07-3224 (MFD5) CF-6R InstallationSo Cal HERS Raters 4840 Normandie Place La Mesa, CA 91941-4545 Tel: 619- 251- 7982 Fax: 888- 826- 9536 Project: Brown Construction Vista Dune Palms La Quinta, CA o�� 14� eae ` SATE S "" www.soC^L-M F1M.0C3M Field Report No. 3 September 16, 2008 On September 16, 2008 So Cal HERS Raters conducted a site visit to the above project. The purpose of this visit was to observe the insulation installation and perform the Quality Insulation Installation / Thermal Bypass Checklist Inspection and identify any areas not passing. The following parties were present: Chris Gianunzio, Brown Construction, Inc. (BCI) Juan Gonzalez, So Cal HERS Raters (SCH) Kevin Rasmussen, So Cal HERS Raters (SCH) The following observations were made on the jobsite, and/or discussed in the jobsite trailer. Chris G. called us on 9/15/08 and asked if we would be able to come out on 9/16/08 and look at the insulation at the attic level on buildings 2100, 2300, and 2400. We visited the jobsite on 9/16/08 and we were able to verify that the insulation at the lid level was installed properly per the QII/TBC requirements. Chris will schedule us for the exterior walls after 9/26/08. For references, insulators and builders can learn more about California's Title-24 credit for High Quality Installation of Insulation by visiting the following websites: Videos hftp://www.buildingmedia.com/naima/videos.htmi Appendix RH httr)://www.enerciy.ca.gov/title24/2005standards/residential acm/2005 RES ACM APP RH.PDF Energy Star Thermal Bypass Checklist Guide Version 1.1 httn://www.enerqystar.ciov/ia/r)artners/bldrs lenders raters/downloads TBC Guide 062507 pdf This concludes field report 3 for Brown Construction, Inc. INSTALLATION CERTIFICATE Rage 1 of 12) CF-6R Site Address Permit Number Ll -7-AS OVA 134 d-1®b -7�� -3aaLA Installation certificates (CF-6R) are required for each and everydwelling unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the procedures specified in this section. When the installation is oomplete, the builder or the builder's subcontractor shall complete the CF-6R (installation Certificate), and keep it at the building site for review by the building department The builder also shall provide a copy of the Installation Certificate to the HERS .rater for any measures requiring field verification and diagnostic testing, ner Section 10-103(2t). WATER HEATING SYSTEMS: 1 For small gas storage (rated input of less than or equal to 15,000 Btu/hr), electric resistance and heat pump water heaters, list Energy Factor (EF). For large gas storage water heaters (rated input of greater than 75,000 Stu/hr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input. For instantaneous gas water heaters, list Thermal Efficiency and Rated Input. 2. R-12 external insulation is mandatory for storage water heaters with an energy factor of less than 0.55. Kitchen Piping: If indicated on the CF-11, all hot water piping ? 314 inches in diameter that runs from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Energy Commission, pursuant to Title 24, Part 6, Section 1 i i . Central Water Heating in Buildings with Multiple dwelling Units (required for prescriptive) QAII hot water piping in main circulating loop is insulated to requirements of § 1500) ❑Central hot water systems serving six or fewer dwelling units which have (1) less than 25' of distriburien piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1500) ©Central hot water systems serving more than 6 dwelling units - presence of either a time control or a time/temperature control ✓ ❑ I, the undersigned, verity that equipment listed above my signature is: 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy -Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Copies to: 'BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY INSTALLATION CERTIFICATE Site Address I of Permit Number CF-fiR Installation certificates (CF-6R) are required for each and every dwelling unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the.procedures specifed in this section. When the installation is complete, the builder or the builder's subcontractor shall complete the CF-6R (installation Certificate), and keep it at the building site for review by the building department. The builder also shall provide