05-0101 (AR) Title 24- err —err
Title 24 Report
L '
CEC Approved 2001 Building Energy Efficiency
Standards
Job Name
Baughan Remodel
53-898 Avenida Velasco
La Quinta, Ca. 92253
Prepared For
Stoney Creek Design Studio
72-925 Fred Waring Drive, Suite 104
,Palm Desert, Ca. 92260
760-341-6997
CITY OF LA QUINTA
BUILDING & SAFETY' DEPT-
APPRT VEID
Prepared. By FOR CONS
Jack LaFontaine AT t 03-
D BY
CABEC Certified Energy Analys E
R 01.03.262
0� Management .services
ENS.Energy
61-1 HVAC /Energy Consulting Services
41-485 Adams Street, Unit C - Bermuda Dunes, Ca. 92203 - (760) 360-4631 1 Fax (760) 360-3074
C20 License No. 315890 - E-mail: freon.iackAverizon.net
T24 Reports —HVAC Mechanical Design — Calif Certified HERS Rater — NBI Certified Air Balance Tests — Cabec Certified Energy Analyst
TITLE 24 REPORT ,
Title 24 Report for:
Baughan Remodel - 10 sgft .
53-898 Avenida Velasco
La Quinta, Ca.'92253
Project Designer: ;
Stoney Creek Design Studio
72-925 Fred Waring Drive, Suite 104
- Palm Desert, Ca. 92260
760-341-6997
Report Prepared By:
Jack LaFontaine
Energy Management Service
41.- 485 Adams Street, Unit C
Bermuda Dunes, CA 92201 J
{ 760-360-4631
Job Number:
111,52004
Date:
12/28/2004 i
The EnergyPro computer program has been used to perform the calculations summarized in this compliance report. This program has approval and is
authorized by the California Energy Commission for use with both the Residential and Nonresidential 2001 Building Energy Efficiency Standards.
This program developed by EnergySoft, LLC (415) 897-6400.
EnergyPro 3.1 By, EnergySoft Job Number: 11152004 User Number: 5021
TABLE OF CONTENTS
Cover Page 1
Table of Contents 2
Form CF -1 R Certificate of Compliance 3
Form MF -1R Mandatory. Measures Checklist 6
0
Ceftificate of Compliance.: Residential
(Part 1 of 2). CF -1 R.
Baughan Remodel - 10 sqft
'
12/28/2004
Project Title
Assembly
Date -
53-898 Avenida Velasco La Quinta
Type
Project Address
(attic, garage, typical, etc.)
Building Permit #
Energy. Management Service
760-360-4631 Plan check / Date
Documentation Author
Telephone
n/a
PRESCRIPTIVE APPROACH
- 15
Field Check/Date
Compliance Method (Package or Computer)
Climate Zone Enforcement Agency Use Only
GENERAL INFORMATION .
El
El
Total Conditioned Floor Area:
10 ft2 Average Ceiling Height: 8.0 ft
Total Conditioned Slab Area:
10 ft
El 1:1
i Building Type:
1:1 El
(check one or more)
El 11
X❑ Single Family Detached
X❑ Addition
1:1 El
❑ Single Family Attached
❑ Existing Building
ElMulti-Family❑
Existing Plus Addition
'
Front Orientation: (East) 90 deg Floor Construction Type:
® Slab Floor
Number of Dwelling Units:
0.01
Number of Stories:
1
❑ Raised Floor
r -
rtrvta I KA I IUN
bnaoing uevlces
0
Type Orientation Area Fenestration Exterior
Overhang Side Fins
Const.
'
Component
Frame
Assembly
Location/Comments
Type
Type
U -Value
(attic, garage, typical, etc.)
