Loading...
Mark Thomas Cost Proposal� C MARK THOMAS LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS d) Fringe Benefits (Rate: 95.61 % ) f) Overhead & G&A (Rate: 55.05% ) h) General & Admin (Rate: ) FIXED FEE $ 534,827.12 $ 28,753.64 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $ 563,580.76 e) Total Fringe Benefits [(c) x (d)] $ g) Overhead f(c) x (f)] $ i) Gen &Admin [(c) x (h)] $ 538,839.57 310,251.21 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $ k) TOTAL FIXED FEE [(c) + (j)] x fixed fee: 10% $ 1) CONSULTANTS OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional Daaes if necessarvl 849,090.77 141,267.15 Description of Item Quantity Unit Unit Cost Total Mileage 9000 MILES $ 0.66 $ 5,895.00 Structure/Quantity Calculations 200 SHEETS $ 0.05 $ 10.00 Overnight Mail/Mail 8 EA $ 15.00 $ 120.00 Potholing 8 EA $ 2,400.00 $ 19,200.00 Pier Diem/Hotel 2 LS $ 400.00 $ 800.00 Traffic Control 2 LS $ 4,000.00 $ 8,000.00 Mobile Scanner 1 DAY $ 7,500.00 $ 7,500.00 Aerial Mapping 1 LS $ 6,500.00 $ 6,500.00 m) SUBCONSULTANTS' COSTS (Add additional pages if necessary) Subconsultant 1: Earth Mechanics Subconsultant 2: Fehr & Peers Subconsultant 3: GPA Subconsultant 4: WEBB and Associates 1) TOTAL OTHER DIRECT COSTS $ 48,025.00 $ 152,664.48 $ 65,711.82 $ 261,631.71 $ 91,919.77 Subconsultant 4: Monument $ 56,979.61 m) TOTAL SUBCONSULTANTS' COSTS $ 628,907.39 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I) + (m)] $ 676,932.39 TOTAL COST [(c) + 0) + (k) + (n)] $ 2,230,871.08 NOTES: 1. Key personnel must be marked with an asterisk (`) and employees that are subject to prevailing wage requirements must be marked with two asterisks ('"). All costs must comply with the Federal cost principles. Subconsullants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. 3. Anticipated salary increases calculation (page 2) must accompany. CALCULATIONS FOR ANTICIPATED SALARY INCREASES Consultant Mark Thomas & Company Project No. BR-NBIL(547) Contract Nc Date 8/23/2023 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $ 534,827.12 9604 = $ 55.69 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate Proposed Escalation Year 1 $ 55.69 + 5% _ $ 58.47 Year 2 Avg Hourly Rate Year 2 $ 58.47 + 5% _ $ 61.40 Year 3 Avg Hourly Rate Year 3 $ 61.40 + 5% _ $ 64.47 Year 4 Avg Hourly Rate Year 4 $ 64.47 + 5% _ $ 67.69 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Year 1 35.00% 9604.0 = 3361.4 Estimated Hours Year 1 Year 2 35.00% 9604.0 = 3361.4 Estimated Hours Year 2 Year 3 20.00% 9604.0 = 1920.8 Estimated Hours Year 3 Year 4 10.00% 9604.0 = 960.4 Estimated Hours Year 4 Total 100% Total = 9604.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours Cost per Year (calculated above) (calculated above) Year 1 $ 55.69 3361 = $ 187,189.49 Estimated Hours Year 1 Year 2 $ 58.47 3361 = $ 196,648.97 Estimated Hours Year 2 Year 3 $ 61.40 • 1921 = $ 117,929.3E Estimated Hours Year 3 Year 4 $ 64.47 960 = $ 61,912.92 Estimated Hours Year 4 Total Direct Labor Cost with Escalation = $ 563,580.76 Direct Labor Subtotal before Escalation = $ 534,827.12 Estimated total of Direct Labor Salary Increase = $ 28,753.64 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable (i,e. $250.000 x 2 % x 5 yrs = $25,000 is not an acceptable methodology). 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted 4 Calculations for anticipated salary escalation must be provided. Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Proceedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Zach Siviglia Signature: Email: Address Title': President Date of Certification: 8/23/2023 zsiviglia@markthomas.com Phone number: (949) 477-9000 2121 Alton Parkway, Suite 210, Irvine, CA 92606 ' An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: Albert A. Webb Associates Exhibit 10-H1 Cost Proposal Consultant: Albert A. Webb Associates Project Name: Avenue 50 Bridge FPN: City Project No. DIRECT LABOR Date 08/01/2023 Classification/Title Name Hours Actually Hourly Rate Total Principal III Practice Leader Joseph Caldwell 93 $ 90.27 $ 8,395.11 Principal I/Senior Engineer Ranjit Singh 99 $ 79.33 $ 7,853.67 Associate II/Associate Engineer Ash Ai 260 $ 49.12 $ 12 771.20 Project Coordinator Tiana Mandell 64 $ 25.50 S 1 632.00 0 $ $ 0 $ $ 0 $ $ 0 $ $ 0 $ $ 0 $ S 0 $ S 0 $ S 0 $ $ * Key Personnel, ** Employees subject to prevailing wages LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see Page 2 for calculation) INDIRECT COSTS d) Fringe Benefit (Rate: 56.48% ) t) Overhead (Rate: 116.14% h) General and Administrative (Rate: Total OH Rate : 172.62% FIXED FEE 1) (Rate: 10% ) $ 30,65198 $ 0.000% c) TOTAL DIRECT LABOR COSTS [(a)-(b)] $ 30,651.98 e) Total Fringe Benefits [(c) x (d)] $ 17,312.24 g) Overhead [(c) x If)] $ 35,599.21 i) Gen & Admin [(e) x (h)] $ I) TOTAL INDIRECT COSTS [(e)+Wg (01 $ 52,911.45 k) TOTAL FIXED FEE [(c)+0)] x (1)] $ 8,356.34 OTHER DIRECT COSTS (ODC) (ODC is actual cost to be reimbursed with supporting documentation.) (See Page 3 for itemized estimate work sheet) m) Travel Mileage $ n) Printing $ o) Transportation S p) Conference Calls $ q) Title Report $ Permit. Fees $ r) TOTAL OTHER DIRECT COSTS f(m) + (n) F (o) + (p) + (q) ] $ SUBCONSULTANTS'COSTS Subconsultant Costs (attach detailed cost proposal in same format as prime consultant estimate for each subconsultant) s) TOTAL SUBCONSULTANTS'COSTS $ TOTAL. COST [(c) + 0) + (k) , (r) + (s)]91-919-77-1 Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-1-11 COST PROPOSAL Page 3 of 3 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Reaulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 6. 48 Code of Federal Reaulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the projectfiles and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indiect Cost Rate(s) Prime Consultant or Subconsultant Certifyina: Name, Kevin Ferguson Sippature Email- Ke nYwgusonO da iates.corn Address:3788 McCray Street, Riverside, CA 92506 Title *: Chief Development Officer Date of Certification (mm/dd/yyyy): 08/23/2023 Phone Number: (951) 830-1830 `An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has auth ority to represent the financial information utilized to establish the cost Proposal for the contract. 0 Engineering services for Avenue 50 Bridge Page 3 of 9 January 2020 Exhibit CPA Cost Proposal COMPANY: $CAPE OF WORK DATE: Earth Mechanics, Inc. Geotechnical 8/22/2023 PROJECT: Ave 50 Bridge MILESTONE/PHASE/PROJECT SUMMARY: PS&E DIRECT LABOR PERSONNEL CLASSIFICATION HOURS LOADED RATE AMOUNT Alahesh Thurairajah Principal 104.0 $ 97.70 $ 10,161 Principal Engineer/Geologist 48.0 $ 88.40 $ 4,243 Senior Engineer/Geologist 220.0 $ 66.30 $ 14,586 Sr. Project Engineer/Geologist 0.0 $ 65.30 $ Poject Engineer/Geologist 90.0 $ 50.90 $ 4,581 Sr. Staff Engineer/Geologist 0.0 $ 49.30 $ Staff Engineer/Geolooist 30.0 $ 43.20 $ 1,296 Senior Technician 40.0 $ 50.40 $ 2,016 Technician 20.0 $ 26.00 $ 520 _ $ TOTAL HOURS L552.0 TOTAL DIRECT LABOR MULTIPLIERS $ 37,403 ESCALATION 5.00% (of Total Direct Labor) $ 1,870 OVERHEAD-Additionai Services 179.97% (of Total Direct Labor Escalation) $ 70,680 TOTAL MULTIPLIERS $ 70,680 OTHER DIRECT EXPENSES ITEM UNIT QUANTITY UNIT COST AMOUNT Drill Rig Rental Day 4 $ 5,200 $ 20,800 Traffic Control Day 4 $ 1,750 $ 7,000 EMI Coring Day 1 $ 400 $ 400 Soil Cutting Contaminants Testing Test 2 $ 350 $ 700 Soil Cuttings (drums) Disposal Drum 10 $ 300 $ 3,000 Mileage Mile 1 2,860 1 $ 0.6551 $ 1,873 TOTAL OTHER DIRECT EXPENSES OUTSIDE SERVICES $ 33,773 COMPANY LABOR MULTIPLIERS FEE EXPENSES TOTAL TOTAL OUTSIDE SERVICES FEES $ FIXED FEE 10.00% $ 10,808 TOTAL FEES $ 10.80 TOTAL COST 1 $ 152,664 Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Proceedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management and Administration of Engineering and Design Related Service 6. 48 Ccode of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Alaheswaran Thurairajah Signature: Email: Address A.Thurairaiah@earthmech.com 17800 Newhope Street, Suite B, Fountain Valley, CA 92708 Title ` President Date of Certification: Phone number: 8/22/2023 714-751-3826 " An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is providing under the proposed contract: 541330 - Geotechnical Engineering 541380 - Laboratory Testing Local Assistance Procedures Manual Exhibit 10-H3 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed Prime Consultant Subconsultant X 2nd Tier Subconsultant Consultant Fehr & Peers Project No. Avenue 50 Evacuation Channel Crossing Contract No. Date Updated 8/7/2023 DIRECT LABOR Classification/Title Name Hours Actual Hourly Rate Total Principal Jason Pack, P.E. g $ 105.77 $846.16 Principal Claude Strayer, P.E. 92 $ 73.56 $6,767.52 Sr. Associate Paul Herrmann, P.E. 20 $ 65.38 $1,307.60 Sr. Engineer Ethan Sun, PhD 32 $ 48.08 $1,538.56 Sr. Engineer Johnny Schmidt 200 $ 45.67 $9,134.00 Engineer/Planner Claire Xie, Local Spietia 24 $ 39.90 $957.60 Project Coordinator Sandra Hyatt, Kayleigh Molina-Pastorious 45 $ S0.48 $2,271.60 Graphics Support/GIS Derek Meksavanh 4 $ 37.50 $1S0.00 0 $ - $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 0 $ $0.00 LABOR COSTS a) Subtotal Direct Labor Costs b) Anticipated Salary Increases (see page 2 for calculation) INDIRECT COSTS d) Fringe Benefits (Rate: f) Overhead (Rate: h) General and Administrative (Rate: q) FIXED FEE 10.00% 62.39 % 121.13% 11 CONSULTANT'S OTHER DIRECT COSTS (OOCI - ITFMI7F (Add additinnal nnoac if noroccawl $22,973.04 $574.33 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $23,547.37 e) Total Fringe Benefits [(c) x (d)] $14,691.20 g) Overhead [(c) x (f)] $28,522.92 i) Gen & Admin [(c) x (h)] $0.00 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $43,214.13 k) TOTAL FIXED FEE [(c) + (j)] x (q)] $6,676.15 Description of Item Quantity Unit Unit Cost Total Mileage - Current IRS Rate 600 miles $0.66 $393.00 Traffic Counts 1 intersections $400.00 $400.00 Traffic Counts 1 segments $400.00 $400.00 RIVCOM Model Application 1 data purchase $500.00 $500.00 $0.00 1) TOTAL OTHER DIRECT COSTS $1,693.00 m) SUBCO NS U LTANTS' COSTS (Add additional pages if necessary) m) TOTAL SUBCONSULTANTS' COSTS $ n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(I)+(m)] $1,693.00 TOTAL COST [(c) + (j) + (k) + (n)] $75,130.64 January 2018 Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $22,973.04 425 = $54.05 Year 1 Avg Hourly Rate Z. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %) Avg Hourly Rate Proposed Escalation Year 1 $54.05 + 5.0% _ $56,76 Year 2 Avg Hourly Rate Year 2 $56.76 + 3.0% _ $58.46 Year 3 Avg Hourly Rate Year 3 $58.46 + 3.0% $60.21 Year 4 Avg Hourly Rate Year 4 $60.21 + 3.0% _ $62.02 Year S Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Year 1 50.00% " 425.0 = 212.5 Estimated Hours Year 1 Year 2 50.00% * 425.0 = 212.5 Estimated Hours Year 2 Year 3 0.00% * 425.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 425.0 = 0.0 Estimated Hours Year 4 Year 5 0,00% * 425.0 = 0.0 Estimated Hours Year 5 Total 100 % Total = 425.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours (calculated above) (calculated above) Cost per Year Year 1 $54.05 * 212.5 = $11,486.52 Estimated Hours Year 1 Year 2 $56.76 * 212.5 = $12,060.85 Estimated Hours Year 2 Year 3 $58.46 ' 0.0 $0.00 Estimated Hours Year 3 Year 4 $60.21 " 0.0 $0.00 Estimated Hours Year 4 Year 5 $62.02 * 0.0 $0.00 Estimated Hours Year 5 Total Direct Labor Cost with Escalation $23,547.37 Direct Labor Subtotal before Escalation = $22,973.04 Estimated total of Direct Labor Salary Increase = $574.33 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2018 Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal Page3o(3 Exhibit 10-H1 Cost Pr000sal Certification of Direct Costs: I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31- Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifying: Name: Lysa Wollard Title ": CFO Signature: k)&J -Q- Date of Certification (mm/dd/yyyy): 6/13/2022 Email: I.wollard@fehrandpeers,com Phone Number: Address: 100 Pringle Avenue, Suite 600, Walnut Creek, CA 94596 925.977.3216 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. ust services the consultant is providing under the proposed contract: Traffic Engineering and transportation planning. Specifically, development of the following deliverables in support of the PA/ED document: (1) Assumptions and Methodologies Memorandum, (2) Traffic Volumes Report, (3) Step 2 Intersection Control Evaluation (ICE), (4) Traffic Operations Analysis Report (TOAR), and (5) Misc. support for AQ/Noise assessment and/or vehicle miles of travel (VMT) for the GHG assessment January 2018 Local Assistance Procedures Manual Exhibit 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed ❑ Prime Consultant ❑✓ Subconsultant ❑ 2nd Tier Subconsultant Consultant GPA Consulting Project No. Avenue 50 Bridge, La Quinta (Yr l Base) Contract No. DIRECT LABOR Date 8/2/2023 Classification/Title Name Hours Actual Hourly Rate Total Principal Environmental Planner Erinn Silva 36 $86.54 $3,115.44 Senior Associate Environmental Plannei Ryan Todaro 8 $86.54 $692.32 Senior Environmental Planner Marya Samuelson 142 $60.10 $8,534.20 Environmental Planner Savannah Marburger 120 $32.69 $3,922.80 Environmental Planner Alyssa "Riley" Vera 210 $32.69 $6,864.90 Senior Associate Biologist Marieka Schrader 28 $74.52 $2,086.56 Senior Associate Biologist Jennifer Johnson 68 $62.50 $4,250.00 Senior Biologist Manjunath Venkat 76 $55.53 $4,220.28 Associate Biologist Victoria Masjuan 158 $36.35 $5,743.30 Associate Biologist Lizbeth Pliego Guzman 88 $31.50 $2,772.00 Senior Associate Architectural Historian Jenna Kachour 12 $62.50 $750.00 Senior Architectural Historian Amanda Duane 34 $51.44 $1,748.96 Associate Architectural Historian Audrey von Ahrens 2 $42.31 $84.62 Associate Architectural Historian Emma Haggerty 4 $42.09 $168.36 Senior GIS Analyst Martin Rose 86 $54.47 $4,684.42 LABOR COSTS a) Subtotal Direct Labor Costs $49 638.16 b) Anticipated Salary Increases (see page 2 for calculation) $0.00 Why is this negative overhead? P TOTAL DIRECT LABOR COSTS [(a) + (b)] INDIRECT COSTS d) Fringe Benefits (Rat 50.27% e) Total Fringe Benefits [(c) x (d)] $24,953.10 f) Overhead (Rate: - . l% g) Overhead [(c) x (f)]-$501.35 h) General and Administrative (Rate: 67.23% i) Gen & Admin [(c) x (h)] $33,371.73 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] FIXED FEE k) TOTAL FIXED FEE [(c) + 0)] x fixed fee 12% ] 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional palzes if necessary) $49,638.16 $57,823.49 $12,895.40 Description of Item Quantity