Loading...
BCOM2023-1029DESIGN & DEVELOPMENT DEPARTMENT 78-495 CALLE TAMPICO LA QUINTA, CALIFORNIA 92253 Permit Type: Permit Number: Property Address APN: Legal Description Property Zoning: Valuation: BUILDING PERMIT eca Qa�&a CALIFORNIA Building Commercial BCOM2023-1029 49499 EISENHOWER DR ROOMS 401-406 658190011 Lot 30 MB 269/1 TR 28545-3 CT, 30 $107, 587.92 Owner: Applicant: Contractor: PHONE (760) 777-7125 WWW.LAQUINTACA.GOV APPLIED DATE: 12/27/2023 ISSUED DATE: 05/02/2024 HP LQ INVESTMENT LP 150 RADNOR CHESTER RD STE A-270, RADNOR, PA 19087 Kevin Bowsher 2630 Sepulveda Blvd., Torrance, CA 90505 ZELHAM INC / 1078827 5257 W FAIRVIEW AVE, BOISE, ID 83706 PRIOR TO THE ISSUANCE OF THIS PERMIT FOR CONSTRUCTION, ALTERATION, IMPROVEMENT, DEMOLITION, OR REPAIR THE OWNER, APPLICANT AND/OR CONTRACTOR UNDER PENALTY OF PERJURY HAVE AFFIRMED WHEN APPLICABLE, THROUGH THE SUBMITTAL OF FORMS OR BY OTHER ELECTRONIC MEANS, THE FOLLOWING: LICENSED CONTRACTOR OR OWNER -BUILDER DECLARATION (1 or 2) 1) They are licensed under provisions of Chapter 9 (commencing with Section 7000) of Division 3 of the Business and Professions Code, and the referenced License is in full force and effect, or; 2) That they are exempt from the Contractors' State License Law for the reason(s) indicated by either (2)(a) and/or (2)(b), or (2)(c) where he or she is exempt from licensure by a valid exemption. [Section 7031.5, Business and Professions Code: Any city or county that requires a permit to construct, alter, improve, demolish, or repair any structure, prior to its issuance, also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors' State License Law (Chapter (commencing with Section 7000) of Division 3 of the Business and Professions Code] Any violation of Section 7031.5 by any applicant for a permit subjects the applicant to a civil penalty of not more than five hundred dollars ($500).) a) As owner of the property, or my employees with wages as their sole compensation, will do all of or portions of the work, and the structure is not intended or offered for sale (Section 7044, Business and Professions Code: The Contractors' State License Law does not apply to an owner of property who, through employees' or personal effort, builds or improves the property, provided that the improvements are not intended or offered for sale. If, however, the building or improvement is sold within one year of completion, the Owner -Builder will have the burden of proving that it was not built or improved for the purpose of sale.). b) As owner of the property, will be exclusively contracting with licensed c) Are exempt from licensure under the Contractors' State License Law. As an Owner -Builder, they acknowledge that, except for their personal residence in which they must have resided in for at least one year prior to completion of the improvements covered by this permit, they cannot legally sell a structure built as an owner -builder if it has not been constructed in its entirety by licensed contractors. It is understood that a copy of the applicable law, Section 7044 of the Business and Professions Code, is available upon request when this application was submitted at the following Web site: http://www.leginfo.ca.gov/calaw.html. DECLARATION REGARDING CONSTRUCTION LENDING AGENCY (If applicable) A construction lender will be used for completion of the improvements covered by this permit and the name and information of which is on file for public inspection during the regular business hours of the public entity. Failure of the applicant to indicate the construction lender on the application does not relieve that person of the requirement to give the WORKERS' COMPENSATION DECLARATION (1, 2 or 3) WARNING: FAILURE TO SECURE WORKERS' COMPENSATION COVERAGE IS UNLAWFUL, AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS ($100,000), IN ADDITION TO THE COST OF COMPENSATION, DAMAGES AS PROVIDED FOR IN SECTION 3706 OF THE LABOR CODE, INTEREST, AND ATTORNEY'S FEES. 1) Has and will maintain a certificate of consent to self -insure for workers' compensation, issued by the Director of Industrial Relations as provided for by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 2) Has and will maintain workers' compensation insurance, as required by Section 3700 of the Labor Code, for the performance of the work for which this permit is issued. 3) Certifies that, in the performance of the work for which this permit is issued, shall not employ any person in any manner so as to become subject to the workers' compensation laws of California, and agree that, if should become subject to the workers' compensation provisions of Section 3700 of the Labor Code, shall forthwith comply with those provisions. NOTICE TO APPLICANT (1, 2 and 3) 1) Each person upon whose behalf this application was made, each person at whose request and for whose benefit work is being performed under or pursuant to any permit issued as a result of this application, the owner, and the applicant, each agrees to, and shall defend, indemnify and hold harmless the City of La Quinta, its officers, agents, and employees for any act or omission related to the work being performed under or following issuance of this permit. 2) Any permit issued as a result of this application becomes null and void if work is not commenced within 360 days from date of issuance of such permit, or if cessation of work for 180 days will subject permit to cancellation. On or after January 1, 2019, every permit issued shall become invalid unless the work on the site authorized by such permit is commenced within 12 months after its issuance, or if the work authorized on the site by such permit is suspended or abandoned for a period of 12 months after the time the work is commenced. 