Loading...
07-2475 (CONR) CF-6R Installationcsa5 0100 0-1-ay1S- Installation certificates (CF-6R) are required for each and every dwelling unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the procedures specified in this section. When the installation is complete, the builder or the builder's subcontractor shall complete the CF-6R (Installation Certificate), and keep it at the building site for review by the building department. The builder also shall provide a copy of the Installation Certificate to the HERS rater for any measures requiring field verification and diagnostic testing, per Section I0-103(a). WATER HEATING SYSTEMS: Distribution CEC Certified Type Mfr Name & . (Std, Point - Model Number of -Use. etc) P 5 Q S Heater Tyne INSTALLATION CERTIFICATE (Page 1 of 12) CE-6R Site Address Permit Number 1477 5— 0.,...%.. 94) r-‘, S 1 If Recirculation, Control Twit iSV4 of Identical Systems Rated Input (kW or Etalu•)1 a _6250 Tank Volume (gallons) Efficiency (EF, RE)2 Standby Loss (%)2 External Insu lati on R-value R-16, 1 For small gas storage (rated input of less than or equal to 75,000 Btulhr), electric resistance and heat pump water heaters, list Energy Factor (EF). For barge gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input, For instantaneous gas water heaters, list Thermal Efficiency and Rated input. 2. R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0, 58. Kitchen Piping: If indicated on the CF-1 R, all hot water piping ? 3/4 inches in diameter that runs from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Energy Commission, pursuant to Title 24, Part 6, Section 111. Central Water Pleating in Buildings with Multiple Dwelling Units (required for prescriptive) DAll hot water piping in main circulating loop is insulated to requirements of § 150(j) ❑Central hot water systems serving ,six or fewer dwelling units which have (I) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 150(j) OCentral hot water systems serving more than 6 dwelling units - presence of either a time control or a time/temperature control ✓ Q I, the undersigned, verify that equipment listed above my signature is: 1) the actual equipment installed; 2) equivalent to or more efficient than that specified m the certificate of compliance (Form CF-I R) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: AkA, Date; yes/09 l% Copies to: BUILDING DEPARTMENT, PERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY INSTALLATION CERTIFICATE Site Address (Page 1 of 12) CF-6R ermit Number Installation certificates (CF-6R) are required for each and every dwelling unit When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the procedures specified in this section. When the installation is complete, the builder or the builder's subcontractor shall complete the CF-6R (Installation Certificate), and keep it at the building site for review by the building department. The builder also shall provide a copy of the Installation Certificate to the HERS rater for any measures requiring field verification and diagnostic testing, per Section 10-103(a). WATER HEATING SYSTEMS: Heater _ Type Cms CEC Certified MfrName & Model Number °indention Type . (Std, Point - of -Use. etc) If Recirculation, Control n e # of Identical Systems Rated Input (kW or 8tulhr 19 Tank Volume (gallons) Efficiency (F, RS)c Standby Loss (%)z Extemal Insulation R-values Nf- 1 For small gas storage (rated input of less than or equal to 75,000 Btu/hr), electric resistance and heat pump water heaters, list Energy Factor (EF), For large gas storage water heaters (rated input of greater than 75,000ftu/hr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input. For instantaneous gas water heaters, list Thermal Efficiency and Rated Input 2. R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0.58. Kitchen Piping: If indicated on the CF-1R, all hot water piping > 3/4 inches in diameter that rums from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads; All faucets and showerheads installed are certified to the Energy Commission, pursuant to Title 24, Part 6, Section 111. Central Water Heating in Buildings with Multiple Dwelling Units (required for prescriptive) ❑A11 hot water piping in main circulating loop is insulated to requirements of § 150(j) ❑Central hot water systems serving six or fewer dwelling units which have (1) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1506) ❑Central hot water systems serving more than 6 dwelling units - presence of either a time control or a time/temperature control V. ❑ I, the undersigned, verify that equipment listed above my signature is; 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CP-1R) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: /Van %//vb/ Date: . P►er Pialvibir4. Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDXNG OWNER AT OCCUPANCY INSTALLATION CERTIFICATE Site Address 47-795 Dune Palms Rd, La Quinta, Ca 13k..L�G, t OO (Page 2 of 12) CF-6R Permit Number 07-2475 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). FENESTRATION/GLAZING: Item Manufacturer/Brand Name (GROUP LIKE RODUCTS) Product U-factors (S CF-IR value)' Product SHGC1 ,� (5CF-IR value)- it of Panes Total Quontiof Like Product (Optional) Square Feet •Arco Exterior Shading Device or Overhang Comments/Location/ Special Features 1. Pella/Impervia 31 32 2 N/A 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. '3 Use values from a fenestration product's NFRC label. For fenestration products without an NFRC label, use the default values from Section 1 16 of the Energy Efficiency Standards, '-t Installed U-factor must be Tess than or equal to values from CF-1 R. Installed SHGC must be Tess than or equal to values from CF-1 R, or a shading device (exterior or overhang) is installed as specified on the CF-I R. Alternatively, installed weighted average U-factors for the total fenestration area are less than or equal to values from CF-1 R, If using default table SHGC values from §116 identify whether tinted or not. ✓ ® I, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product installed; 2) is equivalent to or has a lower U-factor and lower SHGC than that specified in the certificate of compliance (Fonn CF-IR) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) the product meets or exceeds the appropriate requirements for manufactured devices (from Part 6), where applicable. Item #s (if applicable) (4/ r,, Signature Date ,, 5) Si D� j � Installing Subcontractor (Co.. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor Pella Windows & Doors- HSC, Inc. Item #s (if applicable) Signature Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor Item #s (if applicable) Signature Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor opies to: Building Department, HERS Rater (if applicable) Building Owner at Occupancy Residential Compliance Forms April 2005 Uo1—r Wei --RS' PLCE INSTALLATION CERTIFICATE (Page 3 of 12) CF-6R Site Address Permit Number t volr �,t s-. Ro %Qu$sa—ram q� 0 7 —�1S An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). HVAC SYSTEMS: Heating Equipment QC.S11,._S:1f.)G 1O0 Equip Type (pkg. heat pump) SCR Si✓e- CEC Certified Mfr. Name and Model Number 4 of Identical Systems E Iciency GO etc.) (.. -IR value) Duct Location (attic, etc,) ' Duct or Piping R-value Heating Load (Btu/hr) Heating Capacity (Btu/hr) Cis-v_ 5,9g)ceokx) a cp.. Mrsc R14.2 60� 0 8O Coo `' 59r'teO8o 5 II .. ft"io Re. a Cooling Equipment Equip Type (pkg. heat pump) CRrztz s CEC Certified Mfr. Name and Model Number # of Identicaldir%or Systems Efficiency EER) Duct Location (attic, etc.) Duct R-value Cooling Load (Btu/hr) 'Cooling Capacity (Btu/hr) >_CF-1Rvalue) COOL O N C..Y LinalLI99R �. 14 _D etc R 1-1.- . 48 ono DEr nrl6 4Pic A460Pir SS 'i " c, eaGoo_ N vr _ Iz 8.o - 1. > symbol reads greater than or equal to what is indicated on the CF-1R value. Include both SEER and EER if compliance credit for high EER air conditioner is claimed. ✓ IF I, the undersigned, verifythat equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner s ()) / e.HF rliccrc CoslJ % Signature: \ Date: S -09 Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY Residential Compliance Forms April 2005 INSTALLATION CERTIFICATE Site Address 47-795 DUNE PALMS RD. BLD# 100 (PAGE 10 OF 12) CF-6R i Permit Number Insulation Installation Quality Certificate ✓ II Description of Insulation, (CF-6R, formely IC-1) signed by the installer stating: insulation manufacturer's name, material identification, installed R-values, and for loose -fill insulation: minimum weight per square foot and minimum inches / 11 Installation meets all applicable requirements as specified in the High Quality Insulation Installation Procedures (ACM, Appendix RH) ✓ FLOOR III Yes No A All floor joist cavity insulation installed to uniformly fit the cavity side -to -side and end -to -end Yes 1 No II N!A Insulation in contact with the subfloor or rim joists insulated des ✓ • 0, Insulation properly supported to avoid gaps, voids, and compression WALLS !es R Ea Wall stud cavities caulked or foamed to provide an air tight envelope tQ 2 Wall stud cavity insualtion uniformly fills the cavity side -to -side, top -to -bottom, and front -to -back is Ro IR No gaps t1T R No voids over 3/4" deep or more than 10% of the