Unit(s) Unit Cost Total Mileage Costs 2140 mile 0.655 $1,401.70 Copies/Reproduction 4 ea $15.00 $60.00 m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: Subconsultant 2: Ambient Duke CRM 1) TOTAL OTHER DIRECT COSTS $1,461.70 $8,500.00 $25,015.00 Subconsultant 3: Crawford & Associates $20,831.12 r —_ m) TOTAL SUBCONSULTANT'S COSTS $54,346.12 Need to clarify subconsultant roles. These subconsultant, also NOTES need 10H1 forms. R DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] $55,807.82 TOTAL COST [(c) + 0) + (k) + (n)] $176,164.87 January 2020 Local Assistance Procedures Manual Exhibit 10-H1 EXHIBIT 10-11I COST PROPOSAL Page 2 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $49,638.16 1072 = 46.30425373 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %; Avg Hourly Rate Proposed Escalation Year I $46.30 + 5.0% _ $48.62 Year 2 Avg Hourly Rate Year 2 $48.62 + 5.0% _ $51.05 Year 3 Avg Hourly Rate Year 3 $51.05 + 5.0% _ $53.60 Year 4 Avg Hourly Rate Year 4 $53.60 + 5.0% _ $56.28 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Year 1 100.00% * 1072.0 = 1072.0 Estimated Hours Year I Year 2 0.00% * 1072.0 = 0.0 Estimated Hours Year 2 Year 3 0.00% * 1072.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 1072.0 - 0.0 Estimated Hours Year 4 Year 5 0.00% * 1072.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 1072.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours (calculated above) (calculated above) Cost per Year Year 1 $46.30 * 1072 = 49638.16 Estimated Hours Year 1 Year 2 $48.62 * 0 = $0.00 Estimated Hours Year 2 Year 3 $51.05 * 0 - $0.00 Estimated Hours Year 3 Year 4 $53.60 * 0 = $0.00 Estimated Hours Year 4 Year 5 $56.28 * 0 = $0.00 Estimated Hours Year 5 Total Direct Labor Cost with Escalation - $49,638.16 Direct Labor Subtotal before Escalation = $49,638.16 Estimated total of Direct Labor Salary - $0.00 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January 2020 Local Assistance Procedures Manual Exhibit 10-H1 Certification of Direct Costs Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3 I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration otEngineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that arc noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifyine: Name: Richard Galvin Title *: Vice President Signature Date of Certification (mm/dd/yyyy' 8/2/2023 Email: richard(@gpgconsulting-us.com Phone Number: (310) 792-2690 Address: 840 Apollo Street, Suite 312, El Segundo, CA 90245 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services me consultant is proviautg unaer the proposes contract: Environmental Consulting Services. LPP 15-01 January 2020 Local Assistance Procedures Manual Exhibit 10-HI Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 1 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (DESIGN, ENGINEERING AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed ❑ Prime Consultant ❑✓ Subconsultant ❑ 2nd Tier Subconsultant Consultant GPA Consulting This doesn't need to be split into Project No. Avenue 50 Bridge, La Quinta (Yr 2 Base) two different 1OH1 forms. This Date 8/2/2023 DIRECT LABOR escalation can be done on one Classification/Title Name V ours Actual Hourly Rate Total Principal Environmental Planner Erinn Silva 12 $86.54 $1,038.48 Senior Associate Environmental Planner Ryan Todaro 0 $86.54 $0.00 Senior Environmental Planner Marya Samuelson 52 $60.10 $3,125.20 Environmental Planner Savannah Marburger 70 $32.69 $2,288.30 Environmental Planner Alyssa "Riley" Vera 50 $32.69 $1,634.50 Senior Associate Biologist Marieka Schrader 24 $74.52 $1,788.48 Senior Associate Biologist Jennifer Johnson 48 $62.50 $3,000.00 Senior Biologist Manjunath Venkat 0 $55.53 $0.00 Associate Biologist Victoria Masjuan 240 $36.35 $8,724.00 Associate Biologist Lizbeth Pliego Guzman 72 $31.50 $2,268.00 Senior Associate Architectural Historian Jenna Kachour 0 $62.50 $0.00 Senior Architectural Historian Amanda Duane 0 $51.44 $0.00 Associate Architectural Historian Audrey von Ahrens 0 $42.31 $0.00 Associate Architectural Historian Emma Haggerty 0 $42.09 $0.00 Senior GIS Analyst Martin Rose 48 $54.47 $2,614.56 LABOR COSTS a) Subtotal Direct Labor Costs $26,481.52 b) Anticipated Salary Increases (see page 2 for calculation) $1,324.08 c) TOTAL DIRECT LABOR COSTS [(a) + (b)] $27,805.60 INDIRECT COSTS d) Fringe Benefits (Rate 50.27% e) Total Fringe Benefits [(c) x (d)] $13,977.87 f) Overhead (Rate: 56.94% g) Overhead [(c) x (f)] $15,832.51 h) General and Administrative (Rate: 67.23% i) Gen & Admin [(c) x (h)] $18,693.70 j) TOTAL INDIRECT COSTS [(e) + (g) + (i)] $48,504.08 FIXED FEE k) TOTAL FIXED FEE [(c) + 0)] x fixed fee 12% 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) $9,157.16 Description of Item Quantity Unit(s) Unit Cost Total Mileage Costs I mile 0.655 $0.00 1) TOTAL OTHER DIRECT COSTS $0.00 