3) Certified that they read the application and state that the information provided is correct. Agree to comply with all city and county ordinances and state laws relating to building construction, and hereby authorize representatives of this city to enter upon the above -mentioned property for inspection purposes. IMPORTANT: An Application for Permit was made to the Building Official, subject to the conditions and restrictions set forth at the time of application, which is now hereby an Issued Permit. If any part of the information being supplied on this permit is inaccurate or untrue, please contact the City of La Quinta at (760) 777-7125 immediately for correction. Printed: 3/6/25 10:57 am Page 1 of 6 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2023-1029 Property Address: 49499 EISENHOWER DR ROOMS 401-406 construction lender preliminary notice from that duty. Printed: 3/6/25 10:57 am Page 2 of 6 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2023-1029 Property Address: 49499 EISENHOWER DR ROOMS 401-406 INTERIOR REMODEL, ROOMS 401-406 BUILDING TYPE P1 - 400 SERIES, ROOM TYPES 1 AND 2 [HOUSTON/TYNER ARCHITECTS]. THIS PERMIT DOES NOT INCLUDE A CHANGE IN OCCUPANCY, USE OR OCCUPANT LOAD. PATH OF TRAVEL IMPROVEMENTS INCLUDE INTERIOR RESTROOM UPGRADES AND ACCESSIBLE PARKING. NO TUMF OR DIF IMPACTS. PLAN REVIEW FEES ASSESS[ FOR OVERALL PROJECT ON THIS PERMIT RECORD. LA QUINTA RESORT / 612 UNIT GUEST ROOM RENOVATIONS INCLUDING 119 BATHROOM RENNOVATIONS. 2022 CALIFORNIA BUILDING CODES. REVISION 1 REVISED LAYOUT FOR GUESTROOM TYPE 15 INCLUDING REDUCTION OF SHOWER SIZE, AND AN ALTERNATE FREE-STANDING Tl [HOUSTON/TYNER]. 2022 CALIFORNIA BUILDING CODES. REVISION 2 PLAN UPDATED TO REFLECT TRANSFER SHOWER OPTION FOR ROOM TYPES 16QQ, 16K, 18QQ, AND 18K [HOUSTON/TYNER]. 2022 CALIFORNIA BUILDING CODES. nnstruction Det;:. Commercial Work Type Remodel Gross Square Footage 0 Code Edition 2022 Original Valuation 107587.92 Remodel Area Square 3283 New Electrical Square 3283 Footage Footage Electrical Service? No Temporary Power No Number of Ventilation 12 Service? Fan(s) Number of Plumbing 34 Number of Roof Drains 0 Water System Install Yes Fixtures/Traps or Alteration? Back Flow Prevention No Sewer Connection? No Grease Interceptor or No Device? Sand/Oil Separator? Transportation Uniform No City Development No Art in Public Places No Mitigation Fee Impact Fee Applicable Fund Exempt Applicable Zoning CT General Plan TC City Limits Within La Quinta Limits Subdivision Name TR 28545-3 Lot Number 30 Lot Size 233835 Centerlines 85421, 14816, 82973, Legal Description Lot 30 MB 269/1 TR 82663,85400,15410, 28545-3 82972, 82668 Type Group Sq Ft Value Printed: 3/6/25 10:57 am Page 3 of 6 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2023-1029 Property Address: 49499 EISENHOWER DR ROOMS 401-406 Invoice No. Fee Fee Amount Amount Paid INV-00006128 Building Standards Administration $5.00 $5.00 Fixture/Trap PC $518.84 $518.84 Remodel < 100 $62.24 $62.24 Remodel PC >100 $153.79 $153.79 Digital Archiving and Records Management Fee $23.00 $23.00 Water System Inst/AIURep $15.26 $15.26 Remodel PC (< 100) $170.25 $170.25 Hourly Charge - Interwest Plans Examiner 2023 $287.50 $287.50 Hourly Charge - Interwest Plan Check Engineer 2023 $742.50 $742.50 Technology Enhancement Fee $8.00 $8.00 Ventilation Fan PC $73.20 $73.20 Fixture/Trap $518.84 $518.84 Hourly Charge - Interwest Plans Examiner 2023 $632.50 $632.50 Art in Public Places - Commercial Remodel $537.94 $537.94 Water System Inst/Alt/Rep PC $15.26 $15.26 SMI - Commercial $30.12 $30.12 Non -Residential Electrical PC $114.01 $114.01 Zoning Clearance - Alt/Add - Non -Residential $183.00 $183.00 Non -Residential Electrical $166.66 $166.66 Hourly Charge - City Building Staff $366.00 $366.00 Hourly Charge - City Building Staff $183.00 $183.00 Hourly Charge - Interwest Plan Check Engineer 2023 $202.50 $202.50 Ventilation Fan $183.12 $183.12 Remodel >100 $192.22 $192.22 Total for Invoice INV-00006128 $5,384.75 $5,384.75 Grand Total for Permit $5,384.75 $5,384.75 Workflow Step / Action Name Action Type Start Date End Date Application Completeness Check v.1 12/27/2023 15:04 12/27/2023 15:21 ---------------------------------------------------------------------------------------------------------------------------------------- Submittal Document Verification v.1 Generic Action 12/27/2023 15:04 Plan Check v.1 12/27/2023 0:00 03/28/2024 13:18 ---------------------------------------------------------------------------------------------------------------------------------------- Building Major Review v.1 Receive Submittal 12/27/2023 0:00 01/19/2024 14:47 ---------------------------------------------------------------------------------------------------------------------------------------- Building Major Review v.2 Receive Submittal 02/23/2024 0:00 03/06/2024 17:11 ---------------------------------------------------------------------------------------------------------------------------------------- Building Major Review v.3 Receive Submittal 03/12/2024 0:00 03/28/2024 13:18 Permit Issuance v.1 05/02/2024 15:18 05/02/2024 15:19 ---------------------------------------------------------------------------------------------------------------------------------------- Contractor / Owner -Builder Information v.1 Generic Action 05/02/2024 15:19 ---------------------------------------------------------------------------------------------------------------------------------------- Verify & Invoice Fees v.1 Generic Action 05/02/2024 15:19 ---------------------------------------------------------------------------------------------------------------------------------------- Ready to Issue v.1 Generic Action 05/02/2024 15:19 ---------------------------------------------------------------------------------------------------------------------------------------- Verify Fee Payment & Issue Permit v.1 Generic Action 05/02/2024 15:19 ---------------------------------------------------------------------------------------------------------------------------------------- Print, Attach, and Email Building Permit v.1 Create Report 05/02/2024 15:18 05/02/2024 15:19 Inspections - Do Not Pour Concrete Until Approved v.1 05/20/2024 13:55 ------------------------------------------------------------------------------- rooting v.1 Inspection ---------------------------------------------------------------------------- Inspection Printed: 3/6/25 10:57 am Page 4 of 6 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2023-1029 