Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
BSOL2023-1102
BUILDING PERMIT DESIGN & DEVELOPMENT DEPARTMENT Qa�fra 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 eca CALIFORNIA Permit Type: Solar Owner: Permit Number: BSOL2023-1102 Applicant: Property Address: 51380 CALLE TAMAZULA APN: 770174004 Contractor: Legal Description Property Zoning: Valuation: $18,000.00 PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 12/19/2023 ISSUED DATE: 01/16/2024 EDDIE JURAK VELASCO'S ELECTRICAL 18451 Collier Ave B B, Lake Elsinore, CA 92530 VELASCO'S ELECTRICAL / 1071951 18451 Collier Ave B B, Lake Elsinore, CA 92530 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the construction lender preliminary notice from that duty. WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 1/8/25 6:24 pm Page 1 of 3 1-3111111111]1Z"a4 N IT, IkI Permit Type: Solar Permit Number: BSOL2023-1102 Property Address: 51380 CALLE TAMAZULA 6.0 kWDC ROOF MOUNTED SOLAR PV SYSTEM - (15) 40OW REC TWIN PEAK 5 BLACK REC400 TP5 MODULES, (15) ENPHASE IQ7 PLUS-72-2-US MICROINVERTERS, (1) 125 AMP ENPHASE IQ COMBINER, (1) 30 AMP AC DISCONNECT, TIED INTO EXISTING 200 AMP MAIN SERVICE ELECTRICAL PANEL (306 SF). 2022 CALIFORNIA ELECTRICAL CODE. PV System Type Residential System Size (kW DC) 6 PV Strings (EA) 2 PV Miscellaneous 0 Equipment EA I Type Group Sq Ft Value I Invoice No. Fee Fee Amount Amount Paid INV-00003740 Building Standards Administration $1.00 $1.00 Solar (PV) Less than 10kW PC $30.51 $30.51 Solar (PV) Less than 10kW $30.51 $30.51 Digital Archiving and Records Management Fee - OTC $12.00 $12.00 Permit Issuance $115.94 $115.94 Technology Enhancement Fee $8.00 $8.00 Total for InvoiceINV-00003740 $197.96 $197.96 Grand Total for Permit $197.96 $197.96 Workflow Step / Action Name Action Type Start Date End Date Application Completeness Check v.1 12/20/2023 9:22 12/20/2023 9:23 .. Submittal Document Verification v.1 Generic Action 12/20/2023 9:23 Plan Check v.1 12/20/2023 0:00 ......... ......... ......... ......... ......... ......... Building Review (1 Day) v.1 ........- Receive Submittal 12/20/2023 0:00 .... 01/04/2024 16:19 Permit Issuance v.1 01/16/2024 16:23 01/16/2024 16:25 ......... ......... ......... ......... ......... Verify Contractor info & Conditions have been met v.1 Generic Action ......... 01/16/2024 16:23 ................................................................................................................................................................................................................................................................................................................................... Verify & Invoice Fees v.1 Generic Action .............. 01/16/2024 16:23 ................................................................................................................................................................................................................................................................................................................................... Verify Fee Payment & Issue Permit v.1 Generic Action .............. 01/16/2024 16:25 ................................................................................................................................................................................................................................................................................................................................... Print, Attach, and Email Building Permit v.1 Create Report 01/16/2024 16:25 .................... 01/16/2024 16:25 Solar Inspections v.1 Rough Electrical v.1 9 Inspection P Temp Use of Permanent Power v.1 Inspection Inspections - Final v.1 02/22/2024 0:00 02/26/2024 10:42 ......... Solar Final v.1 Inspection 02/22/2024 0:00 .... 02/26/2024 10:42 Printed: 1/8/25 6:24 pm Page 2 of 3 1-311111111]1Z"a4 N IT, lIII I Permit Type: Solar Permit Number: BSOL2023-1102 Property Address: 51380 CALLE TAMAZULA Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the iurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the building official. Printed: 1/8/25 6:24 pm Page 3 of 3 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Structural Calculations for a Roof Mounted Solar Photovoltaic System for: Eddie Jurak n�oeRof�Sq�� 51380 CII Tamazula La Quinta, CA 92253 Applicable Codes: No. �C58724 * Exp.3-31-25 C V k 2022 California Building Code, 2022 California Electric Code, 2022 California Mechanical Code, American Society of Civil Engineers Standard ASCE 7-16 Minimum Design Loads for Buildings and Other Structures, American Wood Council 2018 National Design Specification for Wood Construction, Local Municipal Code, and all other codes which are adopted by reference or enacted by law. Assumed Design Parameters: The existing structure has been built under a building permit and is in its original condition. The existing roof structure is capable of its code required live load and the ability of the roof structure to support live loads has not been substantially reduced by the age of the structure, termites or mold, or unauthorized modifications to the existing structure. Solar Energy Contractor shall make an inspection of the existing roof framing system prior to installation of the roof mounted solar energy system to verify that the existing roof is capable of supporting minimum roof live loads. Assumed Design Parameters: All 2x members are grade Douglas Fir #2 or better All 4X members are grade Douglas Fir #1 or better All Roof Connectors are Simpson Strong -Tie or Equal All Concrete Foundations are f'c = 2500 psi or stronger Original Structure was built to the Type-V Wood Framed Standards of the Applicable Building Code at the time of Construction. Sht # 1 of 7 2023-5818 Solar Deployed Eddie Jurak December 14, 2023 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Note to Building Official: Based upon a review of the proposed plans I am confident that the existing roof framing system is capable of safely supporting the additional loads caused by the new solar photovoltaic energy system. The contractor shall field verify that the existing roof structure is in its original permited condition and verify that it can support the normal code required roof live loads. Attached in this package are several calculations showing that the roof members can support the additional weight of the solar array. Furthermore, an analysis of the solar array's support for wind forces and a seismic analysis of the existing structure are also included. Check Existing 2X4 Roof Trusses (a- 24" O.C.: W DL+ LL w = 30 psf x 2 ft. = 60 plf R1 R2 13.33' �OQROF ESS104g W C� c, 2 Total load on trusses = 60 plf x 13.33 ft. = 800 Ibs � No. C58724 Exp. 3-31-25 / V �TF OF C AIL-�� 05 Sht#2of7 2023-5818 Solar Deployed Eddie Jurak December 14, 2023 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Check Existing 2X4 Roof Trusses (a- 24" O.C.: P P P P WLL 6 b 6 6 W DL WpL + LL = 30 psf x 2 ft. = 60 plf WpL = 14 psf x 2 ft. = 28 plf R1 R2 13.33' 2.4' 6.8' 4.13' Total load on trusses=(60plf x6.53ft)+(28plf x6.8ft)+(6'x1.7'x3psf x4) = 705 Ibs < 800 Ibs OK Check attachment of Support to Existing Structure for Wind Uplift CHECK SOLAR STRUCTURE ATTACHMENTS PER ASCE 7-16 WIND LOADS ON BUILDING APPURTENANCES AND OTHER STRUCTURES Section 29.4.4 THEREFORE CHECK ATTACHMENT FOR TYPICAL CRITICAL LOAD WHICH IS THE EDGE ZONE - ZONE 2. NOTE: PER DEFINITION ON SHEETS 246 & 247 OF ASCE 7-16 EFFECTIVE WIND AREA: FOR ROOFTOP SOLAR ARRAYS, THE EFFECTIVE WIND AREA IN FIG. 29.4-7 IS EQUAL TO THE TRIBUTARY AREA FOR THE STRUCTURAL ELEMENT BEING CONSIDERED, EXCEPT THAT THE WIDTH OF THE EFFECTIVE WIND AREA NEED NOT BE LESS THAN