PC Resolution 2024-010 Estado (Calle) 3 Mixed-Use BuildingsPLANNING COMMISSION RESOLUTION 2024 - 010
A RESOLUTION OF THE PLANNING COMMISSION OF
THE CITY OF LA QUINTA, CALIFORNIA, APPROVING A
SITE DEVELOPMENT PERMIT FOR THREE 2,839
SQUARE FOOT MIXED-USE BUILDINGS LOCATED AT
78059 CALLE ESTADO
CASE NUMBER:
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
APPLICANT: EVOK STUDIO
WHEREAS, the Planning Commission of the City of La Quinta, California, did, on
July 9, 2024, hold a duly noticed Public Hearing to consider a request by EVOK Studio
for three mixed use buildings located at 78059 Calle Estado, more particularly described as:
APN's 770-152-005, 770-152-006, AND 770-152-007
WHEREAS, the Planning Commission did on June 11, 2024, previously hold a
duly noticed Public Hearing to consider said applications and did vote to continue the
Public Hearing to a date certain of July 9, 2024, to allow the applicant to modify the
architectural plans and enhance the project's compatibility with the Village community; and
WHEREAS, the Design and Development Department published a public hearing
notice in The Desert Sun newspaper on May 30, 2024, as prescribed by the Municipal
Code. Public hearing notices were also mailed to all property owners within 500 feet of
the site; and
WHEREAS, at said Public Hearing, upon hearing and considering all testimony
and arguments, if any, of all interested persons desiring to be heard, said Planning
Commission did make the following mandatory findings pursuant to Section 9.210.010 of
the Municipal Code to justify approval of said Site Development Permit:
1. Consistency with General Plan
- The proposed development is consistent with the General Plan land use
designation of Village Commercial. The City's General Plan policies relating to
the Village encourage the development of a mix of uses to create an integrated,
walkable community that blends residential and commercial development. This
project meets the following Goals, Policies, and Programs:
- Goal LU -7 Innovative land uses in the Village. The project proposes a new
mixed use project within the Village, blending commercial with residential uses
within the future building.
PLANNING COMMISSION RESOLUTION 2024-010
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
Page 2 of 4
- Policy LU -7.1 Encourage the use of mixed use development in appropriate
locations. The proposed mixed use project will be located within the Village
area which is an appropriate area for mixed use in that there are nearby
businesses and services for residents and their visitors to access, reducing the
number of vehicle trips.
- Policy LU -7.7 Continue to allow off-site parking through the payment of in lieu
fees in the Village, as well as other creative parking alternatives. The applicant
will be utilizing the in -lieu fee instead of providing one parking space.
- Program CIR-1.12b Encourages mixed use development to provide optimum
internal connections between uses. The project provides sufficient access
points between residential and commercial through internal and external
corridors. Both residential and commercial users can access the public
sidewalk through the shared pedestrian corridor.
- Program AQ -1.3f Facilitate mixed use development concepts in specific
identified areas to allow a combination of residential and non-residential uses,
such as live -work -shop designs. The project consists of a mixed use
development that facilitates the opportunity for residents to live near commercial
services allowing residents to work within a suitable walking distance.
2. Consistency with Zoning Code
The proposed development, as conditioned, is consistent with the development
standards of the City's Zoning Code in terms of site plan and landscaping. The Site
Development Permit is compliant with the Zoning Code's development standards,
including standards for setbacks, building height, and utilization of a 50% reduction
of parking spaces with the Village Build -Out Area.
3. Compliance with California Environmental Quality Act
The La Quinta Design and Development Department has determined that this
request is consistent with Environmental Assessment 2016-0012 which was
prepared for The Village Build -out Plan.
4. Architectural Design
The architectural design of the project, including, but not limited to, the architectural
style, scale, building mass, materials, colors, architectural details, roof style and
other architectural elements are compatible with surrounding development and
with the quality of design prevalent in the Village area. The modern architecture is
enhanced with wall and roof projections, balconies, and building setbacks to avoid
monotony.