Property Address: 49499 EISENHOWER DR ROOMS 401-406 Slab v.1 Inspection 05/21/2024 0:00 05/22/2024 17:00 -------------------------------------------------------------------------------- -------------------------------------- Underground Plumbing v.1 Inspection 05/20/2024 13:55 05/20/2024 13:55 -------------------------------------------------------------------------------------------------------------------------------------- - Water Line v.1 Inspection Inspections - Cover No Work Until Approved v.1 05/20/2024 7:20 --------------------------------------------------------------------------- Roof Nail v.1 ------------------ Inspection ------------------------ ----------------- - ------------------------------------------------------------------------------------ Okay to Wrap v.1 --------- Inspection ------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.1 Inspection 05/20/2024 7:20 05/20/2024 13:50 ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.2 Inspection 05/21/2024 0:00 05/22/2024 16:53 ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.3 Inspection 06/24/2024 0:00 06/25/2024 13:33 ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.4 Inspection 07/23/2024 16:19 07/23/2024 16:21 ---------------------------------------------------------------------------------------------------------------------------------------- Framing v.5 Inspection 07/23/2024 16:27 07/23/2024 16:27 ------------------------------------------------------------------------------------------------------ Rough Electrical v.1 Inspection -- ------------- 05/20/2024 7:24 -- ----------- 05/20/2024 13:50 -------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.2 Inspection 05/21/2024 0:00 - 05/22/2024 16:54 -------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.3 Inspection 06/24/2024 0:00 - 06/25/2024 13:38 --------------------------------------------------------------------------------------------------------------------------------------- Rough Electrical v.4 Inspection 07/23/2024 16:27 07/23/2024 16:28 --------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.1 Inspection 05/20/2024 7:24 05/20/2024 13:50 --------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.2 Inspection 07/05/2024 0:00 07/08/2024 16:04 --------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.3 Inspection 07/11/2024 0:00 07/12/2024 16:04 --------------------------------------------------------------------------------------------------------------------------------------- Rough Mechanical v.4 Inspection 07/23/2024 16:28 07/23/2024 16:29 -------------------------------------------------------------------------------- Rough Plumbing v.1 Inspection -------------------------------------- 05/20/2024 7:24 05/20/2024 13:50 --------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.2 Inspection 05/21/2024 0:00 05/22/2024 16:54 --------------------------------------------------------------------------------------------------------------------------------------- Rough Plumbing v.3 Inspection 06/24/2024 0:00 06/25/2024 13:35 --------------------------------------------------------------------------------------------------------------------------------------- Rough Fire Clearance Bldg v.1 Inspection --------------------------------------------------------------------------------------------------------------------------------------- Shower Pan v.1 Inspection 05/31/2024 0:00 06/03/2024 13:09 --------------------------------------------------------------------------------------------------------------------------------------- Insulation v.1 Inspection 05/21/2024 0:00 05/22/2024 16:57 --------------------------------------------------------------------------------------------------------------------------------------- Insulation v.2 Inspection 06/24/2024 0:00 06/25/2024 13:39 -------------------------------------------------------------------------------------------------------------------------------------- Drywall Nail v.1 Inspection - ------------------------------------------------------------------------ T-Bar/Overhead v.1 ------------------------------------------------------------- Inspection - ------------------------------------------------------------------------------------ Exterior Lath v.1 --------- Inspection ------------------------------------------- ---------------------------------------------------------------------------------------------------------------------------------------- Gas Test v.1 Inspection ---------------------------------------------------------------------------------------------------------------------------------------- Sewer Connection v.1 Inspection Inspections - Masonry v.1 Inspections - Electrical for Meter Release v.1 ---------------------------------------------------------------------------------------------------------------------------------------- Temporary Power v.1 Inspection Temp Use of Permanent Power v.1 - -- -- -------------------------------------------- Inspection Inspections - Final v.1 07/23/2024 16:32 --------------------------------------------------------------------------------------------------------------------------------------- Final Fire v.1 Inspection --------------------------------------------------------------------------------------------------------------------------------------- Final Building v.1 Inspection 07/23/2024 16:32 07/23/2024 16:34 --------------------------------------------------------------------------------------------------------------------------------------- Final Building v.2 Inspection 07/26/2024 14:01 07/26/2024 14:02 Certificate of Occupancy v.1 --------------------------------------------------------------------------------------------------------------------------------------- Issue Certificate of Occupancy v.1 Create Report Printed: 3/6/25 10:57 am Page 5 of 6 BUILDING PERMIT Permit Type: Building Commercial Permit Number: BCOM2023-1029 Property Address: 49499 EISENHOWER DR ROOMS 401-406 Construction or work for which a permit is required shall be subject to inspection by the building official and such construction or work shall remain visible and able to be accessed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the applicable code and other ordinances of the jurisdiction shall not be valid. It shall be the duty of the owner or the owner's authorized agent to cause the work to remain visible and able to be accessed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspections of such work that are required by this code. A building or structure shall not be used or occupied in whole or in part, and a change of occupancy of a building or structure or portion thereof shall not be made, until the building official has issued a certificate of occupancy therefor as provided herein. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the applicable code and other ordinances of the jurisdiction. Certificates presuming to give authority to violate or cancel the provisions of this code or other ordinances of the jurisdiction shall not be valid. A person shall not make connections from a utility, a source of energy, fuel, or power, or a water system or sewer system to any building or system that is regulated by the applicable code and other ordinances of the jurisdiction for which a permit is required, until approved by the buildinq official. Printed: 3/6/25 10:57 am Page 6 of 6 CAL FIRE - RIVERSIDE UNIT RIVERSIDE COUNTY FIRE DEPARTMENT �Cv BILL WEISER - FIRE CHIEF OFFICE OF THE FIRE MARSHAL — LA QUINTA 78495 Calle Tampico, La Quinta, CA 92253 • Phone (760) 777-7078 • www.rvcfire.org January 11, 2024 Houston Tyner Architecture Re: La Quinta Resort — Renovation BCOM2023-1029 / 49499 Eisenhower Drive The building plan for the above referenced project was reviewed and approved by the Riverside County Fire Department with the following conditions. 1.) If the existing fire sprinkler system needs to be modified, plans shall be submitted to the Office of the Fire Marshal for review and approval before work is performed. Applicant/installer shall be responsible to contact the Fire Department to schedule inspections. Requests for inspections are to be made at least 48 hours in advance and may be arranged by calling (760)777-7131. All questions regarding the meaning of these conditions should be referred to the Office of the Fire Marshal staff at (760)777-7078. Chris Cox - Fire Safety Supervisor INTERWEST A SAFEbuHf COMPANY Bill to: City of La Quinta Attn Danny Castro Design and Development Director 78-495 Calle Tampico La Quinta, CA 92253 Remit to: Interwest Consulting Group P.O. Box 301069 Los Angeles, CA 90030-1069 Invoice #298152 February 28, 2024 Direct questions to Erica Cuevas ecuevas@interwestgrp.com Professional services for the period February 26, 2024 through February 27, 2024 Commercial - Guestrooms Renovation "Resort & Club" - 49499 Eisenhower Dr - LAQ23-0225 - BCOM2023-102 Invoice Total (Please pay this amount) $490.00 Employee Title Hours Rate Total Ho Jun Kong Plan Check Engineer 1.50 $135.00 $202.50 Mark Seven ICC Certified Plans Examiner 2.50 $115.00 $287.50 Labor 4.00 $490.00 Ho Jun Kong LAQ23-0225 Commercial - Guestrooms Renovation "Resort & Club" - 49499 Eisenhower Dr - LAQ23 -0225 - BCOM2023-1029 Day Description Hours 2/27/2024 LAQ23-0225 1.50 Total 1.50 Mark Seven LAQ23-0225 Commercial - Guestrooms Renovation "Resort & Club" - 49499 Eisenhower Dr - LAQ23 -0225 - BCOM2023-1029 Day Description 2/26/2024 LAQ23-0225 Hours 2.50 Total 2.50 1 of 1 January 10, 2024 CITY OF LA QUINTA - FIRST REVIEW Permit No: BCOM2023-1029 Interwest No.: LAQ23-0225 Non -Structural: Total 10 hours (5-hours and MEP 5-hours) Structural: 0.5-hours City of La Quinta Building Department 78-495 Calle Tampico La Quinta, CA 92253 Plan Review: Guestrooms Renovation "Resort & Club" Address: 49499 Eisenhower Dr 0 r"T INTERWEST A SAFEbuilt COMPANY Interwest Consulting Group has completed a first code compliance review of the following documents on behalf of the City of La Quinta: 1. Drawings: Electronic copy of the following: a. A0.1 through A8.20 dated 12/22/2023 by William Harold Wickettiv. b. M0.1 through M2.33 dated 12/15/2023 by Paul L. Ferbrache. C. E01 through E4.09B dated 12/22/2023 by Felix Roth. d. P0.1 through P2.24 dated 12/15/2023 by Peter A. Kraut. The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review. Plan review comments follow on the attached list. Please submit an itemized response letter and complete and revised documents directly to the city of La Quinta Building and Safety Department. Sincerely, INTERWEST CONSULTING GROUP Mark Seven EMP Plan Examiner 1500 S. Haven Ave I Suite 220 Ontario, CA 91761 Ho Jun Kong, PE CASp Civil Engineer/Plans Examiner 909.295-3142 iNTiRwbSTGRP,CgN Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 1110124 PROJECT DATA: City of La Quints - First Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 2 of 8 Occupancy Group: Area (sq. ft.): 1111 329,391 Total Area: N/A Building Height: 28ft. Building Stories: N/A Type of Construction: V-A Occupant Load: Unknown Sprinklered: Y Valuation: $9,360,149 (stated on title sheet) Risk Category: II Site Class (seismic): D-default Seismic Design Category: D Special Wind Region: N Snow Loads: N GENERAL COMMENTS: G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following comments reference the 2022 California Building Standards Code as amended by the authority having jurisdiction unless otherwise noted. G2. Please respond in writing to each plan review comment by marking this comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the following should be included with each plan review response: • Page / sheet number(s), detail / specification number(s), etc., and include all applicable code section(s). Briefly explain in writing how the design is intended to comply with the applicable code sections. Please provide a narrative of revisions made outside the plan review comments. Complete and clear responses will expedite the re -check of this project. G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of signature, and registration number on all sheets of plans depicting structural designed elements and cover sheets of calculations. CBPC 5536.1 and 6735 INTERWEST Guestrooms Renovation "Resort & Club" City of La Quints - First Review 49499 