Alta Verde - Coral Mountain TR 34243 BCPR2021-0028ADDITIONAL SITES
CHRONOLOGY
CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES
2ND PC SUBMITTAL
RECEIVED AJ ORTEGA 9/15/2021 9/15/2021 ATTACHMENTS VERIFIED, 2ND SUBMITTAL REVIEW CREATED.
Description: CORAL MOUNTAIN / MASTER SOLAR PLANS Status: ARCHIVED
Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: 9/15/2021
Subtype: SOLAR Applied: 9/7/2021
Address: 80750 AVENUE 58 Approved: 9/28/2021
City, State, Zip: LA QUINTA,CA92253 Closed:
Project Manager: Expired:
Details: CORAL MOUNTAIN AT PGA WEST BY ALTA VERDE / SOLAR PHOTOVOLTAIC MASTER
PLANS FOR PLANS J & D MOD’S, AND J, D, Z UNDER THE 2019 CALIFORNIA
BUILDING CODES
PLAN J MOD / PLAN D MOD: 5.6kW SOLAR ARRAY - (16) 350W SPR-X21 AC
SUNPOWER PANELS W/INTEGRATED MICROINVETERS [280SF]
PLAN J, D, Z: 5.95kW SOLAR ARRAY - (17) 350W SPR-X21 AC SUNPOWER PANELS
W/INTEGRATED MICROINVETERS [298SF]
REVISION 1: PLAN Z CHANGED TO 5.6kW SOLAR ARRAY AND REARRANGED PLAN D-
MOD SOLAR ARRAY ONLY.
REVISION 2: PLAN D MOD ROOF LAYOUT CHANGED.
REVISION 3: REVISED LAYOUTS BASED ON CHANGED UNIT TYPES AND
ORIENTATION.
REVISION 4: SYSTEM ATTRIBUTES, CONDUCTOR SEGMENTS CHANGED.
REVISION 5: PLAN D - LOT 45 SYSTEM ADDED - 7.0kW SOLAR ARRAY - (20) 350W
SPR-X21 AC SUNPOWER PANELS W/INTEGRATED MICROINVETERS [360SF].
Printed: Friday, February 28, 2025 10:32:13 AM 1 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028
CONTACTS
NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL
APPLICANT SUNPOWER CORPORATION SYSTEMS 1414 HARBOUR WAY
SOUTH #1901
RICHMOND CA 94804 (510)540-0550 Schellin.Gerome@Sunp
owercorp.com
ARCHITECT Schellin Gerome (510)540-0550
CONTRACTOR Schellin Gerome 25323 Alessandro blvd
#1034
Moreno valley CA 92553 (510)540-0550 Schellin.Gerome@sunp
owercorp.com
OWNER AV CONSTRUCTION PO BOX 13290 PALM DESERT CA 92255 (510)540-0550
PRIMARY
CONTACT
Schellin Gerome 25323 Alessandro blvd
#1034
Moreno valley CA 92553 (510)540-0550 Schellin.Gerome@sunp
owercorp.com
EMAIL AJ ORTEGA 9/28/2021 9/28/2021
EMAILED APPLICANT (Schellin.Gerome@sunpowercorp.com)
PLANS ARE APPROVED, ONCE PAYMENT OF PLAN CHECK FEES
ARE PAID THEY CAN THEN SUBMIT INDIVIDUAL
APPLICATIONS ON EACH REFERENCE LOT.
EMAIL AJ ORTEGA 2/13/2023 2/13/2023
EMAILED CONTRACTOR/APPLICANT
(Timothy.Witz@sunpower.com>;
tim.witz@sunpowercorp.com) REVISION 4 IS APPROVED.
EMAIL AJ ORTEGA 7/11/2023 7/11/2023
EMAILED CONTRACTOR/APPLICANT
(Timothy.Witz@sunpower.com>;
tim.witz@sunpowercorp.com) REVISION 5 IS APPROVED.
CONDITIONS
FINANCIAL INFORMATION
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1.5 $241.50 $241.50 9/29/21 WEB9444 CREDIT 890895 AMA
HOURLY CHARGE - CITY
BUILDING STAFF 101-0000-42600 1 $161.00 $161.00 9/29/21 WEB9444 CREDIT 890895 AMA
Total Paid for BUILDING STAFF - PER HOUR: $402.50 $402.50
Printed: Friday, February 28, 2025 10:32:13 AM 2 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028
INSPECTIONS
INSPECTION TYPE INSPECTOR SCHEDULED
DATE
COMPLETED
DATE
RESULT REMARKS NOTES
REVIEWS
DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD
BY
RECORDS
MANAGEMENT FEE -
MAJOR
101-0000-42416 0 $21.00 $21.00 9/29/21 WEB9444 CREDIT 890895 AMA
Total Paid for RECORDS MANAGEMENT FEE - MAJOR: $21.00 $21.00
TECHNOLOGY
ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 9/29/21 WEB9444 CREDIT 890895 AMA
Total Paid for TECHNOLOGY ENHANCEMENT FEE: $5.00 $5.00
TOTALS:$428.50 $428.50
REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED
DATE STATUS REMARKS NOTES
1ST BLDG (1WK)AJ ORTEGA 3/7/2022 3/14/2022 3/21/2022 INCOMPLETE REVISION 1: PLAN Z
COMMENTS SENT TO APPLICANT ON 3/14 -
CLARIFICATION ON THE SCOPE OF WORK STILL
HAS NOT BEEN PROVIDED, REVIEW CLOSED -
REQUIRED:
-CONFIRM BSOL2021-0167 AT 57653 SANTO
THOMAS SHOULD BE A (16) PANEL SYSTEM.