ONE-THIRD ITS LENGTH. EFFECTIVE AREA = 15 SQ FT Sht#3of7 2023-5818 Solar Deployed Eddie Jurak December 14, 2023 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Tributary Area to Each Solar Mount = 6 ft. x 3.1 ft. = 18.6 sq. ft. ( Max ) Calculate Design Wind Pressure at each support (Wind Speed 130 mph Exposure C): p= q h (GCp)(YE)(Y J Eq'n 29.4-7 ASCE 7-16 qh = 0.00256KZ KZt Kd Ke V2 Eq'n 26.10-1 ASCE 7-16 Note: KZ = velocity pressure coefficient Section 29.10.1 ASCE 7-16 KZ = 0.9 (Exposure C, Height = 20 ft or less) KZt = Topographical Factor = 1.0 Kd = Wind Directionality Factor = 0.85 Ke = Ground Elevation Factor = 1.0 V = 130 mph ; VASB = 101 mph qh = 0.00256 (0.9) (1.0) (0.85) (1.0) (101)2 qh = 19.98 psf GCp = -2.0 (Zone 2 ; Effective Area = 15 sq. ft. ) Y E = Exposure Factor = 1.5 Y a = Solar Array Pressure Equalization Factor = 0.7 p = qh (GCp)(YE)(Ya) p = 19.98 psf (-2.0) (1.5) (0.7) = 42 psf QROF ESSIO\ ,mil A. C", o- Lu No. C58724 ap. 3-31-25 �rvti�- ,%OF C AL\F��-> Fig. 29.4-8 ASCE 7-16 Sht # 4 of 7 2023-5818 Solar Deployed Eddie Jurak December 14, 2023 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Check attachment of Support to Existing Structure for Wind Uplift - Cont'd Nominal (Unfactored) Uplift at each support = 42 psf x 18.6 sq. ft. = 781.2 Ibs Note: Section 2.4.1 of ASCE 7-16, Basic Load Combinations for Allowable Stress Design. Note: Applicable Load Combination #5 (D + 0.6W) Design (Factored) Uplift at each support = 0.6 x 781.2 Ibs = 469 Ibs Load per lag screw = 469 Ibs / 1 = 469 Ibs Determine allowable load per 5/16" lag screw w/ 2.5" embedment into wood below according to the 2018 NDS. e�arEssioN W ' = W x Cd x Ct Table 10.3.1 2018 NDS (3 No. C58724 where * Exp.3-31-25 W = 266 Ibs / in. of embedment per Table 12.2a LP CIVO- N Cd = 1.6 per Table 2.3.2 of 2018 NDS �rFOF CP't\ Ct = 1.0 per Table 2.3.3 of 2018 NDS W' = 266 Ibs/ in. x 2.5 in. x 1.6 x 1.0 = 1,064 Ibs > 469 Ibs OK Use Support connected to 2x Min. Roof Member w/ (1) 5/16" x 3.5" lag screws per connection minimum. Sht#5of7 2023-5818 Solar Deployed Eddie Jurak December 14, 2023 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com Check Seismic load due to added dead load of photovoltaic system. Determine Seismic Weight of Existing Building: Effective Existing Seismic Weight Area of (E) Building = Approximate Effective = Seismic Weight Approximately 2,700 Sq. ft 2,700 sq. ft. x 30 psf ave. = 81,000 LBS �oQELOF ESSI0! DETERMINE BASE SHEAR w. LU a � of No. C58724 V = CS W EQ'N 12.8-1 ASCE 7-16 * Exp.3-31-25 LP C/V SDS EQ'N 12.8-2 ASCE 7-16 q�FOF CA1�F�� CS [R] Ie R = THE RESPONSE MODIFICATION FACTOR IN TABLE 12.2-1 R = 6.5 WOOD SHEAR WALLS le = 1.0 IMPORTANCE FACTOR SDS = 2/3 X SMs SMs = FAX SS SMs=1.2x1.5=1.8 SDS= 2/3 x 1.8 = 1.2 CS = SDS = 0.185 EQ'N 12.8-2 ASCE 7-16 LR Tel 2023-5818 Solar Deployed Eddie Jurak Sht#6of7 December 14, 2023 Loyd W. Martin Professional Engineer, Inc. 9924 Universal Boulevard #224-406 Orlando, FL 32819 Tel:1.310.464.1804 Email: loydwmartin@gmail.com www.loydwmartin.com EXISTING BASE SHEAR V = 0.185 x 81,000 LBS = 14,985 LBS DETERMINE NEW BASE SHEAR ���o��q Determine Seismic Weight of Building with Solar Array:LU LU No. C58724 EXISTING SEISMIC = 81,000 LBS Exp. 3 31-25 WEIGHT �jgTFOFjCAOF���\� NEW SOLAR ARRAY = 3 PSF x 15 PANELS x 6.2' x 3.4' = 949 LBS SEISMIC = 81,000 LBS + 949 LBS = 81,949 LBS WEIGHT THEREFORE NEW BASE SHEAR: V = 0.185 x 81,949 = 15,161 LBS EQ'N 12.8-1 ASCE 7-16 % CHANGE = 15,161 LBS - 14,985 LBS ,100 = 1.2 % < 10 % OK 14,985 LBS OK. PER ASCE 7-16 SECTION 11 B.4 ALTERATIONS EXISTING LATERAL FORCE RESISTING SYSTEM IS EXEMPT FROM ANALYSIS SINCE NEW SEISMIC FORCE IS LESS THAN 10% GREATER THAN EXISTING SEISMIC FORCE "Alterations may be made to any structure without requiring the existing structure to comply with this standard, provided that the alterations comply with the requirements for a new structure. Alterations that increase the seismic force in any existing structural element by more than 10% or decrease the design strength of any existing structural element to resist seismic forces by more than 10% shall not be permitted unless the entire seismic force -resisting system is determined to comply with this standard for a new structure. " End of Calculations Sht#7of7 2023-5818 Solar Deployed Eddie Jurak December 14, 2023 I CUE= I ICT TA DI L AUTHORITIES HAVING JURRISDUCTION 2022 CALIFORNIA BUILDING CODE 2022 CALIFORNIA RESIDENTIAL CODE 2022 CALIFORNIA ELECTRICAL CODE 2022 CALIFORNIA FIRE CODE 2022 CALIFORNIA MECHANICAL CODE 2022 CALIFORNIA GREEN CODE 2022 CALIFORNIA PLUMBING CODE 2022 CALIFORNIA ENERGY CODE ANY LA QUINTA MUNICIPAL CODES & AMENDMENTS GENERAL NOTES A. THIS PHOTOVOLTAIC (PV) SYSTEM SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE (NEC) ARTICLE 690, ALL MANUFACTURERS'S LISTING AND INSTALLATION INSTRUCTIONS, AND THE RELEVANT CODES AS SPECIFIED BY THE AUTHORITY HAVING JURISDICTION'S (AHJ) APPLICABLE CODES. B. ALL EQUIPMENT SHALL BE LISTED AND LABELED BY A NATIONALLY RECOGNIZED ELECTRICAL TESTING LABORATORY AND SHALL BE INSTALLED PER ITS LISTING REQUIREMENTS AND MANUFACTURER'S INSTRUCTIONS. C. THE PV SYSTEM WILL BE INTERCONNECTED AND OPERATED IN PARALLEL WITH THE UTILITY ELECTRICAL GRID PER THE REQUIREMENTS OF THE UTILITY AND APPLICABLE CODES. D. CONTRACTORS SHALL BE PRESENT DURING ALL INSPECTIONS. E. A LADDER SHALL BE PROVIDED AND SECURED TO THE STRUCTURE AT THE APPROVED ROOF ACCESS POINT WITH A CAL OSHA APPROVED DEVICE DURING ALL INSPECTIONS. F. THE ROOF ACCESS POINT REQUIRING A LADDER SHALL NOT BE LOCATED OVER A WINDOW, DOOR OR LOCATED WHERE IT CONFLICTS WITH OVERHEAD OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS [CRC 324.7.11. G. THE PV SYSTEM IS DESIGNED IN COMPLIANCE WITH NEC 690.12 (RAPID SHUTDOWN); IDENTIFICATION OF POWER SOURCE RAPID SHUTDOWN AND LABELING SHALL BE IN ACCORDANCE WITH NEC 690.56(C). H. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED [NEC 110.26]. I. POWER PRODUCTION SYSTEMS, AND ALL ASSOCIATED WIRING AND INTERCONNECTIONS OPERATING IN PARALLEL WITH A PRIMARY POWER SOURCE SHALL BE PERFORMED ONLY BY QUALIFIED PERSONS [NEC 690.4(C), 705.81. SMOKE AND CARBON MONOXIDE A. SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE REQUIRED TO BE RETROFITTED ONTO THE EXISTING DWELLING AS PER THE 2022 CRC. THESE SMOKE ALARMS ARE REQUIRED TO BE IN ALL BEDROOMS, OUTSIDE EACH BEDROOM, AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE. CARBON MONOXIDE ALARMS ARE REQUIRED TO BE RETROFITTED OUTSIDE EACH BEDROOM AND AT LEAST ONE ON EACH FLOOR OF THE HOUSE. (CRC 314,315) B. SMOKE ALARMS AND CARBON MONOXIDE ALARMS ARE REQUIRED PER CRC SECTIONS 314 AND 315 TO BE VERIFIED AND INSPECTED BY THE INSPECTOR IN THE FIELD. NOTES TO INSTALLER A. NOTIFY SERVING UTILITY PRIOR TO ACTIVATION OF PV SYSTEM; APPROVAL FROM BOTH THE LOCAL JURISDICTION AND THE UTILITY IS REQUIRED PRIOR TO INTERCONNECTION. B. DIG ALERT (811) IS TO BE CONTACTED AND COMPLIANCE WITH EXCAVATION SAFETY IN ACCORDANCE WITH GOVERNMENT CODE 4216 WILL BE FOLLOWED PRIOR TO ANY EXCAVATION TAKING PLACE. N) PV SYSTEM FOR JURAK RESIDENCE 151380 CLL TAMAZULA, LA QUINTA, CA 92253 SYSTEM SIZE: 6.000 kW DC (STC-DC) 15.475 kW (CEC-AC) 14.350 kW AC (INVERTER) SEE PV.02 FOR ADDITIONAL DETAILS (E) FENCE/GATE (N) PV EQUIPMENT (E) MAIN SERVICE PANEL FIRE ACCESS PATHWAY (DRIVEWAY I STREET) DRIVEWAY Q Q Q J U 0 00 M LO PROPERTY LINE SITE PLAN SCALE: 1/32" = V-0" ACDIAI IIIAAP_`C lip 14 CI l • * + SCOPE OF WORK: INSTALLATION OF NEW PV SYSTEM: 6.000 kW DC (STC-DC) 1 5.475 kW (CEC-AC) 14.350 kW AC (INVERTER) SYSTEM COMPONENTS MODULE: (15) REC SOLAR REC400TP5 BLACK INVERTER: (15) ENPHASE IQ7PLUS-72-2-US [240V] MOUNT: (41) UNIRAC FLASHKIT PRO RAILING: UNIRAC