1 0.1009 11.7351 3.1123 0.0953 3.2077 • 0.0000 9I : V 9 0.0000 0.0000 0.0000 0.0000 • 111.8287 V 9 0.0000 0.0000 0.0000 0.0000 • 25.6092 • i 959.7370 959.7370 0.0320 1 0.0173 965.7005 1 .1 .1 .1 4,716.194 4,716.194 0.1766 1 0.0590 4,738.204 6 6 1 1 5 10,497.35 10,497.35 0.3762 1 0.0000 10,506.75 50 50 I 94 i 0.0000 111.8287 6.6089 0.0000 277.0510 i 672.3993 698.0085 2.6616 0.0686 784.9858 Total Total 15.0502 12.3598 41.4128 0.1211 11.6342 0.3257 11.9599 3.1123 0.3201 3.4324 137.4380 16,845.68 59 16,983.12 38 9.8553 0.1450 17,272.70 11 3.0 Construction Detail Construction Phase Phase Number ROG NOx CO SO2 Fug'tive Exhaust PM10 Fug'tive Exhaust PM2.5 Bio- CO2 NBio-0O2 Total CO2 CH4 N20 CO2e PM10 PM10 Total PM2.5 PM2.5 Total Percent 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 44.86 0.55 1.20 40.16 0.62 2.10 Reduction 3.0 Construction Detail Construction Phase Phase Number Phase Name Phase Type Start Date End Date Num Days Week Num Days Phase Description 1 :Demolition :Demolition :3/3/2029 :3/2/2029 0 Acres of Grading (Site Preparation Phase): 0 CaIEEMod Version: CaIEEMod.2016.3.2 Page 53 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Acres of Grading (Grading Phase): 0 Acres of Paving: 35 Residential Indoor: 0; Residential Outdoor: 0; Non -Residential Indoor: 0; Non -Residential Outdoor: 0; Striped Parking Area: 0 (Architectural Coating — sqft) OffRoad Equipment Phase Name Offroad Equipment Type Amount Usage Hours I Horse Power I Load Factor Demolition Demolition Demolition :Concrete/Industrial Saws :Excavators :Rubber Tired Dozers 0 0 0: 8.001 8.001 8.00 81: 158: 0.73 0.38 247: 0.40 Trips and VMT Phase Name Offroad Equipment Count Worker Trip Number Vendor Trip Number Hauling Trip Number Worker Trip Length Vendor Trip Length Hauling Trip Length Worker Vehicle Class Vendor Vehicle Class Hauling Vehicle Class Demolition 0' 0.00' 0.00' 0.00' 11.00 5.40' 20.00:LD Mix ,HDT Mix HHDT 3.1 Mitigation Measures Construction CaIEEMod Version: CaIEEMod.2016.3.2 Page 54 of 69 3.2 Demolition - 2029 Unmitigated Construction On -Site Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Unmitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor 9 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 CaIEEMod Version: CaIEEMod.2016.3.2 Page 55 of 69 3.2 Demolition - 2029 Mitigated Construction On -Site Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Mitigated Construction Off -Site ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Off -Road 4 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 • 0.0000 • i 0.0000 0.0000 0.0000 0.0000 0.0000 Total .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 Mitigated Construction Off -Site 4.0 Operational Detail - Mobile ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Hauling 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 I 0.0000 1 0.0000 0.0000 0.0000 J J J J J J J J m J J J Vendor .i 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 J .J J J J J J J . J J J r Worker 9 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 0.0000 1 0.0000 1 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 0.0000 0.0000 Total 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 4.0 Operational Detail - Mobile CaIEEMod Version: CaIEEMod.2016.3.2 4.1 Mitigation Measures Mobile Page 56 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 4.2 Trip Summary Information ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated •3.1723 1 10.0554 1 31.3567 0.1068 1 11.6342 0.1009 11.7351 1 3.1123 0.0953 3.2077 • 0.0000 10,497.35 10,497.35 0.3762 1 0.0000 i 10,506.75 � i 1 1 1 1 1 1 1 1. 50 1 50 1 1 i 94 •1 • 1 1 a + + + + + + + + r v I. + + + r Unmitigated . 3.1723 . 10.0554 . 31.3567 • 0.1068 . 11.6342 • 0.1009 • 11.7351 . 3.1123 • 0.0953 . 3.2077 • 0.0000 . 10,497.35 • 10,497.35 • 0.3762 . 0.0000 • 10,506.75 50 50 94 4.2 Trip Summary Information 4.3 Trip Type Information Ave age Daily Trip Rate Unmitigated Mitigated Land Use Weekday Saturday Sunday Annual VMT Annual VMT Apartments Low Rise ; 3,140.72 3,492.55 2694.48 • 8,792,610 • 8,792,610 T Golf Course + 219.00 143.38 136.17 • 384•,634 • 384,634 Hotel + 967.00 - 830.21 T 670.50 • 1,936,054 • 1,936,054 Other Asphalt Surfaces ; 0.00 ; 0.00 t0.00 • • T Y 1 Single Family Housing + 6,994.29 7,068.35 6334.91 • 19,430,241 • 19,430,241 Total I 11,321.01 I 11,534.49 9,836.06 I 30,543,539 1 30,543,539 4.3 Trip Type Information CaIEEMod Version: CaIEEMod.2016.3.2 Page 57 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Miles Land Use H -W or C -W H -S or C -C H -O or C -NW H -W or C -W Trip % Trip Purpose % H -S or C -C H -O or C -NW Primary Diverted Pass -by Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing ▪ 8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 ▪ 8.70 8.70 8.70 33.00 i 48.00 19.00 • 52 39 9 ▪ 8.70 8.70 8.70 19.40 61.60 19.00 • 58 38 4 • + -r t r r ▪ 12.50 4.20 5.40 0.00 I 0.00 0.00 • 0 0 0 h t - Y 1- -r r r r • • 8.70 8.70 8.70 40.20 19.20 40.60 • 86 11 3 4.4 Fleet Mix Land Use I LDA I LDT1LDT2 MDV LHD1 LHD2 MHD HHD OBUS UBUS MCY SBUS MH Apartments Low Rise ; 0.563257v 0.034111 0.191453 0.101691 0.009981 0.004112 0.016979 0.070176: 0.001424 0.001067 0.004344 0.000811: 0.000594 r i i i i ii i i i i + Golf Course • 0.563257' 0.0341111 0.1914531 0.1016911 0.0099811 0.004112i 01.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 i --- 1 i 1 i 1 i 1 i 1 i 1 i 1 i 1 i i + Hotel • 0.563257' 0.034111 0.1914531 0.101691 0.009981 0.004112i 0.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 i --- 1 i 1 i 1 i 1 i 1i 1 i 1 i 1 i 1 i i + Other Asphalt Surfaces • 0.563257' 0.034111 0.1914531 0.101691 0.009981 0.004112 0.0169791 0.0701761 0.001424 0.001067 0.004344 0.000811: 0.000594 r 1 Single Family Housing ▪ 0.563257; 0.034111:E 0.191453:E 0.101691; 0.009981; 0.004112; 0.016979; 0.070176; 0.001424; 0.001067; 0.004344; 0.000811; 0.000594 5.0 Energy Detail Historical Energy Use: N 5.1 Mitigation Measures Energy CaIEEMod Version: CaIEEMod.2016.3.2 Page 58 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual ROG NOx co SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr I I I Electricity •1 I 1 1 I 1 I I : I 1 1 1 1 0.0000 1 0.0000 1 0.0000 0.0000 : 0.0000 1 3,150.109 1 3,150.109 1 0.1466 1 0.0303 i 3,162.812 Mitigated ;1 1 1 1 1 1 1 1 1 2 I1 2 11 1 5 I J 1 1 1 1 1 1 I •1J .1 .1 J .1 J J• 1 J1 1 : I : : 1 I I Electricity •1 1 1 1 1 0.0000 I 0.0000 0.0000 ; 0.0000 • 0.0000 1 3,150.109 1 3,150.109 1 0.1466 1 0.0303 : 3,162.812 Unmitigated •1 1 1 1 1 1 1 1 1 • 2 1 2 1 1 •1 1 I 1 I 1 1 I 1 1 1 1 I 5 J J J J J J J J J 1 J •1 I I 1 1 1 I I I 1 1 1 1 NaturalGas •1 0.1583 1 1.3857 1 0.8208 8.6300e- 1 0.1093 1 0.1093 1 1 0.1093 ; 0.1093 • 0.0000 1 1,566.085 1 1,566.085 0.0300 0.0287 1 1,575.391 Mitigated ;1 1 1 1 003 I I 1 1 I • 5 I 5 1 1 1 9 1 1 1 I 1 1 1 1 ' 1 1 1 1 i•.I. } 1 1.4 4. 4 4. ,. 4. 4. 4. r NaturalGas •• 0.1583 ' 1.3857 • 0.8208 • 8.6300e- ' • 0.1093 • 0.1093 • • 0.1093 ' 0.1093 • 0.0000 • 1,566.085 • 1,566.085 • 0.0300 ' 0.0287 • 1,575.391 Unmitigated 003 5 5 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 59 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Unmitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low 1 4.64804e •i Rise i +006 ;:1 r -I Golf Course I 0 •1 '11 '� r �I Hotel : 1.13766e .1 i +007 :: fJ : Other Asphalt 0 •1 i Surfaces 1 .� f -. Single Family1 1.33227e • Housing 1 +007 : i 0.0251 0.2142 1 0.0911 1 1.3700e- 1 0.0173 0.0173 1 1 0.0173 0.0173 • 0.0000 I 003 : J J J J J J J J 0.0000 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 • 0.0000 1 1 1 1 1 1 1 1 1 • J J J J J J J J 7 0.0613 0.5577 1 0.4685 1 3.3500e- 1 0.0424 0.0424 1 1 0.0424 0.0424 I 0.0000 1 003 1 J J J J J J J 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 1 . .1 .1 .1 .1 .1 .1 .1 .1 . 0.0718 0.6139 0.2612 3.9200e- 0.0496 0.0496 0.0496 0.0496 • 0.0000 003 i 248.0369 248.0369 4.7500e- 4.5500e- 249.5109 003 003 i J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 607.0998 607.0998 0.0116 0.0111 610.7075 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 710.9487 710.9487 0.0136 0.0130 715.1736 Total 0.1582 1.3857 0.8208 8.6400e- 003 0.1093 0.1093 0.1093 0.1093 0.0000 1,566.085 5 1,566.085 5 0.0300 0.0287 1,575.391 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 60 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 5.2 Energy by Land Use - NaturalGas Mitigated NaturalGa s Use ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Land Use kBTU/yr tons/yr MT/yr Apartments Low 1 4.64804e •i Rise i +006 ;:1 r -I Golf Course I 0 •1 '11 '� r �I Hotel : 1.13766e .1 i +007 :: fJ : Other Asphalt 0 •1 i Surfaces 1 .11 f -. Single Family1 1.33227e • Housing 1 +007 : i 0.0251 0.2142 1 0.0911 1 1.3700e- 1 0.0173 0.0173 1 1 0.0173 0.0173 • 0.0000 I 003 : J J J J J J J J 0.0000 0.0000 1 0.0000 1 0.0000 1 0.0000 0.0000 1 1 0.0000 0.0000 • 0.0000 1 1 1 1 1 1 1 1 1 • J J J J J J J J 7 0.0613 0.5577 1 0.4685 1 3.3500e- 1 0.0424 0.0424 1 1 0.0424 0.0424 I 0.0000 1 003 J J J J J J J 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 1 0.0000 0.0000 • 0.0000 .1 .1 .1 .1 .1 .1 .1 .1 ; 0.0718 0.6139 0.2612 3.9200e- 0.0496 0.0496 0.0496 0.0496 • 0.0000 003 i 248.0369 248.0369 4.7500e- 4.5500e- 249.5109 003 003 i