Eisenhower Dr Interwest Project No. LAQ23-0225 1110124 PermitApp: BCOM2023-1029 Page 3 of 8 PLAN REVIEW COMMENTS: BUILDING AND LIFE SAFETY: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] Al. For final plans: All sheets of the final sets of construction plans and the first sheet of calculations must be stamped & signed by an engineer or architect licensed by the State of California. [CA. Business & Professions Code Sec. 6737.1 & Appendix Chapter 1, Sec. 106.1, 106.3.4.] A2. Sheet A0.1: A. Existing fire alarm: Indicate on plan whether the building/structure has existing fire alarm. SITE ACCESSIBILITY: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] SA1. Sheet A1.0 (Site Plan): A. Provide and show on site plan accessible route/path of travel from the existing/new accessible parking space(s) and public way to an accessible primary entrance of the building/accessible restroom(s)/facility serving the area of alteration. [CBC 11B-202.4] B. Provide and show clear location(s) of new/existing van -accessible parking(s) and car/standard accessible parking(s) on site plan. [CBC 11B-202.4] C. Clarify on plans that access aisle shall be on the passenger side for the existing/new van accessible parking spaces. [CBC, Sec. 1113-502.3.41 D. Floor and Ground Surfaces: Provide and show on plan running slope and cross slope for the vehicle space and access aisle not to exceed 1:48 and detectable warnings shall be permitted. [CBC 1113- 502.4] Provide and show clear location of new/existing detectable warning(s) at platform edges, curb ramps, islands or cur -through, blended transitions, etc. complying with Section 116-705 on plan. [CBC 11B-247.1.2.] F. For new/existing Detectable Warning: Add note on plan "Detectable warning surfaces shall be yellow conforming to FS 33538 of Federal Standard 595C." [CBC, Sec. 11B-705.1.1.3] G. For new/existing Detectable Warning: Add note on plan: "Detectable warning surfaces shall contrast visually with adjacent walking surfaces either light -on -dark or dark -on -light. The material used to provide contrast shall be an integral part of the surface." [CBC, Sec. 11B-705.1.1.3] H. For new/existing Detectable Warning: Add note on plan: "Only approved DSA-AC detectable warning products and directional surfaces shall be installed as provided in the California Code of Regulations (CCR), Title 24, Part 1, Chapter 5, Article 2, 3 and 4." [CBC, Sec. 11B-705.3] I. Truncated Domes: Provide and show detail for existing/new truncated domes to comply with section 1113-705.1 on plans. iNTERWEST Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 1110124 - Dome Size per section 11B-705.1.1 - Dome Spacing per section 11B-705.1.1.2 - Color and Contrast per section 11B-705.1.1.3 ACCESSIBILITY: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] AC1. Sheet A0.1 & for all proposed/updated guestrooms: City of La Quints - First Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 4 of 8 A. Alterations: Where guest rooms are altered or added, the requirements of Section 11B-224 shall apply only to the guest rooms being altered or added until the number of guest rooms complies with the minimum number required for new construction. [CBC 11B-224.1.1] B. Guest room doors and doorways: Clarify on plans that Entrances, doors, and doorways providing user passage into and within guest rooms that are not required to provide mobility features complying with Section 11B-806.2 shall comply with Section 11B-404.2.3. Bathrooms doors shall be either sliding or hung to swing in the direction of egress from the bathroom. [CBC 11B-224.1.21 C. Range of accommodations: Clarify on plans that accessible guest rooms or suites shall be dispersed among the various classes of sleeping accommodations to provide a range of options applicable to room sizes, costs, and amenities provided. [CBC 11B-224.1.3] D. Guest room toilet and bathing rooms: Clarify on plans that where toilet and bathing rooms are provided in guest rooms that are not required to provide mobility features complying with Section 11B-806.2, toilet and bathing fixtures shall only be required to comply with Section 11B-603.6. [CBC 11 B-224.1.4] E. Guest rooms with mobility features: Clarify on plans that in transient lodging facilities, guest rooms with mobility features complying with Section 11B-806.2 shall be provided in accordance with Table 11B-224.2, as follows. [CBC 11B-224.2] 1) Fifty or less guest room facilities: Facilities that are subject to the same permit application on a common site that each have fifty or fewer guest rooms may be combined for the purposes of determining the required number of accessible rooms and type of accessible bathing facility. [11B- 224.2.1] 2) More than fifty guest room facilities: Facilities with more than fifty guest rooms shall be treated separately for the purposes of determining the required number of accessible rooms and type of accessible bathing facility. [11B-224.2.2] 3) Provide and show a clear total number of required guestrooms with mobility features based on table 11B-224.2. (ex. number of guestrooms without roll -in showers and number of guestrooms with roll -in showers.) Clarify it on scope of works in title sheet. Beds: Clarify on plans that in guest rooms having more than 25 beds, 5 percent minimum of the beds shall have clear floor space complying with Section 11B-806.2.3. [CBC 11B-224.3] INTERWESI Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 1110124 City of La Quints - First Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 5 of 8 G. Guest rooms with communication features: Clarify on plans that in transient lodging facilities, guest rooms with communication features complying with Section 1113-806.3 shall be provided in accordance with Table 11B-224.4. [CBC 11B-224.4] - Provide and show the total number of required guestrooms with communication features based on table 1113-224.4. Clarify it on scope of works in title sheet. [CBC 116-224] H. Dispersion: Clarify on plans that guest rooms required to provide mobility features complying with Section 1113-806.2 and guest rooms required to provide communication features complying with