PLANNING COMMISSION RESOLUTION 2024-010
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
Page 3 of 4
5. Site Design
The site design of the project, including project entries, circulation, screening,
exterior lighting, and other site design elements are compatible with surrounding
development and with the quality of design prevalent in the Village area and the
City. The project site plan is integrated into the Village to further create a pedestrian
environment encouraging visitors to stroll and combine visits to multiple
commercial establishments.
6. Landscape Design
The proposed project is consistent with the landscaping standards and plant
palette and implements the standards for landscaping and aesthetics, including
drought tolerant desert landscaping, established in the General Plan and Zoning
Code. The landscape proposed enhances the overall architecture of the building
by creating visual interest within the pedestrian corridor and providing a buffer for
the exterior seating area.
NOW, THEREFORE, BE IT RESOLVED by the Planning Commission of the City
of La Quinta, California, as follows:
SECTION 1. That the above recitations are true and constitute the Findings of the
Planning Commission in this case.
SECTION 2. That the Planning Commission finds the above project consistent with the
previously adopted environmental impact report which was prepared for the Village Build-
out Plan (EA2016-0012).
SECTION 4. That it does hereby approve Site Development Permit 2022-0013, for the
reasons set forth in this Resolution and subject to the attached Conditions of Approval
[Exhibit A].
PASSED, APPROVED, and ADOPTED at a regular meeting of the City of La
Quinta Planning Commission, held on July 9, 2024, by the following vote:
AYES: Commissioners Guerrero, Hassett, McCune, Tyerman, and
Chairperson Nieto
NOES: None
ABSENT: Commissioners Hernandez and Hundt
ABSTAIN: None
PLANNING COMMISSION RESOLUTION 2024-010
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
Page 4 of 4
V_
STEPHN T. NIETO, Cha rperson
City of La Quinta, California
ATTEST:
DANNY CAST , Design and Development Director
City of La Quinta, California
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 1 OF 13
GENERAL
EXHIBIT A
1. The applicant agrees to defend, indemnify and hold harmless the City of La Quinta
("City"), its agents, officers and employees from any claim, action or proceeding to
attack, set aside, void, or annul the approval of this Site Development Permit. The
City shall have sole discretion in selecting its defense counsel.
The City shall promptly notify the applicant of any claim, action or proceeding and
shall cooperate fully in the defense.
2. The Site Development Permit shall expire on July 9, 2026, and shall become null
and void in accordance with La Quinta Municipal Code Section 9.200.080, unless a
building permit has been issued. A time extension may be requested per LQMC
Section 9.200.080.
3. Prior to the issuance of any grading, construction, or building permit by the City, the
applicant shall obtain any necessary clearances and/or permits from the following
agencies, if required:
• Riverside County Fire Marshal
• La Quinta Public Works Department (Grading Permit, Green Sheet (Public
Works Clearance) for Building Permits, Water Quality Management Plan
(WQMP) Exemption Form — Whitewater River Region, Improvement Permit)
• La Quinta Design and Development Department — Planning and Building
Divisions
• Riverside Co. Environmental Health Department
• Desert Sands Unified School District (DSUSD)
• Coachella Valley Water District (CVWD)
• Imperial Irrigation District (IID)
• California Regional Water Quality Control Board (CRWQCB)
• State Water Resources Control Board
• SunLine Transit Agency (SunLine)
• South Coast Air Quality Management District Coachella Valley (SCAQMD)
The applicant is responsible for all requirements of the permits and/or clearances
from the above -listed agencies. When these requirements include approval of
improvement plans, the applicant shall furnish proof of such approvals when
submitting those improvements plans for City approval.