J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 J J J i 607.0998 607.0998 0.0116 0.0111 610.7075 J J J i 0.0000 0.0000 0.0000 0.0000 0.0000 .1 .1 .1 i 710.9487 710.9487 0.0136 0.0130 715.1736 Total 0.1582 1.3857 0.8208 8.6400e- 003 0.1093 0.1093 0.1093 0.1093 0.0000 1,566.085 5 1,566.085 5 0.0300 0.0287 1,575.391 9 CaIEEMod Version: CaIEEMod.2016.3.2 Page 61 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Unmitigated Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing i 1.75292e • i +006 i 1 0 • I . i i 3.81314e • r i +006 r i i 0 • i r i i 5.57843e • i +006 i 495.4824 0.0231 1 4.7700e- 497.4805 1 003 1 r 0.0000 0.0000 1 0.0000 0.0000 1 1 1,077.825 0.0502 ' 0.0104 1,082.172 6 1 J J r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 1,576.8011 0.0734 0.0152 1,583.159 i 9 Total 3,150.109 2 0.1466 0.0303 3,162.812 5 CaIEEMod Version: CaIEEMod.2016.3.2 Page 62 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 5.3 Energy by Land Use - Electricity Mitigated 6.0 Area Detail 6.1 Mitigation Measures Area Electricity Use Total CO2 CH4 N20 CO2e Land Use kWh/yr MT/yr Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing i 1.75292e • i +006 i i 0 • I . i i 3.81314e • r i +006 r i i 0 • i r i i 5.57843e • i +006 i 495.4824 0.0231 1 4.7700e- 497.4805 1 003 1 r 0.0000 0.0000 1 0.0000 0.0000 1 1 1,077.825 0.0502 ' 0.0104 1,082.172 6 1 J J r 0.0000 0.0000 0.0000 0.0000 .1 .1 r 1,576.8011 0.0734 0.0152 1,583.159 i 9 Total 3,150.109 2 0.1466 0.0303 3,162.812 5 6.0 Area Detail 6.1 Mitigation Measures Area CaIEEMod Version: CaIEEMod.2016.3.2 Page 63 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e Category tons/yr MT/yr Mitigated 4 11.7196 0.9186 i 9.2352 5.6800e- � i 0.1154 0.1154 : 0.1154 0.1154 : 0.0000 959.7370 i 959.7370 : 0.0320 0.0173 i 965.7005 ' 111 i 003 1 1 •1 1 1 1 1 1 1 1 • • I. + 4. F 1. 4. + 4. F r 4. F F Unmitigated • 11.7196 • 0.9186 • 9.2352 • 5.6800e- • • 0.1154 • 0.1154 • 0.1154 • 0.1154 • 0.0000 • 959.7370 • 959.7370 • 0.0320 • 0.0173 • 965.7005 003 6.2 Area by SubCategory Unmitigated ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural 4 3.1820 0.0000 0.0000 0.0000 0.0000 0.0000 : 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: 1 •i J J J J J J J J • J J J Consumer •1 8.1762 0.0000 0.0000 0.0000 0.0000 • 0.0000 0.0000 0.0000 0.0000 I 0.0000 0.0000 Products :: : •i J J J J J J J J V J J J Hearth •1 0.0955 1 0.8161 1 0.3473 5.2100e- 1 0.0660 0.0660 0.0660 0.0660 • 0.0000 945.1798 1 945.1798 0.0181 0.0173 950.7965 •I 003 : . .1 .1 .1 .1 .1 .1 .1 .1 . .1 .1 J Landscaping •i 0.2659 0.1025 8.8879 4.7000e- 0.0494 0.0494 0.0494 0.0494 • 0.0000 14.5572 14.5572 0.0139 0.0000 14.9040 004 Total 11.7196 0.9186 9.2352 5.6800e- 0.1154 0.1154 0.1154 0.1154 0.0000 959.7370 959.7370 0.0320 0.0173 965.7005 003 CaIEEMod Version: CaIEEMod.2016.3.2 Page 64 of 69 6.2 Area by SubCategory Mitigated Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower ROG NOx CO SO2 Fugitive PM10 Exhaust PM10 PM10 Total Fugitive PM2.5 Exhaust PM2.5 PM2.5 Total Bio- CO2 NBio- CO2 Total CO2 CH4 N20 CO2e SubCategory tons/yr MT/yr Architectural •i 3.1820 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Coating :: : i Consumer •i 8.1762 0.0000 0.0000 0.0000 0.0000 • 0.0000 i 0.0000 0.0000 0.0000 1 0.0000 0.0000 Products :: : Hearth •i 0.0955 0.8161 0.3473 5.2100e- 0.0660 0.0660 0.0660 0.0660 • 0.0000 i 945.1798 945.1798 0.0181 0.0173 950.7965 .1 003 : J .1 .1 .1 .1 .1 .1 J Landscaping •i 0.2659 0.1025 8.8879 4.7000e- 0.0494 0.0494 0.0494 0.0494 • 0.0000 i 14.5572 14.5572 0.0139 0.0000 14.9040 004 • Total 11.7196 0.9186 9.2352 5.6800e- 0.1154 0.1154 0.1154 0.1154 0.0000 959.7370 959.7370 0.0320 0.0173 965.7005 003 7.0 Water Detail 7.1 Mitigation Measures Water Apply Water Conservation Strategy Install Low Flow Bathroom Faucet Install Low Flow Kitchen Faucet Install Low Flow Toilet Install Low Flow Shower CaIEEMod Version: CaIEEMod.2016.3.2 Page 65 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 7.2 Water by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Category MT/yr MT/yr Mitigated •I 698.0085 i 2.6616 i 0.0686 . 784.9858 9 1 1 Unmitigated •• 791.8340 : 2.6660 • 0.0695 : 879.1897 7.2 Water by Land Use Unmitigated Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal MT/yr Apartments Low 128.7981 / • Rise 1 18.1553 ; I • Golf Course I 0 / .1 99.8142 '003 I • Hotel 12.53668 / • 1 0.281853 : 1 • r -r Other Asphalt I0 / 0 .1 Surfaces 1 I- Z Single Family 149.3868 / • Housing 1 31.1351 ; I 172.1425 1 0.9460 0.0237 J.1 313.4525 1 0.0146 3.0200e- 11.0262 1 0.0831 2.0500e- 003 .1 .1 0.0000 0.0000 0.0000 J J 295.2128 1.6223 0.0407 202.8624 T 314.7165 1 T 13.7155 1 r 0.0000 T 347.8953 Total 791.8340 2.6660 0.0695 879.1897 CaIEEMod Version: CaIEEMod.2016.3.2 7.2 Water by Land Use Mitigated Page 66 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 8.0 Waste Detail 8.1 Mitigation Measures Waste Institute Recycling and Composting Services Indoor/Out door Use Total CO2 CH4 N20 CO2e Land Use Mgal 1 MT/yr Apartments Low :28.7981 / • Rise 1 14.5242 : .J Golf Course : 0 / 9i i 79.8514 : i • Hotel 1 2.53668 / • 0.225482 : i • Other Asphalt : 0 / 0 •i Surfaces i I- 4 Single Family :49.3868 / • Housing 1 24.9081 : i 160.7397 1 0.9454 1 0.0236 191.4136 1 1 250.7620 1 0.0117 1 2.4100e- * 251.7732 1 1 003 i J * 10.8492 1 0.0831 1 2.0500e- 13.5377 1 003 i 0.0000 0.0000 0.0000 0.0000 J J 275.6577 1.6214 0.0405 328.2613 ilTotal 698.0085 2.6616 0.0686 784.9858 8.0 Waste Detail 8.1 Mitigation Measures Waste Institute Recycling and Composting Services CaIEEMod Version: CaIEEMod.2016.3.2 Category/Year Page 67 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 8.2 Waste by Land Use Unmitigated Total CO2 CH4 CH4 N20 CO2e Land Use MT/yr MT/yr Mitigated •i 111.8287 6.6089 : 0.0000 . 277.0510 Unmitigated •• 223.6575 • 13.2178 • 0.0000 • 554.1019 8.2 Waste by Land Use Unmitigated Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons MT/yr Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces Single Family Housing 1 203.32 • I1 i 1 1.6 •1 i •* 1 54.75 • I • r -r 10 •i i ; I- Z 1 842.14 • i 41.2721 1 2.4391 : 0.0000 i .1 0.3248 1 0.0192 : 0.0000 i i 11.1138 I 0.6568 : 0.0000 1 .1 .1 0.0000 0.0000 0.0000 .1 J 170.9468 10.1027 0.0000 102.2499 * 0.8046 27.5339 r 0.0000 T 423.5135 Total 223.6575 13.2178 0.0000 554.1019 CaIEEMod Version: CaIEEMod.2016.3.2 8.2 Waste by Land Use Mitigated Page 68 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type Waste Disposed Total CO2 CH4 N20 CO2e Land Use tons 1 MT/yr Apartments Low Rise Golf Course Hotel Other Asphalt Surfaces I- Single Family Housing i 101.66 • 1 i • i 0.8 .* i i 27.375 • i t i 0 •i i • i 4 i 421.07 • i i 20.6361 1 1.2196 1 0.0000 51.1250 1 I i i 1 0.1624 1 9.6000e- 1 0.0000 0.4023 1 003 J 5.5569 ' 0.3284 1 0.0000 * 13.7669 1 0.0000 0.0000 0.0000 0.0000 85.4734 5.0513 0.0000 211.7567 Total 111.8287 6.6089 0.0000 277.0510 9.0 Operational Offroad Equipment Type Number Hours/Day Days/Year I Horse Power I Load Factor I Fuel Type 10.0 Stationary Equipment Fire Pumps and Emergency Generators Equipment Type Number Hours/Day Hours/Year Horse Power I Load Factor I Fuel Type Boilers Equipment Type Number I Heat Input/Day I Heat Input/Year I Boiler Rating I Fuel Type CaIEEMod Version: CaIEEMod.2016.3.2 User Defined Equipment Page 69 of 69 Date: 1/6/2021 5:03 PM Travertine Specific Plan - Phase 3 (Operations) - Riverside -Salton Sea County, Annual Equipment Type Number 11.0 Vegetation Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.21: RCEM MADISON AVENUE WITH WATER LINE EMISSIONS MODEL OUTPUTS 12188-05 GHG Report [_moi URBAN CROSSROADS Road Construction Emissions Model, Version 9.0.0 Daily Emission Estimates for -> Madison EVA & Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N20 (lbs/day) CO2e (lbs/day) Grubbing/Land Clearing 0.82 7.01 7.63 50.33 0.33 50.00 10.69 0.29 Grading/Excavation 3.95 37.82 38.34 51.64 1.64 50.00 11.87 1.47 Drainage/Utilities/Sub-Grade 3.41 32.76 32.34 51.36 1.36 50.00 11.64 1.24 Paving 1.32 17.54 12.23 0.63 0.63 0.00 0.55 0.55 10.40 10.40 10.40 0.00 0.02 0.09 0.07 0.03 1,748.50 8,373.12 6,934.74 2,869.20 0.43 2.47 1.56 0.74 0.04 0.11 0.09 0.05 1,771.33 8,466.33 7,000.41 2,903.59 Maximum (pounds/day) 3.95 37.82 38.34 51.64 1.64 50.00 11.87 1.47 10.40 0.09 8,373.12 2.47 0.11 8,466.33 Total (tons/construction project) 0.20 1.98 1.93 2.89 0.08 2.81 0.66 0.07 0.58 0.00 421.19 0.11 0.01 425.66 Notes: Project Start Year -> Project Length (months) -> Total Project Area (acres) -> Maximum Area Disturbed/Day (acres) -> Water Truck Used? -> Phase 2024 6 5 5 Yes dust emissions shown in columns J and K. by summing CO2e estimates over all GHGs. Total Material Imported/Exported Volume (yda/day) Daily VMT (miles/day) Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing Grading/Excavation Drainage/Utilities/Sub-Grade Paving 0 0 0 0 0 0 0 0 0 0 280 40 0 0 760 40 0 0 680 40 0 0 520 40 PM10 and PM2.5 estimates assume 50% control of fugitive dust from wale 'ng and associated dust control measures H a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated Total Emission Estimates by Phase for -> Madison EVA & Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Protect Phases (Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) N0x (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) CH4 (tons/phase) N20 (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.01 0.05 0.05 0.33 0.00 0.33 0.07 0.00 Grading/Excavation 0.10 1.00 1.01 1.36 0.04 1.32 0.31 0.04 Drainage/Utilities/Sub-Grade 0.08 0.76 0.75 1.19 0.03 1.16 0.27 0.03 Paving 0.01 0.17 0.12 0.01 0.01 0.00 0.01 0.01 0.07 0.27 0.24 0.00 0.00 0.00 0.00 0.00 11.54 221.05 160.19 28.41 0.00 0.07 0.04 0.01 0.00 0.00 0.00 0.00 10.61 202.77 146.70 26.08 Maximum (tons/phase) 0.10 1.00 1.01 1.36 0.04 1.32 0.31 0.04 0.27 0.00 221.05 0.07 0.00 202.77 Total (tons/construction project) 0.20 1.98 1.93 2.89 0.08 2.81 0.66 0.07 0.58 0.00 421.19 0.11 0.01 386.15 PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and 020, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. The CO2e emissions are reported as metric tons per phase. Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.22: RCEM AVENUE 62 WITH WATER LINE EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS Road Construction Emissions Model, Version 9.0.0 Daily Emission Estimates for ->Avenue 62&Water Llne Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N20 (lbs/day) CO2e (Ibs/day) Grubbing/Land Clearing 0.75 6.54 7.26 50.31 0.31 50.00 10.67 0.27 Grading/Excavation 3.89 37.44 37.97 51.62 1.62 50.00 11.85 1.45 Drainage/Utilities/Sub-Grade 3.03 30.93 27.92 51.13 1.13 50.00 11.43 1.03 Paving 1.18 17.04 10.99 0.55 0.55 0.00 0.48 0.48 10.40 10.40 10.40 0.00 0.02 0.09 0.07 0.03 1,644.51 8,296.47 6,812.70 2,779.02 0.42 2.46 1.55 0.73 0.04 0.10 0.09 0.05 1,666.68 8,389.22 6,877.22 2,812.66 Maximum (pounds/day) 3.89 37.44 37.97 51.62 1.62 50.00 11.85 1.45 10.40 0.09 8,296.47 2.46 0.10 8,389.22 Total (tons/construction project) 0.38 3.83 3.61 5.76 0.15 5.61 1.30 0.14 1.17 0.01 829.53 0.22 0.01 838.37 Notes: Project Start Year -> Project Length (months) -> Total Project Area (acres) -> Maximum Area Disturbed/Day (acres) -> Water Truck Used? -> Phase 2024 12 5 5 Yes dust emissions shown in columns J and K. by summing CO2e estimates over all GHGs. Total Material Imported/Exported Volume (yd'/day) Daily VMT (miles/day) Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing Grading/Excavation Drainage/Utilities/Sub-Grade Paving 0 0 0 0 0 0 0 0 0 0 200 40 0 0 720 40 0 0 600 40 0 0 480 40 PM10 and PM2.5 estimates assume 50% control of fugitive dust from wale 'ng and associated dust control measures 0 a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated Total Emission Estimates by Phase for -> Avenue 62 &Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Protect Phases (Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) NOx (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) CH4 (tons/phase) N20 (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.01 0.09 0.10 0.66 0.00 0.66 0.14 0.00 Grading/Excavation 0.21 1.98 2.01 2.73 0.09 2.64 0.63 0.08 Drainage/Utilities/Sub-Grade 0.14 1.43 1.29 2.36 0.05 2.31 0.53 0.05 Paving 0.02 0.34 0.22 0.01 0.01 0.00 0.01 0.01 0.14 0.55 0.48 0.00 0.00 0.00 0.00 0.00 21.71 438.05 314.75 55.02 0.01 0.13 0.07 0.01 0.00 0.01 0.00 0.00 19.96 401.84 288.24 50.52 Maximum (tons/phase) 0.21 1.98 2.01 2.73 0.09 2.64 0.63 0.08 0.55 0.00 438.05 0.13 0.01 401.84 Total (tons/construction project) 0.38 3.83 3.61 5.76 0.15 5.61 1.30 0.14 1.17 0.01 829.53 0.22 0.01 760.56 PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures 0 a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. The CO2e emissions are reported as metric tons per phase. Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.23: RCEM JEFFERSON WITH WATER LINE EMISSIONS MODEL OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS Road Construction Emissions Model, Version 9.0.0 Daily Emission Estimates for -> Jefferson Construction with Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Project Phases (Pounds) ROG (lbs/day) CO (lbs/day) NOx (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM10 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) PM2.5 (lbs/day) SOx (lbs/day) CO2 (lbs/day) CH4 (lbs/day) N20 (lbs/day) CO2e (lbs/day) Grubbing/Land Clearing 0.87 7.58 7.38 50.33 0.33 50.00 10.69 0.29 Grading/Excavation 3.69 37.02 33.50 51.43 1.43 50.00 11.67 1.27 Drainage/Utilities/Sub-Grade 3.21 31.98 28.99 51.19 1.19 50.00 11.48 1.08 Paving 1.35 17.99 12.06 0.60 0.60 0.00 0.52 0.52 10.40 10.40 10.40 0.00 0.02 0.09 0.07 0.03 1,880.94 8,501.00 7,029.59 2,965.46 0.44 2.48 1.57 0.75 0.04 0.11 0.09 0.05 1,904.24 8,594.38 7,094.96 2,999.66 Maximum (pounds/day) 3.69 37.02 33.50 51.43 1.43 50.00 11.67 1.27 10.40 0.09 8,501.00 2.48 0.11 8,594.38 Total (tons/construction project) 0.76 7.77 6.89 11.50 0.29 11.20 2.59 0.26 2.33 0.02 1,713.78 0.45 0.02 1,731.65 Notes: Project Start Year -> Project Length (months) -> Total Project Area (acres) -> Maximum Area Disturbed/Day (acres) -> Water Truck Used? -> Phase 2026 24 5 5 Yes dust emissions shown in columns J and K. by summing CO2e estimates over all GHGs. Total Material Imported/Exported Volume (yd'/day) Daily VMT (miles/day) Soil Asphalt Soil Hauling Asphalt Hauling Worker Commute Water Truck Grubbing/Land Clearing Grading/Excavation Drainage/Utilities/Sub-Grade Paving 0 0 0 0 0 0 0 0 0 0 360 40 0 0 880 40 0 0 760 40 0 0 600 40 PM10 and PM2.5 estimates assume 50% control of fugitive dust from wale 'ng and associated dust control measures if a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated Total Emission Estimates by Phase for -> Jefferson Construction with Water Line Total Exhaust Fugitive Dust Total Exhaust Fugitive Dust Protect Phases (Tons for all except CO2e. Metric tonnes for CO2e) ROG (tons/phase) CO (tons/phase) NOx (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM10 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) PM2.5 (tons/phase) SOx (tons/phase) CO2 (tons/phase) C114 (tons/phase) N20 (tons/phase) CO2e (MT/phase) Grubbing/Land Clearing 0.02 0.20 0.19 1.31 0.01 1.30 0.28 0.01 Grading/Excavation 0.39 3.91 3.54 5.44 0.15 5.29 1.23 0.13 Drainage/Utilities/Sub-Grade 0.30 2.95 2.68 4.73 0.11 4.62 1.06 0.10 Paving 0.05 0.71 0.47 0.02 0.02 0.00 0.02 0.02 0.27 1.10 0.96 0.00 0.00 0.01 0.01 0.00 48.83 898.64 649.53 116.78 0.01 0.26 0.14 0.03 0.00 0.01 0.01 0.00 44.85 824.20 594.73 107.16 Maximum (tons/phase) 0.39 3.91 3.54 5.44 0.15 5.29 1.23 0.13 1.10 0.01 898.64 0.26 0.01 824.20 Total (tons/construction project) 0.76 7.77 6.89 11.50 0.29 11.20 2.59 0.26 2.33 0.02 1713.78 0.45 0.02 1,570.94 PM10 and PM2.5 estimates assume 50% control of fugitive dust from watering and associated dust control measures if a minimum number of water trucks are specified. Total PM10 emissions shown in column F are the sum of exhaust and fugitive dust emissions shown in columns G and H. Total PM2.5 emissions shown in Column I are the sum of exhaust and fugitive dust emissions shown in columns J and K. CO2e emissions are estimated by multiplying mass emissions for each GHG by its global warming potential (GWP), 1 , 25 and 298 for CO2, CH4 and N20, respectively. Total CO2e is then estimated by summing CO2e estimates over all GHGs. The CO2e emissions are reported as metric tons per phase. Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS Travertine Specific Plan Greenhouse Gas Analysis APPENDIX 3.24: EMFAC2017 OUTPUTS 12188-05 GHG Report L%► URBAN CROSSROADS EMFAC2017 Derived CaIEEMod Annual Emission Rates: Year 20261'2 Season Pollutant LDA LDT1 LDT2 MDV LHDT1 LHDT2 MHDT HHDT OBUS UBUS MCY SBUS MH Annual CH4_IDLEX 0 0 0 0 0.0046207 0.003527603 0.004764067 0.033561004 0.0079359 0 0 0.0585304 0 Annual CH4_RUNEX 0.0014673 0.0046933 0.0030016 0.0034064 0.0027825 0.002564939 0.001838434 0.011680765 0.0029383 4.3642252 0.3254528 0.0041912 0.0028781 Annual CH4_STREX 0.0327251 0.0484789 0.0469195 0.0552762 0.0109571 0.008843628 0.012112005 1.08352E-07 0.0173851 0 0.2275712 0.0045044 0 Annual CO_IDLEX 0 0 0 0 0.1767822 0.146980785 0.432201925 10.40346631 0.5675233 0 0 2.3534099 0 Annual CO_RUNEX 0.5464662 1.0985159 0.8134817 0.8497054 0.3529685 0.322337058 0.22371075 0.193265161 0.3153532 34.118003 18.120226 0.2775967 0.2764364 Annual CO_STREX 1.7087819 1.9026028 2.2026594 2.4068139 0.8599254 0.605324677 1.296458175 0.001377721 1.6638886 0 8.3834168 0.4987033 0 Annual CO2_NBIO_IDLEX 0 0 0 0 8.7594614 13.34171116 68.75314357 1611.91289 84.282856 0 0 339.03436 0 Annual CO2_NBIO RUNEX 239.049 296.79758 306.2662 375.6539 599.19164 615.6240243 975.2071719 1148.479066 1209.9211 1515.2419 209.58602 1050.371 903.23223 Annual CO2_NBIO_STREX 48.087511 59.063099 61.327903 75.790091 10.425275 8.612539162 11.83563287 0.010156005 15.401362 0 58.029411 3.7764288 0 Annual NOX_IDLEX 0 0 0 0 0.0584716 0.081925678 0.358686181 8.359348765 0.3499853 0 0 3 3352082 0 Annual NOX_RUNEX 0.0237268 0.0780161 0.0548059 0.0624697 0.6294043 0.847365833 0.837433083 1.832348019 0.7026114 0.3420506 1.1007331 4.0047937 3.5288535 Annual NOX_STREX' 0.1363013 0.1923512 0.1942762 0.2360008 0.2594083 0.213619709 1.553112903 2.33308116 0.9981819 0 0.2556228 1.001747 0 Annual PM1O_IDLEX 0 0 0 0 0.0009147 0.001295958 0.000243126 0.003096587 0.0001144 0 0 0.0033002 0 Annual PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061532888 0.13034 0.0750313 