2024-25 Ortiz Enterprises - Project 2011-05 Dune Palms Bridge - Change Order No. 9ta0"fra CALIFORNIA - Sheet 1 of 2 CONTRACT: Dune Palms Road Bridge Improvement Project PROJECT M 2011-05 CONTRACTOR: ORTIZ ENTERPRISES, INC. 6 Cushing Suite 200 Irvine, CA 92618-4221 CONTRACT CHANGE ORDER NO. 009 Pursuant to the terms of the original Contract Agreement, you are hereby directed to make the herein described changes or do the following described work not included in the plans and specifications for this Contract. Unless otherwise stated all work shall conform to the terms, general conditions, and special provisions of the original Contract. DESCRIPTION OF CHANGE During over excavation for the footing area of retaining walls type 1A and retaining wall No. 4, pumping material was discovered that could not pass compaction requirements. Area was scarified and given time to dry out, but after re -compaction, material could still not achieve compaction requirements. Contractor was notified to excavate pumping material to 1' depth and replace with class 2 base material. Cost of excavation, replacement with base material and compaction was tracked on a time and material basis as extra work at force account. Total amount was agreed to be $ 13,511.13 and payment shall be as agreed price lump sum. Upon completion and acceptance of quantities installed, payment will be made as tracked in the field. Price total will constitute full and complete compensation, including markups for construction work and delays incurred. Current Contract Amount $ 21,965,199.18 Add This Change Order No. 009 $ 13,511.13 Revised Contract Total $ 21,978,710.31 ta "NW CALIFORNIA By reason of this contract change order the time of completion is adjusted as follows: - 0 - days added to contract time. The contract completion date shall remain: 02/20/2025 Submitted By: A n ( ep t, 202412:57 PDT) Date: 9/24/25 Ertiv Mcklr ire Approved By: Bryanl11'kinney(Sep 30,202413 PDT) Date: We, the undersigned Contractor, have given careful consideration to the change proposed and hereby agree, if this proposal is approved, that we will provide all equipment, furnish all materials, perform all labor, except as may be noted above, and perform all servic s necessary to complete the above specified work, and hereby accept as full payment the amount shown above, which includ s all direct apg indirect overhead expenses for any delays. Accepted By: AIEJared Ramsey Title: Project Engineer Contractor: V Ortiz Enterprises, Inc. Date: 9-24-24 2011-05 Change Order No. 9 Final Audit Report 2024-09-30 Created: 2024-09-30 By: Carley Escarrega (cescarrega@laquintaca.gov) Status: Signed Transaction ID: CBJCHBCAABAAm2gRIEUOv38gJm_88sPaYWYOjrf7ilSt "2011-05 Change Order No. 9" History Document created by Carley Escarrega (cescarrega@laquintaca.gov) 2024-09-30 - 7:49:28 PM GMT Document emailed to uayon@laquintaca.gov for signature 2024-09-30 - 7:50:37 PM GMT Email viewed by uayon@laquintaca.gov 2024-09-30 - 7:52:08 PM GMT i1 Signer uayon@laquintaca.gov entered name at signing as Ubaldo Ayon 2024-09-30 - 7:57:25 PM GMT Document e -signed by Ubaldo Ayon (uayon@laquintaca.gov) Signature Date: 2024-09-30 - 7:57:27 PM GMT - Time Source: server Document emailed to bmckinney@laquintaca.gov for signature 2024-09-30 - 7:57:29 PM GMT Email viewed by bmckinney@laquintaca.gov 2024-09-30 - 7:57:54 PM GMT Signer bmckinney@laquintaca.gov entered name at signing as Bryan Mckinney 2024-09-30 - 8:22:34 PM GMT i1 Document e -signed by Bryan Mckinney (bmckinney@laquintaca.gov) Signature Date: 2024-09-30 - 8:22:36 PM GMT - Time Source: server Agreement completed. 2024-09-30 - 8:22:36 PM GMT Q Adobe Acrobat Sign