Loading...
BSOL2022-0508BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 08/17/2022 ISSUED DATE: 03/24/2023 Permit Type: Permit Number: Property Address: APN: Legal Description Property Zoning: Valuation: Solar 50660 BREVA ST BSOL2022-0508 776330008 $0.00 Owner:NOVA HOMES INC DBA INLAND DEVELOPMENT 1232 VILLAGE WAY STE A, SANTA ANA, CA 92705 Applicant:Alan B Vargas 1232 Village Way, Santa Ana, CA 92705 Contractor:Alan B Vargas / 828225 1232 Village Way, Santa Ana, CA 92705 Declaration / Acknowledgement PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER-BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors’ State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors’ State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors’ State License Law does not apply to an owner of property who, through employees’ or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner-Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors’ State License Law. As an Owner-Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner-builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS’ COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS’ COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY’S FEES. 1) Has and will maintain a certificate of consent to self-insure for workers’ compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers’ compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers’ compensation laws of California, and agree that, if should become subject to the workers’ compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above-mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: November 21, 2024 Page 1 of 3 Permit Type: Permit Number: Property Address: Solar BSOL2022-0508 50660 BREVA ST BUILDING PERMIT NOVA HOMES/8.14KW PV SYSTEM(22) 370W MODULES/(1) INV. N-200A *** 8.14 kW SOLAR ARRAY - (22) 370W PTOS DNA-120-MF26 BB MODULES+SOLAR EDGE SE7600 POWER OPTIMIZERS SE P960 + NEW MAIN SERVICE PANEL 200A [440SF] 2019 CALIFORNIA ELECTRICAL CODE. Use of Permit Construction Details 8.14System Size (kW DC)2PV Strings (EA)1PV Miscellaneous Equipment EA Valuation Details Type Group Sq Ft Value Financial Information Fee AmountFee Amount PaidInvoice No. PERMIT-BSOL2022-050 8 $27.79 PV SYSTEM LESS THAN 10KW PC $27.79 $27.79 PV SYSTEM LESS THAN 10KW $27.79 $11.00 RECORDS MANAGEMENT FEE $11.00 $105.60 PERMIT ISSUANCE $105.60 $27.79 PV SYSTEM MISC EQUIPMENT $27.79 $5.00 TECHNOLOGY ENHANCEMENT FEE $5.00 $27.79 PV SYSTEM MISC EQUIPMENT PC $27.79 $232.76 $232.76 Total for Invoice PERMIT-BSOL2022-0508 Grand Total for Permit $232.76 $232.76 Workflow / Inspections Workflow Step / Action Name Action Type Inspection Status Inspector Inspection End Date Application Completeness Check v.1 Generic ActionSubmittal Document Verification v.1 Plan Check v.1 Receive SubmittalBuilding Review (1 Day) v.1 Permit Issuance v.1 Generic ActionVerify Contractor info & Conditions have been met v.1 Generic ActionVerify & Invoice Fees v.1 Generic ActionVerify Fee Payment & Issue Permit v.1 Create ReportPrint, Attach, and Email Building Permit v.1 Solar Inspections v.1 InspectionRough Electrical v.1 InspectionRough Plumbing v.1 InspectionTemp Use of Permanent Power v.1 Inspections - Final v.1 Inspection Disapproved 01/17/2024Solar Final v.1 Julio Anaya Inspection Approved 02/07/2024Solar Final v.2 Julio Anaya Printed: November 21, 2024 Page 2 of 3 Permit Type: Permit Number: Property Address: Solar BSOL2022-0508 50660 BREVA ST BUILDING PERMIT Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. Inspections A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. Certificate of Occupancy A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Service Utilities Printed: November 21, 2024 Page 3 of 3 SOLAR PLAN 2 01-05-23 SOLAR CORRECTION 8.14 kW SOLAR