0.01176 0.7448002 0.13034 Annual PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099049 0.010614123 0.012000003 0.035875043 0.012 0.0272998 0.004 0.0104884 0.016 Annual PM1O_RUNEX 0.0011828 0.0016848 0.0013258 0.0013309 0.0062847 0.010066821 0.008731216 0.025912243 0.0077949 0.0043037 0.0021058 0.0229171 0.1102668 Annual PM10_STREX 0.0015625 0.002013 0.0016376 0.0016412 0.0002033 0.000122088 0.000129892 1.0535E-07 0.0001561 0 0.0028583 3.834E-05 0 Annual PM25_IDLEX 0 0 0 0 0.0008751 0.001239896 0.000232608 0.00296263 0.0001095 0 0 0.0031574 0 Annual PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026371238 0.05586 0.0321563 0.00504 0.3192001 0.05586 Annual PM25_PMTW 0.002 0.002 0.002 0.002 0.0024762 0.002653531 0.003000001 0.008968761 0.003 0.0068249 0.001 0.0026221 0.004 Annual PM25_RUNEX 0.001089 0.0015503 0.0012203 0.0012268 0.0059929 0.009619738 0.008346381 0.024791281 0.0074436 0.0041175 0.001965 0.0219119 0.1054967 Annual PM25_STREX 0.0014367 0.0018509 0.0015057 0.001509 0.0001869 0.000112255 0.000119431 9.68654E-08 0.0001436 0 0.0026776 3.525E-05 0 Annual ROG_DIURN 0.0737387 0.1859314 0.1232773 0.1567781 0.003393 0.002527749 0.001199681 3.04218E-07 0.0023083 0 2.4552419 0.0014311 0 Annual ROG_HTSK 0.0831414 0.1772212 0.1120016 0.1403543 0.0643101 0.050233092 0.03069597 5.85205E-06 0.0159746 0 0.9570696 0.0062403 0 Annual ROG_IDLEX 0 0 0 0 0.018926 0.016677183 0.021466787 0.703542911 0.0465577 0 0 0.2556471 0 Annual ROG_RESTL 0.0548174 0.1272339 0.097403 0.1282236 0.0016204 0.001266535 0.000609642 1.60039E-07 0.0009724 0 1.3511534 0.0006122 0 Annual ROG_RUNEX 0.0052538 0.0197889 0.0116965 0.013499 0.0323986 0.039166466 0.013199497 0.018701407 0.0169748 0.069753 2.1545665 0.0703957 0.061963 Annual ROG_RUNLS 0.1864236 0.549716 0.3697686 0.4207607 0.3712251 0.254307016 0.141760045 1.94194E-05 0.1637716 0 1.6286214 0.038863 0 Annual ROG_STREX 0.1386651 0.2256081 0.2042856 0.254718 0.0524792 0.042834769 0.060525647 5.57286E-07 0.0813577 0 1.6991526 0.0236428 0 Annual S02_IDLEX 0 0 0 0 8.48E-05 0.0001278 0.000653327 0.015203548 0.0008014 0 0 0.0032279 0 Annual S02_RUNEX 0.0022758 0.0028257 0.0029157 0.0035759 0.0058367 0.005953169 0.009353894 0.010781637 0.0117373 0 0.002074 0.0100655 0.0085388 Annual S02_STREX 0.0004578 0.0005623 0.0005839 0.0007216 0.0001032 8.52281E-05 0.000117123 1.00502E-07 0.0001524 0 0.0005742 3.737E-05 0 Annual TOG DIURN 0.0739002 0.1863401 0.1235481 0.1571226 0.003393 0.002527749 0.001199681 3.04218E-07 0.0023083 0 2.4552419 0.0014311 0 Annual TOG_HTSK 0.0833239 0.1776109 0.1122478 0.1406628 0.0643101 0.050233092 0.03069597 5.85205E-06 0.0159746 0 0.9570696 0.0062403 0 Annual TOG_IDLEX 0 0 0 0 0.0264372 0.022692008 0.029640642 0.801818506 0.0606162 0 0 0.3664064 0 Annual TOG_RESTL 0.0549377 0.1275137 0.0976171 0.1285054 0.0016204 0.001266535 0.000609642 1.60039E-07 0.0009724 0 1.3511534 0.0006122 0 Annual TOG RUNEX 0.0076523 0.0289194 0.0170646 0.0196634 0.0391348 0.045792673 0.017279754 0.032180844 0.0230693 4.4620874 2.6908313 0.0816303 0.0705408 Annual TOG_RUNLS 0.1868337 0.5509254 0.3705821 0.4216864 0.3712251 0.254307016 0.141760045 1.94194E-05 0.1637716 0 1.6286214 0.038863 0 Annual TOG_STREX 0.1521245 0.2475065 0.2241143 0.2794418 0.0574581 0.04689868 0.066267965 6.10158E-07 0.0890764 0 1.8501275 0.0258859 0 Summer CH4_IDLEX 0 0 0 0 0.0046278 0.003533295 0.004519033 0.035550753 0.0080124 0 0 0.0585903 0 Summer CH4_RUNEX 0.0017238 0.0054421 0.003498 0.0039836 0.0028131 0.002580556 0.001862868 0.01168095 0.0029827 4.3642252 0.3298426 0.004213 0.0028781 Summer CH4_STREX 0.0303427 0.0447776 0.0433993 0.0510984 0.0107061 0.008642237 0.011850673 1.05526E-07 0.0168541 0 0.2171027 0.0039276 0 Summer CO_IDLEX 0 0 0 0 0.1767822 0.146980785 0.365017256 10.2680186 0.5625081 0 0 2.3196964 0 Summer CO_RUNEX 0.7163866 1.4183305 1.0576327 1.1046412 0.356508 0.323973139 0.226351946 0.193354535 0.3197623 34.118003 20.007292 0.279151 0.2764364 Summer CO_STREX 1.7606826 1.9569463 2.2582832 2.463921 0.8365154 0.58882212 1.260037997 0.001339015 1.589309 0 8.317885 0.3872219 0 Summer CO2_NBIO_IDLEX 0 0 0 0 8.7594614 13.34171116 68.62317246 1590.95288 83.289694 0 0 346.4231 0 Summer CO2_NBIO RUNEX 264.80446 324.56734 332.25059 402.43666 599.19787 615.6268806 975.2118008 1148.479212 1209.9289 1515.2419 212.69352 1050.3738 903.23223 Summer CO2_NBIO_STREX 48.13593 59.093262 61.364956 75.816232 10.383831 8.582840884 11.77297915 0.010094606 15.274361 0 57.670573 3.5894867 0 Summer NOX_IDLEX 0 0 0 0 0.0584716 0.081925678 0.348178529 7.946854415 0.3325089 0 0 3.4013647 0 Summer NOX_RUNEX 0.0244089 0.0794437 0.0560733 0.0639618 0.5934017 0.799811416 0.787111733 1.731958174 0.6579459 0.3420075 0.969651 3.7685592 3.3308279 Summer NOX_STREX' 0.1439255 0.2028364 0.2050732 0.2490462 0.2546228 0.20967824 1.550815626 2.333081106 0.9944142 0 0.2470827 0.9994302 0 Summer PM1O_IDLEX 0 0 0 0 0.0009147 0.001295958 0.000208077 0.002746966 0.0001017 0 0 0.0027902 0 Summer PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061532888 0.13034 0.0750313 0.01176 0.7448002 0.13034 Summer PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099049 0.010614123 0.012000003 0.035875043 0.012 0.0272998 0.004 0.0104884 0.016 Summer PM1O_RUNEX 0.0011828 0.0016848 0.0013258 0.0013309 0.0062847 0.010066821 0.008731216 0.025912243 0.0077949 0.0043037 0.0021058 0.0229171 0.1102668 Summer PM10_STREX 0.0015625 0.002013 0.0016376 0.0016412 0.0002033 0.000122088 0.000129892 1.0535E-07 0.0001561 0 0.0028583 3.834E-05 0 Summer PM25_IDLEX 0 0 0 0 0.0008751 0.001239896 0.000199076 0.002628134 9.728E-05 0 0 0.0026695 0 Summer PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026371238 0.05586 0.0321563 0.00504 0.3192001 0.05586 Summer PM25_PMTW 0.002 0.002 0.002 0.002 0.0024762 0.002653531 0.003000001 0.008968761 0.003 0.0068249 0.001 0.0026221 0.004 Summer PM25_RUNEX 0.001089 0.0015503 0.0012203 0.0012268 0.0059929 0.009619738 0.008346381 0.024791281 0.0074436 0.0041175 0.001965 0.0219119 0.1054967 Summer PM25_STREX 0.0014367 0.0018509 0.0015057 0.001509 0.0001869 0.000112255 0.000119431 9.68654E-08 0.0001436 0 0.0026776 3.525E-05 0 Summer ROG_DIURN 0.1504957 0.3803588 0.2511015 0.3191656 0.0067856 0.005058613 0.002402859 6.06487E-07 0.0045384 0 5.0584748 0.0028078 0 Summer ROG_HTSK 0.1039477 0.2344218 0.1416801 0.1748117 0.0805236 0.062504853 0.03795749 8.18777E-06 0.0182627 0 1.6658056 0.0069551 0 Summer ROG_IDLEX 0 0 0 0 0.018926 0.016677183 0.020752652 0.745514448 0.0479293 0 0 0.2556813 0 Summer ROG_RESTL 0.1014691 0.2386149 0.1763293 0.2302215 0.0030014 0.002311005 0.001125629 3.06276E-07 0.0017829 0 3.0532454 0.0011057 0 Summer ROG_RUNEX 0.0061447 0.0230642 0.0136412 0.015796 0.0325412 0.039227451 0.013302086 0.018702319 0.0171721 0.069753 2.185908 0.0704796 0.061963 Summer ROG_RUNLS 0.1939614 0.5796853 0.3873081 0.440328 0.383574 0.263853536 0.147907105 1.99425E-05 0.1679901 0 1.7175721 0.0383158 0 Summer ROG_STREX 0.1282359 0.2088018 0.1888547 0.2354647 0.051187 0.041779976 0.059058384 5.43776E-07 0.0787401 0 1.6225524 0.0205934 0 Summer S02_IDLEX 0 0 0 0 8.48E-05 0.0001278 0.000652257 0.015005675 0.000792 0 0 0.0032977 0 Summer S02_RUNEX 0.002521 0.0030901 0.0031631 0.0038309 0.0058368 0.005953197 0.00935394 0.010781638 0.0117374 0 0.0021048 0.0100655 0.0085388 Summer S02_STREX 0.0004583 0.0005626 0.0005842 0.0007218 0.0001028 8.49342E-05 0.000116503 9.98943E-08 0.0001512 0 0.0005707 3.552E-05 0 Summer TOG DIURN 0.1508253 0.3811949 0.251653 0.3198669 0.0067856 0.005058613 0.002402859 6.06487E-07 0.0045384 0 5.0584748 0.0028078 0 Summer TOG_HTSK 0.1041761 0.2349374 0.1419915 0.1751961 0.0805236 0.062504853 0.03795749 8.18777E-06 0.0182627 0 1.6658056 0.0069551 0 Summer TOG_IDLEX 0 0 0 0 0.0264372 0.022692008 0.028515532 0.849640337 0.0621778 0 0 0.3664452 0 Summer TOG_RESTL 0.1016914 0.2391394 0.1767167 0.2307274 0.0030014 0.002311005 0.001125629 3.06276E-07 0.0017829 0 3.0532454 0.0011057 0 Summer TOG RUNEX 0.0089551 0.0337083 0.0199079 0.0230216 0.0393429 0.045881662 0.017429452 0.032182174 0.0233573 4.4620874 2.7300107 0.0817527 0.0705408 Summer TOG_RUNLS 0.1943881 0.5809606 0.3881602 0.4412967 0.383574 0.263853536 0.147907105 1.99425E-05 0.1679901 0 1.7175721 0.0383158 0 Summer TOG_STREX 0.140683 0.229069 0.2071856 0.2583198 0.0560433 0.045743815 0.064661497 5.95366E-07 0.0862105 0 1.7667073 0.0225472 0 Winter CH4_IDLEX 0 0 0 0 0.0046073 0.003516995 0.005101007 0.029984222 0.0078275 0 0 0.0584498 0 Winter CH4_RUNEX 0.0013001 0.0042129 0.0026797 0.0030353 0.0027338 0.002539051 0.001795126 0.000857002 0.0028617 4.3642252 0.3300815 0.0041547 0.0028781 Winter CH4_STREX 0.0371419 0.0553918 0.0534104 0.0629653 0.0114277 0.009221412 0.012642756 1.13993E-07 0.0182712 0 0.2572359 0.0053141 0 Winter CO_IDLEX 0 0 0 0 0.1767822 0.146980785 0.526185615 10.57432526 0.5744491 0 0 2.3999667 0 Winter CO_RUNEX 0.4563957 0.9302412 0.6844665 0.7152031 0.3475312 0.319743629 0.219190462 0.160039118 0.3079472 34.118003 18.196175 0.2750872 0.2764364 Winter CO_STREX 1.9819247 2.2110393 2.5644125 2.8064682 0.9086327 0.639642031 1.377402883 0.001463737 1.7909187 0 9.2636384 0.6601301 0 Winter CO2_NBIO_IDLEX 0 0 0 0 8.7594614 13.34171116 68.92593549 1638.189538 85.654366 