-CONFIRM IF THE (17) PANEL SYSTEM ORIGINALLY
PROPOSED AT THE PLAN Z WILL BE GOING AWAY,
TO BE REPLACED BY A (16) PANEL SYSTEM ONLY.
IF NOT THEN THE PLANS WILL NEED TO BE
REVISED TO IDENTIFY A NEW PLAN Z SYSTEM,
MAYBE SOMETHING LIKE Z-MOD TO BE
CONSISTENT.
1ST BLDG (1WK)AJ ORTEGA 4/15/2022 4/22/2022 5/2/2022 APPROVED REVISION 2: ROOF
LAYOUTS
REVISION 2: PLAN D MOD ROOF LAYOUT
CHANGED
Printed: Friday, February 28, 2025 10:32:13 AM 3 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028
BOND INFORMATION
1ST BLDG (1WK)AJ ORTEGA 6/8/2022 6/15/2022 8/12/2022 APPROVED REVISION 3: ALL
LAYOUTS
REVISION 3: REVISED LAYOUTS BASED ON
CHANGED UNIT TYPES AND ORIENTATION.
1ST BLDG (1WK)AJ ORTEGA 12/1/2022 12/8/2022 2/13/2023 APPROVED REVISION 4: SYSTEM
ATTRIBUTES
REVISION 4: SYSTEM ATTRIBUTES, CONDUCTOR
SEGMENTS CHANGED.
1ST BLDG (1WK)AJ ORTEGA 5/1/2023 5/8/2023 7/11/2023 APPROVED REVISION 5: PLAN D
FOR LOT 45
REVISION 5: PLAN D - LOT 45 SYSTEM 7.0kW
SOLAR ARRAY - (20) 350W SPR-X21 AC
SUNPOWER PANELS W/INTEGRATED
MICROINVETERS [360SF]. REFERENCE BCPR2021-
0028 FOR APPROVED MASTER PLANS. 2019
CALIFORNIA BUILDING CODES.
1ST PERMIT
TECHNICIAN (1DAY)AJ ORTEGA 9/7/2021 9/8/2021 9/7/2021 REVISIONS REQUIRED
1. Add to signage sheet (PVE-2) the directory
required by CEC 705.10 denoting the location of
all electric power source disconnecting means on
or in the premises that shall be installed at each
service equipment location and at the location(s)
of the system disconnect(s) for all electric power
production sources capable of being
interconnected.
2. Make the cut-sheet page (PVE-3) clear, the
sheets are nearly illegible.
3. On the single line diagrams move the
“Rooftop/Attic” line to the junction box, no part
of the NM-B conductor is allowed in an exterior
conduit.
2ND BLDG (1WK)AJ ORTEGA 9/15/2021 9/22/2021 9/28/2021 APPROVED
2ND BLDG (1WK)AJ ORTEGA 3/21/2022 3/28/2022 3/22/2022 APPROVED REVISION 1: PLAN Z
REVISION 1: PLAN Z CHANGED TO 5.6kW SOLAR
ARRAY AND REARRANGED PLAN D-MOD SOLAR
ARRAY ONLY.