a copy of the Installation Certificate to the HERS rater for any measures requiring field verification and diagnostic testing, per Section 10-103(a), WATER HEATING SYSTEMS: 1 For small gas storage (rated input of less than or equal to 75,000 BtuJhr), electric resistance and heat pump water CP heaters, list Energy Factor (BF). For large gas storage water heaters (rated input of greater than 75,000 Btu(hr), list Recovery (RE), "Thermal Efficiency, Standby Loss and Rated Input. For instantaneous gas water heaters, list Thermal Efficiency and Rated Input, 2. R-12 externaI insulation is mandatory for storage water heaters with an energy factor of less than 0.58. Kitchen Piping: If indicated on the CF-1R, all hot waterpiping > 3/4 inches in diameter that runs from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Energy Corrunission, pursuant to Title 24, Part 6, Section 111. Central Water Heating in Buildings with Multiple Dwelling Units (required for prescriptive) ❑All hot water piping in main circulating loop is insulated to requirements of § 150G) DCentraI hot water systems serving six or fewer dwelling units which have (1) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1500) []Central hot water systems serving more than 6 dwelling units - presence of either a time control or a time/temperature control ✓ ❑ I, the undersigned, verify that equipment listed above my signature is: 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the cerrificate of compliance (Form CF-IR) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regularions or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: I_,.— I hate: 411jo Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDXNG OWNER AT OCCUPANCY Gage 1 of 12) CF-GR r- INSTALLATION CERTIFICATE Site Address Permit Installation certificates (CF-6R) are required for each and every dwelling unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the procedures specified in this section. When the installation is complete, the builder or the builder's subcontractor shall complete the CF-6R (Installation Certificate), and keep it at the building site for review by the building department The builder also shall provide a copy of the Installation Certificate to the HERS rater for any measures requiring field verification and diagnostic testing, per Section 10-103(a). WATER HEATING SYSTEMS: 1 For small gas storage (rated input of less than or equal to 75,000 Btuthr), electric resistance and heat pump water heaters, list Energy Factor (EF). For large gas storage water heaters (rated input of greater than 75,000 Btu/hr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input, For instantaneous gas water heaters, list Thermal Efficiency and Rated Input. 2. R-12 external insulation is mandatory for- storage water heaters with an energy factor of less than 0.5 S. Kitchen Piping: If indicated on the CF-1 R, all hot water piping > 3/4 inches in diameter that nuns from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads: All faucets and showerheads installed are certified to the Energy Commission, pursuant to Title 24, Part 6, Section 11 I. Central Water Heating in Buildings with Multiple Dwelling Units (required for prescriptive) ❑All hot water piping in main circulating loop is insulated to requirements of § 1500) ❑Central hot water systems serving six or fewer dwelling units which have (1) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1300) ❑Central hot water systems serving more than 6 dwelling units - presence of either a time control or a time/temperature control ✓ ❑ I, the undersig ed, verify that equipment listed above my signature is; 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-I R) submitted for compliance with the Energy Efciency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for mauufacturtd devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Copies to: BUILDING DEPARTMENT, HERS RATER (TF APPLICABLE) B=T)INC pVVnR AT OCCUPANCY INSTALLATION CERTIFICATE (Page 2 o€12} CF-6R Site Address 47-795 Dune Palms Rd, La Quinta, Ca BLDG - 2100 Permit Number 07-3224 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). FENESTRATION/GLAZING: Item Manufacturer/Brand Name (GROUP L.IKE RODUCT$) i Product U-factor (_<CF-IRvalue) 2 Product SHGC (SCF-IRvaluc)2 11 of Pancs