Section 116-806.3 shall be dispersed among the various classes of guest rooms, and shall provide choices of types of guest rooms, number of beds, and other amenities comparable to the choices provided to other guests. [CBC 1113-224.51 MECHANICAL: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] M1. Please provide regularly occupied areas of the building with air filtration media for outside and return air that provides at least a Minimum Efficiency Reporting Value (MERV) of 13. Note to be added to the plans. M2. Show all fire and smoke -rated walls and ceilings on mechanical plans. (CBC 705 through 711). Please provide a detailed drawing showing duct penetration through fire -rated walls. If applicable. M3. Please clarify that the exhaust fan is running at a low speed while the room is occupied and will ramp up upon humidity sensor activation. Please review. M4. The access panel shall match the rating of the wall and or ceiling in which they are located. MIN access panel sizes shall be as follows. Hand access:12" X 12" and Body access:30" X 30". M5. Please provide seismic restraints to all ductwork and the details of the exhaust fan installation. PLUMBING: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] P1. All Plumbing fixtures and equipment shall be certified by the California stat energy commission to comply with efficiency standards per section 10-103. (a).1. A of the Title -24 part 6 regulations. Note to be added to the plan. P2. All hose bibs must have an approved anti -siphon device. (CPC 603.5.7) P3. Domestic water pipe shall be tested per CPC 609.4. Drainage and vent pipe shall be tested per CPC 712.0 and bleeding sewer per CPC 723.0. P4. Bathtub, shower, and tub -shower combinations require individual control valves of the pressure balance or thermostatic mixing valve type. handle position stops should be provided on the valves and should be adjusted per the manufacturer's instructions to deliver a maximum of 1201. INTERWES i Guestrooms Renovation "Resort & Club" City of La Quints - First Review 49499 Eisenhower Dr Interwest Project No. LAQ23-0225 1110124 PermitApp: BCOM2023-1029 Page 6 of 8 P5. Hot water and drainpipes under accessible lavatories shall be insulated or otherwise covered. there shall be no sharp or abrasive surfaces under lavatories. P6. cleanouts are required to be provided on the 'upper terminal' of all sinks located on the first floor of a building. Demonstrate cleanout at all sinks (including mop sinks, lavatories, and hand sinks) that are part of this project. Show all required cleanouts on the plan. ELECTRICAL: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] E1. Please show the size of all disconnect switches on the plan or clarify with a note that all disconnect switches will match the breaker /switch size of the same branch circuit/feeder in the panel respectively. CEC 240.4; CEC 220.18(A). E2. Please provide a GFCI type and weather-proof outlet in the AC units area. A 125-volt, single-phase, 15- or 20- ampere-rated receptacle outlet shall be installed at an accessible location for servicing heating, air conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment by disconnecting means. CEC 210.63. E3. all branch circuit penetrations through rated walls, floors, or ceilings shall be sealed with UL-listed and approved rated sealants/assemblies. perform penetrations such that a fire rating of the roof and/or walls is maintained. E4. Please identify the circuit number and the panel feed for each circuit in the layouts. E5. Please specify all new 120-volt, single phase,15 and 20-amp branch circuits installed in kitchens, dining rooms, living rooms, parlors, bedrooms, recreation rooms, closets, hallways, laundry rooms, or similar rooms or areas shall be protected by a listed arc -fault circuit interrupter, combination type, installed to protect the branch circuits. CEC 210.12(A). E6. All exhaust fans shall be switched separately from the lighting system(s). 2022 California energy code 160.5(a)2g. E7. Hotel motel guest rooms shall have captive card key controls, occupancy sensing controls, or automatic controls such that, no longer than 30 minutes after the guest room has been vacated, the lighting power is switched off. The refrigerator should not be disconnected if available. E8. Please remove the overlap lines in the drawings, especially in the receptacles in the bathroom. E9. Sheet E4.02A and sheet E4.0613 Access and working space shall be provided and maintained for all electrical equipment to permit ready and safe operation and maintenance of such equipment. CEC.110.26. Please clarify the working space for all panels shown in the mentioned sheet. iNTERWEST Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 1110124 E10. Please clarify the changes in the lighting and provide layouts if applicable. City of La Quints - First Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 7 of 8 E11. Please confirm that all electrical panels exist. otherwise, provide the single -line diagram and load schedules. E12. Please provide a load summary/calculation to show this project's net electrical load change. The total load shall not exceed the ampacity rating of the main switchboard. CEC 220.87. E13. Please clarify in the electrical cover sheet the electrical scope of work. ENERGY COMPLIANCE: Electrical Compliance: [Mark Seven; mseven@interwestgrp.com; 949.363.30541 EEL Clarify that the total load for lighting has not increased, otherwise, provide T-24 forms. Mechanical Compliance: [Mark Seven; mseven@interwestgrp.com; 949.363.30541 EM1. No comments in this section all equipment are exist. STRUCTURAL: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] S1. Sheet M0.2: A. Suspended equipment/ducts/etc.: Provide and show the weight of all suspended equipment/ducts/etc. on structural plans per mechanical schedules, if applicable. Provide structural plans and details with structural calculations for the support and anchorage of suspended components weighing more than 75 pounds. Also clarify seismic supports on details and calculations. [ASCE 7-16, Sec. 13.1 & ASCE 7-16, Sec. 13.6.7] B. Provide and