Loading...
Floresta TR 36762 BCPR2018-0002 (Plan 1, 1X, 2 & 3) SFD x4ADDITIONAL SITES CHRONOLOGY CHRONOLOGY TYPE STAFF NAME ACTION DATE COMPLETION DATE NOTES 1ST PC SUBMITTAL RECEIVED MARY FASANO 5/22/2018 5/22/2018 I EMAILED BEAZER TO INFORM THEM THAT MONEY NEEDED TO BE DEPOSITED INTO THEIR TRUST ACCOUNT 1ST PC COMPLETE/READY FOR PICK UP AJ ORTEGA 6/14/2018 6/14/2018 EMAILED APPLICANTS (LONNIE.ELLISOR@BEAZER.COM; RROSECRANS@BASSENIANLAGONI.COM) THAT 1ST REVIEW COMMENTS ARE COMPLETE 3RD PC SUBMITTAL RECEIVED CARLOS FLORES 10/24/2018 10/24/2018 LONNIE DROPPED OFF ORIGINAL GEOTECH REPORT AND CIVIL, GAVE TO BRYAN COUNTER VISIT AARON HICKSON 10/26/2018 10/26/2018 BRENT SPATES CAME IN TO ASK ABOUT HIS TRUSS COMPANY SUBMITTING NEW TRUSS CALCS. INSTRUCTED HE CALL AJ ON PROCESS FOR CHANGING TRUSS COMPANY WHILE IN REVIEW. CONDITIONS Description: FLORESTA / SFD X 4 Status: ARCHIVED Type: BUILDING CONSTRUCTION PLAN REVIEW (WEB)Status Date: Subtype: TRACT RESIDENTIAL Applied: 5/9/2018 Address: 79860 AVENUE 52 Approved: 11/6/2018 City, State, Zip: LA QUINTA,CA92253 Closed: Project Manager: AJ ORTEGA Expired: Details: FLORESTA / BEAZER HOMES / TM 36762 / SFD X 4 - PLAN 1, 1X, 2 AND 3 / VALID UNDER THE 2016 CALIFORNIA BUILDING CODES UNTIL JANUARY 31, 2019 BASED ON ARCHITECT KENNETH CHESTER NIEMERSKI RENEWAL/EXPIRATION DATE. Printed: Monday, March 20, 2023 11:16:28 AM 1 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 CONTACTS NAME TYPE NAME ADDRESS1 CITY STATE ZIP PHONE FAX EMAIL APPLICANT BEAZER HOMES HOLDINGS LLC- LONNIE ELLISOR 310 COMMERCE STE 150 IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ ER.COM ARCHITECT Bassenian Lagoni 2031 Orchard Drive Suite 100 Newport Beach CA 92660075 3 (714)672-7017 rrosecrans@bassenianl agoni.com CONTRACTOR BEAZER HOMES HOLDINGS LLC 310 COMMERCE STE 150 IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ ER.COM DEVELOPER (714)672-7017 ENGINEER (714)672-7017 OWNER BEAZER HOMES HOLDINGS LLC- LONNIE ELLISOR 310 COMMERCE STE 150 IRVINE CA 92602 (714)672-7017 LONNIE.ELLISOR@BEAZ ER.COM PRIMARY CONTACT (714)672-7017 FINANCIAL INFORMATION DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY 101-0000-42600 ($840.00)($840.00)6/20/18 OFFSET OFFSET AOR 101-0000-42600 ($187.00)($187.00)8/21/18 OFFSET OFFSET AOR HOURLY CHARGE - CITY BUILDING STAFF 101-0000-42600 6 $187.00 $187.00 8/21/18 DEPOSIT DEPOSIT AOR HOURLY CHARGE - ESGIL STRUCTURAL ENGINEER 101-0000-42600 7 $840.00 $840.00 6/20/18 DEPOSIT DEPOSIT AOR Total Paid for BUILDING STAFF - PER HOUR: $0.00 $0.00 Printed: Monday, March 20, 2023 11:16:28 AM 2 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 INSPECTIONS INSPECTION TYPE INSPECTOR SCHEDULED DATE COMPLETED DATE RESULT REMARKS