0 0 328.83086 0 Winter CO2_NBIO RUNEX 222.21681 278.67955 289.30016 358.16777 599.18207 615.6194838 975.1992177 1141.193163 1209.9079 1515.2419 209.85529 1050.3664 903.23223 Winter CO2_NBIO_STREX 48.605863 59.686924 62.025999 76.576857 10.510677 8.673624988 11.97377924 0.010292437 15.617404 0 60.198842 4.0467024 0 Winter NOX_IDLEX 0 0 0 0 0.0584716 0.081925678 0.373195778 8.913171387 0.3741195 0 0 3.2438492 0 Winter NOX_RUNEX 0.0241536 0.0800493 0.0560396 0.0638186 0.6406748 0.861241668 0.851927576 1.85450864 0.7172679 0.3420607 1.1786069 4.0670518 3.5780078 Winter NOX_STREX' 0.1448623 0.2045146 0.2064939 0.2508829 0.271682 0.223727353 1.558658163 2.33308129 1.0074337 0 0.2721941 1.0057987 0 Winter PM10_IDLEX 0 0 0 0 0.0009147 0.001295958 0.000291526 0.00355905 0.000132 0 0 0.0040045 0 Winter PM10_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061387001 0.13034 0.0750313 0.01176 0.7448002 0.13034 Winter PM10_PMTW 0.008 0.008 0.008 0.008 0.0099049 0.010614123 0.012000003 0.035789978 0.012 0.0272998 0.004 0.0104884 0.016 Winter PM10_RUNEX 0.0011828 0.0016848 0.0013258 0.0013309 0.0062847 0.010066821 0.008731216 0.025900336 0.0077949 0.0043037 0.0021058 0.0229171 0.1102668 Winter PM10_STREX 0.0015625 0.002013 0.0016376 0.0016412 0.0002033 0.000122088 0.000129892 1.0535E-07 0.0001561 0 0.0028583 3.834E-05 0 Winter PM25_IDLEX 0 0 0 0 0.0008751 0.001239896 0.000278915 0.003405087 0.0001263 0 0 0.0038312 0 Winter PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026308715 0.05586 0.0321563 0.00504 0.3192001 0.05586 Winter PM25_PMTW 0.002 0.002 0.002 0.002 0.0024762 0.002653531 0.003000001 0.008947494 0.003 0.0068249 0.001 0.0026221 0.004 Winter PM25_RUNEX 0.001089 0.0015503 0.0012203 0.0012268 0.0059929 0.009619738 0.008346381 0.024779889 0.0074436 0.0041175 0.001965 0.0219119 0.1054967 Winter PM25_STREX 0.0014367 0.0018509 0.0015057 0.001509 0.0001869 0.000112255 0.000119431 9.68654E-08 0.0001436 0 0.0026776 3.525E-05 0 Winter ROG_DIURN 0.0287379 0.073938 0.0473884 0.0597653 0.0014583 0.001062974 0.00050163 1.26136E-07 0.0010195 0 1.0198084 0.0006248 0 Winter ROG_HTSK 0.077271 0.161466 0.1035221 0.1303225 0.0613144 0.047184857 0.028605074 5.15383E-06 0.0153058 0 0.761325 0.0060078 0 Winter ROG_IDLEX 0 0 0 0 0.018926 0.016677183 0.022471508 0.645552076 0.0446635 0 0 0.2556 0 Winter ROG_RESTL 0.025653 0.0591522 0.0469282 0.0623325 0.0008363 0.000660047 0.000310466 7.56654E-08 0.0005248 0 0.4052687 0.0003349 0 Winter ROG_RUNEX 0.0047176 0.0178452 0.0105306 0.0121459 0.0321784 0.039066818 0.013016479 0.018199691 0.0166373 0.069753 2.1956484 0.0702529 0.061963 Winter ROG_RUNLS 0.20645 0.6181825 0.4147419 0.4697042 0.391783 0.268976896 0.150709903 2.09312E-05 0.1716239 0 1.8210062 0.0466214 0 Winter ROG_STREX 0.1593156 0.2599609 0.2349563 0.2930535 0.0549213 0.044827945 0.063458061 5.84286E-07 0.085734 0 1.9318914 0.0279329 0 Winter S02_IDLEX 0 0 0 0 8.48E-05 0.0001278 0.000654739 0.015476802 0.0008143 0 0 0.0031315 0 Winter S02 RUNEX 0.0021155 0.0026532 0.0027542 0.0034094 0.0058366 0.005953124 0.009353815 0.010781634 0.0117372 0 0.0020767 0.0100654 0.0085388 Winter S02_STREX 0.0004628 0.0005683 0.0005905 0.0007291 0.000104 8.58326E-05 0.00011849 1.01852E-07 0.0001545 0 0.0005957 4.005E-05 0 Winter TOG DIURN 0.0288009 0.0741006 0.0474925 0.0598967 0.0014583 0.001062974 0.00050163 1.26136E-07 0.0010195 0 1.0198084 0.0006248 0 Winter TOG_HTSK 0.0774406 0.1618211 0.1037496 0.130609 0.0613144 0.047184857 0.028605074 5.15383E-06 0.0153058 0 0.761325 0.0060078 0 Winter TOG_IDLEX 0 0 0 0 0.0264372 0.022692008 0.031221409 0.734911898 0.0584598 0 0 0.3663526 0 Winter TOG_RESTL 0.0257094 0.0592824 0.0470314 0.0624696 0.0008363 0.000660047 0.000310466 7.56654E-08 0.0005248 0 0.4052687 0.0003349 0 Winter TOG RUNEX 0.0068684 0.0260775 0.0153598 0.0176851 0.0388135 0.045647267 0.017012695 0.02073877 0.0225769 4.4620874 2.7409195 0.0814218 0.0705408 Winter TOG_RUNLS 0.2069042 0.6195425 0.4156543 0.4707376 0.391783 0.268976896 0.150709903 2.09312E-05 0.1716239 0 1.8210062 0.0466214 0 Winter TOG STREX 0.1747794 0.2851937 0.257762 0.3214983 0.0601319 0.049080957 0.069478589 6.39719E-07 0.093868 0 2.103491 0.030583 0 1 Source: California Air Resources Board. EMFAC2017 Web Database. https://www.arb.ca.gov/emfac/1017/, California Air Pollution Control Officers Association (CAPCOA). 2017, November. California Emissions Estimator Model User's Guide, Version 2016.3.2, Appendix A. 2 Unless otherwise noted, per CaIEEMod methodology, the calculated CaIEEMod emission rates are derived from the emission rates obtained using the EMFAC2017 Web Database for the Rivereside (55) region. 3 Because EMFAC2017 provides vehicle trips data for MHDT and HHDT diesel trucks, the formula provided in Appendix A of the CaIEEMod User's Guide in calculating the NO x STREX emission rates are utilized. EMFAC2017 Derived CaIEEMod Annual Emission Rates: Year 20291'2 Season Pollutant LDA LDT1 LDT2 MDV LHDT1 LHDT2 MHDT HHDT OBUS UBUS MCY SBUS MH Annual CH4_IDLEX 0 0 0 0 0.0042262 0.003136834 0.004959772 0.033808638 0.0076408 0 0 0.0665561 0 Annual CH4_RUNEX 0.0011186 0.0032049 0.002319 0.0024809 0.0021011 0.002046399 0.001342913 0.012556502 0.0020649 4.4662477 0.32327 0.0037562 0.0026406 Annual CH4_STREX 0.026671 0.0377064 0.0387947 0.0437914 0.0088381 0.006982849 0.011692448 1.09845E-07 0.015974 0 0.2254275 0.005139 0 Annual CO_IDLEX 0 0 0 0 0.1743257 0.141886778 0.437198772 10.44980053 0.5794847 0 0 2.6681824 0 Annual CO_RUNEX 0.490689 0.8496854 0.708041 0.7130889 0.2586154 0.246581569 0.156640819 0.199357355 0.2097513 34.928508 17.709565 0.260562 0.2482625 Annual CO_STREX 1.5430522 1.7155662 2.0322598 2.1398255 0.8110161 0.538925234 1.17886307 0.00186199 1.4904101 0 8.416702 0.5675561 0 Annual CO2_NBIO_IDLEX 0 0 0 0 8.4250376 12.99888829 64.38193521 1527.021792 84.837104 0 0 333.40432 0 Annual CO2_NBIO RUNEX 225.89036 282.0231 286.58725 348.85054 567.96254 579.2763273 936.7275058 1061.632085 1127.6983 1546.2285 209.47169 1005.5035 872.46628 Annual CO2_NBIO_STREX 45.28276 55.927999 57.158561 69.934519 9.8036922 7.756959053 11.60312714 0.015395552 13.972954 0 57.277956 4.2185617 0 Annual NOX_IDLEX 0 0 0 0 0.052165 0.074638234 0.324154807 8.386568644 0.371365 0 0 2.9536424 0 Annual NOX_RUNEX 0.0197879 0.0542914 0.0417786 0.0446268 0.4173516 0.595942719 0.791397581 1.7586336 0.6923577 0.3506754 1.0976466 3.2710458 3.1886257 Annual N0X_STREX' 0.1195369 0.1602905 0.1609909 0.1857936 0.2205796 0.178973628 1.532969722 2.338776261 1.0619505 0 0.2557104 1.1735196 0 Annual PM1O_IDLEX 0 0 0 0 0.0009462 0.001365049 0.000157956 0.00308232 0.000121 0 0 0.0025206 0 Annual PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061511078 0.13034 0.0750313 0.01176 0.7448002 0.13034 Annual PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099466 0.010701751 0.012000003 0.035860935 0.012 0.0272998 0.004 0.0103701 0.016 Annual PM1O_RUNEX 0.0009523 0.0013176 0.001134 0.0011213 0.0052134 0.009475065 0.008666707 0.025179279 0.0081267 0.0051021 0.0021681 0.0186849 0.0955713 Annual PM10_STREX 0.0013202 0.0016405 0.0014119 0.0014111 0.0001949 0.000112293 0.000131604 1.69294E-07 0.0001537 0 0.0028435 4.856E-05 0 Annual PM25_IDLEX 0 0 0 0 0.0009053 0.001305997 0.000151123 0.002948981 0.0001158 0 0 0.0024115 0 Annual PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026361891 0.05586 0.0321563 0.00504 0.3192001 0.05586 Annual PM25_PMTW 0.002 0.002 0.002 0.002 0.0024866 0.002675438 0.003000001 0.008965234 0.003 0.0068249 0.001 0.0025925 0.004 Annual PM25_RUNEX 0.0008764 0.0012117 0.001044 0.0010333 0.0049683 0.009054104 0.008284112 0.024090022 0.0077611 0.0048814 0.0020221 0.0178602 0.0914369 Annual PM25_STREX 0.0012139 0.0015084 0.0012982 0.0012975 0.0001792 0.000103249 0.000121005 1.55659E-07 0.0001414 0 0.0026587 4.465E-05 0 Annual ROG_DIURN 0.0623876 0.1446999 0.1107462 0.1448516 0.0029528 0.002110438 0.001117034 6.67448E-07 0.0021175 0 2.4402717 0.00182 0 Annual ROG_HTSK 0.0706861 0.1382274 0.0973547 0.1228354 0.0559936 0.041151512 0.028400878 1.35565E-05 0.0148915 0 0.9344234 0.0079829 0 Annual ROG_IDLEX 0 0 0 0 0.0173987 0.015359493 0.021732803 0.706375221 0.0464496 0 0 02888257 0 Annual ROG_RESTL 0.0468525 0.1021963 0.088615 0.1189309 0.0014417 0.001097406 0.000590398 3.61335E-07 0.0009079 0 1.3330492 0.0007807 0 Annual ROG_RUNEX 0.0038274 0.0130569 0.0087745 0.0095144 0.0257244 0.0329521 0.010566081 0.018368116 0.0128472 0.0717276 2.1319451 0.0598156 0.0568501 Annual ROG_RUNLS 0.1732956 0.4464005 0.3337643 0.3762798 0.3480611 0.206439407 0.130041186 5.49469E-05 0.1580258 0 1.4627728 0.0497301 0 Annual ROG_STREX 0.1097372 0.1677127 0.1641395 0.1945792 0.0415208 0.033322363 0.056715716 5.64458E-07 0.0741799 0 1.679559 0.0270584 0 Annual S02_IDLEX 0 0 0 0 8.152E-05 0.00012439 0.000612025 0.014399113 0.0008062 0 0 0.0031775 0 Annual S02_RUNEX 0.0021033 0.0026257 0.0026685 0.0032491 0.0055303 0.005595689 0.008992335 0.009955159 0.010926 0 0.0020729 0.0096483 0.0082479 Annual S02_STREX 0.0004216 0.0005207 0.0005322 0.0006511 9.702E-05 7.67614E-05 0.000114822 1.52351E-07 0.0001383 0 0.0005668 4.175E-05 0 Annual TOG DIURN 0.0626478 0.1453066 0.1112102 0.1454587 0.0029528 0.002110438 0.001117034 6.67448E-07 0.0021175 