R-38 Roof (R.38.2x4.24)
Wood
0.027
Exterior Roof
Slab On Grade
n/a
0.756
Exposed Slab w/R-0.0 Perimeter Insulation
R-13 Wall (W.13.2x4.16)
Wood
0.088
Exterior Wall
rtrvta I KA I IUN
bnaoing uevlces
0
Type Orientation Area Fenestration Exterior
Overhang Side Fins
SF U -Factor SHGC Shading
Yes/ No
Yes / No
Rear (West) 6.0 0.65 0.40 Bug Screen
❑ X❑
❑ 0
❑ ❑
❑ ❑
❑ ❑
❑ ❑
El El
El F1
El
El
1-1 EJ
1:1 1:1
El 1:1
0
1:1 El
El
El 11
1:1 1:1
1:1 El
❑❑
Run Initiation Time: 1212810412:26:57 Run Code: 1104265617
[E6ergyPro 3.1 By Ener Soft User Number. 5021 Job Number. 11152004
Pa e:3 of 7
r
Certificate of Compliance: Residential (Part 2 of 2) CF -1 R
Baughan Remodel - 10 sgft 12/28/2004
Project Title Date
HVAC SYSTEMS - Note: Input Hydronic or Combined Hydronic data under Water Heating Systems, except Design Heating Load.
Distribution
Heating Equipment Minimum . Type and Duct or
Type (furnace, heat Efficiency Location Piping Thermostat Location /
pump, etc.) (AFUE/HSPF)(ducts, attic, etc.) R -Value Type Comments
ti
Cooling Equipment Minimum Duct
Type (air conditioner, Efficiency Location Duct Thermostat Location /
heat pump, evap. cooling) (SEER) (attic, etc.) R -Value Type Comments
WATER HEATING SYSTEMS
Rated 1
Tank
Energy Fact!
1 ' External
Water Heater Water Heater Distribution
# in Input
Cap.
or Recovery
Standby Tank Insul.-
System Name Type Type
Syst: Btu/hr
(gal)
Efficiency
Loss (a/o) R -Value
1 For small gas storage (rated inputs of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list energy factor.
For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Rated Input, Recovery Efficiency and Standby Loss.
For instantaneous gas water heaters, list Rated Input and Recovery Efficiency.
REMARKS
rhe existing water heating and space heating and
tooling system meets the requirements of the
SEC Subchapter 9, Section 152 (a) EXCEPTION
1. PRESCRIPTIVE APPROACH 1. A.
GViviVILIArvGt J t A 1 tmtN 1
This certificate of compliance lists the building features and performance specifications needed to comply with Title 24, Parts 1 and 6 of the
California Code of Regulations, and the administrative regulations to implement them. This certificate has been signed by the individual with
overall design responsibility. The undersigned recognize that compliance using duct sealing and TXV's requires installer testing and certification
and field verification by an approved HERS rater.
Designer or O ner. (per Business i£ Professions Code) Documentation Author
Name: ' �' Name: Jack LaFontaine
Title/Firm:. Stoney Cree Design Studio U - Title/Firm: Energy Management Service
Address: 72-925 Fred Waring Drive, Suite 104 Address: 41- 485 Adams Street Unit C
Palm Desert, Ca. 92260 Ber d Dunes CA 92201
Telephone: 760-341-6997 TlephQe:7 3 -4631
Lic. #: l� _ I
(sign`attJre) - - f
Enforcement Agency
Name:
Title/Firm:
Address:
Telephone:
(date)
lEnergyPro 3.1 By EnergySoft User Number: 5021 Job Number: 11152004 Paae:4 of 7 I
Certificate of Compliance: Residential (Addendum) CF -1 R
a
Baughan Remodel - 10 sqft " 'k 12/28/2004
Project Title Date
Special Features and Modeling Assumptions -
The local enforcement agency should pay special attention to the items specified in this checklist. These items require special
written justification and documentation, and special verification to be used with the performance approach. The local
enforcement aaencv determines the adeauacv of the iustification. and may refect a buildina or desian that otherwise complies
based on the adequacy of the special justification and documentation submitted. Plan Field
HIGH MASS Design(see C -2R) -Verify Thermal Mass: 10 sqft Exposed Slab Floor, 3.50" thick at Addition 10 sqft
i
HERS Required Verification
These features must be confirmed and/or tested by a certified HERS rater under the supervision of a CEC approved HERS
proviaer. i ne mr-Kb rater must aocument the nein ventication ana aiagnostic testing of tnese measures on a torm (;F -6R.