4. The applicant shall comply with applicable provisions of the City's NPDES
stormwater discharge permit, LQMC Sections 8.70.010 et seq. (Stormwater
Management and Discharge Controls), and 13.24.170 (Clean Air/Clean Water);
Riverside County Ordinance No. 457; the California Regional Water Quality Control
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 2 OF 13
Board — Colorado River Basin Region Board Order No. R7-2013-0011 and the State
Water Resources Control Board's Order No. 2009-0009-DWQ and Order No. 2012-
0006-DWQ.
A. For construction activities including clearing, grading or excavation of land
that disturbs one (1) acre or more of land, or that disturbs less than one (1)
acre of land, but which is a part of a construction project that encompasses
more than one (1) acre of land, the Permitee shall be required to submit a
Storm Water Pollution Protection Plan ("SWPPP") to the State Water
Resources Control Board.
B. The applicant shall include provisions for all of the following Best
Management Practices ("BMPs") (LQMC Section 8.70.020 (Definitions)):
1) Temporary Soil Stabilization (erosion control).
2) Temporary Sediment Control.
3) Wind Erosion Control.
4) Tracking Control.
5) Non -Storm Water Management.
6) Waste Management and Materials Pollution Control.
D. The BMPs shall remain in effect for the entire duration of project construction
until all improvements are completed and accepted by the City Council.
E. The provision for the funding and perpetual maintenance and operation of all
post -construction BMPs as required.
5. Permits issued under this approval shall be subject to the provisions of the
Development Impact Fee and Transportation Uniform Mitigation Fee programs in
effect at the time of issuance of building permit(s).
6. Developer shall reimburse the City, within thirty (30) days of presentment of the
invoice, all costs and actual attorney's fees incurred by the City Attorney to review,
negotiate and/or modify any documents or instruments required by these conditions,
if Developer requests that the City modify or revise any documents or instruments
prepared initially by the City to effect these conditions. This obligation shall be paid
in the time noted above without deduction or offset and Developer's failure to make
such payment shall be a material breach of the Conditions of Approval.
7. Developer shall reimburse the City, within thirty (30) days of presentment of the
invoice, all costs and actual consultant's fees incurred by the City for engineering
and/or surveying consultants to review and/or modify any documents or instruments
required by this project. This obligation shall be paid in the time noted above without
deduction or offset and Developer's failure to make such payment shall be a
material breach of the Conditions of Approval.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 3 OF 13
PROPERTY RIGHTS
8. Prior to issuance of any permit(s), the applicant shall acquire or confer easements
and other property rights necessary for the construction or proper functioning of the
proposed development.
9. A separate drywell is required for each parcel, or a drainage easement is required
for flow to cross property line(s). Applicant shall comply with this condition prior to
issuance of grading permit.
10. The applicant shall offer for dedication all public street rights-of-way in conformance
with the City's General Plan, Municipal Code, applicable specific plans, and/or as
required by the City Engineer.
11. When the City Engineer determines that access rights to the proposed street rights-
of-way shown on the approved Site Development Permit are necessary prior to
approval of the improvements dedicating such rights-of-way, the applicant shall
grant the necessary rights-of-way within 60 days of a written request by the City.
12. Where public facilities (e.g., sidewalks) are placed on privately -owned setbacks, the
applicant shall offer for dedication blanket easements for those purposes.
13. The applicant shall offer for dedication those easements necessary for the
placement of, and access to, utility lines and structures, drainage basins, mailbox
clusters, and common areas.
14. Direct vehicular access is restricted, except for those access points identified on the
Site Development Permit, or as otherwise conditioned in these conditions of approval.
15. The applicant shall furnish proof of easements, or written permission, as
appropriate, from those owners of all abutting properties on which grading, retaining
wall construction, permanent slopes, or other encroachments will occur.
BUILDING PLANS
16. Plans shall be prepared to the applicable code at the time of submittal for the
building permit. As of January 1, 2023, these are the 2022 California Building
Codes.