m) SUBCONSULTANT'S COSTS (Add additional pages if necessary) Subconsultant 1: $0.00 m) TOTAL SUBCONSULTANT'S COSTS $0.00 n) TOTAL OTHER DIRECT COSTS INCLUDING SUBCONSULTANTS [(1) + (m)] $0.00 TOTAL COST [(c) + 0) + (k) + (n)] $85,466.84 NOTES: l.hey personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be markedwith two asterisks All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2.The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with thcconsultant's annual accounting period and established by a cognizant agency or accepted by Caltrans. January 2020 Local Assistance Procedures Manual Exhibit 10-H1 EXHIBIT 10-H1 COST PROPOSAL Page 2 of 3 COST -PLUS -FIXED FEE OR LUMP SUM OR FIRM FIXED PRICE CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) Direct Labor Subtotal Total Hours Avg Hourly 5 Year Contract per Cost Proposal per Cost Proposal Rate Duration $26,481.52 616 = 42.98948052 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average Hourly Rate for a year by proposed escalation %; Avg Hourly Proposed Escalation Rate Year 1 $42.99 + 5.0% $45.14 Year 2 Avg Hourly Rate Year 2 $45.14 + 5.0% - $47.40 Year 3 Avg Hourly Rate Year 3 $47.40 + 5.0% $49.77 Year 4 Avg Hourly Rate Year 4 $49.77 + 5.0% - $52.25 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Total Hours Total Hours Completed Each Year per Cost Proposal per Year Year 1 0.00% * 616.0 0.0 Estimated Hours Year l Year 2 100.00% * 616.0 - 616.0 Estimated Hours Year 2 Year 3 0.00% * 616.0 = 0.0 Estimated Hours Year 3 Year 4 0.00% * 616.0 = 0.0 Estimated Hours Year 4 Year 5 0.00% * 616.0 - 0.0 Estimated Hours Year 5 Total 100% Total = 616.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours (calculated above) (calculated above) Cost per Year Year 1 $42.99 * 0 = 0 Estimated Hours Year I Year 2 $45.14 * 616 = $27,805.60 Estimated Hours Year 2 Year 3 $47.40 * 0 = $0.00 Estimated Hours Year 3 Year 4 $49.77 * 0 = $0.00 Estimated Hours Year 4 Year 5 $52.25 * 0 = $0.00 Estimated Hours Year 5 Total Direct Labor Cost with Escalation = $27,805.60 Direct Labor Subtotal before Escalation = $26,481.52 Estimated total of Direct Labor Salary = $1,324.08 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. January2020 Local Assistance Procedures Manual Exhibit 10-H1 Certification of Direct Costs Cost Proposal EXHIBIT 10-H1 COST PROPOSAL Page 3 of 3 I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1. Generally Accepted Accounting Principles (GAAP) 2. Terms and conditions of the contract 3. Title 23 United States Code Section 112 - Letting of Contracts 4. 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5. 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration ofBngineering and Design Related Service 6. 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Subconsultant Certifyin2: Name: Richard Galvin Title *: Vice President Signature : �= _j Date of Certification (mm/dd/yyyy; 8/2/2023 Email: rich ardCa)npaconsultin R-us.com Phone Number: (310) 792-2690 Address: 840 Apollo Street, Suite 312, El Segundo, CA 90245 *An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. List services the consultant is provtamg unaer the proposed contract: Environmental Consulting Services. [,PP 15-01 January 2020 Local Assistance Procedures Manual EXHIBIT 10-11I Cost Proposal EXHIBIT 10-H1 COST PROPOSAL (Page I of 3) ACTUAI-COST-PLUS-FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (DESIGN, ENGINEERING, AND ENVIRONMENTAL STUDIES) Note: Mark-ups are Not Allowed ❑ Prime Consultant X❑ Subconsultant 2nd Tier Subconsultant Consultant Monument ROW Project No. DIRECT LABOR Contract No. Date 8/22/23 Classification/Title Name Hours Actual Hourly Rate Total R/W Project Manager Kim Bibolet 66 $ 82.73 $ 5,460.18 R/W Agent / Analyst Alex Flores 163 $ 36.06 $ 5,877.78 Project Support Specialist fiffiany McCloud 99 S 31.25 $ 3,093.75 $ $ g _ $ S $ J Total: 328.0 $ 14,431.71 LABOR COSTS a) Subtotal Direct Labor Costs S 14,431.71 b) Anticipated Salary Increases (see page 2 for calculations) S 701.96 c) TOTAL DIRECT LABOR COSTS [(a) + (b)J $ 15,133.67 INDIRECT COSTS d) Fringe Benefits Rate: 43.92 % e) Total fringe benefits [(c) x (d)] S 6,647.91 Overhead Rate: 72.20% g) Overhead [(c) x (t)] S10,927.16 h) General and Administrative Rate: 0.00% i) Gen & Admin [(c) x (h)] i) TOTAL INDIRECT COSTS I(e) + (g) + (i)l $ 17,575.07 FIXED FEE k) TOTAL FIXED FEE [(c) + 0)] x fixed fee 10.00% S 3,270.87 1) CONSULTANT'S OTHER DIRECT COSTS (ODC) - ITEMIZE (Add additional pages if necessary) Description of Item Quantity Unit Unit Cost Total Mileage Costs mile $ 1,200.00 Express Mails / Deliveries at cost) / Copies each $ 200.00 each each spelling 1) TOTAL OTHER DIRECT COSTS $ 1,400.00 m r dd a 'tional pages if necessary) Subconsultant : Reliminary Title Reports (2) - Commonwealth Land Title $ 2,100.00 Subconsultant 2: Fee Appraisal (2) - Santolucito Dore $ 12,000.00 Subconsultant 3: Appraisal Review (2) - Vaughn Hosmann $ 5,500.00 Subconsultant 4: $ m) SUBCONSULTANTS' COSTS $ 19,600.00 n) TOTAL OTHER DIRECT COSTS LNCLUDING SUBCONSULT'ANTS [(1)+(m)] $ 21,000.00 TOTAL COST [(c) + 0) + (k) +(n)I $ 56,979.61 NOTES: 1. Key personnel must be marked with an asterisk (*) and employees that are subject to prevailing wage requirements must be marked with two asterisks (**) All costs must comply with the Federal cost principles. Subconsultants will provide their own cost proposals. 