Plan
Field
C
\
4
Kun initiation I Ime: 1Z/Ztf►u4 11:'16:5! Kun GOae: 1104265617
EnergyPro 3.1 By EnergySoft User Number: 5021 Job Number: 11152004 Page:5 of 7
ti
Mandatory Measures Checklist: Residential (Page 1 of,2) MF -1 R
NOTE:' Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
T asterisk (•) may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted, shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether'they are shown elsewhere in the documents or on this checklist only.,,
DESCRIPTION instructions: Check or initial applicable boxes or enter N/A if not applicable.
DESIGNER
ENFORCEMENT
Building Envelope Measures
a '§150(a): Minimum R-19 ceiling insulation. )
❑ §150(b): Loose fill insulation manufacturer's labeled R -Value.
'§ 150(c): Minimum R-13 wall insulation in wood framed walls or equivalent U -value in metal frame walls (does
not apply to exterior mass walls).
[]11150(d): Minimum R-13 raised floor insulation in framed floors or equivalent.
❑§150(1): Slab edge insulation -water absorption rate no greater than 0.3%, water vapor transmission rate no
greater than 2.0 perm/inch.
§ 118: Insulation specified or installed meets insulation quality standards: Indicate type and form.
❑ §116-17: Fenestration Products, Exterior Doors and Infiltration/Exfiltration Controls
1. Doors and windows between conditioned and unconditioned spaces designed to limit air leakage.
2. Fenestration products (except field fabricated) have label with certified U -Factor, certified Solar Heat Gain
Coefficient (SHGC), and infiltration certification.
3. Exterior doors and windows weatherstripped; all joints and penetrations caulked and sealed.
§150(g): Vapor barriers mandatory in Climate Zones 14 and 16 only.
§ 150(f): Special infiltration barrier installed to comply with Section 151 meets Commission quality standards.
❑
§ 150(e): Installation of Fireplaces, Decorative Gas Appliances and Gas Logs.
1. Masonry and factory -built fireplaces have:
a. Closeable metal or glass door
1
b. Outside air intake with damper and control
c. Flue damper and control
2. No continuous burning gas pilots allowed.
Space Conditioning, Water Heating and Plumbing System Measures
❑ §110-13: HVAC equipment, water heaters, showerheads and faucets certified by the Commission.
❑ § 150(h): Heating and/or cooling loads calculated in accordance with ASH RAE, SMACNA or ACCA.
❑ § 150(i): Setback thermostat on all applicable heating and/or cooling systems.
§1500): Pipe and Tank Insulation
1. Storage gas water heaters rated with an Energy Factor less than 0.58 must be externally wrapped with
insulation having an installed thermal resistance of R-12 or greater.
2. First 5 feet of pipes closest to water heater. tank, non -recirculating systems, insulated (R-4 or greater)
, 3. Back-up tanks for solar system, unfired storage tanks, or other indirect hot water tanks have R-12 external -
insulation or R-16 combined internal/external insulation.
4. All buried or exposed piping insulated in recirculating sections of hot water systems.
5. Cooling system piping below 55 degrees F. insulated.
6. Piping insulating between heating source and indirect hot water tank.
EnergyPro 3.1 By EnergySoft • User Number: 5021 Job Number: 11152004 Page:6 of 7
I
'tr
Mandatory Measures Checklist: Residential (Page 2 Of 2) MF -1 R
NOTE' Lowrise residential buildings subject to the Standards must contain these measures regardless of the compliance approach used. Items marked with an
asterisk (') may be superseded by more stringent compliance requirements listed on the Certificate of Compliance. When this checklist is incorporated into
the permit documents, the features noted shall be considered by all parties as minimum component performance specifications for the mandatory measures
whether they are shown elsewhere in the documents or on this checklist only.