17. Commercial projects are required to be prepared by a Licensed Architect or
Engineer. On each sheet of construction documents provide the preparer's name
and telephone number and electronic -signature and his/her stamp as prescribed by
California Business and Professions Code '5536.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 4 OF 13
18. This project does not qualify to be constructed under the provisions of the California
Residential Code, please remove all references to the CRC from the cover sheet,
and revise compliance to the California Building Code.
19. An allowable area analysis for the entire structure, including covered areas, shall
demonstrate compliance with Chapters 5, 6 and 7 of the California Building Code -
"Patio Cover" is a residential code term only, the proposed structure is intended to
be occupied and is required to comply as building area. Structures shall be
classified with respect to occupancy and type of construction. There appear to be
combustible materials proposed, please update the construction type if Type IIB is
unable to be achieved.
20. Proposed construction material and fire -resistance ratings shall comply with the
Building Elements Tables 601 and 705.5 for building elements and exterior wall
ratings, and Table 705.8 for opening protection requirements.
21. Based on the fire -separation distance shown an exterior wall fire -resistance rating is
required and the amount of unprotected openings is limited, provide requested
information to demonstrate compliance on plans. The percentage of opening for the
setback distance and include not just window openings but also openings to covered
and carport areas in the overall plain of the building's exterior wall.
22. Parapets shall be provided on exterior walls of buildings, unless construction
complies specifically with any of the applicable Exceptions of Section 705.11.
23. The cover sheet shows the buildings as being non-sprinklered. However, sprinklers
will be required based on occupancy types and building area -please revise.
24. Means of Egress Analysis detailing the Exit Access, the Exit and the Exit Discharge,
including dimensioning widths and paths of egress travel, occupant loads, rated
construction, stair design compliance and accessible egress shall comply with
Chapter 10 & 11B of the California Building Code.
25. Proposed buildings are a Place of Public Accommodation and are required to be
accessible to persons with disabilities in accordance with Chapter 11B of the
California Building Code, and other relevant State and Federal Laws.
26. Photovoltaic and Energy Storage System Required. Requirements exist for both
Non-residential and Multi -Family residential PV and ESS. Applies to Grocery, Office,
Unleased Tenant Space, Retail, Warehouse, Auditorium, Convention Center,
Hotel/Motel, Library, Medical, Restaurant, Theater, Apartments and Low-rise
Residential. Design for all occupancy groups as applicable to the California Energy
Code.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 5 OF 13
PARKING
27. The project is required to incorporate 15 parking spaces. These 15 spaces include:
A. Six (6) spaces in residential garages.
B. Eight (8) on -street parking spaces located immediately adjacent to the project
site, per LQMC Section 9.150.050 (B)(1). These parking spaces are within
the public right-of-way and are not intended for the exclusive use of the
project.
C. One (1) parking space provided through payment into the Parking In -Lieu
Program. Payment is required prior to the issuance of the first building
permit. The parking in -lieu fee amount is $10,600 per space, pursuant to the
Director's determination Memo dated August 28, 2014, and on file with the
Design and Development Department.
28. The design of parking facilities shall conform to LQMC Chapter 9.150 and in
particular the following:
A. On-site parking spaces shall conform to LQMC Chapter 9.150. Parking
Spaces in residential garages shall provide ten feet in width and 20 feet in
depth.
B. Cross slopes should be a maximum of 2% where accessibility is required
including accessibility routes between buildings.
C. Building access points shall be shown on the Precise Grading Plans to
evaluate accessibility issues.
D. Accessibility routes to public streets and adjacent development shall be
shown on the Precise Grading Plan.
IMPROVEMENTS
29. The applicant shall submit current mix designs (less than two years old at the time of
construction) for base, asphalt concrete and Portland cement concrete. The
submittal shall include test results for all specimens used in the mix design
procedure. For mix designs over six months old, the submittal shall include recent
(less than six months old at the time of construction) aggregate gradation test
results confirming that design gradations can be achieved in current production. The
applicant shall not schedule construction operations until mix designs are approved.