SOLARMOUNT MSP UPGRADE: NO ADDITIONAL INSTALLATION NOTES PROJECT INFORMATION AUTHORITIES HAVING JURISDICTION AHJ: LA QUINTA UTILITY: SCE LOT INFORMATION APN: 770174004 LOT AREA: 0.26 ACRES LIVING AREA: 2745 SQFT DESIGN SPECIFICATIONS OCCUPANCY: R-3/U CONSTRUCTION: V-B ZONING: RESIDENTIAL SNOW LOAD: 0 WIND EXPOSURE: C WIND SPEED: 130 MPH ROOF SURFACE: 4646 PV COVERAGE: 318.99 OF STORIES: ONE FIRE SPRINKLERS: NO ALL WORK SHALL COMPLY WITH APPLICABLE, LOCAL, MUNICIPAL CODES, AND TO MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. PV.01 COVER SHEET PV.02 ROOF & FIRE PLAN PV.03 STRUCTURAL DETAILS PV.04 THREE LINE DIAGRAM PV.05 ELECTRICAL CALCULATIONS PV.06 LABELS PV.07 PLACARD MAP MM MICROINVERTER MAP SPEC SPECIFICATION SHEETS SITE PLAN LEGEND KEY MAIN ELECTRICAL PANEL PV EQUIPMENT PROPERTY LINE ------ D— FENCE FIRE SETBACKS & PROPOSED PATHWAYS REVISIONS SEE RESPONSE LETTER FOR DETAILS ENGINEER OF RECORD 00 ESSIOv C C� LY No, C58724 Exp.3.31-25 December 14, 2023 www. Loyd W Martin .corn Solar Structures Engineering #2023-5818 Structural Only r ELM MCAL VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: C10.1071951 JAVIER VELASCO #fs6.ar NEW PV SYSTEM 6.000 kW DC (STC-DC)15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN: 770174004 DESIGNED BY SOLAR DEPLOYED, LLC. 931 10TH ST 9114, MODESTO, CA 95354 209-671-20011 HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. SIGNATURE: DRAWN BY: E.V. CHECKED BY: A.B. PAPER: 11X17 (ANSI B) DATE: 1211412023 SHEET NAME: SHEET NO.: COVER SHEET PV.01 ADDITIONAL NOTES SITE PLAN NOTES PV MODULE DETAILS A. ALL WORK SHALL COMPLY WITH APPLICABLE, LOCAL, MUNICIPAL CODES, AND REC SOLAR TO MANUFACTURERS' LISTINGS AND INSTALLATION INSTRUCTIONS. (N) IQ COMBINER REC400TP5 BLACK 400 WATTS B. THE ROOF ACCESS POINT REQUIRING A LADDER SHALL NOT BE LOCATED (N) 30A AC DISCONNECT 74.8" H X 40.94" L X 1.2" D OVER A WINDOW, DOOR OR LOCATED WHERE IT CONFLICTS WITH OVERHEAD WEIGHT: 47.6 LBS OBSTRUCTIONS SUCH AS TREE LIMBS, WIRES OR SIGNS [R324.7.1]. ROOF ACCESS POINT (E) 200A MAIN SERVICE PANEL C. PROPER ACCESS AND WORKING CLEARANCE AROUND EXISTING AND ROOF AREA PV COVERAGE PROPOSED ELECTRICAL EQUIPMENT WILL BE PROVIDED [NEC 110.261. ROOF SURFACE: 4646 SQ. FT. D. THE DEPICTED CONDUIT RUN ON PLANS IS A PROPOSED CONDUIT ROUTE. PV COVERAGE: 318.99 SQ. FT THE CONDUIT RUN MAY BE ALTERED AT INSTALLATION AS REQUIRED, AS LONG °C s "' _ _ ROOF AREA COVERED: 6.87% AS ALTERATIONS ADHERE TO ALL AHJ AND HOA REQUIREMENTS. i E. INSTALLATION OF NEW PV SYSTEM SHALL NOT OBSTRUCT EXISTING FIRE SETBACKS &PATHWAYS PLUMBING VENTS, SKYLIGHTS, EXHAUST OUTLETS, OR VENTILATION INTAKE AIR OPENINGS; ANY RELOCATED PLUMBING VENTS MUST BE THROUGH THE ATTIC T FIRE CODE PATHWAY SPACE AND TERMINATED A MIN. 6 INCHES ABOVE THE ROOF LINE. 18" RIDGE FIRE SETBACK F. ALL EQUIPMENT SHALL BE LISTED AND ALL OUTDOOR EQUIPMENT SHALL BE NEMA 3R RATED, INCLUDING ROOF MOUNTED TRANSITION BOXES AND FIRE SETBACKS AND PATHWAYS DESIGNED SWITCHES. IN COMPLIANCE WITH R324.6.2 AND ASSUMES NO AUTOMATIC FIRE G. EQUIPMENT LISTINGS AND CERTIFICATIONS ARE AS FOLLOWS: I SPRINKLERS ARE ON THE PROPERTY I. MODULES ARE LISTED UNDER UL61370-1 & UL61370-2 CY) UNLESS CONFIRMED BY THE INSTALLER. II. INVERTER IS LISTED UNDER UL1741 III. RACKING IS LISTED UNDER UL2703 IV. RACKING SYSTEMS IN COMBINATION WITH TYPE 1 OR 2 MODULES, ENGINEER OF RECORD ARE CLASS A FIRE RATED. JB P P qi�'OIF Ess�o w. _ ED FIRE PATHWAY NOTES 04 No, C58724 ARRAY 1 3.200 kW p p R324.6.1: PATHWAYS TO RIDGE. [X8] (N) MODULES � p 3.31_25 I. NOT LESS THAN TWO MINIMUM 36-INCH WIDE (914 MM) PATHWAYS ON TILT: 18 DEGREES SEPARATE ROOF PLANES, FROM LOWEST ROOF EDGE TO RIDGE, SHALL �F r ti• BE PROVIDED ON ALL BUILDINGS. AT LEAST ONE PATHWAY SHALL BE AZIMUTH: 270 DEGREES PROVIDED ON THE STREET OR DRIVEWAY SIDE OF THE ROOF. II. FOR EACH ROOF PLANE WITH A PHOTOVOLTAIC ARRAY, A MINIMUM-- 36-INCH-WIDE PATHWAY FROM THE LOWEST ROOF EDGE TO RIDGE p December 14, 2023 SHALL BE PROVIDED ON THE SAME ROOF PLANE AS THE PHOTOVOLTAIC Loyd W Martin ARRAY, ON AN ADJACENT ROOF PLANE, OR STRADDLING THE SAME AND Vvww. .com ADJACENT ROOF PLANES. I Solar Structures Engineering III. PATHWAYS SHALL BE OVER AREAS CAPABLE OF SUPPORTING FIRE #2023-5818 Structural Only y FIGHTERS ACCESSING THE ROOF. PATHWAYS SHALL BE LOCATED IN AREAS WITH MINIMAL OBSTRUCTIONS SUCH AS VENT PIPES, CONDUIT, OR MECHANICAL EQUIPMENT. i R324.6.2 SETBACKS AT RIDGE. FOR PHOTOVOLTAIC ARRAYS OCCUPYING 33 PERCENT OR LESS OF THE r PLAN VIEW TOTAL ROOF AREA, A MINIMUM 18 IN. SETBACK IS REQUIRED ON mein MCA BOTH SIDES OF A HORIZONTAL RIDGE. FOR PHOTOVOLTAIC ARRAYS VELASCO'S ELECTRICAL OCCUPYING MORE THAN 33 PERCENT OF THE PLANVIEW TOTAL ROOF AREA, 1705 HALDEN WAY, A MINIMUM 36 IN. WIDE SETBACK IS REQUIRED ON BOTH SIDES OF A 11-11 " 26-0" 10'-2" MODESTO, CA 95350 HORIZONTAL RIDGE. PHONE: (209) 595-9039 ROOF ACCESS POINT LIC NO.: C10.1071951 R324.7.2.6 EMERGENCY ESCAPE AND RESCUE OPENING. JAVIER VELASCO PANELS AND MODULES INSTALLED ON DWELLINGS SHALL NOT BE PLACED ARRAY 2 2.800 kW yrr ON THE PORTION OF A ROOF THAT IS BELOW AN EMERGENCY ESCAPE AND RESCUE OPENING. A 36 IN. WIDE PATHWAY SHALL BE PROVIDED TO THE [x7] (N) MODULES EMERGENCY ESCAPE AND RESCUE OPENING. TILT: 18 DEGREES NEW PV SYSTEM AZIMUTH: 180 DEGREES 6.000 kW DC (STC-DC) 15.475 kW (CEC-AC) FIRE PATHWAY REQUIREMENT EXCEPTIONS. EDDIE JURAK I. DETACHED, NONHABITABLE STRUCTURES SHALL NOT BE REQUIRED TO 51380 CALLE TAMAZULA, PROVIDE ROOF ACCESS. ROOF & FIRE PLAN LA QUINTA, CA 92253 II. FIRE ACCESS PATHWAYS NOT REQUIRED FOR ROOFS WITH SLOPES OF 2:12 SCALE: 3/32" = 1' APN: 770174004 (11 DEGREE PITCH) OR LESS. DESIGNED BY SOLAR DEPLOYED, LLC. LEGEND KEY JB NEVA 3R JBOX cn IKKI CHIMNEY � SATELLITE DISH A/C ROOFTOP A/C UNIT ADDITIONAL FIRE NOTES. I. FIRE PATHWAYS TO RIDGE ARE PROPOSED PATHWAYS AND ARE NOT INTENDED TO LIMIT ALTERNATIVE PATHWAYS TO ROOF AT INSTALLATION IF 931 10TH ST 9114, MODESTO, CA 95354 209-671-20011 HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. SIGNATURE: SITE CONDITIONS REQUIRE. ALTERNATIVE PATHWAYS MUST COMPLY WITH oo OPTIMIZER/RSD/ COMBO METER/MAIN W SUB PANEL BATTERY BANK DRAWN BY: E.V. CHECKED BY: A.B. MICROINVERTER ALL AHJ AND CODE REQUIREMENTS FOR FIRE PATHWAYS. D m SKY LIGHT ® PLUMBING VENT PAPER: 11X17 (ANSI B) DATE: 1211412023 II. SEE ADDITIONAL NOTES SECTION FOR ROOF COVERAGE CALCULATIONS < INVERTER AC LOADCENTER EV CHARGER PROPOSED CONDUIT AC DISCONNECT ° IQ COMBINER < PRODUCTION METER PROPOSED STRINGING ® ATTIC VENT O ELECTRICAL MAST SHEET NAME: SHEETNO.: ELECTRICAL & FIRE PLAN PV.02 ROOF INFORMATION ADDITIONAL NOTES 1. ROOF MATERIAL: CLAY TILE 2. ROOF SLOPE: 18 DEGREES 3. ROOF STRUCTURE: MANUFACTURED DOUBLE QUEEN TRUSS 4. RAFTER SIZE: 2X4 5. RAFTER SPACING: 24" O.C. 6. MAX RAFTER SPAN: 4'-0" & 2'-8" & 6'-8" MODULE INFORMATION 7. PV MODULE: REC SOLAR REC400TP5 BLACK 8. DIMENSION: 74.8" H X 40.94" W X 1.2" D 9. WEIGHT 47.6 LBS 10. MODULE CLEARANCE: 31N. MIN 16 IN. MAX ATTACHMENT & RAILING 11. ATTACHMENT: 12. MAX. HORIZONTAL STANDOFF: 13. STANDOFF STAGGERING: 14. MAX. VERTICAL STANDOFF: 15. RAILING: 16. MAX RAIL CANTILEVER: 17. LAG BOLT SIZE: 18. LAG BOLT EMBEDMENT: 72 IN. MAX LOAD CALCULATIONS (41) UNIRAC FLASHKIT PRO 72 IN. YES PER INSTALLATION INSTRUCTIONS UNIRAC SOLARMOUNT PER INSTALLATION INSTRUCTIONS 3-1/2 IN. X 5/16 IN. DIA 2-1/2 IN. UNIRAC FLASHKIT PRO UNIRAC SOLARMOUNT APPROX. INSTALLATION AREA: 318.99 SO. FT. TOTAL SYSTEM WEIGHT: 784.50 LBS. DISTRIBUTED WEIGHT OF ARRAY: 2.46 PSF. WEIGHT PER MOUNT: 19.13 LBS STRUCTURAL NOTES A. ALL HARDWARE, INCLUDING MOUNTING AND RACKING, TO BE INSTALLED PER MANUFACTURER SPECIFICATIONS. B. ALL PV RELATED RACKING ATTACHMENTS WILL BE SPACED NO GREATER THAN THE SPAN DISTANCE