batt surface area es (] No n PTA Hard to accesswall stud cavities such as; corner channels, wall intersections, and behind tub/shower enclosures insulated to proper R-Value is R 0, Small spaces filled I No R Rim -joists insulated des ig7A Loose fill wall insulation meets or exceeds manufacturer's minimum weight -per -square -foot requirement / ROOF/CEILING PREPARATION �s R t7IA All draft stops in place to form a continuous ceiling and wall air barrier is P 0, All drops covered with hard covers Ms R a All draft stops and hard covers caulked or foamed to provide an air tight envelope Yes n n t�7A All recessed light fixtures IC and air tight (AT) rated and sealed with a gasket or caulk between the housing and the ceiling fis A AO 0, Floor cavities on multiple -story buildings have air tight draft stops to all adjoining attics des IF R Eave vents prepared for blown insulation - maintain net free -ventilation area fis AO 0, Knee walls insulated or prepared for blown insualtion , NO R Area under equipment platforms and car -walks insulated or accessible for blow insulation 2 1 ig Attic rulers installed Residental Compliance Forms April 2005 INSTALLATION CERTIFICATE Site Address 47-795 DUNE PALMS RD. BLD# 100 (PAGE 11 OF 12) CF•6R IPerrnit Number a1-d 6 / ROOF CEILING BATTS • 1111 No gaps Yes IN MI No voids over 3/4" deep or more than 10% of the ball surface area No !s Ro la Insulation in contact with the air -barrier ms AO 6 Recessed light fixtures covered e Ro 0, Net free -ventilation area maintained at eave vents ✓ ROOF/CEILING LOOSE -FILL lres i NlA Insulation uniformly covers the entire ceiling (or roof) area from the outside of all exterior walls Yes AO a Baffles installed at eaves vents or soffit vents - maintain net free-ventilationa rea of eave vent l es Ao IOTA Attic access insulated e i R Recessed light fixtures covered QsRo � (n-� FITA Insulation at proper depth - insualtion rulers visible and indicating proper depth and R-Value No Loose -fill insualtion meets or exceeds manufacturer's minimum weight and thickness requirements for the target R-value. Target R-value . Manufacturer's minimum required weight for Yes N/A the target R-value (pounds -per -square -foot). Manufacturer's minimum required thickness at time of installation . Manufacturer's minimum required settled thickness . Note: To receive compliance credit the HERS rater shall verify that the manufacturer's minimum weight and thickness has been achieved for the target R-value. (CF-6R only) DECLARATION ✓ I hereby certify that the installation meets all applicable requirements as specified in the Insulation Installation Procedures Installing Subcontractor (Co. Name) OR General Contractor Na OR Owner MASCO CONTRACTOR SERVICES Signatur Q�- \ _ _ I Date: 04/17/09 , lit —mac Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE), BUILDING OWNER AT OCCUPANCY Residental Compliance Forms April 2005 INSTALLATION CERTIFICATE Site Address 47-795 DUNE PALMS RD. BLD# 100 (PAGE 12 OF 12) CF-6R Permit Number County Subdivision: La Quinta Dune Palms Description of Insulation (Formerly IC-1) Form) 1 RAISED FLOOR Material N/A Thickness (inches) 2 SLAB FLOOR/PERIMETER Material N/A Thickness (inches) Perimeter Insulation Depth (Inches) 3 EXTERIOR WALL Frame Type WOOD 2 X 6 A. Cavity Insulation Brand Name Building Number 100 Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) Material FIBER GLASS INSULATION Brand Name CERTAINTEED Thicness (inches) 5.5 INCHES B. Exterior Foam Sheathing Material Thicness (inches) 4 FOUNDATION WALL Material N/A Thermal Resistance (R-value) R-21 Brand Name Thermal Resistance (R-value) Brand Name Thickness (inches) Thermal Resistance (R-value) 5 CEILING Batt or Blanket Type BATT Brand Name CERTAINTEED Thickness (inches) 12 INCHES Thermal Resistance (R-value) Loose Fill Type Brand R-38 Contactor's min installed weight/ft lb Minimum thickness Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) 6 ROOF Material N/A Thickness (inches) Brand Name inches Thermal Resistance (R-value) DECLARATION ✓ El hereby certify that the abouve insulation was installed in the building at the above location in conformance with the current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) as indicated on the Certificate of Compliance, where applicable. Item #s (if applicable) 3, 5 Signatur Date , nl� q I(iJ�9 Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor MASCO CONTRACTOR SERVICES Item #s (if applicable) Signature Dat Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor Item #s (if applicable) Signature Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor Residental Compliance Forms April 2005