NOTES REVIEWS DESCRIPTION ACCOUNT QTY AMOUNT PAID PAID DATE RECEIPT #CHECK #METHOD PAID BY CLTD BY BUILDING TRACT RESIDENTIAL CONSTRUCTION PLAN DEPOSIT 101-0000-42600 1 $1,500.00 $1,500.00 5/24/18 R35783 CTAAEC789 TRUST ACCOUNT BEAZER HOMES HOLDINGS LLC-LONN AMA Total Paid for BUILDING TRACT RESIDENTIAL CONSTRUCTION PLAN DEPOSIT: $1,500.00 $1,500.00 101-0000-42600 ($468.00)($468.00)6/20/18 OFFSET OFFSET AOR FIRE NEW MULTI- RESIDENTIAL PC 101-0000-42420 0 $468.00 $468.00 6/20/18 DEPOSIT DEPOSIT AOR Total Paid for FIRE FEES: $0.00 $0.00 101-0000-42600 ($5.00)($5.00)6/20/18 OFFSET OFFSET AOR TECHNOLOGY ENHANCEMENT FEE 502-0000-43611 0 $5.00 $5.00 6/20/18 DEPOSIT DEPOSIT AOR Total Paid for TECHNOLOGY ENHANCEMENT FEE: $0.00 $0.00 TOTALS:$1,500.00 $1,500.00 REVIEW TYPE REVIEWER SENT DATE DUE DATE RETURNED DATE STATUS REMARKS NOTES 1ST BLDG NS (3WK)AJ ORTEGA 5/9/2018 5/31/2018 6/14/2018 REVISIONS REQUIRED SEE ATTACHED 1ST REVIEW DOCUMENTS. 1ST BLDG STR (2WK)KURT CULVER 5/9/2018 5/28/2018 5/29/2018 REVISIONS REQUIRED SENT THIS TO ESGIL LATE. Printed: Monday, March 20, 2023 11:16:28 AM 3 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 1ST BLDG STR (2WK)KURT CULVER 5/9/2018 5/28/2018 5/29/2018 REVISIONS REQUIRED 1. Provide the truss calculations (La Quinta does not allow deferred submittals). 2. Provide evidence that the EOR has reviewed the truss calculations. 3. Many of the sheets have illegible notes/symbols on them. For example, beginning with the sheet after S1X.9, many notes are unintelligible. 1ST FIRE (2WK)RONALD GRIESINGER 5/9/2018 5/21/2018 5/11/2018 READY FOR APPROVAL All new buildings shall have automatic fire sprinklers. 1ST PERMIT TECHNICIAN (1DAY) MARY FASANO 5/9/2018 5/10/2018 5/22/2018 COMPLETE 1ST PLANNING (2WK) NICOLE CRISTE 5/9/2018 5/21/2018 5/10/2018 PENDING DOCUMENTS SDP Pending. Cannot approve. 1ST PUBLIC WORKS (2WK)AMY YU 5/9/2018 5/21/2018 5/17/2018 APPROVED- CONDITIONS PRECISE GRADING PLAN APPROVAL REQUIRED PRIOR TO BUILDING PERMIT ISSUANCE. 2ND BLDG NS (2WK)AJ ORTEGA 7/17/2018 7/31/2018 8/21/2018 REVISIONS REQUIRED SEE ATTACHED 2ND REVIEW COMMENTS. 2ND BLDG STR (2WK)KURT CULVER 7/17/2018 7/31/2018 7/20/2018 READY FOR APPROVAL 2ND PLANNING (2WK) NICOLE CRISTE 7/17/2018 7/31/2018 7/24/2018 REVISIONS REQUIRED As previously, SDP is not approved. No building permits can be issued. Also note that based on revision requests made by City and agreed to by Applicant, roof structure on plans 1 and 1X will change. Planning cannot approve until Planning Commission approves. Expected end of September. 3RD BLDG (1WK)AJ ORTEGA 9/27/2018 10/4/2018 10/9/2018 REVISIONS REQUIRED 1ST REVIEW COMMENTS STILL OUTSTANDING, RESPONSE AS TO WHY HAVE NOT BEEN PROVIDED, SEE ATTACHED 3RD REVIEW EMAIL CORRESPONDECE TO APPLICANT. 