SPECIFIED BY THE RACKING MANUFACTURER; FINAL ATTACHMENT LOCATIONS MAY BE ADJUSTED IN THE FIELD AS NECESSARY. C. ROOFTOP PENETRATIONS PERTAINING TO SOLAR RACKING WILL BE COMPLETED AND SEALED W/ APPROVED CHEMICAL SEALNT PER CODE BY A LICENSED CONTRACTOR. LAG 'MIN OOD NOTE: PILOT HOLES REQUIRED FOR 5/16" DIA. LAG BOLTS NOTE - Engineer of Record assumes that all structural components of the existing building were permitted and met the requirements of the Building Code at the time of construction. Solar Contractor shall field verify that the roof framing is in its existing permitted condition and capable of supporting required live loads. Framing specified on solar plans shall be assumed to be minimum size and spacing, actual framing may be different. [a]WTA 'A014: 0 ?X4 RAFTERS @24" CENTERS COMP SHINGLE (1 LAYER) (COMP INSET) ATTACHMENT DETAIL SCALE: 3/32" = 1' ENGINEER OF RECORD December 14, 2023 www. Loyd W Martin .corn Solar Structures Engineering #2023-5818 Structural Only d d. ELM ECAL VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: CIO .1071951 JAVIER VELASCO NEW PV SYSTEM 6.000 kW DC (STC-DC)15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN: 770174004 DESIGNED BY SOLAR DEPLOYED, LLC. 931 10TH ST #114, MODESTO, CA 95354 209-671-20011 HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. I SIGNATURE: DRAWN BY: E.V. I CHECKED BY: A.B. PAPER: 11 X1 7 (ANSI B) I DATE: 12/1412023 SHEET NAME: SHEET NO.: STRUCTURAL PLAN PV.03 PV SYSTEM COMPONENTS ELECTRICAL & CONDUIT NOTES ADDITIONAL NOTES ® MODULES (15) REC SOLAR REC400TP5 BLACK ® MICROINVERTERS (15)ENPHASE IQ71PLUS-72-2-US [240] [SI1-JUN20] PV COMPONENT NOTES 1. PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN PER CEC 690.12 2. ENPHASE MICROINVERTERS ARE MODULE -LEVEL RSD COMPLIANT IQ COMBINER W/ ENPHASE ENVOY 240/120 V 10, 3W o w MICROINVERTERS m co( MMS ) ENVOY e DU221 RB BRANCH 1-2 0 ? 15A PV AC DISCONNECT F~ N 30A NON -FUSED FB2] • • • 7 z240V, uJ NEMA 3R z B1 • • • � MR1 20A 20A i PV WIRE SCHEDULE SEE CALCULATIONS PAGE FOR FULL WIRE AND CONDUIT CALCULATIONS 01 MODULES I MICROINVERTERS TO JUNCTION BOX CONDUCTOR 12 AWG PV WIRE, COPPER GROUND 6 AWG BARE, COPPER CONDUIT FREE AIR CURRENT -CARRYING CONDUCTORS N/A MAX OUTPUT PER BRANCH (125%) 20A Oz JUNCTION BOX TO PV BRANCH BREAKERS CONDUCTOR 10 AWG THWN-2, COPPER GROUND 8 AWG THWN-2, COPPER CONDUIT 0.75" EMT CURRENT -CARRYING CONDUCTORS 4 (2 PER BRANCH) MAX OUTPUT PER BRANCH (125%) 20A VISIBLE/LOCKABLE LABELLED ACD COMBINED PV BREAKERS TO INTERCONNECTION CONDUCTOR 10 AWG THWN-2, COPPER GROUND 8 AWG THWN-2, COPPER CONDUIT 0.75" EMT CURRENT -CARRYING CONDUCTORS 3 CONTINUOUS CURRENT 18.15A MAX CURRENT (125%) 22.69A (E) 200A MAIN SERVICE PANEL 240/120 V 10, 3W BUS RATING: 200A MCB RATING: 200A INTERCONNECTION STRATEGY: LOAD SIDE 705.12(B)(3)(2) MAX. BACKFEED CURRENT CALC: 200A X 1.2 - 200A = 40A TO UTILITY GRID (UNDERGROUND) 200A (N (E) GROUNDING ELECTRODE M 0 A. MAIN PANEL UPGRADES. A TYPE 1 OR TYPE 2 SURGE PROTECTION DEVICE SHALL BE INSTALLED FOR THE NEW MSP EITHER AS AN INTEGRAL PART OF THE SERVICE EQUIPMENT OR LOCATED IMMEDIATELY ADJACENT THERETO. [NEC 230.671 B. ALL CONDUIT AND WIRE WILL BE LISTED AND APPROVED FOR THEIR PURPOSE. CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENT AND ARE NOT MEANT TO LIMIT UP -SIZING AS REQUIRED BY FIELD CONDITIONS. C. CONDUIT RACEWAYS SHALL BE PROVIDED WITH EXPANSION FITTINGS TO COMPENSATE FOR THERMAL EXPANSION AND CONTRACTION. [NEC 110 (B) AND 110.14 (D)] D. PROVIDE PULL BOXES AND/OR EXPANSION OR DEFLECTION FITTINGS FOR THE ROOFTOP CONDUITS TO ACCOMMODATE THERMAL EXPANSION AND CONTRACTION. [NEC 300.7(B)] E. ALL CONDUCTORS AND CONDUITS ON THE ROOF SHALL BE INSTALLED A MINIMUM DISTANCE ABOVE THE ROOF TO THE BOTTOM OF THE RACEWAY OR CABLE OF 7/8" IN. (INCLUDING CABLES UNDERNEATH MODULES AND RACKING). F. ALL CONDUCTORS IN EXPOSED OUTDOOR LOCATIONS SHALL BE LISTED AND IDENTIFIED FOR USE IN DIRECT SUNLIGHT AND FOR THE APPLICATION. [NEC 690.31(C) THROUGH (F), 310.10(D)] G. EXPOSED CONDUCTORS WITHIN THE PV ARRAY SHALL BE PV WIRE/CABLE, OR TYPE USE-2, OR TYPE RHW-2 (UL 4703 & 854 LISTED) [NEC 690.31(C)(1)] H. ALL EXTERIOR CONDUIT, FITTINGS, AND BOXES SHALL BE RAIN TIGHT AND APPROVED FOR USE IN WET LOCATIONS. (NEC 314.15) I. DC WIRING INSIDE A BUILDING MUST BE IN METAL RACEWAYS, METAL -CLAD CABLE, OR METAL ENCLOSURES. [NEC 690.31(D)] J. EQUIPMENT GROUNDING CONDUCTOR (EGC) SMALLER THAN #6-AWG SHALL BE PROTECTED FROM PHYSICAL DAMAGE BY AN IDENTIFIED RACEWAY OR CABLE ARMOR, UNLESS INSTALLED WITHIN HOLLOW SPACES OF THE FRAMING MEMBERS OF BUILDINGS OR STRUCTURES AND WHERE NOT SUBJECT TO PHYSICAL DAMAGE. [NEC 250.120(C)] K. CABLES/WIRES THAT ARE SUBJECT TO PHYSICAL DAMAGE, SUCH AS THOSE NOT LOCATED UNDER THE MODULES, MUST BE PROTECTED. [NEC 300.4] L. CONDUIT AND WIRE SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP -SIZING AS REQUIRED BY FIELD CONDITIONS. ENGINEER OF RECORD omm 771 VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: C10.1071951 JAVIER VELASCO NEW PV SYSTEM 6.000 kW DC (STC-DC)15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN: 770174004 DESIGNED BY SOLAR DEPLOYED, LLC. 931 10TH ST 9114, MODESTO, CA 95354 209-671-20011 HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. SIGNATURE: DRAWN BY: E.V. CHECKED BY: A.B. PAPER: 11X17 (ANSI B) DATE: 1211412023 SHEET NAME: SHEET NO.: LINE DIAGRAM PV.04 PV SYSTEM ELECTRICAL SPECIFICATIONS AND CALCULATIONS PV CONDUIT AND CONDUCTOR CALCULATIONS ADDITIONAL NOTES DESIGN LOCATION AND TEMPERATURE PV SYSTEM COMPONENTS o1 MODULES I MICROINVERTERS TO JUNCTION BOX WEATHER STATION JACQUELINE COCHRAN ® MODULES (15) REC SOLAR CONDUCTOR 12 AWG PV WIRE, COPPER TEMP. CORR. FACTOR 0.58 (66°C) ASHRAE EXTREME LOW TEMP. -7.5°C GROUND 6 AWG BARE, COPPER CONDUIT FILL FACTOR N/A ASHRAE 2% HIGH TEMP. 44°C REC400TP5 BLACK CONDUIT FREE AIR BASE AMP 40A ® MICROINVERTERS (15)ENPHASE I07PLUS-72-2-US CURRENT -CARRYING CONDUCTORS N/A DERATED AMP 23.20A> 20A OK [240] [SI1-JUN20] MAX OUTPUT PER BRANCH (125%) 20A TERMINAL TEMP & AMP 40A @ 90°C PV COMPONENT NOTES TOTAL SYSTEM SUMMARY 1. PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN PER CEC 690.12 2. ENPHASE MICROINVERTERS ARE MODULE -LEVEL RSD COMPLIANT SYSTEM SIZE (STC-DC): 6.000 kW os JUNCTION BOX TO PV BRANCH BREAKERS SYSTEM SIZE (CEC-AC): 5.475 kW CONDUCTOR 10 AWG THWN-2, COPPER TEMP. CORR. FACTOR 0.82 (44°C) INVERTER RATED POWER (AC): 4.350 kW GROUND 8 AWG THWN-2, COPPER MAX. CONDUIT FILL FACTOR 0.8 MAX PV CURRENT (125%): 12.69A CONDUIT 0.75" EMT BASE AMP 40A CURRENT -CARRYING CONDUCTORS 4 (2 PER BRANCH) MAX. DERATED AMP 26.24A> 20A OK MAX OUTPUT PER BRANCH (125%) 20A TERMINAL TEMP & AMP 35A @ 75°C ® MODULE SPECIFICATIONS (15) REC SOLAR REC400TP5 BLACK o3 COMBINED PV BREAKERS TO INTERCONNECTION RATED POWER (PMAX) (W) 40OW CONDUCTOR 10 AWG THWN-2, COPPER TEMP. CORR. FACTOR 0.82 (44°C) RATED POWER (PTC) (W) 376.3W GROUND 8 AWG THWN-2, COPPER CONDUIT FILL FACTOR 1.0 SHORT CIRCUIT CURRENT (ISC) (A) 11.39A CONDUIT 0.75" EMT BASE AMP 40A MAXIMUM POWER CURRENT (IMP) (A) 10.64A CURRENT -CARRYING CONDUCTORS 3 DERATED AMP 32.80A> 22.69A OK OPEN CIRCUIT VOLTAGE (VOC) (V) 45V CONTINUOUS CURRENT 18.15A TERMINAL TEMP & AMP 35A @ 75°C MAXIMUM POWER VOLATGE (VMP) (V) 37.6V MAX CURRENT (125%) 22.69A VOLTAGE DROP (@ 10') 0.19% DROP ENGINEER OF RECORD TEMP. COEFF. OF VOC-0.116V/K ® MICROINVERTER DETAILS MICROINVERTER RATIO [1:1] (15) ENPHASE IQ7PLUS-72-2-US [240V1 [JUN20-Sill SPECIFICATIONS BRANCH DETAILS B1 B2 MAX OCPD (A) 20A INVERTERS PER BRANCH 8 7 RATED POWER (W) 29OW MODULE PER BRANCH 8 7 MAX OUTPUT (A) 1.21A AC CURRENT 9.68A 8.47A MAX INPUT (A) 15A MAX AC CURRENT (125%) 12.10A 10.59A MAX INPUT (V) 60V MAX AC OUTPUT POWER 2320W 