30. Improvements shall include appurtenances such as traffic control signs, markings
and other devices, raised medians if required, street name signs and sidewalks.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 6 OF 13
31. Improvements shall be designed and constructed in accordance with City adopted
standards, supplemental drawings and specifications, or as approved by the City
Engineer. Improvement plans shall be stamped and signed by engineers registered
in California.
IMPROVEMENT PLANS
As used throughout these Conditions of Approval, professional titles such as "engineer,"
"surveyor," and "architect," refer to persons currently certified or licensed to practice their
respective professions in the State of California.
32. Improvement plans shall be prepared by or under the direct supervision of qualified
engineers and/or architects, as appropriate, and shall comply with the provisions of
LQMC Section 13.24.040 (Improvement Plans).
33. The following improvement plans shall be prepared and submitted for review and
approval by the Design and Development Department. A separate set of plans for
each line item specified below shall be prepared. The plans shall utilize the
minimum scale specified, unless otherwise authorized by the City Engineer in
writing. Plans may be prepared at a larger scale if additional detail or plan clarity is
desired. Note, the applicant may be required to prepare other improvement plans
not listed here pursuant to improvements required by other agencies and utility
purveyors.
A. On -Site Precise Grading Plan 1" = 20' Horizontal
B. Green Sheet for PM -10 Dust Control
Other engineered improvement plans prepared for City approval that are not listed
above shall be prepared in formats approved by the City Engineer prior to
commencing plan preparation.
All Off -Site Plan & Profile Street Plans and Signing & Striping Plans shall show all
existing improvements for a distance of at least 200 -feet beyond the project limits, or
a distance sufficient to show any required design transitions.
All On -Site Signing & Striping Plans shall show, at a minimum; Stop Signs, Limit
Lines and Legends, No Parking Signs, Raised Pavement Markers (including Blue
RPMs at fire hydrants) and Street Name Signs per Public Works Standard Plans
and/or as approved by the Public Works Department.
"On -Site Precise Grading" plan is required to be submitted for approval by the
Building Official, Planning Manager and the City Engineer.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 7 OF 13
"On -Site Precise Grading" plans shall normally include all on-site surface
improvements including but not limited to finish grades for curbs & gutters, building
floor elevations, wall elevations, parking lot improvements and accessibility
requirements.
34. The City maintains standard plans, detail sheets and/or construction notes for
elements of construction which can be accessed via the Public Works section of the
City website (www.laquintaca.gov). Please navigate to the Public Works home page
and look for the Standard Drawings hyperlink.
35. Upon completion of construction, and prior to final acceptance of the improvements
by the City, the applicant shall furnish the City with reproducible record drawings of
all improvement plans which were approved by the City. Each sheet shall be clearly
marked "Record Drawing" and shall be stamped and signed by the engineer or
surveyor certifying to the accuracy and completeness of the drawings. The applicant
shall have all approved mylars previously submitted to the City, revised to reflect the
as -built conditions. The applicant shall employ or retain the Engineer of Record
during the construction phase of the project so that the EOR can make site visits in
support of preparing "Record Drawing". However, if subsequent approved revisions
have been approved by the City Engineer and reflect said "Record Drawing"
conditions, the Engineer of Record may submit a letter attesting to said fact to the
City Engineer in lieu of mylar submittal.
GRADING
36. The applicant shall comply with the provisions of LQMC Section 13.24.050 (Grading
Improvements).
37. Prior to occupancy of the project site for any construction, or other purposes, the
applicant shall obtain a grading permit approved by the City Engineer.
38. To obtain an approved grading permit, the applicant shall submit and obtain
approval of all of the following:
A. A grading plan prepared by a civil engineer registered in the State of
California,
B. A preliminary geotechnical ("soils") report prepared by an engineer registered
in the State of California,
C. A Fugitive Dust Control Plan prepared in accordance with LQMC Chapter
6.16, (Fugitive Dust Control), and
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 8 OF 13
All grading shall conform with the recommendations contained in the Soils Report
and shall be certified as being adequate by soils engineer, or engineering geologist
registered in the State of California.