0 2.4402717 0.00182 0 Annual TOG_HTSK 0.0709822 0.1388074 0.0977631 0.1233507 0.0559936 0.041151512 0.028400878 1.35565E-05 0.0148915 0 0.9344234 0.0079829 0 Annual TOG_IDLEX 0 0 0 0 0.0241684 0.02068871 0.030130507 0.805159299 0.060096 0 0 0.4149915 0 Annual TOG_RESTL 0.0470484 0.1026251 0.0889866 0.1194298 0.0014417 0.001097406 0.000590398 3.61335E-07 0.0009079 0 1.3330492 0.0007807 0 Annual TOG RUNEX 0.0055801 0.0191107 0.0128042 0.0138598 0.0307592 0.038290085 0.01349983 0.032696345 0.0169792 4.5667732 2.6714701 0.069683 0.0647201 Annual TOG_RUNLS 0.1740234 0.4482754 0.3351661 0.3778601 0.3480611 0.206439407 0.130041186 5.49469E-05 0.1580258 0 1.4627728 0.0497301 0 Annual TOG_STREX 0.1205329 0.1842119 0.1802872 0.2137214 0.0454601 0.036483793 0.06209657 6.1801E-07 0.0812176 0 1.8292355 0.0296255 0 Summer CH4_IDLEX 0 0 0 0 0.0042326 0.00314179 0.004704579 0.035817815 0.0077205 0 0 0.0666366 0 Summer CH4_RUNEX 0.0013148 0.0037167 0.0027031 0.002895 0.0021194 0.002057002 0.001360363 0.012556769 0.0020929 4.4662477 0.327653 0.0037793 0.0026406 Summer CH4_STREX 0.0247494 0.0348614 0.0359064 0.0405054 0.0086349 0.006823594 0.011445362 1.0698E-07 0.0154884 0 0.2149344 0.0044811 0 Summer CO_IDLEX 0 0 0 0 0.1743257 0.141886778 0.368316007 10.31398717 0.5741855 0 0 2.6392057 0 Summer CO_RUNEX 0.6435656 1.0999597 0.9213426 0.9270857 0.2607751 0.24763252 0.158282019 0.199486271 0.2121854 34.928508 19.522097 0.2622346 0.2482625 Summer CO_STREX 1.5939073 1.7687121 2.0868192 2.1943452 0.7890501 0.524324314 1.145743353 0.001809678 1.4236974 0 8.3040954 0.4406832 0 Summer CO2_NBIO_IDLEX 0 0 0 0 8.4250376 12.99888829 64.15852394 1507.125338 83.82109 0 0 338.86181 0 Summer CO2_NBIO RUNEX 250.21982 308.21521 310.74718 373.2699 567.96627 579.2781566 936.7303916 1061.632295 1127.7027 1546.2285 212.46054 1005.5066 872.46628 Summer CO2_NBIO_STREX 45.337913 55.971586 57.205011 69.97239 9.7654377 7.731057407 11.54601491 0.015312587 13.859198 0 56.843853 4.0057442 0 Summer NOX_IDLEX 0 0 0 0 0.052165 0.074638234 0.312572359 7.971818613 03528025 0 0 2.9971587 0 Summer NOX_RUNEX 0.0203763 0.0554 0.0427724 0.0457166 0.3939877 0.562876703 0.744707208 1.662245027 0.6500043 0.3506507 0.9671581 3.0772117 3.0096662 Summer NOX_STREX' 0.1262251 0.169101 0.1699636 0.1961034 0.2165332 0.175687733 1.53069217 2.338776209 1.0584195 0 0.2472675 1.1708769 0 Summer PM1O_IDLEX 0 0 0 0 0.0009462 0.001365049 0.000136231 0.002735548 0.0001076 0 0 0.002134 0 Summer PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061511078 0.13034 0.0750313 0.01176 0.7448002 0.13034 Summer PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099466 0.010701751 0.012000003 0.035860935 0.012 0.0272998 0.004 0.0103701 0.016 Summer PM1O_RUNEX 0.0009523 0.0013176 0.001134 0.0011213 0.0052134 0.009475065 0.008666707 0.025179279 0.0081267 0.0051021 0.0021681 0.0186849 0.0955713 Summer PM10_STREX 0.0013202 0.0016405 0.0014119 0.0014111 0.0001949 0.000112293 0.000131604 1.69294E-07 0.0001537 0 0.0028435 4.856E-05 0 Summer PM25_IDLEX 0 0 0 0 0.0009053 0.001305997 0.000130337 0.002617209 0.0001029 0 0 0.0020416 0 Summer PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026361891 0.05586 0.0321563 0.00504 0.3192001 0.05586 Summer PM25_PMTW 0.002 0.002 0.002 0.002 0.0024866 0.002675438 0.003000001 0.008965234 0.003 0.0068249 0.001 0.0025925 0.004 Summer PM25_RUNEX 0.0008764 0.0012117 0.001044 0.0010333 0.0049683 0.009054104 0.008284112 0.024090022 0.0077611 0.0048814 0.0020221 0.0178602 0.0914369 Summer PM25_STREX 0.0012139 0.0015084 0.0012982 0.0012975 0.0001792 0.000103249 0.000121005 1.55659E-07 0.0001414 0 0.0026587 4.465E-05 0 Summer ROG_DIURN 0.1272549 0.2957263 0.2254169 0.2946906 0.0058999 0.004217863 0.002232336 1.32972E-06 0.0041589 0 5.0183555 0.0035708 0 Summer ROG_HTSK 0.0875822 0.1795319 0.122543 0.153963 0.069621 0.050018706 0.034305581 1.74554E-05 0.0168969 0 1.6396474 0.0088004 0 Summer ROG_IDLEX 0 0 0 0 0.0173987 0.015359493 0.020999016 0.748537263 0.0478896 0 0 0.2891135 0 Summer ROG_RESTL 0.0864414 0.1894957 0.1595484 0.2131746 0.0026446 0.001969399 0.001065169 6.61639E-07 0.001644 0 3.0199539 0.0013983 0 Summer ROG_RUNEX 0.0044736 0.0151976 0.0102175 0.0110694 0.0257965 0.032989998 0.010632027 0.018369451 0.0129527 0.0717276 2.1630613 0.0599049 0.0568501 Summer ROG_RUNLS 0.1804602 0.4699819 0.3494223 0.3935936 0.3589355 0.213886565 0.135213438 5.65043E-05 0.1619529 0 1.5492692 0.0490811 0 Summer ROG_STREX 0.1015076 0.1551741 0.1517449 0.1797986 0.0404969 0.032500665 0.055340813 5.50774E-07 0.0717932 0 1.6027878 0.0235684 0 Summer S02_IDLEX 0 0 0 0 8.152E-05 0.00012439 0.000610069 0.01421137 0.0007966 0 0 0.0032291 0 Summer S02_RUNEX 0.0023299 0.0028696 0.0028934 0.0034765 0.0055303 0.005595707 0.008992363 0.009955161 0.010926 0 0.0021025 0.0096484 0.0082479 Summer S02_STREX 0.0004221 0.0005211 0.0005326 0.0006515 9.664E-05 7.65051E-05 0.000114257 1.5153E-07 0.0001371 0 0.0005625 3.964E-05 0 Summer TOG DIURN 0.1277857 0.2969664 0.2263612 0.2959258 0.0058999 0.004217863 0.002232336 1.32972E-06 0.0041589 0 5.0183555 0.0035708 0 Summer TOG_HTSK 0.0879492 0.1802854 0.1230571 0.154609 0.069621 0.050018706 0.034305581 1.74554E-05 0.0168969 0 1.6396474 0.0088004 0 Summer TOG_IDLEX 0 0 0 0 0.0241684 0.02068871 0.028971804 0.853208652 0.0617353 0 0 0.4153192 0 Summer TOG_RESTL 0.0868022 0.1902903 0.160217 0.2140684 0.0026446 0.001969399 0.001065169 6.61639E-07 0.001644 0 3.0199539 0.0013983 0 Summer TOG RUNEX 0.006526 0.0222444 0.0149166 0.0161361 0.0308645 0.038345386 0.013596058 0.032698293 0.0171332 4.5667732 2.7104846 0.0698133 0.0647201 Summer TOG_RUNLS 0.1812181 0.4719558 0.3508899 0.3952467 0.3589355 0.213886565 0.135213438 5.65043E-05 0.1619529 0 1.5492692 0.0490811 0 Summer TOG STREX 0.1114937 0.1704398 0.1666732 0.1974868 0.0443391 0.035584138 0.060591225 6.03028E-07 0.0786046 0 1.7456128 0.0258045 0 Winter CH4_IDLEX 0 0 0 0 0.0042142 0.003127623 0.005310177 0.030103736 0.007528 0 0 0.0664473 0 Winter CH4_RUNEX 0.0009904 0.0028729 0.0020687 0.0022102 0.0020705 0.002028718 0.001312073 0.000850817 0.0020152 4.4662477 0.3274439 0.0037174 0.0026406 Winter CH4_STREX 0.0302393 0.0429963 0.0441202 0.0498271 0.0092182 0.007280802 0.01219591 1.15564E-07 0.0167837 0 0.2543615 0.0060627 0 Winter CO_IDLEX 0 0 0 0 0.1743257 0.141886778 0.533569963 10.6186063 05868026 0 0 2.7081978 0 Winter CO_RUNEX 0.4096165 0.7176243 0.5952159 0.5998727 0.2552076 0.244901715 0.153824684 0.160752408 0.2055734 34.928508 17.772317 0.2578615 0.2482625 Winter CO_STREX 1.7859049 1.989071 2.3629586 2.490877 0.8565817 0.569216212 1.252463708 0.001978241 1.6039964 0 9.3341533 0.75127 0 Winter CO2_NBIO_IDLEX 0 0 0 0 8.4250376 12.99888829 64.68386402 1551.560839 86.24017 0 0 325.86778 0 Winter CO2_NBIO RUNEX 209.98898 264.92352 270.81008 332.90359 567.95662 579.2733947 936.7225322 1053.705576 1127.6909 1546.2285 209.70686 1005.4986 872.46628 Winter CO2_NBIO_STREX 45.744357 56.472901 57.795714 70.621992 9.8823932 7.810170068 11.72901302 0.01557991 14.16639 0 59.48447 4.5262425 0 Winter NOX_IDLEX 0 0 0 0 0.052165 0.074638234 0.340148613 8.941981027 0.396999 0 0 2.8935485 0 Winter NOX_RUNEX 0.0201346 0.0556301 0.0426943 0.0455672 0.4247338 0.605580584 0.804353289 1.780656522 0.7053417 0.3506812 1.1749448 3.3226903 3.2330384 Winter NOX_STREX' 0.1270461 0.1704066 0.171107 0.197492 0.2310014 0.187431443 1.538467396 2.338776387 1.0706214 0 0.272139 1.1781412 0 Winter PM10_IDLEX 0 0 0 0 0.0009462 0.001365049 0.000187958 0.00354459 0.0001397 0 0 0.0030544 0 Winter PM10_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061344868 0.13034 0.0750313 0.01176 0.7448002 0.13034 Winter PM10_PMTW 0.008 0.008 0.008 0.008 0.0099466 0.010701751 0.012000003 0.035764019 0.012 0.0272998 0.004 0.0103701 0.016 Winter PM10_RUNEX 0.0009523 0.0013176 0.001134 0.0011213 0.0052134 0.009475065 0.008666707 0.025167866 0.0081267 0.0051021 0.0021681 0.0186849 0.0955713 Winter PM10_STREX 0.0013202 0.0016405 0.0014119 0.0014111 0.0001949 0.000112293 0.000131604 1.69294E-07 0.0001537 0 0.0028435 4.856E-05 0 Winter PM25_IDLEX 0 0 0 0 0.0009053 0.001305997 0.000179827 0.003391252 0.0001336 0 0 0.0029223 0 Winter PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026290658 0.05586 0.0321563 0.00504 0.3192001 0.05586 Winter PM25_PMTW 0.002 0.002 0.002 0.002 0.0024866 0.002675438 0.003000001 0.008941005 0.003 0.0068249 0.001 0.0025925 0.004 Winter PM25_RUNEX 0.0008764 0.0012117 0.001044 0.0010333 0.0049683 0.009054104 0.008284112 0.024079102 0.0077611 0.0048814 0.0020221 0.0178602 0.0914369 Winter PM25_STREX 0.0012139 0.0015084 0.0012982 0.0012975 0.0001792 0.000103249 0.000121005 1.55659E-07 0.0001414 0 0.0026587 4.465E-05 0 Winter ROG_DIURN 0.0242 0.0570548 0.0423862 0.0551007 0.0012586 0.000876302 0.000460843 2.73471E-07 0.0009249 0 1.0161289 0.000792 0 Winter ROG_HTSK 0.0658189 0.1266145 0.090079 0.113755 0.0536548 0.03888537 0.026670095 1.23909E-05 0.0142814 0 0.7336101 0.0077169 0 Winter ROG_IDLEX 0 0 0 0 0.0173987 0.015359493 0.022765328 0.648125189 0.044461 0 0 0.2884282 0 Winter ROG_RESTL 0.0220176 0.048241 0.0430061 0.0579197 0.0007511 0.0005822 0.000309306 1.83557E-07 0.0004952 0 0.4001611 0.000432 0 Winter ROG_RUNEX 0.0034369 0.0117696 0.007903 0.0085738 