203OW EFFICIENCY (CEC) 0.97% MAX. OVERCURRENT CALCULATION: 1.21A X 15=18.15A; 18.15A X 125%= 22.69A MAX ♦ m` ELM MCAL VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: C10.1071951 JAVIER VELASCO NEW PV SYSTEM 6.000 kW DC (STC-DC) 15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN: 770174004 DESIGNED BY SOLAR DEPLOYED, L-C. 931 10TH ST 9114, MODESTO, CA 95354 209-671-2001 I HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. SIGNATURE: DRAWN BY: E.V. CHECKED BY: A.B. PAPER: 11X17 (ANSI B) DATE: 1211412023 SHEET NAME: SHEET NO.: DESIGN CALCULATIONS PV.05 ADDITIONAL NOTES AWARNING ELECTRIC SHOCK HAZARD TERMINALS ON BOTH LINE AND LOAD SIDES MAY BE ENERGIZED IN THE OPEN POSITION CODE REFERENCE: NEC 690.5(C) LOCATION: PLACE ON ALL DISCONNECTING MEANS WHERE ENERGIZED IN AN OPEN POSITION 06 AC DISCONNECT AC PHOTOVOLTAIC POWER SOURCE MAX AC OPERATING CURRENT: 18.15A MAX AC OPERATING VOLTAGE: 240 VAC CODE REFERENCE: NEC 690.54 LOCATION: AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT (I.E. MAIN PANEL AND SUB PANEL IF APPLICABLE) AWARNING PHOTOVOLTAIC 07 AC DISCONNECT POWER SOURCE OUTPUT 02 CODE REFERENCE: NEC 690.13(B) CONNECTION. DO NOT LOCATION: AT P.O.C. TO SERVICE DISTRIBUTION RELOCATE THIS EQUIPMENT / AC DISCONNECTS / BREAKERS OVERCURRENT DEVICE Ee CODE REFERENCE: NEC 705.12(B)(3)(2) LOCATION: AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT (I.E. MAIN PANEL AND SUB PANEL IF APPLICABLE) 08 AWARNING THIS EQUIPMENT FED BY MULTIPLE SOURCES: TOTAL RATING OF ALL OVERCURRRENT DEVICES, EXCLUDING MAIN SUPPLY OVERCURRENT DEVICE, SHALL NOT EXCEED AMPACITY OF BUSBAR CODE REFERENCE: NEC 705.12(B)(3)(3) LOCATION: AT P.O.C. TO SERVICE DISTRIBUTION EQUIPMENT (I.E. MAIN PANEL AND SUB PANEL IF APPLICABLE) SOLAR PV SYSTEM EQUIPPED WITH RAPID SHUTDOWN TURN RAPID SHUTDOWN SWITCH TO THE "OFF" POSITION TO SOLAR ELECTRIC SHUT DOWN PV SYSTEM PV PANELS AND REDUCE SHOCK HAZARD IN THE ARRAY CODE REFERENCE: NEC 690.56 LOCATION: SIGN TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM SERVICE DISCONNECTING MEANS TO WHICH THE PV SYSTEMS ARE CONNECTED AND SHALL INDICATE THE LOCATION OF ALL IDENTIFIED RAPID SHUTDOWN SWITCHES IF NOT AT THE SAME LOCATION. AWARN ING DUAL POWER SOURCE 09 RAPID SHUTDOWN SWITCH 04 SECOND SOURCE IS PHOTOVOLTAIC SYSTEM ) � FOR SOLAR PV SYSTEM CODE REFERENCE: NEC 690.64(B)(4) LOCATION: ALL EQUIPMENT CONTAINING OVERCURRENT DEVICES IN CIRCUITS SUPPLYING POWER TO A BUSBAR OR CONDUCTORS SUPPLIED FROM MULTIPLE SOURCES CODE REFERENCE: NEC 690.56 (C)(2) LOCATION: TO BE LOCATED ON OR NO MORE THAN 3 FT AWAY FROM RSD INITIATION DEVICE 05 PHOTOVOLTAIC POWER SOURCE 1 AWARNING CODE REFERENCE: NEC 690.31(D)(2) PHOTOVOLTAIC SYSTEM LOCATION: AT EXPOSED RACEWAYS, COMBINER PANEL CABLE TRAYS, AND OTHER WIRING DO NOT ADD LOADS. METHODS; SPACED A MAX. 10 FT SECTIONS OR WHERE SEPARATED BY ENCLOSURES, WALLS, PARTITIONS, LOCATION: AT PV COMBINER PANEL CEILINGS, OR FLOORS. (IF APPLICABLE) FORMAT 1. WHITE LETTERING ON A RED BACKGF 2. MINIMUM 3/8 INCHES LETTER HEIGHT 3. ALL LETTERS SHALL BE CAPITALIZED 4. ARIAL OR SIMILAR FONT (NON -BOLD) MATERIAL REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL-969 AS STANDARD FOR WEATHER RATING). DURABLE ADHESIVE MATERIALS. ENGINEER OF RECORD VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: CIO .1071951 JAVIER VELASCO I NEW PV SYSTEM 6.000 kW DC (STC-DC)15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN: 770174004 DESIGNED BY SOLAR DEPLOYED, LLC. 931 10TH ST #114, MODESTO, CA 95354 209-671-20011 HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. SIGNATURE: DRAWN BY: E.V. CHECKED BY: A.B. PAPER: 11X17 (ANSI B) DATE: 1211412023 SHEET NAME: SHEET NO.: LABELS PV.O6 ADDITIONAL NOTES DISCONNECT DIRECTORY PLAQUE INSTALL AT MAIN SERVICE PANEL ■ CAUTION. POWER TO THIS BUILDING ALSO SUPPLIED FROM THE FOLLOWING SOURCES WITH DISCONNECTS LOCATED AS SHOWN AC DISCONNECT UTILITY METER AND IQ COMBINER MAIN SERVICE PANEL YOU ARE HERE ROOFTOP PV ARRAY 51380 CLL TAMAZULA,LA QUINTA, CA 92253 NOTE: NEW AND EXISTING PV ARRAY ARE 690.12 RSD COMPLIANT FnPKAAT 1. WHITE LETTERING ON A RED BACKGROUND 2. MINIMUM 3/8 INCHES LETTER HEIGHT 3. ALL LETTERS SHALL BE CAPITALIZED 4. ARIAL OR SIMILAR FONT (NON -BOLD) I��il�r�d`7I�\■ REFLECTIVE, WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT (USE UL-969 AS STANDARD FOR WEATHER RATING). DURABLE ADHESIVE MATERIALS ENGINEER OF RECORD �a ,, UMFOCAL VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: C10.1071951 JAVIER VELASCO NEW PV SYSTEM 6.000 kW DC (STC-DC) 15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN:770174004 DESIGNED BY SOLAR DEPLOYED, LLC. 931 10TH ST #114, MODESTO, CA 95354 209-671-2001 I HELLO@SOLARDEPLOYED. COM DESIGN LEAD: T.M. SIGNATURE: t v DRAWN BY: E.V. CHECKED BY: A.B. PAPER: 11X17 (ANSI B) DATE: 12114/2023 SHEET NAME: SHEET NO.: PLACARD MAP PV.07 1 2 3 4 5 6 7 8 9 10 11 12 13 ADDITIONAL NOTES 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 $0 41 42 43 44 45 4E 47 48 49 50 54 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 ENGINEER OF RECORD -i VELASCO'S ELECTRICAL 1705 HALDEN WAY, MODESTO, CA 95350 PHONE: (209) 595-9039 LIC NO.: CIO .1071951 JAVIER VELASCO NEW PV SYSTEM 6.000 kW DC (STC-DC)15.475 kW (CEC-AC) EDDIE JURAK 51380 CALLE TAMAZULA, LA QUINTA, CA 92253 APN: 770174004 DESIGNED BY SOLAR DEPLOYED, LLC. 931 10TH ST #114, MODESTO, CA 95354 209-671-2001 1 HELLO@SOLARDEPLOYED.COM DESIGN LEAD: T.M. SIGNATURE: DRAWN BY: E.V. CHECKED BY: A.B. PAPER: 11X17 (ANSI B) DATE: 1211412023 SHEET NAME: SHEET NO.: OPTIMIZER MAP OM REC TWINPEAK __ BLACK SERIES PREMIUM SOLAR PANELS WITH SUPERIOR PERFORMANCE REC TwinPeak 5 Black Series solar panels feature an innovative design with high panel efficiency and power output, enabling customers to get the most out of the space used for the installation. Combined with industry -leading product quality and the reliability of a strong and established European brand, REC TwinPeak 5 Black Series panels are ideal for residential and commercial rooftops worldwide. MOREPOWER FEATURING REC'S PIONEERING 100% SUPER -STRONG ELIGIBLE OUTPUT PER M2 TWIN DESIGN PID FREE FRAME �6, REC SOLAR'S MOST TRUSTED GENERAL DATA Celltype: 132 half -cut mono c-Si p-type cells, 6 strings of 22 cells in series Glass: 3.2 mm solarglass with anti -reflective surface treatment in accordance with EN 12150 Backsheet: Highly resistant polymer (black) Frame: Anodized aluminum (black) with silver support bars Junction box: 3-part, 3 bypass diodes, lead-free IP68 rated, in accordance with IEC 62790 Connectors: Staubli MC4 PV-KBT4/KST4 (4 mm2) in accordance with IEC 62852, IP68 only when connected Cable: 4 mm2 solar cable,1.2 m+1.2 m in accordancewith EN 50618 Dimensions: 1899 x1040 x 30 mm (1.97 m2) Weight: 21.6 kg Origin: Made in Singapore 1899t2.5 [74.8 t0.11 .� .28 [1.1] _ 859[33.81 520[20.5] ❑ 156 [6.14] 1200 [472] + 5.5±0.2 u11 [0.22+0.011 t0.2 [0.43 ±0.1 ] 0 20.530.5 [0.8 +0.02] 1200 [47.21 0 ._ 156[6.141 4511.81 3011.21 Measurements in mm [in] 6ELECTRICAL DATA Product Code': RECxxxTPS Black JIIIIIIIIIIIIIIIIII IWIFICATIO Power Output -PM,x(Wp) 390 395 400 405 410 IEC 61215:2016, IEC 61730:2016, UL 61730 Watt Class Sorting-(W) 0/+5 W 0/+5 W 0/+5 W 0/+5 W 0/+5 W IEC62804 PID IEC61701 Salt Mist Corrosion Nominal Power Voltage-VMPP(V) 36.8 37.2 37.6 38.0 38.3 IEC62716 Ammonia Corrosion Resistance Nominal Power Current-IMPP(A) 10.60 10.62 10.64 10.67 10.71 ISO11925-2 Ignitability (Class E) Open Circuit Voltage - Voc(V) 44.8 44.9 45.0 45.1 45.2 UL790 Fire Class C Short Circuit Current - Isc(A) 11.31 11.35 11.39 11.43 11.47 EC 62782 Dynamic Mechanical Load IEC61215-2:2016 Hailstone(35mm) Panel Efficiency(%) 19.8 20.1 20.3 20.6 20.8 150 14001,150 9001, IEC 45001, IEC 62941 ja !