39. In the event the applicant fails to construct the improvements for the development or
fails to satisfy its obligations for the development in a timely manner, pursuant to the
approved plan, the City shall have the right to halt issuance of all permits, and/or
final inspections, or withhold other approvals related to the development of the
project.
40. The applicant shall maintain all open graded, undeveloped land in order to prevent
wind and/or water erosion of such land. All open graded, undeveloped land shall
either be planted with interim landscaping, or stabilized with such other erosion
control measures, as were approved in the Fugitive Dust Control Plan.
41. Grading within the perimeter setback and parkway areas shall have undulating
terrain and shall conform with the requirements of LQMC Section 9.60.240(F)
except as otherwise modified by this condition requirement. The maximum slope
shall not exceed 3:1 anywhere in the landscape setback area, except for the
backslope (i.e. the slope at the back of the landscape lot) which shall not exceed 2:1
if fully planted with ground cover. The maximum slope in the first six (6) feet
adjacent to the curb shall not exceed 4:1 when the nearest edge of sidewalk is
within six feet (6') of the curb, otherwise the maximum slope within the right of way
shall not exceed 3:1. All unpaved parkway areas adjacent to the curb shall be
depressed one and one-half inches (1.5") in the first eighteen inches (18") behind
the curb.
42. Building pad elevations on the precise grading plan submitted for City Engineer's
approval shall conform with pad elevations shown on the Site Development Permit
Preliminary Grading Plans, unless the pad elevations have other requirements
imposed elsewhere in these Conditions of Approval.
43. Prior to any site grading or regrading that will raise or lower any portion of the site by
more than plus or minus half of a foot (0.5') from the elevations shown on the
approved Site Development Permit, the applicant shall submit the proposed grading
changes to the City Engineer for approval through a substantial conformance
review.
44. Prior to the issuance of a building permit for any building lot, the applicant shall
provide a lot pad certification stamped and signed by a qualified engineer or
surveyor with applicable compaction tests and over excavation documentation.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 9 OF 13
Each pad certification shall list the pad elevation as shown on the approved grading
plan, the actual pad elevation and the difference between the two, if any. Such pad
certification shall also list the relative compaction of the pad soil.
DRAINAGE
45. Stormwater handling shall conform with the approved hydrology and drainage report
for SDP 2022-0013, or as approved by the City Engineer. Nuisance water shall be
disposed of in an approved manner.
46. The applicant shall comply with the provisions of LQMC Section 13.24.120
(Drainage), Retention Basin Design Criteria, Engineering Bulletin No. 06-16 —
Hydrology Report with Preliminary Hydraulic Report Criteria for Storm Drain
Systems and Engineering Bulletin No. 06-015 - Underground Retention Basin
Design Requirements. More specifically, stormwater falling on site during the 10
year storm in the Village area shall be retained within the development, unless
otherwise approved by the City Engineer. The design storm shall be either the 1
hour, 3 hour, 6 hour or 24 hour event producing the greatest total run off.
47. Nuisance water shall be retained on site. Nuisance water shall be disposed of per
approved methods contained in Engineering Bulletin No. 06-16 — Hydrology Report
with Preliminary Hydraulic Report Criteria for Storm Drain Systems and Engineering
Bulletin No. 06-015 - Underground Retention Basin Design Requirements.
48. In design of retention facilities, the maximum percolation rate shall be two inches per
hour. The percolation rate will be considered to be zero unless the applicant
provides site specific data indicating otherwise and as approved by the City Engineer.
49. No fence or wall shall be constructed around any retention basin unless approved
by the Planning Manager and the City Engineer.
50. For on-site above ground common retention basins, retention depth shall be
according to Engineering Bulletin No. 06-16 — Hydrology Report with Preliminary
Hydraulic Report Criteria for Storm Drain Systems. Side slopes shall not exceed 3:1
and shall be planted with maintenance -free ground cover. Additionally, retention
basin widths shall be not less than 20 feet at the bottom of the basin or as approved
by the City Engineer.