DESCRIPTION Instructions: Check or initial applicable boxes or enter N/A If not applicable. (
DESIGNER
ENFORCEMENT
Space Conditioning, Water Heating and Plumbing System Measures: (continued)
❑ 150(m): Ducts and Fans
1. All ducts and plenums installed, sealed and insulated to meet the requirements of the 1998 CMC Sections 601,
603, 604 and Standard 6-3; ducts insulated to a minimum installed level of R-4.2 or enclosed entirely in
conditioned space. Openings shall be sealed with mastic, tape, aerosol sealant, or other duct -closure system
that meets the applicable requirements of UL181, UL181A, or UL181B. If mastic or tape is used to seal openings
greater than 1/4 inch, the combination of mastic and either mesh or tape shall be used. Building cavities shall not
be used for conveying conditioned air. Joints and seams of duct systems and their components shall not be
sealed with clothlback rubber adhesive duct tapes unless such tape is used in combination with mastic and
drawbands.
2. Building cavities, support platforms for air handlers, and plenums defined or constructed with materials other
than sealed sheet metal, duct board or flexible duct shall not be used for conveying conditioned air. Building
cavities and support platforms may contain ducts. Ducts installed in cavities and support platforms shall not be
compressed to cause reductions in the cross-sectional area of the ducts.
3. Joints and seams of duct systems and their components shall not be sealed with Goth back rubber adhesive
duct tapes unless such`a tape is used in combination with mastic and drawbands.
4. Exhaust fan systems have back draft or automatic dampers.
`
5. Gravity ventilation systems serving conditioned space have eitherautomatic or readily accessible, manually
operated dampers.
6. Protection of Insulation. Insulation shall be protected from damage, including that due to sunlight, moisture,
equipment maintenance, and wind but not limited to the following: Insulation exposed to weather shall be suitable
for outdoor service e.g., protected by aluminum, sheet metal, painted canvas, or plastic cover. Cellular foam
insulation shall be protected as above or painted with a coating that is water retardant and provides shielding
from solar radiation that can cause degradation of the material.
❑ 114: Pool and Spa Heating Systems and Equipment
1. Certified with 78% thermal efficiency, on-off switch, weatherproof operating instructions, no electric resistance
heating, and no pilot.
2. System is installed with at least 36" of pipe between filter and heater for future solar, cover for outdoor pools or
spas. I
a. At least 36" of pipe between filter and heater for future solar heating.
b. Cover for outdoor pools or outdoor spas.
3. Pool system has directional inlets and a circulation pump time switch.
i
❑ §115: Gas fired central furnaces, pool heaters, spa heaters or household cooking appliances have no
continuously burning pilot light. (Exception: Non -electrical cooking appliances with pilot < 150 Btu/hr)
❑ §118 (f): Cool Roof material meet specified criteria
,
Lighting Measures
❑ §150(k)1: Luminaires for general lighting in kitchens shall have lamps with an efficacy 40 lumens/watt or greater for
general lighting in kitchens. This general lighting shall be controlled by a switch on a readily accessible lighting
control panel at an entrance to the kitchen.
a§150(k)2: Rooms with a shower or bathtub must have either at least one luminaire with lamps with an efficacy of
40 lumens/watt or greater switched at the entrance to the room or one of the alternative to this requirement
allowed in Section 150(k)2.; and recessed ceiling fixtures are IC (insulation cover) approved.
3,1 By EnergySoft User Number: 5021 _ Job Number: 11152004 Page:7 of 7
I
3,w aax
PLYMDDD TYR
2c.
OR ML STUDS. S' O.C., 5EE PLAN
a4
OR ML DF. e.T. PL W 5I6Y
1'IAX.
d2'
L, A. �b �r
.B.
fell" mm
* tow. sue
2• CLEAN
•
SAND
244 Carr.
Y
jT
A T7PICAL PERIMET;R FOOTIING
yr . r -o•
AGi/p-p NH
/FFL a4 a:ur.
2' CLEAN
2• al
N
I
5AND
N
SAND
EPoNT 14 TtES TOP AND
.
.
BOrra11 24' OX-
t4rteN. 6' 013mt8rr
24W
r 1
om SPEak
115PBCM REUMM FM
12'
6' 12'
ALL EPW MUMS.
