07-3243 (MFD5) CF-6R InstallationCERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 7 of 8) CF-4R Project Title: La Ouinta Dune Palms Quality Insulation Q ty Date: 1l20/2008 oject Address: 47-795 Dune Palms Rd. Bld# 8400 La Ouinta CA 92253 Builder Name: CVHC Builder or Installer Contact: Telephone: Permit or Plan No. CVHC 800-689-4663 07-3243 HERS Rater: Telephone: Sample Group No. Kevin Rasmussen CCNKR350475 19-251-7982 Not S m led Certifying Signature: Date: Sample House No. 1 20 2008 Not Sam led Firm: HERS Provider: So Cal HERS R ters I CHEERS R Street Address: City / State / Zip I 4840 Normand*— La Mesa CA 91941 Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE), BUILDING OWNER AT OCCUPANCY HERS RATER COMPLIANCE STATEMENT This house was: ✓ ® Tested ✓ ❑ Approved as part of a sample testing, but was not tested. As the HERS rater providing diagnostic testing and field verification, I certify that the house identified on this form complies with all applicable requirements of the "High Quality Installation of Insulation" protocols as specified in the Residential ACM, Appendix RH and as checked on this form. Note that to PASS and receive compliance credit, NONE of the BOXES below may be checked "No" and the first three boxes also must be checked. Check "NA" only if the item is not part of the design of the building (i.e., single story buildings do not have rim joists or there may be no recessed can lights installed, etc.). ✓ ® REQUIREMENTS FOR "HIGH QUALITY INSTALLATION OF INSULATION" COMPLIANCE CREDIT ✓ ❑ The building is wood frame construction with wall stud cavities, ceilings, and roof assemblies insulated with mineral fiber or cellulose insulation in low-rise residential buildings. ✓ ® Description of insulation, (CF-6R, formerly IC-1) signed by the installer stating: insulation manufacturer's name, material identification, installed R-values, and for loose -fill insulation: minimum weight per square foot and minimum inches. ✓ ® Installation Certificate, (CF-6R) signed by the installer certifying that the installation meets all applicable requirements as specified in the High Quality Insulation Installation Procedures ACM Appendix RH . ✓FLOOR ❑ ❑ 1 ® All floor joist cavity insulation installed to uniformly fit the cavity side -to -side and end -to -end YES No NA ® ❑ ❑ Insulation in contact with the subfloor or rim joists insulated YES No NA ❑ ❑ ® Insulation properly supported to avoid gaps, voids, and compression YES No NA ✓WALLS ® ❑ ❑ Wall stud cavity insulation uniformly fills the cavity side -to -side, top -to -bottom, and front -to -back YES No NA ® ❑ ❑ No Gaps YES No NA ® ❑ ❑ No voids over 3/4" deep or more than 10% of the batt surface area. YES No NA ® ❑ ❑ Hard to access wall stud cavities such as; corner channels, wall intersections, and behind YES No NA tub/shower enclosures insulated to proper R-Value ® ❑ ❑ Small spaces filled YES No NA ® ❑ ❑ Rim -joists insulated ES No NA ® ❑ ❑ Wall stud cavities caulked or foamed to provide an air tight envelope. YES I No NA CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 7 of 8 CF-4R Project Title: La Q _Qiriinta Dune Palms Quality Insulation Date; 1/20/2008 oject Address: 47-795 Dune Palms Rd. Bld# 8400 La Quinta CA 92253 Builder Name: CVHC Builder or Installer Contact: Telephone: Permit or Plan No. CVHC 800-689-4663 07-3243 HERS Rater: Telephone: Sample Group No. Kevin Rasmussen CCNKR350475 619-251-7982 Not Sampled Certifying Signature: Date: Sample House No. 1/20/2 )08 Not Sampled Firm: HERS Provider: So Cal HERS Raters CHEERSr7 Street Address: City /State /Zip 4840 Normandie Place La Mesa CA 91941 Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE), BUILDING OWNER AT OCCUPANCY HERS RATER COMPLIANCE STATEMENT This house was: ✓ ® Tested ✓ ❑ Approved as part of a sample testing, but was not tested. As the HERS rater providing diagnostic testing and field verification, I certify that the house identified on this form complies with all applicable requirements of the "High Quality Installation of Insulation" protocols as specified in the Residential ACM, Appendix RH and as checked on this form. Note