ARRAY - (22) 370W PTOS DNA-120-MF26 BB MODULES+SOLAR EDGE SE7600 POWER OPTIMIZERS SE P960 + NEW MAIN SERVICE PANEL 200A [440SF] 2019 CALIFORNIA ELECTRICAL CODE. 03/10/2023Deisy Mendez BSOL2022-0508 03/10/2023Deisy Mendez BSOL2022-0508 SOLAR PLAN MAXIMUM VOLTAGE: 41.4V MAXIMUM CIRCUIT CURRENT: 23.73A MAXIMUM RATED OUTPUT OF DC-TO-DC CONVERTER: 15A FMC 03/10/2023Deisy Mendez BSOL2022-0508 MIN. 2x4 TRUSS TOPCHORD PER PLANROOF TILEPER ARCH.2METALBIRDSTOPMODULECOMP. SHINGLEMODULEROOFSHEATHINGROOF SHEATHINGCOMP.SHINGLETRUSSTOP CHORD5/16" Ø x 3"STAINLESS (A307)LAG SCREW w/ MIN. 2"PENETRATION, TYP.MODULARPANELMODULARRAILSEALANT BYOTHERS1TYPICAL ROOF LAYOUTMODULAR PANEL CONNECTIONMETAL BIRDSTOP BYOTHERSCOMP.SHINGLESBELOWPANELSROOF TILEPER PLANNOTES:1.REFER TO MANUFACTURER'S SPECIFICATIONS FOR INFORMATION NOT SHOWN.2.MODULAR PANEL CONNECTION HARDWARE TO BE PROVIDED BY OTHERS.3.RAIL TO ROOF CONNECTIONS TO OCCUR AT 24" o/c AND BE FASTENED TO A ROOF TRUSS BELOW PER DETAIL 2 BELOW.SCALE : N.T.S.LOT 8SOLAR LAYOUT PLANPANEL INSTALLLOCATIONSheet:Project Number:201699REVISIONSNo.DescriptionDateStamp:Issue Date:01/31/23Engineer:Drafter:DTNTGCITRUS CLUB AT THE GOLD RESERVE SOLAR (LOT 8) LA QUINTA, CA. 92253 INLAND DEVELOPMENT 1232 VILLAGE WAY, SUITE A SANTA ANA, CA. 92705 43180 Business Park Dr.,Suite 200Temecula, CA 92590P: 951-695-7101F: 951-848-091703/10/2023Deisy MendezBSOL2022-0508 Building Department Submittal Citrus Club at the Gold Reserve Solar (Lot 8) La Quinta, California Sign Date:December 5, 2022 Job #: 201699 43180 Business Park Dr., Suite 200, Temecula, CA 92590 Phone 951.695.7101 Fax 951.848.0917 03/10/2023Deisy Mendez BSOL2022-0508 8.14 kW SOLAR ARRAY - (22) 370W PTOS DNA-120-MF26 BB MODULES+SOLAR EDGE SE7600 POWER OPTIMIZERS SE P960 + NEW MAIN SERVICE PANEL 200A [440SF] 2019 CALIFORNIA ELECTRICAL CODE. Project Design Criteria: ASCE 7-16 - Components & Cladding Job Name:Breva St. - Lot 8 Risk Cat.:II Wind Speed:110 mph Pressure, Pnet30 :40.2 psf ASCE 7-16, Figure 30.4-1 Adjustment Factor, ƛ:1.3 ASCE 7-16, Figure 30.4-1 Topo Factor, Kzt:1.0 ASCE 7-16, Section 26.8 Uplift Pressure, P = ƛ Kzt Pnet30 =psf ASCE7-16, eq. 30.4-1 Connection Analysis: Panel Dimensions: 4' x 8'Connection Hardware:(1) - 5/16" φ lag screw w/ min. 2" embed. Truss spacin:2' o/c Min. 1/4" steel side member Tributary Area, A = (L)(W/2) = 8 sf Uplift force, U = 415 lbs. per connection Withdrawal Capacity = 266 lbs. per inch of penetration NDS Table 12.2A Uplift Force, U =415 lbs. per conn.<lbs. per connection OK! - Provide (1) - 5/16" φ lag screw with minimum embedment of 2" to truss below. - Truss manufacturer to verify connection to Truss top chord is acceptable. - Truss manufacturer to verify truss design for additional uplift due to solar panel connection. - Roof tiles to be removed below solar panels. -Design of connection hardware to be by others. Roof-Top Solar Panel Anchorage Design 51.9 532 1 DESIGN & DEVELOPMENT D EPARTMENT 78-495 C ALLE T AMPICO L A Q UINTA , CALIFORNIA 92253 (760) 777 -7 125 FAX (760) 777 -7011 Residential Plan Check Correction List (SOLAR) Page 1 of 3 RESIDENTIAL PLAN CHECK CORRECTION LIST (SOLAR) DATE: 1/5/2022 STATUS: SECOND REVIEW PLAN CHECKED BY: JAKE FUSON TELEPHONE NUMBER: 760-777-7081 ADDRESS: 50-660 BREVA ST DESCRIPTION: PV SOLAR SYSTEM APPLICANT: INLAND DEVELOPMENT PLAN CHECK #: BSOL2022-0508 This submittal has been checked for compliance with the 2019 California Building Codes and the City of La Quinta Municipal Code. APPLICANT: BUILDING DEPARTMENT STAFF: The following items are being returned to you for correction: THIS CORRECTION LIST DO NOT accept any resubmittal unless ALL of the following items are included: WRITTEN RESPONSES TO THIS CORRECTION LIST REVISED PLAN SET STRUCTURAL CALCULATIONS/ENGINEERING INSTRUCTIONS TO APPLICANT: 1) Provide a written response to each comment on the following pages, noting specifically where the correction can be found. Responses such as, “Sheet A-3,” or, “Handrails shall be per CBC Section 1003,” are not acceptable. Show or note specifically how compliance with a code requirement is achieved. Responses such as, “Added note 16 on sheet A-3” are appropriate and will help expedite your back check. 