51. Stormwater may not be retained in landscaped parkways or landscaped setback
lots. Only incidental storm water (precipitation which directly falls onto the setback)
will be permitted to be retained in the landscape setback areas. The perimeter
setback and parkway areas in the street right-of-way shall be shaped with berms
and mounds, pursuant to LQMC Section 9.100.040(6)(7).
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 10 OF 13
52. The design of the development shall not cause any increase in flood boundaries and
levels in any area outside the development.
53. The development shall be graded to permit storm flow in excess of retention
capacity to flow out of the development through a designated overflow and into the
historic drainage relief route.
54. Storm drainage historically received from adjoining property shall be received and
retained or passed through into the historic downstream drainage relief route.
55. The applicant shall comply with applicable provisions for post construction runoff per
the City's NPDES stormwater discharge permit, LQMC Sections 8.70.010 et seq.
(Stormwater Management and Discharge Controls), and 13.24.170 (Clean Air/Clean
Water); Riverside County Ordinance No. 457; and the California Regional Water
Quality Control Board — Colorado River Basin (CRWQCB-CRB) Region Board Order
No. R7-2013-0011.
UTILITIES
56. The applicant shall comply with the provisions of LQMC Section 13.24.110 (Utilities).
57. The applicant shall obtain the approval of the City Engineer for the location of all
utility lines within any right-of-way, and all above -ground utility structures including,
but not limited to, traffic signal cabinets, electric vaults, water valves, and telephone
stands, to ensure optimum placement for practical and aesthetic purposes.
58. Existing overhead utility lines within, or adjacent to the proposed development, and
all proposed utilities shall be installed underground.
The 92 KV transmission power poles and all existing utility lines attached to joint use
92 KV transmission power poles are exempt from the requirement to be placed
underground.
59. Underground utilities shall be installed prior to overlying hardscape. For installation
of utilities in existing improved streets, the applicant shall comply with trench
restoration requirements maintained, or required by the City Engineer.
The applicant shall provide certified reports of all utility trench compaction for
approval by the City Engineer. Additionally, grease traps and the maintenance
thereof shall be located so as to not conflict with access aisles/entrances.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 11 OF 13
FIRE
60. Fire Hydrants and Fire Flow: Prior to building permit issuance, provide
documentation showing a water system capable of delivering 1,000 GPM at 20 psi.
The minimum number and location of fire hydrants shall comply with the CFC.
Reference 2022 California Fire Code (CFC) 507.5.1.
61. Fire Department Access: Fire lane marking and/or signage shall be provided to
restrict the obstruction of the required fire lane. The existing fire lane on Calle
Estado and any trees located next to the driveway shall be maintained to provide a
minimum vertical unobstructed clearance of 13 feet, 6 inches. CFC 503
62. Traffic Calming Devices - Requests for installation of traffic calming designs/devices
on fire apparatus access roads shall be submitted to the Office of the Fire Marshal
for approval. Reference CFC 503.4.1
63. Building Permit Review - Submittal of construction plans to the Fire Department will
be required. Final fire and life safety conditions will be addressed when the Fire
Department reviews these plans. These conditions will be based on California Fire
Code, California Building Code (CBC), and related codes/standards adopted at the
time of construction plan submittal. Reference CFC 105.1
64. Residential Fire Sprinklers: Residential fire sprinklers are required in all one and
two-family dwellings per the California Residential Code (CRC). Plans must be
submitted to the Office of the Fire Marshal for review and approval prior to
installation. Ref. CRC 313.2
65. Fire Alarm and Detection System: A water flow monitoring system and/or fire alarm
system may be required and determined at time of building plan review. Ref. CFC
903.4, CFC 907.2 and NFPA 72
66. Knox Box and Gate Access: Buildings shall be provided with a Knox Box. The Knox
Box shall be installed in an accessible location approved by the Office of the Fire
Marshal. All electronically operated gates shall be provided with Knox key switches
and automatic sensors for access. Ref. CFC 506.1
67. Addressing: All residential dwellings shall display street numbers in a prominent
location on the street side of the residence. All commercial buildings shall display
street numbers in a prominent location on the address side and additional locations
as required. Ref. CFC 505.1 and County of Riverside Office of the Fire Marshal
Standard #07-01
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 12 OF 13
CONSTRUCTION
68. The City will conduct final inspections of habitable buildings only when the buildings
have improved streets and (if required) sidewalk access to publicly maintained
streets. The improvements shall include the required traffic control devices,
pavement markings and street name signs.