0.0256055 0.032889522 0.010447859 0.017955716 0.0126581 0.0717276 2.1690312 0.0596634 0.0568501 Winter ROG_RUNLS 0.1927237 0.5021034 0.374775 0.4208736 0.3674932 0.218425841 0.138427278 5.90258E-05 0.1657653 0 1.6434641 0.0594465 0 Winter ROG_STREX 0.1259979 0.1930454 0.1886885 0.2237522 0.0434502 0.034870826 0.059463542 5.91805E-07 0.0781702 0 1.9056065 0.0319682 0 Winter S02_IDLEX 0 0 0 0 8.152E-05 0.00012439 0.00061466 0.014658377 0.0008194 0 0 0.0031063 0 Winter S02 RUNEX 0.0019553 0.0024665 0.0025216 0.0031006 0.0055302 0.00559566 0.008992286 0.009955155 0.0109259 0 0.0020752 0.0096483 0.0082479 Winter S02_STREX 0.0004259 0.0005258 0.0005381 0.0006575 9.779E-05 7.7288E-05 0.000116068 1.54176E-07 0.0001402 0 0.0005886 4.479E-05 0 Winter TOG DIURN 0.0243012 0.0572942 0.0425639 0.0553318 0.0012586 0.000876302 0.000460843 2.73471E-07 0.0009249 0 1.0161289 0.000792 0 Winter TOG_HTSK 0.0660945 0.1271458 0.0904567 0.1142322 0.0536548 0.03888537 0.026670095 1.23909E-05 0.0142814 0 0.7336101 0.0077169 0 Winter TOG_IDLEX 0 0 0 0 0.0241684 0.02068871 0.031758637 0.737841191 0.0578322 0 0 0.414539 0 Winter TOG_RESTL 0.02211 0.0484436 0.0431866 0.0581629 0.0007511 0.0005822 0.000309306 1.83557E-07 0.0004952 0 0.4001611 0.000432 0 Winter TOG RUNEX 0.0050084 0.0172263 0.0115284 0.0124828 0.0305858 0.038198772 0.013327321 0.020470233 0.0167032 4.5667732 2.7171439 0.0694609 0.0647201 Winter TOG_RUNLS 0.1935331 0.5042122 0.376349 0.4226413 0.3674932 0.218425841 0.138427278 5.90258E-05 0.1657653 0 1.6434641 0.0594465 0 Winter TOG STREX 0.1383933 0.2120368 0.2072513 0.2457645 0.0475725 0.038179165 0.065105093 6.47952E-07 0.0855865 0 2.0753833 0.0350012 0 1 Source: California Air Resources Board. EMFAC2017 Web Database. https://www.arb.ca.gov/emfac/1017/, California Air Pollution Control Officers Association (CAPCOA). 2017, November. California Emissions Estimator Model User's Guide, Version 2016.3.2, Appendix A. 2 Unless otherwise noted, per CaIEEMod methodology, the calculated CaIEEMod emission rates are derived from the emission rates obtained using the EMFAC2017 Web Database for the Riverside (55) region. 3 Because EMFAC2017 provides vehicle trips data for MHDT and HHDT diesel trucks, the formula provided in Appendix A of the CaIEEMod User's Guide in calculating the NO x STREX emission rates are utilized. EMFAC2017 Derived CaIEEMod Annual Emission Rates: Year 202311'2 Season Pollutant LDA LDT1 LDT2 MDV LHDT1 LHDT2 MHDT HHDT OBUS UBUS MCY SBUS MH Annual CH4_IDLEX 0 0 0 0 0.0040086 0.002917614 0.005087623 0.033981109 0.0074953 0 0 0.0721473 0 Annual CH4_RUNEX 0.001023 0.0026264 0.0021082 0.0022024 0.0017985 0.001884141 0.001164539 0.01309217 0.0018582 4.4790433 0.3358676 0.0033989 0.0026012 Annual CH4_STREX 0.023666 0.0322949 0.0345911 0.0382959 0.0077106 0.005986785 0.011625563 1.08012E-07 0.0154052 0 0.223222 0.005613 0 Annual CO_IDLEX 0 0 0 0 0.1731281 0.139105116 0.441369397 10.48405432 0.5778579 0 0 2.8933484 0 Annual CO_RUNEX 0.4813325 0.7511279 0.679912 0.6762812 0.2056999 0.216490621 0.134620941 0.208034278 0.1860736 34.99361 17.703612 0.2463098 0.236604 Annual CO_STREX 1.4650316 1.6257162 1.947044 2.0174619 0.7803631 0.507382505 1.126883023 0.002224226 1.4343542 0 8.4341771 0.6182707 0 Annual CO2_NBI0_IDLEX 0 0 0 0 8.2252226 12.78175626 61.93000297 1476.785954 83.679943 0 0 328.32332 0 Annual CO2_NBIO RUNEX 223.31386 278.63447 280.81732 340.15102 553.85311 562.9329672 919.2589855 1021.530763 1095.1627 1549.8549 212.57649 974.47371 860.96813 Annual CO2_NBIO_STREX 43.921525 54.326355 55.03893 66.884744 9.450426 7.288668645 11.53754624 0.019052688 13.386086 0 56.865999 4.5312747 0 Annual NOX_IDLEX 0 0 0 0 0.0483603 0.070181865 0.30694614 8.408268424 0.3745136 0 0 2.6464932 0 Annual NOX_RUNEX 0.0185433 0.0427485 0.0363921 0.0378471 0.311039 0.46959816 0.802659712 1.807045338 0.7337132 0.3528036 1.1007915 2.7480207 3.0298871 Annual NOX_STREX' 0.112421 0.1454057 0.1460689 0.1648332 0.2006699 0.159486618 1.518415693 2.344077927 1.0845315 0 0.2556157 1.3065472 0 Annual PM1O_IDLEX 0 0 0 0 0.0009626 0.001395194 0.000120935 0.003073342 0.0001217 0 0 0.0020089 0 Annual PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061499087 0.13034 0.0750313 0.01176 0.7448002 0.13034 Annual PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099656 0.010745432 0.012000003 0.035853185 0.012 0.0272998 0.004 0.0102941 0.016 Annual PM1O_RUNEX 0.0008757 0.0011913 0.001075 0.0010595 0.0047167 0.00930605 0.0081495 0.023707788 0.0080329 0.00563 0.002306 0.0154941 0.083554 Annual PM10_STREX 0.0011698 0.0014332 0.0012678 0.0012716 0.0001895 0.000107637 0.000135375 2.15553E-07 0.0001571 0 0.0028253 5.577E-05 0 Annual PM25_IDLEX 0 0 0 0 0.000921 0.001334839 0.000115703 0.002940391 0.0001165 0 0 0.001922 0 Annual PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026356752 0.05586 0.0321563 0.00504 0.3192001 0.05586 Annual PM25_PMTW 0.002 0.002 0.002 0.002 0.0024914 0.002686358 0.003000001 0.008963296 0.003 0.0068249 0.001 0.0025735 0.004 Annual PM25_RUNEX 0.0008058 0.0010953 0.0009899 0.0009763 0.0044926 0.008892258 0.007788706 0.022682184 0.0076708 0.0053864 0.0021501 0.0148058 0.0799395 Annual PM25_STREX 0.0010756 0.0013177 0.0011657 0.0011692 0.0001742 9.89683E-05 0.000124472 1.98193E-07 0.0001444 0 0.0026387 5.128E-05 0 Annual ROG_DIU RN 0.0554326 0.120529 0.1027302 0.1372825 0.0026939 0.001886524 0.001103017 9.92673E-07 0.0021197 0 2.4396361 0.0021063 0 Annual ROG_HTSK 0.0630288 0.1159232 0.0883985 0.1131249 0.0509316 0.035867271 0.027452536 2.05562E-05 0.0147173 0 0.9289057 0.0092565 0 Annual ROG_IDLEX 0 0 0 0 0.0165663 0.014619209 0.022022122 0.708496207 0.0459924 0 0 0.3121881 0 Annual ROG_RESTL 0.04202 0.0876141 0.0827264 0.1127787 0.0013402 0.001002182 0.000594086 5.43797E-07 0.0009085 0 1.3298027 0.0009049 0 Annual ROG_RUNEX 0.0034093 0.0104051 0.0078511 0.0083161 0.0232467 0.031312014 0.009534285 0.017952864 0.0119239 0.0731349 2.224256 0.0512476 0.0560032 Annual ROG_RUNLS 0.1655223 0.3807308 0.3077518 0.3435649 0.3184455 0.177872463 0.126064348 8.92185E-05 0.1587898 0 1.3870967 0.0576902 0 Annual ROG_STREX 0.0955825 0.1392291 0.143965 0.1667804 0.0354075 0.028189116 0.055572845 5.57251E-07 0.0714503 0 1.6704326 0.0296101 0 Annual S02_IDLEX 0 0 0 0 7.956E-05 0.000122244 0.000588873 0.013923095 0.000795 0 0 0.0031315 0 Annual S02_RUNEX 0.0020524 0.0025602 0.0025808 0.0031278 0.0053918 0.005434578 0.008827897 0.009573203 0.0106037 0 0.0021036 0.0093595 0.0081392 Annual S02_STREX 0.0004036 0.0004992 0.0005057 0.0006146 9.352E-05 7.21273E-05 0.000114173 1.88542E-07 0.0001325 0 0.0005627 4.484E-05 0 Annual TOG DIURN 0.0557678 0.1212626 0.1033549 0.1381178 0.0026939 0.001886524 0.001103017 9.92673E-07 0.0021197 0 2.4396361 0.0021063 0 Annual TOG_HTSK 0.0634118 0.1166295 0.0889367 0.113814 0.0509316 0.035867271 0.027452536 2.05562E-05 0.0147173 0 0.9289057 0.0092565 0 Annual TOG IDLEX 0 0 0 0 0.0229339 0.019564793 0.030602806 0.807648096 0.0594323 0 0 0.4491404 0 Annual TOG_RESTL 0.042275 0.0881478 0.0832301 0.1134656 0.0013402 0.001002182 0.000594086 5.43797E-07 0.0009085 0 1.3298027 0.0009049 0 Annual TOG RUNEX 0.0049725 0.0152463 0.0114558 0.0121102 0.0275155 0.036257434 0.012041452 0.032782099 0.0156084 4.5811689 2.7908895 0.059999 0.0637559 Annual TOG_RUN LS 0.1665319 0.3830532 0.3096291 0.3456607 0.3184455 0.177872463 0.126064348 8.92185E-05 0.1587898 0 1.3870967 0.0576902 0 Annual TOG_STREX 0.1050903 0.1530785 0.1582856 0.1833705 0.0387668 0.030863534 0.06084527 6.1012E-07 0.078229 0 1.819521 0.0324194 0 Summer CH4_IDLEX 0 0 0 0 0.0040146 0.002922112 0.004825433 0.036002965 0.0075747 0 0 0.0722429 0 Summer CH4_RUNEX 0.0012031 0.0030491 0.0024586 0.0025716 0.0018129 0.001892893 0.001179591 0.013092494 0.0018833 4.4790433 0.3404345 0.003423 0.0026012 Summer CH4_STREX 0.0219642 0.0298685 0.0320161 0.0354272 0.007533 0.005849926 0.011382185 1.05194E-07 0.0149377 0 0.2127589 0.0048943 0 Summer CO_IDLEX 0 0 0 0 0.1731281 0.139105116 0.371021849 10.34793731 0.572533 0 0 2.8676919 0 Summer CO_RUNEX 0.6315639 0.974924 0.8853949 0.8796079 0.2072066 0.217324901 0.135914214 0.208191491 0.1881166 34.99361 19.493912 0.2480716 0.236604 Summer CO_STREX 1.5154966 1.6784744 2.0011416 2.0712311 0.7593066 0.493687434 1.095223666 0.002161737 1.3701506 0 8.2958109 0.4800609 0 Summer CO2_NBI0_IDLEX 0 0 0 0 8.2252226 12.78175626 61.66870038 1457.518591 82.672537 0 0 332.26853 0 Summer CO2_NBIO RUNEX 247.40346 304.4618 304.46073 363.81308 553.85572 562.9344171 919.261265 1021.531019 1095.1663 1549.8549 215.53582 974.4769 860.96813 Summer CO2_NBIO_STREX 43.980384 54.377226 55.090453 66.929271 9.4141155 7.264625146 11.48284179 0.018953593 13.276602 0 56.390543 4.2993827 0 Summer NOX_IDLEX 0 0 0 0 0.0483603 0.070181865 0.294901442 7.991915678 0.3557856 0 0 2.6720776 0 Summer NOX_RUNEX 0.0191042 0.0437305 0.0372795 0.0387873 0.2940558 0.443814459 0.755716223 1.707703065 0.6895207 0.3527826 0.9700709 2.5844088 2.859725 Summer NOX_STREX' 0.1187113 0.1534475 0.1542214 0.1739996 0.1969996 0.156568611 1.516114704 2.344077876 1.0810886 0 0.2472308 1.3036454 0 Summer PM1O_IDLEX 0 0 0 0 0.0009626 0.001395194 0.000104988 0.002728428 0.0001082 0 0 0.0017034 0 Summer