-IyWEE Power Output -P_(Wp) 295 298 302 306 310 ovE 0- C E H take-e-way WEE -compliant Intertek recyclingscheme Nominal Power Voltage-VMPP(V) 34.4 34.8 35.2 35.5 35.8 0 Nominal Power Current - IMPP(A) 8.56 8.58 8.59 8.62 8.65 z Open Circuit Voltage - Voc(V) 41.9 42.0 42.1 42.2 42.3 Short Circuit Current - Isr(A) 9.13 9.17 9.20 9.23 9.27 Values at standard test conditions (STC: air mass AM 1.5, irradiance 1000 W/m', temperature 25°C), based on a production spread with a tolerance of P_ Va& Isc±3%within one watt class. Nominal module operating temperature (NMOT: air mass AM 1.5, irradiance 800 W/m2, temperature 20°C, windspeed 1 m/s). `Where xxx indicates the nominal power class (P.) at STC above. MAXIMUM RATINGS Operational temperature: -40...+85°C Maximum system voltage: 1000 V Maximum test load (front): +7000Pa(713kg/m2)` Maximum test load (rear): -4000Pa(407kg/m2)° Max series fuse rating: 25 A Max reverse current: 25 A `See installation manual for mounting instructions. Design load = Test load /1.5 (safety factor) Availablefrom: Standard REC ProTrust Installed by an REC No Yes Yes Certified Solar Professional System Size All 425 kW 25-500 kW Product Warranty (yrs) 20 25 25 Power Warranty (yrs) 25 25 25 Labor Warranty (yrs) 0 25 10 Power in Year 98% 98% 98% Annual Degradation 0.5% 0.5% 0.5% Power in Year 25 86% 86% 86% The REC ProTrust Warranty is only available on panels purchased through an REC Certified Solar Professional installer. Warranty conditions apply. See www.recgroup.com for more details. Founded inl996, REC Group is an international pioneering solar energy company dedicated to empowering consumers with clean, affordable solar power. As Solar's Most Trusted, REC is committed to high quality, innovation, and a low carbon footprint in the solar materials and solar panels it manufactures. Headquartered in Norway with operational headquarters in Singapore, REC also has regional hubs in North America, Europe, and Asia -Pacific. LTEMPERATURE RATINGSIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII Nominal Module Operating Temperature: 44.6°C (±2°C) Temperature coefficient OfPWA : -0.34%/'C Temperature coefficient ofVoc: -0.26%/'C Temperature coefficient of ISc: 0.04 %/'C `The temperature coefficients stated are linear values DELIVERY INFORMATION Panels per pallet: 33 Panels per 13.6 m truck: 858 (26 pallets) Panels per 40 ft GP/high cube container 792(24pallets) Typical low irradiance performance of module at STC: X w Po =m Irradiance (W/m2) am ® REC Solar LTD. 20 Tuas South Ave.14 Singapore 637312 REC post@recgroup.com www.recgroup.com Data Sheet Enphase Microinverters Region: AMERICAS Enphase IQ7and IQ 7+ Microinverters a swum To learn more about Enphase offerings, visit enphase.com The high-powered smart grid -ready Enphase IQ 7 MicroT°" and Enphase IQ 7+ MicroTM dramatically simplify the installation process while achieving the highest system efficiency. Part of the Enphase IQ System, the IQ 7 and IQ 7+ Microinverters integrate with the Enphase IQ EnvoyTM, Enphase IQ BatteryT", and the Enphase Enlighten TM monitoring and analysis software. IQ Series Microinverters extend the reliability standards set forth by previous generations and undergo over a million hours of power -on testing, enabling Enphase to provide an industry -leading warranty of up to 25 years. Easy to Install • Lightweight and simple • Faster installation with improved, lighter two -wire cabling • Built-in rapid shutdown compliant (NEC 2014 & 2017) Productive and Reliable • Optimized for high powered 60-cell and 72-cell* modules • More than a million hours of testing • Class II double -insulated enclosure • UL listed Smart Grid Ready • Complies with advanced grid support, voltage and frequency ride -through requirements • Remotely updates to respond to changing grid requirements • Configurable for varying grid profiles • Meets CA Rule 21 (UL 1741-SA) * The IQ 7+ Micro is required to support 72-cell modules. 0*7�' ENPHASE Enphase IQ 7 and IQ 7+ Microinverters INPUT DATA (DC) IQ7-60-2-US IQ7PLUS-72-2-US Commonly used module pairings' Module compatibility Maximum input DC voltage Peak power tracking voltage Operating range Min/Max start voltage Max DC short circuit current (module Isc) Overvoltage class DC port DC port backfeed current PV array configuration 235 W - 350 W + 60-cell PV modules only 48 V 27V-37V 16V-48V 22V/48V 15A 0A 235 W - 440 W + 60-cell and 72-cell PV modules 60 V 27V-45V 16V-60V 22V/60V 15A 0A 1 x 1 ungrounded array; No additional DC side protection required; AC side protection requires max 20A per branch circuit OUTPUT DATA (AC) IQ 7 Microinverter IQ 7+ Microinverter Peak output power 250 VA Maximum continuous output power 240 VA Nominal (L-L) voltage/range2 240 V / 211-264 V Maximum continuous output current 1.0 A (240 V) Nominal frequency 60 Hz 295 VA 290 VA 208 V / 240 V / 208 V / 183-229 V 211-264 V 183-229 V 1.15 A (208 V) 1.21 A (240 V) 1.39 A (208 V) 60 Hz Extended frequency range 47 - 68 Hz 47 - 68 Hz AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms Maximum units per 20 A (L-L) branch circuit' 16 (240 VAC) 13 (208 VAC) 13 (240 VAC) 11 (208 VAC) Overvoltage class AC port III III AC port backfeed current 0 A 0 A Power factor setting 1.0 1.0 Power factor (adjustable) 0.85 leading ... 0.85 lagging 0.85 leading ... 0.85 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak efficiency 97.6 % 97.6 % 97.5 % 97.3 % CEC weighted efficiency 97.0 % 97.0 % 97.0 % 97.0 % MECHANICAL DATA Ambient temperature range Relative humidity range Connector type (IQ7-60-2-US & IQ7PLUS-72-2-US) Dimensions (WxHxD) Weight Cooling Approved for wet locations Pollution degree Enclosure -400C to +65°C 4°i to 100°i (condensing) MC4 (or Amphenol H4 UTX with additional Q-DCC-5 adapter) 212 mm x 175 mm x 30.2 mm (without bracket) 1.08 kg (2.38 Ibs) Natural convection - No fans Yes PD3 Class II double -insulated, corrosion resistant polymeric enclosure Environmental category / UV exposure rating NEMA Type 6 / outdoor FEATURES Communication Power Line Communication (PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load -break disconnect required by NEC 690. Compliance CA Rule 21 (UL 1741-SA) UL 62109-1, UL1741/IEEE1547, FCC Part 15 Class B, ICES-0003 Class B, CAN/CSA-C22.2 NO. 107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems, for AC and DC conductors, when installed according manufacturer's instructions. 1. No enforced DC/AC ratio. See the compatibility calculator at httpsWenphase, com/en-us/support/module-compatibility. 2. Nominal voltage range can be extended beyond nominal if required by the utility. 3. Limits may vary. Refer to local requirements to define the number of microinverters per branch in your area. To learn more about Enphase offerings, visit enphase.com v E N P H A S E © 2019 Enphase Energy. All rights reserved. All trademarks or brands used are the property of Enphase Energy, Inc. 2019-3-26 En pha seO E n ergy I! Rapid Shutdown Rapid shutdown is built-in The 2014 and 2047 editions of the National Electrical Code (NEC 2014/NEC What's now in Section 690_12? 