show type of anchorage on plan. C. Specify ICC-ESR# or other approval listing number for the anchorage on plan, if applicable. D. If anchorage is required special inspection based on the approval report, specify it on plan. S2. Sheet M0.2: INTERWES` Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 1110124 City of La Quints - First Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 8 of 8 A. Floor/Roof Mounted Equipment/Unit: Provide and show the weight of the floor/ground/roof mounted equipment on structural plans per mechanical schedules, if applicable. Provide structural plans and details with calculations for the support and anchorage of the floor/ground/roof mounted equipment weighing more than 400 pounds or with a center of mass located more than 4-feet above the roof level. [ASCE 7-16, Sec. 13.1] B. Provide and show type of anchorage on plan. C. Specify ICC-ESR# or other approval listing number for the anchorage on plan, if applicable. D. If anchorage is required special inspection based on the approval report, specify it on plan. Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions. [END] INTERWEST February 27, 2024 CITY OF LA QUINTA - SECOND REVIEW Permit No: BCOM2023-1029 Interwest No.: LAQ23-0225 Non -Structural: Total 3.0-hours Structural: 1.0-hours City of La Quinta Building Department 78-495 Calle Tampico La Quinta, CA 92253 Plan Review: Guestrooms Renovation "Resort & Club" Address: 49499 Eisenhower Dr 0 r"T INTERWEST A SAFEbuillf COMPANY Interwest Consulting Group has completed a second code compliance review of the following documents on behalf of the City of La Quinta: 1. Drawings: Electronic copy of the following: a. A0.1 through A8.20 dated 12/22/2023 by William Harold Wickettiv. b. M0.1 through M2.33 dated 0210212024 by Paul L. Ferbrache. C. E01 through E4.09B dated 0210212024 by Felix Roth. d. P0.1 through P2.24 dated 0210212024 by Peter A. Kraut. The applicable provisions of the 2022 California Building Standards Code were used as the basis of this review. Plan review comments follow on the attached list. Please submit an itemized response letter and complete and revised documents directly to the city of La Quinta Building and Safety Department. Sincerely, INTERWEST CONSULTING GROUP Mark Seven EMP Plan Examiner 1500 S. Haven Ave I Suite 220 Ontario, CA 91761 Ho Jun Kong, PE CASp Civil Engineer/Plans Examiner 909.295-3142 JhTERAESTGRP.COM Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 2127124 PROJECT DATA: City of La Quinta - Second Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 2 of 6 Occupancy Group: Area (sq. ft.): R1 329,391 Total Area: N/A Building Height: 28ft. Building Stories: N/A Type of Construction: V-A Occupant Load: Unknown Sprinklered: Y Valuation: $9,360,149 (stated on title sheet) Risk Category: II Site Class (seismic): D-default Seismic Design Category: D Special Wind Region: N Snow Loads: N GENERAL COMMENTS: G1. The following plan review documents are based on the City of La Quinta Building Regulations. The following comments reference the 2022 California Building Standards Code as amended by the authority having jurisdiction unless otherwise noted. G2. Please respond in writing to each plan review comment by marking this comment list or creating a response letter. Indicate which detail, specification, or calculation shows the requested information. At minimum, the following should be included with each plan review response: • Page / sheet number(s), detail / specification number(s), etc., and include all applicable code section(s). Briefly explain in writing how the design is intended to comply with the applicable code sections. Please provide a narrative of revisions made outside the plan review comments. Complete and clear responses will expedite the re -check of this project. G3. Please be sure to include on the re -submittal the architect's and /or engineer's stamp, signature, date of signature, and registration number on all sheets of plans depicting structural designed elements and cover sheets of calculations. CBPC 5536.1 and 6735 Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 2127124 PLAN REVIEW COMMENTS: City of La Quinta - Second Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 3 of 6 The revised permit documents have been reviewed. The following comments are numbered per the original list and require further response and/or revision. The format includes the original comment followed by a new or clarified recheck comment in bold italic typeface, prefaced by PC2. BUILDING AND LIFE SAFETY: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] Al. For final plans: All sheets of the final sets of construction plans and the first sheet of calculations must be stamped & signed by an engineer or architect licensed by the State of California. [CA. Business & Professions Code Sec. 6737.1 & Appendix Chapter 1, Sec. 106.1, 106.3.4.1 A2. Sheet A0.1: A. Existing fire alarm: Indicate on plan whether the building/structure has existing fire alarm. PC2: All architectural sheets are missing in the plan set for PC2. Please provide and submit a complete set of plans for final sign off. (Only MEP Plans were submitted.) SITE ACCESSIBILITY: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] SA1. Sheet A1.0 (Site Plan): A. Provide and show on site plan accessible route/path of travel from the existing/new accessible parking space(s) and public way to an accessible primary entrance of the building/accessible restroom(s)/facility serving the area of alteration. [CBC 11B-202.4] B. Provide and show clear location(s) of new/existing van -accessible parking(s) and car/standard accessible parking(s) on site plan. [CBC 11B-202.4] C. Clarify on plans that access aisle shall be on the passenger side for the existing/new van accessible parking spaces. [CBC, Sec. 11B-502.3.4] D. Floor and Ground Surfaces: Provide and show on plan running slope and cross slope for the vehicle space and access aisle not to exceed 1:48 and detectable warnings shall be permitted. [CBC 116- 502.4] E. Provide and show clear location of new/existing detectable warning(s) at platform edges, curb ramps, islands or