Printed: Friday, February 28, 2025 10:32:13 AM 4 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 9/7/2021 AJ ORTEGA 1ST SUBMITTAL PLAN
SET
BCPR2021-0028 - 1ST
SUBMITTAL PLAN
SET.pdf
0
DOC 9/28/2021 AJ ORTEGA MASTER SOLAR PLAN
SET (APPROVED)
BCPR2021-0028 -
MASTER SOLAR PLAN
SET (APPROVED).pdf
1
DOC 9/28/2021 AJ ORTEGA SOLAR PERMIT
TAKEOFFS
BCPR2021-0028 - SOLAR
PERMIT TAKEOFFS.docx 0
DOC 3/22/2022 AJ ORTEGA
REVISION 1 - MASTER
SOLAR PLAN SET
(APPROVED)
BCPR2021-0028 -
REVISION 1 - MASTER
SOLAR PLAN SET
(APPROVED).pdf
1
DOC 3/22/2022 AJ ORTEGA REVISION 1 - SOLAR
PERMIT TAKEOFFS
BCPR2021-0028 -
REVISION 1 - SOLAR
PERMIT TAKEOFFS.docx
0
DOC 5/2/2022 AJ ORTEGA
REVISION 2 - MASTER
SOLAR PLAN SET
(APPROVED)
BCPR2021-0028 -
REVISION 2 - MASTER
SOLAR PLAN SET
(APPROVED).pdf
1
DOC 8/12/2022 AJ ORTEGA
REVISION 3 - MASTER
SOLAR PLAN SET
(APPROVED)
BCPR2021-0028 -
REVISION 3 - MASTER
SOLAR PLAN SET
(APPROVED).pdf
1
DOC 2/13/2023 AJ ORTEGA
REVISION 4 - MASTER
SOLAR PLAN SET
(APPROVED)
BCPR2021-0028 -
REVISION 4 - MASTER
SOLAR PLAN SET
(APPROVED).pdf
1
DOC 7/11/2023 AJ ORTEGA
REVISION 5 - MASTER
SOLAR PLAN SET
(APPROVED)
BCPR2021-0028 -
REVISION 5 - MASTER
SOLAR PLAN SET
(APPROVED).pdf
1
Printed: Friday, February 28, 2025 10:32:13 AM 5 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 7/11/2023 AJ ORTEGA REVISION 5 - SOLAR
PERMIT TAKEOFFS
BCPR2021-0028 -
REVISION 5 - SOLAR
PERMIT TAKEOFFS.pdf
0
DOC 9/15/2021 Etrakit Contractor 2ND SUBMITTAL PLAN
SET
BCPR2021-0028 - 2ND
SUBMITTAL PLAN
SET.pdf
0
DOC 9/15/2021 Etrakit Contractor 2ND SUBMITTAL PLAN
SET
Coral Mnt. C002231 -
MPermit (2).pdf 0
DOC 9/15/2021 Etrakit Contractor 2ND SUBMITTAL
RESPONSE LETTER
C002231 - MPermit -
Response Letter.pdf 0
DOC 3/7/2022 Etrakit Contractor
REVISION 1 - 1ST
SUBMITTAL SOLAR
PLAN
BCPR2021-0028 -
REVISION 1 - 1ST
SUBMITTAL SOLAR
PLAN.pdf
0
DOC 3/7/2022 Etrakit Contractor
REVISION 1 - 1ST
SUBMITTAL APPLICANT
RESPONSES
BCPR2021-0028 -
REVISION 1 - 1ST
SUBMITTAL APPLICANT
RESPONSES.pdf
0
DOC 4/15/2022 Etrakit Contractor REVISION 2 - 1ST
SUBMITTAL NARRATIVE
BCPR2021-0028 -
REVISION 2 - 1ST
SUBMITTAL
NARRATIVE.pdf
0
DOC 4/15/2022 Etrakit Contractor
REVISION 2 - 1ST
SUBMITTAL SOLAR
PLAN
BCPR2021-0028 -
REVISION 2 - 1ST
SUBMITTAL SOLAR
PLAN.pdf
0
DOC 6/8/2022 Etrakit Contractor REVISION 3 - 1ST
SUBMITTAL PLAN SET
BCPR2021-0028 -
REVISION 3 - 1ST
SUBMITTAL PLAN
SET.pdf
0
Printed: Friday, February 28, 2025 10:32:13 AM 6 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028
ATTACHMENTS
Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED
DOC 6/8/2022 Etrakit Contractor
REVISION 3 - 1ST
SUBMITTAL
TRANSMITTAL
BCPR2021-0028 -
REVISION 3 - 1ST
SUBMITTAL
TRANSMITTAL.pdf
0
DOC 12/1/2022 Etrakit Contractor
4th Revision to the solar
master plan -
resubmittal letter
Coral Mountain
(BCPR2021-0028)-
Revised Solar Master
Plan Set - D-0124141 -
Resubmittal Letter.pdf
0
DOC 12/1/2022 Etrakit Contractor 4th Revision to the solar
master plan
Coral Mountain
(BCPR2021-0028)-
Revised Solar Master
Plan Set - D-
0124141_1.pdf
0
DOC 5/1/2023 Etrakit Contractor Revision 5 Master solar
plan set
Coral Mountain - 405W
Master plans.pdf 0
DOC 5/1/2023 Etrakit Contractor Revision 5 Master solar
resubmittal letter
Coral Mountain -
MPermit Resubmittal
Letter.pdf
0
Printed: Friday, February 28, 2025 10:32:13 AM 7 of 7
Project Details
City of La Quinta
PROJECT NUMBER
BCPR2021-0028