Total Quantity of Like Product (optional) Area Square Feet Exterior Shading Device or Overhang Commenis/L.ocation/ Special Features I. Pella/Impervia 31 32 2 N/A 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. �l Use values from a fenestration product's NFRC label. For fenestration products without an NFRC label, use the default values from Section 116 of the Energy Efficiency Standards. '`l Installed U-factor must be less than or equal to values from CF-I R. Installed SHGC must be less than or equal to values from CF-I R, or a shading device (exterior or overhang) is installed as specified on the CF-I R. Alternatively, installed weighted average U-factors for the total fenestration area are less than or equal to values from CF-I R. If using default table SHGC values from § 116 identify whether tinted or not. ✓ i I, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product installed; 2) is equivalent to or has a lower U-factor and lower SHGC than that specified in the certificate of compliance (Form CF-I R) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) the product meets or exceeds the appropriate requirements for manufactured devices (from Part 6), where applicable. Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner Q OR Window Distributor Pella Windows & Doors- HSC, Inc. Item #s Signature Date Installing Subcontractor (Co Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co.. Name) OR Owner OR Window Distributor Copies to: Building Department, HERS Rater (irapplicable) Building Owner at Occupancy Residential Compliance Forms April 2005 W o LF-F- INSTALLATION CERTIFICATE (Page 3 of 12) CF-6R Site Address Permit Number 1'-)v.NC- R, Ls�s Ro L�) Quo,TQ 9--207 - :3M--XL4 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). HVAC SYSTEMS: aCS �� r�G 2� 00 Heating Equipment Equip Type (pkg. heat pump) CEC Certified Mfr. Name and Model Number # of Identical Systems Efficiency� (AFUE. etc.) (>_CF-1Rvalue) Duct Location (attic, etc.) Duct or Piping R-value Heating Load (Btu/hr) Heating Capacity (Bw/hr) FAN Coi t- fhTtc fRy-a 19 boo It)fzhT 37eP�sC�—C WRY r' J�+►o �-lOo wprlenic Gig �6 lid RS,v yore y8 H SaS 71 '49 i co Cooling Equipment Equip Type (pkg. heat pump) CARS' CEC Certified Mfr. Name and Model Number # of Identical Systems Efficiency (SEE or EER) (>_CF-1Rvalue) Duct Location (attic, etc.) Duct R-value Cooling Load (Btu/hr) Cooling Capacity (Btu/hr) Cocx- GWLL. r ZX.1L419cAL93ofl 1 Ll-o 9 y.---z 3®0--0 �p�nto�rts�N6 �Rcl?r L13 (, g ) (I.O ° j Arid pro Ur7s-r :- 14.0 `' R 8.0 poo 1. > symbol reads greater than or equal to what is indicated on the CF-IR value. Include both SEER and EER if compliance credit for high EER air conditioner is claimed. ✓ ElI I, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner S' s'�GyHS� sc,QrL (�n('S, T1�Co Signature: 05�� Date: Copies to: BUILDING DEPARTMENT, BERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY Residential Compliance Forms April 2005 INSTALLATION CERTIFICATE (PAGE 10 OF 12) CF-6R Site Address Permit Number ,AZz95 DUNE PALMS RD. BLD# 2100 07-3224 Insulation Installation Quality Certificate ✓ 0 Description of Insulation, (CF-6R, formely IC-1) signed by the installer stating: insulation manufacturer's name, material identification, installed R-values, and for loose -fill insulation: minimum weight per square foot and minimum inches ✓ E Installation meets all applicable requirements as specified in the High Quality Insulation Installation Procedures (ACM, Appendix RH) ✓ FLOOR 0 No 0 All floor joist cavity insulation installed to uniformly fit the cavity side -to -side and end -to -end �0 Insulation in contact with the subfloor or rim joists insulated 0 � 0 Insulation properly supported to avoid gaps, voids, and compression ✓ WALLS Ps I N❑o 4A Wall stud cavities caulked or foamed to provide an air tight envelope ■ Yes El No NWall [a stud cavity insualtion uniformly fills the cavity side -to -side, top -to -bottom, and front -to -back � No gaps Yes Y s N❑o 4A No voids over 3/4" deep or more than 10% of the batt surface area N ❑ ❑ Hard to accesswall stud cavities such as; corner channels, wall intersections, and behind zs No N/A tub/shower enclosures insulated to proper R-Value JPA spaces filled WA Rim -joists insulated es 0 Pn s No 4A Loose fill