2017) added new rapid shutdown requirements for PV systems installed on NEC 2Gf4/2017 Section 690.12 applies buildings. Enphase Microimrerters fully meet rapid shutdown requirements in to RV conductors ovar 10 feet from the new code without the need to install any additional electrical equipment. the PV array and requires that tiro ooncluctors power down to 3+0 volts and 240 voEt-amperes vA tt n 10 seconds of rapid shutdown initiation. String inverters require work arounds for rapid shutdown work aro und, SpeclafflzPad Rap4d Shutdcm deotricari box InsWied on tl root within 10 feet of array. Work around. Shutoff switch that is easily able to first respondws on the ground. Hark around. Extra oondult in installation, Residentiei String Inverter Work around. String inverter installed on root, a hcst,le ertwonment that string Inv Mars are not rUft to live in. Commercial String inverter Enphase comes standard with rapid shutdown capability All Enphase mleroin- verters, evert those that wwa pPYvKxj ty Installed, lnh awtly rrrWrapid shLddown requxemerits, rKo additional equipment or vuorkarour�ds r)eoded ResidorRW Microirlwter To learn more, visit enphesexonn Erphase tniorolmiertars can safely shut down autDm4oally, leaving only low -voltage aC electricity isolated to 1 he loll module Carnmerclat Micrairtrerter nENPHASE IQ Combiner 4/4C Data Sheet Enphase Networking IQ Combiner 4/4C X-IQ-AM1-240-4C X2-IQ-AM1-240-4C ( ENFI165E X2-IQ-AM1-240-4(IEEE 1547:2018) The IQ Combiner 4/4C with IQ Gateway and integrated LTE-M1 cell modem (included only with IQ Combiner 4C) consolidates interconnection equipment into a single enclosure. It streamlines IQ Microinverters and storage installations by providing a consistent, pre -wired solution for residential applications. It offers up to four 2-pole input circuits and Eaton BR series busbar assembly. Smart • Includes IQ Gateway for communication and control • Includes Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), included only with IQ Combiner 4C • Includes solar shield to match Enphase IQ Battery aesthetics and deflect heat • Supports Wi-Fi, Ethernet, or cellular connectivity • Optional AC receptacle available for PLC bridge • Provides production metering and consumption monitoring Simple • Mounts on single stud with centered brackets • Supports bottom, back and side conduit entry • Allows up to four 2-pole branch circuits for 240VAC plug-in breakers (not included) • 80A total PV or storage branch circuits Reliable Durable NRTL-certified NEMA type 3R enclosure Five-year limited warranty Two years labor reimbursement program coverage included for both the IQ Combiner SKU's UL listed X2-IQ-AM1-240-4 and X2-IQ-AM1-240-4C comply with IEEE 1547:2018 (UL 1741-SB, 3rd Ed.) To learn more about Enphase offerings, visit enphase.com E N P H A S E IQ-C-4-4C-DS-0103-EN-US-12-29-2022 MODEL NUMBER IQ Combiner 4 IQ Combiner 4 with IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20 ± 0.5 i) X-IQ-AM1-240-4 and consumption monitoring (± 2.5 i). Includes a silver solar shield to match the IQ Battery and IQ System Controller 2 and to X2-IQ-AM1-240-4 (IEEE 1547:2018) deflect heat. IQ Combiner 4C IQ Combiner 4C with IQ Gateway printed circuit board for integrated revenue grade PV production metering (ANSI C12.20±0.5i) X-IQ-AM1-240-4C and consumption monitoring (±2.5 i). Includes Mobile Connect cellular modem (CELLMODEM-M1-06-SP-05), a plug -and -play X2-IQ-AM1-240-4C (IEEE 1547:2018) industrial -grade cell modem for systems up to 60 microinverters. (Available in the US, Canada, Mexico, Puerto Rico, and the US Virgin Islands, where there is adequate cellular service in the installation area.) Includes a silver solar shield to match the IQ Battery and IQ System Controller and to deflect heat. ACCESSORIES AND REPLACEMENT PARTS (not included, order separately) Supported microinverters IQ6, IQ7, and IQ8. (Do not mix IQ6/7 Microinverters with IQ8) Communications Kit COMMS-CELLMODEM-M1-06 Includes COMMS-KIT-01 and CELLMODEM-M1-06-SP-05with 5-year Sprint data plan CELLMODEM-M1-06-SP-05 4G based LTE-M1 cellular modem with 5-year Sprint data plan CELLMODEM-M1-06-AT-05 4G based LTE-M1 cellular modem with 5-year AT&T data plan Circuit Breakers Supports Eaton BR210, BR215, BR220, BR230, BR240, BR250, and BR260 circuit breakers. BRK-10A-2-240V Circuit breaker, 2 pole, 10A, Eaton BR210 BRK-15A-2-240V Circuit breaker, 2 pole, 15A, Eaton BR215 BRK-20A-2P-240V Circuit breaker, 2 pole, 20A, Eaton BR220 BRK-15A-2P-240V-B Circuit breaker, 2 pole, 15A, Eaton BR215B with hold down kit support BRK-20A-2P-240V-B Circuit breaker, 2 pole, 20A, Eaton BR220B with hold down kit support XA-SOLARSHIELD-ES Replacement solar shield for IQ Combiner 4/4C XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 4/4C (required for EPLC-01) X-IQ-NA-HD-125A Hold-down kit for Eaton circuit breaker with screws Consumption monitoring CT A pair of 200A split core current transformers (CT-200-SPLIT/CT-200-CLAM P) ELECTRICAL SPECIFICATIONS Rating Continuous duty System voltage 120/240VAC, 60 Hz Eaton BR series busbar rating 125A Max. continuous current rating 65A Max. continuous current rating (input from PV/storage) 64A Max. fuse/circuit rating (output) 90A Branch circuits (solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation (DG) breakers only (not included) Max. total branch circuit breaker rating (input) 80A of distributed generation/95A with IQ Gateway breaker included IQ Gateway breaker 10A or 15A rating GE/Siemens/Eaton included Production metering CT 200A solid core pre -installed and wired to IQ Gateway MECHANICAL DATA Dimensions (WxHxD) 37.5 cm x 49.5 cm x 16.8 cm (14.75 in x 19.5 in x 6.63 in). Height is 53.5 cm (21.06 in) with mounting brackets. Weight 7.5 kg (16.5 Ibs) Ambient temperature range -40°C to +46°C (-40°F to 1150F) Cooling Natural convection, plus heat shield Enclosure environmental rating Outdoor, NRTL-certified, NEMA type 3R, polycarbonate construction Wire sizes 20A to 50A breaker inputs: 14to 4 AWG copper conductors 60A breaker branch input: 4 to 1/0 AWG copper conductors Main lug combined output: 10 to 2/0 AWG copper conductors Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. Altitude Up to 3,000 meters (9,842 feet) INTERNET CONNECTION OPTIONS Integrated Wi-Fi IEEE 802.11b/g/n Cellular CELLMODEM-M1-06-SP-05, CELLMODEM-M1-06-AT-05 (4G based LTE-M1 cellular modem). Notethat an Mobile Connect cellular modem is required for all Enphase Energy System installations. Ethernet Optional, IEEE 802.3, Cat5E (or Cat6) UTP Ethernet cable (not included) COMPLIANCE Compliance, IQ Combiner CA Rule 21 (UL 1741-SA) IEEE 1547:2018 - UL 1741-SB, 3rd Ed. (X2-IQ-AM1-240-4 and X2-IQ-AM1-240-4C) CAN/CSA C22.2 No. 107.1, Title 47 CFR, Part 15, Class B, ICES 003 Production metering: ANSI C12.20 accuracy class 0.5 (PV production) Consumption metering: accuracy class 2.5 Compliance, IQ Gateway UL 60601-1/CANCSA 22.2 No. 61010-1 © 2022 Enphase Energy. All rights reserved. Enphase, the Enphase logo, IQ Combiner 4/4C, and other names are trademarks of Enphase Energy, Inc. Data subject to change. IQ-C-4-4C-DS-0103-EN-US-12-29-2022 FLASHKIT PRO 0 .B�UNIRAC FEATURING O SHED & SEAL TECHNOLOGY FLASHKIT PRO is the complete attachment solution for composition shingle roofs. Featuring Unirac's patented SHED & SEAL technology, a weather proof system which provides the ultimate protection against roof leaks. Kitted in 10 packs for maximum convenience, flashings and hardware are available in Mill or Dark finishes. With FLASHKIT pro, you have everything you need for a quick, professional installation. TRUSTED WATER SEAL FLASHINGS FEATURING OO SHED & SEAL TECHNOLOGY YOUR COMPLETE SOLUTION CONVENIENT 10 PACKS Flashings, lags, continuous slot L-Feet and hardware Packaged for speed and ease of handling FLASHKIT PRO INSTALLATION GUIDE .