2. The cost proposal format shall not be amended. Indirect cost rates shall be updated on an annual basis in accordance with the consultant's annual accounting period and established by a cognizant agency or accept by Caltrans. 3. Anticipated salary increases calculations (page 2) must accompany. Page 1 of 9 January 2018 Local Assistance Procedures Manual EXHIBIT 10-111 COST PROPOSAL (Page 2 of 3) ACTUAL COST -PLUS -FIXED FEE OR LUMP SUM (FIRM FIXED PRICE) CONTRACTS (CALCULATIONS FOR ANTICIPATED SALARY INCREASES) 1. Calculate Average Hourly Rate for 1st year of the contract (Direct Labor Subtotal divided by total hours) EXHIBIT 10-HI Cost Proposal Direct Total Hours per Avg 5 Year Labor Subtotal per Hourly Contract Cost Proposal Cost Proposal Rate Duration $14,431.71 / 328.0 = $44.00 Year 1 Avg Hourly Rate 2. Calculate hourly rate for all years (Increase the Average hourly rate for a year by proposed escalation %) Avg Hourly Rate Proposed Escalation Year 1 $44.00 + 4.0% _ $45.76 Year 2 Avg Hourly Rate Year 2 $45.76 + 4.0% _ $47.59 Year 3 Avg Hourly Rate Year 3 $47.59 + 4.0% _ $49.49 Year 4 Avg Hourly Rate Year 4 $49.49 + 4.0% _ $51.47 Year 5 Avg Hourly Rate 3. Calculate estimated hours per year (Multiply estimate % each year by total hours) Estimated % Completed Total Hours per Cost Total Hours per Each Year Proposal Year Year l 20% * 328.0 = 65.6 Estimated Hours Year I Year 2 40% * 328.0 = 131.2 Estimated Hours Year 2 Year 3 40% * 328.0 = 131.2 Estimated Hours Year 3 Year 4 * 328.0 = 0.0 Estimated Hours Year 4 Year 5 * 328.0 = 0.0 Estimated Hours Year 5 Total 100% Total = 328.0 4. Calculate Total Costs including Escalation (Multiply Average Hourly Rate by the number of hours) Avg Hourly Rate Estimated hours (calculated above) (calculated above) Year 1 $ 44.00 * 65.6 Year 2 $ 45.76 * 131.2 Year 3 $ 47.59 * 131.2 Year 4 $ 49.49 * 0.0 Year 5 $ 51.47 * 0.0 Total Direct Labor Cost with Escalation Direct Labor Subtotal before escalation Estimated total of Direct Labor Salary Increase Cost per Year _ $2,886.34 Estimated Hours Year I _ $6,003.59 Estimated I Iours Year 2 _ $6,243.74 Estimated Hours Year 3 _ $0.00 Estimated Hours Year 4 _ $0.00 Estimated Hours Year 5 _ $15,133.67 _ $14,431.71 _ $701.96 Transfer to Page 1 NOTES: 1. This is not the only way to estimate salary increases. Other methods will be accepted if they clearly indicate the % increase, the # of years of the contract, and a breakdown of the labor to be performed each year. 2. An estimation that is based on direct labor multiplied by salary increase % multiplied by the # of years is not acceptable. (i.e. $250,000 x 2% x 5 yrs = $25,000 is not an acceptable methodology) 3. This assumes that one year will be worked at the rate on the cost proposal before salary increases are granted. 4. Calculations for anticipated salary escalation must be provided. Page 2 of 9 January 2018 Local Assistance Procedures Manual EXHIBIT 10-H1 Cost Proposal EXHIBIT 10-H1 COST PROPOSAL (Page 3 of 3) Certification of Direct Costs I, the undersigned, certify to the best of my knowledge and belief that all direct costs identified on the cost proposal(s) in this contract are actual, reasonable, allowable, and allocable to the contract in accordance with the contract terms and the following requirements: 1 Generally Accepted Accounting Principles (GAAP) 2 Terms and conditions of the contract 3 Title 23 United States Code Section 112 - Letting of Contracts 4 48 Code of Federal Regulations Part 31 - Contract Cost Principles and Procedures 5 23 Code of Federal Regulations Part 172 - Procurement, Management, and Administration of Engineering and Design Related Services 6 48 Code of Federal Regulations Part 9904 - Cost Accounting Standards Board (when applicable) All costs must be applied consistently and fairly to all contracts. All documentation of compliance must be retained in the project files and be in compliance with applicable federal and state requirements. Costs that are noncompliant with the federal and state requirements are not eligible for reimbursement. Local governments are responsible for applying only cognizant agency approved or Caltrans accepted Indirect Cost Rate(s). Prime Consultant or Suconsultant Certifying: Name: Joey Mendoza Signature: Email: 'men oza(a)monumentrow.com Title": Vice President Date of