that to PASS and receive compliance credit, NONE of the BOXES below may be checked "No" and the first three boxes also must be checked. Check "NA" only if the item is not part of the design of the building (i.e., single story buildings do not have rim joists or there may be no recessed can lights installed, etc.) . ✓ ® REQUIREMENTS FOR "HIGH QUALITY INSTALLATION OF INSULATION" COMPLIANCE CREDIT ✓ ® The building is wood frame construction with wall stud cavities, ceilings, and roof assemblies insulated with mineral fiber or cellulose insulation in low-rise residential buildings. ✓ ® Description of insulation, (CF-611, formerly IC-1) signed by the installer stating: insulation manufacturer's f name, material identification, installed R-values, and for loose -fill insulation: minimum weight per square f` foot and minimum inches. ✓ ® Installation Certificate, (CF-611) signed by the installer certifying that the installation meets all applicable requirements as specified in the High Quality Insulation Installation Procedures ACM Appendix RH . ,"FLOOR ❑ ❑ 1 ® All floor joist cavity insulation installed to uniformly fit the cavity side -to -side and end -to -end YES No NA ® ❑ ❑ Insulation in contact with the subfloor or rim joists insulated YES No NA ❑ ❑ ® Insulation properly supported to avoid gaps, voids, and compression YES No NA ✓WALLS ® ❑ ❑ Wall stud cavity insulation uniformly fills the cavity side -to -side, top -to -bottom, and front -to -back YES No NA ® ❑ ❑ No Gaps YES No NA ® ❑ ❑ No voids over 3/4" deep or more than 10% of the batt surface area. YES I No NA ® YES ❑ No ❑ NA Hard to access wall stud cavities such as; corner channels, wall intersections, and behind tub/shower enclosures insulated to proper R-Value ® ❑ ❑ Small spaces filled YES No I NA ® ❑ ❑ Rim -joists insulated 'ES No NA ® ❑ ❑ Wall stud cavities caulked or foamed to provide an air tight envelope. YES No NA CERTIFICATE OF FIELD VERIFICATION & DIAGNOSTIC TESTING (Page 8 of 81 CF-4R -)ject Address 47-795 Dune Palms Rd. Bid# 8400 La Quinta, CA 92253 Builders Name t CVHC ,/Roo /Ceiling Pre ® ❑ ❑ All draft stops in place to form a continuous ceiling and wall air barrier. YES No NA ® ❑ ❑ All drops covered with hard covers YES No NA ® ❑ ❑ All draft stops and hard covers caulked or foamed to provide an air tight envelope YES No NA ® ❑ ❑ All recessed light fixtures IC and air tight (AT) rated and sealed with a gasket or caulk between YES No NA the housing and the ceiling ® ❑ ❑ Floor cavities on multiple -story buildings have air tight draft stops to all adjoining attics YES No NA ❑ ❑ ® Eave vents prepared for blown insulation - maintain net free -ventilation area YES No NA ❑ ❑ ® Knee walls insulated or prepared for blown insulation YES No NA ❑ ❑ ® Area under equipment platforms and cat -walks insulated or accessible for blown insulation YES No NA ❑ ❑ ® Attic rulers installed YES No NA toof Ceiling Batts 0 No Gaps ® N❑ ® ❑ ❑ No voids over 3/4 in. deep or more than 10% of the batt surface area. YES No NA ® ❑ ❑ Insulation in contact with the air -barrier YES No NA ® ❑ ❑ Recessed light fixtures covered YES No NA ❑ ❑ ® Net free -ventilation area maintained at eave vents YES No NA -/Roof/Ceiiiiing Loose Fill ® ❑ ❑ Insulation uniformly covers the entire ceiling (or roof) area from the outside of all exterior walls. YES No NA ❑ ❑ ® Baffles installed at eaves vents or soffit vents - maintain net free -ventilation area of eave vent YES No NA ❑ ❑ ® Attic access insulated YES No NA ❑ ❑ ® Recessed light fixtures covered YES No NA ❑ ❑ ® Insulation at proper depth - insulation rulers visible and indicating proper depth and R-value YES No NA Loose -fill insulation meets or exceeds manufacturer's minimum weight and thickness requirements for the target R-value. Target R-value . Manufacturer's minimum required weight for the target R-value (pounds -per -square -foot). Manufacturer's ❑ ❑ ® minimum required thickness at time of installation . Manufacturer's minimum YES No NA required settled thickness . Note: To receive compliance credit the HERS rater shall verify that the manufacturer's minimum weight and thickness has