Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Cost Proposal - RY + AO
Fee Schedule LA QUINTA CITY HALL DRAINAGE IMPROVEMENTS PROJECT (CITY PROJECT NO.2024-04) December 23, 2024 ry-aoarchitects.com We propose to provide Architectural & Engineering services for the scope of services outlined in our proposal for City Hall Drainage Improvement Project, City Project No. 2024-04, for a fee of Fifty - One Thousand Eight Hundred Sixty Dollars ($51,860.00) plus reimbursable expenses as follows. Reimbursable expenses are estimated not to exceed Two Thousand Six Hundred Dollars ($2,600.00). Architectural $15,090.00 Building Enclosure Consultant $19,750.00 Civil $11,500.00 Cost Estimating $ 5,520.00 $51,860.00 Estimated Reimbursable Expenses $ 2,600.00 Phase 1 $20,920.00 Phase 2 $30,940.00 51,860.00 ALTERNATE FEE Phase II - Discovery { • Additional site visit fee range: $3,200 - $9,600, @ $3,200 / visit. • Additional testing day fee range: $5,000 - $25,000, @ $5,000 /day. r HOURLY RATE SCHEDULES Billing Classification Hourly Rate RV+AA Principal $250.00 Design Director $230.00 Project Director $230.00 Senior Associate $210.00 Associate $190.00 Senior Designer $190.00 Senior Project Architect $190.00 Senior Project Manager $190.00 Project Manager $180.00 Project Architect $170.00 Designer $165.00 Senior Job Captain $155.00 Job Captain $145.00 Draftsperson $135.00 Junior Designer $130.00 Junior Draftsperson $130.00 Professional Staff $105.00 Snipes -Dye Associates CIVIL ENGINEERING SERVICES Principal Engineer $235.00 Project Manager $215.00 Project Engineer $195.00 Senior Design Engineer $160.00 Design Engineer $140.00 Assistant Design Engineer $120.00 Junior Design Engineer $110.00 CAD Technician $140.00 Assistant CAD Technician $110.00 Technical Assistant $ 95.00 Project Administrator $ 70.00 HOURLY RATE SCHEDULES Billing Classification Pinchin Vice President / Senior Vice President Director/ Senior Director/ Discipline Lead Manager / Senior PM / Senior Engineer / Senior Professional Project Manager/ Engineer/Architect/ Building Consultant Senior Technician / Senior Inspector/ RRO Engineer in Training Technician / Inspector Administrative Cumming Managing Director Associate Director, Lead Senior Cost Manager Cost Manager Hourly Rate $320.00 $270.00 $240.00 $225.00 $180.00 $165.00 $125.00 $ 85.00 $255.00 $225.00 $200.00 $190.00 731 South Highway101, Suite 1M Solana Beach, CA 92075 619.224.3605 RY+AOry-acarchitects.com