Certification (mm/dd/yyyy): 8/22/23 Phone Number: 949.378.0687 Address: 200 Spectrum Center, Suite 300, Irvine, CA 92618 'An individual executive or financial officer of the consultant's or subconsultant's organization at a level no lower than a Vice President or a Chief Financial Officer, or equivalent, who has authority to represent the financial information utilized to establish the cost proposal for the contract. Last services the consultant is providing under this proposed contract: Right of Way and Utility Coordination Services Page 3 of 9 January 2018 COST PROPOSAL FOR PROJECT SCOPE: La Quinta- Avenue 50 over the La Quinta Evacuation Channel - Federal Project No. BR-NBIL(547); City Project No. 2019-02 Subconsultants k.A MARK ■ ■ THOMAS OH RATE: 150.66%/FEE: 10% A c C 00 W N $380 C m y p 6 N $239 1 C L ~ Vf $265 A t N O 1 $214 t $214 d W W O 1 $164 _ d S W 0p O $142 - a01i m ry O $115 c A C y F V1 $145 o S O W Z V�1 $318 _ > L N W O a $192 _ " 2 a, $136 Z L F l: N $126 W N 0. W V $202 N o ; V C 0 W 6 N $379 C d ° 6 O N $243 - y y A 9 Cry J $117 2 w 6 m 9 C - $157 R Q N 6 $129 a0 o 'o' 15 G d IA $145 Total Hours Total MT Cost Q 'L a�a W DBE S S LL Non -DBE Q l7 DBE m W 3 Non -DBE z Z 0 DBE TOTAL COST 1.0(Phase I Phase-TrY 1.1.1. Project Management (Phase 1) 80 48 80 24 8 240 $46,803 - - - $46,803 1.1.2. Project Team Meetings (Phase 1) 24 32 32 32 8 12 140 $25,975 $25,975 1.1.3. City Council Presentations (Phase 1) 8 4 16 24 24 76 $11,924 - - - $11,924 1.1.4. Quality Control and Quality Assurance (QAjQC) (Phase 1) 24 120 260 16 420 $82,5071 $82,507 1.2.1 Project Management (Phase 11 & III) 24 140 100 120 60 24 468 $94,9421 $94,942 1.2.2. Project Team Meetings (Phase 118, III) 20 24 24 32 8 12 120 $21,993 - $21,993 1.2.3. City Council Presentations (Phase 11 & III) 8 4 16 24 8 60 $9,412 - - $9,412 Subtotal Phase 1 24 304 120 212 0 548 0 112 0 0 16 01 0 0 0 24 0 32 84 48 1524 $293,554 $0 $0 $0 $0 $0 $293,554 2.0 SURVEY (PHASE 1) 2.1. Encroachment Permits and Right of Entry 4 8 72 120 204 $28 278 _ _ _ $28,278 2.2. Survey Research 2 8 2 12 $2,462 - $2,462 2.3. Site Reconnaissance 4 8 16 16 24 68 $10,326 - - - $10,326 2.4. Record Drawing Review 8 24 32 $4,072 _ _ $4,072 2.5. Surveying 4 4 16 4 20 44 50 48 4 194 $39,520 - - $39,520 2.6. Monuments & RW 2 4 40 12 2 60 $11,682 - $11,682 2.7. Locate Pothole Reference Marks 8 8 12 1 2 30 $5,170 - - $5,170 Subtotal Phase 2 0 8 01 20 0 100 16 192 0 8 40 84 50 12 60 0 0 0 0 10 600 $101,510 $0 $0 $0 $0 $0 $101,510 3.0 UTILITY COORDINATION (PHASE I / PHASE 11) 3.1.1. Utility 'A' Letters - Mapping Requests (Phase 1) 4 24 28 $3,416 - - - $3,416 3.1.2. Existing Utility Mapping (Phase 1) 4 40 44 $5,256 - - $5,256 3.1.3. Utility Potholing (8) (Phase 1) 8 20 40 68 $9,592 - - $9,592 3.2.1. Utility Coordination/Conflict Mapping (Phase 11) 20 80 100 203 $28,900 - - $28,900 Subtotal Phase 3 0 0 0 28 0 108 0 204 0 0 0 0 0 0 0 0 0 0 0 0 340 $47,164 $0 $0 $0 $0 $0 $47,164 4.0 GEOTECHNICAL ANALYSIS (PHASE I) 4.1. Preliminary Foundation Report 4 12 16 $2,824 11,055 - $13,879 Subtotal Phase 4 0 0 0 4 0 12 0 0 0 0 0 0 0 0 0 0 0 0 0 0 16 $2,824 $11,055 $0 $0 $0 $0 $13,979 5.0 HYDRAULIC ANALYSIS (PHASE 1) 5.1. Regional Flow Rate Analysis 24 24 $3,480 - 34,918 - $38,398 5.2. Bridge Alternatives Hydraulic Analysis 3 $0 - - 17,324 - $17,324 5.3. Preliminary Roadway Drainage Report / Local Drainage Analysis 2 4 8 16 24 54 $7,883 - - 11,863 - $19,746 5.4 Preliminary Water Quality Report 2 16 32 40 90 $12,298 - - $12,298 Subtotal Phase 5 0 2 6 0 01 24 48 64 24 0 0 0 0 0 0 0 0 0 0 0 168 $23,661 $0 $0 $0 $64,105 $0 $87,766 6.0 ENVIRONMENTAL APPROVAL (PHASE 1) 6.1. Project Initiation & Preliminary Environmental Study 16 8 8 24 40 40 20 156 $24,371 - 26,000 - - $50,371 6.2.1. Technical Studies - Air Quality 0 $0 - 600 - $600 6.2.2. Technical Studies - NES 0 $0 - 20,000 - - $20,000 6.2.3. Technical Studies - Aquatic Resources 0 $01 18,000 - $18,000 6.2.4. Technical Studies -Area of Potential Effects Map 0 Sol 5,000 - - $5,000 6.2.5. Technical Studies - Section 306/AB 52 Outreach 0 $0 - 600 - $600 6.2.6. Technical Studies - Paleontological Identification 0 $0 - 600 - $600 6.2.7. Technical Studies - Archaeological Survey Report 0, $0 750 $750 6.2.8. Technical Studies - HPSR 0 $0 - - 5,000 - $5,000 6.2.9. Technical Studies- Section 106 Outreach 0 $0 1,000 - $1,000 6.2.10. Technical Studies - Phase I / Phase II SI Results 0 $0 - 1,000 - - $1,000 6.2.11. Technical Studies - Noise 0 $0 600 - $600 6.2.12. Technical Studies - AbbreviatedVIA 10 12 22 $3,834 - - 9,200 - - $13,034 6.2.13. TechnicalStudies- WaterQualityAssessment 0 $0 8,900 - $8,900 6.3. VMT Screening Assessment 0 $0 - 2,874 - - - $2,874 6.4. Initial Study / Mitigated Negative Declaration 0 $0 52,000 $52,000 0 $0 - - - - - $0 0 $0 - - $0 Subtotal Phase 6 0 16 0 8 8 24 40 40 20 0 0 0 0 0 0 10 12 0 0 0 179 $28,205 $0 $2,874 $149,250 $0 $0 $180,329 7.0 GEOMETRIC APPROVAL DRAWINGS (PHASE 1) - 35% DESIGN 7.1. Preliminary Engineering 4 8 24 60 4 100 $14,580 - - - - $14,580 7.2. Transportation Study 1 0 $0 16,158 - - $16,158 7.3. Bridge Type Selection Report & Meeting 8 16 100 16 40 18011 27,384 - - - $27,394 7.4. Geometric Approval Drawings 4 4 8 24 40 160 20 4 8 272 $36,554 8,914 - - $45,468 Subtotal Phase 7 0 4 16 32 0 48 140 236 60 0 0 0 0 0 0 8 8 0 0 0 552 $78,518 $0 $25,072 $0��4$0 $0 $103,590 Please note that the rates shown are for estimating purposes only. See rate schedule for actual rates/ranges. 