PM1O_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.061499087 0.13034 0.0750313 0.01176 0.7448002 0.13034 Summer PM1O_PMTW 0.008 0.008 0.008 0.008 0.0099656 0.010745432 0.012000003 0.035853185 0.012 0.0272998 0.004 0.0102941 0.016 Summer PM1O_RUNEX 0.0008757 0.0011913 0.001075 0.0010595 0.0047167 0.00930605 0.0081495 0.023707788 0.0080329 0.00563 0.002306 0.0154941 0.083554 Summer PM10_STREX 0.0011698 0.0014332 0.0012678 0.0012716 0.0001895 0.000107637 0.000135375 2.15553E-07 0.0001571 0 0.0028253 5.577E-05 0 Summer PM25_IDLEX 0 0 0 0 0.000921 0.001334839 0.000100447 0.002610398 0.0001035 0 0 0.0016297 0 Summer PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026356752 0.05586 0.0321563 0.00504 0.3192001 0.05586 Summer PM25_PMTW 0.002 0.002 0.002 0.002 0.0024914 0.002686358 0.003000001 0.008963296 0.003 0.0068249 0.001 0.0025735 0.004 Summer PM25_RUNEX 0.0008058 0.0010953 0.0009899 0.0009763 0.0044926 0.008892258 0.007788706 0.022682184 0.0076708 0.0053864 0.0021501 0.0148058 0.0799395 Summer PM25_STREX 0.0010756 0.0013177 0.0011657 0.0011692 0.0001742 9.89683E-05 0.000124472 1.98193E-07 0.0001444 0 0.0026387 5.128E-05 0 Summer ROG_DIU RN 0.1130354 0.2461416 0.2090383 0.2792406 0.0053807 0.003767181 0.002201752 1.97703E-06 0.0041622 0 5.0141491 0.0041324 0 Summer ROG_HTSK 0.0778137 0.1487346 0.1112887 0.1428091 0.063295 0.043035007 0.032726065 2.55803E-05 0.0166562 0 1.6351229 0.0101453 0 Summer ROG_IDLEX 0 0 0 0 0.0165663 0.014619209 0.02126732 0.75079951 0.0474321 0 0 0.3126583 0 Summer ROG_RESTL 0.0774786 0.1612085 0.1487385 0.2023348 0.002444 0.001782612 0.00105948 9.78494E-07 0.0016403 0 3.0142735 0.0016134 0 Summer ROG_RUNEX 0.0039864 0.0121174 0.0091403 0.0096744 0.0232976 0.031341575 0.009587517 0.017954501 0.0120151 0.0731349 2.2568704 0.0513409 0.0560032 Summer ROG_RUNLS 0.1724971 0.400477 0.322118 0.3593614 0.3283361 0.184132264 0.130786191 9.17904E-05 0.1626772 0 1.4727419 0.0569697 0 Summer ROG_STREX 0.0884381 0.1288105 0.1331051 0.1541377 0.0345333 0.027493234 0.054225647 5.43742E-07 0.0691514 0 1.5935163 0.0257911 0 Summer S02_IDLEX 0 0 0 0 7.956E-05 0.000122244 0.000586559 0.01374134 0.0007855 0 0 0.0031688 0 Summer S02_RUNEX 0.0022737 0.0027975 0.002798 0.0033452 0.0053919 0.005434592 0.008827919 0.009573205 0.0106037 0 0.0021329 0.0093595 0.0081392 Summer S02_STREX 0.0004041 0.0004996 0.0005062 0.000615 9.316E-05 7.18894E-05 0.000113632 1.87561E-07 0.0001314 0 0.000558 4.255E-05 0 Summer TOG DIURN 0.1137189 0.2476398 0.2103095 0.2809398 0.0053807 0.003767181 0.002201752 1.97703E-06 0.0041622 0 5.0141491 0.0041324 0 Summer TOG_HTSK 0.078287 0.1496411 0.1119666 0.1436793 0.063295 0.043035007 0.032726065 2.55803E-05 0.0166562 0 1.6351229 0.0101453 0 Summer TOG IDLEX 0 0 0 0 0.0229339 0.019564793 0.029411604 0.855864419 0.0610713 0 0 0.4496756 0 Summer TOG_RESTL 0.0779475 0.1621898 0.1496434 0.2035665 0.002444 0.001782612 0.00105948 9.78494E-07 0.0016403 0 3.0142735 0.0016134 0 Summer TOG RUNEX 0.0058183 0.0177553 0.0133449 0.0141006 0.0275898 0.036300569 0.012119127 0.032784488 0.0157414 4.5811689 2.8318307 0.0601351 0.0637559 Summer TOG_RUN LS 0.1735493 0.4029199 0.3240829 0.3615535 0.3283361 0.184132264 0.130786191 9.17904E-05 0.1626772 0 1.4727419 0.0569697 0 Summer TOG_STREX 0.0972353 0.1416237 0.1463455 0.1694702 0.0378097 0.030101631 0.059370258 5.95329E-07 0.0757121 0 1.7357321 0.028238 0 Winter CH4_IDLEX 0 0 0 0 0.0039975 0.00290927 0.005447455 0.030193262 0.0073827 0 0 0.0720178 0 Winter CH4_RUNEX 0.0009055 0.0023514 0.0018799 0.0019615 0.0017743 0.001869425 0.001137941 0.000836945 0.0018136 4.4790433 0.3399501 0.0033585 0.0026012 Winter CH4_STREX 0.0268243 0.0367866 0.0393319 0.0435624 0.0080422 0.006242342 0.012122267 1.13638E-07 0.0161848 0 0.2516586 0.0066217 0 Winter CO_IDLEX 0 0 0 0 0.1731281 0.139105116 0.539796125 10.65169744 0.5852114 0 0 2.9287788 0 Winter CO_RUNEX 0.4016954 0.6329292 0.571244 0.5687445 0.2032768 0.215145404 0.132397694 0.166388299 0.1825613 34.99361 17.760232 0.2434651 0.236604 Winter CO_STREX 1.6937095 1.8825176 2.2622416 2.3463046 0.8239818 0.535755357 1.197238361 0.002363092 1.5436684 0 9.3721075 0.8184005 0 Winter CO2_NBIO_IDLEX 0 0 0 0 8.2252226 12.78175626 62.28429327 1500.300022 85.071122 0 0 322.87518 0 Winter CO2_NBIO RUNEX 207.59001 261.79039 265.39738 324.71843 553.8489 562.9306224 919.2550482 1013.272876 1095.1564 1549.8549 212.80011 974.46851 860.96813 Winter CO2_NBIO_STREX 44.356282 54.832824 55.645514 67.526752 9.5250811 7.338033949 11.65810221 0.019272892 13.572258 0 59.093972 4.8665302 0 Winter NOX_IDLEX 0 0 0 0 0.0483603 0.070181865 0.323578264 8.964881754 0.4003759 0 0 2.6111624 0 Winter NOX_RUNEX 0.018866 0.0437347 0.0371772 0.0386374 0.3164796 0.477136229 0.815404089 1.830255834 0.7468237 0.3528085 1.1780954 2.7921018 3.0721017 Winter NOX_STREX' 0.1194848 0.1545699 0.1552446 0.1752048 0.210144 0.167017019 1.523969941 2.344078051 1.0929863 0 0.2719568 1.3116222 0 Winter PM10_IDLEX 0 0 0 0 0.0009626 0.001395194 0.000142956 0.003534468 0.0001405 0 0 0.0024308 0 Winter PM10_PMBW 0.03675 0.03675 0.03675 0.03675 0.07644 0.089180026 0.130340037 0.06132127 0.13034 0.0750313 0.01176 0.7448002 0.13034 Winter PM10_PMTW 0.008 0.008 0.008 0.008 0.0099656 0.010745432 0.012000003 0.035749502 0.012 0.0272998 0.004 0.0102941 0.016 Winter PM10_RUNEX 0.0008757 0.0011913 0.001075 0.0010595 0.0047167 0.00930605 0.0081495 0.023696433 0.0080329 0.00563 0.002306 0.0154941 0.083554 Winter PM10_STREX 0.0011698 0.0014332 0.0012678 0.0012716 0.0001895 0.000107637 0.000135375 2.15553E-07 0.0001571 0 0.0028253 5.577E-05 0 Winter PM25_IDLEX 0 0 0 0 0.000921 0.001334839 0.000136772 0.003381569 0.0001344 0 0 0.0023256 0 Winter PM25_PMBW 0.01575 0.01575 0.01575 0.01575 0.03276 0.038220011 0.055860016 0.026280544 0.05586 0.0321563 0.00504 0.3192001 0.05586 Winter PM25_PMTW 0.002 0.002 0.002 0.002 0.0024914 0.002686358 0.003000001 0.008937376 0.003 0.0068249 0.001 0.0025735 0.004 Winter PM25_RUNEX 0.0008058 0.0010953 0.0009899 0.0009763 0.0044926 0.008892258 0.007788706 0.02267132 0.0076708 0.0053864 0.0021501 0.0148058 0.0799395 Winter PM25_STREX 0.0010756 0.0013177 0.0011657 0.0011692 0.0001742 9.89683E-05 0.000124472 1.98193E-07 0.0001444 0 0.0026387 5.128E-05 0 Winter ROG_DIURN 0.0214193 0.0471483 0.0392273 0.0521746 0.0011389 0.000777297 0.000452039 4.04728E-07 0.0009251 0 1.0161641 0.0009149 0 Winter ROG_HTSK 0.0586897 0.1064163 0.0817271 0.1044226 0.0486776 0.03397517 0.02589573 1.90536E-05 0.0141274 0 0.7245208 0.0089672 0 Winter ROG_IDLEX 0 0 0 0 0.0165663 0.014619209 0.023084177 0.650052647 0.0440043 0 0 0.3115389 0 Winter ROG_RESTL 0.0197364 0.0417283 0.0402 0.0548225 0.0007008 0.000536423 0.000315611 2.83559E-07 0.0004974 0 0.4000745 0.0005036 0 Winter ROG_RUNEX 0.0030609 0.0093705 0.0070721 0.0074957 0.0231619 0.031262715 0.009438444 0.01758103 0.0117597 0.0731349 2.2606684 0.0510887 0.0560032 Winter ROG_RUNLS 0.1846264 0.4283528 0.3457512 0.3847067 0.3364826 0.188307734 0.13429869 9.57074E-05 0.1665831 0 1.5631084 0.0688283 0 Winter ROG_STREX 0.1096941 0.1601229 0.1654457 0.1917259 0.0370509 0.029497649 0.058265299 5.84249E-07 0.0752937 0 1.8931229 0.034983 0 Winter S02_IDLEX 0 0 0 0 7.956E-05 0.000122244 0.000592004 0.014174091 0.0008082 0 0 0.00308 0 Winter S02 RUNEX 0.0019079 0.0024054 0.0024391 0.002986 0.0053918 0.005434555 0.008827858 0.009573198 0.0106036 0 0.0021058 0.0093594 0.0081392 Winter S02_STREX 0.0004076 0.0005038 0.0005113 0.0006205 9.426E-05 7.26158E-05 0.000115366 1.90721E-07 0.0001343 0 0.0005848 4.816E-05 0 Winter TOG DIURN 0.0215492 0.0474354 0.039466 0.0524923 0.0011389 0.000777297 0.000452039 4.04728E-07 0.0009251 0 1.0161641 0.0009149 0 Winter TOG_HTSK 0.0590463 0.1070647 0.0822246 0.1050586 0.0486776 0.03397517 0.02589573 1.90536E-05 0.0141274 0 0.7245208 0.0089672 0 Winter TOG_IDLEX 0 0 0 0 0.0229339 0.019564793 0.032276559 0.740035456 0.0571689 0 0 0.4484013 0 Winter TOG_RESTL 0.0198567 0.0419828 0.0404451 0.0551569 0.0007008 0.000536423 0.000315611 2.83559E-07 0.0004974 0 0.4000745 0.0005036 0 Winter TOG RUNEX 0.004462 0.0137302 0.0103144 0.010908 0.0273918 0.036185497 0.011901601 0.020050237 0.0153688 4.5811689 2.8359528 0.0597671 0.0637559 Winter TOG_RUNLS 0.1857526 0.4309658 0.3478602 0.3870534 0.3364826 0.188307734 0.13429869 9.57074E-05 0.1665831 0 1.5631084 0.0688283 0 Winter TOG STREX 0.1206057 0.1760508 0.181903 0.2107974 0.0405661 0.032296213 0.063793169 6.39679E-07 0.0824371 0 2.0620489 0.038302 0 1 Source: California Air Resources Board. EMFAC2017 Web Database. https://www.arb.ca.gov/emfac/1017/, California Air Pollution Control Officers Association (CAPCOA). 2017, November. California Emissions Estimator Model User's Guide, Version 2016.3.2, Appendix A. 2 Unless otherwise noted, per CaIEEMod methodology, the calculated CaIEEMod emission rates are derived from the emission rates obtained using the EMFAC2017 Web Database for the Riverisde (55) region. 3 Because EMFAC2017 provides vehicle trips data for MHDT and HHDT diesel trucks, the formula provided in Appendix A of the CaIEEMod User's Guide in calculating the NO x STREX emission rates are utilized. Travertine Specific Plan Greenhouse Gas Analysis This page intentionally left blank 12188-05 GHG Report LI, URBAN CROSSROADS