FRAMING,/FOUNDATION PLAN
1/411 to 1'-011
• r f POST SCHEDULE
P-1 4X4 POST W/SIMPSON PC CONNECTOR.
EXISTING ROOF OVERHANG
TO REMAIN.
F.00TING SCHEDULE :
TYPICAL FOOTINGS : fC= 2,000 psi Fy= 40,000 psi
ALLOW/SOIL t3RG: 1 500 PSF
ALL HARDWARE TO BE SIMPSON OR EQ.
CITY I OF LA QUA
BUILDING & SAFETY �T-jj
APPRJVEEIFOR CONSCTIONProvide 26 -gauge minimum galvanized weep screed at foundation plate CBc 3250
THE EXISTING FOOTINGS ON THIS PROJECT ARE O.K. FOR THE
N6W LOADING (SEE STRUCTRUCTURAL CALCS.), AS LONG AS
THE ASSUMPTIONS LISTED FOR THIS PROJECT ARE VERIFIED,
SEE NOTE TO CONTRACTOR.
Noteon Plans: "Weep screed shall be placed a minimum of 4 inches above the earth or 2 inches above NOTE:
paved areas."Icsc32so6.$) ALL FRAMING SHALL BE INSTALLED STRAIGHT
15IMP50N A35 CLIP
--EACH RAFTER, TYR,
IN. R-381 CEILING
INSOLATION.
w
NEW HEADER, SEE
FRAMING PLAN.
NEW LOCATION OF
EXISTING WINDOW
MIN. R-13 WALL
INSULATION.
o I (
II
II
II
II
(I
I his
A�- I
-woo
3D
3SECTION ® BATROOM EXPANSION
v2" 1'-011
TRUE. ALL FRAMING SMALL BE PLUMBED AND
LINED AT FINISH OF FRAMING. ALL WARPED OR
DAMAGED LUMBER SHALL BE REPLACED WITH
STRAIGHT LUMBER.
ALL WALL FRAMNG SHALL BE BRACED TO
PREVENT RACKING DURING ROOF TRUSS
INSTALLATION. BRACING SHALL BE REMOVED
ONLY AFTER PROPER SHEARING AND BRACING
IS FULLY IN PLACE.
CONTRACTOR SHALL COORDINATE
ALL FOUNDATION HARDWARE FROM
THI5 SHEET TO THE FOUNDATION WORK
AS REQ. TO PROVIDE ALL HARDWARE
IN PROPER LOCATIONS, TYP.
ALL PERIMETER WALLS
SHALL HAVE MIN. R-21 FIBERGLASS
BATT INSULATION.
ALL INSULATION MATERIALS SHALL
HAVE A FLAME SPREAD RATING NOT
TO EXCEED 25 AND A SMOKE DENSITY
NOT TO EXCEED 450. 2001 CBC
SLAB NOTES :
HOUSE SLAB :
4' THICK CONCRETE (MIN. 2000PSI) W/
6X6/10-10 WWM OVER 2' CLEAN FILL OVER
IOMIL WPM OVER MIN. 2' CLEAN AND
COMPACTED GRADE. TYP.
FINISH TO BE AS REQUIRED FOR FINISH
FLOOR INSTALLATION, VERIFY W/ OWNER
FOR FINISH MATERIALS.
ALL SLABS ARE TO BE POURED
MONOLITHICALLY. TWO STAGE POURS ARE
PERMITTED WITH ADDTIONAL ENGINEERING
AND REBAR BY ARCHITECT IF REQUESTED.
PROVIDE ALTERNATE BID TO 6AWWO-WO WWM
TO USE INSTEAD t4 BARS P 24' O/C E.W.
(SET ON CHAIRS). 014" TO MAKE FINAL DECISION.
PROVIDE tW@24'0/C TIE BARS BETWEEN ALL EXISTING
FOOTINGS, PATIO SLABS, AND HOUSE SLABS. TYP.
NOTE : ALL EXTERIOR WALLS ARE TO RECEIVE MIN. 3/8' CDX PLYWD 514TG, TYPICAL.