� U N I RAC FEATURING O SHED & SEAL TECHNOLOGY FLASHKIT PRO IS THE COMPLETE FLASHING AND ATTACHMENT SOLUTION FOR COMPOSITION ROOFS. INSTALL FLASHKIT PRO FLASHING PRE -INSTALL INSTALL L-FOOT • Locate roof rafters and snap chalk lines to mark the installation point for each roof attachment. • Drill a 7/32" pilot hole at each roof attachment. Fill each pilot hole with sealant. STEP 1 INSTALL FLASHKIT PRO FLASHING Add a U-shaped bead of roof sealant to the underside of the flashing with the open side of the U pointing down the roof slope. Slide the aluminum flashing underneath the row of shingles directly up slope from the pilot hole as shown. Align the indicator marks on the lower end of the flashing with the chalk lines on the roof to center the raised hole in the flashing over the pilot hole in the roof. When installed correctly, the flashingwill extend underthe two courses of shingles above the pilot hole. STEP 2 INSTALL L-FOOT • Fasten 1--foot and Flashing into place by passing the included lag bolt and pre -installed stainless steel -backed EPDM washer through the L-foot EPDM grommet, and the raised hole in the flashing, into the pilot hole in the roof rafter. ATTACH L-FOOTTO RAIL • Drive the lag bolt down until the L-foot is held firmly in place. It is normal for the EPDM on the underside of the stainless steel backed EPDM washer to compress and expand beyond the outside edge of the steel washer when the proper torque is applied. TIP: • Use caution to avoid over-torqueingthe lag bolt if usingan impact driver. • Repeat Steps 1 and 2 at each roof attachment point. STEP 3 ATTACH L-FOOT TO RAIL • Insert the included 3/8"-16 T-bolts into the lower slot on the Rail (sold separately), spacing the bolts to match the spacing between the roof attachments. • Position the Rail against the 1-foot and insert the threaded end of the T-Bolt through the continuous slat in the L-Foot. Apply anti -seize to bolt threads to prevent galling of the T-bolt and included 3/8" serrated flange nut. Place the 3/8" flange nut on the T-bolt and finger tighten. Repeat STEP 3 until all L-Feet are secured to the Rail with a T-bolt. Adjust the level and height of the Rail and torque each bolt to 30ft-lbs. 11 wall AAR CONCEALED UNIVERSAL CLAMPS OPTIONAL FRONT TRIM i :� UNIRAC 25 YEAS FULL -SYSTEM WARRANTY SOLARMOUNT BETTER DESIGNS TRUST THE INDUSTRY'S BEST DESIGN TOOL Start the design process for every project in our U-Builder on-line design tool. It's a great way to save time and money. BETTER SYSTEMS ONE SYSTEM - MANY APPLICATIONS Quickly set modules flush to the roof on steep pitched roofs. Orient a large variety of modules in Portrait or Landscape. Tilt the system up on flat or low slow roofs. Components available in mill, clear, and darkfinishesto optimize your design financials and aesthetics. BETTER RESULTS MAXIMIZE PROFITABILITY ON EVERY JOB Trust Unirac to help you minimize both system and labor costs from the time the job is quoted to the time yourteams get off the roof. Faster installs. Less Waste. More Profits. BETTER SUPPORT WORK WITH THE INDUSTRIES MOST EXPERIENCED TEAM Professional support for professional installers and designers. You have access to our technical support and training groups. Whatever your support needs, we've got you covered. Visit Unirac.com/solarmount for more information. o BONDING&GROUNDING w N MECHANICAL LOADING SYSTEM FIRE CLASSIFICATION 0 .� U N I RAC CONCEALED UNIVERSAL ENDCLAMPS UNIVERSAL SELF STANDING MIDCLAMPS END CAPS INCLUDED WITH EVERY ENDCLAMP U-BUILDER ONLINE DESIGN TOOL SAVES TIME & MONEY Visit design.unirac.com UNIRAC CUSTOMER SERVICE MEANS THE HIGHEST LEVEL OF PRODUCT SUPPORT % - W-F UNMATCHED CERTIFIED ENGINEERING BANKABLE DESIGN PERMIT i included End Caps EXPERIENCE QUALITY EXCELLENCE WARRANTY TOOLS DOCUMENTATION THE PROFESSIONALS' CHOICE FOR RESIDENTIAL RACKING BEST INSTALLATION EXPERIENCE • CURB APPEAL • COMPLETE SOLUTION • UNIRAC SUPPORT FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.00M OR CALL (505) 248-2702 TECHNICAL SUPPORT Unirac's technical support team is dedicated to answering questions & addressing issues in real time. An online library of documents including engineering reports, stamped letters and technical data sheets greatly simplifiesyour permittingand project planning process. CERTIFIED QUALITY PROVIDER Unirac isthe only PV mounting vendor with ISO certifications for 9001:2008,14001:2004and OHSAS 18001:2007, which means we deliverthe highest standards forfit, form, and function.These certifications demonstrate our excellence and commitment to first class business practices. BANKABLE WARRANTY Don't leave your project to chance, Unirac has the financial strength to back our products and reduce your risk. Have peace of mind knowingyou are providing products of exceptional quality. SOLARMOUNT is covered by a 25 year limited product warranty and a 5 year limited finish warranty. ENHANCE YOUR REPUTATION WITH QUALITY RACKING SOLUTIONS BACKED BY ENGINEERING EXCELLENCE AND A SUPERIOR SUPPLY CHAIN PUB2018AUG31-PRINTED UPDATE FOR QUESTIONS OR CUSTOMER SERVICE VISIT UNIRAC.COM OR CALL (505) 248-2702 @ CSA GROUP" Certificate of Compliance Certificate: 70131735 Project: 80050628 Issued To: Unirac 1411 Broadway NE Albuquerque, New Mexico, 87102 United States Attention: Klaus Nicolaedis Master Contract: 266909 Date Issued: 2020-09-29 The products listed below are eligible to bear the CSA Mark shown with adjacent indicators 'C' and 'US' for Canada and US or with adjacent indicator 'US' for US only or without either indicator for Canada only. Issued by: M4601,61e HOfhll,� Michael Hoffnagle PRODUCTS CLASS - C531302 - POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems CLASS - C531382 - POWER SUPPLIES - PHOTOVOLTAICS-PV Racking and clamping systems - Certified to US Standards Models: SM SOLARMOUNT Flush -to -Roof is an extruded aluminum rail PV racking system that is installed parallel to the roof in landscape or portrait orientations. ULA Unirac Large Array is a ground mount system using the SolarMount (SM) platform for the bonding and grounding of PV modules. CIP CSA GROUP'" Certificate: 70131735 Project: 80050628 Conditions of Acceptability: Master Contract: 266909 Date Issued: 2020-09-29 Installation is subject to acceptance of the local inspection authorities having jurisdiction. The certification of these products relates only to the methods of installation, bonding, and grounding as outlined in the Installation Manual for each product. APPLICABLE REQUIREMENTS UL 2703-1st Edition - Mounting Systems, Mounting Devices, Clamping/Retention Devices, and Ground Lugs for Use with Flat -Plate Photovoltaic Modules and Panels. LTR AE-001-2012 - List of Technical Requirements for Photovoltaic Module and Panel racking Systems MARKINGS The manufacturer is required to apply the following markings: • Products shall be marked with the markings specified by the particular product standard. • Products certified for Canada shall have all Caution and Warning markings in both English and French. Additional bilingual markings not covered by the product standard(s) may be required by the Authorities Having Jurisdiction. It is the responsibility of the manufacturer to provide and apply these additional markings, where applicable, in accordance with the requirements of those authorities. The products listed are eligible to bear the CSA Mark shown with adjacent indicators'C' and 'US' for Canada and US (indicating that products have been manufactured to the requirements of both Canadian and U.S. Standards) or with adjacent indicator 'US' for US only or without either indicator for Canada only. The following markings appear on the rail by adhesive label: 1. Submitter's name and/or CSA Master Contract number "266909"; 2. Model designation; 3. Manufacturing date; 4. System fire class rating/designation of information location in Installation Manual; 5. Design load rating/designation of information location in Installation Manual; The following markings appear on the Mid clamp by stamping: 1. Submitter's name and/or CSA Master Contract number "266909"; 2. CSA mark 3. Mil ID for factory location