Loading...
07-3212 (MFD5) Air Balance Report,SS7rt% MECHANICAL CONSTRUCTION, INC. Air Balance Report Name 01J �JE Ptr1 S Address _ P--I��Ucw\j( j i op A?T1 l I Tested By ��L Size 2�-LT 4'p Date Tested — 14 -.9 System 21h 7CQuti(i Mmmmmml Settings �F Remarks *Legend: Type S = Supply R = Return 0 = Outside Air E = Exhaust SSW MECHANICAL CONSTRUCTION, INC. Air Balance Report Name Address WTII Tested By 0- Size 2112T Date Tested q ' 14 - b System 2 zT ell LIQ 1.01 • ® ..Final ""Settings ® 1 ��■��EIMm � Legend: Type S = Supply R = Return 0 = Outside Air E = Exhaust SSW/ MECHANICAL CONSTRUCTION, INC. Air Balance Report Name Address 1, �IZI Tested By Size Date Tested I 0 System ( ���I►J� �• I=-:-�Mjffijj� 'Legend: Type S = Supply R = Return 0 = Outside Air E = Exhaust SSW MECHANICAL CONSTRUCTION, INC. Air Balance Report Name Address kPT [ 122- Tested By ��- Size Date Tested 9-14--og System "�-5T M M 0 M® -.. 1Remarks Legend: Type S = Supply R = Return 0 = Outside Air E = Exhaust INSTALLATION CERTIFICATE (Page 2 of 12) CF-6R Site Address Permit Number 47-795 Dune Palms Rd, La Quinta, Ca 5LDC,G I I QO 07-3212 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a).. FENESTRATION/GLAZING: Item Manufacturer/Brand Name (GROUP LIKE RODUCTS) t Product t value) {SCF-]ttvalue)` t Product SHGC (5CF-Mvalue)- 11 of Panes Total Quantity of Like Product (Optional) Area Square Feet Exterior Shading Device or Overhang CommenM ocation/ S ccialFeatures 1. Pella/impervia 31 32 2: N/A 2. 3. 4. 5. 6. 7. 8. 9. 10. IL 12 13. 14. 15. t� Use values from a fenestration product's NFRC label.. For fenestration products without an NFRC label, use the default values from Section 116 of the Energy Efficiency Standards, Zt Installed U-factor must be less than or equal to values from CF-I R. Installed SHGC must be less than or equal to values from CF-1 R, or a shading device (exterior or overhang) is installed as specified on the CF-I R. Alternatively, installed weighted average U-factors for the total fenestration area are less than or equal to values from CF-IR- If using default table SHGC values from § 116 identify whether tinted or not. ✓ E 1, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product installed; 2) is equivalent to or has a lower U-factor and lower SHGC than that specified in the certificate of compliance (Form CF-I R) submitted for compliance with the Energy Efficiency Standards for residential buildings; and .3) the product meets or exceeds the appropriate requirements for manufactured devices (from Part 6), where applicable. Item #s Signatu Date Installing Subcontractor (Co.. Name) OR (if applicable) General Contractor (Co.. Name) OR Owner `� j0 OR Window Distributor 16 { Pella Windows & Doors- HSC, Inc.. Item #s Signature Date Installing Subcontractor (Co. Name) OR (if'applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Item #s Signature Date Installing Subcontractor (Co.. Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Copies to: Building Department, HERS Rater (if applicable) Building Owner at Occupancy Residenlial Compliance Forms April 200.5 W o t-F'F' W m -rE PL,-,, a E LNSTALLATION CERTIFICATE (Page 3 of 12) C�+-6Iz Site Address p Permit Number Ll-i �ni S DWv C— PIN Lrn-r Ro 9--:207 - 3:a 1 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a cop), must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). HVAC SYSTEMS: g Q i ,lJ G ) 00 Heating Equipment r�S's a. Equip Type CEC Certified Mfr. # of Efficiency (SUE, etc.) Duct Duct or Heating Heating Name and Model Identical Location Piping Load Capacity (pkg. heat pump) Number Svstems (>_CF-IRvalue) (attic. etc.) R-value (Btu/hr) (Bru/hr) FAN Coi t- 3 )co5c(5i.- C. 1 Hor AT 4) boo to H)'0T 31c Dxc'-C 1 Wpmer_ " pwo --2:1 -too W�ot Cc I (- 3(6149GtQ la1� °° i28® o oko 148 H 9&—S -e- 149 too Cooling Equipment Equip Type (pkg. heat um) C�sziz s � CEC Certified Mfr. Name and Model Number # of Identical Systems Efficiency t (SEE or EER) > F-1Rvalue) Duct Location (attic, etc.) Duct R-value Cooling Load (Bm4w) Cooling Capacity (Btu/fir) CoaL 0-" ..ter 'a.yACF 4--,ioh I 1 L4.0 Fhrjlc )z Y.-:a 30G1'o 14.o t s frlrisa -314 oao )o iT cA L1 ten9 1 Lj. 0 `° k 8.0 46000 1. > symbol reads greater than or equal to what is indicated on the CF-IR value. Include both SEER and EER if compliance credit for high EER air conditioner is claimed. ✓ 911, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: Rnptl Date: Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY Residential Compliance Forms April 2005 INSTALLATION CER'TIMATE AN f of III CFECK Site Address Permit Number 47)06 1%,, w eht3l 0 0-7-30 LIa Installation certificates (CF-6R) are requb-ed for each and every dwelling unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic tearing and the procedures specified in this section. When the installation is complete, the builder or the builder's subcontractor shall complete the CF-6R (Installation