(0513 NOT ACCEPTABLE). NOTE. NAIL W/ MIN. 8d ! 6/6/12 NAILING, TYPICAL. ALL
EDGES TO BE SOLID BLOCKED, TYPICAL. RUN 514EET5 IN HORIZONTAL DIRECTION AND
STAGGERED 48' SO AS NOT TO ALIGN VERTICAL JOINTS. TYPICAL.
NOTE: SEE STANDARD STRUCTURAL NOTE AND SPEC
59EET WITHIN THESE DRAWINGS FOR ADDITIONAL
INFORMATION REGARDING, FASTENERS, MATERIALS
AND STANDARDS, M.
MIN. RAFTER GRADE, SIZE AND SPACING TO BE PER CBC TABLE
NO. 23 -VII -R -X, MIN. JOIST GRADE, SIZE AND SPACING TO BE PER
CBC TABLE NO. 23 -VII -J -X, I THRU 12 AS MINIMUM SIZES. USE SIZE
CALLED OUT ON PLANS FOR INSULATION AND ACCESS PURPOSES FOR
FIXTURES, ETC.
MN. HEADER SIZE TO BE PER CBC TABLE NO. 23 -VIII -5. USE SIZE
CALLED OUT ON PLANS AS PER NOTES ABOVE.
6'-8°
E-]:)
"--NEW LOCATION OF
EXISTING WINDOW
911
DEMO/FLOOR PLAN
1/411 m 11-011
NEW BATHROOM DESIGN
BY OTHERS.
ELECTRICAL NOTE :
ANY CHANGES TO THE EXISTING ELECTRICAL FO vis P • 5NAL1 BE-%w"p- .. -
BY THE CONTRACTOR TO THE CITY OF LA ouift A1tCDING'6m FOR APPROVAL. ,
PLUMBING NOTE : •z:.� c4: c a .__ . .��
ANY CHANGES TO THE EXISTING PLUMBING 51`58 PRO.IECT SMALL BE SUBMITTED BY
THE CONTRACTOR TO THE CITY OF LA QUINTA BUILDING DEPT. FOR APPROVAL.
ef!'e,
SITE NOTES
REMOVE EXISTING HARDSCAPE AND DISPOSE TO APPROVED DUMPING SITE. PAY ALL FEES
AS REQUIRED.
SCARIFY EXISTING GRADES AND MAKE READY FOR NEW FOUNDATIONS. RECOMPACT ALL
EXISTING GRADES TO MIN. 95Z RELATIVE DENSITY.
REMOVE EXISTING YARD WALLS AND DISPOSE TO APPROVED DUMPING SITE. PAY ALL FEES
AS REQUIRED.
PROTECT ALL EXISTING HARDSCAPE AND LANDSCAPE MATERIALS 50 AS NOT TO CAUSE ANY
DAMAGE OR LOSS OF PLANT MATERIALS WHICH ARE TO REMAIN DURING CONSTRUCTION. TYP.
CAP OFF ALL EXISTING IRRIGATION ANDIRRIGATIOI4 TUNGT 0M''FOR REM NTNG � "
PLANTING MATERIALS. -j `' L9" ` ti " .
REMOVE All EXISTING LANDSCAPE 1" AS 1bIJIRED�a INS TAU NEIN WORK CAP OFF
ALL EXISTING CONDUITS AND INSULATE &106ARE'WIRES' FREVIEW LANDSCAPE LIGHTING
WITFI OWNER AND OR LANDSCAPE ARCHI f�lOJ2TQ�NS(AI IA�1oN of NEW III
Ls
FIXTURES. (� ` r I z *
J tS
� a •t -, .T �'`, 1
F-1-11111 Y,0li I'J Oil"
SIDE
F — —•o -Y-ARD — -I
i
ADDIT
AREA ION i RESIDENCE L FRONT
YARD
BACK
YARD
I I 20'
J
I I
20 r _J
I I
GARAGE
I I
I
L— — —
51 F! — _I
tl° YARD
SITE PLAN
N.T.S.
r � -
§ REVISIONS NO.