been achieved for the target R-value. (CF-6R only) N1 J7I I I. 1 INSTALLATION CERTIFICATE ' ite Address 14-7 -25 [m-i MAt '34010 101 m Cy -3aLl3 Installation certificates (CF-6it) are required for each and every d4llirig unit. When the installation of measures that require field verification and diagnostic testing is complete, the builder or the builder's subcontractor shall complete diagnostic testing and the procedures specified in this section. When the installation is complete, the builder or the builder's subcontractor shalt complete the CF-6R (Installation Certificate), and keep it at the building site for review by the building department. The builder also shall provide a copy of the Installation Certificate to the HEM rater for any measures requiring field verification and diagnostic testing, per Section 10-103(a). WATER HEATING SYSTEMS: 1 For small gas storage (rated input of less than or equal to 75,000 Btulhr), electric resistance and heat pump water heaters, list Energy Factor (EF). For large gas storage water heaters (rated input of greater than 75,000 btu/hr), list Recovery (RE), Thermal Efficiency, Standby Loss and Rated Input, For instantaneous gas water heaters, list Thermal Efficiency and Rated Input. 2. R-12 external insulation is mandatory for, storage water heaters with an energy factor of less than 0.58. Kitchen Piping: If indicated on the CF-1 R, all hot water piping —> 3/4 inches in diameter that runs from the hot water source to the kitchen fixtures is insulated. Faucets & Shower Heads; All faucets and showerheads installed are ccrtifred to the Energy Commission, pursuant to Title 24, Part 6, Section 111. Central VVater Heating in Buildings with Multiple Dwelling Units (required for prescriptive) ❑All hot water piping in main circulating loop is insulated to requirements of § 1500) ❑Central hot water systems serving six or fewer dwelling units which have (1) less than 25' of distribution piping outdoors; (2) zero distribution piping underground; (3) no recirculation pump; and (4) insulation on distribution piping that meets the requirements of Section 1506) []Central hot water systems serving snore than 6 dwelling units - presence of either a time control or a time/temperature control ✓ ❑ I, the undersigned, verify that equipment listed above my signature is; 1) the actual equipment installed; 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-I R) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the.lppliance Effzcierrcy Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: I�/An C1 have Date: Copies to: BUILDING DEPARTMENT, HERS RATER (fF APPLICABLE) BUILDING OWNER A7 OCCUPANCY INSTALLATION CERTIFICATE (Page 2 of 12) CF-6R Site Address 47 Permit Number -795 Dune Palms Rd, La Quinta, Ca BLDG - 8400 07-3243 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). FENESTRATION/GLAZING: Item Manufacturer/Brand Name (GROUP LIKE RODUCTS t Product U-factor (5 CF-IR value)' t Product SHGC (5CF-IR value) Z u of Panes Total Quantity of t ike Product (optional) Area Square Feet Exterior Shading Device or Overhang Commenis/t.ocation/ Special Features 1. Pella/impervia 31 32 2 WA 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. tl Use values from a fenestration product's NFRC label. For fenestration products without an NFRC label, use the default values from Section 116 of the Energy Efficiency Standards. 'r Installed U-factor must be less than or equal to values from CF-I R. Installed SHGC must be less than or equal to values from CF-1 R, or a shading device (exterior or overhang) is installed as specified on the CF-I R.. Alternatively, installed weighted average U-factors for the total fenestration area are less than or equal to values from CF-I R. If using default table SHGC values from §116 identify whether tinted or not. ✓ R I, the undersigned, verify that the fenestration/glazing listed above my signature: 1) is the actual fenestration product installed; 2) is equivalent to or has a lower U-factor and lower SHGC than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy Efficiency Standards for residential buildings; and 3) the product meets or exceeds the appropriate requirements for manufactured devices (from Part 6), where applicable. Item #s Signature Date. Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Pella Windows & Doors- HSC, Inc. Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co.. Name) OR Owner OR Window Distributor Copies to: Building Department, HERS Rater (if applicable) Building Owner at Occupancy Residential Compliance Forras April 2005 A W o l-F-F, Lj!=rr-cis, Pt nce; INSTALLATION CERTIFICATE (Page 3 of 12) CF-6R Site Address Permit Number D V sQF R�i u g Ro. L� Q "srrs Q 9 -,:2 0-7 - 3 �4 3 An installation certificate is required to be posted at the building site or made available for all appropriate inspections. (The information provided on this form is required) After completion of final inspection, a copy must be provided to the building department (upon request) and the building owner at occupancy, per Section 10-103(a). HVAC SYSTEMS: 17 y_ G B L4po Heating Equipment , RSA �' Equip Type CEC Certified Mfr. # of Efficiency (AFUE. etc.) Duct Duct or Heating Heating Name and Model Identical Location Piping Load Capacity (pkg. heat um) Number Systems (>_CF-IRvalue) (attic, etc.) R-value (BaAr) (Btu/hr) FAN Co',(- 31cnxo-- c .e- Ho-r Arfic- R14.2 19 boo W M HT 37c DxC3�'- c -a— Wpmer- " ,Rr►o = '100 Wri'l5ft EATee- 48 N 9&c S 3 44,3 i oo Cooling Equipment Equip Type (pkg. heat pump) CF4RR S CEC Certified Mfr. Name and Model Number # of Identical Systems Efficiency or EER) PF-lRvalue) Duct Location (attic, etc.) Duct R-value Cooling Load (Btu/hr) Cooling Capacity (Btu/hr) C'_oot..Dauer �tJACALJ30Pi �" )L)_o 300co Lbbr440 1915 ) 4.0 °' Rxm -33 & 000 DwRCq 1449j? 3 1H.0 `' B.o y8000 1. > symbol reads greater than or equal to what is indicated on the CF-1R value. Include both SEER and EER if compliance credit for high EER air conditioner is claimed. ✓ ❑I I, the undersigned, verify that equipment listed above is: 1) is the actual equipment installed, 2) equivalent to or more efficient than that specified in the certificate of compliance (Form CF-1R) submitted for compliance with the Energy Efficiency Standards for residential buildings, and 3) equipment that meets or exceeds the appropriate requirements for manufactured devices (from the Appliance Efficiency Regulations or Part 6), where applicable. Installing Subcontractor (Co. Name) OR General Contractor (Co. Name) OR Owner Signature: Date: Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE) BUILDING OWNER AT OCCUPANCY Residential Compliance Forms April 2005 INSTALLATION CERTIFICATE DUNE PALMS RD. BLD# 8400 Insulation Installation Quality Certificate (PAGE 10 Or CF-GP ✓ N Description of Insulation, (CF-6R, formely IC-1) signed by the installer stating: insulation manufacturer's name, material identification, installed R-values, and for loose -fill insulation: minimum weight per square foot and minimum inches ✓ N Installation meets all applicable requirements as specified in the High Quality Insulation Installation Procedures (ACM, Appendix RH) ✓ FLOOR Yes No 0 All floor joist cavity insulation installed to uniformly fit the cavity side -to -side and end -to -end 01:1 No M E3 Insulation in contact with the subfloor or rim joists insulated Ps I R 6 Insulation properly supported to avoid gaps, voids, and compression ✓ WALLS Yes PoPAWall stud cavities caulked or foamed to provide an air tight envelope Yes P 6 1 Wall stud cavity insualtion uniformly fills the cavity side -to -side, top -to -bottom, and front -to -back Ps Po IAA No gaps Yes 0 No voids over 3/4" deep or more than 10% of the batt surface area "f �] No 2 Hard to accesswall stud cavities such as; comer channels, wall intersections, and behind tub/shower enclosures insulated to proper R-Value 1 � �A Small spaces filled Ms t7o R Rim- oists insulated Pes R 6 Loose fill wall insulation meets or exceeds manufacturer's minimum weight -per -square -foot requirement ✓ ROOF/CEILING PREPARATION Yes � No nn t�TA All draft stops in place to form a continuous ceiling and wall air barrier Ps Po PA All drops covered with hard covers rs 0 tV/A All draft stops and hardcovers