2) Corrections may not be made by handwriting on existing drawings. Revise originals and reprint Plans and/or Calculations as necessary. 3) Return all red-marked Plans and/or Calculations with your resubmittal. 4) Each sheet of resubmitted Plans and/or Calculations shall include the preparer’s name and telephone number and shall be wet-signed by the preparer. If the preparer is a licensed architect or engineer, all documents prepared by that licensed individual shall also bear his/her stamp as prescribed by California Business and Professions Code Section 5536. Resubmittals will not be accepted with signatures missing. 5) Return this list, your written responses, and all documents listed above with your resubmittal. Residential Plan Check Correction List (SOLAR) Page 2 of 3 SECTION A - GENERAL 1) Sheet Index does not reflect actual sheets in plans, please ensure sheets are in the correct order. 2nd REVIEW COMMENT: Sheet SP-1.0 is still missing from the set. SECTION B – SOLAR 1) The service equipment rating does not match the approved plans for the dwelling. (CRC R106.1) 2nd REVIEW COMMENT: Comment remains, dwelling plans show a 200A main service panel. 2) Roof access, pathways and setback requirements shall be provided in accordance with Sections R324.6.1 through R324.6.2.1. (CRC R324.6) Show all required clearances on the plans and provide dimensions. 2nd REVIEW COMMENT: Comment remains, dimensions of clearances still not shown on plans. 3) Where PV system dc circuits run inside a building they shall be contained in metal raceways, Type MC metal-clad cable that complies with 250.118(10), or metal enclosures from the point of penetration of the surface of the building to the first readily accessible disconnecting means. (CEC §690.31(G)) Provide compliant raceways or other components at the PV output circuit. 2nd REVIEW COMMENT: Plans specify a metallic raceway for the PV wire sections between the modules and the inverter—what type of metallic raceway? EMT? RMC? Please revise to specify the conduit type. 4) Please clarify the location of the conduit/conductor runs (i.e. on roof, in attic, etc). (CRC R106.1) 2nd REVIEW COMMENT: Comment remains, location of conduit runs still not shown on plans. 5) Underground service-entrance cable (USE) shall not be used for interior wiring or for aboveground installations except where USE cable emerges from the ground and is terminated in an enclosure at an outdoor location and the cable is protected in accordance with 300.5(D). Please revise conductor type. 2nd REVIEW COMMENT: The conductor type was revised to “K1 or K2” however it does not appear that this is a recognized conductor type in the CA Electrical Code, please revise accordingly to specify a conductor type that is recognized in the code. 6) A permanent label for the DC PV power source indicating the information specified in (1) through (3) shall be provided by the installer at DC PV system disconnecting means and at each DC equipment disconnecting means required by 690.15. Where a disconnecting means has more than one dc PV power source, the values in 690.53(l) through (3) shall be specified for each source. a) Maximum voltage b) Maximum circuit current c) Maximum rated output current of the dc-to-dc converter 2nd REVIEW COMMENT: Comment remains, the DC disconnect signage has not been updated on the plans, please revise label 6 per the above. 