Certificate), and keep it at the building site for review by the building department. The builder also shall provide a copy of the I,nstallatio:n Certificate to the HERS rater for any measures requiring field verification and diagnostic testing, per Section 10-103(a). WATER HEATING SYSTEMS: Dismhacion CEC Cerditd Type If * of Rated Iapat External Heater Mfr Name & (Std, Point- Recirculation, ldeatical (kW or Tank Volume Efficiency Standby Insulation Type Model Number of -Um etc) Control Type systems nw/hr)i tons (EF, Rd Loss (%)2 R-valuo GA ! Q50 .SOS Al 1 For small gas storage (rated input of less than or equal to 75,000 Btulhr), electric resistance and heat pump water heaters, list Energy Factor (EF). For large gas storage water heaters (rated input of greater than 75,000 Btulhr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input, For instantaneous gas water heaters, list Thermal Efficiency and Rated Input. 2. R-12 external insulation is mandatory for -storage water heaters with an energy factor of less than 0.58. Kitchen Piping; If indicated on the CF-I R, all hot water piping ? 3/4 inches in diameter that runs from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Energy Commission, pursuant to Title 24, Part 6, Section 111. Central Water Heating in Buildings with Multiple Dwelling Units (required for prescriptive) 0AI1 hot water piping in main circulating loop is insulated to requirements of § 1500) ❑Central hot water systems serving six or fewer dwelling units which have (1) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1506) [3 Central hot water systems serving more than 6 dwelling units - presence of either a time control or a time/temperature control ✓ ❑ I, the undersigned, verify tt,,at equipment listed above my signature is; 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-I R) submitted for compliance with the ,Energy Efciency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the.Appliance Efficiency Pegulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner signature; hnln G av,- Date: Copies to: BUILDING DEPARTMEN'T,11RS RATER (Ili APPLICABLE) BLTILT)INC OwNFR AT OCCUPANCY e 1 of CF-6R f". INSTALLATION CERTIFICATE Site Address Permit Number Installation certificates (CF-6R) are required for each and every dwelling unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the .procedures specified in this section. When the installation is complete, the builder or the builder's subcontractor shall complete the CF-6R (Installation Certificate), and keep it at the building site for review by the building department. The builder also shall provide a copy of the Installation Certifieate to the HERS rater for any measures requiring field verification and diagnostic testing, per Section 10-103(a). WATER HEATING SYSTEMS: 1 For small gas storage (rated input of less than or equal to 75,000 Bfti/hr), electric resistance and heat pump water heaters, list Energy Factor (EF). For large gas storage water heaters (rated input of greater than 75,000 Btu(hr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input. For instantaneous gas water heaters, list Thermal Efficiency and Rated Input. 2. R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0.58. Kitchen Piping: If indicated on the CF-IR, all hot waterpiping ? 3/4 inches in diameter that inns from the hot wat.-r source ro the latchen fixtures is insulated. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Energy Commission, pursuant to Title 24, Part 6, Section 111. Central Water Heating in Buildings with Multiple Dwelling Units (required for prescriptive) OAII hot water piping in main circulating loop is insulated to requirements of § 1506) []central hot water systems serving six or fewer dwelling units which have (1) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1500) ❑Central hot water systems serving more than 6 dwelling units -presence of either a time control or a time/temperature control ✓ ❑ I, the undersigned, verify that equipment listed above my signature is: 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-IR) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regidarions or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDXNG OWNER AT OCCIMAINCY F'INSTALLATION CERTIFICATE SAe Address 47-795 DUNE PALMS RD. BLD# 1100 La Quinta Description of Insulation (Formerly IC-1) Form) 1 RAISED FLOOR Material N/A Thickness (inches) 2 SLAB FLOOR/PERIMETER Material N/A Thickness (inches) Perimeter Insulation Depth (Inches) 3 EXTERIOR WALL Frame Type WOOD 2 X 6 A. Cavity Insulation Material FIBER GLASS INSULATION Thicness (inches) 5.5 INCHES B. Exterior Foam Sheathing Material Thicness (inches) 4 FOUNDATION WALL Material N/A Thickness (inches) E 12 OF 12) CF-6R rmrt Number b-371z Number 1100 Brand Name Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) Brand Name CERTAINTEED Thermal Resistance (R-value) R-21 Brand Name Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) 