8/23/2023 COST PROPOSAL FOR PROJECT SCOPE: La Quinta- Avenue 50 over the La Quinta Evacuation Channel - Federal Project No. BR-NBIL(547); City Project No. 2019-02 Subconsultants u MARK ■■ T H O M A S OH RATE: 250.66%/FEE: 20% Cm C C r y W N $380 A g tJ d V1 $239 S u f N $265 A C N W 6 $214 J L f $214 C N 6 $164 _ W c W U G $142 v c C Cm C $115 m .V of $145 A o_ N > VI $318 _ _ 0 ; 6 $192 o 0 Q $136 _ C. s W N $126 W 1 0 U $202 W ° d U Cc W 9- $379 d c 6 ar'L N $243 _ C m= o W my J $117 V H � $157 C Y ti p $129 C `o 0 O y� $145 Total Hours Total MT Cost V a = W S W DBE 12 W � W Non -DBE l7 DBE CA 3 Non -DBE W z 'L DBE TOTAL COST 8.0 FINAL PLANS, SPECIFICATIONS & ESTIMATE (PHASE 11) 8.1.1. Geotechnical Investigations 0 $0 16,879 - $16,879 8.2.2 Laboratory Testing 1G $0 18,898 $18,898 8.1.3. Geotechnical Engineering Analysis 0 $0 28,433 - - $28,433 8.2.4. Report Preparation 4 4 8 8 24 $4,046 33,201 - - - $37,246 8.2. Regulatory Agency Permits 4 4 16 24 48 $7,198 56,574 - $63,772 8.3. 65% Roadway Plans and Estimate 8 16 32 24 240 160 480 200 20 40 1220 $176,307 19,776 - - - $196,083 8.4. 65% Unchecked Detail - Structure Plans and Estimate 16 60 240 360 240 916 $127,360 - $127,360 8.5. Identify ROW Requirements 4 4 8 16 32 64 $9,830 - - - 4,564 $14,394 8.6. 90% Roadway PS&E 4 16 16 24 200 120 400 240 16 32 106E $152,999 - 3,490 - $156,489 8.7. Bridge Design Independent Check 16 40 200 256 $32,104 - - $32,104 8.8. 90% (Final) Structures PS&E 2 16 32 140 160 80 12 28 470 $67,920 - - - $67,920 8.9. 100% PS&E 4 4 24 80 80 180 220 8 24 524 $74,486 2,908 - $77,394 8.20. Final PS&E 4 4 16 80 48 100 40 4 8 304 $44,586 - 2,908 - - $47,494 8.21. Final Drainage Report 4 4 8 8 16 40 $6,678 R277,815 $34,493 8.22. Final Water Quality Report 4 4 8 16 24 56 $8,910 - - - - $8,910 Subtotal Phase 8 14 60 88 216 24 664 828 2984 920 0 0 0 0 0 0 60 132 0 0 0 499 $712,422 $97,411 $29,082 $56,574 $4,564 $927,867 9.0 RIGHT OF WAY (PHASE III) 9.1. Plats & Descriptions 4 16 4 16 16 16 72 $11,032 - $11,032 9.2. UtilityAgreement(s) 4 24 48 60 136 $18,610 - - - $18,610 9.3. Final ROW Requirements 2 2 4 12 24 44 $6,491 - - - - 31,416 $37,906 Subtotal Phase 9 0 6 0 2 4 40 48 100 0 4 16 16 16 0 0 0 0 0 0 0 252 $36,133 $0 $0 $0 $0 $31,416 $67,548 10.0 CONSTRUCTION SUPPORT (PHASE IV) 10.1. Bid Support (T&M) 12 20 1 60 92 $12,748 - - $12,748 20.2. Project Management (T&M) 24 8 16 1 8 24 80 $14,595 - - - $14,595 10.3. Request for Information (RFI) (T&M) 32 24 48 80 16 40 240 $38,438 10,426 6,991 - $55,855 10.4. Submittal Reviews (T&M) 8 8 24 48 88 $14,380 - - - - - $14,380 10.5. Contract Change Orders (CCO's) (T&M) 8 8 24 60 48 80 228 $34,620 - - $34,620 Record Drawings (T&M) 8 8 40 100 100 256 $35,888 - - - - - $35,888 Subtotal Phase 10 0 80 0 60 32 208 196 320 0 0 0 0 ol 0 0 16 40 0 8 24 984 $150,667 $10,426 $6,991 $0 $0 $0 $168,084 TOTAL HOURS 381 4801 582 68 1776 1316 3252 1024 12 721100 66 12 60 118 292 32 92 82 9604 Anticipated Salary Increases $79,281 Sol Sol Sol Sol $0 $79,281 OTHER DIRECT COSTS $48,0251 $33,7731 $1,6931 $55,808 $0 $21,0001 $260,299 TOTALCOST $14,440 $114,931 $60,950 $124,548 $14,552 $291,264 $186,872 $373,980 $148,480 $3,816 $13,824 $13,600 $8,316 $2,424 $22,740 $28,674 $22,464 $5,0241 $11,868 $11,890 $1,602,964 $152,664 $65,712 $262,632 $91,920 $56,980 $2,230,871 OPTIONAL TASKS 6.4.1. Administrative Draft Environmental Assessment (Optional) 4 4 8 12 28 $4,506 - 25,508 - - $30,014 6.4.2. Draft Environmental Assessment (Optional) 0 $0 - - 13,000 $13,000 6.4.3. Final Environmental Assessment (Optional) 0 $0 - - 2,300 - - $2,300 Traffic Signal Interconnect (Optional) 0 $01 9,419 $9,419 8.6.1. Contract Specifications and Special Provisions Env Support 0 $0 - - 5,500 - - $5,500 Subtotal Optional Tasks 0 4 0 4 0 8 0 12 0 0 0 0 0 0 0 0 0 0 0 0 28 $4,506 $0 $9,419 $46,308 $0 $0 $60,233 TOTAL HOURS - OPTIONAL 0 4 0 4 0 8 0 12 0 0 0 0 0 0 0 0 0 0 0 0 28 Anticipated Salary Increases $0 $0 $0 $0 $0 $0 $0 OTHER DIRECT COSTS - OPTIONAL $0 $0 $0 $0 $0 $0 $0 TOTAL COST - OPTIONAL $0 $958 $0 $856 $0 $2,312 $0 $1,380 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $4,506 $0 $9,4191 $46,308 $01 0 $60,233 Please note that the rates shown are for estimating purposes only. See rate schedule for actual rates/ranges 8/23/2023