cur -through, blended transitions, etc. complying with Section 116-705 on plan. [CBC 11B-247.1.2.] F. For new/existing Detectable Warning: Add note on plan "Detectable warning surfaces shall be yellow conforming to FS 33538 of Federal Standard 595C." [CBC, Sec. 11B-705.1.1.3] G. For new/existing Detectable Warning: Add note on plan: "Detectable warning surfaces shall contrast visually with adjacent walking surfaces either light -on -dark or dark -on -light. The material used to provide contrast shall be an integral part of the surface." [CBC, Sec. 11B-705.1.1.3] Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 2127124 City of La Quinta - Second Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 4 of 6 H. For new/existing Detectable Warning: Add note on plan: "Only approved DSA-AC detectable warning products and directional surfaces shall be installed as provided in the California Code of Regulations (CCR), Title 24, Part 1, Chapter 5, Article 2, 3 and 4." [CBC, Sec. 11B-705.3] I. Truncated Domes: Provide and show detail for existing/new truncated domes to comply with section 11B-705.1 on plans. - Dome Size per section 11B-705.1.1 - Dome Spacing per section 11B-705.1.1.2 - Color and Contrast per section 11B-705.1.1.3 PC2: All architectural sheets are missing in the plan set for PC2. Please provide and submit a complete set of plans for final sign off. (Only MEP Plans were submitted.) ACCESSIBILITY: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.84241 AC1. Sheet A0.1 & for all proposed/updated guestrooms: A. Alterations: Where guest rooms are altered or added, the requirements of Section 11B-224 shall apply only to the guest rooms being altered or added until the number of guest rooms complies with the minimum number required for new construction. [CBC 11B-224.1.1] B. Guest room doors and doorways: Clarify on plans that Entrances, doors, and doorways providing user passage into and within guest rooms that are not required to provide mobility features complying with Section 11B-806.2 shall comply with Section 11B-404.2.3. Bathrooms doors shall be either sliding or hung to swing in the direction of egress from the bathroom. [CBC 11B-224.1.2] C. Range of accommodations: Clarify on plans that accessible guest rooms or suites shall be dispersed among the various classes of sleeping accommodations to provide a range of options applicable to room sizes, costs, and amenities provided. [CBC 11B-224.1.3] D. Guest room toilet and bathing rooms: Clarify on plans that where toilet and bathing rooms are provided in guest rooms that are not required to provide mobility features complying with Section 11B-806.2, toilet and bathing fixtures shall only be required to comply with Section 11B-603.6. [CBC 11B-224.1.4] E. Guest rooms with mobility features: Clarify on plans that in transient lodging facilities, guest rooms with mobility features complying with Section 11B-806.2 shall be provided in accordance with Table 11B-224.2, as follows. [CBC 11B-224.21 1) Fifty or less guest room facilities: Facilities that are subject to the same permit application on a common site that each have fifty or fewer guest rooms may be combined for the purposes of determining the required number of accessible rooms and type of accessible bathing facility. [11B- 224.2.1] Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 2127124 City of La Quinta - Second Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 5 of 6 2) More than fifty guest room facilities: Facilities with more than fifty guest rooms shall be treated separately for the purposes of determining the required number of accessible rooms and type of accessible bathing facility. [11B-224.2.2] 3) Provide and show a clear total number of required guestrooms with mobility features based on table 11B-224.2. (ex. number of guestrooms without roll -in showers and number of guestrooms with roll -in showers.) Clarify it on scope of works in title sheet. F. Beds: Clarify on plans that in guest rooms having more than 25 beds, 5 percent minimum of the beds shall have clear floor space complying with Section 11B-806.2.3. [CBC 11B-224.3] G. Guest rooms with communication features: Clarify on plans that in transient lodging facilities, guest rooms with communication features complying with Section 11B-806.3 shall be provided in accordance with Table 11B-224.4. [CBC 11B-224.4] - Provide and show the total number of required guestrooms with communication features based on table 11B-224.4. Clarify it on scope of works in title sheet. [CBC 11B-224] H. Dispersion: Clarify on plans that guest rooms required to provide mobility features complying with Section 11B-806.2 and guest rooms required to provide communication features complying with Section 11B-806.3 shall be dispersed among the various classes of guest rooms, and shall provide choices of types of guest rooms, number of beds, and other amenities comparable to the choices provided to other guests. [CBC 11B-224.5] PC2: All architectural sheets are missing in the plan set for PC2. Please provide and submit a complete set of plans for final sign off. (Only MEP Plans were submitted.) MECHANICAL: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] PC2. No further comments in this section 02126124 MS. PLUMBING: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] PC2. No further comments in this section 02126124 MS. ELECTRICAL: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] PC2. No further comments in this section 02126124 MS. ENERGY COMPLIANCE: Electrical Compliance: [Mark Seven; mseven@interwestgrp.com; 949.363.3054] PC2. No further comments in this section 02126124 MS. Guestrooms Renovation "Resort & Club" 49499 Eisenhower Dr 2127124 Mechanical Compliance: [Mark Seven; mseven@interwestgrp.com; 949.363.30541 EM1. No comments in this section all equipment exists. STRUCTURAL: [Ho Jun Kong; hkong@interwestgrp.com; 619.517.8424] No further comments. 212712024. HX. City of La Quinta - Second Review Interwest Project No. LAQ23-0225 PermitApp: BCOM2023-1029 Page 6 of 6 Please contact the listed reviewers between 9:00 A.M. and 4:00 P.M., M-F, with any questions. [END]