5 CEILING Batt or Blanket Type BATT Brand Name CERTAINTEED Thickness (inches) 12 INCHES Thermal Resistance (R-value) Loose Fill Type Brand Contactor's min installed weight/ft lb Minimum thickness Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) 6 ROOF Material Thickness (inches) N/A Brand Name Thermal Resistance (R-value) inches R-38 DECLARATION ✓ El hereby certify that the abouve insulation was installed in the building at the above location in conformance with the current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) as indicated on the Certificate of Compliance, where applicable. Item #s (if applicable) 3,5 Signature Date / Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor MASCO CONTRACTOR SERVICES Item #s (if applicable) Signature Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor Item #s (if applicable) Signature Date Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner OR Window Distributor Residental Compliance Forms April 2005 INSTALLATION CERTIFICATE Site Address 47-795 DUNE PALMS RD. BLD# 1100 11 OF 12) CF-6R 01 - ID(W- ✓ ROOF CEILING BATTS- YN es 0 No EJ No gaps Yes No El El No voids over 3/4" deep or more than 10% of the batt surface area l es IOTA Insulation in contact with the air -barrier les 2 Recessed light fixtures covered l es R 9 Net free -ventilation area maintained at eave vents ✓ ROOF/CEILING LOOSE -FILL Ps RO � Insulation uniformly covers the entire ceiling (or roof) area from the outside of all exterior walls l es 6 Baffles installed at eaves vents or soffit vents - maintain net free-ventilationa rea of eave vent �s l 2 Attic access insulated l es Recessed light fixtures covered Yes NO 2 Insulation at proper depth - insualtion rulers visible and indicating proper depth and R-Value El Ye No No El N/A Loose -fill insualtion meets or exceeds manufacturer's minimum weight and thickness requirements for the target R-value. Target R-value . Manufacturer's minimum required weight for the target R-value (pounds -per -square -foot). Manufacturer's minimum required thickness at time of installation . Manufacturer's minimum required settled thickness . Note: To receive compliance credit the HERS rater shall verify that the manufacturer's minimum weight and thickness has been achieved for the target R-value. (CF-6R only) DECLARATION ✓ E I hereby certify that the installation meets all applicable requirements as specified in the Insulation Installation Procedures Installing Subcontractor (Co. Name) OR General Contractor . N e OR Owner MASCO CONTRACTOR SERVICES Si nature: Date:04/17/09 Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE), BUILDING OWNER AT OCCUPANCY Residental Compliance Forms April 2005 ALLATION CERTIFICATE 47-795 DUNE PALMS RD. BLD# 1100 Insulation Installation Quality Certificate AGE 10 OF 12) CF-6R -321z ✓ N Description of Insulation, (CF-6R, formely IC-1) signed by the installer stating: insulation manufacturer's name, material identification, installed R-values, and for loose -fill insulation: minimum weight per square foot and minimum inches ✓ N Installation meets all applicable requirements as specified in the High Quality Insulation Installation Procedures (ACM, Appendix RH) ✓ FLOOR All floor joist cavity insulation installed to uniformly fit the cavity side -to -side and end -to -end 11 Yes 01 No 0 Insulation in contact with the subfloor or rim joists insulated l es ✓ WALLS Ro TR Insulation properly supported to avoid gaps, voids, and compression Ps Ao 2 Wall stud cavities caulked or foamed to provide an air tight envelope Yes Po 6 Wall stud cavity insualtion uniformly fills the cavity side -to -side, top -to -bottom, and front -to -back Ps R 2 No gaps Ps Q R No voids over 3/4" deep or more than 10% of the batt surface area 1'es Po Hard to accesswall stud cavities such as; comer channels, wall intersections, and behind tub/shower enclosures insulated to proper R-Value 17es Po R I Small spaces filled YNes AO 6. Rim -joists insulated es Ffo n f-1 Loose fill wall insulation meets or exceeds manufacturer's minimum weight -per -square -foot requirement ✓ ROOF/CEILING PREPARATION Re,f j o n tgTA All draft stops in place to form a continuous ceiling and wall air barrier Ms P 2 All drops covered with hard covers es o n f-1 All draft stops and hard covers caulked or foamed to provide an air tight envelope 1'es Pof-1 ('� All recessed light fixtures IC and air tight (AT) rated and sealed with a gasket or caulk between the housing and the ceiling I Yo 2 Floor cavities on multiple -story buildings have air tight draft stops to all adjoining attics Pe, No ❑ �/A Eave vents prepared for blown insulation - maintain net free -ventilation area Merl n n Knee walls insulated or prepared for blown insualtion es j ro ('j � Area under equipment platforms and car -walks insulated or accessible for blow insulation es •o n t7TA Attic rulers installed Residental Compliance Forms April 2005