*NOTE TO CONTRACTOR: to
THESE ASSUMPTIONS ARE TO BE VERIFIED BY THE CONTRACTOR. w E
THE ASSUMPTIONS ARE THAT; THERE IS A CONTINUIOUS MIN. 12'X12' PERIMETER FOOTING AROUND
THE ENTIRE STRUCTURE W/ MIN. #4 RE AR TOPIBTM.4 V ANCHOR BOLTS SPACED NOT MORE
THAN 6' APPART
DEMOLITION NOTES
L GENERAL CONTRACTOR 15 RESPONSIBLE FOR ALL REMOVAL AND INSTALLATION OF ANY AND O
ALL TEMPORARY SHORING AS REQUIRED TO COMPLETE THE WORK M
1 A
2. ALL DEMOLITION SHALL BE DONE IN A SAFE AND RESPONSIBLE MANNER BY LICENSED,
INSURED AND BONDED CONTRACTORS.
3. ALL DEMOLITION MATERIALS SHALL BE DISPOSED OF IN A SAFE AND PROFESSIONAL MANNER
AS REQUIRED BY ALL GOVERNING AGENCIES. IV ') p
VJ "oc
4. GENERAL CONTRACTOR SHALL PAY FOR ALL EXPENSES AND FEES FOR HANDLING AND
DISPOSAL. OF ALL DEMOLISHED AND UNUSED MATERIALS. a �_ Z
5. STOCK PILING OF MATERIALS ON SITE OR IN STREET R.O.W. IS PROHIBITED. +'
-1.-
15,
6. ALL TOXIC OR HAZARDOUS MATERIALS ARE TO BE PROPERLY REMOVED FROM THE SITE AS V J V w a
SOON AS POSSIBLE. �/ J W Q
KEY NOTES:
p = D
A. REMOVE EXISTING HARDSCAPE AND DISPOSE TO APPROVED DUMPING SITE. PAY ALL FEES Q Fu
ND
AS REQUIRED FOR HAULING ADUMPING. SCARIFY EXISTING GRADES AND MAKE READY FOR NEW
FOUNDATIONS. RECOMPACT ALL EXISTING GRADS TO MIN. 95% RELATIVE DENSITY. (SEE SITE W Hw
PLAN ON SHEET ALI FOR SCOPE OF WORK.) � � W
B. REMOVE EX15TING INTERIOR FIN15WS FROM EXTERIOR WALLS AND OVERHANGS TO MAKE LU
READY FOR NEW MATERIALS AND FINISHES.
C. REMOVE EXISTING WALLS AND DISPOSE TO APPROVED DUMPING SITE. PAY ALL FEES AS °C V
REQUIRED FOR HAULING AND DUMPING. ~ �-
D. VERIFY WITH OWNER SCOPE OF WORK FOR PLANTER BEDS. INCLUDING, PLANTING, W
IRRIGATION 7::(CECr
AND LIGHTING. (Jj 6
ZznE. LIGHTLlatr4j(�
IJB ORSHOWER iNCLO$l1RE �SHAL 8E IED 'SUITABLE FOR O1/T{',—`h.\ DAMP LOCAT:` F. SMOKE -F20-OL�If �AT FE12Y BACACIIR;.(Cj 310.9.13)^ 0 i
- (0 r
BUILDING AND SAFETYvNflTES, ,i W
i. APPROVEDIriAltlr i'1`AII#TIES; (I.E; CHEMICALf TOILETS) SHALL BE ON BAUGHA ,
SITE PRIOR TO REE�I FOR FI*T INut SPEGI IONS .PER HEALTH AND SAFETY CODES. BATHROOM
EXPANSIA
3 i l- i •WRELlODFL
2. CONTRACTOR AND/OR OWNER SFWI Of A TRASH BIN TO INSURE PROPER CLEANUP OF ALL �4
BUILDING MATERIALS PER ORDINANa #(8.01070 OF THE"CITY-OF LA QUANTA MUNICIPAL CODE ,fir, ss Ave"VRMw
d055
151 LA Q*frk Gk