caulked or foamed to provide an airtight envelope Yesf`To n� n❑ N/A All recessed light fixtures IC and air tight (AT) rated and sealed with a gasket or caulk between the housina and the ceiling Yes Po 4A Floor cavities on multiple -story buildings have air tight draft stops to all adjoining attics Yes N Eave vents prepared for blown insulation - maintain net free -ventilation area Pes � Knee walls insulated or prepared for blown insualtion Yes PoF—Y0e:-[V,PA 4A Area under equipment platforms and car -walks insulated or accessible for blow insulation Attic rulers installed Residental Compliance Forms April 2005 -795 DUNE PALMS RD. BLD# 8400 ✓ ROOF CEILING BATTS Yes El E] No gaps Yes No El No voids over 3/4" deep or more than 10% of the batt surface area Ps Yo 19 Insulation in contact with the air -barrier Ps Y 6 Recessed light fixtures covered 13 101 Net free -ventilation area maintained at eave vents ✓ ROOF/CEILING LOOSE -FILL Ps Fo 6 Insulation uniformly covers the entire ceiling (or roof) area from the outside of all exterior walls Ps NNo 16 Baffles installed at eaves vents or soffit vents - maintain net free-ventilationa rea of eave vent Pes�A No Attic access insulated Yes R 6 Recessed light fixtures covered Ps F PA Insulation at proper depth - insualtion rulers visible and indicating proper depth and R-Value El Yes 0 No El N/A Loose -fill insualtion meets or exceeds manufacturer's minimum weight and thickness requirements for the target R-value. Target R-value . Manufacturer's minimum required weight for the target R-value (pounds -per -square -foot). Manufacturer's minimum required thickness at time of installation . Manufacturer's minimum required settled thickness . Note: To receive compliance credit the HERS rater shall verify that the manufacturer's minimum weight and thickness has been achieved for the target R-value. (CF-6R only) DECLARATION ✓ N I hereby certify that the installation meets all applicable requirements as specified in the Insulation Installation Procedures Installing Subcontractor (Co. Name) OR General Contractor Co. Na Owner MASCO CONTRACTOR SERVICES Si natur ee/ Date: Copies to: BUILDING DEPARTMENT, HERS RATER (IF APPLICABLE), BUILDING OWNER AT OCCUPANCY Residental Compliance Forms April 2005 ALLATION CERTIFICATE tir-795 DUNE PALMS RD. BLD# 8400 Subdivision: La Quinta Dune Palms Description of Insulation (Formerly IC-1) Form) it 2 RAISED FLOOR Material N/A Thickness (inches) SLAB FLOOR/PERIMETER Material N/A Thickness (inches) Perimeter Insulation Depth (Inches) 3 EXTERIOR WALL Frame Type WOOD 2 X 6 A. Cavity Insulation Material FIBER GLASS INSULATION Thicness (inches) 5.5 INCHES B. Exterior Foam Sheathing Material Thicness (inches) FOUNDATION WALL Material N/A Thickness (inches) (PAGE 12 OF 12) CF-611 Permit Number 07-3243 Buildinq Number8400 Brand Name Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) Brand Name CERTAINTEED Thermal Resistance (R-value) R-21 Brand Name Thermal Resistance (R-value) Brand Name Thermal Resistance (R-value) 5 CEILING Batt or Blanket Type BATT Brand Name CERTAINTEED Thickness (inches) 12 INCHES Thermal Resistance (R-value) Loose Fill Type Brand Contactor's min installed weight/ft lb Minimum thickness Manufacturer's installed weight per square foot to achieve Thermal Resistance (R-Value) 6 ROOF Material Thickness (inches) N/A Brand Name Thermal Resistance (R-value) inches R-38 DECLARATION ✓ 0 1 hereby certify that the abouve insulation was installed in the building at the above location in conformance with the current Energy Efficiency Standards for residential buildings (Title 24, Part 6, California Code of Regulations) as indicated on the Certificate of Compliance, where applicable. Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner 3,5 �F/ao 46 — _ OR Window Distributor MASCO CONTRACTOR SERVICES Item #s Signature Date Installing Subcontractor (Co. Name) OR (if applicable) General Contractor (Co. Name) OR Owner OR Window Distributor #s Signature Date Installing Subcontractor (Co. Name) OR applicable) General Contractor (Co. Name) OR Owner OR Window Distributor Residental Compliance Forms April 2005