3RD PLANNING (1WK) NICOLE CRISTE 9/27/2018 10/4/2018 10/2/2018 COMPLETE Plans are consistent with approved SDP. 4TH BLDG (1WK)AJ ORTEGA 10/17/2018 10/24/2018 10/31/2018 REVISIONS REQUIRED PREVIOUS REVIEW COMMENTS STILL REMAIN, SEE ATTACHED 4TH REVIEW CORRECTIONS. 5TH BLDG (1WK)AJ ORTEGA 11/1/2018 11/8/2018 11/6/2018 APPROVED Printed: Monday, March 20, 2023 11:16:28 AM 4 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 6/14/2018 AJ ORTEGA 1ST REVIEW CORRECTION LIST BCPR2018-0002 - 1ST REVIEW CORRECTION LIST.pdf 0 DOC 6/14/2018 AJ ORTEGA 1ST REVIEW NON- STRUCTURAL PLAN MARKUPS BCPR2018-0002 - 1ST REVIEW NON- STRUCTURAL PLAN MARKUPS.pdf 0 DOC 8/21/2018 AJ ORTEGA 2ND REVIEW CORRECTION LIST BCPR2018-0002 - 2ND REVIEW CORRECTION LIST.pdf 0 DOC 8/21/2018 AJ ORTEGA 2ND REVIEW NON- STRUCTURAL PLAN MARKUPS BCPR2018-0002 - 2ND REVIEW NON- STRUCTURAL PLAN MARKUPS.pdf 0 DOC 10/9/2018 AJ ORTEGA 3RD REVIEW CORRECTION CORRESPONDENCE BCPR2018-0002 - 3RD REVIEW CORRECTION CORRESPONDENCE.pdf 0 DOC 10/31/2018 AJ ORTEGA 4TH REVIEW CORRECTION CORRESPONDENCE BCPR2018-0002 - 4TH REVIEW CORRECTION CORRESPONDENCE.pdf 0 DOC 10/31/2018 AJ ORTEGA 4TH REVIEW PLAN MARKUP BCPR2018-0002 - 4TH REVIEW PLAN MARKUP.pdf 0 DOC 11/6/2018 AJ ORTEGA ENERGY DOCUMENTS (APPROVED) BCPR2018-0002 - ENERGY DOCUMENTS (APPROVED).pdf 1 DOC 11/6/2018 AJ ORTEGA PLAN SET (APPROVED)BCPR2018-0002 - PLAN SET (APPROVED).pdf 1 BOND INFORMATION Printed: Monday, March 20, 2023 11:16:28 AM 5 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 11/6/2018 AJ ORTEGA STRUCTURAL CALCULATIONS (APPROVED) BCPR2018-0002 - STRUCTURAL CALCULATIONS (APPROVED).pdf 1 DOC 11/6/2018 AJ ORTEGA TRUSS CALCULATIONS (APPROVED) BCPR2018-0002 - TRUSS CALCULATIONS (APPROVED).pdf 1 DOC 5/9/2018 EtrakitContractor 1ST SUBMITTAL - PLAN SET (COMPLETE) 1st Submittal - Architectural Drawings_1.pdf 0 DOC 5/8/2018 EtrakitContractor 1ST SUBMITTAL - FEATURE SUMMARY 1st Submittal - 2016 Feature Summary V2.pdf 0 DOC 5/8/2018 EtrakitContractor 1ST SUBMITTAL - AHRI REPORTS 1st Submittal - AHRIC Certificates.pdf 0 DOC 5/8/2018 EtrakitContractor 1ST SUBMITTAL - ACCA REPORTS 1st Submittal - JDS Reports.pdf 0 DOC 5/8/2018 EtrakitContractor 1ST SUBMITTAL - POST TENSION CALCULATIONS 1st Submittal - Post Tension Calculations.pdf 0 DOC 5/8/2018 EtrakitContractor 1ST SUBMITTAL - STRUCTURAL CALCULATIONS 1st Submittal - Structural Calculations.pdf 0 DOC 5/8/2018 EtrakitContractor 1ST SUBMITTAL - ENERGY DOCUMENTS 1st Submittal - T24 - CF- 1R.PDF 0 DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - AHRI REPORTS 2nd Submittal - AHRIC Certificates.pdf 0 DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - PLAN SET 2nd