7) All interactive system(s) points of interconnection with other sources shall be marked at an accessible location at the disconnecting means as a power source and with the rated ac output current and the nominal operating ac voltage. (CEC 690.54) Please provide a label at the AC disconnecting means that shows rated AC output current and operating voltage. 8) PV array equipment grounding conductors shall be connected to the grounding electrode system of the building or Signal. Correction noted on Page T-1 Sheet Index Signal Alarms & Electric Answers Signal. Noted on Page T-1 Signal. Noted on page A-1 Site Plan Signal. Noted on Page A-1 Site Plan, 1" Alum. Flex and or EMT Signal. Noted on Page A-1 1" alum. Flex and or EMT shown as ******** 1" Flex and or EMT. Signal. THHN run to Combiner Box outdoor PV Solar Cable outdoor Noted on SP-1 Plan Lable #6 Signal. Noted on SP-1 Plan Lables 3 & 4. Residential Plan Check Correction List Page 3 of 3 structure supporting the PV array. (CEC 690.47) The plans show a separate DC grounding electrode system with (2) ground rods, please remove these and revise plans to show the equipment grounding conductors being connected to the building’s grounding electrode system. 9) The single line diagram shows breakers within the inverter and identifies a “load center on solar rack” which is not standard with this inverter. Please remove these and/or clarify that there are no load center or breakers installed within the inverter. Alternatively, provide product info showing how this load center and breakers are installed. END CORRECTION LIST As further information is provided and reviewed, additional corrections may be required. Signal. Noted on SP-1 Plan Grounding system Signal. Corrected om SP-1 Plan on Solar Rack NOTICE OF APPROVAL August 22, 2022 Inland Development Company, LLC c/o Karen Matchniff 1232 Village Way, Suite A Santa Ana, CA 92705 RE: Breva Street Lots 7, 8 & 12 Dear Inland Development Company, LLC: Your Request for an architectural change has been approved. Specifically, you have approval to proceed with the following: Installing solar at Breva Lots 7, 8 & 12, per submitted application. We reserve the right to make a final inspection of the change to make sure it matches the Request you submitted for Approval. Please follow the plan you submitted or submit an additional Request form if you cannot follow the original plan. Your approval is conditional with the stipulation of the following: Installation of batteries at a later date will require additional Architectural Committee Approval. You must follow all local building codes, CCRs, Architectural/Landscape Rules Standards and Guidelines, and setback requirements when making this change. A Building Permit may be needed. This can be applied for at the City offices. Our approval here is only based on the aesthetics of your proposed change. This approval should not be taken as any certification as to the construction worthiness or structural integrity of the change you propose. If applicable, please be aware that you are responsible for contacting the appropriate utility companies before digging. Thank you for submitting your application and we look forward to receiving your notice of completion upon commencement of completed work. For your convenience a "notice of completion" document has been attached. We appreciate your cooperation in submitting this Request for Approval. An attractive Community helps all of us get the full value from our homes when we decide to sell. Sincerely, Peter S. Shahinian, CCAM Community Association Manager On behalf of the Citrus Course HOA Architectural Committee P.O. Box 12920 Palm Desert, CA 92255 * 41-865 Boardwalk, Suite 101, Palm Desert, California 760.346.9000 * FAX 760.346.9997 * www.citruscoursehoa.com