LANDSCAPE AND IRRIGATION
69. The applicant shall comply with LQMC Sections 13.24.130 (Landscaping Setbacks)
& 13.24.140 (Landscaping Plans).
70. Landscape and irrigation plans for landscaped lots and setbacks, medians, retention
basins, and parks shall be signed and stamped by a licensed landscape architect.
71. All new and modified landscape areas shall have landscaping and permanent
irrigation improvements in compliance with the City's Water Efficient Landscape
regulations contained in LQMC Section 8.13 (Water Efficient Landscape).
72. Lighting plans shall be submitted with the final landscaping plans for a
recommendation to the Planning Manager for her approval. Exterior lighting shall be
consistent with LQMC Section 9.100.150 (Outdoor Lighting). All freestanding lighting
shall not exceed 18 feet in height and shall be fitted with a visor if deemed
necessary by staff to minimize trespass of light off the property. The illuminated
carports shall be included in the photometric study as part of the final lighting plan
submittal.
73. All water features shall be designed to minimize "splash" and use high efficiency
pumps and lighting to the satisfaction of the Design and Development Director. They
shall be included in the landscape plan water efficiency calculations per Municipal
Code Chapter 8.13.
74. All rooftop mechanical equipment shall be completely screened from view. Utility
transformers or other ground mounted mechanical equipment shall be fully screened
with a screening wall or landscaping and painted to match the adjacent buildings.
75. The applicant shall submit the final landscape plans for review, processing and
approval to the Design and Development Department, in accordance with the Final
Landscape Plan application process. Planning Manager approval of the final
landscape plans is required prior to issuance of the first building permit unless the
Planning Manager determines extenuating circumstances exist which justifies an
alternative processing schedule.
PLANNING COMMISSION RESOLUTION 2024-010
CONDITIONS OF APPROVAL - ADOPTED
SITE DEVELOPMENT PERMIT 2022-0013
PROJECT: CALLE ESTADO MIXED USE BUILDINGS
LOCATION: 78059 CALLE ESTADO
ADOPTED: JULY 9, 2024
PAGE 13 OF 13
NOTE: Plans are not approved for construction until signed by the appropriate City
official, including the Planning Manager and/or City Engineer.
76. The applicant or his agent has the responsibility for proper sight distance
requirements per guidelines in the American Association of State Highway and
Transportation Officials (AASHTO) "A Policy on Geometric Design of Highways and
Streets" latest edition, in the design and/or installation of all landscaping and
appurtenances abutting and within the private and public street right-of-way.
77. The final design of the perimeter landscaping, particularly the perimeter wall, shall
be included with the Final Landscape Plan submittal.
MAINTENANCE
78. The applicant shall comply with the provisions of LQMC Section 13.24.160
(Maintenance).
79. The applicant shall make provisions for the continuous and perpetual maintenance
of all private on-site improvements, perimeter landscaping, access drives,
sidewalks, and stormwater BMPs.
FEES AND DEPOSITS
80. The applicant shall comply with the provisions of LQMC Section 13.24.180 (Fees
and Deposits). These fees include all deposits and fees required by the City for plan
checking and construction inspection. Deposits and fee amounts shall be those in
effect when the applicant makes application for plan check and permits.