Submittal - Architectural Drawings.pdf 0 Printed: Monday, March 20, 2023 11:16:28 AM 6 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - ACCA REPORTS 2nd Submittal - JDS Reports.pdf 0 DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - STRUCTURAL CALCULATIONS 2nd Submittal - Structural Calculations (2018-06-28 -- Client Revisions).pdf 0 DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - ENERGY DOCUMENTS 2nd Submittal - T24_CF- 1R.pdf 0 DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - TRUSS CALCULATIONS 2nd Submittal - Trusses Recd 2018-06-28.pdf 0 DOC 7/17/2018 EtrakitContractor 2ND SUBMITTAL - APPLICANT RESPONSES BCPR2018-0002 - 1st Review Response to Comments.pdf 0 DOC 9/27/2018 EtrakitContractor 3RD SUBMITTAL - PLAN SET 3rd Submittal - Architectural Drawings.pdf 0 DOC 9/27/2018 EtrakitContractor 3RD SUBMITTAL - JDS REPORT 3rd Submittal - JDS Reports.pdf 0 DOC 9/27/2018 EtrakitContractor 3RD SUBMITTAL - STR CALCS 3rd Submittal - Structural Calculations (Client Revisions -- Delta 2 -- 2018-09-20).pdf 0 DOC 9/27/2018 EtrakitContractor 3RD SUBMITTAL - T24 3rd Submittal - T24_CF- 1R.pdf 0 DOC 9/27/2018 EtrakitContractor 3RD SUBMITTAL - TRUSS 3rd Submittal - Trusses Recd 2018-09-26.pdf 0 DOC 9/27/2018 EtrakitContractor 3RD SUBMITTAL - RESPONCES 3rd Submittal Revisions Lists.pdf 0 Printed: Monday, March 20, 2023 11:16:28 AM 7 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002 ATTACHMENTS Attachment Type CREATED OWNER DESCRIPTION PATHNAME SUBDIR ETRAKIT ENABLED DOC 10/17/2018 EtrakitContractor 4TH SUBMITTAL PLAN SHEETS 3rd Submittal - Architectural Drawings (Slipsheets)-10-17- 2018.pdf 0 DOC 10/17/2018 EtrakitContractor 4TH SUBMITTAL APPLICANT RESPONSES 3rd Submittal - Floresta Revision List-10-17- 18.pdf 0 DOC 11/1/2018 EtrakitContractor 5th Submittal Applicant Responses 5th Submittal - Floresta Revision List-11-01- 2018.pdf 0 DOC 11/1/2018 EtrakitContractor 5th Submittal Plan Sheets 5th Submittal - Plumbing-11-01-2018- BCPR2018-0002.pdf 0 DOC 12/17/2018 EtrakitContractor REVISION 1 - 1ST SUBMITTAL PLAN SET BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL PLAN SET.pdf 1 DOC 12/17/2018 EtrakitContractor REVISION 1 - 1ST SUBMITTAL TRUSS CALCULATIONS BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL TRUSS CALCULATIONS.pdf 1 DOC 12/17/2018 EtrakitContractor REVISION 1 - 1ST SUBMITTAL STRUCTURAL CALCULATIONS BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL STRUCTURAL CALCULATIONS.pdf 1 DOC 12/17/2018 EtrakitContractor REVISION 1 - 1ST SUBMITTAL REVISION LIST BCPR2018-0002 - REVISION 1 - 1ST SUBMITTAL REVISION LIST.pdf 1 Printed: Monday, March 20, 2023 11:16:28 AM 8 of 8 Project Details City of La Quinta PROJECT NUMBER BCPR2018-0002