3. STORAGE OF BUILDING MATERIALS ORjO) 8R1S SHALL` BE tONFINED TO THE LOT FOR WHICH THE Ai -a �-
PERMIT Is ISSUED. ADJACENT VACANT PROPERTI!'.9 MAY NOTIBE UTILIZED FOR THIS PURPOSE
A
UNLESS WRITTEN PERMISSION OF THE OWN132,a5"ON FILE WITFf THE DEPARTMENT OF BUILDING
AND SAFETY OFFICE. -
4. ALL CONTRACTORS SHALLHAVE A , VALID CITY BI INE55 LICENSE PRIOR TO PERMIT
ISSUANCE, PER LA QUINTA 1 AUNIGPALp CODA 2 G ' `' • •• y
5. ALL CONTRACTORS AND/OR OWNER BUILDERS MUST SUBMIT CERTIFICATE OF WORKER'S
COMPENSATION INSURANCE COVERAGE PRIOR TO THE ISSUANCE OF A BUILDING PERMIT
PER CALIFORNIA LABOR CODE, SECTION 3800. 11 MATE
CODES USED: 2001 CALIFORNIA BUILDING CODE 1
2001 CALIFORNIA PLUMBING CODE 161
' 34200,I CALIFORNIA MECHANICAL CODE
r�CItC, WtA-jR—E�TRICAL CODE o
,��%,3it1QCAU ,a I „GY CODE 9
ADDRESS: ` ,53 -Ml A& .TOSCO �
Q.1 a
CONSTRUCTION HOURS:
�
OCTOBER I - APRIL 30 MAY I - SEPTEMBER 30 6
MON. - FRI. 7470 AM - 5:30 PM MON. - FRT. 6:00 AM - 7:00 PM -
SATURDAY 8:00 AM - 5,00 PM SATURDAY 8:0 AM - 5d10 PM p w
SUNDAY NOT ALLOWED SUNDAY NOT ALLOWED
GOVERNMENT CODE GOVERNMENT CODE g
HOLIDAYS NOT ALLOWED HOLIDAYS NOT ALLOWED g 1p LU
VIOLATION OF THE ABOVE WORT: HOURS 15 A CITEABL E OFFENSE a` Z
NN
UNDER LA QUINTA MUNICIPAL CODE. 9 0
PROJ
SITE
VICINITY MAP
-
Z
X
_ w
Z o .�
U
Z aa4
�Vi Q„ U Qw;>>
IX LU
s O LLI
Ll. Q
IS
j
00
0
a orTe
11/12/2
xrr
� n.a•a� NOTED
A-1
IL SN
Construction is NOT PERMITTED
on the following Code Holidays:
New Year's Day
Dr. Martin Luther IGngJr. Day
President's Day
Memorial Day
Independence Day
Labor Day
Veteran's Day
Thanksgiving Day
Christmas Day
0
p RE tNSPEC'f 10N % APpROVED
WIC B AND 10B CARR ARE NOT ON
CM�GtD IF
p1.ANS FOR A SCHEDULED
1HE
SITE
INSPEGTI HO FXCEPT10NS!
CONSTRUCTION HOURS
October 1st - April 30 to 5:30 p m.
Monday - Friday: 7:00 a.m.
Saturday: 8:00 a.m. to 5:00 p.m•
Sunday: None
Government Code Holidays: None
May 1 st - September 30th
Monday - Friday: 6:00 a.m. to 7:00 P.M -
Saturday: 8:00 a.m. to 5:00 pm•
Sunday: None
Government Code Holidays: None
"AN ADEQUATELY SIZED DEBRIS CONTAINER
IS REQUIRED ON THE 10B SITE DURING ALL
r`V,SES OF CONSTRUCTION AND MUST BE
} ' 7D AS NECESSARY. FAILURE TO DO SO
" . pIJSE THE CITY TO HAVE THE CONTAINER
4:o
AT THE EXPENSE OF THE OWNER/
"' � dED ?,ACTOR.'