wall insulation meets or exceeds manufacturer's minimum weight -per -square -foot requirement ✓ ROOF/CEILING PREPARATION Yes No 4A All draft stops in place to form a continuous ceiling and wall air barrier Yes 0 NSA All drops covered with hard covers N 0 All draft stops and hard covers caulked or foamed to provide an air tight envelope 0 All recessed light fixtures IC and air tight (AT) rated and sealed with a gasket or caulk between the YesN❑o 14A housingand the ceilin 0 Floor cavities on multiple -story buildings have air tight draft stops to all adjoining attics s E3 E 0 Eave vents prepared for blown insulation - maintain net free -ventilation area Yes No Yes Po0 1�7A Knee walls insulated or prepared for blown insualtion El0 Area under equipment platforms and car -walks insulated or accessible for blow insulation Yes I�A Ps R NYA Attic rulers installed ,esidental Compliance Forms April 2005 (INSTALLATION CERTIFICATE (PAGE 11 OF 12TF-6R DUNE PALMS RD. BLD# 2100 07-3224 ✓ ROOF CEILING BATTS No gaps Yes No N/A Yes El No 0 No voids over 3/4" deep or more than 10% of the batt surface area Yes 0N El El Insulation in contact with the air -barrier Yes 0N El 0 Recessed light fixtures covered 0 No 0 Net free -ventilation area maintained at eave vents ✓ ROOF/CEILING LOOSE -FILL El Yes E No 0 Insulation uniformly covers the entire ceiling (or roof) area from the outside of all exterior walls 0 No El Baffles installed at eaves vents or soffit vents - maintain net free-ventilationa rea of eave vent 0 No El Attic access insulated Yes No 0 Recessed light fixtures covered 0 Yes No 0 Insulation at proper depth - insualtion rulers visible and indicating proper depth and R-Value Yes No N/A Loose -fill insualtion meets or exceeds manufacturer's minimum weight and thickness requirements for the target R-value. Target R-value . Manufacturer's minimum required weight for the target R-value (pounds -per -square -foot). Manufacturer's minimum required thickness at time of installation . Manufacturer's minimum required settled thickness . Note: To receive compliance credit the HERS rater shall verify that the manufacturer's minimum weight and thickness has been achieved for the target R-value. (CF-6R only) DECLARATION ✓ 0 1 hereby certify that the installation meets all applicable requirements as specified in the Insulation Installation Procedures Installing Subcontractor (Co. Name) OR General Contractor Co ame OR wner MASCO CON RACT SERVICES Si natur Date: O o� //R�� V Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE), BUILDING OWNER AT OCCUPANCY Residental Compliance Forms April 2005 INSTALLATION CERTIFICATE (PAGE 12 OF 12) CF-6R ice Address Permit Number -795 DUNE PALMS RD. BLD# 2100 07-3224 Subdivision: La Quinta Dune Palms Description of Insulation (Formerly IC-1) Form) 1 RAISED FLOOR Material N/A Thickness (inches) 2 SLAB FLOOR/PERIMETER Material N/A Thickness (inches) Perimeter Insulation Depth (Inches) 3 EXTERIOR WALL Frame Type WOOD 2 X 6 A. Cavity Insulation Material FIBER GLASS INSULATION Thicness (inches) 5.5 INCHES B. Exterior Foam Sheathing _ Material Thicness (inches) 4 FOUNDATION WALL (� Material N/A Thickness (inches) Brand Name Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) Brand Name CERTAINTEED Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) 5 CEILING Batt or Blanket Type BATT Brand Name CERTAINTEED Thickness (inches) 12 INCHES Thermal Resistance (R-value) Loose Fill Type Brand Contactor's min installed weight/ft lb Minimum thickness Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) Number 2100 inches R-21 R-38 6 ROOF Material N/A Brand Name Thickness (inches) Thermal Resistance (R-value) DECLARATION ✓ N I hereby certify that the abouve insulation was installed in the building at the above location in conformance with the current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) as indicated on the Certificate of Compliance, where applicable. Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) _ General Contractor (Co. Name) OR Owner 3,5 <� / �� OR Window Distributor MASCO CONTRACTOR SERVICES Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Item #s Signature Date Installing Subcontractor (Co. Name) OR if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Residental Compliance Forms April 2005